Introduction
Page ii
CONTENTS
Acknowledgments................................................................................................................v
Introduction...................................................................................................................... viii
Lesson One: Introduction to Epidemiology
Lesson Introduction ......................................................................................................... 1-1
Lesson Objectives ............................................................................................................ 1-1
Major Sections
Definition of Epidemiology....................................................................................... 1-2
Historical Evolution of Epidemiology....................................................................... 1-7
Uses.......................................................................................................................... 1-12
Core Epidemiologic Functions ................................................................................ 1-15
The Epidemiologic Approach.................................................................................. 1-21
Descriptive Epidemiology ....................................................................................... 1-31
Analytic Epidemiology............................................................................................ 1-46
Concepts of Disease Occurrence ............................................................................. 1-52
Natural History and Spectrum of Disease................................................................ 1-59
Chain of Infection .................................................................................................... 1-62
Epidemic Disease Occurrence ................................................................................. 1-72
Summary.................................................................................................................. 1-80
Exercise Answers........................................................................................................... 1-81
Self-Assessment Quiz.................................................................................................... 1-85
Answers to Self-Assessment Quiz................................................................................. 1-90
References...................................................................................................................... 1-93
Lesson Two: Summarizing Data
Lesson Introduction ......................................................................................................... 2-1
Lesson Objectives ............................................................................................................ 2-1
Major Sections
Organizing Data......................................................................................................... 2-2
Types of Variables..................................................................................................... 2-4
Frequency Distributions............................................................................................. 2-7
Properties of Frequency Distributions ..................................................................... 2-11
Methods for Summarizing Data............................................................................... 2-15
Measures of Central Location.................................................................................. 2-16
Measures of Spread.................................................................................................. 2-36
Choosing the Right Measure of Central Location and Spread ................................ 2-53
Summary.................................................................................................................. 2-58
Exercise Answers........................................................................................................... 2-59
Self-Assessment Quiz.................................................................................................... 2-64
Answers to Self-Assessment Quiz................................................................................. 2-69
References...................................................................................................................... 2-71
Introduction
Page iii
Lesson Three: Measures of Risk
Lesson Introduction ......................................................................................................... 3-1
Lesson Objectives ............................................................................................................ 3-1
Major Sections
Frequency Measures .................................................................................................. 3-2
Morbidity Frequency Measures............................................................................... 3-10
Mortality Frequency Measures ................................................................................ 3-20
Natality (Birth) Measures ........................................................................................ 3-38
Measures of Association.......................................................................................... 3-39
Measures of Public Health Impact........................................................................... 3-48
Summary.................................................................................................................. 3-51
Exercise Answers........................................................................................................... 3-52
Self-Assessment Quiz.................................................................................................... 3-56
Answers to Self-Assessment Quiz................................................................................. 3-62
References...................................................................................................................... 3-65
Lesson Four: Displaying Public Health Data
Lesson Introduction ......................................................................................................... 4-1
Lesson Objectives ............................................................................................................ 4-1
Major Sections
Introduction to Tables and Graphs............................................................................. 4-2
Tables......................................................................................................................... 4-3
Graphs...................................................................................................................... 4-22
Other Data Displays................................................................................................. 4-42
Using Computer Technology................................................................................... 4-63
Summary.................................................................................................................. 4-66
Exercise Answers........................................................................................................... 4-72
Self-Assessment Quiz.................................................................................................... 4-79
Answers to Self-Assessment Quiz................................................................................. 4-84
References...................................................................................................................... 4-87
Lesson Five: Public Health Surveillance
Lesson Introduction ......................................................................................................... 5-1
Lesson Objectives ............................................................................................................ 5-1
Major Sections:
Introduction................................................................................................................ 5-2
Purpose and Characteristics of Public Health Surveillance....................................... 5-4
Identifying Health Problems for Surveillance ........................................................... 5-6
Identifying or Collecting Data for Surveillance....................................................... 5-13
Analyzing and Interpreting Data.............................................................................. 5-23
Disseminating Data and Interpretations................................................................... 5-34
Evaluating and Improving Surveillance................................................................... 5-38
Summary.................................................................................................................. 5-42
Appendix A. Characteristics of Well-Conducted Surveillance............................. 5-43
Introduction
Page iv
Appendix B. CDC Fact Sheet on Chlamydia........................................................ 5-45
Appendix C. Examples of Surveillance ................................................................ 5-48
Appendix D. Major Health Data Systems in the United States............................. 5-52
Appendix E. Limitations of Notifiable Disease Surveillance and
Recommendations for Improvement................................................ 5-53
Exercise Answers........................................................................................................... 5-57
Self-Assessment Quiz.................................................................................................... 5-63
Answers to Self-Assessment Quiz................................................................................. 5-68
References...................................................................................................................... 5-73
Lesson Six: Investigating an Outbreak
Lesson Introduction ......................................................................................................... 6-1
Lesson Objectives ............................................................................................................ 6-1
Major Sections:
Introduction to Investigating an Outbreak................................................................. 6-2
Steps of an Outbreak Investigation............................................................................ 6-8
Summary.................................................................................................................. 6-57
Exercise Answers........................................................................................................... 6-59
Self-Assessment Quiz.................................................................................................... 6-64
Answers to Self-Assessment Quiz................................................................................. 6-71
References...................................................................................................................... 6-75
Glossary
Introduction
Page v
ACKNOWLEDGMENTS
Developed by
U.S. Department of Health and Human Services
Centers for Disease Control and Prevention (CDC)
Office of Workforce and Career Development (OWCD)
Career Development Division (CDD)
Atlanta, Georgia 30333
Technical Content
Richard C. Dicker, MD, MSc, Lead Author, CDC/OWCD/CDD (retired)
Fátima Coronado, MD, MPH, CDC/OWCD/CDD
Denise Koo, MD, MPH, CDC/OWCD/CDD
Roy Gibson Parrish, II, MD
Development Team
Sonya D. Arundar, MS, CDC (contractor)
Ron Teske, MS, CDC (contractor)
Susan Baker Toal, MPH, Public Health Consultant
Nancy M. Hunt, MPH, CDC (ORISE Fellow)
Susan D. Welch, MEd, Georgia Poison Center
Cassie Edwards, CDC (contractor)
Planning Committee
Christopher K. Allen, RPh, MPH, CDC
W. Randolph Daley, DVM, MPH, CDC
Patricia Drehobl, RN, MPH
Sharon Hall, RN, PhD, CDC
Dennis Jarvis, MPH, CHES, CDC
Denise Koo, MD, MPH, CDC
Graphics/Illustrations
Sonya D. Arundar, MS, CDC (contractor)
Lee Oakley, CDC (retired)
Jim Walters, CDC
Technical Reviewers
Tomas Aragon, MD, DrPH, San Francisco Department of Public Health
Diane Bennett, MD, MPH, CDC
Danae Bixler, MD, MPH, West Virginia Bureau for Public Health
R. Elliot Churchill, MS, MA, CDC (retired)
Roxanne Ereth, MPH, Arizona Department of Health Services
Stephen Everett, MPH, Yavapai County Community Health Services, Arizona
Michael Fraser, PhD, National Association of County and City Health Officials
Introduction
Page vi
Nancy C. Gathany, MEd, CDC
Marjorie A.Getz, MPHIL, Bradley University, Illinois
John Mosely Hayes, DrPH, MBA, MSPH, Tribal Epidemiology Center United South and
Eastern Tribes, Inc., Tennessee
Richard Hopkins, MD, MSPH, Florida Department of Health
John M. Horan, MD, MPH, Georgia Division of Public Health
Christina M. Bruton Kwon, MSPH, Science Applications International Corporation,
Atlanta
Edmond F. Maes, PhD, CDC
Sharon McDonnell, MD, MPH, Darmouth Medical School
William S. Paul, MD, MPH, Chicago Department of Public Health
James Ransom, MPH, National Association of County and City Health Officials
Lynn Steele, MS, CDC
Donna Stroup, PhD, MSc, American Cancer Society
Douglas A. Thoroughman, PhD, MS CDC
Kirsten T. Weiser, MD, Darmouth Hitchcock Medical School
Celia Woodfill, PhD, California Department of Health Services
Field Test Participants
Sean Altekruse, DVM, MPH, PhD, U.S. Public Health Service
Gwen A. Barnett, MPH, CHES, CDC
Jason Bell, MD, MPH
Lisa Benaise, MD, Med Immune, Inc., Maryland
Amy Binggeli, DrPH, RD, CHES, CLE, Imperial County Public Health Department,
California
Kim M. Blindauer, DVM, MPH, Agency for Toxic Substances and Disease Registry
R. Bong, RN, BSN, Federal Bureau of Prisons
Johnna L. Burton, BS, CHES, Tennessee Department of Health
Catherine C. Chow, MD, MPH, Hawaii Department of Health
Janet Cliatt, MT, CLS(NCA), National Institutes of Health
Catherine Dentinger, FNP, MS, New York City Department of Health and Mental
Hygiene
Veronica Gordon, BSN, MS, Indian Health Service, New Mexico
Susan E. Gorman, PharmD, DABAT, CDC
Deborah Gould, PhD, CDC
Juliana Grant, MD, MPH, CDC
Lori Evans Hall, PharmD, CDC
Nazmul Hassan, MS, Food and Drug Administration
Daniel L. Holcomb, BS, Agency for Toxic Substances and Disease Registry
Asim A. Jani, MD, MPH FACP, CDC
Charletta L. Lewis, BSN, Wellpinit Indian Health Service, Washington
Sheila F. Mahoney, CNM, MPH, National Institutes of Health
Cassandra Martin, MPH, CHES, Georgia Department of Human Resources
Joan Marie McFarland, AS, BSN, MS, Winslow Indian Health Care Center, Arizona
Rosemarie McIntyre, RN, MS, CHES, CDC
Introduction
Page vii
Gayle L. Miller, DVM, Jefferson County Department of Health and Environment,
Colorado
Long S. Nguyen, MPH, CHES, NIH
Paras M. Patel, RPh, Food and Drug Administration
Rossanne M. Philen, MD, MS, CDC
Alyson Richmond, MPH, CHES, CDC (contractor)
Glenna A. Schindler, MPH, RN, CHES, Healthcare Services Group, Missouri
Sandra K. Schumacher, MD, MPH, CDC
Julie R. Sinclair, MA, DVM, MPH, CDC
Nita Sood, RPh, PharmD, U.S. Public Health Service
P. Lynne Stockton, VMD, MS, ELS(D), CDC
Jill B. Surrency, MPH, CHES, CDC (contractor)
Joyce K. Witt, RN, CDC
Introduction
Page viii
INTRODUCTION
This course was developed by the Centers for Disease Control and Prevention (CDC) as a
self-study course. Continuing education is available for certified public health educators,
nurses, physicians, pharmacists, veterinarians, and public health professionals. CE credit
is available only through the CDC/ATSDR Training and Continuing Education Online
system at http://www.cdc.gov/TCEOnline.
To receive CE credit, you must register for the course (SS1978) and complete the
evaluation and examination online. You must achieve a score of 70% or higher to pass
the examination. If you do not pass the first time, you can take the exam a second time.
For more information about continuing education, call 1-800-41-TRAIN (1-800-418-
7246) or by e-mail at ce@cdc.gov.
Course Design
This course covers basic epidemiology principles, concepts, and procedures useful in the
surveillance and investigation of health-related states or events. It is designed for federal,
state, and local government health professionals and private sector health professionals
who are responsible for disease surveillance or investigation. A basic understanding of
the practices of public health and biostatistics is recommended.
Course Materials
The course materials consist of six lessons. Each lesson presents instructional text
interspersed with relevant exercises that apply and test knowledge and skills gained.
Lesson One: Introduction to Epidemiology
Key features and applications of descriptive and analytic epidemiology
Lesson Two: Summarizing Data
Calculation and interpretation of mean, median, mode, ranges, variance, standard
deviation, and confidence interval
Lesson Three: Measures of Risk
Calculation and interpretation of ratios, proportions, incidence rates, mortality rates,
prevalence, and years of potential life lost
Lesson Four: Displaying Public Health Data
Preparation and application of tables, graphs, and charts such as arithmetic-scale line,
histograms, pie chart, and box plot
Lesson Five: Public Health Surveillance
Processes, uses, and evaluation of public health surveillance in the United States
Introduction
Page ix
Lesson Six: Investigating an Outbreak
Steps of an outbreak investigation
A Glossary that defines the major terms used in the course is also provided at the end of
Lesson Six.
Supplementary Materials
In addition to the course materials, students may want to use the following:
• A calculator with square root and logarithmic functions for some of the exercises.
• A copy of Heymann, DL, ed. Control of Communicable Diseases Manual, 18th
edition, 2004, for reference. Available from the American Public Health Association
(202) 777-2742.
Objectives
Students who successfully complete this course should be able to correctly:
• Describe key features and applications of descriptive and analytic epidemiology.
• Calculate and interpret ratios, proportions, incidence rates, mortality rates, prevalence,
and years of potential life lost.
• Calculate and interpret mean, median, mode, ranges, variance, standard deviation, and
confidence interval.
• Prepare and apply tables, graphs, and charts such as arithmetic-scale line, scatter
diagram, pie chart, and box plot.
• Describe the processes, uses, and evaluation of public health surveillance.
• Describe the steps of an outbreak investigation.
General Instructions
Self-study courses are “self-paced.” We recommend that a lesson be completed within
two weeks. To get the most out of this course, establish a regular time and method of
study. Research has shown that these factors greatly influence learning ability.
Each lesson in the course consists of reading, exercises, and a self-assessment quiz.
Reading Assignments
Complete the assigned reading before attempting to answer the self-assessment questions.
Read thoroughly and re-read for understanding as necessary. A casual reading may result
in missing useful information which supports main themes. Assignments are designed to
cover one or two major subject areas. However, as you progress, it is often necessary to
combine previous learning to accomplish new skills. A review of previous lessons may
be necessary. Frequent visits to the Glossary may also be useful.
Exercises
Exercises are included within each lesson to help you apply the lesson content. Some
exercises may be more applicable to your workplace and background than others. You
should review the answers to all exercises since the answers are very detailed. Answers to
Introduction
Page x
the exercises can be found at the end of each lesson. Your answers to these exercises are
valuable study guides for the final examination.
Self-Assessment Quizzes
After completing the reading assignment, answer the self-assessment quizzes before
continuing to the next lesson. Answers to the quizzes can be found at the end of the
lesson. After passing all six lesson quizzes, you should be prepared for the final
examination.
• Self-assessment quizzes are open book.
• Unless otherwise noted, choose ALL CORRECT answers.
• Do not guess at the answer.
• You should score at least 70% correct before continuing to the next lesson.
Tips for Answering Questions
• Carefully read the question.
Note that it may ask, “Which is CORRECT?” as well as “Which is NOT CORRECT?”
or “Which is the EXCEPTION?”
• Read all the choices given.
One choice may be a correct statement, but another choice may be more nearly correct
or complete for the question that is asked.
Final Examination and Course Evaluation
The final examination and course evaluation are available only on-line. The final
requirement for the course is an open-book examination. We recommend that you
thoroughly review the questions included with each lesson before completing the exam.
It is our sincere hope that you will find this undertaking to be a profitable and satisfying
experience. We solicit your constructive criticism at all times and ask that you let us
know whenever you have problems or need assistance.
Introduction
Page xi
Continuing Education
To receive continuing education for completing the self-study course, go to the CDC/ATSDR
Training and Continuing Education Online at http://www.cdc.gov/TECOnline and register
as a participant. You will need to register for the course (SS1978) and complete the
course evaluation and exam online. You will have to answer at least 70% of the exam
questions correctly to obtain continuing education credits/contact hours and a certificate.
For more information about continuing education, please call 1-800-41 TRAIN (1-800-
418-7246) or go to www.cdc.gov/TCEOnline.
Continuing Education Accreditation Statements
Origination Date: November 4, 2011
Expiration Date: November 4, 2013
CDC, our planners, and our content experts wish to disclose they have no financial
interests or other relationships with the manufacturers of commercial products, suppliers
of commercial services, or commercial supporters. Planners have reviewed content to
ensure there is no bias.
Content will not include any discussion of the unlabeled use of a product or a product
under investigational use.
CDC does not accept commercial support.
Continuing Medical Education for Physicians (CME):
The Centers for Disease Control and Prevention is accredited by the Accreditation
Council for Continuing Medical Education (ACCME®
) to provide continuing medical
education for physicians.
The Centers for Disease Control and Prevention designates this enduring activity for a
maximum of 17 AMA PRA Category 1 Credits™. Physicians should only claim credit
commensurate with the extent of their participation in the activity.
Continuing Education Designated for Non-Physicians:
Non-physicians will receive a certificate of participation.
Continuing Medical Education for Nurses (CNE):
The Centers for Disease Control and Prevention is accredited as a provider of Continuing
Nursing Education by the American Nurses Credentialing Center's Commission on
Accreditation.
This activity provides 17 contact hours.
Continuing Education for Certified Health Educators (CECH):
Sponsored by the Centers for Disease Control and Prevention, a designated provider of
continuing education contact hours (CECH) in health education by the National
Introduction
Page xii
Commission for Health Education Credentialing, Inc. This program is designed for
Certified Health Education Specialists (CHES) to receive up to 17 Category I CECH in
health education. CDC provider number GA0082.
Continuing Education for Pharmacists (CPE):
The Centers for Disease Control and Prevention is accredited by the
Accreditation Council for Pharmacy Education as a provider of continuing
pharmacy education.
This program is a designated event for pharmacists to receive 1.7Contact
Hours in pharmacy education. The Universal Activity Number is 0387-0000-
11-098-H04-P.
Course Category: This activity has been designated as Knowledge-Based.
Cost: There is no fee related to the web-based version of the activity. There is
a fee charged for the version ordered from the Public Health Foundation.
IACET Continuing Education Units (CEU):
The CDC has been approved as an Authorized Provider by the International Association
for Continuing Education and Training (IACET), 1760 Old Meadow Road, Suite 500,
McLean, VA 22102. The CDC is authorized by IACET to offer 1.7 ANSI/IACET CEU's
for this program.
Continuing Education for Veterinarians (AAVSB/RACE):
This program was reviewed and approved by the AAVSB RACE program for 20 hours of
continuing education in jurisdictions which recognize AAVSB RACE approval. Please
contact the AAVSB RACE program if you have any comments/concerns regarding this
program’s validity or relevancy to the veterinary profession.
Course Evaluation
Even if you are not interested in continuing education, we still encourage you to complete
the course evaluation. To do this, go to http://www.cdc.gov/TCEOnline and register as a
participant. You will then need to register for the course (SS1978) and complete the
course evaluation online. There is no cost to obtain continuing education online. Your
comments are valuable to us and will help to revise the self-study course in the future.
Ordering Information
A hard-copy of the text can be obtained from the Public Health Foundation. Specify Item
No. SS1978 when ordering.
• Online at: http://bookstore.phf.org
• By phone:
Toll-free within the US: 877-252-1200
International: (301) 645-7773.
Introduction to Epidemiology
Page 1-1
INTRODUCTION TO EPIDEMIOLOGY
Recently, a news story described an inner-city neighborhood’s concern
about the rise in the number of children with asthma. Another story
reported the revised recommendations for who should receive influenza
vaccine this year. A third story discussed the extensive disease-monitoring
strategies being implemented in a city recently affected by a massive
hurricane. A fourth story described a finding published in a leading
medical journal of an association in workers exposed to a particular chemical and an increased
risk of cancer. Each of these news stories included interviews with public health officials or
researchers who called themselves epidemiologists. Well, who are these epidemiologists, and
what do they do? What is epidemiology? This lesson is intended to answer those questions by
describing what epidemiology is, how it has evolved and how it is used today, and what some of
the key methods and concepts are. The focus is on epidemiology in public health practice, that is,
the kind of epidemiology that is done at health departments.
Objectives
After studying this lesson and answering the questions in the exercises, you will be able to:
• Define epidemiology
• Summarize the historical evolution of epidemiology
• Name some of the key uses of epidemiology
• Identify the core epidemiology functions
• Describe primary applications of epidemiology in public health practice
• Specify the elements of a case definition and state the effect of changing the value of any
of the elements
• List the key features and uses of descriptive epidemiology
• List the key features and uses of analytic epidemiology
• List the three components of the epidemiologic triad
• Describe the different modes of transmission of communicable disease in a population
Major Sections
Definition of Epidemiology......................................................................................................... 1-2
Historical Evolution of Epidemiology......................................................................................... 1-7
Uses............................................................................................................................................ 1-12
Core Epidemiologic Functions .................................................................................................. 1-15
The Epidemiologic Approach.................................................................................................... 1-21
Descriptive Epidemiology ......................................................................................................... 1-31
Analytic Epidemiology.............................................................................................................. 1-46
Concepts of Disease Occurrence ............................................................................................... 1-52
Natural History and Spectrum of Disease.................................................................................. 1-59
Chain of Infection ...................................................................................................................... 1-62
Epidemic Disease Occurrence ................................................................................................... 1-72
Summary.................................................................................................................................... 1-80
1
Introduction to Epidemiology
Page 1-2
Definition of Epidemiology
The word epidemiology comes from the Greek words epi, meaning
on or upon, demos, meaning people, and logos, meaning the study
of. In other words, the word epidemiology has its roots in the study
of what befalls a population. Many definitions have been proposed,
but the following definition captures the underlying principles and
public health spirit of epidemiology:
Epidemiology is the study of the distribution and
determinants of health-related states or events in specified
populations, and the application of this study to the control
of health problems.1
Key terms in this definition reflect some of the important
principles of epidemiology.
Students of journalism are
taught that a good news
story, whether it be about
a bank robbery, dramatic
rescue, or presidential
candidate’s speech, must
include the 5 W’s: what,
who, where, when and
why (sometimes cited as
why/how). The 5 W’s are
the essential components
of a news story because if
any of the five are
missing, the story is
incomplete.
The same is true in
characterizing
epidemiologic events,
whether it be an outbreak
of norovirus among cruise
ship passengers or the use
of mammograms to detect
early breast cancer. The
difference is that
epidemiologists tend to
use synonyms for the 5
W’s: diagnosis or health
event (what), person
(who), place (where), time
(when), and causes, risk
factors, and modes of
transmission (why/how).
Study
Epidemiology is a scientific discipline with sound methods of
scientific inquiry at its foundation. Epidemiology is data-driven
and relies on a systematic and unbiased approach to the collection,
analysis, and interpretation of data. Basic epidemiologic methods
tend to rely on careful observation and use of valid comparison
groups to assess whether what was observed, such as the number
of cases of disease in a particular area during a particular time
period or the frequency of an exposure among persons with
disease, differs from what might be expected. However,
epidemiology also draws on methods from other scientific fields,
including biostatistics and informatics, with biologic, economic,
social, and behavioral sciences.
In fact, epidemiology is often described as the basic science of
public health, and for good reason. First, epidemiology is a
quantitative discipline that relies on a working knowledge of
probability, statistics, and sound research methods. Second,
epidemiology is a method of causal reasoning based on developing
and testing hypotheses grounded in such scientific fields as
biology, behavioral sciences, physics, and ergonomics to explain
health-related behaviors, states, and events. However,
epidemiology is not just a research activity but an integral
component of public health, providing the foundation for directing
practical and appropriate public health action based on this science
and causal reasoning.2
Introduction to Epidemiology
Page 1-3
Distribution
Epidemiology is concerned with the frequency and pattern of
health events in a population:
Frequency refers not only to the number of health events
such as the number of cases of meningitis or diabetes in a
population, but also to the relationship of that number to
the size of the population. The resulting rate allows
epidemiologists to compare disease occurrence across
different populations.
Pattern refers to the occurrence of health-related events by
time, place, and person. Time patterns may be annual,
seasonal, weekly, daily, hourly, weekday versus weekend,
or any other breakdown of time that may influence disease
or injury occurrence. Place patterns include geographic
variation, urban/rural differences, and location of work
sites or schools. Personal characteristics include
demographic factors which may be related to risk of illness,
injury, or disability such as age, sex, marital status, and
socioeconomic status, as well as behaviors and
environmental exposures.
Characterizing health events by time, place, and person are
activities of descriptive epidemiology, discussed in more detail
later in this lesson.
Determinant: any factor,
whether event,
characteristic, or other
definable entity, that
brings about a change in a
health condition or other
defined characteristic.1
Determinants
Epidemiology is also used to search for determinants, which are
the causes and other factors that influence the occurrence of
disease and other health-related events. Epidemiologists assume
that illness does not occur randomly in a population, but happens
only when the right accumulation of risk factors or determinants
exists in an individual. To search for these determinants,
epidemiologists use analytic epidemiology or epidemiologic
studies to provide the “Why” and “How” of such events. They
assess whether groups with different rates of disease differ in their
demographic characteristics, genetic or immunologic make-up,
behaviors, environmental exposures, or other so-called potential
risk factors. Ideally, the findings provide sufficient evidence to
direct prompt and effective public health control and prevention
measures.
Introduction to Epidemiology
Page 1-4
Health-related states or events
Epidemiology was originally focused exclusively on epidemics of
communicable diseases3
but was subsequently expanded to address
endemic communicable diseases and non-communicable infectious
diseases. By the middle of the 20th Century, additional
epidemiologic methods had been developed and applied to chronic
diseases, injuries, birth defects, maternal-child health, occupational
health, and environmental health. Then epidemiologists began to
look at behaviors related to health and well-being, such as amount
of exercise and seat belt use. Now, with the recent explosion in
molecular methods, epidemiologists can make important strides in
examining genetic markers of disease risk. Indeed, the term health-
related states or events may be seen as anything that affects the
well-being of a population. Nonetheless, many epidemiologists
still use the term “disease” as shorthand for the wide range of
health-related states and events that are studied.
Specified populations
Although epidemiologists and direct health-care providers
(clinicians) are both concerned with occurrence and control of
disease, they differ greatly in how they view “the patient.” The
clinician is concerned about the health of an individual; the
epidemiologist is concerned about the collective health of the
people in a community or population. In other words, the
clinician’s “patient” is the individual; the epidemiologist’s
“patient” is the community. Therefore, the clinician and the
epidemiologist have different responsibilities when faced with a
person with illness. For example, when a patient with diarrheal
disease presents, both are interested in establishing the correct
diagnosis. However, while the clinician usually focuses on treating
and caring for the individual, the epidemiologist focuses on
identifying the exposure or source that caused the illness; the
number of other persons who may have been similarly exposed;
the potential for further spread in the community; and interventions
to prevent additional cases or recurrences.
Application
Epidemiology is not just “the study of” health in a population; it
also involves applying the knowledge gained by the studies to
community-based practice. Like the practice of medicine, the
practice of epidemiology is both a science and an art. To make the
proper diagnosis and prescribe appropriate treatment for a patient,
the clinician combines medical (scientific) knowledge with
experience, clinical judgment, and understanding of the patient.
Similarly, the epidemiologist uses the scientific methods of
Introduction to Epidemiology
Page 1-5
descriptive and analytic epidemiology as well as experience,
epidemiologic judgment, and understanding of local conditions in
“diagnosing” the health of a community and proposing
appropriate, practical, and acceptable public health interventions to
control and prevent disease in the community.
Summary
Epidemiology is the study (scientific, systematic, data-driven) of
the distribution (frequency, pattern) and determinants (causes, risk
factors) of health-related states and events (not just diseases) in
specified populations (patient is community, individuals viewed
collectively), and the application of (since epidemiology is a
discipline within public health) this study to the control of health
problems.
Introduction to Epidemiology
Page 1-6
Exercise 1.1
Below are four key terms taken from the definition of epidemiology,
followed by a list of activities that an epidemiologist might perform. Match
the term to the activity that best describes it. You should match only one
term per activity.
A. Distribution
B. Determinants
C. Application
_____ 1. Compare food histories between persons with Staphylococcus food poisoning and
those without
_____ 2. Compare frequency of brain cancer among anatomists with frequency in general
population
_____ 3. Mark on a map the residences of all children born with birth defects within 2 miles of
a hazardous waste site
_____ 4. Graph the number of cases of congenital syphilis by year for the country
_____ 5. Recommend that close contacts of a child recently reported with meningococcal
meningitis receive Rifampin
_____ 6. Tabulate the frequency of clinical signs, symptoms, and laboratory findings among
children with chickenpox in Cincinnati, Ohio
Check your answers on page 1-81
Introduction to Epidemiology
Page 1-7
Historical Evolution of Epidemiology
Although epidemiology as a discipline has blossomed since World
War II, epidemiologic thinking has been traced from Hippocrates
through John Graunt, William Farr, John Snow, and others. The
contributions of some of these early and more recent thinkers are
described below.5
Epidemiology’s roots are
nearly 2500 years old.
Circa 400 B.C.
Hippocrates attempted to explain disease occurrence from a
rational rather than a supernatural viewpoint. In his essay entitled
“On Airs, Waters, and Places,” Hippocrates suggested that
environmental and host factors such as behaviors might influence
the development of disease.
1662
Another early contributor to epidemiology was John Graunt, a
London haberdasher and councilman who published a landmark
analysis of mortality data in 1662. This publication was the first to
quantify patterns of birth, death, and disease occurrence, noting
disparities between males and females, high infant mortality,
urban/rural differences, and seasonal variations.5
1800
William Farr built upon Graunt’s work by systematically collecting
and analyzing Britain’s mortality statistics. Farr, considered the
father of modern vital statistics and surveillance, developed many
of the basic practices used today in vital statistics and disease
classification. He concentrated his efforts on collecting vital
statistics, assembling and evaluating those data, and reporting to
responsible health authorities and the general public.4
1854
In the mid-1800s, an anesthesiologist named John Snow was
conducting a series of investigations in London that warrant his
being considered the “father of field epidemiology.” Twenty years
before the development of the microscope, Snow conducted
studies of cholera outbreaks both to discover the cause of disease
and to prevent its recurrence. Because his work illustrates the
classic sequence from descriptive epidemiology to hypothesis
generation to hypothesis testing (analytic epidemiology) to
application, two of his investigations will be described in detail.
Snow conducted one of his now famous studies in 1854 when an
epidemic of cholera erupted in the Golden Square of London.5
He
Introduction to Epidemiology
Page 1-8
began his investigation by determining where in this area persons
with cholera lived and worked. He marked each residence on a
map of the area, as shown in Figure 1.1. Today, this type of map,
showing the geographic distribution of cases, is called a spot map.
Figure 1.1 Spot map of deaths from cholera in Golden Square area,
London, 1854 (redrawn from original)
Source: Snow J. Snow on cholera. London: Humphrey Milford: Oxford University Press;
1936.
Because Snow believed that water was a source of infection for
cholera, he marked the location of water pumps on his spot map,
then looked for a relationship between the distribution of
households with cases of cholera and the location of pumps. He
noticed that more case households clustered around Pump A, the
Broad Street pump, than around Pump B or C. When he questioned
residents who lived in the Golden Square area, he was told that
they avoided Pump B because it was grossly contaminated, and
that Pump C was located too inconveniently for most of them.
From this information, Snow concluded that the Broad Street pump
(Pump A) was the primary source of water and the most likely
source of infection for most persons with cholera in the Golden
Square area. He noted with curiosity, however, that no cases of
cholera had occurred in a two-block area just to the east of the
Broad Street pump. Upon investigating, Snow found a brewery
located there with a deep well on the premises. Brewery workers
got their water from this well, and also received a daily portion of
Introduction to Epidemiology
Page 1-9
malt liquor. Access to these uncontaminated rations could explain
why none of the brewery’s employees contracted cholera.
To confirm that the Broad Street pump was the source of the
epidemic, Snow gathered information on where persons with
cholera had obtained their water. Consumption of water from the
Broad Street pump was the one common factor among the cholera
patients. After Snow presented his findings to municipal officials,
the handle of the pump was removed and the outbreak ended. The
site of the pump is now marked by a plaque mounted on the wall
outside of the appropriately named John Snow Pub.
Figure 1.2 John Snow Pub, London
Source: The John Snow Society [Internet]. London: [updated 2005 Oct 14; cited 2006 Feb
6]. Available from: http://johnsnowsociety.org.
Snow’s second investigation reexamined data from the 1854
cholera outbreak in London. During a cholera epidemic a few
years earlier, Snow had noted that districts with the highest death
rates were serviced by two water companies: the Lambeth
Company and the Southwark and Vauxhall Company. At that time,
both companies obtained water from the Thames River at intake
points that were downstream from London and thus susceptible to
contamination from London sewage, which was discharged
directly into the Thames. To avoid contamination by London
sewage, in 1852 the Lambeth Company moved its intake water
works to a site on the Thames well upstream from London. Over a
7-week period during the summer of 1854, Snow compared
cholera mortality among districts that received water from one or
the other or both water companies. The results are shown in Table
1.1.
Introduction to Epidemiology
Page 1-10
Table 1.1 Mortality from Cholera in the Districts of London Supplied by the Southwark and Vauxhall
and the Lambeth Companies, July 9–August 26, 1854
Districts with Water
Supplied By:
Population
(1851 Census)
Number of Deaths
from Cholera
Cholera Death Rate per
1,000 Population
Southwark and Vauxhall Only 167,654 844 5.0
Lambeth Only 19,133 18 0.9
Both Companies 300,149 652 2.2
Source: Snow J. Snow on cholera. London: Humphrey Milford: Oxford University Press; 1936.
The data in Table 1.1 show that the cholera death rate was more
than 5 times higher in districts served only by the Southwark and
Vauxhall Company (intake downstream from London) than in
those served only by the Lambeth Company (intake upstream from
London). Interestingly, the mortality rate in districts supplied by
both companies fell between the rates for districts served
exclusively by either company. These data were consistent with the
hypothesis that water obtained from the Thames below London
was a source of cholera. Alternatively, the populations supplied by
the two companies may have differed on other factors that affected
their risk of cholera.
To test his water supply hypothesis, Snow focused on the districts
served by both companies, because the households within a district
were generally comparable except for the water supply company.
In these districts, Snow identified the water supply company for
every house in which a death from cholera had occurred during the
7-week period. Table 1.2 shows his findings.
Table 1.2 Mortality from Cholera in London Related to the Water Supply of Individual Houses in
Districts Served by Both the Southwark and Vauxhall Company and the Lambeth Company, July 9–
August 26, 1854
Water Supply of
Individual House
Population
(1851 Census)
Number of Deaths
from Cholera
Cholera Death Rate per
1,000 Population
Southwark and Vauxhall Only 98,862 419 4.2
Lambeth Only 154,615 80 0.5
Source: Snow J. Snow on cholera. London: Humphrey Milford: Oxford University Press; 1936.
This study, demonstrating a higher death rate from cholera among
households served by the Southwark and Vauxhall Company in the
mixed districts, added support to Snow’s hypothesis. It also
established the sequence of steps used by current-day
epidemiologists to investigate outbreaks of disease. Based on a
characterization of the cases and population at risk by time, place,
and person, Snow developed a testable hypothesis. He then tested
his hypothesis with a more rigorously designed study, ensuring that
the groups to be compared were comparable. After this study,
efforts to control the epidemic were directed at changing the
location of the water intake of the Southwark and Vauxhall
Introduction to Epidemiology
Page 1-11
Company to avoid sources of contamination. Thus, with no
knowledge of the existence of microorganisms, Snow
demonstrated through epidemiologic studies that water could serve
as a vehicle for transmitting cholera and that epidemiologic
information could be used to direct prompt and appropriate public
health action.
19th
and 20th
centuries
In the mid- and late-1800s, epidemiological methods began to be
applied in the investigation of disease occurrence. At that time,
most investigators focused on acute infectious diseases. In the
1930s and 1940s, epidemiologists extended their methods to
noninfectious diseases. The period since World War II has seen an
explosion in the development of research methods and the
theoretical underpinnings of epidemiology. Epidemiology has been
applied to the entire range of health-related outcomes, behaviors,
and even knowledge and attitudes. The studies by Doll and Hill
linking lung cancer to smoking6
and the study of cardiovascular
disease among residents of Framingham, Massachusetts7
are two
examples of how pioneering researchers have applied
epidemiologic methods to chronic disease since World War II.
During the 1960s and early 1970s health workers applied
epidemiologic methods to eradicate naturally occurring smallpox
worldwide.8
This was an achievement in applied epidemiology of
unprecedented proportions.
In the 1980s, epidemiology was extended to the studies of injuries
and violence. In the 1990s, the related fields of molecular and
genetic epidemiology (expansion of epidemiology to look at
specific pathways, molecules and genes that influence risk of
developing disease) took root. Meanwhile, infectious diseases
continued to challenge epidemiologists as new infectious agents
emerged (Ebola virus, Human Immunodeficiency virus (HIV)/
Acquired Immunodeficiency Syndrome (AIDS)), were identified
(Legionella, Severe Acute Respiratory Syndrome (SARS)), or
changed (drug-resistant Mycobacterium tuberculosis, Avian
influenza). Beginning in the 1990s and accelerating after the
terrorist attacks of September 11, 2001, epidemiologists have had
to consider not only natural transmission of infectious organisms
but also deliberate spread through biologic warfare and
bioterrorism.
Today, public health workers throughout the world accept and use
epidemiology regularly to characterize the health of their
communities and to solve day-to-day problems, large and small.
Introduction to Epidemiology
Page 1-12
Uses
Epidemiology and the information generated by epidemiologic
methods have been used in many ways.9
Some common uses are
described below.
Assessing the community’s health
Public health officials responsible for policy development,
implementation, and evaluation use epidemiologic information as a
factual framework for decision making. To assess the health of a
population or community, relevant sources of data must be
identified and analyzed by person, place, and time (descriptive
epidemiology).
• What are the actual and potential health problems in the
community?
• Where are they occurring?
• Which populations are at increased risk?
• Which problems have declined over time?
• Which ones are increasing or have the potential to increase?
• How do these patterns relate to the level and distribution of
public health services available?
More detailed data may need to be collected and analyzed to
determine whether health services are available, accessible,
effective, and efficient. For example, public health officials used
epidemiologic data and methods to identify baselines, to set health
goals for the nation in 2000 and 2010, and to monitor progress
toward these goals.10-12
Making individual decisions
Many individuals may not realize that they use epidemiologic
information to make daily decisions affecting their health. When
persons decide to quit smoking, climb the stairs rather than wait for
an elevator, eat a salad rather than a cheeseburger with fries for
lunch, or use a condom, they may be influenced, consciously or
unconsciously, by epidemiologists’ assessment of risk. Since
World War II, epidemiologists have provided information related
to all those decisions. In the 1950s, epidemiologists reported the
increased risk of lung cancer among smokers. In the 1970s,
epidemiologists documented the role of exercise and proper diet in
reducing the risk of heart disease. In the mid-1980s,
epidemiologists identified the increased risk of HIV infection
associated with certain sexual and drug-related behaviors. These
and hundreds of other epidemiologic findings are directly relevant
to the choices people make every day, choices that affect their
health over a lifetime.
Introduction to Epidemiology
Page 1-13
Completing the clinical picture
When investigating a disease outbreak, epidemiologists rely on
health-care providers and laboratorians to establish the proper
diagnosis of individual patients. But epidemiologists also
contribute to physicians’ understanding of the clinical picture and
natural history of disease. For example, in late 1989, a physician
saw three patients with unexplained eosinophilia (an increase in
the number of a specific type of white blood cell called an
eosinophil) and myalgias (severe muscle pains). Although the
physician could not make a definitive diagnosis, he notified public
health authorities. Within weeks, epidemiologists had identified
enough other cases to characterize the spectrum and course of the
illness that came to be known as eosinophilia-myalgia syndrome.13
More recently, epidemiologists, clinicians, and researchers around
the world have collaborated to characterize SARS, a disease
caused by a new type of coronavirus that emerged in China in late
2002.14
Epidemiology has also been instrumental in characterizing
many non-acute diseases, such as the numerous conditions
associated with cigarette smoking — from pulmonary and heart
disease to lip, throat, and lung cancer.
Searching for causes
Much epidemiologic research is devoted to searching for causal
factors that influence one’s risk of disease. Ideally, the goal is to
identify a cause so that appropriate public health action might be
taken. One can argue that epidemiology can never prove a causal
relationship between an exposure and a disease, since much of
epidemiology is based on ecologic reasoning. Nevertheless,
epidemiology often provides enough information to support
effective action. Examples date from the removal of the handle
from the Broad St. pump following John Snow’s investigation of
cholera in the Golden Square area of London in 1854,5
to the
withdrawal of a vaccine against rotavirus in 1999 after
epidemiologists found that it increased the risk of intussusception,
a potentially life-threatening condition.15
Just as often,
epidemiology and laboratory science converge to provide the
evidence needed to establish causation. For example,
epidemiologists were able to identify a variety of risk factors
during an outbreak of pneumonia among persons attending the
American Legion Convention in Philadelphia in 1976, even though
the Legionnaires’ bacillus was not identified in the laboratory from
lung tissue of a person who had died from Legionnaires’ disease
until almost 6 months later.16
Introduction to Epidemiology
Page 1-14
Exercise 1.2
In August 1999, epidemiologists learned of a cluster of cases of encephalitis
caused by West Nile virus infection among residents of Queens, New York.
West Nile virus infection, transmitted by mosquitoes, had never before been
identified in North America.
Describe how this information might be used for each of the following:
1. Assessing the community’s health
2. Making decisions about individual patients
3. Documenting the clinical picture of the illness
4. Searching for causes to prevent future outbreaks
Check your answers on page 1-81
Introduction to Epidemiology
Page 1-15
Core Epidemiologic Functions
In the mid-1980s, five major tasks of epidemiology in public
health practice were identified: public health surveillance, field
investigation, analytic studies, evaluation, and linkages.17
A
sixth task, policy development, was recently added. These tasks
are described below.
Public health surveillance
Public health surveillance is the ongoing, systematic collection,
analysis, interpretation, and dissemination of health data to help
guide public health decision making and action. Surveillance is
equivalent to monitoring the pulse of the community. The purpose
of public health surveillance, which is sometimes called
“information for action,”18
is to portray the ongoing patterns of
disease occurrence and disease potential so that investigation,
control, and prevention measures can be applied efficiently and
effectively. This is accomplished through the systematic collection
and evaluation of morbidity and mortality reports and other
relevant health information, and the dissemination of these data
and their interpretation to those involved in disease control and
public health decision making.
Figure 1.3. Surveillance Cycle
Morbidity and mortality reports are common sources of
surveillance data for local and state health departments. These
reports generally are submitted by health-care providers, infection
control practitioners, or laboratories that are required to notify the
health department of any patient with a reportable disease such as
pertussis, meningococcal meningitis, or AIDS. Other sources of
health-related data that are used for surveillance include reports
from investigations of individual cases and disease clusters, public
Introduction to Epidemiology
Page 1-16
health program data such as immunization coverage in a
community, disease registries, and health surveys.
Most often, surveillance relies on simple systems to collect a
limited amount of information about each case. Although not every
case of disease is reported, health officials regularly review the
case reports they do receive and look for patterns among them.
These practices have proven invaluable in detecting problems,
evaluating programs, and guiding public health action.
While public health surveillance traditionally has focused on
communicable diseases, surveillance systems now exist that target
injuries, chronic diseases, genetic and birth defects, occupational
and potentially environmentally-related diseases, and health
behaviors. Since September 11, 2001, a variety of systems that rely
on electronic reporting have been developed, including those that
report daily emergency department visits, sales of over-the-counter
medicines, and worker absenteeism.19,20
Because epidemiologists
are likely to be called upon to design and use these and other new
surveillance systems, an epidemiologist’s core competencies must
include design of data collection instruments, data management,
descriptive methods and graphing, interpretation of data, and
scientific writing and presentation.
Field investigation
As noted above, surveillance provides information for action. One
of the first actions that results from a surveillance case report or
report of a cluster is investigation by the public health department.
The investigation may be as limited as a phone call to the health-
care provider to confirm or clarify the circumstances of the
reported case, or it may involve a field investigation requiring the
coordinated efforts of dozens of people to characterize the extent
of an epidemic and to identify its cause.
The objectives of such investigations also vary. Investigations
often lead to the identification of additional unreported or
unrecognized ill persons who might otherwise continue to spread
infection to others. For example, one of the hallmarks of
investigations of persons with sexually transmitted disease is the
identification of sexual partners or contacts of patients. When
interviewed, many of these contacts are found to be infected
without knowing it, and are given treatment they did not realize
they needed. Identification and treatment of these contacts prevents
further spread.
For some diseases, investigations may identify a source or vehicle
of infection that can be controlled or eliminated. For example, the
Introduction to Epidemiology
Page 1-17
investigation of a case of Escherichia coli O157:H7 infection
usually focuses on trying to identify the vehicle, often ground beef
but sometimes something more unusual such as fruit juice. By
identifying the vehicle, investigators may be able to determine how
many other persons might have already been exposed and how
many continue to be at risk. When a commercial product turns out
to be the culprit, public announcements and recalling the product
may prevent many additional cases.
Occasionally, the objective of an investigation may simply be to
learn more about the natural history, clinical spectrum, descriptive
epidemiology, and risk factors of the disease before determining
what disease intervention methods might be appropriate. Early
investigations of the epidemic of SARS in 2003 were needed to
establish a case definition based on the clinical presentation, and to
characterize the populations at risk by time, place, and person. As
more was learned about the epidemiology of the disease and
communicability of the virus, appropriate recommendations
regarding isolation and quarantine were issued.21
Field investigations of the type described above are sometimes
referred to as “shoe leather epidemiology,” conjuring up images of
dedicated, if haggard, epidemiologists beating the pavement in
search of additional cases and clues regarding source and mode of
transmission. This approach is commemorated in the symbol of the
Epidemic Intelligence Service (EIS), CDC’s training program for
disease detectives — a shoe with a hole in the sole.
Symbol of EIS
Analytic studies
Surveillance and field investigations are usually sufficient to
identify causes, modes of transmission, and appropriate control and
prevention measures. But sometimes analytic studies employing
more rigorous methods are needed. Often the methods are used in
combination — with surveillance and field investigations
providing clues or hypotheses about causes and modes of
transmission, and analytic studies evaluating the credibility of
those hypotheses.
Clusters or outbreaks of disease frequently are investigated initially
with descriptive epidemiology. The descriptive approach involves
the study of disease incidence and distribution by time, place, and
person. It includes the calculation of rates and identification of
parts of the population at higher risk than others. Occasionally,
when the association between exposure and disease is quite strong,
the investigation may stop when descriptive epidemiology is
complete and control measures may be implemented immediately.
John Snow’s 1854 investigation of cholera is an example. More
Introduction to Epidemiology
Page 1-18
frequently, descriptive studies, like case investigations, generate
hypotheses that can be tested with analytic studies. While some
field investigations are conducted in response to acute health
problems such as outbreaks, many others are planned studies.
The hallmark of an analytic epidemiologic study is the use of a
valid comparison group. Epidemiologists must be skilled in all
aspects of such studies, including design, conduct, analysis,
interpretation, and communication of findings.
• Design includes determining the appropriate research
strategy and study design, writing justifications and
protocols, calculating sample sizes, deciding on criteria for
subject selection (e.g., developing case definitions),
choosing an appropriate comparison group, and designing
questionnaires.
• Conduct involves securing appropriate clearances and
approvals, adhering to appropriate ethical principles,
abstracting records, tracking down and interviewing
subjects, collecting and handling specimens, and managing
the data.
• Analysis begins with describing the characteristics of the
subjects. It progresses to calculation of rates, creation of
comparative tables (e.g., two-by-two tables), and
computation of measures of association (e.g., risk ratios or
odds ratios), tests of significance (e.g., chi-square test),
confidence intervals, and the like. Many epidemiologic
studies require more advanced analytic techniques such as
stratified analysis, regression, and modeling.
• Finally, interpretation involves putting the study findings
into perspective, identifying the key take-home messages,
and making sound recommendations. Doing so requires that
the epidemiologist be knowledgeable about the subject
matter and the strengths and weaknesses of the study.
Evaluation
Epidemiologists, who are accustomed to using systematic and
quantitative approaches, have come to play an important role in
evaluation of public health services and other activities. Evaluation
is the process of determining, as systematically and objectively as
possible, the relevance, effectiveness, efficiency, and impact of
activities with respect to established goals.22
• Effectiveness refers to the ability of a program to produce
the intended or expected results in the field; effectiveness
differs from efficacy, which is the ability to produce results
under ideal conditions.
• Efficiency refers to the ability of the program to produce
Introduction to Epidemiology
Page 1-19
the intended results with a minimum expenditure of time
and resources.
The evaluation itself may focus on plans (formative evaluation),
operations (process evaluation), impact (summative evaluation), or
outcomes — or any combination of these. Evaluation of an
immunization program, for example, might assess the efficiency of
the operations, the proportion of the target population immunized,
and the apparent impact of the program on the incidence of
vaccine-preventable diseases. Similarly, evaluation of a
surveillance system might address operations and attributes of the
system, its ability to detect cases or outbreaks, and its usefulness.23
Linkages
Epidemiologists working in public health settings rarely act in
isolation. In fact, field epidemiology is often said to be a “team
sport.” During an investigation an epidemiologist usually
participates as either a member or the leader of a multidisciplinary
team. Other team members may be laboratorians, sanitarians,
infection control personnel, nurses or other clinical staff, and,
increasingly, computer information specialists. Many outbreaks
cross geographical and jurisdictional lines, so co-investigators may
be from local, state, or federal levels of government, academic
institutions, clinical facilities, or the private sector. To promote
current and future collaboration, the epidemiologists need to
maintain relationships with staff of other agencies and institutions.
Mechanisms for sustaining such linkages include official
memoranda of understanding, sharing of published or on-line
information for public health audiences and outside partners, and
informal networking that takes place at professional meetings.
Policy development
The definition of epidemiology ends with the following phrase:
“...and the application of this study to the control of health
problems.” While some academically minded epidemiologists have
stated that epidemiologists should stick to research and not get
involved in policy development or even make recommendations,24
public health epidemiologists do not have this luxury. Indeed,
epidemiologists who understand a problem and the population in
which it occurs are often in a uniquely qualified position to
recommend appropriate interventions. As a result, epidemiologists
working in public health regularly provide input, testimony, and
recommendations regarding disease control strategies, reportable
disease regulations, and health-care policy.
Introduction to Epidemiology
Page 1-20
Exercise 1.3
Match the appropriate core function to each of the statements below.
A. Public health surveillance
B. Field investigation
C. Analytic studies
D. Evaluation
E. Linkages
F. Policy development
_____ 1. Reviewing reports of test results for Chlamydia trachomatis from public health
clinics
_____ 2. Meeting with directors of family planning clinics and college health clinics to
discuss Chlamydia testing and reporting
_____ 3. Developing guidelines/criteria about which patients coming to the clinic should be
screened (tested) for Chlamydia infection
_____ 4. Interviewing persons infected with Chlamydia to identify their sex partners
_____ 5. Conducting an analysis of patient flow at the public health clinic to determine
waiting times for clinic patients
_____ 6. Comparing persons with symptomatic versus asymptomatic Chlamydia infection to
identify predictors
Check your answers on page 1-82
Introduction to Epidemiology
Page 1-21
The Epidemiologic Approach
As with all scientific endeavors, the practice of epidemiology relies
on a systematic approach. In very simple terms, the
epidemiologist:
• Counts cases or health events, and describes them in terms
of time, place, and person;
• Divides the number of cases by an appropriate denominator
to calculate rates; and
• Compares these rates over time or for different groups of
people.
An epidemiologist:
• Counts
• Divides
• Compares
Before counting cases, however, the epidemiologist must decide
what a case is. This is done by developing a case definition. Then,
using this case definition, the epidemiologist finds and collects
information about the case-patients. The epidemiologist then
performs descriptive epidemiology by characterizing the cases
collectively according to time, place, and person. To calculate the
disease rate, the epidemiologist divides the number of cases by the
size of the population. Finally, to determine whether this rate is
greater than what one would normally expect, and if so to identify
factors contributing to this increase, the epidemiologist compares
the rate from this population to the rate in an appropriate
comparison group, using analytic epidemiology techniques. These
epidemiologic actions are described in more detail below.
Subsequent tasks, such as reporting the results and recommending
how they can be used for public health action, are just as
important, but are beyond the scope of this lesson.
Defining a case
Before counting cases, the epidemiologist must decide what to
count, that is, what to call a case. For that, the epidemiologist uses
a case definition. A case definition is a set of standard criteria for
classifying whether a person has a particular disease, syndrome, or
other health condition. Some case definitions, particularly those
used for national surveillance, have been developed and adopted as
national standards that ensure comparability. Use of an agreed-
upon standard case definition ensures that every case is equivalent,
regardless of when or where it occurred, or who identified it.
Furthermore, the number of cases or rate of disease identified in
one time or place can be compared with the number or rate from
another time or place. For example, with a standard case definition,
health officials could compare the number of cases of listeriosis
that occurred in Forsyth County, North Carolina in 2000 with the
number that occurred there in 1999. Or they could compare the rate
of listeriosis in Forsyth County in 2000 with the national rate in
Introduction to Epidemiology
Page 1-22
that same year. When everyone uses the same standard case
definition and a difference is observed, the difference is likely to
be real rather than the result of variation in how cases are
classified.
To ensure that all health departments in the United States use the
same case definitions for surveillance, the Council of State and
Territorial Epidemiologists (CSTE), CDC, and other interested
parties have adopted standard case definitions for the notifiable
infectious diseases.25
These definitions are revised as needed. In
1999, to address the need for common definitions and methods for
state-level chronic disease surveillance, CSTE, the Association of
State and Territorial Chronic Disease Program Directors, and CDC
adopted standard definitions for 73 chronic disease indicators.29
Other case definitions, particularly those used in local outbreak
investigations, are often tailored to the local situation. For
example, a case definition developed for an outbreak of viral
illness might require laboratory confirmation where such
laboratory services are available, but likely would not if such
services were not readily available.
Components of a case definition for outbreak
investigations
A case definition consists of clinical criteria and, sometimes,
limitations on time, place, and person. The clinical criteria usually
include confirmatory laboratory tests, if available, or combinations
of symptoms (subjective complaints), signs (objective physical
findings), and other findings. Case definitions used during
outbreak investigations are more likely to specify limits on time,
place, and/or person than those used for surveillance. Contrast the
case definition used for surveillance of listeriosis (see box below)
with the case definition used during an investigation of a listeriosis
outbreak in North Carolina in 2000.25,26
Both the national surveillance case definition and the outbreak case
definition require a clinically compatible illness and laboratory
confirmation of Listeria monocytogenes from a normally sterile
site, but the outbreak case definition adds restrictions on time and
place, reflecting the scope of the outbreak.
Introduction to Epidemiology
Page 1-23
Listeriosis — Surveillance Case Definition
Clinical description
Infection caused by Listeria monocytogenes, which may produce any of
several clinical syndromes, including stillbirth, listeriosis of the newborn,
meningitis, bacteriemia, or localized infections
Laboratory criteria for diagnosis
Isolation of L. monocytogenes from a normally sterile site (e.g., blood or
cerebrospinal fluid or, less commonly, joint, pleural, or pericardial fluid)
Case classification
Confirmed: a clinically compatible case that is laboratory confirmed
Source: Centers for Disease Control and Prevention. Case definitions for
infectious conditions under public health surveillance. MMWR
Recommendations and Reports 1997:46(RR-10):49-50.
Listeriosis — Outbreak Investigation
Case definition
Clinically compatible illness with L. monocytogenes isolated
• From a normally sterile site
• In a resident of Winston-Salem, North Carolina
• With onset between October 24, 2000 and January 4, 2001
Source: MacDonald P, Boggs J, Whitwam R, Beatty M, Hunter S, MacCormack
N, et al. Listeria-associated birth complications linked with homemade
Mexican-style cheese, North Carolina, October 2000 [abstract]. 50th Annual
Epidemic Intelligence Service Conference; 2001 Apr 23-27; Atlanta, GA.
Many case definitions, such as that shown for listeriosis, require
laboratory confirmation. This is not always necessary, however; in
fact, some diseases have no distinctive laboratory findings.
Kawasaki syndrome, for example, is a childhood illness with fever
and rash that has no known cause and no specifically distinctive
laboratory findings. Notice that its case definition (see box below)
is based on the presence of fever, at least four of five specified
clinical findings, and the lack of a more reasonable explanation.
Introduction to Epidemiology
Page 1-24
Kawasaki Syndrome — Case Definition
Clinical description
A febrile illness of greater than or equal to 5 days’ duration, with at least four
of the five following physical findings and no other more reasonable
explanation for the observed clinical findings:
• Bilateral conjunctival injection
• Oral changes (erythema of lips or oropharynx, strawberry tongue, or
fissuring of the lips)
• Peripheral extremity changes (edema, erythema, or generalized or
periungual desquamation)
• Rash
• Cervical lymphadenopathy (at least one lymph node greater than or
equal to 1.5 cm in diameter)
Laboratory criteria for diagnosis
None
Case classification
Confirmed: a case that meets the clinical case definition
Comment: If fever disappears after intravenous gamma globulin therapy is
started, fever may be of less than 5 days’ duration, and the clinical case
definition may still be met.
Source: Centers for Disease Control and Prevention. Case definitions for
infectious conditions under public health surveillance. MMWR
Recommendations and Reports 1990:39(RR-13):18.
Criteria in case definitions
A case definition may have several sets of criteria, depending on
how certain the diagnosis is. For example, during an investigation
of a possible case or outbreak of measles, a person with a fever and
rash might be classified as having a suspected, probable, or
confirmed case of measles, depending on what evidence of measles
is present (see box below).
Introduction to Epidemiology
Page 1-25
A case might be classified as suspected or probable while waiting
for the laboratory results to become available. Once the laboratory
provides the report, the case can be reclassified as either confirmed
or “not a case,” depending on the laboratory results. In the midst of
a large outbreak of a disease caused by a known agent, some cases
may be permanently classified as suspected or probable because
officials may feel that running laboratory tests on every patient
with a consistent clinical picture and a history of exposure (e.g.,
chickenpox) is unnecessary and even wasteful. Case definitions
should not rely on laboratory culture results alone, since organisms
are sometimes present without causing disease.
Measles (Rubeola) — 1996 Case Definition
Clinical description
An illness characterized by all the following:
• A generalized rash lasting greater than or equal to 3 days
• A temperature greater than or equal to 101.0°F (greater than or equal to
38.3°C)
• Cough, coryza, or conjunctivitis
Laboratory criteria for diagnosis
• Positive serologic test for measles immunoglobulin M antibody, or
• Significant rise in measles antibody level by any standard serologic assay, or
• Isolation of measles virus from a clinical specimen
Case classification
Suspected: Any febrile illness accompanied by rash
Probable: A case that meets the clinical case definition, has noncontributory
or no serologic or virologic testing, and is not epidemiologically
linked to a confirmed case
Confirmed: A case that is laboratory confirmed or that meets the clinical case
definition and is epidemiologically linked to a confirmed case. (A
laboratory-confirmed case does not need to meet the clinical case
definition.)
Comment: Confirmed cases should be reported to National Notifiable Diseases
Surveillance System. An imported case has its source outside the country or state.
Rash onset occurs within 18 days after entering the jurisdiction, and illness cannot
be linked to local transmission. Imported cases should be classified as:
• International. A case that is imported from another country
• Out-of-State. A case that is imported from another state in the United States.
The possibility that a patient was exposed within his or her state of residence
should be excluded; therefore, the patient either must have been out of state
continuously for the entire period of possible exposure (at least 7-18 days
before onset of rash) or have had one of the following types of exposure while
out of state: a) face-to-face contact with a person who had either a probable
or confirmed case or b) attendance in the same institution as a person who
had a case of measles (e.g., in a school, classroom, or day care center).
An indigenous case is defined as a case of measles that is not imported. Cases
that are linked to imported cases should be classified as indigenous if the
exposure to the imported case occurred in the reporting state. Any case that
cannot be proved to be imported should be classified as indigenous.
Source: Centers for Disease Control and Prevention. Case definitions for infectious
conditions under public health surveillance. MMWR Recommendations and Reports
1997:46(RR-10):23–24.
Introduction to Epidemiology
Page 1-26
Modifying case definitions
Case definitions can also change over time as more information is
obtained. The first case definition for SARS, based on clinical
symptoms and either contact with a case or travel to an area with
SARS transmission, was published in CDC’s Morbidity and
Mortality Weekly Report (MMWR) on March 21, 2003 (see box
below).27
Two weeks later it was modified slightly. On March 29,
after a novel coronavirus was determined to be the causative agent,
an interim surveillance case definition was published that included
laboratory criteria for evidence of infection with the SARS-
associated coronavirus. By June, the case definition had changed
several more times. In anticipation of a new wave of cases in 2004,
a revised and much more complex case definition was published in
December 2003.28
CDC Preliminary Case Definition for Severe Acute Respiratory
Syndrome (SARS) — March 21, 2003
Suspected case
Respiratory illness of unknown etiology with onset since February 1, 2003,
and the following criteria:
• Documented temperature > 100.4°F (>38.0°C)
• One or more symptoms with respiratory illness (e.g., cough, shortness of
breath, difficulty breathing, or radiographic findings of pneumonia or
acute respiratory distress syndrome)
• Close contact*
within 10 days of onset of symptoms with a person under
investigation for or suspected of having SARS or travel within 10 days of
onset of symptoms to an area with documented transmission of SARS as
defined by the World Health Organization (WHO)
* Defined as having cared for, having lived with, or having had direct contact
with respiratory secretions and/or body fluids of a person suspected of
having SARS.
Source: Centers for Disease Control and Prevention. Outbreak of severe
acute respiratory syndrome–worldwide, 2003. MMWR 2003:52:226–8.
Variation in case definitions
Case definitions may also vary according to the purpose for
classifying the occurrences of a disease. For example, health
officials need to know as soon as possible if anyone has symptoms
of plague or anthrax so that they can begin planning what actions
to take. For such rare but potentially severe communicable
diseases, for which it is important to identify every possible case,
health officials use a sensitive case definition. A sensitive case
definition is one that is broad or “loose,” in the hope of capturing
most or all of the true cases. For example, the case definition for a
suspected case of rubella (German measles) is “any generalized
rash illness of acute onset.”25
This definition is quite broad, and
Introduction to Epidemiology
Page 1-27
would include not only all cases of rubella, but also measles,
chickenpox, and rashes due to other causes such as drug allergies.
So while the advantage of a sensitive case definition is that it
includes most or all of the true cases, the disadvantage is that it
sometimes includes other illnesses as well.
On the other hand, an investigator studying the causes of a disease
outbreak usually wants to be certain that any person included in a
study really had the disease. That investigator will prefer a specific
or “strict” case definition. For instance, in an outbreak of
Salmonella Agona infection, the investigators would be more
likely to identify the source of the infection if they included only
persons who were confirmed to have been infected with that
organism, rather than including anyone with acute diarrhea,
because some persons may have had diarrhea from a different
cause. In this setting, the only disadvantages of a strict case
definition are the requirement that everyone with symptoms be
tested and an underestimation of the total number of cases if some
people with salmonellosis are not tested.
Introduction to Epidemiology
Page 1-28
Exercise 1.4
Investigators of an outbreak of trichinosis used a case definition with the
following categories:
Clinical Criteria
Confirmed case: Signs and symptoms plus laboratory confirmation
Probable case: Acute onset of at least three of the following four features: myalgia,
fever, facial edema, or eosinophil count greater than 500/mm3
Possible case: Acute onset of two of the four features plus a physician diagnosis of
trichinosis
Suspect case: Unexplained eosinophilia
Not a case: Failure to fulfill the criteria for a confirmed, probable, possible, or suspect
case
Time: Onset after October 1, 2006
Place: Metropolitan Atlanta
Person: Any
Using this case definition, assign the appropriate classification to each of the persons included
in the line listing below. Use the highest rate classification possible. (All were residents of
Atlanta with acute onset of symptoms in November.)
ID# Last Name Myalgias Fever
Facial
Edema
Eosinophil
Count
Physician
Diagnosis
Laboratory
Confirmation Classification
1 Anderson yes yes no 495 trichinosis yes
2
Buffington yes yes yes pending possible
trichinosis
pending
3
Callahan yes yes no 1,100 possible
trichinosis
pending
4 Doll yes yes no 2,050 EMS* pending
5 Ehrlich no yes no 600 trichinosis not done
*Eosinophilia-Myalgia Syndrome
Check your answers on page 1-82
Introduction to Epidemiology
Page 1-29
Exercise 1.5
Consider the initial case definition for SARS presented on page 1-26. Explain
how the case definition might address the purposes listed below.
1. Diagnosing and caring for individual patients
2. Tracking the occurrence of disease
3. Doing research to identify the cause of the disease
4. Deciding who should be quarantined (quarantine is the separation or restriction of
movement of persons who are not ill but are believed to have been exposed to infection, to
prevent further transmission)
Check your answers on page 1-82
Introduction to Epidemiology
Page 1-30
Using counts and rates
As noted, one of the basic tasks in public health is identifying and
counting cases. These counts, usually derived from case reports
submitted by health-care workers and laboratories to the health
department, allow public health officials to determine the extent
and patterns of disease occurrence by time, place, and person.
They may also indicate clusters or outbreaks of disease in the
community.
Counts are also valuable for health planning. For example, a health
official might use counts (i.e., numbers) to plan how many
infection control isolation units or doses of vaccine may be needed.
Rate:
the number of cases
divided by
the size of the population
per unit of time
However, simple counts do not provide all the information a health
department needs. For some purposes, the counts must be put into
context, based on the population in which they arose. Rates are
measures that relate the numbers of cases during a certain period of
time (usually per year) to the size of the population in which they
occurred. For example, 42,745 new cases of AIDS were reported
in the United States in 2002.30
This number, divided by the
estimated 2002 population, results in a rate of 15.3 cases per
100,000 population. Rates are particularly useful for comparing the
frequency of disease in different locations whose populations differ
in size. For example, in 2003, Pennsylvania had over twelve times
as many births (140,660) as its neighboring state, Delaware
(11,264). However, Pennsylvania has nearly ten times the
population of Delaware. So a more fair way to compare is to
calculate rates. In fact, the birth rate was greater in Delaware (13.8
per 1,000 women aged 15–44 years) than in Pennsylvania (11.4 per
1,000 women aged 15–44 years).31
Rates are also useful for comparing disease occurrence during
different periods of time. For example, 19.5 cases of chickenpox
per 100,000 were reported in 2001 compared with 135.8 cases per
100,000 in 1991. In addition, rates of disease among different
subgroups can be compared to identify those at increased risk of
disease. These so-called high risk groups can be further assessed
and targeted for special intervention. High risk groups can also be
studied to identify risk factors that cause them to have increased
risk of disease. While some risk factors such as age and family
history of breast cancer may not be modifiable, others, such as
smoking and unsafe sexual practices, are. Individuals can use
knowledge of the modifiable risk factors to guide decisions about
behaviors that influence their health.
Introduction to Epidemiology
Page 1-31
Descriptive Epidemiology
As noted earlier, every novice newspaper reporter is taught that a
story is incomplete if it does not describe the what, who, where,
when, and why/how of a situation, whether it be a space shuttle
launch or a house fire. Epidemiologists strive for similar
comprehensiveness in characterizing an epidemiologic event,
whether it be a pandemic of influenza or a local increase in all-
terrain vehicle crashes. However, epidemiologists tend to use
synonyms for the five W’s listed above: case definition, person,
place, time, and causes/risk factors/modes of transmission.
Descriptive epidemiology covers time, place, and person.
Compiling and analyzing data by time, place, and person is
desirable for several reasons.
The 5W’s of descriptive
epidemiology:
What = health issue of
concern
Who = person
Where = place
When = time
Why/how = causes, risk
factors, modes of
transmission
• First, by looking at the data carefully, the epidemiologist
becomes very familiar with the data. He or she can see what
the data can or cannot reveal based on the variables
available, its limitations (for example, the number of records
with missing information for each important variable), and
its eccentricities (for example, all cases range in age from 2
months to 6 years, plus one 17-year-old.).
• Second, the epidemiologist learns the extent and pattern of
the public health problem being investigated — which
months, which neighborhoods, and which groups of people
have the most and least cases.
• Third, the epidemiologist creates a detailed description of
the health of a population that can be easily communicated
with tables, graphs, and maps.
• Fourth, the epidemiologist can identify areas or groups
within the population that have high rates of disease. This
information in turn provides important clues to the causes of
the disease, and these clues can be turned into testable
hypotheses.
Time
The occurrence of disease changes over time. Some of these
changes occur regularly, while others are unpredictable. Two
diseases that occur during the same season each year include
influenza (winter) and West Nile virus infection (August–
September). In contrast, diseases such as hepatitis B and
salmonellosis can occur at any time. For diseases that occur
seasonally, health officials can anticipate their occurrence and
Introduction to Epidemiology
Page 1-32
implement control and prevention measures, such as an influenza
vaccination campaign or mosquito spraying. For diseases that
occur sporadically, investigators can conduct studies to identify the
causes and modes of spread, and then develop appropriately
targeted actions to control or prevent further occurrence of the
disease.
In either situation, displaying the patterns of disease occurrence by
time is critical for monitoring disease occurrence in the community
and for assessing whether the public health interventions made a
difference.
Time data are usually displayed with a two-dimensional graph. The
vertical or y-axis usually shows the number or rate of cases; the
horizontal or x-axis shows the time periods such as years, months,
or days. The number or rate of cases is plotted over time. Graphs
of disease occurrence over time are usually plotted as line graphs
(Figure 1.4) or histograms (Figure 1.5).
Figure 1.4 Reported Cases of Salmonellosis per 100,000 Population, by Year — United States, 1972–
2002
Source: Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2002. Published April 30, 2004,
for MMWR 2002;51(No. 53): p. 59.
Introduction to Epidemiology
Page 1-33
Figure 1.5 Number of Intussusception Reports After the Rhesus Rotavirus Vaccine-tetravalent (RRV-
TV) by Vaccination Date—United States, September 1998–December 1999
Source: Zhou W, Pool V, Iskander JK, English-Bullard R, Ball R, Wise RP, et al. In: Surveillance Summaries, January 24, 2003.
MMWR 2003;52(No. SS-1):1–26.
Sometimes a graph shows the timing of events that are related to
disease trends being displayed. For example, the graph may
indicate the period of exposure or the date control measures were
implemented. Studying a graph that notes the period of exposure
may lead to insights into what may have caused illness. Studying a
graph that notes the timing of control measures shows what
impact, if any, the measures may have had on disease occurrence.
As noted above, time is plotted along the x-axis. Depending on the
disease, the time scale may be as broad as years or decades, or as
brief as days or even hours of the day. For some conditions —
many chronic diseases, for example — epidemiologists tend to be
interested in long-term trends or patterns in the number of cases or
the rate. For other conditions, such as foodborne outbreaks, the
relevant time scale is likely to be days or hours. Some of the
common types of time-related graphs are further described below.
These and other graphs are described in more detail in Lesson 4.
Secular (long-term) trends. Graphing the annual cases or rate of a
disease over a period of years shows long-term or secular trends in
the occurrence of the disease (Figure 1.4). Health officials use
these graphs to assess the prevailing direction of disease
occurrence (increasing, decreasing, or essentially flat), help them
evaluate programs or make policy decisions, infer what caused an
Introduction to Epidemiology
Page 1-34
increase or decrease in the occurrence of a disease (particularly if
the graph indicates when related events took place), and use past
trends as a predictor of future incidence of disease.
Seasonality. Disease occurrence can be graphed by week or month
over the course of a year or more to show its seasonal pattern, if
any. Some diseases such as influenza and West Nile infection are
known to have characteristic seasonal distributions. Seasonal
patterns may suggest hypotheses about how the infection is
transmitted, what behavioral factors increase risk, and other
possible contributors to the disease or condition. Figure 1.6 shows
the seasonal patterns of rubella, influenza, and rotavirus. All three
diseases display consistent seasonal distributions, but each disease
peaks in different months – rubella in March to June, influenza in
November to March, and rotavirus in February to April. The
rubella graph is striking for the epidemic that occurred in 1963
(rubella vaccine was not available until 1969), but this epidemic
nonetheless followed the seasonal pattern.
Introduction to Epidemiology
Page 1-35
Figure 1.6 Seasonal Pattern of Rubella, Influenza and Rotavirus
Source: Dowell SF. Seasonal Variation in Host Susceptibility and Cycles of Certain
Infectious Diseases. Emerg Infect Dis. 2001;5:369–74.
Day of week and time of day. For some conditions, displaying data
by day of the week or time of day may be informative. Analysis at
these shorter time periods is particularly appropriate for conditions
related to occupational or environmental exposures that tend to
occur at regularly scheduled intervals. In Figure 1.7, farm tractor
fatalities are displayed by days of the week.32
Note that the number
of farm tractor fatalities on Sundays was about half the number on
the other days. The pattern of farm tractor injuries by hour, as
displayed in Figure 1.8 peaked at 11:00 a.m., dipped at noon, and
peaked again at 4:00 p.m. These patterns may suggest hypotheses
and possible explanations that could be evaluated with further
study. Figure 1.9 shows the hourly number of survivors and
rescuers presenting to local hospitals in New York following the
attack on the World Trade Center on September 11, 2001.
Introduction to Epidemiology
Page 1-36
Figure 1.7 Farm Tractor Deaths by Day of Week Figure 1.8 Farm Tractor Deaths by Hour of Day
Source: Goodman RA, Smith JD, Sikes RK, Rogers DL, Mickey JL. Fatalities associated with farm tractor injuries: an epidemiologic
study. Public Health Rep 1985;100:329–33.
Figure 1.9 World Trade Center Survivors and Rescuers
Source: Centers for Disease Control and Prevention. Rapid Assessment of Injuries Among Survivors of the
Terrorist Attack on the World Trade Center — New York City, September 2001. MMWR 2002;51:1–5.
Epidemic period. To show the time course of a disease outbreak or
epidemic, epidemiologists use a graph called an epidemic curve.
As with the other graphs presented so far, an epidemic curve’s y-
axis shows the number of cases, while the x-axis shows time as
either date of symptom onset or date of diagnosis. Depending on
the incubation period (the length of time between exposure and
onset of symptoms) and routes of transmission, the scale on the x-
axis can be as broad as weeks (for a very prolonged epidemic) or
as narrow as minutes (e.g., for food poisoning by chemicals that
cause symptoms within minutes). Conventionally, the data are
displayed as a histogram (which is similar to a bar chart but has no
gaps between adjacent columns). Sometimes each case is displayed
as a square, as in Figure 1.10. The shape and other features of an
epidemic curve can suggest hypotheses about the time and source
Introduction to Epidemiology
Page 1-37
of exposure, the mode of transmission, and the causative agent.
Epidemic curves are discussed in more detail in Lessons 4 and 6.
Figure 1.10 Cases of Salmonella Enteriditis — Chicago, February 13–21,
by Date and Time of Symptom Onset
Source: Cortese M, Gerber S, Jones E, Fernandez J. A Salmonella Enteriditis outbreak in
Chicago. Presented at the Eastern Regional Epidemic Intelligence Service Conference,
March 23, 2000, Boston, Massachusetts.
Place
Describing the occurrence of disease by place provides insight into
the geographic extent of the problem and its geographic variation.
Characterization by place refers not only to place of residence but
to any geographic location relevant to disease occurrence. Such
locations include place of diagnosis or report, birthplace, site of
employment, school district, hospital unit, or recent travel
destinations. The unit may be as large as a continent or country or
as small as a street address, hospital wing, or operating room.
Sometimes place refers not to a specific location at all but to a
place category such as urban or rural, domestic or foreign, and
institutional or noninstitutional.
Consider the data in Tables 1.3 and 1.4. Table 1.3 displays SARS
data by source of report, and reflects where a person with possible
SARS is likely to be quarantined and treated.33
In contrast, Table
1.4 displays the same data by where the possible SARS patients
had traveled, and reflects where transmission may have occurred.
Introduction to Epidemiology
Page 1-38
Table 1.3 Reported Cases of SARS through
November 3, 2004 — United States, by Case
Definition Category and State of Residence
Location
Total
Cases
Reported
Total
Suspect
Cases
Reported
Total
Probable
Cases
Reported
Total
Confirmed
Cases
Reported
Alaska 1 1 0 0
California 29 22 5 2
Colorado 2 2 0 0
Florida 8 6 2 0
Georgia 3 3 0 0
Hawaii 1 1 0 0
Illinois 8 7 1 0
Kansas 1 1 0 0
Kentucky 6 4 2 0
Maryland 2 2 0 0
Massachusetts 8 8 0 0
Minnesota 1 1 0 0
Mississippi 1 0 1 0
Missouri 3 3 0 0
Nevada 3 3 0 0
New Jersey 2 1 0 1
New Mexico 1 0 0 1
New York 29 23 6 0
North Carolina 4 3 0 1
Ohio 2 2 0 0
Pennsylvania 6 5 0 1
Rhode Island 1 1 0 0
South
Carolina 3 3 0 0
Tennessee 1 1 0 0
Texas 5 5 0 0
Utah 7 6 0 1
Vermont 1 1 0 0
Virginia 3 2 0 1
Washington 12 11 1 0
West Virginia 1 1 0 0
Wisconsin 2 1 1 0
Puerto Rico 1 1 0 0
Total 158 131 19 8
Adapted from: Centers for Disease Control and Prevention.
Severe Acute Respiratory Syndrome (SARS) Report of Cases
in the United States.
Table 1.4 Reported Cases of SARS through
November 3, 2004 — United States, by High-Risk
Area Visited
Area Count* Percent
Hong Kong City, China 45 28
Toronto, Canada 35 22
Guangdong Province, China 34 22
Beijing City, China 25 16
Shanghai City, China 23 15
Singapore 15 9
China, mainland 15 9
Taiwan 10 6
Anhui Province, China 4 3
Hanoi, Vietnam 4 3
Chongqing City, China 3 2
Guizhou Province, China 2 1
Macoa City, China 2 1
Tianjin City, China 2 1
Jilin Province, China 2 1
Xinjiang Province 1 1
Zhejiang Province, China 1 1
Guangxi Province, China 1 1
Shanxi Province, China 1 1
Liaoning Province, China 1 1
Hunan Province, China 1 1
Sichuan Province, China 1 1
Hubei Province, China 1 1
Jiangxi Province, China 1 1
Fujian Province, China 1 1
Jiangsu Province, China 1 1
Yunnan Province, China 0 0
Hebei Province, China 0 0
Qinghai Province, China 0 0
Tibet (Xizang) Province, China 0 0
Hainan Province 0 0
Henan Province, China 0 0
Gansu Province, China 0 0
Shandong Province, China 0 0
*
158 reported case-patients visited 232 areas
Data Source: Heymann DL, Rodier G. Global Surveillance,
National Surveillance, and SARS. Emerg Infect Dis.
2004;10:173–175.
Introduction to Epidemiology
Page 1-39
Although place data can be shown in a table such as Table 1.3 or
Table 1.4, a map provides a more striking visual display of place
data. On a map, different numbers or rates of disease can be
depicted using different shadings, colors, or line patterns, as in
Figure 1.11.
Figure 1.11 Mortality Rates for Asbestosis, by State — United States, 1968–1981 and 1982–2000
Source: Centers for Disease Control and Prevention. Changing patterns of pneumoconiosis mortality–United States, 1968-2000.
MMWR 2004;53:627–32.
Another type of map for place data is a spot map, such as Figure
1.12. Spot maps generally are used for clusters or outbreaks with a
limited number of cases. A dot or X is placed on the location that
is most relevant to the disease of interest, usually where each
victim lived or worked, just as John Snow did in his spot map of
the Golden Square area of London (Figure 1.1). If known, sites that
are relevant, such as probable locations of exposure (water pumps
in Figure 1.1), are usually noted on the map.
Figure 1.12 Spot Map of Giardia Cases
Introduction to Epidemiology
Page 1-40
Analyzing data by place can identify communities at increased risk
of disease. Even if the data cannot reveal why these people have an
increased risk, it can help generate hypotheses to test with
additional studies. For example, is a community at increased risk
because of characteristics of the people in the community such as
genetic susceptibility, lack of immunity, risky behaviors, or
exposure to local toxins or contaminated food? Can the increased
risk, particularly of a communicable disease, be attributed to
characteristics of the causative agent such as a particularly virulent
strain, hospitable breeding sites, or availability of the vector that
transmits the organism to humans? Or can the increased risk be
attributed to the environment that brings the agent and the host
together, such as crowding in urban areas that increases the risk of
disease transmission from person to person, or more homes being
built in wooded areas close to deer that carry ticks infected with
the organism that causes Lyme disease? (More techniques for
graphic presentation are discussed in Lesson 4.)
“Person” attributes include
age, sex, ethnicity/race, and
socioeconomic status.
Person
Because personal characteristics may affect illness, organization
and analysis of data by “person” may use inherent characteristics
of people (for example, age, sex, race), biologic characteristics
(immune status), acquired characteristics (marital status), activities
(occupation, leisure activities, use of medications/tobacco/drugs),
or the conditions under which they live (socioeconomic status,
access to medical care). Age and sex are included in almost all data
sets and are the two most commonly analyzed “person”
characteristics. However, depending on the disease and the data
available, analyses of other person variables are usually necessary.
Usually epidemiologists begin the analysis of person data by
looking at each variable separately. Sometimes, two variables such
as age and sex can be examined simultaneously. Person data are
usually displayed in tables or graphs.
Age. Age is probably the single most important “person” attribute,
because almost every health-related event varies with age. A
number of factors that also vary with age include: susceptibility,
opportunity for exposure, latency or incubation period of the
disease, and physiologic response (which affects, among other
things, disease development).
When analyzing data by age, epidemiologists try to use age groups
that are narrow enough to detect any age-related patterns that may
be present in the data. For some diseases, particularly chronic
diseases, 10-year age groups may be adequate. For other diseases,
10-year and even 5-year age groups conceal important variations in
Introduction to Epidemiology
Page 1-41
disease occurrence by age. Consider the graph of pertussis
occurrence by standard 5-year age groups shown in Figure 1.13a.
The highest rate is clearly among children 4 years old and younger.
But is the rate equally high in all children within that age group, or
do some children have higher rates than others?
Figure 1.13a Pertussis by 5-Year Age Groups
Figure 1.13b Pertussis by <1, 4-Year, Then 5-
Year Age Groups
To answer this question, different age groups are needed. Examine
Figure 1.13b, which shows the same data but displays the rate of
pertussis for children under 1 year of age separately. Clearly,
infants account for most of the high rate among 0–4 year olds.
Public health efforts should thus be focused on children less than 1
year of age, rather than on the entire 5-year age group.
Sex. Males have higher rates of illness and death than do females
for many diseases. For some diseases, this sex-related difference is
because of genetic, hormonal, anatomic, or other inherent
differences between the sexes. These inherent differences affect
susceptibility or physiologic responses. For example,
premenopausal women have a lower risk of heart disease than men
of the same age. This difference has been attributed to higher
estrogen levels in women. On the other hand, the sex-related
differences in the occurrence of many diseases reflect differences
in opportunity or levels of exposure. For example, Figure 1.14
shows the differences in lung cancer rates over time among men
and women.34
The difference noted in earlier years has been
attributed to the higher prevalence of smoking among men in the
past. Unfortunately, prevalence of smoking among women now
equals that among men, and lung cancer rates in women have been
climbing as a result.35
Introduction to Epidemiology
Page 1-42
Figure 1.14 Lung Cancer Rates — United States, 1930–1999
Data Source: American Cancer Society [Internet]. Atlanta: The American Cancer Society,
Inc.
Ethnic and racial groups. Sometimes epidemiologists are
interested in analyzing person data by biologic, cultural or social
groupings such as race, nationality, religion, or social groups such
as tribes and other geographically or socially isolated groups.
Differences in racial, ethnic, or other group variables may reflect
differences in susceptibility or exposure, or differences in other
factors that influence the risk of disease, such as socioeconomic
status and access to health care. In Figure 1.15, infant mortality
rates for 2002 are shown by race and Hispanic origin of the
mother.
Introduction to Epidemiology
Page 1-43
Figure 1.15 Infant Mortality Rates for 2002, by Race and Ethnicity of Mother
Source: Centers for Disease Control and Prevention. QuickStats: Infant mortality rates, by selected racial/ethnic populations—United
States, 2002, MMWR 2005;54(05):126.
Socioeconomic status. Socioeconomic status is difficult to
quantify. It is made up of many variables such as occupation,
family income, educational achievement or census track, living
conditions, and social standing. The variables that are easiest to
measure may not accurately reflect the overall concept.
Nevertheless, epidemiologists commonly use occupation, family
income, and educational achievement, while recognizing that these
variables do not measure socioeconomic status precisely.
The frequency of many adverse health conditions increases with
decreasing socioeconomic status. For example, tuberculosis is
more common among persons in lower socioeconomic strata.
Infant mortality and time lost from work due to disability are both
associated with lower income. These patterns may reflect more
harmful exposures, lower resistance, and less access to health care.
Or they may in part reflect an interdependent relationship that is
impossible to untangle: Does low socioeconomic status contribute
to disability, or does disability contribute to lower socioeconomic
status, or both? What accounts for the disproportionate prevalence
of diabetes and asthma in lower socioeconomic areas?36,37
A few adverse health conditions occur more frequently among
persons of higher socioeconomic status. Gout was known as the
“disease of kings” because of its association with consumption of
rich foods. Other conditions associated with higher socioeconomic
Introduction to Epidemiology
Page 1-44
status include breast cancer, Kawasaki syndrome, chronic fatigue
syndrome, and tennis elbow. Differences in exposure account for
at least some if not most of the differences in the frequency of
these conditions.
Introduction to Epidemiology
Page 1-45
Exercise 1.6
Using the data in Tables 1.5 and 1.6, describe the death rate patterns for
the “Unusual Event.” For example, how do death rates vary between men
and women overall, among the different socioeconomic classes, among men
and women in different socioeconomic classes, and among adults and
children in different socioeconomic classes? Can you guess what type of situation might result
in such death rate patterns?
Table 1.5 Deaths and Death Rates for an Unusual Event, by Sex and Socioeconomic Status
Socioeconomic Status
Sex Measure High Middle Low Total
Males Persons at risk 179 173 499 851
Deaths 120 148 441 709
Death rate (%) 67.0 85.5 88.4 83.3
Females Persons at risk 143 107 212 462
Deaths 9 13 132 154
Death rate (%) 6.3 12.6 62.3 33.3
Both sexes Persons at risk 322 280 711 1313
Deaths 129 161 573 863
Death rate (%) 40.1 57.5 80.6 65.7
Table 1.6 Deaths and Death Rates for an Unusual Event, by Age and Socioeconomic Status
Socioeconomic Status
Age Group Measure High/Middle Low Total
Adults Persons at risk 566 664 1230
Deaths 287 545 832
Death rate (%) 50.7 82.1 67.6
Children Persons at risk 36 47 83
Deaths 3 28 31
Death rate (%) 8.3 59.6 37.3
All Ages Persons at risk 602 711 1313
Deaths 290 573 863
Death rate (%) 48.2 80.6 65.7
Check your answers on page 1-82
Introduction to Epidemiology
Page 1-46
Analytic Epidemiology
As noted earlier, descriptive epidemiology can identify patterns
among cases and in populations by time, place and person. From
these observations, epidemiologists develop hypotheses about the
causes of these patterns and about the factors that increase risk of
disease. In other words, epidemiologists can use descriptive
epidemiology to generate hypotheses, but only rarely to test those
hypotheses. For that, epidemiologists must turn to analytic
epidemiology.
Key feature of analytic
epidemiology =
Comparison group
The key feature of analytic epidemiology is a comparison group.
Consider a large outbreak of hepatitis A that occurred in
Pennsylvania in 2003.38
Investigators found almost all of the case-
patients had eaten at a particular restaurant during the 2–6 weeks
(i.e., the typical incubation period for hepatitis A) before onset of
illness. While the investigators were able to narrow down their
hypotheses to the restaurant and were able to exclude the food
preparers and servers as the source, they did not know which
particular food may have been contaminated. The investigators
asked the case-patients which restaurant foods they had eaten, but
that only indicated which foods were popular. The investigators,
therefore, also enrolled and interviewed a comparison or control
group — a group of persons who had eaten at the restaurant during
the same period but who did not get sick. Of 133 items on the
restaurant’s menu, the most striking difference between the case
and control groups was in the proportion that ate salsa (94% of
case-patients ate, compared with 39% of controls). Further
investigation of the ingredients in the salsa implicated green onions
as the source of infection. Shortly thereafter, the Food and Drug
Administration issued an advisory to the public about green onions
and risk of hepatitis A. This action was in direct response to the
convincing results of the analytic epidemiology, which compared
the exposure history of case-patients with that of an appropriate
comparison group.
When investigators find that persons with a particular
characteristic are more likely than those without the characteristic
to contract a disease, the characteristic is said to be associated with
the disease. The characteristic may be a:
• Demographic factor such as age, race, or sex;
• Constitutional factor such as blood group or immune status;
• Behavior or act such as smoking or having eaten salsa; or
• Circumstance such as living near a toxic waste site.
Identifying factors associated with disease help health officials
Introduction to Epidemiology
Page 1-47
appropriately target public health prevention and control activities.
It also guides additional research into the causes of disease.
Thus, analytic epidemiology is concerned with the search for
causes and effects, or the why and the how. Epidemiologists use
analytic epidemiology to quantify the association between
exposures and outcomes and to test hypotheses about causal
relationships. It has been said that epidemiology by itself can never
prove that a particular exposure caused a particular outcome.
Often, however, epidemiology provides sufficient evidence to take
appropriate control and prevention measures.
Epidemiologic studies fall into two categories: experimental and
observational.
Experimental studies
In an experimental study, the investigator determines through a
controlled process the exposure for each individual (clinical trial)
or community (community trial), and then tracks the individuals or
communities over time to detect the effects of the exposure. For
example, in a clinical trial of a new vaccine, the investigator may
randomly assign some of the participants to receive the new
vaccine, while others receive a placebo shot. The investigator then
tracks all participants, observes who gets the disease that the new
vaccine is intended to prevent, and compares the two groups (new
vaccine vs. placebo) to see whether the vaccine group has a lower
rate of disease. Similarly, in a trial to prevent onset of diabetes
among high-risk individuals, investigators randomly assigned
enrollees to one of three groups — placebo, an anti-diabetes drug,
or lifestyle intervention. At the end of the follow-up period,
investigators found the lowest incidence of diabetes in the lifestyle
intervention group, the next lowest in the anti-diabetic drug group,
and the highest in the placebo group.39
Observational studies
In an observational study, the epidemiologist simply observes the
exposure and disease status of each study participant. John Snow’s
studies of cholera in London were observational studies. The two
most common types of observational studies are cohort studies and
case-control studies; a third type is cross-sectional studies.
Cohort study. A cohort study is similar in concept to the
experimental study. In a cohort study the epidemiologist records
whether each study participant is exposed or not, and then tracks
the participants to see if they develop the disease of interest. Note
that this differs from an experimental study because, in a cohort
Introduction to Epidemiology
Page 1-48
study, the investigator observes rather than determines the
participants’ exposure status. After a period of time, the
investigator compares the disease rate in the exposed group with
the disease rate in the unexposed group. The unexposed group
serves as the comparison group, providing an estimate of the
baseline or expected amount of disease occurrence in the
community. If the disease rate is substantively different in the
exposed group compared to the unexposed group, the exposure is
said to be associated with illness.
The length of follow-up varies considerably. In an attempt to
respond quickly to a public health concern such as an outbreak,
public health departments tend to conduct relatively brief studies.
On the other hand, research and academic organizations are more
likely to conduct studies of cancer, cardiovascular disease, and
other chronic diseases which may last for years and even decades.
The Framingham study is a well-known cohort study that has
followed over 5,000 residents of Framingham, Massachusetts,
since the early 1950s to establish the rates and risk factors for heart
disease.7
The Nurses Health Study and the Nurses Health Study II
are cohort studies established in 1976 and 1989, respectively, that
have followed over 100,000 nurses each and have provided useful
information on oral contraceptives, diet, and lifestyle risk factors.40
These studies are sometimes called follow-up or prospective
cohort studies, because participants are enrolled as the study begins
and are then followed prospectively over time to identify
occurrence of the outcomes of interest.
An alternative type of cohort study is a retrospective cohort study.
In this type of study both the exposure and the outcomes have
already occurred. Just as in a prospective cohort study, the
investigator calculates and compares rates of disease in the
exposed and unexposed groups. Retrospective cohort studies are
commonly used in investigations of disease in groups of easily
identified people such as workers at a particular factory or
attendees at a wedding. For example, a retrospective cohort study
was used to determine the source of infection of cyclosporiasis, a
parasitic disease that caused an outbreak among members of a
residential facility in Pennsylvania in 2004.41
The investigation
indicated that consumption of snow peas was implicated as the
vehicle of the cyclosporiasis outbreak.
Case-control study. In a case-control study, investigators start by
enrolling a group of people with disease (at CDC such persons are
called case-patients rather than cases, because case refers to
occurrence of disease, not a person). As a comparison group, the
Introduction to Epidemiology
Page 1-49
investigator then enrolls a group of people without disease
(controls). Investigators then compare previous exposures between
the two groups. The control group provides an estimate of the
baseline or expected amount of exposure in that population. If the
amount of exposure among the case group is substantially higher
than the amount you would expect based on the control group, then
illness is said to be associated with that exposure. The study of
hepatitis A traced to green onions, described above, is an example
of a case-control study. The key in a case-control study is to
identify an appropriate control group, comparable to the case group
in most respects, in order to provide a reasonable estimate of the
baseline or expected exposure.
Cross-sectional study. In this third type of observational study, a
sample of persons from a population is enrolled and their
exposures and health outcomes are measured simultaneously. The
cross-sectional study tends to assess the presence (prevalence) of
the health outcome at that point of time without regard to duration.
For example, in a cross-sectional study of diabetes, some of the
enrollees with diabetes may have lived with their diabetes for
many years, while others may have been recently diagnosed.
From an analytic viewpoint the cross-sectional study is weaker
than either a cohort or a case-control study because a cross-
sectional study usually cannot disentangle risk factors for
occurrence of disease (incidence) from risk factors for survival
with the disease. (Incidence and prevalence are discussed in more
detail in Lesson 3.) On the other hand, a cross-sectional study is a
perfectly fine tool for descriptive epidemiology purposes. Cross-
sectional studies are used routinely to document the prevalence in a
community of health behaviors (prevalence of smoking), health
states (prevalence of vaccination against measles), and health
outcomes, particularly chronic conditions (hypertension, diabetes).
In summary, the purpose of an analytic study in epidemiology is to
identify and quantify the relationship between an exposure and a
health outcome. The hallmark of such a study is the presence of at
least two groups, one of which serves as a comparison group. In an
experimental study, the investigator determines the exposure for
the study subjects; in an observational study, the subjects are
exposed under more natural conditions. In an observational cohort
study, subjects are enrolled or grouped on the basis of their
exposure, then are followed to document occurrence of disease.
Differences in disease rates between the exposed and unexposed
groups lead investigators to conclude that exposure is associated
with disease. In an observational case-control study, subjects are
Introduction to Epidemiology
Page 1-50
enrolled according to whether they have the disease or not, then are
questioned or tested to determine their prior exposure. Differences
in exposure prevalence between the case and control groups allow
investigators to conclude that the exposure is associated with the
disease. Cross-sectional studies measure exposure and disease
status at the same time, and are better suited to descriptive
epidemiology than causation.
Introduction to Epidemiology
Page 1-51
Exercise 1.7
Classify each of the following studies as:
A. Experimental
B. Observational cohort
C. Observational case-control
D. Observational cross-sectional
E. Not an analytical or epidemiologic study
_____ 1. Representative sample of residents were telephoned and asked how much they
exercise each week and whether they currently have (have ever been diagnosed
with) heart disease.
_____ 2. Occurrence of cancer was identified between April 1991 and July 2002 for 50,000
troops who served in the first Gulf War (ended April 1991) and 50,000 troops who
served elsewhere during the same period.
_____ 3. Persons diagnosed with new-onset Lyme disease were asked how often they walk
through woods, use insect repellant, wear short sleeves and pants, etc. Twice as
many patients without Lyme disease from the same physician’s practice were
asked the same questions, and the responses in the two groups were compared.
_____ 4. Subjects were children enrolled in a health maintenance organization. At 2 months,
each child was randomly given one of two types of a new vaccine against rotavirus
infection. Parents were called by a nurse two weeks later and asked whether the
children had experienced any of a list of side-effects.
Check your answers on page 1-83
Introduction to Epidemiology
Page 1-52
Concepts of Disease Occurrence
A critical premise of epidemiology is that disease and other health
events do not occur randomly in a population, but are more likely
to occur in some members of the population than others because of
risk factors that may not be distributed randomly in the population.
As noted earlier, one important use of epidemiology is to identify
the factors that place some members at greater risk than others.
Causation
A number of models of disease causation have been proposed.
Among the simplest of these is the epidemiologic triad or triangle,
the traditional model for infectious disease. The triad consists of an
external agent, a susceptible host, and an environment that brings
the host and agent together. In this model, disease results from the
interaction between the agent and the susceptible host in an
environment that supports transmission of the agent from a source
to that host. Two ways of depicting this model are shown in Figure
1.16.
Agent, host, and environmental factors interrelate in a variety of
complex ways to produce disease. Different diseases require
different balances and interactions of these three components.
Development of appropriate, practical, and effective public health
measures to control or prevent disease usually requires assessment
of all three components and their interactions.
Figure 1.16 Epidemiologic Triad
Agent originally referred to an infectious microorganism or
pathogen: a virus, bacterium, parasite, or other microbe. Generally,
the agent must be present for disease to occur; however, presence
of that agent alone is not always sufficient to cause disease. A
variety of factors influence whether exposure to an organism will
result in disease, including the organism’s pathogenicity (ability to
cause disease) and dose.
Introduction to Epidemiology
Page 1-53
Over time, the concept of agent has been broadened to include
chemical and physical causes of disease or injury. These include
chemical contaminants (such as the L-tryptophan contaminant
responsible for eosinophilia-myalgia syndrome), as well as
physical forces (such as repetitive mechanical forces associated
with carpal tunnel syndrome). While the epidemiologic triad serves
as a useful model for many diseases, it has proven inadequate for
cardiovascular disease, cancer, and other diseases that appear to
have multiple contributing causes without a single necessary one.
Host refers to the human who can get the disease. A variety of
factors intrinsic to the host, sometimes called risk factors, can
influence an individual’s exposure, susceptibility, or response to a
causative agent. Opportunities for exposure are often influenced by
behaviors such as sexual practices, hygiene, and other personal
choices as well as by age and sex. Susceptibility and response to an
agent are influenced by factors such as genetic composition,
nutritional and immunologic status, anatomic structure, presence of
disease or medications, and psychological makeup.
Environment refers to extrinsic factors that affect the agent and
the opportunity for exposure. Environmental factors include
physical factors such as geology and climate, biologic factors such
as insects that transmit the agent, and socioeconomic factors such
as crowding, sanitation, and the availability of health services.
Component causes and causal pies
Because the agent-host-environment model did not work well for
many non-infectious diseases, several other models that attempt to
account for the multifactorial nature of causation have been
proposed. One such model was proposed by Rothman in 1976, and
has come to be known as the Causal Pies.42
This model is
illustrated in Figure 1.17. An individual factor that contributes to
cause disease is shown as a piece of a pie. After all the pieces of a
pie fall into place, the pie is complete — and disease occurs. The
individual factors are called component causes. The complete pie,
which might be considered a causal pathway, is called a sufficient
cause. A disease may have more than one sufficient cause, with
each sufficient cause being composed of several component causes
that may or may not overlap. A component that appears in every
pie or pathway is called a necessary cause, because without it,
disease does not occur. Note in Figure 1.17 that component cause
A is a necessary cause because it appears in every pie.
Introduction to Epidemiology
Page 1-54
Figure 1.17 Rothman’s Causal Pies
Source: Rothman KJ. Causes. Am J Epidemiol 1976;104:587–592.
The component causes may include intrinsic host factors as well as
the agent and the environmental factors of the agent-host-
environment triad. A single component cause is rarely a sufficient
cause by itself. For example, even exposure to a highly infectious
agent such as measles virus does not invariably result in measles
disease. Host susceptibility and other host factors also may play a
role.
At the other extreme, an agent that is usually harmless in healthy
persons may cause devastating disease under different conditions.
Pneumocystis carinii is an organism that harmlessly colonizes the
respiratory tract of some healthy persons, but can cause potentially
lethal pneumonia in persons whose immune systems have been
weakened by human immunodeficiency virus (HIV). Presence of
Pneumocystis carinii organisms is therefore a necessary but not
sufficient cause of pneumocystis pneumonia. In Figure 1.17, it
would be represented by component cause A.
As the model indicates, a particular disease may result from a
variety of different sufficient causes or pathways. For example,
lung cancer may result from a sufficient cause that includes
smoking as a component cause. Smoking is not a sufficient cause
by itself, however, because not all smokers develop lung cancer.
Neither is smoking a necessary cause, because a small fraction of
lung cancer victims have never smoked. Suppose Component
Cause B is smoking and Component Cause C is asbestos.
Sufficient Cause I includes both smoking (B) and asbestos (C).
Sufficient Cause II includes smoking without asbestos, and
Sufficient Cause III includes asbestos without smoking. But
because lung cancer can develop in persons who have never been
exposed to either smoking or asbestos, a proper model for lung
cancer would have to show at least one more Sufficient Cause Pie
that does not include either component B or component C.
Introduction to Epidemiology
Page 1-55
Note that public health action does not depend on the identification
of every component cause. Disease prevention can be
accomplished by blocking any single component of a sufficient
cause, at least through that pathway. For example, elimination of
smoking (component B) would prevent lung cancer from sufficient
causes I and II, although some lung cancer would still occur
through sufficient cause III.
Introduction to Epidemiology
Page 1-56
Exercise 1.8
Read the Anthrax Fact Sheet on the following 2 pages, then answer the
questions below.
1. Describe its causation in terms of agent, host, and environment.
a. Agent:
b. Host:
c. Environment:
2. For each of the following risk factors and health outcomes, identify whether they are
necessary causes, sufficient causes, or component causes.
Risk Factor
_____ a. Hypertension
_____ b. Treponema pallidum
_____ c. Type A personality
_____ d. Skin contact with a strong acid
Health Outcome
Stroke
Syphilis
Heart disease
Burn
Check your answers on page 1-83
Introduction to Epidemiology
Page 1-57
Anthrax Fact Sheet
What is anthrax?
Anthrax is an acute infectious disease that usually occurs in animals such as livestock, but can also affect humans.
Human anthrax comes in three forms, depending on the route of infection: cutaneous (skin) anthrax, inhalation
anthrax, and intestinal anthrax. Symptoms usually occur within 7 days after exposure.
Cutaneous: Most (about 95%) anthrax infections occur when the bacterium enters a cut or abrasion on the skin after
handling infected livestock or contaminated animal products. Skin infection begins as a raised itchy bump that
resembles an insect bite but within 1–2 days develops into a vesicle and then a painless ulcer, usually 1–3 cm
in diameter, with a characteristic black necrotic (dying) area in the center. Lymph glands in the adjacent area
may swell. About 20% of untreated cases of cutaneous anthrax will result in death. Deaths are rare with
appropriate antimicrobial therapy.
Inhalation: Initial symptoms are like cold or flu symptoms and can include a sore throat, mild fever, and muscle
aches. After several days, the symptoms may progress to cough, chest discomfort, severe breathing problems
and shock. Inhalation anthrax is often fatal. Eleven of the mail-related cases were inhalation; 5 (45%) of the
11 patients died.
Intestinal: Initial signs of nausea, loss of appetite, vomiting, and fever are followed by abdominal pain, vomiting of
blood, and severe diarrhea. Intestinal anthrax results in death in 25% to 60% of cases.
While most human cases of anthrax result from contact with infected animals or contaminated animal products,
anthrax also can be used as a biologic weapon. In 1979, dozens of residents of Sverdlovsk in the former Soviet Union
are thought to have died of inhalation anthrax after an unintentional release of an aerosol from a biologic weapons
facility. In 2001, 22 cases of anthrax occurred in the United States from letters containing anthrax spores that were
mailed to members of Congress, television networks, and newspaper companies.
What causes anthrax?
Anthrax is caused by the bacterium Bacillus anthracis. The anthrax bacterium forms a protective shell called a spore.
B. anthracis spores are found naturally in soil, and can survive for many years.
How is anthrax diagnosed?
Anthrax is diagnosed by isolating B. anthracis from the blood, skin lesions, or respiratory secretions or by measuring
specific antibodies in the blood of persons with suspected cases.
Is there a treatment for anthrax?
Antibiotics are used to treat all three types of anthrax. Treatment should be initiated early because the disease is
more likely to be fatal if treatment is delayed or not given at all.
How common is anthrax and where is it found?
Anthrax is most common in agricultural regions of South and Central America, Southern and Eastern Europe, Asia,
Africa, the Caribbean, and the Middle East, where it occurs in animals. When anthrax affects humans, it is usually the
result of an occupational exposure to infected animals or their products. Naturally occurring anthrax is rare in the
United States (28 reported cases between 1971 and 2000), but 22 mail-related cases were identified in 2001.
Infections occur most commonly in wild and domestic lower vertebrates (cattle, sheep, goats, camels, antelopes, and
other herbivores), but it can also occur in humans when they are exposed to infected animals or tissue from infected
animals.
How is anthrax transmitted?
Anthrax can infect a person in three ways: by anthrax spores entering through a break in the skin, by inhaling
anthrax spores, or by eating contaminate, undercooked meat. Anthrax is not spread from person to person. The skin
(“cutaneous”) form of anthrax is usually the result of contact with infected livestock, wild animals, or contaminated
animal products such as carcasses, hides, hair, wool, meat, or bone meal. The inhalation form is from breathing in
spores from the same sources. Anthrax can also be spread as a bioterrorist agent.
Introduction to Epidemiology
Page 1-58
Anthrax Fact Sheet (Continued)
Who has an increased risk of being exposed to anthrax?
Susceptibility to anthrax is universal. Most naturally occurring anthrax affects people whose work brings them into
contact with livestock or products from livestock. Such occupations include veterinarians, animal handlers, abattoir
workers, and laboratorians. Inhalation anthrax was once called Woolsorter’s Disease because workers who inhaled
spores from contaminated wool before it was cleaned developed the disease. Soldiers and other potential targets of
bioterrorist anthrax attacks might also be considered at increased risk.
Is there a way to prevent infection?
In countries where anthrax is common and vaccination levels of animal herds are low, humans should avoid contact
with livestock and animal products and avoid eating meat that has not been properly slaughtered and cooked. Also,
an anthrax vaccine has been licensed for use in humans. It is reported to be 93% effective in protecting against
anthrax. It is used by veterinarians, laboratorians, soldiers, and others who may be at increased risk of exposure, but
is not available to the general public at this time.
For a person who has been exposed to anthrax but is not yet sick, antibiotics combined with anthrax vaccine are
used to prevent illness.
Sources: Centers for Disease Control and Prevention [Internet]. Atlanta: Anthrax. Available from:
http://www.bt.cdc.gov/agent/anthrax/ and Anthrax Public Health Fact Sheet, Mass. Dept. of Public Health, August
2002.
Introduction to Epidemiology
Page 1-59
Natural History and Spectrum of Disease
Natural history of disease refers to the progression of a disease
process in an individual over time, in the absence of treatment. For
example, untreated infection with HIV causes a spectrum of
clinical problems beginning at the time of seroconversion (primary
HIV) and terminating with AIDS and usually death. It is now
recognized that it may take 10 years or more for AIDS to develop
after seroconversion.43
Many, if not most, diseases have a
characteristic natural history, although the time frame and specific
manifestations of disease may vary from individual to individual
and are influenced by preventive and therapeutic measures.
Figure 1.18 Natural History of Disease Timeline
Source: Centers for Disease Control and Prevention. Principles of epidemiology, 2nd
ed.
Atlanta: U.S. Department of Health and Human Services;1992.
The process begins with the appropriate exposure to or
accumulation of factors sufficient for the disease process to begin
in a susceptible host. For an infectious disease, the exposure is a
microorganism. For cancer, the exposure may be a factor that
initiates the process, such as asbestos fibers or components in
tobacco smoke (for lung cancer), or one that promotes the process,
such as estrogen (for endometrial cancer).
After the disease process has been triggered, pathological changes
then occur without the individual being aware of them. This stage
of subclinical disease, extending from the time of exposure to
onset of disease symptoms, is usually called the incubation period
for infectious diseases, and the latency period for chronic
diseases. During this stage, disease is said to be asymptomatic (no
symptoms) or inapparent. This period may be as brief as seconds
for hypersensitivity and toxic reactions to as long as decades for
certain chronic diseases. Even for a single disease, the
characteristic incubation period has a range. For example, the
typical incubation period for hepatitis A is as long as 7 weeks. The
Introduction to Epidemiology
Page 1-60
latency period for leukemia to become evident among survivors of
the atomic bomb blast in Hiroshima ranged from 2 to 12 years,
peaking at 6–7 years.44
Incubation periods of selected exposures
and diseases varying from minutes to decades are displayed in
Table 1.7.
Table 1.7 Incubation Periods of Selected Exposures and Diseases
Exposure Clinical Effect Incubation/Latency Period
Saxitoxin and similar
toxins from shellfish
Paralytic shellfish poisoning
(tingling, numbness around lips
and fingertips, giddiness,
incoherent speech,
respiratory paralysis,
sometimes death)
few minutes–30 minutes
Organophosphorus
ingestion
Nausea, vomiting, cramps,
headache, nervousness,
blurred vision, chest pain,
confusion, twitching,
convulsions
few minutes–few hours
Salmonella Diarrhea, often with fever and cramps usually 6–48 hours
SARS-associated
corona virus
Severe Acute Respiratory
Syndrome (SARS)
3–10 days, usually 4–6 days
Varicella-zoster virus Chickenpox 10–21 days, usually 14–16 days
Treponema pallidum Syphilis 10–90 days, usually 3 weeks
Hepatitis A virus Hepatitis 14–50 days, average 4 weeks
Hepatitis B virus Hepatitis 50–180 days, usually 2–3 months
Human immunodeficiency virus AIDS <1 to 15+ years
Atomic bomb radiation (Japan) Leukemia 2–12 years
Radiation (Japan, Chernobyl) Thyroid cancer 3–20+ years
Radium (watch dial painters) Bone cancer 8–40 years
Although disease is not apparent during the incubation period,
some pathologic changes may be detectable with laboratory,
radiographic, or other screening methods. Most screening
programs attempt to identify the disease process during this phase
of its natural history, since intervention at this early stage is likely
to be more effective than treatment given after the disease has
progressed and become symptomatic.
The onset of symptoms marks the transition from subclinical to
clinical disease. Most diagnoses are made during the stage of
clinical disease. In some people, however, the disease process may
never progress to clinically apparent illness. In others, the disease
process may result in illness that ranges from mild to severe or
fatal. This range is called the spectrum of disease. Ultimately, the
disease process ends either in recovery, disability or death.
Introduction to Epidemiology
Page 1-61
For an infectious agent, infectivity refers to the proportion of
exposed persons who become infected. Pathogenicity refers to the
proportion of infected individuals who develop clinically apparent
disease. Virulence refers to the proportion of clinically apparent
cases that are severe or fatal.
Because the spectrum of disease can include asymptomatic and
mild cases, the cases of illness diagnosed by clinicians in the
community often represent only the tip of the iceberg. Many
additional cases may be too early to diagnose or may never
progress to the clinical stage. Unfortunately, persons with
inapparent or undiagnosed infections may nonetheless be able to
transmit infection to others. Such persons who are infectious but
have subclinical disease are called carriers. Frequently, carriers
are persons with incubating disease or inapparent infection.
Persons with measles, hepatitis A, and several other diseases
become infectious a few days before the onset of symptoms.
However carriers may also be persons who appear to have
recovered from their clinical illness but remain infectious, such as
chronic carriers of hepatitis B virus, or persons who never
exhibited symptoms. The challenge to public health workers is that
these carriers, unaware that they are infected and infectious to
others, are sometimes more likely to unwittingly spread infection
than are people with obvious illness.
Introduction to Epidemiology
Page 1-62
Chain of Infection
As described above, the traditional epidemiologic triad model
holds that infectious diseases result from the interaction of agent,
host, and environment. More specifically, transmission occurs
when the agent leaves its reservoir or host through a portal of
exit, is conveyed by some mode of transmission, and enters
through an appropriate portal of entry to infect a susceptible
host. This sequence is sometimes called the chain of infection.
Figure 1.19 Chain of Infection
Source: Centers for Disease Control and Prevention. Principles of epidemiology, 2nd ed.
Atlanta: U.S. Department of Health and Human Services;1992.
Reservoir
The reservoir of an infectious agent is the habitat in which the
agent normally lives, grows, and multiplies. Reservoirs include
humans, animals, and the environment. The reservoir may or may
not be the source from which an agent is transferred to a host. For
example, the reservoir of Clostridium botulinum is soil, but the
source of most botulism infections is improperly canned food
containing C. botulinum spores.
Human reservoirs. Many common infectious diseases have human
reservoirs. Diseases that are transmitted from person to person
without intermediaries include the sexually transmitted diseases,
measles, mumps, streptococcal infection, and many respiratory
pathogens. Because humans were the only reservoir for the
smallpox virus, naturally occurring smallpox was eradicated after
the last human case was identified and isolated.8
Introduction to Epidemiology
Page 1-63
Human reservoirs may or may not show the effects of illness. As
noted earlier, a carrier is a person with inapparent infection who is
capable of transmitting the pathogen to others. Asymptomatic or
passive or healthy carriers are those who never experience
symptoms despite being infected. Incubatory carriers are those
who can transmit the agent during the incubation period before
clinical illness begins. Convalescent carriers are those who have
recovered from their illness but remain capable of transmitting to
others. Chronic carriers are those who continue to harbor a
pathogen such as hepatitis B virus or Salmonella Typhi, the
causative agent of typhoid fever, for months or even years after
their initial infection. One notorious carrier is Mary Mallon, or
Typhoid Mary, who was an asymptomatic chronic carrier of
Salmonella Typhi. As a cook in New York City and New Jersey in
the early 1900s, she unintentionally infected dozens of people until
she was placed in isolation on an island in the East River, where
she died 23 years later.45
Carriers commonly transmit disease because they do not realize
they are infected, and consequently take no special precautions to
prevent transmission. Symptomatic persons who are aware of their
illness, on the other hand, may be less likely to transmit infection
because they are either too sick to be out and about, take
precautions to reduce transmission, or receive treatment that limits
the disease.
Animal reservoirs. Humans are also subject to diseases that have
animal reservoirs. Many of these diseases are transmitted from
animal to animal, with humans as incidental hosts. The term
zoonosis refers to an infectious disease that is transmissible under
natural conditions from vertebrate animals to humans. Long
recognized zoonotic diseases include brucellosis (cows and pigs),
anthrax (sheep), plague (rodents), trichinellosis/trichinosis (swine),
tularemia (rabbits), and rabies (bats, raccoons, dogs, and other
mammals). Zoonoses newly emergent in North America include
West Nile encephalitis (birds), and monkeypox (prairie dogs).
Many newly recognized infectious diseases in humans, including
HIV/AIDS, Ebola infection and SARS, are thought to have
emerged from animal hosts, although those hosts have not yet been
identified.
Environmental reservoirs. Plants, soil, and water in the
environment are also reservoirs for some infectious agents. Many
fungal agents, such as those that cause histoplasmosis, live and
multiply in the soil. Outbreaks of Legionnaires disease are often
traced to water supplies in cooling towers and evaporative
Introduction to Epidemiology
Page 1-64
condensers, reservoirs for the causative organism Legionella
pneumophila.
Portal of exit
Portal of exit is the path by which a pathogen leaves its host. The
portal of exit usually corresponds to the site where the pathogen is
localized. For example, influenza viruses and Mycobacterium
tuberculosis exit the respiratory tract, schistosomes through urine,
cholera vibrios in feces, Sarcoptes scabiei in scabies skin lesions,
and enterovirus 70, a cause of hemorrhagic conjunctivitis, in
conjunctival secretions. Some bloodborne agents can exit by
crossing the placenta from mother to fetus (rubella, syphilis,
toxoplasmosis), while others exit through cuts or needles in the
skin (hepatitis B) or blood-sucking arthropods (malaria).
Modes of transmission
An infectious agent may be transmitted from its natural reservoir to
a susceptible host in different ways. There are different
classifications for modes of transmission. Here is one classification:
• Direct
− Direct contact
− Droplet spread
• Indirect
− Airborne
− Vehicleborne
− Vectorborne (mechanical or biologic)
In direct transmission, an infectious agent is transferred from a
reservoir to a susceptible host by direct contact or droplet spread.
Direct contact occurs through skin-to-skin contact, kissing,
and sexual intercourse. Direct contact also refers to contact
with soil or vegetation harboring infectious organisms.
Thus, infectious mononucleosis (“kissing disease”) and
gonorrhea are spread from person to person by direct
contact. Hookworm is spread by direct contact with
contaminated soil.
Droplet spread refers to spray with relatively large,
short-range aerosols produced by sneezing, coughing, or
even talking. Droplet spread is classified as direct because
transmission is by direct spray over a few feet, before the
droplets fall to the ground. Pertussis and meningococcal
infection are examples of diseases transmitted from an
infectious patient to a susceptible host by droplet spread.
Introduction to Epidemiology
Page 1-65
Indirect transmission refers to the transfer of an infectious agent
from a reservoir to a host by suspended air particles, inanimate
objects (vehicles), or animate intermediaries (vectors).
Airborne transmission occurs when infectious agents are
carried by dust or droplet nuclei suspended in air. Airborne
dust includes material that has settled on surfaces and
become resuspended by air currents as well as infectious
particles blown from the soil by the wind. Droplet nuclei
are dried residue of less than 5 microns in size. In contrast
to droplets that fall to the ground within a few feet, droplet
nuclei may remain suspended in the air for long periods of
time and may be blown over great distances. Measles, for
example, has occurred in children who came into a
physician’s office after a child with measles had left,
because the measles virus remained suspended in the air.46
Vehicles that may indirectly transmit an infectious agent
include food, water, biologic products (blood), and fomites
(inanimate objects such as handkerchiefs, bedding, or
surgical scalpels). A vehicle may passively carry a
pathogen — as food or water may carry hepatitis A virus.
Alternatively, the vehicle may provide an environment in
which the agent grows, multiplies, or produces toxin — as
improperly canned foods provide an environment that
supports production of botulinum toxin by Clostridium
botulinum.
Vectors such as mosquitoes, fleas, and ticks may carry an
infectious agent through purely mechanical means or may
support growth or changes in the agent. Examples of
mechanical transmission are flies carrying Shigella on their
appendages and fleas carrying Yersinia pestis, the causative
agent of plague, in their gut. In contrast, in biologic
transmission, the causative agent of malaria or guinea
worm disease undergoes maturation in an intermediate host
before it can be transmitted to humans (Figure 1.20).
Portal of entry
The portal of entry refers to the manner in which a pathogen enters
a susceptible host. The portal of entry must provide access to
tissues in which the pathogen can multiply or a toxin can act.
Often, infectious agents use the same portal to enter a new host
that they used to exit the source host. For example, influenza virus
exits the respiratory tract of the source host and enters the
Introduction to Epidemiology
Page 1-66
respiratory tract of the new host. In contrast, many pathogens that
cause gastroenteritis follow a so-called “fecal-oral” route because
they exit the source host in feces, are carried on inadequately
washed hands to a vehicle such as food, water, or utensil, and enter
a new host through the mouth. Other portals of entry include the
skin (hookworm), mucous membranes (syphilis), and blood
(hepatitis B, human immunodeficiency virus).
Figure 1.20 Complex Life Cycle of Dracunculus medinensis (Guinea
worm)
Source: Centers for Disease Control and Prevention. Principles of epidemiology, 2nd ed.
Atlanta: U.S. Department of Health and Human Services;1992.
Introduction to Epidemiology
Page 1-67
Host
The final link in the chain of infection is a susceptible host.
Susceptibility of a host depends on genetic or constitutional
factors, specific immunity, and nonspecific factors that affect an
individual’s ability to resist infection or to limit pathogenicity. An
individual’s genetic makeup may either increase or decrease
susceptibility. For example, persons with sickle cell trait seem to
be at least partially protected from a particular type of malaria.
Specific immunity refers to protective antibodies that are directed
against a specific agent. Such antibodies may develop in response
to infection, vaccine, or toxoid (toxin that has been deactivated but
retains its capacity to stimulate production of toxin antibodies) or
may be acquired by transplacental transfer from mother to fetus or
by injection of antitoxin or immune globulin. Nonspecific factors
that defend against infection include the skin, mucous membranes,
gastric acidity, cilia in the respiratory tract, the cough reflex, and
nonspecific immune response. Factors that may increase
susceptibility to infection by disrupting host defenses include
malnutrition, alcoholism, and disease or therapy that impairs the
nonspecific immune response.
Interventions are directed
at:
• Controlling or
eliminating agent at
source of transmission
• Protecting portals of
entry
• Increasing host’s
defenses
Implications for public health
Knowledge of the portals of exit and entry and modes of
transmission provides a basis for determining appropriate control
measures. In general, control measures are usually directed against
the segment in the infection chain that is most susceptible to
intervention, unless practical issues dictate otherwise.
For some diseases, the most appropriate intervention may be
directed at controlling or eliminating the agent at its source. A
patient sick with a communicable disease may be treated with
antibiotics to eliminate the infection. An asymptomatic but
infected person may be treated both to clear the infection and to
reduce the risk of transmission to others. In the community, soil
may be decontaminated or covered to prevent escape of the agent.
Some interventions are directed at the mode of transmission.
Interruption of direct transmission may be accomplished by
isolation of someone with infection, or counseling persons to avoid
the specific type of contact associated with transmission.
Vehicleborne transmission may be interrupted by elimination or
decontamination of the vehicle. To prevent fecal-oral transmission,
efforts often focus on rearranging the environment to reduce the
risk of contamination in the future and on changing behaviors,
such as promoting handwashing. For airborne diseases, strategies
Introduction to Epidemiology
Page 1-68
may be directed at modifying ventilation or air pressure, and
filtering or treating the air. To interrupt vectorborne transmission,
measures may be directed toward controlling the vector
population, such as spraying to reduce the mosquito population.
Some strategies that protect portals of entry are simple and
effective. For example, bed nets are used to protect sleeping
persons from being bitten by mosquitoes that may transmit
malaria. A dentist’s mask and gloves are intended to protect the
dentist from a patient’s blood, secretions, and droplets, as well to
protect the patient from the dentist. Wearing of long pants and
sleeves and use of insect repellent are recommended to reduce the
risk of Lyme disease and West Nile virus infection, which are
transmitted by the bite of ticks and mosquitoes, respectively.
Some interventions aim to increase a host’s defenses. Vaccinations
promote development of specific antibodies that protect against
infection. On the other hand, prophylactic use of antimalarial
drugs, recommended for visitors to malaria-endemic areas, does
not prevent exposure through mosquito bites, but does prevent
infection from taking root.
Finally, some interventions attempt to prevent a pathogen from
encountering a susceptible host. The concept of herd immunity
suggests that if a high enough proportion of individuals in a
population are resistant to an agent, then those few who are
susceptible will be protected by the resistant majority, since the
pathogen will be unlikely to “find” those few susceptible
individuals. The degree of herd immunity necessary to prevent or
interrupt an outbreak varies by disease. In theory, herd immunity
means that not everyone in a community needs to be resistant
(immune) to prevent disease spread and occurrence of an outbreak.
In practice, herd immunity has not prevented outbreaks of measles
and rubella in populations with immunization levels as high as
85% to 90%. One problem is that, in highly immunized
populations, the relatively few susceptible persons are often
clustered in subgroups defined by socioeconomic or cultural
factors. If the pathogen is introduced into one of these subgroups,
an outbreak may occur.
Introduction to Epidemiology
Page 1-69
Exercise 1.9
Information about dengue fever is provided on the following pages. After
studying this information, outline the chain of infection by identifying the
reservoir(s), portal(s) of exit, mode(s) of transmission, portal(s) of entry,
and factors in host susceptibility.
Reservoirs:
Portals of exit:
Modes of transmission:
Portals of entry:
Factors in host susceptibility:
Check your answers on page 1-84
Introduction to Epidemiology
Page 1-70
Dengue Fact Sheet
What is dengue?
Dengue is an acute infectious disease that comes in two forms: dengue and dengue hemorrhagic fever. The principal
symptoms of dengue are high fever, severe headache, backache, joint pains, nausea and vomiting, eye pain, and
rash. Generally, younger children have a milder illness than older children and adults.
Dengue hemorrhagic fever is a more severe form of dengue. It is characterized by a fever that lasts from 2 to 7
days, with general signs and symptoms that could occur with many other illnesses (e.g., nausea, vomiting,
abdominal pain, and headache). This stage is followed by hemorrhagic manifestations, tendency to bruise easily or
other types of skin hemorrhages, bleeding nose or gums, and possibly internal bleeding. The smallest blood vessels
(capillaries) become excessively permeable (“leaky”), allowing the fluid component to escape from the blood vessels.
This may lead to failure of the circulatory system and shock, followed by death, if circulatory failure is not corrected.
Although the average case-fatality rate is about 5%, with good medical management, mortality can be less than 1%.
What causes dengue?
Dengue and dengue hemorrhagic fever are caused by any one of four closely related flaviviruses, designated DEN-1,
DEN-2, DEN-3, or DEN-4.
How is dengue diagnosed?
Diagnosis of dengue infection requires laboratory confirmation, either by isolating the virus from serum within 5 days
after onset of symptoms, or by detecting convalescent-phase specific antibodies obtained at least 6 days after onset
of symptoms.
What is the treatment for dengue or dengue hemorrhagic fever?
There is no specific medication for treatment of a dengue infection. Persons who think they have dengue should use
analgesics (pain relievers) with acetaminophen and avoid those containing aspirin. They should also rest, drink plenty
of fluids, and consult a physician. Persons with dengue hemorrhagic fever can be effectively treated by fluid
replacement therapy if an early clinical diagnosis is made, but hospitalization is often required.
How common is dengue and where is it found?
Dengue is endemic in many tropical countries in Asia and Latin America, most countries in Africa, and much of the
Caribbean, including Puerto Rico. Cases have occurred sporadically in Texas. Epidemics occur periodically. Globally,
an estimated 50 to 100 million cases of dengue and several hundred thousand cases of dengue hemorrhagic fever
occur each year, depending on epidemic activity. Between 100 and 200 suspected cases are introduced into the
United States each year by travelers.
How is dengue transmitted?
Dengue is transmitted to people by the bite of an Aedes mosquito that is infected with a dengue virus. The mosquito
becomes infected with dengue virus when it bites a person who has dengue or DHF and after about a week can
transmit the virus while biting a healthy person. Monkeys may serve as a reservoir in some parts of Asia and Africa.
Dengue cannot be spread directly from person to person.
Who has an increased risk of being exposed to dengue?
Susceptibility to dengue is universal. Residents of or visitors to tropical urban areas and other areas where dengue is
endemic are at highest risk of becoming infected. While a person who survives a bout of dengue caused by one
serotype develops lifelong immunity to that serotype, there is no cross-protection against the three other serotypes.
Introduction to Epidemiology
Page 1-71
Dengue Fact Sheet (Continued)
What can be done to reduce the risk of acquiring dengue?
There is no vaccine for preventing dengue. The best preventive measure for residents living in areas infested with
Aedes aegypti is to eliminate the places where the mosquito lays her eggs, primarily artificial containers that hold
water.
Items that collect rainwater or are used to store water (for example, plastic containers, 55-gallon drums, buckets, or
used automobile tires) should be covered or properly discarded. Pet and animal watering containers and vases with
fresh flowers should be emptied and scoured at least once a week. This will eliminate the mosquito eggs and larvae
and reduce the number of mosquitoes present in these areas.
For travelers to areas with dengue, as well as people living in areas with dengue, the risk of being bitten by
mosquitoes indoors is reduced by utilization of air conditioning or windows and doors that are screened. Proper
application of mosquito repellents containing 20% to 30% DEET as the active ingredient on exposed skin and
clothing decreases the risk of being bitten by mosquitoes. The risk of dengue infection for international travelers
appears to be small, unless an epidemic is in progress.
Can epidemics of dengue hemorrhagic fever be prevented?
The emphasis for dengue prevention is on sustainable, community-based, integrated mosquito control, with limited
reliance on insecticides (chemical larvicides and adulticides). Preventing epidemic disease requires a coordinated
community effort to increase awareness about dengue/DHF, how to recognize it, and how to control the mosquito
that transmits it. Residents are responsible for keeping their yards and patios free of sites where mosquitoes can be
produced.
Source: Centers for Disease Control and Prevention [Internet]. Dengue Fever. [updated 2005 Aug 22]. Available from
http://www.cdc.gov/ncidod/dvbid/dengue/index.htm.
Introduction to Epidemiology
Page 1-72
Epidemic Disease Occurrence
Level of disease
The amount of a particular disease that is usually present in a
community is referred to as the baseline or endemic level of the
disease. This level is not necessarily the desired level, which may
in fact be zero, but rather is the observed level. In the absence of
intervention and assuming that the level is not high enough to
deplete the pool of susceptible persons, the disease may continue
to occur at this level indefinitely. Thus, the baseline level is often
regarded as the expected level of the disease.
While some diseases are so rare in a given population that a single
case warrants an epidemiologic investigation (e.g., rabies, plague,
polio), other diseases occur more commonly so that only
deviations from the norm warrant investigation. Sporadic refers to
a disease that occurs infrequently and irregularly. Endemic refers
to the constant presence and/or usual prevalence of a disease or
infectious agent in a population within a geographic area.
Hyperendemic refers to persistent, high levels of disease
occurrence.
Occasionally, the amount of disease in a community rises above
the expected level. Epidemic refers to an increase, often sudden, in
the number of cases of a disease above what is normally expected
in that population in that area. Outbreak carries the same
definition of epidemic, but is often used for a more limited
geographic area. Cluster refers to an aggregation of cases grouped
in place and time that are suspected to be greater than the number
expected, even though the expected number may not be known.
Pandemic refers to an epidemic that has spread over several
countries or continents, usually affecting a large number of people.
Epidemics occur when an agent and susceptible hosts are present
in adequate numbers, and the agent can be effectively conveyed
from a source to the susceptible hosts. More specifically, an
epidemic may result from:
• A recent increase in amount or virulence of the agent,
• The recent introduction of the agent into a setting where it
has not been before,
• An enhanced mode of transmission so that more susceptible
persons are exposed,
• A change in the susceptibility of the host response to the
agent, and/or
• Factors that increase host exposure or involve introduction
Introduction to Epidemiology
Page 1-73
through new portals of entry.47
The previous description of epidemics presumes only infectious
agents, but non-infectious diseases such as diabetes and obesity
exist in epidemic proportion in the U.S.51,52
Introduction to Epidemiology
Page 1-74
Exercise 1.10
For each of the following situations, identify whether it reflects:
A. Sporadic disease
B. Endemic disease
C. Hyperendemic disease
D. Pandemic disease
E. Epidemic disease
_____ 1. 22 cases of legionellosis occurred within 3 weeks among residents of a particular
neighborhood (usually 0 or 1 per year)
_____ 2. Average annual incidence was 364 cases of pulmonary tuberculosis per 100,000
population in one area, compared with national average of 134 cases per 100,000
population
_____ 3. Over 20 million people worldwide died from influenza in 1918—1919
_____ 4. Single case of histoplasmosis was diagnosed in a community
_____ 5. About 60 cases of gonorrhea are usually reported in this region per week, slightly
less than the national average
Check your answers on page 1-84
Introduction to Epidemiology
Page 1-75
Epidemic Patterns
Epidemics can be classified according to their manner of spread
through a population:
• Common-source
− Point
− Continuous
− Intermittent
• Propagated
• Mixed
• Other
A common-source outbreak is one in which a group of persons
are all exposed to an infectious agent or a toxin from the same
source.
If the group is exposed over a relatively brief period, so that
everyone who becomes ill does so within one incubation period,
then the common-source outbreak is further classified as a point-
source outbreak. The epidemic of leukemia cases in Hiroshima
following the atomic bomb blast and the epidemic of hepatitis A
among patrons of the Pennsylvania restaurant who ate green
onions each had a point source of exposure.38,44
If the number of
cases during an epidemic were plotted over time, the resulting
graph, called an epidemic curve, would typically have a steep
upslope and a more gradual downslope (a so-called “log-normal
distribution”).
Figure 1.21 Hepatitis A Cases by Date of Onset, November–December,
1978
Source: Centers for Disease Control and Prevention. Unpublished data; 1979.
In some common-source outbreaks, case-patients may have been
exposed over a period of days, weeks, or longer. In a continuous
common-source outbreak, the range of exposures and range of
Introduction to Epidemiology
Page 1-76
incubation periods tend to flatten and widen the peaks of the
epidemic curve (Figure 1.22). The epidemic curve of an
intermittent common-source outbreak often has a pattern
reflecting the intermittent nature of the exposure.
Figure 1.22 Diarrheal Illness in City Residents by Date of Onset and
Character of Stool, December 1989–January 1990
Source: Centers for Disease Control and Prevention. Unpublished data; 1990.
A propagated outbreak results from transmission from one
person to another. Usually, transmission is by direct
person-to-person contact, as with syphilis. Transmission may also
be vehicleborne (e.g., transmission of hepatitis B or HIV by
sharing needles) or vectorborne (e.g., transmission of yellow fever
by mosquitoes). In propagated outbreaks, cases occur over more
than one incubation period. In Figure 1.23, note the peaks
occurring about 11 days apart, consistent with the incubation
period for measles. The epidemic usually wanes after a few
generations, either because the number of susceptible persons falls
below some critical level required to sustain transmission, or
because intervention measures become effective.
Figure 1.23 Measles Cases by Date of Onset, October 15, 1970–January
16, 1971
Source: Centers for Disease Control and Prevention. Measles outbreak—Aberdeen, S.D.
Introduction to Epidemiology
Page 1-77
MMWR 1971;20:26.
Some epidemics have features of both common-source epidemics
and propagated epidemics. The pattern of a common-source
outbreak followed by secondary person-to-person spread is not
uncommon. These are called mixed epidemics. For example, a
common-source epidemic of shigellosis occurred among a group of
3,000 women attending a national music festival (Figure 1.24).
Many developed symptoms after returning home. Over the next
few weeks, several state health departments detected subsequent
generations of Shigella cases propagated by person-to-person
transmission from festival attendees.48
Figure 1.24 Shigella Cases at a Music Festival by Day of Onset, August
1988
Adapted from: Lee LA, Ostroff SM, McGee HB, Johnson DR, Downes FP, Cameron DN, et al.
An outbreak of shigellosis at an outdoor music festival. Am J Epidemiol 1991;133:608–15.
Finally, some epidemics are neither common-source in its usual
sense nor propagated from person to person. Outbreaks of zoonotic
or vectorborne disease may result from sufficient prevalence of
infection in host species, sufficient presence of vectors, and
sufficient human-vector interaction. Examples (Figures 1.25 and
1.26) include the epidemic of Lyme disease that emerged in the
northeastern United States in the late 1980s (spread from deer to
human by deer ticks) and the outbreak of West Nile encephalitis in
the Queens section of New York City in 1999 (spread from birds to
humans by mosquitoes).49,50
Introduction to Epidemiology
Page 1-78
Figure 1.25 Number of Reported Cases of Lyme Disease by Year —
United States, 1992–2003.
Data Source: Centers for Disease Control and Prevention. Summary of notifiable diseases–
United States, 2003. Published April 22, 2005, for MMWR 2003;52(No. 54):9,17,71–72.
Figure 1.26 Number of Reported Cases of West Nile Encephalitis — New
York City, 1999
Source: Centers for Disease Control and Prevention. Outbreak of West Nile-Like Viral
Encephalitis–New York, 1999. MMWR 1999;48(38):845–9.
Introduction to Epidemiology
Page 1-79
Exercise 1.11
For each of the following situations, identify the type of epidemic spread
with which it is most consistent.
A. Point source
B. Intermittent or continuous common source
C. Propagated
_____ 1. 21 cases of shigellosis among children and workers at a day care center over a
period of 6 weeks, no external source identified incubation period for shigellosis is
usually 1–3 days)
_____ 2. 36 cases of giardiasis over 6 weeks traced to occasional use of a supplementary
reservoir (incubation period for giardiasis 3–25 days or more, usually 7–10 days)
_____ 3. 43 cases of norovirus infection over 2 days traced to the ice machine on a cruise
ship (incubation period for norovirus is usually 24–48 hours)
Check your answers on page 1-84
Introduction to Epidemiology
Page 1-80
Summary
As the basic science of public health, epidemiology includes the study of the frequency, patterns,
and causes of health-related states or events in populations, and the application of that study to
address public health issues. Epidemiologists use a systematic approach to assess the What,
Who, Where, When, and Why/How of these health states or events. Two essential concepts of
epidemiology are population and comparison. Core epidemiologic tasks of a public health
epidemiologist include public health surveillance, field investigation, research, evaluation, and
policy development. In carrying out these tasks, the epidemiologist is almost always part of the
team dedicated to protecting and promoting the public’s health.
Epidemiologists look at differences in disease and injury occurrence in different populations to
generate hypotheses about risk factors and causes. They generally use cohort or case-control
studies to evaluate these hypotheses. Knowledge of basic principles of disease occurrence and
spread in a population is essential for implementing effective control and prevention measures.
Introduction to Epidemiology
Page 1-81
Exercise Answers
Exercise 1.1
1. B
2. B
3. A
4. A
5. C
6. A
Exercise 1.2
1. Having identified a cluster of cases never before seen in the area, public health officials must
seek additional information to assess the community’s health. Is the cluster limited to persons
who have just returned from traveling where West Nile virus infection is common, or was the
infection acquired locally, indicating that the community is truly at risk? Officials could
check whether hospitals have seen more patients than usual for encephalitis. If so, officials
could document when the increase in cases began, where the patients live or work or travel,
and personal characteristics such as age. Mosquito traps could be placed to catch mosquitoes
and test for presence of the West Nile virus. If warranted, officials could conduct a
serosurvey of the community to document the extent of infection. Results of these efforts
would help officials assess the community’s burden of disease and risk of infection.
2. West Nile virus infection is spread by mosquitoes. Persons who spend time outdoors,
particularly at times such as dusk when mosquitoes may be most active, can make personal
decisions to reduce their own risk or not. Knowing that the risk is present but may be small,
an avid gardener might or might not decide to curtail the time spent gardening in the evening,
or use insect repellent containing DEET, or wear long pants and long-sleeve shirts even
though it is August, or empty the bird bath where mosquitoes breed.
3. What proportion of persons infected with West Nile virus actually develops encephalitis? Do
some infected people have milder symptoms or no symptoms at all? Investigators could
conduct a serosurvey to assess infection, and ask about symptoms and illness. In addition,
what becomes of the persons who did develop encephalitis? What proportion survived? Did
they recover completely or did some have continuing difficulties?
4. Although the cause and mode of transmission were known (West Nile virus and mosquitoes,
respectively), public health officials asked many questions regarding how the virus was
introduced (mosquito on an airplane? wayward bird? bioterrorism?), whether the virus had a
reservoir in the area (e.g., birds), what types of mosquitoes could transmit the virus, what
were the host risk factors for infection or encephalitis, etc.
Introduction to Epidemiology
Page 1-82
Exercise 1.3
1. A
2. E
3. F
4. B
5. D
6. C
Exercise 1.4
1. Confirmed
2. Probable
3. Probable
4. Probable
5. Possible
Exercise 1.5
1. Third criterion may be limiting because patient may not be aware of close contact
2. Probably reasonable
3. Criteria do not require sophisticated evaluation or testing, so can be used anywhere in the
world
4. Too broad. Most persons with cough and fever returning from Toronto, China, etc., are more
likely to have upper respiratory infections than SARS.
Exercise 1.6
The following tables can be created from the data in Tables 1.5 and 1.6:
Table A. Deaths and Death Rates for an Unusual Event, By Sex and Socioeconomic Status
Female Male
High Middle Low High Middle Low
Persons at risk 143 107 212 179 173 499
Survivors 134 94 80 59 25 58
Deaths 9 13 132 120 148 441
Death rate (%) 6.3 12.1 62.3 67.0 85.5 88.4
Table B. Deaths and Death Rates for an Unusual Event, By Sex
Female Male Total
Persons at risk 462 851 1,313
Survivors 308 142 450
Deaths 154 709 863
Death rate (%) 33.3 83.3 65.7
Introduction to Epidemiology
Page 1-83
Table C. Deaths and Death Rates for an Unusual Event, By Age Group
Child Adult Total
Persons at risk 83 1,230 1,313
Survivors 52 398 450
Deaths 31 832 863
Death rate (%) 37.3 67.6 65.7
By reviewing the data in these tables, you can see that men (see Table B) and adults (see Table
C) were more likely to die than were women and children. Death rates for both women and men
declined as socioeconomic status increased (see Table A), but the men in even the highest
socioeconomic class were more likely to die than the women in the lowest socioeconomic class.
These data, which are consistent with the phrase “Women and children first,” represent the
mortality experience of passengers on the Titanic.
Data Sources: Passengers on the Titanic [Internet]. StatSci.org; [updated 2002 Dec 29; cited 2005 April]. Available from
http://www.statsci.org/data/general/titanic.html.
Victims of the Titanic Disaster [Internet]. Encyclopedia Titanica; [cited 2005 April]. Available from http://www.encyclopedia-
titanica.org.
Note: the precise number of passengers, deaths, and class of service are disputed. The Encyclopedia Titanica website includes
numerous discussions of these disputed numbers.
Exercise 1.7
1. D
2. B
3. C
4. A
Exercise 1.8
1.
a. Agent: Bacillus anthracis, a bacterium that can survive for years in spore form, is a
necessary cause.
b. Host: People are generally susceptible to anthrax. However, infection can be prevented
by vaccination. Cuts or abrasions of the skin may permit entry of the bacteria.
c. Environment: Persons at risk for naturally acquired infection are those who are likely to
be exposed to infected animals or contaminated animal products, such as veterinarians,
animal handlers, abattoir workers, and laboratorians. Persons who are potential targets of
bioterrorism are also at increased risk.
2.
a. Component cause
b. Necessary cause
c. Component cause
d. Sufficient cause
Introduction to Epidemiology
Page 1-84
Exercise 1.9
Reservoirs: humans and possibly monkeys
Portals of exit: skin (via mosquito bite)
Modes of transmission: indirect transmission to humans by mosquito vector
Portals of entry: through skin to blood (via mosquito bite)
Factors in host susceptibility: except for survivors of dengue infection who are immune to
subsequent infection from the same serotype, susceptibility is universal
Exercise 1.10
1. E
2. C
3. D
4. A
5. B
Exercise 1.11
1. C
2. B
3. A
Introduction to Epidemiology
Page 1-85
SELF-ASSESSMENT QUIZ
Now that you have read Lesson 1 and have completed the exercises, you
should be ready to take the self-assessment quiz. This quiz is designed to
help you assess how well you have learned the content of this lesson. You
may refer to the lesson text whenever you are unsure of the answer.
Unless instructed otherwise, choose ALL correct answers for each
question.
1. In the definition of epidemiology, “distribution” refers to:
A. Who
B. When
C. Where
D. Why
2. In the definition of epidemiology, “determinants” generally includes:
A. Agents
B. Causes
C. Control measures
D. Risk factors
E. Sources
3. Epidemiology, as defined in this lesson, would include which of the following activities?
A. Describing the demographic characteristics of persons with acute aflatoxin poisoning in
District A
B. Prescribing an antibiotic to treat a patient with community-acquired methicillin-resistant
Staphylococcus aureus infection
C. Comparing the family history, amount of exercise, and eating habits of those with and
without newly diagnosed diabetes
D. Recommending that a restaurant be closed after implicating it as the source of a
hepatitis A outbreak
4. John Snow’s investigation of cholera is considered a model for epidemiologic field
investigations because it included a:
A. Biologically plausible hypothesis
B. Comparison of a health outcome among exposed and unexposed groups
C. Multivariate statistical model
D. Spot map
E. Recommendation for public health action
5. Public health surveillance includes which of the following activities:
A. Diagnosing whether a case of encephalitis is actually due to West Nile virus infection
B. Soliciting case reports of persons with symptoms compatible with SARS from local
hospitals
C. Creating graphs of the number of dog bites by week and neighborhood
D. Writing a report on trends in seat belt use to share with the state legislature
E. Disseminating educational materials about ways people can reduce their risk of Lyme
disease
Introduction to Epidemiology
Page 1-86
6. The hallmark feature of an analytic epidemiologic study is: (Choose one best answer)
A. Use of an appropriate comparison group
B. Laboratory confirmation of the diagnosis
C. Publication in a peer-reviewed journal
D. Statistical analysis using logistic regression
7. A number of passengers on a cruise ship from Puerto Rico to the Panama Canal have
recently developed a gastrointestinal illness compatible with norovirus (formerly called
Norwalk-like virus). Testing for norovirus is not readily available in any nearby island, and
the test takes several days even where available. Assuming you are the epidemiologist
called on to board the ship and investigate this possible outbreak, your case definition
should include, at a minimum: (Choose one best answer)
A. Clinical criteria, plus specification of time, place, and person
B. Clinical features, plus the exposure(s) you most suspect
C. Suspect cases
D. The nationally agreed standard case definition for disease reporting
8. A specific case definition is one that:
A. Is likely to include only (or mostly) true cases
B. Is considered “loose” or “broad”
C. Will include more cases than a sensitive case definition
D. May exclude mild cases
9. Comparing numbers and rates of illness in a community, rates are preferred for: (Choose
one best answer)
A. Conducting surveillance for communicable diseases
B. Deciding how many doses of immune globulin are needed
C. Estimating subgroups at highest risk
D. Telling physicians which strain of influenza is most prevalent
10. For the cruise ship scenario described in Question 7, how would you display the time course
of the outbreak? (Choose one best answer)
A. Endemic curve
B. Epidemic curve
C. Seasonal trend
D. Secular trend
11. For the cruise ship scenario described in Question 7, if you suspected that the norovirus
may have been transmitted by ice made or served aboard ship, how might you display
“place”?
A. Spot map by assigned dinner seating location
B. Spot map by cabin
C. Shaded map of United States by state of residence
D. Shaded map by whether passenger consumed ship’s ice or not
Introduction to Epidemiology
Page 1-87
12. Which variables might you include in characterizing the outbreak described in Question 7 by
person?
A. Age of passenger
B. Detailed food history (what person ate) while aboard ship
C. Status as passenger or crew
D. Symptoms
13. When analyzing surveillance data by age, which of the following age groups is preferred?
(Choose one best answer)
A. 1-year age groups
B. 5-year age groups
C. 10-year age groups
D. Depends on the disease
14. A study in which children are randomly assigned to receive either a newly formulated
vaccine or the currently available vaccine, and are followed to monitor for side effects and
effectiveness of each vaccine, is an example of which type of study?
A. Experimental
B. Observational
C. Cohort
D. Case-control
E. Clinical trial
15. The Iowa Women’s Health Study, in which researchers enrolled 41,837 women in 1986 and
collected exposure and lifestyle information to assess the relationship between these factors
and subsequent occurrence of cancer, is an example of which type(s) of study?
A. Experimental
B. Observational
C. Cohort
D. Case-control
E. Clinical trial
16. British investigators conducted a study to compare measles-mumps-rubella (MMR) vaccine
history among 1,294 children with pervasive development disorder (e.g., autism and
Asperger’s syndrome) and 4,469 children without such disorders. (They found no
association.) This is an example of which type(s) of study?
A. Experimental
B. Observational
C. Cohort
D. Case-control
E. Clinical trial
Source: Smeeth L, Cook C, Fombonne E, Heavey L, Rodrigues LC, Smith PG, Hall AJ. MMR vaccination and pervasive developmental
disorders. Lancet 2004;364:963–9.
Introduction to Epidemiology
Page 1-88
17. A cohort study differs from a case-control study in that:
A. Subjects are enrolled or categorized on the basis of their exposure status in a cohort
study but not in a case-control study
B. Subjects are asked about their exposure status in a cohort study but not in a case-
control study
C. Cohort studies require many years to conduct, but case-control studies do not
D. Cohort studies are conducted to investigate chronic diseases, case-control studies are
used for infectious diseases
18. A key feature of a cross-sectional study is that:
A. It usually provides information on prevalence rather than incidence
B. It is limited to health exposures and behaviors rather than health outcomes
C. It is more useful for descriptive epidemiology than it is for analytic epidemiology
D. It is synonymous with survey
19. The epidemiologic triad of disease causation refers to: (Choose one best answer)
A. Agent, host, environment
B. Time, place, person
C. Source, mode of transmission, susceptible host
D. John Snow, Robert Koch, Kenneth Rothman
20. For each of the following, identify the appropriate letter from the time line in Figure 1.27
representing the natural history of disease.
_______ Onset of symptoms
_______ Usual time of diagnosis
_______ Exposure
Figure 1.27 Natural History of Disease Timeline
21. A reservoir of an infectious agent can be:
A. An asymptomatic human
B. A symptomatic human
C. An animal
D. The environment
Introduction to Epidemiology
Page 1-89
22. Indirect transmission includes which of the following?
A. Droplet spread
B. Mosquito-borne
C. Foodborne
D. Doorknobs or toilet seats
23. Disease control measures are generally directed at which of the following?
A. Eliminating the reservoir
B. Eliminating the vector
C. Eliminating the host
D. Interrupting mode of transmission
E. Reducing host susceptibility
24. Which term best describes the pattern of occurrence of the three diseases noted below in a
single area?
A. Endemic
B. Outbreak
C. Pandemic
D. Sporadic
_______ Disease 1: usually 40–50 cases per week; last week, 48 cases
_______ Disease 2: fewer than 10 cases per year; last week, 1 case
_______ Disease 3: usually no more than 2–4 cases per week; last week, 13 cases
25. A propagated epidemic is usually the result of what type of exposure?
A. Point source
B. Continuous common source
C. Intermittent common source
D. Person-to-person
Introduction to Epidemiology
Page 1-90
Answers to Self-Assessment Quiz
1. A, B, C. In the definition of epidemiology, “distribution” refers to descriptive epidemiology,
while “determinants” refers to analytic epidemiology. So “distribution” covers time (when),
place (where), and person (who), whereas “determinants” covers causes, risk factors,
modes of transmission (why and how).
2. A, B, D, E. In the definition of epidemiology, “determinants” generally includes the causes
(including agents), risk factors (including exposure to sources), and modes of transmission,
but does not include the resulting public health action.
3. A, C, D. Epidemiology includes assessment of the distribution (including describing
demographic characteristics of an affected population), determinants (including a study of
possible risk factors), and the application to control health problems (such as closing a
restaurant). It does not generally include the actual treatment of individuals, which is the
responsibility of health-care providers.
4. A, B, D, E. John Snow’s investigation of cholera is considered a model for epidemiologic field
investigations because it included a biologically plausible (but not popular at the time)
hypothesis that cholera was water-borne, a spot map, a comparison of a health outcome
(death) among exposed and unexposed groups, and a recommendation for public health
action. Snow’s elegant work predated multivariate analysis by 100 years.
5. B, C, D. Public health surveillance includes collection (B), analysis (C), and dissemination (D)
of public health information to help guide public health decision making and action, but it
does not include individual clinical diagnosis, nor does it include the actual public health
actions that are developed based on the information.
6. A. The hallmark feature of an analytic epidemiologic study is use of an appropriate
comparison group.
7. A. A case definition for a field investigation should include clinical criteria, plus specification
of time, place, and person. The case definition should be independent of the exposure you
wish to evaluate. Depending on the availability of laboratory confirmation, certainty of
diagnosis, and other factors, a case definition may or may not be developed for suspect
cases. The nationally agreed standard case definition for disease reporting is usually quite
specific, and usually does not include suspect or possible cases.
8. A, D. A specific or tight case definition is one that is likely to include only (or mostly) true
cases, but at the expense of excluding milder or atypical cases.
9. C. Rates assess risk. Numbers are generally preferred for identifying individual cases and for
resource planning.
10. B. An epidemic curve, with date or time of onset on its x-axis and number of cases on the y-
axis, is the classic graph for displaying the time course of an epidemic.
11. A, B, C. “Place” includes location of actual or suspected exposure as well as location of
residence, work, school, and the like.
Introduction to Epidemiology
Page 1-91
12. A, C. “Person” refers to demographic characteristics. It generally does not include clinical
features characteristics or exposures.
13. D. Epidemiologists tailor descriptive epidemiology to best describe the data they have.
Because different diseases have different age distributions, epidemiologists use different
age breakdowns appropriate for the disease of interest.
14. A, E. A study in which subjects are randomized into two intervention groups and monitored
to identify health outcomes is a clinical trial, which is type of experimental study. It is not a
cohort study, because that term is limited to observational studies.
15. B, C. A study that assesses (but does not dictate) exposure and follows to document
subsequent occurrence of disease is an observational cohort study.
16. B, D. A study in which subjects are enrolled on the basis of having or not having a health
outcome is an observational case-control study.
Source: Smeeth L, Cook C, Fombonne E, Heavey L, Rodrigues LC, Smith PG, Hall AJ. MMR vaccination and pervasive
developmental disorders. Lancet 2004;364:963–9.
17. A. The key difference between a cohort and case-control study is that, in a cohort study,
subjects are enrolled on the basis of their exposure, whereas in a case-control study
subjects are enrolled on the basis of whether they have the disease of interest or not. Both
types of studies assess exposure and disease status. While some cohort studies have been
conducted over several years, others, particularly those that are outbreak-related, have
been conducted in days. Either type of study can be used to study a wide array of health
problems, including infectious and non-infectious.
18. A, C, D. A cross-sectional study or survey provides a snapshot of the health of a population,
so it assesses prevalence rather than incidence. As a result, it is not as useful as a cohort or
case-control study for analytic epidemiology. However, a cross-sectional study can easily
measure prevalence of exposures and outcomes.
19. A. The epidemiologic triad of disease causation refers to agent-host-environment.
20. C. Onset of symptoms
D. Usual time of diagnosis
A. Exposure
21. A, B, C, D. A reservoir of an infectious agent is the habitat in which an agent normally lives,
grows, and multiplies, which may include humans, animals, and the environment.
22. B, C, D. Indirect transmission refers to the transmission of an infectious agent by suspended
airborne particles, inanimate objects (vehicles, food, water) or living intermediaries (vectors
such as mosquitoes). Droplet spread is generally considered short-distance direct
transmission.
23. A, B, D, E. Disease control measures are generally directed at eliminating the reservoir or
vector, interrupting transmission, or protecting (but not eliminating!) the host.
Introduction to Epidemiology
Page 1-92
24. A. Disease 1: usually 40–50 cases per week; last week, 48 cases
D. Disease 2: fewer than 10 cases per year; last week, 1 case
B. Disease 3: usually no more than 2–4 cases per week; last week, 13 cases
25. D. A propagated epidemic is one in which infection spreads from person to person.
Introduction to Epidemiology
Page 1-93
References
1. Last JM, editor. Dictionary of epidemiology. 4th
ed. New York: Oxford University Press;
2001. p. 61.
2. Cates W. Epidemiology: Applying principles to clinical practice. Contemp Ob/Gyn
1982;20:147–61.
3. Greenwood M. Epidemics and crowd-diseases: an introduction to the study of
epidemiology, Oxford University Press; 1935.
4. Thacker SB. Historical development. In: Teutsch SM, Churchill RE, editors. Principles and
practice of public health surveillance, 2nd
ed. New York: Oxford University Press; 2002. p.
1–16.
5. Snow J. Snow on cholera. London: Humphrey Milford: Oxford University Press; 1936.
6. Doll R, Hill AB. Smoking and carcinoma of the lung. Brit Med J 1950;2:739–48.
7. Kannel WB. The Framingham Study: its 50-year legacy and future promise. J Atheroscler
Thromb 2000;6:60–6.
8. Fenner F, Henderson DA, Arita I, Jezek Z, Ladnyi ID. Smallpox and its eradication.
Geneva: World Health Organization; 1988.
9. Morris JN. Uses of epidemiology. Edinburgh: Livingstone; 1957.
10. U.S. Department of Health and Human Services (HHS). Healthy people 2000: national
health promotion and disease prevention objectives. Washington, DC: HHS, Public Health
Service; 1991.
11. U.S. Department of Health and Human Services (HHS). Healthy people 2010. 2nd
ed.
Washington, DC: U.S. Government Printing Office (GPO); November 2000.
12. U.S. Department of Health and Human Services (HHS). Tracking healthy people 2010.
Washington, DC: GPO; November 2000.
13. Eidson M, Philen RM, Sewell CM, Voorhees R, Kilbourne EM. L-tryptophan and
eosinophilia-myalgia syndrome in New Mexico. Lancet 1990;335:645–8.
14. Kamps BS, Hoffmann C, editors. SARS Reference, 3rd ed. Flying Publisher, 2003.
Available from: http://www.sarsreference.com/index.htm.
15. Murphy TV, Gargiullo PM, Massoudi MS, et al. Intussusception among infants given an
oral rotavirus vaccine. N Eng J Med 2001;344:564–72.
16. Fraser DW, Tsai TR, Orenstein W, Parkin WE, Beecham HJ, Sharrar RG, et al.
Legionnaires’ disease: description of an epidemic of pneumonia. New Engl J Med 1977;
297:1189–97.
17. Tyler CW, Last JM. Epidemiology. In: Last JM, Wallace RB, editors. Maxcy-Rosenau-Last
public health and preventive medicine, 14th
ed. Norwalk (Connecticut): Appleton & Lange;
1992. p. 11.
Introduction to Epidemiology
Page 1-94
18. Orenstein WA, Bernier RH. Surveillance: information for action. Pediatr Clin North Am
1990; 37:709–34.
19. Wagner MM, Tsui FC, Espino JU, Dato VM, Sittig DF, Caruana FA, et al. The emerging
science of very early detection of disease outbreaks. J Pub Health Mgmt Pract 2001;6:51–9.
20. Centers for Disease Control and Prevention. Framework for evaluating public health
surveillance systems for early detection of outbreaks: recommendations from the CDC
Working Group. MMWR May 7, 2004; 53(RR05);1–11.
21. Centers for Disease Control and Prevention. Interim guidance on infection control
precautions for patients with suspected severe acute respiratory syndrome (SARS) and
close contacts in households. Available from:
http://emergency.cdc.gov/HAN/han00132.asp.
22. Beaglehole R, Bonita R, Kjellstrom T. Basic epidemiology. Geneva: World Health
Organization; 1993. p. 133.
23. Centers for Disease Control and Prevention. Updated guidelines for evaluating public
health surveillance systems: recommendations from the Guidelines Working Group.
MMWR Recommendations and Reports 2001:50(RR13).
24. Rothman KJ. Policy recommendations in epidemiology research papers. Epidemiol 1993;
4: 94–9.
25. Centers for Disease Control and Prevention. Case definitions for infectious conditions
under public health surveillance. MMWR Recomm Rep 1997:46(RR-10):1–55.
26. MacDonald P, Boggs J, Whitwam R, Beatty M, Hunter S, MacCormack N, et al. Listeria-
associated birth complications linked with homemade Mexican-style cheese, North
Carolina, October 2000 [abstract]. 50th Annual Epidemic Intelligence Service Conference;
2001 Apr 23-27; Atlanta, GA.
27. Centers for Disease Control and Prevention. Outbreak of severe acute respiratory
syndrome–worldwide, 2003. MMWR 2003: 52:226–8.
28. Centers for Disease Control and Prevention. Revised U.S. surveillance case definition for
severe acute respiratory syndrome (SARS) and update on SARS cases–United States and
worldwide, December 2003. MMWR 2003:52:1202–6.
29. Centers for Disease Control and Prevention. Indicators for chronic disease surveillance.
MMWR Recomm Rep 2004;53(RR-11):1–6.
30. Centers for Disease Control and Prevention. Summary of notifiable diseases–United States,
2001. MMWR 2001;50(53).
31. Arias E, Anderson RN, Hsiang-Ching K, Murphy SL, Kovhanek KD. Deaths: final data for
2001. National vital statistics reports; vol 52, no. 3. Hyattsville (Maryland): National
Center for Health Statistics; 2003.
32. Goodman RA, Smith JD, Sikes RK, Rogers DL, Mickey JL. Fatalities associated with farm
tractor injuries: an epidemiologic study. Public Health Rep 1985;100:329–33.
Introduction to Epidemiology
Page 1-95
33. Heyman DL, Rodier G. Global surveillance, national surveillance, and SARS. Emerg Infect
Dis. 2003;10:173–5.
34. American Cancer Society [Internet]. Atlanta: The American Cancer Society, Inc. Available
from: http://www.cancer.org/Research/CancerFactsFigures/cancer-facts-figures-2005/
35. Centers for Disease Control and Prevention. Current trends. Lung cancer and breast cancer
trends among women–Texas. MMWR 1984;33(MM19):266.
36. Liao Y, Tucker P, Okoro CA, Giles WH, Mokdad AH, Harris VB, et. al. REACH 2010
surveillance for health status in minority communities — United States, 2001–2002.
MMWR 2004;53:1–36.
37. Centers for Disease Control and Prevention. Asthma mortality — Illinois, 1979-1994.
MMWR. 1997;46(MM37):877–80.
38. Centers for Disease Control and Prevention. Hepatitis A outbreak associated with green
onions at a restaurant–Monaca, Pennsylvania, 2003. MMWR 2003; 52(47):1155–7.
39. Knowler WC, Barrett-Connor E, Fowler SE, Hamman RF, Lachin JM, Walker EA, Nathan
DM, Diabetes Prevention Program Research Group. Reduction in the incidence of type 2
diabetes with lifestyle intervention or metformin. N Engl J Med 2002;346:393–403.
40. Colditz GA, Manson JE, Hankinson SE. The Nurses’ Health Study: 20-year contribution to
the understanding of health among women. J Women’s Health 1997;49–62.
41. Centers for Disease Control and Prevention. Outbreak of Cyclosporiasis associated with
snow peas–Pennsylvania, 2004. MMWR 2004;53:876–8.
42. Rothman KJ. Causes. Am J Epidemiol 1976;104:587–92.
43. Mindel A, Tenant-Flowers M. Natural history and management of early HIV infection.
BMJ 2001;332:1290–93.
44. Cobb S, Miller M, Wald N. On the estimation of the incubation period in malignant
disease. J Chron Dis 1959;9:385–93.
45. Leavitt JW. Typhoid Mary: captive to the public’s health. Boston: Beacon Press; 1996.
46. Remington PL, Hall WN, Davis IH, Herald A, Gunn RA. Airborne transmission of measles
in a physician’s office. JAMA 1985;253:1575–7.
47. Kelsey JL, Thompson WD, Evans AS. Methods in observational epidemiology. New York:
Oxford University Press; 1986. p. 216.
48. Lee LA, Ostroff SM, McGee HB, Jonson DR, Downes FP, Cameron DN, et al. An
outbreak of shigellosis at an outdoor music festival. Am J Epidemiol 1991; 133:608–15.
49. White DJ, Chang H-G, Benach JL, Bosler EM, Meldrum SC, Means RG, et al. Geographic
spread and temporal increase of the Lyme disease epidemic. JAMA 1991;266:1230–6.
50. Centers for Disease Control and Prevention. Outbreak of West Nile-Like Viral
Encephalitis–New York, 1999. MMWR 1999;48(38):845–9.
Introduction to Epidemiology
Page 1-96
51. Centers for Disease Control and Prevention. Prevalence of overweight and obesity among
adults with diagnosed diabetes–United States, 1988-1994 and 1999-2002.MMWR
2004;53(45):1066–8.
52. National Center for Health Statistics [Internet]. Atlanta: Centers for Disease Control and
Prevention [updated 2005 Feb 8].
Websites
For more information on: Visit the following websites:
CDC’s Epidemic Intelligence Service http://www.cdc.gov/eis/
CDC’s framework for program
evaluation in public health
http://www.cdc.gov/mmwr/preview/mmwrhtml/rr4811a1.htm
Updated Guidelines for Evaluating
Public Health Surveillance Systems
http://www.cdc.gov/mmwr/preview/mmwrhtml/rr5013a1.htm
Case Definitions for Infectious
Conditions Under Public Health
Surveillance
http://www.cdc.gov/osels/ph_surveillance/nndss/casedef/
John Snow http://www.ph.ucla.edu/epi/snow.html
Summarizing Data
Page 2-1
SUMMARIZING DATA
Imagine that you work in a county health department and are faced with
two challenges. First, a case of hepatitis B is reported to the health
department. The patient, a 40-year-old man, denies having either of the
two common risk factors for the disease: he has never used injection drugs
and has been in a monogamous relationship with his wife for twelve years.
However, he remembers going to the dentist for some bridge work
approximately three months earlier. Hepatitis B has occasionally been
transmitted between dentist and patients, particularly before dentists routinely wore gloves.
Question: What proportion of other persons with new onset of hepatitis B reported recent
exposure to the same dentist, or to any dentist during their likely period of exposure?
Then, in the following week, the health department receives 61 death certificates. A new
employee in the Vital Statistics office wonders how many death certificates the health
department usually receives each week.
Question: What is the average number of death certificates the health department receives each
week? By how much does this number vary? What is the range over the past year?
If you were given the appropriate raw data, would you be able to answer these two questions
confidently? The materials in this lesson will allow you do so — and more.
Objectives
After studying this lesson and answering the questions in the exercises, you will be able to:
• Construct a frequency distribution
• Calculate and interpret four measures of central location: mode, median, arithmetic
mean, and geometric mean
• Apply the most appropriate measure of central location for a frequency distribution
• Apply and interpret four measures of spread: range, interquartile range, standard
deviation, and confidence interval (for mean)
Major Sections
Organizing Data........................................................................................................................... 2-2
Types of Variables ....................................................................................................................... 2-4
Frequency Distributions............................................................................................................... 2-7
Properties of Frequency Distributions ....................................................................................... 2-11
Methods for Summarizing Data................................................................................................. 2-15
Measures of Central Location.................................................................................................... 2-16
Measures of Spread.................................................................................................................... 2-36
Choosing the Right Measure of Central Location and Spread .................................................. 2-53
Summary.................................................................................................................................... 2-58
2
1
Summarizing Data
Page 2-2
Organizing Data
A variable can be any
characteristic that differs
from person to person,
such as height, sex,
smallpox vaccination
status, or physical activity
pattern. The value of a
variable is the number or
descriptor that applies to a
particular person, such as
5'6" (168 cm), female, and
never vaccinated.
Whether you are conducting routine surveillance, investigating an
outbreak, or conducting a study, you must first compile
information in an organized manner. One common method is to
create a line list or line listing. Table 2.1 is a typical line listing
from an epidemiologic investigation of an apparent cluster of
hepatitis A.
The line listing is one type of epidemiologic database, and is
organized like a spreadsheet with rows and columns. Typically,
each row is called a record or observation and represents one
person or case of disease. Each column is called a variable and
contains information about one characteristic of the individual,
such as race or date of birth. The first column or variable of an
epidemiologic database usually contains the person’s name,
initials, or identification number. Other columns might contain
demographic information, clinical details, and exposures possibly
related to illness.
Table 2.1 Line Listing of Hepatitis A Cases, County Health Department, January — February 2004
ID
Date of
Diagnosis Town
Age
(Years) Sex Hosp Jaundice Outbreak
IV
Drugs
IgM
Pos
Highest
ALT*
01 01/05 B 74 M Y N N N Y 232
02 01/06 J 29 M N Y N Y Y 285
03 01/08 K 37 M Y Y N N Y 3250
04 01/19 J 3 F N N N N Y 1100
05 01/30 C 39 M N Y N N Y 4146
06 02/02 D 23 M Y Y N Y Y 1271
07 02/03 F 19 M Y Y N N Y 300
08 02/05 I 44 M N Y N N Y 766
09 02/19 G 28 M Y N N Y Y 23
10 02/22 E 29 F N Y Y N Y 543
11 02/23 A 21 F Y Y Y N Y 1897
12 02/24 H 43 M N Y Y N Y 1220
13 02/26 B 49 F N N N N Y 644
14 02/26 H 42 F N N Y N Y 2581
15 02/27 E 59 F Y Y Y N Y 2892
16 02/27 E 18 M Y N Y N Y 814
17 02/27 A 19 M N Y Y N Y 2812
18 02/28 E 63 F Y Y Y N Y 4218
19 02/28 E 61 F Y Y Y N Y 3410
20 02/29 A 40 M N Y Y N Y 4297
* ALT = Alanine aminotransferase
Summarizing Data
Page 2-3
Some epidemiologic databases, such as line listings for a small
cluster of disease, may have only a few rows (records) and a
limited number of columns (variables). Such small line listings are
sometimes maintained by hand on a single sheet of paper. Other
databases, such as birth or death records for the entire country,
might have thousands of records and hundreds of variables and are
best handled with a computer. However, even when records are
computerized, a line listing with key variables is often printed to
facilitate review of the data.
Icon of the Epi Info
computer software
developed at CDC
One computer software package that is widely used by
epidemiologists to manage data is Epi Info, a free package
developed at CDC. Epi Info allows the user to design a
questionnaire, enter data right into the questionnaire, edit the data,
and analyze the data. Two versions are available:
Epi Info 3 (formerly Epi Info 2000 or Epi Info 2002) is
Windows-based, and continues to be supported and upgraded.
It is the recommended version and can be downloaded from
the CDC website: http://www.cdc.gov/epiinfo/downloads.htm.
Epi Info 6 is DOS-based, widely used, but being phased out.
This lesson includes Epi Info commands for creating frequency
distributions and calculating some of the measures of central
location and spread described in the lesson. Since Epi Info 3 is the
recommended version, only commands for this version are
provided in the text; corresponding commands for Epi Info 6 are
offered at the end of the lesson.
Summarizing Data
Page 2-4
Types of Variables
Look again at the variables (columns) and values (individual
entries in each column) in Table 2.1. If you were asked to
summarize these data, how would you do it?
First, notice that for certain variables, the values are numeric; for
others, the values are descriptive. The type of values influence the
way in which the variables can be summarized. Variables can be
classified into one of four types, depending on the type of scale
used to characterize their values (Table 2.2).
Table 2.2 Types of Variables
Scale Example Values
Nominal
Ordinal
 “categorical” or
/ “qualitative”
disease status ovarian
cancer
yes / no
Stage I, II, III, or IV
Interval
Ratio
 “continuous” or
/ “quantitative”
date of birth tuberculin
skin test
any date from recorded time to current
0 – ??? of induration
• A nominal-scale variable is one whose values are categories
without any numerical ranking, such as county of residence. In
epidemiology, nominal variables with only two categories are
very common: alive or dead, ill or well, vaccinated or
unvaccinated, or did or did not eat the potato salad. A nominal
variable with two mutually exclusive categories is sometimes
called a dichotomous variable.
• An ordinal-scale variable has values that can be ranked but are
not necessarily evenly spaced, such as stage of cancer (see
Table 2.3).
• An interval-scale variable is measured on a scale of equally
spaced units, but without a true zero point, such as date of birth.
• A ratio-scale variable is an interval variable with a true zero
point, such as height in centimeters or duration of illness.
Nominal- and ordinal-scale variables are considered qualitative or
categorical variables, whereas interval- and ratio-scale variables
are considered quantitative or continuous variables. Sometimes
the same variable can be measured using both a nominal scale and
a ratio scale. For example, the tuberculin skin tests of a group of
persons potentially exposed to a co-worker with tuberculosis can
be measured as “positive” or “negative” (nominal scale) or in
millimeters of induration (ratio scale).
Summarizing Data
Page 2-5
Table 2.3 Example of Ordinal-Scale Variable: Stages of Breast Cancer*
Stage Tumor Size Lymph Node Involvement Metastasis (Spread)
I Less than 2 cm No No
II Between 2 and 5 cm No or in same side of breast No
III More than 5 cm Yes, on same side of breast No
IV Not applicable Not applicable Yes
* This table describes the stages of breast cancer. Note that each stage is more extensive than the previous one and
generally carries a less favorable prognosis, but you cannot say that the difference between Stages 1 and 3 is the
same as the difference between Stages 2 and 4.
Summarizing Data
Page 2-6
Exercise 2.1
For each of the variables listed below from the line listing in Table 2.1,
identify what type of variable it is.
A. Nominal
B. Ordinal
C. Interval
D. Ratio
________ 1. Date of diagnosis
________ 2. Town of residence
________ 3. Age (years)
________ 4. Sex
________ 5. Highest alanine aminotransferase (ALT)
Check your answers on page 2-59
Summarizing Data
Page 2-7
Frequency Distributions
Look again at the data in Table 2.1. How many of the cases (or
case-patients) are male?
When a database contains only a limited number of records, you
can easily pick out the information you need directly from the raw
data. By scanning the 5th
column, you can see that 12 of the 20
case-patients are male.
With larger databases, however, picking out the desired
information at a glance becomes increasingly difficult. To facilitate
the task, the variables can be summarized into tables called
frequency distributions.
A frequency distribution displays the values a variable can take
and the number of persons or records with each value. For
example, suppose you have data from a study of women with
ovarian cancer and wish to look at parity, that is, the number of
times each woman has given birth. To construct a frequency
distribution that displays these data:
• First, list all the values that the variable parity can take,
from the lowest possible value to the highest.
• Then, for each value, record the number of women who had
that number of births (twins and other multiple-birth
pregnancies count only once).
Table 2.4 displays what the resulting frequency distribution would
look like. Notice that the frequency distribution includes all values
of parity between the lowest and highest observed, even though
there were no women for some values. Notice also that each
column is clearly labeled, and that the total is given in the bottom
row.
Summarizing Data
Page 2-8
Table 2.4 Distribution of Case-Subjects by Parity (Ratio-Scale
Variable), Ovarian Cancer Study, CDC
Parity Number of Cases
0 45
1 25
2 43
3 32
4 22
5 8
6 2
7 0
8 1
9 0
10 1
Total 179
Data Sources: Lee NC, Wingo PA, Gwinn ML, Rubin GL, Kendrick JS, Webster LA, Ory HW.
The reduction in risk of ovarian cancer associated with oral contraceptive use. N Engl J Med
1987;316: 650–5.
Centers for Disease Control Cancer and Steroid Hormone Study. Oral contraceptive use and
the risk of ovarian cancer. JAMA 1983;249:1596–9.
To create a frequency
distribution from a data
set in Analysis Module:
Select frequencies, then
choose variable.
Table 2.4 displays the frequency distribution for a continuous
variable. Continuous variables are often further summarized with
measures of central location and measures of spread. Distributions
for ordinal and nominal variables are illustrated in Tables 2.5 and
2.6, respectively. Categorical variables are usually further
summarized as ratios, proportions, and rates (discussed in Lesson
3).
Table 2.5 Distribution of Cases by Stage of Disease (Ordinal-Scale
Variable), Ovarian Cancer Study, CDC
CASES
Stage Number Percent
I 45 20
II 11 5
III 104 58
IV 30 17
Total 179 100
Data Sources: Lee NC, Wingo PA, Gwinn ML, Rubin GL, Kendrick JS, Webster LA, Ory HW.
The reduction in risk of ovarian cancer associated with oral contraceptive use. N Engl J Med
1987;316: 650–5.
Centers for Disease Control Cancer and Steroid Hormone Study. Oral contraceptive use and
the risk of ovarian cancer. JAMA 1983;249:1596–9.
Summarizing Data
Page 2-9
Table 2.6 Distribution of Cases by Enrollment Site (Nominal-Scale
Variable), Ovarian Cancer Study, CDC
CASES
Enrollment Site Number Percent
Atlanta 18 10
Connecticut 39 22
Detroit 35 20
Iowa 30 17
New Mexico 7 4
San Francisco 33 18
Seattle 9 5
Utah 8 4
Total 179 100
Data Sources: Lee NC, Wingo PA, Gwinn ML, Rubin GL, Kendrick JS, Webster LA, Ory HW.
The reduction in risk of ovarian cancer associated with oral contraceptive use. N Engl J Med
1987;316: 650–5.
Centers for Disease Control Cancer and Steroid Hormone Study. Oral contraceptive use and
the risk of ovarian cancer. JAMA 1983;249:1596–9.
Epi Info Demonstration: Creating a Frequency Distribution
Scenario: In Oswego, New York, numerous people became sick with gastroenteritis after attending a church
picnic. To identify all who became ill and to determine the source of illness, an epidemiologist administered a
questionnaire to almost all of the attendees. The data from these questionnaires have been entered into an Epi
Info file called Oswego.
Question: In the outbreak that occurred in Oswego, how many of the participants became ill?
Answer: In Epi Info:
Select Analyzing Data.
Select Read (Import). The default data set should be Sample.mdb. Under Views, scroll down to
view OSWEGO, and double click, or click once and then click OK.
Select Frequencies. Then click on the down arrow beneath Frequency of, scroll down and select
ILL, then click OK.
The resulting frequency distribution should indicate 46 ill persons, and 29 persons not ill.
Your Turn: How many of the Oswego picnic attendees drank coffee? [Answer: 31]
Summarizing Data
Page 2-10
Exercise 2.2
At an influenza immunization clinic at a retirement community, residents
were asked in how many previous years they had received influenza
vaccine. The answers from the first 19 residents are listed below. Organize
these data into a frequency distribution.
2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1
Check your answers on page 2-59
Summarizing Data
Page 2-11
Properties of Frequency Distributions
Graphing will be covered
in Lesson 4
The data in a frequency distribution can be graphed. We call this
type of graph a histogram. Figure 2.1 is a graph of the number of
outbreak-related salmonellosis cases by date of illness onset.
Figure 2.1 Number of Outbreak-Related Salmonellosis Cases by Date of
Onset of Illness — United States, June–July 2004
Source: Centers for Disease Control and Prevention. Outbreaks of Salmonella infections
associated with eating Roma tomatoes–United States and Canada, 2004. MMWR 54;325–8.
Even a quick look at this graph reveals three features:
• where the distribution has its peak (central location),
• how widely dispersed it is on both sides of the peak (spread),
and
• whether it is more or less symmetrically distributed on the two
sides of the peak.
Central location
Note that the data in Figure 2.1 seem to cluster around a central
value, with progressively fewer persons on either side of this
central value. This type of symmetric distribution, as illustrated in
Figure 2.2, is the classic bell-shaped curve — also known as a
normal distribution. The clustering at a particular value is known
as the central location or central tendency of a frequency
distribution. The central location of a distribution is one of its most
important properties. Sometimes it is cited as a single value that
summarizes the entire distribution. Figure 2.3 illustrates the graphs
of three frequency distributions identical in shape but with
different central locations.
Summarizing Data
Page 2-12
Figure 2.2 Bell-Shaped Curve
Figure 2.3 Three Identical Curves with Different Central Locations
Three measures of central location are commonly used in
epidemiology: arithmetic mean, median, and mode. Two other
measures that are used less often are the midrange and geometric
mean. All of these measures will be discussed later in this lesson.
Depending on the shape of the frequency distribution, all measures
of central location can be identical or different. Additionally,
measures of central location can be in the middle or off to one side
or the other.
Summarizing Data
Page 2-13
Spread
A second property of frequency distribution is spread (also called
variation or dispersion). Spread refers to the distribution out from a
central value. Two measures of spread commonly used in
epidemiology are range and standard deviation. For most
distributions seen in epidemiology, the spread of a frequency
distribution is independent of its central location. Figure 2.4
illustrates three theoretical frequency distributions that have the
same central location but different amounts of spread. Measures of
spread will be discussed later in this lesson.
Figure 2.4 Three Distributions with Same Central Location but Different
Spreads
Shape
A third property of a frequency distribution is its shape. The
graphs of the three theoretical frequency distributions in Figure 2.4
were completely symmetrical. Frequency distributions of some
characteristics of human populations tend to be symmetrical. On
the other hand, the data on parity in Figure 2.5 are asymmetrical or
more commonly referred to as skewed.
Skewness refers to the
tail, not the hump. So a
distribution that is skewed
to the left has a long left
tail.
Summarizing Data
Page 2-14
Figure 2.5 Distribution of Case-Subjects by Parity, Ovarian Cancer
Study, CDC
Data Sources: Lee NC, Wingo PA, Gwinn ML, Rubin GL, Kendrick JS, Webster LA, Ory HW.
The reduction in risk of ovarian cancer associated with oral contraceptive use. N Engl J Med
1987;316: 650–5.
Centers for Disease Control Cancer and Steroid Hormone Study. Oral contraceptive use and
the risk of ovarian cancer. JAMA 1983;249:1596–9.
A distribution that has a central location to the left and a tail off to
the right is said to be positively skewed or skewed to the right. In
Figure 2.6, distribution A is skewed to the right. A distribution that
has a central location to the right and a tail to the left is said to be
negatively skewed or skewed to the left. In Figure 2.6, distribution
C is skewed to the left.
Figure 2.6 Three Distributions with Different Skewness
Summarizing Data
Page 2-15
Question: How would you describe the parity data in Figure 2.5?
Answer: Figure 2.5 is skewed to the right. Skewing to the right is
common in distributions that begin with zero, such as number of
servings consumed, number of sexual partners in the past month,
and number of hours spent in vigorous exercise in the past week.
One distribution deserves special mention — the Normal or
Gaussian distribution. This is the classic symmetrical bell-shaped
curve like the one shown in Figure 2.2. It is defined by a
mathematical equation and is very important in statistics. Not only
do the mean, median, and mode coincide at the central peak, but
the area under the curve helps determine measures of spread such
as the standard deviation and confidence interval covered later in
this lesson.
Methods for Summarizing Data
Knowing the type of variable helps you decide how to summarize
the data. Table 2.7 displays the ways in which different variables
might be summarized.
Table 2.7 Methods for Summarizing Different Types of Variables
Scale
Ratio or
Proportion
Measure of
Central Location
Measure of
Spread
Nominal yes no no
Ordinal yes no no
Interval yes, but might
need to group first
yes yes
Ratio yes, but might
need to group first
yes yes
Summarizing Data
Page 2-16
Measure of central
location: a single, usually
central, value that best
represents an entire
distribution of data.
Measures of Central Location
A measure of central location provides a single value that
summarizes an entire distribution of data. Suppose you had data
from an outbreak of gastroenteritis affecting 41 persons who had
recently attended a wedding. If your supervisor asked you to
describe the ages of the affected persons, you could simply list the
ages of each person. Alternatively, your supervisor might prefer
one summary number — a measure of central location. Saying
that the mean (or average) age was 48 years rather than reciting 41
ages is certainly more efficient, and most likely more meaningful.
Measures of central location include the mode, median, arithmetic
mean, midrange, and geometric mean. Selecting the best measure
to use for a given distribution depends largely on two factors:
• The shape or skewness of the distribution, and
• The intended use of the measure.
Each measure — what it is, how to calculate it, and when best to
use it — is described in this section.
Mode
Definition of mode
The mode is the value that occurs most often in a set of data. It can
be determined simply by tallying the number of times each value
occurs. Consider, for example, the number of doses of diphtheria-
pertussis-tetanus (DPT) vaccine each of seventeen 2-year-old
children in a particular village received:
0, 0, 1, 1, 2, 2, 2, 3, 3, 3, 3, 3, 3, 4, 4, 4, 4
Two children received no doses; two children received 1 dose;
three received 2 doses; six received 3 doses; and four received all 4
doses. Therefore, the mode is 3 doses, because more children
received 3 doses than any other number of doses.
Method for identifying the mode
Step 1. Arrange the observations into a frequency distribution,
indicating the values of the variable and the frequency
with which each value occurs. (Alternatively, for a data
set with only a few values, arrange the actual values in
ascending order, as was done with the DPT vaccine doses
above.)
Identify the value that occurs most often.
Summarizing Data
Page 2-17
EXAMPLES: Identifying the Mode
Example A: Table 2.8 (on page 2-17) provides data from 30 patients who were hospitalized and received
antibiotics. For the variable “length of stay” (LOS) in the hospital, identify the mode.
Step 1. Arrange the data in a frequency distribution.
LOS Frequency LOS Frequency LOS Frequency
0 1 10 5 20 0
1 0 11 1 21 0
2 1 12 3 22 1
3 1 13 1 . 0
4 1 14 1 . 0
5 2 15 0 27 1
6 1 16 1 . 0
7 1 17 0 . 0
8 1 18 2 49 1
9 3 19 1
Alternatively, arrange the values in ascending order.
0, 2, 3, 4, 5, 5, 6, 7, 8, 9,
9, 9, 10, 10, 10, 10, 10, 11, 12, 12,
12, 13, 14, 16, 18, 18, 19, 22, 27, 49,
Step 2. Identify the value that occurs most often.
Most values appear once, but the distribution includes two 5s, three 9s, five 10s, three 12s, and two 18s.
Because 10 appears most frequently, the mode is 10.
Example B: Find the mode of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days.
Step 1. Arrange the values in ascending order.
15, 22, 27, 30, and 31 days
Step 2. Identify the value that occurs most often.
None
Note: When no value occurs more than once, the distribution is said to have no mode.
Example C: Find the mode of the following incubation periods for Bacillus cereus food poisoning:
2, 3, 3, 3, 3, 3, 4, 4, 5, 6, 7, 9, 10, 11, 11, 12, 12, 12, 12, 12, 14, 14, 15, 17, 18, 20, 21 hours
Step 1. Arrange the values in ascending order.
Done
Step 2. Identify the values that occur most often.
Five 3s and five 12s
Example C illustrates the fact that a frequency distribution can have more than one mode. When this occurs, the
distribution is said to be bi-modal. Indeed, Bacillus cereus is known to cause two syndromes with different
incubation periods: a short-incubation-period (1–6 hours) syndrome characterized by vomiting; and a long-
incubation-period (6–24 hours) syndrome characterized by diarrhea.
Summarizing Data
Page 2-18
Table 2.8 Sample Data from the Northeast Consortium Vancomycin Quality Improvement Project
ID
Admission
Date
Discharge
Date LOS
DOB
(mm/dd)
DOB
(year) Age Sex ESRD
No. Days
Vancomycin
Vancomycin
OK?
1 1/01 1/10 9 11/18 1928 66 M Y 3 N
2 1/08 1/30 22 01/21 1916 78 F N 10 Y
3 1/16 3/06 49 04/22 1920 74 F N 32 Y
4 1/23 2/04 12 05/14 1919 75 M N 5 Y
5 1/24 2/01 8 08/17 1929 65 M N 4 N
6 1/27 2/14 18 01/11 1918 77 M N 6 Y
7 2/06 2/16 10 01/09 1920 75 F N 2 Y
8 2/12 2/22 10 06/12 1927 67 M N 1 N
9 2/22 3/04 10 05/09 1915 79 M N 8 N
10 2/22 3/08 14 04/09 1920 74 F N 10 N
11 2/25 3/04 7 07/28 1915 79 F N 4 N
12 3/02 3/14 12 04/24 1928 66 F N 8 N
13 3/11 3/17 6 11/09 1925 69 M N 3 N
14 3/18 3/23 5 04/08 1924 70 F N 2 N
15 3/19 3/28 9 09/13 1915 79 F N 1 Y
16 3/27 4/01 5 01/28 1912 83 F N 4 Y
17 3/31 4/02 2 03/14 1921 74 M N 2 Y
18 4/12 4/24 12 02/07 1927 68 F N 3 N
19 4/17 5/06 19 03/04 1921 74 F N 11 Y
20 4/29 5/26 27 02/23 1921 74 F N 14 N
21 5/11 5/15 4 05/05 1923 72 M N 4 Y
22 5/14 5/14 0 01/03 1911 84 F N 1 N
23 5/20 5/30 10 11/11 1922 72 F N 9 Y
24 5/21 6/08 18 08/08 1912 82 M N 14 Y
25 5/26 6/05 10 09/28 1924 70 M Y 5 N
26 5/27 5/30 3 05/14 1899 96 F N 2 N
27 5/28 6/06 9 07/22 1921 73 M N 1 Y
28 6/07 6/20 13 12/30 1896 98 F N 3 N
29 6/07 6/23 16 08/31 1906 88 M N 1 N
30 6/16 6/27 11 07/07 1917 77 F N 7 Y
Summarizing Data
Page 2-19
Properties and uses of the mode
The mode is the easiest measure of central location to understand
and explain. It is also the easiest to identify, and requires no
calculations.
• The mode is the preferred measure of central location for
addressing which value is the most popular or the most
common. For example, the mode is used to describe which day
of the week people most prefer to come to the influenza
vaccination clinic, or the “typical” number of doses of DPT the
children in a particular community have received by their
second birthday.
• As demonstrated, a distribution can have a single mode.
However, a distribution has more than one mode if two or more
values tie as the most frequent values. It has no mode if no
value appears more than once.
• The mode is used almost exclusively as a “descriptive”
measure. It is almost never used in statistical manipulations or
analyses.
• The mode is not typically affected by one or two extreme values
(outliers).
To identify the mode from
a data set in Analysis
Module:
Epi Info does not have a
Mode command. Thus, the
best way to identify the
mode is to create a
histogram and look for the
tallest column(s).
Select graphs, then
choose histogram under
Graph Type.
The tallest column(s)
is(are) the mode(s).
NOTE: The Means
command provides a
mode, but only the lowest
value if a distribution has
more than one mode.
Summarizing Data
Page 2-20
Exercise 2.3
Using the same vaccination data as in Exercise 2.2, find the mode. (If you
answered Exercise 2.2, find the mode from your frequency distribution.)
2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1
Check your answers on page 2-59
Summarizing Data
Page 2-21
Median
Definition of median
The median is the middle value of a set of data that has been put
into rank order. Similar to the median on a highway that divides
the road in two, the statistical median is the value that divides the
data into two halves, with one half of the observations being
smaller than the median value and the other half being larger.
The median is also the 50th
percentile of the distribution.
Suppose you had the following ages in years for patients with a
particular illness:
4, 23, 28, 31, 32
The median age is 28 years, because it is the middle value, with
two values smaller than 28 and two values larger than 28.
Method for identifying the median
Step 1. Arrange the observations into increasing or decreasing
order.
Step 2. Find the middle position of the distribution by using the
following formula:
Middle position = (n + 1) / 2
a. If the number of observations (n) is odd, the middle
position falls on a single observation.
b. If the number of observations is even, the middle
position falls between two observations.
Step 3. Identify the value at the middle position.
a. If the number of observations (n) is odd and the
middle position falls on a single observation, the
median equals the value of that observation.
b. If the number of observations is even and the middle
position falls between two observations, the median
equals the average of the two values.
To identify the median
from a data set in Analysis
Module:
Click on the Means
command under the
Statistics folder.
In the Means Of drop-
down box, select the
variable of interest
 Select Variable
Click OK
 You should see the
list of the frequency
by the variable you
selected. Scroll down
until you see the
Median among other
data.
Summarizing Data
Page 2-22
EXAMPLES: Identifying the Median
Example A: Odd Number of Observations
Find the median of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days.
Step 1. Arrange the values in ascending order.
15, 22, 27, 30, and 31 days
Step 2. Find the middle position of the distribution by using (n + 1) / 2.
Middle position = (5 + 1) / 2 = 6 / 2 = 3
Therefore, the median will be the value at the third observation.
Step 3. Identify the value at the middle position.
Third observation = 27 days
Example B: Even Number of Observations
Suppose a sixth case of hepatitis was reported. Now find the median of the following incubation periods for hepatitis
A: 27, 31, 15, 30, 22 and 29 days.
Step 1. Arrange the values in ascending order.
15, 22, 27, 29, 30, and 31 days
Step 2. Find the middle position of the distribution by using (n + 1) / 2.
Middle location = 6 + 1 / 2 = 7 / 2 = 3½
Therefore, the median will be a value halfway between the values of the third and fourth observations.
Step 3. Identify the value at the middle position.
The median equals the average of the values of the third (value = 27) and fourth (value = 29) observations:
Median = (27 + 29) / 2 = 28 days
Summarizing Data
Page 2-23
Epi Info Demonstration: Finding the Median
Question: In the data set named SMOKE, what is the median number of cigarettes smoked per day?
Answer: In Epi Info:
Select Analyze Data.
Select Read (Import). The default data set should be Sample.mdb. Under Views, scroll down to view
SMOKE, and double click, or click once and then click OK.
Select Means. Then click on the down arrow beneath Means of, scroll down and select NUMCIGAR, then
click OK.
The resulting output should indicate a median of 20 cigarettes smoked per day.
Your Turn: What is the median height of the participants in the smoking study? (Note: The variable is coded as
feet-inch-inch, so 5'1" is coded as 501.) [Answer: 503]
Properties and uses of the median
• The median is a good descriptive measure, particularly for data
that are skewed, because it is the central point of the
distribution.
• The median is relatively easy to identify. It is equal to either a
single observed value (if odd number of observations) or the
average of two observed values (if even number of
observations).
• The median, like the mode, is not generally affected by one or
two extreme values (outliers). For example, if the values on the
previous page had been 4, 23, 28, 31, and 131 (instead of 31),
the median would still be 28.
• The median has less-than-ideal statistical properties. Therefore,
it is not often used in statistical manipulations and analyses.
Summarizing Data
Page 2-24
Exercise 2.4
Determine the median for the same vaccination data used in Exercises 2.2.
and 2.3.
2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1
Check your answers on page 2-59
Summarizing Data
Page 2-25
Arithmetic mean
Definition of mean
The arithmetic mean is a more technical name for what is more
commonly called the mean or average. The arithmetic mean is the
value that is closest to all the other values in a distribution.
Method for calculating the mean
Step 1.Add all of the observed values in the distribution.
Step 2.Divide the sum by the number of observations.
EXAMPLE: Finding the Mean
Find the mean of the following incubation periods for hepatitis A: 27, 31, 15, 30,
and 22 days.
Step 1. Add all of the observed values in the distribution.
27 + 31 + 15 + 30 + 22 = 125
Step 2. Divide the sum by the number of observations.
125 / 5 = 25.0
Therefore, the mean incubation period is 25.0 days.
• The mean has excellent statistical properties and is commonly
used in additional statistical manipulations and analyses. One
such property is called the centering property of the mean.
When the mean is subtracted from each observation in the data
set, the sum of these differences is zero (i.e., the negative sum is
equal to the positive sum). For the data in the previous hepatitis
A example:
Value minus Mean Difference
15 – 25.0 -10.0
22 – 25.0 -3.0
27 – 25.0 + 2.0
30 – 25.0 + 5.0
31 – 25.0 + 6.0
125 – 125.0 = 0 + 13.0 - 13.0 = 0
To identify the mean from
a data set in Analysis
Module:
Click on the Means
command under the
Statistics folder
In the Means Of drop-
down box, select the
variable of interest
 Select Variable
Click OK
 You should see the
list of the frequency by
the variable you
selected. Scroll down
until you see the Mean
among other data.
Properties and uses of the arithmetic mean
Summarizing Data
Page 2-26
This demonstrates that the mean is the arithmetic center of the
distribution.
• Because of this centering property, the mean is sometimes
called the center of gravity of a frequency distribution. If the
frequency distribution is plotted on a graph, and the graph is
balanced on a fulcrum, the point at which the distribution would
balance would be the mean.
• The arithmetic mean is the best descriptive measure for data that
are normally distributed.
• On the other hand, the mean is not the measure of choice for
data that are severely skewed or have extreme values in one
direction or another. Because the arithmetic mean uses all of the
observations in the distribution, it is affected by any extreme
value. Suppose that the last value in the previous distribution
was 131 instead of 31. The mean would be 225 / 5 = 45.0 rather
than 25.0. As a result of one extremely large value, the mean is
much larger than all values in the distribution except the
extreme value (the “outlier”).
Epi Info Demonstration: Finding the Median
Question: In the data set named SMOKE, what is the mean weight of the participants?
Answer: In Epi Info:
Select Analyze Data.
Select Read (Import). The default data set should be Sample.mdb. Under Views, scroll down to
view SMOKE, and double click, or click once and then click OK. Note that 9 persons have a
weight of 777, and 10 persons have a weight of 999. These are code for “refused” and
“missing.” To delete these records, enter the following commands:
Click on Select. Then type in the weight < 770, or select weight from available values, then type
< 750, and click on OK.
Select Means. Then click on the down arrow beneath Means of, scroll down and select WEIGHT, then
click OK.
The resulting output should indicate a mean weight of 158.116 pounds.
Your Turn: What is the mean number of cigarettes smoked per day? [Answer: 17]
Mean: the center of
gravity of the
distribution
Summarizing Data
Page 2-27
Exercise 2.5
Determine the mean for the same set of vaccination data.
2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1
Check your answers on page 2-60
Summarizing Data
Page 2-28
The midrange (midpoint of an interval)
Definition of midrange
The midrange is the half-way point or the midpoint of a set of
observations. The midrange is usually calculated as an
intermediate step in determining other measures.
Method for identifying the midrange
Step 1. Identify the smallest (minimum) observation and the
largest (maximum) observation.
Step 2. Add the minimum plus the maximum, then divide by two.
Exception: Age differs from most other variables because age does
not follow the usual rules for rounding to the nearest integer.
Someone who is 17 years and 360 days old cannot claim to be 18
year old for at least 5 more days. Thus, to identify the midrange for
age (in years) data, you must add the smallest (minimum)
observation plus the largest (maximum) observation plus 1, then
divide by two.
Midrange (most types of data) = (minimum + maximum) / 2
Midrange (age data) = (minimum + maximum + 1) / 2
Consider the following example:
In a particular pre-school, children are assigned to rooms on the
basis of age on September 1. Room 2 holds all of the children who
were at least 2 years old but not yet 3 years old as of September 1.
In other words, every child in room 2 was 2 years old on
September 1. What is the midrange of ages of the children in room
2 on September 1?
For descriptive purposes, a reasonable answer is 2. However, recall
that the midrange is usually calculated as an intermediate step in
other calculations. Therefore, more precision is necessary.
Consider that children born in August have just turned 2 years old.
Others, born in September the previous year, are almost but not
quite 3 years old. Ignoring seasonal trends in births and assuming a
very large room of children, birthdays are expected to be uniformly
distributed throughout the year. The youngest child, born on
September 1, is exactly 2.000 years old. The oldest child, whose
birthday is September 2 of the previous year, is 2.997 years old.
For statistical purposes, the mean and midrange of this theoretical
group of 2-year-olds are both 2.5 years.
Summarizing Data
Page 2-29
Properties and uses of the midrange
• The midrange is not commonly reported as a measure of central
location.
• The midrange is more commonly used as an intermediate step in
other calculations, or for plotting graphs of data collected in
intervals.
EXAMPLES: Identifying the Midrange
Example A: Find the midrange of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days.
Step 1. Identify the minimum and maximum values.
Minimum = 15, maximum = 31
Step 2. Add the minimum plus the maximum, then divide by two.
Midrange = 15 + 31 / 2 = 46 / 2 = 23 days
Example B: Find the midrange of the grouping 15–24 (e.g., number of alcoholic beverages consumed in one
week).
Step 1. Identify the minimum and maximum values.
Minimum = 15, maximum = 24
Step 2. Add the minimum plus the maximum, then divide by two.
Midrange = 15 + 24 / 2 = 39 / 2 = 19.5
This calculation assumes that the grouping 15–24 really covers 14.50–24.49…. Since the midrange of 14.50–24.49…
= 19.49…, the midrange can be reported as 19.5.
Example C: Find the midrange of the age group 15–24 years.
Step 1. Identify the minimum and maximum values.
Minimum = 15, maximum = 24
Step 2. Add the minimum plus the maximum plus 1, then divide by two.
Midrange = (15 + 24 + 1) / 2 = 40 / 2 = 20 years
Age differs from the majority of other variables because age does not follow the usual rules for rounding to the
nearest integer. For most variables, 15.99 can be rounded to 16. However, an adolescent who is 15 years and 360
days old cannot claim to be 16 years old (and hence get his driver’s license or learner’s permit) for at least 5 more
days. Thus, the interval of 15–24 years really spans 15.0–24.99… years. The midrange of 15.0 and 24.99… =
19.99… = 20.0 years.
Summarizing Data
Page 2-30
Geometric mean
Definition of geometric mean
The geometric mean is the mean or average of a set of data
measured on a logarithmic scale. The geometric mean is used
when the logarithms of the observations are distributed normally
(symmetrically) rather than the observations themselves. The
geometric mean is particularly useful in the laboratory for data
from serial dilution assays (1/2, 1/4, 1/8, 1/16, etc.) and in
environmental sampling data.
To calculate the geometric
mean, you need a
scientific calculator with
log and yx
keys.
More About Logarithms
A logarithm is the power to which a base is raised.
To what power would you need to raise a base of 10 to get a value of 100?
Because 10 times 10 or 102
equals 100, the log of 100 at base 10 equals 2. Similarly, the log of 16 at base 2
equals 4, because 24
= 2 x 2 x 2 x 2 = 16.
20
= 1 (anything raised to the 0 power is 1)
21
= 2 = 2
22
= 2 x 2 = 4
23
= 2 x 2 x 2 = 8
24
= 2 x 2 x 2 x 2 = 16
25
= 2 x 2 x 2 x 2 x 2 = 32
26
= 2 x 2 x 2 x 2 x 2 x 2 = 64
27
= 2 x 2 x 2 x 2 x 2 x 2 x 2 = 128
and so on.
100
= 1 (Anything raised to the 0 power equals 1)
101
= 10
102
= 100
103
= 1,000
104
= 10,000
105
= 100,000
106
= 1,000,000
107
= 10,000,000
and so on.
An antilog raises the base to the power (logarithm). For example, the antilog of 2 at base 10 is 102
, or 100. The
antilog of 4 at base 2 is 24
, or 16. The majority of titers are reported as multiples of 2 (e.g., 2, 4, 8, etc.);
therefore, base 2 is typically used when dealing with titers.
Method for calculating the geometric mean
There are two methods for calculating the geometric mean.
Method A
Step 1. Take the logarithm of each value.
Step 2. Calculate the mean of the log values by summing the log
values, then dividing by the number of observations.
Step 3. Take the antilog of the mean of the log values to get the
geometric mean.
Method B
Step 1. Calculate the product of the values by multiplying all of
the values together.
Step 2. Take the nth
root of the product (where n is the number of
observations) to get the geometric mean.
Summarizing Data
Page 2-31
EXAMPLES: Calculating the Geometric Mean
Example A: Using Method A
Calculate the geometric mean from the following set of data.
10, 10, 100, 100, 100, 100, 10,000, 100,000, 100,000, 1,000,000
Because these values are all multiples of 10, it makes sense to use logs of base 10.
Step 1. Take the log (in this case, to base 10) of each value.
log10(xi) = 1, 1, 2, 2, 2, 2, 4, 5, 5, 6
Step 2. Calculate the mean of the log values by summing and dividing by the number of observations (in this
case, 10).
Mean of log10(xi) = (1+1+2+2+2+2+4+5+5+6) / 10 = 30 / 10 = 3
Step 3. Take the antilog of the mean of the log values to get the geometric mean.
Antilog10(3) = 103
= 1,000.
The geometric mean of the set of data is 1,000.
Example B: Using Method B
Calculate the geometric mean from the following 95% confidence intervals of an odds ratio: 1.0, 9.0.
Step 1. Calculate the product of the values by multiplying all values together.
1.0 x 9.0 = 9.0
Step 2. Take the square root of the product.
The geometric mean = square root of 9.0 = 3.0.
Summarizing Data
Page 2-32
Properties and uses of the geometric mean
The geometric mean is the average of logarithmic values,
converted back to the base. The geometric mean tends to dampen
the effect of extreme values and is always smaller than the
corresponding arithmetic mean. In that sense, the geometric mean
is less sensitive than the arithmetic mean to one or a few extreme
values.
• The geometric mean is the measure of choice for variables
measured on an exponential or logarithmic scale, such as
dilutional titers or assays.
• The geometric mean is often used for environmental samples,
when levels can range over several orders of magnitude. For
example, levels of coliforms in samples taken from a body of
water can range from less than 100 to more than 100,000.
Scientific Calculator Tip
On most scientific
calculators, the sequence
for calculating a geometric
mean is:
• Enter a data point.
• Press either the <Log>
or <Ln> function key.
• Record the result or
store it in memory.
• Repeat for all values.
• Calculate the mean or
average of these log
values.
• Calculate the antilog
value of this mean
(<10x
> key if you used
<Log> key, <ex
> key if
you used <Ln> key).
Practice: Find the
geometric mean of 10, 100
and 1000 using a scientific
calculator.
Enter:
Calculator
Displays:
10 10
LOG 1
+ 1
100 100
LOG 2
+ 3
1000 1000
LOG 3
= 6
3 3
= 2
10x 100
Summarizing Data
Page 2-33
Exercise 2.6
Using the dilution titers shown below, calculate the geometric mean titer of
convalescent antibodies against tularemia among 10 residents of Martha’s
Vineyard. [Hint: Use only the second number in the ratio, i.e., for 1:640, use
640.]
ID # Acute Convalescent
1 1:16 1:512
2 1:16 1:512
3 1:32 1:128
4 not done 1:512
5 1:32 1:1024
6 “negative” 1:1024
7 1:256 1:2048
8 1:32 1:128
9 “negative” 1:4096
10 1:16 1:1024
Check your answers on page 2-60
Summarizing Data
Page 2-34
Selecting the appropriate measure
Measures of central location are single values that summarize the
observed values of a distribution. The mode provides the most
common value, the median provides the central value, the
arithmetic mean provides the average value, the midrange provides
the midpoint value, and the geometric mean provides the
logarithmic average.
The mode and median are useful as descriptive measures.
However, they are not often used for further statistical
manipulations. In contrast, the mean is not only a good descriptive
measure, but it also has good statistical properties. The mean is
used most often in additional statistical manipulations.
While the arithmetic mean is the measure of choice when data are
normally distributed, the median is the measure of choice for data
that are not normally distributed. Because epidemiologic data tend
not to be normally distributed (incubation periods, doses, ages of
patients), the median is often preferred. The geometric mean is
used most commonly with laboratory data, particularly dilution
titers or assays and environmental sampling data.
The arithmetic mean uses all the data, which makes it sensitive to
outliers. Although the geometric mean also uses all the data, it is
not as sensitive to outliers as the arithmetic mean. The midrange,
which is based on the minimum and maximum values, is more
sensitive to outliers than any other measures. The mode and
median tend not to be affected by outliers.
In summary, each measure of central location — mode, median,
mean, midrange, and geometric mean — is a single value that is
used to represent all of the observed values of a distribution. Each
measure has its advantages and limitations. The selection of the
most appropriate measure requires judgment based on the
characteristics of the data (e.g., normally distributed or skewed,
with or without outliers, arithmetic or log scale) and the reason for
calculating the measure (e.g., for descriptive or analytic purposes).
Summarizing Data
Page 2-35
Exercise 2.7
For each of the variables listed below from the line listing in Table 2.9,
identify which measure of central location is best for representing the data.
A. Mode
B. Median
C. Mean
D. Geometric mean
E. No measure of central location is appropriate
_____ 1. Year of diagnosis
_____ 2. Age (years)
_____ 3. Sex
_____ 4. Highest IFA titer
_____ 5. Platelets x 106
/L
_____ 6. White blood cell count x 109
/L
Table 2.9 Line Listing for 12 Patients with Human Monocytotropic Ehrlichiosis — Missouri, 1998–1999
Patient ID
Year of
Diagnosis
Age
(years) Sex
Highest
IFA* Titer
Platelets
x 106
/L
White Blood Cell
Count x 109
/L
01 1999 44 M 1:1024 90 1.9
02 1999 42 M 1:512 114 3.5
03 1999 63 M 1:2048 83 6.4
04 1999 53 F 1:512 180 4.5
05 1999 77 M 1:1024 44 3.5
06 1999 43 F 1:512 89 1.9
10 1998 22 F 1:128 142 2.1
11 1998 59 M 1:256 229 8.8
12 1998 67 M 1:512 36 4.2
14 1998 49 F 1:4096 271 2.6
15 1998 65 M 1:1024 207 4.3
18 1998 27 M 1:64 246 8.5
Mean: 1998.5 50.92 na 1:976.00 144.25 4.35
Median: 1998.5 51 na 1:512 128 3.85
Geometric Mean: 1998.5 48.08 na 1:574.70 120.84 3.81
Mode: none none M 1:512 none 1.9, 3.5
* Immunofluorescence assay
Data Source: Olano JP, Masters E, Hogrefe W, Walker DH. Human monocytotropic ehrlichiosis, Missouri. Emerg Infect
Dis 2003;9:1579-86.
Check your answers on page 2-60
Summarizing Data
Page 2-36
Measures of Spread
Spread, or dispersion, is the second important feature of frequency
distributions. Just as measures of central location describe where
the peak is located, measures of spread describe the dispersion (or
variation) of values from that peak in the distribution. Measures of
spread include the range, interquartile range, and standard
deviation.
Range
Definition of range
The range of a set of data is the difference between its largest
(maximum) value and its smallest (minimum) value. In the
statistical world, the range is reported as a single number and is the
result of subtracting the maximum from the minimum value. In the
epidemiologic community, the range is usually reported as “from
(the minimum) to (the maximum),” that is, as two numbers rather
than one.
Method for identifying the range
Step 1. Identify the smallest (minimum) observation and the
largest (maximum) observation.
Step 2. Epidemiologically, report the minimum and maximum
values. Statistically, subtract the minimum from the
maximum value.
EXAMPLE: Identifying the Range
Find the range of the following incubation periods for hepatitis A: 27, 31, 15, 30,
and 22 days.
Step 1. Identify the minimum and maximum values.
Minimum = 15, maximum = 31
Step 2. Subtract the minimum from the maximum value.
Range = 31–15 = 16 days
For an epidemiologic or lay audience, you could report that “incubation periods
ranged from 15 to 31 days.” Statistically, that range is 16 days.
Summarizing Data
Page 2-37
Percentiles
Percentiles divide the data in a distribution into 100 equal parts.
The Pth
percentile (P ranging from 0 to 100) is the value that has P
percent of the observations falling at or below it. In other words,
the 90th
percentile has 90% of the observations at or below it. The
median, the halfway point of the distribution, is the 50th
percentile.
The maximum value is the 100th
percentile, because all values fall
at or below the maximum.
Quartiles
Sometimes, epidemiologists group data into four equal parts, or
quartiles. Each quartile includes 25% of the data. The cut-off for
the first quartile is the 25th
percentile. The cut-off for the second
quartile is the 50th
percentile, which is the median. The cut-off for
the third quartile is the 75th
percentile. And the cut-off for the
fourth quartile is the 100th
percentile, which is the maximum.
Interquartile range
The interquartile range is a measure of spread used most
commonly with the median. It represents the central portion of the
distribution, from the 25th
percentile to the 75th
percentile. In other
words, the interquartile range includes the second and third
quartiles of a distribution. The interquartile range thus includes
approximately one half of the observations in the set, leaving one
quarter of the observations on each side.
Method for determining the interquartile range
Step 1. Arrange the observations in increasing order.
Step 2. Find the position of the 1st
and 3rd
quartiles with the
following formulas. Divide the sum by the number of
observations.
Position of 1st
quartile (Q1) = 25th
percentile = (n + 1) / 4
Position of 3rd
quartile (Q3) = 75th
percentile = 3(n + 1) / 4 = 3 × Q1
Step 3. Identify the value of the 1st
and 3rd
quartiles.
a. If a quartile lies on an observation (i.e., if its position
is a whole number), the value of the quartile is the
value of that observation. For example, if the position
of a quartile is 20, its value is the value of the 20th
observation.
b. If a quartile lies between observations, the value of
Summarizing Data
Page 2-38
the quartile is the value of the lower observation plus
the specified fraction of the difference between the
observations. For example, if the position of a quartile
is 20¼, it lies between the 20th
and 21st
observations,
and its value is the value of the 20th
observation, plus
¼ the difference between the value of the 20th
and 21st
observations.
Step 4. Epidemiologically, report the values at Q1 and Q3.
Statistically, calculate the interquartile range as Q3 minus
Q1.
Figure 2.7 The Middle Half of the Observations in a Frequency
Distribution Lie within the Interquartile Range
Summarizing Data
Page 2-39
EXAMPLE: Finding the Interquartile Range
Find the interquartile range for the length of stay data in Table 2.8 on page 2-17.
Step 1. Arrange the observations in increasing order.
0, 2, 3, 4, 5, 5, 6, 7, 8, 9,
9, 9, 10, 10, 10, 10, 10, 11, 12, 12,
12, 13, 14, 16, 18, 18, 19, 22, 27, 49
Step 2. Find the position of the 1st
and 3rd
quartiles. Note that the distribution has 30 observations.
Position of Q1 = (n + 1) / 4 = (30 + 1) / 4 = 7.75
Position of Q3 = 3(n + 1) / 4 = 3(30 + 1) / 4 = 23.25
Thus, Q1 lies ¾ of the way between the 7th and 8th observations, and Q3 lies ¼ of the way between the 23rd
and
24th observations.
Step 3. Identify the value of the 1st
and 3rd
quartiles (Q1 and Q3).
Value of Q1: The position of Q1 is 7¾; therefore, the value of Q1 is equal to the value of the 7th
observation plus ¾
of the difference between the values of the 7th
and 8th
observations:
Value of the 7th
observation: 6
Value of the 8th
observation: 7
Q1 = 6 + ¾(7 − 6) = 6 + ¾(1) = 6.75
Value of Q3: The position of Q3 was 23¼; thus, the value of Q3 is equal to the value of the 23rd
observation plus ¼
of the difference between the value of the 23rd
and 24th
observations:
Value of the 23rd
observation: 14
Value of the 24th
observation: 16
Q3 = 14 + ¼(16 − 14) = 14 + ¼(2) = 14 + (2 / 4) = 14.5
Step 4. Calculate the interquartile range as Q3 minus Q1 .
Q3 = 14.5
Q1 = 6.75
Interquartile range = 14.5 − 6.75 = 7.75
As indicated above, the median for the length of stay data is 10. Note that the distance between Q1 and the median
is 10 – 6.75 = 3.25. The distance between Q3 and the median is 14.5 – 10 = 4.5. This indicates that the length of
stay data is skewed slightly to the right (to the longer lengths of stay).
Summarizing Data
Page 2-40
Epi Info Demonstration: Finding the Interquartile Range
Question: In the data set named SMOKE, what is the interquartile range for the weight of the participants?
Answer: In Epi Info:
Select Analyze Data.
Select Read (Import). The default data set should be Sample.mdb. Under Views, scroll down to
view SMOKE, and double click, or click once and then click OK.
Click on Select. Then type in weight < 770, or select weight from available values, then type <
770, and click on OK.
Select Means. Then click on the down arrow beneath Means of, scroll down and select WEIGHT,
then click OK.
Scroll to the bottom of the output to find the first quartile (25% = 130) and the third quartile (75%
= 180). So the interquartile range runs from 130 to 180 pounds, for a range of 50
pounds.
Your Turn: What is the interquartile range of height of study participants? [Answer: 506 to 777]
Properties and uses of the interquartile range
• The interquartile range is generally used in conjunction with the
median. Together, they are useful for characterizing the central
location and spread of any frequency distribution, but
particularly those that are skewed.
• For a more complete characterization of a frequency
distribution, the 1st
and 3rd
quartiles are sometimes used with the
minimum value, the median, and the maximum value to produce
a five-number summary of the distribution. For example, the
five-number summary for the length of stay data is:
Minimum value = 0,
Q1 = 6.75,
Median = 10,
Q3 = 14.5, and
Maximum value = 49.
• Together, the five values provide a good description of the
center, spread, and shape of a distribution. These five values can
be used to draw a graphical illustration of the data, as in the
boxplot in Figure 2.8.
Summarizing Data
Page 2-41
Figure 2.8 Interquartile Range from Cumulative Frequencies
Some statistical analysis software programs such as Epi Info
produce frequency distributions with three output columns: the
number or count of observations for each value of the distribution,
the percentage of observations for that value, and the cumulative
percentage. The cumulative percentage, which represents the
percentage of observations at or below that value, gives you the
percentile (see Table 2.10).
Table 2.10 Frequency Distribution of Length of Hospital Stay, Sample
Data, Northeast Consortium Vancomycin Quality Improvement Project
Length of
Stay (Days) Frequency Percent
Cumulative
Percent
0 1 3.3 3.3
2 1 3.3 6.7
3 1 3.3 10.0
4 1 3.3 13.3
5 2 6.7 20.0
6 1 3.3 23.3
7 1 3.3 26.7
8 1 3.3 30.0
9 3 10.0 40.0
10 5 16.7 56.7
11 1 3.3 60.0
12 3 10.0 70.0
13 1 3.3 73.3
14 1 3.3 76.7
16 1 3.3 80.0
18 2 6.7 86.7
19 1 3.3 90.0
22 1 3.3 93.3
27 1 3.3 96.7
49 1 3.3 100.0
Total 30 100.0
A shortcut to calculating Q1, the median, and Q3 by hand is to look
at the tabular output from these software programs and note which
values include 25%, 50%, and 75% of the data, respectively. This
Summarizing Data
Page 2-42
shortcut method gives slightly different results than those you
would calculate by hand, but usually the differences are minor.
For example, the output in Table 2.10 indicates that the 25th
, 50th
,
and 75th
percentiles correspond to lengths of stay of 7, 10 and 14
days, not substantially different from the 6.75, 10 and 14.5 days
calculated above.
Summarizing Data
Page 2-43
Exercise 2.8
Determine the first and third quartiles and interquartile range for the same
vaccination data as in the previous exercises.
2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1
Check your answers on page 2-60
Summarizing Data
Page 2-44
Standard deviation
Definition of standard deviation
The standard deviation is the measure of spread used most
commonly with the arithmetic mean. Earlier, the centering
property of the mean was described — subtracting the mean from
each observation and then summing the differences adds to 0. This
concept of subtracting the mean from each observation is the basis
for the standard deviation. However, the difference between the
mean and each observation is squared to eliminate negative
numbers. Then the average is calculated and the square root is
taken to get back to the original units.
Method for calculating the standard deviation
Step 1. Calculate the arithmetic mean.
Step 2. Subtract the mean from each observation. Square the
difference.
Step 3. Sum the squared differences.
Step 4. Divide the sum of the squared differences by n – 1.
Step 5. Take the square root of the value obtained in Step 4. The
result is the standard deviation.
To calculate the
standard deviation from
a data set in Analysis
Module:
Click on the Means
command under the
Statistics folder
In the Means Of drop-
down box, select the
variable of interest
 Select Variable
Click OK
 You should see the
list of the frequency
by the variable you
selected. Scroll down
until you see the
Standard Deviation
(Std Dev) and other
data.
Properties and uses of the standard deviation
• The numeric value of the standard deviation does not have an
easy, non-statistical interpretation, but similar to other measures
of spread, the standard deviation conveys how widely or tightly
the observations are distributed from the center. From the
previous example, the mean incubation period was 25 days,
with a standard deviation of 6.6 days. If the standard deviation
in a second outbreak had been 3.7 days (with the same mean
incubation period of 25 days), you could say that the incubation
periods in the second outbreak showed less variability than did
the incubation periods of the first outbreak.
• Standard deviation is usually calculated only when the data are
more-or-less “normally distributed,” i.e., the data fall into a
typical bell-shaped curve. For normally distributed data, the
arithmetic mean is the recommended measure of central
location, and the standard deviation is the recommended
measure of spread. In fact, means should never be reported
without their associated standard deviation.
Summarizing Data
Page 2-45
EXAMPLE: Calculating the Standard Deviation
Find the mean of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days.
Step 1. Calculate the arithmetic mean.
Mean = (27 + 31 + 15 + 30 +22) / 5 = 125 / 5 = 25.0
Step 2. Subtract the mean from each observation. Square the difference.
Value Minus Mean Difference Difference Squared
27 - 25.0 + 2.0 4.0
31 - 225.0 + 6.0 36.0
15 - 225.0 –10.0 100.0
30 - 225.0 + 5.0 25.0
22 - 225.0 – 3.0 9.0
Step 3. Sum the squared differences.
Sum = 4 + 36 + 100 + 25 + 9 = 174
Step 4. Divide the sum of the squared differences by (n – 1). This is the variance.
Variance = 174 / (5 – 1) = 174 / 4 = 43.5 days squared
Step 5. Take the square root of the variance. The result is the standard deviation.
Standard deviation = square root of 43.5 = 6.6 days
Areas included in normal
distribution:
±1 SD includes 68.3%
±1.96 SD includes 95.0%
±2 SD includes 95.5%
±3 SD includes 99.7%
Consider the normal curve illustrated in Figure 2.9. The mean is at
the center, and data are equally distributed on either side of this
mean. The points that show ±1, 2, and 3 standard deviations are
marked on the x-axis. For normally distributed data, approximately
two-thirds (68.3%, to be exact) of the data fall within one standard
deviation of either side of the mean; 95.5% of the data fall within
two standard deviations of the mean; and 99.7% of the data fall
within three standard deviations. Exactly 95.0% of the data fall
within 1.96 standard deviations of the mean.
Summarizing Data
Page 2-46
Figure 2.9 Area Under Normal Curve within 1, 2 and 3 Standard
Deviations
Summarizing Data
Page 2-47
Exercise 2.9
Calculate the standard deviation for the same set of vaccination data.
2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1
Check your answers on page 2-61
Summarizing Data
Page 2-48
Standard error of the mean
Definition of standard error
The standard deviation is sometimes confused with another
measure with a similar name — the standard error of the mean.
However, the two are not the same. The standard deviation
describes variability in a set of data. The standard error of the
mean refers to variability we might expect in the arithmetic means
of repeated samples taken from the same population.
The standard error assumes that the data you have is actually a
sample from a larger population. According to the assumption,
your sample is just one of an infinite number of possible samples
that could be taken from the source population. Thus, the mean for
your sample is just one of an infinite number of other sample
means. The standard error quantifies the variation in those sample
means.
Method for calculating the standard error of the mean
Step 1. Calculate the standard deviation.
Step 2. Divide the standard deviation by the square root of the
number of observations (n).
Properties and uses of the standard error of the mean
• The primary practical use of the standard error of the mean is in
calculating confidence intervals around the arithmetic mean.
(Confidence intervals are addressed in the next section.)
EXAMPLE: Finding the Standard Error of the Mean
Find the standard error of the mean for the length-of-stay data in Table 2.10,
given that the standard deviation is 9.1888.
Step 1. Calculate the standard deviation.
Standard deviation (given) = 9.188
Step 2. Divide the standard deviation by the square root of n.
n = 30
Standard error of the mean = 9.188 / √30 = 9.188 / 5.477 = 1.67
Summarizing Data
Page 2-49
Confidence limits (confidence interval)
Definition of a confidence interval
Often, epidemiologists conduct studies not only to measure
characteristics in the subjects studied, but also to make
generalizations about the larger population from which these
subjects came. This process is called inference. For example,
political pollsters use samples of perhaps 1,000 or so people from
across the country to make inferences about which presidential
candidate is likely to win on Election Day. Usually, the inference
includes some consideration about the precision of the
measurement. (The results of a political poll may be reported to
have a margin of error of, say, plus or minus three points.) In
epidemiology, a common way to indicate a measurement’s
precision is by providing a confidence interval. A narrow
confidence interval indicates high precision; a wide confidence
interval indicates low precision.
Confidence intervals are calculated for some but not all
epidemiologic measures. The two measures covered in this lesson
for which confidence intervals are often presented are the mean
and the geometric mean. Confidence intervals can also be
calculated for some of the epidemiologic measures covered in
Lesson 3, such as a proportion, risk ratio, and odds ratio.
The confidence interval for a mean is based on the mean itself and
some multiple of the standard error of the mean. Recall that the
standard error of the mean refers to the variability of means that
might be calculated from repeated samples from the same
population. Fortunately, regardless of how the data are distributed,
means (particularly from large samples) tend to be normally
distributed. (This is from an argument known as the Central Limit
Theorem). So we can use Figure 2.9 to show that the range from
the mean minus one standard deviation to the mean plus one
standard deviation includes 68.3% of the area under the curve.
Consider a population-based sample survey in which the mean
total cholesterol level of adult females was 206, with a standard
error of the mean of 3. If this survey were repeated many times,
68.3% of the means would be expected to fall between the mean
minus 1 standard error and the mean plus 1 standard error, i.e.,
between 203 and 209. One might say that the investigators are
68.3% confident those limits contain the actual mean of the
population.
Summarizing Data
Page 2-50
In public health, investigators generally want to have a greater
level of confidence than that, and usually set the confidence level
at 95%. Although the statistical definition of a confidence interval
is that 95% of the confidence intervals from an infinite number of
similarly conducted samples would include the true population
values, this definition has little meaning for a single study. More
commonly, epidemiologists interpret a 95% confidence interval as
the range of values consistent with the data from their study.
Method for calculating a 95% confidence interval for a mean
Step 1. Calculate the mean and its standard error.
Step 2. Multiply the standard error by 1.96.
Step 3. Lower limit of the 95% confidence interval =
mean minus 1.96 x standard error.
Upper limit of the 95% confidence interval =
mean plus 1.96 x standard error.
EXAMPLE: Calculating a 95% Confidence Interval for a Mean
Find the 95% confidence interval for a mean total cholesterol level of 206, standard error of the mean of 3.
Step 1. Calculate the mean and its error.
Mean = 206, standard error of the mean = 3 (both given)
Step 2. Multiply the standard error by 1.96.
3 x 1.96 = 5.88
Step 3. Lower limit of the 95% confidence interval = mean minus 1.96 x standard error.
206 – 5.88 = 200.12
Upper limit of the 95% confidence interval = mean plus 1.96 x standard error.
206 + 5.88 = 211.88
Rounding to one decimal, the 95% confidence interval is 200.1 to 211.9. In other words, this study’s best estimate
of the true population mean is 206, but is consistent with values ranging from as low as 200.1 and as high as 211.9.
Thus, the confidence interval indicates how precise the estimate is. (This confidence interval is narrow, indicating
that the sample mean of 206 is fairly precise.) It also indicates how confident the researchers should be in drawing
inferences from the sample to the entire population.
Properties and uses of confidence intervals
• The mean is not the only measure for which a confidence
interval can or should be calculated. Confidence intervals are
also commonly calculated for proportions, rates, risk ratios,
Summarizing Data
Page 2-51
odds ratios, and other epidemiologic measures when the purpose
is to draw inferences from a sample survey or study to the larger
population.
• Most epidemiologic studies are not performed under the ideal
conditions required by the theory behind a confidence interval.
As a result, most epidemiologists take a common-sense
approach rather than a strict statistical approach to the
interpretation of a confidence interval, i.e., the confidence
interval represents the range of values consistent with the data
from a study, and is simply a guide to the variability in a study.
• Confidence intervals for means, proportions, risk ratios, odds
ratios, and other measures all are calculated using different
formulas. The formula for a confidence interval of the mean is
well accepted, as is the formula for a confidence interval for a
proportion. However, a number of different formulas are
available for risk ratios and odds ratios. Since different formulas
can sometimes give different results, this supports interpreting a
confidence interval as a guide rather than as a strict range of
values.
• Regardless of the measure, the interpretation of a confidence
interval is the same: the narrower the interval, the more precise
the estimate; and the range of values in the interval is the range
of population values most consistent with the data from the
study.
Demonstration: Using Confidence Intervals
Imagine you are going to Las Vegas to bet on the true mean total cholesterol level among adult women in the
United States.
Question: On what number are you going to bet?
Answer: On 206, since that is the number found in the sample. The mean you calculated from your sample is
your best guess of the true population mean.
Question: How does a confidence interval help?
Answer: It tells you how much to bet! If the confidence interval is narrow, your best guess is relatively precise,
and you might feel comfortable (confident) betting more. But if the confidence interval is wide, your
guess is relatively imprecise, and you should bet less on that one number, or perhaps not bet at all!
Summarizing Data
Page 2-52
Exercise 2.10
When the serum cholesterol levels of 4,462 men were measured, the mean
cholesterol level was 213, with a standard deviation of 42. Calculate the
standard error of the mean for the serum cholesterol level of the men
studied.
Check your answers on page 2-62
Summarizing Data
Page 2-53
Choosing the Right Measure of Central
Location and Spread
Measures of central location and spread are useful for summarizing
a distribution of data. They also facilitate the comparison of two or
more sets of data. However, not every measure of central location
and spread is well suited to every set of data. For example, because
the normal distribution (or bell-shaped curve) is perfectly
symmetrical, the mean, median, and mode all have the same value
(as illustrated in Figure 2.10). In practice, however, observed data
rarely approach this ideal shape. As a result, the mean, median, and
mode usually differ.
Figure 2.10 Effect of Skewness on Mean, Median, and Mode
How, then, do you choose the most appropriate measures? A
partial answer to this question is to select the measure of central
location on the basis of how the data are distributed, and then use
the corresponding measure of spread. Table 2.11 summarizes the
recommended measures.
Table 2.11 Recommended Measures of Central Location and Spread by
Type of Data
Type of Distribution
Measure of
Central Location
Measure of
Spread
Normal Arithmetic mean Standard deviation
Asymmetrical or skewed Median Range or
interquartile range
Exponential or logarithmic Geometric mean Geometric standard
In statistics, the arithmetic mean is the most commonly used
measure of central location, and is the measure upon which the
majority of statistical tests and analytic techniques are based. The
standard deviation is the measure of spread most commonly used
Summarizing Data
Page 2-54
with the mean. But as noted previously, one disadvantage of the
mean is that it is affected by the presence of one or a few
observations with extremely high or low values. The mean is
“pulled” in the direction of the extreme values. You can tell the
direction in which the data are skewed by comparing the values of
the mean and the median; the mean is pulled away from the
median in the direction of the extreme values. If the mean is higher
than the median, the distribution of data is skewed to the right. If
the mean is lower than the median, as in the right side of Figure
2.10, the distribution is skewed to the left.
The advantage of the median is that it is not affected by a few
extremely high or low observations. Therefore, when a set of data
is skewed, the median is more representative of the data than is the
mean. For descriptive purposes, and to avoid making any
assumption that the data are normally distributed, many
epidemiologists routinely present the median for incubation
periods, duration of illness, and age of the study subjects.
Two measures of spread can be used in conjunction with the
median: the range and the interquartile range. Although many
statistics books recommend the interquartile range as the preferred
measure of spread, most practicing epidemiologists use the simpler
range instead.
The mode is the least useful measure of central location. Some sets
of data have no mode; others have more than one. The most
common value may not be anywhere near the center of the
distribution. Modes generally cannot be used in more elaborate
statistical calculations. Nonetheless, even the mode can be helpful
when one is interested in the most common value or most popular
choice.
The geometric mean is used for exponential or logarithmic data
such as laboratory titers, and for environmental sampling data
whose values can span several orders of magnitude. The measure
of spread used with the geometric mean is the geometric standard
deviation. Analogous to the geometric mean, it is the antilog of the
standard deviation of the log of the values.
The geometric standard deviation is substituted for the standard
deviation when incorporating logarithms of numbers. Examples
include describing environmental particle size based on mass, or
variability of blood lead concentrations.1
Sometimes, a combination of these measures is needed to
adequately describe a set of data.
Summarizing Data
Page 2-55
EXAMPLE: Summarizing Data
Consider the smoking histories of 200 persons (Table 2.12) and summarize the data.
Table 2.12 Self-Reported Average Number of Cigarettes Smoked Per Day, Survey of Students (n = 200)
Number of Cigarettes Smoked Per Day
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 2 3
4 6 7 7 8 8 9 10 12 12 13 13
14 15 15 15 15 15 16 17 17 18 18 18
18 19 19 20 20 20 20 20 20 20 20 20
20 20 21 21 22 22 23 24 25 25 26 28
29 30 30 30 30 32 35 40
Analyzing all 200 observations yields the following results:
Mean = 5.4
Median = 0
Mode = 0
Minimum value = 0
Maximum value = 40
Range = 0–40
Interquartile range = 8.8 (0.0–8.8)
Standard deviation = 9.5
These results are correct, but they do not summarize the data well. Almost three fourths of the students,
representing the mode, do not smoke at all. Separating the 58 smokers from the 142 nonsmokers yields a more
informative summary of the data. Among the 58 (29%) who do smoke:
Mean = 18.5
Median = 19.5
Mode = 20
Minimum value = 2
Maximum value = 40
Range = 2–40
Interquartile range = 8.5 (13.7–22.25)
Standard deviation = 8.0
Thus, a more informative summary of the data might be “142 (71%) of the students do not smoke at all. Of the 58
students (29%) who do smoke, mean consumption is just under a pack* a day (mean = 18.5, median = 19.5). The
range is from 2 to 40 cigarettes smoked per day, with approximately half the smokers smoking from 14 to 22
cigarettes per day.”
* a typical pack contains 20 cigarettes
Summarizing Data
Page 2-56
Exercise 2.11
The data in Table 2.13 (on page 2-57) are from an investigation of an
outbreak of severe abdominal pain, persistent vomiting, and generalized
weakness among residents of a rural village. The cause of the outbreak was
eventually identified as flour unintentionally contaminated with lead
dust.
1. Summarize the blood level data with a frequency distribution.
2. Calculate the arithmetic mean. [Hint: Sum of known values = 2,363]
3. Identify the median and interquartile range.
4. Calculate the standard deviation. [Hint: Sum of squares = 157,743]
5. Calculate the geometric mean using the log lead levels provided. [Hint: Sum of log lead
levels = 68.45]
Check your answers on page 2-62
Summarizing Data
Page 2-57
Table 2.13 Age and Blood Lead Levels (BLLs) of Ill Villagers and Family Members — Country X, 1996
ID
Age
(Years) BLL
†
Log10BLL
1 3 69 1.84
2 4 45 1.66
3 6 49 1.69
4 7 84 1.92
5 9 48 1.68
6 10 58 1.77
7 11 17 1.23
8 12 76 1.88
9 13 61 1.79
10 14 78 1.89
11 15 48 1.68
12 15 57 1.76
13 16 68 1.83
14 16 ? ?
15 17 26 1.42
16 19 78 1.89
17 19 56 1.75
18 20 54 1.73
19 22 73 1.86
20 26 74 1.87
21 27 63 1.80
ID
Age
(Years) BLL Log10BLL
22 33 103 2.01
23 33 46 1.66
24 35 78 1.89
25 35 50 1.70
26 36 64 1.81
27 36 67 1.83
28 38 79 1.90
29 40 58 1.76
30 45 86 1.93
31 47 76 1.88
32 49 58 1.76
33 56 ? ?
34 60 26 1.41
35 65 104 2.02
36 65 39 1.59
37 65 35 1.54
38 70 72 1.86
39 70 57 1.76
40 76 38 1.58
41 78 44 1.64
† Blood lead levels measured in micrograms per deciliter (mcg/dL)
? Missing value
Data Source: Nasser A, Hatch D, Pertowski C, Yoon S. Outbreak investigation of an unknown illness in a rural village, Egypt (case
study). Cairo: Field Epidemiology Training Program, 1999.
Summarizing Data
Page 2-58
Summary
Frequency distributions, measures of central location, and measures of spread are effective
tools for summarizing numerical variables including:
• Physical characteristics such as height and diastolic blood pressure,
• Illness characteristics such as incubation period, and
• Behavioral characteristics such as number of lifetime sexual partners.
Some characteristics, such as IQ, follow a normal or symmetrical bell-shaped distribution in
the population. Other characteristics have distributions that are skewed to the right (tail
toward higher values) or skewed to the left (tail toward lower values). Some characteristics
are mostly normally distributed, but have a few extreme values or outliers. Some
characteristics, particularly laboratory dilution assays, follow a logarithmic pattern. Finally,
other characteristics follow other patterns (such as a uniform distribution) or appear to follow
no apparent pattern at all. The distribution of the data is the most important factor in selecting
an appropriate measure of central location and spread.
Measures of central location are single values that represent the center of the observed
distribution of values. The different measures of central location represent the center in
different ways. The arithmetic mean represents the balance point for all the data. The median
represents the middle of the data, with half the observed values below the median and half
the observed values above it. The mode represents the peak or most prevalent value. The
geometric mean is comparable to the arithmetic mean on a logarithmic scale.
Measures of spread describe the spread or variability of the observed distribution. The range
measures the spread from the smallest to the largest value. The standard deviation, usually
used in conjunction with the arithmetic mean, reflects how closely clustered the observed
values are to the mean. For normally distributed data, 95% of the data fall in the range from –
1.96 standard deviations to +1.96 standard deviations. The interquartile range, used in
conjunction with the median, includes data in the range from the 25th
percentile to the 75th
percentile, or approximately the middle 50% of the data.
Data that are normally distributed are usually summarized with the arithmetic mean and
standard deviation. Data that are skewed or have a few extreme values are usually
summarized with the median and range, or with the median and interquartile range. Data that
follow a logarithmic scale and data that span several orders of magnitude are usually
summarized with the geometric mean.
Summarizing Data
Page 2-59
Exercise Answers
Exercise 2.1
1. C
2. A
3. D
4. A
5. D
Exercise 2.2
Previous Years Frequency
0 2
1 5
2 4
3 3
4 1
5 1
6 1
7 0
8 1
9 0
10 0
11 0
12 1
Total 19
Exercise 2.3
1. Create frequency distribution (done in Exercise 2.2, above)
2. Identify the value that occurs most often.
Most common value is 1, so mode is 1 previous vaccination.
Exercise 2.4
1. Arrange the observations in increasing order.
0, 0, 1, 1, 1, 1, 1, 2, 2, 2, 2, 3, 3, 3, 4, 5, 6, 8, 12
2. Find the middle position of the distribution with 19 observations.
Middle position = (19 + 1) / 2 = 10
3. Identify the value at the middle position.
0, 0, 1, 1, 1, 1, 1, 2, 2, *2*, 2, 3, 3, 3, 4, 5, 6, 8, 12
Summarizing Data
Page 2-60
Counting from the left or right to the 10th
position, the value is 2. So the median = 2
previous vaccinations.
Exercise 2.5
1. Add all of the observed values in the distribution.
2 + 0 + 3 + 1 + 0 + 1 + 2 + 2 + 4 + 8 + 1 + 3 + 3 + 12 + 1 + 6 + 2 + 5 + 1 = 57
2. Divide the sum by the number of observations
57 / 19 = 3.0
So the mean is 3.0 previous vaccinations
Exercise 2.6
Using Method A:
1. Take the log (in this case, to base 2) of each value.
ID # Convalescent Log base 2
1 1:512 9
2 1:512 9
3 1:128 7
4 1:512 9
5 1:1024 10
6 1:1024 10
7 1:2048 11
8 1:128 7
9 1:4096 12
10 1:1024 10
2. Calculate the mean of the log values by summing and dividing by the number of
observations (10).
Mean of log2(xi) = (9 + 9 + 7 + 9 + 10 + 10 + 11 + 7 + 12 + 10) / 10 = 94 / 10 = 9.4
3. Take the antilog of the mean of the log values to get the geometric mean.
Antilog2(9.4) = 29.4
= 675.59. Therefore, the geometric mean dilution titer is 1:675.6.
Exercise 2.7
1. E or A; equal number of patients in 1999 and 1998.
2. C or B; mean and median are very close, so either would be acceptable.
3. E or A; for a nominal variable, the most frequent category is the mode.
4. D
5. B; mean is skewed, so median is better choice.
6. B; mean is skewed, so median is better choice.
Exercise 2.8
1. Arrange the observations in increasing order.
0, 0, 1, 1, 1, 1, 1, 2, 2, 2, 2, 3, 3, 3, 4, 5, 6, 8, 12
Summarizing Data
Page 2-61
2. Find the position of the 1st
and 3rd
quartiles. Note that the distribution has 19
observations.
Position of Q1 = (n + 1) / 4 = (19 + 1) / 4 = 5
Position of Q3 = 3(n + 1) / 4 = 3(19 + 1) / 4 = 15
3. Identify the value of the 1st
and 3rd
quartiles.
Value at Q1 (position 5) = 1
Value at Q3 (position 15) = 4
4. Calculate the interquartile range as Q3 minus Q1.
Interquartile range = 4 – 1 = 3
5. The median (at position 10) is 2. Note that the distance between Q1 and the median is 2 –
1 = 1. The distance between Q3 and the median is 4 – 2 = 2. This indicates that the
vaccination data is skewed slightly to the right (tail points to greater number of previous
vaccinations).
Exercise 2.9
1. Calculate the arithmetic mean.
Mean = (2 + 0 + 3 + 1 + 0 + 1 + 2 + 2 + 4 + 8 + 1 + 3 + 3 + 12 + 1 + 6 + 2 + 5 + 1) / 19
= 57 / 19
= 3.0
2. Subtract the mean from each observation. Square the difference.
3. Sum the squared differences.
Value minus Mean Difference Difference Squared
2 - 3.0 –1.0 1.0
0 - 3.0 –3.0 9.0
3 - 3.0 0.0 0.0
1 - 3.0 –2.0 4.0
0 - 3.0 –3.0 9.0
1 - 3.0 –2.0 4.0
2 - 3.0 –1.0 1.0
2 - 3.0 –1.0 1.0
4 - 3.0 1.0 1.0
8 - 3.0 5.0 25.0
1 - 3.0 –2.0 4.0
57 - 57.0 = 0 0.0 162.0
4. Divide the sum of the squared differences by n – 1.
Variance = 162 / (19 – 1) = 162 / 18 = 9.0 previous vaccinations squared
5. Take the square root of the variance. This is the standard deviation.
Standard deviation = 9.0 = 3.0 previous vaccinations
Summarizing Data
Page 2-62
Exercise 2.10
Standard error of the mean = 42 divided by the square root of 4,462 = 0.629
Exercise 2.11
1. Summarize the blood level data with a frequency distribution.
Table 2.14 Frequency Distribution (1:g/dL Intervals) of Blood Lead Levels — Rural Village,
1996 (Intervals with No Observations Not Shown)
Blood Lead
Level (g/dL) Frequency
Blood Lead
Level (g/dL) Frequency
Blood Lead
Level (g/dL) Frequency
17 1 57 2 76 2
26 2 58 3 78 3
35 1 61 1 79 1
38 1 63 1 84 1
39 1 64 1 86 1
44 1 67 1 103 1
45 1 68 1 104 1
46 1 69 1 Unknown 48
49 1 72 1
50 1 73 1
54 1 74 1
56 1
To summarize the data further you could use intervals of 5, 10, or perhaps even 20
mcg/dL. Table 2.15 below uses 10 mcg/dL intervals.
Table 2.15 Frequency Distribution (10 mcg/dL Intervals) of Blood Lead Levels — Rural Village,
1996
Blood Lead Level (g/dL) Frequency
0–9 0
10–19 1
20–29 2
30–39 3
40–49 6
50–59 8
60–69 6
70–79 9
80–89 2
90–99 0
100–110 2
Total 39
2. Calculate the arithmetic mean.
Arithmetic mean = sum / n = 2,363 / 39 = 60.6 mcg/dL
3. Identify the median and interquartile range.
Median at (39 + 1) / 2 = 20th
position. Median = value at 20th
position = 58
Q1 at (39 + 1) / 4 = 10th
position. Q1 = value at 10th
position = 48
Q3 at 3 x Q1 position = 30th
position. Q3 = value at 30th
position = 76
Summarizing Data
Page 2-63
4. Calculate the standard deviation.
Square of sum = 2,3632
= 5,583,769
Sum of squares x n = 157,743 x 39 = 6,157,977
Difference = 6,151,977 – 5,583,769 = 568,208
Variance = 568,208 / (39 x 38) = 383.4062
Standard deviation = square root (383.4062) = 19.58 mcg/dL
5. Calculate the geometric mean using the log lead levels provided.
Geometric mean = 10(68.45 / 39)
= 10(1.7551)
= 56.9 mcg/dL
Summarizing Data
Page 2-64
SELF-ASSESSMENT QUIZ
Now that you have read Lesson 2 and have completed the exercises, you
should be ready to take the self-assessment quiz. This quiz is designed to
help you assess how well you have learned the content of this lesson.
You may refer to the lesson text whenever you are unsure of the answer.
Unless instructed otherwise, choose ALL correct answers for each question.
Use Table 2.16 for Questions 1 and 2, and for Questions 10–13.
Table 2.16 Admitting Clinical Characteristics of Patients with Severe Acute Respiratory Syndrome
— Singapore, March–May, 2003
ID
Date of
Diagnosis Sex
Age
(Years)
How
Acquired Symptoms†
Temp (°C)
Lymphocyte
Count (x 10-9
/L)‡ Outcome
01 * Female 71 Community F, confusion 38.7 0.78 Survived
02 3/16 Female 43 Community C,D,S,H,F 38.9 0.94 Died
03 3/29 Male 40 HCW¶ C,H,M,F 36.8 0.71 Survived
04 * Female 78 Community D 36.0 1.02 Died
05 * Female 53 Community C,D,F 39.6 0.53 Died
06 4/6 Male 63 Community C,M,F,dizziness 35.1 0.63 Died
07 * Male 84 Inpatient D,F 38.0 0.21 Died
08 * Male 63 Inpatient F 38.5 0.83 Survived
09 * Female 74 Inpatient F 38.0 1.34 Died
10 * Male 72 Inpatient F 38.5 1.04 Survived
11 * Female 28 HCW H,M,F 38.2 0.30 Survived
12 * Female 24 HCW M,F 38.0 0.84 Survived
13 * Female 28 HCW M,F 38.5 1.13 Survived
14 * Male 21 HCW H,M,F 38.8 0.97 Survived
* Date of onset not provided in manuscript
† C=cough, D=dyspnea, F=fever, H=headache, M=myalgia, S=sore throat
‡ Normal > 1.50 x 10-9
/L
¶ HCW = health-care worker
Data Source: Singh K, Hsu L-Y, Villacian JS, Habib A, Fisher D, Tambyah PA. Severe acute respiratory syndrome: lessons from
Singapore. Emerg Infect Dis 2003;9:1294–8.
1. Table 2.16 is an example of a/an _________________________.
2. For each of the following variables included in Table 2.16, identify if it is:
A. Categorical
B. Continuous
C. Interval
D. Nominal
E. Ordinal
F. Qualitative
G. Quantitative
H. Ratio
_____ Sex
_____ Age
_____ Lymphocyte Count
Summarizing Data
Page 2-65
3. Which of the following best describes the similarities and differences in the three
distributions shown in Figure 2.11?
Figure 2.11
A. Same mean, median, mode; different standard deviation
B. Same mean, median, mode; same standard deviation
C. Different mean, median, mode; different standard deviation
D. Different mean, median, mode; same standard deviation
4. Which of the following terms accurately describe the distribution shown in Figure 2.12?
Figure 2.12
A. Negatively skewed
B. Positively skewed
C. Skewed to the right
D. Skewed to the left
E. Asymmetrical
5. What is the likely relationship between mean, median, and mode of the distribution shown
in Figure 2.12?
A. Mean < median < mode
B. Mean = median = mode
C. Mean > median > mode
D. Mode < mean and median, but cannot tell relationship between mean and median
Summarizing Data
Page 2-66
6. The mode is the value that:
A. Is midway between the lowest and highest value
B. Occurs most often
C. Has half the observations below it and half above it
D. Is statistically closest to all of the values in the distribution
7. The median is the value that:
A. Is midway between the lowest and highest value
B. Occurs most often
C. Has half the observations below it and half above it
D. Is statistically closest to all of the values in the distribution
8. The mean is the value that:
A. Is midway between the lowest and highest value
B. Occurs most often
C. Has half the observations below it and half above it
D. Is statistically closest to all of the values in the distribution
9. The geometric mean is the value that:
A. Is midway between the lowest and highest value on a log scale
B. Occurs most often on a log scale
C. Has half the observations below it and half above it on a log scale
D. Is statistically closest to all of the values in the distribution on a log scale
Use Table 2.16 for Questions 10–13. Note that the sum of the 14 temperatures listed in Table
2.16 is 531.6.
10. The mode of the temperatures listed in Table 2.16 is:
A. 37.35°C
B. 37.9°C
C. 38.0°C
D. 38.35°C
E. 38.5°C
11. The median of the temperatures listed in Table 2.16 is:
A. 37.35°C
B. 37.9°C
C. 38.0°C
D. 38.35°C
E. 38.5°C
12. The mean of the temperatures listed in Table 2.16 is:
A. 37.35°C
B. 37.9°C
C. 38.0°C
D. 38.35°C
E. 38.5°C
Summarizing Data
Page 2-67
13. The midrange of the temperatures listed in Table 2.16 is:
A. 37.35°C
B. 37.9°C
C. 38.0°C
D. 38.35°C
E. 38.5°C
14. In epidemiology, the measure of central location generally preferred for summarizing
skewed data such as incubation periods is the:
A. Mean
B. Median
C. Midrange
D. Mode
15. The measure of central location generally preferred for additional statistical analysis is the:
A. Mean
B. Median
C. Midrange
D. Mode
16. Which of the following are considered measures of spread?
A. Interquartile range
B. Percentile
C. Range
D. Standard deviation
17. The measure of spread most affected by one extreme value is the:
A. Interquartile range
B. Range
C. Standard deviation
D. Mean
18. The interquartile range covers what proportion of a distribution?
A. 25%
B. 50%
C. 75%
D. 100%
19. The measure of central location most commonly used with the interquartile range is the:
A. Arithmetic mean
B. Geometric mean
C. Median
D. Midrange
E. Mode
Summarizing Data
Page 2-68
20. The measure of central location most commonly used with the standard deviation is the:
A. Arithmetic mean
B. Median
C. Midrange
D. Mode
21. The algebraic relationship between the variance and standard deviation is that:
A. The standard deviation is the square root of the variance
B. The variance is the square root of the standard deviation
C. The standard deviation is the variance divided by the square root of n
D. The variance is the standard deviation divided by the square root of n
22. Before calculating a standard deviation, one should ensure that:
A. The data are somewhat normally distributed
B. The total number of observations is at least 50
C. The variable is an interval-scale or ratio-scale variable
D. The calculator or software has a square-root function
23. Simply by scanning the values in each distribution below, identify the distribution with the
largest standard deviation.
A. 1, 10, 15, 18, 20, 20, 22, 25, 30, 39
B. 1, 3, 8, 10, 20, 20, 30, 32, 37, 39
C. 1, 15, 17, 19, 20, 20, 21, 23, 25, 39
D. 41, 42, 43, 44, 45, 45, 46, 47, 48, 49
24. Given the area under a normal curve, which two of the following ranges are the same?
(Circle the TWO that are the same.)
A. From the 2.5th
percentile to the 97.5th
percentile
B. From the 5th
percentile to the 95th
percentile
C. From the 25th
percentile to the 75th
percentile
D. From 1 standard deviation below the mean to 1 standard deviation above the mean
E. From 1.96 standard deviations below the mean to 1.96 standard deviations above the
mean
25. The primary use of the standard error of the mean is in calculating the:
A. confidence interval
B. error rate
C. standard deviation
D. variance
Summarizing Data
Page 2-69
Answers to Self-Assessment Quiz
1. Line list or line listing. A line listing is a table in which each row typically represents one
person or case of disease, and each column represents a variable such as ID, age, sex, etc.
2. Sex A, D, F
Age B, G, H
Lymphocyte count B, G, H
Sex is a nominal variable, meaning that its categories have names but not numerical value.
Nominal variables are qualitative or categorical variables.
Age and lymphocyte count are ratio variables because they are both numeric variables with
true zero points. Ratio variables are continuous and quantitative variables.
3. A. Because the centers of each distribution line up, they have the same measure of central
location. But because each distribution is spread differently, they have different measures of
spread.
4. B, C, E. Right/left skewness refers to the tail of a distribution. Because the “hump” of this
distribution is on the left and the tail is on the right, it is said to be skewed positively to the
right. A skewed distribution is not symmetrical.
5. C. For a distribution such as that shown in Figure 2.12, with its hump to the left, the mode
will be smaller than either the median or the mean. The long tail to the right will pull the
mean upward, so that the sequence will be mode < median < mean.
6. B. The mode is the value that occurs most often.
7. C. The median is the value that has half the observations below it and half above it.
8. D. The mean is the value that is statistically closest to all of the values in the distribution
9. D. The geometric mean is the value that is statistically closest to all of the values in the
distribution on a log scale.
10. C, E. The mode is the value that occurs most often. A distribution can have one mode, more
than one mode, or no mode. In this distribution, both 38.0°C and 38.5°C appear 3 times.
11. D. The median is the value that has half the observations below it and half above it. For a
distribution with an even number of values, the median falls between 2 observations, in this
situation between the 7th and 8th values. The 7th value is 38.2°C and the 8th value is
38.5°C, so the median is the average of those two values, i.e., 38.35°C.
12. C. The mean is the average of all the values. Given 14 temperatures that sum to 531.6, the
mean is calculated as 531.6 / 14, which equals 37.97°C, which should be rounded to
38.0°C.
Summarizing Data
Page 2-70
13. A. The midrange is halfway between the smallest and largest values. Since the lowest and
highest temperatures are 35.1°C and 39.6°C , the midrange is calculated as 35.1 + 39.6 /
2, or 37.35°C.
14. B. In epidemiology, the measure of central location generally preferred for summarizing
skewed data such as incubation periods is the median.
15. A. The measure of central location generally preferred for additional statistical analysis is
the mean, which is the only measure that has good statistical properties.
16. A, C, D, E. Interquartile range, range, standard deviation, and variance are all measures of
spread. A percentile identifies a particular place on the distribution, but is not a measure of
spread.
17. B. The range is the difference between the extreme values on either side, so it is most
directly affected by those values.
18. B. The interquartile range covers the central 50% of a distribution.
19. C. The interquartile range usually accompanies the median, since both are based on
percentiles. The interquartile range covers from the 25th to the 75th percentile, while the
median marks the 50th percentile.
20. A. The standard deviation usually accompanies the arithmetic mean.
21. A. The standard deviation is the square root of the variance.
22. A, D. Use of the mean and standard deviation are usually restricted to data that are more-
or-less normally distributed. Calculation of the standard deviation requires squaring
differences and then taking the square root, so you need a calculator that has a square-root
function.
23. B. Distributions A, B, and C all range from 1 to 39 and have two central values of 20.
Considering the eight values other than the smallest and largest, distribution C has values
close to 20 (from 15 to 25), Distribution A has values from 10 to 30, and Distribution B has
values from 3 to 37. So Distribution B has the broadest spread among the first 3
distributions. Distribution D has larger values than the first 3 distributions (41–49 rather
than 1–39), but they cluster rather tightly around the central value of 45.
24. A and E. The area from the 2.5th percentile to the 97.5th percentile includes 95% of the
area below the curve, which corresponds to ± 1.96 standard deviations along the x-axis.
25. A. The primary use of the standard error of the mean is in calculating a confidence interval.
Summarizing Data
Page 2-71
References
1. Griffin S., Marcus A., Schulz T., Walker S. Calculating the interindividual geometric
standard deviation of r use in the integrated exposure uptake biokinetic model for lead in
children. Environ Health Perspect 1999;107:481–7.
Instructions for Epi Info 7To download:
Go to http://wwwn.cdc.gov/epiinfo/7/index.htm and click on “Downloads.”
To get a complete installation package:
Download and run all three self-expanding, compressed files to a temporary directory.
EPI604_1.EXE (File Size = 1,367,649 bytes)
EPI604_2.EXE (File Size = 1,341,995 bytes)
EPI604_3.EXE (File Size = 1,360,925 bytes)
Then run INSTALL.EXE to install the software.
To create a frequency distribution from a data set in Analysis Module:
EpiInfo6: >freq variable.
To identify the mode from a data set in Analysis Module:
Epi Info does not have a Mode command. Thus, the best way to identify the mode is to
create a histogram and look for the tallest column(s).
EpiInfo6: >histogram variable.
To identify the median from a data set in Analysis Module:
EpiInfo6: >means variable. Output indicates median.
To identify the mean from a data set in Analysis Module:
EpiInfo6: >means variable. Output indicates median.
To calculate the standard deviation from a data set in Analysis Module:
EpiInfo6: >means variable. Output indicates standard deviation, abbreviated as Std Dev.
Measures of Risk
Page 3-1
MEASURES OF RISK
Lesson 2 described measures of central location and spread, which are
useful for summarizing continuous variables. However, many variables
used by field epidemiologists are categorical variables, some of which have
only two categories — exposed yes/no, test positive/negative, case/control,
and so on. These variables have to be summarized with frequency measures
such as ratios, proportions, and rates. Incidence, prevalence, and mortality
rates are three frequency measures that are used to characterize the occurrence of health events in
a population.
Objectives
After studying this lesson and answering the questions in the exercises, you will be able to:
• Calculate and interpret the following epidemiologic measures:
– Ratio
– Proportion
– Incidence proportion (attack rate)
– Incidence rate
– Prevalence
– Mortality rate
• Choose and apply the appropriate measures of association and measures of public health
impact
Major Sections
Frequency Measures ........................................................................................................................3-2
Morbidity Frequency Measures .......................................................................................................3-10
Mortality Frequency Measures ........................................................................................................3-20
Natality (Birth) Measures ................................................................................................................3-38
Measures of Association..................................................................................................................3-39
Measures of Public Health Impact...................................................................................................3-48
Summary..........................................................................................................................................3-51
3133
Measures of Risk
Page 3-2
Frequency Measures
Numerator = upper
portion of a fraction
Denominator = lower
portion of a fraction
A measure of central location provides a single value that
summarizes an entire distribution of data. In contrast, a frequency
measure characterizes only part of the distribution. Frequency
measures compare one part of the distribution to another part of the
distribution, or to the entire distribution. Common frequency
measures are ratios, proportions, and rates. All three frequency
measures have the same basic form:
numerator
x 10n
denominator
Recall that:
100
= 1 (anything raised to the 0 power equals 1)
101
= 10 (anything raised to the 1st
power is the value itself)
102
= 10 x 10 = 100
103
= 10 x 10 x 10 = 1,000
So the fraction of (numerator/denominator) can be multiplied by 1,
10, 100, 1000, and so on. This multiplier varies by measure and
will be addressed in each section.
Ratio
Definition of ratio
A ratio is the relative magnitude of two quantities or a comparison
of any two values. It is calculated by dividing one interval- or
ratio-scale variable by the other. The numerator and denominator
need not be related. Therefore, one could compare apples with
oranges or apples with number of physician visits.
Method for calculating a ratio
Number or rate of events, items, persons,
etc. in one group
Number or rate of events, items, persons,
etc. in another group
After the numerator is divided by the denominator, the result is
often expressed as the result “to one” or written as the result “:1.”
Note that in certain ratios, the numerator and denominator are
different categories of the same variable, such as males and
females, or persons 20–29 years and 30–39 years of age. In other
ratios, the numerator and denominator are completely different
variables, such as the number of hospitals in a city and the size of
Measures of Risk
Page 3-3
the population living in that city.
EXAMPLE: Calculating a Ratio — Different Categories of Same Variable
Between 1971 and 1975, as part of the National Health and Nutrition Examination Survey (NHANES), 7,381 persons
ages 40–77 years were enrolled in a follow-up study.1
At the time of enrollment, each study participant was
classified as having or not having diabetes. During 1982–1984, enrollees were documented either to have died or
were still alive. The results are summarized as follows.
Original Enrollment
(1971–1975)
Dead at Follow-Up
(1982–1984)
Diabetic men 189 100
Nondiabetic men 3,151 811
Diabetic women 218 72
Nondiabetic women 3,823 511
Of the men enrolled in the NHANES follow-up study, 3,151 were nondiabetic and 189 were diabetic. Calculate the
ratio of non-diabetic to diabetic men.
Ratio = 3,151 / 189 x 1 = 16.7:1
Properties and uses of ratios
• Ratios are common descriptive measures, used in all fields. In
epidemiology, ratios are used as both descriptive measures and
as analytic tools. As a descriptive measure, ratios can describe
the male-to-female ratio of participants in a study, or the ratio of
controls to cases (e.g., two controls per case). As an analytic
tool, ratios can be calculated for occurrence of illness, injury, or
death between two groups. These ratio measures, including risk
ratio (relative risk), rate ratio, and odds ratio, are described later
in this lesson.
• As noted previously, the numerators and denominators of a ratio
can be related or unrelated. In other words, you are free to use a
ratio to compare the number of males in a population with the
number of females, or to compare the number of residents in a
population with the number of hospitals or dollars spent on
over-the-counter medicines.
• Usually, the values of both the numerator and denominator of a
ratio are divided by the value of one or the other so that either
the numerator or the denominator equals 1.0. So the ratio of
non-diabetics to diabetics cited in the previous example is more
likely to be reported as 16.7:1 than 3,151:189.
Measures of Risk
Page 3-4
EXAMPLES: Calculating Ratios for Different Variables
Example A: A city of 4,000,000 persons has 500 clinics. Calculate the ratio of clinics per person.
500 / 4,000,000 x 10n = 0.000125 clinics per person
To get a more easily understood result, you could set 10n = 104 = 10,000. Then the ratio becomes:
0.000125 x 10,000 = 1.25 clinics per 10,000 persons
You could also divide each value by 1.25, and express this ratio as 1 clinic for every 8,000 persons.
Example B: Delaware’s infant mortality rate in 2001 was 10.7 per 1,000 live births.2
New Hampshire’s infant
mortality rate in 2001 was 3.8 per 1,000 live births. Calculate the ratio of the infant mortality rate in Delaware to
that in New Hampshire.
10.7 / 3.8 x 1 = 2.8:1
Thus, Delaware’s infant mortality rate was 2.8 times as high as New Hampshire’s infant mortality rate in 2001.
A commonly used epidemiologic ratio: death-to-case ratio
Death-to-case ratio is the number of deaths attributed to a
particular disease during a specified period divided by the number
of new cases of that disease identified during the same period. It is
used as a measure of the severity of illness: the death-to-case ratio
for rabies is close to 1 (that is, almost everyone who develops
rabies dies from it), whereas the death-to-case ratio for the
common cold is close to 0.
For example, in the United States in 2002, a total of 15,075 new
cases of tuberculosis were reported.3
During the same year, 802
deaths were attributed to tuberculosis. The tuberculosis death-to-
case ratio for 2002 can be calculated as 802 / 15,075. Dividing
both numerator and denominator by the numerator yields 1 death
per 18.8 new cases. Dividing both numerator and denominator by
the denominator (and multiplying by 10n
= 100) yields 5.3 deaths
per 100 new cases. Both expressions are correct.
Note that, presumably, many of those who died had initially
contracted tuberculosis years earlier. Thus many of the 802 in the
numerator are not among the 15,075 in the denominator.
Therefore, the death-to-case ratio is a ratio, but not a proportion.
Proportion
Definition of proportion
A proportion is the comparison of a part to the whole. It is a type
of ratio in which the numerator is included in the denominator.
Measures of Risk
Page 3-5
You might use a proportion to describe what fraction of clinic
patients tested positive for HIV, or what percentage of the
population is younger than 25 years of age. A proportion may be
expressed as a decimal, a fraction, or a percentage.
Method for calculating a proportion
Number of persons or events with a
particular characteristic
x 10n
Total number of persons or events, of which
the numerator is a subset
For a proportion, 10n
is usually 100 (or n = 2) and is often
expressed as a percentage.
EXAMPLE: Calculating a Proportion
Example A: Calculate the proportion of men in the NHANES follow-up study who were diabetics.
Numerator = 189 diabetic men
Denominator = Total number of men = 189 + 3,151 = 3,340
Proportion = (189 / 3,340) x 100 = 5.66%
Example B: Calculate the proportion of deaths among men.
Numerator = deaths in men
= 100 deaths in diabetic men + 811 deaths in nondiabetic men
= 911 deaths in men
Notice that the numerator (911 deaths in men) is a subset of the denominator.
Denominator = all deaths
= 911 deaths in men + 72 deaths in diabetic women + 511 deaths in nondiabetic women
= 1,494 deaths
Proportion = 911 / 1,494 = 60.98% = 61%
Your Turn: What proportion of all study participants were men? (Answer = 45.25%)
Properties and uses of proportions
• Proportions are common descriptive measures used in all fields.
In epidemiology, proportions are used most often as descriptive
measures. For example, one could calculate the proportion of
persons enrolled in a study among all those eligible
(“participation rate”), the proportion of children in a village
vaccinated against measles, or the proportion of persons who
developed illness among all passengers of a cruise ship.
• Proportions are also used to describe the amount of disease that
Measures of Risk
Page 3-6
can be attributed to a particular exposure. For example, on the
basis of studies of smoking and lung cancer, public health
officials have estimated that greater than 90% of the lung cancer
cases that occur are attributable to cigarette smoking.
• In a proportion, the numerator must be included in the
denominator. Thus, the number of apples divided by the number
of oranges is not a proportion, but the number of apples divided
by the total number of fruits of all kinds is a proportion.
Remember, the numerator is always a subset of the
denominator.
• A proportion can be expressed as a fraction, a decimal, or a
percentage. The statements “one fifth of the residents became
ill” and “twenty percent of the residents became ill” are
equivalent.
• Proportions can easily be converted to ratios. If the numerator is
the number of women (179) who attended a clinic and the
denominator is all the clinic attendees (341), the proportion of
clinic attendees who are women is 179 / 341, or 52% (a little
more than half). To convert to a ratio, subtract the numerator
from the denominator to get the number of clinic patients who
are not women, i.e., the number of men (341 – 179 = 162
men.)Thus, ratio of women to men could be calculated from the
proportion as:
Ratio = 179 / (341 – 179) x 1
= 179 / 162
= 1.1 to 1 female-to-male ratio
Conversely, if a ratio’s numerator and denominator together make
up a whole population, the ratio can be converted to a proportion.
You would add the ratio’s numerator and denominator to form the
denominator of the proportion, as illustrated in the NHANES
follow-up study examples (provided earlier in this lesson).
A specific type of epidemiologic proportion: proportionate
mortality
Proportionate mortality is the proportion of deaths in a specified
population during a period of time that are attributable to different
causes. Each cause is expressed as a percentage of all deaths, and
the sum of the causes adds up to 100%. These proportions are not
rates because the denominator is all deaths, not the size of the
population in which the deaths occurred. Table 3.1 lists the
primary causes of death in the United States in 2003 for persons of
all ages and for persons aged 25–44 years, by number of deaths,
proportionate mortality, and rank.
Measures of Risk
Page 3-7
Table 3.1 Number, Proportionate Mortality, and Ranking of Deaths for Leading Causes of Death, All
Ages and 25–44 Year Age Group — United States, 2003
All Ages Ages 25–44 Years
Number Percentage Rank Number Percentage Rank
All causes 2,443,930 100.0 128,924 100.0
Diseases of heart 684,462 28.0 1 16,283 12.6 3
Malignant neoplasms 554,643 22.7 2 19,041 14.8 2
Cerebrovascular disease 157,803 6.5 3 3,004 2.3 8
Chronic lower respiratory diseases 126,128 5.2 4 401 0.3 *
Accidents (unintentional injuries) 105,695 4.3 5 27,844 21.6 1
Diabetes mellitus 73,965 3.0 6 2,662 2.1 9
Influenza & pneumonia 64,847 2.6 7 1,337 1.0 10
Alzheimer's disease 63,343 2.6 8 0 0.0 *
Nephritis, nephrotic syndrome, nephrosis 33,615 1.4 9 305 0.2 *
Septicemia 34,243 1.4 10 328 0.2 *
Intentional self-harm (suicide) 30,642 1.3 11 11,251 8.7 4
Chronic liver disease and cirrhosis 27,201 1.1 12 3,288 2.6 7
Assault (homicide) 17,096 0.7 13 7,367 5.7 5
HIV disease 13,544 0.5 * 6,879 5.3 6
All other 456,703 18.7 29,480 22.9
* Not among top ranked causes
Data Sources: Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 2003. MMWR 2005;2(No.
54).
Hoyert DL, Kung HC, Smith BL. Deaths: Preliminary data for 2003. National Vital Statistics Reports; vol. 53 no 15. Hyattsville, MD:
National Center for Health Statistics 2005: p. 15, 27.
As illustrated in Table 3.1, the proportionate mortality for HIV was
0.5% among all age groups, and 5.3% among those aged 25–44
years. In other words, HIV infection accounted for 0.5% of all
deaths, and 5.3% of deaths among 25–44 year olds.
Rate
Definition of rate
In epidemiology, a rate is a measure of the frequency with which
an event occurs in a defined population over a specified period of
time. Because rates put disease frequency in the perspective of the
size of the population, rates are particularly useful for comparing
disease frequency in different locations, at different times, or
among different groups of persons with potentially different sized
populations; that is, a rate is a measure of risk.
To a non-epidemiologist, rate means how fast something is
happening or going. The speedometer of a car indicates the car’s
speed or rate of travel in miles or kilometers per hour. This rate is
always reported per some unit of time. Some epidemiologists
restrict use of the term rate to similar measures that are expressed
per unit of time. For these epidemiologists, a rate describes how
quickly disease occurs in a population, for example, 70 new cases
Measures of Risk
Page 3-8
of breast cancer per 1,000 women per year. This measure conveys
a sense of the speed with which disease occurs in a population, and
seems to imply that this pattern has occurred and will continue to
occur for the foreseeable future. This rate is an incidence rate,
described in the next section, starting on page 3-13.
Other epidemiologists use the term rate more loosely, referring to
proportions with case counts in the numerator and size of
population in the denominator as rates. Thus, an attack rate is the
proportion of the population that develops illness during an
outbreak. For example, 20 of 130 persons developed diarrhea after
attending a picnic. (An alternative and more accurate phrase for
attack rate is incidence proportion.) A prevalence rate is the
proportion of the population that has a health condition at a point
in time. For example, 70 influenza case-patients in March 2005
reported in County A. A case-fatality rate is the proportion of
persons with the disease who die from it. For example, one death
due to meningitis among County A’s population. All of these
measures are proportions, and none is expressed per units of time.
Therefore, these measures are not considered “true” rates by some,
although use of the terminology is widespread.
Table 3.2 summarizes some of the common epidemiologic
measures as ratios, proportions, or rates.
Table 3.2 Epidemiologic Measures Categorized as Ratio, Proportion, or Rate
Condition Ratio Proportion Rate
Morbidity
(Disease)
Risk ratio
(Relative risk)
Rate ratio
Odds ratio
Period prevalence
Attack rate
(Incidence proportion)
Secondary attack rate
Point prevalence
Attributable proportion
Person-time incidence rate
Mortality
(Death)
Death-to-case ratio Proportionate mortality Crude mortality rate
Case-fatality rate
Cause-specific mortality rate
Age-specific mortality rate
Maternal mortality rate
Infant mortality rate
Natality
(Birth)
Crude birth rate
Crude fertility rate
Measures of Risk
Page 3-9
Exercise 3.1
For each of the fractions shown below, indicate whether it is a ratio, a
proportion, a rate, or none of the three.
A. Ratio
B. Proportion
C. Rate
D. None of the above
________ 1.
2004
in
died
who
A
State
in
women
of
number
2004
in
disease
heart
from
died
who
A
State
in
women
of
number
________ 2.
2004
1,
July
on
A
State
in
living
women
of
number
estimated
2004
in
disease
heart
from
died
who
A
State
in
women
of
number
________ 3.
2004
in
cancer
from
died
who
A
State
in
women
of
number
2004
in
disease
heart
from
died
who
A
State
in
women
of
number
________ 4.
2004
in
types)
(all
cancer
from
died
who
A
State
in
women
of
number
2004
in
cancer
lung
from
died
who
A
State
in
women
of
number
________ 5.
2004
in
sales
cigarette
from
A
State
in
dollars)
(in
revenue
estimated
2004
in
cancer
lung
from
died
who
A
State
in
women
of
number
Check your answers on page 3-52
Measures of Risk
Page 3-10
Morbidity Frequency Measures
Morbidity has been defined as any departure, subjective or
objective, from a state of physiological or psychological well-
being. In practice, morbidity encompasses disease, injury, and
disability. In addition, although for this lesson the term refers to
the number of persons who are ill, it can also be used to describe
the periods of illness that these persons experienced, or the
duration of these illnesses.4
Measures of morbidity frequency characterize the number of
persons in a population who become ill (incidence) or are ill at a
given time (prevalence). Commonly used measures are listed in
Table 3.3.
Table 3.3 Frequently Used Measures of Morbidity
Measure Numerator Denominator
Incidence proportion
(or attack rate or risk)
Number of new cases of disease during
specified time interval
Population at start of time interval
Secondary attack rate Number of new cases among contacts Total number of contacts
Incidence rate
(or person-time rate)
Number of new cases of disease during
specified time interval
Summed person-years of
observation or average population
during time interval
Point prevalence Number of current cases (new and preexisting)
at a specified point in time
Population at the same specified
point in time
Period prevalence Number of current cases (new and preexisting)
over a specified period of time
Average or mid-interval population
Incidence refers to the occurrence of new cases of disease or
injury in a population over a specified period of time. Although
some epidemiologists use incidence to mean the number of new
cases in a community, others use incidence to mean the number of
new cases per unit of population.
Two types of incidence are commonly used — incidence
proportion and incidence rate.
Measures of Risk
Page 3-11
Incidence proportion or risk
Synonyms for incidence
proportion
• Attack rate
• Risk
• Probability of
developing disease
• Cumulative incidence
Definition of incidence proportion
Incidence proportion is the proportion of an initially disease-free
population that develops disease, becomes injured, or dies during a
specified (usually limited) period of time. Synonyms include attack
rate, risk, probability of getting disease, and cumulative incidence.
Incidence proportion is a proportion because the persons in the
numerator, those who develop disease, are all included in the
denominator (the entire population).
Method for calculating incidence proportion (risk)
Number of new cases of disease or injury
during specified period
Size of population at start of period
EXAMPLES: Calculating Incidence Proportion (Risk)
Example A: In the study of diabetics, 100 of the 189 diabetic men died during the 13-year follow-up period.
Calculate the risk of death for these men.
Numerator = 100 deaths among the diabetic men
Denominator = 189 diabetic men
10n
= 102
= 100
Risk = (100 / 189) x 100 = 52.9%
Example B: In an outbreak of gastroenteritis among attendees of a corporate picnic, 99 persons ate potato salad,
30 of whom developed gastroenteritis. Calculate the risk of illness among persons who ate potato salad.
Numerator = 30 persons who ate potato salad and developed gastroenteritis
Denominator = 99 persons who ate potato salad
10n
= 102
= 100
Risk = “Food-specific attack rate” = (30 / 99) x 100 = 0.303 x 100 = 30.3%
Properties and uses of incidence proportions
• Incidence proportion is a measure of the risk of disease or the
probability of developing the disease during the specified
period. As a measure of incidence, it includes only new cases of
disease in the numerator. The denominator is the number of
persons in the population at the start of the observation period.
Because all of the persons with new cases of disease
(numerator) are also represented in the denominator, a risk is
also a proportion.
Measures of Risk
Page 3-12
More About Denominators
The denominator of an incidence proportion is the number of persons at the start of the observation period. The
denominator should be limited to the “population at risk” for developing disease, i.e., persons who have the
potential to get the disease and be included in the numerator. For example, if the numerator represents new cases
of cancer of the ovaries, the denominator should be restricted to women, because men do not have ovaries. This is
easily accomplished because census data by sex are readily available. In fact, ideally the denominator should be
restricted to women with ovaries, excluding women who have had their ovaries removed surgically (often done in
conjunction with a hysterectomy), but this is not usually practical. This is an example of field epidemiologists doing
the best they can with the data they have.
• In the outbreak setting, the term attack rate is often used as a
synonym for risk. It is the risk of getting the disease during a
specified period, such as the duration of an outbreak. A variety
of attack rates can be calculated.
Overall attack rate is the total number of new cases
divided by the total population.
A food-specific attack rate is the number of persons who
ate a specified food and became ill divided by the total
number of persons who ate that food, as illustrated in the
previous potato salad example.
A secondary attack rate is sometimes calculated to
document the difference between community transmission
of illness versus transmission of illness in a household,
barracks, or other closed population. It is calculated as:
Number of cases among contacts
of primary cases
x 10n
Total number of contacts
Often, the total number of contacts in the denominator is calculated
as the total population in the households of the primary cases,
minus the number of primary cases. For a secondary attack rate,
10n
usually is 100%.
EXAMPLE: Calculating Secondary Attack Rates
Consider an outbreak of shigellosis in which 18 persons in 18 different households all became ill. If the population of
the community was 1,000, then the overall attack rate was 18 / 1,000 x 100% = 1.8%. One incubation period later,
17 persons in the same households as these “primary” cases developed shigellosis. If the 18 households included 86
persons, calculate the secondary attack rate.
Secondary attack rate = (17 / (86 - 18)) x 100% = (17 / 68) x 100% = 25.0%
Measures of Risk
Page 3-13
Incidence rate or person-time rate
Definition of incidence rate
Incidence rate or person-time rate is a measure of incidence that
incorporates time directly into the denominator. A person-time rate
is generally calculated from a long-term cohort follow-up study,
wherein enrollees are followed over time and the occurrence of
new cases of disease is documented. Typically, each person is
observed from an established starting time until one of four “end
points” is reached: onset of disease, death, migration out of the
study (“lost to follow-up”), or the end of the study. Similar to the
incidence proportion, the numerator of the incidence rate is the
number of new cases identified during the period of observation.
However, the denominator differs. The denominator is the sum of
the time each person was observed, totaled for all persons. This
denominator represents the total time the population was at risk of
and being watched for disease. Thus, the incidence rate is the ratio
of the number of cases to the total time the population is at risk of
disease.
Method for calculating incidence rate
Number of new cases of disease or injury
during specified period
Time each person was observed,
totaled for all persons
In a long-term follow-up study of morbidity, each study participant
may be followed or observed for several years. One person
followed for 5 years without developing disease is said to
contribute 5 person-years of follow-up.
What about a person followed for one year before being lost to
follow-up at year 2? Many researchers assume that persons lost to
follow-up were, on average, disease-free for half the year, and thus
contribute ½ year to the denominator. Therefore, the person
followed for one year before being lost to follow-up contributes
1.5 person-years. The same assumption is made for participants
diagnosed with the disease at the year 2 examination — some may
have developed illness in month 1, and others in months 2 through
12. So, on average, they developed illness halfway through the
year. As a result, persons diagnosed with the disease contribute ½
year of follow-up during the year of diagnosis.
The denominator of the person-time rate is the sum of all of the
Measures of Risk
Page 3-14
person-years for each study participant. So, someone lost to
follow-up in year 3, and someone diagnosed with the disease in
year 3, each contributes 2.5 years of disease-free follow-up to the
denominator.
Properties and uses of incidence rates
• An incidence rate describes how quickly disease occurs in a
population. It is based on person-time, so it has some
advantages over an incidence proportion. Because person-time
is calculated for each subject, it can accommodate persons
coming into and leaving the study. As noted in the previous
example, the denominator accounts for study participants who
are lost to follow-up or who die during the study period. In
addition, it allows enrollees to enter the study at different times.
In the NHANES follow-up study, some participants were
enrolled in 1971, others in 1972, 1973, 1974, and 1975.
• Person-time has one important drawback. Person-time assumes
that the probability of disease during the study period is
constant, so that 10 persons followed for one year equals one
person followed for 10 years. Because the risk of many chronic
diseases increases with age, this assumption is often not valid.
• Long-term cohort studies of the type described here are not very
common. However, epidemiologists far more commonly
calculate incidence rates based on a numerator of cases
observed or reported, and a denominator based on the mid-year
population. This type of incident rate turns out to be comparable
to a person-time rate.
• Finally, if you report the incidence rate of, say, the heart disease
study as 2.5 per 1,000 person-years, epidemiologists might
understand, but most others will not. Person-time is
epidemiologic jargon. To convert this jargon to something
understandable, simply replace “person-years” with “persons
per year.” Reporting the results as 2.5 new cases of heart
disease per 1,000 persons per year sounds like English rather
than jargon. It also conveys the sense of the incidence rate as a
dynamic process, the speed at which new cases of disease occur
in the population.
Measures of Risk
Page 3-15
EXAMPLES: Calculating Incidence Rates
Example A: Investigators enrolled 2,100 women in a study and followed them annually for four years to determine
the incidence rate of heart disease. After one year, none had a new diagnosis of heart disease, but 100 had been
lost to follow-up. After two years, one had a new diagnosis of heart disease, and another 99 had been lost to follow-
up. After three years, another seven had new diagnoses of heart disease, and 793 had been lost to follow-up. After
four years, another 8 had new diagnoses with heart disease, and 392 more had been lost to follow-up.
The study results could also be described as follows: No heart disease was diagnosed at the first year. Heart disease
was diagnosed in one woman at the second year, in seven women at the third year, and in eight women at the
fourth year of follow-up. One hundred women were lost to follow-up by the first year, another 99 were lost to
follow-up after two years, another 793 were lost to follow-up after three years, and another 392 women were lost to
follow-up after 4 years, leaving 700 women who were followed for four years and remained disease free.
Calculate the incidence rate of heart disease among this cohort. Assume that persons with new diagnoses of heart
disease and those lost to follow-up were disease-free for half the year, and thus contribute ½ year to the
denominator.
Numerator = number of new cases of heart disease
= 0 + 1 + 7 + 8 = 16
Denominator = person-years of observation
= (2,000 + ½ x 100) + (1,900 + ½ x 1 + ½ x 99) + (1,100 + ½ x 7 + ½ x 793) +
(700 + ½ x 8 + ½ x 392)
= 6,400 person-years of follow-up
or
Denominator = person-years of observation
= (1 x 1.5) + (7 x 2.5) + (8 x 3.5) + (100 x 0.5) + (99 x 1.5) + (793 x 2.5) +
(392 x 3.5) + (700 x 4)
= 6,400 person-years of follow-up
Person-time rate = Number of new cases of disease or injury during specified period
Time each person was observed, totaled for all persons
= 16 / 6,400
= .0025 cases per person-year
= 2.5 cases per 1,000 person-years
In contrast, the incidence proportion can be calculated as 16 / 2,100 = 7.6 cases per 1,000 population during the
four-year period, or an average of 1.9 cases per 1,000 per year (7.6 divided by 4 years). The incidence proportion
underestimates the true rate because it ignores persons lost to follow-up, and assumes that they remained disease-
free for all four years.
Example B: The diabetes follow-up study included 218 diabetic women and 3,823 nondiabetic women. By the end
of the study, 72 of the diabetic women and 511 of the nondiabetic women had died. The diabetic women were
observed for a total of 1,862 person years; the nondiabetic women were observed for a total of 36,653 person
years. Calculate the incidence rates of death for the diabetic and non-diabetic women.
For diabetic women, numerator = 72 and denominator = 1,862
Person-time rate = 72 / 1,862
= 0.0386 deaths per person-year
= 38.6 deaths per 1,000 person-years
For nondiabetic women, numerator = 511 and denominator = 36,653
Person-time rate = 511 / 36,653 = 0.0139 deaths per person-year
= 13.9 deaths per 1,000 person-years
Measures of Risk
Page 3-16
EXAMPLES: Calculating Incidence Rates (Continued)
Example C: In 2003, 44,232 new cases of acquired immunodeficiency syndrome (AIDS) were reported in the
United States.5
The estimated mid-year population of the U.S. in 2003 was approximately 290,809,777.6
Calculate
the incidence rate of AIDS in 2003.
Numerator = 44,232 new cases of AIDS
Denominator = 290,809,777 estimated mid-year population
10n = 100,000
Incidence rate = (44,232 / 290,809,777) x 100,000
= 15.21 new cases of AIDS per 100,000 population
Prevalence
Definition of prevalence
Prevalence, sometimes referred to as prevalence rate, is the
proportion of persons in a population who have a particular disease
or attribute at a specified point in time or over a specified period of
time. Prevalence differs from incidence in that prevalence includes
all cases, both new and preexisting, in the population at the
specified time, whereas incidence is limited to new cases only.
Point prevalence refers to the prevalence measured at a particular
point in time. It is the proportion of persons with a particular
disease or attribute on a particular date.
Period prevalence refers to prevalence measured over an interval
of time. It is the proportion of persons with a particular disease or
attribute at any time during the interval.
Method for calculating prevalence of disease
All new and pre-existing cases
during a given time period x 10n
Population during the same time period
Method for calculating prevalence of an attribute
Persons having a particular attribute
during a given time period x 10n
Population during the same time period
The value of 10n
is usually 1 or 100 for common attributes. The
value of 10n
might be 1,000, 100,000, or even 1,000,000 for rare
attributes and for most diseases.
Measures of Risk
Page 3-17
EXAMPLE: Calculating Prevalence
In a survey of 1,150 women who gave birth in Maine in 2000, a total of 468 reported taking a multivitamin at least 4
times a week during the month before becoming pregnant.7
Calculate the prevalence of frequent multivitamin use in
this group.
Numerator = 468 multivitamin users
Denominator = 1,150 women
Prevalence = (468 / 1,150) x 100 = 0.407 x 100 = 40.7%
Properties and uses of prevalence
• Prevalence and incidence are frequently confused. Prevalence
refers to proportion of persons who have a condition at or
during a particular time period, whereas incidence refers to the
proportion or rate of persons who develop a condition during a
particular time period. So prevalence and incidence are similar,
but prevalence includes new and pre-existing cases whereas
incidence includes new cases only. The key difference is in their
numerators.
Numerator of incidence = new cases that occurred during
a given time period
Numerator of prevalence = all cases present during a given
time period
• The numerator of an incidence proportion or rate consists only
of persons whose illness began during the specified interval.
The numerator for prevalence includes all persons ill from a
specified cause during the specified interval regardless of
when the illness began. It includes not only new cases, but also
preexisting cases representing persons who remained ill during
some portion of the specified interval.
• Prevalence is based on both incidence and duration of illness.
High prevalence of a disease within a population might reflect
high incidence or prolonged survival without cure or both.
Conversely, low prevalence might indicate low incidence, a
rapidly fatal process, or rapid recovery.
• Prevalence rather than incidence is often measured for chronic
diseases such as diabetes or osteoarthritis which have long
duration and dates of onset that are difficult to pinpoint.
Measures of Risk
Page 3-18
EXAMPLES: Incidence versus Prevalence
Figure 3.1 represents 10 new cases of illness over about 15 months in a population of 20 persons. Each horizontal
line represents one person. The down arrow indicates the date of onset of illness. The solid line represents the
duration of illness. The up arrow and the cross represent the date of recovery and date of death, respectively.
Figure 3.1 New Cases of Illness from October 1, 2004–September 30, 2005
Example A: Calculate the incidence rate from October 1, 2004, to September 30, 2005, using the midpoint
population (population alive on April 1, 2005) as the denominator. Express the rate per 100 population.
Incidence rate numerator = number of new cases between October 1 and September 30
= 4 (the other 6 all had onsets before October 1, and are not included)
Incidence rate denominator = April 1 population
= 18 (persons 2 and 8 died before April 1)
Incidence rate = (4 / 18) x 100
= 22 new cases per 100 population
Example B: Calculate the point prevalence on April 1, 2005. Point prevalence is the number of persons ill on the
date divided by the population on that date. On April 1, seven persons (persons 1, 4, 5, 7, 9, and 10) were ill.
Point prevalence = (7 / 18) x 100
= 38.89%
Example C: Calculate the period prevalence from October 1, 2004, to September 30, 2005. The numerator of
period prevalence includes anyone who was ill any time during the period. In Figure 3.1, the first 10 persons were
all ill at some time during the period.
Period prevalence = (10 / 20) x 100
= 50.0%
Measures of Risk
Page 3-19
Exercise 3.2
For each of the fractions shown below, indicate whether it is an incidence
proportion, incidence rate, prevalence, or none of the three.
A. Incidence proportion
B. Incidence rate
C. Prevalence
D. None of the above
________ 1. number of women in Framingham Study
who have died through last year from heart disease
number of women initially enrolled in Framingham Study
________ 2. number of women in Framingham Study who have died
through last year from heart disease
number of person-years contributed through last year by
women initially enrolled in Framingham Study
________ 3. number of women in town of Framingham who reported
having heart disease in recent health survey
estimated number of women residents of Framingham
during same period
________ 4. number of women in Framingham Study newly diagnosed
with heart disease last year
number of women in Framingham Study without heart disease
at beginning of same year
________ 5. number of women in State A newly diagnosed with heart disease in 2004
estimated number of women living in State A on July 1, 2004
________ 6. estimated number of women smokers in State A
according to 2004 Behavioral Risk Factor Survey
estimated number of women living in State A on July 1, 2004
________ 7. number of women in State A who reported having
heart disease in 2004 health survey
estimated number of women smokers in State A according to
2004 Behavioral Risk Factor Survey
Check your answers on page 3-52
Measures of Risk
Page 3-20
Mortality Frequency Measures
Mortality rate
A mortality rate is a measure of the frequency of occurrence of
death in a defined population during a specified interval. Morbidity
and mortality measures are often the same mathematically; it’s just
a matter of what you choose to measure, illness or death. The
formula for the mortality of a defined population, over a specified
period of time, is:
Deaths occurring during a given time period
x 10n
Size of the population among which
the deaths occurred
When mortality rates are based on vital statistics (e.g., counts of
death certificates), the denominator most commonly used is the
size of the population at the middle of the time period. In the
United States, values of 1,000 and 100,000 are both used for 10n
for most types of mortality rates. Table 3.4 summarizes the
formulas of frequently used mortality measures.
Table 3.4 Frequently Used Measures of Mortality
Measure Numerator Denominator 10n
Crude death rate Total number of deaths during a given time interval Mid-interval population 1,000 or
100,000
Cause-specific
death rate
Number of deaths assigned to a specific cause
during a given time interval
Mid-interval population 100,000
Proportionate
mortality
Number of deaths assigned to a specific cause
during a given time interval
Total number of deaths from
all causes during the same
time interval
100 or
1,000
Death-to-case ratio Number of deaths assigned to a specific cause
during a given time interval
Number of new cases of same
disease reported during the
same time interval
100
Neonatal mortality
rate
Number of deaths among children
< 28 days of age during a given time interval
Number of live births during
the same time interval
1,000
Postneonatal
mortality rate
Number of deaths among children 28–364 days of
age during a given time interval
Number of live births during
the same time interval
1,000
Infant mortality rate Number of deaths among children
< 1 year of age during a given time interval
Number of live births during
the same time interval
1,000
Maternal mortality
rate
Number of deaths assigned to pregnancy-related
causes during a given time interval
Number of live births during
the same time interval
100,000
Measures of Risk
Page 3-21
Crude mortality rate (crude death rate)
The crude mortality rate is the mortality rate from all causes of
death for a population. In the United States in 2003, a total of
2,419,921 deaths occurred. The estimated population was
290,809,777. The crude mortality rate in 2003 was, therefore,
(2,419,921 / 290,809,777) x 100,000, or 832.1 deaths per 100,000
population.8
Cause-specific mortality rate
The cause-specific mortality rate is the mortality rate from a
specified cause for a population. The numerator is the number of
deaths attributed to a specific cause. The denominator remains the
size of the population at the midpoint of the time period. The
fraction is usually expressed per 100,000 population. In the United
States in 2003, a total of 108,256 deaths were attributed to
accidents (unintentional injuries), yielding a cause-specific
mortality rate of 37.2 per 100,000 population.8
Age-specific mortality rate
An age-specific mortality rate is a mortality rate limited to a
particular age group. The numerator is the number of deaths in that
age group; the denominator is the number of persons in that age
group in the population. In the United States in 2003, a total of
130,761 deaths occurred among persons aged 25–44 years, or an
age-specific mortality rate of 153.0 per 100,000 25–44 year olds.8
Some specific types of age-specific mortality rates are neonatal,
postneonatal, and infant mortality rates, as described in the
following sections.
Infant mortality rate
The infant mortality rate is perhaps the most commonly used
measure for comparing health status among nations. It is calculated
as follows:
Number of deaths among children < 1 year of
age reported during a given time period
x 1,000
Number of live births reported during the
same time period
The infant mortality rate is generally calculated on an annual basis.
It is a widely used measure of health status because it reflects the
health of the mother and infant during pregnancy and the year
thereafter. The health of the mother and infant, in turn, reflects a
wide variety of factors, including access to prenatal care,
prevalence of prenatal maternal health behaviors (such as alcohol
Measures of Risk
Page 3-22
or tobacco use and proper nutrition during pregnancy, etc.),
postnatal care and behaviors (including childhood immunizations
and proper nutrition), sanitation, and infection control.
Is the infant mortality rate a ratio? Yes. Is it a proportion? No,
because some of the deaths in the numerator were among children
born the previous year. Consider the infant mortality rate in 2003.
That year, 28,025 infants died and 4,089,950 children were born,
for an infant mortality rate of 6.951 per 1,000.8
Undoubtedly, some
of the deaths in 2003 occurred among children born in 2002, but
the denominator includes only children born in 2003.
Is the infant mortality rate truly a rate? No, because the
denominator is not the size of the mid-year population of children
< 1 year of age in 2003. In fact, the age-specific death rate for
children < 1 year of age for 2003 was 694.7 per 100,000.8
Obviously the infant mortality rate and the age-specific death rate
for infants are very similar (695.1 versus 694.7 per 100,000) and
close enough for most purposes. They are not exactly the same,
however, because the estimated number of infants residing in the
United States on July 1, 2003 was slightly larger than the number
of children born in the United States in 2002, presumably because
of immigration.
Neonatal mortality rate
The neonatal period covers birth up to but not including 28 days.
The numerator of the neonatal mortality rate therefore is the
number of deaths among children under 28 days of age during a
given time period. The denominator of the neonatal mortality rate,
like that of the infant mortality rate, is the number of live births
reported during the same time period. The neonatal mortality rate
is usually expressed per 1,000 live births. In 2003, the neonatal
mortality rate in the United States was 4.7 per 1,000 live births.8
Postneonatal mortality rate
The postneonatal period is defined as the period from 28 days of
age up to but not including 1 year of age. The numerator of the
postneonatal mortality rate therefore is the number of deaths
among children from 28 days up to but not including 1 year of age
during a given time period. The denominator is the number of live
births reported during the same time period. The postneonatal
mortality rate is usually expressed per 1,000 live births. In 2003,
the postneonatal mortality rate in the United States was 2.3 per
1,000 live births.8
Measures of Risk
Page 3-23
Maternal mortality rate
The maternal mortality rate is really a ratio used to measure
mortality associated with pregnancy. The numerator is the number
of deaths during a given time period among women while pregnant
or within 42 days of termination of pregnancy, irrespective of the
duration and the site of the pregnancy, from any cause related to or
aggravated by the pregnancy or its management, but not from
accidental or incidental causes. The denominator is the number of
live births reported during the same time period. Maternal
mortality rate is usually expressed per 100,000 live births. In 2003,
the U.S. maternal mortality rate was 8.9 per 100,000 live births.8
Sex-specific mortality rate
A sex-specific mortality rate is a mortality rate among either males
or females. Both numerator and denominator are limited to the one
sex.
Race-specific mortality rate
A race-specific mortality rate is a mortality rate related to a
specified racial group. Both numerator and denominator are
limited to the specified race.
Combinations of specific mortality rates
Mortality rates can be further stratified by combinations of cause,
age, sex, and/or race. For example, in 2002, the death rate from
diseases of the heart among women ages 45–54 years was 50.6 per
100,000.9
The death rate from diseases of the heart among men in
the same age group was 138.4 per 100,000, or more than 2.5 times
as high as the comparable rate for women. These rates are a cause-,
age-, and sex-specific rates, because they refer to one cause
(diseases of the heart), one age group (45–54 years), and one sex
(female or male).
Measures of Risk
Page 3-24
EXAMPLE: Calculating Mortality Rates
Table 3.5 provides the number of deaths from all causes and from accidents (unintentional injuries) by age group in
the United States in 2002. Review the following rates. Determine what to call each one, then calculate it using the
data provided in Table 3.5.
a. Unintentional-injury-specific mortality rate for the entire population
This is a cause-specific mortality rate.
Rate = number of unintentional injury deaths in the entire population x 100,000
estimated midyear population
= (106,742 / 288,357,000) x 100,000
= 37.0 unintentional-injury-related deaths per 100,000 population
b. All-cause mortality rate for 25–34 year olds
This is an age-specific mortality rate.
Rate = number of deaths from all causes among 25–34 year olds x 100,000
estimated midyear population of 25–34 year olds
= (41,355 / 39,928,000) x 100,000
= 103.6 deaths per 100,000 25–34 year olds
c. All-cause mortality among males
This is a sex-specific mortality rate.
Rate = number of deaths from all causes among males x 100,000
estimated midyear population of males
= (1,199,264 / 141,656,000) x 100,000
= 846.6 deaths per 100,000 males
d. Unintentional-injury specific mortality among 25 to 34 year old males
This is a cause-specific, age-specific, and sex-specific mortality rate
Rate = number of unintentional injury deaths among 25–34 year old males x 100,000
estimated midyear population of 25–34 year old males
= (9,635 / 20,203,000) x 100,000
= 47.7 unintentional-injury-related deaths per 100,000 25–34 year olds
Measures of Risk
Page 3-25
Table 3.5 All-Cause and Unintentional Injury Mortality and Estimated Population by Age Group, For
Both Sexes and For Males Alone — United States, 2002
All Races, Both Sexes All Races, Males
Age group
(years)
All
Causes
Unintentional
Injuries
Estimated
Pop. (x 1000)
All
Causes
Unintentional
Injuries
Estimated
Pop. (x 1000)
0–4 32,892 2,587 19,597 18,523 1,577 10,020
5–14 7,150 2,718 41,037 4,198 1713 21,013
15–24 33,046 15,412 40,590 24,416 11,438 20,821
25–34 41,355 12,569 39,928 28,736 9,635 20,203
35–44 91,140 16,710 44,917 57,593 12,012 22,367
45–54 172,385 14,675 40,084 107,722 10,492 19,676
55–64 253,342 8,345 26,602 151,363 5,781 12,784
65+ 1,811,720 33,641 35,602 806,431 16,535 14,772
Not stated 357 85 0 282 74 0
Total 2,443,387 106,742 288,357 1,199,264 69,257 141,656
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for
Injury Prevention and Control. Available from: http://www.cdc.gov/injury/wisqars.
Measures of Risk
Page 3-26
Exercise 3.3
In 2001, a total of 15,555 homicide deaths occurred among males and
4,753 homicide deaths occurred among females. The estimated 2001
midyear populations for males and females were 139,813,000 and
144,984,000, respectively.
1. Calculate the homicide-related death rates for males and for females.
2. What type(s) of mortality rates did you calculate in Question 1?
3. Calculate the ratio of homicide-mortality rates for males compared to females.
4. Interpret the rate you calculated in Question 3 as if you were presenting information to a
policymaker.
Check your answers on page 3-52
Measures of Risk
Page 3-27
Age-adjusted mortality rates
Age-adjusted
mortality rate: a
mortality rate
statistically modified to
eliminate the effect of
different age
distributions in the
different populations.
Mortality rates can be used to compare the rates in one area with
the rates in another area, or to compare rates over time. However,
because mortality rates obviously increase with age, a higher
mortality rate among one population than among another might
simply reflect the fact that the first population is older than the
second.
Consider that the mortality rates in 2002 for the states of Alaska
and Florida were 472.2 and 1,005.7 per 100,000, respectively (see
Table 3.6). Should everyone from Florida move to Alaska to
reduce their risk of death? No, the reason that Alaska’s mortality
rate is so much lower than Florida’s is that Alaska’s population is
considerably younger. Indeed, for seven age groups, the age-
specific mortality rates in Alaska are actually higher than Florida’s.
To eliminate the distortion caused by different underlying age
distributions in different populations, statistical techniques are used
to adjust or standardize the rates among the populations to be
compared. These techniques take a weighted average of the age-
specific mortality rates, and eliminate the effect of different age
distributions among the different populations. Mortality rates
computed with these techniques are age-adjusted or
age-standardized mortality rates. Alaska’s 2002 age-adjusted
mortality rate (794.1 per 100,000) was higher than Florida’s (787.8
per 100,000), which is not surprising given that 7 of 13 age-
specific mortality rates were higher in Alaska than Florida.
Death-to-case ratio
Definition of death-to-case ratio
The death-to-case ratio is the number of deaths attributed to a
particular disease during a specified time period divided by the
number of new cases of that disease identified during the same
time period. The death-to-case ratio is a ratio but not necessarily a
proportion, because some of the deaths that are counted in the
numerator might have occurred among persons who developed
disease in an earlier period, and are therefore not counted in the
denominator.
Measures of Risk
Page 3-28
Table 3.6 All-Cause Mortality by Age Group — Alaska and Florida, 2002
ALASKA FLORIDA
Age group
(years) Population Deaths
Death Rate
(per 100,000) Population Deaths
Death Rate
(per 100,000)
<1 9,938 55 553.4 205,579 1,548 753.0
1–4 38,503 12 31.2 816,570 296 36.2
5–9 50,400 6 11.9 1,046,504 141 13.5
10–14 57,216 24 41.9 1,131,068 219 19.4
15–19 56,634 43 75.9 1,073,470 734 68.4
20–24 42,929 63 146.8 1,020,856 1,146 112.3
25–34 84,112 120 142.7 2,090,312 2,627 125.7
35–44 107,305 280 260.9 2,516,004 5,993 238.2
45–54 103,039 427 414.4 2,225,957 10,730 482.0
55–64 52,543 480 913.5 1,694,574 16,137 952.3
65–74 24,096 502 2,083.3 1,450,843 28,959 1,996.0
65–84 11,784 645 5,473.5 1,056,275 50,755 4,805.1
85+ 3,117 373 11,966.6 359,056 48,486 13,503.7
Unknown NA 0 NA NA 43 NA
Total 3,030 3,030 472.2 16,687,068 167,814 1,005.7
Age-adjusted
rate: 794.1 787.8
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for
Injury Prevention and Control. Available from: http://www.cdc.gov/injury/wisqars.
Method for calculating death-to-case ratio
Number of deaths attributed to a particular
disease during specified period
x 10n
Number of new cases of the disease identified
during the specified period
EXAMPLE: Calculating Death-to-Case Ratios
Between 1940 and 1949, a total of 143,497 incident cases of diphtheria were reported. During the same decade,
11,228 deaths were attributed to diphtheria. Calculate the death-to-case ratio.
Death-to-case ratio = 11,228 / 143,497 x 1 = 0.0783
or
= 11,228 / 143,497 x 100 = 7.83 per 100
Measures of Risk
Page 3-29
Exercise 3.4
Table 3.7 provides the number of reported cases of diphtheria and the
number of diphtheria-associated deaths in the United States by decade.
Calculate the death-to-case ratio by decade. Describe the data in Table 3.7,
including your results.
Table 3.7 Number of Cases and Deaths from Diphtheria by Decade — United States, 1940–1999
Decade
Number of
New Cases
Number of
Deaths
Death-to-case
Ratio (x 100)
1940–1949 143,497 11,228 7.82
1950–1959 23,750 1,710
1960–1969 3,679 390
1970–1979 1,956 90
1980–1989 27 3
1990–1999 22 5
Data Sources: Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 2001. MMWR
2001;50(No. 53).
Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 1998. MMWR 1998;47(No. 53).
Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 1989. MMWR 1989;38 (No. 53).
Check your answers on page 3-53
Measures of Risk
Page 3-30
Case-fatality rate
The case-fatality rate is the proportion of persons with a particular
condition (cases) who die from that condition. It is a measure of
the severity of the condition. The formula is:
Number of cause-specific deaths among the
incident cases
x 10n
Number of incident cases
The case-fatality rate is a proportion, so the numerator is restricted
to deaths among people included in the denominator. The time
periods for the numerator and the denominator do not need to be
the same; the denominator could be cases of HIV/AIDS diagnosed
during the calendar year 1990, and the numerator, deaths among
those diagnosed with HIV in 1990, could be from 1990 to the
present.
EXAMPLE: Calculating Case-Fatality Rates
In an epidemic of hepatitis A traced to green onions from a restaurant, 555 cases were identified. Three of the case-
patients died as a result of their infections. Calculate the case-fatality rate.
Case fatality rate = (3 / 555) x 100 = 0.5%
The case-fatality rate is a proportion, not a true rate. As a result,
some epidemiologists prefer the term case-fatality ratio.
The concept behind the case-fatality rate and the death-to-case
ratio is similar, but the formulations are different. The death-to-
case ratio is simply the number of cause-specific deaths that
occurred during a specified time divided by the number of new
cases of that disease that occurred during the same time. The
deaths included in the numerator of the death-to-case ratio are not
restricted to the new cases in the denominator; in fact, for many
diseases, the deaths are among persons whose onset of disease was
years earlier. In contrast, in the case-fatality rate, the deaths
included in the numerator are restricted to the cases in the
denominator.
Proportionate mortality
Definition of proportionate mortality
Proportionate mortality describes the proportion of deaths in a
specified population over a period of time attributable to different
causes. Each cause is expressed as a percentage of all deaths, and
Measures of Risk
Page 3-31
the sum of the causes must add to 100%. These proportions are not
mortality rates, because the denominator is all deaths rather than
the population in which the deaths occurred.
Method for calculating proportionate mortality
For a specified population over a specified period,
Deaths caused by a particular cause
x 100
Deaths from all causes
The distribution of primary causes of death in the United States in
2003 for the entire population (all ages) and for persons ages 25–
44 years are provided in Table 3.1. As illustrated in that table,
accidents (unintentional injuries) accounted for 4.3% of all deaths,
but 21.6% of deaths among 25–44 year olds.8
Sometimes, particularly in occupational epidemiology,
proportionate mortality is used to compare deaths in a population
of interest (say, a workplace) with the proportionate mortality in
the broader population. This comparison of two proportionate
mortalities is called a proportionate mortality ratio, or PMR for
short. A PMR greater than 1.0 indicates that a particular cause
accounts for a greater proportion of deaths in the population of
interest than you might expect. For example, construction workers
may be more likely to die of injuries than the general population.
However, PMRs can be misleading, because they are not based on
mortality rates. A low cause-specific mortality rate in the
population of interest can elevate the proportionate mortalities for
all of the other causes, because they must add up to 100%. Those
workers with a high injury-related proportionate mortality very
likely have lower proportionate mortalities for chronic or disabling
conditions that keep people out of the workforce. In other words,
people who work are more likely to be healthier than the
population as a whole — this is known as the healthy worker
effect.
Measures of Risk
Page 3-32
Exercise 3.5
Using the data in Table 3.8, calculate the missing proportionate mortalities
for persons ages 25—44 years for diseases of the heart and assaults
(homicide).
Table 3.8 Number, Proportion (Percentage), and Ranking of Deaths for Leading Causes of Death, All
Ages and 25–44 Year Age Group — United States, 2003
All Ages Ages 25–44 Years
Number Percentage Rank Number Percentage Rank
All causes 2,443,93
0
100.0 128,924 100.0
Diseases of heart 684,462 28.0 1 16,283 3
Malignant neoplasms 554,643 22.7 2 19,041 14.8 2
Cerebrovascular disease 157,803 6.5 3 3,004 2.3 8
Chronic lower respiratory diseases 126,128 5.2 4 401 0.3 *
Accidents (unintentional injuries) 105,695 4.3 5 27,844 21.6 1
Diabetes mellitus 73,965 3.0 6 2,662 2.1 9
Influenza & pneumonia 64,847 2.6 7 1,337 1.0 10
Alzheimer's disease 63,343 2.6 8 0 0.0 *
Nephritis, nephrotic syndrome, nephrosis 33,615 1.4 9 305 0.2 *
Septicemia 34,243 1.4 10 328 0.2 *
Intentional self-harm (suicide) 30,642 1.3 11 11,251 8.7 4
Chronic liver disease and cirrhosis 27,201 1.1 12 3,288 2.6 7
Assault (homicide) 17,096 0.7 13 7,367 5
HIV disease 13,544 0.5 * 6,879 5.3 6
All other 456,703 18.7 29,480 22.9
* Not among top ranked causes
Data Sources: CDC. Summary of notifiable diseases, United States, 2003. MMWR 2005;2(No. 54).
Hoyert DL, Kung HC, Smith BL. Deaths: Preliminary data for 2003. National Vital Statistics Reports; vol. 53 no 15. Hyattsville, MD:
National Center for Health Statistics 2005: 15, 27.
Check your answers on page 3-53
Measures of Risk
Page 3-33
Years of potential life lost
Definition of years of potential life lost
Years of potential life lost (YPLL) is one measure of the impact of
premature mortality on a population. Additional measures
incorporate disability and other measures of quality of life. YPLL
is calculated as the sum of the differences between a predetermined
end point and the ages of death for those who died before that end
point. The two most commonly used end points are age 65 years
and average life expectancy.
The use of YPLL is affected by this calculation, which implies a
value system in which more weight is given to a death when it
occurs at an earlier age. Thus, deaths at older ages are “devalued.”
However, the YPLL before age 65 (YPLL65) places much more
emphasis on deaths at early ages than does YPLL based on
remaining life expectancy (YPLLLE). In 2000, the remaining life
expectancy was 21.6 years for a 60-year-old, 11.3 years for a 70-
year-old, and 8.6 for an 80-year-old. YPLL65 is based on the fewer
than 30% of deaths that occur among persons younger than 65. In
contrast, YPLL for life expectancy (YPLLLE) is based on deaths
among persons of all ages, so it more closely resembles crude
mortality rates.10
YPLL rates can be used to compare YPLL among populations of
different sizes. Because different populations may also have
different age distributions, YPLL rates are usually age-adjusted to
eliminate the effect of differing age distributions.
Method for calculating YPLL from a line listing
Step 1. Decide on end point (65 years, average life expectancy,
or other).
Step 2. Exclude records of all persons who died at or after the
end point.
Step 3. For each person who died before the end point,
calculate that person’s YPLL by subtracting the age at
death from the end point.
YPLLindividual = end point – age at death
Step 4. Sum the individual YPLLs.
YPLL = ∑ YPLLindividual
Measures of Risk
Page 3-34
Method for calculating YPLL from a frequency
Step 1. Ensure that age groups break at the identified end point
(e.g., 65 years). Eliminate all age groups older than the
endpoint.
Step 2. For each age group younger than the end point, identify
the midpoint of the age group, where midpoint =
age group’s youngest age in years + oldest age + 1
2
Step 3. For each age group younger than the end point, identify
that age group’s YPLL by subtracting the midpoint
from the end point.
Step 4. Calculate age-specific YPLL by multiplying the age
group’s YPLL times the number of persons in that age
group.
Step 5. Sum the age-specific YPLLs.
The YPLL rate represents years of potential life lost per 1,000
population below the end-point age, such as 65 years. YPLL rates
should be used to compare premature mortality in different
populations, because YPLL does not take into account differences
in population sizes.
The formula for a YPLL rate is as follows:
Years of potential life lost
x 10n
Population under age 65 years
Measures of Risk
Page 3-35
EXAMPLE: Calculating YPLL and YPLL Rates
Use the data in Tables 3.9 and 3.10 to calculate the leukemia-related mortality rate for all ages, mortality rate for
persons under age 65 years, YPLL, and YPLL rate.
1. Leukemia related mortality rate, all ages
= (21,498 / 288,357,000) x 100,000 = 7.5 leukemia deaths per 100,000 population
2. Leukemia related mortality rate for persons under age 65 years
= 125 + 316 + 472 + 471 + 767 + 1,459 + 2,611 x 100,000
(19,597 + 41,037 + 40,590 +39,928 + 44,917 + 40,084 + 26,602)
= 6,221 / 252,755,000 = x 100,000
= 2.5 leukemia deaths per 100,000 persons under age 65 years
3. Leukemia related YPLL
a. Calculate the midpoint of each age interval. Using the previously shown formula, the midpoint of the age
group 0–4 years is (0 + 4 + 1) / 2, or 5 / 2, or 2.5 years. Using the same formula, midpoints must be
determined for each age group up to and including the age group 55 to 64 years (see column 3 of Table
3.10).
b. Subtract the midpoint from the end point to determine the years of potential life lost for a particular age
group. For the age group 0–4 years, each death represents 65 minus 2.5, or 62.5 years of potential life lost
(see column 4 of Table 3.10).
c. Calculate age specific years of potential life lost by multiplying the number of deaths in a given age group
by its years of potential life lost. For the age group 0–4 years, 125 deaths x 62.5 = 7,812.5 YPLL (see
column 5 of Table 3.10).
d. Total the age specific YPLL. The total YPLL attributed to leukemia in the United States in 2002 was 117,033
years (see Total of column 5, Table 3.10).
4. Leukemia related YPLL rate
= YPLL65 rate
= YPLL divided by population to age 65
= (117,033 / 252,755,000) x 1,000
= 0.5 YPLL per 1,000 population under age 65
Measures of Risk
Page 3-36
Table 3.9 Deaths Attributed to HIV or Leukemia by Age Group — United States, 2002
Age group
(Years)
Population
(X 1,000)
Number of
HIV Deaths
Number of
Leukemia Deaths
0–4 19,597 12 125
5–14 41,037 25 316
15–24 40,590 178 472
25–34 39,928 1,839 471
35–44 44,917 5,707 767
45–54 40,084 4,474 1,459
55–64 26,602 1,347 2,611
65+ 35,602 509 15,277
Not stated 4 0
Total 288,357 14,095 21,498
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for
Injury Prevention and Control. Available from: http://www.cdc.gov/injury/wisqars.
Table 3.10 Deaths and Years of Potential Life Lost Attributed to Leukemia by Age Group — United
States, 2002
Column 1
Age Group (years)
Column 2
Deaths
Column 3
Age Midpoint
Column 4
Years to 65
Column 5
YPLL
0–4 125 2.5 62.5 7,813
5–14 316 10 55 17,380
15–24 472 20 45 21,240
25–34 471 30 35 16,485
35–44 767 40 25 19,175
45–54 1,459 50 15 21,885
55–64 2,611 60 5 13,055
65+ 15,277 — — —
Not stated 0 — — —
Total 21,498 117,033
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for
Injury Prevention and Control. Available from: http://www.cdc.gov/injury/wisqars.
Measures of Risk
Page 3-37
Exercise 3.6
Use the HIV data in Table 3.9 to answer the following questions:
1. What is the HIV-related mortality rate, all ages?
2. What is the HIV-related mortality rate for persons under 65 years?
3. What is the HIV-related YPLL before age 65?
4. What is the HIV-related YPLL65 rate?
5. Create a table comparing the mortality rates and YPLL for leukemia and HIV. Which
measure(s) might you prefer if you were trying to support increased funding for leukemia
research? For HIV research?
Check your answers on page 3-53
Measures of Risk
Page 3-38
Natality (Birth) Measures
Natality measures are population-based measures of birth. These
measures are used primarily by persons working in the field of
maternal and child health. Table 3.11 includes some of the
commonly used measures of natality.
Table 3.11 Frequently Used Measures of Natality
Measure Numerator Denominator 10n
Crude birth rate Number of live births during a
specified time interval
Mid-interval population 1,000
Crude fertility rate Number of live births during a
specified time interval
Number of women ages 15–44
years at mid-interval
1,000
Crude rate of natural
increase
Number of live births minus number
of deaths during a specified time
interval
Mid-interval population 1,000
Low-birth weight ratio Number of live births <2,500 grams
during a specified time interval
Number of live births during
the same time interval
100
Measures of Risk
Page 3-39
Measures of Association
The key to epidemiologic analysis is comparison. Occasionally
you might observe an incidence rate among a population that
seems high and wonder whether it is actually higher than what
should be expected based on, say, the incidence rates in other
communities. Or, you might observe that, among a group of case-
patients in an outbreak, several report having eaten at a particular
restaurant. Is the restaurant just a popular one, or have more case-
patients eaten there than would be expected? The way to address
that concern is by comparing the observed group with another
group that represents the expected level.
A measure of association quantifies the relationship between
exposure and disease among the two groups. Exposure is used
loosely to mean not only exposure to foods, mosquitoes, a partner
with a sexually transmissible disease, or a toxic waste dump, but
also inherent characteristics of persons (for example, age, race,
sex), biologic characteristics (immune status), acquired
characteristics (marital status), activities (occupation, leisure
activities), or conditions under which they live (socioeconomic
status or access to medical care).
The measures of association described in the following section
compare disease occurrence among one group with disease
occurrence in another group. Examples of measures of association
include risk ratio (relative risk), rate ratio, odds ratio, and
proportionate mortality ratio.
Risk ratio
Definition of risk ratio
A risk ratio (RR), also called relative risk, compares the risk of a
health event (disease, injury, risk factor, or death) among one
group with the risk among another group. It does so by dividing
the risk (incidence proportion, attack rate) in group 1 by the risk
(incidence proportion, attack rate) in group 2 . The two groups are
typically differentiated by such demographic factors as sex (e.g.,
males versus females) or by exposure to a suspected risk factor
(e.g., did or did not eat potato salad). Often, the group of primary
interest is labeled the exposed group, and the comparison group is
labeled the unexposed group.
Method for Calculating risk ratio
The formula for risk ratio (RR) is:
Measures of Risk
Page 3-40
Risk of disease (incidence proportion, attack rate)
in group of primary interest
Risk of disease (incidence proportion, attack rate)
in comparison group
A risk ratio of 1.0 indicates identical risk among the two groups. A
risk ratio greater than 1.0 indicates an increased risk for the group
in the numerator, usually the exposed group. A risk ratio less than
1.0 indicates a decreased risk for the exposed group, indicating that
perhaps exposure actually protects against disease occurrence.
Measures of Risk
Page 3-41
EXAMPLES: Calculating Risk Ratios
Example A: In an outbreak of tuberculosis among prison inmates in South Carolina in 1999, 28 of 157 inmates
residing on the East wing of the dormitory developed tuberculosis, compared with 4 of 137 inmates residing on the
West wing.11
These data are summarized in the two-by-two table so called because it has two rows for the exposure
and two columns for the outcome. Here is the general format and notation.
Table 3.12A General Format and Notation for a Two-by-Two Table
Ill Well Total
Exposed a b a + b = H1
Unexposed c d c + d = H0
Total a + c = V1 b + d = V0 T
In this example, the exposure is the dormitory wing (and the outcome is tuberculosis) illustrated in Table 3.12B.
Calculate the risk ratio.
Table 3.12B Incidence of Mycobacterium Tuberculosis Infection Among Congregated,
HIV-Infected Prison Inmates by Dormitory Wing — South Carolina, 1999
Developed tuberculosis?
Yes No Total
East wing a = 28 b = 129 H1 = 157
West wing c = 4 d = 133 H0 = 137
Total 32 262 T = 294
Data source: McLaughlin SI, Spradling P, Drociuk D, Ridzon R, Pozsik CJ, Onorato I. Extensive
transmission of Mycobacterium tuberculosis among congregated, HIV-infected prison inmates in
South Carolina, United States. Int J Tuberc Lung Dis 2003;7:665–672.
To calculate the risk ratio, first calculate the risk or attack rate for each group. Here are the formulas:
Attack Rate (Risk)
Attack rate for exposed = a / a+b
Attack rate for unexposed = c / c+d
For this example:
Risk of tuberculosis among East wing residents = 28 / 157 = 0.178 = 17.8%
Risk of tuberculosis among West wing residents = 4 / 137 = 0.029 = 2.9%
The risk ratio is simply the ratio of these two risks:
Risk ratio = 17.8 / 2.9 = 6.1
Thus, inmates who resided in the East wing of the dormitory were 6.1 times as likely to develop tuberculosis as
those who resided in the West wing.
Measures of Risk
Page 3-42
EXAMPLES: Calculating Risk Ratios (Continued)
Example B: In an outbreak of varicella (chickenpox) in Oregon in 2002, varicella was diagnosed in 18 of 152
vaccinated children compared with 3 of 7 unvaccinated children. Calculate the risk ratio.
Table 3.13 Incidence of Varicella Among Schoolchildren in 9 Affected Classrooms —
Oregon, 2002
Varicella Non-case Total
Vaccinated a = 18 b = 134 152
Unvaccinated c = 3 d = 4 7
Total 21 138 159
Data Source: Tugwell BD, Lee LE, Gillette H, Lorber EM, Hedberg K, Cieslak PR. Chickenpox
outbreak in a highly vaccinated school population. Pediatrics 2004 Mar;113(3 Pt 1):455–459.
Risk of varicella among vaccinated children = 18 / 152 = 0.118 = 11.8%
Risk of varicella among unvaccinated children = 3 / 7 = 0.429 = 42.9%
Risk ratio = 0.118 / 0.429 = 0.28
The risk ratio is less than 1.0, indicating a decreased risk or protective effect for the exposed (vaccinated) children.
The risk ratio of 0.28 indicates that vaccinated children were only approximately one-fourth as likely (28%, actually)
to develop varicella as were unvaccinated children.
Rate ratio
A rate ratio compares the incidence rates, person-time rates, or
mortality rates of two groups. As with the risk ratio, the two groups
are typically differentiated by demographic factors or by exposure
to a suspected causative agent. The rate for the group of primary
interest is divided by the rate for the comparison group.
Rate ratio =
Rate for group of primary interest
Rate for comparison group
The interpretation of the value of a rate ratio is similar to that of
the risk ratio. That is, a rate ratio of 1.0 indicates equal rates in the
two groups, a rate ratio greater than 1.0 indicates an increased risk
for the group in the numerator, and a rate ratio less than 1.0
indicates a decreased risk for the group in the numerator.
Measures of Risk
Page 3-43
EXAMPLE: Calculating Rate Ratios (Continued)
Public health officials were called to investigate a perceived increase in visits to ships’ infirmaries for acute
respiratory illness (ARI) by passengers of cruise ships in Alaska in 1998.13
The officials compared passenger visits to
ship infirmaries for ARI during May–August 1998 with the same period in 1997. They recorded 11.6 visits for ARI
per 1,000 tourists per week in 1998, compared with 5.3 visits per 1,000 tourists per week in 1997. Calculate the rate
ratio.
Rate ratio = 11.6 / 5.3 = 2.2
Passengers on cruise ships in Alaska during May–August 1998 were more than twice as likely to visit their ships’
infirmaries for ARI than were passengers in 1997. (Note: Of 58 viral isolates identified from nasal cultures from
passengers, most were influenza A, making this the largest summertime influenza outbreak in North America.)
Measures of Risk
Page 3-44
Exercise 3.7
Table 3.14 illustrates lung cancer mortality rates for persons who continued
to smoke and for smokers who had quit at the time of follow-up in one of
the classic studies of smoking and lung cancer conducted in Great Britain.
Using the data in Table 3.14, calculate the following:
1. Rate ratio comparing current smokers with nonsmokers
2. Rate ratio comparing ex-smokers who quit at least 20 years ago with nonsmokers
3. What are the public health implications of these findings?
Table 3.14 Number and Rate (Per 1,000 Person-years) of Lung Cancer Deaths for Current Smokers and
Ex-smokers by Years Since Quitting, Physician Cohort Study — Great Britain, 1951–1961
Cigarette smoking status
Lung cancer
deaths
Rate per 1000
person-years Rate Ratio
Current smokers 133 1.30 ________
For ex-smokers, years since
quitting:
<5 years 5 0.67 9.6
5–9 years 7 0.49 7.0
10–19 years 3 0.18 2.6
20+ years 2 0.19 ________
Nonsmokers 3 0.07 1.0 (reference group)
Data Source: Doll R, Hill AB. Mortality in relation to smoking: 10 years' observation of British doctors. Brit Med J 1964; 1:1399–
1410, 1460–1467.
Check your answers on page 3-54
Measures of Risk
Page 3-45
Odds ratio
An odds ratio (OR) is another measure of association that
quantifies the relationship between an exposure with two
categories and health outcome. Referring to the four cells in Table
3.15, the odds ratio is calculated as
Odds ratio = ( a
)( c
) = ad / bc
b d
where
a = number of persons exposed and with disease
b = number of persons exposed but without disease
c = number of persons unexposed but with disease
d = number of persons unexposed: and without disease
a+c = total number of persons with disease (case-patients)
b+d = total number of persons without disease (controls)
The odds ratio is sometimes called the cross-product ratio
because the numerator is based on multiplying the value in cell “a”
times the value in cell “d,” whereas the denominator is the product
of cell “b” and cell “c.” A line from cell “a” to cell “d” (for the
numerator) and another from cell “b” to cell “c” (for the
denominator) creates an x or cross on the two-by-two table.
Table 3.15 Exposure and Disease in a Hypothetical Population of 10,000 Persons
Disease No Disease Total Risk
Exposed a = 100 b = 1,900 2,000 5.0%
Not Exposed c = 80 d = 7,920 8,000 1.0%
Total 180 9,820 10,000
Measures of Risk
Page 3-46
EXAMPLE: Calculating Odds Ratios
Use the data in Table 3.15 to calculate the risk and odds ratios.
1. Risk ratio
5.0 / 1.0 = 5.0
2. Odds ratio
(100 x 7,920) / (1,900 x 80) = 5.2
Notice that the odds ratio of 5.2 is close to the risk ratio of 5.0. That is one of the attractive features of the odds
ratio — when the health outcome is uncommon, the odds ratio provides a reasonable approximation of the risk
ratio. Another attractive feature is that the odds ratio can be calculated with data from a case-control study,
whereas neither a risk ratio nor a rate ratio can be calculated.
In a case-control study,
investigators enroll a
group of case-patients
(distributed in cells a
and c of the two-by-two
table), and a group of
non-cases or controls
(distributed in cells b
and d).
The odds ratio is the measure of choice in a case-control study (see
Lesson 1). A case-control study is based on enrolling a group of
persons with disease (“case-patients”) and a comparable group
without disease (“controls”). The number of persons in the control
group is usually decided by the investigator. Often, the size of the
population from which the case-patients came is not known. As a
result, risks, rates, risk ratios or rate ratios cannot be calculated
from the typical case-control study. However, you can calculate an
odds ratio and interpret it as an approximation of the risk ratio,
particularly when the disease is uncommon in the population.
Measures of Risk
Page 3-47
Exercise 3.8
Calculate the odds ratio for the tuberculosis data in Table 3.12. Would you
say that your odds ratio is an accurate approximation of the risk ratio?
(Hint: The more common the disease, the further the odds ratio is from the
risk ratio.)
Check your answers on page 3-55
Measures of Risk
Page 3-48
Measures of Public Health Impact
A measure of public health impact is used to place the association
between an exposure and an outcome into a meaningful public
health context. Whereas a measure of association quantifies the
relationship between exposure and disease, and thus begins to
provide insight into causal relationships, measures of public health
impact reflect the burden that an exposure contributes to the
frequency of disease in the population. Two measures of public
health impact often used are the attributable proportion and
efficacy or effectiveness.
Attributable proportion
Definition of attributable proportion
The attributable proportion, also known as the attributable risk
percent, is a measure of the public health impact of a causative
factor. The calculation of this measure assumes that the occurrence
of disease in the unexposed group represents the baseline or
expected risk for that disease. It further assumes that if the risk of
disease in the exposed group is higher than the risk in the
unexposed group, the difference can be attributed to the exposure.
Thus, the attributable proportion is the amount of disease in the
exposed group attributable to the exposure. It represents the
expected reduction in disease if the exposure could be removed (or
never existed).
Appropriate use of attributable proportion depends on a single risk
factor being responsible for a condition. When multiple risk factors
may interact (e.g., physical activity and age or health status), this
measure may not be appropriate.
Method for calculating attributable proportion
Attributable proportion is calculated as follows:
Risk for exposed group – risk for unexposed group
x 100%
Risk for exposed group
Attributable proportion can be calculated for rates in the same way.
Measures of Risk
Page 3-49
EXAMPLE: Calculating Attributable Proportion
In another study of smoking and lung cancer, the lung cancer mortality rate among nonsmokers was 0.07 per 1,000
persons per year.14
The lung cancer mortality rate among persons who smoked 1–14 cigarettes per day was 0.57
lung cancer deaths per 1,000 persons per year. Calculate the attributable proportion.
Attributable proportion = (0.57 – 0.07) / 0.57 x 100% = 87.7%
Given the proven causal relationship between cigarette smoking and lung cancer, and assuming that the groups are
comparable in all other ways, one could say that about 88% of the lung cancer among smokers of 1 14 cigarettes
per day might be attributable to their smoking. The remaining 12% of the lung cancer cases in this group would
have occurred anyway.
Vaccine efficacy or vaccine effectiveness
Vaccine efficacy and vaccine effectiveness measure the
proportionate reduction in cases among vaccinated persons.
Vaccine efficacy is used when a study is carried out under ideal
conditions, for example, during a clinical trial. Vaccine
effectiveness is used when a study is carried out under typical
field (that is, less than perfectly controlled) conditions.
Vaccine efficacy/effectiveness (VE) is measured by calculating
the risk of disease among vaccinated and unvaccinated persons
and determining the percentage reduction in risk of disease
among vaccinated persons relative to unvaccinated persons.
The greater the percentage reduction of illness in the
vaccinated group, the greater the vaccine
efficacy/effectiveness. The basic formula is written as:
Risk among unvaccinated group – risk among vaccinated group
Risk among unvaccinated group
OR: 1 – risk ratio
In the first formula, the numerator (risk among unvaccinated –
risk among vaccinated) is sometimes called the risk difference
or excess risk.
Vaccine efficacy/effectiveness is interpreted as the
proportionate reduction in disease among the vaccinated group.
So a VE of 90% indicates a 90% reduction in disease
occurrence among the vaccinated group, or a 90% reduction
from the number of cases you would expect if they have not
been vaccinated.
Measures of Risk
Page 3-50
EXAMPLE: Calculating Vaccine Effectiveness
Calculate the vaccine effectiveness from the varicella data in Table 3.13.
VE = (42.9 – 11.8) / 42.9 = 31.1 / 42.9 = 72%
Alternatively, VE = 1 – RR = 1 – 0.28 = 72%
So, the vaccinated group experienced 72% fewer varicella cases than they would have if they had not been
vaccinated.
Measures of Risk
Page 3-51
Summary
Because many of the variables encountered in field epidemiology are nominal-scale
variables, frequency measures are used quite commonly in epidemiology. Frequency
measures include ratios, proportions, and rates. Ratios and proportions are useful for
describing the characteristics of populations. Proportions and rates are used for
quantifying morbidity and mortality. These measures allow epidemiologists to infer risk
among different groups, detect groups at high risk, and develop hypotheses about causes
— that is, why these groups might be at increased risk.
The two primary measures of morbidity are incidence and prevalence.
• Incidence rates reflect the occurrence of new disease in a population.
• Prevalence reflects the presence of disease in a population.
A variety of mortality rates describe deaths among specific groups, particularly by age or
sex or by cause.
The hallmark of epidemiologic analysis is comparison, such as comparison of observed
amount of disease in a population with the expected amount of disease. The comparisons
can be quantified by using such measures of association as risk ratios, rate ratios, and
odds ratios. These measures provide evidence regarding causal relationships between
exposures and disease.
Measures of public health impact place the association between an exposure and a
disease in a public health context. Two such measures are the attributable proportion and
vaccine efficacy.
Measures of Risk
Page 3-52
Exercise Answers
Exercise 3.1
1. B
2. C
3. A
4. B
5. A
Exercise 3.2
1. A; denominator is size of population at start of study, numerator is number of deaths
among that population.
2. B; denominator is person-years contributed by participants, numerator is number of
death among that population.
3. C; numerator is all existing cases.
4. A; denominator is size of population at risk, numerator is number of new cases
among that population.
5. B; denominator is mid-year population, numerator is number of new cases among that
population.
6. C; numerator is total number with attribute.
7. D; this is a ratio (heart disease:smokers)
Exercise 3.3
1. Homicide-related death rate (males)
= (# homicide deaths among males / male population) x 100,000
= 15,555 / 139,813,000 x 100,000
= 11.1 homicide deaths / 100,000 population among males
Homicide-related death rate (females)
= (# homicide deaths among females / female population) x 100,000
= 4,753 / 144,984,000 x 100,000
= 3.3 homicide deaths / 100,000 population among females
2. These are cause- and sex-specific mortality rates.
3. Homicide-mortality rate ratio
= homicide death rate (males) / homicide death rate (females)
= 11.1 / 3.3
= 3.4 to 1
Measures of Risk
Page 3-53
= (see below, which is the answer to question 4).
4. Because the homicide rate among males is higher than the homicide rate among
females, specific intervention programs need to target males and females differently.
Exercise 3.4
Decade
Number of
New Cases
Number of
Deaths
Death-to-case
Ratio(x100)
1940–1949 143,497 11,228 7.82(Given)
1950–1959 23,750 1,710 7.20
1960–1969 3,679 390 10.60
1970–1979 1,956 90 4.60
1980–1989 27 3 11.11
1990–1999 22 5 22.72
The number of new cases and deaths from diphtheria declined dramatically from the
1940s through the 1980s, but remained roughly level at very low levels in the 1990s. The
death-to-case ratio was actually higher in the 1980s and 1990s than in 1940s and 1950s.
From these data one might conclude that the decline in deaths is a result of the decline in
cases, that is, from prevention, rather than from any improvement in the treatment of
cases that do occur.
Exercise 3.5
Proportionate mortality for diseases of heart, 25–44 years
= (# deaths from diseases of heart / # deaths from all causes) x 100
= 16,283 / 128,294 x 100
= 12.6%
Proportionate mortality for assault (homicide), 25–44 years
= (# deaths from assault (homicide) / # deaths from all causes) x 100
= 7,367 / 128,924 x 100
= 5.7%
Exercise 3.6
1. HIV-related mortality rate, all ages
= (# deaths from HIV / estimated population, 2002) x 100,000
= (14,095 / 288,357,000) x 100,000
= 4.9 HIV deaths per 100,000 population
2. HIV-related mortality rate for persons under 65 years
= (# deaths from HIV among <65 years year-olds / estimated population < 65
years, 2002) x 100,000
= (12 + 25 + 178 + 1,839 + 5,707 + 4,474 + 1,347 / 19,597 + 41,037 + 40,590
+39,928 + 44,917 + 40,084 + 26,602) x 100,000
= 13,582 / 252,755,000 x 100,000
Measures of Risk
Page 3-54
= 5.4 HIV deaths per 100,000 persons under age 65 years
3. HIV-related YPLL before age 65
Deaths and years of potential life lost attributed to HIV by age group — United States, 2002
Column 1
Age Group (years)
Column 2
Deaths
Column 3
Age Midpoint
Column 4
Years to 65
Column 5
YPLL
0–4 12 2.5 62.5 750
5–10 25 10 55 1,375
15–24 178 20 45 8,010
25–34 1,839 30 35 64,365
35–44 5,707 40 25 142,675
45–54 4,474 50 15 67,110
55–64 1,347 60 5 6,735
65+ 509 - - -
Not stated 4 - - -
Total 14,095 291,020
4. HIV-related YPLL65 rate
YPLL65 rate = (291,020 / 252,755,000) x 1,000 = 1.2 YPLL per 1,000 population
under age 65.
5. Compare mortality rates and YPLL for leukemia and HIV
Leukemia HIV
# cause-specific deaths, all ages 21,498 14,095
cause-specific death rate, all ages (per 100,000 pop) 7.5 4.9
# deaths, < 65 years 6,221 13,582
death rate, < 65 years 2.5 5.4
YPLL65 117,033 291,020
YPLL65 rate 0.5 1.2
An advocate for increased leukemia research funding might use the first two
measures, which shows that leukemia is a larger problem in the entire population. An
advocate for HIV funding might use the last four measures, since they highlight HIV
deaths among younger persons.
Exercise 3.7
1. Rate ratio comparing current smokers with nonsmokers
= rate among current smokers / rate among non-smokers
= 1.30 / 0.07
= 18.6
2. Rate ratio comparing ex-smokers who quit at least 20 years ago with nonsmokers
= rate among ex-smokers / rate among non-smokers
= 0.19 / 0.07
= 2.7
3. The lung cancer rate among smokers is 18 times as high as the rate among non-
smokers. Smokers who quit can lower their rate considerably, but it never gets back
Measures of Risk
Page 3-55
to the low level seen in never-smokers. So the public health message might be, “If
you smoke, quit. But better yet, don’t start.”
Exercise 3.8
Odds ratio = ad / bc
= (28 x 133) / (129 x 4)
= 7.2
The odds ratio of 7.2 is somewhat larger (18% larger, to be precise) than the risk ratio of
6.1. Whether that difference is “reasonable” or not is a judgment call. The odds ratio of
7.2 and the risk ratio of 6.1 both reflect a very strong association between prison wing
and risk of developing tuberculosis.
Measures of Risk
Page 3-56
SELF-ASSESSMENT QUIZ
Now that you have read Lesson 3 and have completed the exercises,
you should be ready to take the self-assessment quiz. This quiz is
designed to help you assess how well you have learned the content
of this lesson. You may refer to the lesson text whenever you are
unsure of the answer.
Unless otherwise instructed, choose ALL correct choices for each question.
1. Which of the following are frequency measures?
A. Birth rate
B. Incidence
C. Mortality rate
D. Prevalence
Use the following choices for Questions 2–4.
E. Ratio
F. Proportion
G. Incidence proportion
H. Mortality rate
2. ____ # women in Country A who died from lung cancer in 2004
# women in Country A who died from cancer in 2004
3. ____ # women in Country A who died from lung cancer in 2004
# women in Country A who died from breast cancer in 2004
4. ____ # women in Country A who died from lung cancer in 2004
estimated # women living in Country A on July 1, 2004
5. All proportions are ratios, but not all ratios are proportions.
A. True
B. False
6. In a state that did not require varicella (chickenpox) vaccination, a boarding school
experienced a prolonged outbreak of varicella among its students that began in
September and continued through December. To calculate the probability or risk
of illness among the students, which denominator would you use?
A. Number of susceptible students at the ending of the period (i.e., June)
B. Number of susceptible students at the midpoint of the period (late October/early
November)
C. Number of susceptible students at the beginning of the period (i.e., September)
D. Average number of susceptible students during outbreak
Measures of Risk
Page 3-57
7. Many of the students at the boarding school, including 6 just coming down with
varicella, went home during the Thanksgiving break. About 2 weeks later, 4 siblings
of these 6 students (out of a total of 10 siblings) developed varicella. The secondary
attack rate among siblings was, therefore,:
A. 4 / 6
B. 4 / 10
C. 4 / 16
D. 6 / 10
8. Investigators enrolled 100 diabetics without eye disease in a cohort (follow-up)
study. The results of the first 3 years were as follows:
Year 1: 0 cases of eye disease detected out of 92; 8 lost to follow-up
Year 2: 2 new cases of eye disease detected out of 80; 2 had died; 10 lost to
follow-up
Year 3: 3 new cases of eye disease detected out of 63; 2 more had died; 13 more
lost to follow-up
The person-time incidence rate is calculated as:
A. 5 / 100
B. 5 / 63
C. 5 / 235
D. 5 / 250
9. The units for the quantity you calculated in Question 8 could be expressed as:
A. cases per 100 persons
B. percent
C. cases per person-year
D. cases per person per year
10. Use the following choices for the characteristics or features listed below:
A. Incidence
B. Prevalence
______ Measure of risk
______ Generally preferred for chronic diseases without clear date of onset
______ Used in calculation of risk ratio
______ Affected by duration of illness
Measures of Risk
Page 3-58
Use the following information for Questions 11–15.
Within 10 days after attending a June wedding, an outbreak of cyclosporiasis occurred
among attendees. Of the 83 guests and wedding party members, 79 were interviewed;
54 of the 79 met the case definition. The following two-by-two table shows consumption
of wedding cake (that had raspberry filling) and illness status.
Ill Well Total
Ate wedding cake?
Yes 50 3 53
No 4 22 26
Total 54 25 79
Source: Ho AY, Lopez AS, Eberhart MG, et al. Outbreak of cyclosporiasis associated with imported raspberries,
Philadelphia, Pennsylvania, 2000. Emerg Infect Dis 2002;l8:783–6.
11. The fraction 54 / 79 is a/an:
A. Food-specific attack rate
B. Attack rate
C. Incidence proportion
D. Proportion
12. The fraction 50 / 54 is a/an:
A. Attack rate
B. Food-specific attack rate
C. Incidence proportion
D. Proportion
13. The fraction 50 / 53 is a/an:
A. Attack rate
B. Food-specific attack rate
C. Incidence proportion
D. Proportion
14. The best measure of association to use for these data is a/an:
A. Food-specific attack rate
B. Odds ratio
C. Rate ratio
D. Risk ratio
15. The best estimate of the association between wedding cake and illness is:
A. 6.1
B. 7.7
C. 68.4
D. 83.7
E. 91.7
F. 94.3
Measures of Risk
Page 3-59
16. The attributable proportion for wedding cake is:
A. 6.1%
B. 7.7%
C. 68.4%
D. 83.7%
E. 91.7%
F. 94.3%
Use the following diagram for Questions 17 and 18. Assume that the horizontal lines in
the diagram represent duration of illness in 8 different people, out of a community of
700.
17. What is the prevalence of disease during July?
A. 3 / 700
B. 4 / 700
C. 5 / 700
D. 8 / 700
18. What is the incidence of disease during July?
A. 3 / 700
B. 4 / 700
C. 5 / 700
D. 8 / 700
19. What is the following fraction?
Number of children < 365 days of age who died in Country A in 2004
Number of live births in Country A in 2004
A. Ratio
B. Proportion
C. Incidence proportion
D. Mortality rate
Measures of Risk
Page 3-60
20. Using only the data shown below for deaths attributed to Alzheimer’s disease and to
pneumonia/influenza, which measure(s) can be calculated?
A. Proportionate mortality
B. Cause-specific mortality rate
C. Age-specific mortality rate
D. Mortality rate ratio
E. Years of potential life lost
Table 3.16 Number of Deaths Due to Alzheimer’s Disease and
Pneumonia/Influenza — United States, 2002
Age Group (years)
Alzheimer’s
disease
Pneumonia/
Influenza
< 5 0 373
5–14 1 91
15–24 0 167
<34 32 345
35–44 12 971
45–54 52 1,918
55–64 51 2,987
65–74 3,602 6,847
75–84 20,135 19,984
85+ 34,552 31,995
Total 58,866 65,681
Source: Kochanek KD, Murphy SL, Anderson RN, Scott C. Deaths: Final data for
2002. National vital statistics reports; vol 53, no 5. Hyattsville, Maryland: National
Center for Health Statistics, 2004.
21. Which of the following mortality rates use the estimated total mid-year population as
its denominator?
A. Age-specific mortality rate
B. Sex-specific mortality rate
C. Crude mortality rate
D. Cause-specific mortality rate
22. What is the following fraction?
Number of deaths due to septicemia among men aged 65–74 years in 2004
Estimated number of men aged 65–74 years alive on July 1, 2004
A. Age-specific mortality rate
B. Age-adjusted mortality rate
C. Cause-specific mortality rate
D. Sex-specific mortality rate
Measures of Risk
Page 3-61
23. Vaccine efficacy measures are:
A. The proportion of vaccinees who do not get the disease
B. 1 – the attack rate among vaccinees
C. The proportionate reduction in disease among vaccinees
D. 1 – disease attributable to the vaccine
24. To study the causes of an outbreak of aflatoxin poisoning in Africa, investigators
conducted a case-control study with 40 case-patients and 80 controls. Among the 40
poisoning victims, 32 reported storing their maize inside rather than outside. Among
the 80 controls, 20 stored their maize inside. The resulting odds ratio for the
association between inside storage of maize and illness is:
A. 3.2
B. 5.2
C. 12.0
D. 33.3
25. The crude mortality rate in Community A was higher than the crude mortality rate in
Community B, but the age-adjusted mortality rate was higher in Community B than
in Community A. This indicates that:
A. Investigators made a calculation error
B. No inferences can be made about the comparative age of the populations from
these data
C. The population of Community A is, on average, older than that of Community B
D. The population of Community B is, on average, older than that of Community A
Measures of Risk
Page 3-62
Answers to Self-Assessment Quiz
1. A, B, C, D. Frequency measures of health and disease include those related to birth,
death, and morbidity (incidence and prevalence).
2. A, B. All fractions are ratios. This fraction is also a proportion, because all of the
deaths from lung cancer in the numerator are included in the denominator. It is not
an incidence proportion, because the denominator is not the size of the population
at the start of the period. It is not a mortality rate because the denominator is not
the estimated midpoint population.
3. A. All fractions are ratios. This fraction is not a proportion, because lung cancer
deaths in the numerator are not included in the denominator. It is not an incidence
proportion, because the denominator is not the size of the population at the start of
the period. It is not a mortality rate because the denominator is not the estimated
midpoint population.
4. A, D. All fractions are ratios. This fraction is not a proportion, because some of the
deaths occurred before July 1, so those women are not included in the calculation. It
is not an incidence proportion, because the denominator is not the size of the
population at the start of the period. It is a mortality rate because the denominator
is the estimated midpoint population.
5. A. All fractions, including proportions, are ratios. But only ratios in which the
numerator is included in the denominator is a proportions.
6. C. Probability or risk are estimated by the incidence proportion, calculated as the
number of new cases during a specified period divided by the size of the population
at the start of that period.
7. B. The secondary attack rate is calculated as the number of cases among contacts
(4) divided by the number of contacts (10).
8. D. During year 1, 92 returning patients contributed 92 person-years; 8 patients lost
to follow-up contributed 8 x ½ or 4 years, for a total of 96. During the second year,
78 disease-free patients contributed 78 person-years, plus ½ years for the 2 with
newly diagnosed eye disease, the 2 who had died, and the 10 lost to follow-up (all
events are assumed to have occurred randomly during the year, or an average, at
the half-year point), for a total of 78 + 14 x ½ years, for another 85 years. During
the third year, returning healthy patients contributed 60 years; the 3 with eye
disease, the 4 who died, and the 11 lost to follow-up contributed 18 x ½ years or 9
years, for a total of 69 years during the 3rd
year. The total person-years is therefore
96 + 85 + 69 = 250 person-years.
9. C, D. The person-time rate presented in Question 8 should be reported as 5 cases
per 250 person-years. Usually person-time rates are expressed per 1,000 or 10,000
or 100,000, depending on the rarity of the disease, so the rate in Question 8 could
Measures of Risk
Page 3-63
be expressed as 2 cases per 100 person-years of follow-up. One could express this
more colloquially as 2 new cases of eye disease per 100 diabetics per year.
10. A. Measure of risk
B. Generally preferred for chronic diseases without clear date of onset
A. Used in calculation of risk ratio
B. Affected by duration of illness
Incidence reflects new cases only; incidence proportion is a measure of risk. A risk
ratio is simply the ratio of two incidence proportions. Prevalence reflects existing
cases at a given point or period of time, so one does not need to know the date of
onset. Prevalence is influenced by both incidence and duration of disease — the
more cases that occur and the longer the disease lasts, the greater the prevalence at
any given time.
Ill Well Total
Ate wedding cake?
Yes 50 3 53
No 4 22 26
Total 54 25 79
11. B, C, D. The fraction 54 / 79 (see bottom row of the table) reflects the overall attack
rate among persons who attended the wedding and were interviewed. Attack rate is
a synonym for incidence proportion.
12. D. The fraction 50 / 54 (under the Ill column) is the proportion of case-patients who
ate wedding cake. It is not an attack rate, because the denominator of an attack
rate is the size of the population at the start of the period, not all cases.
13. A, B, C, D. The fraction 50 / 53 (see top row of table) is the proportion of wedding
cake eaters who became ill, which is a food-specific attack rate. A food-specific
attack rate is a type of attack rate, which in turn is synonymous with incidence
proportion.
14. C. Investigators were able to interview almost everyone who attended the wedding,
so incidence proportions (measure of risk) were calculated. When incidence
proportions (risks) can be calculated, the best measure of association to use is the
ratio of incidence proportions (risks), i.e., risk ratio.
15. A. The risk ratio is calculated as the attack rate among cake eaters divided by the
attack rate among those who did not eat cake, or (50 / 53) / (4 / 26), or 94.3% /
15.4%, which equals 6.1.
16. D. The attributable proportion is calculated as the attack rate among cake eaters
minus the attack rate among non-eaters, divided by the attack rate among cake
eaters, or 94.3 – 15.4) / 94.3, which equals 83.7%. This attributable proportion
means that 83.7% of the illness might be attributable to eating the wedding cake
(note that some people got sick without eating cake, so the attributable proportion is
not 100%).
17. D. A total of 8 cases are present at some time during the month of July.
Measures of Risk
Page 3-64
18. C. Five new cases occurred during the month of July.
19. A, D. The fraction shown is the infant mortality rate. It is a ratio, because all
fractions are ratios. It is not a proportion because some of the children who died in
early 2004 may have been born in late 2003, so some of those in the numerator are
not in the denominator. Technically, the mortality rate for infants is the number of
infants who died in 2004 divided by the estimated midyear population of infants, so
the fraction shown is not a mortality rate in that sense. However, the fraction is
known throughout the world as the infant mortality rate, despite the technical
inaccuracy.
20. E. The data shown in the table are numbers of deaths. No denominators are
provided from which to calculate rates. Neither is the total number of deaths given,
so proportionate mortality cannot be calculated. However, calculation of potential life
lost need only the numbers of deaths by age, as shown.
21. C, D. Only crude and cause-specific mortality rates use the estimated total mid-year
population as its denominator. The denominator for an age-specific mortality rate is
the estimated mid-year size of that particular age group. The denominator for a sex-
specific mortality rate is the estimated mid-year male or female population.
22. A, C, D. The fraction is the mortality rate due to septicemia (cause) among men
(sex) aged 65–74 years (age). Age-specific mortality rates are narrowly defined (in
this fraction, limited to 10 years of age), so are generally valid for comparing two
populations without any adjustment.
23. C. Vaccine efficacy measures the proportionate reduction in disease among
vaccinees.
24. C. The results of this study could be summarized in a two-by-two table as follows:
Cases Controls Total
Stored maize inside?
Yes a = 32 c = 20 52
No b = 8 d = 60 68
Total 40 80 120
The odds ratio is calculated as ad/bc, or (32 x 60) / (8 x 20), which equals 1,920 /
160 or 12.0.
25. C. The crude mortality rate reflects the mortality experience and the age distribution
of a community, whereas the age-adjusted mortality rate eliminates any differences
in the age distribution. So if Community A’s age-adjusted mortality rate was lower
than its crude rate, that indicates that its population is older.
Measures of Risk
Page 3-65
References
1. Kleinman JC, Donahue RP, Harris MI, Finucane FF, Madans JH, Brock DB.
Mortality among diabetics in a national sample. Am J Epidemiol 1988;128:389–401.
2. Arias E, Anderson RN, Kung H-C, Murphy SL, Kochanek KD. Deaths: final data for
2001. National vital statistics reports; vol. 52 no. 3. Hyattsville, Maryland: National
Center for Health Statistics, 2003; 9:30–3.
3. Centers for Disease Control and Prevention. Reported tuberculosis in the United
States, 2003. Atlanta, GA: U.S. Department of Health and Human Services, CDC,
September 2004.
4. Last JM. A dictionary of epidemiology, 4th ed. New York: Oxford U. Press; 2001.
5. Hopkins RS, Jajosky RA, Hall PA, Adams DA, Connor FJ, Sharp P, et. al. Summary
of notifiable diseases — United States, 2003. MMWR 2003;52(No 54):1–85.
6. U.S. Census Bureau [Internet]. Washington, DC: [updated 11 Jul 2006; cited 2005
Oct 2]. Population Estimates. Available from: http://www.census.gov/popest.
7. Williams LM, Morrow B, Lansky A. Surveillance for selected maternal behaviors and
experiences before, during, and after pregnancy: Pregnancy Risk Assessment
Monitoring System (PRAMS). In: Surveillance Summaries, November 14, 2003.
MMWR 2003;52(No. SS-11):1–14.
8. Web-based Injury Statistics Query and Reporting System (WISQARS) [online
database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb
1]. Available from: http://www.cdc.gov/injury/wisqars.
9. Centers for Disease Control and Prevention. Health, United States, 2004. Hyattsville,
MD.; 2004.
10. Wise RP, Livengood JR, Berkelman RL, Goodman RA. Methodologic alternatives
for measuring premature mortality. Am J Prev Med 1988;4:268–273.
11. McLaughlin SI, Spradling P, Drociuk D, Ridzon R, Pozsik CJ, Onorato I. Extensive
transmission of Mycobacterium tuberculosis among congregated, HIV-infected prison
inmates in South Carolina, United States. Int J Tuberc Lung Dis 2003;7:665–72.
12. Tugwell BD, Lee LE, Gillette H, Lorber EM, Hedberg K, Cieslak PR. Chickenpox
outbreak in a highly vaccinated school population. Pediatrics 2004 Mar;113(3 Pt
1):455–9.
13. Uyeki TM, Zane SB, Bodnar UR, Fielding KL, Buxton JA, Miller JM, et al. Large
summertime Influenza A outbreak among tourists in Alaska and the Yukon Territory.
Clin Infect Dis 2003;36:1095–1102.
14. Doll R, Hill AB. Smoking and carcinoma of the lung. Br Med J 1950;1:739–48.
Displaying Public Health Data
Page 4-1
DISPLAYING PUBLIC HEALTH DATA
Imagine that you work in a county or state health department. The
department must prepare an annual summary of the individual
surveillance reports and other public health data from the year that just
ended. This summary needs to display trends and patterns in a concise and
understandable manner. You have been selected to prepare this annual
summary. What tools might you use to organize and display the data?
Most annual reports use a combination of tables, graphs, and charts to summarize and display
data clearly and effectively. Tables and graphs can be used to summarize a few dozen records or
a few million. They are used every day by epidemiologists to summarize and better understand
the data they or others have collected. They can demonstrate distributions, trends, and
relationships in the data that are not apparent from looking at individual records. Thus, tables and
graphs are critical tools for descriptive and analytic epidemiology. In addition, remembering the
adage that a picture is worth a thousand words, you can use tables and graphs to communicate
epidemiologic findings to others efficiently and effectively. This lesson covers tabular and
graphic techniques for data display; interpretation was covered in Lessons 2 and 3.
Objectives
After completing this lesson and answering the questions in the exercises, you will be able to:
• Prepare and interpret one, two, or three variable tables and composite tables (including
creating class intervals)
• Prepare and interpret arithmetic-scale line graphs, semilogarithmic-scale line graphs,
histograms, frequency polygons, bar charts, pie charts, maps, and area maps
• State the value and proper use of population pyramids, cumulative frequency graphs,
survival curves, scatter diagrams, box plots, dot plots, forest plots, and tree plots
• Identify when to use each type of table and graph
Major Sections
Introduction to Tables and Graphs............................................................................................... 4-2
Tables........................................................................................................................................... 4-4
Graphs........................................................................................................................................ 4-23
Other Data Displays................................................................................................................... 4-43
Using Computer Technology..................................................................................................... 4-64
Summary.................................................................................................................................... 4-67
3134
Displaying Public Health Data
Page 4-2
Introduction to Tables and Graphs
Data analysis is an important component of public health practice.
In examining data, one must first determine the data type in order
to select the appropriate display format. The data to be displayed
will be in one of the following categories:
• Nominal
• Ordinal
• Discrete
• Continuous
Nominal measurements have no intrinsic order and the difference
between levels of the variable have no meaning. In epidemiology,
sex, race, or exposure category (yes/no) are examples of nominal
measurements. Ordinal variables do have an intrinsic order, but,
again, differences between levels are not relevant. Examples of
ordinal variables are “low, medium, high” or perhaps categories of
other variables (e.g., age ranges). Discrete variables have values
that are integers (e.g., number of ill persons who were exposed to a
risk factor). Finally, continuous variables can have any value in a
range (e.g., amount of time between meal being served and onset
of gastro-intestinal symptoms; infant mortality rate).
Before constructing any display of epidemiologic data, it is
important to first determine the point to be conveyed. Are you
highlighting a change from past patterns in the data? Are you
showing a difference in incidence by geographic area or by some
predetermined risk factor? What is the interpretation you want the
reader to reach? Your answer to these questions will help to
determine the choice of display.
To analyze data effectively, an epidemiologist must become
familiar with the data before applying analytic techniques. The
epidemiologist may begin by examining individual records such as
those contained in a line listing. This review will be followed by
production of a table to summarize the data. Sometimes, the
resulting tables are the only analysis that is needed, particularly
when the amount of data is small and relationships are
straightforward.
When the data are more complex, graphs and charts can help the
epidemiologist visualize broader patterns and trends and identify
variations from those trends. Variations in data may represent
important new findings or only errors in typing or coding which
need to be corrected. Thus, tables and graphs can be helpful tools
to aid in verifying and analyzing the data.
Displaying Public Health Data
Page 4-3
Once an analysis is complete, tables and graphs further serve as
useful visual aids for describing the data to others. When preparing
tables and graphs, keep in mind that your primary purpose is to
communicate information.
Tables and graphs can be presented using a variety of media. In
epidemiology, the most common media are print and projection.
This lesson will focus on creating effective and attractive tables
and graphs for print and will also offer suggestions for projection.
At the end, we present tables that summarize all techniques
presented and guidelines for use.
Displaying Public Health Data
Page 4-4
Tables
If a table is taken out of its
original context, it should
still convey all the
information necessary for
the reader to understand
the data.
A table is a set of data arranged in rows and columns. Almost any
quantitative information can be organized into a table. Tables are
useful for demonstrating patterns, exceptions, differences, and
other relationships. In addition, tables usually serve as the basis for
preparing additional visual displays of data, such as graphs and
charts, in which some of the details may be lost.
Tables designed to present data to others should be as simple as
possible.1
Two or three small tables, each focusing on a different
aspect of the data, are easier to understand than a single large table
that contains many details or variables.
A table in a printed publication should be self-explanatory. If a
table is taken out of its original context, it should still convey all
the information necessary for the reader to understand the data. To
create a table that is self-explanatory, follow the guidelines below.
More About Constructing Tables
• Use a clear and concise title that describes person, place and time — what, where, and when — of the data in the
table. Precede the title with a table number.
• Label each row and each column and include the units of measurement for the data (for example, years, mm Hg,
mg/dl, rate per 100,000).
• Show totals for rows and columns, where appropriate. If you show percentages (%), also give their total (always
100).
• Identify missing or unknown data either within the table (for example, Table 4.11) or in a footnote below the table.
• Explain any codes, abbreviations, or symbols in a footnote (for example, Syphilis P&S = primary and secondary
syphilis).
• Note exclusions in a footnote (e.g., 1 case and 2 controls with unknown family history were excluded from this
analysis).
• Note the source of the data below the table or in a footnote if the data are not original.
One-variable tables
In descriptive epidemiology, the most basic table is a simple
frequency distribution with only one variable, such as Table 4.1a,
which displays number of reported syphilis cases in the United
States in 2002 by age group.2
(Frequency distributions are
discussed in Lesson 2.) In this type of frequency distribution table,
the first column shows the values or categories of the variable
represented by the data, such as age or sex. The second column
shows the number of persons or events that fall into each category.
In constructing any table, the choice of columns results from the
Displaying Public Health Data
Page 4-5
interpretation to be made. In Table 4.1a, the point the analyst
wishes to make is the role of age as a risk factor of syphilis. Thus,
age group is chosen as column 1 and case count as column 2.
To create a frequency
distribution from a data
set in Analysis Module:
Select frequencies, then
choose variable under
Frequencies of.
(Since Epi Info 3 is the
recommended version,
only commands for this
version are provided in the
text; corresponding
commands for Epi Info 6
are offered at the end of
the lesson.)
Often, an additional column lists the percentage of persons or
events in each category (see Table 4.1b). The percentages shown in
Table 4.1b actually add up to 99.9% rather than 100.0% due to
rounding to one decimal place. Rounding that results in totals of
99.9% or 100.1% is common in tables that show percentages.
Nonetheless, the total percentage should be displayed as 100.0%,
and a footnote explaining that the difference is due to rounding
should be included.
The addition of percent to a table shows the relative burden of
illness; for example, in Table 4.1b, we see that the largest
contribution to illness for any single age category is from 35–39
year olds. The subsequent addition of cumulative percent (e.g.,
Table 4.1c) allows the public health analyst to illustrate the impact
of a targeted intervention. Here, any intervention effective at
preventing syphilis among young people and young adults (under
age 35) would prevent almost half of the cases in this population.
The one-variable table can be further modified to show cumulative
frequency and/or cumulative percentage, as in Table 4.1c. From
this table, you can see at a glance that 46.7% of the primary and
secondary syphilis cases occurred in persons younger than age 35
years, meaning that over half of the syphilis cases occurred in
persons age 35 years or older. Note that the choice of age-
groupings will affect the interpretation of your data.3
Table 4.1a Reported Cases of Primary and Secondary Syphilis by Age — United States, 2002
Age Group (years) Number of Cases
<14 21
15–19 351
20–24 842
25–29 895
30–34 1,097
35–39 1,367
40–44 1,023
45–54 982
≥55 284
Total 6,862
Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department
of Health and Human Services; 2003.
Displaying Public Health Data
Page 4-6
Table 4.1b Reported Cases of Primary and Secondary Syphilis by Age — United States, 2002
CASES
Age Group (years) Number Percent
<14 21 0.3
15–19 351 5.1
20–24 842 12.3
25–29 895 13.0
30–34 1,097 16.0
35–39 1,367 19.9
40–44 1,023 14.9
45–54 982 14.3
≥55 284 4.1
Total 6,862 100.0*
* Actual total of percentages for this table is 99.9% and does not add to 100.0% due to rounding error.
Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department
of Health and Human Services; 2003.
Table 4.1c Reported Cases of Primary and Secondary Syphilis by Age — United States, 2002
CASES
Age Group (years) Number Percent Cumulative Percent
<14 21 0.3 0.3
15–19 351 5.1 5.4
20–24 842 12.3 17.7
25–29 895 13.0 30.7
30–34 1,097 16.0 46.7
35–39 1,367 19.9 66.6
40–44 1,023 14.9 81.6
45–54 982 14.3 95.9
≥55 284 4.1 100.0
Total 6,862 100.0* 100.0*
* Percentages do not add to 100.0% due to rounding error.
Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department
of Health and Human Services; 2003.
Two- and three-variable tables
Tables 4.1a, 4.1b, and 4.1c show case counts (frequency) by a
single variable, e.g., age. Data can also be cross-tabulated to show
counts by an additional variable. Table 4.2 shows the number of
syphilis cases cross-classified by both age group and sex of the
patient.
Displaying Public Health Data
Page 4-7
Table 4.2 Reported Cases of Primary and Secondary Syphilis by Age and Sex — United States, 2002
NUMBER OF CASES
Age Group (years) Male Female Total
<14 9 12 21
15–19 135 216 351
20–24 533 309 842
25–29 668 227 895
30–34 877 220 1,097
35–39 1,121 246 1,367
40–44 845 178 1,023
45–54 825 157 982
≥55 255 29 284
Total 5,268 1,594 6,862
Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department
of Health and Human Services; 2003.
To create a two-variable
table from a data set in
Analysis Module:
Select frequencies, then
choose variable under
Frequencies of. Output
shows table with row and
column percentages, plus
chi-square and p-value.
For a two-by-two table,
output also provides odds
ratio, risk ratio, risk
difference and confidence
intervals. Note that for a
cohort study, the row
percentage in cells of ill
patients is the attack
proportion, sometimes
called the attack rate.
A two-variable table with data categorized jointly by those two
variables is known as a contingency table. Table 4.3 is an
example of a special type of contingency table, in which each of
the two variables has two categories. This type of table is called a
two-by-two table and is a favorite among epidemiologists. Two-
by-two tables are convenient for comparing persons with and
without the exposure and those with and without the disease. From
these data, epidemiologists can assess the relationship, if any,
between the exposure and the disease. Table 4.3 is a two-by-two
table that shows one of the key findings from an investigation of
carbon monoxide poisoning following an ice storm and prolonged
power failure in Maine.4
In the table, the exposure variable,
location of power generator, has two categories — inside or
outside the home. Similarly the outcome variable, carbon
monoxide poisoning, has two categories — cases (number of
persons who became ill) and controls (number of persons who did
not become ill).
Displaying Public Health Data
Page 4-8
Table 4.3 Generator Location and Risk of Carbon Monoxide Poisoning After an Ice Storm — Maine, 1998
NUMBER OF
Cases Controls Total
Generator location
Inside home or
attached structure
23 23 46
Outside home 4 139 143
Total 27 162 189
Data Source: Daley RW, Smith A, Paz-Argandona E, Mallilay J, McGeehin M. An outbreak of carbon monoxide poisoning after a
major ice storm in Maine. J Emerg Med 2000;18:87–93.
Table 4.4 illustrates a generic format and standard notation for a
two-by-two table. Disease status (e.g., ill versus well, sometimes
denoted cases vs. controls if a case-control study) is usually
designated along the top of the table, and exposure status (e.g.,
exposed versus not exposed) is designated along the side. The
letters a, b, c, and d within the 4 cells of the two-by-two table refer
to the number of persons with the disease status indicated above
and the exposure status indicated to its left. For example, in Table
4.4, “c” represents the number of persons in the study who are ill
but who did not have the exposure being studied. Note that the
“Hi” represents horizontal totals; H1 and H0 represent the total
number of exposed and unexposed persons, respectively. The “Vi”
represents vertical totals; V1 and V0 represent the total number of
ill and well persons (or cases and controls), respectively. The total
number of subjects included in the two-by-two table is represented
by the letter T (or N).
Table 4.4 General Format and Notation for a Two-by-Two Table
Ill Well Total Attack Rate (Risk)
Exposed a b a + b = H1 a / a+b
Unexposed c d c + d = H0 c / c+d
Total a + c = V1 b + d = V0 T V1 / T
When producing a table to display either in print or projection, it is
best, generally, to limit the number of variables to one or two. One
exception to this rule occurs when a third variable modifies the
effect (technically, produces an interaction) of the first two. Table
4.5 is intended to convey the way in which race/ethnicity may
modify the effect of age and sex on incidence of syphilis. Because
three-way tables are often hard to understand, they should be used
only when ample explanation and discussion is possible.
Displaying Public Health Data
Page 4-9
Table 4.5 Number of Reported Cases of Primary and Secondary Syphilis, by Race/Ethnicity, Age, and
Sex — United States, 2002
Race/ethnicity Age Group (years) Male Female Total
American Indian/
Alaskan Native
<14 1 0 1
15–19 0 1 1
20–24 5 3 8
25–29 3 1 4
30–34 1 2 3
35–39 3 5 8
40–44 4 3 7
45–54 8 8 16
≥55 2 1 3
Total 27 24 51
Asian/Pacific Islander <14 1 1 2
15–19 0 2 2
20–24 9 4 13
25–29 16 1 17
30–34 21 1 22
35–39 14 1 15
40–44 14 1 15
45–54 8 0 8
≥55 0 0 0
Total 83 11 94
Black, Non-Hispanic <14 3 9 12
15–19 89 164 253
20–24 313 233 546
25–29 322 163 485
30–34 310 166 476
35–39 385 183 568
40–44 305 142 447
45–54 370 112 482
≥55 129 23 152
Total 2,226 1,195 3,421
Hispanic <14 1 1 2
15–19 37 25 62
20–24 117 29 146
25–29 139 26 165
30–34 172 20 192
35–39 178 22 200
40–44 93 9 102
45–54 69 14 83
≥55 18 1 19
Total 824 147 971
White, Non-Hispanic <14 3 1 4
15–19 9 24 33
20–24 89 40 129
25–29 188 36 224
30–34 373 31 404
35–39 541 35 576
40–44 429 23 452
45–54 370 23 393
≥55 106 4 110
Total 2,108 217 2,325
Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department
of Health and Human Services; 2003. p. 118.
Displaying Public Health Data
Page 4-10
Exercise 4.1
The data in Table 4.6 describe characteristics of the 38 persons who ate
food at or from a church supper in Texas in August 2001. Fifteen of these
persons later developed botulism. 5
1. Construct a table of the illness (botulism) by age group. Use botulism status (yes/no) as the
column labels and age groups as the row labels.
2. Construct a two-by-two table of the illness (botulism) by exposure to chicken.
3. Construct a two-by-two table of the illness (botulism) by exposure to chili.
4. Construct a three-way table of illness (botulism) by exposure to chili and chili leftovers.
Check your answers on page 4-72
Displaying Public Health Data
Page 4-11
Table 4.6 Line Listing for Exercise 4.1
ID Age
Attended
Supper Case
Date of
Onset Case Status
Ate Any
Food
Ate
Chili
Ate
Chicken
Ate Chili
Leftovers
1 1 Y N - Y Y Y N
2 3 Y Y 8/27 Lab-confirmed Y Y N N
3 7 Y Y 8/31 Lab-confirmed Y Y N N
4 7 Y N - Y Y Y N
5 10 Y N - Y Y N Y
6 17 Y Y 8/28 Lab-confirmed Y Y Y N
7 21 Y N - N N N N
8 23 Y N - Y Y N N
9 25 Y Y 8/26 Epi-linked Y Y N N
10 29 N Y 8/28 Lab-confirmed Y Unk Unk Y
11 38 Y N - N N N N
12 39 Y N - N N N N
13 41 Y N - Y Y Y N
14 41 Y N - N N N N
15 42 Y Y 8/26 Lab-confirmed Y Y Unk N
16 45 Y Y 8/26 Lab-confirmed Y Y Y Y
17 45 Y Y 8/27 Epi-linked Y Y Y N
18 46 Y N - Y N Y N
19 47 Y N - Y N Y N
20 48 Y Y 9/1 Lab-confirmed Y Y Unk N
21 50 Y Y 8/29 Epi-linked Y Y N N
22 50 Y N - Y N Y N
23 50 Y N - Y N N Y
24 52 Y Y 8/28 Lab-confirmed Y Y Y N
25 52 Y N - N N N N
26 53 Y Y 8/27 Epi-linked Y Y Y N
27 53 Y N - Y Y Y N
28 62 Y Y 8/27 Epi-linked Y Y Y N
29 62 Y N - Y N Y N
30 63 Y N - N N N N
31 67 Y N - N N N N
32 68 Y N - N N N N
33 69 Y N - Y Y Y N
34 71 Y N - Y N Y N
35 72 Y Y 8/27 Lab-confirmed Y Y Y N
36 74 Y N - Y Y N N
37 74 Y N - Y N Y N
38 78 Y Y 8/25 Epi-linked Y Y Y N
Data Source: Kalluri P, Crowe C, Reller M, Gaul L, Hayslett J, Barth S, Eliasberg S, Ferreira J, Holt K, Bengston S, Hendricks K, Sobel
J. An outbreak of foodborne botulism associated with food sold at a salvage store in Texas. Clin Infect Dis 2003;37:1490–5.
Displaying Public Health Data
Page 4-12
Tables of statistical measures other than frequency
Tables 4.1–4.5 show case counts (frequency). The cells of a table
could also display averages, rates, relative risks, or other
epidemiological measures. As with any table, the title and/or
headings must clearly identify what data are presented. For
example, the title of Table 4.7 indicates that the data for reported
cases of primary and secondary syphilis are rates rather than
numbers.
Table 4.7 Rate per 100,000 Population for Reported Cases of Primary and Secondary Syphilis, by Age
and Race — United States, 2002
Age Group
(years)
Am. Indian/
Alaska Native
Asian/
Pacific Is.
Black, Non-
Hispanic Hispanic
White, Non-
Hispanic Total
10–14 0.0 0.1 0.3 0.1 0.0 0.1
15–19 0.5 0.2 8.6 1.9 0.3 1.7
20–24 5.0 1.5 20.7 4.3 1.1 4.4
25–29 2.7 1.6 19.1 4.9 1.8 4.6
30–34 2.0 2.2 18.2 6.1 3.0 5.4
35–39 4.8 1.6 20.1 7.1 3.6 6.0
40–44 4.5 1.6 16.6 4.4 2.8 4.6
45–54 6.1 0.6 11.8 2.7 1.4 2.6
55–64 1.4 0.0 4.6 0.6 0.5 0.9
65+ 0.8 0.0 1.5 0.5 0.1 0.2
Totals 2.4 0.9 9.8 2.7 1.2 2.4
Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department
of Health and Human Services; 2003.
Composite tables
To conserve space in a report or manuscript, several tables are
sometimes combined into one. For example, epidemiologists often
create simple frequency distributions by age, sex, and other
demographic variables as separate tables, but editors may combine
them into one large composite table for publication. Table 4.8 is an
example of a composite table from the investigation of carbon
monoxide poisoning following the power failure in Maine.4
It is important to realize that this type of table should not be
interpreted as for a three-way table. The data in Table 4.8 have not
been arrayed to indicate the interrelationship of sex, age, smoking,
and disposition from medical care. Merely, several one variable
tables (independently assessing the number of cases by each of
these variables) have been concatenated for space conservation. So
this table would not help in assessing the modification that
smoking has on the risk of illness by age, for example. This
difference also explains why portraying total values would be
inappropriate and meaningless for Table 4.8.
Displaying Public Health Data
Page 4-13
Table 4.8 Number and Percentage of Confirmed Cases of Carbon Monoxide Poisoning Identified from
Four Hospitals, by Selected Characteristics — Maine, January 1998
CASES
Characteristic Number Percent
Total cases 100 100
Sex (female) 59 59
Age (years)
0–3 5 5
4–12 17 17
13–18 9 9
19–64 52 52
≥65 17 17
Smokers 20 20
Disposition
Released from ED* 83 83
Admitted to hospital 11 11
Transferred 5 5
Died 1 1
* ED = Emergency department
Data Source: Daley RW, Smith A, Paz-Argandona E, Mallilay J, McGeehin M. An outbreak of carbon monoxide poisoning after a
major ice storm in Maine. J Emerg Med 2000;18:87–93.
Table shells
Although you cannot analyze data before you have collected them,
epidemiologists anticipate and design their analyses in advance to
delineate what the study is going to convey, and to expedite the
analysis once the data are collected. In fact, most protocols, which
are written before a study can be conducted, require a description
of how the data will be analyzed. As part of the analysis plan, you
can develop table shells that show how the data will be organized
and displayed. Table shells are tables that are complete except for
the data. They show titles, headings, and categories. In developing
table shells that include continuous variables such as age, we
create more categories than we may later use, in order to disclose
any interesting patterns and quirks in the data.
The following table shells were designed before conducting a
case-control study of fractures related to falls in community-
dwelling elderly persons. The researchers were particularly
interested in assessing whether vigorous and/or mild physical
activity was associated with a lower risk of fall-related fractures.
Table shells of epidemiologic studies usually follow a standard
sequence from descriptive to analytic. The first and second tables
in the sequence usually cover clinical features of the health event
and demographic characteristics of the subjects. Next, the analyst
portrays the association of most interest to the researchers, in this
Displaying Public Health Data
Page 4-14
case, the association between physical activity and fracture.
Subsequent tables may present stratified or adjusted analyses,
refinements, and subset analyses. Of course, once the data are
available and used for these tables, additional analyses will come
to mind and should be pursued.
This sequence of table shells provides a systematic and logical
approach to the analysis. The first two tables (Table shells 4.9a and
4.9b), describing the health problem of interest and the population
studied, provide the background a reader would need to put the
analytic results in perspective.
Table Shell 4.9a Anatomic Site of Fall-related Fractures Sustained by Participants, SAFE Study — Miami,
1987–1989
Fracture Site Number (Percent)
Skull ____ ( )
Spine ____ ( )
Clavicle (collarbone) ____ ( )
Scapula (shoulderblade) ____ ( )
Humerus (upper arm) ____ ( )
Radius / ulna (lower arm) ____ ( )
Bones of the hand ____ ( )
Ribs, sternum ____ ( )
Pelvis ____ ( )
Neck of femur (hip) ____ ( )
Other parts of femur (upper leg) ____ ( )
Patella (knee) ____ ( )
Tibia / fibula (lower leg) ____ ( )
Ankle ____ ( )
Bones of the foot ____ ( )
Adapted from: Stevens, JA, Powell KE, Smith SM, Wingo PA, Sattin RW. Physical activity, functional limitations, and the risk of fall-
related fractures in community-dwelling elderly. Annals of Epidemiology 1997;7:54–61.
Displaying Public Health Data
Page 4-15
Table Shell 4.9b Selected Characteristics of Case and Control Participants, SAFE Study — Miami, 1987–
1989
CASES CONTROLS
Number (Percent) Number (Percent)
Age 65–74 ____ ( ) ____ ( )
75–84 ____ ( ) ____ ( )
≥85 ____ ( ) ____ ( )
Sex Male ____ ( ) ____ ( )
Female ____ ( ) ____ ( )
Race White ____ ( ) ____ ( )
Black ____ ( ) ____ ( )
Other ____ ( ) ____ ( )
Unknown ____ ( ) ____ ( )
Ethnicity Hispanic ____ ( ) ____ ( )
Non-Hispanic ____ ( ) ____ ( )
Unknown ____ ( ) ____ ( )
Hours/day spent on feet
<1 ____ ( ) ____ ( )
2–4 ____ ( ) ____ ( )
5–7 ____ ( ) ____ ( )
>8 ____ ( ) ____ ( )
Smoking status
Never smoked ____ ( ) ____ ( )
Former smoker ____ ( ) ____ ( )
Current smoker ____ ( ) ____ ( )
Unknown ____ ( ) ____ ( )
Alcohol use (drinks / week)
None ____ ( ) ____ ( )
<1 ____ ( ) ____ ( )
1–3 ____ ( ) ____ ( )
>4 ____ ( ) ____ ( )
Unknown ____ ( ) ____ ( )
Adapted from: Stevens, JA, Powell KE, Smith SM, Wingo PA, Sattin RW. Physical activity, functional limitations, and the risk of fall-
related fractures in community-dwelling elderly. Annals of Epidemiology 1997;7:54–61.
Now that the data in Table shells 4.9a and 4.9b have illustrated
descriptive characteristics of cases and controls in this study, we
are ready to refine the analysis by demonstrating the variability of
the data as assessed by statistical confidence intervals. Because of
the study design in this example, we have chosen the odds ratio to
assess statistical differences (see Lesson 3). Table shell 4.9c
illustrates a useful display for this information.
Displaying Public Health Data
Page 4-16
Table Shell 4.9c Relationship Between Physical Activity (Vigorous and Mild) and Fracture, SAFE Study
— Miami, 1987–1989
CASES CONTROLS Odds Ratio
(95% Confidence
Interval)
Number (Percent) Number (Percent)
Vigorous Activity Yes ____ ( ) ____ ( ) _____ (____ – ____)
No ____ ( ) ____ ( )
Mild Activity Yes ____ ( ) ____ ( ) _____ (____ – ____)
No ____ ( ) ____ ( )
Adapted from: Stevens, JA, Powell KE, Smith SM, Wingo PA, Sattin RW. Physical activity, functional limitations, and the risk of fall-
related fractures in community-dwelling elderly. Annals of Epidemiology 1997;7:54–61.
Creating class intervals
Conventional Rounding
Rules
If a fraction is greater
than .5, round it up (e.g.,
round 6.6 to 7).
If a fraction is less than
.5, round it down (e.g.,
round 6.4 to 6).
If a fraction is exactly .5,
it is recommended that
you round it to the even
value (e.g., round both 5.5
and 6.5 to 6). More
common and also
acceptable is to round it
up (e.g., round 6.5 to 7)
If the epidemiologic hypothesis for the investigation involves
variables such as “gender” or “exposure to a risk factor (yes/no),”
the construction of tables as described thus far in this chapter
should be straightforward. Often, however, the presumed risk
factor may not be so conveniently packaged. We may need to
investigate an infection acquired as a result of hospitalization and
“days of hospitalization” may be relevant; for many chronic
conditions, blood pressure is an important factor; if we are
interested in the effect of alcohol consumption on health risk,
number of drinks per week may be an important measurement.
These examples illustrate relevant variables that have a broader
range of possible responses than are easily handled by the methods
described earlier in this chapter. One solution in this case is to
create class intervals for your data, keeping the following
guidelines in mind:
• Class intervals should be mutually exclusive and exhaustive. In
plain language, that means that each individual in your data set
should fit uniquely into one class interval, and all persons
should fit into some class interval. So, for example, age ranges
should not overlap. Most measures follow conventional
rounding rules (see sidebar).
A general tip is to use a large number of class intervals for the
initial analysis to gain an appreciation for the variability of your
data. You can combine your categories later.
• Use principles of biologic plausibility when constructing
categories. For example, when analyzing infant and childhood
mortality, we might use categories of 0–12 months (since
neonatal problems are different epidemiologically from those of
other childhood problems), 1–5 years (since these result
Displaying Public Health Data
Page 4-17
CDC’s National Center for
Health Statistics uses the
following age
categorizations:
<1 infants
1–4 toddlers
5–14 adolescents
15–24 teens and young
adults
25–44 adults
45–64 older adults
>65 elderly
from causes of death primarily outside of institutions), and 5–
10 years (since these may result from risks in school settings).
Table 4.10 illustrates age groups that are sensible for the study
of various health conditions that are behaviorally-related.
• A natural baseline group should be kept as a distinct category.
Often the baseline group will include those who have not had
an exposure, e.g., non-smokers (0 cigarettes per day).
• If you wish to calculate rates to illustrate the relative risk of
adverse health events by these categories of risk factors, be
sure that the intervals you choose for the classes of your data
are the same as the intervals for the denominators that you will
find for readily available data. For example, to compute rates
of infant mortality by maternal age, you must find data on the
number of live-born infants to women; in determining age
groupings, consider what categories are used by the United
States Census Bureau.
• Always consider a category for “unknown” or “not stated.”
Table 4.10 Age Groupings Used for Different Conditions, as Reported in Surveillance Summaries, CDC,
2003
Overweight In
Adults7
Traumatic Brain
Injury8
Pregnancy-
Related Mortality9
HIV/AIDS10
Vaccine Adverse
Events11
18–24 years <4 years <19 years <13 years <1 year
25–34 5–14 20–24 13–14 1–6
35–44 15–19 25–29 15–24 7–17
45–54 20–24 30–34 25–34 18–64
55–64 25–34 35–39 35–44 >65
65–74 35–44 >40 45–54
>75 45–64 55–64
>65 >65
Total Total Total Total Total
In addition to these guidelines for creating class intervals, the
analyst must decide how many intervals to portray. If no natural or
standard class intervals are apparent, the strategies below may be
helpful.
Strategy 1: Divide the data into groups of similar size
A particularly appropriate approach if you plan to create area maps
(see later section on Maps) is to create a number of class intervals,
each with the same number of observations. For example, to
portray the rates of incidence of lung cancer by state (for men,
2001), one might group the rates into four class intervals, each
with 10–12 observations:
Displaying Public Health Data
Page 4-18
Table 4.11 Rates of Lung Cancer in Men, 2001 by State (and the District
of Columbia)
Rate Number of States in the US Cumulative Frequency
22.1–48.3 11 11
48.4–53.3 11 22
53.4–58.7 12 34
58.8–73.3 10 44
Missing data 7 51
Data Source: U.S. Cancer Statistics Working Group. United States Cancer Statistics: 2002
Incidence and Mortality. Atlanta: U.S. Department of Health and Human Services, Centers
for Disease Control and Prevention and National Cancer Institute; 2005.
Strategy 2: Base intervals on mean and standard deviation
With this strategy, you can create three, four, or six class intervals.
First, calculate the mean and standard deviation of the distribution
of data. (Lesson 2 covers the calculation of these measures.) Then
use the mean plus or minus different multiples of the standard
deviation to establish the upper limits for the intervals. This
strategy is most appropriate for large data sets. For example, let’s
suppose you are investigating a scoring system for preparedness of
health departments to respond to emerging and urgent threats. You
have devised a series of evaluation questions ranging from 0 to
100, with 100 being highest. You conduct a survey and find that
the scores for health departments in your jurisdiction range from
19 to 82; the mean of the scores is 50, and the standard deviation is
10. Here, the strategy for establishing six intervals for these data
specifies:
Upper limit of interval 6 = maximum value = 82
Upper limit of interval 5 = 50 + 20 = 70
Upper limit of interval 4 = 50 + 10 = 60
Upper limit of interval 3 = 50
Upper limit of interval 2 = 50 − 10 = 40
Upper limit of interval 1 = 50 − 20 = 30
Lower limit of interval 1 = 19
If you then select the obvious lower limit for each upper limit, you
have the six intervals:
Interval 6 = 71–82
Interval 5 = 61–70
Interval 4 = 51–60
Interval 3 = 41–50
Interval 2 = 31–40
Interval 1 = 19–30
You can create three or four intervals by combining some of the
adjacent six-interval limits.
Strategy 3: Divide the range into equal class intervals
This method is the simplest and most commonly used, and is most
readily adapted to graphs. The selection of groups or categories is
often arbitrary, but must be consistent (for example, age groups by
Displaying Public Health Data
Page 4-19
5 or 10 years throughout the data set). To use equal class intervals,
do the following:
Find the range of the values in your data set. That is, find the
difference between the maximum value (or some slightly larger
convenient value) and zero (or the minimum value).
Decide how many class intervals (groups or categories) you want
to have. For tables, choose between four and eight class intervals.
For graphs and maps, choose between three and six class intervals.
The number will depend on what aspects of the data you want to
highlight.
Find what size of class interval to use by dividing the range by the
number of class intervals you have decided on.
Begin with the minimum value as the lower limit of your first
interval and specify class intervals of whatever size you calculated
until you reach the maximum value in your data.
For example, to display 52 observations, say the percentage of men
over age 40 screened for prostate cancer within the past two years
in 2004 by state (including Puerto Rico and the District of
Columbia), you could create five categories, each containing the
number of states with percentages of screened men in the given
range.
Table 4.12 Percentage of Men Over Age 40 Screened for Prostate
Cancer, by State (including Puerto Rico and the District of Columbia),
2004
Percentage Number of States Cumulative Frequency
40.0–44.9 3 3
45.0–49.9 18 21
50.0–54.9 25 46
55.0–59.9 5 51
60.0–64.9 1 52
Data Source: Behavioral Risk Factor Surveillance System [Internet]. Atlanta: Centers for
Disease Control and Prevention. Available from: http://www.cdc.gov/brfss/.
Displaying Public Health Data
Page 4-20
EXAMPLE: Creating Class Interval Categories
Use each strategy to create four class interval categories by using the lung cancer mortality rates shown in Table
4.13.
Table 4.13 Age-adjusted Lung Cancer Death Rates per 100,000 population, in Rank
Order by State — United States, 2000
Rate per Rate per
Rank State 100,000 Rank State 100,000
1 Kentucky 116.1 26 Florida 75.3
2 Mississippi 111.7 27 Kansas 74.5
3 West Virginia 104.1 28 Massachusetts 73.6
4 Tennessee 103.4 29 Alaska 72.9
5 Alabama 100.8 30 Oregon 72.7
6 Louisiana 99.2 31 New Hampshire 71.2
7 Arkansas 99.1 32 New Jersey 71.2
8 North Carolina 94.6 33 Washington 71.2
9 Georgia 93.2 34 Vermont 70.2
10 South Carolina 92.4 35 South Dakota 68.1
11 Indiana 91.6 36 Wisconsin 67.0
12 Oklahoma 89.4 37 Montana 66.5
13 Missouri 88.5 38 Connecticut 66.4
14 Ohio 85.6 39 New York 66.2
15 Virginia 83.0 40 Nebraska 65.6
16 Maine 80.2 41 North Dakota 64.9
17 Illinois 80.0 42 Wyoming 64.4
18 Texas 79.3 43 Arizona 62.0
19 Maryland 79.2 44 Minnesota 60.7
20 Nevada 78.7 45 California 60.1
21 Delaware 78.2 46 Idaho 59.7
22 Rhode Island 77.9 47 New Mexico 52.3
23 Iowa 77.0 48 Colorado 52.1
24 Michigan 76.7 49 Hawaii 49.8
25 Pennsylvania 76.5 50 Utah 39.7
Total United States 76.9
Data Source: Stewart SL, King JB, Thompson TD, Friedman C, Wingo PA. Cancer Mortality–United States,
1990-2000. In: Surveillance Summaries, June 4, 2004. MMWR 2004;53 (No. SS-3):23–30.
Strategy 1: Divide the data into groups of similar size
(Note: If the states in Table 4.13 had been listed alphabetically rather than in rank order, the first step would have
been to sort the data into rank order by rate. Fortunately, this has already been done.)
1. Divide the list into four equal sized groups of places:
50 states / 4 = 12.5 states per group. Because states can’t be cut in half, use two groups of 12 states and two
groups of 13 states. Missouri (#13) could go into either the first or second group and Connecticut (#38) could
go into either third or fourth group. Arbitrarily putting Missouri in the second category and Connecticut into the
third results in the following groups:
a. Kentucky through Oklahoma (States 1–12)
b. Missouri through Pennsylvania (States 13–25)
c. Florida through Connecticut (States 26–38)
d. New York through Utah (States 39–50)
2. Identify the rate for the first and last state in each group:
a. Oklahoma through Kentucky 89.4–116.1
b. Pennsylvania through Missouri 76.5–88.5
c. Connecticut through Florida 66.4–75.3
d. Utah through New York 39.7–66.2
Displaying Public Health Data
Page 4-21
EXAMPLE: Creating Class Interval Categories (Continued)
3. Adjust the limits of each interval so no gap exists between the end of one class interval and beginning of the
next. Deciding how to adjust the limits is somewhat arbitrary — you could split the difference, or use a
convenient round number.
a. Oklahoma through Kentucky 89.0–116.1
b. Pennsylvania through Missouri 76.0–88.9
c. Connecticut through Florida 66.3–75.9
d. Utah through New York 39.7–66.2
Strategy 2: Base intervals on mean and standard deviation
1. Calculate the mean and standard deviation (see Lesson 2 for instructions in calculating these measures.):
Mean = 77.1
Standard deviation = 16.1
2. Find the upper limits of four intervals
a. Upper limit of interval 4 = maximum value = 116.1
b. Upper limit of interval 3 = mean + 1 standard deviation = 77.1 + 16.1 = 93.2
c. Upper limit of interval 2 = mean = 77.1
d. Upper limit of interval 1 = mean – 1 standard deviation = 77.1 – 16.1 = 61.0
e. Lower limit of interval 1 = minimum value = 39.7
3. Select the lower limit for each upper limit to define four full intervals. Specify the states that fall into each
interval. (Note: To place the states with the highest rates first, reverse the order of the intervals):
a. North Carolina through Kentucky (8 states) 93.3–116.1
b. Rhode Island through Georgia (14 states) 77.1–93.2
c. Arizona through Iowa (21 states) 61.1–77.1
d. Utah through Minnesota (7 states) 39.7–61.0
Strategy 3: Divide the range into equal class intervals
4. Divide the range from zero (or the minimum value) to the maximum by 4:
a. (116.1 – 39.7) / 4 = 76.4 / 4 = 19.1
5. Use multiples of 19.1 to create four categories, starting with 39.7:
a. 39.7 through (39.7 + 19.1) = 39.7 through 58.8
b. 58.9 through (39.7 + [2 x 19.1]) = 58.9 through 77.9
c. 78.0 through (39.7 + [3 x 19.1]) = 78.0 through 97.0
d. 97.1 through (39.7 + [4 x 19.1]) = 97.1 through 116.1
6. Final categories:
a. Arkansas through Kentucky (7 states) 97.1–116.1
b. Delaware through North Carolina (14 states) 78.0–97.0
c. Idaho through Rhode Island (25 states) 58.9–77.9
d. Utah through New Mexico (4 states) 39.7–58.8
7. Alternatively, since 19.1 is close to 20, multiples of 20 might be used to create the four categories that might
look cleaner. For example, the final categories could look like:
a. Arkansas through Kentucky (7 states) 97.0–116.9
b. Iowa through North Carolina (16 states) 77.0–96.9
c. Idaho through Michigan (23 states) 57.0–76.9
d. Utah through New Mexico (4 states) 37.0–56.9
OR
a. Alabama through Kentucky (5 states) 100.0–119.9
b. Illinois through Louisiana (12 states) 80.0–99.9
c. California through Texas (28 states) 60.0–79.9
d. Utah through Idaho (5 states) 39.7–59.9
Displaying Public Health Data
Page 4-22
Exercise 4.2
With the data on lung cancer mortality rates presented in Table 4.13, use
each strategy to create three class intervals for the rates.
Check your answers on page 4-73
Displaying Public Health Data
Page 4-23
“Charts…should fulfill
certain basic objectives:
they should be: (1)
accurate representations
of the facts, (2) clear,
easily read, and
understood, and (3) so
designed and constructed
as to attract and hold
attention.”12
- CF Schmid and
SE Schmid
“Make the data stand out.
Avoid superfluity.”13
- WS Cleveland
Graphs
A graph (used here interchangeably with chart) displays numeric
data in visual form. It can display patterns, trends, aberrations,
similarities, and differences in the data that may not be evident in
tables. As such, a graph can be an essential tool for analyzing and
trying to make sense of data. In addition, a graph is often an
effective way to present data to others less familiar with the data.
When designing graphs, the guidelines for categorizing data for
tables also apply. In addition, some best practices for graphics
include:
• Ensure that a graphic can stand alone by clear labeling of
title, source, axes, scales, and legends;
• Clearly identify variables portrayed (legends or keys),
including units of measure;
• Minimize number of lines on a graph;
• Generally, portray frequency on the vertical scale, starting at
zero, and classification variable on horizontal scale;
• Ensure that scales for each axis are appropriate for data
presented;
• Define any abbreviations or symbols; and
• Specify any data excluded.
In epidemiology, most graphs have two scales or axes, one
horizontal and one vertical, that intersect at a right angle. The
horizontal axis is known as the x-axis and generally shows values
of the independent (or x) variable, such as time or age group. The
vertical axis is the y-axis and shows the dependent (or y) variable,
which, in epidemiology, is usually a frequency measure such as
number of cases or rate of disease. Each axis should be labeled to
show what it represents (both the name of the variable and the
units in which it is measured) and marked by a scale of
measurement along the line.
In constructing a useful graph, the guidelines for categorizing data
for tables by types of data also apply. For example, the number of
reported measles cases by year of report is technically a nominal
variable, but because of the large number of cases when
aggregated over the United States, we can treat this variable as a
continuous one. As such, a line graph is appropriate to display
these data.
Displaying Public Health Data
Page 4-24
Try It: Plotting a Graph
Scenario: Table 4.14 shows the number of measles cases by year of report from 1950 to 2003. The number of
measles cases in years 1950 through 1954 has been plotted in Figure 4.1, below. The independent variable, years,
is shown on the horizontal axis. The dependent variable, number of cases, is shown on the vertical axis. A grid is
included in Figure 4.1 to illustrate how points are plotted. For example, to plot the point on the graph for the
number of cases in 1953, draw a line up from 1953, and then draw a line from 449 cases to the right. The point
where these lines intersect is the point for 1953 on the graph.
Your Turn: Use the data in Table 4.14 to plot the points for 1955 to 1959 and complete the graph in Figure 4.1.
Figure 4.1 Partial Graph of Measles by Year of Report — United States, 1950–1959
Table 4.14 Number of Reported Measles Cases, by Year of Report — United States, 1950–2003
Year Cases Year Cases Year Cases
1950 319,000 1970 47,351 1990 27,786
1951 530,000 1971 75,290 1991 9,643
1952 683,000 1972 32,275 1992 2,237
1953 449,000 1973 26,690 1993 312
1954 683,000 1974 22,094 1994 963
1955 555,000 1975 24,374 1995 309
1956 612,000 1976 41,126 1996 508
1957 487,000 1977 57,345 1997 138
1958 763,000 1978 26,871 1998 100
1959 406,000 1979 13,597 1999 100
1960 442,000 1980 13,506 2000 86
1961 424,000 1981 3,124 2001 116
1962 482,000 1982 1,714 2002 44
1963 385,000 1983 1,497 2003 56
1964 458,000 1984 2,587
1965 262,000 1985 2,822
1966 204,000 1986 6,282
1967 62,705 1987 3,655
1968 22,231 1988 3,396
1969 25,826 1989 18,193
Data Sources: Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 1989. MMWR
1989;38(No. 54).
Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2002. MMWR 2002;51(No. 53)
Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2003. MMWR 2005;52(No. 54)
Displaying Public Health Data
Page 4-25
Arithmetic-scale line graphs
An arithmetic-scale line graph (such as Figure 4.1) shows patterns
or trends over some variable, often time. In epidemiology, this type
of graph is used to show long series of data and to compare several
series. It is the method of choice for plotting rates over time.
In an arithmetic-scale line graph, a set distance along any axis
represents the same quantity anywhere on that axis. In Figure 4.2,
for example, the space between tick marks along the y-axis
(vertical axis) represents an increase of 10,000 (10 x 1,000) cases
anywhere along the axis — a continuous variable.
Furthermore, the distance between any two tick marks on the x-
axis (horizontal axis) represents a period of time of one year. This
represents an example of a discrete variable. Thus an arithmetic-
scale line graph is one in which equal distances along either the x-
or y- axis portray equal values.
Arithmetic-scale line graphs can display numbers, rates,
proportions, or other quantitative measures on the y-axis.
Generally, the x-axis for these graphs is used to portray the time
period of data occurrence, collection, or reporting (e.g., days,
weeks, months, or years). Thus, these graphs are primarily used to
portray an overall trend over time, rather than an analysis of
particular observations (single data points). For example, Figure
4.2 shows prevalence (of neural tube defects) per 100,000 births.
Figure 4.2 Trends in Neural Tube Defects (Anencephaly and Spina
Bifida) Among All Births, 45 States and District of Columbia, 1990–
1999
Source: Honein MA, Paulozzi LJ, Mathews TJ, Erickson JD, Wong L-Y. Impact of folic acid
fortification of the US food supply on the occurrence of neural tube defects. JAMA
2001;285:2981–6.
Displaying Public Health Data
Page 4-26
Figure 4.3 shows another example of an arithmetic-scale line
graph. Here the y-axis is a calculated variable, median age at death
of people born with Down’s syndrome from 1983–1997. Here also,
we see the value of showing two data series on one graph; we can
compare the mortality risk for males and females.
Figure 4.3 Median Age at Death of People with Down’s Syndrome by
Sex — United States, 1983–1997
Source: Yang Q, Rasmussen A, Friedman JM. Mortality associated with Down’s syndrome in
the USA from 1983 to 1997: a population-based study. Lancet 2002;359:1019–25.
More About the X-axis and the Y-axis
When you create an arithmetic-scale line graph, you need to select a scale for the x- and y-axes. The scale should
reflect both the data and the point of the graph. For example, if you use the data in Table 4.14 to graph the number
of cases of measles cases by year from 1990 to 2002, then the scale of the x-axis will most likely be year of report,
because that is how the data are available. Consider, however, if you had line-listed data with the actual dates of
onset or report that spanned several years. You might prefer to plot these data by week, month, quarter, or even
year, depending on the point you wish to make.
The following steps are recommended for creating a scale for the y-axis.
• Make the length of the y-axis shorter than the x-axis so that your graph is horizontal or “landscape.” A 5:3 ratio
is often recommended for the length of the x-axis to y-axis.
• Always start the y-axis with 0. While this recommendation is not followed in all fields, it is the standard practice
in epidemiology.
• Determine the range of values you need to show on the y-axis by identifying the largest value you need to graph
on the y-axis and rounding that figure off to a slightly larger number. For example, the largest y-value in Figure
4.3 is 49 years in 1997, so the scale on the y-axis goes up to 50. If median age continues to increase and
exceeds 50 in future years, a future graph will have to extend the scale on the y-axis to 60 years.
• Space the tick marks and their labels to describe the data in sufficient detail for your purposes. In Figure 4.3, five
intervals of 10 years each were considered adequate to give the reader a good sense of the data points and
pattern.
Displaying Public Health Data
Page 4-27
Exercise 4.3
Using the data on measles rates (per 100,000) from 1955 to 2002 in Table
4.15:
1. Construct an arithmetic-scale line graph of rate by year. Use intervals on the y-axis that are
appropriate for the range of data you are graphing.
2. Construct a separate arithmetic-scale line graph of the measles rates from 1985 to 2002.
Use intervals on the y-axis that are appropriate for the range of data you are graphing.
Graph paper is provided at the end of this lesson.
Table 4.15 Rate (per 100,000 Population) of Reported Measles Cases by Year of Report — United
States, 1955–2002
Year
Rate per
100,000 Year Rate per 100,000 Year
Rate per
100,000
1955 336.3 1971 36.5 1987 1.5
1956 364.1 1972 15.5 1988 1.4
1957 283.4 1973 12.7 1989 7.3
1958 438.2 1974 10.5 1990 11.2
1959 229.3 1975 11.4 1991 3.8
1960 246.3 1976 19.2 1992 0.9
1961 231.6 1977 26.5 1993 0.1
1962 259.0 1978 12.3 1994 0.4
1963 204.2 1979 6.2 1995 0.1
1964 239.4 1980 6.0 1996 0.2
1965 135.1 1981 1.4 1997 0.06
1966 104.2 1982 0.7 1998 0.04
1967 31.7 1983 0.6 1999 0.04
1968 11.1 1984 1.1 2000 0.03
1969 12.8 1985 1.2 2001 0.04
1970 23.2 1986 2.6 2002 0.02
Data Sources: Centers for Disease Control. Summary of notifiable diseases–United States, 1989. MMWR 1989;38(No. 54).
Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2002. Published April 30, 2004 for
MMWR 2002;51(No. 53).
Check your answers on page 4-75
Displaying Public Health Data
Page 4-28
Semilogarithmic-scale line graphs
In some cases, the range of data observed may be so large that
proper construction of an arithmetic-scale graph is problematic.
For example, in the United States, vaccination policies have
greatly reduced the incidence of mumps; however, outbreaks can
still occur in unvaccinated populations. To portray these competing
forces, an arithmetic graph is insufficient without an inset
amplifying the problem years (Figure 4.4).
Figure 4.4 Mumps by Year — United States, 1978–2003
Source: Centers for Disease Control and Prevention. Summary of notifiable diseases–United
States, 2003. Published April 22, 2005, for MMWR 2003;52(No. 54):54.
An alternative approach to this problem of incompatible scales is
to use a logarithmic transformation for the y-axis. Termed a
“semi-log” graph, this technique is useful for displaying a variable
with a wide range of values (as illustrated in Figure 4.5). The x-
axis uses the usual arithmetic-scale, but the y-axis is measured on a
logarithmic rather than an arithmetic scale. As a result, the distance
from 1 to 10 on the y- axis is the same as the distance from 10 to
100 or 100 to 1,000.
*
Displaying Public Health Data
Page 4-29
Another use for the semi-log graph is when you are interested in
portraying the relative rate of change of several series, rather than
the absolute value. Figure 4.5 shows this application. Note several
aspects of this graph:
Cycle = order of
magnitude
That is, from 1 to 10 is
one cycle; from 10 to 100
is another cycle.
• The y-axis includes four cycles of the order of magnitude,
each a multiple of ten (e.g., 0.1 to 1, 1 to 10, etc.) — each a
constant multiple.
• Within a cycle, the ten tick-marks are spaced so that spaces
become smaller as the value increases. Notice that the absolute
distance from 1.0 to 2.0 is wider than the distance from 2.0 to
3.0, which is, in turn, wider than the distance from 8.0 to 9.0.
This results from the fact that we are graphing the logarithmic
transformation of numbers, which, in fact, shrinks them as they
become larger. We can still compare series, however, since the
shrinking process preserves the relative change between series.
Figure 4.5 Age-adjusted Death Rates for 5 of the 15 Leading Causes of
Death — United States, 1958–2002
Adapted from: Kochanek KD, Murphy SL, Anderson RN, Scott C. Deaths: final data for
2002. National vital statistics report; vol 53, no 5. Hyattsville, Maryland: National Center for
Health Statistics, 2004. p. 9.
Displaying Public Health Data
Page 4-30
Consider the data shown in Table 4.16. Two hypothetical countries
begin with a population of 1,000,000. The population of Country A
grows by 100,000 persons each year. The population of Country B
grows by 10% each year. Figure 4.6 displays data from Country A
on the left, and Country B on the right. Arithmetic-scale line
graphs are above semilog-scale line graphs of the same data. Look
at the left side of the figure. Because the population of Country A
grows by a constant number of persons each year, the data on the
arithmetic-scale line graph fall on a straight line. However,
because the percentage growth in Country A declines each year,
the curve on the semilog-scale line graph flattens. On the right side
of the figure the population of Country B curves upward on the
arithmetic-scale line graph but is a straight line on the semilog
graph. In summary, a straight line on an arithmetic-scale line graph
represents a constant change in the number or amount. A straight
line on a semilog-scale line graph represents a constant percent
change from a constant rate.
Table 4.16 Hypothetical Population Growth in Two Countries
COUNTRY A
(Constant Growth by 100,000)
COUNTRY B
(Constant Growth by 10%)
Year Population Growth Rate Population Growth Rate
0 1,000,000 1,000,000
1 1,100,000 10.0% 1,100,000 10.0%
2 1,200,000 9.1% 1,210,000 10.0%
3 1,300,000 8.3% 1,331,000 10.0%
4 1,400,000 7.7% 1,464,100 10.0%
5 1,500,000 7.1% 1,610,510 10.0%
6 1,600,000 6.7% 1,771,561 10.0%
7 1,700,000 6.3% 1,948,717 10.0%
8 1,800,000 5.9% 2,143,589 10.0%
9 1,900,000 5.6% 2,357,948 10.0%
10 2,000,000 5.3% 2,593,742 10.0%
11 2,100,000 5.0% 2,853,117 10.0%
12 2,200,000 4.8% 3,138,428 10.0%
13 2,300,000 4.4% 3,452,271 10.0%
14 2,400,000 4.3% 3,797,498 10.0%
15 2,500,000 4.2% 4,177,248 10.0%
16 2,600,000 4.0% 4,594,973 10.0%
17 2,700,000 3.8% 5,054,470 10.0%
18 2,800,000 3.7% 5,559,917 10.0%
19 2,900,000 3.6% 6,115,909 10.0%
20 3,000,000 3.4% 6,727,500 10.0%
Displaying Public Health Data
Page 4-31
To create a semilogarithmic
graph from a data set in
Analysis Module:
To calculate data for
plotting, you must define a
new variable. For example,
if you want a semilog plot
for annual measles
surveillance data in a
variable called MEASLES,
under the VARIABLES
section of the Analysis
commands:
• Select Define.
• Type logmeasles into
the Variable Name box.
• Since your new variable is
not used by other
programs, the Scope
should be Standard.
• Click on OK to define the
new variable. Note that
logmeasles now
appears in the pull-down
list of Variables.
• Under the Variables
section of the Analysis
commands, select
Assign.
Types of variables and class
intervals are discussed in
Lesson 2.
Figure 4.6 Comparison of Arithmetic-scale Line Graph and
Semilogarithmic-scale Line Graph for Hypothetical Country A (Constant
Increase in Number of People) and Country B (Constant Increase in
Rate of Growth)
Consequently, a semilog-scale line graph has the following
features:
• The slope of the line indicates the rate of increase or
decrease.
• A straight line indicates a constant rate (not amount) of
increase or decrease in the values.
• A horizontal line indicates no change.
• Two or more lines following parallel paths show identical
rates of change.
Semilog graph paper is available commercially, and most include
at least three cycles.
Histograms
A histogram is a graph of the frequency distribution of a
continuous variable, based on class intervals. It uses adjoining
columns to represent the number of observations for each class
interval in the distribution. The area of each column is proportional
to the number of observations in that interval. Figures 4.7a and
4.7b show two versions of a histogram of frequency distributions
with equal class intervals. Since all class intervals are equal in this
histogram, the height of each column is in proportion to the
number of observations it depicts.
Figures 4.7a, 4.7b, and 4.7c are examples of a particular type of
histogram that is commonly used in field epidemiology — the
Displaying Public Health Data
Page 4-32
epidemic curve. An epidemic curve is a histogram that displays the
number of cases of disease during an outbreak or epidemic by
times of onset. The y-axis represents the number of cases; the x-
axis represents date and/or time of onset of illness. Figure 4.7a is a
perfectly acceptable epidemic curve, but some epidemiologists
prefer drawing the histogram as stacks of squares, with each square
representing one case (Figure 4.7b). Additional information may
be added to the histogram. The rendition of the epidemic curve
shown in Figure 4.7c shades the individual boxes in each time
period to denote which cases have been confirmed with culture
results. Other information such as gender or presence of a related
risk factor could be portrayed in this fashion.
Conventionally, the numbers on the x-axis are centered between
the tick marks of the appropriate interval. The interval of time
should be appropriate for the disease in question, the duration of
the outbreak, and the purpose of the graph. If the purpose is to
show the temporal relationship between time of exposure and onset
of disease, then a widely accepted rule of thumb is to use intervals
approximately one-fourth (or between one-eighth and one-third) of
the incubation period of the disease shown. The incubation period
for salmonellosis is usually 12–36 hours, so the x-axis of this
epidemic curve has 12-hour intervals.
Figure 4.7a Number of Cases of Salmonella Enteriditis Among Party
Attendees by Date and Time of Onset — Chicago, Illinois, February
2000
Source: Cortese M, Gerber S, Jones E, Fernandez J. A Salmonella Enteriditis outbreak in
Chicago. Presented at the Eastern Regional Epidemic Intelligence Service Conference,
March 23, 2000, Boston, Massachusetts.
Displaying Public Health Data
Page 4-33
Figure 4.7b Number of Cases of Salmonella Enteriditis Among Party
Attendees by Date and Time of Onset — Chicago, Illinois, February
2000
Source: Cortese M, Gerber S, Jones E, Fernandez J. A Salmonella Enteriditis outbreak in
Chicago. Presented at the Eastern Regional Epidemic Intelligence Service Conference,
March 23, 2000, Boston, Massachusetts.
The most common choice for the x-axis variable in field
epidemiology is calendar time, as shown in Figures 4.7a–c.
However, age, cholesterol level or another continuous-scale
variable may be used on the x-axis of an epidemic curve.
Figure 4.7c Number of Cases of Salmonella Enteriditis Among Party
Attendees by Date and Time of Onset — Chicago, Illinois, February
2000
Source: Cortese M, Gerber S, Jones E, Fernandez J. A Salmonella Enteriditis outbreak in
Chicago. Presented at the Eastern Regional Epidemic Intelligence Service Conference,
March 23, 2000, Boston, Massachusetts.
Displaying Public Health Data
Page 4-34
In Figure 4.8, which shows a frequency distribution of adults with
diagnosed diabetes in the United States, the x-axis displays a
measure of body mass — weight (in kilograms) divided by height
(in meters) squared. The choice of variable for the x-axis of an
epidemic curve is clearly dependent on the point of the display.
Figures 4.7a, 4.7b, or 4.7c are constructed to show the natural
course of the epidemic over time; Figure 4.8 conveys the burden of
the problem of overweight and obesity.
Figure 4.8 Distribution of Body Mass Index Among Adults with
Diagnosed Diabetes — United States, 1999–2002
Data Source: Centers for Disease Control and Prevention. Prevalence of overweight and
obesity among adults with diagnosed diabetes–United States, 1988-1994 and 1999-2002.
MMWR 2004;53:1066–8.
The component of most interest should always be put at the bottom
because the upper component usually has a jagged baseline that
may make comparison difficult. Consider the data on
pneumoconiosis in Figure 4.9a. The graph clearly displays a
gradual decline in deaths from all pneumoconiosis between 1972
and 1999. It appears that deaths from asbestosis (top subgroup in
Figure 4.9a) went against the overall trend, by increasing over the
same period. However, Figure 4.9b makes this point more clearly
by placing asbestosis along the baseline.
Displaying Public Health Data
Page 4-35
Figure 4.9a Number of Deaths with Any Death Certificate Mention of
Asbestosis, Coal Worker’s Pneumoconiosis (CWP), Silicosis, and
Unspecified/Other Pneumoconiosis Among Persons Aged > 15 Years,
by Year — United States, 1968–2000
Adapted from: Centers for Disease Control and Prevention. Changing patterns of
pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–31.
Figure 4.9b Number of Deaths with Any Death Certificate Mention of
Asbestosis, Coal Worker’s Pneumoconiosis (CWP), Silicosis, and
Unspecified/Other Pneumoconiosis Among Persons Aged > 15 Years,
by Year — United States, 1968–2000
Data Source: Centers for Disease Control and Prevention. Changing patterns of
pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–31.
Epidemic curves are
discussed in more detail in
Lesson 6.
Some histograms, particularly those that are drawn as stacks of
squares, include a box that indicates how many cases are
represented by each square. While a square usually represents one
case in a relatively small outbreak, a square may represent five or
ten cases in a relatively large outbreak.
Displaying Public Health Data
Page 4-36
Exercise 4.4
Using the botulism data presented in Exercise 4.1, draw an epidemic curve.
Then use this epidemic curve to describe this outbreak as if you were
speaking over the telephone to someone who cannot see the graph. Graph
paper is provided at the end of this lesson.
Check your answers on page 4-76
Displaying Public Health Data
Page 4-37
Population pyramid
A population pyramid displays the count or percentage of a
population by age and sex. It does so by using two histograms —
most often one for females and one for males, each by age group
— turned sideways so the bars are horizontal, and placed base to
base (Figures 4.10 and 4.11). Notice the overall pyramidal shape of
the population distribution of a developing country with many
births, relatively high infant mortality, and relatively low life
expectancy (Figure 4.10). Compare that with the shape of the
population distribution of a more developed country with fewer
births, lower infant mortality, and higher life expectancy (Figure
4.11).
Figure 4.10 Population Distribution of Zambia by Age and Sex, 2000
Source: U.S. Census Bureau [Internet]. Washington, DC: IDB Population Pyramids [cited
2004 Sep 10]. Available from: http://www.census.gov/population/international/.
Figure 4.11 Population Distribution of Sweden by Age and Sex, 1997
Source: U.S. Census Bureau [Internet]. Washington, DC: IDB Population Pyramids [cited
2004 Sep 10]. Available from: http://www.census.gov/population/international/.
While population pyramids are used most often to display the
distribution of a national population, they can also be used to
display other data such as disease or a health characteristic by age
Displaying Public Health Data
Page 4-38
and sex. For example, smoking prevalence by age and sex is
shown in Figure 4.12. This pyramid clearly shows that, at every
age, females are less likely to be current smokers than males.
Figure 4.12 Percentage of Persons >18 Years Who Were Current
Smokers,* by Age and Sex — United States, 2002
Answer “yes” to both questions: “Do you now smoke cigarettes everyday or some days?”
and “Have you smoked at least 100 cigarettes in your entire life?”
Data Source: Centers for Disease Control and Prevention. Cigarette smoking among adults–
United States, 2002. MMWR 2004;53:427–31.
Frequency polygons
A frequency polygon, like a histogram, is the graph of a frequency
distribution. In a frequency polygon, the number of observations
within an interval is marked with a single point placed at the
midpoint of the interval. Each point is then connected to the next
with a straight line. Figure 4.13 shows an example of a frequency
polygon over the outline of a histogram for the same data. This
graph makes it easy to identify the peak of the epidemic (4 weeks).
Figure 4.13 Comparison of Frequency Polygon and Histogram
Displaying Public Health Data
Page 4-39
A frequency polygon contains the same area under the line as does
a histogram of the same data. Indeed, the data that were displayed
as a histogram in Figure 4.9a are displayed as a frequency polygon
in Figure 4.14.
Figure 4.14 Number of Deaths with Any Death Certificate Mention of
Asbestosis, Coal Worker’s Pneumoconiosis (CWP), Silicosis, and
Unspecified/Other Pneumoconiosis Among Persons Aged > 15 Years,
by Year — United States, 1968–2000
Data Source: Centers for Disease Control and Prevention. Changing patterns of
pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–31.
A frequency polygon differs from an arithmetic-scale line graph in
several ways. A frequency polygon (or histogram) is used to
display the entire frequency distribution (counts) of a continuous
variable. An arithmetic-scale line graph is used to plot a series of
observed data points (counts or rates), usually over time. A
frequency polygon must be closed at both ends because the area
under the curve is representative of the data; an arithmetic-scale
line graph simply plots the data points. Compare the
pneumoconiosis mortality data displayed as a frequency polygon in
Figure 4.14 and as a line graph in Figure 4.15.
Figure 4.15 Number of Deaths with Any Death Certificate Mention of
Asbestosis, Coal Worker’s Pneumoconiosis (CWP), Silicosis, and
Unspecified/Other Pneumoconiosis Among Persons Aged > 15 Years,
by Year — United States, 1968–2000
Data Source: Centers for Disease Control and Prevention. Changing patterns of
pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–31.
Displaying Public Health Data
Page 4-40
Exercise 4.5
Consider the epidemic curve constructed for Exercise 4.4. Prepare a
frequency polygon for these same data. Compare the interpretations of the
two graphs.
Check your answers on page 4-76
Displaying Public Health Data
Page 4-41
Ogive (pronounced O’-jive)
is another name for a
cumulative frequency
curve. Ogive also means
the diagonal rib of a
Gothic vault, a pointed arc,
or the curved area making
up the nose of a projectile.
Cumulative frequency and survival curves
As its name implies, a cumulative frequency curve plots the
cumulative frequency rather than the actual frequency distribution
of a variable. This type of graph is useful for identifying medians,
quartiles, and other percentiles. The x-axis records the class
intervals, while the y-axis shows the cumulative frequency either
on an absolute scale (e.g., number of cases) or, more commonly, as
percentages from 0% to 100%. The median (50% or half-way
point) can be found by drawing a horizontal line from the 50% tick
mark on the y-axis to the cumulative frequency curve, then
drawing a vertical line from that spot down to the x-axis. Figure
4.16 is a cumulative frequency graph showing the number of days
until smallpox vaccination scab separation among persons who had
never received smallpox vaccination previously (primary
vaccinees) and among persons who had been previously vaccinated
(revaccinees). The median number of days until scab separation
was 19 days among revaccinees, and 22 days among primary
vaccinees.
Figure 4.16 Days to Smallpox Vaccination Scab Separation Among
Primary Vaccinees (n=29) and Revaccinees (n=328) — West Virginia,
2003
Source: Kaydos-Daniels S, Bixler D, Colsher P, Haddy L. Symptoms following smallpox
vaccination–West Virginia, 2003. Presented at 53rd
Annual Epidemic Intelligence Service
Conference, April 19-23, 2004, Atlanta, Georgia.
A survival curve can be used with follow-up studies to display the
proportion of one or more groups still alive at different time
periods. Similar to the axes of the cumulative frequency curve, the
x-axis records the time periods, and the y-axis shows percentages,
from 0% to 100%, still alive.
Displaying Public Health Data
Page 4-42
Kaplan-Meier is a well
accepted method for
estimating survival
probabilities.14
The most striking difference is in the plotted curves themselves.
While a cumulative frequency starts at zero in the lower left corner
of the graph and approaches 100% in the upper right corner, a
survival curve begins at 100% in the upper left corner and
proceeds toward the lower right corner as members of the group
die. The survival curve in Figure 4.17 shows the difference in
survival in the early 1900s, mid-1900s, and late 1900s. The
survival curve for 1900–1902 shows a rapid decline in survival
during the first few years of life, followed by a relatively steady
decline. In contrast, the curve for 1949–1951 is shifted right,
showing substantially better survival among the young. The curve
for 1997 shows improved survival among the older population.
Figure 4.17 Percent Surviving by Age in Death-registration States,
1900–1902 and United States, 1949–1951 and 1997
Source: Anderson RN. United States life tables, 1997. National vital statistics reports; vol
47, no. 28. Hyattsville, Maryland: National Center for Health Statistics, 1999.
Note that the smallpox scab separation data plotted as a cumulative
frequency graph in Figure 4.16 can be plotted as a smallpox scab
survival curve, as shown in Figure 4.18.
Figure 4.18 “Survival” of Smallpox Vaccination Scabs Among Primary
Vaccines (n=29) and Revaccinees (n=328) — West Virginia, 2003
Source: Kaydos-Daniels S, Bixler D, Colsher P, Haddy L. Symptoms following smallpox
vaccination–West Virginia, 2003. Presented at 53rd
Annual Epidemic Intelligence Service
Conference, April 19-23, 2004, Atlanta, Georgia.
Displaying Public Health Data
Page 4-43
Other Data Displays
Thus far in this lesson, we have covered the most common ways
that epidemiologists and other public health analysts display data
in tables and graphs. We now cover some additional graphical
techniques that are useful in specific situations. While you may not
find yourself constructing these figures often, our objective is to
equip you to properly interpret these displays when you encounter
them.
Scatter diagrams
A scatter diagram (or “scattergram”) is a graph that portrays the
relationship between two continuous variables, with the x-axis
representing one variable and the y-axis representing the other.15
To create a scatter diagram you must have a pair of values (one for
each variable) for each person, group, country, or other entity in
the data set, one value for each variable. A point is placed on the
graph where the two values intersect. For example, demographers
may be interested in the relationship between infant mortality and
total fertility in various nations. Figure 4.19 plots the total fertility
rate (estimated average number of children per woman) by the
infant mortality rate in 194 countries, so this scatter diagram has
194 data points.
To interpret a scatter diagram, look at the overall pattern made by
the plotted points. A fairly compact pattern of points from the
lower left to the upper right indicates a positive correlation, in
which one variable increases as the other increases. A compact
pattern from the upper left to lower right indicates a negative or
inverse correlation, in which one variable decreases as the other
increases. Widely scattered points or a relatively flat pattern
indicates little correlation. The data in Figure 4.19 seem to show a
positive correlation between infant mortality and total fertility, that
is, countries with high infant mortality seem to have high total
fertility as well. Statistical tools such as linear regression can be
applied to such data to quantify the correlation between variables
in a scatter diagram. Similarly, scatter diagrams often display
correlations that may provoke intriguing hypotheses about causal
relationships, but additional investigation is almost always needed
before any causal hypotheses should be accepted.
Displaying Public Health Data
Page 4-44
Figure 4.19 Correlation of Infant Mortality Rate and Total Fertility Rate
Among 194 Nations, 1997
Data Source: Population Reference Bureau [Internet]. Datafinder [cited 2004 Dec 13].
Available from: http://www.prb.org/datafind/datafinder7.htm.
Bar charts
A bar chart uses bars of equal width to display comparative data.
Comparison of categories is based on the fact that the length of the
bar is proportional to the frequency of the event in that category.
Therefore, breaks in the scale could cause the data to be
misinterpreted and should not be used in bar charts. Bars for
different categories are separated by spaces (unlike the bars in a
histogram). The bar chart can be portrayed with the bars either
vertical or horizontal. (This choice is usually made based on the
length of text labels — long labels fit better on a horizontal chart
than a vertical one) The bars are usually arranged in ascending or
descending length, or in some other systematic order dictated by
any intrinsic order of the categories. Appropriate data for bar
charts include discrete data (e.g., race or cause of death) or
variables treated as though they were discrete (age groups). (Recall
that a histogram shows frequency of a continuous variable, such as
dates of onset of symptoms).
Displaying Public Health Data
Page 4-45
More About Constructing Bar Charts
• Arrange the categories that define the bars or groups of bars in a natural order, such as alphabetical or
increasing age, or in an order that will produce increasing or decreasing bar lengths.
• Choose whether to display the bars vertically or horizontally.
• Make all of the bars the same width.
• Make the length of bars in proportion to the frequency of the event. Do not use a scale break, because the
reader could easily misinterpret the relative size of different categories.
• Show no more than five bars within a group of bars, if possible.
• Leave a space between adjacent groups of bars but not between bars within a group (see Figure 4.22).
• Within a group, code different variables by differences in bar color, shading, cross hatching, etc. and include a
legend that interprets your code.
The simplest bar chart is used to display the data from a
one-variable table (see page 4-4). Figure 4.20 shows the number of
deaths among persons ages 25–34 years for the six most common
causes, plus all other causes grouped together, in the United States
in 2003. Note that this bar chart is aligned horizontally to allow for
long labels.
Figure 4.20 Number of Deaths by Cause Among 25–34 Year Olds —
United States, 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online
database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15].
Available from: http://www.cdc.gov/injury/wisqars/.
Grouped bar charts
A grouped bar chart is used to illustrate data from two-variable or
three-variable tables. A grouped bar chart is particularly useful
when you want to compare the subgroups within a group. Bars
within a group are adjoining. The bars should be illustrated
distinctively and described in a legend. For example, consider the
data for Figure 4.12 — current smokers by age and sex. In Figure
Displaying Public Health Data
Page 4-46
4.21, each bar grouping represents an age group. Within the group,
separate bars are used to represent data for males and females. This
shows graphically that regardless of age, men are more likely to be
current smokers than are women, but that difference declines with
age.
Figure 4.21 Percentage of Persons Aged >18 Years Who Were Current
Smokers, by Age and Sex — United States, 2002
Data Source: Centers for Disease Control and Prevention. Cigarette smoking among adults–
United States, 2002. MMWR 2004;53:427–31.
The bar chart in Figure 4.22a shows the leading causes of death in
1997 and 2003 among persons ages 25–34 years. The graph is
more effective at showing the differences in causes of death during
the same year than in showing differences in a single cause
between years. While the decline in deaths due to HIV infection
between 1997 and 2003 is quite apparent, the smaller drop in heart
disease is more difficult to see. If the goal of the figure is to
compare specific causes between the two years, the bar chart in
Figure 4.22b is a better choice.
Displaying Public Health Data
Page 4-47
Figure 4.22a Number of Deaths by Cause Among 25–34 Year Olds — United States, 1997 and 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for
Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/.
Figure 4.22b Number of Deaths by Cause Among 25–34 Year Olds — United States, 1997 and 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for
Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/.
Displaying Public Health Data
Page 4-48
Stacked bar charts
A stacked bar chart is used to show the same data as a grouped bar
chart but stacks the subgroups of the second variable into a single
bar of the first variable. It deviates from the grouped bar chart in
that the different groups are differentiated not with separate bars,
but with different segments within a single bar for each category.
A stacked bar chart is more effective than a grouped bar chart at
displaying the overall pattern of the first variable but less effective
at displaying the relative size of each subgroup. The trends or
patterns of the subgroups can be difficult to decipher because,
except for the bottom categories, the categories do not rest on a flat
baseline.
To see the difference between grouped and stacked bar charts, look
at Figure 4.23. This figure shows the same data as Figures 4.22a
and 4.22b. With the stacked bar chart, you can easily see the
change in the total number of deaths between the two years;
however, it is difficult to see the values of each cause of death. On
the other hand, with the grouped bar chart, you can more easily see
the changes by cause of death.
Figure 4.23 Number of Deaths by Cause Among 25–44 Year Olds — United States, 1997 and 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for
Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/.
Displaying Public Health Data
Page 4-49
100% component bar charts
A 100% component bar chart is a variant of a stacked bar chart, in
which all of the bars are pulled to the same height (100%) and
show the components as percentages of the total rather than as
actual values. This type of chart is useful for comparing the
contribution of different subgroups within the categories of the
main variable. Figure 4.24 shows a 100% component bar chart that
compares lengths of hospital stay by age group. The figure clearly
shows that the percentage of people who stay in the hospital for 1
day or less (bottom component) is greatest for children ages 0–4
years, and declines with increasing age. Concomitantly, lengths of
stay of 7 or more days increase with age. However, because the
columns are the same height, you cannot tell from the columns
how many people in each age group were hospitalized for
traumatic brain injury — putting numbers above the bars to
indicate the totals in each age group would solve that problem.
Figure 4.24 Length of Hospital Stay for Traumatic Brain Injury-related
Discharges — 14 States*, 1997
Source: Langlois JA, Kegler SR, Butler JA, Gotsch KE, Johnson RL, Reichard AA, et al.
Traumatic brain injury-related hospital discharges: results from a 14-state surveillance
system. In: Surveillance Summaries, June 27, 2003. MMWR 2003;52(No. SS-04):1–18.
Displaying Public Health Data
Page 4-50
Deviation bar charts
While many bar charts show only positive values, a deviation bar
chart displays both positive and negative changes from a baseline.
(Imagine profit/loss data at different times.) Figure 4.25 shows
such a deviation bar chart of selected reportable diseases in the
United States. A similar chart appears in each issue of CDC’s
Morbidity and Mortality Weekly Report. In this chart, the number
of cases reported during the past 4 weeks is compared to the
average number reported during comparable periods of the past
few years. The deviations to the right for hepatitis B and pertussis
indicate increases over historical levels. The deviations to the left
for measles, rubella, and most of the other diseases indicate
declines in reported cases compared to past levels. In this
particular chart, the x-axis is on a logarithmic scale, so that a 50%
reduction (one-half of the cases) and a doubling (50% increase) of
cases are represented by bars of the same length, though in
opposite directions. Values beyond historical limits (comparable to
95% confidence limits) are highlighted for special attention.
Figure 4.25 Comparison of Current Four-week Totals with Historical
Data for Selected Notifiable Diseases — United States, 4-weeks Ending
December 11, 2004
Source: Centers for Disease Control and Prevention. Figure 1. Selected notifiable disease
reports, United States, comparison of provisional 4-week totals ending December 11, 2004,
with historical data. MMWR 2004;53:1161.
Displaying Public Health Data
Page 4-51
Exercise 4.6
Use the data in Table 4.17 to draw a stacked bar chart, a grouped bar chart,
and a 100% component bar chart to illustrate the differences in the age
distribution of syphilis cases among white males, white females, black
males, and black females. What information is best conveyed by each chart? Graph paper is
provided at the end of this lesson.
Table 4.17 Number of Reported Cases of Primary and Secondary Syphilis, by Age Group, Among Non-
Hispanic Black and White Men and Women — United States, 2002
Age Group (Years)
Black
Men
White
Men
Black
Women
White
Women
<20 804 905 277 50
20–29 695 914 349 66
30–39 635 277 396 76
≥40 92 12 173 25
Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department
of Health and Human Services; 2003.
Check your answers on page 4-77
Displaying Public Health Data
Page 4-52
Pie charts
Pie graphs are used for
proportional assessment by
comparing data elements as
percentages or counts against
other data elements and
against the sum of the data
elements. Displaying data
using a pie graph is easy using
Epi Info.
1. Read (import) the file
containing the data.
2. Click on the Graph
command under the
Statistics folder.
3. Under Graph Type, select
type of graph you would
like to create (Pie).
4. Under 1st Title/2nd Title,
write a page title for the pie
chart.
5. Select the variable you wish
to graph from the X-Axis
(Main variables) drop-
down box.
6. Select the value you want
to show from the Y-Axis
(Shown value of) drop-
down box. Usually you want
to show percentages. Then,
select Count %.
7. Click OK and the pie chart
will be displayed.
A pie chart is a simple, easily understood chart in which the size of
the “slices” or wedges shows the proportional contribution of each
component part.16
Pie charts are useful for showing the proportions
of a single variable’s frequency distribution. Figure 4.26 shows a
simple pie chart of the leading causes of death in 2003 among
persons aged 25–34 years.
Figure 4.26 Number of Deaths by Cause Among 25–34 Year Olds —
United States, 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online
database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15].
Available from: http://www.cdc.gov/injury/wisqars/.
More About Constructing Pie Charts
• Conventionally, pie charts begin at 12 o’clock.
• The wedges should be labeled and arranged from largest to smallest, proceeding clockwise, although the “other”
or “unknown” may be last.
• Shading may be used to distinguish between slices but is not always necessary.
• Because the eye cannot accurately gauge the area of the slices, the chart should indicate what percentage each
slice represents either inside or near each slice.
Displaying Public Health Data
Page 4-53
Given current technology, pie charts are almost always generated
by computer rather than drawn by hand. But the default settings of
many computer programs differ from recommended epidemiologic
practice. Many computer programs allow one or more slices to
“explode” or be pulled out of the pie. In general, this technique
should be limited to situations when you want to place special
emphasis on one wedge, particularly when additional detail is
provided about that wedge (Figure 4.27).
Figure 4.27 Number of Deaths by Cause Among 25–34 Year Olds —
United States, 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online
database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15].
Available from: http://www.cdc.gov/injury/wisqars/.
Multiple pie charts are occasionally used in place of a 100%
component bar chart, that is, to display differences in proportional
distributions. In some figures the size of each pie is proportional to
the number of observations, but in others the pies are the same size
despite representing different numbers of observations (Figure
4.28a and 4.28b).
Displaying Public Health Data
Page 4-54
Figure 4.28a Number of Deaths by Cause Among 25–34 and 35-44 Year Olds — United States, 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for
Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/.
Figure 4.28b Number of Deaths by Cause Among 25–34 and 35-44 Year Olds — United States, 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for
Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/.
Dot plots and box plots
A dot plot uses dots to show the relationship between a categorical
variable on the x-axis and a continuous variable on the y-axis. A
dot is positioned at the appropriate place for each observation. The
dot plot displays not only the clustering and spread of observations
for each category of the x-axis variable but also differences in the
patterns between categories. In Figure 4.29 the villages using
either antibacterial soap or plain soap have lower incidence rates of
diarrhea than do the control (no soap) villages.17
Displaying Public Health Data
Page 4-55
Figure 4.29 Incidence of Childhood Diarrhea in Each Neighborhood by
Hygiene Intervention Group — Pakistan, 2002–2003
Source: Luby SP, Agboatwalla M, Painter J, Altaf A, Billhimer WL, Hoekstra RM. Effect of
intensive handwashing promotion on childhood diarrhea in high-risk communities in
Pakistan: a randomized controlled trial. JAMA 2004;291:2547–54.
A dot plot shows the relationship between a continuous and a
categorical variable. The same data could also be displayed in a
box plot, in which the data are summarized by using “box-and-
whiskers.” Figure 4.30 is an example of a box plot. The “box”
represents values of the middle 50% (or interquartile range) of the
data points, and the “whiskers” extend to the minimum and
maximum values that the data assume. The median is usually
marked with a horizontal line inside the box. As a result, you can
use a box plot to show and compare the central location (median),
dispersion (interquartile range and range), and skewness (indicated
by a median line not centered in the box, such as for the cases in
Figure 4.30).18
Displaying Public Health Data
Page 4-56
Figure 4.30 Risk Score for Alveolar Echinococcosis Among Cases and
Controls — Germany, 1999–2000
Adapted from: Kern P, Ammon A, Kron M, Sinn G, Sander S, Petersen LR, et al. Risk factors
for alveolar echinococcosis in humans. Emerg Infect Dis 2004;10:2089-93.
Forest plots
A forest plot, also called a confidence interval plot, is used to
display the point estimates and confidence intervals of individual
studies assembled for a meta-analysis or systematic review.19
In
the forest plot, the variable on the x-axis is the primary outcome
measure from each study (relative risk, treatment effects, etc.). If
risk ratio, odds ratio, or another ratio measure is used, the x-axis
uses a logarithmic-scale. This is because the logarithmic
transformation of these risk estimates has a more symmetric
distribution than do the risk estimates themselves (since the risk
estimates can vary from zero to an arbitrarily large number). Each
study is represented by a horizontal line — reflecting the
confidence interval — and a dot or square — reflecting the point
estimate — usually due to study size or some other aspect of study
design (Figure 4.31). The shorter the horizontal line, the more
precise the study’s estimate. Point estimates (dots or squares) that
line up reasonably well indicate that the studies show a relatively
consistent effect. A vertical line indicates where no effect (relative
risk = 1 or treatment effect = 0) falls on the x-axis. If a study’s
horizontal line does not cross the vertical line, that study’s result is
statistically significant. From a forest plot, one can easily ascertain
patterns among studies as well as outliers.
Displaying Public Health Data
Page 4-57
Figure 4.31 Net Change in Glycohemoglobin (GHb) Following Self-
management Education Intervention for Adults with Type 2 Diabetes,
by Different Studies and Follow-up Intervals, 1980–1999
Source: Norris SL, Lau J, Smith SJ, Schmid CH, Engelgau MM. Self-management education
for adults with type 2 diabetes. Diabetes Care 2002;25:1159–71.
Phylogenetic trees
A phylogenetic tree, a type of dendrogram, is a branching chart
that indicates the evolutionary lineage or genetic relatedness of
organisms involved in outbreaks of illness. Distance on the tree
reflects genetic differences, so organisms that are close to one
another on the tree are more related than organisms that are further
apart. The phylogenetic tree in Figure 4.32 shows that the
organisms isolated from patients with restaurant-associated
hepatitis A in Georgia and North Carolina were identical and
closely related to those from patients in Tennessee.20
Furthermore,
these organisms were similar to those typically seen in patients
from Mexico. These microbiologic data supported epidemiologic
data which implicated green onions from Mexico.
Displaying Public Health Data
Page 4-58
Figure 4.32 Comparison of Genetic Sequences of Hepatitis A Virus
Isolates from Outbreaks in Georgia, North Carolina, and Tennessee in
2003 with Isolates from National Surveillance
Source: Amon JJ, Devasia R, Guoliang X, Vaughan G, Gabel J, MacDonald P, et al. Multiple
hepatitis A outbreaks associated with green onions among restaurant patrons–Tennessee,
Georgia, and North Carolina, 2003. Presented at 53rd
Annual Epidemic Intelligence Service
Conference, April 19-23, 2004, Atlanta, Georgia.
Decision trees
A decision tree is a branching chart that represents the logical
sequence or pathway of a clinical or public health decision.21
Decision analysis is a systematic method for making decisions
when outcomes are uncertain. The basic building blocks of a
decision analysis are (1) decisions, (2) outcomes, and (3)
probabilities.
A decision is a choice made by a person, group, or organization to
select a course of action from among a set of mutually exclusive
alternatives. The decision maker compares expected outcomes of
available alternatives and chooses the best among them. This
choice is represented by a decision node, a square, with branches
representing the choices in the decision-tree diagram (for example,
see Figure 4.33). For example, after receiving information that a
person has a family history of a disease (colorectal cancer for this
example), that person may decide (choose) to seek medical advice
or choose not to do so.
Outcomes are the chance events that occur in response to a
decision. Outcomes can be intermediate or final. Intermediate
outcomes are followed by more decisions or chance events. For
example, if a person decides to seek medical care for colorectal
Displaying Public Health Data
Page 4-59
cancer screening, depending on the findings (outcomes) of the
screening, his or her physician may advise diet or more frequent
screenings; some combination of these two; or treatment. From the
person’s perspective, this is a chance outcome; from a health-care
provider’s perspective, it is a decision. Whether an outcome is
intermediate or final may depend on the context of the decision
problem. For example, colorectal cancer screening may be the final
outcome in a decision analysis focusing on colorectal cancer as the
health condition of interest, but it may be an intermediate outcome
in a decision analysis focusing on more invasive cancer treatment.
In a decision tree, outcomes follow a chance node, a circle, with
branches representing different outcomes that occur by chance, one
and only one of which occurs.
Each chance outcome has a probability by which it can occur
written below the branch in a decision-tree diagram. The sum of
probabilities for all outcomes that can occur at a chance node is
one. The building blocks of decision analysis –– decisions,
outcomes, and probabilities — can be used to represent and
examine complex decision problems.
Figure 4.33 Decision Tree Comparing Colorectal Screening Current
Practice with a Targeted Family History Strategy
Source: Tyagi A, Morris J. Using decision analytic methods to assess the utility of family
history tools. Am J Prev Med 2003;24:199–207.
Maps
Maps are used to show the geographic location of events or
attributes. Two types of maps commonly used in field
epidemiology are spot maps and area maps. Spot maps use dots or
other symbols to show where each case-patient lived or was
Displaying Public Health Data
Page 4-60
EpiMap is an application of
Epi Info for creating maps
and overlaying survey
data, and is available for
download.
exposed. Figure 4.34 is a spot map of the residences of persons
with West Nile Virus encephalitis during the outbreak in the New
York City area in 1999.A spot map is useful for showing the
geographic distribution of cases, but because it does not take the
size of the population at risk into account a spot map does not
show risk of disease. Even when a spot map shows a large number
of dots in the same area, the risk of acquiring disease may not be
particularly high if that area is densely populated.
More About Constructing Maps
• Excellent examples of the use of maps to display public health data are
available in these selected publications:
• Atlas of United States Mortality, U. S. Department of Health and Human
Services, Centers for Disease Control and Prevention, Hyattsville, MD, 1996
(DHHS Publication No. (PHS) 97-1015)
• Atlas of AIDS. Matthew Smallman-Raynor, Andrew Cliff, and Peter Haggett.
Blackwell Publishers, Oxford, UK, 1992
• An Historical Geography of a Major Human Viral Disease: From Global
Expansion to Local Retreat, 1840-1990. Andrew Cliff, Peter Haggett, Matthew
Smallman-Raynor. Blackwell Publishers, Oxford, UK, 1988
Figure 4.34 Laboratory-confirmed Cases of West Nile Virus Disease —
New York City, August–September 1999
Source: Nash D, Mostashari F, Murray K, et al. Recognition of an outbreak of West Nile
Virus disease. Presented at 49th
Annual Epidemic Intelligence Service Conference, April 10–
14, 2000, Atlanta, Georgia.
An area map, also called a chloropleth map, can be used to show
rates of disease or other health conditions in different areas by
using different shades or colors (Figure 4.35). When choosing
Displaying Public Health Data
Page 4-61
shades or colors for each category, ensure that the intensity of
shade or color reflects increasing disease burden. In Figure 4.35, as
mortality rates increase, the shading becomes darker.
Figure 4.35 Mortality Rates (per 100,000) for Asbestosis by State —
United States, 1982–2000
Source: Centers for Disease Control and Prevention. Changing patterns of pneumoconiosis
mortality–United States, 1968-2000. MMWR 2004;53:627–31.
Displaying Public Health Data
Page 4-62
Exercise 4.7
Using the cancer mortality data in Table 4.13, construct an area map based
on dividing the states into four quartiles as follows:
1. Oklahoma through Kentucky
2. Pennsylvania through Missouri
3. Connecticut through Florida
4. Utah through New York
A map of the United States is provided below for your use.
Check your answers on page 4-78
Displaying Public Health Data
Page 4-63
More About Geographic Information Systems (GIS)
A geographic information system is a computer system for the input, editing, storage, retrieval, analysis, synthesis,
and output of location-based information.22
In public health, GIS may use geographic distribution of cases or risk
factors, health service availability or utilization, presence of insect vectors, environmental factors, and other
location-based variables. GIS can be particularly effective when layers of information or different types of
information about place are combined to identify or clarify geographic relationships. For example, in Figure 4.36,
human cases of West Nile virus are shown as dots superimposed over areas of high crow mortality within the
Chicago city limits.
Figure 4.36 High Crow-mortality Areas (HCMAs) and Reported Residences of
A) West Nile Virus (WNV)-infected Case-patients, or B) WNV
Meningoencephalitis Case-patients (WNV Fever Cases Excluded) — Chicago,
Illinois, 2002
Source: Watson JT, Jones RC, Gibbs K, Paul W. Dead crow reports and location of human West
Nile virus cases, Chicago, 2002. Emerg Infect Dis 2004;10:938–40.
Displaying Public Health Data
Page 4-64
Using Computer Technology
Many computer software packages are available to create tables
and graphs. Most of these packages are quite useful, particularly in
allowing the user to redraw a graph with only a few keystrokes.
With these packages, you can now quickly and easily draw a
number of graphs of different types and see for yourself which one
best illustrates the point you wish to make when you present your
data.23-28
Many software packages
are available for producing
all the tables and charts
discussed in this chapter.
One particularly helpful
one is R,
29
used by
universities and available
for no charge around the
world. In addition to
graphical techniques, R
provides a wide variety of
statistical techniques
(including linear and
nonlinear modeling,
classical statistical tests,
time-series analysis,
classification, and
clustering).
On the other hand, these packages tend to have default values that
differ from standard epidemiologic practice. Do not let the
software package dictate the appearance of the graph. Remember
the adage: let the computer do the work, but you still must do the
thinking. Keep in mind the primary purpose of the graph — to
communicate information to others. For example, many packages
can draw bar charts and pie charts that appear three-dimensional.
Will a three-dimensional chart communicate the information better
than a two-dimensional one?
Compare and contrast the effectiveness of Figure 4.37a and 4.37b
in communicating information.
Figure 4.37a Past Month Marijuana Use Among Youths Aged 12–17, by
Geographic Region — United States, 2003 and 2004
Data Source: Substance Abuse and Mental Health Services Administration. (2005). Results
from the 2004 National Survey on Drug Use and Health: National Findings (Office of
Applied Studies, NSDUH Series H-28, DHHS Publication No. SMA 05-4062). Rockville, MD.
Displaying Public Health Data
Page 4-65
Figure 4.37b Past Month Marijuana Use Among Youths Aged 12–17, by
Geographic Region — United States, 2003 and 2004
Data Source: Substance Abuse and Mental Health Services Administration. (2005). Results
from the 2004 National Survey on Drug Use and Health: National Findings (Office of
Applied Studies, NSDUH Series H-28, DHHS Publication No. SMA 05-4062). Rockville, MD.
“The problem with
presenting information is
simple — the world is
high-dimensional, but our
displays are not. To
address this basic
problem, answer 5
questions:
1. Quantitative thinking
comes down to one
question: Compared to
what?
2. Try very hard to show
cause and effect.
3. Don't break up
evidence by accidents
of means of
production.
4. The world is
multivariant, so the
display should be high-
dimensional.
5. The presentation
stands and falls on the
quality, relevance, and
integrity of the
content.”30
- ER Tufte
Most observers and analysts would agree that the three-
dimensional graph does not communicate the information as
effectively as the two-dimensional graph. For example, can you
tell by a glance at the three-dimensional graph that marijuana use
declined slightly in the Northeast in 2004? These differences are
more distinct in the two-dimensional graph.
Similarly, does the three-dimensional pie chart in Figure 4.38a
provide any more information than the two-dimensional chart in
Figure 4.38b? The relative sizes of the components may be
difficult to judge because of the tilting in the three-dimensional
version. From Figure 4.38a, can you tell whether the wedge for
heart disease is larger, smaller, or about the same as the wedge for
malignant neoplasms? Now look at Figure 4.38b. The wedge for
malignant neoplasms is larger.
Remember that communicating the names and relative sizes of the
components (wedges) is the primary purpose of a pie chart. Keep
the number of dimensions as small as possible to clearly convey
the important points, and avoid using gimmicks that do not add
information.
Displaying Public Health Data
Page 4-66
More About Using Color in Graphs
Many people misuse technology in selecting color, particularly for slides that accompany oral presentations.32
If you
use colors, follow these recommendations.
• Select colors so that all components of the graph — title, axes, data plots, and legends — stand out clearly from
the background and each plotted series of data can be distinguished from the others.
• Avoid contrasting red and green, because up to 10% of males in the audience may have some degree of color
blindness.
• Use colors or shades to communicate information, particularly with area maps. For example, for an area map in
which states are divided into four groups according to their rates for a particular disease, use a light color or
shade for the states with the lowest rates and use progressively darker colors or shades for the groups with
progressively higher rates. In this way, the colors or shades contribute directly to the impression you want the
viewer to have about the data.
Figure 4.38a Leading Causes of Death in 25–34 Year Olds — United
States, 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online
database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15].
Available from: http://www.cdc.gov/injury/wisqars/.
Figure 4.38b Leading Causes of Death in 25–34 Year Olds — United
States, 2003
Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online
database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15].
Available from: http://www.cdc.gov/injury/wisqars/.
Displaying Public Health Data
Page 4-67
Summary
Much work has been done on other graphical methods of presentation.33
One of the more
creative is face plots.34
Originally developed by Chernoff,35
these give a way to display n
variables on a two-dimensional surface. For instance, suppose you have several variables (x, y, z,
etc.) that you have collected on each of n people, and for purposes of this illustration, suppose
each variable can have one of 10 possible values. We can let x be eyebrow slant, y be eye size, z
be nose length, etc. The figures below show faces produced using 10 characteristics — head
eccentricity, eye size, eye spacing, eye eccentricity, pupil size, eyebrow slant, nose size, mouth
shape, mouth size, and mouth opening) — each assigned one of 10 possible values.
Figure 4.39 Example of Face Plot Faces Produced Using 10 Characteristics
Source: Weisstein, Eric W. Chernoff Face. From MathWorld — A Wolfram Web Resource.
http://mathworld.wolfram.com/ChernoffFace.html.
To convey the messages of epidemiologic findings, you must first select the best illustration
method. Tables are commonly used to display numbers, rates, proportions, and cumulative
percents. Because tables are intended to communicate information, most tables should have no
more than two variables and no more than eight categories (class intervals) for any variable.
Printed tables should be properly titled, labeled, and referenced; that is, they should be able to
stand alone if separated from the text.
Tables can be used with either nominal or continuous ordinal data. Nominal variables such as sex
and state of residence have obvious categories. For continuous variables that do not have obvious
categories, class intervals must be created. For some diseases, standard class intervals for age
have been adopted. Otherwise a variety of methods are available for establishing reasonable class
intervals. These include class intervals with an equal number of people or observations in each;
class intervals with a constant width; and class intervals based on the mean and standard
deviation.
Graphs can visually communicate data rapidly. Arithmetic-scale line graphs have traditionally
been used to show trends in disease rates over time. Semilogarithmic-scale line graphs are
preferred when the disease rates vary over two or more orders of magnitude. Histograms and
frequency polygons are used to display frequency distributions. A special type of histogram
Displaying Public Health Data
Page 4-68
known as an epidemic curve shows the number of cases by time of onset of illness or time of
diagnosis during an epidemic period. The cases may be represented by squares that are stacked to
form the columns of the histogram; the squares may be shaded to distinguish important
characteristics of cases, such as fatal outcome.
Simple bar charts and pie charts are used to display the frequency distribution of a single
variable. Grouped and stacked bar charts can display two or even three variables.
Spot maps pinpoint the location of each case or event. An area map uses shading or coloring to
show different levels of disease numbers or rates in different areas.
The final pages of this lesson provide guidance in the selection of illustration methods and
construction of tables and graphs. When using each of these methods, it is important to
remember their purpose: to summarize and to communicate. Even the best method must be
constructed properly or the message will be lost. Glitzy and colorful are not necessarily better;
sometimes less is more!
Displaying Public Health Data
Page 4-69
Guide to Selecting a Graph or Chart to Illustrate Epidemiologic Data
Type of Graph or Chart When to Use
Arithmetic scale line graph Show trends in numbers or rates over time
Semilogarithmic scale line graph Display rate of change over time; appropriate for values ranging over more than
2 orders of magnitude
Histogram Show frequency distribution of continuous variable; for example, number of
cases during epidemic (epidemic curve) or over longer period of time
Frequency polygon Show frequency distribution of continuous variable, especially to show
components
Cumulative frequency Display cumulative frequency for continuous variables
Scatter diagram Plot association between two variables
Simple bar chart Compare size or frequency of different categories of a single variable
Grouped bar chart Compare size or frequency of different categories of 2 4 series of data
Stacked bar chart Compare totals and illustrate component parts of the total among different
groups
Deviation bar chart Illustrate differences, both positive and negative, from baseline
100% component bar chart Compare how components contribute to the whole in different groups
Pie chart Show components of a whole
Spot map Show location of cases or events
Area map Display events or rates geographically
Box plot Visualize statistical characteristics (median, range, asymmetry) of a variable’s
distribution
Displaying Public Health Data
Page 4-70
Guide to Selecting a Method of Illustrating Epidemiologic Data
If data are: And these conditions apply: Then use:
Numbers or rates over time Numbers • 1 or 2 sets Histogram
• 2 or more sets Frequency polygon
Rates • Range of values ≤ 2 orders of
magnitude
Arithmetic-scale line graph
• Range of values ≥ 2 orders of
magnitude
Semilogarithmic-scale line
graph
Continuous data other than
time series
Frequency distribution Histogram or frequency
polygon
Data with discrete categories Bar chart or pie chart
Place data Numbers Not readily identifiable on map Bar chart or pie chart
Readily identifiable
on map
• Specific site important Spot map
• Specific site unimportant Area map
Rates Area map
Checklist for Constructing Printed Tables
1. Title
• Does the table have a title?
• Does the title describe the objective of the data display and its content, including subject, person, place,
and time?
• Is the title preceded by the designation “Table #''? (“Table'' is used for typed text; “Figure'' is used for
graphs, maps, and illustrations. Separate numerical sequences are used for tables and figures in the same
document (e.g., Table 4.1, Table 4.2; Figure 4.1, Figure 4.2).
2. Rows and Columns
• Is each row and column labeled clearly and concisely?
• Are the specific units of measurement shown? (e.g., years, mg/dl, rate per 100,000).
• Are the categories appropriate for the data?
• Are the row and column totals provided?
3. Footnotes
• Are all codes, abbreviations, or symbols explained?
• Are all exclusions noted?
• If the data are not original, is the source provided?
• If source is from website, is complete address specified; and is current, active, and reference date cited?
Displaying Public Health Data
Page 4-71
Checklist for Constructing Printed Graphs
1. Title
• Does the graph or chart have a title?
• Does the title describe the content, including subject, person, place, and time?
• Is the title preceded by the designation “Figure #''? (“Table'' is used for typed text; “Figure'' is used for
graphs, charts, maps, and illustrations. Separate numerical sequences are used for tables and figures in the
same document (e.g., Table 1, Table 2; Figure 1, Figure 2).
2. Axes
• Is each axis labeled clearly and concisely?
• Are the specific units of measurement included as part of the label? (e.g., years, mg/dl, rate per 100,000)
• Are the scale divisions on the axes clearly indicated?
• Are the scales for each axis appropriate for the data?
• Does the y axis start at zero?
• If a scale break is used with an arithmetic-scale line graph, is it clearly identified?
• Has a scale break been used with a histogram, frequency polygon, or bar chart? (Answer should be NO!)
• Are the axes drawn heavier than the other coordinate lines?
• If two or more graphs are to be compared directly, are the scales identical?
3. Grid Lines
• Does the figure include only as many grid lines as are necessary to guide the eye? (Often, these are
unnecessary.)
4. Data plots
• Does the table have a title?
• Are the plots drawn clearly?
• Are the data lines drawn more heavily than the grid lines?
• If more than one series of data or components is shown, are they clearly distinguishable on the graph?
• Is each series or component labeled on the graph, or in a legend or key?
• If color or shading is used on an area map, does an increase in color or shading correspond to an increase
in the variable being shown?
• Is the main point of the graph obvious, and is it the point you wish to make?
5. Footnotes
• Are all codes, abbreviations, or symbols explained?
• Are all exclusions noted?
• If the data are not original, is the source provided?
6. Visual Display
• Does the figure include any information that is not necessary?
• Is the figure positioned on the page for optimal readability?
• Do font sizes and colors improve readability?
Displaying Public Health Data
Page 4-72
Guide to Preparing Projected Slides
1. Legibility (make sure your audience can easily read your visuals)
• When projected, can your visuals be read from the farthest parts of the room?
2. Simplicity (keep the message simple)
• Have you used plain words?
• Is the information presented in the language of the audience?
• Have you used only key words?
• Have you omitted conjunctions, prepositions, etc.?
• Is each slide limited to only one major idea/concept/theme?
• Is the text on each slide limited to 2 or 3 colors (e.g., 1 color for title, another for text)?
• Are there no more than 6–8 lines of text and 6–8 words per line?
3. Color
• Colors have an impact on the effect of your visuals. Use warm/hot colors to emphasize, to highlight, to
focus, or to reinforce key concepts. Use cool/cold colors for background or to separate items. The following
table describes the effect of different colors.
Hot Warm Cool Cold
Colors:
Red Light orange Light blue Dark blue
Bright orange Light yellow Light green Dark green
Bright yellow Light gold Light purple Dark purple
Bright gold Browns Light gray Dark gray
Effect: Exciting Mild Subdued Somber
• Are you using the best color combinations? The most important item should be in the text color that has
the greatest contrast with its background. The most legible color combinations are:
Black on yellow
Black on white
Dark Green on white
Dark Blue on white
White on dark blue (yellow titles and white text on a dark blue background is a favorite choice
among epidemiologists)
• Restrict use of red except as an accent.
4. Accuracy
• Slides are distracting when mistakes are spotted. Have someone who has not seen the slide before check
for typos, inaccuracies, and errors in general.
Displaying Public Health Data
Page 4-73
Exercise Answers
Exercise 4.1
1.
Botulism Status by Age Group, Texas Church Supper Outbreak, 2001
Botulism Status
Age Group (Years) Yes No
≤9 2 2
10–19 1 1
20–29 2 2
30–39 0 2
40–49 4 4
50–59 3 4
60–69 1 5
70–79 2 3
≥80 0 0
Total 15 23
2.
Botulism Status by Exposure to Chicken,* Texas Church Supper Outbreak, 2001
Botulism?
Yes No Total
Ate chicken?
Yes 8 11 19
No 4 12 16
Total 12 23 35
* Excludes 3 botulism case-patients with unknown exposure to chicken
3.
Botulism Status by Exposure to Chili,* Texas Church Supper Outbreak, 2001
Botulism?
Yes No Total
Ate chili?
Yes 14 8 22
No 0 15 15
Total 14 23 37
* Excludes 1 botulism case-patient with unknown exposure to chili
Displaying Public Health Data
Page 4-74
4.
Number of Botulism Cases/Controls by Exposure to Chili and Leftover Chili
Ate Leftover Chili
Yes No Total
Ate chili?
Yes 1 / 1 13 / 7 22
No 0 / 1 0 / 14 15
Total* 3 34 37*
* One case with unknown exposure to initial chili consumption
Exercise 4.2
Strategy 1: Divide the data into groups of similar size
1. Divide the list into three equal-sized groups of places:
50 states ÷ 3 = 16.67 states per group. Because states can’t be cut in thirds, two groups will
contain 17 states and one group will contain 16 states.
Illinois (#17) could go into either the first or second group, but its rate (80.0) is closer to #16
Maine’s rate (80.2) than Texas’ rate (79.3), so it makes sense to put Illinois in the first group.
Similarly, #34 Vermont could go into either the second or third group.
Arbitrarily putting Illinois into the first category and Vermont into the second results in the
following groups:
a. Kentucky through Illinois (States 1–17)
b. Texas through Vermont (States 18–34)
c. South Dakota through Utah (States 35–50)
2. Identify the rate for the first and last state in each group:
a. Kentucky through Illinois 80.0–116.1
b. Texas through Vermont 70.2–79.3
c. South Dakota through Utah 39.7–68.1
3. Adjust the limits of each interval so no gap exists between the end of one class interval and
beginning of the next. Deciding how to adjust the limits is somewhat arbitrary — you could
split the difference, or use a convenient round number.
a. Kentucky through Illinois 80.0–116.1
b. Texas through Vermont 70.0–79.9
c. South Dakota through Utah 39.7–69.9
Strategy 2: Base intervals on mean and standard deviation
1. Create three categories based on the mean (77.1) and standard deviation (16.1) by finding the
upper limits of three intervals:
a. Upper limit of interval 3 = maximum value = 116.1
b. Upper limit of interval 2 = mean + 1 standard deviation = 77.1 + 16.1 = 93.2
Displaying Public Health Data
Page 4-75
c. Upper limit of interval 1 = mean – 1 standard deviation = 77.1 – 16.1 = 61.0
d. Lower limit of interval 1 = minimum value = 39.7
2. Select the lower limit for each upper limit to define three full intervals. Specify the states that
fall into each interval. (Note: To place the states with the highest rates first, reverse the order
of the intervals):
a. North Carolina through Kentucky (8 states) 93.3–116.1
b. Arizona through Georgia (35 states) 61.1–93.2
c. Utah through Minnesota (7 states) 39.7–61.0
Strategy 3: Divide the range into equal class intervals
1. Divide the range from zero (or the minimum value) to the maximum by 3:
(116.1 – 39.7) / 3 = 76.4 / 3 = 25.467
2. Use multiples of 25.467 to create three categories, starting with 39.7:
39.7 through (39.7 + 1 x 25.467) = 39.7 through 65.2
65.3 through (39.7 + 2 x 25.467) = 65.3 through 90.6
90.7 through (39.7 + 3 x 25.467) = 90.7 through 116.1
3. Final categories:
a. Indiana through Kentucky (11 states) 90.7–116.1
b. Nebraska through Oklahoma (29 states) 65.3–90.6
c. Utah through North Dakota (10 states) 39.7–65.2
4. Alternatively, since 90.6 is close to 90 and 65.2 is close to 65.0, the categories could be
reconfigured with no change in state assignments. For example, the final categories could
look like:
Indiana through Kentucky (11 states) 90.1–116.1
Nebraska through Oklahoma (29 states) 65.1–90.0
Utah through North Dakota (10 states) 39.7–65.0
Displaying Public Health Data
Page 4-76
Exercise 4.3
1. Highest rate is 438.2 per 100,000 (in 1958), so maximum on y-axis should be 450 or 500 per
100,000.
Rate (per 100,000 Population) of Reported Measles Cases by Year of Report — United States,
1955–2002
2. Highest rate between 1985 and 2002 was 11.2 (per 100,000 in 1990), so maximum on y-axis
should be 12 per 100,000.
Rate (per 100,000 Population) of Reported Measles Cases by Year of Report — United States,
1985–2002
Displaying Public Health Data
Page 4-77
Exercise 4.4
Number of Cases of Botulism by Date of Onset of Symptoms, Texas Church Supper Outbreak, 2001
The first case occurs on August 25, rises to a peak two days later on August 27, then declines
symmetrically to 1 case on August 29. A late case occurs on August 31 and September 1.
Exercise 4.5
Number of Cases of Botulism by Date of Onset of Symptoms, Texas Church Supper Outbreak, 2001
The area under the line in this frequency polygon is the same as the area in the answer to
Exercise 4.4. The peak of the epidemic (8/27) is easier to identify.
Displaying Public Health Data
Page 4-78
Exercise 4.6
Number of Reported Cases of Primary and Secondary Syphilis, by Age Group, Among Non-Hispanic
Black and White Men and Women — United States, 2002 (Stacked Bar Chart)
Number of Reported Cases of Primary and Secondary Syphilis,by Age Group, Among Non-Hispanic
Black and White Men and Women — United States, 2002 (Grouped Bar Chart)
Percent of Reported Cases of Primary and Secondary Syphilis, by Age Group, Among Non-Hispanic
Black and White Men and Women — United States, 2002 (100% Component Bar Chart)
Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta, Georgia. U.S.
Department of Health and Human Services; 2003.
The stacked bar chart clearly displays the differences in total number of cases, as reflected by the
overall height of each column. The number of cases in the lowest category (age <20 years) is
Displaying Public Health Data
Page 4-79
also easy to compare across race-sex groups, because it rests on the x-axis. Other categories
might be a little harder to compare because they do not have a consistent baseline. If the size of
each category in a given column is different enough and the column is tall enough, the categories
within a column can be compared.
The grouped bar chart clearly displays the size of each category within a given group. You can
also discern different patterns across the groups. Comparing categories across groups takes work.
The 100% component bar chart is best for comparing the percent distribution of categories across
groups. You must keep in mind that the distribution represents percentages, so while the 30-39
year category in white females appears larger than the 30-39 year category in the other race-sex
groups, the actual numbers are much smaller.
Exercise 4.7
Age-adjusted Lung Cancer Death Rates per 100,000 Population, by State — United States, 2002
Displaying Public Health Data
Page 4-80
Self-Assessment Quiz
Now that you have read Lesson 4 and have completed the exercises, you
should be ready to take the self-assessment quiz. This quiz is designed to
help you assess how well you have learned the content of this lesson. You
may refer to the lesson text whenever you are unsure of the answer.
Unless otherwise instructed, choose ALL correct choices for each question.
1. Tables and graphs are important tools for which tasks of an epidemiologist?
A. Data collection
B. Data summarization (descriptive epidemiology)
C. Data analysis
D. Data presentation
2. A table in a report or manuscript should include:
A. Title
B. Row and column labels
C. Footnotes that explain abbreviations, symbols, exclusions
D. Source of the data
E. Explanation of the key findings
3. The following table is unacceptable because the percentages add up to 99.9% rather than
100.0%
Age group No. Percent
< 1 year 10 19.6
1–4 9 17.6
5–9 9 17.6
10–14 17 33.3
≥ 15 6 11.8
Total 53
A. True
B. False
4. In the following table, the total number of persons with the disease is:
Cases Controls Total
Exposed 22 12 34
Unexposed 3 13 16
Total 25 25 50
A. 3
B. 22
C. 25
D. 34
E. 50
Displaying Public Health Data
Page 4-81
5. A table shell is the:
A. Box around the outside of a table
B. Lines (“skeleton”) of a table without the labels or title
C. Table with data but without the title, labels or data
D. Table with labels and title but without the data
6. The best time to create table shells is:
A. Just before planning a study
B. As part of planning the study
C. Just after collecting the data
D. Just before analyzing the data
E. As part of analyzing the data
7. Recommended methods for creating categories for continuous variables include:
A. Basing the categories on the mean and standard deviation
B. Dividing the data into categories with similar numbers of observations in each
C. Dividing the range into equal class intervals
D. Using categories that have been used in national surveillance summary reports
E. Using the same categories as your population data are grouped
8. In frequency distributions, observations with missing values should be excluded.
A. True
B. False
9. The following are reasonable categories for a disease that mostly affects people over age 65
years:
Age Group
< 65 years
65–70
70–75
75–80
80–85
85
A. True
B. False
10. In general, before you create a graph to display data, you should put the data into a table.
A. True
B. False
11. On an arithmetic-scale line graph, the x-axis and y-axis each should:
A. Begin at zero on each axis
B. Have labels for the tick marks and each axis
C. Use equal distances along the axis to represent equal quantities (although the quantities
measured on each axis may differ)
D. Use the same tick mark spacing on the two axes
Displaying Public Health Data
Page 4-82
12. Use the following choices for Questions 12a–d:
A. Arithmetic-scale line graph
B. Semilogarithmic-scale line graph
C. Both
D. Neither
12a. ____ A wide range of values can be plotted and seen clearly, regardless of
magnitude
12b. ____ A constant rate of change would be represented by a curved line
12c. ____ The y-axis tick labels could be 0.1, 1, 10, and 100
12d. ____ Can plot numbers or rates
13. Use the following choices for Questions 13a–d:
A. Histogram
B. Bar chart
C. Both
D. Neither
13a. ____ Used for categorical variables on the x-axis
13b. ____ Columns can be subdivided with color or shading to show subgroups
13c. ____ Displays continuous data
13d. ____ Epidemic curve
14. Which of the following shapes of a population pyramid is most consistent with a young
population?
A. Tall, narrow rectangle
B. Short, wide rectangle
C. Triangle base down
D. Triangle base up
15. A frequency polygon differs from a line graph because a frequency polygon:
A. Displays a frequency distribution; a line graph plots data points
B. Must be closed (plotted line much touch x-axis) at both ends
C. Cannot be used to plot data over time
D. Can show percentages on the y-axis; a line graph cannot
16. Use the following choices for Questions 16a–d:
A. Cumulative frequency curve
B. Survival curve
C. Both
D. Neither
16a. ____ Y-axis shows percentages from 0% to 100%
16b. ____ Plotted curve usually begins in the upper left corner
16c. ____ Plotted curve usually begins in the lower left corner
16d. ____ Horizontal line drawn from 50% tick mark to plotted curve intersects at median
Displaying Public Health Data
Page 4-83
17. A scatter diagram is the graph of choice for plotting:
A. Anabolic steroid levels measured in both blood and urine among a group of athletes
B. Mean cholesterol levels over time in a population
C. Infant mortality rates by mean annual income among different countries
D. Systolic blood pressure by eye color (brown, blue, green, other) measured in each
person
18. Which of the following requires more than one variable?
A. Frequency distribution
B. One-variable table
C. Pie chart
D. Scatter diagram
E. Simple bar chart
19. Compared with a scatter diagram, a dot plot:
A. Is another name for the same type of graph
B. Differ because a scatter diagram plots two continuous variables; a dot plot plots one
continuous and one categorical variable
C. Differ because a scatter diagram plots one continuous and one categorical variable; a
dot plot plots two continuous variables
D. Plots location of cases on a map
20. A spot map must reflect numbers; an area map must reflect rates.
A. True
B. False
21. To display different rates on an area map using different colors, select different colors that
have the same intensity, so as not to bias the audience.
A. True
B. False
22. In an oral presentation, three-dimensional pie charts and three-dimensional columns in bar
charts are desirable because they add visual interest to a slide.
A. True
B. False
23. A 100% component bar chart shows the same data as a stacked bar chart. The key
difference is in the units on the x-axis.
A. True
B. False
24. When creating a bar chart, the decision to use vertical or horizontal bars is usually based
on:
A. The magnitude of the data being graphed and hence the scale of the axis
B. Whether the data being graphed represent numbers or percentages
C. Whether the creator is an epidemiologist (who almost always use vertical bars)
D. Which looks better, such as whether the label fits below the bar
Displaying Public Health Data
Page 4-84
25. Use the following choices for Questions 25a–d (match all that apply):
A. Grouped bar chart
B. Histogram
C. Line graph
D. Pie chart
25a. ____ Number of cases of dog bites over time
25b. ____ Number of cases of dog bites by age group (adult or child) and sex of the
victim
25c. ____ Number of cases of dog bites by breed of the dog
25d. ____ Number of cases of dog bites per 100,000 population over time
Displaying Public Health Data
Page 4-85
Answers to Self-Assessment Quiz
1. B, C, D. Tables and graphs are important tools for summarizing, analyzing, and
presenting data. While data are occasionally collected using a table (for example,
counting observations by putting tick marks into particular cells in table), this is not a
common epidemiologic practice.
2. A, B, C, D. A table in a printed publication should be self-explanatory. If a table is taken
out of its original context, it should still convey all the information necessary for the
reader to understand the data. Therefore, a table should include, in addition to the data,
a proper title, row and column labels, source of the data, and footnotes that explain
abbreviations, symbols, and exclusions, if any. Tables generally present the data, while
the accompanying text of the report may contain an explanation of key findings.
3. B (False). Rounding that results in totals of 99.9% or 100.1% is common in tables that
show percentages. Nonetheless, the total percentage should be displayed as 100.0%,
and a footnote explaining that the difference is due to rounding should be included.
4. C. In the two-by-two table presented in Question 4, the total number of cases is shown
as the total of the left column (labeled “Cases”). That column total number is 25.
5. D. A table shell is the skeleton of a table, complete with titles and labels, but without the
data. It is created when designing the analysis phase of an investigation. Table shells
help guide what data to collect and how to analyze the data.
6. B. Creation of table shells should be part of the overall study plan or protocol. Creation
of table shells requires the investigator to decide how to analyze the data, which
dictates what questions should be asked on the questionnaire.
7. A, B, C, D, E. All of the methods listed are in Question 6 are appropriate and commonly
used by epidemiologists
8. B (False). The number of observations with missing values is important when
interpreting the data, particularly for making generalizations.
9. B (False). The limits of the class intervals must not overlap. For example, would a 70-
year-old be counted in the 65–70 category or in the 70–75 category?
10. A (True). In general, before you create a graph, you should observe the data in a table.
By reviewing the data in the table, you can anticipate the range of values that must be
covered by the axes of a graph. You can also get a sense of the patterns in the data, so
you can anticipate what the graph should look like.
11. B, C. On an arithmetic-scale line graph, the axes and tick marks should be clearly
labeled. For both the x- and y-axis, a particular distance anywhere along the axis should
represent the same increase in quantity, although the x- and y-axis usually differ in what
is measured. The y-axis, measuring frequency, should begin at zero. But the x-axis,
which often measures time, need not start at zero.
12. a. B. One of the key advantages of a semilogarithmic-scale line graph is that it can display
Displaying Public Health Data
Page 4-86
a wide range of values clearly.
12b. A. A starting value of, say, 100,000 and a constant rate of change of, say, 10%, would
result in observations of 100,000, 110,000, 121,000, 133,100, 146, 410, 161,051, etc.
The resulting plotted line on an arithmetic-scale line graph would curve upwards. The
resulting plotted line on a semilogarithmic-scale line graph would be a straight line.
12c. B. Values of 0.1, 1,10, and 100 represent orders of magnitude typical of the y-axis of a
semilogarithmic-scale line graph.
12d. C. Both arithmetic-scale and semilogarithmic-scale line graphs can be used to plot
numbers or rates.
13. a. B. A bar chart is used to graph the frequency of events of a categorical variable such as
sex, or geographic region.
13b. C. The columns of either a histogram or a bar chart can be shaded to distinguish
subgroups. Note that a bar chart with shaded subgroups is called a stacked bar chart.
13c. A. A histogram is used to graph the frequency of events of a continuous variable such as
time.
13d. A. An epidemic curve is a particular type of histogram in which the number of cases (on
the y-axis) that occur during an outbreak or epidemic are graphed over time (on the x-
axis).
14. C. A typical population pyramid usually displays the youngest age group at the bottom
and the oldest age group at the top, with males on one side and females on the other
side. A young population would therefore have a wide bar at the bottom with gradually
narrowing bars above.
15. A, B. A frequency polygon differs from a line graph in that a frequency polygon
represents a frequency distribution, with the area under the curve proportionate to the
frequency. Because the total area must represent 100%, the ends of the frequency
polygon must be closed. Although a line graph is commonly used to display frequencies
over time, a frequency polygon can display the frequency distribution of a given period
of time as well. Similarly, the y-axis of both types of graph can measure percentages.
16. a. C. The y-axis of both cumulative frequency curves and survival curves typically display
percentages from 0% at the bottom to 100% at the top. The main difference is that a
cumulative frequency curve begins at 0% and increases, whereas a survival curve
begins at 100% and decreases.
16b. B. Because a survival curve begins at 100%, the plotted curve begins at the top of the
y-axis and at the beginning time interval (sometimes referred to as time-zero) of the x-
axis, i.e., in the upper left corner.
16c. A. Because a cumulative frequency curve begins at 0%., the plotted curve begins at the
base of the y-axis and at the beginning time interval (sometimes referred to as time-
zero) of the x-axis, i.e., in the lower left corner.
Displaying Public Health Data
Page 4-87
16d. C. Because the y-axis represents proportions, a horizontal line drawn from the 50% tick
mark to the plotted curve will indicate 50% survival or 50% cumulative frequency. The
median is another name for the 50% mark of a distribution of data.
17. A, C. A scatter diagram graphs simultaneous data points of two continuous variables for
individuals or communities. Drug levels, infant mortality, and mean annual income are
all examples of continuous variables. Eye color, at least as presented in the question, is
a categorical variable.
18. D. A frequency distribution, one-variable table, pie chart, and simple bar chart are all
used to display the frequency of categories of a single variable. A scatter diagram
requires two variables.
19. B. A scatter diagram graphs simultaneous data points of two continuous variables for
individuals or communities; whereas a dot plot graphs data points of a continuous
variable according to categories of a second, categorical variable.
20. B (False). The spots on a spot map usually reflect one or more cases, i.e., numbers. The
shading on an area map may represent numbers, proportions, rates, or other measures.
21. B (False). Shading should be consistent with frequency. So rather than using different
colors of the same intensity, increasing shades of the same color or family of colors
should be used.
22. B (False). The primary purpose of any visual is to communicate information clearly. 3-D
columns, bars, and pies may have pizzazz, but they rarely help communicate
information, and sometimes they mislead.
23. A (False). The difference between a stacked bar chart and a 100% component bar chart
is that the bars of a 100% component bar chart are all pulled to the top of the y-axis
(100%). The units on the x-axis are the same.
24. D. Any bar chart can be oriented vertically or horizontally. The creator of the chart can
choose, and often does so on the basis of consistency with other graphs in a series,
opinion about which orientation looks better or fits better, and whether the labels fit
adequately below vertical bars or need to placed beside horizontal bars.
25. a. B, C. Both line graphs and histograms are commonly used to graph numbers of cases
over time. Line graphs are commonly used to graph secular trends over longer time
periods; histograms are often used to graph cases over a short period of observation,
such as during an epidemic.
25b. A. A grouped bar chart (or a stacked bar chart) is ideal for graphing frequency over two
categorical variables. A pie chart is used for a single variable.
25c. D. A pie chart (or a simple bar chart) is used for graphing the frequency of categories of
a single categorical variable such as breed of dog.
25d. C. Rates over time are traditionally plotted by using a line graph.
Displaying Public Health Data
Page 4-88
References
1. Koschat MA. A case for simple tables. The American Statistician 2005;59:31–40.
2. Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance,
2002. Atlanta, GA: U.S. Department of Health and Human Services, Centers for Disease
Control and Prevention, September 2003.
3. Pierchala C. The choice of age groupings may affect the quality of tabular presentations.
ASA Proceedings of the Joint Statistical Meetings; 2002; Alexandria, VA: American
Statistical Association; 2002:2697–702.
4. Daley RW, Smith A, Paz-Argandona E, Mallilay J, McGeehin M. An outbreak of carbon
monoxide poisoning after a major ice storm in Maine. J Emerg Med 2000;18:87–93.
5. Kalluri P, Crowe C, Reller M, Gaul L, Hayslett J, Barth S, Eliasberg S, Ferreira J, Holt K,
Bengston S, Hendricks K, Sobel J. An outbreak of foodborne botulism associated with food
sold at a salvage store in Texas. Clin Infect Dis 2003;37:1490–5.
6. Stevens JA, Powell KE, Smith SM, Wingo PA, Sattin RW. Physical activity, functional
limitations, and the risk of fall-related fractures in community-dwelling elderly. Ann
Epidemiol 1997;7:54–61.
7. Ahluwalia IB, Mack K, Murphy W, Mokdad AH, Bales VH. State-specific prevalence of
selected chronic disease-related characteristics–Behavioral Risk Factor Surveillance System,
2001. In: Surveillance Summaries, August 22, 2003. MMWR 2003;52(No. SS-08):1–80.
8. Langlois JA, Kegler SR, Butler JA, Gotsch KE, Johnson RL, Reichard AA, et al. Traumatic
brain injury-related hospital discharges: results from a 14-state surveillance system. In:
Surveillance Summaries, June 27, 2003. MMWR 2003;52(No. SS-04):1–18.
9. Chang J, Elam-Evans LD, Berg CJ, Herndon J, Flowers L, Seed KA, Syverson CJ.
Pregnancy-related mortality surveillance–United States, 1991-1999. In: Surveillance
Summaries, February 22, 2003. MMWR 2003;52(No. SS-02):1–8.
10. Centers for Disease Control and Prevention. HIV/AIDS Surveillance Report, 2003 (Vol. 15).
Atlanta, Georgia: US Department of Health and Human Services;2004:1–46.
11. Zhou W, Pool V, Iskander JK, English-Bullard R, Ball R, Wise RP, et al. Surveillance for
safety after immunization: Vaccine Adverse Event Reporting System (VAERS)–1991-2001.
In: Surveillance Summaries, January 24, 2003. MMWR 2003;52(No. SS-01):1–24.
12. Schmid CF, Schmid SE. Handbook of graphic presentation. New York: John Wiley & Sons,
1954.
13. Cleveland WS. The elements of graphing data. Summit, NJ: Hobart Press, 1994.
14. Brookmeyer R, Curriero FC. Survival curve estimation with partial non-random exposure
information. Statistics in Medicine 2002;21:2671–83.
Displaying Public Health Data
Page 4-89
15. Korn EL, Graubard BI. Scatterplots with survey data. The American Statistician 1998;52,58–
69.
16. Souvaine DL, Van Wyk CJ. How hard can it be to draw a pie chart? Mathematics Magazine
1990;63:165–72.
17. Luby SP, Agboatwalla M, Painter J, Altaf A, Billhimer WL, Hoekstra RM. Effect of
intensive handwashing promotion on childhood diarrhea in high-risk communities in
Pakistan: a randomized controlled trial. JAMA 2004; 291(21):2547–54.
18. Kafadar K. John Tkey and robustness. Statistical Science 2003:18:319–31.
19. Urbank S. Exploring statistical forests. ASA Proceedings of the Join Statistical Meetings;
2002; Alexandria, VA: American Statistical Association, 2002: 3535–40.
20. Amon J, Devasia R, Guoliang X, Vaughan G, Gabel J, MacDonald P, et al. Multiple hepatitis
A outbreaks associated with green onions among restaurant patrons–Tennessee, Georgia, and
North Carolina, 2003. Presented at 53rd
Annual Epidemic Intelligence Service Conference,
April 19-23, 2004, Atlanta, Georgia.
21. Haddix AC, Teutsch SM, Corso PS. Prevention effectiveness: a guide to decision analysis
and economic evaluation. 2nd
ed. New York, New York: Oxford University Press; October
2002.
22. Croner CM. Public health GIS and the internet. Annu Rev Public Health 2003;24:57–82.
23. Hilbe JM. Statistical computing software reviews. The American Statistician 2004;58:92.
24. Devlin SJ. Statistical graphs in customer survey research. ASA Proceedings of the Joint
Statistical Meetings 2003:1212–16.
25. Taub GE. A review of {it ActivStats for SPSS/}: Integrating SPSS instruction and
multimedia in an introductory statistics course. Journal of Educational and Behavioral
Statistics 2003;28:291–3.
26. Hilbe J. Computing and software: editor’s notes. Health Services & Outcomes Research
Methodology 2000;1:75–9.
27. Oster RA. An examination of five statistical software packages for epidemiology. The
American Statistician 1998;52:267–80.
28. Morgan WT. A review of eight statistics software packages for general use. The American
Statistician 1998;52:70–82.
29. Anderson-Cook CM. Data analysis and graphics using R: an example-based approach.
Journal of the American Statistical Association 2004;99:901–2.
30. Tufte ER. The visual display of quantitative information. Cheshire CT: Graphics Press, LLC;
2002.
31. Tufte ER. The visual display of quantitative information. Cheshire, CT: Graphics Press;
1983.
Displaying Public Health Data
Page 4-90
32. Olsen J. 2002. Using color in statistical graphs and maps. ASA Proceedings of the Joint
Statistical Meetings; 2002; Alexandria, VA: American Statistical Association; 2002: 2524-9.
33. Wainer H, Velleman PF. Statistical Graphics: mapping the pathways of science. Annual
Review of Psychology 2001;52:305–35.
34. Benedetto DD. Faces and the others: interactive expressions for observations. ASA
Proceedings of the Joint Statistical Meetings; 2003; Alexandria, VA: American Statistical
Association; 2003:520–7.
35. Weisstein EW. [Internet] MathWorld–A Wolfram Web Resource [updated 2006]. Chernoff
Face. Available from: http://mathworld.wolfram.com/ChernoffFace.html.
Websites
For more information on: Visit the following websites:
Age categorization used by CDC’s National Center for
Health Statistics
http://www.cdc.gov/nchs/
Age groupings used by the United States Census Bureau http://www.census.gov
CDC’s Morbidity and Mortality Weekly Report http://www.cdc.gov/mmwr/
Epi Info and EpiMap http://www.cdc.gov/epiinfo/
GIS at CDC http://www.cdc.gov/gis/
The R Project for Statistical Computing http://www.r-project.org
ColorBrewer: color advice for cartography http://www.colorbrewer.org
Instructions for Epi Info 6 (DOS)
To create a frequency distribution from a data set in Analysis Module:
EpiInfo6: >freq variable. Output provides columns for number, percentage, and
cumulative percentage.
To create a two-variable table from a data set in Analysis Module:
EpiInfo6: >Tables exposure_variable outcome_variable. Output shows table plus chi-
square and p-value. For a two-by-two table, output also provides risk ratio, odds ratio,
and confidence intervals.
Displaying Public Health Data
Page 4-91
Public Health Surveillance
Page 5-1
PUBLIC HEALTH SURVEILLANCE
The health department is responsible for protecting the public’s health, but
how does it learn about cases of communicable diseases from which the
public might need protection? How might health officials track behaviors
that place citizens at increased risk of heart disease or diabetes? If a highly
publicized mass gathering potentially attracts terrorists (e.g., a
championship sporting event or political convention), how might a health
department detect the presence of biologic agents or the outbreak of a disease the agent might
cause?
The answer is public health surveillance.
Objectives
After studying this lesson and answering the questions in the exercises, you will be able to:
• Define public health surveillance
• List the essential activities of surveillance
• List the desirable characteristics of well-conducted surveillance activities
• Describe sources of data and data systems commonly used for public health surveillance
• Describe the principal methods of analyzing and presenting surveillance data
• Describe selected examples of surveillance in the United States
• Given a scenario and a specific health problem, design a plan for conducting
surveillance of the problem
Major Sections
Introduction.................................................................................................................................. 5-2
Purpose and Characteristics of Public Health Surveillance......................................................... 5-4
Identifying Health Problems for Surveillance ............................................................................. 5-6
Identifying or Collecting Data for Surveillance......................................................................... 5-13
Analyzing and Interpreting Data................................................................................................ 5-23
Disseminating Data and Interpretation ...................................................................................... 5-34
Evaluating and Improving Surveillance..................................................................................... 5-38
Summary.................................................................................................................................... 5-42
Appendix A. Characteristics of Well-Conducted Surveillance ................................................ 5-43
Appendix B. CDC Fact Sheet on Chlamydia ........................................................................... 5-45
Appendix C. Examples of Surveillance.................................................................................... 5-48
Appendix D. Major Health Data Systems in the United States ................................................ 5-52
Appendix E. Limitations of Notifiable Disease Surveillance and
Recommendations for Improvement................................................................... 5-53
3135
Public Health Surveillance
Page 5-2
Introduction
Surveillance — from the French sur (over) and veiller (to watch)
— is the “close and continuous observation of one or more persons
for the purpose of direction, supervision, or control.”1
In his classic
1963 paper, Alexander Langmuir applied surveillance for a
disease to mean “the continued watchfulness over the distribution
and trends of incidence [of a disease] through the systematic
collection, consolidation, and evaluation of morbidity and
mortality reports and other relevant data.” He illustrated this
application with four communicable diseases: malaria,
poliomyelitis, influenza, and hepatitis.2
Since then, surveillance
has been extended to non-communicable diseases and injuries (and
to their risk factors), and we now use the term public health
surveillance to describe the general application of surveillance to
public health problems.3
Evolution of Surveillance
The term surveillance was used initially in public health to describe the close monitoring of persons who, because
of an exposure, were at risk for developing highly contagious and virulent infectious diseases that had been
controlled or eradicated in a geographic area or among a certain population (e.g., cholera, plague, and yellow fever
in the United States in the latter 1800s). These persons were monitored so that, if they exhibited evidence of
disease, they could be quarantined to prevent spreading the disease to others.
In 1952, the U.S. Communicable Disease Center described its effort to redirect large-scale control programs for
multiple infectious diseases, which had achieved their purpose, "toward the establishment of a continuing
surveillance program. The objective of this redirected program is to maintain constant vigilance to detect the
presence of serious infectious diseases anywhere in the country, and when necessary, to mobilize all available forces
to control them."4
In 1968 at the 21st
World Health Assembly, surveillance was defined as "the systematic collection and use of
epidemiologic information for the planning, implementation, and assessment of disease control."5
In the 1980s and
1990s, Thacker3
and others6-8
expanded the term to encompass not just disease, but any outcome, hazard, or
exposure. In fact, the term surveillance is often applied to almost any effort to monitor, observe, or determine
health status, diseases, or risk factors within a population. Care should be taken, however, in applying the term
surveillance to virtually any program for or method of gathering information about a population's health, because
this might lead to disagreement and confusion among public health policymakers and practitioners. Other terms
(e.g., survey, health statistics, and health information system) might be more appropriate for describing specific
information-gathering activities or programs.9
The essence of public health surveillance is the use of data to
monitor health problems to facilitate their prevention or control.
Data, and interpretations derived from the evaluation of
surveillance data, can be useful in setting priorities, planning, and
conducting disease control programs, and in assessing the
effectiveness of control efforts. For example, identifying
geographic areas or populations with higher rates of disease can be
helpful in planning control programs and targeting interventions,
Public Health Surveillance
Page 5-3
and monitoring the temporal trend of the rate of disease after
implementation of control efforts.
Those persons conducting surveillance should: (1) identify, define,
and measure the health problem of interest; (2) collect and compile
data about the problem (and if possible, factors that influence it);
(3) analyze and interpret these data; (4) provide these data and
their interpretation to those responsible for controlling the health
problem; and (5) monitor and periodically evaluate the usefulness
and quality of surveillance to improve it for future use. Note that
surveillance of a problem does not include actions to control the
problem.2
In this lesson, we describe these five essential activities of
surveillance, enumerate the desirable characteristics of
surveillance, and provide examples of surveillance for multiple
health problems.
Public Health Surveillance
Page 5-4
Purpose and Characteristics of Public Health
Surveillance
Public health surveillance provides and interprets data to facilitate
the prevention and control of disease. To achieve this purpose,
surveillance for a disease or other health problem should have clear
objectives. These objectives should include a clear description of
how data that are collected, consolidated, and analyzed for
surveillance will be used to prevent or control the disease. For
example, the objective of surveillance for tuberculosis might be to
identify persons with active disease to ensure that their disease is
adequately treated. For such an objective, data collection should be
sufficiently frequent, timely, and complete to allow effective
treatment. Alternatively, the objective might be to determine
whether control measures for tuberculosis are effective. To meet
this objective, one might track the temporal trend of tuberculosis,
and data might not need to be collected as quickly or as frequently.
Surveillance for a health problem can have more than one
objective.
After the objectives for surveillance have been determined, critical
characteristics of surveillance are usually apparent, including:
• Timeliness, to implement effective control measures;
• Representation, to provide an accurate picture of the
temporal trend of the disease;
• Sensitivity, to allow identification of individual persons
with disease to facilitate treatment; quarantine, or other
appropriate control measures; and
• Specificity, to exclude persons not having disease.
Other characteristics of well-conducted surveillance are described
in Appendix A. The importance of each of these characteristics can
vary according to the purpose of surveillance, the disease under
surveillance, and the planned use of surveillance data (See Table
5.7 in Appendix A). To establish the objectives of surveillance for
a particular disease in a specific setting and to select an appropriate
method of conducting surveillance for that disease, asking and
answering the following questions will be helpful.
• What is the health-related event under surveillance? What
is its case definition?
• What is the purpose and what are the objectives of
surveillance?
• What are the planned uses of the surveillance data?
• What is the legal authority for any data collection?
Public Health Surveillance
Page 5-5
• Where is the organizational home of the surveillance?
• Is the system integrated with other surveillance and health
information systems?
• What is the population under surveillance?
• What is the frequency of data collection (weekly, monthly,
annually)?
• What data are collected and how? Would a sentinel
approach or sampling be more effective?
• What are the data sources? What approach is used to
obtain data?
• During what period should surveillance be conducted? Does
it need to be continuous, or can it be intermittent or short-
term?
• How are the data processed and managed? How are they
routed, transferred, stored? Does the system comply with
applicable standards for data formats and coding schemes?
How is confidentiality maintained?
• How are the data analyzed? By whom? How often? How
thoroughly?
• How is the information disseminated? How often are
reports distributed? To whom? Does it get to all those who
need to know, including the medical and public health
communities and policymakers? 9,10
Public Health Surveillance
Page 5-6
Identifying Health Problems for Surveillance
Multiple health problems confront the populations of the world.
Certain problems present an immediate threat to health, whereas
others are persistent, long-term problems with relatively stable
incidence and prevalence among the populations they affect.
Examples of the former include influenza epidemics and hurricanes;
the latter include atherosclerotic cardiovascular disease and colon
cancer. Health problems also vary for different populations and
settings, and an immediate threat among one population might be a
chronic problem among another. For example, an outbreak of
malaria in the United States in 2006 would be an immediate threat,
but malaria in Africa is a chronic problem.
Selecting a Health Problem for Surveillance
Because conducting surveillance for a health problem consumes
time and resources, taking care in selecting health problems for
surveillance is critical. In certain countries, selection is based on
criteria developed for prioritizing diseases, review of available
morbidity and mortality data, knowledge of diseases and their
geographic and temporal patterns, and impressions of public and
political concerns, sometimes augmented with surveys of the
general public or nonhealth-associated government officials.
Criteria developed for selecting and prioritizing health problems
for surveillance include the following: 9,10,11,12
Public health importance of the problem:
• incidence, prevalence,
• severity, sequela, disabilities,
• mortality caused by the problem,
• socioeconomic impact,
• communicability,
• potential for an outbreak,
• public perception and concern, and
• international requirements.
Ability to prevent, control, or treat the health problem:
• preventability and
• control measures and treatment.
Capacity of health system to implement control measures for
the health problem:
• speed of response,
• economics,
• availability of resources, and
• what surveillance of this event requires.
Public Health Surveillance
Page 5-7
In the United States, the Centers for Disease Control and
Prevention (CDC) and the Council of State and Territorial
Epidemiologists (CSTE) periodically review communicable
diseases and other health conditions to determine which ones
should be reported to federal authorities by the states. Because of
their greater likelihood of producing immediate, increased threats
to public health, communicable diseases are the most common
diseases under surveillance. Table 5.1 presents nationally notifiable
infectious diseases for the United States for 2006. The Morbidity
and Mortality Weekly Report (MMWR) presents a weekly and
annual summary of nationally notifiable infectious diseases in the
U.S. After priorities have been set, the extent to which a state or
local health department can conduct surveillance for particular
diseases is dependent on available resources.
Table 5.1 Nationally Notifiable Infectious Diseases — United States, 2006
Acquired immunodeficiency
syndrome (AIDS)
Anthrax
Arboviral neuroinvasive and
nonneuroinvasive diseases
• California serogroup virus disease
• Eastern equine encephalitis virus
disease
• Powassan virus disease
• St. Louis encephalitis virus disease
• West Nile virus disease
• Western equine encephalitis virus
disease
Botulism
• Botulism, foodborne
• Botulism, infant
• Botulism, other (wound and
unspecified)
Brucellosis
Chancroid
Chlamydia trachomatis, genital
infections
Cholera
Coccidioidomycosis
Cryptosporidiosis
Cyclosporiasis
Diphtheria
Ehrlichiosis
• Ehrlichiosis, human granulocytic
• Ehrlichiosis, human monocytic
• Ehrlichiosis, human, other or
unspecified agent
Giardiasis
Gonorrhea
Haemophilus influenzae, invasive
disease
Hansen disease (leprosy)
Hantavirus pulmonary syndrome
Hemolytic uremic syndrome,
postdiarrheal
Hepatitis, viral, acute
• Hepatitis A, acute
• Hepatitis B, acute
• Hepatitis B virus, perinatal
infection
• Hepatitis, C, acute
Hepatitis, viral, chronic
• Chronic Hepatitis B
• Hepatitis C Virus Infection (past or
present)
HIV infection
• HIV infection, adult (aged ≥13
years)
• HIV infection, pediatric (aged <13
years)
Influenza-associated pediatric
mortality
Legionellosis
Listeriosis
Lyme disease
Malaria
Measles
Meningococcal disease
Mumps
Pertussis
Plague
Poliomyelitis, paralytic
Psittacosis
Q Fever
Rabies
• Rabies, animal
• Rabies, human
Rocky Mountain spotted fever
Rubella
Rubella, congenital syndrome
Salmonellosis
Severe acute respiratory syndrome-
associated coronavirus (SARS-CoV)
disease
Shiga toxin-producing Escherichia
coli (STEC)
Shigellosis
Smallpox
Streptococcal disease, invasive,
Group A
Streptococcal toxic-shock syndrome
Streptococcus pneumoniae, drug
resistant, invasive disease
Streptococcus pneumoniae, invasive
in children aged <5 years
Syphilis
• Syphilis, primary
• Syphilis, secondary
• Syphilis, latent
• Syphilis, early latent
• Syphilis, late latent
• Syphilis, latent, unknown duration
• Neurosyphilis
• Syphilis, latent, nonneurological
Syphilis, congenital
• Syphilitic stillbirth
Tetanus
Toxic-shock syndrome (other than
streptococcal)
Trichinellosis (trichinosis)
Tuberculosis
Tularemia
Typhoid fever
Vancomycin — intermediate
Staphylococcus aureus (VISA)
Vancomycin-resistant Staphylococcus
aureus (VRSA)
Varicella (morbidity)
Varicella (deaths only)
Yellow fever
Adapted from: National Notifiable Diseases Surveillance System [Internet]. Atlanta: CDC [updated 2006 Jan 13]. Nationally Notifiable
Infectious Diseases United States 2006 . Available from: http://www.cdc.gov/osels/ph_surveillance/nndss/phs/infdis2006.htm.
Public Health Surveillance
Page 5-8
Exercise 5.1
A researcher at the state university’s medical center is urging the state
health department to add chlamydial infections to the state's list of diseases
for which surveillance is required. On the basis of the information about
chlamydial infections provided in Appendix B, draw conclusions on the table
below and discuss the advantages and disadvantages of adding chlamydia infections to the
state’s list of notifiable diseases.
Public health importance of chlamydia
Incidence
Severity
Mortality caused by chlamydia
Socioeconomic impact
Communicability
Potential for an outbreak
Public perception and concern
International requirements
Ability to prevent, control, or treat chlamydia
Preventability
Control measures and treatment
Capacity of health system to implement control measures for chlamydia
Speed of response
Economics
Availability of resources
What does surveillance for this
event require?
Advantages Disadvantages
Check your answers on page 5-57
Public Health Surveillance
Page 5-9
Defining the health problem, identifying needed
information, and establishing the scope for
surveillance
After a decision has been made to undertake surveillance for a
particular health problem, adopting — or, if necessary, developing
— an operational definition of the health problem for surveillance
is necessary for the health problem to be accurately and reliably
recognized and counted. The operational definition consists of one
or more criteria and is known as the case definition for
surveillance. The case definition criteria might differ from the
clinical criteria for diagnosing the disease and from the case
definition of the disease used in outbreak investigations. For
example, the case definition of listeriosis for surveillance is
provided in the box below. (See Lesson 1 for further discussion of
case definitions and for an example of a case definition of
listeriosis for outbreak investigation). CDC and CSTE have
developed case definitions for common communicable diseases,13
certain chronic diseases, and selected injuries.
Case Definition of Listeriosis for Surveillance Purposes
Clinical description
Infection caused by Listeria monocytogenes, which can produce any of multiple clinical syndromes, including
stillbirth, listeriosis of the newborn, meningitis, bacteremia, or localized infections.
Laboratory criteria for diagnosis
Isolation of L. monocytogenes from a normally sterile site (e.g., blood or cerebrospinal fluid or, less commonly,
joint, pleural, or pericardial fluid).
Case classification
Confirmed: A clinically compatible case that is laboratory-confirmed.
Source: Centers for Disease Control and Prevention. Case definitions for infectious conditions under public health
surveillance. MMWR 1997;46(No.RR-10):p. 43.
Situations might exist in which the criteria for identifying and
counting occurrences of a disease consist of a constellation of signs
and symptoms, chief complaints or presumptive diagnoses, or
other characteristics of the disease, rather than specific clinical or
laboratory diagnostic criteria. Surveillance using less specific
criteria is sometimes referred as syndromic surveillance.
For example, a syndromic surveillance system was put in place in
New York City after the World Trade Center (WTC) attacks in
2001. Here, the objectives were to detect illness related to either a
bioterrorist event or an outbreak because of concern that the WTC
attack could be followed by terrorists’ use of biological or
Public Health Surveillance
Page 5-10
chemical agents in the city. One example of non-bioterrorist
syndromic surveillance is surveillance for acute flaccid paralysis
(syndrome) in order to capture possible cases of poliomyelitis. This
is an example where the syndrome is monitored as a proxy for the
disease, and the syndrome is infrequent and severe enough to
warrant investigation of each identified case.
The goal of syndromic surveillance is to provide an earlier
indication of an unusual increase in illnesses than traditional
surveillance might, to facilitate early intervention (e.g., vaccination
or chemoprophylaxis). For syndromic surveillance, a syndrome is a
constellation of signs and symptoms. Signs and symptoms are
grouped into syndrome categories (e.g., the category of
“respiratory” includes cough, shortness of breath, difficulty
breathing, and so forth).
The term, as used in the United States, often refers to observing
emergency department visits for multiple syndromes (e.g.,
“respiratory disease with fever”) as an early detection system for a
biologic or chemical terrorism event. The advantage of syndromic
surveillance is that persons can be identified when they seek
medical attention, which is often 1–2 days before a diagnosis is
made. In addition, syndromic surveillance does not rely on a
clinician’s ability to think of and test for a specific disease or on
the availability of local laboratory or other diagnostic resources.
Because syndromic surveillance focuses on syndromes instead of
diagnoses and suspect diagnoses, it is less specific and more likely
to identify multiple persons without the disease of interest. As a
result, more data have to be handled, and the analyses tend to be
more complex. Syndromic surveillance relies on computer
methods to look for deviations above baseline (certain methods
look for space-time clusters). Emergency department data are the
most common data source for syndromic surveillance systems.
You might use syndromic surveillance when:
• Timeliness is key either for naturally occurring infectious
diseases (e.g., severe acute respiratory syndrome [SARS]),
or a terrorism event;
• Making a diagnosis is difficult or time-consuming (e.g., a
new, emerging, or rare pathogen);
• Trying to detect outbreaks (e.g., when syndromic
surveillance identified an increase in gastroenteritis after a
widespread electrical blackout, probably from consuming
spoiled food); or
• Defining the scope of an outbreak (e.g., investigators
quickly having information on the age breakdown of
patients or being able to determine geographic clustering).
Public Health Surveillance
Page 5-11
Syndromic surveillance is a key adjunct reporting system that can
detect terrorism events early. Syndromic surveillance is not
intended to replace traditional surveillance, but rather to
supplement it. However, evaluation of these approaches is needed
because syndromic surveillance is largely untested (fortunately, no
terrorism events have occurred that test the available models); its
usefulness has not been proven, given the early stage of the science
and the relative lack of specificity of the systems. Criticism and
concern have arisen regarding the associated costs and the number
of false alarms that will be fruitlessly pursued and whether
syndromic surveillance will work to detect outbreaks (See below
for a possible scenario).
Possible Scenario for Syndromic Surveillance
Consider the time sequence of an unsuspecting person exposed to an aerosolized agent (e.g., anthrax).
• Two days after exposure, the person experiences a prodrome of headache and fever and visits a local pharmacy
to buy acetaminophen or another over-the-counter medicine.
• On day 3, he develops a cough and calls his health-care provider.
• On day 4, feeling worse, he visits his physician’s office and receives a diagnosis of influenza.
• On day 5, he feels weaker, calls 9-1-1, and is taken by ambulance to his local hospital’s emergency department,
but is then sent home.
• By day 6, he is admitted to the hospital with a diagnosis of pneumonia.
• The following day, the radiologist identifies the characteristic feature of pulmonary anthrax on the chest
radiograph and indicates a diagnosis. Laboratory tests are also positive. The infection-control practitioner,
familiar with notifiable disease reporting, immediately calls the health department, which is on day 7 after
exposure.
Thus, the health department learns about this case and perhaps others a full 7 days after exposure. However, if
enough persons had been exposed on day 0, the health department might have detected an increase days earlier by
using a syndromic surveillance system that tracks pharmacy over-the-counter medicine sales, nurses’ hotlines,
managed care office visits, school or work absenteeism, ambulance dispatches, emergency medical system or 9-1-1
calls, or emergency room visits.
After a case definition has been developed, the persons conducting
surveillance should determine the specific information needed
from surveillance to implement control measures. For example, the
geographic distribution of a health problem at the county level
might be sufficient to identify counties to be targeted for control
measures, whereas the names and addresses of persons affected
with sexually transmitted diseases are needed to identify contacts
for follow-up investigation and treatment. How quickly this
information must be available for effective control is also critical
in planning surveillance. For example, knowing of new cases of
hepatitis A within a week of diagnosis is helpful in preventing
further spread, but knowing of new cases of colon cancer within a
year might be sufficient for tracking its long-term trend and the
effectiveness of prevention strategies and treatment regimens.
Public Health Surveillance
Page 5-12
Another key component of establishing surveillance for a health
problem is defining the scope of surveillance, including the
geographic area and population to be covered by surveillance.
Establishing a period during which surveillance initially will be
conducted is also useful. At the end of this period, the results of
surveillance can be reviewed to determine whether surveillance
should be continued. This approach might prevent the continuation
of surveillance when it is no longer needed.
Public Health Surveillance
Page 5-13
Identifying or Collecting Data for Surveillance
After the problem for surveillance has been identified and defined
and the needs and scope determined, available reports and other
relevant data should be located that can be used to conduct
surveillance. These reports and data are gathered for different
purposes from multiple sources by using selected methods. Data
might be collected initially to serve health-related purposes,
whereas data might later serve administrative, legal, political, or
economic purposes. Examples of the former include collecting data
from death certificates regarding the cause and circumstances of
death and collecting data from national health surveys regarding
health-related behaviors; examples of the latter include collecting
data on cigarette and alcohol sales and administrative data
generated from the reimbursement of health-care providers.
Before describing available local and national data resources for
surveillance, understanding the principal sources and methods of
obtaining data about health problems is helpful. As you recall from
Lesson 1, the majority of diseases have a characteristic natural
history. An understanding of the natural history of a disease is
critical to conducting surveillance for that disease because
someone — either the patient or a health-care provider — must
recognize, or diagnose, the disease and create a record of its
existence for it to be identified and counted for surveillance. For
diseases that cause severe illness or death (e.g., lung cancer or
rabies), the likelihood that the disease will be diagnosed and
recorded by a health-care provider is high. For diseases that
produce limited or no symptoms in the majority of those affected,
the likelihood that the disease will be recognized is low. Certain
diseases fall between these extremes. The characteristics and
natural history of a disease determine how best to conduct
surveillance for that disease.
Examples of documentation of
financial, legal, and
administrative activities that
might be used for surveillance
• Receipts for cigarette and
other tobacco product sales.
• Automated reports of
pharmaceutical sales.
• Electronic records of billing
and payment for health-care
services.
• Laws and regulations related
to drug use.
Sources and Methods for Gathering Data
Data collected for health-related purposes typically come from
three sources, individual persons, the environment, and health-care
providers and facilities. Moreover, data collected for nonhealth–
related purposes (e.g., taxes, sales, or administrative data) might
also be used for surveillance of health-related problems. Because a
researcher might wish to calculate rates of disease, information
about the size of the population under surveillance and its
geographic distribution are also helpful. Table 5.2 summarizes
health and nonhealth-related sources of data, and the box to the left
provides examples of nonhealth-related data that can be used for
surveillance of specific health problems.
Public Health Surveillance
Page 5-14
Table 5.2 Typical Sources of Data
Individual persons
Health-care providers, facilities, and records
• Physician offices
• Hospitals
• Outpatient departments
• Emergency departments
• Inpatient settings
• Laboratories
Environmental conditions
• Air
• Water
• Animal vectors
Administrative actions
Financial transactions
• Sales of goods and services
• Taxation
Legal actions
Laws and regulations
A limited number of methods are used to collect the majority of
health-related data, including environmental monitoring, surveys,
notifications, and registries. These methods can be further
characterized by the approach used to obtain information from the
sources described previously. For example, the method of
collecting information might be an annual population survey that
uses an in-person interview and a standardized questionnaire for
obtaining data from women aged 18–45 years; or the method might
be a notification that requires completion and submission of a form
by health-care providers about occurrences of specific diseases that
they see in their practices.
Depending on the situation, these methods might be used to obtain
information about a sample of a population or events or about all
members of the population or all occurrences of a specific event
(e.g., birth or death). Information might be collected continuously,
periodically, or for a defined period, depending on the need.
Careful consideration of the objectives of surveillance for a
particular disease and a thorough understanding of the advantages
and disadvantages of different sources and methods for gathering
data are critical in deciding what data are needed for surveillance
and the most appropriate sources and methods for obtaining it.9,14
We now discuss each of these four methods.
Public Health Surveillance
Page 5-15
Environmental Monitoring
Examples of environmental
monitoring
• Cities and states monitor
air pollutants.
• Cities and towns monitor
public water supplies for
bacterial and chemical
contaminants.
• State and local health
authorities monitor
beaches, lakes, and
swimming pools for
increased levels of
harmful bacteria and
other biologic and
chemical hazards.
• Health agencies monitor
animal and insect
vectors for the presence
of viruses and parasites
that are harmful to
humans.
• National, state, and local
departments of
transportation monitor
roads, highways, and
bridges to ensure that
they are safe for traffic;
they also monitor traffic
to ensure that speed
limits and other traffic
laws are observed.
• Public safety and health
departments periodically
monitor compliance with
laws requiring seat belt
use.
• Occupational health
authorities monitor noise
levels in the workplace
to prevent hearing loss
among employees.
Monitoring the environment is critical for ensuring that it is
healthy and safe (see Examples of Environmental Monitoring).
Multiple qualitative and quantitative approaches are used to
monitor the environment, depending on the problem, setting, and
planned use of the monitoring data.
Survey
A survey is an investigation that uses a “structured and systematic
gathering of information” from a sample of “a population of
interest to describe the population in quantitative terms.”15
The
majority of surveys gather information from a representative
sample of a population so that the results of the survey can be
generalized to the entire population. Surveys are probably the most
common method used for gathering information about populations.
The subjects of a survey can be members of the general public,
patients, health-care providers, or organizations. Although their
topics might vary widely, surveys are typically designed to obtain
specific information about a population and can be conducted once
or on a periodic basis.
Notification
A notification is the reporting of certain diseases or other health-
related conditions by a specific group, as specified by law,
regulation, or agreement. Notifications are typically made to the
state or local health agency. Notifications are often used for
surveillance, and they aid in the timely control of specific health
problems or hazardous conditions. When reporting is required by
law, the diseases or conditions to be reported are known as
notifiable diseases or conditions.
Individual notifiable disease case reports are considered
confidential and are not available for public inspection. In most
states, a case report from a physician or hospital is sent to the local
health department, which has primary responsibility for taking
appropriate action. The local health department then forwards a
copy of the case report to the state health department. In states that
have no local health departments or in which the state heath
department has primary responsibility for collecting and
investigating case reports, initial case reports go directly to the
state health department. In some states all laboratory reports are
sent to the state health department, which informs the local health
department responsible for following up with the physician.
Public Health Surveillance
Page 5-16
This form of data collection, in which health-care providers send
reports to a health department on the basis of a known set of rules
and regulations, is called passive surveillance (provider-initiated).
Less commonly, health department staff may contact healthcare
providers to solicit reports. This active surveillance (health
department- initiated) is usually limited to specific diseases over a
limited period of time, such as after a community exposure or
during an outbreak.
Table 5.3 shows the types of notification and examples.
Table 5.3 Types of Notification and Examples
1. Disease or hazard-specific notifications
a. Communicable diseases
i. World Health Organization: International health regulations require reporting of cholera, plague, and
yellow fever
ii. National: United States and Canada specify diseases that require notification by all states and
provinces, respectively
iii. Provincial, state, or subnational: for example, coccidioidomycosis in California
b. Chemical and physical hazards in the environment
i. Childhood lead poisoning
ii. Occupational hazards
iii. Firearm-related injury
iv. Consumer product-related injury
2. Notifications related to treatment administration
a. Adverse effect of drugs or medical products
b. Adverse effect from vaccines
3. Notifications related to persons at risk
a. Elevated blood lead among adults
b. Elevated blood lead among children
Adapted from: Koo D, Wingo P, Rothwell C. Health Statistics from Notifications, Registration Systems, and Registries. In: Friedman
D, Parrish RG, Hunter E (editors). Health Statistics: Shaping Policy and Practice to Improve the Population’s Health. New York:
Oxford University Press; 2005, p. 82.
Public Health Surveillance
Page 5-17
Use of sentinel sites has
become the preferred approach
for human immunodeficiency
virus/acquired
immunodeficiency syndrome
(HIV/AIDS) surveillance for
certain countries where
national population-based
surveillance for HIV infection is
not feasible. This approach is
based on periodic serologic
surveys conducted at selected
sites with well-defined
population subgroups (e.g.,
prenatal clinics). Under this
strategy, health officials define
the population subgroups and
the regions to study and then
identify health-care facilities
serving those populations that
are capable and willing to
participate. These facilities
then conduct serologic surveys
at least annually to provide
statistically valid estimates of
HIV prevalence.
Because underreporting is common for certain diseases, an
alternative to traditional reporting is sentinel reporting, which
relies on a prearranged sample of health-care providers who agree
to report all cases of certain conditions. These sentinel providers
are clinics, hospitals, or physicians who are likely to observe cases
of the condition of interest. The network of physicians reporting
influenza-like illness, as described in one of the examples in
Appendix C,is an example of surveillance that uses sentinel
providers. Although the sample used in sentinel surveillance might
not be representative of the entire population, reporting is probably
consistent over time because the sample is stable and the
participants are committed to providing high-quality data.
Registries
Maintaining registries is a method for documenting or tracking
events or persons over time (Table 5.4). Certain registries are
required by law (e.g., registries of vital events). Although similar
to notifications, registries are more specific because they are
intended to be a permanent record of persons or events. For
example, birth and death certificates are permanent legal records
that also contain important health-related information. A disease
registry (e.g., a cancer registry) tracks a person with disease over
time and usually includes diagnostic, treatment, and outcome
information. Although the majority of disease registries require
health facilities to report information on patients with disease, an
active component might exist in which the registry periodically
updates patient information through review of health, vital, or
other records.
Reanalysis or Secondary Use of Data
Surveillance for a health problem can use data originally collected
for other purposes — a practice known as the reanalysis or
secondary use of data. This approach is efficient but can suffer
from a lack of timeliness, or it can lack sufficient detail to address
the problem under surveillance. Because the primary collection of
data for surveillance is time-consuming and resource-intensive if
done well, it should be undertaken only if the health problem is of
high priority and no other adequate source of data exists.
Public Health Surveillance
Page 5-18
Table 5.4 Types of Registries and Examples of Selected Types
1. Vital event registration
a. Birth registration
b. Marriage and divorce registration
c. Death registration
2. Registries used in preventive medicine
a. Immunization registries
b. Registries of persons at risk for selected conditions
c. Registries of persons positive for genetic conditions
3. Disease-specific registries
a. Blind registries
b. Birth defects registries
c. Cancer registries
d. Psychiatric case registries
e. Ischemic heart disease registries
4. Treatment registries
a. Radiotherapy registries
b. Follow-up registries for detection of iatrogenic thyroid disease
5. After-treatment registries
a. Handicapped children
b. Disabled persons
6. Registries of persons at risk or exposed
a. Children at high risk for developing a health problem
b. Occupational hazards registries
c. Medical hazards registries
d. Older persons or chronically ill registries
e. Atomic bomb survivors (Japan)
f. World Trade Center survivors (New York City)
7. Skills and resources registries
8. Prospective research studies
9. Specific information registries
Adapted from: Koo D, Wingo P, Rothwell C. Health Statistics from Notifications,
Registration Systems, and Registries. In: Friedman D, Parrish RG, Hunter E (editors).
Health Statistics: Shaping Policy and Practice to Improve the Population’s Health. New
York: Oxford University Press; 2005, p. 91.
Weddell JM. Registers and registries: a review. Int J Epid 1973;2:221–8.
Public Health Surveillance
Page 5-19
Exercise 5.2
State funding for a childhood asthma program has just become available. To
initiate surveillance for childhood asthma, the staff is reviewing different
sources of data on asthma. Discuss the advantages and disadvantages of
the following sources of data and methods for conducting surveillance for asthma. (Figure 5.12
in Appendix C indicates national data for these different sources.)
• Self-reported asthma prevalence and asthmatic attacks obtained by a telephone survey
of the general population.
• Asthma-associated outpatient visits obtained from periodic surveys of local health-care
providers, including emergency departments and hospital outpatient clinics.
Check your answers on page 5-58
Public Health Surveillance
Page 5-20
Major health data systems
Data regarding the characteristics of diseases and injuries are
critical for guiding efforts for preventing and controlling those
diseases. Multiple systems exist in the United States to gather such
data, as well as other health-related data, at national, state, and
local levels. These systems provide the “morbidity and mortality
reports and other relevant data” for surveillance, as described by
Langmuir, and examples of such systems are listed in Appendix E.
Remember, however, that surveillance is an activity — the
continued watchfulness over a disease by using data collected
about it — and not the data about a disease or the different data
systems used to collect or manage such data.
Surveillance for communicable diseases principally relies upon
reports of notifiable diseases from health-care providers and
laboratories and the registration of deaths. Because the most
common use of surveillance for communicable diseases at the local
level is to prevent or control cases of disease, local surveillance
relies on finding individual cases of disease through notifications
or, where more complete reporting is required, actively contacting
health-care facilities or providers on a regular basis.10
At the state
and national level, the principal notification system in the United
States is the National Notifiable Disease Surveillance System
(NNDSS). State and local vital registration provides data for
monitoring deaths from certain infectious diseases (e.g., influenza
and AIDS).
More About the National Notifiable Disease Surveillance System
A notifiable disease is one for which regular, frequent, and timely information regarding individual cases is
considered necessary for preventing and controlling the disease.
The list of nationally notifiable diseases is revised periodically. For example, a disease might be added to the list as a
new pathogen emerges, and diseases are deleted as incidence declines. Public health officials at state health
departments and CDC collaborate in determining which diseases should be nationally notifiable. The Council of State
and Territorial Epidemiologists, with input from CDC, makes recommendations annually for additions and deletions.
However, reporting of nationally notifiable diseases to CDC by the states is voluntary. Reporting is mandated (i.e.,
by legislation or regulation) only at the state and local levels. Thus, the list of diseases considered notifiable varies
slightly by state. All states typically report diseases for which the patients must be quarantined (i.e., cholera, plague,
and yellow fever) in compliance with the World Health Organization's International Health Regulations.
Data in the National Notifiable Disease Surveillance System (NNDSS) are derived primarily from reports transmitted
to CDC by the 50 states, two cities, and five territorial health departments.
Source: National Notifiable Diseases Surveillance System [Internet]. Atlanta: CDC [updated 2006 Jan 13]. Available from:
http://www.cdc.gov/osels/ph_surveillance/nndss/nndsshis.htm.
Public Health Surveillance
Page 5-21
Surveillance for chronic diseases usually relies upon health-care–
related data (e.g., hospital discharges, surveys of the public, and
mortality data from the vital statistics system). Given the slow rate
of change in the incidence and prevalence of these diseases, data
for surveillance of chronic conditions need not be as timely as
those for acute infectious diseases.
Surveillance for behaviors that influence health and for other
markers for health (e.g., smoking, blood pressure, and serum
cholesterol) is accomplished by population surveys, which might
be supplemented with health-care related data. The Behavioral
Risk Factor Surveillance System (BRFSS), the Youth Risk
Behavior Surveillance System (YRBSS), the National Health
Interview Survey (NHIS), and the National Household Survey on
Drug Abuse are all surveys that gather data regarding behaviors
that influence health. The National Health and Nutrition
Examination Survey (NHANES), probably the most
comprehensive survey in the United States of health and the factors
that influence it, gathers extensive data on physiologic and
biochemical measures of the population and on the presence of
chemicals among the population resulting from environmental
exposures (e.g., lead, pesticides, and cotinine from secondhand
smoke).Data from NHANES have been used for approximately 40
years to monitor the lead burden among the general public,
demonstrating its marked elevation and then substantial decline
after the mandated removal of lead from gasoline and paint.
Public Health Surveillance
Page 5-22
Exercise 5.3
Assume you work in a state in which none of the following conditions is on
the state list of notifiable diseases. For each condition, list at least one
existing source of data that you need for conducting surveillance on the
condition. What factors make the selected source or data system more appropriate than
another?
Listeriosis: A serious infection can result from eating food contaminated with the bacterium
Listeria monocytogenes. The disease affects primarily pregnant women, newborns, and adults
with weakened immune systems. A person with listeriosis has fever, muscle aches, and
sometimes gastrointestinal symptoms (e.g., nausea or diarrhea). If infection spreads to the
nervous system, such symptoms as headache, stiff neck, confusion, loss of balance, or
convulsions can occur. Infected pregnant women might experience only a mild influenza-like
illness; however, infections during pregnancy can lead to miscarriage or stillbirth, premature
delivery, or infection of the newborn. In the United States, approximately 800 cases of listeriosis
are reported each year. Of those with serious illness, 15% die; newborns and
immunocompromised persons are at greatest risk for serious illness and death.
Spinal cord injury: Approximately 11,000 persons sustain a spinal cord injury (SCI) each year
in the United States, and 200,000 persons in the United States live with a disability related to an
SCI. More than half of the persons who sustain SCIs are aged 15–29 years. The leading cause
of SCI varies by age. Motor vehicle crashes are the leading cause of SCIs among persons aged
<65 years. Among persons aged ≥65 years, falls cause the majority of spinal cord injuries.
Sports and recreation activities cause an estimated 18% of spinal cord injuries.
Lung cancer among nonsmokers: A usually fatal cancer of the lung can occur in a person
who has never smoked. An estimated 10%–15% of lung cancer cases occur among
nonsmokers, and this type of cancer appears to be more common among women and persons
of East Asian ancestry.
Check your answers on page 5-60
Public Health Surveillance
Page 5-23
Analyzing and Interpreting Data
After morbidity, mortality, and other relevant data about a health
problem have been gathered and compiled, the data should be
analyzed by time, place, and person. Different types of data are
used for surveillance, and different types of analyses might be
needed for each. For example, data on individual cases of disease
are analyzed differently than data aggregated from multiple
records; data received as text must be sorted, categorized, and
coded for statistical analysis; and data from surveys might need to
be weighted to produce valid estimates for sampled populations.
For analysis of the majority of surveillance data, descriptive
methods are usually appropriate. The display of frequencies
(counts) or rates of the health problem in simple tables and graphs,
as discussed in Lesson 4, is the most common method of analyzing
data for surveillance. Rates are useful — and frequently preferred
— for comparing occurrence of disease for different geographic
areas or periods because they take into account the size of the
population from which the cases arose. One critical step before
calculating a rate is constructing a denominator from appropriate
population data. For state- or countywide rates, general population
data are used. These data are available from the U.S. Census
Bureau or from a state planning agency. For other calculations, the
population at risk can dictate an alternative denominator. For
example, an infant mortality rate uses the number of live-born
infants; rates of surgical wound infections in a hospital requires the
number of such procedures performed. In addition to calculating
frequencies and rates, more sophisticated methods (e.g., space-time
cluster analysis, time series analysis, or computer mapping) can be
applied.
To determine whether the incidence or prevalence of a health
problem has increased, data must be compared either over time or
across areas. The selection of data for comparison depends on the
health problem under surveillance and what is known about its
typical temporal and geographic patterns of occurrence.
For example, data for diseases that indicate a seasonal pattern (e.g.,
influenza and mosquito-borne diseases) are usually compared with
data for the corresponding season from past years. Data for
diseases without a seasonal pattern are commonly compared with
data for previous weeks, months, or years, depending on the nature
of the disease. Surveillance for chronic diseases typically requires
data covering multiple years. Data for acute infectious diseases
might only require data covering weeks or months, although data
Public Health Surveillance
Page 5-24
extending over multiple years can also be helpful in the analysis of
the natural history of disease. Data from one geographic area are
sometimes compared with data from another area. For example,
data from a county might be compared with data from adjacent
counties or with data from the state. We now describe common
methods for, and provide examples of, the analysis of data by time,
place, and person.
Analyzing by time
Basic analysis of surveillance data by time is usually conducted to
characterize trends and detect changes in disease incidence. For
notifiable diseases, the first analysis is usually a comparison of the
number of case reports received for the current week with the
number received in the preceding weeks. These data can be
organized into a table, a graph, or both (Table 5.5 and Figures 5.2
and 5.3). An abrupt increase or a gradual buildup in the number of
cases can be detected by looking at the table or graph. For
example, health officials reviewing the data for Clark County in
Table 5.5 and Figures 5.2 and 5.3 will have noticed that the
number of cases of hepatitis A reported during week 4 exceeded
the numbers in the previous weeks. This method works well when
new cases are reported promptly.
Table 5.5 Reported Cases of Hepatitis A, by County and Week of
Report, 1991
Week of report
County 1 2 3 4 5 6 7 8 9
Adams — — — 1 — — 1 — —
Asotin — — — — — — — — —
Benton — — — 2 1 — 2 — 3
Chelen — — 1 3 1 1 — — 1
Clallam — — 1 — — — — 2 —
Clark — — 3 8 14 13 11 6 —
Columbia — — — — — — — — —
Cowlitz 2 — 3 — — 6 4 9 —
Douglas — — — — — — — — —
Ferry — — — — — — — — —
Franklin — — 3 2 3 — 5 — 4
Garfield — — — — — — — 1 —
Etc.
Another common analysis is a comparison of the number of cases
during the current period to the number reported during the same
period for the last 2–10 years (Table 5.6). For example, health
officials will have noted that the 11 cases reported for Clark
County during weeks 1–4 during 1991 exceeded the numbers
reported during the same 4-week period during the previous 3
years. A related method involves comparing the cumulative
Public Health Surveillance
Page 5-25
number of cases reported to date during the current year (or during
the previous 52 weeks) to the cumulative number reported to the
same date during previous years.
Table 5.6 Reported Cases of Hepatitis A, by County for Weeks 1–4,
1988–1991
Year
County 1988 1989 1990 1991
Adams — — — 1
Asotin — — — —
Benton — — 3 2
Chelen — 1 2 4
Clallam — 1 1 1
Clark 6 3 — 11
Columbia — — — —
Cowlitz — 5 — 5
Douglas — — 2 —
Ferry 1 — — —
Franklin — 2 3 5
Garfield — — — —
Etc.
Analysis of long-term time trends, also known as secular trends,
usually involves graphing occurrence of disease by year. Figure
5.1 illustrates the rate of reported cases of malaria for the United
States during 1932–2003. Graphs can also indicate the occurrence
of events thought to have an impact on the secular trend (e.g.,
implementation or cessation of a control program or a change in
the method of conducting surveillance). Figure 5.2 illustrates
reported morbidity from malaria for 1932–1962, along with events
and control activities that influenced its incidence.2
Public Health Surveillance
Page 5-26
Figure 5.1 Rate (per 100,000 Persons) of Reported Cases of Malaria, By Year — United States, 1932–
2003
Adapted from: Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 1993b. MMWR 1993;
42(53):38, and Langmuir AD. The surveillance of communicable diseases of national importance. N Engl J Med 1963;268:182–92.
Figure 5.2 Reported Malaria Morbidity — United States, 1932–1962
Adapted from: Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 1993b. MMWR
1993;42(53):38, and National Notifiable Diseases Surveillance System [Internet]. Atlanta: CDC [updated 2005 Oct 14; cited 2005
Nov 16]. Available from: http://www.cdc.gov/mmwr/preview/mmwrhtml/00035381.htm, Langmuir AD. The surveillance of
communicable diseases of national importance. N Engl J Med 1963;268:184.
Public Health Surveillance
Page 5-27
Statistical methods can be used to detect changes in disease
occurrence. The Early Aberration Detection System (EARS) is a
package of statistical analysis programs for detecting aberrations or
deviations from the baseline, by using either long- (3–5 years) or
short-term (as short as 1–6 days) baselines.16
Analyzing by place
The analysis of cases by place is usually displayed in a table or a
map. State and local health departments usually analyze
surveillance data by neighborhood or by county. CDC routinely
analyzes surveillance data by state. Rates are often calculated by
adjusting for differences in the size of the population of different
counties, states, or other geographic areas. Figure 5.3 illustrates
lung cancer mortality rates for white males for all U.S. counties for
1998–2002. To deal with county-to-county variations in population
size and age distribution, age-adjusted rates are displayed.
Figure 5.3 Age-Adjusted Lung and Bronchus Cancer Mortality Rates (per 100,000 Population) By State
— United States, 1998–2002
Data Source: National Cancer Institute [Internet] Bethesda: NCI [cited 2006 Mar 22] Surveillance Epidemiology and End Results
(SEER). Available from: http://seer.cancer.gov/faststats/.
The advent of geographic information systems (GIS) allows more
robust analysis of data by place and has moved spot and shaded, or
choropleth, maps to much more sophisticated applications.17
Using GIS is particularly effective when different types of
information about place are combined to identify or clarify
geographic relationships. For example, in Figure 5.4, the absence
or presence of the tick that transmits Lyme disease, Ixodes
scapularis, are illustrated superimposed over habitat suitability.18
Such software packages as SatScan™ (Martin Kulldorff, Harvard
Public Health Surveillance
Page 5-28
University and Information Management System, Inc., Silver
Spring, Maryland), EpiInfo™ (CDC, Atlanta, Georgia), and Health
Mapper (World Health Organization, Geneva, Switzerland)
provide GIS functionality and can be useful when analyzing
surveillance data.19-21
Figure 5.4 Predictive Risk Map of Habitat Suitability for Ixodes
scapularis in Wisconsin and Illinois
Source: Guerra M, Walker E, Jones C, Paskewitz S, Cortinas MR, Stancil A, Beck L, Bobo M,
Kitron U. Predicting the risk of Lyme disease: habitat suitability for Ixodes scapularis in the
north central United States. Emerg Infect Dis. 2002;8:289–97.
Analyzing by time and place
As a practical matter, disease occurrence is often analyzed by time
and place simultaneously. An analysis by time and place can be
organized and presented in a table or in a series of maps
highlighting different periods or populations (Figures 5.5 and 5.6).
Public Health Surveillance
Page 5-29
Figure 5.5 Age-Adjusted Colon Cancer Mortality Rates* for White Females by State — United States,
1950–1954, 1970–1974, and 1990–1994
*Scale based on 1950–1994 rates (per 100,000 person years).
Data Source: Customizable Mortality Maps [Internet] Bethesda: National Cancer Institute [cited 2006 Mar 22]. Available from:
http://ratecalc.cancer.gov/ratecalc//.
Figure 5.6 Age-Adjusted Colon Cancer Mortality Rates* for White Males by State — United States,
1950–1954, 1970–1974, and 1990–1994
*Scale based on 1950–1994 rates (per 100,000 person years).
Data Source: Customizable Mortality Maps [Internet] Bethesda: National Cancer Institute [cited 2006 Mar 22]. Available from:
http://ratecalc.cancer.gov/ratecalc//.
Analyzing by person
The most commonly collected and analyzed person characteristics
are age and sex. Data regarding race and ethnicity are less
consistently available for analysis. Other characteristics (e.g.,
school or workplace, recent hospitalization, and the presence of
such risk factors for specific diseases as recent travel or history of
cigarette smoking) might also be available and useful for analysis,
depending on the health problem.
Age
Meaningful age categories for analysis depend on the disease of
interest. Categories should be mutually exclusive and all-inclusive.
Mutually exclusive means the end of one category cannot overlap
with the beginning of the next category (e.g., 1–4 years and 5–9
years rather than 1–5 and 5–9). All-inclusive means that the
categories should include all possibilities, including the extremes
Public Health Surveillance
Page 5-30
of age (e.g., <1 year and ≥84 years) and unknowns.
Standard age categories for childhood illnesses are usually <1 year
and ages 1–4, 5–9, 10–14, 15–19, and ≥20 years. For pneumonia
and influenza mortality, which usually disproportionally affects
older persons, the standard categories are <1 year and 1–24, 25–44,
45–64, and ≥65 years. Because two-thirds of all deaths in the
United States occur among persons aged ≥65 years, researchers
often divide the last category into ages 65–74, 75–84, and ≥85
years.
The characteristic age distribution of a disease should be used in
deciding the age categories — multiple narrow categories for the
peak ages, broader categories for the remainder. If the age
distribution changes over time or differs geographically, the
categories can be modified to accommodate those differences.
To use data in the calculation of rates, the age categories must be
consistent with the age categories available for the population at
risk. For example, census data are usually published as <5 years,
5–9, 10–14, and so on in 5-year age groups. These denominators
could not be used if the surveillance data had been categorized in
different 5-year age groups (e.g., 1–5 years, 6–10, 11–15, and so
forth).
Other Person- or Disease-Related Risk Factor
For certain diseases, information on other specific risk factors
(e.g., race, ethnicity, and occupation) are routinely collected and
regularly analyzed. For example, have any of the reported cases of
hepatitis A occurred among food-handlers who might expose (or
might have exposed) unsuspecting patrons? For hepatitis B case
reports, have two or more reports listed the same dentist as a
potential source? For a varicella (chickenpox) case report, had the
patient been vaccinated? Analysis of risk-factor data can provide
information useful for disease control and prevention.
Unfortunately, data regarding risk factors are often not available
for analysis, particularly if a generic form (i.e., one report form for
all diseases) or a secondary data source is used.
Interpreting results of analyses
When the incidence of a disease increases or its pattern among a
specific population at a particular time and place varies from its
expected pattern, further investigation or increased emphasis on
prevention or control measures is usually indicated. The amount of
increase or variation required for action is usually determined
locally and reflects the priorities assigned to different diseases, the
Public Health Surveillance
Page 5-31
local health department’s capabilities and resources, and
sometimes, public, political, or media attention or pressure.
For certain diseases (e.g., botulism), a single case of an illness of
public health importance or suspicion of a common source of
infection for two or more cases is often sufficient reason for
initiating an investigation. Suspicion might also be aroused from
finding that patients have something in common (e.g., place of
residence, school, occupation, racial/ethnic background, or time of
onset of illness). Or a physician or other knowledgeable person
might report that multiple current or recent cases of the same
disease have been observed and are suspected of being related
(e.g., a report of multiple cases of hepatitis A within the past 2
weeks from one county).
Observed increases or decreases in incidence or prevalence might,
however, be the result of an aspect of the way in which
surveillance was conducted rather than a true change in disease
occurrence. Common causes of such artifactual changes are:
• Changes in local reporting procedures or policies (e.g., a change
from passive to active surveillance).
• Changes in case definition (e.g., AIDS in 1993).
• Increased health-seeking behavior (e.g., media publicity
prompts persons with symptoms to seek medical care).
• Increase in diagnosis.
• New laboratory test or diagnostic procedure.
• Increased physician awareness of the condition, or a new
physician is in town.
• Increase in reporting (i.e., improved awareness of requirement
to report).
• Outbreak of similar disease, misdiagnosed as disease of interest.
• Laboratory error.
• Batch reporting in which reports from previous periods are held
and reported all at once during another reporting period (e.g.,
reporting all cases received during December and the first week
of January during the second week of January).
Artifactual changes include an increase in population size,
improved diagnostic procedures, enhanced reporting, and duplicate
reporting. Compare the sharp increases in disease incidence
illustrated in Figures 5.7 and 5.8. Although they appear similar, the
increase displayed in Figure 5.7 represents a true increase in
incidence, whereas the increase displayed in Figure 5.8 resulted
from a change in the case definition.22,23
Nonetheless, because a
health department’s primary responsibility is to protect the health
of the public, public health officials usually consider an apparent
increase real, and respond accordingly, until proven otherwise.
Public Health Surveillance
Page 5-32
Figure 5.7 Reported Cases of Salmonellosis per
100,000 Population, By Year — United States,
1972–2002
Source: Centers for Disease Control and Prevention.
Summary of notifiable diseases–United States, 2002.
Published April 30, 2004, for MMWR 2002;51(No. 53): p. 59.
Figure 5.8 Reported Cases of AIDS, by Year —
United States* and U.S. Territories, 1982–
2002
* Total number of AIDS cases includes all cases reported to
CDC as of December 31, 2002. Total includes cases among
residents in the U.S. territories and 94 cases among persons
with unknown state of residence.
Source: Centers for Disease Control and Prevention.
Summary of notifiable diseases–United States, 2002.
Published April 30, 2004, for MMWR 2002;51(No. 53): p.
59.
Public Health Surveillance
Page 5-33
Exercise 5.4
During the previous 6 years, one to three cases per year of tuberculosis
had been reported to a state health department. During the past 3 months,
17 cases have been reported. All but two of these cases have been
reported from one county. The local newspaper published an article about one of the first
reported cases, which occurred in a girl aged 3 years. Describe the possible causes of the
increase in reported cases.
Check your answers on page 5-60
Public Health Surveillance
Page 5-34
Disseminating Data and Interpretations
“Development of a
reasonably effective
primary surveillance
system took time. Usually,
2 full years were required.
Experience showed that
development was best
achieved by establishing
for each administrative
unit of perhaps 2–5 million
population, a surveillance
team of perhaps two to
four persons with
transport. Each team, in
addition to its other duties
in outbreak containment,
visited each reporting unit
regularly to explain and
discuss the program, to
distribute forms (and often
vaccine), and to check on
those who were delinquent
in reporting. Regularly
distributed surveillance
reports also helped to
motivate these units.
Undoubtedly, the greatest
stimulus to reporting was
the prompt visit of the
surveillance team for
outbreak investigations
and control whenever
cases were reported. This
simple, obvious, and direct
indication that the routine
weekly reports were
actually seen and were a
cause for public health
action did more, I am
sure, than the multitude of
government directives
which were issued.”
[Emphasis added]25
As Langmuir2
emphasized, the timely, regular dissemination of
basic data and their interpretations is a critical component of
surveillance. Data and interpretations should be sent to those who
provided reports or other data (e.g., health-care providers and
laboratory directors). They should also be sent to those who use
them for planning or managing control programs, administrative
purposes, or other health-related decision-making.
Dissemination of surveillance information can take different forms.
Perhaps the most common is a surveillance report or summary,
which serves two purposes: to inform and to motivate. Information
on the occurrence of health problems by time, place, and person
informs local physicians about their risk for their encountering the
problem among their patients. Other useful information
accompanying surveillance data might include prevention and
control strategies and summaries of investigations or other studies
of the health problem. A report should be prepared on a regular
basis and distributed by mail or e-mail and posted on the health
department’s Internet or intranet site, as appropriate. Increasingly,
surveillance data are available in a form that can be queried by the
general public on health departments’ Internet sites.24
A surveillance report can also be a strong motivational factor in
that it demonstrates that the health department actually looks at the
case reports that are submitted and acts on those reports. Such
efforts are important in maintaining a spirit of collaboration among
the public health and medical communities, which in turn,
improves the reporting of diseases to health authorities.
State and local health departments often publish a weekly or
monthly newsletter that is distributed to the local medical and
public health community. These newsletters usually provide tables
of current surveillance data (e.g., the number of cases of disease
identified since the last report for each disease and geographic area
under surveillance), the number of cases previously identified (for
comparison with current numbers), and other relevant information.
They also usually contain information of current interest about the
prevention, diagnosis, and treatment of selected diseases and
summarize current or recently completed epidemiologic
investigations.
At the national level, CDC provides similar information through
the MMWR, MMWR Annual Summary of Notifiable Diseases,
MMWR Surveillance Summaries, and individual surveillance
Public Health Surveillance
Page 5-35
reports published either by CDC or in peer-reviewed public health
and medical journals.
When faced with a health problem of immediate public concern,
whether it is a rapid increase in the number of heroin-related
deaths in a city or the appearance of a new disease (e.g., AIDS in
the early 1980s or West Nile Virus in the United States in 1999), a
health department might need to disseminate information more
quickly and to a wider audience than is possible with routine
reports, summaries, or newsletters. Following the appearance of
West Nile Virus in New York City in late August 1999, the
following measures were taken:
“Emergency telephone hotlines were established in
New York City on September 3 and in Westchester
County on September 21 to address public inquiries
about the encephalitis outbreak and pesticide
application. As of September 28, approximately
130,000 calls [had] been received by the New York City
hotline and 12,000 by the WCDH [Westchester County
Health Department] hotline. Approximately 300,000
cans of DEET-based mosquito repellant were
distributed citywide through local firehouses, and
750,000 public health leaflets were distributed with
information about personal protection against mosquito
bites. Recurring public messages were announced on
radio, television, on the New York City and WCDH
World-Wide Web sites, and in newspapers, urging
personal protection against mosquito bites, including
limiting outdoor activity during peak hours of mosquito
activity, wearing long-sleeved shirts and long pants,
using DEET-based insect repellents, and eliminating
any potential mosquito breeding niches. Spraying
schedules also were publicized with recommendations
for persons to remain indoors while spraying occurred
to reduce pesticide exposure.” 26
Depending on the circumstances, reports of surveillance data and
their interpretation might also be directed at the general public,
particularly when a need exists for a public response to a particular
problem.
Public Health Surveillance
Page 5-36
Exercise 5.5
You have recently been hired by a state health department to direct
surveillance activities for notifiable diseases, among other tasks. All
notifiable disease surveillance data are entered and stored in computer files at the state and
transmitted to CDC once each week. CDC publishes these data for all states in the MMWR each
week, but health department staff do not routinely review these data in the MMWR. The state
has never generated its own set of tables for analysis and dissemination, and you believe that it
would be valuable to do so to educate and increase interest among health department staff.
1. What three tables might you want to generate by computer each week for use by health
department staff?
2. You next decide that it would be a good idea to share these data with health-care providers,
as well. What tables or figures might you generate for distribution to health-care providers,
and how frequently would you distribute them?
Check your answers on page 5-61
Public Health Surveillance
Page 5-37
Exercise 5.6
Last week, the state public health laboratory diagnosed rabies among four
raccoons that had been captured in a wooded residential neighborhood.
This information will be duly reported in the tables of the monthly state
health department newsletter. Who needs to know this information?
Check your answers on page 5-62
Public Health Surveillance
Page 5-38
Evaluating and Improving Surveillance
Surveillance for a disease or other health-related problem should
be evaluated periodically to ensure that it is serving a useful public
health function and is meeting its objectives. Such an evaluation:
(1) identifies elements of surveillance that should be enhanced to
improve its attributes, (2) assesses how surveillance findings affect
control efforts, and (3) improves the quality of data and
interpretations provided by surveillance.
Although the aspects of surveillance that are emphasized in an
evaluation can differ, depending on the purpose and objectives of
surveillance, the evaluation’s overall scope and approach should be
similar for any health-related problem. The evaluation usually
begins by identifying and interviewing key stakeholders and by
collecting background documents, forms, and reports. The
evaluation should address the purpose of surveillance, objectives,
and mechanics of conducting surveillance; the resources needed to
conduct surveillance; the usefulness of surveillance; and the
presence or absence of the characteristics or qualities of optimal
surveillance. The outcome of the evaluation should provide
recommendations for improvement.9,27,28
We discuss these main
components in the following sections.
Stakeholders
Stakeholders are the persons and organizations who contribute to,
use, and benefit from surveillance. They typically include public
health officials and staff, health-care providers, data providers and
users, community representatives, government officials, and others
interested in the health condition under surveillance. Stakeholders
should be identified not only because they contribute to or use
surveillance results, but also because they might be interested in,
and can contribute to the evaluation. Stakeholders should be
engaged early in the evaluation process because some might have a
hand in implementing recommendations that emerge from the
evaluation. Evaluations conducted without early buy-in from those
responsible for conducting surveillance are often viewed as
unwanted criticism and interference from outsiders and are usually
ignored.
Purpose, objectives, and operations
The evaluation should start with a clear statement of the purpose of
surveillance, which usually facilitates prevention or control of a
health-related problem. The purpose should be followed by clearly
stated objectives describing how surveillance data and their
Public Health Surveillance
Page 5-39
interpretations are used. Considering the information needed for
effective prevention and control of the health problem is also
helpful. For example, an objective of surveillance for gonorrhea
might be to detect individual cases and their contacts so that both
can be treated. To meet this objective, sufficient information will
be needed to identify cases and contacts for follow-up. To
characterize the purpose, objectives, and operations of
surveillance, addressing the questions at the beginning of this
lesson will be helpful.
Sketching a flow chart of the method of conducting surveillance is
recommended. First, identify gaps in the evaluator’s knowledge of
how surveillance is being conducted. Second, provide a clear
visual display of the activities of and flow of data for surveillance
for those not familiar with it (Figure 5.9).
Usefulness
Usefulness refers to whether surveillance contributes to prevention
and control of a health-related problem. Note that usefulness can
include improved understanding of the public health implications
of the health problem. Usefulness is typically assessed by
determining whether surveillance meets its objectives. For
example, if the primary objective of surveillance is to identify
individual cases of disease to facilitate timely and effective control
measures, does surveillance permit timely and accurate
identification, diagnosis, treatment, or other handling of contacts
when appropriate?
Usefulness of surveillance is influenced greatly by its operation,
including its feedback mechanism to those who need to know, and
by the presence or absence of the characteristics of optimal
surveillance. Qualities or characteristics described previously in
this lesson and in Appendix A affect the operation and usefulness
of surveillance. Evaluation of surveillance requires assessment,
either qualitatively or quantitatively, of each characteristic.
Public Health Surveillance
Page 5-40
Figure 5.9 Simplified Diagram of Surveillance for a Health Problem
Source: Centers for Disease Control and Prevention. Updated guidelines for evaluating public health surveillance systems:
recommendations from the guidelines working group. MMWR 2001;50(No. RR-13): p. 8.
Public Health Surveillance
Page 5-41
Resource requirements (personnel and other costs)
In the context of surveillance evaluation, resources refers to
finances, personnel, and other direct costs needed to operate all
phases of surveillance, including any collection, analysis, and
dissemination of data. The following should be identified and
quantified:
• Funding sources and budget;
• Personnel requirements to collect, compile, edit, analyze,
interpret, or disseminate data; and
• Other resources (e.g., training, travel, supplies, and
computers and related equipment).
These costs are usually assessed in light of the objectives of
surveillance and its usefulness and against the expected costs of
possible modifications or alternatives to the way in which
surveillance is conducted.
Recommendations
The purpose of evaluating surveillance for a specific disease is to
draw conclusions and make recommendations about its present
state and future potential. The conclusions should state whether
surveillance as it is being conducted is meeting its objectives and
whether it is operating efficiently. If it is not, recommendations
should address what modifications should be made to do so.
Recommendations must recognize that the characteristics and costs
of conducting surveillance are interrelated and potentially
conflicting. For example, improving sensitivity can reduce
predictive value positive and increase costs. For surveillance,
recommendations should be prioritized on the basis of needs and
objectives. For example, for syndromic surveillance, timeliness
and sensitivity are critical, but high sensitivity increases false
alarms, which can drain limited public health resources. Each
characteristic must be considered and balanced to ensure that the
objectives of surveillance are met. (See Appendix E for an
assessment of and recommendations for notifiable disease
surveillance.)
Recommendations should be realistic, feasible, and clearly
explained. Feedback to health facilities and stakeholders is an
important, but sometimes neglected, part of the evaluation. Certain
recommendations might be unpopular and will need convincing
justification. When possible, include an estimate of the time and
resources needed to implement the changes. Prioritizing plans and
developing a timetable for surveillance improvements might be
helpful. A method for ensuring that improvements are initiated in a
timely fashion is critical to the evaluation’s ultimate success.9,29
Public Health Surveillance
Page 5-42
Summary
Surveillance has a long history of value to the health of populations and continues to evolve as
new health-related problems arise. In this lesson, we have defined public health surveillance as
continued watchfulness over health-related problems through systematic collection,
consolidation, and evaluation of relevant data.2
Data and interpretations derived from
surveillance activities are useful in setting priorities, planning and conducting disease control
programs, and assessing the effectiveness of control efforts. We have reviewed the identification
and prioritization of health problems for surveillance; the need for a clear, functional definition
of a health problem to facilitate surveillance for it; and various approaches for gathering data
about health problems, including environmental monitoring, surveys, notifications, and
registries. Sources of data are often available and used for surveillance at the national, state, and
local levels.
We have described and illustrated basic methods for analyzing and interpreting data and have
focused on time, place, and person as the foundation for characterizing a health-related problem
through surveillance. Potential problems with surveillance data that can lead to errors in their
analysis or interpretation have been presented. We have emphasized the importance of the
timely, regular dissemination of basic data and their interpretation as a critical component of
surveillance. These data and surveillance reports must be shared with those who supplied the
data and those responsible for the control of health problems.
Critical to maintaining useful, cost-effective surveillance is periodic evaluation and
implementation of recommended improvements. Stakeholders should be identified and included
in evaluation processes; a clear description and diagram of surveillance activities should be
developed; and the usefulness, resource requirements, and characteristics of optimal surveillance
should be individually assessed. This lesson ends with examples of surveillance and
recommendations for further reading.
Public Health Surveillance
Page 5-43
Appendix A. Characteristics of Well-Conducted
Surveillance
Acceptability reflects the willingness of individual persons and organizations to participate in
surveillance. Acceptability is influenced substantially by the time and effort required to complete
and submit reports or perform other surveillance tasks.
Flexibility refers to the ability of the method used for surveillance to accommodate changes in
operating conditions or information needs with little additional cost in time, personnel, or funds.
Flexibility might include the ability of an information system, whose data are used for
surveillance of a particular health condition, to be used for surveillance of a new health problem.
Predictive Value Positive is the proportion of reported or identified cases that truly are cases, or
the proportion of reported or identified epidemics that were actual epidemics. Conducting
surveillance that has poor predictive value positive is wasteful, because the unsubstantiated or
false-positive reports result in unnecessary investigations, wasteful allocation of resources, and
especially for false reports of epidemics, unwarranted public anxiety (see Figure 5.10 for how to
calculate predictive value positive.)
Quality reflects the completeness and validity of the data used for surveillance. One simple
measure is the percentage of unknown or blank values for a particular variable (e.g., age) in the
data used for surveillance.
Representativeness is the extent to which the findings of surveillance accurately portray the
incidence of a health event among a population by person, place, or time. Representativeness is
influenced by the acceptability and sensitivity (see the following) of the method used to obtain
data for surveillance. Too often, epidemiologists who calculate incidence rates from surveillance
data incorrectly assume that those data are representative of the population.
Sensitivity is the ability of surveillance to detect the health problem that it is intended to detect.
(see Figure 5.10 for how to calculate sensitivity.) Surveillance for the majority of health
problems might detect a relatively limited proportion of those that actually occur. The critical
question is whether surveillance is sufficiently sensitive to be useful in preventing or controlling
the health problem.
Simplicity refers to the ease of operation of surveillance as a whole and of each of its
components (e.g., how easily case definitions can be applied or how easily data for surveillance
can be obtained). The method for conducting surveillance typically should be as simple as
possible while still meeting its objectives.
Stability refers to the reliability of the methods for obtaining and managing surveillance data and
to the availability of those data. This characteristic is usually related to the reliability of computer
systems that support surveillance but might also reflect the availability of resources and
personnel for conducting surveillance.
Public Health Surveillance
Page 5-44
Timeliness refers to the availability of data rapidly enough for public health authorities to take
appropriate action. Any unnecessary delay in the collection, management, analysis, nterpretation,
or dissemination of data for surveillance might affect a public health agency's ability to initiate
prompt intervention or provide timely feedback.
Validity refers to whether surveillance data are measuring what they are intended to measure. As
such, validity is related to sensitivity and predictive value positive: Is surveillance detecting the
outbreaks it should? Is it detecting any nonoutbreaks?
Figure 5.10 Calculation of Predictive Value Positive, Sensitivity, and Specificity for Surveillance
True case or outbreak
True case or outbreak
Yes
True case or outbreak
No
True case or outbreak
Total
Detected by
surveillance?
Detected by surveillance?
Yes
True positive
(A)
False positive
(B)
Total detected by
surveillance (A + B)
Detected by surveillance?
No
False negative
(C)
True negative
(D)
Total missed by
surveillance (C + D)
Detected by surveillance?
Total
Total true cases or
outbreaks (A + C)
Total noncases or non-
outbreaks (B + D)
Total (A + B + C + D)
Predictive value positive = A / (A+B)
Sensitivity = A / (A+C)
Specificity = D / (B+D)
Adapted from: Centers for Disease Control and Prevention. Updated guidelines for evaluating public health surveillance systems:
recommendations from the guidelines working group. MMWR 2001;50(No. RR-13): p. 18.
Protocol for the evaluation of epidemiological surveillance systems [monograph on the Internet]. Geneva: World Health
Organization [updated 1997; cited 2006 Jan 20]. Available from: http://whqlibdoc.who.int/hq/1997/WHO_EMC_DIS_97.2.pdf.
Table 5.7 Relative Importance of Selected Surveillance Characteristics By Use of Surveillance Findings
Use of surveillance
Characteristic
Use of surveillance for
Managing individual
cases of disease
Use of surveillance for
Detecting outbreaks
of disease
Use of surveillance for
Planning and evaluating
health programs
Flexibility *** **** *
Predictive value
positive
**** *** ****
Quality ***** *** ****
Representativeness ** ** ****
Sensitivity **** **** ***
Stability **** ***** ***
Timeliness **** ***** *
The number of asterisks reflects the relative importance of each characteristic with more asterisks signifying greater
importance.
Adapted from: Sosin DM, Hopkins RS. Monitoring disease and risk factors: surveillance. In: Pencheon D, Melzer D, Gray M, Guest C
(editors). Oxford Handbook of Public Health, 2nd
ed. Oxford: Oxford University Press; 2006 (in Press).
Public Health Surveillance
Page 5-45
Appendix B. CDC Fact Sheet on Chlamydia
What is chlamydia? Chlamydia is a common sexually transmitted disease (STD) caused by the
bacterium, Chlamydia trachomatis, which can damage a woman's reproductive organs. Even
though symptoms of chlamydia are usually mild or absent, serious complications that can cause
irreversible damage, including infertility, can occur without notice before a woman ever
recognizes a problem. Chlamydia also can cause discharge from the penis of an infected man.
How common is chlamydia? Chlamydia is the most frequently reported bacterial STD in the
United States. In 2002, a total of 834,555 chlamydial infections were reported to CDC from 50
states and the District of Columbia. Underreporting is substantial because the majority of persons
with chlamydia are not aware of their infections and do not seek testing. Also, testing is not often
performed if patients are treated for their symptoms. An estimated 2.8 million Americans are
infected with chlamydia each year. Women are frequently re-infected if their sex partners are not
treated.
How do people contract chlamydia? Chlamydia can be transmitted during vaginal, anal, or oral
sex. Chlamydia can also be passed from an infected mother to her baby during vaginal childbirth.
Any sexually active person can be infected with chlamydia. The greater the number of sex
partners, the greater the risk for infection. Because the cervix (opening to the uterus) of teenage
females and young women is not fully matured, they are at particularly high risk for infection if
sexually active. Because chlamydia can be transmitted by oral or anal sex, men who have sex
with men are also at risk for chlamydial infection.
What are the symptoms of chlamydia? Chlamydia is known as a "silent" disease because
approximately three quarters of infected women and half of infected men have no symptoms. If
symptoms do occur, they usually appear within 1–3 weeks after exposure.
Among women, the bacteria initially infect the cervix and the urethra (urine canal). Women who
have symptoms might have an abnormal vaginal discharge or a burning sensation when
urinating. When the infection spreads from the cervix to the fallopian tubes (the tubes that carry
eggs from the ovaries to the uterus), certain women still have no signs or symptoms; others have
lower abdominal pain, low back pain, nausea, fever, pain during intercourse, or bleeding between
menstrual periods. Chlamydial infection of the cervix can spread to the rectum.
Men with signs or symptoms might have a discharge from their penis or a burning sensation
when urinating. Men might also have burning and itching around the opening of the penis. Pain
and swelling in the testicles are uncommon symptoms.
Men or women who have receptive anal intercourse might acquire chlamydial infection in the
rectum, causing rectal pain, discharge, or bleeding. Chlamydia has also been identified in the
throats of women and men having oral sex with an infected partner.
What complications can result from untreated chlamydia? If untreated, chlamydial infections
can progress to serious reproductive and other health problems with both short- and long-term
consequences. Similar to the disease itself, the damage that chlamydia causes is often
Public Health Surveillance
Page 5-46
asymptomatic.
Among women, untreated infection can spread into the uterus or fallopian tubes and cause pelvic
inflammatory disease (PID). This happens among ≤40% of women with untreated chlamydia.
PID can cause permanent damage to the fallopian tubes, uterus, and surrounding tissues. The
damage can lead to chronic pelvic pain, infertility, and potentially fatal ectopic pregnancy
(pregnancy outside the uterus). Women infected with chlamydia are ≤5 times more likely to
become infected with HIV, if exposed.
To help prevent the serious consequences of chlamydia, screening at least annually for
chlamydia is recommended for all sexually active women aged ≤25 years. An annual screening
test also is recommended for women aged ≥25 years who have risk factors for chlamydia (a new
sex partner or multiple sex partners). All pregnant women should have a screening test for
chlamydia.
Complications among men are rare. Infection sometimes spreads to the epididymis (a tube that
carries sperm from the testis), causing pain, fever, and, rarely, sterility. Rarely, genital
chlamydial infection can cause arthritis that can be accompanied by skin lesions and
inflammation of the eye and urethra (Reiter syndrome).
How does chlamydia affect a pregnant woman and her baby? Among pregnant women,
evidence exists that untreated chlamydial infections can lead to premature delivery. Babies who
are born to infected mothers can contract chlamydial infections in their eyes and respiratory
tracts. Chlamydia is a leading cause of early infant pneumonia and conjunctivitis (pink eye)
among newborns.
How is chlamydia diagnosed? Laboratory tests are used to diagnose chlamydia. Diagnostic
tests can be performed on urine; other tests require that a specimen be collected from such sites
as the penis or cervix.
What is the treatment for chlamydia? Chlamydia can be easily treated and cured with
antibiotics. A single dose of azithromycin or a week of doxycycline (twice daily) are the most
commonly used treatments. HIV-positive persons with chlamydia should receive the same
treatment as those who are HIV-negative.
All sex partners should be evaluated, tested, and treated. Persons with chlamydia should abstain
from sexual intercourse until they and their sex partners have completed treatment; otherwise re-
infection is possible.
Women whose sex partners have not been appropriately treated are at high risk for re-infection.
Having multiple infections increases a woman's risk for serious reproductive health
complications, including infertility. Retesting should be considered for females, especially
adolescents, 3–4 months after treatment. This is especially true if a woman does not know if her
sex partner has received treatment.
How can chlamydia be prevented? The surest way to avoid transmission of STDs is to abstain
Public Health Surveillance
Page 5-47
from sexual contact or to be in a long-term mutually monogamous relationship with a partner
who has been tested and is known to be uninfected. Latex male condoms, when used consistently
and correctly, can reduce the risk of transmission of chlamydia.
Chlamydia screening is recommended annually for all sexually active women aged ≤25 years.
An annual screening test also is recommended for older women with risk factors for chlamydia
(a new sex partner or multiple sex partners). All pregnant women should have a screening test
for chlamydia.
Any genital symptoms (e.g., discharge or burning during urination or unusual sores or rashes)
should be a signal to stop having sex and to consult a health-care provider immediately. If a
person has been treated for chlamydia (or any other STD), he or she should notify all recent sex
partners so they can see a health-care provider and be treated. This will reduce the risk that the
sex partners will experience serious complications from chlamydia and will also reduce the
person's risk for becoming re-infected. The person and all of his or her sex partners should avoid
sex until they have completed their treatment for chlamydia.
Adapted from: Chlamydia - CDC Fact Sheet [Internet]. Atlanta: CDC [updated 2006 April; cited 2006 May 17]. Available from:
http://www.cdc.gov/std/chlamydia/STDFact-Chlamydia.htm.
Public Health Surveillance
Page 5-48
Appendix C. Examples of Surveillance
Surveillance for Consumer Product-Related Injuries
The U.S. Consumer Product Safety Commission’s (CPSC) National Electronic Injury
Surveillance System (NEISS) is a national probability sample of hospitals in the United States
and its territories (Figure 5.11). Patient information is collected from each NEISS hospital for
every emergency department (ED)visit involving an injury associated with consumer products.
From this sample, the total number of product-related injuries treated in hospital EDs nationwide
can be estimated.
Figure 5.11 U.S. Consumer Product Safety Commission NEISS Hospitals, 2003
Source: NEISS: The National Electronic Injury Surveillance System - A Tool for Researchers [monograph on the Internet].
Washington (DC): U.S. Consumer Product Safety Commission, Division of Hazard and Injury Data Systems [updated 2000 Mar; cited
2005 Dec 2]. Available from: http://www.cpsc.gov/neiss/2000d015.pdf.
The data-collection process begins when a patient in the ED of an NEISS hospital relates to a
clerk, nurse, or physician how the injury occurred. The ED staff enters this information in the
patient's medical record. Each day, a person designated as an NEISS coordinator examines the
records for within-scope cases. The NEISS coordinator is someone designated by the hospital
who is given access to the ED records. NEISS coordinator duties are sometimes performed by an
ED staff member and sometimes by a person under contract to CPSC. CPSC data-collection
specialists train NEISS coordinators and conduct ED staff orientation during on-site hospital
visits. For all within-scope cases, the NEISS coordinator abstracts information for the specified
NEISS variables. The coordinator uses an NEISS coding manual to apply numerical codes to the
NEISS variables. For CPSC, the key variable is the one that identifies any consumer product
mentioned. The coordinator is trained to be as specific as possible in selecting among the
approximately 900 product codes in the NEISS coding manual. Another essential variable is the
free-text narrative description from the ED record of the incident scenario. Up to two lines of
text are provided for this narrative that often describes what the patient was doing at the time of
the accident. The specific NEISS variables are listed as follows:
Public Health Surveillance
Page 5-49
Basic Surveillance Record Variables (before year 2000 expansion)
• Treatment date.
• Case record number.
• Patient's age.
• Patient's sex.
• Injury diagnosis.
• Body part affected.
• Disposition (e.g., treated and released or hospitalized).
• Product(s) mentioned.
• Locale.
• Fire or motor-vehicle involvement.
• Whether work-related.
• Race or ethnicity.
• Incident scenario.
• Whether intentionally inflicted (year 2000 expansion).
NEISS continuously monitors product-related injuries treated in the 100 hospital EDs that
comprise the probability sample. Within-scope injuries examined in these EDs are reported to
CPSC year-round on a daily basis. Thus, daily, weekly, monthly, seasonal, or episodic trends can
be observed. Numerous published articles have used NEISS data to characterize consumer
product-related injuries.30-32
Surveillance for Asthma
CDC conducts national surveillance for asthma, a chronic disease that affects the respiratory
system among both children and adults. Because of its high prevalence and substantial
morbidity, asthma has been the focus of clinical and public health interventions, and surveillance
has been helpful in quantifying its prevalence and tracking its trend.
In conducting surveillance, CDC uses multiple sources of data because of asthma’s broad
spectrum of severity, which ranges from occasional, self-managed episodes to attacks requiring
hospitalization, and rarely, resulting in death. Asthma-related health effects under surveillance
and the data systems used to monitor them are as follows:
• Self-reported asthma prevalence, self-reported asthma episodes or attacks, school and
work days lost because of asthma, and asthma-associated activity limitations are obtained
from the National Health Interview Survey.
• Asthma-associated outpatient visits are obtained from the National Ambulatory Medical
Care Survey.
• Asthma-associated ED and hospital outpatient visits are obtained from the National
Hospital Ambulatory Medical Care Survey.
• Asthma-associated hospitalizations are obtained from the National Hospital Discharge
Survey.
• Asthma-associated deaths are obtained from the Mortality Component of the National
Vital Statistics System.
Data from these systems and from the U.S. Census Bureau are analyzed to produce national and
regional estimates of asthma-related effects, including rates (see Figure 5.12 for examples of
Public Health Surveillance
Page 5-50
these estimates).
Two reports summarizing the findings of surveillance for asthma have been published; the first,
in 199833
and the second in 200234
. The reports present findings in a series of tables and graphs.
Efforts are under way to improve surveillance for asthma by obtaining state-level data on its
prevalence, developing methods to estimate the incidence of asthma by using data from EDs, and
improving the timeliness of reporting of asthma-related deaths so that they can be investigated to
determine how such deaths might have been prevented.
Figure 5.12. Asthma Prevalence, Morbidity, and Mortality Rates — United States, 1960–
1999
Data Sources: Mannino DM, Homa DM, Pertowski CA, et al. Surveillance for asthma—United States, 1960–1995. In: Surveillance
Summaries, April 24, 1998. MMWR 1998;47(No. SS-1):1–28, and Mannino DM, Homa DM, Akinbami LJ, Moorman JE, Gwynn C,
Redd SC. Surveillance for Asthma—United States, 1980–1999. In: Surveillance Summaries, March 29, 2002. MMWR 2002;51(No.
SS-1):1–13.
)
Public Health Surveillance
Page 5-51
Surveillance for Influenza
Reporting from states to the Centers for Disease Control and Prevention (CDC) is not limited to
notifiable diseases. Surveillance for influenza is one such example. Because influenza can be
widespread during the winter but its diagnosis is rarely confirmed by laboratory test, surveillance
for influenza has presented challenges that have been met by using a combination of different
sources of data.
At the state and local levels, health authorities receive reports of outbreaks of influenza-like
illness, laboratory identification of influenza virus from nasopharyngeal swabs, and reports from
schools of excess absenteeism (e.g., >10% of a school's student body). In addition, certain local
systems monitor death certificates for pneumonia and influenza, arrange for selected physicians
to report the number of patients they examine with influenza-like illness each week, and ask
selected businesses and schools to report excessive employee absenteeism. At least one type of
surveillance for influenza includes pharmacy reports of the number of prescriptions of antiviral
drugs used to treat influenza. Another health department monitors the number of chest
radiographs a mobile radiology group performs of nursing home patients; >50% of the total chest
radiographs ordered is used as a marker of increased influenza activity.
At the national level, CDC collects and analyzes data weekly from seven different data systems
to assess influenza activity.
• The laboratory-based system receives reports of the number of percentage of influenza
isolates from approximately 125 laboratories located throughout the United States.
Selected isolates are sent to CDC for additional testing.
• The U.S. Influenza Sentinel Providers Surveillance Network receives reports of the
number and percentage of patients examined with influenza-like illness by age group from
a network of approximately 1,000 health-care providers.
• The 122 City Mortality Reporting System receives counts of deaths and the proportion of
those deaths attributable to pneumonia and influenza from 122 cities and counties across
the country.
• Each state and territorial health department provides an assessment of influenza activity in
the state as either “No Activity,” “Sporadic,” “Local,” “Regional,” or “Widespread.”
• Influenza-associated pediatric mortality (defined as laboratory-confirmed influenza-
associated death among children aged <18 years) is now a nationally notifiable condition
and is reported through the National Notifiable Disease Surveillance System.
• Emerging Infections Program conducts surveillance for laboratory-confirmed influenza-
related hospitalizations among persons aged <18 years in 11 metropolitan areas in 10
states.
By using multiple data sources at all levels — local, state, and national — public health officials
are able to assess influenza activity reliably throughout the United States without asking every
health-care provider to report each individual case.
Public Health Surveillance
Page 5-52
Appendix D. Major Health Data Systems in the United
States
Note: For additional information on data systems see the sources listed just below the table.
Title Topic Method Approach
Geographic
Level*
AirData Air pollution Environmental
monitoring
Sampling and
measurement
L
Behavioral Risk Factor Surveillance
System
Behavior Population survey Telephone interview N, S, Ci
Continuing Survey of Food Intake by
Individuals
Nutrition Population survey Personal interview N
Fatal Analysis Reporting System Fatal traffic crashes Agency and health-
care provider survey
Police, driving, and
health records review
N, S, L
HIV/AIDS Surveillance System HIV/AIDS Disease notification Reports by physicians N, S, L
Medical Expenditure Panel Survey Health costs Population and
provider surveys
Personal interview
Telephone interview
N
Monitoring the Future Study Drug use Population survey School questionnaire N, S, Ci
National Ambulatory Medical Care
Survey
Ambulatory care Health-care provider
survey
Health record review N, R
National Crime Victimization Survey Victims of crime Population survey Telephone interview N, S
National Electronic Injury Surveillance
System
Consumer product-
related injuries
Health-care provider
survey
Reports by emergency
department staff
N
National Health and Nutrition
Examination Survey
General health Population survey Personal interview and
exam
N
National Health Interview Survey General health Population survey Personal Interview N, R
National Hospital Ambulatory Medical
Care Survey
Ambulatory care Health-care provider
survey
Health record review N, R
National Hospital Discharge Survey Hospitalizations Health-care provider
survey
Health record review N, S
National Immunization Survey Immunizations Population survey Telephone interview N, S, L
National Notifiable Disease Surveillance
System
Infectious diseases Disease notification Reports by physicians
and laboratories
N, S, L
National Profile of Local Health
Departments
Local public health
agencies
Agency survey Mailed questionnaire N, L
National Program of Cancer Registries Cancer incidence and
mortality
Registry Health record review N, S
National Survey on Drug Use and Health Drug use Population survey Personal interview N
National Survey of Family Growth Pregnancy and
women's health
Population survey Personal interview
National Vital Statistics System Birth and Death Vital registration Reports by physicians N, S, Co
School Health Policies and Programs
Study
School health policies
and programs
Administrative data
Population survey
Mailed questionnaire
Personal interview
S, L
State and Local Area Integrated
Telephone Survey
Health care Population survey Telephone interview N, S, L
State Tobacco Activities Tracking and
Evaluation System
Tobacco-related
activities
Multiple S
STD Case Surveillance Reporting System Sexually transmitted
diseases
Disease notification Reports by physicians N, S, L
STORET Water quality Environmental
monitoring
Sampling and
measurement
L
Surveillance, Epidemiology, and End
Results
Cancer incidence and
survival
Registry Health record review N, S, Ci
United States Renal Data System End stage renal disease Multiple
Youth Risk Behavior Surveillance System Behavior Population survey School questionnaire N, S
*N = national; R = regional; S = state; L = local (county, city, or town); Co = county; Ci = city.
Sources: Healthy People 2010: Tracking Healthy People 2010 [Internet]. Washington, DC: Department of Health and Human
Services; Part C. Major Data Sources for Healthy People 2010 [updated 2001 Jan 30; cited 2006 Jan 16]. Available from:
http://www.cdc.gov/nchs/data/hpdata2010/tracking_healthy_people/part_c.pdf.
Stroup DF, Brookmeyer R, Kalsbeek WD. Public health surveillance in action: a framework. In: Brookmeyer R, Stroup DF (editors).
Monitoring the Health of Populations: Statistical Principles and Methods for Public Health Surveillance. Oxford: Oxford University
Press; 2004, p. 1–35.
Public Health Surveillance
Page 5-53
Appendix E. Limitations of Notifiable Disease Surveillance
and Recommendations for Improvement
Surveillance need not be perfect to be useful. However, surveillance might have limitations,
particularly as a result of underreporting, lack of representativeness, and lack of timeliness, that
compromise its usefulness. Fortunately, health departments can implement measures to
overcome these hurdles.
Although the intention of the laws and regulations of each state in the United States is that every
case of a notifiable disease be reported, the reality is otherwise. For rare, serious diseases of
public health importance (e.g., rabies, plague, or botulism), the percentage of cases actually
reported might approach 100% of diagnosed cases. Reporting completeness for diseases that
have local programs that specifically look for cases of the disease to aid in their prevention or
control (e.g., AIDS, tuberculosis, and sexually transmitted diseases [STDs]) has been identified
as being higher than for other, nonlife-threatening diseases.35
For other diseases, reporting has
been reported to be as low as 9%.35
Table
5.8 illustrates this situation for the
identification and reporting of
shigellosis. The authors of the study from
which these data are derived concluded
that the number of Shigella cases
reported nationally should be multiplied
by 20 to obtain a more realistic estimate
of the actual number of infections.36
Others have proposed multiplication
factors of 38 for infectious agents that
cause nonbloody diarrhea, 20 for agents
that cause bloody diarrhea, and two for
pathogens that typically cause severe
gastrointestinal illness.37
Limitations
Underreporting. For the majority of notifiable diseases, data for surveillance are based on
passive reporting by physicians and other health-care providers. Studies have demonstrated that
in the majority of jurisdictions, only a fraction of cases of the notifiable diseases overall are ever
reported.37-39
The most obvious result of such underreporting is that effective action is delayed,
and cases occur that might have been prevented by prompt reporting and prompt initiation of
control measures. For example, if a case of hepatitis A in a food handler goes unreported, the
opportunity to provide protective immune globulin to restaurant patrons will be missed, and
cases or an outbreak of hepatitis A that should have been prevented will instead occur. However,
underreported data might still be useful for assessing trends or other patterns reflecting the
occurrence or burden of disease.
Health-care providers cite a number of reasons for not reporting.40
Selected reasons are listed in
the following text. Public health agencies must recognize these barriers to reporting, because the
majority are within an agency's power to address or correct.
Table 5.8. Rosenberg’s Shigellosis Cascade
Event
Percentage of
Patients
Cumulative Days
Elapsed from Onset
of Symptoms
Infected 100 —
Symptomatic 76 —
Consulted physician 28 —
Culture obtained 9 7
Culture positive 7 10
Reported to local
health department
6 11
Reported to CDC 6 29
Patient contacted 6 —
Negative follow-up
culture obtained
2 39
Adapted from: Rosenberg MJ, Marr JS, Gangarosa EJ, Pollard RA, Wallace
M, Brolnitsky O. Shigella surveillance in the United States, 1975. J Infect
Dis 1977;136:458–60.
Public Health Surveillance
Page 5-54
Lack of knowledge of reporting requirements:
• Lack of awareness of responsibility to report.
• Lack of awareness of which diseases must be reported.
• Lack of awareness of how or to whom to report.
• Assumption that someone else (e.g., the laboratory) will report.
Negative attitude toward reporting:
• Time consuming.
• Hassle (e.g., a lengthy or complex report form or procedure).
• Lack of incentive.
• Lack of feedback.
• Distrust of government.
Misconceptions that result from lack of knowledge or negative attitude:
• Compromises patient-physician relationship.
• Concern that report might result in a breach of confidentiality (e.g., HIPAA concerns).
• Disagreement with need to report.
• Judgment that the disease is not that serious.
• Belief that no effective public health measures exist.
• Perception that health department does not act on the reports.
Lack of representativeness of reported cases. Underreporting is not uniform or random. Two
important biases distort the completeness of reporting. First, health-care providers are more
likely to report a case that results in severe illness and hospitalization than a mild case, even
though a person with mild illness might be more likely to transmit infection to others because the
person might not be confined at home or in the hospital. This bias results in an inflated estimate
of disease severity in such measures as the death-to-case ratio. Second, health-care providers are
more likely to report cases when the disease is receiving media attention. This bias results in an
underestimate of the baseline incidence of disease after media attention wanes.
Both biases were operating in 1981 during the national epidemic of tampon-associated toxic
shock syndrome. Early reports indicated a death-to-case ratio much higher than the ratio
determined by subsequent studies, and reported cases declined more than incident cases after the
publicity waned.41
Lack of timeliness. Lack of timeliness can occur at almost any step in the collection, analysis,
and dissemination of data on notifiable diseases. The reasons for the delays vary. Certain delays
are disease-dependent. For example, physicians cannot diagnose certain diseases until
confirmatory laboratory and other tests have been completed. Certain delays are caused by
cumbersome or inefficient reporting procedures. Delays in analysis are common when
surveillance is believed to be a rote function rather than as one that provides information for
action. Finally, delays at any step might culminate in delays in dissemination, with the result that
the medical and public health communities do not have the information they need to take prompt
action.
Public Health Surveillance
Page 5-55
Recommendations for Improving Notifiable Disease Surveillance
The preceding limitations of reporting systems demonstrate multiple steps that can be taken by a
local or state health department to improve reporting.
Improving awareness of practitioners. Most important, all persons who have a responsibility
to report must be aware of this responsibility. The health department should actively publicize
the list of notifiable diseases and the reporting mechanisms. Certain states send the reporting
requirements in a packet when a physician becomes licensed to practice in the state. Other state
health officials visit hospitals and speak at medical presentations or seminars to increase the
visibility of surveillance.
Incentives. Health-care providers might need services or therapeutic agents that are only
available from the health department, which might be able to use this need to obtain reports of
certain diseases. Services can include laboratory testing and consultation on diagnosis and
treatment of certain diseases. Agents might include immune globulin for human rabies and
hepatitis B and antitoxin for diphtheria and botulism. These services and agents might be
particularly effective incentives if they are available promptly and delivered in a professional,
authoritative manner.10
Simplify reporting. Reporting should be as simple as possible. Health departments often accept
telephone reports or have toll-free telephone numbers. If paper forms are used, they should be
widely available and easy to complete, and they should ask only for relevant information. Certain
state health departments have arranged for electronic transfer of laboratory or other patient- or
case-related data; therefore, reporting is accomplished automatically at scheduled times or at the
push of a computer key.
Frequent feedback. The role of feedback cannot be overemphasized. Feedback can be written
(e.g., a monthly newsletter) or oral (e.g., updates at regular meetings of medical staff or at
rounds). The feedback should be timely, informative, interesting, and relevant to each reporter's
practice. Feedback should include information about disease patterns and control activities to
increase awareness and to reinforce the importance of participating in a meaningful public health
activity.
Widening the net. Traditionally, surveillance for notifiable diseases has relied on reporting by
physicians. Almost every state now requires reporting of positive cultures or diagnostic tests for
notifiable diseases by commercial and hospital laboratories. For certain states, the number of
laboratory reports exceeds the number of reports from physicians, hospitals, clinics, and other
sources. Other health-care staff (e.g., infection control personnel and school nurses) can be used
as sources of data for surveillance. Another way to widen the net is to develop alternative
methods for conducting surveillance (e.g., using secondary sources of data). This method has
been used effectively for surveillance of influenza and certain injuries.
Shifting the burden. Another effective approach is to shift the burden for gathering data from
the health-care provider to the health department. In essence, this approach involves ongoing
surveys of providers to more completely identify cases of disease, and it has been demonstrated
to increase the number of cases and the proportion of identified-to-incident cases. Because health
Public Health Surveillance
Page 5-56
department staff contact health-care providers regularly, this approach also promotes closer
personal ties among providers and health department staff. As with surveys in general, this
approach is relatively expensive, and its cost-effectiveness is not entirely clear. In practice, it is
usually limited to disease elimination programs, short-term intensive investigation and control
activities, or seasonal problems (e.g., certain arboviral diseases).
Public Health Surveillance
Page 5-57
Exercise Answers
Exercise 5.1
Public health importance of chlamydia
Incidence Estimated to be 2.8 million new cases each year in the United
States.
Severity Approximately 40% of infected, untreated women experience
pelvic inflammatory disease. Five-fold increase in risk among
women of experiencing HIV infection, if exposed.
Mortality caused by chlamydia Ectopic pregnancy, a potential complication of chlamydial
infection, can cause death, but frequency is unknown.
Socioeconomic impact Complications of chlamydial infections among women have
impact on their reproductive ability and can cause chronic
illness among certain women, resulting in an undue burden on
them, their families, and the health-care system.
Communicability Passed person to person through sexual contact or from
mother to baby during birth.
Potential for an outbreak Varies with population sexual activity and practices, as well as
underlying prevalence.
Public perception and concern Not described in fact sheet provided. Different readers might
have differing perceptions of the level of public concern.
International requirements None.
Ability to prevent, control, or treat chlamydia
Preventability Preventable by sexual abstinence, sexual contact with
uninfected partners, and use of latex male condoms.
Control measures and treatment Secondary prevention through annual screening for
chlamydia, which is recommended for all sexually active
women aged ≤25 years. An annual screening test is also
recommended for women aged ≥25 years who have risk
factors for chlamydia (e.g., a new sex partner or multiple sex
partners). All pregnant women should have a screening test
for chlamydia. Chlamydia is highly responsive to antibiotic
treatment. Sexual partners should be evaluated, tested, and
treated, if infected.
Public Health Surveillance
Page 5-58
Capacity of health-care system to implement control measures for Chlamydia
Speed of response Disease is often asymptomatic, resulting in delayed diagnosis.
Annual screening for chlamydia is recommended for all
sexually active women aged ≤25 years and for women aged
≥25 years who have risk factors for chlamydia.
Economics Treatment is typically through the health-care system, and the
costs are paid by insurers, employers, or the government.
Follow-up of patients to identify contacts is the responsibility
of the health department. Given the frequency of the disease,
this might require substantial resources that are not be
available in certain places.
Availability of resources Dependent on location.
What does surveillance for
this event require?
Screening and diagnosis of men and women with chlamydial
disease and then reporting of disease by health-care providers
to the state health department by using a standard form. The
percentage of women who actually receive recommended
screening is unknown. Surveillance can also be conducted by
using reporting of positive diagnostic tests by laboratory
facilities.
Advantages
• Surveillance provides an estimate of the true prevalence of this important but often
overlooked condition.
• Infection is treatable, and transmission is preventable.
• Untreated chlamydial infection is a major cause of pelvic inflammatory disease and
infertility.
• Surveillance can be conducted through routine laboratory reporting of all positive tests for
chlamydia, which might reduce the reporting burden on health-care providers.
Disadvantages
• Clinicians might ignore the requirement to report chlamydia, even if it is added to the list
of notifiable diseases, if they believe the list is already too long. They might believe they
should only be required to report communicable diseases with statistically significant
morbidity or mortality that can lead to immediate intervention by the health department.
• Clinicians might not adhere to screening recommendations, and therefore, recognition of
disease might be low.
• Adding chlamydia to the list will not lead to better diagnosis and treatment, because the
majority of infections are asymptomatic.
Exercise 5.2
Asthma is a chronic illness that can vary in severity. Using just one source of data or just one
dataset to monitor it provides limited knowledge of its extent and the potential effect of treatment
and other interventions on it. Thus, using multiple sources of data with information on asthma's
Public Health Surveillance
Page 5-59
incidence, prevalence, morbidity, and mortality is the best way to conduct surveillance for this
illness.
• Self-reported asthma prevalence or attacks provides information on its occurrence among
the entire population, even those who might not seek or receive medical care for it.
• The majority of cases of asthma requiring medical attention are observed in physician
offices, emergency departments, or outpatient clinics. Thus, obtaining information from
these sources provides optimal knowledge of its occurrence and morbidity among the
majority of persons.
• Severe episodes of illness can require hospitalization and be an indicator that routine
treatment in outpatient settings is not being delivered effectively to the whole population.
Thus, data on hospitalizations caused by asthma is helpful in monitoring effectiveness of
interventions.
• Deaths from asthma are similar to hospitalizations and might represent a failure of the
health-care system to deal effectively with the illness.
In addition to the usefulness of different sources, as described previously, certain advantages and
disadvantages of different methods of gathering data from these sources are described in the
following sections.
Surveys
Advantages
• More control over the quality of the data.
• More in-depth data possibly collected on each case than is usually possible with
notifications.
• Can identify the spectrum of illness, including cases that do not warrant medical care.
• More accurate assessment of true incidence and prevalence.
Disadvantages
• More costly to perform because surveys usually require development of de-novo data-
collection systems and hiring of interviewers who require training and supervision.
• Might represent only a single point in time (“snapshot''), if survey is not periodically
repeated; might miss seasonal trends, rare diseases, or rapidly fatal diseases.
• Recall bias more likely to affect results because data collected retrospectively
(notifications are usually prospective).
Notifications (Reporting of illness by health-care providers)
Advantages
• Cheaper (for the health department).
• Typically use existing systems and health-care personnel for collecting data.
• Allows monitoring of trends over time.
• Ongoing data collection might allow collection of an adequate number of cases to study
those at risk. With surveys, an event might be too infrequent to gather enough cases for
study; with notifications, the observation period can be extended until sufficient numbers
of cases are collected.
Disadvantages
• Might not provide a representative picture of the incidence or prevalence unless care is
taken in selecting reporting sites and ensuring complete reporting.
Public Health Surveillance
Page 5-60
• Data that can be collected are limited by the skill, time, and willingness of the data
collectors, who usually have other responsibilities.
• Quality control might be a major problem in data collection.
• The quality of data might vary among collection sites.
• As a result, notifications usually provide a substandard estimate of the true incidence and
prevalence.
An alternative to notification might be to enroll interested and appropriate health-care providers
and clinics in a sentinel system to gather case numbers of asthma.
Exercise 5.3
Factors that influence the choice of one source of data or one dataset over another include
severity of illness (e.g., hospitalization and mortality); need for laboratory confirmation of
diagnosis; rarity of the condition; specialization, if any, of the health-care providers who
commonly examine patients with the condition under surveillance; quality, reliability, or
availability of relevant data; and timeliness of the data in terms of need for response.
Listeriosis: A wide spectrum of nonspecific clinical illness and a low case fatality rate exists
(except among newborns and immunocompromised persons). Therefore, surveillance should be
based on morbidity rather than mortality data; diagnoses should be confirmed in the laboratory.
Possible sources of surveillance data include laboratory reports, hospital discharge data (although
patients with listeriosis are often not hospitalized), or adding listeriosis to the notifiable disease
list.
Spinal cord injury: This is a severe health event with substantial mortality; almost all persons
who sustain a spinal cord injury are brought to a hospital. Therefore, surveillance would most
logically be based on hospital records and mortality data (e.g., death certificates or medical
examiner data). Special efforts might be directed to obtaining data from regional trauma centers.
Using data from emergency medical services and rehabilitation centers might also be explored.
Lung cancer among nonsmokers: Similar to spinal cord injury, lung cancer is a severe health
event with high morbidity and mortality. Unfortunately, hospital discharge records and vital
records do not routinely provide smoking information. For this condition, cancer registries might
provide the best opportunity for surveillance, if smoking information is routinely collected.
Alternatively, surveillance might be established by using interested internists, oncologists, and
other health-care providers likely to interact with lung cancer patients.
Exercise 5.4
Possible explanations for the sudden increase include those listed in the following. Each
possibility should be investigated before deciding that the increase is a true increase in incidence.
1. Change in surveillance system or policy of reporting.
2. Change in case definition.
3. Improved or incorrect diagnosis.
Public Health Surveillance
Page 5-61
• New laboratory test.
• Increased physician awareness of the need to test for tuberculosis, new physician in town,
and so forth.
• Increase in publicity or public awareness that might have prompted persons or parents to
seek medical attention for compatible illness.
• New population subgroup (e.g., refugees) in state A who have previous recent vaccination
against tuberculosis using the bacille de Calmette-Guérin (BCG) vaccine.
• New or untrained staff conducting testing for tuberculosis and incorrect interpretation of
skin reaction to tuberculin.
4. Increase in reporting (i.e., improved awareness of requirement to report).
5. Batch reporting (unlikely in this scenario).
6. True increase in incidence.
Exercise 5.5
No right answer exists, but one set of tables for health department staff might be as follows:
Table 1. Number of reported cases of each notifiable disease this week for each county in the
state.
Table 2. Number of reported cases of each notifiable disease by week for the entire state for the
current and the previous 6–8 weeks for comparison.
Table 3. Number of reported cases of each notifiable disease for the past 4 weeks (current week
and previous 3 weeks) and for comparison, the number of cases during the same
period during the previous 5 years.
Table 1 addresses disease occurrence by place. Tables 2 and 3 address disease occurrence by
time. Together, these tables should provide an indication of whether an unusual cluster or pattern
of disease is occurring. If such a pattern is detected, person characteristics might then be
explored.
A report for health-care providers does not need to be distributed as frequently and does not need
to include all of the notifiable diseases. One approach might be to distribute a report every 6
months and include notifiable diseases that have demonstrated substantial change since the last
report, with a discussion of possible causes for the change. Maps of the geographic distribution
and figures illustrating the trends over time of selected diseases might be more appealing and
informative to health-care providers than tables of frequencies. Information on the diagnosis and
treatment of highlighted diseases might also be of interest to health-care providers.
Reports for the media and public typically should be issued to inform them of outbreaks, of new
diseases, or of diseases of particular concern. These reports should include basic information
about the diseases, the location and frequency of their occurrence, and information on
recognition, prevention, and treatment of the diseases.
Exercise 5.6
State health department newsletters do not always go to all those who have a need to know. Even
among those who receive the newsletter, some do not read it, and many others skim the articles
Public Health Surveillance
Page 5-62
and ignore the tables. In addition, depending on the timing of the laboratory report and
publication deadlines, the information might be delayed by weeks or months.
This information about finding rabid raccoons in a residential area is important for those who
might be affected and for those who might be able to take preventive measures, including the
following:
• Other public health agencies (e.g., neighboring local health departments or animal control
staff) — Contact and inform by telephone or e-mail message.
• Health-care providers serving the population in the affected area — Contact and inform
through a special mailing.
• Veterinarians — Inform through a mailing so that they can be on alert for pets that might
have come into contact with rabid wildlife; veterinarians can provide specimens, as
appropriate, of both wild animals and pets to the state laboratory for testing for rabies.
• The public — Inform by issuing press release to the media asking the public to avoid wild
animals and to have their pets vaccinated.
Public Health Surveillance
Page 5-63
SELF-ASSESSMENT QUIZ
Now that you have read Lesson 5 and have completed the exercises, you
should be ready to take the self-assessment quiz. This quiz is designed to
help you assess how well you have learned the content of this lesson. You
may refer to the lesson text whenever you are unsure of the answer.
Unless instructed otherwise, choose ALL correct answers for each question.
1. As described in this lesson, public health surveillance includes which activities?
A. Data collection.
B. Data analysis.
C. Data interpretation.
D. Data dissemination.
E. Disease control.
2. Current public health surveillance targets which of the following?
A. Chronic diseases.
B. Communicable diseases.
C. Health-related behaviors.
D. Occupational hazards.
E. Presence of viruses in mosquitoes.
3. Public health surveillance can be described primarily as which of the following?
A. A method to monitor occurrences of public health problems.
B. A program to control disease outbreaks.
C. A system for collecting health-related information.
D. A system for monitoring persons who have been exposed to a communicable disease.
4. Public health surveillance is only conducted by public health agencies.
A. True.
B. False.
5. Common uses and applications of public health surveillance include which of the following?
A. Detecting individual persons with malaria so that they can receive prompt and
appropriate treatment.
B. Helping public health officials decide how to allocate their disease control resources.
C. Identifying changes over time in the proportion of children with elevated blood lead
levels in a community.
D. Documenting changes in the incidence of varicella (chickenpox), if any, after a law
requiring varicella vaccination took effect.
6. Data collected through which of the following methods is commonly used for surveillance?
A. Vital registration.
B. Randomized clinical trials.
C. Disease notifications.
D. Population surveys.
Public Health Surveillance
Page 5-64
7. Health-care providers might be important sources of surveillance data used by public health
officials, and they should receive feedback to close the surveillance loop as a courtesy;
however, the results almost never have any relevance to patient care provided by those
health-care providers.
A. True.
B. False.
8. Vital statistics are important sources of data on which of the following?
A. Morbidity.
B. Mortality.
C. Health-related behaviors.
D. Injury and disability.
E. Outpatient health-care usage.
9. Vital statistics provide an archive of certain health data. These data do not become
surveillance data until they are analyzed, interpreted, and disseminated with the intent of
influencing public health decision-making or action.
A. True.
B. False.
10. Key sources of morbidity data include which of the following?
A. Environmental monitoring data.
B. Hospital discharge data.
C. Laboratory results.
D. Notifiable disease reports.
E. Vital records.
11. Notifiable disease surveillance usually focuses on morbidity from the diseases on the list and
does not cover mortality from those diseases.
A. True.
B. False.
12. The list of diseases that a physician must report to the local health department is typically
compiled by the . . .
A. Local health department.
B. State health department.
C. Centers for Disease Control and Prevention (CDC).
D. Council of State and Territorial Epidemiologists (CSTE).
E. Medical licensing board.
13. A physician working in an emergency room in Town A, USA, has just examined a tourist
from Southeast Asia with watery diarrhea. The physician suspects the man might have
cholera. The physician should notify the . . .
A. Local (town or county) health agency.
B. State health department.
C. Centers for Disease Control and Prevention (CDC).
D. U.S. Department of State.
E. Washington, D.C., embassy of country of origin (ask for health attaché).
Public Health Surveillance
Page 5-65
14. Use the following choices for Questions 14a–e.
A. Notifiable disease surveillance
B. Surveillance for consumer product-related injuries
C. Both.
D. Neither.
14a. ____ State-based, with subsequent reporting to CDC.
14b. ____ Focused on identifying individual cases.
14c. ____ Can monitor trends over time.
14d. ____ Based on statistically valid sample.
14e. ____ Complete, unbiased reporting.
15. Evaluating and improving surveillance should address which of the following?
A. Purpose and objectives of surveillance.
B. Resources needed to conduct surveillance.
C. Effectiveness of measures for controlling the disease under surveillance.
D. Presence of characteristics of well-conducted surveillance.
16. Criteria for prioritizing health problems for surveillance include which of the following?
A. Incidence of the problem.
B. Public concern about the problem.
C. Number of previous studies of the problem.
D. Social and economic impact of the problem.
17. Use the following choices for Questions 17a–d.
A. Surveillance based on a specific case definition for a disease (e.g., listeriosis).
B. Syndromic surveillance based on symptoms, signs, or other characteristics of a disease,
rather than specific clinical or laboratory diagnostic criteria.
C. Both.
D. Neither.
17a. ____ Watches for individual cases of disease of public health importance.
17b. ____ Watches for diseases that might be caused by acts of biologic or chemical
terrorism.
17c. ____ Can watch for disease before a patient seeks care from a health-care provider.
17d. ____ Requires little effort on the part of the health department.
18. Routine analysis of notifiable disease surveillance data at the state health department might
include looking at the number of cases of a disease reported this week . . .
A. and during the previous 2–4 weeks.
B. and the number reported during the comparable weeks of the previous 2–5 years.
C. simultaneously by age, race, and sex of the patient.
D. by county.
E. by county, divided by each county’s population (i.e., county rates).
Public Health Surveillance
Page 5-66
19. One week, a state health department received substantially more case reports of a disease
in one county than had been reported during the previous 2 weeks. No increase was
reported in neighboring counties. Possible explanations for this increase include which of the
following?
A. An outbreak in the county.
B. Batch reports.
C. Duplicate reports.
D. Increase in the county’s population.
E. Laboratory error.
20. The primary reason for preparing and distributing periodic surveillance summaries is which
of the following?
A. Document recent epidemiologic investigations.
B. Provide timely information on disease patterns and trends to those who need to know it.
C. Provide reprints of MMWR articles, reports, and recommendations.
D. Acknowledge the contributions of those who submitted case reports.
21. Use the following choices for Questions 21a–b.
A. Predictive value positive.
B. Sensitivity.
C. Specificity.
D. Validity.
21a. ____ Surveillance detected 23 of 30 actual cases of a disease.
21b. ____ Of 16 statistically significant aberrations (deviations from baseline) detected by
syndromic surveillance, only one represented an actual outbreak of disease.
22. Underreporting is not a problem for detecting outbreaks of notifiable diseases because the
proportion of cases reported tends to remain relatively stable over time.
A. True.
B. False.
23. Initiating surveillance for a public health problem or adding a disease to the notifiable
disease list is justified for which of the following reasons?
A. If it is a communicable disease with a high case-fatality rate.
B. If the problem is new and systematically collected data are needed to characterize the
disease and its impact on the public.
C. If a program at CDC has recommended its addition to better understand national trends
and patterns.
D. To guide, monitor, and evaluate programs to prevent or control the problem.
24. The case definition used for surveillance of a health problem should be the same as the
case definition used for clinical (treatment) purposes.
A. True.
B. False.
Public Health Surveillance
Page 5-67
25. A state health department decides to strengthen its notifiable disease reporting. The one
best action to take is to . . .
A. allow reporting through use of the Internet.
B. require more disease-specific forms from local health departments.
C. ensure that all persons with a responsibility to report understand the requirements and
reasons for reporting and how reports will be used.
D. reduce the number of diseases on the list.
Public Health Surveillance
Page 5-68
Answers to Self-Assessment Quiz
1. A, B, C, D. The term public health surveillance includes data collection, analysis,
interpretation, and dissemination to help guide health officials and programs in directing
and conducting disease control and prevention activities. However, surveillance does not
include control or prevention activities themselves.
2. A, B, C, D, E. Current public health surveillance targets health-related conditions among
humans, including chronic diseases (e.g., cancer), communicable diseases (e.g., those on
the notifiable disease list), health-related behaviors, and occupationally related conditions
(e.g., black lung disease and other pneumoconioses). Surveillance also focuses on
indicators of disease potential (e.g., such diseases among animals as rabies) or presence
of an infectious agent among animals or insects (e.g., West Nile virus among mosquitoes).
3. A. Public health surveillance can be thought of as one of the methods that a community
has available to monitor the health among its population by detecting problems,
communicating alerts as needed, guiding the appropriate response, and evaluating the
effect of the response. Surveillance should not be confused with medical surveillance,
which is monitoring of exposed persons to detect early evidence of disease. Public health
surveillance is the continued watchfulness for public health problems; it is not a data-
collection system.
4. B (False). The practice of surveillance is not limited to public health agencies. Hospitals,
nursing homes, the military, and other institutions have long conducted surveillance of their
populations.
5. A, B, C, D. Among the uses of surveillance are detecting individual cases of diseases of
public health importance (e.g., malaria), supporting planning (e.g., priority setting),
monitoring trends and patterns of health-related conditions (e.g., elevated blood lead
levels), and supporting evaluation of prevention and control measures (e.g., a vaccination
requirement).
6. A, C, D. Data collected through vital registration, disease notifications, and population
surveys are commonly used for surveillance of health-related problems. Data from
randomized clinical trials typically cover only a specially selected population and are used
to answer specific questions about the effectiveness of a particular treatment. They are
not useful for surveillance.
7. B (False). One of the important uses of surveillance data and one of the key reasons to
close the surveillance loop by disseminating surveillance data back to health-care
providers, is to provide clinically relevant information about disease occurrence, trends,
and patterns. For example, health departments alert clinicians to the presence of new
diseases (e.g., severe acute respiratory syndrome [SARS]) and provide information so that
clinicians can make diagnoses. Health departments also advise clinicians about changing
patterns of antibiotic resistance so that clinicians can choose the right treatment regimen.
Public Health Surveillance
Page 5-69
8. B. Vital statistics refer to data on birth, death, marriage, and divorce. Therefore, vital
statistics are the primary source of data on mortality, but not on morbidity (illness),
behaviors, injury (other than fatal injuries), and health-care usage. Before development of
population health surveys and disease registries and the use of health-care records to
assess morbidity, vital statistics were the primary source of data on the health of
populations. During recent years, administrative, financial, and other health-care–related
records have supplemented the information from vital statistics, especially for assessing
morbidity within populations. National, state, and local population-based health surveys,
some of which are conducted on a regular or continuing basis, provide another important
part of our view of the health of populations.
9. A (True). Vital statistics are usually thought of as an archive of births, deaths, marriages,
and divorces. Vital statistics offices in health departments typically are not linked to
disease prevention and control activities. However, surveillance for certain health
problems might rely on vital statistics as its primary source of data. When these data
undergo timely and systematic analysis, interpretation, and dissemination with the intent
of influencing public health decision-making and action, they become surveillance data.
10. B, C, D. Sources of morbidity (illness) data include notifiable disease reports, laboratory
data, hospital discharge data, outpatient health-care data, and surveillance for specific
conditions (e.g., cancer). Vital records are an important source of mortality data, and even
though a patient first gets sick from a disease before dying from it, vital records are not
regarded as a source of data for the surveillance of morbidity from the disease.
Environmental monitoring is used to evaluate disease potential or risk.
11. B (False). Notifiable disease surveillance targets occurrence or death from any of the
diseases on the list.
12. B. The list of nationally notifiable diseases is compiled by the Council of State and
Territorial Epidemiologists (CSTE) and the Centers for Disease Control and Prevention. The
list of notifiable diseases that physicians must report to their state or local health
department is set by the state, either by the state legislature, the state board of health,
the state health department, the state health officer, or the state epidemiologist. CSTE
votes on the diseases that should be nationally notifiable, but the states have the ultimate
authority whether to add any newly voted diseases to their state list.
13. A or B, depending on the state. The agency that a physician should notify is determined
by the state, just as the list of notifiable diseases is set by the state (see answer to
question 12). The manner in which notification should occur and how rapidly reports
should be made are also defined by the state and can vary by disease. For example, the
state might require that a case of cholera be reported immediately by telephone or fax to
the local or state health department, whereas reporting of varicella (chickenpox) might
only be required monthly, by using a paper form. Regardless of the disease and reporting
requirements, reporting should proceed through established channels. In certain states,
physicians should notify the county health department, which will then notify the state
health department, which will notify CDC, which will notify the World Health Organization.
In states with no or limited local health departments, physicians are usually required to
notify the state health department. The seriousness of the disease might influence how
rapidly these communications take place but should not influence the sequence.
Public Health Surveillance
Page 5-70
14a. A. Notifiable disease surveillance is state-based, with subsequent reporting to CDC.
Surveillance for consumer product-related injuries is hospital emergency department-
based with subsequent reporting to the Consumer Product Safety Commission.
14b. A. Notifiable disease surveillance attempts to identify every case of a notifiable disease.
Surveillance for consumer product-related injuries relies on a sample of hospital
emergency departments to characterize the incidence and types of these injuries.
14c. C. Because surveillance for notifiable diseases and surveillance for consumer product-
related injuries are both ongoing, both can monitor trends over time.
14d. B. Surveillance for consumer product-related injuries is based on a statistically valid
sample of hospital emergency departments in the United States. Notifiable disease
surveillance covers the entire population.
14e. D. Neither approach to surveillance is perfect. Underreporting is a serious problem in the
majority of states for notifiable disease surveillance. Surveillance for consumer product-
related injuries is based on visits to a sample of emergency departments; therefore,
persons who do not seek care at an emergency department are not represented.
15. A, B, D. Evaluation of surveillance for a health-related problem should include review of
the purpose and objectives of surveillance, the resources needed to conduct surveillance
for the problem, and whether the characteristics of well-conducted surveillance are
present. Because surveillance does not have direct responsibility for the control of the
health problem, this is not part of evaluating a surveillance system. Whether effective
measures for preventing or controlling a health-related problem are available can be a
useful criterion in prioritizing diseases for surveillance.
16. A, B, D. The incidence of, public concern about, and social and economic impact of a
health problem are all important in assessing its suitability for surveillance. Although
previous studies of the problem might have helped to characterize its natural history,
cause, and impact, the number of such studies is not used as a criterion for prioritization.
17a. C (Both). Surveillance based on specific case definition for a disease attempts to identify
individual cases of disease of public health importance, and syndromic surveillance,
depending on its purpose, might also attempt to identify cases of disease of public health
importance. In certain situations, the goal of syndromic surveillance might be to identify
clusters or outbreaks (more cases than expected) of disease rather than individual cases.
17b. C (Both). Both syndromic surveillance and surveillance based on a specific case definition
for a disease can be used to watch for diseases caused by acts of biologic or chemical
terrorism. Which approach is used depends on the disease and the setting.
17c. B. Syndromic surveillance that targets sales of over-the-counter medications, calls to
hotlines, and school or work absenteeism all watch for disease before a patient seeks care
from a health-care provider. Surveillance based on a specific case definition for a disease
is usually based on reporting by a health-care provider.
Public Health Surveillance
Page 5-71
17d. D. Neither type of surveillance can function properly without attention and effort on the
part of the health department. Health department staff should review the case report
forms and conduct follow-up of cases reported through surveillance based on specific case
definitions for diseases. Health department staff should review the cases identified by
syndromic surveillance and determine whether they reflect true outbreaks or not.
Additionally, health department staff should compile and communicate the results. These
tasks are a minimum.
18. A, B, D, E. Analysis by time often includes comparison with previous weeks and previous
years. Analysis by place can include analysis of both numbers and rates. Routine analysis
by person includes age and sex, but a three-variable table of age by race and sex is
probably too much stratification for routine analysis.
19. A, B, C, D, E. An increase in case reports during a single week might represent a true
increase in disease (i.e., an outbreak). However, the increase can also represent an
increase in the population (e.g., from an influx of tourists, migrant workers, refugees, or
students); reporting of cases in a batch, particularly after a holiday season; duplicate
reports of the same case; laboratory or computer error; a new clinic or health-care
provider that is more likely to make a particular diagnosis or is more conscientious about
reporting; or other sudden changes in the method of conducting surveillance.
20. B. The primary purpose of preparing and distributing surveillance summaries is to provide
timely information about disease occurrence to those in the community who need to
know. The report also serves to motivate those who report by demonstrating that their
efforts are valued and to inform health-care providers and others in the community about
health department activities and general public health concerns.
21a. B. Sensitivity is the ability of surveillance (or laboratory tests or case definitions) to detect
a true case (or, for certain systems, a true outbreak). Specificity is the ability of
surveillance (or laboratory tests or case definitions) to rule out disease among persons
who do not have it.
21b. A. Predictive value positive is the proportion of patients (or outbreaks) detected by
surveillance who truly have the disease (or are true outbreaks). Predictive value positive is
a function of both the sensitivity of surveillance and the prevalence of the disease (or
prevalence of real outbreaks).
22. B (False). Underreporting is a serious problem for surveillance that relies on notifications.
Because the notifiable disease surveillance is supposed to identify individual cases of
disease of public health importance, underreporting of even a single case of, for example,
hepatitis A in a food handler, can result in an outbreak that should have been prevented.
Similarly, if a limited number of cases are reported at all, even outbreaks can be missed.
23. B, D. Initiating surveillance for a health-related problem can be justified for multiple
reasons. These reasons include if a disease is new and surveillance is the most effective
means for collecting information on cases to learn more about its clinical and
epidemiologic features (e.g., SARS); if a new prevention or control measure is about to be
implemented and surveillance is the most effective means for assessing its impact (e.g.,
Public Health Surveillance
Page 5-72
varicella vaccination regulations); or if surveillance is needed to guide, monitor, and
evaluate prevention or control measures. Surveillance is more difficult to justify if a
disease does not occur locally, even if it is a communicable disease with a high case
fatality rate (e.g., Ebola or Marburg virus infection), or simply because CDC requests it
(without funding).
24. B (False). A case definition for surveillance should be clear, understandable, acceptable,
and implementable by those who are required to apply it. However, it need not use the
same criteria that are used for clinical purposes. For example, health-care providers might
treat patients on the basis of clinical features without laboratory confirmation, whereas a
surveillance case definition might require confirmation, or vice versa.
25. C. The most important way to improve notifiable disease surveillance is to ensure that
everyone who is supposed to report knows
• that they are supposed to report,
• what to report (i.e., which diseases are on the list), and
• how, to whom, and how quickly to report.
In addition, they will be more likely to report if they know that the health department is
actually doing something with the reports. No data are available that demonstrate that
reporting through the Internet improves reporting; in fact, for certain health-care
providers, reporting might involve extra work. Requiring more disease-specific forms tends
to reduce reporting, because it requires more time and effort for those reporting.
Reducing the number of diseases on the list might be part of a strategy to improve
reporting, but it is not the most important way to do so.
Public Health Surveillance
Page 5-73
References
1. Merriam-Webster. Merriam-Webster's Dictionary of English Usage. Springfield (MA):
Merriam-Webster, Inc. 1976.
2. Langmuir AD. The surveillance of communicable diseases of national importance. N Engl
J Med 1963;268:182–92.
3. Thacker SB, Berkelman RL. Public health surveillance in the United States. Epidemiol Rev
1988;10:164-190.
4. Communicable Disease Center. Communicable Disease Center Activities 1952-1953.
Atlanta: Department of Health, Education, and Welfare; 1953. Public Health Service
Publication Number 391, p. 17.
5. World Health Organization. Report of the technical discussions at the twenty-first World
Health Assembly on 'national and global surveillance of communicable diseases.' Geneva:
World Health Organization; 18 May 1968, p. A21.
6. Thacker SB, Stroup DF, Parrish RG, Anderson HA. Surveillance in environmental public
health: issues, systems, and sources. Am J Public Health 1996;86:633–8.
7. Vaughan JP, Morrow RH. Manual of epidemiology for district health management.
Geneva: World Health Organization; 1989.
8. Wegman DH. Hazard Surveillance. In: Halperin W, Baker E, Monson R (editors). Public
Health Surveillance. New York: Van Nostrand Reinhold; 1992, pp. 62–75.
9. Protocol for the evaluation of epidemiological surveillance systems [monograph on the
Internet]. Geneva: World Health Organization [updated 1997; cited 2006 Jan 20].
Available from: http://whqlibdoc.who.int/hq/1997/WHO_EMC_DIS_97.2.pdf.
10. Hopkins RS. Design and operation of state and local infectious disease surveillance
systems. J Public Health Management Practice 2005;11(3):184–90.
11. Doherty JA. Establishing priorities for national communicable disease surveillance. Can J
Infect Dis 2000;11(1):21–4.
12. Rushdy A, O’Mahony M. PHLS overview of communicable diseases 1997: results of a
priority setting exercise. Commun Dis Rep CDR Suppl 1998;8 (suppl 5):S1–12.
13. Centers for Disease Control and Prevention. Case Definitions for Infectious Conditions
Under Public Health Surveillance. MMWR 1997;46(No. RR-10):1–55. .
14. Parrish RG, McDonnell SM. Sources of health-related information. In: Teutsch SM,
Churchill RE, editors. Principles and practice of Public Health Surveillance, 2nd
ed. New
York: Oxford University Press; 2000, pp. 30–75.
15. Groves RM, Fowler FJ, Couper MP, Lepkowski J, Singer E, Tourangeau R. Survey
methodology. New York: John Wiley; 2004.
Public Health Surveillance
Page 5-74
16. Hutwagner L, Thompson W, Seeman GM, Treadwell T. The bioterrorism preparedness and
response Early Aberration Reporting System (EARS). J Urban Health 2003;80:89–96.
17. Croner CM. Public health GIS and the Internet. Annu Rev Public Health 2003;24:57–82.
18. Guerra M, Walker E, Jones C, Paskewitz S, Cortinas MR, Stancil A, Beck L, Bobo M,
Kitron U. Predicting the risk of Lyme disease: habitat suitability for Ixodes scapularis in
the north central United States. Emerg Infect Dis. 2002;8:289–97.
19. SaTScan [Internet]. Boston: SaTScan [updated 2006 Aug 14] Available from:
http://www.satscan.org/.
20. Centers for Disease Control and Prevention [Internet]. Atlanta: CDC [updated 2005 Nov 8;
cited 2006 Jan 31]. EpiInfo. Available from: http://wwwn.cdc.gov/epiinfo/
21. The HealthMapper [Internet] Geneva: World Health Organization [updated 2006; cited
2006 Jan 31].
22. Centers for Disease Control and Prevention. Current Trends Update: Impact of the
expanded AIDS surveillance case definition for adolescents and adults on case reporting—
United States, 1993a. MMWR 1994;43:160–1,167–70.
23. Ryan CA, Nickels MK, Hargrett-Bean NT, et al. Massive outbreak of antimicrobial-
resistant salmonellosis traced to pasteurized milk. JAMA 1987;258:3269–74.
24. Friedman DJ, Parrish RG. Characteristics, desired functionalities, and datasets of state
webbased data query systems. J Public Health Management Practice 2006;12(2):119–129.
In press.
25. Henderson DA. Surveillance of smallpox. Int J Epidemiol 1976;5(1):19-28.
26. Centers for Disease Control and Prevention. Outbreak of West Nile-Like Viral
Encephalitis—New York, 1999. MMWR 1999;48(38):845–9.
27. Centers for Disease Control and Prevention. Updated guidelines for evaluating public
health surveillance systems: recommendations from the guidelines working group. MMWR
2001;50(No. RR-13):1–35.
28. Centers for Disease Control and Prevention. Framework for evaluating public health
surveillance systems for early detection of outbreaks; recommendations from the CDC
Working Group. MMWR 2004;53(No. RR-5):1-13.
29. World Health Organization Regional Office for Africa and the Centers for Disease Control
and Prevention. Technical Guidelines for Integrated Disease Surveillance and Response in
the African Region. Harare, Zimbabwe and Atlanta, Georgia, USA. July 2001: 1–229.
30. Hopkins RS. Consumer product-related injuries in Athens, Ohio, 1980-85: assessment of
emergency room-based surveillance. Am J Prev Med 1989 Mar-Apr;5(2):104–12.
31. Schrieber, R.A., Branche-Dorsey, C.M., Ryan, G.W. et al. Risk factors for injuries from in-
line skating and the effectiveness of safety gear. N Engl J Med 1996;335:1630–1635.
Public Health Surveillance
Page 5-75
32. NEISS: The National Electronic Injury Surveillance System - A Tool for Researchers
[monograph on the Internet]. Washington (DC): U.S. Consumer Product Safety
Commission, Division of Hazard and Injury Data Systems [updated 2000 Mar; cited 2005
Dec 2]. Available from: http://www.cpsc.gov/neiss/2000d015.pdf.
33. Mannino DM, Homa DM, Pertowski CA, et al. Surveillance for asthma—United States,
1960–1995. In: Surveillance Summaries, April 24, 1998. MMWR 1998;47(No. SS- 1):1–28.
34. Mannino DM, Homa DM, Akinbami LJ, Moorman JE, Gwynn C, Redd SC. Surveillance
for Asthma—United States, 1980–1999. In: Surveillance Summaries, March 29, 2002.
MMWR 2002;51(No. SS-1):1–13.
35. Doyle TJ, Glynn MK, Groseclose SL. Completeness of notifiable infectious disease
reporting in the United States: an analytic literature review. Am J Epidemiol
2002;155:866– 74.
36. Rosenberg MJ, Marr JS, Gangarosa EJ, Pollard RA, Wallace M, Brolnitsky O. Shigella
surveillance in the United States, 1975. J Infect Dis 1977;136:458–60.
37. Mead PS, Slutsker L, Dietz V, et al. Food-related illness and death in the United States.
Emerg Infect Dis 1999;5:607–25.
38. Campos-Outcalt D, England R, Porter B. Reporting of communicable diseases by
university physicians. Public Health Rep 1991;106:579–83.
39. Marier R. The reporting of communicable diseases. Am J Epidemiol 1977;105:587–90.
40. Konowitz PM, Petrossian GA, Rose DN. The underreporting of disease and physicians'
knowledge of reporting requirements. Public Health Rep 1984;99:31–5.
41. Hajjeh R, Reingold A, Weil A, Shutt K, Schuchat A, Perkins BA. Toxic shock syndrome in
the United States: surveillance update, 1979–1996. Emerg Infect Dis 1999;5:807–10.
Further Reading
Buehler JW. Surveillance. In: Rothman KJ, Greenland S, editors. Modern Epidemiology, 2nd
ed.
Philadelphia: Williams and Wilkins; 1988, pp. 435–57.
Eylenbosch WJ, Noah ND, editors. Surveillance in health and disease. Oxford: Oxford
University Press; 1988.
Langmuir AD. Evolution of the concept of surveillance in the United States. Proc R Soc Med.
1971;64:681–4.
Langmuir AD. William Farr: founder of modern concepts of surveillance. Int J Epidemiol
1976;5(1):13–8.
Orenstein WA, Bernier RH. Surveillance: information for action. Pediatr Clin N Amer
1990;37:709–734.
Rothman KJ. Lessons from John Graunt. Lancet. 1996;347(8993):37–9.
Public Health Surveillance
Page 5-76
Sandiford P, Annett H, Cibulskis R. What can information systems do for primary health care?
An international perspective. Soc Sci Med 1992:34(10):1077–87.
Teutsch SM, Churchill RE, editors. Principles and practice of public health surveillance, 2nd
ed.
New York: Oxford University Press; 2000.
Websites
For more information
on:
Visit the following websites:
CDC Case Definitions http://www.cdc.gov/osels/ph_surveillance/nndss/casedef/index.htm
CPSC National Electronic Injury
Surveillance System (NEISS)
On-line
http://www.cpsc.gov/library/neiss.html
Emergency Preparedness and
Response: A-Z Index
http://emergency.cdc.gov/az/a.asp
FDA Adverse Event Reporting
System (AERS)
http://www.fda.gov/cder/aers/default.htm
Healthy People 2010: Tracking
Healthy People 2010: Part C.
Major Data Sources for Healthy
People 2010
http://www.cdc.gov/nchs/data/hpdata2010/tracking_healthy_people/part_c.pdf
MedWatch, The FDA Safety
Information and Adverse Event
Reporting Program
http://www.fda.gov/medwatch/index.html
National Health and Nutrition
Examination Survey
http://www.cdc.gov/nchs/nhanes.htm
Nationally Notifiable Infectious
Diseases
http://www.cdc.gov/osels/ph_surveillance/nndss/phs/infdis.htm
NCI cancer mortality maps &
graphs
http://ratecalc.cancer.gov/ratecalc/index.html
NCI SEER http://seer.cancer.gov/faststats/
NIDA DAWN http://www.samhsa.gov/data/DAWN.aspx
NIDA Monitoring the Future
Survey
http://www.drugabuse.gov/related-topics/trends-statistics/monitoring-future/
SAMHSA Drug Abuse Statistics http://www.samhsa.gov/data/
Summary of notifiable diseases
– United States, 2004
http://www.cdc.gov/mmwr/preview/mmwrhtml/mm5353a1.htm
World Health Organization
International Classification of
Diseases, 10th revision
http://www.who.int/classifications/icd/en/
Investigating an Outbreak
Page 6-1
INVESTIGATING AN OUTBREAK
Public health department staff responsible for reviewing disease report
forms notice that the number of forms for shigellosis seems higher than
usual this week. Someone from a nursing home calls to report several cases
of pneumonia among its residents. Is the number of cases in either of these
situations actually higher than usual? What should be used to estimate
“usual?” If it is higher than usual, should the health department staff call
the situation a cluster, an outbreak, an epidemic? Is a field investigation needed? What criteria
should they use to decide? And if they decide that a field investigation is indeed warranted, how
do they go about conducting such an investigation? These and related questions will be
addressed in this lesson.
Objectives
After studying this lesson and answering the questions in the exercises, you will be able to:
• List the reasons that health agencies investigate reported outbreaks
• List the steps in the investigation of an outbreak
• Define cluster, outbreak, and epidemic
• Given the initial information of a possible disease outbreak, describe how to determine
whether an epidemic exists
• State the purpose of a line listing
• Given information about a community outbreak of disease, list the initial steps of an
investigation
• Given the appropriate information from the initial steps of an outbreak investigation,
develop biologically plausible hypotheses
• Draw and interpret an epidemic curve
• Given data in a two-by-two table, calculate the appropriate measure of association
Major Sections
Introduction to Investigating an Outbreak...................................................................................... 2
Steps of an Outbreak Investigation................................................................................................. 8
Summary....................................................................................................................................... 57
3136
Investigating an Outbreak
Page 6-2
Introduction to Investigating an Outbreak
To uncover outbreaks:
• Review routinely
collected surveillance
data
• Astutely observe single
events or clusters by
clinicians, infection
control practitioners, or
laboratorians
• Review reports by one
or more patients or
members of the public
Uncovering outbreaks
Outbreaks of disease — the occurrence of more cases than expected
— occur frequently. Each day, health departments learn about cases
or outbreaks that require investigation. While CDC recorded over
500 outbreaks of foodborne illness alone each year during the
1990s,1
recognized outbreaks of respiratory and other diseases are
also common, and many more outbreaks may go undetected.
So how are outbreaks uncovered? One way is to analyze
surveillance data — reports of cases of communicable diseases that
are routinely sent by laboratories and healthcare providers to health
departments (see Lesson 5). Some health departments regularly
review exposure information from individual case reports to look for
common factors. For example, health department staff in Oregon
uncovered an outbreak of E. coli O157:H7 in 1997 by noticing that
three patients with the infection all had reported drinking raw milk.2
Alternatively, outbreaks may be detected when health department
staff conduct regular, timely analysis of surveillance data that
reveals an increase in reported cases or an unusual clustering of
cases by time and place. For example, by analyzing data from four
different syndromic surveillance systems, health department staff in
New York City noted a consistent increase in gastroenteritis in the
days following a prolonged blackout in August 2003.3
Investigation
indicated that the increase in gastroenteritis was probably
attributable to the consumption of meat that had spoiled during the
power failure.
Review of surveillance data to detect outbreaks is not limited to
health departments. Many hospital infection control practitioners
review microbiologic isolates from patients by organism and ward
each week to detect an increase in the number of, say, surgical
wound infections or nosocomial (hospital-acquired) cases of
legionellosis. In the same way, staff at CDC regularly review
laboratory patterns of organisms and are able to detect clusters of
illness caused by the same organism, even if the victims are
geographically scattered.4
Nonetheless, most outbreaks come to the attention of health
authorities because an alert clinician is concerned enough to call the
health department. The emergence of West Nile virus infection in
North America in 1999 was uncovered only after the New York City
health department responded to a call from a physician who had
recently seen two patients with encephalitis.5
Similarly, a single case
Investigating an Outbreak
Page 6-3
of inhalational anthrax of suspicious origin in Florida in 2001
resulted in a massive investigation involving multiple government
agencies, but it all started with an astute diagnosis and prompt report
to the health department by a physician.6
Epidemic: the occurrence
of more cases of disease
than expected in a given
area or among a specific
group of people over a
particular period of time.
Usually, the cases are
presumed to have a
common cause or to be
related to one another in
some way
Outbreak: epidemic limited
to localized increase in the
incidence of disease
Cluster: aggregation of
cases in a given area over
a particular period without
regard to whether the
number of cases is more
than expected
Another reporting source for apparent clusters of both infectious and
noninfectious disease is patients or other members of the
community. For example, an individual may call the health
department and report that she and some friends came down with
severe gastroenteritis after attending a banquet a night or two earlier.
Similarly, a local citizen may call about several cases of cancer
diagnosed among his neighbors and express concern that these are
more than coincidental. Most health departments have routine
procedures for handling calls from the public regarding potential
communicable disease outbreaks, and some states have guidelines
for how to respond to noninfectious disease cluster reports.7-9
Deciding whether to investigate a possible outbreak
Different health departments respond to these reports in different
ways. The decisions regarding whether and how extensively to
investigate a potential outbreak depend on a variety of factors.
These usually include some factors related to the health problem,
some related to the health department, and some related to external
concerns. Factors related to the problem itself include the severity
of the illness, the number of cases, the source, mode or ease of
transmission, and the availability of prevention and control
measures. Most local health departments are more likely to
investigate an apparent outbreak when the number of affected (or
exposed) persons is large, when the disease is severe (serious
illness with high risk of hospitalization, complications, or death),
when effective control measures exist, and when the outbreak has
the potential to affect others unless prompt control measures are
taken. For example, a single case of gastroenteritis is unlikely to
prompt a field investigation, but a cluster of cases may. On the
other hand, even a single case of botulism is likely to be
investigated immediately to identify and eliminate the source,
because it is both potentially fatal and preventable, and the source
can usually be identified. At the state or national level, the unusual
presentation of disease may spur an investigation. Occurrence of a
new or rare disease or a change in the pattern of disease in an area
is more likely to prompt an investigation than occurrence of a
common disease with well-established transmission patterns and
control measures.
However, field investigations place a burden on a health
department, so the decision also hinges on the availability of staff
Investigating an Outbreak
Page 6-4
and resources, and competing priorities. In addition, some health
departments have a practice of aggressively investigating
outbreaks and hence have experience in doing so, while other
health departments may lack such experience.
Regardless, field investigations are usually justified for one or
more of the following reasons:
• Control or prevention of the health problem
• Opportunity to learn (research opportunity)
• Public, political, or legal concerns
• Public health program considerations
• Training
Each of these reasons is discussed in more detail below.
Control and prevention
The most important public health reasons for investigating an
outbreak are to help guide disease prevention and control
strategies. These disease control efforts depend on several factors,
including knowledge of the agent, the natural course of the
outbreak, the usual transmission mechanism of the disease, and
available control measures. For example, if a health department
learns of an outbreak of hepatitis A (known agent) in which one of
the victims is a restaurant cook, the department can offer immune
globulin to the restaurant patrons to prevent a second wave of
cases (control measure), but only if they are within 14 days of
exposure (timing). On the other hand, if an outbreak appears to be
almost over, the health agency may not need to implement control
measures, but may be interested in identifying factors that
contributed to the outbreak in order to develop strategies to prevent
similar outbreaks in the future. For that outbreak of hepatitis A,
investigators may find that the poor personal hygiene that led to
the outbreak was the result of lack of soap or water in the
workplace washroom, which could be addressed in public health
messages to other worksites.
The balance between control measures and further investigation
depends on how much is known about the cause, the source, and
the mode of transmission of the agent.10
Table 6.1 illustrates how
public health emphasis on investigation versus control is
influenced by these factors. In particular, if the source and/or mode
of transmission are known, then control measures that target the
source or interrupt transmission can be implemented. If the source
and/or mode of transmission are not known, then you can’t know
what control measures to implement, so investigation takes
priority.
Investigating an Outbreak
Page 6-5
Table 6.1 Relative Priority of Investigative and Control Efforts During an Outbreak, Based on
Knowledge of the Source, Mode of Transmission, and Causative Agent
Source/Mode of Transmission
(How people are getting exposed to the agent)
Known Unknown
Causative Agent
Known
Investigation +
Control +++
Investigation +++
Control +
Unknown
Investigation +++
Control +++
Investigation +++
Control +
+++ = highest priority
+ = lowest priority
Source: Goodman RA, Buehler JW, Koplan JP. The epidemiologic field investigation: science and judgment in public health practice.
Am J Epidemiol 1990;132:9–16.
Opportunity to learn (research opportunity)
Another important objective of many outbreak investigations is to
advance research. For most public health problems, health officials
cannot conduct randomized trials. We cannot randomize who eats
the undercooked hamburger or sits near the ice resurfacing
machine that emits carbon monoxide, nor should we randomize
who receives preventive health benefits (e.g., mammogram
screening). However, we can take advantage of what has already
happened and learn from it. Some view an outbreak as an
experiment of nature waiting to be analyzed and exploited. For a
newly recognized disease, field investigation provides an
opportunity to characterize the natural history — including agent,
mode of transmission, and incubation period — and the clinical
spectrum of disease. Investigators also attempt to characterize the
populations at greatest risk and to identify specific risk factors.
Acquiring such information was an important motivation for
investigators studying such newly recognized diseases as
Legionnaires’ disease in Philadelphia in 1976, AIDS in the early
1980s, hantavirus in 1993, severe acute respiratory syndrome
(SARS) in 2003, and avian flu in 2005.
Even for diseases that are well characterized, an outbreak may
provide opportunities to gain additional knowledge by assessing
the impact of control measures and the usefulness of new
epidemiology and laboratory techniques. For example, outbreaks
of varicella (chickenpox) in highly immunized communities
allowed investigators to determine effectiveness of the new
vaccine and immunization recommendations.11,12
An outbreak of
giardiasis provided the opportunity to study the appropriateness of
a clinical case definition,13
while an outbreak of rotavirus was used
to study the performance of a novel diagnostic method.14
With
increased access to the Internet and e-mail in the 1990s, outbreak
Investigating an Outbreak
Page 6-6
investigations were used to evaluate whether potential controls
would respond to e-mail solicitations to participate.15-17
Public, political, or legal concerns
Public, political, or legal concerns can be the driving force behind
the decision to conduct an investigation. A cluster of cancer cases
in a neighborhood may prompt concerned residents to advocate for
an investigation. Sometimes the public is concerned that the
disease cluster is the result of an environmental exposure such as
toxic waste. Investigations of such clusters almost never identify a
causal link between exposure and disease.18,19
Nevertheless, many
health departments have learned that they must be “responsibly
responsive” to public concerns, even if they think that an
epidemiologic link is unlikely.7,8,20
Similarly, the public may fear
that an outbreak is the result of an intentional criminal or
bioterrorist act. The health department may be able to allay those
fears by documenting that the outbreak was the result of an
inadvertent or naturally occurring exposure.
Some investigations are conducted because they are required by
law. For example, CDC’s National Institute for Occupational
Safety and Health (NIOSH) is required to evaluate the risks to
health and safety in a workplace if requested to do so by a union,
three or more workers, or an employer.21
Program considerations
Many health departments run programs to control and prevent
communicable diseases such as influenza, tuberculosis, vaccine-
preventable diseases, and sexually transmitted diseases. An
outbreak of a disease targeted by a public health program may
reveal a weakness in that program and an opportunity to change or
strengthen program efforts. Investigating the outbreak’s causes
may identify populations that have been overlooked, failures in
intervention strategies, or changes in the agent. Using the outbreak
to evaluate program effectiveness can help program directors
improve future directions and strategies.
Training
Investigating an outbreak requires a combination of diplomacy,
logical thinking, problem-solving ability, quantitative skills,
epidemiologic know-how, and judgment. These skills improve
with practice and experience. Thus, many investigative teams pair
a seasoned epidemiologist with an epidemiologist-in-training. The
latter gains valuable on-the-job training and experience while
providing assistance in the investigation and control of the
outbreak.
Investigating an Outbreak
Page 6-7
Exercise 6.1
During the previous year, nine residents of a community died from cervical
cancer. List at least 4 reasons that might justify an investigation.
Check your answers on page 6-59
Investigating an Outbreak
Page 6-8
Steps of an Outbreak Investigation
Once the decision to conduct a field investigation of an acute
outbreak has been made, working quickly is essential — as is
getting the right answer. In other words, epidemiologists cannot
afford to conduct an investigation that is “quick and dirty.” They
must conduct investigations that are “quick and clean.”22
Under
such circumstances, epidemiologists find it useful to have a
systematic approach to follow, such as the sequence listed in Table
6.2. This approach ensures that the investigation proceeds without
missing important steps along the way.
Table 6.2 Epidemiologic Steps of an Outbreak Investigation
1. Prepare for field work
2. Establish the existence of an outbreak
3. Verify the diagnosis
4. Construct a working case definition
5. Find cases systematically and record information
6. Perform descriptive epidemiology
7. Develop hypotheses
8. Evaluate hypotheses epidemiologically
9. As necessary, reconsider, refine, and re-evaluate hypotheses
10. Compare and reconcile with laboratory and/or environmental studies
11. Implement control and prevention measures
12. Initiate or maintain surveillance
13. Communicate findings
The steps listed in Table 6.2 are presented in conceptual order; in
practice, however, several steps may be done at the same time, or
the circumstances of the outbreak may dictate that a different order
be followed. For example, the order of the first three listed steps is
highly variable — a health department often verifies the diagnosis
and establishes the existence of an outbreak before deciding that a
field investigation is warranted. Conceptually, control measures
come after hypotheses have been confirmed, but in practice control
measures are usually implemented as soon as the source and mode
of transmission are known, which may be early or late in any
particular outbreak investigation.
Each of the steps is described below in more detail, based on the
assumption that you are the health department staff member
scheduled to conduct the next field investigation.
Step 1: Prepare for field work
The numbering scheme for this step is problematic, because
preparing for field work often is not the first step. Only
occasionally do public health officials decide to conduct a field
investigation before confirming an increase in cases and verifying
Investigating an Outbreak
Page 6-9
the diagnosis. More commonly, officials discover an increase in
the number of cases of a particular disease and then decide that a
field investigation is warranted. Sometimes investigators collect
enough information to perform descriptive epidemiology without
leaving their desks, and decide that a field investigation is
necessary only if they cannot reach a convincing conclusion
without one.
Regardless of when the decision to conduct a field investigation is
made, you should be well prepared before leaving for the field.
The preparations can be grouped into two broad categories: (a)
scientific and investigative issues, and (b) management and
operational issues. Good preparation in both categories is needed
to facilitate a smooth field experience.
Scientific and investigative issues
As a field investigator, you must have the appropriate scientific
knowledge, supplies, and equipment to carry out the investigation
before departing for the field. Discuss the situation with someone
knowledgeable about the disease and about field investigations,
and review the applicable literature. In previous similar outbreaks,
what have been the sources, modes of transmission, and risk
factors for the disease? Assemble useful references such as journal
articles and sample questionnaires.
Before leaving for a field investigation, consult laboratory staff to
ensure that you take the proper laboratory material and know the
proper collection, storage, and transportation techniques. By
talking with the laboratory staff you are also informing them about
the outbreak, and they can anticipate what type of laboratory
resources will be needed.
You also need to know what supplies or equipment to bring to
protect yourself. Some outbreak investigations require no special
equipment while an investigation of SARS or Ebola hemorrhagic
fever may require personal protective equipment such as masks,
gowns, and gloves.
Finally, before departing, you should have a plan of action. What
are the objectives of this investigation, i.e., what are you trying to
accomplish? What will you do first, second, and third? Having a
plan of action upon which everyone agrees will allow you to “hit
the ground running” and avoid delays resulting from
misunderstandings.
Investigating an Outbreak
Page 6-10
Management and operational issues
A good field investigator must be a good manager and collaborator
as well as a good epidemiologist, because most investigations are
conducted by a team rather than just one individual. The team
members must be selected before departure and know their
expected roles and responsibilities in the field. Does the team need
a laboratorian, veterinarian, translator/interpreter, computer
specialist, entomologist, or other specialist? What is the role of
each? Who is in charge? If you have been invited to participate but
do not work for the local health agency, are you expected to lead
the investigation, provide consultation to the local staff who will
conduct the investigation, or simply lend a hand to the local staff?
And who are your local contacts?
Depending on the type of outbreak, the number of involved
agencies may be quite large. The investigation of an outbreak from
an animal source may include state and federal departments of
agriculture and/or the Food and Drug Administration (FDA). If
criminal or bioterrorist intent is suspected, law enforcement
agencies and the Federal Bureau of Investigation (FBI) may be in
charge, or at least involved. In a natural disaster (hurricane or
flood), the Federal Emergency Management Agency (FEMA) may
be the lead. Staff from different agencies have different
perspectives, approaches, and priorities that must be reconciled.
For example, whereas the public health investigation may focus on
identifying a pathogen, source, and mode of transmission, a
criminal investigation is likely to focus on finding the perpetrator.
Sorting out roles and responsibilities in such multi-agency
investigations is critical to accomplishing the disparate objectives
of the different agencies.
A communications plan must be established. The need for
communicating with the public health and clinical community has
long been acknowledged, but the need for communicating quickly
and effectively with elected officials and the public became
obvious during the epidemics of West Nile Virus encephalitis,
SARS, and anthrax. The plan should include how often and when
to have conference calls with involved agencies, who will be the
designated spokesperson, who will prepare health alerts and press
releases, and the like. When a federal agency is involved in the
survey of 10 or more individuals, the data collection instrument
must first be cleared by the White House Office of Management
and Budget (OMB).
In addition, operational and logistical details are important.
Investigating an Outbreak
Page 6-11
Arrange to bring a laptop computer, cell phone or phone card,
camera, and other supplies. If you are arriving from outside the
area, you should arrange in advance when and where you are to
meet with local officials and contacts when you arrive in the field.
You must arrange travel, lodging, and local transportation. Many
agencies and organizations have strict approval processes and
budgetary limits that you must follow. If you are traveling to
another country, you will need a passport and often a visa. You
should also take care of personal matters before you leave,
especially if the investigation is likely to be lengthy.
Step 2: Establish the existence of an outbreak
An outbreak or an epidemic is the occurrence of more cases of
disease than expected in a given area or among a specific group of
people over a particular period of time. Usually, the cases are
presumed to have a common cause or to be related to one another
in some way. Many epidemiologists use the terms outbreak and
epidemic interchangeably, but the public is more likely to think
that epidemic implies a crisis situation. Some epidemiologists
apply the term epidemic to situations involving larger numbers of
people over a wide geographic area. Indeed, the Dictionary of
Epidemiology defines outbreak as an epidemic limited to localized
increase in the incidence of disease, e.g., village, town, or closed
institution.23
In contrast to outbreak and epidemic, a cluster is an aggregation of
cases in a given area over a particular period without regard to
whether the number of cases is more than expected. This
aggregation of cases seems to be unusual, but frequently the public
(and sometimes the health agency) does not know the denominator.
For example, the diagnosis in one neighborhood of four adults with
cancer may be disturbing to residents but may well be within the
expected level of cancer occurrence, depending on the size of the
population, the types of cancer, and the prevalence of risk factors
among the residents.
One of the first tasks of the field investigator is to verify that a
cluster of cases is indeed an outbreak. Some clusters turn out to be
true outbreaks with a common cause, some are sporadic and
unrelated cases of the same disease, and others are unrelated cases
of similar but unrelated diseases.
Even if the cases turn out to be the same disease, the number of
cases may not exceed what the health department normally sees in
a comparable time period. Here, as in other areas of epidemiology,
the observed is compared with the expected. The expected number
is usually the number from the previous few weeks or months, or
Investigating an Outbreak
Page 6-12
from a comparable period during the previous few years. For a
notifiable disease, the expected number is based on health
department surveillance records. For other diseases and conditions,
the expected number may be based on locally available data such
as hospital discharge records, mortality statistics, or cancer or birth
defect registries. When local data are not available, a health
department may use rates from state or national data, or,
alternatively, conduct a telephone survey of physicians to
determine whether they are seeing more cases of the disease than
usual. Finally, a survey of the community may be conducted to
establish the background or historical level of disease.
Even if the current number of reported cases exceeds the expected
number, the excess may not necessarily indicate an outbreak.
Reporting may rise because of changes in local reporting
procedures, changes in the case definition, increased interest
because of local or national awareness, or improvements in
diagnostic procedures. A new physician, infection control nurse, or
healthcare facility may more consistently report cases, when in fact
there has been no change in the actual occurrence of the disease.
Some apparent increases are actually the result of misdiagnosis or
laboratory error. Finally, particularly in areas with sudden changes
in population size such as resort areas, college towns, and migrant
farming areas, changes in the numerator (number of reported
cases) may simply reflect changes in the denominator (size of the
population).
Whether an apparent problem should be investigated further is not
strictly tied to verifying the existence of an epidemic (more cases
than expected). Sometimes, health agencies respond to small
numbers of cases, or even a single case of disease, that may not
exceed the expected or usual number of cases. As noted earlier, the
severity of the illness, the potential for spread, availability of
control measures, political considerations, public relations,
available resources, and other factors all influence the decision to
launch a field investigation.
Investigating an Outbreak
Page 6-13
Exercise 6.2
For the month of August, 12 new cases of tuberculosis and 12 new cases of
West Nile virus infection were reported to a county health department. You
are not sure if either group of cases is a cluster or an outbreak. What
additional information might be helpful in making this determination?
Check your answers on page 6-60
Investigating an Outbreak
Page 6-14
Step 3: Verify the diagnosis
The next step, verifying the diagnosis, is closely linked to verifying
the existence of an outbreak. In fact, often these two steps are
addressed at the same time. Verifying the diagnosis is important:
(a) to ensure that the disease has been properly identified, since
control measures are often disease-specific; and (b) to rule out
laboratory error as the basis for the increase in reported cases.
First, review the clinical findings and laboratory results. If you
have questions about the laboratory findings (for example, if the
laboratory tests are inconsistent with the clinical and epidemiologic
findings), ask a qualified laboratorian to review the laboratory
techniques being used. If you need specialized laboratory work
such as confirmation in a reference laboratory, DNA or other
chemical or biological fingerprinting, or polymerase chain
reaction, you must secure a sufficient number of appropriate
specimens, isolates, and other laboratory material as soon as
possible.
Second, many investigators — clinicians and non-clinicians —
find it useful to visit one or more patients with the disease. If you
do not have the clinical background to verify the diagnosis, bring a
qualified clinician with you. Talking directly with some patients
gives you a better understanding of the clinical features, and helps
you to develop a mental image of the disease and the patients
affected by it. In addition, conversations with patients are very
useful in generating hypotheses about disease etiology and spread.
They may be able to answer some critical questions: What were
their exposures before becoming ill? What do they think caused
their illness? Do they know anyone else with the disease? Do they
have anything in common with others who have the disease?
Third, summarize the clinical features using frequency
distributions. Are the clinical features consistent with the
diagnosis? Frequency distributions of the clinical features are
useful in characterizing the spectrum of illness, verifying the
diagnosis, and developing case definitions. These clinical
frequency distributions are considered so important in establishing
the credibility of the diagnosis that they are frequently presented in
the first table of an investigation’s report or manuscript.
Investigating an Outbreak
Page 6-15
Step 4: Construct a working case definition
A case definition is a
standard set of criteria for
deciding whether an
individual should be
classified as having the
health condition of
interest.
A case definition is a standard set of criteria for deciding whether
an individual should be classified as having the health condition of
interest. A case definition includes clinical criteria and —
particularly in the setting of an outbreak investigation —
restrictions by time, place, and person. The clinical criteria should
be based on simple and objective measures such as “fever ≥ 40°C
(101°F),” “three or more loose bowel movements per day,” or
“myalgias (muscle pain) severe enough to limit the patient’s usual
activities.” The case definition may be restricted by time (for
example, to persons with onset of illness within the past 2 months),
by place (for example, to residents of the nine-county area or to
employees of a particular plant) and by person (for example, to
persons with no previous history of a positive tuberculin skin test,
or to premenopausal women). Whatever the criteria, they must be
applied consistently to all persons under investigation.
The case definition must not include the exposure or risk factor
you are interested in evaluating. This is a common mistake. For
example, if one of the hypotheses under consideration is that
persons who worked in the west wing were at greater risk of
disease, do not define a case as “illness among persons who
worked in the west wing with onset between…” Instead, define a
case as “illness among persons who worked in the facility with
onset between…” Then conduct the appropriate analysis to
determine whether those who worked in the west wing were at
greater risk than those who worked elsewhere.
Diagnoses may be uncertain, particularly early in an investigation.
As a result, investigators often create different categories of a case
definition, such as confirmed, probable, and possible or suspect,
that allow for uncertainty. To be classified as confirmed, a case
usually must have laboratory verification. A case classified as
probable usually has typical clinical features of the disease without
laboratory confirmation. A case classified as possible usually has
fewer of the typical clinical features. For example, in the box on
page 6-16, you can see the Pan American Health Organization
(PAHO) recommended case definition for meningococcal
disease.24
Here you can see the different categories that PAHO uses
for this diagnosis.
Investigating an Outbreak
Page 6-16
In the outbreak setting, the investigators would need to specify
time and place to complete the outbreak case definition. For
example, if investigating an epidemic of meningococcal meningitis
in Bamako, the case definition might be the clinical features as
described in the box with onset between January and April of this
year among residents and visitors of Bamako.
Classifications such as confirmed-probable-possible are helpful
because they provide flexibility to the investigators. A case might
be temporarily classified as probable or possible while laboratory
results are pending. Alternatively, a case may be permanently
classified as probable or possible if the patient’s physician decided
not to order the confirmatory laboratory test because the test is
expensive, difficult to obtain, or unnecessary. For example, while
investigating an outbreak of diarrhea on a cruise ship, investigators
usually try to identify the causative organism from stool samples
from a few afflicted persons. If the tests confirm that all of those
case-patients were infected with the same organism, for example
norovirus, the other persons with compatible clinical illness are all
presumed to be part of the same outbreak and to be infected with
the same organism. Note that while this approach is typical in the
United States, some countries prefer to acquire laboratory samples
from every affected person, and only those with a positive
laboratory test are counted as true cases.
A case definition is a tool for classifying someone as having or not
having the disease of interest, but few case definitions are 100%
accurate in their classifications. Some persons with mild illness
may be missed, and some persons with a similar but not identical
illness may be included. Generally, epidemiologists strive to
ensure that a case definition includes most if not all of the actual
Meningococcal Disease — PAHO Case Definition
Clinical case definition
An illness with sudden onset of fever (>38.5°C rectal or >38.0°C axillary) and
one or more of the following: neck stiffness, altered consciousness, other
meningeal sign or petechial or puerperal rash.
Laboratory criteria for diagnosis
Positive cerebrospinal fluid (CSF) antigen detection or positive culture.
Case classification
Suspected: A case that meets the clinical case definition.
Probable: A suspected case as defined above and turbid CSF (with or without
positive Gram stain) or ongoing epidemic and epidemiological link to a
confirmed case.
Confirmed: A suspected or probable case with laboratory confirmation.
Source: Pan American Health Organization. Case Definitions Meningococcal
Disease. Epidemiological Bulletin 2002; 22(4):14–5.
Investigating an Outbreak
Page 6-17
cases, but very few or no false-positive cases. However, this ideal
is not always met. For example, case definitions often miss
infected people who have mild or no symptoms, because they have
little reason to be tested.
More About Case Definitions
Early in an investigation, investigators may use a “loose” or sensitive case definition that includes confirmed,
probable, and possible cases to characterize the extent of the problem, identify the populations affected, and
develop hypotheses about possible causes. The strategy of being more inclusive early on is especially useful in
investigations that require travel to different hospitals, homes, or other sites to gather information, because
collecting extra data while you are there is more efficient than having to return a second time. This illustrates an
important axiom of field epidemiology: Get it while you can. Later on, when hypotheses have come into sharper
focus, the investigator may tighten the case definition by dropping the “possible” and sometimes the “probable”
category. In analytic epidemiology, inclusion of false-positive cases can produce misleading results. Therefore, to
test these hypotheses by using analytic epidemiology (see Step 8), specific or tight case definitions are
recommended.
Other investigations, particularly those of a newly recognized disease or syndrome, begin with a relatively specific
or narrow case definition. For example, acquired immunodeficiency syndrome (AIDS) and severe acute respiratory
syndrome (SARS) both began with relatively specific case definitions. This ensures that persons whose illness
meets the case definition truly have the disease in question. As a result, investigators could accurately characterize
the typical clinical features of the illness, risk factors for illness, and cause of the illness. After the cause was
known and diagnostic tests were developed, investigators could use the laboratory test to learn about the true
spectrum of illness, and could broaden the case definition to include those with early infection or mild symptoms.
Investigating an Outbreak
Page 6-18
Exercise 6.3
In 1989, a worldwide epidemic of a previously unrecognized syndrome
occurred. This condition was characterized by severe myalgias (muscle
pains) and an elevated number of a particular type of white blood cell called
an eosinophil. The illness was given the name eosinophilia-myalgia syndrome. Public health
officials initially used the following case definition:25
Eosinophil count ≥2,000 cells/mm3
in the absence of any other known cause of eosinophilia (in
particular, parasitic or fungal infection, end-stage renal disease, leukemia, allergic disorder, or
drug reaction)
Using the information in the line listing below, determine whether or not each should be
classified as a case, according to the initial case definition above.
Table 6.3 Line Listing of 7 Persons with Suspected Eosinophilia-myalgia
Patient #
Eosinophils
(per mm3
)
Other
Known
Cause
Severe
Myalgias Myalgias*
Case?
(Initial Def)
Case?
(Revised Def)
1 535 No Yes No _____ _____
2 12,100 No Yes Yes _____ _____
3 2,310 No Yes Yes _____ _____
4 2,064 No Yes No _____ _____
5 2,250 No Yes Yes _____ _____
6 1,670 No Yes Yes _____ _____
7 2,115 Leukemia Yes Yes _____ _____
* Severe enough to affect the patient’s ability to pursue usual daily activities
Eventually, public health officials agreed on the following revised case definition:26
1. A peripheral eosinophil count of >1,000 cells/mm3
;
2. Generalized myalgia at some point during the illness severe enough to affect the
patient's ability to pursue usual daily activities;
3. No infection or neoplasm that could account for #1 or #2.
Reclassify each patient using the revised case definition.
Check your answers on page 6-60
Investigating an Outbreak
Page 6-19
Exercise 6.4
In December 2003, an outbreak of gastroenteritis occurred among tenth-
grade students who had participated in a city-wide field trip. Half of the
students traveled from December 2 to December 7 (Tour A); the other half
traveled from December 3 to December 8 (Tour B). The itineraries were
similar. Although teachers and other adult chaperones accompanied the students on both tours,
no adult reported illness. In addition, no illness was reported among students who did not go
on the field trip, and no cases of E. coli O157 were reported in the community that week.
A line listing of 26 persons with symptoms of abdominal pain and/or diarrhea is presented
below. Using the information in the line listing, develop a case definition that you might use for
the outbreak investigation. [Note that persons infected with E. coli O157 typically experience
severe abdominal cramps, bloody diarrhea, and low grade fever after a 1– to 8–day incubation
period (usually 2–4 days).]
Table 6.4 Line Listing of 26 Persons with Symptoms — School District A, December 2003
Patient #
Grade &
School Age Sex Tour
Onset
Date
Severe
Abdominal
Pain?
No.
Times
Diarrhea Stool Testing
1 10 — 1 17 M A Dec. 8 Y 3 Not done
2 10 — 1 16 F A Dec. 6 N 1 Negative
3 10 — 2 16 M A Dec. 10 Y 2 E. coli O157
4 10 — 2 17 F A Dec. 8 Y 3 Not done
5 10 — 2 16 F A Dec. 5 Y 8 E. coli O157
6 10 — 2 16 M A Dec. 6 Y 3 Not done
7 10 — 3 17 M A Dec. 7 Y 4 Not done
8 10 — 3 17 F A Dec. 8 Y 2 E. coli O157
9 10 — 3 16 F A Dec. 7 Y 3 Negative
10 10 — 4 17 F A Dec. 7 Y 2 E. coli O157
11 10 — 4 16 M A Dec. 8 Y 3 Not done
12 10 — 4 16 M A Dec. 9 Y 3 Negative
13 10 — 5 16 F A Dec. 8 Y 3 Not done
14 10 — 6 17 F B Dec. 8 Y 3 E. coli O157
15 10 — 6 16 F B Dec. 9 Y 2 Negative
16 10 — 7 17 F B Dec. 6 Y 3 Not done
17 10 — 7 17 F B Dec. 7 Y 5 E. coli O157
18 10 — 7 16 F B Dec. 8 Y 2 Negative
19 10 — 8 17 F B Dec. 6 Y 5 E. coli O157
20 10 — 8 17 F B Dec. 7 Y 3 Negative
21 10 — 9 16 M B Dec. 8 Y 2 Not done
22 10 — 9 16 F B Dec. 7 Y 3 Negative
23 10 — 9 16 F B Dec. 7 Y 3 E. coli O157
24 10 — 10 17 F B Dec. 9 Y 3 E. coli O157
25 10 — 10 17 M B Dec. 7 N 1 Negative
26 10 — 10 16 M B Dec. 6 Y 3 Not done
Check your answers on page 6-60
Investigating an Outbreak
Page 6-20
Step 5: Find cases systematically and record
information
As noted earlier, many outbreaks are brought to the attention of
health authorities by concerned healthcare providers or citizens.
However, the cases that prompt the concern are often only a small
and unrepresentative fraction of the total number of cases. Public
health workers must therefore look for additional cases to
determine the true geographic extent of the problem and the
populations affected by it.
Usually, the first effort to identify cases is directed at healthcare
practitioners and facilities — physicians’ clinics, hospitals, and
laboratories — where a diagnosis is likely to be made.
Investigators may conduct what is sometimes called stimulated or
enhanced passive surveillance by sending a letter describing the
situation and asking for reports of similar cases. Alternatively, they
may conduct active surveillance by telephoning or visiting the
facilities to collect information on any additional cases.
In some outbreaks, public health officials may decide to alert the
public directly, usually through the local media. In other situations,
the media may have already spread the word. For example, in an
outbreak of listeriosis in 2002 caused by contaminated sliceable
turkey deli meat, announcements in the media alerted the public to
avoid the implicated product and instructed them to see a physician
if they developed symptoms compatible with the disease in
question.27
If an outbreak affects a restricted population such as persons on a
cruise ship, in a school, or at a work site, and if many cases are
mild or asymptomatic and therefore undetected, a survey of the
entire population is sometimes conducted to determine the extent
of infection. A questionnaire could be distributed to determine the
true occurrence of clinical symptoms, or laboratory specimens
could be collected to determine the number of asymptomatic cases.
Finally, investigators should ask case-patients if they know anyone
else with the same condition. Frequently, one person with an
illness knows or hears of others with the same illness.
In some investigations, investigators develop a data collection
form tailored to the specific details of that outbreak. In others,
investigators use a generic case report form. Regardless of which
form is used, the data collection form should include the following
types of information about each case.
Investigating an Outbreak
Page 6-21
• Identifying information. A name, address, and telephone
number is essential if investigators need to contact patients
for additional questions and to notify them of laboratory
results and the outcome of the investigation. Names also
help in checking for duplicate records, while the addresses
allow for mapping the geographic extent of the problem.
• Demographic information. Age, sex, race, occupation, etc.
provide the person characteristics of descriptive
epidemiology needed to characterize the populations at risk.
• Clinical information. Signs and symptoms allow
investigators to verify that the case definition has been met.
Date of onset is needed to chart the time course of the
outbreak. Supplementary clinical information, such as
duration of illness and whether hospitalization or death
occurred, helps characterize the spectrum of illness.
• Risk factor information. This information must be tailored
to the specific disease in question. For example, since food
and water are common vehicles for hepatitis A but not
hepatitis B, exposure to food and water sources must be
ascertained in an outbreak of the former but not the latter.
• Reporter information. The case report must include the
reporter or source of the report, usually a physician, clinic,
hospital, or laboratory. Investigators will sometimes need to
contact the reporter, either to seek additional clinical
information or report back the results of the investigation.
Traditionally, the information described above is collected on a
standard case report form, questionnaire, or data abstraction form.
Examples of case report forms are shown in Figure 6.1 (in Exercise
6.5). Investigators then abstract selected critical items onto a form
called a line listing (See Lesson 2 for more information on line
listings.)
An example of the line listing from the 2001 anthrax investigation
is shown in Table 6.5.28
In a line listing, each column represents an
important variable, such as name or identification number, age,
sex, case classification, etc., while each row represents a different
case. New cases are added to a line listing as they are identified.
Thus, a line listing contains key information on every case and can
be scanned and updated as necessary. Even in the era of
computers, many epidemiologists still maintain a handwritten line
listing of key data items, and turn to their computers for more
complex manipulations and cross-tabulations.
Investigating an Outbreak
Page 6-22
Table 6.5 Line Listing of Demographic, Clinical, and Exposure Characteristics of 22 Cases of Bioterrorism-
Related Anthrax—United States, 2001
Case
No.
Onset
Date,
2001
Date of
Anthrax
Diagnosis
by Lab
Testing Statea
Age
(yrs) Sexa
Racea
Occu-
pationa
Case
Statusb
Anthrax
Presentationb
Outcome Diagnostic Testsa
1 9/22 10/19 NY 31 F W NY Post
employee
Suspect Cutaneous Alive Serum IgG reactive
2 9/25 10/12 NY 38 F W NBC anchor
assistant
Confirmed Cutaneous Alive Skin biopsy IHC+ /
serum IgG reactive
3 9/26 10/18 NJ 39 M W USPS machine
mechanic
Suspect Cutaneous Alive Serum IgG reactive
4 9/28 10/15 FL 73 M W, H AMI mailroom
worker
Confirmed Inhalational Alive Pleural biopsy IHC+ /
serum IgG reactive
5 9/28 10/18 NJ 45 F W USPS mail
carrier
Confirmed Cutaneous Alive Skin biopsy IHC+ and
PCR+ / serum IgG reac.
6 9/28 10/12 NY 23 F W NBC TV news
intern
Suspect Cutaneous Alive Serum IgG reactive
7 9/29 10/15 NY 0.6 M W Child of ABC
employee
Confirmed Cutaneous Alive Skin biopsy IHC+ /
blood PCR+
8 9/30 10/4 FL 63 M W AMI photo
editor
Confirmed Inhalational Dead Cerebrospinal fluid
culture +
9 10/1 10/18 NY 27 F W CBS anchor
assistant
Confirmed Cutaneous Alive Skin biopsy IHC+ /
serum IgG reactive
10 10/14 10/19 PA 35 M W USPS mail
processor
Confirmed Cutaneous Alive Blood culture + / serum
IgG reactive
11 10/14 10/28 NJ 56 F B USPS mail
processor
Confirmed Inhalational Alive Blood PCR+ / pleural
fluid cytology IHC+ /
serum IgG reactive
12 10/15 10/29 NJ 43 F A USPS mail
processor
Confirmed Inhalational Alive Pleural fluid IHC+ /
bronchial biopsy IHC+ /
serum IgG reactive
13 10/16 10/21 VA 56 M B USPS mail
worker
Confirmed Inhalational Alive Blood culture +
14 10/16 10/23 MD 55 M B USPS mail
worker
Confirmed Inhalational Dead Blood culture +
15 10/16 10/26 MD 47 M B USPS mail
worker
Confirmed Inhalational Dead Blood culture +
16 10/16 10/22 MD 56 M B USPS mail
worker
Confirmed Inhalational Alive Blood culture +
17 10/17 10/29 NJ 51 F W Bookkeeper Confirmed Cutaneous Alive Skin biopsy IHC+ and
PCR+ / serum IgG
reactive
18 10/19 10/22 NY 34 M W, H NY Post mail
handler
Suspect Cutaneous Alive Skin biopsy IHC+
19 10/22 10/25 VA 59 M W Government
mail processor
Confirmed Inhalational Alive Blood culture +
20 10/23 10/28 NY 38 M W NY Post
employee
Confirmed Cutaneous Alive Skin biopsy culture +
21 10/25 10/30 NY 61 F A Hospital
supply worker
Confirmed Inhalational Dead Pleural fluid and blood
culture +
22 11/14 11/21 CT 94 F W Retired at
home
Confirmed Inhalational Dead Blood culture +
a
NY, New York; FL, Florida; NJ, New Jersey; PA, Pennsylvania; VA, Virginia; DC, District of Columbia; MD, Maryland; CT,
Connecticut; F, female; M, male; W, white; B, black; A, Asian; W,H, white with Hispanic ethnicity; NY, New York; NBC,
National Broadcasting Company; AMI, American Media Inc.; USPS, United States Postal Service; CBS, Columbia Broadcasting
System; PCR, polymerase chain reaction; IHC, immunohistochemical staining; + positive; IgG, immunoglobulin G.
b
Case status and anthrax presentation are described in the anthrax surveillance case definition in the Methods section.
Source: Jernigan DB, Raghunathan PL, Bell BP, Brechner R, Bresnitz EA, Butler JC, et al. Investigation of bioterrorism-related anthrax, United
States, 2001: epidemiologic findings. Emerg Infect Dis 2002;8:1019–28.
Investigating an Outbreak
Page 6-23
Exercise 6.5
Review the six case report forms in Figure 6.1. Create a line listing based on
this information.
Figure 6.1
Continued.
Investigating an Outbreak
Page 6-24
Check your answers on page 6-61
Investigating an Outbreak
Page 6-25
Step 6: Perform descriptive epidemiology
Conceptually, the next step after identifying and gathering basic
information on the persons with the disease is to systematically
describe some of the key characteristics of those persons. This
process, in which the outbreak is characterized by time, place, and
person, is called descriptive epidemiology. It may be repeated
several times during the course of an investigation as additional
cases are identified or as new information becomes available.
This step is critical for several reasons.
• Summarizing data by key demographic variables provides a
comprehensive characterization of the outbreak — trends
over time, geographic distribution (place), and the
populations (persons) affected by the disease.
• From this characterization you can identify or infer the
population at risk for the disease.
• The characterization often provides clues about etiology,
source, and modes of transmission that can be turned into
testable hypotheses (see Step 7).
• Descriptive epidemiology describes the where and whom of
the disease, allowing you to begin intervention and
prevention measures.
• Early (and continuing) analysis of descriptive data helps you
to become familiar with those data, enabling you to identify
and correct errors and missing values.
Time
Traditionally, a special type of histogram is used to depict the time
course of an epidemic. This graph, called an epidemic curve, or
epi curve for short, provides a simple visual display of the
outbreak’s magnitude and time trend. The classic epidemic curve,
such as the one shown in Figure 6.2a from an outbreak of
Salmonella enterica serotype Enteritidis, graphs the number of
cases by date or time of onset of illness.
Investigating an Outbreak
Page 6-26
Figure 6.2a Outbreak of Salmonella Enteritidis Gastroenteritis —
Maryland, 2003 (Epidemic Curve by 12-Hour Intervals)
Source: Castel AD, Blythe D, Edwards L, Totaro J, Shah D, Moore M. A large outbreak of
Salmonella Enteritidis infections associated with crabcakes at a church fundraiser–
Maryland, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April
19-23, 2004, Atlanta.
Epidemic curves are a basic investigative tool because they are so
informative (see Lesson 4).
• The epi curve shows the magnitude of the epidemic over
time as a simple, easily understood visual. It permits the
investigator to distinguish epidemic from endemic disease.
Potentially correlated events can be noted on the graph.
• The shape of the epidemic curve may provide clues about
the pattern of spread in the population, e.g., point versus
intermittent source versus propagated.
• The curve shows where you are in the course of the
epidemic — still on the upswing, on the down slope, or after
the epidemic has ended. This information forms the basis
for predicting whether more or fewer cases will occur in the
near future.
• The curve can be used for evaluation, answering questions
like: How long did it take for the health department to
identify a problem? Are intervention measures working?
• Outliers — cases that don’t fit into the body of the curve —
may provide important clues.
• If the disease and its incubation period are known, the epi
curve can be used to deduce a probable time of exposure
and help develop a questionnaire focused on that time
period.
Drawing an epidemic curve. To draw an epidemic curve, you first
must know the time of onset of illness for each case. For some
diseases, date of onset is sufficient. For other diseases, particularly
Investigating an Outbreak
Page 6-27
those with a relatively short incubation period, hour of onset may
be more suitable (see Lesson 4).
Occasionally, you may be asked to draw an epidemic curve when
you don’t know either the disease or its incubation time. In that
situation, it may be useful to draw several epidemic curves with
different units on the x-axis to find one that best portrays the data.
For example, the epidemic curves shown in Figures 6.2b and 6.2c
display the same data as in Figure 6.2a; the x-axis is measured in
units of 12 hours in Figure 6.2a, 6 hours in Figure 6.2b, and 24
hours (1 day) in 6.2c. Figure 6.2d shows the same data one more
time, but with stacks of squares that each represent one case.
Figure 6.2b Outbreak of Salmonella Enteritidis Gastroenteritis —
Maryland, 2003 (Epidemic Curve by 6-Hour Intervals)
Source: Castel AD, Blythe D, Edwards L, Totaro J, Shah D, Moore M. A large outbreak of
Salmonella Enteritidis infections associated with crabcakes at a church fundraiser–
Maryland, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April
19-23, 2004, Atlanta.
Figure 6.2c Outbreak of Salmonella Enteritidis Gastroenteritis —
Maryland, 2003 (Epidemic Curve by One Day Intervals)
Source: Castel AD, Blythe D, Edwards L, Totaro J, Shah D, Moore M. A large outbreak of
Salmonella Enteritidis infections associated with crabcakes at a church fundraiser–
Maryland, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April
19-23, 2004, Atlanta.
Investigating an Outbreak
Page 6-28
Figure 6.2d Outbreak of Salmonella Enteritidis Gastroenteritis —
Maryland, 2003 (Epidemic Curve by 6-Hour Intervals)
Source: Castel AD, Blythe D, Edwards L, Totaro J, Shah D, Moore M. A large outbreak of
Salmonella Enteritidis infections associated with crabcakes at a church fundraiser–
Maryland, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April
19-23, 2004, Atlanta.
Interpreting an epidemic curve. The first step in interpreting an
epidemic curve is to consider its overall shape. The shape of the
epidemic curve is determined by the epidemic pattern (for
example, common source versus propagated), the period of time
over which susceptible persons are exposed, and the minimum,
average, and maximum incubation periods for the disease.
An epidemic curve that has a steep upslope and a more gradual
down slope (a so-called log-normal curve) is characteristic of a
point-source epidemic in which persons are exposed to the same
source over a relative brief period. In fact, any sudden rise in the
number of cases suggests sudden exposure to a common source
one incubation period earlier (Figure 6.3).
In a point-source epidemic, all the cases occur within one
incubation period. If the duration of exposure is prolonged, the
epidemic is called a continuous common-source epidemic, and
the epidemic curve has a plateau instead of a peak. An intermittent
common-source epidemic (in which exposure to the causative
agent is sporadic over time) usually produces an irregularly jagged
epidemic curve reflecting the intermittence and duration of
exposure and the number of persons exposed. In theory, a
propagated epidemic — one spread from person-to-person with
increasing numbers of cases in each generation — should have a
series of progressively taller peaks one incubation period apart, but
in reality few produce this classic pattern.
Investigating an Outbreak
Page 6-29
Figure 6.3 Typical Epi Curves for Different Types of Spread
Adapted from: European Programme for Intervention Epidemiology Training [Internet].
Solna, Sweden: Smittskyddsinstitutet [updated 2004 Sep 27; cited 2006 Sep 22]
Figure 6.4 Number of Cases of Acute Hemorrhagic Conjunctivitis, By
Month and Week of Report — Puerto Rico, August 7–October 30, 2003
Adapted from: Acute hemorrhagic conjunctivitis outbreak caused by Coxsackievirus A24–
Puerto Rico, 2003. MMWR 2004;53:632–4.
As noted above, the epidemic curve shows where you are in the
natural course of the epidemic. Consider the epidemic curve of
acute hemorrhagic conjunctivitis in Puerto Rico, shown in Figure
6.4. If you only had data through Week 35, that is, through point
A, you might conclude that the outbreak is still on the upswing,
with more cases to come. On the other hand, if you had data
through point B, you might judge that the outbreak has peaked and
may soon be over.
Investigating an Outbreak
Page 6-30
The cases that stand apart may be just as informative as the overall
pattern. An early case may represent a background or unrelated
case, a source of the epidemic, or a person who was exposed
earlier than most of the cases (for example, the cook who tasted a
dish hours before bringing it to the big picnic). Similarly, late cases
may represent unrelated cases, cases with long incubation periods,
secondary cases, or persons exposed later than most others (for
example, someone eating leftovers). On the other hand, these
outlying cases sometimes represent miscoded or erroneous data.
All outliers are worth examining carefully because if they are part
of the outbreak, they may have an easily identifiable exposure that
may point directly to the source.
In a point-source epidemic of a known disease with a known
incubation period, the epidemic curve can be used to identify a
likely period of exposure. Knowing the likely period of exposure
allows you to ask questions about the appropriate period of time so
you can identify the source of the epidemic.
To identify the likely period of exposure from an epidemic curve
of an apparent point source epidemic:
1. Look up the average and minimum incubation periods of
the disease. This information can be found on disease fact
sheets available on the Internet or in the Control of
Communicable Diseases Manual.29
2. Identify the peak of the outbreak or the median case and
count back on the x-axis one average incubation period.
Note the date.
3. Start at the earliest case of the epidemic and count back the
minimum incubation period, and note this date as well.
Ideally, the two dates will be similar, and represent the probable
period of exposure. Since this technique is not precise, widen the
probable period of exposure by, say, 20% to 50% on either side of
these dates, and then ask about exposures during this widened
period in an attempt to identify the source.
In a similar fashion, if the time of exposure and the times of onset
of illness are known but the cause has not yet been identified, the
incubation period can be estimated from the epidemic curve.
Subtract the time of onset of the earliest cases from the time of
exposure to estimate the minimum incubation period. Subtract the
time of onset of the median case from the time of exposure to
estimate the median incubation period. These incubation periods
can be compared with a list of incubation periods of known
diseases to narrow the possibilities.
Investigating an Outbreak
Page 6-31
EXAMPLE: Interpreting an Epidemic Curve
Consider, for example, the outbreak of hepatitis A illustrated by the epidemic curve in Figure 6.5. The incubation
period for hepatitis A ranges from 15 to 50 days (roughly 2 to 7 weeks), with an average incubation period of 28–30
days (roughly one month). Because cases can occur from 15 to 50 days after exposure, all cases from a point
source exposure should occur within a span of 50 – 15 = 35 days.
Figure 6.5 Hepatitis A from Sub Shop — Massachusetts, 2001
Adapted from: Foodborne transmission of hepatitis A — Massachusetts, 2001. MMWR 2003;52:565–7.
Is this epidemic curve consistent with a point-source epidemic? (That is, do all of the cases occur with one
incubation period?)
Yes. The date of onset of the first case was during the week of October 28. The date of onset of the last
known case was during the week of November 18, less than one month later. All of the cases occur within
the range of incubation periods expected for a point source exposure. Therefore, the epidemic curve can
be used to identify the likely period of exposure.
What is the peak of the outbreak or the median date of onset?
Both the peak of the outbreak and the median case occurred during the week of November 4.
When is the likely date(s) of exposure, based on one average incubation period prior to the peak (median date) of
the outbreak?
Since both the peak and the median of the outbreak occurred during the week of November 4, the most
likely period of exposure was a month earlier, in early October.
When is the beginning of the outbreak?
The earliest case occurred during the week of October 28.
When is the likely dates of exposure, based on the minimum incubation period before the first case?
Subtracting 2 weeks from the week of October 28 points to the week of October 14.
Thus you would look for exposures during the weeks of October 7 and 14, plus or minus a few days. This turned out
to be the exact period during which a restaurant employee, diagnosed with hepatitis A in mid-October, would have
been shedding virus while still working. In summary, the graph reflects an outbreak (number of cases clearly in
excess of usual) beginning during the week of October 28, peaking during the week of November 4, and ending
during the week of November 18. Based on these data and knowledge of the incubation period of hepatitis A, the
period of exposure was probably in early to mid-October.
Investigating an Outbreak
Page 6-32
Exercise 6.6
An outbreak of an acute respiratory disease, coccidioidomycosis, occurred
among volunteers, group leaders, and archaeologists who began working at
a Native American archaeological site in Utah on June 18.30
1. Using the dates of onset listed below, draw an epidemic curve. Graph paper is provided at
the end of this lesson.
Case # Date of Onset Case # Date of Onset
1 6/28 6 6/29
2 6/28 7 6/29
3 6/29 8 6/30
4 6/29 9 7/1
5 6/29 10 7/1
2. The average incubation period for coccidioidomycosis is 12 days, with a minimum incubation
period of 7 days. Using your epidemic curve and the average and minimum incubation
periods for coccidioidomycosis, identify the likely exposure period.
Check your answers on page 6-62
Investigating an Outbreak
Page 6-33
Place
Assessment of an outbreak by place not only provides information
on the geographic extent of a problem, but may also demonstrate
clusters or patterns that provide important etiologic clues. A spot
map is a simple and useful technique for illustrating where cases
live, work, or may have been exposed.
Some spot maps indicate each patient’s residence. If the map
shows a cluster or other pattern (such as cases along a road), the
investigator must consider possible explanations — perhaps water
supplies, wind currents, or proximity to a restaurant or grocery. A
spot map, like that used by John Snow in London in 1854 (see
Lesson 1, Figure 1.1), can give clues about mode of spread.31
For
example, clustering of cases in a wing of a nursing home is
consistent with either a focal source or person-to-person spread,
whereas scattering of cases throughout the facility is more
consistent with a widely disseminated vehicle or a source common
to the residents that is not associated with room assignment, such
as a common dining hall or water supply. In an outbreak of
pneumococcal pneumonia in a nursing home in New Jersey, cases
were more common in the north wing than in the south wing
(Figure 6.6). Nursing home staff did report that the 2 residents of
the south wing who developed pneumonia did spend much of their
time in the north wing.32
Figure 6.6 Cases of Pneumonia by Room, Nursing Home A — New
Jersey, 2001
Adapted from: Tan C. A preventable outbreak of pneumococcal pneumonia among
unvaccinated nursing home residents in New Jersey during 2001. Infect Control Hosp
Epidemiol 2003;24:848–52.
Investigating an Outbreak
Page 6-34
Often, a spot map by site of presumed exposure is more
informative than one by residence. Figure 6.7 shows the location of
staff in two offices in the U.S. Senate’s Hart Building who had
nasal swabs positive for B. anthracis after an envelope containing
anthrax spores was opened in their presence.33
To look for clustering in an outbreak of surgical wound infections
in a hospital, cases may be plotted by operating room, recovery
room, and ward room. In studying “sick-building syndrome” and
other disorders related to air-flow patterns in buildings, cases
should be plotted by work location. A spot map may even plot sites
of recreational or other outdoor exposures.
Figure 6.7 Desk Locations of Persons with Nasal Swabs Positive for
Bacillus anthracis, Hart Building — Washington, DC, 2001
Adapted from: Lukacs SL, Hsu V, Harper S, Handzel T, Hayslett J, Khabbaz R,,et al.
Anthrax outbreak averted: public health response to a contaminated envelope on Capital
Hill–Washington, DC, 2001. Presented at 51st Annual Epidemic Intelligence Service
Conference, April 22-26, 2004, Atlanta.
Spot maps are useful for demonstrating cases within a geographic
area, but they do not take the size of the underlying population into
account. To compare incidence between different areas with
different population densities, an area map showing area-specific
rates is preferable. Figure 6.8 shows the number of cases of human
granulocytic ehrlichiosis by county in Wisconsin during 1996–
1998.34
The most cases occurred in Washburn (n=21) and
Chippewa (n=17) Counties. By dividing the number of cases by
the size of the population, county-specific rates of ehrlichiosis can
be calculated (Figure 6.9). While Jackson (n=11) and Rusk (n=9)
Counties had fewer cases than Chippewa, their populations are
much smaller, and they turned out to have higher rates of disease.
Investigating an Outbreak
Page 6-35
Figure 6.8 Cases of Human Granulocytic Ehrlichiosis by County —
Wisconsin, May 1996–December 1998
Source: Ramsey AH, Belongia EA, Gale CM, Davis JP. Outcomes of treated human
granulocytic ehrlichiosis cases. Emerg Infect Dis 2002;8:398-401.
Figure 6.9 Rates of Human Granulocytic Ehrlichiosis by County —
Wisconsin, May 1996–December 1998
Source: Ramsey AH, Belongia EA, Gale CM, Davis JP. Outcomes of treated human
granulocytic ehrlichiosis cases. Emerg Infect Dis 2002;8:398-401.
Investigating an Outbreak
Page 6-36
Person
Characterization of the outbreak by person provides a description
of whom the case-patients are and who is at risk. Person
characteristics that are usually described include both host
characteristics (age, race, sex, and medical status) and possible
exposures (occupation, leisure activities, and use of medications,
tobacco, and drugs). Both of these influence susceptibility to
disease and opportunities for exposure.
The two most commonly described host characteristics are age and
sex because they are easily collected and because they are often
related to exposure and to the risk of disease. Depending on the
outbreak, occupation, race, or other personal characteristics
specific to the disease under investigation and the setting of the
outbreak may also be important. For example, investigators of an
outbreak of hepatitis B might characterize the cases by intravenous
drug use and sexual contacts, two of the high risk exposures for
that disease. Investigators of a school-based gastroenteritis
outbreak might describe occurrence by grade or classroom, and by
student versus teacher or other staff.
Early in an investigation, investigators may restrict the descriptive
epidemiology to numbers of cases. However, in many
circumstances the investigators also calculate rates (number of
cases divided by the population or number of people at risk).
Numbers indicate the burden of disease and are useful for planning
and service delivery. Rates are essential for identifying groups with
elevated risk of disease.
Summarizing by time, place, and person
After characterizing an outbreak by time, place, and person, it is
useful to summarize what you know. For example, during an
investigation of an outbreak of Legionnaires’ disease in Louisiana,
members of the investigative team discussed what they knew based
on the descriptive epidemiology.35
Specifically, the epidemic curve
indicated that the outbreak was basically over, because no new
case had been reported in the previous two weeks. The affected
population had a greater proportion of persons who were black,
female, young, and less likely to smoke than persons in a typical
Legionnaires’ outbreak. There appeared to be no clustering by
either residence or worksite, and no connection with exposure to
the town’s cooling towers. Thus, the investigators were forced to
develop new hypotheses about a source of Legionnaires’ disease to
explain this outbreak.
Investigating an Outbreak
Page 6-37
Step 7: Develop hypotheses
“Round up the usual
suspects.”
- Capt. Renault (Claude
Rains) to his policemen
after Rick Blaine
(Humphrey Bogart) had
just shot a Nazi officer,
Casablanca, 1942
Although the next conceptual step in an investigation is
formulating hypotheses, in reality, investigators usually begin to
generate hypotheses at the time of the initial telephone call.
Depending on the outbreak, the hypotheses may address the source
of the agent, the mode (and vehicle or vector) of transmission, and
the exposures that caused the disease. The hypotheses should be
testable, since evaluating hypotheses is the next step in the
investigation.
In an outbreak context, hypotheses are generated in a variety of
ways. First, consider what you know about the disease itself: What
is the agent’s usual reservoir? How is it usually transmitted? What
vehicles are commonly implicated? What are the known risk
factors? In other words, by being familiar with the disease, you
can, at the very least, “round up the usual suspects.”
Another useful way to generate hypotheses is to talk to a few of the
case-patients, as discussed in Step 3. The conversations about
possible exposures should be open-ended and wide-ranging, not
necessarily confined to the known sources and vehicles. In some
challenging investigations that yielded few clues, investigators
have convened a meeting of several case-patients to search for
common exposures. In addition, investigators have sometimes
found it useful to visit the homes of case-patients and look through
their refrigerators and shelves for clues to an apparent foodborne
outbreak.
Just as case-patients may have important insights into causes, so
too may the local health department staff. The local staff know the
people in the community and their practices, and often have
hypotheses based on their knowledge.
The descriptive epidemiology may provide useful clues that can be
turned into hypotheses. If the epidemic curve points to a narrow
period of exposure, what events occurred around that time? Why
do the people living in one particular area have the highest attack
rate? Why are some groups with particular age, sex, or other
person characteristics at greater risk than other groups with
different person characteristics? Such questions about the data may
lead to hypotheses that can be tested by appropriate analytic
techniques.
Investigating an Outbreak
Page 6-38
When the epidemiology
does not fit the natural
pattern, think unnatural,
i.e., intentional.
Given recent concerns about bioterrorism, investigators should
consider intentional dissemination of an infectious or chemical
agent when trying to determine the cause of an outbreak. An
intentional act, one with either terrorist or criminal intent, should
be considered under a variety of circumstances listed in Table 6.6.
Investigators of an outbreak of salmonellosis in The Dalles,
Oregon, were stumped when they were able to implicate salad bars
in several local restaurants, but could not identify any common
ingredients or distribution system.36
A year later, a member of a
local cult admitted that the cult had intentionally contaminated the
salads bars with Salmonella organisms. The lesson learned is that
when the epidemiology does not fit the usual or natural patterns of
transmission, investigators should think about intentional modes of
transmission.
Table 6.6 Epidemiologic Clues to Bioterrorism
1. Single case of disease caused by an uncommon agent (e.g., glanders, smallpox, viral hemorrhagic fever,
inhalational or cutaneous anthrax) without adequate epidemiologic explanation
2. Unusual, atypical, genetically engineered, or antiquated strain of an agent (or antibiotic-resistance pattern)
3. Higher morbidity and mortality in association with a common disease or syndrome or failure of such patients
to respond to usual therapy
4. Unusual disease presentation (e.g., inhalational anthrax or pneumonic plague)
5. Disease with an unusual geographic or seasonal distribution (e.g., tularemia in a non-endemic area,
influenza in the summer)
6. Stable endemic disease with an unexplained increase in incidence (e.g., tularemia, plague)
7. Atypical disease transmission through aerosols, food, or water, in a mode suggesting deliberate sabotage
(i.e., no other physical explanation)
8. No illness in persons who are not exposed to common ventilation systems (have separate closed ventilation
systems) when illness is seen in persons in close proximity who have a common ventilation system
9. Several unusual or unexplained diseases coexisting in the same patient without any other explanation
10. Unusual illness that affects a large, disparate population (e.g., respiratory disease in a large population may
suggest exposure to an inhalational pathogen or chemical agent)
11. Illness that is unusual (or atypical) for a given population or age group (e.g., outbreak of measles-like rash
in adults)
12. Unusual pattern of death or illness among animals (which may be unexplained or attributed to an agent of
bioterrorism) that precedes or accompanies illness or death in humans
13. Unusual pattern of death or illness among humans (which may be unexplained or attributed to an agent of
bioterrorism) that precedes or accompanies illness or death in animals
14. Ill persons who seek treatment at about the same time (point source with compressed epidemic curve)
15. Similar genetic type among agents isolated from temporally or spatially distinct sources
16. Simultaneous clusters of similar illness in noncontiguous areas, domestic or foreign
17. Large number of cases of unexplained diseases or deaths
Source: Treadwell TA, Koo D, Kuker K, Khan AS. Epidemiologic clues to bioterrorism. Public Health Reports 2003; 118:92–8.
Outliers also can provide important clues. In an outbreak of
thyrotoxicosis in 1985, most cases came from Luverne, Minnesota,
and the surrounding areas. Only one case was identified in Sioux
Falls, South Dakota, 60 miles away. Did this person ever go to
Luverne? Yes. Was she a friend or acquaintance of any of the
Luverne cases? Not really. What does she do when she goes to
Luverne? Visit my father and buy the locally produced ground beef
that he sells in his store. Aha! The hypothesis that the locally
produced ground beef was the vehicle could easily be tested by
Investigating an Outbreak
Page 6-39
asking case-patients and controls (persons without thyrotoxicosis
or other thyroid disease) whether they ate ground beef from the
same source. Case-patients did, controls did not.37
Step 8: Evaluate hypotheses epidemiologically
After a hypothesis that might explain an outbreak has been
developed, the next step is to evaluate the plausibility of that
hypothesis. Typically, hypotheses in a field investigation are
evaluated using a combination of environmental evidence,
laboratory science, and epidemiology. From an epidemiologic point
of view, hypotheses are evaluated in one of two ways: either by
comparing the hypotheses with the established facts or by using
analytic epidemiology to quantify relationships and assess the role
of chance.
The first method is likely to be used when the clinical, laboratory,
environmental, and/or epidemiologic evidence so obviously
supports the hypotheses that formal hypothesis testing is
unnecessary. For example, in an outbreak of hypervitaminosis D
that occurred in Massachusetts in 1991, investigators found that all
of the case-patients drank milk delivered to their homes by a local
dairy. Therefore, investigators hypothesized that the dairy was the
source and the milk was the vehicle. When they visited the dairy,
they quickly recognized that the dairy was inadvertently adding far
more than the recommended dose of vitamin D to the milk. No
analytic epidemiology was really necessary to evaluate the basic
hypothesis in this setting or to implement appropriate control
measures, although investigators did conduct additional studies to
identify additional risk factors.38,39
In many other investigations, however, the circumstances are not as
straightforward, and information from the series of cases is not
sufficiently compelling or convincing. In such investigations,
epidemiologists use analytic epidemiology to test their hypotheses.
The key feature of analytic epidemiology is a comparison group.
The comparison group allows epidemiologists to compare the
observed pattern among case-patients or a group of exposed persons
with the expected pattern among noncases or unexposed persons.
By comparing the observed with expected patterns, epidemiologists
can determine whether the observed pattern differs substantially
from what should be expected and, if so, by what degree. In other
words, epidemiologists can use analytic epidemiology with its
hallmark comparison group to quantify relationships between
exposures and disease, and to test hypotheses about causal
relationships. The two most common types of analytic epidemiology
Investigating an Outbreak
Page 6-40
studies used in field investigations are retrospective cohort studies
and case-control studies, as described in the following sections.
Retrospective cohort studies
A retrospective cohort study is the study of choice for an outbreak in
a small, well-defined population, such as an outbreak of
gastroenteritis among wedding guests for which a complete list of
guests is available. In a cohort study, the investigator contacts each
member of the defined population (e.g., wedding guests), determines
each person’s exposure to possible sources and vehicles (e.g., what
food and drinks each guest consumed), and notes whether the person
later became ill with the disease in question (e.g., gastroenteritis).
After collecting similar information from each attendee, the
investigator calculates an attack rate for those exposed to (e.g., who
ate) a particular item and an attack rate for those who were not
exposed. Generally, an exposure that has the following three
characteristics or criteria is considered a strong suspect:
1. The attack rate is high among those exposed to the item.
2. The attack rate is low among those not exposed, so the
difference or ratio between attack rates is high.
3. Most of the case-patients were exposed to the item, so that
the exposure could “explain” or account for most, if not all,
of the cases.
Method for calculating risk
ratio:
Attack rate (risk)
in exposed group
Attack rate (risk)
in unexposed group
Relative and attributable risk. Commonly, the investigator
compares the attack rate in the exposed group to the attack rate in
the unexposed group to measure the association between the
exposure (e.g., the food item) and disease. This is called the risk
ratio or the relative risk. When the attack rate for the exposed
group is the same as the attack rate for the unexposed group, the
relative risk is equal to 1.0, and the exposure is said not to be
associated with disease. The greater the difference in attack rates
between the exposed and unexposed groups, the larger the relative
risk, and the stronger the association between exposure and disease.
Table 6.7 includes data from an investigation of an outbreak of
Salmonella Typhimurium gastroenteritis following a company’s
holiday banquet in December 2003.40
Approximately 135 persons
attended the party, and of 116 who were interviewed, 57 (49%) met
the case definition. Food-specific attack rates for those who did and
did not eat each of 9 items served only at this banquet are presented.
Scan the column of attack rates among those who ate the specified
items and consider the three criteria listed on the previous page.
Which item shows the highest attack rate? Is the attack rate low
Investigating an Outbreak
Page 6-41
among persons not exposed to that item? Were most of the 57 case-
patients exposed to that food item?
Table 6.7 Attack Rates By Items Served at Company A’s Holiday Banquet — Virginia, December 2003
Food Items
Served
Number of Persons who ATE
Specified Food
Number of Persons who DID NOT
EAT Specified Food
Risk
Ratio
Ill Not Ill Total Attack Rate Ill Not Ill Total Attack Rate
Beef 53 28 81 65% 4 31 35 11% 5.7
Ravioli 43 35 78 55% 14 24 38 37% 1.5
Cajun sauce* 19 11 30 63% 37 48 85 44% 1.5
Pesto cream* 37 29 66 56% 19 30 49 39% 1.4
California rolls* 21 14 35 60% 34 44 78 44% 1.4
Mushrooms* 32 26 58 55% 24 31 55 44% 1.3
Broccoli* 34 30 64 53% 22 29 51 43% 1.2
Carrots* 34 30 64 53% 23 28 51 43% 1.2
Potatoes* 39 41 80 49% 17 17 34 50% 1.0
*Excludes 1 or more persons with indefinite history of consumption of that food.
Source: Jani AA, Barrett E, Murphy J, Norton D, Novak C, Painter J, Toney D. A steamship full of trouble: an outbreak of Salmonella
Typhimurium DT 104 gastroenteritis at a holiday banquet–Virginia, 2003. Presented at 53rd Annual Epidemic Intelligence Service
Conference, April 19-23, 2004, Atlanta.
Beef, which had the highest attack rate among those who ate it, the
lowest attack rate among those who did not eat it, and could
account for almost all (53 of 57) of the cases, was indeed the
culprit. The data showing the relationship between an exposure and
disease are often displayed in a two-by-two table. The following
two-by-two table shows the data for beef and gastroenteritis.
Table 6.8 Risk of Gastroenteritis By Consumption of Beef — Virginia, December 2003
Ill Not Ill Total Attack Rate (Risk)
Ate beef?
Ate beef Yes 53 28 81 65.4%
Ate be No 4 31 35 11.4%
Ate be Total 57 59 116 49.1%
Risk ratio = 65.4 / 11.4 = 5.7
Proportion of cases exposed = 53 / 57 = 93.0%
Population attributable risk percent = (49.1 - 11.4) / 49.1 = 76.7%
Source; Jani AA, Barrett E, Murphy J, Norton D, Novak C, Painter J, Toney D. A steamship full of trouble: an outbreak of Salmonella
Typhimurium DT 104 gastroenteritis at a holiday banquet–Virginia, 2003. Presented at 53rd Annual Epidemic Intelligence Service
Conference, April 19-23, 2004, Atlanta.
The risk ratio is calculated as the ratio of the attack rates or risks,
i.e., 65.4% divided by 11.4%, which equals 5.7. This risk ratio
indicates that persons who ate the beef were 5.7 times more likely
to become ill than those who did not eat the beef.
Considering the third criterion listed earlier, notice that almost all
(53 out of 57) of the cases could be accounted for by the beef.
Some investigators use a more quantitative approach and calculate
Investigating an Outbreak
Page 6-42
Method for calculating
population attributable risk
percent:
( ARP - ARU )
ARP
ARP = Attack rate (risk) in
total population
ARU = Attack rate (risk) in
unexposed group
a population attributable risk percent for each food. The population
attributable risk percent describes the proportion of illness in the
entire study population that could be attributable to a given
exposure, assuming that those who became ill in the unexposed
group and a similar proportion in the exposed group must be
attributable to something else. The population attributable risk
percent may actually be an underestimate in many outbreaks, since
it does not take into account such common occurrences as cross-
contamination of foods or sampling of a spouse’s dish. The
population attributable risk percent for beef was 76.7% (see Table
6.8), much higher than that for any other food.
Statistical significance testing. When an exposure is found to have
a relative risk different from 1.0, many investigators calculate a
chi-square or other test of statistical significance to determine the
likelihood of finding an association as large or larger on the basis
of chance alone. A detailed description of statistical testing is
beyond the scope of this lesson, but the following text presents
some key features and formulas.
To test an association for statistical significance, assume first that
the exposure is not related to disease, i.e., the relative risk (RR)
equals 1.0. This assumption is known as the null hypothesis. The
alternative hypothesis, which will be adopted if the null
hypothesis proves to be implausible, is that exposure is associated
with disease. Next, compute a measure of association, such as a
risk ratio or odds ratio. Then calculate a chi-square or other
statistical test. This test indicates the probability of finding an
association as strong as or stronger than the one you have observed
if the null hypothesis were really true, that is, if in reality the
exposure being tested was not related to the disease. This
probability is called the p-value. A very small p-value means that
the observed association occurs only rarely if the null hypothesis is
true. If the p-value is smaller than some cutoff that has been
specified in advance, commonly 0.05 or 5%, you discard or reject
the null hypothesis in favor of the alternative hypothesis.
Table 6.9 shows the standard notation for a two-by-two table.
Table 6.9 Standard Notation of a Two-By-Two Table
Ill Well Total Attack Rate (Risk)
Exposed a b a+b = H1 a / a+b
Unexposed c d c+d = H0 c / c+d
Total a+c=V1 b+d=V2 T V1 / T
Investigating an Outbreak
Page 6-43
One formula for the chi-square
test:
T(ad-bc)2
H1 x H0 x V1 x V2
The most common statistical test for data in a two-by-two table
from an outbreak is the chi-square test. To apply this test, calculate
the chi-square statistic, then look up its corresponding p-value in a
table of chi-squares, such as Table 6.10. Since a two-by-two table
has 1 degree of freedom, a chi-square larger than 3.84 corresponds
to a p-value smaller than 0.05. This means that if you planned to
reject the null hypothesis if the p-value is less than 0.05, you can
do so if your value for chi-square is greater than 3.84. Recognize,
however, that the chi-square and similar tests are guides to help
you make a decision about a hypothesis. Whichever decision you
make, you may be right or you may be wrong. You could calculate
a p-value that is not less than 0.05 and consequently fail to reject
the null hypothesis, which may turn out to be true. This often
occurs when a study has relatively few people. The opposite can
also occur — a p-value less than 0.05 can actually be a chance
finding rather than the true explanation of the outbreak.
Table 6.10 Table of Chi-Squares
Degrees of
Freedom
Probability
.50 .20 .10 .05 .02 .01 .001
1 .455 1.642 2.706 3.841 5.412 6.635 10.827
2 1.386 3.219 4.605 5.991 7.824 9.210 13.815
3 2.366 4.642 6.251 7.815 9.837 11.345 16.268
4 3.357 5.989 7.779 9.488 11.668 13.277 18.465
5 4.351 7.289 9.236 11.070 13.388 15.086 20.517
10 9.342 13.442 15.987 18.307 21.161 23.209 29.588
15 14.339 19.311 22.307 24.996 28.259 30.578 37.697
20 19.337 25.038 28.412 31.410 35.020 37.566 43.315
25 24.337 30.675 34.382 37.652 41.566 44.314 52.620
30 29.336 36.250 40.256 43.773 47.962 50.892 59.703
Consider the gastroenteritis and beef consumption data presented
in Table 6.8. The relative risk is 5.7, which most epidemiologists
would deem a “strong” association between exposure and disease.
In addition, the p-value is exceedingly small, less than 0.001, and
far less than the commonly used cutoff of 0.05. So the
investigators rejected the null hypothesis (that beef was not
associated with illness) and adopted the alternative hypothesis (that
beef was indeed associated with illness). In this outbreak, the
association between eating beef at the banquet and gastroenteritis
was both strong (RR=5.7) and statistically significant (p < 0.001).
The chi-square test works well if the number of people in the study
is greater than about 30. For smaller studies, a test called the Fisher
Exact Test may be more appropriate. Because the Fisher Exact
Test is tedious to calculate, let Epi Info or another computer
program perform the calculations for you.
Investigating an Outbreak
Page 6-44
Confidence intervals. An alternative to calculating a p-value is
calculating a confidence interval. A 95% confidence interval, the
interval used most commonly by epidemiologists, corresponds to a
p=0.05 cut-off. In non-technical terms, a confidence interval for a
risk ratio is the range of values of the risk ratio consistent with the
data in a study. A wide confidence interval indicates that the study
is consistent with a wide range of values, i.e., the study is not very
precise in describing the strength of the association (risk ratio)
between exposure and disease. A narrow confidence interval
indicates that the risk ratio is fairly precise. Consider again the
gastroenteritis data in Table 6.8. The 95% confidence interval for
the risk ratio of 5.7 ranged from 2.2 to 14.6. This confidence
interval indicates that the study is consistent with risk ratios for the
beef/gastroenteritis association in that range.
Because a confidence interval provides more information than a p-
value does, many medical and epidemiologic journals now prefer
confidence intervals to p-values. However, in the outbreak setting,
the difference may be irrelevant. If the objective of an outbreak
investigation is to identify the culprit such as a contaminated food,
a relative risk and p-value may do just as well as a relative risk and
confidence interval.
Case-control studies
A cohort study is feasible only when the population is well defined
and can be followed over a period of time. However, in many
outbreak settings, the population is not well defined and speed of
investigation is important. In such settings, the case-control study
becomes the study design of choice.
In a case-control study, the investigator asks both case-patients and
a comparison group of persons without disease (“controls”) about
their exposures. Using the information about disease and exposure
status, the investigator then calculates an odds ratio to quantify the
relationship between exposure and disease. Finally, a p-value or
confidence interval is calculated to assess statistical significance.
Choosing controls. When designing a case-control study, one of
the most important decisions is deciding who the controls should
be. The controls must not have the disease being studied, but
should represent the population in which the cases occurred. In
other words, they should be similar to the cases except that they
don’t have the disease. The controls provide the level of exposure
you would expect to find among the case-patients if the null
hypothesis were true. If exposure is much more common among
the case-patients than among the controls, i.e., the observed
exposure among case-patients is greater than expected exposure
Investigating an Outbreak
Page 6-45
provided by the controls, then exposure is said to be associated
with illness.
In practice, choosing who the most appropriate control group is
may be quite difficult. In addition, investigators must consider
logistical issues, such as how to contact potential controls, gain
their cooperation, ensure that they are free of disease, and obtain
appropriate exposure data from them. In a community outbreak, a
random sample of the healthy population may, in theory, be the
best control group. In practice, however, persons in a random
sample may be difficult to contact and enroll. Nonetheless, many
investigators attempt to enroll such “population-based” controls
through dialing of random telephone numbers in the community or
through a household survey.
Other common control groups consist of:
• Neighbors of case-patients,
• Patients from the same physician practice or hospital who
do not have the disease in question,
• Friends of case-patients.
While controls from these groups may be more likely to participate
in the study than randomly identified population-based controls,
they may not be as representative of the population. If the control
group is systematically different from the case group in certain
ways, a true association between exposure and disease may be
missed or a spurious association may be observed between a non-
causal exposure and disease. A systematic difference between
cases and controls that results in a mistaken estimate of the
association between exposure and disease is called a bias.
When designing a case-control study, you must consider a variety
of other issues about controls, including how many to use. Sample
size formulas are available to help you make this decision. In
general, the more subjects (case-patients and controls) in a study,
the easier it will be to find a statistically significant association.
Often, the number of case-patients that can be enrolled in a study is
limited by the size of the outbreak. For example, in a hospital, four
or five cases may constitute an outbreak. Fortunately, potential
controls are usually plentiful. In an outbreak of 50 or more cases,
one control per case will usually suffice. In smaller outbreaks, you
might use two, three, or four controls per case. Including more than
four controls per case is rarely worth the effort in terms of
increasing the statistical power of your investigation.
Investigating an Outbreak
Page 6-46
As an example, consider again the outbreak of Legionnaires’
disease that occurred in Louisiana described at the end of Step 6.
Investigators enrolled 27 case-patients into a case-control study.
They also enrolled two controls per case, a total of 54 controls.
Using descriptive epidemiology, the investigators did not see any
connection with the town’s various cooling towers. Using analytic
epidemiology, the investigators determined quantitatively that
case-patients and controls were about equally exposed to cooling
towers. However, case-patients were far more likely to shop at a
particular grocery store, as shown in the following two-by-two
table.35
Table 6.11 Exposure to Grocery Store A Among Cases and Controls, Legionellosis Outbreak —
Louisiana, 1990
Cases Controls Total
Exposed 25 28 53
Unexposed 2 26 28
Data Source: Mahoney FJ, Hoge CW, Farley TA, Barbaree JM, Breiman RF, Benson RF, McFarland LM. Communitywide outbreak of
Legionnaires' disease associated with a grocery store mist machine. J Infect Dis 1992;165:736–9.
Method for calculating the
odds ratio:
OR
ad / bc
Odds ratios. In most case-control studies, the population is not
well defined, and the total number of people exposed (or
unexposed) to a suspected vehicle or source is not known. Without
a proper denominator, attack rates cannot be calculated. In the
example above, since the investigators did not know how many
community residents did or did not shop at Grocery Store A, they
could not calculate attack rates or a risk ratio. For a case-control
study, the measure of association of choice is the odds ratio.
Fortunately, for a rare disease such as legionellosis and most other
outbreak-associated diseases, the odds ratio from a case-control
study approximates the relative risk that would have been found if
a cohort study had been feasible.
The odds ratio for Grocery Store A is calculated as:
25 x 26 / 28 x 2 = 11.6
An odds ratio of 11 is quite large, indicating that shopping at
Grocery Store A was strongly associated with developing
legionellosis. These data would seem to indicate that persons
exposed to Grocery Store A had 11.6 times the odds of developing
legionellosis than persons not exposed to that store.
To test the statistical significance of this finding, a chi-square test
can be computed using the formula shown earlier.
Investigating an Outbreak
Page 6-47
For Grocery Store A, the chi-square is:
= 81 x (25 x 26 – 28 x 2)2
53 x 28 x 27 x 54
= 28,579,716 / 2,163,672
= 13.02
Referring to Table 6.10, a chi-square of 13.02 corresponds to a p-
value less than 0.001. A p-value this small indicates that the null
hypothesis is highly improbable, and the investigators rejected the
null hypothesis. The 95% confidence interval ranged from 2.3 to
78.7. Although this confidence interval is quite wide and includes a
wide range of values compatible with the data in the study, it does
not include the null hypothesis value of 1.0.
Investigating an Outbreak
Page 6-48
Exercise 6.7
You are called to help investigate a cluster of 17 persons who developed
brain cancer in an area over the past couple of years. Most, perhaps all,
used cell phones. Which study design would you choose to investigate a
possible association between cell phone use and brain cancer?
Check your answers on page 6-62
Investigating an Outbreak
Page 6-49
Exercise 6.8
Investigators conducted a case-control study of histoplasmosis among
industrial plant workers in Nebraska.41
The following table shows the
number of case-patients and controls who worked in Building X, near a
recently excavated site.
Cases Controls Total
Building X 15 8 23
Other Building 7 23 30
Total 22 31 53
1. What is the appropriate measure of association?
2. Calculate this measure.
3. The chi-square is 9.41, and the 95% confidence interval is 1.6–25.1. How would you
interpret your results?
Check your answers on page 6-63
Investigating an Outbreak
Page 6-50
Exercise 6.9
Consider the following data from an outbreak of gastroenteritis among
college football players.42
At which meal do you think the critical exposure
occurred?
Ate Meal Did Not Eat Meal
Meal #Ill (% Ill) Total #Ill (% Ill) Total
9/18 Breakfast 9 (90) 10 45 (46) 98
9/18 Lunch 50 (62) 81 4 (15) 27
9/18 Dinner 45 (52) 87 9 (43) 21
9/18 Late dinner 34 (54) 63 20 (44) 45
9/19 Breakfast 42 (49) 85 12 (52) 23
9/19 Lunch 39 (51) 76 15 (47) 32
Check your answers on page 6-63
Investigating an Outbreak
Page 6-51
Step 9: Reconsider, refine, and re-evaluate
hypotheses
Unfortunately, analytic studies sometimes are unrevealing. This is
particularly true if the hypotheses were not well founded at the
outset. It is an axiom of field epidemiology that if you cannot
generate good hypotheses (for example, by talking to some case-
patients or local staff and examining the descriptive epidemiology
and outliers), then proceeding to analytic epidemiology, such as a
case-control study, is likely to be a waste of time.
When analytic epidemiology is unrevealing, rethink your
hypotheses. Consider convening a meeting of the case-patients to
look for common links or visiting their homes to look at the
products on their shelves. Consider new vehicles or modes of
transmission.
An investigation of an outbreak of Salmonella Muenchen in Ohio
illustrates how a reexamination of hypotheses can be productive. In
that investigation, a case-control study failed to implicate any
plausible food source as a common vehicle. Interestingly, all case-
households but only 41% of control households included persons
aged 15–35 years. The investigators thus began to consider
vehicles of transmission to which young adults were commonly
exposed. By asking about drug use in a second case-control study,
the investigators implicated marijuana as the likely vehicle.
Laboratory analysts subsequently isolated the outbreak strain of S.
Muenchen from several samples of marijuana provided by case-
patients.43
Even when an analytic study identifies an association between an
exposure and disease, the hypothesis may need to be honed. For
example, in the investigation of Legionnaires’ disease (Table
6.11), what about Grocery Store A linked it to disease? The
investigators asked case-patients and controls how much time they
spent in the store and where they went in the store. Using the
epidemiologic data, the investigators were able to implicate the
ultrasonic mist machine that sprayed the fruits and vegetables. This
association was confirmed in the laboratory, where the outbreak
subtype of the Legionnaires’ disease bacillus was isolated from the
water in the mist machine’s reservoir.35
Sometimes a more specific control group is needed to test a more
specific hypothesis. For example, in many hospital outbreaks,
investigators use an initial study to narrow their focus. They then
conduct a second study, with more closely matched controls, to
Investigating an Outbreak
Page 6-52
identify a more specific exposure or vehicle. In a large community
outbreak of botulism in Illinois, investigators used three sequential
case-control studies to identify the vehicle. In the first study,
investigators compared exposures of case-patients and controls
from the general public to implicate a restaurant. In a second study
they compared restaurant exposures of case-patients and healthy
restaurant patrons to identify a specific menu item, a meat and
cheese sandwich. In a third study, investigators used radio
broadcast appeals to identify healthy restaurant patrons who had
eaten the implicated sandwich. Compared to case-patients who had
also eaten the sandwich, controls were more likely to have avoided
the onions that came with the sandwich. Type A Clostridium
botulinum was then identified from a pan of leftover sautéed
onions used to make only that particular sandwich.44
Finally, recall that one reason to investigate outbreaks is research.
An outbreak may provide an “experiment of nature” that would be
unethical to set up deliberately but from which the scientific
community can learn when it does happen to occur. For example,
the outbreak of West Nile virus in Queens, New York, in 1999 was
promptly investigated to determine the extent of the outbreak and
risk factors for disease so appropriate control measures could be
developed and implemented.45
However, capitalizing on this
unfortunate “experiment of nature,” investigators continued to
follow the patients to determine the persistence of IgM and the
prognosis of patients up to two years after infection.46, 47
Thus, the
investigations resulted not only in the development of appropriate
control and prevention strategies, but also in increased knowledge
about a health problem not previously seen or studied in the
Western hemisphere.
When an outbreak occurs, whether it is routine or unusual,
consider what questions remain unanswered about that particular
disease and what kind of study you might do in this setting to
answer some of those questions. The circumstances may allow you
to learn more about the disease, its modes of transmission, the
characteristics of the agent, host factors, and the like.
Step 10: Compare and reconcile with laboratory and
environmental studies
While epidemiology can implicate vehicles and guide appropriate
public health action, laboratory evidence can confirm the findings.
The laboratory was essential in both the outbreak of salmonellosis
linked to marijuana and in the Legionellosis outbreak traced to the
grocery store mist machine. You may recall that the investigation
of pneumonia among attendees of an American Legion conference
Investigating an Outbreak
Page 6-53
in Philadelphia in 1976 that gave Legionnaires’ disease its name
was not considered complete until a new organism was isolated in
the laboratory some six months later.48
Environmental studies are equally important in some settings.
They are often helpful in explaining why an outbreak occurred. For
example, in the investigation of the outbreak of E. coli O157:H7
among visitors to a county fair, the epidemiologists were able to
identify one very strong risk factor — consumption of beverages
with ice purchased from a vendor in zone 6. Environmental
inspection of the fairgrounds identified lack of chlorination of the
well supplying water to that zone. Furthermore, the well was found
to be close to the manure pits and a septic tank for the worker’s
dormitory. Flourescein dye poured into the bathroom of the dorm
found its way into the well water, revealing cross-contamination.
Finally, laboratorians were able to culture E. coli from the well, the
supply line, and the tap at zone 6.49
Thus the epidemiologic,
environmental, and laboratory arms of the investigation
complemented one another, and led to an inescapable conclusion
that the well had been contaminated and was the source of the
outbreak.
While you may not be an expert in these other areas, you can help.
Use a camera to photograph working or environmental conditions.
Coordinate with the laboratory, and bring back physical evidence
to be analyzed.
Step 11: Implement control and prevention measures
In most outbreak investigations, the primary goal is control of the
outbreak and prevention of additional cases. Indeed, although
implementing control and prevention measures is listed as Step 11
in the conceptual sequence, in practice control and prevention
activities should be implemented as early as possible. The health
department’s first responsibility is to protect the public’s health, so
if appropriate control measures are known and available, they
should be initiated even before an epidemiologic investigation is
launched. For example, a child with measles in a community with
other susceptible children may prompt a vaccination campaign
before an investigation of how that child became infected.
Confidentiality is an important issue in implementing control
measures. Healthcare workers need to be aware of the
confidentiality issues relevant to collection, management and
sharing of data. For example, in the treatment of tuberculosis (TB),
the relationship between the patient and the healthcare worker is
extremely important because of the serious consequences of
Investigating an Outbreak
Page 6-54
treatment failure. If patient information is disclosed to
unauthorized persons without the patient’s permission, the patient
may be stigmatized or experience rejection from family and
friends, lose a job, or be evicted from housing. Moreover, the
healthcare worker may lose the trust of the patient, which can
affect adherence to TB treatment. Therefore, confidentiality — the
responsibility to protect a patient’s private information — is
critical in TB control and many other situations. 50
In general, control measures are usually directed against one or
more segments in the chain of transmission (agent, source, mode of
transmission, portal of entry, or host) that are susceptible to
intervention. For some diseases, the most appropriate intervention
may be directed at controlling or eliminating the agent at its
source. A patient with a communicable disease such as
tuberculosis, whether symptomatic or asymptomatic, may be
treated with antibiotics both to clear the infection and to reduce the
risk of transmission to others. For an environmental toxin or
infectious agent that resides in soil, the soil may be
decontaminated or covered to prevent escape of the agent.
Some interventions are aimed at blocking the mode of
transmission. Interruption of direct transmission may be
accomplished by isolation of someone with infection, or
counseling persons to avoid the specific type of contact associated
with transmission. Similarly, to control an outbreak of influenza-
like illness in a nursing home, affected residents could be
cohorted, that is, put together in a separate area to prevent
transmission to others. Vehicle borne transmission may be
interrupted by elimination or decontamination of the vehicle. For
example, contaminated foods should be discarded, and surgical
equipment is routinely sterilized to prevent transmission. Efforts to
prevent fecal-oral transmission often focus on rearranging the
environment to reduce the risk of contamination in the future and
on changing behaviors, such as promoting hand washing. For
airborne diseases, strategies may be directed at modifying
ventilation or air pressure, and filtering or treating the air. To
interrupt vector borne transmission, measures may be directed
toward controlling the vector population, such as spraying to
reduce the mosquito population that may carry West Nile virus.
Some simple and effective strategies protect portals of entry. For
example, bed nets are used to protect sleeping persons from being
bitten by mosquitoes that may transmit malaria. A dentist’s mask
and gloves are intended to protect the dentist from a patient’s
blood, secretions, and droplets, as well to protect the patient from
Investigating an Outbreak
Page 6-55
the dentist. Wearing of long pants and sleeves and use of insect
repellent are recommended to reduce the risk of Lyme disease and
West Nile virus infection.
Some interventions aim to increase a host’s defenses. Vaccinations
promote development of specific antibodies that protect against
infection. Similarly, prophylactic use of antimalarial drugs,
recommended for visitors to malaria-endemic areas, does not
prevent exposure through mosquito bites but does prevent infection
from taking root.
Step 12: Initiate or maintain surveillance
Once control and prevention measures have been implemented,
they must continue to be monitored. If surveillance has not been
ongoing, now is the time to initiate active surveillance. If active
surveillance was initiated as part of case finding efforts, it should
be continued. The reasons for conducting active surveillance at this
time are twofold. First, you must continue to monitor the situation
and determine whether the prevention and control measures are
working. Is the number of new cases slowing down or, better yet,
stopping? Or are new cases continuing to occur? If so, where are
the new cases? Are they occurring throughout the area, indicating
that the interventions are generally ineffective, or are they
occurring only in pockets, indicating that the interventions may be
effective but that some areas were missed?
Second, you need to know whether the outbreak has spread outside
its original area or the area where the interventions were targeted.
If so, effective disease control and prevention measures must be
implemented in these new areas.
Step 13: Communicate findings
As noted in Step 1, development of a communications plan and
communicating with those who need to know during the
investigation is critical. The final task is to summarize the
investigation, its findings, and its outcome in a report, and to
communicate this report in an effective manner. This
communication usually takes two forms:
• An oral briefing for local authorities. If the field
investigator is responsible for the epidemiology but not
disease control, then the oral briefing should be attended by
the local health authorities and persons responsible for
implementing control and prevention measures. Often these
persons are not epidemiologists, so findings must be
presented in clear and convincing fashion with appropriate
and justifiable recommendations for action. This
Investigating an Outbreak
Page 6-56
presentation is an opportunity for the investigators to
describe what they did, what they found, and what they
think should be done about it. They should present their
findings in a scientifically objective fashion, and they
should be able to defend their conclusions and
recommendations.
• A written report. Investigators should also prepare a
written report that follows the usual scientific format of
introduction, background, methods, results, discussion, and
recommendations. By formally presenting
recommendations, the report provides a blueprint for action.
It also serves as a record of performance and a document for
potential legal issues. It serves as a reference if the health
department encounters a similar situation in the future.
Finally, a report that finds its way into the public health
literature serves the broader purpose of contributing to the
knowledge base of epidemiology and public health.
In recent years, the public has become more aware of and
interested in public health. In response, health departments have
made great strides in attempting to keep the public informed. Many
health departments strive to communicate directly with the public,
usually through the media, both during an investigation and when
the investigation is concluded.
Epi-X is the CDC’s Web-
based communications
solution for public health
professionals. Through
Epi-X, CDC officials, state
and local health
departments, poison
control centers, and other
public health professionals
can access and share
preliminary health
surveillance information
quickly and securely. Users
can also be actively
notified of breaking health
events as they occur. Key
features of Epi-X include:
• Scientific and editorial
support
• Controlled user access
• Digital credentials and
authentication
• Rapid outbreak
reporting
• Peer-to-peer
consultation.
Investigating an Outbreak
Page 6-57
Summary
Outbreaks occur frequently. Not every outbreak comes to light, but of those that do, public health
agencies must decide whether to handle them without leaving the office, or spend the time,
energy, and resources to conduct field investigations. The most important reason to investigate is
to learn enough about the situation to implement appropriate control and prevention measures.
Other reasons include taking the opportunity to advance knowledge about the disease, agent, risk
factors, interventions and other scientific issues; responding to public, political, or legal
concerns; evaluating a health program’s effectiveness and weaknesses; and to provide training.
Outbreaks are almost always unexpected events. Sometimes they are the subject of media
attention and public concern, so investigators feel pressured to work quickly to find answers.
When multiple agencies are involved, coordination and communication become even more
essential but are more complicated than usual. Often the investigation takes place in the field, far
from the conveniences and routines one counts on in the office. Under these circumstances, it is
essential to have a systematic plan for conducting the investigation.
The steps listed in Table 6.2 comprise one such plan. Note that the order of the steps is
conceptual, and investigators may decide that a different order is best suited for any given
outbreak. To summarize, these are the steps of an outbreak investigation:
• Planning for field work, establishing the existence of an outbreak, and verifying the
diagnosis are usually the first steps, sometimes done in that order, sometimes done in
reverse order, sometimes done simultaneously. (Steps 1–3)
• After the diagnosis has been confirmed investigators create a workable case definition,
then go out and look for additional cases. Information about these cases is organized either
in a line listing or in a computer database that allows staffers to check for duplicate
records, update records as additional information comes in, and perform descriptive
epidemiology. (Steps 4-6)
• Descriptive epidemiology — organizing the data by time, place, and person — is essential
for characterizing the outbreak, identifying populations at risk, developing hypotheses
about risk factors, and targeting control/prevention strategies. An epidemic curve — a
histogram of number of cases by time of onset of illness — provides a handy visual
display of the outbreak’s magnitude and time trend. (Step 6)
• Hypotheses, based on what is known about the disease, descriptive epidemiology, and
what others have postulated, must be developed before conducting any kind of
epidemiologic study (what are you going to study if you don’t know what you are looking
for?). (Step 7)
• While not every outbreak requires an analytic study, those that do are usually addressed
by either a cohort study or a case-control study. Both types of study attempt to identify
associations between exposures (risk factors or causes) and the disease of interest. In a
cohort study, best suited for an outbreak in a well-defined population such as guests at a
wedding, investigators usually attempt to enroll everyone, determine exposures and
outcomes, calculate attack rates, and compare attack rates with a risk ratio or relative risk
to identify associations. In a case-control study, which is well suited for outbreaks without
a well-defined population, investigators usually enroll all of the case-patients plus a
Investigating an Outbreak
Page 6-58
sample of persons who did not get ill, then ask about exposures and compute an odds ratio
to look for associations. (Step 8)
• If needed, hypotheses can be refined and re-evaluated. In many investigations, while the
epidemiologists are conducting their epidemiologic investigations, environmental health
specialists and laboratorians are conducting studies and tests of their own. Ideally, this
multidisciplinary approach points to a single conclusion. (Steps 9 and 10)
• While implementing control and prevention measures is listed as Step 11, it is the primary
goal of most outbreak investigations and usually occurs early in the investigation. Such
measures can be implemented as soon as any link in the chain of disease transmission that
is susceptible to intervention can be identified. If the source and mode of transmission is
known, disease control measures need not wait. However, there is no guarantee that these
measures will work, so continued surveillance is essential. (Steps 11 and 12)
• Finally, communicating what was found and what should be or was done in a written
report provides key public health, scientific, and legal documentation. (Step 13)
Investigating an Outbreak
Page 6-59
Exercise Answers
Exercise 6.1
Nine cases of cancer in a community represents a cluster — a group of cases in a given area over
a particular period of time that seems to be unusual, although we do not actually know the size of
the community, the background rate of cancer, and the number of cases that might be expected.
Nonetheless, either the health department or the community or both is concerned enough to raise
the issue. Under these circumstances, an investigation may be justified for several reasons.
1. Because the number of expected cases is not known (or at least not stated), one reason to
investigate is to determine how many cases to expect in the community. In a large
community, nine cases of a common cancer (for example, lung, breast, or colon cancer)
would not be unusual. If the particular cancer is a rare type, nine cases even in a large
community may be unusual. And in a very small community, nine cases of even a common
cancer may be unusual.
2. If the number of cancer cases turns out to be high for that community, public health officials
might choose to investigate further. They may have a research agenda — perhaps they can
identify a new risk factor (workers exposed to a particular chemical) or predisposition
(persons with a particular genetic trait) for the cancer.
3. Control and prevention may be the justification for additional investigation. If modifiable
risk factors are known or identified, control and prevention measures can be developed.
Alternatively, if the cancer is one that can treated successfully if found early, and a screening
test is available, then investigation might focus on why these persons died from a treatable
disease. If, for example, the nine cases were cancers of the cervix (detectable by Pap smear
and generally nonfatal if identified and treated early), a study might identify: a) lack of
access to healthcare; b) physicians not following the recommendations to screen women at
appropriate intervals; and/or c) laboratory error in reading or reporting the test results.
Measures to correct these problems, such as public screening clinics, physician education,
and laboratory quality assurance, could then be developed.
4. If new staff need to gain experience in conducting cluster investigations, training might be a
justification for investigating these cases. More commonly, cancer clusters generate public
concern, which, in turn, often results in political pressure. Perhaps one of the affected persons
is a member of the mayor’s family. A health department needs to be responsive to such
concerns, and should investigate enough to address the concerns with facts. Finally, legal
concerns may prompt an investigation, especially if a particular site (manufacturing plant,
houses built on an old dump site, etc.) is accused of causing the cancers.
Investigating an Outbreak
Page 6-60
Exercise 6.2
First, you should check the dates of onset rather than dates of report. The 12 reports could
represent 12 recent cases, but could represent 12 cases scattered in time that were sent in as a
batch.
However, assuming that all 12 reports of tuberculosis and the 12 of West Nile virus infection
represent recent cases in a single county, both situations could be called clusters (several new
cases seen in a particular area during a relatively brief period of time). Classifying the cases as an
outbreak depends on whether the 12 cases exceed the usual number of cases reported in August
in that county.
Tuberculosis does not have a striking seasonal distribution. The number of cases during August
could be compared with: a) the numbers reported during the preceding several months; and b)
the numbers reported during August of the preceding few years.
West Nile virus infection is a highly seasonal disease that peaks during August-September-
October. As a result, the number of cases in August is expected to be higher than the numbers
reported during the preceding several months. To determine whether the number of cases
reported in August is greater than expected, the number must be compared with the numbers
reported during August of the preceding few years.
Exercise 6.3
Initial Case Definition
Patient 1: No, eosinophil count < 2,000
cells/mm3
Patient 2: Yes
Patient 3: Yes
Patient 4: Yes
Patient 5: Yes
Patient 6: No, eosinophil count < 2,000
cells/mm3
Patient 7: No, other known cancer of
eosinophilia
Revised Case Definition
Patient 1: No, eosinophil count < 1,000
cells/mm3 and myalgias not
severe
Patient 2: Yes
Patient 3: Yes
Patient 4: No, myalgias not severe
Patient 5: Yes
Patient 6: Yes
Patient 7: No, other known cancer of
eosinophilia
This illustrates that a case definition is a method for deciding whether to classify someone as
having the disease of interest or not, not whether they actually do or do not have the disease.
Patients 1 and 4 may have mild cases, and Patient 7 may have leukemia and eosinophilia-
myalgia syndrome, but are classified as non-cases under the revised definition.
Exercise 6.4
A case definition is a set of standard criteria for determining whether an individual should be
categorized as having a particular disease or health-related condition. For an outbreak, a case
definition consists of clinical criteria and specification of time, place, and person. A case
definition can have degrees of certainty, e.g., suspect case (usually based on clinical and
Investigating an Outbreak
Page 6-61
sometimes epidemiologic criteria) versus confirmed case (based on laboratory confirmation).
The outbreak appeared to be limited to students (no adults reported illness), but included both
tour groups. Some students had severe abdominal pain and diarrhea and stool cultures positive
for E. coli O157. Clearly these should be counted as case-patients. Some students had the same
symptoms but negative cultures. Should they be counted as case-patients? Still others had the
same symptoms but no stool testing. Should they be counted as case-patients? Finally, two
students had single bouts of diarrhea, but no abdominal pain and negative cultures.
No one case definition is the absolutely correct case definition. One investigator could decide to
include those with symptoms but without testing as suspect or probable cases, while another
investigator could exclude them. Similarly, one investigator might put a great deal of faith in the
stool culture and exclude those who tested negative, regardless of the presence of compatible
symptoms, while another investigator might allow that some stool cultures could be “false
negatives” (test negative even though the person actually has the infection) and include them in a
suspect or probable or possible category. The two students with single bouts of diarrhea but no
abdominal pain and negative cultures seem least likely to have true cases of E. coli infection.
Similarly, the beginning time limit could be set on December 2, the date that Tour A departed, or
could be set later, to account for the minimum incubation period.
So, one case definition might be:
PERSON: Any tenth-grade student who went on either tour
PLACE: Limited to students at city high schools
TIME: Onset since December 2? 3? 4?
CLINICAL: Confirmed stool sample positive for E. coli O157:H7, regardless of
symptoms
SUSPECT: Self-reported severe abdominal pain and diarrhea >2 episodes/day, with
stool culture not done; or self-reported abdominal pain and diarrhea >2
episodes/day and stool culture negative
Exercise 6.5
ID # Age Sex Race Disease Date of Onset Lab Results
Signs,
Symptoms Physician
1 46 M W Lyme disease 8/1/2006 WB IgM+ EM,Fat,S,C Snow
2 56 F W Lyme disease 8/2/2006 WB IgM+,
WB IgG+
EM,A,Fat,S,Fev Farr
3 40 F W Lyme disease 8/17/2006 WB IgM+,
WB IgG+
EM Howard
4 53 M B Lyme disease 9/18/2006 WB IgM+,
WB IgG-
EM Fine
5 45 M W Lyme disease mid-May 2006 WB IgG+ A,Arthral,
HA,Fat,S,C
Howard
6 13 M B Lyme disease 2005 A,Arthral,Fat Steere
A = arthritis
Arthral = arthralgias
C = chills
EM = erythema migrans
Fat = fatigue
Fev = fever
HA = headache
S = sweats
Investigating an Outbreak
Page 6-62
Exercise 6.6
1.
2. The date of onset of the earliest case was June 28. Subtracting the minimum incubation
period (7 days) from June 28 points to June 21. The median and modal date of onset was
June 29. Subtracting the average (say, 12 days) from June 29 points to June 17. So the most
likely exposure period was sometime around June 17 through June 21, give or take a day or
two on either side. Indeed, the investigators determined that exposure most likely occurred
on June 19, when all ill persons either actively participated in or were nearby the sifting of
dirt that probably harbored the organism.
Exercise 6.7
Cell phones are quite popular. Noting that most if not all of the 17 patients had used cell phones
does not indicate that cell phones are the cause of brain cancer. An epidemiologic study that
compares the exposure experience of the case-patients with the exposure experience of persons
without brain cancer is necessary. A case-control study is the design of choice, since 17 persons
with the disease of interest have already been identified.
As many as possible of the 17 persons with brain cancer should be enrolled in the case-control
study as the case group. A group of persons without brain cancer need to be identified and
enrolled as the control group. Whom would you enroll as controls? Remember that controls are
supposed to represent the general exposure experience in the population from which the case-
patients came. Controls could come from the same community (randomly selected telephone
numbers, neighbors, friends) or the same healthcare providers (e.g., patients treated by the same
neurologist but who do not have brain cancer). Once case-patients and controls are identified and
enrolled, each would be questioned about exposure to cell phones. Finally, the exposure
experience of case-patients and controls would be compared to determine whether case-patients
were more likely to use cell phones, or use particular types of phones, or used them more
frequently, or for longer cumulative time, etc.
Investigating an Outbreak
Page 6-63
The alternative to a case-control study is a cohort study. For a cohort study you would have to
enroll a group of cell phone users (“exposed group”) and a group of persons who do not use cell
phones (“unexposed group”). You would then have to determine how many in each group
develop brain cancer. Since brain cancer is a relatively rare event, you would need rather large
groups in order to have enough brain cancer cases for the study to be useful. Therefore, a cohort
study is less practical than a case-control study in this setting.
Exercise 6.8
1. The appropriate measure of association for a case-control study is the odds ratio.
2. The odds ratio is calculated as the cross-product ratio: ad / bc.
Odds ratio = 15 x 23 / 8 x 7 = 6.16 = 6.2
3. With a chi-square of 9.41 and a 95% confidence interval of 1.6–25.1, this study shows a very
strong (odds ratio = 6.2) association between histoplasmosis and working in Building X. This
finding is quite statistically significant (chi-square = 9.41 corresponds to a p-value between
0.01 and 0.001). And although the 95% confidence interval indicates that the study is
compatible with a seemingly relatively wide range of values (1.6–25.1), most of these values
indicate a strong if not stronger association than the one observed.
Exercise 6.9
The first step in answering this question is to compare the attack rates (% ill) among those who
ate the meal and those who did not eat the meal. Since the % ill is a measure of risk of illness,
you could calculate a risk ratio for each meal.
Date Risk Ratio
9/18 Breakfast 90% vs. 46% = 2.0
9/18 Lunch 62% vs. 15% = 4.1
9/18 Dinner 52% vs. 43% = 1.2
9/18 Late dinner 54% vs. 44% = 1.2
9/19 Breakfast 49% vs. 52% = 0.9
9/19 Lunch 51% vs. 47% = 1.1
Clearly, the September 18 lunch has the highest risk ratio. It has a relatively high attack rate
(though not the highest) among those who ate the meal, and the lowest attack rate among those
who did not eat the meal. Furthermore, almost all of the cases (50 out of 54) could be “accounted
for” by that lunch.
In contrast, although the September 18 breakfast has a high attack rate among those who ate that
meal, it has a relatively high attack rate among those who did not eat that breakfast, and most
importantly, it can only account for one-sixth (9 out of 54) of the cases. Perhaps the September
18 breakfast was a minor contributor, but most of the illness probably resulted from exposure
that occurred at the September 18 lunch.
Investigating an Outbreak
Page 6-64
SELF-ASSESSMENT QUIZ
Now that you have read Lesson 6 and have completed the exercises, you
should be ready to take the self-assessment quiz. This quiz is designed to
help you assess how well you have learned the content of this lesson. You
may refer to the lesson text whenever you are unsure of the answer.
Unless instructed otherwise, choose ALL correct answers for each question.
1. Which are the most common ways that a local health department uncovers outbreaks?
A. Performing descriptive analysis of surveillance data each week
B. Performing time series analysis to detect deviations from expected values based on
the previous few weeks and comparable periods during the previous few years
C. Receiving calls from affected residents
D. Receiving calls from healthcare providers
E. Reviewing all case reports received each week to detect common features
2. Factors that influence a health department’s decision whether or not to conduct a field
investigation in response to one or more cases of disease include:
A. The nature of the disease
B. The number of cases
C. Resources available
D. Health department’s traditional attitude toward conducting field investigations
3. If a particular outbreak presents an unusual opportunity to learn more about the disease
and its epidemiology by conducting a study, but early disease control measures would
interfere with the study, one should conduct the study quickly, then implement control
measures immediately afterwards.
A. True
B. False
4. Use the following choices for Questions 14a–c.
A. Disease control and prevention efforts take priority over investigation efforts
B. Investigation efforts take priority over disease control and prevention efforts
4a. _____ Outbreak with known causative agent, source, and mode of transmission
4b. _____ Outbreak with known causative agent, but unknown source and mode of
transmission
4c. _____ Outbreak with unknown causative agent, source, and mode of transmission
Investigating an Outbreak
Page 6-65
5. Use the following steps of an outbreak investigation for Question 5:
1. Analyze data by time, place, and person
2. Conduct a case-control study
3. Generate hypotheses
4. Conduct active surveillance for additional cases
5. Verify the diagnosis
6. Confirm that the number of cases exceeds the expected number
7. Talk with laboratorians about specimen collection
For an investigation of an outbreak, what is the logical conceptual order of the steps listed
above?
A. 1-2-3-4-5-6-7
B. 5-6-4-1-2-3-7
C. 6-5-3-1-2-7-4
D. 6-5-7-4-1-3-2
6. To avoid skipping a critical step, investigators should conduct the steps of an outbreak
investigation in the precise order you answered in Question 5.
A. True
B. False
7. Use the following choices for Questions 7a–c.
A. Cluster
B. Epidemic
C. Outbreak
7a. _____ 200 cases of Marburg virus infection in several districts in Angola over
several months (usually none)
7b. _____ 40 cases of Salmonella Enteritidis in 1 week traced to a single meal served
at a cafeteria (usually none)
7c. _____ 10 cases of cancer diagnosed over 2 years among residents of a single
neighborhood (previous data not available)
8. Why should an investigator who has no clinical background nonetheless talk to a patient
or two as an early step in the outbreak investigation?
A. To advise the patient about common risk factors and the usual course of the illness,
after reviewing such information in appropriate reference material
B. To develop hypotheses about the cause of the outbreak
C. To learn more about the clinical manifestations of the disease
D. To verify the clinical findings as part of verifying the diagnosis
E. To verify the laboratory findings as part of verifying the diagnosis
9. A case definition during an outbreak investigation should specify:
A. Clinical features
B. Time
C. Place
D. Person
E. Hypothesized exposure
Investigating an Outbreak
Page 6-66
10. Ideally, a case definition is 100% accurate in identifying who does and does not have the
disease in question, but in reality few case definitions achieve this ideal.
A. True
B. False
11. Once a case definition for an outbreak investigation has been established, it should not be
changed.
A. True
B. False
12. Common methods of identifying additional cases (expanding surveillance) as part of an
outbreak investigation include:
A. Advising the public through newspapers, TV, radio, and the health department’s
website to contact the local health department
B. Asking case-patients who they were with at the time of exposure (if known)
C. Sending a fax to healthcare providers
D. Telephoning the infection control practitioners at local hospitals
13. A case report form devised for an outbreak investigation usually includes which of the
following types of information?
A. Identifying information
B. Demographic information
C. Clinical information
D. Risk factor information
E. Reporter, interviewer, or data abstractor information
14. Descriptive epidemiology is essential for “characterizing the outbreak” by time, place, and
person, but has little bearing on the analytic epidemiology.
A. True
B. False
Investigating an Outbreak
Page 6-67
15. Use the following epi curves as choices for Questions 15a–c.
Match the epi curve with the outbreak description.
15a._____ A malfunctioning space heater was used each time the outside temperature
dropped below freezing
15b._____ At the Eclipse Restaurant, sodium nitrite was mistaken for table salt in the
preparation of breakfast one morning only
15c._____ Common cold passed from classmate to classmate
Investigating an Outbreak
Page 6-68
16. Use the following epidemic curve for Question 16.
A group of tourists on a weeklong bus tour of a European country experienced an
outbreak of norovirus. The group had followed a consistent meal time pattern: each
morning they had breakfast together in whichever hotel they had stayed from 6:00 a.m.
to 7:00 a.m., stopped for lunch from 1:00 p.m. to 2:00 p.m., then had dinner together
either at the next hotel or at a restaurant at about 7:00 p.m. The incubation period for
norovirus is about 24-48 hours, with a median of about 33 hours. On which day and at
which meal was exposure most likely?
A. April 19 Dinner
B. April 20 Breakfast
C. April 20 Lunch
D. April 20 Dinner
E. April 21 Breakfast
17. Possible explanations for a case that occurs substantially later than the other cases in an
outbreak include:
A. Similar but unrelated disease
B. Secondary case
C. Case with unusually long incubation period
D. Time of exposure later than others
E. Error in recording date
18. A spot map is particularly useful for displaying:
A. Geographic location of exposure of each case-patient
B. Residence of each case-patient
C. Incidence rate of disease by area
D. Prevalence rate of disease by area
19. Which of the following may be useful in generating hypotheses in an outbreak setting?
A. Review the literature
B. Look at the descriptive epidemiology
C. Look at the outliers
D. Talk with the local health authorities
E. Talk with a few of the case-patients
F. Talk with subject matter experts
Investigating an Outbreak
Page 6-69
20. The key feature of an analytic (epidemiologic) study is: (Select only one answer)
A. Analysis by time, place, and person
B. Calculation of a risk ratio or odds ratio
C. Use of Epi Info to analyze the data
D. Presence of a comparison group
21. Disease control measures can be directed at the:
A. Agent
B. Source
C. Mode of transmission
D. Portal of entry
E. Host susceptibility
Use the information in the following paragraph and data in the table for Questions 22–25.
An outbreak of gastrointestinal disease occurred 24-36 hours after people had attended a
wedding. Of the 203 attendees (including the bride and groom), 200 completed questionnaires,
and 50 reported illness compatible with the case definition. Tabulated food consumption
histories are presented in the table below.
Ate Specified Food Did Not Eat Specified Food
Food Item Ill Well Total Ill Well Total
Punch 46 (25%) 138 184 4 (25%) 12 16
Wedding Cake 45 (45%) 55 100 5 (5%) 95 100
Sushi 10 (91%) 1 11 40 (21%) 149 189
22. This study is an example of a retrospective cohort study.
A. True
B. False
23. The most appropriate measure of association for these data is the:
A. Attributable risk percent
B. Chi-square
C. Odds ratio
D. Risk ratio
24. Which food is the most likely culprit?
A. Punch
B. Wedding cake
C. Sushi
D. Can’t determine from the data presented.
E. Must be more than one food.
Investigating an Outbreak
Page 6-70
25. Results of this outbreak investigation should be communicated to:
A. The caterer
B. Local officials
C. Wedding party family and attendees
D. World Health Organization
Investigating an Outbreak
Page 6-71
Answers to Self-Assessment Quiz
1. C, D. Most outbreaks come to the attention of health authorities because an alert clinician or
a concerned case-patient (or parent of a case-patient) calls. The other methods listed
occasionally detect outbreaks, but less frequently.
2. A, B, C, D. Factors influencing a health department’s decision to conduct a field investigation
include some related to the health problem itself (e.g., severity of illness, number of cases,
availability of prevention / control measures), some relate to the health department (e.g.,
“corporate culture” for conducting field investigations versus handling it by telephone,
available staff and resources), and some relate to external concerns (e.g., public or political
pressure).
3. B (False). The most important public health reason for investigating an outbreak is disease
control and prevention. Protecting and promoting the public’s health is our primary mission,
even if it interferes with our ability to conduct research.
4a. A. As in Answer 3, our primary mission is to protect the public’s health, so disease control
and prevention measures should take priority whenever possible. Because disease
prevention and control measures are often aimed at interrupting transmission, such
measures can be implemented if the source and mode of transmission are known.
4b. B. If the agent is known but the source and mode of transmission are not known (example:
Salmonella eventually traced to marijuana), then the health department does not know how
to target its intervention. Investigation to learn the source and/or mode is necessary.
4c. B. As in Answer 4b, If the agent, source, and mode of transmission are not known
(examples: Legionnaires’ Disease in Philadelphia in 1976; Kawasaki Syndrome — if it turns
out to be an infectious disease), then the health department does not know how to target
its intervention. Investigation to learn the source and/or mode is necessary.
5. D. Early steps include confirming that the number of cases exceeds the expected number,
verifying the diagnosis, and preparing for field work (which includes talking with
laboratorians about specimen collection). Next steps include conducting surveillance to
identify additional cases; analyzing the data by time, place, and person; generating
hypotheses; and evaluating those hypotheses (for example, by conducting a case-control
study).
6. B (False). The order presented in this text is conceptual. In practice, the order can be
different. For example, preparing for field work often follows establishing the existence of
an outbreak and verifying the diagnosis. When possible, control measures are initiated at
the same time the field investigation begins, or even earlier.
7a. B. Epidemic, the occurrence of more cases of disease than expected in a given area or
among a specific group of people over a particular period of time, tends to refer to more
widespread occurrence than outbreak.
7b. C. Outbreak tends to be used for an increase that is localized.
Investigating an Outbreak
Page 6-72
7c. A. Cluster is an aggregation of cases in a given area over a particular period of time that
seems unusual or suspicious, but often the usual or expected number of cases is not
known.
8. B, C. Even an investigator without a clinical background should, if possible, see and talk to a
patient or two to gain a better understanding of the clinical features of the disease (needed
for developing a case definition) and to generate hypotheses by asking about possible
exposures.
9. A, B, C, D. A case definition for an outbreak should specify clinical criteria as well as
appropriate time, place, and person characteristics. The case definition should NOT include
the hypothesized exposure of interest. First, the hypothesized exposure may not turn out to
be the true exposure, so inclusion of the hypothesized exposure as part of the case
definition during the case-finding step may result in missed cases. Second, during the
analytic step, disease status and exposure must be determined independently to avoid bias.
Including exposure as part of the case definition means that all cases will, by definition, be
exposed, while only some of the controls will likely be exposed. As a result, the exposure
will appear to be associated with disease, not necessarily because it is the true exposure,
but because of the case definition.
10. A (True). A case definition is a decision making tool. It provides criteria for classifying illness
as a “case” or “not a case.” However, few case definitions are 100% accurate, because
people with mild or atypical or asymptomatic disease are likely to be missed, and people
with similar but not the same disease may be included. Even a case definition that requires
a laboratory test is not 100% perfect, because laboratory tests themselves are not perfect.
11. B (False). On the one hand, case definitions need to be applied consistently, so that
everyone involved in an investigation defines a case in the same way. On the other hand,
case definitions can change during the course of an outbreak. For example, for case finding
purposes, a case definition might include categories such as confirmed, probable, and
possible, to try to include as many cases as possible. Later on, in the analytic phase, the
case definition may be restricted to the confirmed cases. As another example, a case
definition may initially be restricted to a particular community. If the outbreak spreads
beyond that geographic area, the “place” component of the case definition also would need
to be expanded.
12. A, B, C, D. To identify additional cases as part of an outbreak investigation, health
department staff contact (by telephone, broadcast fax, or e-mail) physicians’ offices, clinics,
hospitals, and laboratories. Depending on the affected age group, staff might also contact
day care centers, schools, employers, or nursing homes. Sometimes a press release is
issued to local media outlets that inform the public and suggest that persons with particular
symptoms or exposures contact their healthcare providers or health department. In
addition, health department staff routinely interview case-patients and ask whether they
know any persons with the same exposure, if known, or with the same illness.
13. A, B, C, D, E. A data collection form for an outbreak investigation should include patient
identifying information (e.g., name, telephone number), demographic information (e.g.,
age, sex), clinical information (e.g., date of onset, laboratory confirmation, whether
Investigating an Outbreak
Page 6-73
hospitalized), risk factor information (disease-specific, e.g., attended sports banquet
(yes/no), previously vaccinated?), and information about who collected the data (e.g.,
interviewer or abstracter initials, date of collection).
14. B (False). Descriptive epidemiology is essential not only for characterizing the pattern and
distribution of the outbreak, but also for generating testable hypotheses about the source,
mode of transmission, and risk factors for illness. Two of the suggested ways for generating
hypotheses are to review the descriptive epidemiology, particularly (1) the overall pattern of
cases and develop hypotheses about what they have in common, and (2) the outliers to
determine how they might be linked to the other cases. These hypotheses, in turn, are the
ones that are tested using analytic epidemiology.
15a. C. This scenario represents an intermittent exposure. The resulting epidemic curve has
cases that appear to be occurring sporadically, but in fact occur when the malfunctioning
heater is turned on at irregular intervals.
15b. A. This scenario represents a point source exposure. The epidemic curve has a single
peak, and all cases occur during a single incubation period.
15c. D. This scenario represents person-to-person transmission. The epidemic curve has a
succession of “waves” of cases.
16 D. Subtracting 24 hours (the minimum incubation period) from the time of onset of the first
case puts you in the April 20 Dinner interval. Subtracting 33 hours from the median case
(which occurred in the 4-8 AM interval) on April 22), puts you in the April 20 4-7 pm
interval, near both lunch and dinner that day. While the minimum method points to dinner
on April 20, thorough investigators would probably investigate possible exposures at lunch
that day, too.
17. A, B, C, D, E. A late case on an epidemic curve has several possible explanations, including
a case of a similar but unrelated disease, a secondary case (assuming it occurs one
incubation period after another case), a case with an unusually long incubation period, a
case that resulted from exposure at a different time (for example, someone who ate
leftovers the next day), or an error in recall or in recording the date.
18. A, B. A spot map is useful for pinpointing the geographic location of exposures, residences,
employment sites, and the like. The spots represent occurrences, either of exposure or
disease. Spot maps are not used to display rates. Rather, area maps (also called shaded or
chloropleth maps) are used to display incidence and prevalence rates.
19. A, B, C, D, E, F. Hypotheses can be generated in a variety of ways. One way is based on
subject matter knowledge derived by reviewing the literature or talking with experts – what
are the usual causes, sources, vehicles, or modes of transmission? Other ways include
reviewing the overall pattern and the outliers from the descriptive epidemiology, by asking
case-patients if they have any suspicions about the cause of their illness, and by asking the
same question of local authorities (if you are from out of town).
20. D. The key feature that characterizes an analytic (epidemiologic) study is presence of a
comparison group. Single case reports and case series do not have comparison groups and
are not analytic studies. Cohort studies (compares disease experience among exposed and
Investigating an Outbreak
Page 6-74
unexposed groups) and case-control studies (compares exposure experience among persons
with and without disease) have comparison groups and are analytic studies.
21. A, B, C, D, E. Disease control measures can be directed at the eliminating the agent (e.g.,
by sterilizing surgical equipment), interrupting transmission (e.g., reducing mosquito
population, covering one’s mouth when coughing), preventing entry into a host (e.g.,
wearing a mask, using insect repellant), or improving host defenses (e.g., by immunization).
22. A. A retrospective cohort study is one in which disease has already occurred (hence,
retrospective) and the investigator enrolls all (or almost all) of a population (hence, cohort).
The investigator then determines exposures and calculates risks (attack rates) for different
exposures and risk ratios (relative risks) for those exposed and unexposed. The study
described for Questions 22-25 meets this characterization.
23. D. The measure of association recommended for a retrospective cohort study is a risk ratio,
calculated as the ratio of the risk of disease among those exposed divided by the risk of
disease among those not exposed. The attributable risk percent is a supplemental measure
that quantifies how much of the disease could be “explained” or accounted for by a
particular exposure. The chi-square is not a measure of association, but a test of statistical
significance (which is affected both by the strength of association and number of subjects in
the study). The odds ratio is used primarily as a measure of association in case-control
studies.
24. B. The wedding cake (risk ratio = 45% / 5% = 9.0) is the most likely culprit. It has a high
attack rate among the exposed group, a low attack rate among the unexposed group, and
can account for 45 out of the 50 cases. The five “unaccounted for” cases are within the
range that can be “explained away,” for example by misreporting (for example, a man takes
a bite of his partner’s cake but reports “no” for cake because he didn’t take a whole piece
himself), poor recall, etc. Punch is not associated with illness at all (risk ratio = 25% / 25%
= 1.0). Sushi has an extremely high attack rate among those exposed (91%), but a
relatively high attack rate among those unexposed (21%), and most importantly, could only
account for 10 of the 50 cases.
25. A, B, C. The results should be communicated to all those who need or want to know,
including the concerned family and wedding attendees, local governmental officials, the
caterer, the church or facility where the wedding was held, et al. The outbreak is also
reportable to the state health department, who in turn is likely to report it to CDC. However,
local outbreaks do not need to be reported to the World Health Organization.
Investigating an Outbreak
Page 6-75
References
1. Olsen SJ, MacKinon LC, Goulding JS, Bean NH, Slutsker L. Surveillance for foodborne
disease outbreaks — United States, 1993-1997. In: Surveillance Summaries, March 27,
2000. MMWR 2000; 49(No. SS-1):1–59.
2. Keene WE, Hedberg K, Herriott DE, Hancock DD, McKay R, Barrett T, Fleming D. A
prolonged outbreak of Escherichia coli O157:H7 infections caused by commercially
distributed raw milk. J Infect Dis 1997;176:815–8.
3. Marx M. Diarrheal illness detected through syndromic surveillance after a massive
blackout, New York City. Presented at 2003 National Syndromic Surveillance Conference.
4. Swaminathan B, Barrett TJ, Hunter SB, Tauxe RV. PulseNet: the molecular subtyping
network for foodborne bacterial disease surveillance, United States. Emerg Infect Dis 2001;
7:382–9.
5. Preston R. West Nile mystery. The New Yorker, October 18–25,1999;90–107.
6. Bush LM, Abrams BH, Beall A, Johnson CC. Index case of fatal inhalational anthrax due
to bioterrorism in the United States, N Engl J Med 2001;345:1607–10.
7. Bender AP, Williams AN, Johnson RA, Jagger HG. Appropriate public health responses to
clusters: the art of being responsibly responsive. Am J Epidemiol 1990;132:S48–S52.
8. Fiore BJ, Hanrahan LP, Anderson HA. State health department response to disease cluster
reports: a protocol for investigation. Am J Epidemiol 1990;132:S14–22.
9. Washington State Department of Health. Guidelines for investigating clusters of chronic
disease and adverse birth outcomes [monograph on the Internet]. Olympia, Washington;
2001 [cited 2006 Sep 19].
10. Goodman RA, Buehler JW, Koplan JP. The epidemiologic field investigation: science and
judgment in public health practice. Am J Epidemiol 1990;132:9–16.
11. Galil K, Lee B, Strine T, Carraher C, Baughman AL, Eaton M, et al. Outbreak of varicella
at a day-care center despite vaccination. New Engl J Med 2002;347:1909–15.
12. Tugwell BD, Lee LE, Gillette H, Lorber EM, Hedberg K, Cieslak PR. Chickenpox
outbreak in a highly vaccinated school population. Pediatrics. 2004;113:455–9.
13. Hopkins RS, Juranek DD. Acute giardiasis: an improved clinical case definition for
epidemiologic studies. Am J Epidemiol 1991;133:402–7.
14. Fischer TK, Gentsch J, Ashley D, et al. Evaluation and utility of a novel diagnostic method
in the investigation of an unusual outbreak of rotavirus diarrhea among children —
Jamaica, 2003. Presented at: 53rd
Annual EIS Conference, CDC, Atlanta, Georgia, April
19-23, 2004.
Investigating an Outbreak
Page 6-76
15. Raupach JC, Hundy RL. An outbreak of Campylobacter jejuni infection among conference
delegates. Commun Dis Intell 2003;27:380–3.
16. Kuusi M, Nuorti JP, Maunula L, Miettinen I, Pesonen H, von Bonsdorff C-H. Internet use
and epidemiologic investigation of gastroenteritis outbreak. Emerg Infect Dis
2004;10:447–50.
17. Pryor JH, Martin MT, Whitney CG, Turco JH, Baumgartner YY, Zegans ME. Rapid
response to a conjunctivitis outbreak: the use of technology to leverage information. J Am
Coll Health 2002;50:267–71.
18. Caldwell GG. Twenty-two years of cancer cluster investigations at the Centers for Disease
Control. Am J Epidemiol 1990;132:S43–S47.
19. Schulte PA, Ehrenberg RL, Singal M. Investigation of occupational cancer clusters: theory
and practice. Am J Public Health 1987;77:52–6.
20. Cartwright RA. Cluster investigations: are they worth it? Med J Aust 1999;171:p. 172.
21. Centers for Disease Control and Prevention. NIOSH health hazard evaluation program.
Cincinnati, Ohio: Department of Health and Human Services (NIOSH) Publication No.
2000-132: p. 3
22. Palmer SR. Epidemiology in search of infectious diseases: methods in outbreak
investigation. J Epidemiol Comm Health 1989;43:311–4.
23. Last JM. A dictionary of epidemiology, 4th
ed. New York: Oxford U Press, 2001:129.
24. PAHO. Case definitions: meningococcal disease and viral meningitis. Epidemiol Bull
2001;22(4):14–6.
25. Centers for Disease Control and Prevention. Eosinophilia-myalgia syndrome — New
Mexico. MMWR 1989;38:765–7.
26. Centers for Disease Control and Prevention. Eosinophilia-myalgia syndrome and L-
tryptophan-containing products — New Mexico, Minnesota, Oregon, and New York, 1989.
MMWR 1989;38:785–8.
27. Centers for Disease Control and Prevention. Public health dispatch: outbreak of listeriosis
— northeastern United States, 2002. MMWR 2002;51:950–1.
28. Jernigan DB, Raghunathan PL, Bell BP, Brechner R, Bresnitz EA, Butler JC, et al.
Investigation of bioterrorism-related anthrax, United States, 2001: epidemiologic findings.
Emerg Infect Dis 2002;8:1019–28.
29. Heyman DL, ed. Control of communicable diseases manual, 18th
ed. Washington, DC:
American Public Health Association, 2004.
30. Peterson LR, Marshall SL, Barton-Dickson C, Hajjeh RA, Lindsley MD, Warnock DW, et
al. Coccidioidomycosis among workers at an archaeologic site, northeast Utah. Emerg
Infect Dis 2004;10:637–42.
Investigating an Outbreak
Page 6-77
31. Snow J. Snow on cholera. London: Humphrey Milford: Oxford U Press, 1936.
32. Tan C. A preventable outbreak of pneumococcal pneumonia among unvaccinated nursing
home residents–New Jersey, 2001. Presented at Northeast Regional Epidemic Intelligence
Service Conference, March 14, 2002, New York City.
33. Lukacs SL, Hsu V, Harper S, Handzel T, Hayslett J, Khabbaz R, et al. Anthrax outbreak
averted: public health response to a contaminated envelope on Capital Hill–Washington,
DC, 2001. Presented at 51st Annual Epidemic Intelligence Service Conference, April 22-
26, 2004, Atlanta.
34. Ramsey AH, Belongia EA, Gale CM, Davis JP. Outcomes of treated human granulocytic
ehrlichiosis cases. Emerg Infect Dis 2002;8:383–401.
35. Mahoney FJ, Hoge CW, Farley TA, Barbaree JM, Breiman RF, Benson RF, McFarland
LM. Communitywide outbreak of Legionnaires’ disease associated with a grocery store
mist machine. J Infect Dis 1992;165: 736–9.
36. Torok TJ, Tauxe RV, Wise RP, Livengood JR, Sokolow R, Mauvais S, et al. A large
community outbreak of salmonellosis caused by intentional contamination of restaurant
salad bars. JAMA 1997;278:389–95.
37. Hedberg CW, Fishbein DB, Janssen RS, Meyers B, McMillen JM, MacDonald KL, et al.
An outbreak of thyrotoxicosis caused by the consumption of bovine thyroid gland in
ground beef. N Engl J Med 1987;316:993–8.
38. Jacobus CH, Holick MF, Shao Q, Chen TC, Holm IA, Kolodny JM, et al. Hypervitaminosis
D associated with drinking milk. New Engl J Med 1992;326:1173–7.
39. Blank S, Scanlon KS, Sinks TH, Lett S, Falk H. An outbreak of hypervitaminosis D
associated with the overfortication of milk from a home-delivery dairy. Am J Public Health
1995;85:656–9.
40. Jani AA, Barrett E, Murphy J, Norton D, Novak C, Painter J, Toney D. A steamship full of
trouble: an outbreak of Salmonella Typhimurium DT 104 gastroenteritis at a holiday
banquet — Virginia, 2003. Presented at the 53rd Annual Epidemic Intelligence Service
Conference; 2004 Apr 19-23; Atlanta.
41. Centers for Disease Control and Prevention. Outbreak of histoplasmosis among industrial
plant workers — Nebraska, 2004. MMWR 2004;53:1020–2.
42. Becker KM, Moe CL, Southwick KL, MacCormack JN. Transmission of Norwalk virus
during a football game. N Engl J Med 2000;343;1223–7.
43. Taylor DN, Wachsmuth IK, Shangkuan YH, Schmidt EV, Barrett TJ, Schrader JS, et al.
Salmonellosis associated with marijuana: a multistate outbreak traced by plasmid
fingerprinting. New Engl J Med 1982;306:1249–53.
44. MacDonald KL, Spengler RF, Hatheway CL, Hargrett NT, Cohen ML. Type A botulism
from sauteed onions. JAMA 1985;253:1275–8.
Investigating an Outbreak
Page 6-78
45. Nash D, Mostashari F, Fine A, Miller J, O’Leary D, Murray K, et al. The outbreak of West
Nile virus infection in the New York City area in 1999. N Engl J Med 2001;344:1807–14.
46. Roehrig JT, Nash D, Maldin B, Labowitz A, Martin DA, Lanciotti RS, et al. Persistence of
virus-reactive serum immunoglobulin M antibody in confirmed West Nile virus
encephalitis cases. Emerg Infect Dis 2003;9:376–9.
47. Klee AL, Maldin B, Edwin B, IPoshni I, Mostashari F, Fine A, et al. Long-term prognosis
for clinical West Nile Virus infection. Emerg Infect Dis 2004;10:1405–11.
48. Fraser DW, Tsai TF, Orenstein W, Parkin WE, Beecham HJ, Sharrar RG, et al.
Legionnaires’ disease: description of an epidemic of pneumonia. N Engl J Med
1977;297:1189–97.
49. Bopp DJ, Saunders BD, Waring AL, Waring AL, Ackelsberg J, Dumas N, et al. Detection,
isolation, and molecular subtyping of Escherichia coli O157:H7 and Campylobacter jejuni
associated with a large waterborne outbreak. J Clin Microbiol 2003;41:174–80.
50. Division of Tuberculosis Elimination [Internet]. Atlanta: CDC; [updated 1999 Oct; cited
2006 Sep 19]. Self study modules on Tuberculosis, Module 7: Confidentiality in
Tuberculosis Control: Background. Available from:
http://www.cdc.gov/tb/education/ssmodules/module7/ss7contents.htm
Websites
For more information on: Visit the following websites:
MMWR Guidelines for Confirmation
for Foodborne-Disease Outbreaks
http://www.cdc.gov/mmwr/preview/mmwrhtml/00044
239.htm
Guide to Confirming a Diagnosis in
Foodborne Disease
http://www.cdc.gov/outbreaknet/references_resources/
guide_confirming_diagnosis.html
Glossary
Page 1
GLOSSARY
A
active immunity see immunity, active.
active surveillance see surveillance, active.
age-adjusted mortality rate see mortality rate, age-adjusted.
agent a factor (e.g., a microorganism or chemical substance) or form of energy whose presence,
excessive presence, or in the case of deficiency diseases, relative absence is essential for the
occurrence of a disease or other adverse health outcome.
age-specific mortality rate see mortality rate, age-specific.
alternative hypothesis see hypothesis, alternative.
analytic epidemiology see epidemiology, analytic.
analytic study see study, analytic.
antibody any of a variety of proteins in the blood that are produced in response to an antigen as
an immune response.
antigen any substance (e.g., a toxin or the surface of a microorganism or transplanted organ)
recognized as foreign by the human body and that stimulates the production of antibodies.
applied epidemiology see epidemiology, applied.
arbovirus any of a group of viruses that are transmitted between hosts by mosquitoes, ticks, and
other arthropods.
arithmetic mean see mean, arithmetic.
arithmetic-scale line graph see line graph, arithmetic-scale.
arthropod an organism that has jointed appendages and segmented external skeleton (e.g., flies,
mosquitoes, ticks, or mites).
association the statistical relation between two or more events, characteristics, or other variables.
asymmetrical a type of distribution where the shape to the right and left of the central location is
not the same. Often referred to as a skewed distribution; the mean, median, and mode of an
asymmetrical distribution are not the same.
asymptomatic without symptoms.
Glossary
Page 2
attack rate a form of incidence that measures the proportion of persons in a population who
experience an acute health event during a limited period (e.g., during an outbreak), calculated as
the number of new cases of a health problem during an outbreak divided by the size of the
population at the beginning of the period, usually expressed as a percentage or per 1,000 or
100,000 population (see also incidence proportion).
attack rate, secondary a measure of the frequency of new cases of a disease among the contacts
of known patients.
attributable proportion see proportion, attributable.
attributable risk percent see proportion, attributable.
attribute a risk factor that is an intrinsic characteristic of the individual person, animal, plant, or
other type of organism under study (e.g., genetic susceptibility, age, sex, breed, weight).
axis one of the dimensions of a graph in a rectangular graph, the x-axis is the horizontal axis, and
the y-axis is the vertical axis.
B
bar chart a visual display in which each category of a variable is represented by a bar or column
bar charts are used to illustrate variations in size among categories.
bar chart, 100% component a stacked bar chart in which all bars or columns are the same
length, and the measured axis represents 0%–100%.
bar chart, deviation a bar chart displaying either positive or negative differences from a
baseline.
bar chart, grouped a bar chart displaying quantities of two variables, represented by adjoining
bars or columns (i.e., a group) of categories of one variable, separated by space between groups.
bar chart, stacked a bar chart displaying quantities of two variables, represented by subdivided
bars or columns (the subdivisions representing the categories of one variable) separated by space
between bars or columns.
bias a systematic deviation of results or inferences from the truth or processes leading to such
systematic deviation; any systematic tendency in the collection, analysis, interpretation,
publication, or review of data that can lead to conclusions that are systematically different from
the truth. In epidemiology, does not imply intentional deviation.
bias, information systematic difference in the collection of data regarding the participants in a
study (e.g., about exposures in a case-control study, or about health outcomes in a cohort study)
that leads to an incorrect result (e.g., risk ratio or odds ratio) or inference.
bias, selection systematic difference in the enrollment of participants in a study that leads to an
incorrect result (e.g., risk ratio or odds ratio) or inference.
bimodal having two data peaks.
Glossary
Page 3
biologic transmission see transmission, biologic.
birth cohort see cohort, birth.
birth rate, crude the number of live births during a specified period divided by the mid-period
population, usually expressed per 1,000 population.
box plot a visual display that summarizes data by using a "box and whiskers" format to indicate
the minimum and maximum values (ends of the whiskers), interquartile range (length of the
box), and median (line through the box).
C
carrier a person or animal that harbors the infectious agent for a disease and can transmit it to
others, but does not demonstrate signs of the disease. A carrier can be asymptomatic (never
indicate signs of the disease) or can display signs of the disease only during the incubation
period, convalescence, or postconvalescence. The period of being a carrier can be short (a
transient carrier) or long (a chronic carrier).
case an instance of a particular disease, injury, or other health conditions that meets selected
criteria (see also case definition). Using the term to describe the person rather than the health
condition is discouraged (see also case-patient).
case-control study see study, case-control.
case definition a set of uniformly applied criteria for determining whether a person should be
identified as having a particular disease, injury, or other health condition. In epidemiology,
particularly for an outbreak investigation, a case definition specifies clinical criteria and details
of time, place, and person.
case-fatality rate (also called case-fatality ratio) the proportion of persons with a particular
condition (e.g., patients) who die from that condition. The denominator is the number of persons
with the condition; the numerator is the number of cause-specific deaths among those persons.
case, index the first case or instance of a patient coming to the attention of health authorities.
case-patient in a case-control study, a person who has the disease, injury, or other health
condition that meets the case definition (see also case).
case, source the case or instance of a patient responsible for transmitting infection to others; the
instance of a patient who gives rise to an outbreak or epidemic.
cause, component a factor that contributes to a sufficient cause (see also cause, sufficient).
cause of disease a factor (e.g., characteristic, behavior, or event) that directly influences the
occurrence of a disease. Reducing such a factor among a population should reduce occurrence of
the disease.
cause, necessary a factor that must be present for a disease or other health problem to occur.
Glossary
Page 4
cause-specific mortality rate see mortality rate, cause-specific.
cause, sufficient a factor or collection of factors whose presence is always followed by the
occurrence of a particular health problem.
census the enumeration of an entire population, usually including details on residence, age, sex,
occupation, racial/ethnic group, marital status, birth history, and relationship to the head of
household.
central location (also called central tendency) a statistical measurement to quantify the middle
or the center of a distribution. Of the multiple ways to define central tendency, the most common
are the mean, median, and mode.
chain of infection the progression of an infectious agent that leaves its reservoir or host through
a portal of exit, is conveyed by a mode of transmission, and then enters through an appropriate
portal of entry to infect a susceptible host.
"chartjunk" unnecessary or confusing visual elements in charts, illustrations, or graphs. The
term was first used by Edward Tufte in his book, The Visual Display of Quantitative Information
(1983).
class interval the span of values of a continuous variable that are grouped into a single category
(see also class), usually to create a frequency distribution for that variable.
class limits the values at the upper and lower ends of a class interval.
clinical criteria the medical features (e.g., symptoms, medical examination findings, and
laboratory results) that are used in a case definition.
clinical disease a disease that has been manifested by its symptoms and features.
clinical trial see trial, clinical.
cluster an aggregation of cases of a disease, injury, or other health condition (particularly cancer
and birth defects) in a circumscribed area during a particular period without regard to whether
the number of cases is more than expected (often the expected number is not known).
cohort a well-defined group of persons who have had a common experience or exposure and are
then followed up, as in a cohort study or prospective study, to determine the incidence of new
diseases or health events.
cohort, birth a group of persons born during a particular period or year.
cohort study see study, cohort.
common-source outbreak see outbreak, common-source.
community immunity see immunity, herd.
community trial see trial, community.
Glossary
Page 5
comparison group a group in an analytic study (e.g., a cohort or case-control study) with whom
the primary group of interest (exposed group in a cohort study or case-patients in a case-control
study) is compared. The comparison group provides an estimate of the background or expected
incidence of disease (in a cohort study) or exposure (in a case-control study).
confidence interval a range of values for a measure (e.g., rate or odds ratio) constructed so that
the range has a specified probability (often, but not necessarily, 95%) of including the true value
of the measure.
confidence limits the end points (i.e., the minimum and maximum values) of a confidence.
confounding the distortion of the association between an exposure and a health outcome by a
third variable that is related to both.
contact exposure to a source of an infection; a person who has been exposed.
contact, direct exposure or transmission of an agent from a source to a susceptible host through
touching (e.g., from a human host by kissing, sexual intercourse, or skin-to-skin contact) or from
touching an infected animal or contaminated soil or vegetation.
contagious capable of being transmitted from one person to another by contact or close
proximity.
contingency table a two-variable table of cross-tabulated data.
continuous variable see variable, continuous.
control in a case-control study, a member of the group of persons without the health problem
under study (see also comparison group and study, case-control).
crude when referring to a rate, an overall or summary rate for a population, without adjustment.
crude birth rate see birth rate, crude.
crude death rate see mortality rate, crude.
crude mortality rate see mortality rate, crude.
cumulative frequency in a frequency distribution, the number or proportion of observations
with a particular value and any smaller value.
cumulative frequency curve a plot of the cumulative frequency rather than the actual frequency
for each class interval of a variable. This type of graph is useful for identifying medians and
quartiles and other percentiles.
D
death-to-case ratio the number of deaths attributed to a particular disease, injury, or other health
condition during a specified period, divided by the number of new cases of that disease, injury,
or condition identified during the same period.
Glossary
Page 6
decision analysis application of quantitative methods to decision-making.
decision tree a branching chart that represents the logical sequence or pathway of a clinical or
public health decision.
demographic information personal characteristics of a person or group (e.g., age, sex,
race/ethnicity, residence, and occupation) demographic information is used in descriptive
epidemiology to characterize patients or populations.
dendrogram see phylogenetic tree.
denominator the lower portion of a fraction; used in calculating a ratio, proportion, or rate. For a
rate, the denominator is usually the midinterval population.
dependent variable see variable, dependent.
descriptive epidemiology see epidemiology, descriptive.
determinant any factor that brings about change in a health condition or in other defined
characteristics (see also cause and risk factor).
direct transmission see transmission, direct.
discrete variable (or data) see variable (or data), discrete.
distribution in epidemiology, the frequency and pattern of health-related characteristics and
events in a population. In statistics, the frequency and pattern of the values or categories of a
variable.
dose-response association between an exposure and health outcome that varies in a consistently
increasing or decreasing fashion as the amount of exposure (dose) increases.
dot plot a visual display of the specific data points of a variable.
droplet nuclei the residue of dried droplets of infectious agents that is easily inhaled and exhaled
and can remain suspended in air for relatively long periods or be blown over great distances.
droplet spread the direct transmission of an infectious agent by means of the aerosols produced
in sneezing, coughing, or talking that travel only a short distance before falling to the ground.
E
effect the result of a cause.
effectiveness the ability of an intervention or program to produce the intended or expected
results in the field.
efficacy the ability of an intervention or program to produce the intended or expected results
under ideal conditions.
efficiency the ability of an intervention or program to produce the intended or expected results
Glossary
Page 7
with a minimum expenditure of time and resources.
EIS Epidemic Intelligence Service; CDC’s 2-year training program in applied epidemiology for
public health professionals (http://www.cdc.gov/eis/).
endemic the constant presence of an agent or health condition within a given geographic area or
population; can also refer to the usual prevalence of an agent or condition.
environmental factor an extrinsic factor (e.g., geology, climate, insects, sanitation, or health
services) that affects an agent and the opportunity for exposure.
epidemic the occurrence of more cases of disease, injury, or other health condition than expected
in a given area or among a specific group of persons during a particular period. Usually, the
cases are presumed to have a common cause or to be related to one another in some way (see
also outbreak).
epidemic curve a histogram that displays the course of an outbreak or epidemic by plotting the
number of cases according to time of onset.
epidemic period the time span of an outbreak or epidemic.
epidemiologic triad the traditional model of infectious disease causation having three
components: an external agent, a susceptible host, and an environment that brings the host and
agent together so that disease occurs.
epidemiology the study of the distribution and determinants of health conditions or events
among populations and the application of that study to control health problems.
epidemiology, analytic the aspect of epidemiology concerned with why and how a health
problem occurs. Analytic epidemiology uses comparison groups to provide baseline or expected
values so that associations between exposures and outcomes can be quantified and hypotheses
about the cause of the problem can be tested (see also study, analytic).
epidemiology, applied the application or practice of epidemiology to control and prevent health
problems.
epidemiology, descriptive the aspect of epidemiology concerned with organizing and
summarizing data regarding the persons affected (e.g., the characteristics of those who became
ill), time (e.g., when they become ill), and place (e.g., where they might have been exposed to
the cause of illness).
epidemiology, field applied epidemiology (i.e., the application or practice of epidemiology to
control and prevent health problems), particularly when the epidemiologist(s) must travel to and
work in the community in which the health problem is occurring or has occurred.
evaluation systematic and objective examination of activities to determine their relevance,
effectiveness, and impact.
excess risk risk difference, calculated as the risk among the exposed group minus the risk among
the unexposed group.
Glossary
Page 8
experimental study see study, experimental.
exposed group a group whose members have had contact with a suspected cause of, or possess a
characteristic that is a suspected determinant of, a particular health problem.
exposure having come into contact with a cause of, or possessing a characteristic that is a
determinant of, a particular health problem.
F
false-negative a negative test result for a person who actually has the condition similarly, a
person who has the disease (perhaps mild or variant) but who does not fit the case definition, or a
patient or outbreak not detected by a surveillance system.
false-positive a positive test result for a person who actually does not have the condition.
Similarly, a person who does not have the disease but who nonetheless fits the case definition, or
a patient or outbreak erroneously identified by a surveillance system.
field epidemiology see epidemiology, field.
follow-up study see study, cohort.
fomite an inanimate object that can be the vehicle for transmission of an infectious agent (e.g.,
bedding, towels, or surgical instruments).
forest plot a graph that displays the point estimates and confidence intervals of individual
studies included in a meta-analysis or systematic review as a series of parallel lines.
frequency the amount or number of occurrences of an attribute or health outcome among a
population.
frequency distribution a complete summary of the frequencies of the values or categories of a
variable, often displayed in a two-column table with the individual values or categories in the left
column and the number of observations in each category in the right column.
frequency polygon a graph of a frequency distribution in which values of the variable are
plotted on the horizontal axis, and the number of observations are plotted on the vertical axis.
Data points are plotted at the midpoints of the intervals and are connected with straight lines.
G
geometric mean see mean, geometric.
graph a visual display of quantitative data arranged on a system of coordinates.
H
health a state of complete physical, mental, and social well-being and not merely the absence of
Glossary
Page 9
disease or other infirmity.
health indicator any of a variety of measures (e.g., mortality rate) that indicate the state of
health of a given population.
health information system a combination of health statistics from different sources. Data from
these systems are used to learn about health status, health care, provision and use of services, and
the impact of services and programs on health.
healthy worker effect the observation that employed persons generally have lower mortality
rates than the general population, because persons with severe, disabling disease (who have
higher mortality rates) tend to be excluded from the workforce.
herd immunity see immunity, herd.
high-risk group a group of persons whose risk for a particular disease, injury, or other health
condition is greater than that of the rest of their community or population.
HIPAA the Health Insurance Portability and Accountability Act, enacted in 1996, which
addresses the privacy of a person’s medical information as well as postemployment insurance
and other health-related concerns.
histogram a visual representation of the frequency distribution of a continuous variable. The
class intervals of the variable are grouped on a linear scale on the horizontal axis, and the class
frequencies are grouped on the vertical axis. Columns are drawn so that their bases equal the
class intervals (i.e., so that columns of adjacent intervals touch), and their heights correspond to
the class frequencies.
host a person or other living organism that is susceptible to or harbors an infectious agent under
natural conditions.
host factor an intrinsic factor (e.g., age, race/ethnicity, sex, or behaviors) that influences a
person's exposure, susceptibility, or response to an agent.
hyperendemic the constant presence at high incidence and prevalence of an agent or health
condition within a given geographic area or population.
hypothesis a supposition, arrived at from observation or reflection, that leads to refutable
predictions; any conjecture cast in a form that will allow it to be tested and refuted.
hypothesis, alternative the supposition that an exposure is associated with the health condition
under study. The alternative is adopted if the null hypothesis (see also hypothesis, null) proves
implausible.
hypothesis, null the supposition that two (or more) groups do not differ in the measure of
interest (e.g., incidence or proportion exposed); the supposition that an exposure is not associated
with the health condition under study, so that the risk ratio or odds ratio equals 1. The null
hypothesis is used in conjunction with statistical testing.
Glossary
Page 10
I
immunity, active resistance developed in response to an antigen (i.e., an infecting agent or
vaccine), usually characterized by the presence of antibody produced by the host.
immunity, herd the resistance to an infectious agent of an entire group or community (and, in
particular, protection of susceptible persons) as a result of a substantial proportion of the
population being immune to the agent. Herd immunity is based on having a substantial number
of immune persons, thereby reducing the likelihood that an infected person will come in contact
with a susceptible one among human populations, also called community immunity.
immunity, passive immunity conferred by an antibody produced in another host This type of
immunity can be acquired naturally by an infant from its mother or artificially by administration
of an antibody-containing preparation (e.g., antiserum or immune globulin).
incidence a measure of the frequency with which new cases of illness, injury, or other health
condition occurs among a population during a specified period.
incidence proportion the fraction of persons with new cases of illness, injury, or other health
condition during a specified period, calculated as the number of new cases divided by the size of
the population at the start of the study period (see also attack rate).
incidence rate a measure of the frequency with which new cases of illness, injury, or other
health condition occur, expressed explicitly per a time frame. Incidence rate is calculated as the
number of new cases over a specified period divided either by the average population (usually
mid-period) or by the cumulative person-time the population was at risk.
incubation period the time interval from exposure to an infectious agent to the onset of
symptoms of an infectious disease.
independent variable see variable, independent.
index case see case, index.
indirect transmission see transmission, indirect.
individual data values or observations from each record (also called raw data).
infant mortality rate see mortality rate, infant.
infection invasion of the body tissues of a host by an infectious agent, whether or not it causes
disease.
infectivity the ability of an infectious agent to cause infection, measured as the proportion of
persons exposed to an infectious agent who become infected.
information bias see bias, information.
interquartile range a measure of spread representing the middle 50% of the observations,
calculated as the difference between the third quartile (75th
percentile) and the first quartile (25th
Glossary
Page 11
percentile).
isolation the separation of infected persons to prevent transmission to susceptible ones. Isolation
refers to separation of ill persons; quarantine refers to separation of potentially exposed but well
persons.
L
latency period the time from exposure to a causal agent to onset of symptoms of a (usually
noninfectious) disease (see also incubation period).
life expectancy a statistical projection of the average number of years a person of a given age is
expected to live, if current mortality rates continue to apply.
line graph, arithmetic-scale a graph that displays patterns or trends by plotting the frequency
(e.g., number, proportion, or rate) of a characteristic or event during some variable, usually time.
The y-axis, measuring frequency, uses an arithmetic scale.
line graph, semilogarithmic-scale a graph that displays patterns or trends by plotting the
frequency (e.g., number, proportion, or rate) of a characteristic or event during some variable,
usually time. The y-axis, measuring frequency, uses a logarithmic scale.
line listing a type of epidemiologic database, organized similar to a spreadsheet with rows and
columns in which information from cases or patients are listed each column represents a
variable, and each row represents an individual case or patient.
logarithmic transformation conversion of nominal or ordinal data to logarithmic data. The
purpose is to examine rate of change instead of amount of change only.
M
map, area (shaded, choropleth) a visual display of the geographic pattern of a health problem,
in which a marker is placed on a map to indicate where each affected person lives, works, or
might have been exposed.
mean (or average) commonly called the average; it is the most common measure of central
tendency.
mean, arithmetic the measure of central location, commonly called the average, calculated by
adding all the values in a group of measurements and dividing by the number of values in the
group.
mean, geometric the mean, or average, of a set of data measured on a logarithmic scale.
measure of association a quantified relationship between exposure and a particular health
problem (e.g., risk ratio, rate ratio, and odds ratio).
measure of central location a central value that best represents a distribution of data. Common
measures of central location are the mean, median, and mode also called the measure of central
Glossary
Page 12
tendency.
measure of dispersion see measure of spread.
measure of spread a measure of the distribution of observations out from its central value.
Measures of spread used in epidemiology include the interquartile range, variance, and the
standard deviation.
measurement scale the complete range of possible values for a measurement.
mechanical transmission see transmission, mechanical.
median the measure of central location that divides a set of data into two equal parts, above and
below which lie an equal number of values (see also measure of central location).
medical surveillance see surveillance, medical.
midrange the halfway point, or midpoint, in a set of observations. For the majority of data, the
midrange is calculated by adding the smallest observation and the largest observation and
dividing by two. The midrange is usually calculated as an intermediate step in determining other
measures.
mode the most frequently occurring value in a set of observations (see also measure of central
location).
mode of transmission the manner in which an agent is transmitted from its reservoir to a
susceptible host (see also transmission).
morbidity disease; any departure, subjective or objective, from a state of physiological or
psychological health and well-being.
mortality death.
mortality rate a measure of the frequency of occurrence of death among a defined population
during a specified time interval.
mortality rate, age-adjusted a mortality rate that has been statistically modified to eliminate the
effect of different age distributions among different populations.
mortality rate, age-specific a mortality rate limited to a particular age group, calculated as the
number of deaths among the age group divided by the number of persons in that age group,
usually expressed per 100,000.
mortality rate, cause-specific the mortality rate from a specified cause, calculated as the
number of deaths attributed to a specific cause during a specified time interval among a
population divided by the size of the midinterval population.
mortality rate, crude a mortality rate from all causes of death for an entire population, without
adjustment.
mortality rate, infant the mortality rate for children aged <1 year, calculated as the number of
Glossary
Page 13
deaths reported among this age group during a given period divided by the number of live births
reported during the same period, and expressed per 1,000 live births. Infant mortality rate is a
universally accepted indicator of the health of a nation’s population and the adequacy of its
health-care system.
mortality rate, neonatal the mortality rate for children from age birth up to, but not including,
28 days. In calculating neonatal mortality rates, the numerator is the number of deaths among
this age group during a given period, and the denominator is the number of live births reported
during the same period. The neonatal mortality rate is usually expressed per 1,000 live births.
mortality rate, postneonatal the mortality rate for children from age 28 days up to, but not
including, 1 year. In calculating postneonatal mortality rates, the numerator is the number of
deaths among this age group during a given period, and the denominator is the number of live
births during the same period.. The postneonatal mortality rate is usually expressed per 1,000
live births.
mortality rate, race/ethnic-specific a mortality rate limited to a specified racial or ethnic group
both numerator and denominator are limited to that group.
mortality rate, sex-specific a mortality rate among either males or females.
N
natural history of disease the progression of a disease process in a person from the time it
begins to the time it resolves, in the absence of treatment.
NCHS The National Center for Health Statistics, the US governmental organization responsible
for national vital statistics and multiple national health surveys. Organizationally, NCHS is a
component of the Centers for Disease Control and Prevention, one of the agencies of the US
Department of Health and Human Services.
NHANES The National Health and Nutrition Examination Survey, a representative survey of the
civilian, noninstitutionalized US population conducted by the National Center for Health
Statistics, designed to (1) estimate the proportion of the US population and designated groups
with selected disease and risk factors; (2) monitor trends in selected behaviors, exposures, and
diseases; and (3) study the associations among diet, nutrition, and health.
necessary cause see cause, necessary.
neonatal mortality rate see mortality rate, neonatal.
nominal scale see scale, nominal.
normal curve the bell-shaped curve that results when a normal distribution is graphed.
normal distribution a distribution represented as a bell shape, symmetrical on both sides of the
peak, which is simultaneously the mean, median, and mode, and with both tails extending to
infinity.
Glossary
Page 14
notifiable disease a disease that, by law, must be reported to public health authorities upon
diagnosis.
null hypothesis see hypothesis, null.
numerator the upper portion of a fraction (see also denominator).
O
observational study see study, observational.
odds ratio a measure of association used in comparative studies, particularly case-control
studies, that quantifies the association between an exposure and a health outcome; also called the
cross-product ratio.
ordinal scale see scale, ordinal.
outbreak the occurrence of more cases of disease, injury, or other health condition than expected
in a given area or among a specific group of persons during a specific period. Usually, the cases
are presumed to have a common cause or to be related to one another in some way. Sometimes
distinguished from an epidemic as more localized, or the term less likely to evoke public panic
(see also epidemic).
outbreak, common-source an outbreak that results from persons being exposed to the same
harmful influence (e.g., an infectious agent or toxin). The exposure period can be brief or can
extend over days, weeks, or longer, with the exposure being either intermittent or continuous.
outbreak, point-source a common source outbreak in which the exposure period is relatively
brief so that all cases occur within one incubation period.
outbreak, propagated an outbreak that spreads from person to person rather than from a
common source.
outcome(s) any or all of the possible results that can stem from exposure to a causal factor or
from preventive or therapeutic interventions; all identified changes in health status that result
from the handling of a health problem.
outlier a value substantively or statistically different from all (or approximately all) of the other
values in a distribution.
P
P value the probability of observing an association between two variables or a difference
between two or more groups as large or larger than that observed, if the null hypothesis were
true. Used in statistical testing to evaluate the plausibility of the null hypothesis (i.e., whether the
observed association or difference plausibly might have occurred by chance).
pandemic an epidemic occurring over a widespread area (multiple countries or continents) and
usually affecting a substantial proportion of the population.
Glossary
Page 15
passive immunity see immunity, passive.
passive surveillance see surveillance, passive.
pathogenicity the ability of an agent to cause disease after infection, measured as the proportion
of persons infected by an agent who then experience clinical disease.
percentile a set of cut points used to divide a distribution or a set of ranked data into 100 parts of
equal area with each interval between the points containing 1/100 or 1% of the observations. For
example, the 5th
percentile is a cut point with 5% of the observations below it and the remaining
95% above it.
period prevalence see prevalence, period.
person-time rate the incidence rate calculated as the number of new cases among a population
divided by the cumulative person-time of that population, usually expressed as the number of
events per persons per unit of time.
person-time the amount of time each participant in a cohort study is observed and disease-free,
often summed to provide the denominator for a person-time rate.
phylogenetic tree a branching chart that indicates the evolutionary lineage or genetic relatedness
of organisms.
pie chart a circular graph of a frequency distribution in which each segment of the pie is
proportional in size to the frequency of corresponding category.
point prevalence see prevalence, point.
point-source outbreak see outbreak, point-source.
population the total number of inhabitants of a geographic area or the total number of persons in
a particular group (e.g., the number of persons engaged in a certain occupation).
population pyramid a graphical display of the age-sex distribution of a population, constructed
with a horizontal histogram of the age distribution of males pointing to the left, and the
corresponding horizontal histogram of age distribution of females pointing to the right.
portal of entry a pathway into the host that gives an agent access to tissue that will allow it to
multiply or act.
portal of exit a pathway by which an agent can leave its host.
postneonatal mortality rate see mortality rate, postneonatal.
predictive value positive the proportion of cases identified by a test, reported by a surveillance
system, or classified by a case definition that are true cases, calculated as the number of true-
positives divided by the number of true-positives plus false-positives.
prevalence the number or proportion of cases or events or attributes among a given population.
Glossary
Page 16
prevalence rate the proportion of a population that has a particular disease, injury, other health
condition, or attribute at a specified point in time (point prevalence) or during a specified period
(period prevalence).
prevalence, period the amount of a particular disease, chronic condition, or type of injury
present among a population at any time during a particular period.
prevalence, point the amount of a particular disease, chronic condition, or type of injury present
among a population at a single point in time.
privacy rule a set of regulations based on the Health Insurance Portability and Accountability
Act to protect the privacy of individually identifiable health information.
propagated outbreak see outbreak, propagated.
proportion a ratio in which the numerator is included in the denominator; the ratio of a part to
the whole, expressed as a "decimal fraction" (e.g., 0 2), a fraction (1/5), or a percentage (20%).
proportion, attributable a measure of the impact of a causative factor on the public health; the
proportion of a health state or event among exposed persons that can be attributed to the
exposure also called attributable risk percent.
proportionate mortality the proportion of deaths among a population attributable to a particular
cause during a selected period. Each cause of death is expressed as a percentage of all deaths,
and the sum of the proportionate mortality for all causes must equal 100%. These proportions are
not mortality rates because, in proportionate mortality, the denominator is all deaths instead of
the population among whom the deaths occurred.
prospective study see study, prospective.
Q
quarantine the separation of well persons who have been exposed or are suspected to have been
exposed to a communicable disease, to monitor for illness and to prevent potential transmission
of infection to susceptible persons during the incubation period. Quarantine refers to separation
of potentially exposed but well persons; isolation refers to separation of ill persons.
R
race/ethnic-specific mortality rate see mortality rate, race/ethnic-specific.
random sample see sample, random.
range in statistics, the difference between the largest and smallest values in a distribution; in
common use, the span of values from smallest to largest.
rate an expression of the relative frequency with which an event occurs among a defined
population per unit of time, calculated as the number of new cases or deaths during a specified
period divided by either person-time or the average (midinterval) population. In epidemiology, it
Glossary
Page 17
is often used more casually to refer to proportions that are not truly rates (e.g., attack rate or
case-fatality rate).
rate ratio a measure of association that quantifies the relation between an exposure and a health
outcome from an epidemiologic study, calculated as the ratio of incidence rates or mortality rates
of two groups.
ratio the relative size of two quantities, calculated by dividing one quantity by the other.
record in a line listing, each row is a record or observation. A record represents data related to a
single case.
relative risk a general term for measures of association calculated from the data in a two-by-two
table, including risk ratio, rate ratio, and odds ratio (see also risk ratio).
representative sample see sample, representative.
reservoir the habitat in which an infectious agent normally lives, grows, and multiplies, which
can include humans, animals, or the environment.
retrospective study see study, retrospective.
risk the probability that an event will occur (e.g., that a person will be affected by, or die from,
an illness, injury, or other health condition within a specified time or age span).
risk factor an aspect of personal behavior or lifestyle, an environmental exposure, or a
hereditary characteristic that is associated with an increase in the occurrence of a particular
disease, injury, or other health condition.
risk ratio a measure of association that quantifies the association between an exposure and a
health outcome from an epidemiologic study, calculated as the ratio of incidence proportions of
two groups.
S
sample a selected subset of a population a sample can be random or nonrandom and
representative or nonrepresentative.
sample, random a sample of persons chosen in such a way that each one has the same (and
known) probability of being selected.
sample, representative a sample whose characteristics correspond to those of the original or
reference population.
scale, interval a measurement scale consisting of quantitative categories whose values are
measured on a scale of equally spaced units, but without a true zero point (e.g., date of birth).
scale, nominal a measurement scale consisting of qualitative categories whose values have no
inherent statistical order or rank (e.g., categories of race/ethnicity, religion, or country of birth).
Glossary
Page 18
scale, ordinal a measurement scale consisting of qualitative categories whose values have a
distinct order but no numerical distance between their possible values (e.g., stage of cancer, I, II,
III, or IV).
scale, ratio a measurement scale consisting of quantitative categories whose values are intervals
with a true zero point (e.g., height in centimeters or duration of illness).
scatter diagram (or scattergram) a graphical display of the association between two variables
in which a dot is plotted on the graph for each set of paired values for two continuous variables,
with one variable plotted on the horizontal axis, and the other plotted on the vertical axis.
seasonality change in physiologic status or in the occurrence of a disease, chronic condition, or
type of injury that conforms to a regular seasonal pattern.
secondary attack rate see attack rate, secondary.
secular trend see trend, secular.
selection bias see bias, selection.
semilogarithmic-scale line graph see line graph, semilogarithmic-scale
sensitivity the ability of a test, case definition, or surveillance system to identify true cases; the
proportion of people with a health condition (or the proportion of outbreaks) that are identified
by a screening test or case definition (or surveillance system).
sentinel surveillance see surveillance, sentinel.
sex-specific mortality rate see mortality rate, sex-specific.
skewed a distribution that is not symmetrical.
source (of infection) the person, animal, object, or substance from which an infectious agent is
transmitted to a host.
source case see case, source.
specificity the ability or a test, case definition, or surveillance system to exclude persons without
the health condition of interest; the proportion of persons without a health condition that are
correctly identified as such by a screening test, case definition, or surveillance system.
spectrum of illness the range of manifestations a disease process can take (e.g., from
asymptomatic to mild clinical illness to severe illness and death).
sporadic an event that occurs infrequently and irregularly.
spot map a visual display of the geographic pattern of a health problem, in which a marker is
placed on a map to indicate where each affected person lives, works, or might have been
exposed.
standard deviation a statistical summary of how dispersed the values of a variable are around
Glossary
Page 19
its mean, calculated as the square root of the variance.
standard error (of the mean) the standard deviation of a theoretical distribution of sample
means of a variable around the true population mean of that variable. Standard error is computed
as the standard deviation of the variable divided by the square root of the sample size.
statistical inference generalizations developed from sample data, usually with calculated
degrees of uncertainty.
statistical significance the measure of how likely it is that a set of study results could have
occurred by chance alone. Statistical significance is based on an estimate of the probability of the
observed or a greater degree of association between independent and dependent variables
occurring under the null hypothesis (see also P value).
study, analytic a study, usually observational, in which groups are compared to identify and
quantify associations, test hypotheses, and identify causes. Two common types are cohort studies
and case-control studies.
study, case-control an observational analytic study that enrolls one group of persons with a
certain disease, chronic condition, or type of injury (case-patients) and a group of persons
without the health problem (control subjects) and compares differences in exposures, behaviors,
and other characteristics to identify and quantify associations, test hypotheses, and identify
causes.
study, cohort an observational analytic study in which enrollment is based on status of exposure
to a certain factor or membership in a certain group. Populations are followed, and disease,
death, or other health-related outcomes are documented and compared. Cohort studies can be
either prospective or retrospective.
study, cross-sectional a study in which a sample of persons from a population are enrolled and
their exposures and health outcomes are measured simultaneously; a survey.
study, experimental a study in which the investigator specifies the type of exposure for each
person (clinical trial) or community (community trial) then follows the persons' or communities'
health status to determine the effects of the exposure.
study, observational a study in which the investigator observes rather than influences exposure
and disease among participants. Case-control and cohort studies are observational studies (see
also study, experimental).
study, prospective an analytic study in which participants are enrolled before the health
outcome of interest has occurred.
study, retrospective an analytic study in which participants are enrolled after the health outcome
of interest has occurred. Case-control studies are inherently retrospective.
subclinical without apparent symptoms.
surveillance, active public health surveillance in which the health agency solicits reports.
Glossary
Page 20
surveillance, medical monitoring of a person who might have been exposed to an infectious,
chemical, radiologic, or other potentially causal agent, for the purpose of detecting early
symptoms.
surveillance, passive public health surveillance in which data are sent to the health agency
without prompting.
surveillance, sentinel a surveillance system that uses a prearranged sample of sources (e.g.,
physicians, hospitals, or clinics) who have agreed to report all cases of one or more notifiable
diseases.
surveillance, syndromic (1) the monitoring of the frequency of illnesses with a specified set of
clinical features among a given population without regard to the specific diagnoses, if any, that
are assigned to them by clinicians. (2) A system for early detection of outbreaks whereby health
department staff, assisted by automated acquisition of data routinely collected for other purposes
and computer generation of statistical signals, monitor disease indicators, particularly those
associated with possible terrorism-related biologic and chemical agents, continually or at least
daily to detect outbreaks earlier than would otherwise be possible with traditional public health
methods.
survey a systematic canvassing of persons to collect information, often from a representative
sample of the population.
survival curve a line graph that begins with 100% of the study population and displays the
percentage of the population still surviving at successive points in time. A survival curve can
also be used to depict freedom from a health problem, complication, or another endpoint.
symmetrical a type of distribution where the shapes to the right and left of the central location
are the same. Normal, bell-shaped distributions are symmetrical; the mean, median, and mode
are the same.
symptom any indication of disease noticed or felt by a patient.
syndrome a combination of symptoms characteristic of a disease or health condition; sometimes
refers to a health condition without a clear cause (e.g., chronic fatigue syndrome).
syndromic surveillance see surveillance, syndromic.
T
table an arrangement of data in rows and columns. In epidemiology, the data are usually
summaries of the frequency of occurrence of an event or characteristic occurring among different
groups.
table shell a table that is completely drawn and labeled but contains no data.
table, two-by-two a two-variable table with cross-tabulated data, in which each variable has
only two categories. Usually, one variable represents a health outcome, and one represents an
exposure or personal characteristic.
Glossary
Page 21
transmission (of infection) any mode or mechanism by which an infectious agent is spread to a
susceptible host.
transmission, airborne transfer of an agent suspended in the air, considered a type of indirect
transmission.
transmission, biologic indirect transmission by a vector in which the infectious agent undergoes
biologic changes inside the vector as part of its life cycle before it is transmitted to the host (see
also transmission, mechanical).
transmission, direct immediate transfer of an agent from a reservoir to a host by direct contact
or droplet spread.
transmission, indirect transfer of an agent from a reservoir to a host either by being suspended
in air particles (airborne), carried by an inanimate objects (vehicleborne), or carried by an
animate intermediary (vectorborne).
transmission, mechanical indirect transmission by a vector in which the infectious agent does
not undergo physiologic changes inside the vector (see also transmission, biologic).
transmission, vectorborne transmission of an agent by a living intermediary (e.g., tick,
mosquito, or flea); considered a type of indirect transmission.
transmission, vehicleborne transmission of an agent by an inanimate object; considered a type
of indirect transmission; includes foodborne and waterborne transmission.
trend movement or change in frequency over time, usually upwards or downwards.
trend, secular changes occurring over a substantial period, generally years or decades.
trial, clinical an experimental study that uses data from individual persons. The investigator
specifies the type of exposure for each study participant and then follows each person's health
status to determine the effects of the exposure.
trial, community an experimental study that uses data from communities. The investigator
specifies the type of exposure for each community and then follows the communities' health
status to determine the effects of the exposure.
trial, randomized clinical a clinical trial in which persons are randomly assigned to exposure or
treatment groups.
two-by-two table see table, two-by-two.
V
validity the degree to which a measurement, questionnaire, test, or study or any other data-
collection tool measures what it is intended to measure.
variable any characteristic or attribute that can be measured and can have different values.
Glossary
Page 22
variable (or data), discrete a variable that is limited to a finite number of values; data for such a
variable.
variable, continuous a variable that has the potential for having an infinite number of values
along a continuum (e.g., height and weight).
variable, dependent in a statistical analysis, a variable whose values are a function of one or
more other variables.
variable, independent an exposure, risk factor, or other characteristic being observed or
measured that is hypothesized to influence an event or manifestation (the dependent variable).
variance a measure of the spread in a set of observations, calculated as the sum of the squares of
deviations from the mean, divided by the number of observations minus 1 (see also standard
deviation).
vector a living intermediary that carries an agent from a reservoir to a susceptible host (see also
transmission, biologic and transmission, mechanical) (e.g., mosquitoes, fleas, or ticks).
vehicle an inanimate object that can carry an agent from a reservoir to a susceptible host (e.g.,
food, water, blood products, and bedding) (see also transmission, indirect).
virulence the ability of an infectious agent to cause severe disease, measured as the proportion of
persons with the disease who become severely ill or die.
vital statistics systematically tabulated data about recorded births, marriages, divorces, and
deaths.
X
x-axis the horizontal axis of a rectangular graph, usually displaying the independent variable
(e.g., time).
Y
y-axis the vertical axis of a rectangular graph, usually displaying the dependent variable (e.g.,
frequency — number, proportion, or rate).
years of potential life lost (YPLL) a measure of the impact of premature death on a population,
calculated as the sum of the differences between a predetermined minimally acceptable age (e.g.,
65 years or current life expectancy) and the age at death for everyone who died earlier than that
age.
Z
zoonosis an infectious disease that is transmissible from animals to humans.

Principios de Epidemiología.pdf

  • 1.
    SELF-STUDY Course SS1978 Principles ofEpidemiology in Public Health Practice Third Edition An Introduction to Applied Epidemiology and Biostatistics October 2006 Updated May 2012 U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention (CDC) Office of Workforce and Career Development Atlanta, GA 30333
  • 2.
    Introduction Page ii CONTENTS Acknowledgments................................................................................................................v Introduction...................................................................................................................... viii LessonOne: Introduction to Epidemiology Lesson Introduction ......................................................................................................... 1-1 Lesson Objectives ............................................................................................................ 1-1 Major Sections Definition of Epidemiology....................................................................................... 1-2 Historical Evolution of Epidemiology....................................................................... 1-7 Uses.......................................................................................................................... 1-12 Core Epidemiologic Functions ................................................................................ 1-15 The Epidemiologic Approach.................................................................................. 1-21 Descriptive Epidemiology ....................................................................................... 1-31 Analytic Epidemiology............................................................................................ 1-46 Concepts of Disease Occurrence ............................................................................. 1-52 Natural History and Spectrum of Disease................................................................ 1-59 Chain of Infection .................................................................................................... 1-62 Epidemic Disease Occurrence ................................................................................. 1-72 Summary.................................................................................................................. 1-80 Exercise Answers........................................................................................................... 1-81 Self-Assessment Quiz.................................................................................................... 1-85 Answers to Self-Assessment Quiz................................................................................. 1-90 References...................................................................................................................... 1-93 Lesson Two: Summarizing Data Lesson Introduction ......................................................................................................... 2-1 Lesson Objectives ............................................................................................................ 2-1 Major Sections Organizing Data......................................................................................................... 2-2 Types of Variables..................................................................................................... 2-4 Frequency Distributions............................................................................................. 2-7 Properties of Frequency Distributions ..................................................................... 2-11 Methods for Summarizing Data............................................................................... 2-15 Measures of Central Location.................................................................................. 2-16 Measures of Spread.................................................................................................. 2-36 Choosing the Right Measure of Central Location and Spread ................................ 2-53 Summary.................................................................................................................. 2-58 Exercise Answers........................................................................................................... 2-59 Self-Assessment Quiz.................................................................................................... 2-64 Answers to Self-Assessment Quiz................................................................................. 2-69 References...................................................................................................................... 2-71
  • 3.
    Introduction Page iii Lesson Three:Measures of Risk Lesson Introduction ......................................................................................................... 3-1 Lesson Objectives ............................................................................................................ 3-1 Major Sections Frequency Measures .................................................................................................. 3-2 Morbidity Frequency Measures............................................................................... 3-10 Mortality Frequency Measures ................................................................................ 3-20 Natality (Birth) Measures ........................................................................................ 3-38 Measures of Association.......................................................................................... 3-39 Measures of Public Health Impact........................................................................... 3-48 Summary.................................................................................................................. 3-51 Exercise Answers........................................................................................................... 3-52 Self-Assessment Quiz.................................................................................................... 3-56 Answers to Self-Assessment Quiz................................................................................. 3-62 References...................................................................................................................... 3-65 Lesson Four: Displaying Public Health Data Lesson Introduction ......................................................................................................... 4-1 Lesson Objectives ............................................................................................................ 4-1 Major Sections Introduction to Tables and Graphs............................................................................. 4-2 Tables......................................................................................................................... 4-3 Graphs...................................................................................................................... 4-22 Other Data Displays................................................................................................. 4-42 Using Computer Technology................................................................................... 4-63 Summary.................................................................................................................. 4-66 Exercise Answers........................................................................................................... 4-72 Self-Assessment Quiz.................................................................................................... 4-79 Answers to Self-Assessment Quiz................................................................................. 4-84 References...................................................................................................................... 4-87 Lesson Five: Public Health Surveillance Lesson Introduction ......................................................................................................... 5-1 Lesson Objectives ............................................................................................................ 5-1 Major Sections: Introduction................................................................................................................ 5-2 Purpose and Characteristics of Public Health Surveillance....................................... 5-4 Identifying Health Problems for Surveillance ........................................................... 5-6 Identifying or Collecting Data for Surveillance....................................................... 5-13 Analyzing and Interpreting Data.............................................................................. 5-23 Disseminating Data and Interpretations................................................................... 5-34 Evaluating and Improving Surveillance................................................................... 5-38 Summary.................................................................................................................. 5-42 Appendix A. Characteristics of Well-Conducted Surveillance............................. 5-43
  • 4.
    Introduction Page iv Appendix B.CDC Fact Sheet on Chlamydia........................................................ 5-45 Appendix C. Examples of Surveillance ................................................................ 5-48 Appendix D. Major Health Data Systems in the United States............................. 5-52 Appendix E. Limitations of Notifiable Disease Surveillance and Recommendations for Improvement................................................ 5-53 Exercise Answers........................................................................................................... 5-57 Self-Assessment Quiz.................................................................................................... 5-63 Answers to Self-Assessment Quiz................................................................................. 5-68 References...................................................................................................................... 5-73 Lesson Six: Investigating an Outbreak Lesson Introduction ......................................................................................................... 6-1 Lesson Objectives ............................................................................................................ 6-1 Major Sections: Introduction to Investigating an Outbreak................................................................. 6-2 Steps of an Outbreak Investigation............................................................................ 6-8 Summary.................................................................................................................. 6-57 Exercise Answers........................................................................................................... 6-59 Self-Assessment Quiz.................................................................................................... 6-64 Answers to Self-Assessment Quiz................................................................................. 6-71 References...................................................................................................................... 6-75 Glossary
  • 5.
    Introduction Page v ACKNOWLEDGMENTS Developed by U.S.Department of Health and Human Services Centers for Disease Control and Prevention (CDC) Office of Workforce and Career Development (OWCD) Career Development Division (CDD) Atlanta, Georgia 30333 Technical Content Richard C. Dicker, MD, MSc, Lead Author, CDC/OWCD/CDD (retired) Fátima Coronado, MD, MPH, CDC/OWCD/CDD Denise Koo, MD, MPH, CDC/OWCD/CDD Roy Gibson Parrish, II, MD Development Team Sonya D. Arundar, MS, CDC (contractor) Ron Teske, MS, CDC (contractor) Susan Baker Toal, MPH, Public Health Consultant Nancy M. Hunt, MPH, CDC (ORISE Fellow) Susan D. Welch, MEd, Georgia Poison Center Cassie Edwards, CDC (contractor) Planning Committee Christopher K. Allen, RPh, MPH, CDC W. Randolph Daley, DVM, MPH, CDC Patricia Drehobl, RN, MPH Sharon Hall, RN, PhD, CDC Dennis Jarvis, MPH, CHES, CDC Denise Koo, MD, MPH, CDC Graphics/Illustrations Sonya D. Arundar, MS, CDC (contractor) Lee Oakley, CDC (retired) Jim Walters, CDC Technical Reviewers Tomas Aragon, MD, DrPH, San Francisco Department of Public Health Diane Bennett, MD, MPH, CDC Danae Bixler, MD, MPH, West Virginia Bureau for Public Health R. Elliot Churchill, MS, MA, CDC (retired) Roxanne Ereth, MPH, Arizona Department of Health Services Stephen Everett, MPH, Yavapai County Community Health Services, Arizona Michael Fraser, PhD, National Association of County and City Health Officials
  • 6.
    Introduction Page vi Nancy C.Gathany, MEd, CDC Marjorie A.Getz, MPHIL, Bradley University, Illinois John Mosely Hayes, DrPH, MBA, MSPH, Tribal Epidemiology Center United South and Eastern Tribes, Inc., Tennessee Richard Hopkins, MD, MSPH, Florida Department of Health John M. Horan, MD, MPH, Georgia Division of Public Health Christina M. Bruton Kwon, MSPH, Science Applications International Corporation, Atlanta Edmond F. Maes, PhD, CDC Sharon McDonnell, MD, MPH, Darmouth Medical School William S. Paul, MD, MPH, Chicago Department of Public Health James Ransom, MPH, National Association of County and City Health Officials Lynn Steele, MS, CDC Donna Stroup, PhD, MSc, American Cancer Society Douglas A. Thoroughman, PhD, MS CDC Kirsten T. Weiser, MD, Darmouth Hitchcock Medical School Celia Woodfill, PhD, California Department of Health Services Field Test Participants Sean Altekruse, DVM, MPH, PhD, U.S. Public Health Service Gwen A. Barnett, MPH, CHES, CDC Jason Bell, MD, MPH Lisa Benaise, MD, Med Immune, Inc., Maryland Amy Binggeli, DrPH, RD, CHES, CLE, Imperial County Public Health Department, California Kim M. Blindauer, DVM, MPH, Agency for Toxic Substances and Disease Registry R. Bong, RN, BSN, Federal Bureau of Prisons Johnna L. Burton, BS, CHES, Tennessee Department of Health Catherine C. Chow, MD, MPH, Hawaii Department of Health Janet Cliatt, MT, CLS(NCA), National Institutes of Health Catherine Dentinger, FNP, MS, New York City Department of Health and Mental Hygiene Veronica Gordon, BSN, MS, Indian Health Service, New Mexico Susan E. Gorman, PharmD, DABAT, CDC Deborah Gould, PhD, CDC Juliana Grant, MD, MPH, CDC Lori Evans Hall, PharmD, CDC Nazmul Hassan, MS, Food and Drug Administration Daniel L. Holcomb, BS, Agency for Toxic Substances and Disease Registry Asim A. Jani, MD, MPH FACP, CDC Charletta L. Lewis, BSN, Wellpinit Indian Health Service, Washington Sheila F. Mahoney, CNM, MPH, National Institutes of Health Cassandra Martin, MPH, CHES, Georgia Department of Human Resources Joan Marie McFarland, AS, BSN, MS, Winslow Indian Health Care Center, Arizona Rosemarie McIntyre, RN, MS, CHES, CDC
  • 7.
    Introduction Page vii Gayle L.Miller, DVM, Jefferson County Department of Health and Environment, Colorado Long S. Nguyen, MPH, CHES, NIH Paras M. Patel, RPh, Food and Drug Administration Rossanne M. Philen, MD, MS, CDC Alyson Richmond, MPH, CHES, CDC (contractor) Glenna A. Schindler, MPH, RN, CHES, Healthcare Services Group, Missouri Sandra K. Schumacher, MD, MPH, CDC Julie R. Sinclair, MA, DVM, MPH, CDC Nita Sood, RPh, PharmD, U.S. Public Health Service P. Lynne Stockton, VMD, MS, ELS(D), CDC Jill B. Surrency, MPH, CHES, CDC (contractor) Joyce K. Witt, RN, CDC
  • 8.
    Introduction Page viii INTRODUCTION This coursewas developed by the Centers for Disease Control and Prevention (CDC) as a self-study course. Continuing education is available for certified public health educators, nurses, physicians, pharmacists, veterinarians, and public health professionals. CE credit is available only through the CDC/ATSDR Training and Continuing Education Online system at http://www.cdc.gov/TCEOnline. To receive CE credit, you must register for the course (SS1978) and complete the evaluation and examination online. You must achieve a score of 70% or higher to pass the examination. If you do not pass the first time, you can take the exam a second time. For more information about continuing education, call 1-800-41-TRAIN (1-800-418- 7246) or by e-mail at ce@cdc.gov. Course Design This course covers basic epidemiology principles, concepts, and procedures useful in the surveillance and investigation of health-related states or events. It is designed for federal, state, and local government health professionals and private sector health professionals who are responsible for disease surveillance or investigation. A basic understanding of the practices of public health and biostatistics is recommended. Course Materials The course materials consist of six lessons. Each lesson presents instructional text interspersed with relevant exercises that apply and test knowledge and skills gained. Lesson One: Introduction to Epidemiology Key features and applications of descriptive and analytic epidemiology Lesson Two: Summarizing Data Calculation and interpretation of mean, median, mode, ranges, variance, standard deviation, and confidence interval Lesson Three: Measures of Risk Calculation and interpretation of ratios, proportions, incidence rates, mortality rates, prevalence, and years of potential life lost Lesson Four: Displaying Public Health Data Preparation and application of tables, graphs, and charts such as arithmetic-scale line, histograms, pie chart, and box plot Lesson Five: Public Health Surveillance Processes, uses, and evaluation of public health surveillance in the United States
  • 9.
    Introduction Page ix Lesson Six:Investigating an Outbreak Steps of an outbreak investigation A Glossary that defines the major terms used in the course is also provided at the end of Lesson Six. Supplementary Materials In addition to the course materials, students may want to use the following: • A calculator with square root and logarithmic functions for some of the exercises. • A copy of Heymann, DL, ed. Control of Communicable Diseases Manual, 18th edition, 2004, for reference. Available from the American Public Health Association (202) 777-2742. Objectives Students who successfully complete this course should be able to correctly: • Describe key features and applications of descriptive and analytic epidemiology. • Calculate and interpret ratios, proportions, incidence rates, mortality rates, prevalence, and years of potential life lost. • Calculate and interpret mean, median, mode, ranges, variance, standard deviation, and confidence interval. • Prepare and apply tables, graphs, and charts such as arithmetic-scale line, scatter diagram, pie chart, and box plot. • Describe the processes, uses, and evaluation of public health surveillance. • Describe the steps of an outbreak investigation. General Instructions Self-study courses are “self-paced.” We recommend that a lesson be completed within two weeks. To get the most out of this course, establish a regular time and method of study. Research has shown that these factors greatly influence learning ability. Each lesson in the course consists of reading, exercises, and a self-assessment quiz. Reading Assignments Complete the assigned reading before attempting to answer the self-assessment questions. Read thoroughly and re-read for understanding as necessary. A casual reading may result in missing useful information which supports main themes. Assignments are designed to cover one or two major subject areas. However, as you progress, it is often necessary to combine previous learning to accomplish new skills. A review of previous lessons may be necessary. Frequent visits to the Glossary may also be useful. Exercises Exercises are included within each lesson to help you apply the lesson content. Some exercises may be more applicable to your workplace and background than others. You should review the answers to all exercises since the answers are very detailed. Answers to
  • 10.
    Introduction Page x the exercisescan be found at the end of each lesson. Your answers to these exercises are valuable study guides for the final examination. Self-Assessment Quizzes After completing the reading assignment, answer the self-assessment quizzes before continuing to the next lesson. Answers to the quizzes can be found at the end of the lesson. After passing all six lesson quizzes, you should be prepared for the final examination. • Self-assessment quizzes are open book. • Unless otherwise noted, choose ALL CORRECT answers. • Do not guess at the answer. • You should score at least 70% correct before continuing to the next lesson. Tips for Answering Questions • Carefully read the question. Note that it may ask, “Which is CORRECT?” as well as “Which is NOT CORRECT?” or “Which is the EXCEPTION?” • Read all the choices given. One choice may be a correct statement, but another choice may be more nearly correct or complete for the question that is asked. Final Examination and Course Evaluation The final examination and course evaluation are available only on-line. The final requirement for the course is an open-book examination. We recommend that you thoroughly review the questions included with each lesson before completing the exam. It is our sincere hope that you will find this undertaking to be a profitable and satisfying experience. We solicit your constructive criticism at all times and ask that you let us know whenever you have problems or need assistance.
  • 11.
    Introduction Page xi Continuing Education Toreceive continuing education for completing the self-study course, go to the CDC/ATSDR Training and Continuing Education Online at http://www.cdc.gov/TECOnline and register as a participant. You will need to register for the course (SS1978) and complete the course evaluation and exam online. You will have to answer at least 70% of the exam questions correctly to obtain continuing education credits/contact hours and a certificate. For more information about continuing education, please call 1-800-41 TRAIN (1-800- 418-7246) or go to www.cdc.gov/TCEOnline. Continuing Education Accreditation Statements Origination Date: November 4, 2011 Expiration Date: November 4, 2013 CDC, our planners, and our content experts wish to disclose they have no financial interests or other relationships with the manufacturers of commercial products, suppliers of commercial services, or commercial supporters. Planners have reviewed content to ensure there is no bias. Content will not include any discussion of the unlabeled use of a product or a product under investigational use. CDC does not accept commercial support. Continuing Medical Education for Physicians (CME): The Centers for Disease Control and Prevention is accredited by the Accreditation Council for Continuing Medical Education (ACCME® ) to provide continuing medical education for physicians. The Centers for Disease Control and Prevention designates this enduring activity for a maximum of 17 AMA PRA Category 1 Credits™. Physicians should only claim credit commensurate with the extent of their participation in the activity. Continuing Education Designated for Non-Physicians: Non-physicians will receive a certificate of participation. Continuing Medical Education for Nurses (CNE): The Centers for Disease Control and Prevention is accredited as a provider of Continuing Nursing Education by the American Nurses Credentialing Center's Commission on Accreditation. This activity provides 17 contact hours. Continuing Education for Certified Health Educators (CECH): Sponsored by the Centers for Disease Control and Prevention, a designated provider of continuing education contact hours (CECH) in health education by the National
  • 12.
    Introduction Page xii Commission forHealth Education Credentialing, Inc. This program is designed for Certified Health Education Specialists (CHES) to receive up to 17 Category I CECH in health education. CDC provider number GA0082. Continuing Education for Pharmacists (CPE): The Centers for Disease Control and Prevention is accredited by the Accreditation Council for Pharmacy Education as a provider of continuing pharmacy education. This program is a designated event for pharmacists to receive 1.7Contact Hours in pharmacy education. The Universal Activity Number is 0387-0000- 11-098-H04-P. Course Category: This activity has been designated as Knowledge-Based. Cost: There is no fee related to the web-based version of the activity. There is a fee charged for the version ordered from the Public Health Foundation. IACET Continuing Education Units (CEU): The CDC has been approved as an Authorized Provider by the International Association for Continuing Education and Training (IACET), 1760 Old Meadow Road, Suite 500, McLean, VA 22102. The CDC is authorized by IACET to offer 1.7 ANSI/IACET CEU's for this program. Continuing Education for Veterinarians (AAVSB/RACE): This program was reviewed and approved by the AAVSB RACE program for 20 hours of continuing education in jurisdictions which recognize AAVSB RACE approval. Please contact the AAVSB RACE program if you have any comments/concerns regarding this program’s validity or relevancy to the veterinary profession. Course Evaluation Even if you are not interested in continuing education, we still encourage you to complete the course evaluation. To do this, go to http://www.cdc.gov/TCEOnline and register as a participant. You will then need to register for the course (SS1978) and complete the course evaluation online. There is no cost to obtain continuing education online. Your comments are valuable to us and will help to revise the self-study course in the future. Ordering Information A hard-copy of the text can be obtained from the Public Health Foundation. Specify Item No. SS1978 when ordering. • Online at: http://bookstore.phf.org • By phone: Toll-free within the US: 877-252-1200 International: (301) 645-7773.
  • 13.
    Introduction to Epidemiology Page1-1 INTRODUCTION TO EPIDEMIOLOGY Recently, a news story described an inner-city neighborhood’s concern about the rise in the number of children with asthma. Another story reported the revised recommendations for who should receive influenza vaccine this year. A third story discussed the extensive disease-monitoring strategies being implemented in a city recently affected by a massive hurricane. A fourth story described a finding published in a leading medical journal of an association in workers exposed to a particular chemical and an increased risk of cancer. Each of these news stories included interviews with public health officials or researchers who called themselves epidemiologists. Well, who are these epidemiologists, and what do they do? What is epidemiology? This lesson is intended to answer those questions by describing what epidemiology is, how it has evolved and how it is used today, and what some of the key methods and concepts are. The focus is on epidemiology in public health practice, that is, the kind of epidemiology that is done at health departments. Objectives After studying this lesson and answering the questions in the exercises, you will be able to: • Define epidemiology • Summarize the historical evolution of epidemiology • Name some of the key uses of epidemiology • Identify the core epidemiology functions • Describe primary applications of epidemiology in public health practice • Specify the elements of a case definition and state the effect of changing the value of any of the elements • List the key features and uses of descriptive epidemiology • List the key features and uses of analytic epidemiology • List the three components of the epidemiologic triad • Describe the different modes of transmission of communicable disease in a population Major Sections Definition of Epidemiology......................................................................................................... 1-2 Historical Evolution of Epidemiology......................................................................................... 1-7 Uses............................................................................................................................................ 1-12 Core Epidemiologic Functions .................................................................................................. 1-15 The Epidemiologic Approach.................................................................................................... 1-21 Descriptive Epidemiology ......................................................................................................... 1-31 Analytic Epidemiology.............................................................................................................. 1-46 Concepts of Disease Occurrence ............................................................................................... 1-52 Natural History and Spectrum of Disease.................................................................................. 1-59 Chain of Infection ...................................................................................................................... 1-62 Epidemic Disease Occurrence ................................................................................................... 1-72 Summary.................................................................................................................................... 1-80 1
  • 14.
    Introduction to Epidemiology Page1-2 Definition of Epidemiology The word epidemiology comes from the Greek words epi, meaning on or upon, demos, meaning people, and logos, meaning the study of. In other words, the word epidemiology has its roots in the study of what befalls a population. Many definitions have been proposed, but the following definition captures the underlying principles and public health spirit of epidemiology: Epidemiology is the study of the distribution and determinants of health-related states or events in specified populations, and the application of this study to the control of health problems.1 Key terms in this definition reflect some of the important principles of epidemiology. Students of journalism are taught that a good news story, whether it be about a bank robbery, dramatic rescue, or presidential candidate’s speech, must include the 5 W’s: what, who, where, when and why (sometimes cited as why/how). The 5 W’s are the essential components of a news story because if any of the five are missing, the story is incomplete. The same is true in characterizing epidemiologic events, whether it be an outbreak of norovirus among cruise ship passengers or the use of mammograms to detect early breast cancer. The difference is that epidemiologists tend to use synonyms for the 5 W’s: diagnosis or health event (what), person (who), place (where), time (when), and causes, risk factors, and modes of transmission (why/how). Study Epidemiology is a scientific discipline with sound methods of scientific inquiry at its foundation. Epidemiology is data-driven and relies on a systematic and unbiased approach to the collection, analysis, and interpretation of data. Basic epidemiologic methods tend to rely on careful observation and use of valid comparison groups to assess whether what was observed, such as the number of cases of disease in a particular area during a particular time period or the frequency of an exposure among persons with disease, differs from what might be expected. However, epidemiology also draws on methods from other scientific fields, including biostatistics and informatics, with biologic, economic, social, and behavioral sciences. In fact, epidemiology is often described as the basic science of public health, and for good reason. First, epidemiology is a quantitative discipline that relies on a working knowledge of probability, statistics, and sound research methods. Second, epidemiology is a method of causal reasoning based on developing and testing hypotheses grounded in such scientific fields as biology, behavioral sciences, physics, and ergonomics to explain health-related behaviors, states, and events. However, epidemiology is not just a research activity but an integral component of public health, providing the foundation for directing practical and appropriate public health action based on this science and causal reasoning.2
  • 15.
    Introduction to Epidemiology Page1-3 Distribution Epidemiology is concerned with the frequency and pattern of health events in a population: Frequency refers not only to the number of health events such as the number of cases of meningitis or diabetes in a population, but also to the relationship of that number to the size of the population. The resulting rate allows epidemiologists to compare disease occurrence across different populations. Pattern refers to the occurrence of health-related events by time, place, and person. Time patterns may be annual, seasonal, weekly, daily, hourly, weekday versus weekend, or any other breakdown of time that may influence disease or injury occurrence. Place patterns include geographic variation, urban/rural differences, and location of work sites or schools. Personal characteristics include demographic factors which may be related to risk of illness, injury, or disability such as age, sex, marital status, and socioeconomic status, as well as behaviors and environmental exposures. Characterizing health events by time, place, and person are activities of descriptive epidemiology, discussed in more detail later in this lesson. Determinant: any factor, whether event, characteristic, or other definable entity, that brings about a change in a health condition or other defined characteristic.1 Determinants Epidemiology is also used to search for determinants, which are the causes and other factors that influence the occurrence of disease and other health-related events. Epidemiologists assume that illness does not occur randomly in a population, but happens only when the right accumulation of risk factors or determinants exists in an individual. To search for these determinants, epidemiologists use analytic epidemiology or epidemiologic studies to provide the “Why” and “How” of such events. They assess whether groups with different rates of disease differ in their demographic characteristics, genetic or immunologic make-up, behaviors, environmental exposures, or other so-called potential risk factors. Ideally, the findings provide sufficient evidence to direct prompt and effective public health control and prevention measures.
  • 16.
    Introduction to Epidemiology Page1-4 Health-related states or events Epidemiology was originally focused exclusively on epidemics of communicable diseases3 but was subsequently expanded to address endemic communicable diseases and non-communicable infectious diseases. By the middle of the 20th Century, additional epidemiologic methods had been developed and applied to chronic diseases, injuries, birth defects, maternal-child health, occupational health, and environmental health. Then epidemiologists began to look at behaviors related to health and well-being, such as amount of exercise and seat belt use. Now, with the recent explosion in molecular methods, epidemiologists can make important strides in examining genetic markers of disease risk. Indeed, the term health- related states or events may be seen as anything that affects the well-being of a population. Nonetheless, many epidemiologists still use the term “disease” as shorthand for the wide range of health-related states and events that are studied. Specified populations Although epidemiologists and direct health-care providers (clinicians) are both concerned with occurrence and control of disease, they differ greatly in how they view “the patient.” The clinician is concerned about the health of an individual; the epidemiologist is concerned about the collective health of the people in a community or population. In other words, the clinician’s “patient” is the individual; the epidemiologist’s “patient” is the community. Therefore, the clinician and the epidemiologist have different responsibilities when faced with a person with illness. For example, when a patient with diarrheal disease presents, both are interested in establishing the correct diagnosis. However, while the clinician usually focuses on treating and caring for the individual, the epidemiologist focuses on identifying the exposure or source that caused the illness; the number of other persons who may have been similarly exposed; the potential for further spread in the community; and interventions to prevent additional cases or recurrences. Application Epidemiology is not just “the study of” health in a population; it also involves applying the knowledge gained by the studies to community-based practice. Like the practice of medicine, the practice of epidemiology is both a science and an art. To make the proper diagnosis and prescribe appropriate treatment for a patient, the clinician combines medical (scientific) knowledge with experience, clinical judgment, and understanding of the patient. Similarly, the epidemiologist uses the scientific methods of
  • 17.
    Introduction to Epidemiology Page1-5 descriptive and analytic epidemiology as well as experience, epidemiologic judgment, and understanding of local conditions in “diagnosing” the health of a community and proposing appropriate, practical, and acceptable public health interventions to control and prevent disease in the community. Summary Epidemiology is the study (scientific, systematic, data-driven) of the distribution (frequency, pattern) and determinants (causes, risk factors) of health-related states and events (not just diseases) in specified populations (patient is community, individuals viewed collectively), and the application of (since epidemiology is a discipline within public health) this study to the control of health problems.
  • 18.
    Introduction to Epidemiology Page1-6 Exercise 1.1 Below are four key terms taken from the definition of epidemiology, followed by a list of activities that an epidemiologist might perform. Match the term to the activity that best describes it. You should match only one term per activity. A. Distribution B. Determinants C. Application _____ 1. Compare food histories between persons with Staphylococcus food poisoning and those without _____ 2. Compare frequency of brain cancer among anatomists with frequency in general population _____ 3. Mark on a map the residences of all children born with birth defects within 2 miles of a hazardous waste site _____ 4. Graph the number of cases of congenital syphilis by year for the country _____ 5. Recommend that close contacts of a child recently reported with meningococcal meningitis receive Rifampin _____ 6. Tabulate the frequency of clinical signs, symptoms, and laboratory findings among children with chickenpox in Cincinnati, Ohio Check your answers on page 1-81
  • 19.
    Introduction to Epidemiology Page1-7 Historical Evolution of Epidemiology Although epidemiology as a discipline has blossomed since World War II, epidemiologic thinking has been traced from Hippocrates through John Graunt, William Farr, John Snow, and others. The contributions of some of these early and more recent thinkers are described below.5 Epidemiology’s roots are nearly 2500 years old. Circa 400 B.C. Hippocrates attempted to explain disease occurrence from a rational rather than a supernatural viewpoint. In his essay entitled “On Airs, Waters, and Places,” Hippocrates suggested that environmental and host factors such as behaviors might influence the development of disease. 1662 Another early contributor to epidemiology was John Graunt, a London haberdasher and councilman who published a landmark analysis of mortality data in 1662. This publication was the first to quantify patterns of birth, death, and disease occurrence, noting disparities between males and females, high infant mortality, urban/rural differences, and seasonal variations.5 1800 William Farr built upon Graunt’s work by systematically collecting and analyzing Britain’s mortality statistics. Farr, considered the father of modern vital statistics and surveillance, developed many of the basic practices used today in vital statistics and disease classification. He concentrated his efforts on collecting vital statistics, assembling and evaluating those data, and reporting to responsible health authorities and the general public.4 1854 In the mid-1800s, an anesthesiologist named John Snow was conducting a series of investigations in London that warrant his being considered the “father of field epidemiology.” Twenty years before the development of the microscope, Snow conducted studies of cholera outbreaks both to discover the cause of disease and to prevent its recurrence. Because his work illustrates the classic sequence from descriptive epidemiology to hypothesis generation to hypothesis testing (analytic epidemiology) to application, two of his investigations will be described in detail. Snow conducted one of his now famous studies in 1854 when an epidemic of cholera erupted in the Golden Square of London.5 He
  • 20.
    Introduction to Epidemiology Page1-8 began his investigation by determining where in this area persons with cholera lived and worked. He marked each residence on a map of the area, as shown in Figure 1.1. Today, this type of map, showing the geographic distribution of cases, is called a spot map. Figure 1.1 Spot map of deaths from cholera in Golden Square area, London, 1854 (redrawn from original) Source: Snow J. Snow on cholera. London: Humphrey Milford: Oxford University Press; 1936. Because Snow believed that water was a source of infection for cholera, he marked the location of water pumps on his spot map, then looked for a relationship between the distribution of households with cases of cholera and the location of pumps. He noticed that more case households clustered around Pump A, the Broad Street pump, than around Pump B or C. When he questioned residents who lived in the Golden Square area, he was told that they avoided Pump B because it was grossly contaminated, and that Pump C was located too inconveniently for most of them. From this information, Snow concluded that the Broad Street pump (Pump A) was the primary source of water and the most likely source of infection for most persons with cholera in the Golden Square area. He noted with curiosity, however, that no cases of cholera had occurred in a two-block area just to the east of the Broad Street pump. Upon investigating, Snow found a brewery located there with a deep well on the premises. Brewery workers got their water from this well, and also received a daily portion of
  • 21.
    Introduction to Epidemiology Page1-9 malt liquor. Access to these uncontaminated rations could explain why none of the brewery’s employees contracted cholera. To confirm that the Broad Street pump was the source of the epidemic, Snow gathered information on where persons with cholera had obtained their water. Consumption of water from the Broad Street pump was the one common factor among the cholera patients. After Snow presented his findings to municipal officials, the handle of the pump was removed and the outbreak ended. The site of the pump is now marked by a plaque mounted on the wall outside of the appropriately named John Snow Pub. Figure 1.2 John Snow Pub, London Source: The John Snow Society [Internet]. London: [updated 2005 Oct 14; cited 2006 Feb 6]. Available from: http://johnsnowsociety.org. Snow’s second investigation reexamined data from the 1854 cholera outbreak in London. During a cholera epidemic a few years earlier, Snow had noted that districts with the highest death rates were serviced by two water companies: the Lambeth Company and the Southwark and Vauxhall Company. At that time, both companies obtained water from the Thames River at intake points that were downstream from London and thus susceptible to contamination from London sewage, which was discharged directly into the Thames. To avoid contamination by London sewage, in 1852 the Lambeth Company moved its intake water works to a site on the Thames well upstream from London. Over a 7-week period during the summer of 1854, Snow compared cholera mortality among districts that received water from one or the other or both water companies. The results are shown in Table 1.1.
  • 22.
    Introduction to Epidemiology Page1-10 Table 1.1 Mortality from Cholera in the Districts of London Supplied by the Southwark and Vauxhall and the Lambeth Companies, July 9–August 26, 1854 Districts with Water Supplied By: Population (1851 Census) Number of Deaths from Cholera Cholera Death Rate per 1,000 Population Southwark and Vauxhall Only 167,654 844 5.0 Lambeth Only 19,133 18 0.9 Both Companies 300,149 652 2.2 Source: Snow J. Snow on cholera. London: Humphrey Milford: Oxford University Press; 1936. The data in Table 1.1 show that the cholera death rate was more than 5 times higher in districts served only by the Southwark and Vauxhall Company (intake downstream from London) than in those served only by the Lambeth Company (intake upstream from London). Interestingly, the mortality rate in districts supplied by both companies fell between the rates for districts served exclusively by either company. These data were consistent with the hypothesis that water obtained from the Thames below London was a source of cholera. Alternatively, the populations supplied by the two companies may have differed on other factors that affected their risk of cholera. To test his water supply hypothesis, Snow focused on the districts served by both companies, because the households within a district were generally comparable except for the water supply company. In these districts, Snow identified the water supply company for every house in which a death from cholera had occurred during the 7-week period. Table 1.2 shows his findings. Table 1.2 Mortality from Cholera in London Related to the Water Supply of Individual Houses in Districts Served by Both the Southwark and Vauxhall Company and the Lambeth Company, July 9– August 26, 1854 Water Supply of Individual House Population (1851 Census) Number of Deaths from Cholera Cholera Death Rate per 1,000 Population Southwark and Vauxhall Only 98,862 419 4.2 Lambeth Only 154,615 80 0.5 Source: Snow J. Snow on cholera. London: Humphrey Milford: Oxford University Press; 1936. This study, demonstrating a higher death rate from cholera among households served by the Southwark and Vauxhall Company in the mixed districts, added support to Snow’s hypothesis. It also established the sequence of steps used by current-day epidemiologists to investigate outbreaks of disease. Based on a characterization of the cases and population at risk by time, place, and person, Snow developed a testable hypothesis. He then tested his hypothesis with a more rigorously designed study, ensuring that the groups to be compared were comparable. After this study, efforts to control the epidemic were directed at changing the location of the water intake of the Southwark and Vauxhall
  • 23.
    Introduction to Epidemiology Page1-11 Company to avoid sources of contamination. Thus, with no knowledge of the existence of microorganisms, Snow demonstrated through epidemiologic studies that water could serve as a vehicle for transmitting cholera and that epidemiologic information could be used to direct prompt and appropriate public health action. 19th and 20th centuries In the mid- and late-1800s, epidemiological methods began to be applied in the investigation of disease occurrence. At that time, most investigators focused on acute infectious diseases. In the 1930s and 1940s, epidemiologists extended their methods to noninfectious diseases. The period since World War II has seen an explosion in the development of research methods and the theoretical underpinnings of epidemiology. Epidemiology has been applied to the entire range of health-related outcomes, behaviors, and even knowledge and attitudes. The studies by Doll and Hill linking lung cancer to smoking6 and the study of cardiovascular disease among residents of Framingham, Massachusetts7 are two examples of how pioneering researchers have applied epidemiologic methods to chronic disease since World War II. During the 1960s and early 1970s health workers applied epidemiologic methods to eradicate naturally occurring smallpox worldwide.8 This was an achievement in applied epidemiology of unprecedented proportions. In the 1980s, epidemiology was extended to the studies of injuries and violence. In the 1990s, the related fields of molecular and genetic epidemiology (expansion of epidemiology to look at specific pathways, molecules and genes that influence risk of developing disease) took root. Meanwhile, infectious diseases continued to challenge epidemiologists as new infectious agents emerged (Ebola virus, Human Immunodeficiency virus (HIV)/ Acquired Immunodeficiency Syndrome (AIDS)), were identified (Legionella, Severe Acute Respiratory Syndrome (SARS)), or changed (drug-resistant Mycobacterium tuberculosis, Avian influenza). Beginning in the 1990s and accelerating after the terrorist attacks of September 11, 2001, epidemiologists have had to consider not only natural transmission of infectious organisms but also deliberate spread through biologic warfare and bioterrorism. Today, public health workers throughout the world accept and use epidemiology regularly to characterize the health of their communities and to solve day-to-day problems, large and small.
  • 24.
    Introduction to Epidemiology Page1-12 Uses Epidemiology and the information generated by epidemiologic methods have been used in many ways.9 Some common uses are described below. Assessing the community’s health Public health officials responsible for policy development, implementation, and evaluation use epidemiologic information as a factual framework for decision making. To assess the health of a population or community, relevant sources of data must be identified and analyzed by person, place, and time (descriptive epidemiology). • What are the actual and potential health problems in the community? • Where are they occurring? • Which populations are at increased risk? • Which problems have declined over time? • Which ones are increasing or have the potential to increase? • How do these patterns relate to the level and distribution of public health services available? More detailed data may need to be collected and analyzed to determine whether health services are available, accessible, effective, and efficient. For example, public health officials used epidemiologic data and methods to identify baselines, to set health goals for the nation in 2000 and 2010, and to monitor progress toward these goals.10-12 Making individual decisions Many individuals may not realize that they use epidemiologic information to make daily decisions affecting their health. When persons decide to quit smoking, climb the stairs rather than wait for an elevator, eat a salad rather than a cheeseburger with fries for lunch, or use a condom, they may be influenced, consciously or unconsciously, by epidemiologists’ assessment of risk. Since World War II, epidemiologists have provided information related to all those decisions. In the 1950s, epidemiologists reported the increased risk of lung cancer among smokers. In the 1970s, epidemiologists documented the role of exercise and proper diet in reducing the risk of heart disease. In the mid-1980s, epidemiologists identified the increased risk of HIV infection associated with certain sexual and drug-related behaviors. These and hundreds of other epidemiologic findings are directly relevant to the choices people make every day, choices that affect their health over a lifetime.
  • 25.
    Introduction to Epidemiology Page1-13 Completing the clinical picture When investigating a disease outbreak, epidemiologists rely on health-care providers and laboratorians to establish the proper diagnosis of individual patients. But epidemiologists also contribute to physicians’ understanding of the clinical picture and natural history of disease. For example, in late 1989, a physician saw three patients with unexplained eosinophilia (an increase in the number of a specific type of white blood cell called an eosinophil) and myalgias (severe muscle pains). Although the physician could not make a definitive diagnosis, he notified public health authorities. Within weeks, epidemiologists had identified enough other cases to characterize the spectrum and course of the illness that came to be known as eosinophilia-myalgia syndrome.13 More recently, epidemiologists, clinicians, and researchers around the world have collaborated to characterize SARS, a disease caused by a new type of coronavirus that emerged in China in late 2002.14 Epidemiology has also been instrumental in characterizing many non-acute diseases, such as the numerous conditions associated with cigarette smoking — from pulmonary and heart disease to lip, throat, and lung cancer. Searching for causes Much epidemiologic research is devoted to searching for causal factors that influence one’s risk of disease. Ideally, the goal is to identify a cause so that appropriate public health action might be taken. One can argue that epidemiology can never prove a causal relationship between an exposure and a disease, since much of epidemiology is based on ecologic reasoning. Nevertheless, epidemiology often provides enough information to support effective action. Examples date from the removal of the handle from the Broad St. pump following John Snow’s investigation of cholera in the Golden Square area of London in 1854,5 to the withdrawal of a vaccine against rotavirus in 1999 after epidemiologists found that it increased the risk of intussusception, a potentially life-threatening condition.15 Just as often, epidemiology and laboratory science converge to provide the evidence needed to establish causation. For example, epidemiologists were able to identify a variety of risk factors during an outbreak of pneumonia among persons attending the American Legion Convention in Philadelphia in 1976, even though the Legionnaires’ bacillus was not identified in the laboratory from lung tissue of a person who had died from Legionnaires’ disease until almost 6 months later.16
  • 26.
    Introduction to Epidemiology Page1-14 Exercise 1.2 In August 1999, epidemiologists learned of a cluster of cases of encephalitis caused by West Nile virus infection among residents of Queens, New York. West Nile virus infection, transmitted by mosquitoes, had never before been identified in North America. Describe how this information might be used for each of the following: 1. Assessing the community’s health 2. Making decisions about individual patients 3. Documenting the clinical picture of the illness 4. Searching for causes to prevent future outbreaks Check your answers on page 1-81
  • 27.
    Introduction to Epidemiology Page1-15 Core Epidemiologic Functions In the mid-1980s, five major tasks of epidemiology in public health practice were identified: public health surveillance, field investigation, analytic studies, evaluation, and linkages.17 A sixth task, policy development, was recently added. These tasks are described below. Public health surveillance Public health surveillance is the ongoing, systematic collection, analysis, interpretation, and dissemination of health data to help guide public health decision making and action. Surveillance is equivalent to monitoring the pulse of the community. The purpose of public health surveillance, which is sometimes called “information for action,”18 is to portray the ongoing patterns of disease occurrence and disease potential so that investigation, control, and prevention measures can be applied efficiently and effectively. This is accomplished through the systematic collection and evaluation of morbidity and mortality reports and other relevant health information, and the dissemination of these data and their interpretation to those involved in disease control and public health decision making. Figure 1.3. Surveillance Cycle Morbidity and mortality reports are common sources of surveillance data for local and state health departments. These reports generally are submitted by health-care providers, infection control practitioners, or laboratories that are required to notify the health department of any patient with a reportable disease such as pertussis, meningococcal meningitis, or AIDS. Other sources of health-related data that are used for surveillance include reports from investigations of individual cases and disease clusters, public
  • 28.
    Introduction to Epidemiology Page1-16 health program data such as immunization coverage in a community, disease registries, and health surveys. Most often, surveillance relies on simple systems to collect a limited amount of information about each case. Although not every case of disease is reported, health officials regularly review the case reports they do receive and look for patterns among them. These practices have proven invaluable in detecting problems, evaluating programs, and guiding public health action. While public health surveillance traditionally has focused on communicable diseases, surveillance systems now exist that target injuries, chronic diseases, genetic and birth defects, occupational and potentially environmentally-related diseases, and health behaviors. Since September 11, 2001, a variety of systems that rely on electronic reporting have been developed, including those that report daily emergency department visits, sales of over-the-counter medicines, and worker absenteeism.19,20 Because epidemiologists are likely to be called upon to design and use these and other new surveillance systems, an epidemiologist’s core competencies must include design of data collection instruments, data management, descriptive methods and graphing, interpretation of data, and scientific writing and presentation. Field investigation As noted above, surveillance provides information for action. One of the first actions that results from a surveillance case report or report of a cluster is investigation by the public health department. The investigation may be as limited as a phone call to the health- care provider to confirm or clarify the circumstances of the reported case, or it may involve a field investigation requiring the coordinated efforts of dozens of people to characterize the extent of an epidemic and to identify its cause. The objectives of such investigations also vary. Investigations often lead to the identification of additional unreported or unrecognized ill persons who might otherwise continue to spread infection to others. For example, one of the hallmarks of investigations of persons with sexually transmitted disease is the identification of sexual partners or contacts of patients. When interviewed, many of these contacts are found to be infected without knowing it, and are given treatment they did not realize they needed. Identification and treatment of these contacts prevents further spread. For some diseases, investigations may identify a source or vehicle of infection that can be controlled or eliminated. For example, the
  • 29.
    Introduction to Epidemiology Page1-17 investigation of a case of Escherichia coli O157:H7 infection usually focuses on trying to identify the vehicle, often ground beef but sometimes something more unusual such as fruit juice. By identifying the vehicle, investigators may be able to determine how many other persons might have already been exposed and how many continue to be at risk. When a commercial product turns out to be the culprit, public announcements and recalling the product may prevent many additional cases. Occasionally, the objective of an investigation may simply be to learn more about the natural history, clinical spectrum, descriptive epidemiology, and risk factors of the disease before determining what disease intervention methods might be appropriate. Early investigations of the epidemic of SARS in 2003 were needed to establish a case definition based on the clinical presentation, and to characterize the populations at risk by time, place, and person. As more was learned about the epidemiology of the disease and communicability of the virus, appropriate recommendations regarding isolation and quarantine were issued.21 Field investigations of the type described above are sometimes referred to as “shoe leather epidemiology,” conjuring up images of dedicated, if haggard, epidemiologists beating the pavement in search of additional cases and clues regarding source and mode of transmission. This approach is commemorated in the symbol of the Epidemic Intelligence Service (EIS), CDC’s training program for disease detectives — a shoe with a hole in the sole. Symbol of EIS Analytic studies Surveillance and field investigations are usually sufficient to identify causes, modes of transmission, and appropriate control and prevention measures. But sometimes analytic studies employing more rigorous methods are needed. Often the methods are used in combination — with surveillance and field investigations providing clues or hypotheses about causes and modes of transmission, and analytic studies evaluating the credibility of those hypotheses. Clusters or outbreaks of disease frequently are investigated initially with descriptive epidemiology. The descriptive approach involves the study of disease incidence and distribution by time, place, and person. It includes the calculation of rates and identification of parts of the population at higher risk than others. Occasionally, when the association between exposure and disease is quite strong, the investigation may stop when descriptive epidemiology is complete and control measures may be implemented immediately. John Snow’s 1854 investigation of cholera is an example. More
  • 30.
    Introduction to Epidemiology Page1-18 frequently, descriptive studies, like case investigations, generate hypotheses that can be tested with analytic studies. While some field investigations are conducted in response to acute health problems such as outbreaks, many others are planned studies. The hallmark of an analytic epidemiologic study is the use of a valid comparison group. Epidemiologists must be skilled in all aspects of such studies, including design, conduct, analysis, interpretation, and communication of findings. • Design includes determining the appropriate research strategy and study design, writing justifications and protocols, calculating sample sizes, deciding on criteria for subject selection (e.g., developing case definitions), choosing an appropriate comparison group, and designing questionnaires. • Conduct involves securing appropriate clearances and approvals, adhering to appropriate ethical principles, abstracting records, tracking down and interviewing subjects, collecting and handling specimens, and managing the data. • Analysis begins with describing the characteristics of the subjects. It progresses to calculation of rates, creation of comparative tables (e.g., two-by-two tables), and computation of measures of association (e.g., risk ratios or odds ratios), tests of significance (e.g., chi-square test), confidence intervals, and the like. Many epidemiologic studies require more advanced analytic techniques such as stratified analysis, regression, and modeling. • Finally, interpretation involves putting the study findings into perspective, identifying the key take-home messages, and making sound recommendations. Doing so requires that the epidemiologist be knowledgeable about the subject matter and the strengths and weaknesses of the study. Evaluation Epidemiologists, who are accustomed to using systematic and quantitative approaches, have come to play an important role in evaluation of public health services and other activities. Evaluation is the process of determining, as systematically and objectively as possible, the relevance, effectiveness, efficiency, and impact of activities with respect to established goals.22 • Effectiveness refers to the ability of a program to produce the intended or expected results in the field; effectiveness differs from efficacy, which is the ability to produce results under ideal conditions. • Efficiency refers to the ability of the program to produce
  • 31.
    Introduction to Epidemiology Page1-19 the intended results with a minimum expenditure of time and resources. The evaluation itself may focus on plans (formative evaluation), operations (process evaluation), impact (summative evaluation), or outcomes — or any combination of these. Evaluation of an immunization program, for example, might assess the efficiency of the operations, the proportion of the target population immunized, and the apparent impact of the program on the incidence of vaccine-preventable diseases. Similarly, evaluation of a surveillance system might address operations and attributes of the system, its ability to detect cases or outbreaks, and its usefulness.23 Linkages Epidemiologists working in public health settings rarely act in isolation. In fact, field epidemiology is often said to be a “team sport.” During an investigation an epidemiologist usually participates as either a member or the leader of a multidisciplinary team. Other team members may be laboratorians, sanitarians, infection control personnel, nurses or other clinical staff, and, increasingly, computer information specialists. Many outbreaks cross geographical and jurisdictional lines, so co-investigators may be from local, state, or federal levels of government, academic institutions, clinical facilities, or the private sector. To promote current and future collaboration, the epidemiologists need to maintain relationships with staff of other agencies and institutions. Mechanisms for sustaining such linkages include official memoranda of understanding, sharing of published or on-line information for public health audiences and outside partners, and informal networking that takes place at professional meetings. Policy development The definition of epidemiology ends with the following phrase: “...and the application of this study to the control of health problems.” While some academically minded epidemiologists have stated that epidemiologists should stick to research and not get involved in policy development or even make recommendations,24 public health epidemiologists do not have this luxury. Indeed, epidemiologists who understand a problem and the population in which it occurs are often in a uniquely qualified position to recommend appropriate interventions. As a result, epidemiologists working in public health regularly provide input, testimony, and recommendations regarding disease control strategies, reportable disease regulations, and health-care policy.
  • 32.
    Introduction to Epidemiology Page1-20 Exercise 1.3 Match the appropriate core function to each of the statements below. A. Public health surveillance B. Field investigation C. Analytic studies D. Evaluation E. Linkages F. Policy development _____ 1. Reviewing reports of test results for Chlamydia trachomatis from public health clinics _____ 2. Meeting with directors of family planning clinics and college health clinics to discuss Chlamydia testing and reporting _____ 3. Developing guidelines/criteria about which patients coming to the clinic should be screened (tested) for Chlamydia infection _____ 4. Interviewing persons infected with Chlamydia to identify their sex partners _____ 5. Conducting an analysis of patient flow at the public health clinic to determine waiting times for clinic patients _____ 6. Comparing persons with symptomatic versus asymptomatic Chlamydia infection to identify predictors Check your answers on page 1-82
  • 33.
    Introduction to Epidemiology Page1-21 The Epidemiologic Approach As with all scientific endeavors, the practice of epidemiology relies on a systematic approach. In very simple terms, the epidemiologist: • Counts cases or health events, and describes them in terms of time, place, and person; • Divides the number of cases by an appropriate denominator to calculate rates; and • Compares these rates over time or for different groups of people. An epidemiologist: • Counts • Divides • Compares Before counting cases, however, the epidemiologist must decide what a case is. This is done by developing a case definition. Then, using this case definition, the epidemiologist finds and collects information about the case-patients. The epidemiologist then performs descriptive epidemiology by characterizing the cases collectively according to time, place, and person. To calculate the disease rate, the epidemiologist divides the number of cases by the size of the population. Finally, to determine whether this rate is greater than what one would normally expect, and if so to identify factors contributing to this increase, the epidemiologist compares the rate from this population to the rate in an appropriate comparison group, using analytic epidemiology techniques. These epidemiologic actions are described in more detail below. Subsequent tasks, such as reporting the results and recommending how they can be used for public health action, are just as important, but are beyond the scope of this lesson. Defining a case Before counting cases, the epidemiologist must decide what to count, that is, what to call a case. For that, the epidemiologist uses a case definition. A case definition is a set of standard criteria for classifying whether a person has a particular disease, syndrome, or other health condition. Some case definitions, particularly those used for national surveillance, have been developed and adopted as national standards that ensure comparability. Use of an agreed- upon standard case definition ensures that every case is equivalent, regardless of when or where it occurred, or who identified it. Furthermore, the number of cases or rate of disease identified in one time or place can be compared with the number or rate from another time or place. For example, with a standard case definition, health officials could compare the number of cases of listeriosis that occurred in Forsyth County, North Carolina in 2000 with the number that occurred there in 1999. Or they could compare the rate of listeriosis in Forsyth County in 2000 with the national rate in
  • 34.
    Introduction to Epidemiology Page1-22 that same year. When everyone uses the same standard case definition and a difference is observed, the difference is likely to be real rather than the result of variation in how cases are classified. To ensure that all health departments in the United States use the same case definitions for surveillance, the Council of State and Territorial Epidemiologists (CSTE), CDC, and other interested parties have adopted standard case definitions for the notifiable infectious diseases.25 These definitions are revised as needed. In 1999, to address the need for common definitions and methods for state-level chronic disease surveillance, CSTE, the Association of State and Territorial Chronic Disease Program Directors, and CDC adopted standard definitions for 73 chronic disease indicators.29 Other case definitions, particularly those used in local outbreak investigations, are often tailored to the local situation. For example, a case definition developed for an outbreak of viral illness might require laboratory confirmation where such laboratory services are available, but likely would not if such services were not readily available. Components of a case definition for outbreak investigations A case definition consists of clinical criteria and, sometimes, limitations on time, place, and person. The clinical criteria usually include confirmatory laboratory tests, if available, or combinations of symptoms (subjective complaints), signs (objective physical findings), and other findings. Case definitions used during outbreak investigations are more likely to specify limits on time, place, and/or person than those used for surveillance. Contrast the case definition used for surveillance of listeriosis (see box below) with the case definition used during an investigation of a listeriosis outbreak in North Carolina in 2000.25,26 Both the national surveillance case definition and the outbreak case definition require a clinically compatible illness and laboratory confirmation of Listeria monocytogenes from a normally sterile site, but the outbreak case definition adds restrictions on time and place, reflecting the scope of the outbreak.
  • 35.
    Introduction to Epidemiology Page1-23 Listeriosis — Surveillance Case Definition Clinical description Infection caused by Listeria monocytogenes, which may produce any of several clinical syndromes, including stillbirth, listeriosis of the newborn, meningitis, bacteriemia, or localized infections Laboratory criteria for diagnosis Isolation of L. monocytogenes from a normally sterile site (e.g., blood or cerebrospinal fluid or, less commonly, joint, pleural, or pericardial fluid) Case classification Confirmed: a clinically compatible case that is laboratory confirmed Source: Centers for Disease Control and Prevention. Case definitions for infectious conditions under public health surveillance. MMWR Recommendations and Reports 1997:46(RR-10):49-50. Listeriosis — Outbreak Investigation Case definition Clinically compatible illness with L. monocytogenes isolated • From a normally sterile site • In a resident of Winston-Salem, North Carolina • With onset between October 24, 2000 and January 4, 2001 Source: MacDonald P, Boggs J, Whitwam R, Beatty M, Hunter S, MacCormack N, et al. Listeria-associated birth complications linked with homemade Mexican-style cheese, North Carolina, October 2000 [abstract]. 50th Annual Epidemic Intelligence Service Conference; 2001 Apr 23-27; Atlanta, GA. Many case definitions, such as that shown for listeriosis, require laboratory confirmation. This is not always necessary, however; in fact, some diseases have no distinctive laboratory findings. Kawasaki syndrome, for example, is a childhood illness with fever and rash that has no known cause and no specifically distinctive laboratory findings. Notice that its case definition (see box below) is based on the presence of fever, at least four of five specified clinical findings, and the lack of a more reasonable explanation.
  • 36.
    Introduction to Epidemiology Page1-24 Kawasaki Syndrome — Case Definition Clinical description A febrile illness of greater than or equal to 5 days’ duration, with at least four of the five following physical findings and no other more reasonable explanation for the observed clinical findings: • Bilateral conjunctival injection • Oral changes (erythema of lips or oropharynx, strawberry tongue, or fissuring of the lips) • Peripheral extremity changes (edema, erythema, or generalized or periungual desquamation) • Rash • Cervical lymphadenopathy (at least one lymph node greater than or equal to 1.5 cm in diameter) Laboratory criteria for diagnosis None Case classification Confirmed: a case that meets the clinical case definition Comment: If fever disappears after intravenous gamma globulin therapy is started, fever may be of less than 5 days’ duration, and the clinical case definition may still be met. Source: Centers for Disease Control and Prevention. Case definitions for infectious conditions under public health surveillance. MMWR Recommendations and Reports 1990:39(RR-13):18. Criteria in case definitions A case definition may have several sets of criteria, depending on how certain the diagnosis is. For example, during an investigation of a possible case or outbreak of measles, a person with a fever and rash might be classified as having a suspected, probable, or confirmed case of measles, depending on what evidence of measles is present (see box below).
  • 37.
    Introduction to Epidemiology Page1-25 A case might be classified as suspected or probable while waiting for the laboratory results to become available. Once the laboratory provides the report, the case can be reclassified as either confirmed or “not a case,” depending on the laboratory results. In the midst of a large outbreak of a disease caused by a known agent, some cases may be permanently classified as suspected or probable because officials may feel that running laboratory tests on every patient with a consistent clinical picture and a history of exposure (e.g., chickenpox) is unnecessary and even wasteful. Case definitions should not rely on laboratory culture results alone, since organisms are sometimes present without causing disease. Measles (Rubeola) — 1996 Case Definition Clinical description An illness characterized by all the following: • A generalized rash lasting greater than or equal to 3 days • A temperature greater than or equal to 101.0°F (greater than or equal to 38.3°C) • Cough, coryza, or conjunctivitis Laboratory criteria for diagnosis • Positive serologic test for measles immunoglobulin M antibody, or • Significant rise in measles antibody level by any standard serologic assay, or • Isolation of measles virus from a clinical specimen Case classification Suspected: Any febrile illness accompanied by rash Probable: A case that meets the clinical case definition, has noncontributory or no serologic or virologic testing, and is not epidemiologically linked to a confirmed case Confirmed: A case that is laboratory confirmed or that meets the clinical case definition and is epidemiologically linked to a confirmed case. (A laboratory-confirmed case does not need to meet the clinical case definition.) Comment: Confirmed cases should be reported to National Notifiable Diseases Surveillance System. An imported case has its source outside the country or state. Rash onset occurs within 18 days after entering the jurisdiction, and illness cannot be linked to local transmission. Imported cases should be classified as: • International. A case that is imported from another country • Out-of-State. A case that is imported from another state in the United States. The possibility that a patient was exposed within his or her state of residence should be excluded; therefore, the patient either must have been out of state continuously for the entire period of possible exposure (at least 7-18 days before onset of rash) or have had one of the following types of exposure while out of state: a) face-to-face contact with a person who had either a probable or confirmed case or b) attendance in the same institution as a person who had a case of measles (e.g., in a school, classroom, or day care center). An indigenous case is defined as a case of measles that is not imported. Cases that are linked to imported cases should be classified as indigenous if the exposure to the imported case occurred in the reporting state. Any case that cannot be proved to be imported should be classified as indigenous. Source: Centers for Disease Control and Prevention. Case definitions for infectious conditions under public health surveillance. MMWR Recommendations and Reports 1997:46(RR-10):23–24.
  • 38.
    Introduction to Epidemiology Page1-26 Modifying case definitions Case definitions can also change over time as more information is obtained. The first case definition for SARS, based on clinical symptoms and either contact with a case or travel to an area with SARS transmission, was published in CDC’s Morbidity and Mortality Weekly Report (MMWR) on March 21, 2003 (see box below).27 Two weeks later it was modified slightly. On March 29, after a novel coronavirus was determined to be the causative agent, an interim surveillance case definition was published that included laboratory criteria for evidence of infection with the SARS- associated coronavirus. By June, the case definition had changed several more times. In anticipation of a new wave of cases in 2004, a revised and much more complex case definition was published in December 2003.28 CDC Preliminary Case Definition for Severe Acute Respiratory Syndrome (SARS) — March 21, 2003 Suspected case Respiratory illness of unknown etiology with onset since February 1, 2003, and the following criteria: • Documented temperature > 100.4°F (>38.0°C) • One or more symptoms with respiratory illness (e.g., cough, shortness of breath, difficulty breathing, or radiographic findings of pneumonia or acute respiratory distress syndrome) • Close contact* within 10 days of onset of symptoms with a person under investigation for or suspected of having SARS or travel within 10 days of onset of symptoms to an area with documented transmission of SARS as defined by the World Health Organization (WHO) * Defined as having cared for, having lived with, or having had direct contact with respiratory secretions and/or body fluids of a person suspected of having SARS. Source: Centers for Disease Control and Prevention. Outbreak of severe acute respiratory syndrome–worldwide, 2003. MMWR 2003:52:226–8. Variation in case definitions Case definitions may also vary according to the purpose for classifying the occurrences of a disease. For example, health officials need to know as soon as possible if anyone has symptoms of plague or anthrax so that they can begin planning what actions to take. For such rare but potentially severe communicable diseases, for which it is important to identify every possible case, health officials use a sensitive case definition. A sensitive case definition is one that is broad or “loose,” in the hope of capturing most or all of the true cases. For example, the case definition for a suspected case of rubella (German measles) is “any generalized rash illness of acute onset.”25 This definition is quite broad, and
  • 39.
    Introduction to Epidemiology Page1-27 would include not only all cases of rubella, but also measles, chickenpox, and rashes due to other causes such as drug allergies. So while the advantage of a sensitive case definition is that it includes most or all of the true cases, the disadvantage is that it sometimes includes other illnesses as well. On the other hand, an investigator studying the causes of a disease outbreak usually wants to be certain that any person included in a study really had the disease. That investigator will prefer a specific or “strict” case definition. For instance, in an outbreak of Salmonella Agona infection, the investigators would be more likely to identify the source of the infection if they included only persons who were confirmed to have been infected with that organism, rather than including anyone with acute diarrhea, because some persons may have had diarrhea from a different cause. In this setting, the only disadvantages of a strict case definition are the requirement that everyone with symptoms be tested and an underestimation of the total number of cases if some people with salmonellosis are not tested.
  • 40.
    Introduction to Epidemiology Page1-28 Exercise 1.4 Investigators of an outbreak of trichinosis used a case definition with the following categories: Clinical Criteria Confirmed case: Signs and symptoms plus laboratory confirmation Probable case: Acute onset of at least three of the following four features: myalgia, fever, facial edema, or eosinophil count greater than 500/mm3 Possible case: Acute onset of two of the four features plus a physician diagnosis of trichinosis Suspect case: Unexplained eosinophilia Not a case: Failure to fulfill the criteria for a confirmed, probable, possible, or suspect case Time: Onset after October 1, 2006 Place: Metropolitan Atlanta Person: Any Using this case definition, assign the appropriate classification to each of the persons included in the line listing below. Use the highest rate classification possible. (All were residents of Atlanta with acute onset of symptoms in November.) ID# Last Name Myalgias Fever Facial Edema Eosinophil Count Physician Diagnosis Laboratory Confirmation Classification 1 Anderson yes yes no 495 trichinosis yes 2 Buffington yes yes yes pending possible trichinosis pending 3 Callahan yes yes no 1,100 possible trichinosis pending 4 Doll yes yes no 2,050 EMS* pending 5 Ehrlich no yes no 600 trichinosis not done *Eosinophilia-Myalgia Syndrome Check your answers on page 1-82
  • 41.
    Introduction to Epidemiology Page1-29 Exercise 1.5 Consider the initial case definition for SARS presented on page 1-26. Explain how the case definition might address the purposes listed below. 1. Diagnosing and caring for individual patients 2. Tracking the occurrence of disease 3. Doing research to identify the cause of the disease 4. Deciding who should be quarantined (quarantine is the separation or restriction of movement of persons who are not ill but are believed to have been exposed to infection, to prevent further transmission) Check your answers on page 1-82
  • 42.
    Introduction to Epidemiology Page1-30 Using counts and rates As noted, one of the basic tasks in public health is identifying and counting cases. These counts, usually derived from case reports submitted by health-care workers and laboratories to the health department, allow public health officials to determine the extent and patterns of disease occurrence by time, place, and person. They may also indicate clusters or outbreaks of disease in the community. Counts are also valuable for health planning. For example, a health official might use counts (i.e., numbers) to plan how many infection control isolation units or doses of vaccine may be needed. Rate: the number of cases divided by the size of the population per unit of time However, simple counts do not provide all the information a health department needs. For some purposes, the counts must be put into context, based on the population in which they arose. Rates are measures that relate the numbers of cases during a certain period of time (usually per year) to the size of the population in which they occurred. For example, 42,745 new cases of AIDS were reported in the United States in 2002.30 This number, divided by the estimated 2002 population, results in a rate of 15.3 cases per 100,000 population. Rates are particularly useful for comparing the frequency of disease in different locations whose populations differ in size. For example, in 2003, Pennsylvania had over twelve times as many births (140,660) as its neighboring state, Delaware (11,264). However, Pennsylvania has nearly ten times the population of Delaware. So a more fair way to compare is to calculate rates. In fact, the birth rate was greater in Delaware (13.8 per 1,000 women aged 15–44 years) than in Pennsylvania (11.4 per 1,000 women aged 15–44 years).31 Rates are also useful for comparing disease occurrence during different periods of time. For example, 19.5 cases of chickenpox per 100,000 were reported in 2001 compared with 135.8 cases per 100,000 in 1991. In addition, rates of disease among different subgroups can be compared to identify those at increased risk of disease. These so-called high risk groups can be further assessed and targeted for special intervention. High risk groups can also be studied to identify risk factors that cause them to have increased risk of disease. While some risk factors such as age and family history of breast cancer may not be modifiable, others, such as smoking and unsafe sexual practices, are. Individuals can use knowledge of the modifiable risk factors to guide decisions about behaviors that influence their health.
  • 43.
    Introduction to Epidemiology Page1-31 Descriptive Epidemiology As noted earlier, every novice newspaper reporter is taught that a story is incomplete if it does not describe the what, who, where, when, and why/how of a situation, whether it be a space shuttle launch or a house fire. Epidemiologists strive for similar comprehensiveness in characterizing an epidemiologic event, whether it be a pandemic of influenza or a local increase in all- terrain vehicle crashes. However, epidemiologists tend to use synonyms for the five W’s listed above: case definition, person, place, time, and causes/risk factors/modes of transmission. Descriptive epidemiology covers time, place, and person. Compiling and analyzing data by time, place, and person is desirable for several reasons. The 5W’s of descriptive epidemiology: What = health issue of concern Who = person Where = place When = time Why/how = causes, risk factors, modes of transmission • First, by looking at the data carefully, the epidemiologist becomes very familiar with the data. He or she can see what the data can or cannot reveal based on the variables available, its limitations (for example, the number of records with missing information for each important variable), and its eccentricities (for example, all cases range in age from 2 months to 6 years, plus one 17-year-old.). • Second, the epidemiologist learns the extent and pattern of the public health problem being investigated — which months, which neighborhoods, and which groups of people have the most and least cases. • Third, the epidemiologist creates a detailed description of the health of a population that can be easily communicated with tables, graphs, and maps. • Fourth, the epidemiologist can identify areas or groups within the population that have high rates of disease. This information in turn provides important clues to the causes of the disease, and these clues can be turned into testable hypotheses. Time The occurrence of disease changes over time. Some of these changes occur regularly, while others are unpredictable. Two diseases that occur during the same season each year include influenza (winter) and West Nile virus infection (August– September). In contrast, diseases such as hepatitis B and salmonellosis can occur at any time. For diseases that occur seasonally, health officials can anticipate their occurrence and
  • 44.
    Introduction to Epidemiology Page1-32 implement control and prevention measures, such as an influenza vaccination campaign or mosquito spraying. For diseases that occur sporadically, investigators can conduct studies to identify the causes and modes of spread, and then develop appropriately targeted actions to control or prevent further occurrence of the disease. In either situation, displaying the patterns of disease occurrence by time is critical for monitoring disease occurrence in the community and for assessing whether the public health interventions made a difference. Time data are usually displayed with a two-dimensional graph. The vertical or y-axis usually shows the number or rate of cases; the horizontal or x-axis shows the time periods such as years, months, or days. The number or rate of cases is plotted over time. Graphs of disease occurrence over time are usually plotted as line graphs (Figure 1.4) or histograms (Figure 1.5). Figure 1.4 Reported Cases of Salmonellosis per 100,000 Population, by Year — United States, 1972– 2002 Source: Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2002. Published April 30, 2004, for MMWR 2002;51(No. 53): p. 59.
  • 45.
    Introduction to Epidemiology Page1-33 Figure 1.5 Number of Intussusception Reports After the Rhesus Rotavirus Vaccine-tetravalent (RRV- TV) by Vaccination Date—United States, September 1998–December 1999 Source: Zhou W, Pool V, Iskander JK, English-Bullard R, Ball R, Wise RP, et al. In: Surveillance Summaries, January 24, 2003. MMWR 2003;52(No. SS-1):1–26. Sometimes a graph shows the timing of events that are related to disease trends being displayed. For example, the graph may indicate the period of exposure or the date control measures were implemented. Studying a graph that notes the period of exposure may lead to insights into what may have caused illness. Studying a graph that notes the timing of control measures shows what impact, if any, the measures may have had on disease occurrence. As noted above, time is plotted along the x-axis. Depending on the disease, the time scale may be as broad as years or decades, or as brief as days or even hours of the day. For some conditions — many chronic diseases, for example — epidemiologists tend to be interested in long-term trends or patterns in the number of cases or the rate. For other conditions, such as foodborne outbreaks, the relevant time scale is likely to be days or hours. Some of the common types of time-related graphs are further described below. These and other graphs are described in more detail in Lesson 4. Secular (long-term) trends. Graphing the annual cases or rate of a disease over a period of years shows long-term or secular trends in the occurrence of the disease (Figure 1.4). Health officials use these graphs to assess the prevailing direction of disease occurrence (increasing, decreasing, or essentially flat), help them evaluate programs or make policy decisions, infer what caused an
  • 46.
    Introduction to Epidemiology Page1-34 increase or decrease in the occurrence of a disease (particularly if the graph indicates when related events took place), and use past trends as a predictor of future incidence of disease. Seasonality. Disease occurrence can be graphed by week or month over the course of a year or more to show its seasonal pattern, if any. Some diseases such as influenza and West Nile infection are known to have characteristic seasonal distributions. Seasonal patterns may suggest hypotheses about how the infection is transmitted, what behavioral factors increase risk, and other possible contributors to the disease or condition. Figure 1.6 shows the seasonal patterns of rubella, influenza, and rotavirus. All three diseases display consistent seasonal distributions, but each disease peaks in different months – rubella in March to June, influenza in November to March, and rotavirus in February to April. The rubella graph is striking for the epidemic that occurred in 1963 (rubella vaccine was not available until 1969), but this epidemic nonetheless followed the seasonal pattern.
  • 47.
    Introduction to Epidemiology Page1-35 Figure 1.6 Seasonal Pattern of Rubella, Influenza and Rotavirus Source: Dowell SF. Seasonal Variation in Host Susceptibility and Cycles of Certain Infectious Diseases. Emerg Infect Dis. 2001;5:369–74. Day of week and time of day. For some conditions, displaying data by day of the week or time of day may be informative. Analysis at these shorter time periods is particularly appropriate for conditions related to occupational or environmental exposures that tend to occur at regularly scheduled intervals. In Figure 1.7, farm tractor fatalities are displayed by days of the week.32 Note that the number of farm tractor fatalities on Sundays was about half the number on the other days. The pattern of farm tractor injuries by hour, as displayed in Figure 1.8 peaked at 11:00 a.m., dipped at noon, and peaked again at 4:00 p.m. These patterns may suggest hypotheses and possible explanations that could be evaluated with further study. Figure 1.9 shows the hourly number of survivors and rescuers presenting to local hospitals in New York following the attack on the World Trade Center on September 11, 2001.
  • 48.
    Introduction to Epidemiology Page1-36 Figure 1.7 Farm Tractor Deaths by Day of Week Figure 1.8 Farm Tractor Deaths by Hour of Day Source: Goodman RA, Smith JD, Sikes RK, Rogers DL, Mickey JL. Fatalities associated with farm tractor injuries: an epidemiologic study. Public Health Rep 1985;100:329–33. Figure 1.9 World Trade Center Survivors and Rescuers Source: Centers for Disease Control and Prevention. Rapid Assessment of Injuries Among Survivors of the Terrorist Attack on the World Trade Center — New York City, September 2001. MMWR 2002;51:1–5. Epidemic period. To show the time course of a disease outbreak or epidemic, epidemiologists use a graph called an epidemic curve. As with the other graphs presented so far, an epidemic curve’s y- axis shows the number of cases, while the x-axis shows time as either date of symptom onset or date of diagnosis. Depending on the incubation period (the length of time between exposure and onset of symptoms) and routes of transmission, the scale on the x- axis can be as broad as weeks (for a very prolonged epidemic) or as narrow as minutes (e.g., for food poisoning by chemicals that cause symptoms within minutes). Conventionally, the data are displayed as a histogram (which is similar to a bar chart but has no gaps between adjacent columns). Sometimes each case is displayed as a square, as in Figure 1.10. The shape and other features of an epidemic curve can suggest hypotheses about the time and source
  • 49.
    Introduction to Epidemiology Page1-37 of exposure, the mode of transmission, and the causative agent. Epidemic curves are discussed in more detail in Lessons 4 and 6. Figure 1.10 Cases of Salmonella Enteriditis — Chicago, February 13–21, by Date and Time of Symptom Onset Source: Cortese M, Gerber S, Jones E, Fernandez J. A Salmonella Enteriditis outbreak in Chicago. Presented at the Eastern Regional Epidemic Intelligence Service Conference, March 23, 2000, Boston, Massachusetts. Place Describing the occurrence of disease by place provides insight into the geographic extent of the problem and its geographic variation. Characterization by place refers not only to place of residence but to any geographic location relevant to disease occurrence. Such locations include place of diagnosis or report, birthplace, site of employment, school district, hospital unit, or recent travel destinations. The unit may be as large as a continent or country or as small as a street address, hospital wing, or operating room. Sometimes place refers not to a specific location at all but to a place category such as urban or rural, domestic or foreign, and institutional or noninstitutional. Consider the data in Tables 1.3 and 1.4. Table 1.3 displays SARS data by source of report, and reflects where a person with possible SARS is likely to be quarantined and treated.33 In contrast, Table 1.4 displays the same data by where the possible SARS patients had traveled, and reflects where transmission may have occurred.
  • 50.
    Introduction to Epidemiology Page1-38 Table 1.3 Reported Cases of SARS through November 3, 2004 — United States, by Case Definition Category and State of Residence Location Total Cases Reported Total Suspect Cases Reported Total Probable Cases Reported Total Confirmed Cases Reported Alaska 1 1 0 0 California 29 22 5 2 Colorado 2 2 0 0 Florida 8 6 2 0 Georgia 3 3 0 0 Hawaii 1 1 0 0 Illinois 8 7 1 0 Kansas 1 1 0 0 Kentucky 6 4 2 0 Maryland 2 2 0 0 Massachusetts 8 8 0 0 Minnesota 1 1 0 0 Mississippi 1 0 1 0 Missouri 3 3 0 0 Nevada 3 3 0 0 New Jersey 2 1 0 1 New Mexico 1 0 0 1 New York 29 23 6 0 North Carolina 4 3 0 1 Ohio 2 2 0 0 Pennsylvania 6 5 0 1 Rhode Island 1 1 0 0 South Carolina 3 3 0 0 Tennessee 1 1 0 0 Texas 5 5 0 0 Utah 7 6 0 1 Vermont 1 1 0 0 Virginia 3 2 0 1 Washington 12 11 1 0 West Virginia 1 1 0 0 Wisconsin 2 1 1 0 Puerto Rico 1 1 0 0 Total 158 131 19 8 Adapted from: Centers for Disease Control and Prevention. Severe Acute Respiratory Syndrome (SARS) Report of Cases in the United States. Table 1.4 Reported Cases of SARS through November 3, 2004 — United States, by High-Risk Area Visited Area Count* Percent Hong Kong City, China 45 28 Toronto, Canada 35 22 Guangdong Province, China 34 22 Beijing City, China 25 16 Shanghai City, China 23 15 Singapore 15 9 China, mainland 15 9 Taiwan 10 6 Anhui Province, China 4 3 Hanoi, Vietnam 4 3 Chongqing City, China 3 2 Guizhou Province, China 2 1 Macoa City, China 2 1 Tianjin City, China 2 1 Jilin Province, China 2 1 Xinjiang Province 1 1 Zhejiang Province, China 1 1 Guangxi Province, China 1 1 Shanxi Province, China 1 1 Liaoning Province, China 1 1 Hunan Province, China 1 1 Sichuan Province, China 1 1 Hubei Province, China 1 1 Jiangxi Province, China 1 1 Fujian Province, China 1 1 Jiangsu Province, China 1 1 Yunnan Province, China 0 0 Hebei Province, China 0 0 Qinghai Province, China 0 0 Tibet (Xizang) Province, China 0 0 Hainan Province 0 0 Henan Province, China 0 0 Gansu Province, China 0 0 Shandong Province, China 0 0 * 158 reported case-patients visited 232 areas Data Source: Heymann DL, Rodier G. Global Surveillance, National Surveillance, and SARS. Emerg Infect Dis. 2004;10:173–175.
  • 51.
    Introduction to Epidemiology Page1-39 Although place data can be shown in a table such as Table 1.3 or Table 1.4, a map provides a more striking visual display of place data. On a map, different numbers or rates of disease can be depicted using different shadings, colors, or line patterns, as in Figure 1.11. Figure 1.11 Mortality Rates for Asbestosis, by State — United States, 1968–1981 and 1982–2000 Source: Centers for Disease Control and Prevention. Changing patterns of pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–32. Another type of map for place data is a spot map, such as Figure 1.12. Spot maps generally are used for clusters or outbreaks with a limited number of cases. A dot or X is placed on the location that is most relevant to the disease of interest, usually where each victim lived or worked, just as John Snow did in his spot map of the Golden Square area of London (Figure 1.1). If known, sites that are relevant, such as probable locations of exposure (water pumps in Figure 1.1), are usually noted on the map. Figure 1.12 Spot Map of Giardia Cases
  • 52.
    Introduction to Epidemiology Page1-40 Analyzing data by place can identify communities at increased risk of disease. Even if the data cannot reveal why these people have an increased risk, it can help generate hypotheses to test with additional studies. For example, is a community at increased risk because of characteristics of the people in the community such as genetic susceptibility, lack of immunity, risky behaviors, or exposure to local toxins or contaminated food? Can the increased risk, particularly of a communicable disease, be attributed to characteristics of the causative agent such as a particularly virulent strain, hospitable breeding sites, or availability of the vector that transmits the organism to humans? Or can the increased risk be attributed to the environment that brings the agent and the host together, such as crowding in urban areas that increases the risk of disease transmission from person to person, or more homes being built in wooded areas close to deer that carry ticks infected with the organism that causes Lyme disease? (More techniques for graphic presentation are discussed in Lesson 4.) “Person” attributes include age, sex, ethnicity/race, and socioeconomic status. Person Because personal characteristics may affect illness, organization and analysis of data by “person” may use inherent characteristics of people (for example, age, sex, race), biologic characteristics (immune status), acquired characteristics (marital status), activities (occupation, leisure activities, use of medications/tobacco/drugs), or the conditions under which they live (socioeconomic status, access to medical care). Age and sex are included in almost all data sets and are the two most commonly analyzed “person” characteristics. However, depending on the disease and the data available, analyses of other person variables are usually necessary. Usually epidemiologists begin the analysis of person data by looking at each variable separately. Sometimes, two variables such as age and sex can be examined simultaneously. Person data are usually displayed in tables or graphs. Age. Age is probably the single most important “person” attribute, because almost every health-related event varies with age. A number of factors that also vary with age include: susceptibility, opportunity for exposure, latency or incubation period of the disease, and physiologic response (which affects, among other things, disease development). When analyzing data by age, epidemiologists try to use age groups that are narrow enough to detect any age-related patterns that may be present in the data. For some diseases, particularly chronic diseases, 10-year age groups may be adequate. For other diseases, 10-year and even 5-year age groups conceal important variations in
  • 53.
    Introduction to Epidemiology Page1-41 disease occurrence by age. Consider the graph of pertussis occurrence by standard 5-year age groups shown in Figure 1.13a. The highest rate is clearly among children 4 years old and younger. But is the rate equally high in all children within that age group, or do some children have higher rates than others? Figure 1.13a Pertussis by 5-Year Age Groups Figure 1.13b Pertussis by <1, 4-Year, Then 5- Year Age Groups To answer this question, different age groups are needed. Examine Figure 1.13b, which shows the same data but displays the rate of pertussis for children under 1 year of age separately. Clearly, infants account for most of the high rate among 0–4 year olds. Public health efforts should thus be focused on children less than 1 year of age, rather than on the entire 5-year age group. Sex. Males have higher rates of illness and death than do females for many diseases. For some diseases, this sex-related difference is because of genetic, hormonal, anatomic, or other inherent differences between the sexes. These inherent differences affect susceptibility or physiologic responses. For example, premenopausal women have a lower risk of heart disease than men of the same age. This difference has been attributed to higher estrogen levels in women. On the other hand, the sex-related differences in the occurrence of many diseases reflect differences in opportunity or levels of exposure. For example, Figure 1.14 shows the differences in lung cancer rates over time among men and women.34 The difference noted in earlier years has been attributed to the higher prevalence of smoking among men in the past. Unfortunately, prevalence of smoking among women now equals that among men, and lung cancer rates in women have been climbing as a result.35
  • 54.
    Introduction to Epidemiology Page1-42 Figure 1.14 Lung Cancer Rates — United States, 1930–1999 Data Source: American Cancer Society [Internet]. Atlanta: The American Cancer Society, Inc. Ethnic and racial groups. Sometimes epidemiologists are interested in analyzing person data by biologic, cultural or social groupings such as race, nationality, religion, or social groups such as tribes and other geographically or socially isolated groups. Differences in racial, ethnic, or other group variables may reflect differences in susceptibility or exposure, or differences in other factors that influence the risk of disease, such as socioeconomic status and access to health care. In Figure 1.15, infant mortality rates for 2002 are shown by race and Hispanic origin of the mother.
  • 55.
    Introduction to Epidemiology Page1-43 Figure 1.15 Infant Mortality Rates for 2002, by Race and Ethnicity of Mother Source: Centers for Disease Control and Prevention. QuickStats: Infant mortality rates, by selected racial/ethnic populations—United States, 2002, MMWR 2005;54(05):126. Socioeconomic status. Socioeconomic status is difficult to quantify. It is made up of many variables such as occupation, family income, educational achievement or census track, living conditions, and social standing. The variables that are easiest to measure may not accurately reflect the overall concept. Nevertheless, epidemiologists commonly use occupation, family income, and educational achievement, while recognizing that these variables do not measure socioeconomic status precisely. The frequency of many adverse health conditions increases with decreasing socioeconomic status. For example, tuberculosis is more common among persons in lower socioeconomic strata. Infant mortality and time lost from work due to disability are both associated with lower income. These patterns may reflect more harmful exposures, lower resistance, and less access to health care. Or they may in part reflect an interdependent relationship that is impossible to untangle: Does low socioeconomic status contribute to disability, or does disability contribute to lower socioeconomic status, or both? What accounts for the disproportionate prevalence of diabetes and asthma in lower socioeconomic areas?36,37 A few adverse health conditions occur more frequently among persons of higher socioeconomic status. Gout was known as the “disease of kings” because of its association with consumption of rich foods. Other conditions associated with higher socioeconomic
  • 56.
    Introduction to Epidemiology Page1-44 status include breast cancer, Kawasaki syndrome, chronic fatigue syndrome, and tennis elbow. Differences in exposure account for at least some if not most of the differences in the frequency of these conditions.
  • 57.
    Introduction to Epidemiology Page1-45 Exercise 1.6 Using the data in Tables 1.5 and 1.6, describe the death rate patterns for the “Unusual Event.” For example, how do death rates vary between men and women overall, among the different socioeconomic classes, among men and women in different socioeconomic classes, and among adults and children in different socioeconomic classes? Can you guess what type of situation might result in such death rate patterns? Table 1.5 Deaths and Death Rates for an Unusual Event, by Sex and Socioeconomic Status Socioeconomic Status Sex Measure High Middle Low Total Males Persons at risk 179 173 499 851 Deaths 120 148 441 709 Death rate (%) 67.0 85.5 88.4 83.3 Females Persons at risk 143 107 212 462 Deaths 9 13 132 154 Death rate (%) 6.3 12.6 62.3 33.3 Both sexes Persons at risk 322 280 711 1313 Deaths 129 161 573 863 Death rate (%) 40.1 57.5 80.6 65.7 Table 1.6 Deaths and Death Rates for an Unusual Event, by Age and Socioeconomic Status Socioeconomic Status Age Group Measure High/Middle Low Total Adults Persons at risk 566 664 1230 Deaths 287 545 832 Death rate (%) 50.7 82.1 67.6 Children Persons at risk 36 47 83 Deaths 3 28 31 Death rate (%) 8.3 59.6 37.3 All Ages Persons at risk 602 711 1313 Deaths 290 573 863 Death rate (%) 48.2 80.6 65.7 Check your answers on page 1-82
  • 58.
    Introduction to Epidemiology Page1-46 Analytic Epidemiology As noted earlier, descriptive epidemiology can identify patterns among cases and in populations by time, place and person. From these observations, epidemiologists develop hypotheses about the causes of these patterns and about the factors that increase risk of disease. In other words, epidemiologists can use descriptive epidemiology to generate hypotheses, but only rarely to test those hypotheses. For that, epidemiologists must turn to analytic epidemiology. Key feature of analytic epidemiology = Comparison group The key feature of analytic epidemiology is a comparison group. Consider a large outbreak of hepatitis A that occurred in Pennsylvania in 2003.38 Investigators found almost all of the case- patients had eaten at a particular restaurant during the 2–6 weeks (i.e., the typical incubation period for hepatitis A) before onset of illness. While the investigators were able to narrow down their hypotheses to the restaurant and were able to exclude the food preparers and servers as the source, they did not know which particular food may have been contaminated. The investigators asked the case-patients which restaurant foods they had eaten, but that only indicated which foods were popular. The investigators, therefore, also enrolled and interviewed a comparison or control group — a group of persons who had eaten at the restaurant during the same period but who did not get sick. Of 133 items on the restaurant’s menu, the most striking difference between the case and control groups was in the proportion that ate salsa (94% of case-patients ate, compared with 39% of controls). Further investigation of the ingredients in the salsa implicated green onions as the source of infection. Shortly thereafter, the Food and Drug Administration issued an advisory to the public about green onions and risk of hepatitis A. This action was in direct response to the convincing results of the analytic epidemiology, which compared the exposure history of case-patients with that of an appropriate comparison group. When investigators find that persons with a particular characteristic are more likely than those without the characteristic to contract a disease, the characteristic is said to be associated with the disease. The characteristic may be a: • Demographic factor such as age, race, or sex; • Constitutional factor such as blood group or immune status; • Behavior or act such as smoking or having eaten salsa; or • Circumstance such as living near a toxic waste site. Identifying factors associated with disease help health officials
  • 59.
    Introduction to Epidemiology Page1-47 appropriately target public health prevention and control activities. It also guides additional research into the causes of disease. Thus, analytic epidemiology is concerned with the search for causes and effects, or the why and the how. Epidemiologists use analytic epidemiology to quantify the association between exposures and outcomes and to test hypotheses about causal relationships. It has been said that epidemiology by itself can never prove that a particular exposure caused a particular outcome. Often, however, epidemiology provides sufficient evidence to take appropriate control and prevention measures. Epidemiologic studies fall into two categories: experimental and observational. Experimental studies In an experimental study, the investigator determines through a controlled process the exposure for each individual (clinical trial) or community (community trial), and then tracks the individuals or communities over time to detect the effects of the exposure. For example, in a clinical trial of a new vaccine, the investigator may randomly assign some of the participants to receive the new vaccine, while others receive a placebo shot. The investigator then tracks all participants, observes who gets the disease that the new vaccine is intended to prevent, and compares the two groups (new vaccine vs. placebo) to see whether the vaccine group has a lower rate of disease. Similarly, in a trial to prevent onset of diabetes among high-risk individuals, investigators randomly assigned enrollees to one of three groups — placebo, an anti-diabetes drug, or lifestyle intervention. At the end of the follow-up period, investigators found the lowest incidence of diabetes in the lifestyle intervention group, the next lowest in the anti-diabetic drug group, and the highest in the placebo group.39 Observational studies In an observational study, the epidemiologist simply observes the exposure and disease status of each study participant. John Snow’s studies of cholera in London were observational studies. The two most common types of observational studies are cohort studies and case-control studies; a third type is cross-sectional studies. Cohort study. A cohort study is similar in concept to the experimental study. In a cohort study the epidemiologist records whether each study participant is exposed or not, and then tracks the participants to see if they develop the disease of interest. Note that this differs from an experimental study because, in a cohort
  • 60.
    Introduction to Epidemiology Page1-48 study, the investigator observes rather than determines the participants’ exposure status. After a period of time, the investigator compares the disease rate in the exposed group with the disease rate in the unexposed group. The unexposed group serves as the comparison group, providing an estimate of the baseline or expected amount of disease occurrence in the community. If the disease rate is substantively different in the exposed group compared to the unexposed group, the exposure is said to be associated with illness. The length of follow-up varies considerably. In an attempt to respond quickly to a public health concern such as an outbreak, public health departments tend to conduct relatively brief studies. On the other hand, research and academic organizations are more likely to conduct studies of cancer, cardiovascular disease, and other chronic diseases which may last for years and even decades. The Framingham study is a well-known cohort study that has followed over 5,000 residents of Framingham, Massachusetts, since the early 1950s to establish the rates and risk factors for heart disease.7 The Nurses Health Study and the Nurses Health Study II are cohort studies established in 1976 and 1989, respectively, that have followed over 100,000 nurses each and have provided useful information on oral contraceptives, diet, and lifestyle risk factors.40 These studies are sometimes called follow-up or prospective cohort studies, because participants are enrolled as the study begins and are then followed prospectively over time to identify occurrence of the outcomes of interest. An alternative type of cohort study is a retrospective cohort study. In this type of study both the exposure and the outcomes have already occurred. Just as in a prospective cohort study, the investigator calculates and compares rates of disease in the exposed and unexposed groups. Retrospective cohort studies are commonly used in investigations of disease in groups of easily identified people such as workers at a particular factory or attendees at a wedding. For example, a retrospective cohort study was used to determine the source of infection of cyclosporiasis, a parasitic disease that caused an outbreak among members of a residential facility in Pennsylvania in 2004.41 The investigation indicated that consumption of snow peas was implicated as the vehicle of the cyclosporiasis outbreak. Case-control study. In a case-control study, investigators start by enrolling a group of people with disease (at CDC such persons are called case-patients rather than cases, because case refers to occurrence of disease, not a person). As a comparison group, the
  • 61.
    Introduction to Epidemiology Page1-49 investigator then enrolls a group of people without disease (controls). Investigators then compare previous exposures between the two groups. The control group provides an estimate of the baseline or expected amount of exposure in that population. If the amount of exposure among the case group is substantially higher than the amount you would expect based on the control group, then illness is said to be associated with that exposure. The study of hepatitis A traced to green onions, described above, is an example of a case-control study. The key in a case-control study is to identify an appropriate control group, comparable to the case group in most respects, in order to provide a reasonable estimate of the baseline or expected exposure. Cross-sectional study. In this third type of observational study, a sample of persons from a population is enrolled and their exposures and health outcomes are measured simultaneously. The cross-sectional study tends to assess the presence (prevalence) of the health outcome at that point of time without regard to duration. For example, in a cross-sectional study of diabetes, some of the enrollees with diabetes may have lived with their diabetes for many years, while others may have been recently diagnosed. From an analytic viewpoint the cross-sectional study is weaker than either a cohort or a case-control study because a cross- sectional study usually cannot disentangle risk factors for occurrence of disease (incidence) from risk factors for survival with the disease. (Incidence and prevalence are discussed in more detail in Lesson 3.) On the other hand, a cross-sectional study is a perfectly fine tool for descriptive epidemiology purposes. Cross- sectional studies are used routinely to document the prevalence in a community of health behaviors (prevalence of smoking), health states (prevalence of vaccination against measles), and health outcomes, particularly chronic conditions (hypertension, diabetes). In summary, the purpose of an analytic study in epidemiology is to identify and quantify the relationship between an exposure and a health outcome. The hallmark of such a study is the presence of at least two groups, one of which serves as a comparison group. In an experimental study, the investigator determines the exposure for the study subjects; in an observational study, the subjects are exposed under more natural conditions. In an observational cohort study, subjects are enrolled or grouped on the basis of their exposure, then are followed to document occurrence of disease. Differences in disease rates between the exposed and unexposed groups lead investigators to conclude that exposure is associated with disease. In an observational case-control study, subjects are
  • 62.
    Introduction to Epidemiology Page1-50 enrolled according to whether they have the disease or not, then are questioned or tested to determine their prior exposure. Differences in exposure prevalence between the case and control groups allow investigators to conclude that the exposure is associated with the disease. Cross-sectional studies measure exposure and disease status at the same time, and are better suited to descriptive epidemiology than causation.
  • 63.
    Introduction to Epidemiology Page1-51 Exercise 1.7 Classify each of the following studies as: A. Experimental B. Observational cohort C. Observational case-control D. Observational cross-sectional E. Not an analytical or epidemiologic study _____ 1. Representative sample of residents were telephoned and asked how much they exercise each week and whether they currently have (have ever been diagnosed with) heart disease. _____ 2. Occurrence of cancer was identified between April 1991 and July 2002 for 50,000 troops who served in the first Gulf War (ended April 1991) and 50,000 troops who served elsewhere during the same period. _____ 3. Persons diagnosed with new-onset Lyme disease were asked how often they walk through woods, use insect repellant, wear short sleeves and pants, etc. Twice as many patients without Lyme disease from the same physician’s practice were asked the same questions, and the responses in the two groups were compared. _____ 4. Subjects were children enrolled in a health maintenance organization. At 2 months, each child was randomly given one of two types of a new vaccine against rotavirus infection. Parents were called by a nurse two weeks later and asked whether the children had experienced any of a list of side-effects. Check your answers on page 1-83
  • 64.
    Introduction to Epidemiology Page1-52 Concepts of Disease Occurrence A critical premise of epidemiology is that disease and other health events do not occur randomly in a population, but are more likely to occur in some members of the population than others because of risk factors that may not be distributed randomly in the population. As noted earlier, one important use of epidemiology is to identify the factors that place some members at greater risk than others. Causation A number of models of disease causation have been proposed. Among the simplest of these is the epidemiologic triad or triangle, the traditional model for infectious disease. The triad consists of an external agent, a susceptible host, and an environment that brings the host and agent together. In this model, disease results from the interaction between the agent and the susceptible host in an environment that supports transmission of the agent from a source to that host. Two ways of depicting this model are shown in Figure 1.16. Agent, host, and environmental factors interrelate in a variety of complex ways to produce disease. Different diseases require different balances and interactions of these three components. Development of appropriate, practical, and effective public health measures to control or prevent disease usually requires assessment of all three components and their interactions. Figure 1.16 Epidemiologic Triad Agent originally referred to an infectious microorganism or pathogen: a virus, bacterium, parasite, or other microbe. Generally, the agent must be present for disease to occur; however, presence of that agent alone is not always sufficient to cause disease. A variety of factors influence whether exposure to an organism will result in disease, including the organism’s pathogenicity (ability to cause disease) and dose.
  • 65.
    Introduction to Epidemiology Page1-53 Over time, the concept of agent has been broadened to include chemical and physical causes of disease or injury. These include chemical contaminants (such as the L-tryptophan contaminant responsible for eosinophilia-myalgia syndrome), as well as physical forces (such as repetitive mechanical forces associated with carpal tunnel syndrome). While the epidemiologic triad serves as a useful model for many diseases, it has proven inadequate for cardiovascular disease, cancer, and other diseases that appear to have multiple contributing causes without a single necessary one. Host refers to the human who can get the disease. A variety of factors intrinsic to the host, sometimes called risk factors, can influence an individual’s exposure, susceptibility, or response to a causative agent. Opportunities for exposure are often influenced by behaviors such as sexual practices, hygiene, and other personal choices as well as by age and sex. Susceptibility and response to an agent are influenced by factors such as genetic composition, nutritional and immunologic status, anatomic structure, presence of disease or medications, and psychological makeup. Environment refers to extrinsic factors that affect the agent and the opportunity for exposure. Environmental factors include physical factors such as geology and climate, biologic factors such as insects that transmit the agent, and socioeconomic factors such as crowding, sanitation, and the availability of health services. Component causes and causal pies Because the agent-host-environment model did not work well for many non-infectious diseases, several other models that attempt to account for the multifactorial nature of causation have been proposed. One such model was proposed by Rothman in 1976, and has come to be known as the Causal Pies.42 This model is illustrated in Figure 1.17. An individual factor that contributes to cause disease is shown as a piece of a pie. After all the pieces of a pie fall into place, the pie is complete — and disease occurs. The individual factors are called component causes. The complete pie, which might be considered a causal pathway, is called a sufficient cause. A disease may have more than one sufficient cause, with each sufficient cause being composed of several component causes that may or may not overlap. A component that appears in every pie or pathway is called a necessary cause, because without it, disease does not occur. Note in Figure 1.17 that component cause A is a necessary cause because it appears in every pie.
  • 66.
    Introduction to Epidemiology Page1-54 Figure 1.17 Rothman’s Causal Pies Source: Rothman KJ. Causes. Am J Epidemiol 1976;104:587–592. The component causes may include intrinsic host factors as well as the agent and the environmental factors of the agent-host- environment triad. A single component cause is rarely a sufficient cause by itself. For example, even exposure to a highly infectious agent such as measles virus does not invariably result in measles disease. Host susceptibility and other host factors also may play a role. At the other extreme, an agent that is usually harmless in healthy persons may cause devastating disease under different conditions. Pneumocystis carinii is an organism that harmlessly colonizes the respiratory tract of some healthy persons, but can cause potentially lethal pneumonia in persons whose immune systems have been weakened by human immunodeficiency virus (HIV). Presence of Pneumocystis carinii organisms is therefore a necessary but not sufficient cause of pneumocystis pneumonia. In Figure 1.17, it would be represented by component cause A. As the model indicates, a particular disease may result from a variety of different sufficient causes or pathways. For example, lung cancer may result from a sufficient cause that includes smoking as a component cause. Smoking is not a sufficient cause by itself, however, because not all smokers develop lung cancer. Neither is smoking a necessary cause, because a small fraction of lung cancer victims have never smoked. Suppose Component Cause B is smoking and Component Cause C is asbestos. Sufficient Cause I includes both smoking (B) and asbestos (C). Sufficient Cause II includes smoking without asbestos, and Sufficient Cause III includes asbestos without smoking. But because lung cancer can develop in persons who have never been exposed to either smoking or asbestos, a proper model for lung cancer would have to show at least one more Sufficient Cause Pie that does not include either component B or component C.
  • 67.
    Introduction to Epidemiology Page1-55 Note that public health action does not depend on the identification of every component cause. Disease prevention can be accomplished by blocking any single component of a sufficient cause, at least through that pathway. For example, elimination of smoking (component B) would prevent lung cancer from sufficient causes I and II, although some lung cancer would still occur through sufficient cause III.
  • 68.
    Introduction to Epidemiology Page1-56 Exercise 1.8 Read the Anthrax Fact Sheet on the following 2 pages, then answer the questions below. 1. Describe its causation in terms of agent, host, and environment. a. Agent: b. Host: c. Environment: 2. For each of the following risk factors and health outcomes, identify whether they are necessary causes, sufficient causes, or component causes. Risk Factor _____ a. Hypertension _____ b. Treponema pallidum _____ c. Type A personality _____ d. Skin contact with a strong acid Health Outcome Stroke Syphilis Heart disease Burn Check your answers on page 1-83
  • 69.
    Introduction to Epidemiology Page1-57 Anthrax Fact Sheet What is anthrax? Anthrax is an acute infectious disease that usually occurs in animals such as livestock, but can also affect humans. Human anthrax comes in three forms, depending on the route of infection: cutaneous (skin) anthrax, inhalation anthrax, and intestinal anthrax. Symptoms usually occur within 7 days after exposure. Cutaneous: Most (about 95%) anthrax infections occur when the bacterium enters a cut or abrasion on the skin after handling infected livestock or contaminated animal products. Skin infection begins as a raised itchy bump that resembles an insect bite but within 1–2 days develops into a vesicle and then a painless ulcer, usually 1–3 cm in diameter, with a characteristic black necrotic (dying) area in the center. Lymph glands in the adjacent area may swell. About 20% of untreated cases of cutaneous anthrax will result in death. Deaths are rare with appropriate antimicrobial therapy. Inhalation: Initial symptoms are like cold or flu symptoms and can include a sore throat, mild fever, and muscle aches. After several days, the symptoms may progress to cough, chest discomfort, severe breathing problems and shock. Inhalation anthrax is often fatal. Eleven of the mail-related cases were inhalation; 5 (45%) of the 11 patients died. Intestinal: Initial signs of nausea, loss of appetite, vomiting, and fever are followed by abdominal pain, vomiting of blood, and severe diarrhea. Intestinal anthrax results in death in 25% to 60% of cases. While most human cases of anthrax result from contact with infected animals or contaminated animal products, anthrax also can be used as a biologic weapon. In 1979, dozens of residents of Sverdlovsk in the former Soviet Union are thought to have died of inhalation anthrax after an unintentional release of an aerosol from a biologic weapons facility. In 2001, 22 cases of anthrax occurred in the United States from letters containing anthrax spores that were mailed to members of Congress, television networks, and newspaper companies. What causes anthrax? Anthrax is caused by the bacterium Bacillus anthracis. The anthrax bacterium forms a protective shell called a spore. B. anthracis spores are found naturally in soil, and can survive for many years. How is anthrax diagnosed? Anthrax is diagnosed by isolating B. anthracis from the blood, skin lesions, or respiratory secretions or by measuring specific antibodies in the blood of persons with suspected cases. Is there a treatment for anthrax? Antibiotics are used to treat all three types of anthrax. Treatment should be initiated early because the disease is more likely to be fatal if treatment is delayed or not given at all. How common is anthrax and where is it found? Anthrax is most common in agricultural regions of South and Central America, Southern and Eastern Europe, Asia, Africa, the Caribbean, and the Middle East, where it occurs in animals. When anthrax affects humans, it is usually the result of an occupational exposure to infected animals or their products. Naturally occurring anthrax is rare in the United States (28 reported cases between 1971 and 2000), but 22 mail-related cases were identified in 2001. Infections occur most commonly in wild and domestic lower vertebrates (cattle, sheep, goats, camels, antelopes, and other herbivores), but it can also occur in humans when they are exposed to infected animals or tissue from infected animals. How is anthrax transmitted? Anthrax can infect a person in three ways: by anthrax spores entering through a break in the skin, by inhaling anthrax spores, or by eating contaminate, undercooked meat. Anthrax is not spread from person to person. The skin (“cutaneous”) form of anthrax is usually the result of contact with infected livestock, wild animals, or contaminated animal products such as carcasses, hides, hair, wool, meat, or bone meal. The inhalation form is from breathing in spores from the same sources. Anthrax can also be spread as a bioterrorist agent.
  • 70.
    Introduction to Epidemiology Page1-58 Anthrax Fact Sheet (Continued) Who has an increased risk of being exposed to anthrax? Susceptibility to anthrax is universal. Most naturally occurring anthrax affects people whose work brings them into contact with livestock or products from livestock. Such occupations include veterinarians, animal handlers, abattoir workers, and laboratorians. Inhalation anthrax was once called Woolsorter’s Disease because workers who inhaled spores from contaminated wool before it was cleaned developed the disease. Soldiers and other potential targets of bioterrorist anthrax attacks might also be considered at increased risk. Is there a way to prevent infection? In countries where anthrax is common and vaccination levels of animal herds are low, humans should avoid contact with livestock and animal products and avoid eating meat that has not been properly slaughtered and cooked. Also, an anthrax vaccine has been licensed for use in humans. It is reported to be 93% effective in protecting against anthrax. It is used by veterinarians, laboratorians, soldiers, and others who may be at increased risk of exposure, but is not available to the general public at this time. For a person who has been exposed to anthrax but is not yet sick, antibiotics combined with anthrax vaccine are used to prevent illness. Sources: Centers for Disease Control and Prevention [Internet]. Atlanta: Anthrax. Available from: http://www.bt.cdc.gov/agent/anthrax/ and Anthrax Public Health Fact Sheet, Mass. Dept. of Public Health, August 2002.
  • 71.
    Introduction to Epidemiology Page1-59 Natural History and Spectrum of Disease Natural history of disease refers to the progression of a disease process in an individual over time, in the absence of treatment. For example, untreated infection with HIV causes a spectrum of clinical problems beginning at the time of seroconversion (primary HIV) and terminating with AIDS and usually death. It is now recognized that it may take 10 years or more for AIDS to develop after seroconversion.43 Many, if not most, diseases have a characteristic natural history, although the time frame and specific manifestations of disease may vary from individual to individual and are influenced by preventive and therapeutic measures. Figure 1.18 Natural History of Disease Timeline Source: Centers for Disease Control and Prevention. Principles of epidemiology, 2nd ed. Atlanta: U.S. Department of Health and Human Services;1992. The process begins with the appropriate exposure to or accumulation of factors sufficient for the disease process to begin in a susceptible host. For an infectious disease, the exposure is a microorganism. For cancer, the exposure may be a factor that initiates the process, such as asbestos fibers or components in tobacco smoke (for lung cancer), or one that promotes the process, such as estrogen (for endometrial cancer). After the disease process has been triggered, pathological changes then occur without the individual being aware of them. This stage of subclinical disease, extending from the time of exposure to onset of disease symptoms, is usually called the incubation period for infectious diseases, and the latency period for chronic diseases. During this stage, disease is said to be asymptomatic (no symptoms) or inapparent. This period may be as brief as seconds for hypersensitivity and toxic reactions to as long as decades for certain chronic diseases. Even for a single disease, the characteristic incubation period has a range. For example, the typical incubation period for hepatitis A is as long as 7 weeks. The
  • 72.
    Introduction to Epidemiology Page1-60 latency period for leukemia to become evident among survivors of the atomic bomb blast in Hiroshima ranged from 2 to 12 years, peaking at 6–7 years.44 Incubation periods of selected exposures and diseases varying from minutes to decades are displayed in Table 1.7. Table 1.7 Incubation Periods of Selected Exposures and Diseases Exposure Clinical Effect Incubation/Latency Period Saxitoxin and similar toxins from shellfish Paralytic shellfish poisoning (tingling, numbness around lips and fingertips, giddiness, incoherent speech, respiratory paralysis, sometimes death) few minutes–30 minutes Organophosphorus ingestion Nausea, vomiting, cramps, headache, nervousness, blurred vision, chest pain, confusion, twitching, convulsions few minutes–few hours Salmonella Diarrhea, often with fever and cramps usually 6–48 hours SARS-associated corona virus Severe Acute Respiratory Syndrome (SARS) 3–10 days, usually 4–6 days Varicella-zoster virus Chickenpox 10–21 days, usually 14–16 days Treponema pallidum Syphilis 10–90 days, usually 3 weeks Hepatitis A virus Hepatitis 14–50 days, average 4 weeks Hepatitis B virus Hepatitis 50–180 days, usually 2–3 months Human immunodeficiency virus AIDS <1 to 15+ years Atomic bomb radiation (Japan) Leukemia 2–12 years Radiation (Japan, Chernobyl) Thyroid cancer 3–20+ years Radium (watch dial painters) Bone cancer 8–40 years Although disease is not apparent during the incubation period, some pathologic changes may be detectable with laboratory, radiographic, or other screening methods. Most screening programs attempt to identify the disease process during this phase of its natural history, since intervention at this early stage is likely to be more effective than treatment given after the disease has progressed and become symptomatic. The onset of symptoms marks the transition from subclinical to clinical disease. Most diagnoses are made during the stage of clinical disease. In some people, however, the disease process may never progress to clinically apparent illness. In others, the disease process may result in illness that ranges from mild to severe or fatal. This range is called the spectrum of disease. Ultimately, the disease process ends either in recovery, disability or death.
  • 73.
    Introduction to Epidemiology Page1-61 For an infectious agent, infectivity refers to the proportion of exposed persons who become infected. Pathogenicity refers to the proportion of infected individuals who develop clinically apparent disease. Virulence refers to the proportion of clinically apparent cases that are severe or fatal. Because the spectrum of disease can include asymptomatic and mild cases, the cases of illness diagnosed by clinicians in the community often represent only the tip of the iceberg. Many additional cases may be too early to diagnose or may never progress to the clinical stage. Unfortunately, persons with inapparent or undiagnosed infections may nonetheless be able to transmit infection to others. Such persons who are infectious but have subclinical disease are called carriers. Frequently, carriers are persons with incubating disease or inapparent infection. Persons with measles, hepatitis A, and several other diseases become infectious a few days before the onset of symptoms. However carriers may also be persons who appear to have recovered from their clinical illness but remain infectious, such as chronic carriers of hepatitis B virus, or persons who never exhibited symptoms. The challenge to public health workers is that these carriers, unaware that they are infected and infectious to others, are sometimes more likely to unwittingly spread infection than are people with obvious illness.
  • 74.
    Introduction to Epidemiology Page1-62 Chain of Infection As described above, the traditional epidemiologic triad model holds that infectious diseases result from the interaction of agent, host, and environment. More specifically, transmission occurs when the agent leaves its reservoir or host through a portal of exit, is conveyed by some mode of transmission, and enters through an appropriate portal of entry to infect a susceptible host. This sequence is sometimes called the chain of infection. Figure 1.19 Chain of Infection Source: Centers for Disease Control and Prevention. Principles of epidemiology, 2nd ed. Atlanta: U.S. Department of Health and Human Services;1992. Reservoir The reservoir of an infectious agent is the habitat in which the agent normally lives, grows, and multiplies. Reservoirs include humans, animals, and the environment. The reservoir may or may not be the source from which an agent is transferred to a host. For example, the reservoir of Clostridium botulinum is soil, but the source of most botulism infections is improperly canned food containing C. botulinum spores. Human reservoirs. Many common infectious diseases have human reservoirs. Diseases that are transmitted from person to person without intermediaries include the sexually transmitted diseases, measles, mumps, streptococcal infection, and many respiratory pathogens. Because humans were the only reservoir for the smallpox virus, naturally occurring smallpox was eradicated after the last human case was identified and isolated.8
  • 75.
    Introduction to Epidemiology Page1-63 Human reservoirs may or may not show the effects of illness. As noted earlier, a carrier is a person with inapparent infection who is capable of transmitting the pathogen to others. Asymptomatic or passive or healthy carriers are those who never experience symptoms despite being infected. Incubatory carriers are those who can transmit the agent during the incubation period before clinical illness begins. Convalescent carriers are those who have recovered from their illness but remain capable of transmitting to others. Chronic carriers are those who continue to harbor a pathogen such as hepatitis B virus or Salmonella Typhi, the causative agent of typhoid fever, for months or even years after their initial infection. One notorious carrier is Mary Mallon, or Typhoid Mary, who was an asymptomatic chronic carrier of Salmonella Typhi. As a cook in New York City and New Jersey in the early 1900s, she unintentionally infected dozens of people until she was placed in isolation on an island in the East River, where she died 23 years later.45 Carriers commonly transmit disease because they do not realize they are infected, and consequently take no special precautions to prevent transmission. Symptomatic persons who are aware of their illness, on the other hand, may be less likely to transmit infection because they are either too sick to be out and about, take precautions to reduce transmission, or receive treatment that limits the disease. Animal reservoirs. Humans are also subject to diseases that have animal reservoirs. Many of these diseases are transmitted from animal to animal, with humans as incidental hosts. The term zoonosis refers to an infectious disease that is transmissible under natural conditions from vertebrate animals to humans. Long recognized zoonotic diseases include brucellosis (cows and pigs), anthrax (sheep), plague (rodents), trichinellosis/trichinosis (swine), tularemia (rabbits), and rabies (bats, raccoons, dogs, and other mammals). Zoonoses newly emergent in North America include West Nile encephalitis (birds), and monkeypox (prairie dogs). Many newly recognized infectious diseases in humans, including HIV/AIDS, Ebola infection and SARS, are thought to have emerged from animal hosts, although those hosts have not yet been identified. Environmental reservoirs. Plants, soil, and water in the environment are also reservoirs for some infectious agents. Many fungal agents, such as those that cause histoplasmosis, live and multiply in the soil. Outbreaks of Legionnaires disease are often traced to water supplies in cooling towers and evaporative
  • 76.
    Introduction to Epidemiology Page1-64 condensers, reservoirs for the causative organism Legionella pneumophila. Portal of exit Portal of exit is the path by which a pathogen leaves its host. The portal of exit usually corresponds to the site where the pathogen is localized. For example, influenza viruses and Mycobacterium tuberculosis exit the respiratory tract, schistosomes through urine, cholera vibrios in feces, Sarcoptes scabiei in scabies skin lesions, and enterovirus 70, a cause of hemorrhagic conjunctivitis, in conjunctival secretions. Some bloodborne agents can exit by crossing the placenta from mother to fetus (rubella, syphilis, toxoplasmosis), while others exit through cuts or needles in the skin (hepatitis B) or blood-sucking arthropods (malaria). Modes of transmission An infectious agent may be transmitted from its natural reservoir to a susceptible host in different ways. There are different classifications for modes of transmission. Here is one classification: • Direct − Direct contact − Droplet spread • Indirect − Airborne − Vehicleborne − Vectorborne (mechanical or biologic) In direct transmission, an infectious agent is transferred from a reservoir to a susceptible host by direct contact or droplet spread. Direct contact occurs through skin-to-skin contact, kissing, and sexual intercourse. Direct contact also refers to contact with soil or vegetation harboring infectious organisms. Thus, infectious mononucleosis (“kissing disease”) and gonorrhea are spread from person to person by direct contact. Hookworm is spread by direct contact with contaminated soil. Droplet spread refers to spray with relatively large, short-range aerosols produced by sneezing, coughing, or even talking. Droplet spread is classified as direct because transmission is by direct spray over a few feet, before the droplets fall to the ground. Pertussis and meningococcal infection are examples of diseases transmitted from an infectious patient to a susceptible host by droplet spread.
  • 77.
    Introduction to Epidemiology Page1-65 Indirect transmission refers to the transfer of an infectious agent from a reservoir to a host by suspended air particles, inanimate objects (vehicles), or animate intermediaries (vectors). Airborne transmission occurs when infectious agents are carried by dust or droplet nuclei suspended in air. Airborne dust includes material that has settled on surfaces and become resuspended by air currents as well as infectious particles blown from the soil by the wind. Droplet nuclei are dried residue of less than 5 microns in size. In contrast to droplets that fall to the ground within a few feet, droplet nuclei may remain suspended in the air for long periods of time and may be blown over great distances. Measles, for example, has occurred in children who came into a physician’s office after a child with measles had left, because the measles virus remained suspended in the air.46 Vehicles that may indirectly transmit an infectious agent include food, water, biologic products (blood), and fomites (inanimate objects such as handkerchiefs, bedding, or surgical scalpels). A vehicle may passively carry a pathogen — as food or water may carry hepatitis A virus. Alternatively, the vehicle may provide an environment in which the agent grows, multiplies, or produces toxin — as improperly canned foods provide an environment that supports production of botulinum toxin by Clostridium botulinum. Vectors such as mosquitoes, fleas, and ticks may carry an infectious agent through purely mechanical means or may support growth or changes in the agent. Examples of mechanical transmission are flies carrying Shigella on their appendages and fleas carrying Yersinia pestis, the causative agent of plague, in their gut. In contrast, in biologic transmission, the causative agent of malaria or guinea worm disease undergoes maturation in an intermediate host before it can be transmitted to humans (Figure 1.20). Portal of entry The portal of entry refers to the manner in which a pathogen enters a susceptible host. The portal of entry must provide access to tissues in which the pathogen can multiply or a toxin can act. Often, infectious agents use the same portal to enter a new host that they used to exit the source host. For example, influenza virus exits the respiratory tract of the source host and enters the
  • 78.
    Introduction to Epidemiology Page1-66 respiratory tract of the new host. In contrast, many pathogens that cause gastroenteritis follow a so-called “fecal-oral” route because they exit the source host in feces, are carried on inadequately washed hands to a vehicle such as food, water, or utensil, and enter a new host through the mouth. Other portals of entry include the skin (hookworm), mucous membranes (syphilis), and blood (hepatitis B, human immunodeficiency virus). Figure 1.20 Complex Life Cycle of Dracunculus medinensis (Guinea worm) Source: Centers for Disease Control and Prevention. Principles of epidemiology, 2nd ed. Atlanta: U.S. Department of Health and Human Services;1992.
  • 79.
    Introduction to Epidemiology Page1-67 Host The final link in the chain of infection is a susceptible host. Susceptibility of a host depends on genetic or constitutional factors, specific immunity, and nonspecific factors that affect an individual’s ability to resist infection or to limit pathogenicity. An individual’s genetic makeup may either increase or decrease susceptibility. For example, persons with sickle cell trait seem to be at least partially protected from a particular type of malaria. Specific immunity refers to protective antibodies that are directed against a specific agent. Such antibodies may develop in response to infection, vaccine, or toxoid (toxin that has been deactivated but retains its capacity to stimulate production of toxin antibodies) or may be acquired by transplacental transfer from mother to fetus or by injection of antitoxin or immune globulin. Nonspecific factors that defend against infection include the skin, mucous membranes, gastric acidity, cilia in the respiratory tract, the cough reflex, and nonspecific immune response. Factors that may increase susceptibility to infection by disrupting host defenses include malnutrition, alcoholism, and disease or therapy that impairs the nonspecific immune response. Interventions are directed at: • Controlling or eliminating agent at source of transmission • Protecting portals of entry • Increasing host’s defenses Implications for public health Knowledge of the portals of exit and entry and modes of transmission provides a basis for determining appropriate control measures. In general, control measures are usually directed against the segment in the infection chain that is most susceptible to intervention, unless practical issues dictate otherwise. For some diseases, the most appropriate intervention may be directed at controlling or eliminating the agent at its source. A patient sick with a communicable disease may be treated with antibiotics to eliminate the infection. An asymptomatic but infected person may be treated both to clear the infection and to reduce the risk of transmission to others. In the community, soil may be decontaminated or covered to prevent escape of the agent. Some interventions are directed at the mode of transmission. Interruption of direct transmission may be accomplished by isolation of someone with infection, or counseling persons to avoid the specific type of contact associated with transmission. Vehicleborne transmission may be interrupted by elimination or decontamination of the vehicle. To prevent fecal-oral transmission, efforts often focus on rearranging the environment to reduce the risk of contamination in the future and on changing behaviors, such as promoting handwashing. For airborne diseases, strategies
  • 80.
    Introduction to Epidemiology Page1-68 may be directed at modifying ventilation or air pressure, and filtering or treating the air. To interrupt vectorborne transmission, measures may be directed toward controlling the vector population, such as spraying to reduce the mosquito population. Some strategies that protect portals of entry are simple and effective. For example, bed nets are used to protect sleeping persons from being bitten by mosquitoes that may transmit malaria. A dentist’s mask and gloves are intended to protect the dentist from a patient’s blood, secretions, and droplets, as well to protect the patient from the dentist. Wearing of long pants and sleeves and use of insect repellent are recommended to reduce the risk of Lyme disease and West Nile virus infection, which are transmitted by the bite of ticks and mosquitoes, respectively. Some interventions aim to increase a host’s defenses. Vaccinations promote development of specific antibodies that protect against infection. On the other hand, prophylactic use of antimalarial drugs, recommended for visitors to malaria-endemic areas, does not prevent exposure through mosquito bites, but does prevent infection from taking root. Finally, some interventions attempt to prevent a pathogen from encountering a susceptible host. The concept of herd immunity suggests that if a high enough proportion of individuals in a population are resistant to an agent, then those few who are susceptible will be protected by the resistant majority, since the pathogen will be unlikely to “find” those few susceptible individuals. The degree of herd immunity necessary to prevent or interrupt an outbreak varies by disease. In theory, herd immunity means that not everyone in a community needs to be resistant (immune) to prevent disease spread and occurrence of an outbreak. In practice, herd immunity has not prevented outbreaks of measles and rubella in populations with immunization levels as high as 85% to 90%. One problem is that, in highly immunized populations, the relatively few susceptible persons are often clustered in subgroups defined by socioeconomic or cultural factors. If the pathogen is introduced into one of these subgroups, an outbreak may occur.
  • 81.
    Introduction to Epidemiology Page1-69 Exercise 1.9 Information about dengue fever is provided on the following pages. After studying this information, outline the chain of infection by identifying the reservoir(s), portal(s) of exit, mode(s) of transmission, portal(s) of entry, and factors in host susceptibility. Reservoirs: Portals of exit: Modes of transmission: Portals of entry: Factors in host susceptibility: Check your answers on page 1-84
  • 82.
    Introduction to Epidemiology Page1-70 Dengue Fact Sheet What is dengue? Dengue is an acute infectious disease that comes in two forms: dengue and dengue hemorrhagic fever. The principal symptoms of dengue are high fever, severe headache, backache, joint pains, nausea and vomiting, eye pain, and rash. Generally, younger children have a milder illness than older children and adults. Dengue hemorrhagic fever is a more severe form of dengue. It is characterized by a fever that lasts from 2 to 7 days, with general signs and symptoms that could occur with many other illnesses (e.g., nausea, vomiting, abdominal pain, and headache). This stage is followed by hemorrhagic manifestations, tendency to bruise easily or other types of skin hemorrhages, bleeding nose or gums, and possibly internal bleeding. The smallest blood vessels (capillaries) become excessively permeable (“leaky”), allowing the fluid component to escape from the blood vessels. This may lead to failure of the circulatory system and shock, followed by death, if circulatory failure is not corrected. Although the average case-fatality rate is about 5%, with good medical management, mortality can be less than 1%. What causes dengue? Dengue and dengue hemorrhagic fever are caused by any one of four closely related flaviviruses, designated DEN-1, DEN-2, DEN-3, or DEN-4. How is dengue diagnosed? Diagnosis of dengue infection requires laboratory confirmation, either by isolating the virus from serum within 5 days after onset of symptoms, or by detecting convalescent-phase specific antibodies obtained at least 6 days after onset of symptoms. What is the treatment for dengue or dengue hemorrhagic fever? There is no specific medication for treatment of a dengue infection. Persons who think they have dengue should use analgesics (pain relievers) with acetaminophen and avoid those containing aspirin. They should also rest, drink plenty of fluids, and consult a physician. Persons with dengue hemorrhagic fever can be effectively treated by fluid replacement therapy if an early clinical diagnosis is made, but hospitalization is often required. How common is dengue and where is it found? Dengue is endemic in many tropical countries in Asia and Latin America, most countries in Africa, and much of the Caribbean, including Puerto Rico. Cases have occurred sporadically in Texas. Epidemics occur periodically. Globally, an estimated 50 to 100 million cases of dengue and several hundred thousand cases of dengue hemorrhagic fever occur each year, depending on epidemic activity. Between 100 and 200 suspected cases are introduced into the United States each year by travelers. How is dengue transmitted? Dengue is transmitted to people by the bite of an Aedes mosquito that is infected with a dengue virus. The mosquito becomes infected with dengue virus when it bites a person who has dengue or DHF and after about a week can transmit the virus while biting a healthy person. Monkeys may serve as a reservoir in some parts of Asia and Africa. Dengue cannot be spread directly from person to person. Who has an increased risk of being exposed to dengue? Susceptibility to dengue is universal. Residents of or visitors to tropical urban areas and other areas where dengue is endemic are at highest risk of becoming infected. While a person who survives a bout of dengue caused by one serotype develops lifelong immunity to that serotype, there is no cross-protection against the three other serotypes.
  • 83.
    Introduction to Epidemiology Page1-71 Dengue Fact Sheet (Continued) What can be done to reduce the risk of acquiring dengue? There is no vaccine for preventing dengue. The best preventive measure for residents living in areas infested with Aedes aegypti is to eliminate the places where the mosquito lays her eggs, primarily artificial containers that hold water. Items that collect rainwater or are used to store water (for example, plastic containers, 55-gallon drums, buckets, or used automobile tires) should be covered or properly discarded. Pet and animal watering containers and vases with fresh flowers should be emptied and scoured at least once a week. This will eliminate the mosquito eggs and larvae and reduce the number of mosquitoes present in these areas. For travelers to areas with dengue, as well as people living in areas with dengue, the risk of being bitten by mosquitoes indoors is reduced by utilization of air conditioning or windows and doors that are screened. Proper application of mosquito repellents containing 20% to 30% DEET as the active ingredient on exposed skin and clothing decreases the risk of being bitten by mosquitoes. The risk of dengue infection for international travelers appears to be small, unless an epidemic is in progress. Can epidemics of dengue hemorrhagic fever be prevented? The emphasis for dengue prevention is on sustainable, community-based, integrated mosquito control, with limited reliance on insecticides (chemical larvicides and adulticides). Preventing epidemic disease requires a coordinated community effort to increase awareness about dengue/DHF, how to recognize it, and how to control the mosquito that transmits it. Residents are responsible for keeping their yards and patios free of sites where mosquitoes can be produced. Source: Centers for Disease Control and Prevention [Internet]. Dengue Fever. [updated 2005 Aug 22]. Available from http://www.cdc.gov/ncidod/dvbid/dengue/index.htm.
  • 84.
    Introduction to Epidemiology Page1-72 Epidemic Disease Occurrence Level of disease The amount of a particular disease that is usually present in a community is referred to as the baseline or endemic level of the disease. This level is not necessarily the desired level, which may in fact be zero, but rather is the observed level. In the absence of intervention and assuming that the level is not high enough to deplete the pool of susceptible persons, the disease may continue to occur at this level indefinitely. Thus, the baseline level is often regarded as the expected level of the disease. While some diseases are so rare in a given population that a single case warrants an epidemiologic investigation (e.g., rabies, plague, polio), other diseases occur more commonly so that only deviations from the norm warrant investigation. Sporadic refers to a disease that occurs infrequently and irregularly. Endemic refers to the constant presence and/or usual prevalence of a disease or infectious agent in a population within a geographic area. Hyperendemic refers to persistent, high levels of disease occurrence. Occasionally, the amount of disease in a community rises above the expected level. Epidemic refers to an increase, often sudden, in the number of cases of a disease above what is normally expected in that population in that area. Outbreak carries the same definition of epidemic, but is often used for a more limited geographic area. Cluster refers to an aggregation of cases grouped in place and time that are suspected to be greater than the number expected, even though the expected number may not be known. Pandemic refers to an epidemic that has spread over several countries or continents, usually affecting a large number of people. Epidemics occur when an agent and susceptible hosts are present in adequate numbers, and the agent can be effectively conveyed from a source to the susceptible hosts. More specifically, an epidemic may result from: • A recent increase in amount or virulence of the agent, • The recent introduction of the agent into a setting where it has not been before, • An enhanced mode of transmission so that more susceptible persons are exposed, • A change in the susceptibility of the host response to the agent, and/or • Factors that increase host exposure or involve introduction
  • 85.
    Introduction to Epidemiology Page1-73 through new portals of entry.47 The previous description of epidemics presumes only infectious agents, but non-infectious diseases such as diabetes and obesity exist in epidemic proportion in the U.S.51,52
  • 86.
    Introduction to Epidemiology Page1-74 Exercise 1.10 For each of the following situations, identify whether it reflects: A. Sporadic disease B. Endemic disease C. Hyperendemic disease D. Pandemic disease E. Epidemic disease _____ 1. 22 cases of legionellosis occurred within 3 weeks among residents of a particular neighborhood (usually 0 or 1 per year) _____ 2. Average annual incidence was 364 cases of pulmonary tuberculosis per 100,000 population in one area, compared with national average of 134 cases per 100,000 population _____ 3. Over 20 million people worldwide died from influenza in 1918—1919 _____ 4. Single case of histoplasmosis was diagnosed in a community _____ 5. About 60 cases of gonorrhea are usually reported in this region per week, slightly less than the national average Check your answers on page 1-84
  • 87.
    Introduction to Epidemiology Page1-75 Epidemic Patterns Epidemics can be classified according to their manner of spread through a population: • Common-source − Point − Continuous − Intermittent • Propagated • Mixed • Other A common-source outbreak is one in which a group of persons are all exposed to an infectious agent or a toxin from the same source. If the group is exposed over a relatively brief period, so that everyone who becomes ill does so within one incubation period, then the common-source outbreak is further classified as a point- source outbreak. The epidemic of leukemia cases in Hiroshima following the atomic bomb blast and the epidemic of hepatitis A among patrons of the Pennsylvania restaurant who ate green onions each had a point source of exposure.38,44 If the number of cases during an epidemic were plotted over time, the resulting graph, called an epidemic curve, would typically have a steep upslope and a more gradual downslope (a so-called “log-normal distribution”). Figure 1.21 Hepatitis A Cases by Date of Onset, November–December, 1978 Source: Centers for Disease Control and Prevention. Unpublished data; 1979. In some common-source outbreaks, case-patients may have been exposed over a period of days, weeks, or longer. In a continuous common-source outbreak, the range of exposures and range of
  • 88.
    Introduction to Epidemiology Page1-76 incubation periods tend to flatten and widen the peaks of the epidemic curve (Figure 1.22). The epidemic curve of an intermittent common-source outbreak often has a pattern reflecting the intermittent nature of the exposure. Figure 1.22 Diarrheal Illness in City Residents by Date of Onset and Character of Stool, December 1989–January 1990 Source: Centers for Disease Control and Prevention. Unpublished data; 1990. A propagated outbreak results from transmission from one person to another. Usually, transmission is by direct person-to-person contact, as with syphilis. Transmission may also be vehicleborne (e.g., transmission of hepatitis B or HIV by sharing needles) or vectorborne (e.g., transmission of yellow fever by mosquitoes). In propagated outbreaks, cases occur over more than one incubation period. In Figure 1.23, note the peaks occurring about 11 days apart, consistent with the incubation period for measles. The epidemic usually wanes after a few generations, either because the number of susceptible persons falls below some critical level required to sustain transmission, or because intervention measures become effective. Figure 1.23 Measles Cases by Date of Onset, October 15, 1970–January 16, 1971 Source: Centers for Disease Control and Prevention. Measles outbreak—Aberdeen, S.D.
  • 89.
    Introduction to Epidemiology Page1-77 MMWR 1971;20:26. Some epidemics have features of both common-source epidemics and propagated epidemics. The pattern of a common-source outbreak followed by secondary person-to-person spread is not uncommon. These are called mixed epidemics. For example, a common-source epidemic of shigellosis occurred among a group of 3,000 women attending a national music festival (Figure 1.24). Many developed symptoms after returning home. Over the next few weeks, several state health departments detected subsequent generations of Shigella cases propagated by person-to-person transmission from festival attendees.48 Figure 1.24 Shigella Cases at a Music Festival by Day of Onset, August 1988 Adapted from: Lee LA, Ostroff SM, McGee HB, Johnson DR, Downes FP, Cameron DN, et al. An outbreak of shigellosis at an outdoor music festival. Am J Epidemiol 1991;133:608–15. Finally, some epidemics are neither common-source in its usual sense nor propagated from person to person. Outbreaks of zoonotic or vectorborne disease may result from sufficient prevalence of infection in host species, sufficient presence of vectors, and sufficient human-vector interaction. Examples (Figures 1.25 and 1.26) include the epidemic of Lyme disease that emerged in the northeastern United States in the late 1980s (spread from deer to human by deer ticks) and the outbreak of West Nile encephalitis in the Queens section of New York City in 1999 (spread from birds to humans by mosquitoes).49,50
  • 90.
    Introduction to Epidemiology Page1-78 Figure 1.25 Number of Reported Cases of Lyme Disease by Year — United States, 1992–2003. Data Source: Centers for Disease Control and Prevention. Summary of notifiable diseases– United States, 2003. Published April 22, 2005, for MMWR 2003;52(No. 54):9,17,71–72. Figure 1.26 Number of Reported Cases of West Nile Encephalitis — New York City, 1999 Source: Centers for Disease Control and Prevention. Outbreak of West Nile-Like Viral Encephalitis–New York, 1999. MMWR 1999;48(38):845–9.
  • 91.
    Introduction to Epidemiology Page1-79 Exercise 1.11 For each of the following situations, identify the type of epidemic spread with which it is most consistent. A. Point source B. Intermittent or continuous common source C. Propagated _____ 1. 21 cases of shigellosis among children and workers at a day care center over a period of 6 weeks, no external source identified incubation period for shigellosis is usually 1–3 days) _____ 2. 36 cases of giardiasis over 6 weeks traced to occasional use of a supplementary reservoir (incubation period for giardiasis 3–25 days or more, usually 7–10 days) _____ 3. 43 cases of norovirus infection over 2 days traced to the ice machine on a cruise ship (incubation period for norovirus is usually 24–48 hours) Check your answers on page 1-84
  • 92.
    Introduction to Epidemiology Page1-80 Summary As the basic science of public health, epidemiology includes the study of the frequency, patterns, and causes of health-related states or events in populations, and the application of that study to address public health issues. Epidemiologists use a systematic approach to assess the What, Who, Where, When, and Why/How of these health states or events. Two essential concepts of epidemiology are population and comparison. Core epidemiologic tasks of a public health epidemiologist include public health surveillance, field investigation, research, evaluation, and policy development. In carrying out these tasks, the epidemiologist is almost always part of the team dedicated to protecting and promoting the public’s health. Epidemiologists look at differences in disease and injury occurrence in different populations to generate hypotheses about risk factors and causes. They generally use cohort or case-control studies to evaluate these hypotheses. Knowledge of basic principles of disease occurrence and spread in a population is essential for implementing effective control and prevention measures.
  • 93.
    Introduction to Epidemiology Page1-81 Exercise Answers Exercise 1.1 1. B 2. B 3. A 4. A 5. C 6. A Exercise 1.2 1. Having identified a cluster of cases never before seen in the area, public health officials must seek additional information to assess the community’s health. Is the cluster limited to persons who have just returned from traveling where West Nile virus infection is common, or was the infection acquired locally, indicating that the community is truly at risk? Officials could check whether hospitals have seen more patients than usual for encephalitis. If so, officials could document when the increase in cases began, where the patients live or work or travel, and personal characteristics such as age. Mosquito traps could be placed to catch mosquitoes and test for presence of the West Nile virus. If warranted, officials could conduct a serosurvey of the community to document the extent of infection. Results of these efforts would help officials assess the community’s burden of disease and risk of infection. 2. West Nile virus infection is spread by mosquitoes. Persons who spend time outdoors, particularly at times such as dusk when mosquitoes may be most active, can make personal decisions to reduce their own risk or not. Knowing that the risk is present but may be small, an avid gardener might or might not decide to curtail the time spent gardening in the evening, or use insect repellent containing DEET, or wear long pants and long-sleeve shirts even though it is August, or empty the bird bath where mosquitoes breed. 3. What proportion of persons infected with West Nile virus actually develops encephalitis? Do some infected people have milder symptoms or no symptoms at all? Investigators could conduct a serosurvey to assess infection, and ask about symptoms and illness. In addition, what becomes of the persons who did develop encephalitis? What proportion survived? Did they recover completely or did some have continuing difficulties? 4. Although the cause and mode of transmission were known (West Nile virus and mosquitoes, respectively), public health officials asked many questions regarding how the virus was introduced (mosquito on an airplane? wayward bird? bioterrorism?), whether the virus had a reservoir in the area (e.g., birds), what types of mosquitoes could transmit the virus, what were the host risk factors for infection or encephalitis, etc.
  • 94.
    Introduction to Epidemiology Page1-82 Exercise 1.3 1. A 2. E 3. F 4. B 5. D 6. C Exercise 1.4 1. Confirmed 2. Probable 3. Probable 4. Probable 5. Possible Exercise 1.5 1. Third criterion may be limiting because patient may not be aware of close contact 2. Probably reasonable 3. Criteria do not require sophisticated evaluation or testing, so can be used anywhere in the world 4. Too broad. Most persons with cough and fever returning from Toronto, China, etc., are more likely to have upper respiratory infections than SARS. Exercise 1.6 The following tables can be created from the data in Tables 1.5 and 1.6: Table A. Deaths and Death Rates for an Unusual Event, By Sex and Socioeconomic Status Female Male High Middle Low High Middle Low Persons at risk 143 107 212 179 173 499 Survivors 134 94 80 59 25 58 Deaths 9 13 132 120 148 441 Death rate (%) 6.3 12.1 62.3 67.0 85.5 88.4 Table B. Deaths and Death Rates for an Unusual Event, By Sex Female Male Total Persons at risk 462 851 1,313 Survivors 308 142 450 Deaths 154 709 863 Death rate (%) 33.3 83.3 65.7
  • 95.
    Introduction to Epidemiology Page1-83 Table C. Deaths and Death Rates for an Unusual Event, By Age Group Child Adult Total Persons at risk 83 1,230 1,313 Survivors 52 398 450 Deaths 31 832 863 Death rate (%) 37.3 67.6 65.7 By reviewing the data in these tables, you can see that men (see Table B) and adults (see Table C) were more likely to die than were women and children. Death rates for both women and men declined as socioeconomic status increased (see Table A), but the men in even the highest socioeconomic class were more likely to die than the women in the lowest socioeconomic class. These data, which are consistent with the phrase “Women and children first,” represent the mortality experience of passengers on the Titanic. Data Sources: Passengers on the Titanic [Internet]. StatSci.org; [updated 2002 Dec 29; cited 2005 April]. Available from http://www.statsci.org/data/general/titanic.html. Victims of the Titanic Disaster [Internet]. Encyclopedia Titanica; [cited 2005 April]. Available from http://www.encyclopedia- titanica.org. Note: the precise number of passengers, deaths, and class of service are disputed. The Encyclopedia Titanica website includes numerous discussions of these disputed numbers. Exercise 1.7 1. D 2. B 3. C 4. A Exercise 1.8 1. a. Agent: Bacillus anthracis, a bacterium that can survive for years in spore form, is a necessary cause. b. Host: People are generally susceptible to anthrax. However, infection can be prevented by vaccination. Cuts or abrasions of the skin may permit entry of the bacteria. c. Environment: Persons at risk for naturally acquired infection are those who are likely to be exposed to infected animals or contaminated animal products, such as veterinarians, animal handlers, abattoir workers, and laboratorians. Persons who are potential targets of bioterrorism are also at increased risk. 2. a. Component cause b. Necessary cause c. Component cause d. Sufficient cause
  • 96.
    Introduction to Epidemiology Page1-84 Exercise 1.9 Reservoirs: humans and possibly monkeys Portals of exit: skin (via mosquito bite) Modes of transmission: indirect transmission to humans by mosquito vector Portals of entry: through skin to blood (via mosquito bite) Factors in host susceptibility: except for survivors of dengue infection who are immune to subsequent infection from the same serotype, susceptibility is universal Exercise 1.10 1. E 2. C 3. D 4. A 5. B Exercise 1.11 1. C 2. B 3. A
  • 97.
    Introduction to Epidemiology Page1-85 SELF-ASSESSMENT QUIZ Now that you have read Lesson 1 and have completed the exercises, you should be ready to take the self-assessment quiz. This quiz is designed to help you assess how well you have learned the content of this lesson. You may refer to the lesson text whenever you are unsure of the answer. Unless instructed otherwise, choose ALL correct answers for each question. 1. In the definition of epidemiology, “distribution” refers to: A. Who B. When C. Where D. Why 2. In the definition of epidemiology, “determinants” generally includes: A. Agents B. Causes C. Control measures D. Risk factors E. Sources 3. Epidemiology, as defined in this lesson, would include which of the following activities? A. Describing the demographic characteristics of persons with acute aflatoxin poisoning in District A B. Prescribing an antibiotic to treat a patient with community-acquired methicillin-resistant Staphylococcus aureus infection C. Comparing the family history, amount of exercise, and eating habits of those with and without newly diagnosed diabetes D. Recommending that a restaurant be closed after implicating it as the source of a hepatitis A outbreak 4. John Snow’s investigation of cholera is considered a model for epidemiologic field investigations because it included a: A. Biologically plausible hypothesis B. Comparison of a health outcome among exposed and unexposed groups C. Multivariate statistical model D. Spot map E. Recommendation for public health action 5. Public health surveillance includes which of the following activities: A. Diagnosing whether a case of encephalitis is actually due to West Nile virus infection B. Soliciting case reports of persons with symptoms compatible with SARS from local hospitals C. Creating graphs of the number of dog bites by week and neighborhood D. Writing a report on trends in seat belt use to share with the state legislature E. Disseminating educational materials about ways people can reduce their risk of Lyme disease
  • 98.
    Introduction to Epidemiology Page1-86 6. The hallmark feature of an analytic epidemiologic study is: (Choose one best answer) A. Use of an appropriate comparison group B. Laboratory confirmation of the diagnosis C. Publication in a peer-reviewed journal D. Statistical analysis using logistic regression 7. A number of passengers on a cruise ship from Puerto Rico to the Panama Canal have recently developed a gastrointestinal illness compatible with norovirus (formerly called Norwalk-like virus). Testing for norovirus is not readily available in any nearby island, and the test takes several days even where available. Assuming you are the epidemiologist called on to board the ship and investigate this possible outbreak, your case definition should include, at a minimum: (Choose one best answer) A. Clinical criteria, plus specification of time, place, and person B. Clinical features, plus the exposure(s) you most suspect C. Suspect cases D. The nationally agreed standard case definition for disease reporting 8. A specific case definition is one that: A. Is likely to include only (or mostly) true cases B. Is considered “loose” or “broad” C. Will include more cases than a sensitive case definition D. May exclude mild cases 9. Comparing numbers and rates of illness in a community, rates are preferred for: (Choose one best answer) A. Conducting surveillance for communicable diseases B. Deciding how many doses of immune globulin are needed C. Estimating subgroups at highest risk D. Telling physicians which strain of influenza is most prevalent 10. For the cruise ship scenario described in Question 7, how would you display the time course of the outbreak? (Choose one best answer) A. Endemic curve B. Epidemic curve C. Seasonal trend D. Secular trend 11. For the cruise ship scenario described in Question 7, if you suspected that the norovirus may have been transmitted by ice made or served aboard ship, how might you display “place”? A. Spot map by assigned dinner seating location B. Spot map by cabin C. Shaded map of United States by state of residence D. Shaded map by whether passenger consumed ship’s ice or not
  • 99.
    Introduction to Epidemiology Page1-87 12. Which variables might you include in characterizing the outbreak described in Question 7 by person? A. Age of passenger B. Detailed food history (what person ate) while aboard ship C. Status as passenger or crew D. Symptoms 13. When analyzing surveillance data by age, which of the following age groups is preferred? (Choose one best answer) A. 1-year age groups B. 5-year age groups C. 10-year age groups D. Depends on the disease 14. A study in which children are randomly assigned to receive either a newly formulated vaccine or the currently available vaccine, and are followed to monitor for side effects and effectiveness of each vaccine, is an example of which type of study? A. Experimental B. Observational C. Cohort D. Case-control E. Clinical trial 15. The Iowa Women’s Health Study, in which researchers enrolled 41,837 women in 1986 and collected exposure and lifestyle information to assess the relationship between these factors and subsequent occurrence of cancer, is an example of which type(s) of study? A. Experimental B. Observational C. Cohort D. Case-control E. Clinical trial 16. British investigators conducted a study to compare measles-mumps-rubella (MMR) vaccine history among 1,294 children with pervasive development disorder (e.g., autism and Asperger’s syndrome) and 4,469 children without such disorders. (They found no association.) This is an example of which type(s) of study? A. Experimental B. Observational C. Cohort D. Case-control E. Clinical trial Source: Smeeth L, Cook C, Fombonne E, Heavey L, Rodrigues LC, Smith PG, Hall AJ. MMR vaccination and pervasive developmental disorders. Lancet 2004;364:963–9.
  • 100.
    Introduction to Epidemiology Page1-88 17. A cohort study differs from a case-control study in that: A. Subjects are enrolled or categorized on the basis of their exposure status in a cohort study but not in a case-control study B. Subjects are asked about their exposure status in a cohort study but not in a case- control study C. Cohort studies require many years to conduct, but case-control studies do not D. Cohort studies are conducted to investigate chronic diseases, case-control studies are used for infectious diseases 18. A key feature of a cross-sectional study is that: A. It usually provides information on prevalence rather than incidence B. It is limited to health exposures and behaviors rather than health outcomes C. It is more useful for descriptive epidemiology than it is for analytic epidemiology D. It is synonymous with survey 19. The epidemiologic triad of disease causation refers to: (Choose one best answer) A. Agent, host, environment B. Time, place, person C. Source, mode of transmission, susceptible host D. John Snow, Robert Koch, Kenneth Rothman 20. For each of the following, identify the appropriate letter from the time line in Figure 1.27 representing the natural history of disease. _______ Onset of symptoms _______ Usual time of diagnosis _______ Exposure Figure 1.27 Natural History of Disease Timeline 21. A reservoir of an infectious agent can be: A. An asymptomatic human B. A symptomatic human C. An animal D. The environment
  • 101.
    Introduction to Epidemiology Page1-89 22. Indirect transmission includes which of the following? A. Droplet spread B. Mosquito-borne C. Foodborne D. Doorknobs or toilet seats 23. Disease control measures are generally directed at which of the following? A. Eliminating the reservoir B. Eliminating the vector C. Eliminating the host D. Interrupting mode of transmission E. Reducing host susceptibility 24. Which term best describes the pattern of occurrence of the three diseases noted below in a single area? A. Endemic B. Outbreak C. Pandemic D. Sporadic _______ Disease 1: usually 40–50 cases per week; last week, 48 cases _______ Disease 2: fewer than 10 cases per year; last week, 1 case _______ Disease 3: usually no more than 2–4 cases per week; last week, 13 cases 25. A propagated epidemic is usually the result of what type of exposure? A. Point source B. Continuous common source C. Intermittent common source D. Person-to-person
  • 102.
    Introduction to Epidemiology Page1-90 Answers to Self-Assessment Quiz 1. A, B, C. In the definition of epidemiology, “distribution” refers to descriptive epidemiology, while “determinants” refers to analytic epidemiology. So “distribution” covers time (when), place (where), and person (who), whereas “determinants” covers causes, risk factors, modes of transmission (why and how). 2. A, B, D, E. In the definition of epidemiology, “determinants” generally includes the causes (including agents), risk factors (including exposure to sources), and modes of transmission, but does not include the resulting public health action. 3. A, C, D. Epidemiology includes assessment of the distribution (including describing demographic characteristics of an affected population), determinants (including a study of possible risk factors), and the application to control health problems (such as closing a restaurant). It does not generally include the actual treatment of individuals, which is the responsibility of health-care providers. 4. A, B, D, E. John Snow’s investigation of cholera is considered a model for epidemiologic field investigations because it included a biologically plausible (but not popular at the time) hypothesis that cholera was water-borne, a spot map, a comparison of a health outcome (death) among exposed and unexposed groups, and a recommendation for public health action. Snow’s elegant work predated multivariate analysis by 100 years. 5. B, C, D. Public health surveillance includes collection (B), analysis (C), and dissemination (D) of public health information to help guide public health decision making and action, but it does not include individual clinical diagnosis, nor does it include the actual public health actions that are developed based on the information. 6. A. The hallmark feature of an analytic epidemiologic study is use of an appropriate comparison group. 7. A. A case definition for a field investigation should include clinical criteria, plus specification of time, place, and person. The case definition should be independent of the exposure you wish to evaluate. Depending on the availability of laboratory confirmation, certainty of diagnosis, and other factors, a case definition may or may not be developed for suspect cases. The nationally agreed standard case definition for disease reporting is usually quite specific, and usually does not include suspect or possible cases. 8. A, D. A specific or tight case definition is one that is likely to include only (or mostly) true cases, but at the expense of excluding milder or atypical cases. 9. C. Rates assess risk. Numbers are generally preferred for identifying individual cases and for resource planning. 10. B. An epidemic curve, with date or time of onset on its x-axis and number of cases on the y- axis, is the classic graph for displaying the time course of an epidemic. 11. A, B, C. “Place” includes location of actual or suspected exposure as well as location of residence, work, school, and the like.
  • 103.
    Introduction to Epidemiology Page1-91 12. A, C. “Person” refers to demographic characteristics. It generally does not include clinical features characteristics or exposures. 13. D. Epidemiologists tailor descriptive epidemiology to best describe the data they have. Because different diseases have different age distributions, epidemiologists use different age breakdowns appropriate for the disease of interest. 14. A, E. A study in which subjects are randomized into two intervention groups and monitored to identify health outcomes is a clinical trial, which is type of experimental study. It is not a cohort study, because that term is limited to observational studies. 15. B, C. A study that assesses (but does not dictate) exposure and follows to document subsequent occurrence of disease is an observational cohort study. 16. B, D. A study in which subjects are enrolled on the basis of having or not having a health outcome is an observational case-control study. Source: Smeeth L, Cook C, Fombonne E, Heavey L, Rodrigues LC, Smith PG, Hall AJ. MMR vaccination and pervasive developmental disorders. Lancet 2004;364:963–9. 17. A. The key difference between a cohort and case-control study is that, in a cohort study, subjects are enrolled on the basis of their exposure, whereas in a case-control study subjects are enrolled on the basis of whether they have the disease of interest or not. Both types of studies assess exposure and disease status. While some cohort studies have been conducted over several years, others, particularly those that are outbreak-related, have been conducted in days. Either type of study can be used to study a wide array of health problems, including infectious and non-infectious. 18. A, C, D. A cross-sectional study or survey provides a snapshot of the health of a population, so it assesses prevalence rather than incidence. As a result, it is not as useful as a cohort or case-control study for analytic epidemiology. However, a cross-sectional study can easily measure prevalence of exposures and outcomes. 19. A. The epidemiologic triad of disease causation refers to agent-host-environment. 20. C. Onset of symptoms D. Usual time of diagnosis A. Exposure 21. A, B, C, D. A reservoir of an infectious agent is the habitat in which an agent normally lives, grows, and multiplies, which may include humans, animals, and the environment. 22. B, C, D. Indirect transmission refers to the transmission of an infectious agent by suspended airborne particles, inanimate objects (vehicles, food, water) or living intermediaries (vectors such as mosquitoes). Droplet spread is generally considered short-distance direct transmission. 23. A, B, D, E. Disease control measures are generally directed at eliminating the reservoir or vector, interrupting transmission, or protecting (but not eliminating!) the host.
  • 104.
    Introduction to Epidemiology Page1-92 24. A. Disease 1: usually 40–50 cases per week; last week, 48 cases D. Disease 2: fewer than 10 cases per year; last week, 1 case B. Disease 3: usually no more than 2–4 cases per week; last week, 13 cases 25. D. A propagated epidemic is one in which infection spreads from person to person.
  • 105.
    Introduction to Epidemiology Page1-93 References 1. Last JM, editor. Dictionary of epidemiology. 4th ed. New York: Oxford University Press; 2001. p. 61. 2. Cates W. Epidemiology: Applying principles to clinical practice. Contemp Ob/Gyn 1982;20:147–61. 3. Greenwood M. Epidemics and crowd-diseases: an introduction to the study of epidemiology, Oxford University Press; 1935. 4. Thacker SB. Historical development. In: Teutsch SM, Churchill RE, editors. Principles and practice of public health surveillance, 2nd ed. New York: Oxford University Press; 2002. p. 1–16. 5. Snow J. Snow on cholera. London: Humphrey Milford: Oxford University Press; 1936. 6. Doll R, Hill AB. Smoking and carcinoma of the lung. Brit Med J 1950;2:739–48. 7. Kannel WB. The Framingham Study: its 50-year legacy and future promise. J Atheroscler Thromb 2000;6:60–6. 8. Fenner F, Henderson DA, Arita I, Jezek Z, Ladnyi ID. Smallpox and its eradication. Geneva: World Health Organization; 1988. 9. Morris JN. Uses of epidemiology. Edinburgh: Livingstone; 1957. 10. U.S. Department of Health and Human Services (HHS). Healthy people 2000: national health promotion and disease prevention objectives. Washington, DC: HHS, Public Health Service; 1991. 11. U.S. Department of Health and Human Services (HHS). Healthy people 2010. 2nd ed. Washington, DC: U.S. Government Printing Office (GPO); November 2000. 12. U.S. Department of Health and Human Services (HHS). Tracking healthy people 2010. Washington, DC: GPO; November 2000. 13. Eidson M, Philen RM, Sewell CM, Voorhees R, Kilbourne EM. L-tryptophan and eosinophilia-myalgia syndrome in New Mexico. Lancet 1990;335:645–8. 14. Kamps BS, Hoffmann C, editors. SARS Reference, 3rd ed. Flying Publisher, 2003. Available from: http://www.sarsreference.com/index.htm. 15. Murphy TV, Gargiullo PM, Massoudi MS, et al. Intussusception among infants given an oral rotavirus vaccine. N Eng J Med 2001;344:564–72. 16. Fraser DW, Tsai TR, Orenstein W, Parkin WE, Beecham HJ, Sharrar RG, et al. Legionnaires’ disease: description of an epidemic of pneumonia. New Engl J Med 1977; 297:1189–97. 17. Tyler CW, Last JM. Epidemiology. In: Last JM, Wallace RB, editors. Maxcy-Rosenau-Last public health and preventive medicine, 14th ed. Norwalk (Connecticut): Appleton & Lange; 1992. p. 11.
  • 106.
    Introduction to Epidemiology Page1-94 18. Orenstein WA, Bernier RH. Surveillance: information for action. Pediatr Clin North Am 1990; 37:709–34. 19. Wagner MM, Tsui FC, Espino JU, Dato VM, Sittig DF, Caruana FA, et al. The emerging science of very early detection of disease outbreaks. J Pub Health Mgmt Pract 2001;6:51–9. 20. Centers for Disease Control and Prevention. Framework for evaluating public health surveillance systems for early detection of outbreaks: recommendations from the CDC Working Group. MMWR May 7, 2004; 53(RR05);1–11. 21. Centers for Disease Control and Prevention. Interim guidance on infection control precautions for patients with suspected severe acute respiratory syndrome (SARS) and close contacts in households. Available from: http://emergency.cdc.gov/HAN/han00132.asp. 22. Beaglehole R, Bonita R, Kjellstrom T. Basic epidemiology. Geneva: World Health Organization; 1993. p. 133. 23. Centers for Disease Control and Prevention. Updated guidelines for evaluating public health surveillance systems: recommendations from the Guidelines Working Group. MMWR Recommendations and Reports 2001:50(RR13). 24. Rothman KJ. Policy recommendations in epidemiology research papers. Epidemiol 1993; 4: 94–9. 25. Centers for Disease Control and Prevention. Case definitions for infectious conditions under public health surveillance. MMWR Recomm Rep 1997:46(RR-10):1–55. 26. MacDonald P, Boggs J, Whitwam R, Beatty M, Hunter S, MacCormack N, et al. Listeria- associated birth complications linked with homemade Mexican-style cheese, North Carolina, October 2000 [abstract]. 50th Annual Epidemic Intelligence Service Conference; 2001 Apr 23-27; Atlanta, GA. 27. Centers for Disease Control and Prevention. Outbreak of severe acute respiratory syndrome–worldwide, 2003. MMWR 2003: 52:226–8. 28. Centers for Disease Control and Prevention. Revised U.S. surveillance case definition for severe acute respiratory syndrome (SARS) and update on SARS cases–United States and worldwide, December 2003. MMWR 2003:52:1202–6. 29. Centers for Disease Control and Prevention. Indicators for chronic disease surveillance. MMWR Recomm Rep 2004;53(RR-11):1–6. 30. Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2001. MMWR 2001;50(53). 31. Arias E, Anderson RN, Hsiang-Ching K, Murphy SL, Kovhanek KD. Deaths: final data for 2001. National vital statistics reports; vol 52, no. 3. Hyattsville (Maryland): National Center for Health Statistics; 2003. 32. Goodman RA, Smith JD, Sikes RK, Rogers DL, Mickey JL. Fatalities associated with farm tractor injuries: an epidemiologic study. Public Health Rep 1985;100:329–33.
  • 107.
    Introduction to Epidemiology Page1-95 33. Heyman DL, Rodier G. Global surveillance, national surveillance, and SARS. Emerg Infect Dis. 2003;10:173–5. 34. American Cancer Society [Internet]. Atlanta: The American Cancer Society, Inc. Available from: http://www.cancer.org/Research/CancerFactsFigures/cancer-facts-figures-2005/ 35. Centers for Disease Control and Prevention. Current trends. Lung cancer and breast cancer trends among women–Texas. MMWR 1984;33(MM19):266. 36. Liao Y, Tucker P, Okoro CA, Giles WH, Mokdad AH, Harris VB, et. al. REACH 2010 surveillance for health status in minority communities — United States, 2001–2002. MMWR 2004;53:1–36. 37. Centers for Disease Control and Prevention. Asthma mortality — Illinois, 1979-1994. MMWR. 1997;46(MM37):877–80. 38. Centers for Disease Control and Prevention. Hepatitis A outbreak associated with green onions at a restaurant–Monaca, Pennsylvania, 2003. MMWR 2003; 52(47):1155–7. 39. Knowler WC, Barrett-Connor E, Fowler SE, Hamman RF, Lachin JM, Walker EA, Nathan DM, Diabetes Prevention Program Research Group. Reduction in the incidence of type 2 diabetes with lifestyle intervention or metformin. N Engl J Med 2002;346:393–403. 40. Colditz GA, Manson JE, Hankinson SE. The Nurses’ Health Study: 20-year contribution to the understanding of health among women. J Women’s Health 1997;49–62. 41. Centers for Disease Control and Prevention. Outbreak of Cyclosporiasis associated with snow peas–Pennsylvania, 2004. MMWR 2004;53:876–8. 42. Rothman KJ. Causes. Am J Epidemiol 1976;104:587–92. 43. Mindel A, Tenant-Flowers M. Natural history and management of early HIV infection. BMJ 2001;332:1290–93. 44. Cobb S, Miller M, Wald N. On the estimation of the incubation period in malignant disease. J Chron Dis 1959;9:385–93. 45. Leavitt JW. Typhoid Mary: captive to the public’s health. Boston: Beacon Press; 1996. 46. Remington PL, Hall WN, Davis IH, Herald A, Gunn RA. Airborne transmission of measles in a physician’s office. JAMA 1985;253:1575–7. 47. Kelsey JL, Thompson WD, Evans AS. Methods in observational epidemiology. New York: Oxford University Press; 1986. p. 216. 48. Lee LA, Ostroff SM, McGee HB, Jonson DR, Downes FP, Cameron DN, et al. An outbreak of shigellosis at an outdoor music festival. Am J Epidemiol 1991; 133:608–15. 49. White DJ, Chang H-G, Benach JL, Bosler EM, Meldrum SC, Means RG, et al. Geographic spread and temporal increase of the Lyme disease epidemic. JAMA 1991;266:1230–6. 50. Centers for Disease Control and Prevention. Outbreak of West Nile-Like Viral Encephalitis–New York, 1999. MMWR 1999;48(38):845–9.
  • 108.
    Introduction to Epidemiology Page1-96 51. Centers for Disease Control and Prevention. Prevalence of overweight and obesity among adults with diagnosed diabetes–United States, 1988-1994 and 1999-2002.MMWR 2004;53(45):1066–8. 52. National Center for Health Statistics [Internet]. Atlanta: Centers for Disease Control and Prevention [updated 2005 Feb 8]. Websites For more information on: Visit the following websites: CDC’s Epidemic Intelligence Service http://www.cdc.gov/eis/ CDC’s framework for program evaluation in public health http://www.cdc.gov/mmwr/preview/mmwrhtml/rr4811a1.htm Updated Guidelines for Evaluating Public Health Surveillance Systems http://www.cdc.gov/mmwr/preview/mmwrhtml/rr5013a1.htm Case Definitions for Infectious Conditions Under Public Health Surveillance http://www.cdc.gov/osels/ph_surveillance/nndss/casedef/ John Snow http://www.ph.ucla.edu/epi/snow.html
  • 109.
    Summarizing Data Page 2-1 SUMMARIZINGDATA Imagine that you work in a county health department and are faced with two challenges. First, a case of hepatitis B is reported to the health department. The patient, a 40-year-old man, denies having either of the two common risk factors for the disease: he has never used injection drugs and has been in a monogamous relationship with his wife for twelve years. However, he remembers going to the dentist for some bridge work approximately three months earlier. Hepatitis B has occasionally been transmitted between dentist and patients, particularly before dentists routinely wore gloves. Question: What proportion of other persons with new onset of hepatitis B reported recent exposure to the same dentist, or to any dentist during their likely period of exposure? Then, in the following week, the health department receives 61 death certificates. A new employee in the Vital Statistics office wonders how many death certificates the health department usually receives each week. Question: What is the average number of death certificates the health department receives each week? By how much does this number vary? What is the range over the past year? If you were given the appropriate raw data, would you be able to answer these two questions confidently? The materials in this lesson will allow you do so — and more. Objectives After studying this lesson and answering the questions in the exercises, you will be able to: • Construct a frequency distribution • Calculate and interpret four measures of central location: mode, median, arithmetic mean, and geometric mean • Apply the most appropriate measure of central location for a frequency distribution • Apply and interpret four measures of spread: range, interquartile range, standard deviation, and confidence interval (for mean) Major Sections Organizing Data........................................................................................................................... 2-2 Types of Variables ....................................................................................................................... 2-4 Frequency Distributions............................................................................................................... 2-7 Properties of Frequency Distributions ....................................................................................... 2-11 Methods for Summarizing Data................................................................................................. 2-15 Measures of Central Location.................................................................................................... 2-16 Measures of Spread.................................................................................................................... 2-36 Choosing the Right Measure of Central Location and Spread .................................................. 2-53 Summary.................................................................................................................................... 2-58 2 1
  • 110.
    Summarizing Data Page 2-2 OrganizingData A variable can be any characteristic that differs from person to person, such as height, sex, smallpox vaccination status, or physical activity pattern. The value of a variable is the number or descriptor that applies to a particular person, such as 5'6" (168 cm), female, and never vaccinated. Whether you are conducting routine surveillance, investigating an outbreak, or conducting a study, you must first compile information in an organized manner. One common method is to create a line list or line listing. Table 2.1 is a typical line listing from an epidemiologic investigation of an apparent cluster of hepatitis A. The line listing is one type of epidemiologic database, and is organized like a spreadsheet with rows and columns. Typically, each row is called a record or observation and represents one person or case of disease. Each column is called a variable and contains information about one characteristic of the individual, such as race or date of birth. The first column or variable of an epidemiologic database usually contains the person’s name, initials, or identification number. Other columns might contain demographic information, clinical details, and exposures possibly related to illness. Table 2.1 Line Listing of Hepatitis A Cases, County Health Department, January — February 2004 ID Date of Diagnosis Town Age (Years) Sex Hosp Jaundice Outbreak IV Drugs IgM Pos Highest ALT* 01 01/05 B 74 M Y N N N Y 232 02 01/06 J 29 M N Y N Y Y 285 03 01/08 K 37 M Y Y N N Y 3250 04 01/19 J 3 F N N N N Y 1100 05 01/30 C 39 M N Y N N Y 4146 06 02/02 D 23 M Y Y N Y Y 1271 07 02/03 F 19 M Y Y N N Y 300 08 02/05 I 44 M N Y N N Y 766 09 02/19 G 28 M Y N N Y Y 23 10 02/22 E 29 F N Y Y N Y 543 11 02/23 A 21 F Y Y Y N Y 1897 12 02/24 H 43 M N Y Y N Y 1220 13 02/26 B 49 F N N N N Y 644 14 02/26 H 42 F N N Y N Y 2581 15 02/27 E 59 F Y Y Y N Y 2892 16 02/27 E 18 M Y N Y N Y 814 17 02/27 A 19 M N Y Y N Y 2812 18 02/28 E 63 F Y Y Y N Y 4218 19 02/28 E 61 F Y Y Y N Y 3410 20 02/29 A 40 M N Y Y N Y 4297 * ALT = Alanine aminotransferase
  • 111.
    Summarizing Data Page 2-3 Someepidemiologic databases, such as line listings for a small cluster of disease, may have only a few rows (records) and a limited number of columns (variables). Such small line listings are sometimes maintained by hand on a single sheet of paper. Other databases, such as birth or death records for the entire country, might have thousands of records and hundreds of variables and are best handled with a computer. However, even when records are computerized, a line listing with key variables is often printed to facilitate review of the data. Icon of the Epi Info computer software developed at CDC One computer software package that is widely used by epidemiologists to manage data is Epi Info, a free package developed at CDC. Epi Info allows the user to design a questionnaire, enter data right into the questionnaire, edit the data, and analyze the data. Two versions are available: Epi Info 3 (formerly Epi Info 2000 or Epi Info 2002) is Windows-based, and continues to be supported and upgraded. It is the recommended version and can be downloaded from the CDC website: http://www.cdc.gov/epiinfo/downloads.htm. Epi Info 6 is DOS-based, widely used, but being phased out. This lesson includes Epi Info commands for creating frequency distributions and calculating some of the measures of central location and spread described in the lesson. Since Epi Info 3 is the recommended version, only commands for this version are provided in the text; corresponding commands for Epi Info 6 are offered at the end of the lesson.
  • 112.
    Summarizing Data Page 2-4 Typesof Variables Look again at the variables (columns) and values (individual entries in each column) in Table 2.1. If you were asked to summarize these data, how would you do it? First, notice that for certain variables, the values are numeric; for others, the values are descriptive. The type of values influence the way in which the variables can be summarized. Variables can be classified into one of four types, depending on the type of scale used to characterize their values (Table 2.2). Table 2.2 Types of Variables Scale Example Values Nominal Ordinal “categorical” or / “qualitative” disease status ovarian cancer yes / no Stage I, II, III, or IV Interval Ratio “continuous” or / “quantitative” date of birth tuberculin skin test any date from recorded time to current 0 – ??? of induration • A nominal-scale variable is one whose values are categories without any numerical ranking, such as county of residence. In epidemiology, nominal variables with only two categories are very common: alive or dead, ill or well, vaccinated or unvaccinated, or did or did not eat the potato salad. A nominal variable with two mutually exclusive categories is sometimes called a dichotomous variable. • An ordinal-scale variable has values that can be ranked but are not necessarily evenly spaced, such as stage of cancer (see Table 2.3). • An interval-scale variable is measured on a scale of equally spaced units, but without a true zero point, such as date of birth. • A ratio-scale variable is an interval variable with a true zero point, such as height in centimeters or duration of illness. Nominal- and ordinal-scale variables are considered qualitative or categorical variables, whereas interval- and ratio-scale variables are considered quantitative or continuous variables. Sometimes the same variable can be measured using both a nominal scale and a ratio scale. For example, the tuberculin skin tests of a group of persons potentially exposed to a co-worker with tuberculosis can be measured as “positive” or “negative” (nominal scale) or in millimeters of induration (ratio scale).
  • 113.
    Summarizing Data Page 2-5 Table2.3 Example of Ordinal-Scale Variable: Stages of Breast Cancer* Stage Tumor Size Lymph Node Involvement Metastasis (Spread) I Less than 2 cm No No II Between 2 and 5 cm No or in same side of breast No III More than 5 cm Yes, on same side of breast No IV Not applicable Not applicable Yes * This table describes the stages of breast cancer. Note that each stage is more extensive than the previous one and generally carries a less favorable prognosis, but you cannot say that the difference between Stages 1 and 3 is the same as the difference between Stages 2 and 4.
  • 114.
    Summarizing Data Page 2-6 Exercise2.1 For each of the variables listed below from the line listing in Table 2.1, identify what type of variable it is. A. Nominal B. Ordinal C. Interval D. Ratio ________ 1. Date of diagnosis ________ 2. Town of residence ________ 3. Age (years) ________ 4. Sex ________ 5. Highest alanine aminotransferase (ALT) Check your answers on page 2-59
  • 115.
    Summarizing Data Page 2-7 FrequencyDistributions Look again at the data in Table 2.1. How many of the cases (or case-patients) are male? When a database contains only a limited number of records, you can easily pick out the information you need directly from the raw data. By scanning the 5th column, you can see that 12 of the 20 case-patients are male. With larger databases, however, picking out the desired information at a glance becomes increasingly difficult. To facilitate the task, the variables can be summarized into tables called frequency distributions. A frequency distribution displays the values a variable can take and the number of persons or records with each value. For example, suppose you have data from a study of women with ovarian cancer and wish to look at parity, that is, the number of times each woman has given birth. To construct a frequency distribution that displays these data: • First, list all the values that the variable parity can take, from the lowest possible value to the highest. • Then, for each value, record the number of women who had that number of births (twins and other multiple-birth pregnancies count only once). Table 2.4 displays what the resulting frequency distribution would look like. Notice that the frequency distribution includes all values of parity between the lowest and highest observed, even though there were no women for some values. Notice also that each column is clearly labeled, and that the total is given in the bottom row.
  • 116.
    Summarizing Data Page 2-8 Table2.4 Distribution of Case-Subjects by Parity (Ratio-Scale Variable), Ovarian Cancer Study, CDC Parity Number of Cases 0 45 1 25 2 43 3 32 4 22 5 8 6 2 7 0 8 1 9 0 10 1 Total 179 Data Sources: Lee NC, Wingo PA, Gwinn ML, Rubin GL, Kendrick JS, Webster LA, Ory HW. The reduction in risk of ovarian cancer associated with oral contraceptive use. N Engl J Med 1987;316: 650–5. Centers for Disease Control Cancer and Steroid Hormone Study. Oral contraceptive use and the risk of ovarian cancer. JAMA 1983;249:1596–9. To create a frequency distribution from a data set in Analysis Module: Select frequencies, then choose variable. Table 2.4 displays the frequency distribution for a continuous variable. Continuous variables are often further summarized with measures of central location and measures of spread. Distributions for ordinal and nominal variables are illustrated in Tables 2.5 and 2.6, respectively. Categorical variables are usually further summarized as ratios, proportions, and rates (discussed in Lesson 3). Table 2.5 Distribution of Cases by Stage of Disease (Ordinal-Scale Variable), Ovarian Cancer Study, CDC CASES Stage Number Percent I 45 20 II 11 5 III 104 58 IV 30 17 Total 179 100 Data Sources: Lee NC, Wingo PA, Gwinn ML, Rubin GL, Kendrick JS, Webster LA, Ory HW. The reduction in risk of ovarian cancer associated with oral contraceptive use. N Engl J Med 1987;316: 650–5. Centers for Disease Control Cancer and Steroid Hormone Study. Oral contraceptive use and the risk of ovarian cancer. JAMA 1983;249:1596–9.
  • 117.
    Summarizing Data Page 2-9 Table2.6 Distribution of Cases by Enrollment Site (Nominal-Scale Variable), Ovarian Cancer Study, CDC CASES Enrollment Site Number Percent Atlanta 18 10 Connecticut 39 22 Detroit 35 20 Iowa 30 17 New Mexico 7 4 San Francisco 33 18 Seattle 9 5 Utah 8 4 Total 179 100 Data Sources: Lee NC, Wingo PA, Gwinn ML, Rubin GL, Kendrick JS, Webster LA, Ory HW. The reduction in risk of ovarian cancer associated with oral contraceptive use. N Engl J Med 1987;316: 650–5. Centers for Disease Control Cancer and Steroid Hormone Study. Oral contraceptive use and the risk of ovarian cancer. JAMA 1983;249:1596–9. Epi Info Demonstration: Creating a Frequency Distribution Scenario: In Oswego, New York, numerous people became sick with gastroenteritis after attending a church picnic. To identify all who became ill and to determine the source of illness, an epidemiologist administered a questionnaire to almost all of the attendees. The data from these questionnaires have been entered into an Epi Info file called Oswego. Question: In the outbreak that occurred in Oswego, how many of the participants became ill? Answer: In Epi Info: Select Analyzing Data. Select Read (Import). The default data set should be Sample.mdb. Under Views, scroll down to view OSWEGO, and double click, or click once and then click OK. Select Frequencies. Then click on the down arrow beneath Frequency of, scroll down and select ILL, then click OK. The resulting frequency distribution should indicate 46 ill persons, and 29 persons not ill. Your Turn: How many of the Oswego picnic attendees drank coffee? [Answer: 31]
  • 118.
    Summarizing Data Page 2-10 Exercise2.2 At an influenza immunization clinic at a retirement community, residents were asked in how many previous years they had received influenza vaccine. The answers from the first 19 residents are listed below. Organize these data into a frequency distribution. 2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1 Check your answers on page 2-59
  • 119.
    Summarizing Data Page 2-11 Propertiesof Frequency Distributions Graphing will be covered in Lesson 4 The data in a frequency distribution can be graphed. We call this type of graph a histogram. Figure 2.1 is a graph of the number of outbreak-related salmonellosis cases by date of illness onset. Figure 2.1 Number of Outbreak-Related Salmonellosis Cases by Date of Onset of Illness — United States, June–July 2004 Source: Centers for Disease Control and Prevention. Outbreaks of Salmonella infections associated with eating Roma tomatoes–United States and Canada, 2004. MMWR 54;325–8. Even a quick look at this graph reveals three features: • where the distribution has its peak (central location), • how widely dispersed it is on both sides of the peak (spread), and • whether it is more or less symmetrically distributed on the two sides of the peak. Central location Note that the data in Figure 2.1 seem to cluster around a central value, with progressively fewer persons on either side of this central value. This type of symmetric distribution, as illustrated in Figure 2.2, is the classic bell-shaped curve — also known as a normal distribution. The clustering at a particular value is known as the central location or central tendency of a frequency distribution. The central location of a distribution is one of its most important properties. Sometimes it is cited as a single value that summarizes the entire distribution. Figure 2.3 illustrates the graphs of three frequency distributions identical in shape but with different central locations.
  • 120.
    Summarizing Data Page 2-12 Figure2.2 Bell-Shaped Curve Figure 2.3 Three Identical Curves with Different Central Locations Three measures of central location are commonly used in epidemiology: arithmetic mean, median, and mode. Two other measures that are used less often are the midrange and geometric mean. All of these measures will be discussed later in this lesson. Depending on the shape of the frequency distribution, all measures of central location can be identical or different. Additionally, measures of central location can be in the middle or off to one side or the other.
  • 121.
    Summarizing Data Page 2-13 Spread Asecond property of frequency distribution is spread (also called variation or dispersion). Spread refers to the distribution out from a central value. Two measures of spread commonly used in epidemiology are range and standard deviation. For most distributions seen in epidemiology, the spread of a frequency distribution is independent of its central location. Figure 2.4 illustrates three theoretical frequency distributions that have the same central location but different amounts of spread. Measures of spread will be discussed later in this lesson. Figure 2.4 Three Distributions with Same Central Location but Different Spreads Shape A third property of a frequency distribution is its shape. The graphs of the three theoretical frequency distributions in Figure 2.4 were completely symmetrical. Frequency distributions of some characteristics of human populations tend to be symmetrical. On the other hand, the data on parity in Figure 2.5 are asymmetrical or more commonly referred to as skewed. Skewness refers to the tail, not the hump. So a distribution that is skewed to the left has a long left tail.
  • 122.
    Summarizing Data Page 2-14 Figure2.5 Distribution of Case-Subjects by Parity, Ovarian Cancer Study, CDC Data Sources: Lee NC, Wingo PA, Gwinn ML, Rubin GL, Kendrick JS, Webster LA, Ory HW. The reduction in risk of ovarian cancer associated with oral contraceptive use. N Engl J Med 1987;316: 650–5. Centers for Disease Control Cancer and Steroid Hormone Study. Oral contraceptive use and the risk of ovarian cancer. JAMA 1983;249:1596–9. A distribution that has a central location to the left and a tail off to the right is said to be positively skewed or skewed to the right. In Figure 2.6, distribution A is skewed to the right. A distribution that has a central location to the right and a tail to the left is said to be negatively skewed or skewed to the left. In Figure 2.6, distribution C is skewed to the left. Figure 2.6 Three Distributions with Different Skewness
  • 123.
    Summarizing Data Page 2-15 Question:How would you describe the parity data in Figure 2.5? Answer: Figure 2.5 is skewed to the right. Skewing to the right is common in distributions that begin with zero, such as number of servings consumed, number of sexual partners in the past month, and number of hours spent in vigorous exercise in the past week. One distribution deserves special mention — the Normal or Gaussian distribution. This is the classic symmetrical bell-shaped curve like the one shown in Figure 2.2. It is defined by a mathematical equation and is very important in statistics. Not only do the mean, median, and mode coincide at the central peak, but the area under the curve helps determine measures of spread such as the standard deviation and confidence interval covered later in this lesson. Methods for Summarizing Data Knowing the type of variable helps you decide how to summarize the data. Table 2.7 displays the ways in which different variables might be summarized. Table 2.7 Methods for Summarizing Different Types of Variables Scale Ratio or Proportion Measure of Central Location Measure of Spread Nominal yes no no Ordinal yes no no Interval yes, but might need to group first yes yes Ratio yes, but might need to group first yes yes
  • 124.
    Summarizing Data Page 2-16 Measureof central location: a single, usually central, value that best represents an entire distribution of data. Measures of Central Location A measure of central location provides a single value that summarizes an entire distribution of data. Suppose you had data from an outbreak of gastroenteritis affecting 41 persons who had recently attended a wedding. If your supervisor asked you to describe the ages of the affected persons, you could simply list the ages of each person. Alternatively, your supervisor might prefer one summary number — a measure of central location. Saying that the mean (or average) age was 48 years rather than reciting 41 ages is certainly more efficient, and most likely more meaningful. Measures of central location include the mode, median, arithmetic mean, midrange, and geometric mean. Selecting the best measure to use for a given distribution depends largely on two factors: • The shape or skewness of the distribution, and • The intended use of the measure. Each measure — what it is, how to calculate it, and when best to use it — is described in this section. Mode Definition of mode The mode is the value that occurs most often in a set of data. It can be determined simply by tallying the number of times each value occurs. Consider, for example, the number of doses of diphtheria- pertussis-tetanus (DPT) vaccine each of seventeen 2-year-old children in a particular village received: 0, 0, 1, 1, 2, 2, 2, 3, 3, 3, 3, 3, 3, 4, 4, 4, 4 Two children received no doses; two children received 1 dose; three received 2 doses; six received 3 doses; and four received all 4 doses. Therefore, the mode is 3 doses, because more children received 3 doses than any other number of doses. Method for identifying the mode Step 1. Arrange the observations into a frequency distribution, indicating the values of the variable and the frequency with which each value occurs. (Alternatively, for a data set with only a few values, arrange the actual values in ascending order, as was done with the DPT vaccine doses above.) Identify the value that occurs most often.
  • 125.
    Summarizing Data Page 2-17 EXAMPLES:Identifying the Mode Example A: Table 2.8 (on page 2-17) provides data from 30 patients who were hospitalized and received antibiotics. For the variable “length of stay” (LOS) in the hospital, identify the mode. Step 1. Arrange the data in a frequency distribution. LOS Frequency LOS Frequency LOS Frequency 0 1 10 5 20 0 1 0 11 1 21 0 2 1 12 3 22 1 3 1 13 1 . 0 4 1 14 1 . 0 5 2 15 0 27 1 6 1 16 1 . 0 7 1 17 0 . 0 8 1 18 2 49 1 9 3 19 1 Alternatively, arrange the values in ascending order. 0, 2, 3, 4, 5, 5, 6, 7, 8, 9, 9, 9, 10, 10, 10, 10, 10, 11, 12, 12, 12, 13, 14, 16, 18, 18, 19, 22, 27, 49, Step 2. Identify the value that occurs most often. Most values appear once, but the distribution includes two 5s, three 9s, five 10s, three 12s, and two 18s. Because 10 appears most frequently, the mode is 10. Example B: Find the mode of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days. Step 1. Arrange the values in ascending order. 15, 22, 27, 30, and 31 days Step 2. Identify the value that occurs most often. None Note: When no value occurs more than once, the distribution is said to have no mode. Example C: Find the mode of the following incubation periods for Bacillus cereus food poisoning: 2, 3, 3, 3, 3, 3, 4, 4, 5, 6, 7, 9, 10, 11, 11, 12, 12, 12, 12, 12, 14, 14, 15, 17, 18, 20, 21 hours Step 1. Arrange the values in ascending order. Done Step 2. Identify the values that occur most often. Five 3s and five 12s Example C illustrates the fact that a frequency distribution can have more than one mode. When this occurs, the distribution is said to be bi-modal. Indeed, Bacillus cereus is known to cause two syndromes with different incubation periods: a short-incubation-period (1–6 hours) syndrome characterized by vomiting; and a long- incubation-period (6–24 hours) syndrome characterized by diarrhea.
  • 126.
    Summarizing Data Page 2-18 Table2.8 Sample Data from the Northeast Consortium Vancomycin Quality Improvement Project ID Admission Date Discharge Date LOS DOB (mm/dd) DOB (year) Age Sex ESRD No. Days Vancomycin Vancomycin OK? 1 1/01 1/10 9 11/18 1928 66 M Y 3 N 2 1/08 1/30 22 01/21 1916 78 F N 10 Y 3 1/16 3/06 49 04/22 1920 74 F N 32 Y 4 1/23 2/04 12 05/14 1919 75 M N 5 Y 5 1/24 2/01 8 08/17 1929 65 M N 4 N 6 1/27 2/14 18 01/11 1918 77 M N 6 Y 7 2/06 2/16 10 01/09 1920 75 F N 2 Y 8 2/12 2/22 10 06/12 1927 67 M N 1 N 9 2/22 3/04 10 05/09 1915 79 M N 8 N 10 2/22 3/08 14 04/09 1920 74 F N 10 N 11 2/25 3/04 7 07/28 1915 79 F N 4 N 12 3/02 3/14 12 04/24 1928 66 F N 8 N 13 3/11 3/17 6 11/09 1925 69 M N 3 N 14 3/18 3/23 5 04/08 1924 70 F N 2 N 15 3/19 3/28 9 09/13 1915 79 F N 1 Y 16 3/27 4/01 5 01/28 1912 83 F N 4 Y 17 3/31 4/02 2 03/14 1921 74 M N 2 Y 18 4/12 4/24 12 02/07 1927 68 F N 3 N 19 4/17 5/06 19 03/04 1921 74 F N 11 Y 20 4/29 5/26 27 02/23 1921 74 F N 14 N 21 5/11 5/15 4 05/05 1923 72 M N 4 Y 22 5/14 5/14 0 01/03 1911 84 F N 1 N 23 5/20 5/30 10 11/11 1922 72 F N 9 Y 24 5/21 6/08 18 08/08 1912 82 M N 14 Y 25 5/26 6/05 10 09/28 1924 70 M Y 5 N 26 5/27 5/30 3 05/14 1899 96 F N 2 N 27 5/28 6/06 9 07/22 1921 73 M N 1 Y 28 6/07 6/20 13 12/30 1896 98 F N 3 N 29 6/07 6/23 16 08/31 1906 88 M N 1 N 30 6/16 6/27 11 07/07 1917 77 F N 7 Y
  • 127.
    Summarizing Data Page 2-19 Propertiesand uses of the mode The mode is the easiest measure of central location to understand and explain. It is also the easiest to identify, and requires no calculations. • The mode is the preferred measure of central location for addressing which value is the most popular or the most common. For example, the mode is used to describe which day of the week people most prefer to come to the influenza vaccination clinic, or the “typical” number of doses of DPT the children in a particular community have received by their second birthday. • As demonstrated, a distribution can have a single mode. However, a distribution has more than one mode if two or more values tie as the most frequent values. It has no mode if no value appears more than once. • The mode is used almost exclusively as a “descriptive” measure. It is almost never used in statistical manipulations or analyses. • The mode is not typically affected by one or two extreme values (outliers). To identify the mode from a data set in Analysis Module: Epi Info does not have a Mode command. Thus, the best way to identify the mode is to create a histogram and look for the tallest column(s). Select graphs, then choose histogram under Graph Type. The tallest column(s) is(are) the mode(s). NOTE: The Means command provides a mode, but only the lowest value if a distribution has more than one mode.
  • 128.
    Summarizing Data Page 2-20 Exercise2.3 Using the same vaccination data as in Exercise 2.2, find the mode. (If you answered Exercise 2.2, find the mode from your frequency distribution.) 2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1 Check your answers on page 2-59
  • 129.
    Summarizing Data Page 2-21 Median Definitionof median The median is the middle value of a set of data that has been put into rank order. Similar to the median on a highway that divides the road in two, the statistical median is the value that divides the data into two halves, with one half of the observations being smaller than the median value and the other half being larger. The median is also the 50th percentile of the distribution. Suppose you had the following ages in years for patients with a particular illness: 4, 23, 28, 31, 32 The median age is 28 years, because it is the middle value, with two values smaller than 28 and two values larger than 28. Method for identifying the median Step 1. Arrange the observations into increasing or decreasing order. Step 2. Find the middle position of the distribution by using the following formula: Middle position = (n + 1) / 2 a. If the number of observations (n) is odd, the middle position falls on a single observation. b. If the number of observations is even, the middle position falls between two observations. Step 3. Identify the value at the middle position. a. If the number of observations (n) is odd and the middle position falls on a single observation, the median equals the value of that observation. b. If the number of observations is even and the middle position falls between two observations, the median equals the average of the two values. To identify the median from a data set in Analysis Module: Click on the Means command under the Statistics folder. In the Means Of drop- down box, select the variable of interest  Select Variable Click OK  You should see the list of the frequency by the variable you selected. Scroll down until you see the Median among other data.
  • 130.
    Summarizing Data Page 2-22 EXAMPLES:Identifying the Median Example A: Odd Number of Observations Find the median of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days. Step 1. Arrange the values in ascending order. 15, 22, 27, 30, and 31 days Step 2. Find the middle position of the distribution by using (n + 1) / 2. Middle position = (5 + 1) / 2 = 6 / 2 = 3 Therefore, the median will be the value at the third observation. Step 3. Identify the value at the middle position. Third observation = 27 days Example B: Even Number of Observations Suppose a sixth case of hepatitis was reported. Now find the median of the following incubation periods for hepatitis A: 27, 31, 15, 30, 22 and 29 days. Step 1. Arrange the values in ascending order. 15, 22, 27, 29, 30, and 31 days Step 2. Find the middle position of the distribution by using (n + 1) / 2. Middle location = 6 + 1 / 2 = 7 / 2 = 3½ Therefore, the median will be a value halfway between the values of the third and fourth observations. Step 3. Identify the value at the middle position. The median equals the average of the values of the third (value = 27) and fourth (value = 29) observations: Median = (27 + 29) / 2 = 28 days
  • 131.
    Summarizing Data Page 2-23 EpiInfo Demonstration: Finding the Median Question: In the data set named SMOKE, what is the median number of cigarettes smoked per day? Answer: In Epi Info: Select Analyze Data. Select Read (Import). The default data set should be Sample.mdb. Under Views, scroll down to view SMOKE, and double click, or click once and then click OK. Select Means. Then click on the down arrow beneath Means of, scroll down and select NUMCIGAR, then click OK. The resulting output should indicate a median of 20 cigarettes smoked per day. Your Turn: What is the median height of the participants in the smoking study? (Note: The variable is coded as feet-inch-inch, so 5'1" is coded as 501.) [Answer: 503] Properties and uses of the median • The median is a good descriptive measure, particularly for data that are skewed, because it is the central point of the distribution. • The median is relatively easy to identify. It is equal to either a single observed value (if odd number of observations) or the average of two observed values (if even number of observations). • The median, like the mode, is not generally affected by one or two extreme values (outliers). For example, if the values on the previous page had been 4, 23, 28, 31, and 131 (instead of 31), the median would still be 28. • The median has less-than-ideal statistical properties. Therefore, it is not often used in statistical manipulations and analyses.
  • 132.
    Summarizing Data Page 2-24 Exercise2.4 Determine the median for the same vaccination data used in Exercises 2.2. and 2.3. 2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1 Check your answers on page 2-59
  • 133.
    Summarizing Data Page 2-25 Arithmeticmean Definition of mean The arithmetic mean is a more technical name for what is more commonly called the mean or average. The arithmetic mean is the value that is closest to all the other values in a distribution. Method for calculating the mean Step 1.Add all of the observed values in the distribution. Step 2.Divide the sum by the number of observations. EXAMPLE: Finding the Mean Find the mean of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days. Step 1. Add all of the observed values in the distribution. 27 + 31 + 15 + 30 + 22 = 125 Step 2. Divide the sum by the number of observations. 125 / 5 = 25.0 Therefore, the mean incubation period is 25.0 days. • The mean has excellent statistical properties and is commonly used in additional statistical manipulations and analyses. One such property is called the centering property of the mean. When the mean is subtracted from each observation in the data set, the sum of these differences is zero (i.e., the negative sum is equal to the positive sum). For the data in the previous hepatitis A example: Value minus Mean Difference 15 – 25.0 -10.0 22 – 25.0 -3.0 27 – 25.0 + 2.0 30 – 25.0 + 5.0 31 – 25.0 + 6.0 125 – 125.0 = 0 + 13.0 - 13.0 = 0 To identify the mean from a data set in Analysis Module: Click on the Means command under the Statistics folder In the Means Of drop- down box, select the variable of interest  Select Variable Click OK  You should see the list of the frequency by the variable you selected. Scroll down until you see the Mean among other data. Properties and uses of the arithmetic mean
  • 134.
    Summarizing Data Page 2-26 Thisdemonstrates that the mean is the arithmetic center of the distribution. • Because of this centering property, the mean is sometimes called the center of gravity of a frequency distribution. If the frequency distribution is plotted on a graph, and the graph is balanced on a fulcrum, the point at which the distribution would balance would be the mean. • The arithmetic mean is the best descriptive measure for data that are normally distributed. • On the other hand, the mean is not the measure of choice for data that are severely skewed or have extreme values in one direction or another. Because the arithmetic mean uses all of the observations in the distribution, it is affected by any extreme value. Suppose that the last value in the previous distribution was 131 instead of 31. The mean would be 225 / 5 = 45.0 rather than 25.0. As a result of one extremely large value, the mean is much larger than all values in the distribution except the extreme value (the “outlier”). Epi Info Demonstration: Finding the Median Question: In the data set named SMOKE, what is the mean weight of the participants? Answer: In Epi Info: Select Analyze Data. Select Read (Import). The default data set should be Sample.mdb. Under Views, scroll down to view SMOKE, and double click, or click once and then click OK. Note that 9 persons have a weight of 777, and 10 persons have a weight of 999. These are code for “refused” and “missing.” To delete these records, enter the following commands: Click on Select. Then type in the weight < 770, or select weight from available values, then type < 750, and click on OK. Select Means. Then click on the down arrow beneath Means of, scroll down and select WEIGHT, then click OK. The resulting output should indicate a mean weight of 158.116 pounds. Your Turn: What is the mean number of cigarettes smoked per day? [Answer: 17] Mean: the center of gravity of the distribution
  • 135.
    Summarizing Data Page 2-27 Exercise2.5 Determine the mean for the same set of vaccination data. 2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1 Check your answers on page 2-60
  • 136.
    Summarizing Data Page 2-28 Themidrange (midpoint of an interval) Definition of midrange The midrange is the half-way point or the midpoint of a set of observations. The midrange is usually calculated as an intermediate step in determining other measures. Method for identifying the midrange Step 1. Identify the smallest (minimum) observation and the largest (maximum) observation. Step 2. Add the minimum plus the maximum, then divide by two. Exception: Age differs from most other variables because age does not follow the usual rules for rounding to the nearest integer. Someone who is 17 years and 360 days old cannot claim to be 18 year old for at least 5 more days. Thus, to identify the midrange for age (in years) data, you must add the smallest (minimum) observation plus the largest (maximum) observation plus 1, then divide by two. Midrange (most types of data) = (minimum + maximum) / 2 Midrange (age data) = (minimum + maximum + 1) / 2 Consider the following example: In a particular pre-school, children are assigned to rooms on the basis of age on September 1. Room 2 holds all of the children who were at least 2 years old but not yet 3 years old as of September 1. In other words, every child in room 2 was 2 years old on September 1. What is the midrange of ages of the children in room 2 on September 1? For descriptive purposes, a reasonable answer is 2. However, recall that the midrange is usually calculated as an intermediate step in other calculations. Therefore, more precision is necessary. Consider that children born in August have just turned 2 years old. Others, born in September the previous year, are almost but not quite 3 years old. Ignoring seasonal trends in births and assuming a very large room of children, birthdays are expected to be uniformly distributed throughout the year. The youngest child, born on September 1, is exactly 2.000 years old. The oldest child, whose birthday is September 2 of the previous year, is 2.997 years old. For statistical purposes, the mean and midrange of this theoretical group of 2-year-olds are both 2.5 years.
  • 137.
    Summarizing Data Page 2-29 Propertiesand uses of the midrange • The midrange is not commonly reported as a measure of central location. • The midrange is more commonly used as an intermediate step in other calculations, or for plotting graphs of data collected in intervals. EXAMPLES: Identifying the Midrange Example A: Find the midrange of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days. Step 1. Identify the minimum and maximum values. Minimum = 15, maximum = 31 Step 2. Add the minimum plus the maximum, then divide by two. Midrange = 15 + 31 / 2 = 46 / 2 = 23 days Example B: Find the midrange of the grouping 15–24 (e.g., number of alcoholic beverages consumed in one week). Step 1. Identify the minimum and maximum values. Minimum = 15, maximum = 24 Step 2. Add the minimum plus the maximum, then divide by two. Midrange = 15 + 24 / 2 = 39 / 2 = 19.5 This calculation assumes that the grouping 15–24 really covers 14.50–24.49…. Since the midrange of 14.50–24.49… = 19.49…, the midrange can be reported as 19.5. Example C: Find the midrange of the age group 15–24 years. Step 1. Identify the minimum and maximum values. Minimum = 15, maximum = 24 Step 2. Add the minimum plus the maximum plus 1, then divide by two. Midrange = (15 + 24 + 1) / 2 = 40 / 2 = 20 years Age differs from the majority of other variables because age does not follow the usual rules for rounding to the nearest integer. For most variables, 15.99 can be rounded to 16. However, an adolescent who is 15 years and 360 days old cannot claim to be 16 years old (and hence get his driver’s license or learner’s permit) for at least 5 more days. Thus, the interval of 15–24 years really spans 15.0–24.99… years. The midrange of 15.0 and 24.99… = 19.99… = 20.0 years.
  • 138.
    Summarizing Data Page 2-30 Geometricmean Definition of geometric mean The geometric mean is the mean or average of a set of data measured on a logarithmic scale. The geometric mean is used when the logarithms of the observations are distributed normally (symmetrically) rather than the observations themselves. The geometric mean is particularly useful in the laboratory for data from serial dilution assays (1/2, 1/4, 1/8, 1/16, etc.) and in environmental sampling data. To calculate the geometric mean, you need a scientific calculator with log and yx keys. More About Logarithms A logarithm is the power to which a base is raised. To what power would you need to raise a base of 10 to get a value of 100? Because 10 times 10 or 102 equals 100, the log of 100 at base 10 equals 2. Similarly, the log of 16 at base 2 equals 4, because 24 = 2 x 2 x 2 x 2 = 16. 20 = 1 (anything raised to the 0 power is 1) 21 = 2 = 2 22 = 2 x 2 = 4 23 = 2 x 2 x 2 = 8 24 = 2 x 2 x 2 x 2 = 16 25 = 2 x 2 x 2 x 2 x 2 = 32 26 = 2 x 2 x 2 x 2 x 2 x 2 = 64 27 = 2 x 2 x 2 x 2 x 2 x 2 x 2 = 128 and so on. 100 = 1 (Anything raised to the 0 power equals 1) 101 = 10 102 = 100 103 = 1,000 104 = 10,000 105 = 100,000 106 = 1,000,000 107 = 10,000,000 and so on. An antilog raises the base to the power (logarithm). For example, the antilog of 2 at base 10 is 102 , or 100. The antilog of 4 at base 2 is 24 , or 16. The majority of titers are reported as multiples of 2 (e.g., 2, 4, 8, etc.); therefore, base 2 is typically used when dealing with titers. Method for calculating the geometric mean There are two methods for calculating the geometric mean. Method A Step 1. Take the logarithm of each value. Step 2. Calculate the mean of the log values by summing the log values, then dividing by the number of observations. Step 3. Take the antilog of the mean of the log values to get the geometric mean. Method B Step 1. Calculate the product of the values by multiplying all of the values together. Step 2. Take the nth root of the product (where n is the number of observations) to get the geometric mean.
  • 139.
    Summarizing Data Page 2-31 EXAMPLES:Calculating the Geometric Mean Example A: Using Method A Calculate the geometric mean from the following set of data. 10, 10, 100, 100, 100, 100, 10,000, 100,000, 100,000, 1,000,000 Because these values are all multiples of 10, it makes sense to use logs of base 10. Step 1. Take the log (in this case, to base 10) of each value. log10(xi) = 1, 1, 2, 2, 2, 2, 4, 5, 5, 6 Step 2. Calculate the mean of the log values by summing and dividing by the number of observations (in this case, 10). Mean of log10(xi) = (1+1+2+2+2+2+4+5+5+6) / 10 = 30 / 10 = 3 Step 3. Take the antilog of the mean of the log values to get the geometric mean. Antilog10(3) = 103 = 1,000. The geometric mean of the set of data is 1,000. Example B: Using Method B Calculate the geometric mean from the following 95% confidence intervals of an odds ratio: 1.0, 9.0. Step 1. Calculate the product of the values by multiplying all values together. 1.0 x 9.0 = 9.0 Step 2. Take the square root of the product. The geometric mean = square root of 9.0 = 3.0.
  • 140.
    Summarizing Data Page 2-32 Propertiesand uses of the geometric mean The geometric mean is the average of logarithmic values, converted back to the base. The geometric mean tends to dampen the effect of extreme values and is always smaller than the corresponding arithmetic mean. In that sense, the geometric mean is less sensitive than the arithmetic mean to one or a few extreme values. • The geometric mean is the measure of choice for variables measured on an exponential or logarithmic scale, such as dilutional titers or assays. • The geometric mean is often used for environmental samples, when levels can range over several orders of magnitude. For example, levels of coliforms in samples taken from a body of water can range from less than 100 to more than 100,000. Scientific Calculator Tip On most scientific calculators, the sequence for calculating a geometric mean is: • Enter a data point. • Press either the <Log> or <Ln> function key. • Record the result or store it in memory. • Repeat for all values. • Calculate the mean or average of these log values. • Calculate the antilog value of this mean (<10x > key if you used <Log> key, <ex > key if you used <Ln> key). Practice: Find the geometric mean of 10, 100 and 1000 using a scientific calculator. Enter: Calculator Displays: 10 10 LOG 1 + 1 100 100 LOG 2 + 3 1000 1000 LOG 3 = 6 3 3 = 2 10x 100
  • 141.
    Summarizing Data Page 2-33 Exercise2.6 Using the dilution titers shown below, calculate the geometric mean titer of convalescent antibodies against tularemia among 10 residents of Martha’s Vineyard. [Hint: Use only the second number in the ratio, i.e., for 1:640, use 640.] ID # Acute Convalescent 1 1:16 1:512 2 1:16 1:512 3 1:32 1:128 4 not done 1:512 5 1:32 1:1024 6 “negative” 1:1024 7 1:256 1:2048 8 1:32 1:128 9 “negative” 1:4096 10 1:16 1:1024 Check your answers on page 2-60
  • 142.
    Summarizing Data Page 2-34 Selectingthe appropriate measure Measures of central location are single values that summarize the observed values of a distribution. The mode provides the most common value, the median provides the central value, the arithmetic mean provides the average value, the midrange provides the midpoint value, and the geometric mean provides the logarithmic average. The mode and median are useful as descriptive measures. However, they are not often used for further statistical manipulations. In contrast, the mean is not only a good descriptive measure, but it also has good statistical properties. The mean is used most often in additional statistical manipulations. While the arithmetic mean is the measure of choice when data are normally distributed, the median is the measure of choice for data that are not normally distributed. Because epidemiologic data tend not to be normally distributed (incubation periods, doses, ages of patients), the median is often preferred. The geometric mean is used most commonly with laboratory data, particularly dilution titers or assays and environmental sampling data. The arithmetic mean uses all the data, which makes it sensitive to outliers. Although the geometric mean also uses all the data, it is not as sensitive to outliers as the arithmetic mean. The midrange, which is based on the minimum and maximum values, is more sensitive to outliers than any other measures. The mode and median tend not to be affected by outliers. In summary, each measure of central location — mode, median, mean, midrange, and geometric mean — is a single value that is used to represent all of the observed values of a distribution. Each measure has its advantages and limitations. The selection of the most appropriate measure requires judgment based on the characteristics of the data (e.g., normally distributed or skewed, with or without outliers, arithmetic or log scale) and the reason for calculating the measure (e.g., for descriptive or analytic purposes).
  • 143.
    Summarizing Data Page 2-35 Exercise2.7 For each of the variables listed below from the line listing in Table 2.9, identify which measure of central location is best for representing the data. A. Mode B. Median C. Mean D. Geometric mean E. No measure of central location is appropriate _____ 1. Year of diagnosis _____ 2. Age (years) _____ 3. Sex _____ 4. Highest IFA titer _____ 5. Platelets x 106 /L _____ 6. White blood cell count x 109 /L Table 2.9 Line Listing for 12 Patients with Human Monocytotropic Ehrlichiosis — Missouri, 1998–1999 Patient ID Year of Diagnosis Age (years) Sex Highest IFA* Titer Platelets x 106 /L White Blood Cell Count x 109 /L 01 1999 44 M 1:1024 90 1.9 02 1999 42 M 1:512 114 3.5 03 1999 63 M 1:2048 83 6.4 04 1999 53 F 1:512 180 4.5 05 1999 77 M 1:1024 44 3.5 06 1999 43 F 1:512 89 1.9 10 1998 22 F 1:128 142 2.1 11 1998 59 M 1:256 229 8.8 12 1998 67 M 1:512 36 4.2 14 1998 49 F 1:4096 271 2.6 15 1998 65 M 1:1024 207 4.3 18 1998 27 M 1:64 246 8.5 Mean: 1998.5 50.92 na 1:976.00 144.25 4.35 Median: 1998.5 51 na 1:512 128 3.85 Geometric Mean: 1998.5 48.08 na 1:574.70 120.84 3.81 Mode: none none M 1:512 none 1.9, 3.5 * Immunofluorescence assay Data Source: Olano JP, Masters E, Hogrefe W, Walker DH. Human monocytotropic ehrlichiosis, Missouri. Emerg Infect Dis 2003;9:1579-86. Check your answers on page 2-60
  • 144.
    Summarizing Data Page 2-36 Measuresof Spread Spread, or dispersion, is the second important feature of frequency distributions. Just as measures of central location describe where the peak is located, measures of spread describe the dispersion (or variation) of values from that peak in the distribution. Measures of spread include the range, interquartile range, and standard deviation. Range Definition of range The range of a set of data is the difference between its largest (maximum) value and its smallest (minimum) value. In the statistical world, the range is reported as a single number and is the result of subtracting the maximum from the minimum value. In the epidemiologic community, the range is usually reported as “from (the minimum) to (the maximum),” that is, as two numbers rather than one. Method for identifying the range Step 1. Identify the smallest (minimum) observation and the largest (maximum) observation. Step 2. Epidemiologically, report the minimum and maximum values. Statistically, subtract the minimum from the maximum value. EXAMPLE: Identifying the Range Find the range of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days. Step 1. Identify the minimum and maximum values. Minimum = 15, maximum = 31 Step 2. Subtract the minimum from the maximum value. Range = 31–15 = 16 days For an epidemiologic or lay audience, you could report that “incubation periods ranged from 15 to 31 days.” Statistically, that range is 16 days.
  • 145.
    Summarizing Data Page 2-37 Percentiles Percentilesdivide the data in a distribution into 100 equal parts. The Pth percentile (P ranging from 0 to 100) is the value that has P percent of the observations falling at or below it. In other words, the 90th percentile has 90% of the observations at or below it. The median, the halfway point of the distribution, is the 50th percentile. The maximum value is the 100th percentile, because all values fall at or below the maximum. Quartiles Sometimes, epidemiologists group data into four equal parts, or quartiles. Each quartile includes 25% of the data. The cut-off for the first quartile is the 25th percentile. The cut-off for the second quartile is the 50th percentile, which is the median. The cut-off for the third quartile is the 75th percentile. And the cut-off for the fourth quartile is the 100th percentile, which is the maximum. Interquartile range The interquartile range is a measure of spread used most commonly with the median. It represents the central portion of the distribution, from the 25th percentile to the 75th percentile. In other words, the interquartile range includes the second and third quartiles of a distribution. The interquartile range thus includes approximately one half of the observations in the set, leaving one quarter of the observations on each side. Method for determining the interquartile range Step 1. Arrange the observations in increasing order. Step 2. Find the position of the 1st and 3rd quartiles with the following formulas. Divide the sum by the number of observations. Position of 1st quartile (Q1) = 25th percentile = (n + 1) / 4 Position of 3rd quartile (Q3) = 75th percentile = 3(n + 1) / 4 = 3 × Q1 Step 3. Identify the value of the 1st and 3rd quartiles. a. If a quartile lies on an observation (i.e., if its position is a whole number), the value of the quartile is the value of that observation. For example, if the position of a quartile is 20, its value is the value of the 20th observation. b. If a quartile lies between observations, the value of
  • 146.
    Summarizing Data Page 2-38 thequartile is the value of the lower observation plus the specified fraction of the difference between the observations. For example, if the position of a quartile is 20¼, it lies between the 20th and 21st observations, and its value is the value of the 20th observation, plus ¼ the difference between the value of the 20th and 21st observations. Step 4. Epidemiologically, report the values at Q1 and Q3. Statistically, calculate the interquartile range as Q3 minus Q1. Figure 2.7 The Middle Half of the Observations in a Frequency Distribution Lie within the Interquartile Range
  • 147.
    Summarizing Data Page 2-39 EXAMPLE:Finding the Interquartile Range Find the interquartile range for the length of stay data in Table 2.8 on page 2-17. Step 1. Arrange the observations in increasing order. 0, 2, 3, 4, 5, 5, 6, 7, 8, 9, 9, 9, 10, 10, 10, 10, 10, 11, 12, 12, 12, 13, 14, 16, 18, 18, 19, 22, 27, 49 Step 2. Find the position of the 1st and 3rd quartiles. Note that the distribution has 30 observations. Position of Q1 = (n + 1) / 4 = (30 + 1) / 4 = 7.75 Position of Q3 = 3(n + 1) / 4 = 3(30 + 1) / 4 = 23.25 Thus, Q1 lies ¾ of the way between the 7th and 8th observations, and Q3 lies ¼ of the way between the 23rd and 24th observations. Step 3. Identify the value of the 1st and 3rd quartiles (Q1 and Q3). Value of Q1: The position of Q1 is 7¾; therefore, the value of Q1 is equal to the value of the 7th observation plus ¾ of the difference between the values of the 7th and 8th observations: Value of the 7th observation: 6 Value of the 8th observation: 7 Q1 = 6 + ¾(7 − 6) = 6 + ¾(1) = 6.75 Value of Q3: The position of Q3 was 23¼; thus, the value of Q3 is equal to the value of the 23rd observation plus ¼ of the difference between the value of the 23rd and 24th observations: Value of the 23rd observation: 14 Value of the 24th observation: 16 Q3 = 14 + ¼(16 − 14) = 14 + ¼(2) = 14 + (2 / 4) = 14.5 Step 4. Calculate the interquartile range as Q3 minus Q1 . Q3 = 14.5 Q1 = 6.75 Interquartile range = 14.5 − 6.75 = 7.75 As indicated above, the median for the length of stay data is 10. Note that the distance between Q1 and the median is 10 – 6.75 = 3.25. The distance between Q3 and the median is 14.5 – 10 = 4.5. This indicates that the length of stay data is skewed slightly to the right (to the longer lengths of stay).
  • 148.
    Summarizing Data Page 2-40 EpiInfo Demonstration: Finding the Interquartile Range Question: In the data set named SMOKE, what is the interquartile range for the weight of the participants? Answer: In Epi Info: Select Analyze Data. Select Read (Import). The default data set should be Sample.mdb. Under Views, scroll down to view SMOKE, and double click, or click once and then click OK. Click on Select. Then type in weight < 770, or select weight from available values, then type < 770, and click on OK. Select Means. Then click on the down arrow beneath Means of, scroll down and select WEIGHT, then click OK. Scroll to the bottom of the output to find the first quartile (25% = 130) and the third quartile (75% = 180). So the interquartile range runs from 130 to 180 pounds, for a range of 50 pounds. Your Turn: What is the interquartile range of height of study participants? [Answer: 506 to 777] Properties and uses of the interquartile range • The interquartile range is generally used in conjunction with the median. Together, they are useful for characterizing the central location and spread of any frequency distribution, but particularly those that are skewed. • For a more complete characterization of a frequency distribution, the 1st and 3rd quartiles are sometimes used with the minimum value, the median, and the maximum value to produce a five-number summary of the distribution. For example, the five-number summary for the length of stay data is: Minimum value = 0, Q1 = 6.75, Median = 10, Q3 = 14.5, and Maximum value = 49. • Together, the five values provide a good description of the center, spread, and shape of a distribution. These five values can be used to draw a graphical illustration of the data, as in the boxplot in Figure 2.8.
  • 149.
    Summarizing Data Page 2-41 Figure2.8 Interquartile Range from Cumulative Frequencies Some statistical analysis software programs such as Epi Info produce frequency distributions with three output columns: the number or count of observations for each value of the distribution, the percentage of observations for that value, and the cumulative percentage. The cumulative percentage, which represents the percentage of observations at or below that value, gives you the percentile (see Table 2.10). Table 2.10 Frequency Distribution of Length of Hospital Stay, Sample Data, Northeast Consortium Vancomycin Quality Improvement Project Length of Stay (Days) Frequency Percent Cumulative Percent 0 1 3.3 3.3 2 1 3.3 6.7 3 1 3.3 10.0 4 1 3.3 13.3 5 2 6.7 20.0 6 1 3.3 23.3 7 1 3.3 26.7 8 1 3.3 30.0 9 3 10.0 40.0 10 5 16.7 56.7 11 1 3.3 60.0 12 3 10.0 70.0 13 1 3.3 73.3 14 1 3.3 76.7 16 1 3.3 80.0 18 2 6.7 86.7 19 1 3.3 90.0 22 1 3.3 93.3 27 1 3.3 96.7 49 1 3.3 100.0 Total 30 100.0 A shortcut to calculating Q1, the median, and Q3 by hand is to look at the tabular output from these software programs and note which values include 25%, 50%, and 75% of the data, respectively. This
  • 150.
    Summarizing Data Page 2-42 shortcutmethod gives slightly different results than those you would calculate by hand, but usually the differences are minor. For example, the output in Table 2.10 indicates that the 25th , 50th , and 75th percentiles correspond to lengths of stay of 7, 10 and 14 days, not substantially different from the 6.75, 10 and 14.5 days calculated above.
  • 151.
    Summarizing Data Page 2-43 Exercise2.8 Determine the first and third quartiles and interquartile range for the same vaccination data as in the previous exercises. 2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1 Check your answers on page 2-60
  • 152.
    Summarizing Data Page 2-44 Standarddeviation Definition of standard deviation The standard deviation is the measure of spread used most commonly with the arithmetic mean. Earlier, the centering property of the mean was described — subtracting the mean from each observation and then summing the differences adds to 0. This concept of subtracting the mean from each observation is the basis for the standard deviation. However, the difference between the mean and each observation is squared to eliminate negative numbers. Then the average is calculated and the square root is taken to get back to the original units. Method for calculating the standard deviation Step 1. Calculate the arithmetic mean. Step 2. Subtract the mean from each observation. Square the difference. Step 3. Sum the squared differences. Step 4. Divide the sum of the squared differences by n – 1. Step 5. Take the square root of the value obtained in Step 4. The result is the standard deviation. To calculate the standard deviation from a data set in Analysis Module: Click on the Means command under the Statistics folder In the Means Of drop- down box, select the variable of interest  Select Variable Click OK  You should see the list of the frequency by the variable you selected. Scroll down until you see the Standard Deviation (Std Dev) and other data. Properties and uses of the standard deviation • The numeric value of the standard deviation does not have an easy, non-statistical interpretation, but similar to other measures of spread, the standard deviation conveys how widely or tightly the observations are distributed from the center. From the previous example, the mean incubation period was 25 days, with a standard deviation of 6.6 days. If the standard deviation in a second outbreak had been 3.7 days (with the same mean incubation period of 25 days), you could say that the incubation periods in the second outbreak showed less variability than did the incubation periods of the first outbreak. • Standard deviation is usually calculated only when the data are more-or-less “normally distributed,” i.e., the data fall into a typical bell-shaped curve. For normally distributed data, the arithmetic mean is the recommended measure of central location, and the standard deviation is the recommended measure of spread. In fact, means should never be reported without their associated standard deviation.
  • 153.
    Summarizing Data Page 2-45 EXAMPLE:Calculating the Standard Deviation Find the mean of the following incubation periods for hepatitis A: 27, 31, 15, 30, and 22 days. Step 1. Calculate the arithmetic mean. Mean = (27 + 31 + 15 + 30 +22) / 5 = 125 / 5 = 25.0 Step 2. Subtract the mean from each observation. Square the difference. Value Minus Mean Difference Difference Squared 27 - 25.0 + 2.0 4.0 31 - 225.0 + 6.0 36.0 15 - 225.0 –10.0 100.0 30 - 225.0 + 5.0 25.0 22 - 225.0 – 3.0 9.0 Step 3. Sum the squared differences. Sum = 4 + 36 + 100 + 25 + 9 = 174 Step 4. Divide the sum of the squared differences by (n – 1). This is the variance. Variance = 174 / (5 – 1) = 174 / 4 = 43.5 days squared Step 5. Take the square root of the variance. The result is the standard deviation. Standard deviation = square root of 43.5 = 6.6 days Areas included in normal distribution: ±1 SD includes 68.3% ±1.96 SD includes 95.0% ±2 SD includes 95.5% ±3 SD includes 99.7% Consider the normal curve illustrated in Figure 2.9. The mean is at the center, and data are equally distributed on either side of this mean. The points that show ±1, 2, and 3 standard deviations are marked on the x-axis. For normally distributed data, approximately two-thirds (68.3%, to be exact) of the data fall within one standard deviation of either side of the mean; 95.5% of the data fall within two standard deviations of the mean; and 99.7% of the data fall within three standard deviations. Exactly 95.0% of the data fall within 1.96 standard deviations of the mean.
  • 154.
    Summarizing Data Page 2-46 Figure2.9 Area Under Normal Curve within 1, 2 and 3 Standard Deviations
  • 155.
    Summarizing Data Page 2-47 Exercise2.9 Calculate the standard deviation for the same set of vaccination data. 2, 0, 3, 1, 0, 1, 2, 2, 4, 8, 1, 3, 3, 12, 1, 6, 2, 5, 1 Check your answers on page 2-61
  • 156.
    Summarizing Data Page 2-48 Standarderror of the mean Definition of standard error The standard deviation is sometimes confused with another measure with a similar name — the standard error of the mean. However, the two are not the same. The standard deviation describes variability in a set of data. The standard error of the mean refers to variability we might expect in the arithmetic means of repeated samples taken from the same population. The standard error assumes that the data you have is actually a sample from a larger population. According to the assumption, your sample is just one of an infinite number of possible samples that could be taken from the source population. Thus, the mean for your sample is just one of an infinite number of other sample means. The standard error quantifies the variation in those sample means. Method for calculating the standard error of the mean Step 1. Calculate the standard deviation. Step 2. Divide the standard deviation by the square root of the number of observations (n). Properties and uses of the standard error of the mean • The primary practical use of the standard error of the mean is in calculating confidence intervals around the arithmetic mean. (Confidence intervals are addressed in the next section.) EXAMPLE: Finding the Standard Error of the Mean Find the standard error of the mean for the length-of-stay data in Table 2.10, given that the standard deviation is 9.1888. Step 1. Calculate the standard deviation. Standard deviation (given) = 9.188 Step 2. Divide the standard deviation by the square root of n. n = 30 Standard error of the mean = 9.188 / √30 = 9.188 / 5.477 = 1.67
  • 157.
    Summarizing Data Page 2-49 Confidencelimits (confidence interval) Definition of a confidence interval Often, epidemiologists conduct studies not only to measure characteristics in the subjects studied, but also to make generalizations about the larger population from which these subjects came. This process is called inference. For example, political pollsters use samples of perhaps 1,000 or so people from across the country to make inferences about which presidential candidate is likely to win on Election Day. Usually, the inference includes some consideration about the precision of the measurement. (The results of a political poll may be reported to have a margin of error of, say, plus or minus three points.) In epidemiology, a common way to indicate a measurement’s precision is by providing a confidence interval. A narrow confidence interval indicates high precision; a wide confidence interval indicates low precision. Confidence intervals are calculated for some but not all epidemiologic measures. The two measures covered in this lesson for which confidence intervals are often presented are the mean and the geometric mean. Confidence intervals can also be calculated for some of the epidemiologic measures covered in Lesson 3, such as a proportion, risk ratio, and odds ratio. The confidence interval for a mean is based on the mean itself and some multiple of the standard error of the mean. Recall that the standard error of the mean refers to the variability of means that might be calculated from repeated samples from the same population. Fortunately, regardless of how the data are distributed, means (particularly from large samples) tend to be normally distributed. (This is from an argument known as the Central Limit Theorem). So we can use Figure 2.9 to show that the range from the mean minus one standard deviation to the mean plus one standard deviation includes 68.3% of the area under the curve. Consider a population-based sample survey in which the mean total cholesterol level of adult females was 206, with a standard error of the mean of 3. If this survey were repeated many times, 68.3% of the means would be expected to fall between the mean minus 1 standard error and the mean plus 1 standard error, i.e., between 203 and 209. One might say that the investigators are 68.3% confident those limits contain the actual mean of the population.
  • 158.
    Summarizing Data Page 2-50 Inpublic health, investigators generally want to have a greater level of confidence than that, and usually set the confidence level at 95%. Although the statistical definition of a confidence interval is that 95% of the confidence intervals from an infinite number of similarly conducted samples would include the true population values, this definition has little meaning for a single study. More commonly, epidemiologists interpret a 95% confidence interval as the range of values consistent with the data from their study. Method for calculating a 95% confidence interval for a mean Step 1. Calculate the mean and its standard error. Step 2. Multiply the standard error by 1.96. Step 3. Lower limit of the 95% confidence interval = mean minus 1.96 x standard error. Upper limit of the 95% confidence interval = mean plus 1.96 x standard error. EXAMPLE: Calculating a 95% Confidence Interval for a Mean Find the 95% confidence interval for a mean total cholesterol level of 206, standard error of the mean of 3. Step 1. Calculate the mean and its error. Mean = 206, standard error of the mean = 3 (both given) Step 2. Multiply the standard error by 1.96. 3 x 1.96 = 5.88 Step 3. Lower limit of the 95% confidence interval = mean minus 1.96 x standard error. 206 – 5.88 = 200.12 Upper limit of the 95% confidence interval = mean plus 1.96 x standard error. 206 + 5.88 = 211.88 Rounding to one decimal, the 95% confidence interval is 200.1 to 211.9. In other words, this study’s best estimate of the true population mean is 206, but is consistent with values ranging from as low as 200.1 and as high as 211.9. Thus, the confidence interval indicates how precise the estimate is. (This confidence interval is narrow, indicating that the sample mean of 206 is fairly precise.) It also indicates how confident the researchers should be in drawing inferences from the sample to the entire population. Properties and uses of confidence intervals • The mean is not the only measure for which a confidence interval can or should be calculated. Confidence intervals are also commonly calculated for proportions, rates, risk ratios,
  • 159.
    Summarizing Data Page 2-51 oddsratios, and other epidemiologic measures when the purpose is to draw inferences from a sample survey or study to the larger population. • Most epidemiologic studies are not performed under the ideal conditions required by the theory behind a confidence interval. As a result, most epidemiologists take a common-sense approach rather than a strict statistical approach to the interpretation of a confidence interval, i.e., the confidence interval represents the range of values consistent with the data from a study, and is simply a guide to the variability in a study. • Confidence intervals for means, proportions, risk ratios, odds ratios, and other measures all are calculated using different formulas. The formula for a confidence interval of the mean is well accepted, as is the formula for a confidence interval for a proportion. However, a number of different formulas are available for risk ratios and odds ratios. Since different formulas can sometimes give different results, this supports interpreting a confidence interval as a guide rather than as a strict range of values. • Regardless of the measure, the interpretation of a confidence interval is the same: the narrower the interval, the more precise the estimate; and the range of values in the interval is the range of population values most consistent with the data from the study. Demonstration: Using Confidence Intervals Imagine you are going to Las Vegas to bet on the true mean total cholesterol level among adult women in the United States. Question: On what number are you going to bet? Answer: On 206, since that is the number found in the sample. The mean you calculated from your sample is your best guess of the true population mean. Question: How does a confidence interval help? Answer: It tells you how much to bet! If the confidence interval is narrow, your best guess is relatively precise, and you might feel comfortable (confident) betting more. But if the confidence interval is wide, your guess is relatively imprecise, and you should bet less on that one number, or perhaps not bet at all!
  • 160.
    Summarizing Data Page 2-52 Exercise2.10 When the serum cholesterol levels of 4,462 men were measured, the mean cholesterol level was 213, with a standard deviation of 42. Calculate the standard error of the mean for the serum cholesterol level of the men studied. Check your answers on page 2-62
  • 161.
    Summarizing Data Page 2-53 Choosingthe Right Measure of Central Location and Spread Measures of central location and spread are useful for summarizing a distribution of data. They also facilitate the comparison of two or more sets of data. However, not every measure of central location and spread is well suited to every set of data. For example, because the normal distribution (or bell-shaped curve) is perfectly symmetrical, the mean, median, and mode all have the same value (as illustrated in Figure 2.10). In practice, however, observed data rarely approach this ideal shape. As a result, the mean, median, and mode usually differ. Figure 2.10 Effect of Skewness on Mean, Median, and Mode How, then, do you choose the most appropriate measures? A partial answer to this question is to select the measure of central location on the basis of how the data are distributed, and then use the corresponding measure of spread. Table 2.11 summarizes the recommended measures. Table 2.11 Recommended Measures of Central Location and Spread by Type of Data Type of Distribution Measure of Central Location Measure of Spread Normal Arithmetic mean Standard deviation Asymmetrical or skewed Median Range or interquartile range Exponential or logarithmic Geometric mean Geometric standard In statistics, the arithmetic mean is the most commonly used measure of central location, and is the measure upon which the majority of statistical tests and analytic techniques are based. The standard deviation is the measure of spread most commonly used
  • 162.
    Summarizing Data Page 2-54 withthe mean. But as noted previously, one disadvantage of the mean is that it is affected by the presence of one or a few observations with extremely high or low values. The mean is “pulled” in the direction of the extreme values. You can tell the direction in which the data are skewed by comparing the values of the mean and the median; the mean is pulled away from the median in the direction of the extreme values. If the mean is higher than the median, the distribution of data is skewed to the right. If the mean is lower than the median, as in the right side of Figure 2.10, the distribution is skewed to the left. The advantage of the median is that it is not affected by a few extremely high or low observations. Therefore, when a set of data is skewed, the median is more representative of the data than is the mean. For descriptive purposes, and to avoid making any assumption that the data are normally distributed, many epidemiologists routinely present the median for incubation periods, duration of illness, and age of the study subjects. Two measures of spread can be used in conjunction with the median: the range and the interquartile range. Although many statistics books recommend the interquartile range as the preferred measure of spread, most practicing epidemiologists use the simpler range instead. The mode is the least useful measure of central location. Some sets of data have no mode; others have more than one. The most common value may not be anywhere near the center of the distribution. Modes generally cannot be used in more elaborate statistical calculations. Nonetheless, even the mode can be helpful when one is interested in the most common value or most popular choice. The geometric mean is used for exponential or logarithmic data such as laboratory titers, and for environmental sampling data whose values can span several orders of magnitude. The measure of spread used with the geometric mean is the geometric standard deviation. Analogous to the geometric mean, it is the antilog of the standard deviation of the log of the values. The geometric standard deviation is substituted for the standard deviation when incorporating logarithms of numbers. Examples include describing environmental particle size based on mass, or variability of blood lead concentrations.1 Sometimes, a combination of these measures is needed to adequately describe a set of data.
  • 163.
    Summarizing Data Page 2-55 EXAMPLE:Summarizing Data Consider the smoking histories of 200 persons (Table 2.12) and summarize the data. Table 2.12 Self-Reported Average Number of Cigarettes Smoked Per Day, Survey of Students (n = 200) Number of Cigarettes Smoked Per Day 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 3 4 6 7 7 8 8 9 10 12 12 13 13 14 15 15 15 15 15 16 17 17 18 18 18 18 19 19 20 20 20 20 20 20 20 20 20 20 20 21 21 22 22 23 24 25 25 26 28 29 30 30 30 30 32 35 40 Analyzing all 200 observations yields the following results: Mean = 5.4 Median = 0 Mode = 0 Minimum value = 0 Maximum value = 40 Range = 0–40 Interquartile range = 8.8 (0.0–8.8) Standard deviation = 9.5 These results are correct, but they do not summarize the data well. Almost three fourths of the students, representing the mode, do not smoke at all. Separating the 58 smokers from the 142 nonsmokers yields a more informative summary of the data. Among the 58 (29%) who do smoke: Mean = 18.5 Median = 19.5 Mode = 20 Minimum value = 2 Maximum value = 40 Range = 2–40 Interquartile range = 8.5 (13.7–22.25) Standard deviation = 8.0 Thus, a more informative summary of the data might be “142 (71%) of the students do not smoke at all. Of the 58 students (29%) who do smoke, mean consumption is just under a pack* a day (mean = 18.5, median = 19.5). The range is from 2 to 40 cigarettes smoked per day, with approximately half the smokers smoking from 14 to 22 cigarettes per day.” * a typical pack contains 20 cigarettes
  • 164.
    Summarizing Data Page 2-56 Exercise2.11 The data in Table 2.13 (on page 2-57) are from an investigation of an outbreak of severe abdominal pain, persistent vomiting, and generalized weakness among residents of a rural village. The cause of the outbreak was eventually identified as flour unintentionally contaminated with lead dust. 1. Summarize the blood level data with a frequency distribution. 2. Calculate the arithmetic mean. [Hint: Sum of known values = 2,363] 3. Identify the median and interquartile range. 4. Calculate the standard deviation. [Hint: Sum of squares = 157,743] 5. Calculate the geometric mean using the log lead levels provided. [Hint: Sum of log lead levels = 68.45] Check your answers on page 2-62
  • 165.
    Summarizing Data Page 2-57 Table2.13 Age and Blood Lead Levels (BLLs) of Ill Villagers and Family Members — Country X, 1996 ID Age (Years) BLL † Log10BLL 1 3 69 1.84 2 4 45 1.66 3 6 49 1.69 4 7 84 1.92 5 9 48 1.68 6 10 58 1.77 7 11 17 1.23 8 12 76 1.88 9 13 61 1.79 10 14 78 1.89 11 15 48 1.68 12 15 57 1.76 13 16 68 1.83 14 16 ? ? 15 17 26 1.42 16 19 78 1.89 17 19 56 1.75 18 20 54 1.73 19 22 73 1.86 20 26 74 1.87 21 27 63 1.80 ID Age (Years) BLL Log10BLL 22 33 103 2.01 23 33 46 1.66 24 35 78 1.89 25 35 50 1.70 26 36 64 1.81 27 36 67 1.83 28 38 79 1.90 29 40 58 1.76 30 45 86 1.93 31 47 76 1.88 32 49 58 1.76 33 56 ? ? 34 60 26 1.41 35 65 104 2.02 36 65 39 1.59 37 65 35 1.54 38 70 72 1.86 39 70 57 1.76 40 76 38 1.58 41 78 44 1.64 † Blood lead levels measured in micrograms per deciliter (mcg/dL) ? Missing value Data Source: Nasser A, Hatch D, Pertowski C, Yoon S. Outbreak investigation of an unknown illness in a rural village, Egypt (case study). Cairo: Field Epidemiology Training Program, 1999.
  • 166.
    Summarizing Data Page 2-58 Summary Frequencydistributions, measures of central location, and measures of spread are effective tools for summarizing numerical variables including: • Physical characteristics such as height and diastolic blood pressure, • Illness characteristics such as incubation period, and • Behavioral characteristics such as number of lifetime sexual partners. Some characteristics, such as IQ, follow a normal or symmetrical bell-shaped distribution in the population. Other characteristics have distributions that are skewed to the right (tail toward higher values) or skewed to the left (tail toward lower values). Some characteristics are mostly normally distributed, but have a few extreme values or outliers. Some characteristics, particularly laboratory dilution assays, follow a logarithmic pattern. Finally, other characteristics follow other patterns (such as a uniform distribution) or appear to follow no apparent pattern at all. The distribution of the data is the most important factor in selecting an appropriate measure of central location and spread. Measures of central location are single values that represent the center of the observed distribution of values. The different measures of central location represent the center in different ways. The arithmetic mean represents the balance point for all the data. The median represents the middle of the data, with half the observed values below the median and half the observed values above it. The mode represents the peak or most prevalent value. The geometric mean is comparable to the arithmetic mean on a logarithmic scale. Measures of spread describe the spread or variability of the observed distribution. The range measures the spread from the smallest to the largest value. The standard deviation, usually used in conjunction with the arithmetic mean, reflects how closely clustered the observed values are to the mean. For normally distributed data, 95% of the data fall in the range from – 1.96 standard deviations to +1.96 standard deviations. The interquartile range, used in conjunction with the median, includes data in the range from the 25th percentile to the 75th percentile, or approximately the middle 50% of the data. Data that are normally distributed are usually summarized with the arithmetic mean and standard deviation. Data that are skewed or have a few extreme values are usually summarized with the median and range, or with the median and interquartile range. Data that follow a logarithmic scale and data that span several orders of magnitude are usually summarized with the geometric mean.
  • 167.
    Summarizing Data Page 2-59 ExerciseAnswers Exercise 2.1 1. C 2. A 3. D 4. A 5. D Exercise 2.2 Previous Years Frequency 0 2 1 5 2 4 3 3 4 1 5 1 6 1 7 0 8 1 9 0 10 0 11 0 12 1 Total 19 Exercise 2.3 1. Create frequency distribution (done in Exercise 2.2, above) 2. Identify the value that occurs most often. Most common value is 1, so mode is 1 previous vaccination. Exercise 2.4 1. Arrange the observations in increasing order. 0, 0, 1, 1, 1, 1, 1, 2, 2, 2, 2, 3, 3, 3, 4, 5, 6, 8, 12 2. Find the middle position of the distribution with 19 observations. Middle position = (19 + 1) / 2 = 10 3. Identify the value at the middle position. 0, 0, 1, 1, 1, 1, 1, 2, 2, *2*, 2, 3, 3, 3, 4, 5, 6, 8, 12
  • 168.
    Summarizing Data Page 2-60 Countingfrom the left or right to the 10th position, the value is 2. So the median = 2 previous vaccinations. Exercise 2.5 1. Add all of the observed values in the distribution. 2 + 0 + 3 + 1 + 0 + 1 + 2 + 2 + 4 + 8 + 1 + 3 + 3 + 12 + 1 + 6 + 2 + 5 + 1 = 57 2. Divide the sum by the number of observations 57 / 19 = 3.0 So the mean is 3.0 previous vaccinations Exercise 2.6 Using Method A: 1. Take the log (in this case, to base 2) of each value. ID # Convalescent Log base 2 1 1:512 9 2 1:512 9 3 1:128 7 4 1:512 9 5 1:1024 10 6 1:1024 10 7 1:2048 11 8 1:128 7 9 1:4096 12 10 1:1024 10 2. Calculate the mean of the log values by summing and dividing by the number of observations (10). Mean of log2(xi) = (9 + 9 + 7 + 9 + 10 + 10 + 11 + 7 + 12 + 10) / 10 = 94 / 10 = 9.4 3. Take the antilog of the mean of the log values to get the geometric mean. Antilog2(9.4) = 29.4 = 675.59. Therefore, the geometric mean dilution titer is 1:675.6. Exercise 2.7 1. E or A; equal number of patients in 1999 and 1998. 2. C or B; mean and median are very close, so either would be acceptable. 3. E or A; for a nominal variable, the most frequent category is the mode. 4. D 5. B; mean is skewed, so median is better choice. 6. B; mean is skewed, so median is better choice. Exercise 2.8 1. Arrange the observations in increasing order. 0, 0, 1, 1, 1, 1, 1, 2, 2, 2, 2, 3, 3, 3, 4, 5, 6, 8, 12
  • 169.
    Summarizing Data Page 2-61 2.Find the position of the 1st and 3rd quartiles. Note that the distribution has 19 observations. Position of Q1 = (n + 1) / 4 = (19 + 1) / 4 = 5 Position of Q3 = 3(n + 1) / 4 = 3(19 + 1) / 4 = 15 3. Identify the value of the 1st and 3rd quartiles. Value at Q1 (position 5) = 1 Value at Q3 (position 15) = 4 4. Calculate the interquartile range as Q3 minus Q1. Interquartile range = 4 – 1 = 3 5. The median (at position 10) is 2. Note that the distance between Q1 and the median is 2 – 1 = 1. The distance between Q3 and the median is 4 – 2 = 2. This indicates that the vaccination data is skewed slightly to the right (tail points to greater number of previous vaccinations). Exercise 2.9 1. Calculate the arithmetic mean. Mean = (2 + 0 + 3 + 1 + 0 + 1 + 2 + 2 + 4 + 8 + 1 + 3 + 3 + 12 + 1 + 6 + 2 + 5 + 1) / 19 = 57 / 19 = 3.0 2. Subtract the mean from each observation. Square the difference. 3. Sum the squared differences. Value minus Mean Difference Difference Squared 2 - 3.0 –1.0 1.0 0 - 3.0 –3.0 9.0 3 - 3.0 0.0 0.0 1 - 3.0 –2.0 4.0 0 - 3.0 –3.0 9.0 1 - 3.0 –2.0 4.0 2 - 3.0 –1.0 1.0 2 - 3.0 –1.0 1.0 4 - 3.0 1.0 1.0 8 - 3.0 5.0 25.0 1 - 3.0 –2.0 4.0 57 - 57.0 = 0 0.0 162.0 4. Divide the sum of the squared differences by n – 1. Variance = 162 / (19 – 1) = 162 / 18 = 9.0 previous vaccinations squared 5. Take the square root of the variance. This is the standard deviation. Standard deviation = 9.0 = 3.0 previous vaccinations
  • 170.
    Summarizing Data Page 2-62 Exercise2.10 Standard error of the mean = 42 divided by the square root of 4,462 = 0.629 Exercise 2.11 1. Summarize the blood level data with a frequency distribution. Table 2.14 Frequency Distribution (1:g/dL Intervals) of Blood Lead Levels — Rural Village, 1996 (Intervals with No Observations Not Shown) Blood Lead Level (g/dL) Frequency Blood Lead Level (g/dL) Frequency Blood Lead Level (g/dL) Frequency 17 1 57 2 76 2 26 2 58 3 78 3 35 1 61 1 79 1 38 1 63 1 84 1 39 1 64 1 86 1 44 1 67 1 103 1 45 1 68 1 104 1 46 1 69 1 Unknown 48 49 1 72 1 50 1 73 1 54 1 74 1 56 1 To summarize the data further you could use intervals of 5, 10, or perhaps even 20 mcg/dL. Table 2.15 below uses 10 mcg/dL intervals. Table 2.15 Frequency Distribution (10 mcg/dL Intervals) of Blood Lead Levels — Rural Village, 1996 Blood Lead Level (g/dL) Frequency 0–9 0 10–19 1 20–29 2 30–39 3 40–49 6 50–59 8 60–69 6 70–79 9 80–89 2 90–99 0 100–110 2 Total 39 2. Calculate the arithmetic mean. Arithmetic mean = sum / n = 2,363 / 39 = 60.6 mcg/dL 3. Identify the median and interquartile range. Median at (39 + 1) / 2 = 20th position. Median = value at 20th position = 58 Q1 at (39 + 1) / 4 = 10th position. Q1 = value at 10th position = 48 Q3 at 3 x Q1 position = 30th position. Q3 = value at 30th position = 76
  • 171.
    Summarizing Data Page 2-63 4.Calculate the standard deviation. Square of sum = 2,3632 = 5,583,769 Sum of squares x n = 157,743 x 39 = 6,157,977 Difference = 6,151,977 – 5,583,769 = 568,208 Variance = 568,208 / (39 x 38) = 383.4062 Standard deviation = square root (383.4062) = 19.58 mcg/dL 5. Calculate the geometric mean using the log lead levels provided. Geometric mean = 10(68.45 / 39) = 10(1.7551) = 56.9 mcg/dL
  • 172.
    Summarizing Data Page 2-64 SELF-ASSESSMENTQUIZ Now that you have read Lesson 2 and have completed the exercises, you should be ready to take the self-assessment quiz. This quiz is designed to help you assess how well you have learned the content of this lesson. You may refer to the lesson text whenever you are unsure of the answer. Unless instructed otherwise, choose ALL correct answers for each question. Use Table 2.16 for Questions 1 and 2, and for Questions 10–13. Table 2.16 Admitting Clinical Characteristics of Patients with Severe Acute Respiratory Syndrome — Singapore, March–May, 2003 ID Date of Diagnosis Sex Age (Years) How Acquired Symptoms† Temp (°C) Lymphocyte Count (x 10-9 /L)‡ Outcome 01 * Female 71 Community F, confusion 38.7 0.78 Survived 02 3/16 Female 43 Community C,D,S,H,F 38.9 0.94 Died 03 3/29 Male 40 HCW¶ C,H,M,F 36.8 0.71 Survived 04 * Female 78 Community D 36.0 1.02 Died 05 * Female 53 Community C,D,F 39.6 0.53 Died 06 4/6 Male 63 Community C,M,F,dizziness 35.1 0.63 Died 07 * Male 84 Inpatient D,F 38.0 0.21 Died 08 * Male 63 Inpatient F 38.5 0.83 Survived 09 * Female 74 Inpatient F 38.0 1.34 Died 10 * Male 72 Inpatient F 38.5 1.04 Survived 11 * Female 28 HCW H,M,F 38.2 0.30 Survived 12 * Female 24 HCW M,F 38.0 0.84 Survived 13 * Female 28 HCW M,F 38.5 1.13 Survived 14 * Male 21 HCW H,M,F 38.8 0.97 Survived * Date of onset not provided in manuscript † C=cough, D=dyspnea, F=fever, H=headache, M=myalgia, S=sore throat ‡ Normal > 1.50 x 10-9 /L ¶ HCW = health-care worker Data Source: Singh K, Hsu L-Y, Villacian JS, Habib A, Fisher D, Tambyah PA. Severe acute respiratory syndrome: lessons from Singapore. Emerg Infect Dis 2003;9:1294–8. 1. Table 2.16 is an example of a/an _________________________. 2. For each of the following variables included in Table 2.16, identify if it is: A. Categorical B. Continuous C. Interval D. Nominal E. Ordinal F. Qualitative G. Quantitative H. Ratio _____ Sex _____ Age _____ Lymphocyte Count
  • 173.
    Summarizing Data Page 2-65 3.Which of the following best describes the similarities and differences in the three distributions shown in Figure 2.11? Figure 2.11 A. Same mean, median, mode; different standard deviation B. Same mean, median, mode; same standard deviation C. Different mean, median, mode; different standard deviation D. Different mean, median, mode; same standard deviation 4. Which of the following terms accurately describe the distribution shown in Figure 2.12? Figure 2.12 A. Negatively skewed B. Positively skewed C. Skewed to the right D. Skewed to the left E. Asymmetrical 5. What is the likely relationship between mean, median, and mode of the distribution shown in Figure 2.12? A. Mean < median < mode B. Mean = median = mode C. Mean > median > mode D. Mode < mean and median, but cannot tell relationship between mean and median
  • 174.
    Summarizing Data Page 2-66 6.The mode is the value that: A. Is midway between the lowest and highest value B. Occurs most often C. Has half the observations below it and half above it D. Is statistically closest to all of the values in the distribution 7. The median is the value that: A. Is midway between the lowest and highest value B. Occurs most often C. Has half the observations below it and half above it D. Is statistically closest to all of the values in the distribution 8. The mean is the value that: A. Is midway between the lowest and highest value B. Occurs most often C. Has half the observations below it and half above it D. Is statistically closest to all of the values in the distribution 9. The geometric mean is the value that: A. Is midway between the lowest and highest value on a log scale B. Occurs most often on a log scale C. Has half the observations below it and half above it on a log scale D. Is statistically closest to all of the values in the distribution on a log scale Use Table 2.16 for Questions 10–13. Note that the sum of the 14 temperatures listed in Table 2.16 is 531.6. 10. The mode of the temperatures listed in Table 2.16 is: A. 37.35°C B. 37.9°C C. 38.0°C D. 38.35°C E. 38.5°C 11. The median of the temperatures listed in Table 2.16 is: A. 37.35°C B. 37.9°C C. 38.0°C D. 38.35°C E. 38.5°C 12. The mean of the temperatures listed in Table 2.16 is: A. 37.35°C B. 37.9°C C. 38.0°C D. 38.35°C E. 38.5°C
  • 175.
    Summarizing Data Page 2-67 13.The midrange of the temperatures listed in Table 2.16 is: A. 37.35°C B. 37.9°C C. 38.0°C D. 38.35°C E. 38.5°C 14. In epidemiology, the measure of central location generally preferred for summarizing skewed data such as incubation periods is the: A. Mean B. Median C. Midrange D. Mode 15. The measure of central location generally preferred for additional statistical analysis is the: A. Mean B. Median C. Midrange D. Mode 16. Which of the following are considered measures of spread? A. Interquartile range B. Percentile C. Range D. Standard deviation 17. The measure of spread most affected by one extreme value is the: A. Interquartile range B. Range C. Standard deviation D. Mean 18. The interquartile range covers what proportion of a distribution? A. 25% B. 50% C. 75% D. 100% 19. The measure of central location most commonly used with the interquartile range is the: A. Arithmetic mean B. Geometric mean C. Median D. Midrange E. Mode
  • 176.
    Summarizing Data Page 2-68 20.The measure of central location most commonly used with the standard deviation is the: A. Arithmetic mean B. Median C. Midrange D. Mode 21. The algebraic relationship between the variance and standard deviation is that: A. The standard deviation is the square root of the variance B. The variance is the square root of the standard deviation C. The standard deviation is the variance divided by the square root of n D. The variance is the standard deviation divided by the square root of n 22. Before calculating a standard deviation, one should ensure that: A. The data are somewhat normally distributed B. The total number of observations is at least 50 C. The variable is an interval-scale or ratio-scale variable D. The calculator or software has a square-root function 23. Simply by scanning the values in each distribution below, identify the distribution with the largest standard deviation. A. 1, 10, 15, 18, 20, 20, 22, 25, 30, 39 B. 1, 3, 8, 10, 20, 20, 30, 32, 37, 39 C. 1, 15, 17, 19, 20, 20, 21, 23, 25, 39 D. 41, 42, 43, 44, 45, 45, 46, 47, 48, 49 24. Given the area under a normal curve, which two of the following ranges are the same? (Circle the TWO that are the same.) A. From the 2.5th percentile to the 97.5th percentile B. From the 5th percentile to the 95th percentile C. From the 25th percentile to the 75th percentile D. From 1 standard deviation below the mean to 1 standard deviation above the mean E. From 1.96 standard deviations below the mean to 1.96 standard deviations above the mean 25. The primary use of the standard error of the mean is in calculating the: A. confidence interval B. error rate C. standard deviation D. variance
  • 177.
    Summarizing Data Page 2-69 Answersto Self-Assessment Quiz 1. Line list or line listing. A line listing is a table in which each row typically represents one person or case of disease, and each column represents a variable such as ID, age, sex, etc. 2. Sex A, D, F Age B, G, H Lymphocyte count B, G, H Sex is a nominal variable, meaning that its categories have names but not numerical value. Nominal variables are qualitative or categorical variables. Age and lymphocyte count are ratio variables because they are both numeric variables with true zero points. Ratio variables are continuous and quantitative variables. 3. A. Because the centers of each distribution line up, they have the same measure of central location. But because each distribution is spread differently, they have different measures of spread. 4. B, C, E. Right/left skewness refers to the tail of a distribution. Because the “hump” of this distribution is on the left and the tail is on the right, it is said to be skewed positively to the right. A skewed distribution is not symmetrical. 5. C. For a distribution such as that shown in Figure 2.12, with its hump to the left, the mode will be smaller than either the median or the mean. The long tail to the right will pull the mean upward, so that the sequence will be mode < median < mean. 6. B. The mode is the value that occurs most often. 7. C. The median is the value that has half the observations below it and half above it. 8. D. The mean is the value that is statistically closest to all of the values in the distribution 9. D. The geometric mean is the value that is statistically closest to all of the values in the distribution on a log scale. 10. C, E. The mode is the value that occurs most often. A distribution can have one mode, more than one mode, or no mode. In this distribution, both 38.0°C and 38.5°C appear 3 times. 11. D. The median is the value that has half the observations below it and half above it. For a distribution with an even number of values, the median falls between 2 observations, in this situation between the 7th and 8th values. The 7th value is 38.2°C and the 8th value is 38.5°C, so the median is the average of those two values, i.e., 38.35°C. 12. C. The mean is the average of all the values. Given 14 temperatures that sum to 531.6, the mean is calculated as 531.6 / 14, which equals 37.97°C, which should be rounded to 38.0°C.
  • 178.
    Summarizing Data Page 2-70 13.A. The midrange is halfway between the smallest and largest values. Since the lowest and highest temperatures are 35.1°C and 39.6°C , the midrange is calculated as 35.1 + 39.6 / 2, or 37.35°C. 14. B. In epidemiology, the measure of central location generally preferred for summarizing skewed data such as incubation periods is the median. 15. A. The measure of central location generally preferred for additional statistical analysis is the mean, which is the only measure that has good statistical properties. 16. A, C, D, E. Interquartile range, range, standard deviation, and variance are all measures of spread. A percentile identifies a particular place on the distribution, but is not a measure of spread. 17. B. The range is the difference between the extreme values on either side, so it is most directly affected by those values. 18. B. The interquartile range covers the central 50% of a distribution. 19. C. The interquartile range usually accompanies the median, since both are based on percentiles. The interquartile range covers from the 25th to the 75th percentile, while the median marks the 50th percentile. 20. A. The standard deviation usually accompanies the arithmetic mean. 21. A. The standard deviation is the square root of the variance. 22. A, D. Use of the mean and standard deviation are usually restricted to data that are more- or-less normally distributed. Calculation of the standard deviation requires squaring differences and then taking the square root, so you need a calculator that has a square-root function. 23. B. Distributions A, B, and C all range from 1 to 39 and have two central values of 20. Considering the eight values other than the smallest and largest, distribution C has values close to 20 (from 15 to 25), Distribution A has values from 10 to 30, and Distribution B has values from 3 to 37. So Distribution B has the broadest spread among the first 3 distributions. Distribution D has larger values than the first 3 distributions (41–49 rather than 1–39), but they cluster rather tightly around the central value of 45. 24. A and E. The area from the 2.5th percentile to the 97.5th percentile includes 95% of the area below the curve, which corresponds to ± 1.96 standard deviations along the x-axis. 25. A. The primary use of the standard error of the mean is in calculating a confidence interval.
  • 179.
    Summarizing Data Page 2-71 References 1.Griffin S., Marcus A., Schulz T., Walker S. Calculating the interindividual geometric standard deviation of r use in the integrated exposure uptake biokinetic model for lead in children. Environ Health Perspect 1999;107:481–7. Instructions for Epi Info 7To download: Go to http://wwwn.cdc.gov/epiinfo/7/index.htm and click on “Downloads.” To get a complete installation package: Download and run all three self-expanding, compressed files to a temporary directory. EPI604_1.EXE (File Size = 1,367,649 bytes) EPI604_2.EXE (File Size = 1,341,995 bytes) EPI604_3.EXE (File Size = 1,360,925 bytes) Then run INSTALL.EXE to install the software. To create a frequency distribution from a data set in Analysis Module: EpiInfo6: >freq variable. To identify the mode from a data set in Analysis Module: Epi Info does not have a Mode command. Thus, the best way to identify the mode is to create a histogram and look for the tallest column(s). EpiInfo6: >histogram variable. To identify the median from a data set in Analysis Module: EpiInfo6: >means variable. Output indicates median. To identify the mean from a data set in Analysis Module: EpiInfo6: >means variable. Output indicates median. To calculate the standard deviation from a data set in Analysis Module: EpiInfo6: >means variable. Output indicates standard deviation, abbreviated as Std Dev.
  • 180.
    Measures of Risk Page3-1 MEASURES OF RISK Lesson 2 described measures of central location and spread, which are useful for summarizing continuous variables. However, many variables used by field epidemiologists are categorical variables, some of which have only two categories — exposed yes/no, test positive/negative, case/control, and so on. These variables have to be summarized with frequency measures such as ratios, proportions, and rates. Incidence, prevalence, and mortality rates are three frequency measures that are used to characterize the occurrence of health events in a population. Objectives After studying this lesson and answering the questions in the exercises, you will be able to: • Calculate and interpret the following epidemiologic measures: – Ratio – Proportion – Incidence proportion (attack rate) – Incidence rate – Prevalence – Mortality rate • Choose and apply the appropriate measures of association and measures of public health impact Major Sections Frequency Measures ........................................................................................................................3-2 Morbidity Frequency Measures .......................................................................................................3-10 Mortality Frequency Measures ........................................................................................................3-20 Natality (Birth) Measures ................................................................................................................3-38 Measures of Association..................................................................................................................3-39 Measures of Public Health Impact...................................................................................................3-48 Summary..........................................................................................................................................3-51 3133
  • 181.
    Measures of Risk Page3-2 Frequency Measures Numerator = upper portion of a fraction Denominator = lower portion of a fraction A measure of central location provides a single value that summarizes an entire distribution of data. In contrast, a frequency measure characterizes only part of the distribution. Frequency measures compare one part of the distribution to another part of the distribution, or to the entire distribution. Common frequency measures are ratios, proportions, and rates. All three frequency measures have the same basic form: numerator x 10n denominator Recall that: 100 = 1 (anything raised to the 0 power equals 1) 101 = 10 (anything raised to the 1st power is the value itself) 102 = 10 x 10 = 100 103 = 10 x 10 x 10 = 1,000 So the fraction of (numerator/denominator) can be multiplied by 1, 10, 100, 1000, and so on. This multiplier varies by measure and will be addressed in each section. Ratio Definition of ratio A ratio is the relative magnitude of two quantities or a comparison of any two values. It is calculated by dividing one interval- or ratio-scale variable by the other. The numerator and denominator need not be related. Therefore, one could compare apples with oranges or apples with number of physician visits. Method for calculating a ratio Number or rate of events, items, persons, etc. in one group Number or rate of events, items, persons, etc. in another group After the numerator is divided by the denominator, the result is often expressed as the result “to one” or written as the result “:1.” Note that in certain ratios, the numerator and denominator are different categories of the same variable, such as males and females, or persons 20–29 years and 30–39 years of age. In other ratios, the numerator and denominator are completely different variables, such as the number of hospitals in a city and the size of
  • 182.
    Measures of Risk Page3-3 the population living in that city. EXAMPLE: Calculating a Ratio — Different Categories of Same Variable Between 1971 and 1975, as part of the National Health and Nutrition Examination Survey (NHANES), 7,381 persons ages 40–77 years were enrolled in a follow-up study.1 At the time of enrollment, each study participant was classified as having or not having diabetes. During 1982–1984, enrollees were documented either to have died or were still alive. The results are summarized as follows. Original Enrollment (1971–1975) Dead at Follow-Up (1982–1984) Diabetic men 189 100 Nondiabetic men 3,151 811 Diabetic women 218 72 Nondiabetic women 3,823 511 Of the men enrolled in the NHANES follow-up study, 3,151 were nondiabetic and 189 were diabetic. Calculate the ratio of non-diabetic to diabetic men. Ratio = 3,151 / 189 x 1 = 16.7:1 Properties and uses of ratios • Ratios are common descriptive measures, used in all fields. In epidemiology, ratios are used as both descriptive measures and as analytic tools. As a descriptive measure, ratios can describe the male-to-female ratio of participants in a study, or the ratio of controls to cases (e.g., two controls per case). As an analytic tool, ratios can be calculated for occurrence of illness, injury, or death between two groups. These ratio measures, including risk ratio (relative risk), rate ratio, and odds ratio, are described later in this lesson. • As noted previously, the numerators and denominators of a ratio can be related or unrelated. In other words, you are free to use a ratio to compare the number of males in a population with the number of females, or to compare the number of residents in a population with the number of hospitals or dollars spent on over-the-counter medicines. • Usually, the values of both the numerator and denominator of a ratio are divided by the value of one or the other so that either the numerator or the denominator equals 1.0. So the ratio of non-diabetics to diabetics cited in the previous example is more likely to be reported as 16.7:1 than 3,151:189.
  • 183.
    Measures of Risk Page3-4 EXAMPLES: Calculating Ratios for Different Variables Example A: A city of 4,000,000 persons has 500 clinics. Calculate the ratio of clinics per person. 500 / 4,000,000 x 10n = 0.000125 clinics per person To get a more easily understood result, you could set 10n = 104 = 10,000. Then the ratio becomes: 0.000125 x 10,000 = 1.25 clinics per 10,000 persons You could also divide each value by 1.25, and express this ratio as 1 clinic for every 8,000 persons. Example B: Delaware’s infant mortality rate in 2001 was 10.7 per 1,000 live births.2 New Hampshire’s infant mortality rate in 2001 was 3.8 per 1,000 live births. Calculate the ratio of the infant mortality rate in Delaware to that in New Hampshire. 10.7 / 3.8 x 1 = 2.8:1 Thus, Delaware’s infant mortality rate was 2.8 times as high as New Hampshire’s infant mortality rate in 2001. A commonly used epidemiologic ratio: death-to-case ratio Death-to-case ratio is the number of deaths attributed to a particular disease during a specified period divided by the number of new cases of that disease identified during the same period. It is used as a measure of the severity of illness: the death-to-case ratio for rabies is close to 1 (that is, almost everyone who develops rabies dies from it), whereas the death-to-case ratio for the common cold is close to 0. For example, in the United States in 2002, a total of 15,075 new cases of tuberculosis were reported.3 During the same year, 802 deaths were attributed to tuberculosis. The tuberculosis death-to- case ratio for 2002 can be calculated as 802 / 15,075. Dividing both numerator and denominator by the numerator yields 1 death per 18.8 new cases. Dividing both numerator and denominator by the denominator (and multiplying by 10n = 100) yields 5.3 deaths per 100 new cases. Both expressions are correct. Note that, presumably, many of those who died had initially contracted tuberculosis years earlier. Thus many of the 802 in the numerator are not among the 15,075 in the denominator. Therefore, the death-to-case ratio is a ratio, but not a proportion. Proportion Definition of proportion A proportion is the comparison of a part to the whole. It is a type of ratio in which the numerator is included in the denominator.
  • 184.
    Measures of Risk Page3-5 You might use a proportion to describe what fraction of clinic patients tested positive for HIV, or what percentage of the population is younger than 25 years of age. A proportion may be expressed as a decimal, a fraction, or a percentage. Method for calculating a proportion Number of persons or events with a particular characteristic x 10n Total number of persons or events, of which the numerator is a subset For a proportion, 10n is usually 100 (or n = 2) and is often expressed as a percentage. EXAMPLE: Calculating a Proportion Example A: Calculate the proportion of men in the NHANES follow-up study who were diabetics. Numerator = 189 diabetic men Denominator = Total number of men = 189 + 3,151 = 3,340 Proportion = (189 / 3,340) x 100 = 5.66% Example B: Calculate the proportion of deaths among men. Numerator = deaths in men = 100 deaths in diabetic men + 811 deaths in nondiabetic men = 911 deaths in men Notice that the numerator (911 deaths in men) is a subset of the denominator. Denominator = all deaths = 911 deaths in men + 72 deaths in diabetic women + 511 deaths in nondiabetic women = 1,494 deaths Proportion = 911 / 1,494 = 60.98% = 61% Your Turn: What proportion of all study participants were men? (Answer = 45.25%) Properties and uses of proportions • Proportions are common descriptive measures used in all fields. In epidemiology, proportions are used most often as descriptive measures. For example, one could calculate the proportion of persons enrolled in a study among all those eligible (“participation rate”), the proportion of children in a village vaccinated against measles, or the proportion of persons who developed illness among all passengers of a cruise ship. • Proportions are also used to describe the amount of disease that
  • 185.
    Measures of Risk Page3-6 can be attributed to a particular exposure. For example, on the basis of studies of smoking and lung cancer, public health officials have estimated that greater than 90% of the lung cancer cases that occur are attributable to cigarette smoking. • In a proportion, the numerator must be included in the denominator. Thus, the number of apples divided by the number of oranges is not a proportion, but the number of apples divided by the total number of fruits of all kinds is a proportion. Remember, the numerator is always a subset of the denominator. • A proportion can be expressed as a fraction, a decimal, or a percentage. The statements “one fifth of the residents became ill” and “twenty percent of the residents became ill” are equivalent. • Proportions can easily be converted to ratios. If the numerator is the number of women (179) who attended a clinic and the denominator is all the clinic attendees (341), the proportion of clinic attendees who are women is 179 / 341, or 52% (a little more than half). To convert to a ratio, subtract the numerator from the denominator to get the number of clinic patients who are not women, i.e., the number of men (341 – 179 = 162 men.)Thus, ratio of women to men could be calculated from the proportion as: Ratio = 179 / (341 – 179) x 1 = 179 / 162 = 1.1 to 1 female-to-male ratio Conversely, if a ratio’s numerator and denominator together make up a whole population, the ratio can be converted to a proportion. You would add the ratio’s numerator and denominator to form the denominator of the proportion, as illustrated in the NHANES follow-up study examples (provided earlier in this lesson). A specific type of epidemiologic proportion: proportionate mortality Proportionate mortality is the proportion of deaths in a specified population during a period of time that are attributable to different causes. Each cause is expressed as a percentage of all deaths, and the sum of the causes adds up to 100%. These proportions are not rates because the denominator is all deaths, not the size of the population in which the deaths occurred. Table 3.1 lists the primary causes of death in the United States in 2003 for persons of all ages and for persons aged 25–44 years, by number of deaths, proportionate mortality, and rank.
  • 186.
    Measures of Risk Page3-7 Table 3.1 Number, Proportionate Mortality, and Ranking of Deaths for Leading Causes of Death, All Ages and 25–44 Year Age Group — United States, 2003 All Ages Ages 25–44 Years Number Percentage Rank Number Percentage Rank All causes 2,443,930 100.0 128,924 100.0 Diseases of heart 684,462 28.0 1 16,283 12.6 3 Malignant neoplasms 554,643 22.7 2 19,041 14.8 2 Cerebrovascular disease 157,803 6.5 3 3,004 2.3 8 Chronic lower respiratory diseases 126,128 5.2 4 401 0.3 * Accidents (unintentional injuries) 105,695 4.3 5 27,844 21.6 1 Diabetes mellitus 73,965 3.0 6 2,662 2.1 9 Influenza & pneumonia 64,847 2.6 7 1,337 1.0 10 Alzheimer's disease 63,343 2.6 8 0 0.0 * Nephritis, nephrotic syndrome, nephrosis 33,615 1.4 9 305 0.2 * Septicemia 34,243 1.4 10 328 0.2 * Intentional self-harm (suicide) 30,642 1.3 11 11,251 8.7 4 Chronic liver disease and cirrhosis 27,201 1.1 12 3,288 2.6 7 Assault (homicide) 17,096 0.7 13 7,367 5.7 5 HIV disease 13,544 0.5 * 6,879 5.3 6 All other 456,703 18.7 29,480 22.9 * Not among top ranked causes Data Sources: Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 2003. MMWR 2005;2(No. 54). Hoyert DL, Kung HC, Smith BL. Deaths: Preliminary data for 2003. National Vital Statistics Reports; vol. 53 no 15. Hyattsville, MD: National Center for Health Statistics 2005: p. 15, 27. As illustrated in Table 3.1, the proportionate mortality for HIV was 0.5% among all age groups, and 5.3% among those aged 25–44 years. In other words, HIV infection accounted for 0.5% of all deaths, and 5.3% of deaths among 25–44 year olds. Rate Definition of rate In epidemiology, a rate is a measure of the frequency with which an event occurs in a defined population over a specified period of time. Because rates put disease frequency in the perspective of the size of the population, rates are particularly useful for comparing disease frequency in different locations, at different times, or among different groups of persons with potentially different sized populations; that is, a rate is a measure of risk. To a non-epidemiologist, rate means how fast something is happening or going. The speedometer of a car indicates the car’s speed or rate of travel in miles or kilometers per hour. This rate is always reported per some unit of time. Some epidemiologists restrict use of the term rate to similar measures that are expressed per unit of time. For these epidemiologists, a rate describes how quickly disease occurs in a population, for example, 70 new cases
  • 187.
    Measures of Risk Page3-8 of breast cancer per 1,000 women per year. This measure conveys a sense of the speed with which disease occurs in a population, and seems to imply that this pattern has occurred and will continue to occur for the foreseeable future. This rate is an incidence rate, described in the next section, starting on page 3-13. Other epidemiologists use the term rate more loosely, referring to proportions with case counts in the numerator and size of population in the denominator as rates. Thus, an attack rate is the proportion of the population that develops illness during an outbreak. For example, 20 of 130 persons developed diarrhea after attending a picnic. (An alternative and more accurate phrase for attack rate is incidence proportion.) A prevalence rate is the proportion of the population that has a health condition at a point in time. For example, 70 influenza case-patients in March 2005 reported in County A. A case-fatality rate is the proportion of persons with the disease who die from it. For example, one death due to meningitis among County A’s population. All of these measures are proportions, and none is expressed per units of time. Therefore, these measures are not considered “true” rates by some, although use of the terminology is widespread. Table 3.2 summarizes some of the common epidemiologic measures as ratios, proportions, or rates. Table 3.2 Epidemiologic Measures Categorized as Ratio, Proportion, or Rate Condition Ratio Proportion Rate Morbidity (Disease) Risk ratio (Relative risk) Rate ratio Odds ratio Period prevalence Attack rate (Incidence proportion) Secondary attack rate Point prevalence Attributable proportion Person-time incidence rate Mortality (Death) Death-to-case ratio Proportionate mortality Crude mortality rate Case-fatality rate Cause-specific mortality rate Age-specific mortality rate Maternal mortality rate Infant mortality rate Natality (Birth) Crude birth rate Crude fertility rate
  • 188.
    Measures of Risk Page3-9 Exercise 3.1 For each of the fractions shown below, indicate whether it is a ratio, a proportion, a rate, or none of the three. A. Ratio B. Proportion C. Rate D. None of the above ________ 1. 2004 in died who A State in women of number 2004 in disease heart from died who A State in women of number ________ 2. 2004 1, July on A State in living women of number estimated 2004 in disease heart from died who A State in women of number ________ 3. 2004 in cancer from died who A State in women of number 2004 in disease heart from died who A State in women of number ________ 4. 2004 in types) (all cancer from died who A State in women of number 2004 in cancer lung from died who A State in women of number ________ 5. 2004 in sales cigarette from A State in dollars) (in revenue estimated 2004 in cancer lung from died who A State in women of number Check your answers on page 3-52
  • 189.
    Measures of Risk Page3-10 Morbidity Frequency Measures Morbidity has been defined as any departure, subjective or objective, from a state of physiological or psychological well- being. In practice, morbidity encompasses disease, injury, and disability. In addition, although for this lesson the term refers to the number of persons who are ill, it can also be used to describe the periods of illness that these persons experienced, or the duration of these illnesses.4 Measures of morbidity frequency characterize the number of persons in a population who become ill (incidence) or are ill at a given time (prevalence). Commonly used measures are listed in Table 3.3. Table 3.3 Frequently Used Measures of Morbidity Measure Numerator Denominator Incidence proportion (or attack rate or risk) Number of new cases of disease during specified time interval Population at start of time interval Secondary attack rate Number of new cases among contacts Total number of contacts Incidence rate (or person-time rate) Number of new cases of disease during specified time interval Summed person-years of observation or average population during time interval Point prevalence Number of current cases (new and preexisting) at a specified point in time Population at the same specified point in time Period prevalence Number of current cases (new and preexisting) over a specified period of time Average or mid-interval population Incidence refers to the occurrence of new cases of disease or injury in a population over a specified period of time. Although some epidemiologists use incidence to mean the number of new cases in a community, others use incidence to mean the number of new cases per unit of population. Two types of incidence are commonly used — incidence proportion and incidence rate.
  • 190.
    Measures of Risk Page3-11 Incidence proportion or risk Synonyms for incidence proportion • Attack rate • Risk • Probability of developing disease • Cumulative incidence Definition of incidence proportion Incidence proportion is the proportion of an initially disease-free population that develops disease, becomes injured, or dies during a specified (usually limited) period of time. Synonyms include attack rate, risk, probability of getting disease, and cumulative incidence. Incidence proportion is a proportion because the persons in the numerator, those who develop disease, are all included in the denominator (the entire population). Method for calculating incidence proportion (risk) Number of new cases of disease or injury during specified period Size of population at start of period EXAMPLES: Calculating Incidence Proportion (Risk) Example A: In the study of diabetics, 100 of the 189 diabetic men died during the 13-year follow-up period. Calculate the risk of death for these men. Numerator = 100 deaths among the diabetic men Denominator = 189 diabetic men 10n = 102 = 100 Risk = (100 / 189) x 100 = 52.9% Example B: In an outbreak of gastroenteritis among attendees of a corporate picnic, 99 persons ate potato salad, 30 of whom developed gastroenteritis. Calculate the risk of illness among persons who ate potato salad. Numerator = 30 persons who ate potato salad and developed gastroenteritis Denominator = 99 persons who ate potato salad 10n = 102 = 100 Risk = “Food-specific attack rate” = (30 / 99) x 100 = 0.303 x 100 = 30.3% Properties and uses of incidence proportions • Incidence proportion is a measure of the risk of disease or the probability of developing the disease during the specified period. As a measure of incidence, it includes only new cases of disease in the numerator. The denominator is the number of persons in the population at the start of the observation period. Because all of the persons with new cases of disease (numerator) are also represented in the denominator, a risk is also a proportion.
  • 191.
    Measures of Risk Page3-12 More About Denominators The denominator of an incidence proportion is the number of persons at the start of the observation period. The denominator should be limited to the “population at risk” for developing disease, i.e., persons who have the potential to get the disease and be included in the numerator. For example, if the numerator represents new cases of cancer of the ovaries, the denominator should be restricted to women, because men do not have ovaries. This is easily accomplished because census data by sex are readily available. In fact, ideally the denominator should be restricted to women with ovaries, excluding women who have had their ovaries removed surgically (often done in conjunction with a hysterectomy), but this is not usually practical. This is an example of field epidemiologists doing the best they can with the data they have. • In the outbreak setting, the term attack rate is often used as a synonym for risk. It is the risk of getting the disease during a specified period, such as the duration of an outbreak. A variety of attack rates can be calculated. Overall attack rate is the total number of new cases divided by the total population. A food-specific attack rate is the number of persons who ate a specified food and became ill divided by the total number of persons who ate that food, as illustrated in the previous potato salad example. A secondary attack rate is sometimes calculated to document the difference between community transmission of illness versus transmission of illness in a household, barracks, or other closed population. It is calculated as: Number of cases among contacts of primary cases x 10n Total number of contacts Often, the total number of contacts in the denominator is calculated as the total population in the households of the primary cases, minus the number of primary cases. For a secondary attack rate, 10n usually is 100%. EXAMPLE: Calculating Secondary Attack Rates Consider an outbreak of shigellosis in which 18 persons in 18 different households all became ill. If the population of the community was 1,000, then the overall attack rate was 18 / 1,000 x 100% = 1.8%. One incubation period later, 17 persons in the same households as these “primary” cases developed shigellosis. If the 18 households included 86 persons, calculate the secondary attack rate. Secondary attack rate = (17 / (86 - 18)) x 100% = (17 / 68) x 100% = 25.0%
  • 192.
    Measures of Risk Page3-13 Incidence rate or person-time rate Definition of incidence rate Incidence rate or person-time rate is a measure of incidence that incorporates time directly into the denominator. A person-time rate is generally calculated from a long-term cohort follow-up study, wherein enrollees are followed over time and the occurrence of new cases of disease is documented. Typically, each person is observed from an established starting time until one of four “end points” is reached: onset of disease, death, migration out of the study (“lost to follow-up”), or the end of the study. Similar to the incidence proportion, the numerator of the incidence rate is the number of new cases identified during the period of observation. However, the denominator differs. The denominator is the sum of the time each person was observed, totaled for all persons. This denominator represents the total time the population was at risk of and being watched for disease. Thus, the incidence rate is the ratio of the number of cases to the total time the population is at risk of disease. Method for calculating incidence rate Number of new cases of disease or injury during specified period Time each person was observed, totaled for all persons In a long-term follow-up study of morbidity, each study participant may be followed or observed for several years. One person followed for 5 years without developing disease is said to contribute 5 person-years of follow-up. What about a person followed for one year before being lost to follow-up at year 2? Many researchers assume that persons lost to follow-up were, on average, disease-free for half the year, and thus contribute ½ year to the denominator. Therefore, the person followed for one year before being lost to follow-up contributes 1.5 person-years. The same assumption is made for participants diagnosed with the disease at the year 2 examination — some may have developed illness in month 1, and others in months 2 through 12. So, on average, they developed illness halfway through the year. As a result, persons diagnosed with the disease contribute ½ year of follow-up during the year of diagnosis. The denominator of the person-time rate is the sum of all of the
  • 193.
    Measures of Risk Page3-14 person-years for each study participant. So, someone lost to follow-up in year 3, and someone diagnosed with the disease in year 3, each contributes 2.5 years of disease-free follow-up to the denominator. Properties and uses of incidence rates • An incidence rate describes how quickly disease occurs in a population. It is based on person-time, so it has some advantages over an incidence proportion. Because person-time is calculated for each subject, it can accommodate persons coming into and leaving the study. As noted in the previous example, the denominator accounts for study participants who are lost to follow-up or who die during the study period. In addition, it allows enrollees to enter the study at different times. In the NHANES follow-up study, some participants were enrolled in 1971, others in 1972, 1973, 1974, and 1975. • Person-time has one important drawback. Person-time assumes that the probability of disease during the study period is constant, so that 10 persons followed for one year equals one person followed for 10 years. Because the risk of many chronic diseases increases with age, this assumption is often not valid. • Long-term cohort studies of the type described here are not very common. However, epidemiologists far more commonly calculate incidence rates based on a numerator of cases observed or reported, and a denominator based on the mid-year population. This type of incident rate turns out to be comparable to a person-time rate. • Finally, if you report the incidence rate of, say, the heart disease study as 2.5 per 1,000 person-years, epidemiologists might understand, but most others will not. Person-time is epidemiologic jargon. To convert this jargon to something understandable, simply replace “person-years” with “persons per year.” Reporting the results as 2.5 new cases of heart disease per 1,000 persons per year sounds like English rather than jargon. It also conveys the sense of the incidence rate as a dynamic process, the speed at which new cases of disease occur in the population.
  • 194.
    Measures of Risk Page3-15 EXAMPLES: Calculating Incidence Rates Example A: Investigators enrolled 2,100 women in a study and followed them annually for four years to determine the incidence rate of heart disease. After one year, none had a new diagnosis of heart disease, but 100 had been lost to follow-up. After two years, one had a new diagnosis of heart disease, and another 99 had been lost to follow- up. After three years, another seven had new diagnoses of heart disease, and 793 had been lost to follow-up. After four years, another 8 had new diagnoses with heart disease, and 392 more had been lost to follow-up. The study results could also be described as follows: No heart disease was diagnosed at the first year. Heart disease was diagnosed in one woman at the second year, in seven women at the third year, and in eight women at the fourth year of follow-up. One hundred women were lost to follow-up by the first year, another 99 were lost to follow-up after two years, another 793 were lost to follow-up after three years, and another 392 women were lost to follow-up after 4 years, leaving 700 women who were followed for four years and remained disease free. Calculate the incidence rate of heart disease among this cohort. Assume that persons with new diagnoses of heart disease and those lost to follow-up were disease-free for half the year, and thus contribute ½ year to the denominator. Numerator = number of new cases of heart disease = 0 + 1 + 7 + 8 = 16 Denominator = person-years of observation = (2,000 + ½ x 100) + (1,900 + ½ x 1 + ½ x 99) + (1,100 + ½ x 7 + ½ x 793) + (700 + ½ x 8 + ½ x 392) = 6,400 person-years of follow-up or Denominator = person-years of observation = (1 x 1.5) + (7 x 2.5) + (8 x 3.5) + (100 x 0.5) + (99 x 1.5) + (793 x 2.5) + (392 x 3.5) + (700 x 4) = 6,400 person-years of follow-up Person-time rate = Number of new cases of disease or injury during specified period Time each person was observed, totaled for all persons = 16 / 6,400 = .0025 cases per person-year = 2.5 cases per 1,000 person-years In contrast, the incidence proportion can be calculated as 16 / 2,100 = 7.6 cases per 1,000 population during the four-year period, or an average of 1.9 cases per 1,000 per year (7.6 divided by 4 years). The incidence proportion underestimates the true rate because it ignores persons lost to follow-up, and assumes that they remained disease- free for all four years. Example B: The diabetes follow-up study included 218 diabetic women and 3,823 nondiabetic women. By the end of the study, 72 of the diabetic women and 511 of the nondiabetic women had died. The diabetic women were observed for a total of 1,862 person years; the nondiabetic women were observed for a total of 36,653 person years. Calculate the incidence rates of death for the diabetic and non-diabetic women. For diabetic women, numerator = 72 and denominator = 1,862 Person-time rate = 72 / 1,862 = 0.0386 deaths per person-year = 38.6 deaths per 1,000 person-years For nondiabetic women, numerator = 511 and denominator = 36,653 Person-time rate = 511 / 36,653 = 0.0139 deaths per person-year = 13.9 deaths per 1,000 person-years
  • 195.
    Measures of Risk Page3-16 EXAMPLES: Calculating Incidence Rates (Continued) Example C: In 2003, 44,232 new cases of acquired immunodeficiency syndrome (AIDS) were reported in the United States.5 The estimated mid-year population of the U.S. in 2003 was approximately 290,809,777.6 Calculate the incidence rate of AIDS in 2003. Numerator = 44,232 new cases of AIDS Denominator = 290,809,777 estimated mid-year population 10n = 100,000 Incidence rate = (44,232 / 290,809,777) x 100,000 = 15.21 new cases of AIDS per 100,000 population Prevalence Definition of prevalence Prevalence, sometimes referred to as prevalence rate, is the proportion of persons in a population who have a particular disease or attribute at a specified point in time or over a specified period of time. Prevalence differs from incidence in that prevalence includes all cases, both new and preexisting, in the population at the specified time, whereas incidence is limited to new cases only. Point prevalence refers to the prevalence measured at a particular point in time. It is the proportion of persons with a particular disease or attribute on a particular date. Period prevalence refers to prevalence measured over an interval of time. It is the proportion of persons with a particular disease or attribute at any time during the interval. Method for calculating prevalence of disease All new and pre-existing cases during a given time period x 10n Population during the same time period Method for calculating prevalence of an attribute Persons having a particular attribute during a given time period x 10n Population during the same time period The value of 10n is usually 1 or 100 for common attributes. The value of 10n might be 1,000, 100,000, or even 1,000,000 for rare attributes and for most diseases.
  • 196.
    Measures of Risk Page3-17 EXAMPLE: Calculating Prevalence In a survey of 1,150 women who gave birth in Maine in 2000, a total of 468 reported taking a multivitamin at least 4 times a week during the month before becoming pregnant.7 Calculate the prevalence of frequent multivitamin use in this group. Numerator = 468 multivitamin users Denominator = 1,150 women Prevalence = (468 / 1,150) x 100 = 0.407 x 100 = 40.7% Properties and uses of prevalence • Prevalence and incidence are frequently confused. Prevalence refers to proportion of persons who have a condition at or during a particular time period, whereas incidence refers to the proportion or rate of persons who develop a condition during a particular time period. So prevalence and incidence are similar, but prevalence includes new and pre-existing cases whereas incidence includes new cases only. The key difference is in their numerators. Numerator of incidence = new cases that occurred during a given time period Numerator of prevalence = all cases present during a given time period • The numerator of an incidence proportion or rate consists only of persons whose illness began during the specified interval. The numerator for prevalence includes all persons ill from a specified cause during the specified interval regardless of when the illness began. It includes not only new cases, but also preexisting cases representing persons who remained ill during some portion of the specified interval. • Prevalence is based on both incidence and duration of illness. High prevalence of a disease within a population might reflect high incidence or prolonged survival without cure or both. Conversely, low prevalence might indicate low incidence, a rapidly fatal process, or rapid recovery. • Prevalence rather than incidence is often measured for chronic diseases such as diabetes or osteoarthritis which have long duration and dates of onset that are difficult to pinpoint.
  • 197.
    Measures of Risk Page3-18 EXAMPLES: Incidence versus Prevalence Figure 3.1 represents 10 new cases of illness over about 15 months in a population of 20 persons. Each horizontal line represents one person. The down arrow indicates the date of onset of illness. The solid line represents the duration of illness. The up arrow and the cross represent the date of recovery and date of death, respectively. Figure 3.1 New Cases of Illness from October 1, 2004–September 30, 2005 Example A: Calculate the incidence rate from October 1, 2004, to September 30, 2005, using the midpoint population (population alive on April 1, 2005) as the denominator. Express the rate per 100 population. Incidence rate numerator = number of new cases between October 1 and September 30 = 4 (the other 6 all had onsets before October 1, and are not included) Incidence rate denominator = April 1 population = 18 (persons 2 and 8 died before April 1) Incidence rate = (4 / 18) x 100 = 22 new cases per 100 population Example B: Calculate the point prevalence on April 1, 2005. Point prevalence is the number of persons ill on the date divided by the population on that date. On April 1, seven persons (persons 1, 4, 5, 7, 9, and 10) were ill. Point prevalence = (7 / 18) x 100 = 38.89% Example C: Calculate the period prevalence from October 1, 2004, to September 30, 2005. The numerator of period prevalence includes anyone who was ill any time during the period. In Figure 3.1, the first 10 persons were all ill at some time during the period. Period prevalence = (10 / 20) x 100 = 50.0%
  • 198.
    Measures of Risk Page3-19 Exercise 3.2 For each of the fractions shown below, indicate whether it is an incidence proportion, incidence rate, prevalence, or none of the three. A. Incidence proportion B. Incidence rate C. Prevalence D. None of the above ________ 1. number of women in Framingham Study who have died through last year from heart disease number of women initially enrolled in Framingham Study ________ 2. number of women in Framingham Study who have died through last year from heart disease number of person-years contributed through last year by women initially enrolled in Framingham Study ________ 3. number of women in town of Framingham who reported having heart disease in recent health survey estimated number of women residents of Framingham during same period ________ 4. number of women in Framingham Study newly diagnosed with heart disease last year number of women in Framingham Study without heart disease at beginning of same year ________ 5. number of women in State A newly diagnosed with heart disease in 2004 estimated number of women living in State A on July 1, 2004 ________ 6. estimated number of women smokers in State A according to 2004 Behavioral Risk Factor Survey estimated number of women living in State A on July 1, 2004 ________ 7. number of women in State A who reported having heart disease in 2004 health survey estimated number of women smokers in State A according to 2004 Behavioral Risk Factor Survey Check your answers on page 3-52
  • 199.
    Measures of Risk Page3-20 Mortality Frequency Measures Mortality rate A mortality rate is a measure of the frequency of occurrence of death in a defined population during a specified interval. Morbidity and mortality measures are often the same mathematically; it’s just a matter of what you choose to measure, illness or death. The formula for the mortality of a defined population, over a specified period of time, is: Deaths occurring during a given time period x 10n Size of the population among which the deaths occurred When mortality rates are based on vital statistics (e.g., counts of death certificates), the denominator most commonly used is the size of the population at the middle of the time period. In the United States, values of 1,000 and 100,000 are both used for 10n for most types of mortality rates. Table 3.4 summarizes the formulas of frequently used mortality measures. Table 3.4 Frequently Used Measures of Mortality Measure Numerator Denominator 10n Crude death rate Total number of deaths during a given time interval Mid-interval population 1,000 or 100,000 Cause-specific death rate Number of deaths assigned to a specific cause during a given time interval Mid-interval population 100,000 Proportionate mortality Number of deaths assigned to a specific cause during a given time interval Total number of deaths from all causes during the same time interval 100 or 1,000 Death-to-case ratio Number of deaths assigned to a specific cause during a given time interval Number of new cases of same disease reported during the same time interval 100 Neonatal mortality rate Number of deaths among children < 28 days of age during a given time interval Number of live births during the same time interval 1,000 Postneonatal mortality rate Number of deaths among children 28–364 days of age during a given time interval Number of live births during the same time interval 1,000 Infant mortality rate Number of deaths among children < 1 year of age during a given time interval Number of live births during the same time interval 1,000 Maternal mortality rate Number of deaths assigned to pregnancy-related causes during a given time interval Number of live births during the same time interval 100,000
  • 200.
    Measures of Risk Page3-21 Crude mortality rate (crude death rate) The crude mortality rate is the mortality rate from all causes of death for a population. In the United States in 2003, a total of 2,419,921 deaths occurred. The estimated population was 290,809,777. The crude mortality rate in 2003 was, therefore, (2,419,921 / 290,809,777) x 100,000, or 832.1 deaths per 100,000 population.8 Cause-specific mortality rate The cause-specific mortality rate is the mortality rate from a specified cause for a population. The numerator is the number of deaths attributed to a specific cause. The denominator remains the size of the population at the midpoint of the time period. The fraction is usually expressed per 100,000 population. In the United States in 2003, a total of 108,256 deaths were attributed to accidents (unintentional injuries), yielding a cause-specific mortality rate of 37.2 per 100,000 population.8 Age-specific mortality rate An age-specific mortality rate is a mortality rate limited to a particular age group. The numerator is the number of deaths in that age group; the denominator is the number of persons in that age group in the population. In the United States in 2003, a total of 130,761 deaths occurred among persons aged 25–44 years, or an age-specific mortality rate of 153.0 per 100,000 25–44 year olds.8 Some specific types of age-specific mortality rates are neonatal, postneonatal, and infant mortality rates, as described in the following sections. Infant mortality rate The infant mortality rate is perhaps the most commonly used measure for comparing health status among nations. It is calculated as follows: Number of deaths among children < 1 year of age reported during a given time period x 1,000 Number of live births reported during the same time period The infant mortality rate is generally calculated on an annual basis. It is a widely used measure of health status because it reflects the health of the mother and infant during pregnancy and the year thereafter. The health of the mother and infant, in turn, reflects a wide variety of factors, including access to prenatal care, prevalence of prenatal maternal health behaviors (such as alcohol
  • 201.
    Measures of Risk Page3-22 or tobacco use and proper nutrition during pregnancy, etc.), postnatal care and behaviors (including childhood immunizations and proper nutrition), sanitation, and infection control. Is the infant mortality rate a ratio? Yes. Is it a proportion? No, because some of the deaths in the numerator were among children born the previous year. Consider the infant mortality rate in 2003. That year, 28,025 infants died and 4,089,950 children were born, for an infant mortality rate of 6.951 per 1,000.8 Undoubtedly, some of the deaths in 2003 occurred among children born in 2002, but the denominator includes only children born in 2003. Is the infant mortality rate truly a rate? No, because the denominator is not the size of the mid-year population of children < 1 year of age in 2003. In fact, the age-specific death rate for children < 1 year of age for 2003 was 694.7 per 100,000.8 Obviously the infant mortality rate and the age-specific death rate for infants are very similar (695.1 versus 694.7 per 100,000) and close enough for most purposes. They are not exactly the same, however, because the estimated number of infants residing in the United States on July 1, 2003 was slightly larger than the number of children born in the United States in 2002, presumably because of immigration. Neonatal mortality rate The neonatal period covers birth up to but not including 28 days. The numerator of the neonatal mortality rate therefore is the number of deaths among children under 28 days of age during a given time period. The denominator of the neonatal mortality rate, like that of the infant mortality rate, is the number of live births reported during the same time period. The neonatal mortality rate is usually expressed per 1,000 live births. In 2003, the neonatal mortality rate in the United States was 4.7 per 1,000 live births.8 Postneonatal mortality rate The postneonatal period is defined as the period from 28 days of age up to but not including 1 year of age. The numerator of the postneonatal mortality rate therefore is the number of deaths among children from 28 days up to but not including 1 year of age during a given time period. The denominator is the number of live births reported during the same time period. The postneonatal mortality rate is usually expressed per 1,000 live births. In 2003, the postneonatal mortality rate in the United States was 2.3 per 1,000 live births.8
  • 202.
    Measures of Risk Page3-23 Maternal mortality rate The maternal mortality rate is really a ratio used to measure mortality associated with pregnancy. The numerator is the number of deaths during a given time period among women while pregnant or within 42 days of termination of pregnancy, irrespective of the duration and the site of the pregnancy, from any cause related to or aggravated by the pregnancy or its management, but not from accidental or incidental causes. The denominator is the number of live births reported during the same time period. Maternal mortality rate is usually expressed per 100,000 live births. In 2003, the U.S. maternal mortality rate was 8.9 per 100,000 live births.8 Sex-specific mortality rate A sex-specific mortality rate is a mortality rate among either males or females. Both numerator and denominator are limited to the one sex. Race-specific mortality rate A race-specific mortality rate is a mortality rate related to a specified racial group. Both numerator and denominator are limited to the specified race. Combinations of specific mortality rates Mortality rates can be further stratified by combinations of cause, age, sex, and/or race. For example, in 2002, the death rate from diseases of the heart among women ages 45–54 years was 50.6 per 100,000.9 The death rate from diseases of the heart among men in the same age group was 138.4 per 100,000, or more than 2.5 times as high as the comparable rate for women. These rates are a cause-, age-, and sex-specific rates, because they refer to one cause (diseases of the heart), one age group (45–54 years), and one sex (female or male).
  • 203.
    Measures of Risk Page3-24 EXAMPLE: Calculating Mortality Rates Table 3.5 provides the number of deaths from all causes and from accidents (unintentional injuries) by age group in the United States in 2002. Review the following rates. Determine what to call each one, then calculate it using the data provided in Table 3.5. a. Unintentional-injury-specific mortality rate for the entire population This is a cause-specific mortality rate. Rate = number of unintentional injury deaths in the entire population x 100,000 estimated midyear population = (106,742 / 288,357,000) x 100,000 = 37.0 unintentional-injury-related deaths per 100,000 population b. All-cause mortality rate for 25–34 year olds This is an age-specific mortality rate. Rate = number of deaths from all causes among 25–34 year olds x 100,000 estimated midyear population of 25–34 year olds = (41,355 / 39,928,000) x 100,000 = 103.6 deaths per 100,000 25–34 year olds c. All-cause mortality among males This is a sex-specific mortality rate. Rate = number of deaths from all causes among males x 100,000 estimated midyear population of males = (1,199,264 / 141,656,000) x 100,000 = 846.6 deaths per 100,000 males d. Unintentional-injury specific mortality among 25 to 34 year old males This is a cause-specific, age-specific, and sex-specific mortality rate Rate = number of unintentional injury deaths among 25–34 year old males x 100,000 estimated midyear population of 25–34 year old males = (9,635 / 20,203,000) x 100,000 = 47.7 unintentional-injury-related deaths per 100,000 25–34 year olds
  • 204.
    Measures of Risk Page3-25 Table 3.5 All-Cause and Unintentional Injury Mortality and Estimated Population by Age Group, For Both Sexes and For Males Alone — United States, 2002 All Races, Both Sexes All Races, Males Age group (years) All Causes Unintentional Injuries Estimated Pop. (x 1000) All Causes Unintentional Injuries Estimated Pop. (x 1000) 0–4 32,892 2,587 19,597 18,523 1,577 10,020 5–14 7,150 2,718 41,037 4,198 1713 21,013 15–24 33,046 15,412 40,590 24,416 11,438 20,821 25–34 41,355 12,569 39,928 28,736 9,635 20,203 35–44 91,140 16,710 44,917 57,593 12,012 22,367 45–54 172,385 14,675 40,084 107,722 10,492 19,676 55–64 253,342 8,345 26,602 151,363 5,781 12,784 65+ 1,811,720 33,641 35,602 806,431 16,535 14,772 Not stated 357 85 0 282 74 0 Total 2,443,387 106,742 288,357 1,199,264 69,257 141,656 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. Available from: http://www.cdc.gov/injury/wisqars.
  • 205.
    Measures of Risk Page3-26 Exercise 3.3 In 2001, a total of 15,555 homicide deaths occurred among males and 4,753 homicide deaths occurred among females. The estimated 2001 midyear populations for males and females were 139,813,000 and 144,984,000, respectively. 1. Calculate the homicide-related death rates for males and for females. 2. What type(s) of mortality rates did you calculate in Question 1? 3. Calculate the ratio of homicide-mortality rates for males compared to females. 4. Interpret the rate you calculated in Question 3 as if you were presenting information to a policymaker. Check your answers on page 3-52
  • 206.
    Measures of Risk Page3-27 Age-adjusted mortality rates Age-adjusted mortality rate: a mortality rate statistically modified to eliminate the effect of different age distributions in the different populations. Mortality rates can be used to compare the rates in one area with the rates in another area, or to compare rates over time. However, because mortality rates obviously increase with age, a higher mortality rate among one population than among another might simply reflect the fact that the first population is older than the second. Consider that the mortality rates in 2002 for the states of Alaska and Florida were 472.2 and 1,005.7 per 100,000, respectively (see Table 3.6). Should everyone from Florida move to Alaska to reduce their risk of death? No, the reason that Alaska’s mortality rate is so much lower than Florida’s is that Alaska’s population is considerably younger. Indeed, for seven age groups, the age- specific mortality rates in Alaska are actually higher than Florida’s. To eliminate the distortion caused by different underlying age distributions in different populations, statistical techniques are used to adjust or standardize the rates among the populations to be compared. These techniques take a weighted average of the age- specific mortality rates, and eliminate the effect of different age distributions among the different populations. Mortality rates computed with these techniques are age-adjusted or age-standardized mortality rates. Alaska’s 2002 age-adjusted mortality rate (794.1 per 100,000) was higher than Florida’s (787.8 per 100,000), which is not surprising given that 7 of 13 age- specific mortality rates were higher in Alaska than Florida. Death-to-case ratio Definition of death-to-case ratio The death-to-case ratio is the number of deaths attributed to a particular disease during a specified time period divided by the number of new cases of that disease identified during the same time period. The death-to-case ratio is a ratio but not necessarily a proportion, because some of the deaths that are counted in the numerator might have occurred among persons who developed disease in an earlier period, and are therefore not counted in the denominator.
  • 207.
    Measures of Risk Page3-28 Table 3.6 All-Cause Mortality by Age Group — Alaska and Florida, 2002 ALASKA FLORIDA Age group (years) Population Deaths Death Rate (per 100,000) Population Deaths Death Rate (per 100,000) <1 9,938 55 553.4 205,579 1,548 753.0 1–4 38,503 12 31.2 816,570 296 36.2 5–9 50,400 6 11.9 1,046,504 141 13.5 10–14 57,216 24 41.9 1,131,068 219 19.4 15–19 56,634 43 75.9 1,073,470 734 68.4 20–24 42,929 63 146.8 1,020,856 1,146 112.3 25–34 84,112 120 142.7 2,090,312 2,627 125.7 35–44 107,305 280 260.9 2,516,004 5,993 238.2 45–54 103,039 427 414.4 2,225,957 10,730 482.0 55–64 52,543 480 913.5 1,694,574 16,137 952.3 65–74 24,096 502 2,083.3 1,450,843 28,959 1,996.0 65–84 11,784 645 5,473.5 1,056,275 50,755 4,805.1 85+ 3,117 373 11,966.6 359,056 48,486 13,503.7 Unknown NA 0 NA NA 43 NA Total 3,030 3,030 472.2 16,687,068 167,814 1,005.7 Age-adjusted rate: 794.1 787.8 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. Available from: http://www.cdc.gov/injury/wisqars. Method for calculating death-to-case ratio Number of deaths attributed to a particular disease during specified period x 10n Number of new cases of the disease identified during the specified period EXAMPLE: Calculating Death-to-Case Ratios Between 1940 and 1949, a total of 143,497 incident cases of diphtheria were reported. During the same decade, 11,228 deaths were attributed to diphtheria. Calculate the death-to-case ratio. Death-to-case ratio = 11,228 / 143,497 x 1 = 0.0783 or = 11,228 / 143,497 x 100 = 7.83 per 100
  • 208.
    Measures of Risk Page3-29 Exercise 3.4 Table 3.7 provides the number of reported cases of diphtheria and the number of diphtheria-associated deaths in the United States by decade. Calculate the death-to-case ratio by decade. Describe the data in Table 3.7, including your results. Table 3.7 Number of Cases and Deaths from Diphtheria by Decade — United States, 1940–1999 Decade Number of New Cases Number of Deaths Death-to-case Ratio (x 100) 1940–1949 143,497 11,228 7.82 1950–1959 23,750 1,710 1960–1969 3,679 390 1970–1979 1,956 90 1980–1989 27 3 1990–1999 22 5 Data Sources: Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 2001. MMWR 2001;50(No. 53). Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 1998. MMWR 1998;47(No. 53). Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 1989. MMWR 1989;38 (No. 53). Check your answers on page 3-53
  • 209.
    Measures of Risk Page3-30 Case-fatality rate The case-fatality rate is the proportion of persons with a particular condition (cases) who die from that condition. It is a measure of the severity of the condition. The formula is: Number of cause-specific deaths among the incident cases x 10n Number of incident cases The case-fatality rate is a proportion, so the numerator is restricted to deaths among people included in the denominator. The time periods for the numerator and the denominator do not need to be the same; the denominator could be cases of HIV/AIDS diagnosed during the calendar year 1990, and the numerator, deaths among those diagnosed with HIV in 1990, could be from 1990 to the present. EXAMPLE: Calculating Case-Fatality Rates In an epidemic of hepatitis A traced to green onions from a restaurant, 555 cases were identified. Three of the case- patients died as a result of their infections. Calculate the case-fatality rate. Case fatality rate = (3 / 555) x 100 = 0.5% The case-fatality rate is a proportion, not a true rate. As a result, some epidemiologists prefer the term case-fatality ratio. The concept behind the case-fatality rate and the death-to-case ratio is similar, but the formulations are different. The death-to- case ratio is simply the number of cause-specific deaths that occurred during a specified time divided by the number of new cases of that disease that occurred during the same time. The deaths included in the numerator of the death-to-case ratio are not restricted to the new cases in the denominator; in fact, for many diseases, the deaths are among persons whose onset of disease was years earlier. In contrast, in the case-fatality rate, the deaths included in the numerator are restricted to the cases in the denominator. Proportionate mortality Definition of proportionate mortality Proportionate mortality describes the proportion of deaths in a specified population over a period of time attributable to different causes. Each cause is expressed as a percentage of all deaths, and
  • 210.
    Measures of Risk Page3-31 the sum of the causes must add to 100%. These proportions are not mortality rates, because the denominator is all deaths rather than the population in which the deaths occurred. Method for calculating proportionate mortality For a specified population over a specified period, Deaths caused by a particular cause x 100 Deaths from all causes The distribution of primary causes of death in the United States in 2003 for the entire population (all ages) and for persons ages 25– 44 years are provided in Table 3.1. As illustrated in that table, accidents (unintentional injuries) accounted for 4.3% of all deaths, but 21.6% of deaths among 25–44 year olds.8 Sometimes, particularly in occupational epidemiology, proportionate mortality is used to compare deaths in a population of interest (say, a workplace) with the proportionate mortality in the broader population. This comparison of two proportionate mortalities is called a proportionate mortality ratio, or PMR for short. A PMR greater than 1.0 indicates that a particular cause accounts for a greater proportion of deaths in the population of interest than you might expect. For example, construction workers may be more likely to die of injuries than the general population. However, PMRs can be misleading, because they are not based on mortality rates. A low cause-specific mortality rate in the population of interest can elevate the proportionate mortalities for all of the other causes, because they must add up to 100%. Those workers with a high injury-related proportionate mortality very likely have lower proportionate mortalities for chronic or disabling conditions that keep people out of the workforce. In other words, people who work are more likely to be healthier than the population as a whole — this is known as the healthy worker effect.
  • 211.
    Measures of Risk Page3-32 Exercise 3.5 Using the data in Table 3.8, calculate the missing proportionate mortalities for persons ages 25—44 years for diseases of the heart and assaults (homicide). Table 3.8 Number, Proportion (Percentage), and Ranking of Deaths for Leading Causes of Death, All Ages and 25–44 Year Age Group — United States, 2003 All Ages Ages 25–44 Years Number Percentage Rank Number Percentage Rank All causes 2,443,93 0 100.0 128,924 100.0 Diseases of heart 684,462 28.0 1 16,283 3 Malignant neoplasms 554,643 22.7 2 19,041 14.8 2 Cerebrovascular disease 157,803 6.5 3 3,004 2.3 8 Chronic lower respiratory diseases 126,128 5.2 4 401 0.3 * Accidents (unintentional injuries) 105,695 4.3 5 27,844 21.6 1 Diabetes mellitus 73,965 3.0 6 2,662 2.1 9 Influenza & pneumonia 64,847 2.6 7 1,337 1.0 10 Alzheimer's disease 63,343 2.6 8 0 0.0 * Nephritis, nephrotic syndrome, nephrosis 33,615 1.4 9 305 0.2 * Septicemia 34,243 1.4 10 328 0.2 * Intentional self-harm (suicide) 30,642 1.3 11 11,251 8.7 4 Chronic liver disease and cirrhosis 27,201 1.1 12 3,288 2.6 7 Assault (homicide) 17,096 0.7 13 7,367 5 HIV disease 13,544 0.5 * 6,879 5.3 6 All other 456,703 18.7 29,480 22.9 * Not among top ranked causes Data Sources: CDC. Summary of notifiable diseases, United States, 2003. MMWR 2005;2(No. 54). Hoyert DL, Kung HC, Smith BL. Deaths: Preliminary data for 2003. National Vital Statistics Reports; vol. 53 no 15. Hyattsville, MD: National Center for Health Statistics 2005: 15, 27. Check your answers on page 3-53
  • 212.
    Measures of Risk Page3-33 Years of potential life lost Definition of years of potential life lost Years of potential life lost (YPLL) is one measure of the impact of premature mortality on a population. Additional measures incorporate disability and other measures of quality of life. YPLL is calculated as the sum of the differences between a predetermined end point and the ages of death for those who died before that end point. The two most commonly used end points are age 65 years and average life expectancy. The use of YPLL is affected by this calculation, which implies a value system in which more weight is given to a death when it occurs at an earlier age. Thus, deaths at older ages are “devalued.” However, the YPLL before age 65 (YPLL65) places much more emphasis on deaths at early ages than does YPLL based on remaining life expectancy (YPLLLE). In 2000, the remaining life expectancy was 21.6 years for a 60-year-old, 11.3 years for a 70- year-old, and 8.6 for an 80-year-old. YPLL65 is based on the fewer than 30% of deaths that occur among persons younger than 65. In contrast, YPLL for life expectancy (YPLLLE) is based on deaths among persons of all ages, so it more closely resembles crude mortality rates.10 YPLL rates can be used to compare YPLL among populations of different sizes. Because different populations may also have different age distributions, YPLL rates are usually age-adjusted to eliminate the effect of differing age distributions. Method for calculating YPLL from a line listing Step 1. Decide on end point (65 years, average life expectancy, or other). Step 2. Exclude records of all persons who died at or after the end point. Step 3. For each person who died before the end point, calculate that person’s YPLL by subtracting the age at death from the end point. YPLLindividual = end point – age at death Step 4. Sum the individual YPLLs. YPLL = ∑ YPLLindividual
  • 213.
    Measures of Risk Page3-34 Method for calculating YPLL from a frequency Step 1. Ensure that age groups break at the identified end point (e.g., 65 years). Eliminate all age groups older than the endpoint. Step 2. For each age group younger than the end point, identify the midpoint of the age group, where midpoint = age group’s youngest age in years + oldest age + 1 2 Step 3. For each age group younger than the end point, identify that age group’s YPLL by subtracting the midpoint from the end point. Step 4. Calculate age-specific YPLL by multiplying the age group’s YPLL times the number of persons in that age group. Step 5. Sum the age-specific YPLLs. The YPLL rate represents years of potential life lost per 1,000 population below the end-point age, such as 65 years. YPLL rates should be used to compare premature mortality in different populations, because YPLL does not take into account differences in population sizes. The formula for a YPLL rate is as follows: Years of potential life lost x 10n Population under age 65 years
  • 214.
    Measures of Risk Page3-35 EXAMPLE: Calculating YPLL and YPLL Rates Use the data in Tables 3.9 and 3.10 to calculate the leukemia-related mortality rate for all ages, mortality rate for persons under age 65 years, YPLL, and YPLL rate. 1. Leukemia related mortality rate, all ages = (21,498 / 288,357,000) x 100,000 = 7.5 leukemia deaths per 100,000 population 2. Leukemia related mortality rate for persons under age 65 years = 125 + 316 + 472 + 471 + 767 + 1,459 + 2,611 x 100,000 (19,597 + 41,037 + 40,590 +39,928 + 44,917 + 40,084 + 26,602) = 6,221 / 252,755,000 = x 100,000 = 2.5 leukemia deaths per 100,000 persons under age 65 years 3. Leukemia related YPLL a. Calculate the midpoint of each age interval. Using the previously shown formula, the midpoint of the age group 0–4 years is (0 + 4 + 1) / 2, or 5 / 2, or 2.5 years. Using the same formula, midpoints must be determined for each age group up to and including the age group 55 to 64 years (see column 3 of Table 3.10). b. Subtract the midpoint from the end point to determine the years of potential life lost for a particular age group. For the age group 0–4 years, each death represents 65 minus 2.5, or 62.5 years of potential life lost (see column 4 of Table 3.10). c. Calculate age specific years of potential life lost by multiplying the number of deaths in a given age group by its years of potential life lost. For the age group 0–4 years, 125 deaths x 62.5 = 7,812.5 YPLL (see column 5 of Table 3.10). d. Total the age specific YPLL. The total YPLL attributed to leukemia in the United States in 2002 was 117,033 years (see Total of column 5, Table 3.10). 4. Leukemia related YPLL rate = YPLL65 rate = YPLL divided by population to age 65 = (117,033 / 252,755,000) x 1,000 = 0.5 YPLL per 1,000 population under age 65
  • 215.
    Measures of Risk Page3-36 Table 3.9 Deaths Attributed to HIV or Leukemia by Age Group — United States, 2002 Age group (Years) Population (X 1,000) Number of HIV Deaths Number of Leukemia Deaths 0–4 19,597 12 125 5–14 41,037 25 316 15–24 40,590 178 472 25–34 39,928 1,839 471 35–44 44,917 5,707 767 45–54 40,084 4,474 1,459 55–64 26,602 1,347 2,611 65+ 35,602 509 15,277 Not stated 4 0 Total 288,357 14,095 21,498 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. Available from: http://www.cdc.gov/injury/wisqars. Table 3.10 Deaths and Years of Potential Life Lost Attributed to Leukemia by Age Group — United States, 2002 Column 1 Age Group (years) Column 2 Deaths Column 3 Age Midpoint Column 4 Years to 65 Column 5 YPLL 0–4 125 2.5 62.5 7,813 5–14 316 10 55 17,380 15–24 472 20 45 21,240 25–34 471 30 35 16,485 35–44 767 40 25 19,175 45–54 1,459 50 15 21,885 55–64 2,611 60 5 13,055 65+ 15,277 — — — Not stated 0 — — — Total 21,498 117,033 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. Available from: http://www.cdc.gov/injury/wisqars.
  • 216.
    Measures of Risk Page3-37 Exercise 3.6 Use the HIV data in Table 3.9 to answer the following questions: 1. What is the HIV-related mortality rate, all ages? 2. What is the HIV-related mortality rate for persons under 65 years? 3. What is the HIV-related YPLL before age 65? 4. What is the HIV-related YPLL65 rate? 5. Create a table comparing the mortality rates and YPLL for leukemia and HIV. Which measure(s) might you prefer if you were trying to support increased funding for leukemia research? For HIV research? Check your answers on page 3-53
  • 217.
    Measures of Risk Page3-38 Natality (Birth) Measures Natality measures are population-based measures of birth. These measures are used primarily by persons working in the field of maternal and child health. Table 3.11 includes some of the commonly used measures of natality. Table 3.11 Frequently Used Measures of Natality Measure Numerator Denominator 10n Crude birth rate Number of live births during a specified time interval Mid-interval population 1,000 Crude fertility rate Number of live births during a specified time interval Number of women ages 15–44 years at mid-interval 1,000 Crude rate of natural increase Number of live births minus number of deaths during a specified time interval Mid-interval population 1,000 Low-birth weight ratio Number of live births <2,500 grams during a specified time interval Number of live births during the same time interval 100
  • 218.
    Measures of Risk Page3-39 Measures of Association The key to epidemiologic analysis is comparison. Occasionally you might observe an incidence rate among a population that seems high and wonder whether it is actually higher than what should be expected based on, say, the incidence rates in other communities. Or, you might observe that, among a group of case- patients in an outbreak, several report having eaten at a particular restaurant. Is the restaurant just a popular one, or have more case- patients eaten there than would be expected? The way to address that concern is by comparing the observed group with another group that represents the expected level. A measure of association quantifies the relationship between exposure and disease among the two groups. Exposure is used loosely to mean not only exposure to foods, mosquitoes, a partner with a sexually transmissible disease, or a toxic waste dump, but also inherent characteristics of persons (for example, age, race, sex), biologic characteristics (immune status), acquired characteristics (marital status), activities (occupation, leisure activities), or conditions under which they live (socioeconomic status or access to medical care). The measures of association described in the following section compare disease occurrence among one group with disease occurrence in another group. Examples of measures of association include risk ratio (relative risk), rate ratio, odds ratio, and proportionate mortality ratio. Risk ratio Definition of risk ratio A risk ratio (RR), also called relative risk, compares the risk of a health event (disease, injury, risk factor, or death) among one group with the risk among another group. It does so by dividing the risk (incidence proportion, attack rate) in group 1 by the risk (incidence proportion, attack rate) in group 2 . The two groups are typically differentiated by such demographic factors as sex (e.g., males versus females) or by exposure to a suspected risk factor (e.g., did or did not eat potato salad). Often, the group of primary interest is labeled the exposed group, and the comparison group is labeled the unexposed group. Method for Calculating risk ratio The formula for risk ratio (RR) is:
  • 219.
    Measures of Risk Page3-40 Risk of disease (incidence proportion, attack rate) in group of primary interest Risk of disease (incidence proportion, attack rate) in comparison group A risk ratio of 1.0 indicates identical risk among the two groups. A risk ratio greater than 1.0 indicates an increased risk for the group in the numerator, usually the exposed group. A risk ratio less than 1.0 indicates a decreased risk for the exposed group, indicating that perhaps exposure actually protects against disease occurrence.
  • 220.
    Measures of Risk Page3-41 EXAMPLES: Calculating Risk Ratios Example A: In an outbreak of tuberculosis among prison inmates in South Carolina in 1999, 28 of 157 inmates residing on the East wing of the dormitory developed tuberculosis, compared with 4 of 137 inmates residing on the West wing.11 These data are summarized in the two-by-two table so called because it has two rows for the exposure and two columns for the outcome. Here is the general format and notation. Table 3.12A General Format and Notation for a Two-by-Two Table Ill Well Total Exposed a b a + b = H1 Unexposed c d c + d = H0 Total a + c = V1 b + d = V0 T In this example, the exposure is the dormitory wing (and the outcome is tuberculosis) illustrated in Table 3.12B. Calculate the risk ratio. Table 3.12B Incidence of Mycobacterium Tuberculosis Infection Among Congregated, HIV-Infected Prison Inmates by Dormitory Wing — South Carolina, 1999 Developed tuberculosis? Yes No Total East wing a = 28 b = 129 H1 = 157 West wing c = 4 d = 133 H0 = 137 Total 32 262 T = 294 Data source: McLaughlin SI, Spradling P, Drociuk D, Ridzon R, Pozsik CJ, Onorato I. Extensive transmission of Mycobacterium tuberculosis among congregated, HIV-infected prison inmates in South Carolina, United States. Int J Tuberc Lung Dis 2003;7:665–672. To calculate the risk ratio, first calculate the risk or attack rate for each group. Here are the formulas: Attack Rate (Risk) Attack rate for exposed = a / a+b Attack rate for unexposed = c / c+d For this example: Risk of tuberculosis among East wing residents = 28 / 157 = 0.178 = 17.8% Risk of tuberculosis among West wing residents = 4 / 137 = 0.029 = 2.9% The risk ratio is simply the ratio of these two risks: Risk ratio = 17.8 / 2.9 = 6.1 Thus, inmates who resided in the East wing of the dormitory were 6.1 times as likely to develop tuberculosis as those who resided in the West wing.
  • 221.
    Measures of Risk Page3-42 EXAMPLES: Calculating Risk Ratios (Continued) Example B: In an outbreak of varicella (chickenpox) in Oregon in 2002, varicella was diagnosed in 18 of 152 vaccinated children compared with 3 of 7 unvaccinated children. Calculate the risk ratio. Table 3.13 Incidence of Varicella Among Schoolchildren in 9 Affected Classrooms — Oregon, 2002 Varicella Non-case Total Vaccinated a = 18 b = 134 152 Unvaccinated c = 3 d = 4 7 Total 21 138 159 Data Source: Tugwell BD, Lee LE, Gillette H, Lorber EM, Hedberg K, Cieslak PR. Chickenpox outbreak in a highly vaccinated school population. Pediatrics 2004 Mar;113(3 Pt 1):455–459. Risk of varicella among vaccinated children = 18 / 152 = 0.118 = 11.8% Risk of varicella among unvaccinated children = 3 / 7 = 0.429 = 42.9% Risk ratio = 0.118 / 0.429 = 0.28 The risk ratio is less than 1.0, indicating a decreased risk or protective effect for the exposed (vaccinated) children. The risk ratio of 0.28 indicates that vaccinated children were only approximately one-fourth as likely (28%, actually) to develop varicella as were unvaccinated children. Rate ratio A rate ratio compares the incidence rates, person-time rates, or mortality rates of two groups. As with the risk ratio, the two groups are typically differentiated by demographic factors or by exposure to a suspected causative agent. The rate for the group of primary interest is divided by the rate for the comparison group. Rate ratio = Rate for group of primary interest Rate for comparison group The interpretation of the value of a rate ratio is similar to that of the risk ratio. That is, a rate ratio of 1.0 indicates equal rates in the two groups, a rate ratio greater than 1.0 indicates an increased risk for the group in the numerator, and a rate ratio less than 1.0 indicates a decreased risk for the group in the numerator.
  • 222.
    Measures of Risk Page3-43 EXAMPLE: Calculating Rate Ratios (Continued) Public health officials were called to investigate a perceived increase in visits to ships’ infirmaries for acute respiratory illness (ARI) by passengers of cruise ships in Alaska in 1998.13 The officials compared passenger visits to ship infirmaries for ARI during May–August 1998 with the same period in 1997. They recorded 11.6 visits for ARI per 1,000 tourists per week in 1998, compared with 5.3 visits per 1,000 tourists per week in 1997. Calculate the rate ratio. Rate ratio = 11.6 / 5.3 = 2.2 Passengers on cruise ships in Alaska during May–August 1998 were more than twice as likely to visit their ships’ infirmaries for ARI than were passengers in 1997. (Note: Of 58 viral isolates identified from nasal cultures from passengers, most were influenza A, making this the largest summertime influenza outbreak in North America.)
  • 223.
    Measures of Risk Page3-44 Exercise 3.7 Table 3.14 illustrates lung cancer mortality rates for persons who continued to smoke and for smokers who had quit at the time of follow-up in one of the classic studies of smoking and lung cancer conducted in Great Britain. Using the data in Table 3.14, calculate the following: 1. Rate ratio comparing current smokers with nonsmokers 2. Rate ratio comparing ex-smokers who quit at least 20 years ago with nonsmokers 3. What are the public health implications of these findings? Table 3.14 Number and Rate (Per 1,000 Person-years) of Lung Cancer Deaths for Current Smokers and Ex-smokers by Years Since Quitting, Physician Cohort Study — Great Britain, 1951–1961 Cigarette smoking status Lung cancer deaths Rate per 1000 person-years Rate Ratio Current smokers 133 1.30 ________ For ex-smokers, years since quitting: <5 years 5 0.67 9.6 5–9 years 7 0.49 7.0 10–19 years 3 0.18 2.6 20+ years 2 0.19 ________ Nonsmokers 3 0.07 1.0 (reference group) Data Source: Doll R, Hill AB. Mortality in relation to smoking: 10 years' observation of British doctors. Brit Med J 1964; 1:1399– 1410, 1460–1467. Check your answers on page 3-54
  • 224.
    Measures of Risk Page3-45 Odds ratio An odds ratio (OR) is another measure of association that quantifies the relationship between an exposure with two categories and health outcome. Referring to the four cells in Table 3.15, the odds ratio is calculated as Odds ratio = ( a )( c ) = ad / bc b d where a = number of persons exposed and with disease b = number of persons exposed but without disease c = number of persons unexposed but with disease d = number of persons unexposed: and without disease a+c = total number of persons with disease (case-patients) b+d = total number of persons without disease (controls) The odds ratio is sometimes called the cross-product ratio because the numerator is based on multiplying the value in cell “a” times the value in cell “d,” whereas the denominator is the product of cell “b” and cell “c.” A line from cell “a” to cell “d” (for the numerator) and another from cell “b” to cell “c” (for the denominator) creates an x or cross on the two-by-two table. Table 3.15 Exposure and Disease in a Hypothetical Population of 10,000 Persons Disease No Disease Total Risk Exposed a = 100 b = 1,900 2,000 5.0% Not Exposed c = 80 d = 7,920 8,000 1.0% Total 180 9,820 10,000
  • 225.
    Measures of Risk Page3-46 EXAMPLE: Calculating Odds Ratios Use the data in Table 3.15 to calculate the risk and odds ratios. 1. Risk ratio 5.0 / 1.0 = 5.0 2. Odds ratio (100 x 7,920) / (1,900 x 80) = 5.2 Notice that the odds ratio of 5.2 is close to the risk ratio of 5.0. That is one of the attractive features of the odds ratio — when the health outcome is uncommon, the odds ratio provides a reasonable approximation of the risk ratio. Another attractive feature is that the odds ratio can be calculated with data from a case-control study, whereas neither a risk ratio nor a rate ratio can be calculated. In a case-control study, investigators enroll a group of case-patients (distributed in cells a and c of the two-by-two table), and a group of non-cases or controls (distributed in cells b and d). The odds ratio is the measure of choice in a case-control study (see Lesson 1). A case-control study is based on enrolling a group of persons with disease (“case-patients”) and a comparable group without disease (“controls”). The number of persons in the control group is usually decided by the investigator. Often, the size of the population from which the case-patients came is not known. As a result, risks, rates, risk ratios or rate ratios cannot be calculated from the typical case-control study. However, you can calculate an odds ratio and interpret it as an approximation of the risk ratio, particularly when the disease is uncommon in the population.
  • 226.
    Measures of Risk Page3-47 Exercise 3.8 Calculate the odds ratio for the tuberculosis data in Table 3.12. Would you say that your odds ratio is an accurate approximation of the risk ratio? (Hint: The more common the disease, the further the odds ratio is from the risk ratio.) Check your answers on page 3-55
  • 227.
    Measures of Risk Page3-48 Measures of Public Health Impact A measure of public health impact is used to place the association between an exposure and an outcome into a meaningful public health context. Whereas a measure of association quantifies the relationship between exposure and disease, and thus begins to provide insight into causal relationships, measures of public health impact reflect the burden that an exposure contributes to the frequency of disease in the population. Two measures of public health impact often used are the attributable proportion and efficacy or effectiveness. Attributable proportion Definition of attributable proportion The attributable proportion, also known as the attributable risk percent, is a measure of the public health impact of a causative factor. The calculation of this measure assumes that the occurrence of disease in the unexposed group represents the baseline or expected risk for that disease. It further assumes that if the risk of disease in the exposed group is higher than the risk in the unexposed group, the difference can be attributed to the exposure. Thus, the attributable proportion is the amount of disease in the exposed group attributable to the exposure. It represents the expected reduction in disease if the exposure could be removed (or never existed). Appropriate use of attributable proportion depends on a single risk factor being responsible for a condition. When multiple risk factors may interact (e.g., physical activity and age or health status), this measure may not be appropriate. Method for calculating attributable proportion Attributable proportion is calculated as follows: Risk for exposed group – risk for unexposed group x 100% Risk for exposed group Attributable proportion can be calculated for rates in the same way.
  • 228.
    Measures of Risk Page3-49 EXAMPLE: Calculating Attributable Proportion In another study of smoking and lung cancer, the lung cancer mortality rate among nonsmokers was 0.07 per 1,000 persons per year.14 The lung cancer mortality rate among persons who smoked 1–14 cigarettes per day was 0.57 lung cancer deaths per 1,000 persons per year. Calculate the attributable proportion. Attributable proportion = (0.57 – 0.07) / 0.57 x 100% = 87.7% Given the proven causal relationship between cigarette smoking and lung cancer, and assuming that the groups are comparable in all other ways, one could say that about 88% of the lung cancer among smokers of 1 14 cigarettes per day might be attributable to their smoking. The remaining 12% of the lung cancer cases in this group would have occurred anyway. Vaccine efficacy or vaccine effectiveness Vaccine efficacy and vaccine effectiveness measure the proportionate reduction in cases among vaccinated persons. Vaccine efficacy is used when a study is carried out under ideal conditions, for example, during a clinical trial. Vaccine effectiveness is used when a study is carried out under typical field (that is, less than perfectly controlled) conditions. Vaccine efficacy/effectiveness (VE) is measured by calculating the risk of disease among vaccinated and unvaccinated persons and determining the percentage reduction in risk of disease among vaccinated persons relative to unvaccinated persons. The greater the percentage reduction of illness in the vaccinated group, the greater the vaccine efficacy/effectiveness. The basic formula is written as: Risk among unvaccinated group – risk among vaccinated group Risk among unvaccinated group OR: 1 – risk ratio In the first formula, the numerator (risk among unvaccinated – risk among vaccinated) is sometimes called the risk difference or excess risk. Vaccine efficacy/effectiveness is interpreted as the proportionate reduction in disease among the vaccinated group. So a VE of 90% indicates a 90% reduction in disease occurrence among the vaccinated group, or a 90% reduction from the number of cases you would expect if they have not been vaccinated.
  • 229.
    Measures of Risk Page3-50 EXAMPLE: Calculating Vaccine Effectiveness Calculate the vaccine effectiveness from the varicella data in Table 3.13. VE = (42.9 – 11.8) / 42.9 = 31.1 / 42.9 = 72% Alternatively, VE = 1 – RR = 1 – 0.28 = 72% So, the vaccinated group experienced 72% fewer varicella cases than they would have if they had not been vaccinated.
  • 230.
    Measures of Risk Page3-51 Summary Because many of the variables encountered in field epidemiology are nominal-scale variables, frequency measures are used quite commonly in epidemiology. Frequency measures include ratios, proportions, and rates. Ratios and proportions are useful for describing the characteristics of populations. Proportions and rates are used for quantifying morbidity and mortality. These measures allow epidemiologists to infer risk among different groups, detect groups at high risk, and develop hypotheses about causes — that is, why these groups might be at increased risk. The two primary measures of morbidity are incidence and prevalence. • Incidence rates reflect the occurrence of new disease in a population. • Prevalence reflects the presence of disease in a population. A variety of mortality rates describe deaths among specific groups, particularly by age or sex or by cause. The hallmark of epidemiologic analysis is comparison, such as comparison of observed amount of disease in a population with the expected amount of disease. The comparisons can be quantified by using such measures of association as risk ratios, rate ratios, and odds ratios. These measures provide evidence regarding causal relationships between exposures and disease. Measures of public health impact place the association between an exposure and a disease in a public health context. Two such measures are the attributable proportion and vaccine efficacy.
  • 231.
    Measures of Risk Page3-52 Exercise Answers Exercise 3.1 1. B 2. C 3. A 4. B 5. A Exercise 3.2 1. A; denominator is size of population at start of study, numerator is number of deaths among that population. 2. B; denominator is person-years contributed by participants, numerator is number of death among that population. 3. C; numerator is all existing cases. 4. A; denominator is size of population at risk, numerator is number of new cases among that population. 5. B; denominator is mid-year population, numerator is number of new cases among that population. 6. C; numerator is total number with attribute. 7. D; this is a ratio (heart disease:smokers) Exercise 3.3 1. Homicide-related death rate (males) = (# homicide deaths among males / male population) x 100,000 = 15,555 / 139,813,000 x 100,000 = 11.1 homicide deaths / 100,000 population among males Homicide-related death rate (females) = (# homicide deaths among females / female population) x 100,000 = 4,753 / 144,984,000 x 100,000 = 3.3 homicide deaths / 100,000 population among females 2. These are cause- and sex-specific mortality rates. 3. Homicide-mortality rate ratio = homicide death rate (males) / homicide death rate (females) = 11.1 / 3.3 = 3.4 to 1
  • 232.
    Measures of Risk Page3-53 = (see below, which is the answer to question 4). 4. Because the homicide rate among males is higher than the homicide rate among females, specific intervention programs need to target males and females differently. Exercise 3.4 Decade Number of New Cases Number of Deaths Death-to-case Ratio(x100) 1940–1949 143,497 11,228 7.82(Given) 1950–1959 23,750 1,710 7.20 1960–1969 3,679 390 10.60 1970–1979 1,956 90 4.60 1980–1989 27 3 11.11 1990–1999 22 5 22.72 The number of new cases and deaths from diphtheria declined dramatically from the 1940s through the 1980s, but remained roughly level at very low levels in the 1990s. The death-to-case ratio was actually higher in the 1980s and 1990s than in 1940s and 1950s. From these data one might conclude that the decline in deaths is a result of the decline in cases, that is, from prevention, rather than from any improvement in the treatment of cases that do occur. Exercise 3.5 Proportionate mortality for diseases of heart, 25–44 years = (# deaths from diseases of heart / # deaths from all causes) x 100 = 16,283 / 128,294 x 100 = 12.6% Proportionate mortality for assault (homicide), 25–44 years = (# deaths from assault (homicide) / # deaths from all causes) x 100 = 7,367 / 128,924 x 100 = 5.7% Exercise 3.6 1. HIV-related mortality rate, all ages = (# deaths from HIV / estimated population, 2002) x 100,000 = (14,095 / 288,357,000) x 100,000 = 4.9 HIV deaths per 100,000 population 2. HIV-related mortality rate for persons under 65 years = (# deaths from HIV among <65 years year-olds / estimated population < 65 years, 2002) x 100,000 = (12 + 25 + 178 + 1,839 + 5,707 + 4,474 + 1,347 / 19,597 + 41,037 + 40,590 +39,928 + 44,917 + 40,084 + 26,602) x 100,000 = 13,582 / 252,755,000 x 100,000
  • 233.
    Measures of Risk Page3-54 = 5.4 HIV deaths per 100,000 persons under age 65 years 3. HIV-related YPLL before age 65 Deaths and years of potential life lost attributed to HIV by age group — United States, 2002 Column 1 Age Group (years) Column 2 Deaths Column 3 Age Midpoint Column 4 Years to 65 Column 5 YPLL 0–4 12 2.5 62.5 750 5–10 25 10 55 1,375 15–24 178 20 45 8,010 25–34 1,839 30 35 64,365 35–44 5,707 40 25 142,675 45–54 4,474 50 15 67,110 55–64 1,347 60 5 6,735 65+ 509 - - - Not stated 4 - - - Total 14,095 291,020 4. HIV-related YPLL65 rate YPLL65 rate = (291,020 / 252,755,000) x 1,000 = 1.2 YPLL per 1,000 population under age 65. 5. Compare mortality rates and YPLL for leukemia and HIV Leukemia HIV # cause-specific deaths, all ages 21,498 14,095 cause-specific death rate, all ages (per 100,000 pop) 7.5 4.9 # deaths, < 65 years 6,221 13,582 death rate, < 65 years 2.5 5.4 YPLL65 117,033 291,020 YPLL65 rate 0.5 1.2 An advocate for increased leukemia research funding might use the first two measures, which shows that leukemia is a larger problem in the entire population. An advocate for HIV funding might use the last four measures, since they highlight HIV deaths among younger persons. Exercise 3.7 1. Rate ratio comparing current smokers with nonsmokers = rate among current smokers / rate among non-smokers = 1.30 / 0.07 = 18.6 2. Rate ratio comparing ex-smokers who quit at least 20 years ago with nonsmokers = rate among ex-smokers / rate among non-smokers = 0.19 / 0.07 = 2.7 3. The lung cancer rate among smokers is 18 times as high as the rate among non- smokers. Smokers who quit can lower their rate considerably, but it never gets back
  • 234.
    Measures of Risk Page3-55 to the low level seen in never-smokers. So the public health message might be, “If you smoke, quit. But better yet, don’t start.” Exercise 3.8 Odds ratio = ad / bc = (28 x 133) / (129 x 4) = 7.2 The odds ratio of 7.2 is somewhat larger (18% larger, to be precise) than the risk ratio of 6.1. Whether that difference is “reasonable” or not is a judgment call. The odds ratio of 7.2 and the risk ratio of 6.1 both reflect a very strong association between prison wing and risk of developing tuberculosis.
  • 235.
    Measures of Risk Page3-56 SELF-ASSESSMENT QUIZ Now that you have read Lesson 3 and have completed the exercises, you should be ready to take the self-assessment quiz. This quiz is designed to help you assess how well you have learned the content of this lesson. You may refer to the lesson text whenever you are unsure of the answer. Unless otherwise instructed, choose ALL correct choices for each question. 1. Which of the following are frequency measures? A. Birth rate B. Incidence C. Mortality rate D. Prevalence Use the following choices for Questions 2–4. E. Ratio F. Proportion G. Incidence proportion H. Mortality rate 2. ____ # women in Country A who died from lung cancer in 2004 # women in Country A who died from cancer in 2004 3. ____ # women in Country A who died from lung cancer in 2004 # women in Country A who died from breast cancer in 2004 4. ____ # women in Country A who died from lung cancer in 2004 estimated # women living in Country A on July 1, 2004 5. All proportions are ratios, but not all ratios are proportions. A. True B. False 6. In a state that did not require varicella (chickenpox) vaccination, a boarding school experienced a prolonged outbreak of varicella among its students that began in September and continued through December. To calculate the probability or risk of illness among the students, which denominator would you use? A. Number of susceptible students at the ending of the period (i.e., June) B. Number of susceptible students at the midpoint of the period (late October/early November) C. Number of susceptible students at the beginning of the period (i.e., September) D. Average number of susceptible students during outbreak
  • 236.
    Measures of Risk Page3-57 7. Many of the students at the boarding school, including 6 just coming down with varicella, went home during the Thanksgiving break. About 2 weeks later, 4 siblings of these 6 students (out of a total of 10 siblings) developed varicella. The secondary attack rate among siblings was, therefore,: A. 4 / 6 B. 4 / 10 C. 4 / 16 D. 6 / 10 8. Investigators enrolled 100 diabetics without eye disease in a cohort (follow-up) study. The results of the first 3 years were as follows: Year 1: 0 cases of eye disease detected out of 92; 8 lost to follow-up Year 2: 2 new cases of eye disease detected out of 80; 2 had died; 10 lost to follow-up Year 3: 3 new cases of eye disease detected out of 63; 2 more had died; 13 more lost to follow-up The person-time incidence rate is calculated as: A. 5 / 100 B. 5 / 63 C. 5 / 235 D. 5 / 250 9. The units for the quantity you calculated in Question 8 could be expressed as: A. cases per 100 persons B. percent C. cases per person-year D. cases per person per year 10. Use the following choices for the characteristics or features listed below: A. Incidence B. Prevalence ______ Measure of risk ______ Generally preferred for chronic diseases without clear date of onset ______ Used in calculation of risk ratio ______ Affected by duration of illness
  • 237.
    Measures of Risk Page3-58 Use the following information for Questions 11–15. Within 10 days after attending a June wedding, an outbreak of cyclosporiasis occurred among attendees. Of the 83 guests and wedding party members, 79 were interviewed; 54 of the 79 met the case definition. The following two-by-two table shows consumption of wedding cake (that had raspberry filling) and illness status. Ill Well Total Ate wedding cake? Yes 50 3 53 No 4 22 26 Total 54 25 79 Source: Ho AY, Lopez AS, Eberhart MG, et al. Outbreak of cyclosporiasis associated with imported raspberries, Philadelphia, Pennsylvania, 2000. Emerg Infect Dis 2002;l8:783–6. 11. The fraction 54 / 79 is a/an: A. Food-specific attack rate B. Attack rate C. Incidence proportion D. Proportion 12. The fraction 50 / 54 is a/an: A. Attack rate B. Food-specific attack rate C. Incidence proportion D. Proportion 13. The fraction 50 / 53 is a/an: A. Attack rate B. Food-specific attack rate C. Incidence proportion D. Proportion 14. The best measure of association to use for these data is a/an: A. Food-specific attack rate B. Odds ratio C. Rate ratio D. Risk ratio 15. The best estimate of the association between wedding cake and illness is: A. 6.1 B. 7.7 C. 68.4 D. 83.7 E. 91.7 F. 94.3
  • 238.
    Measures of Risk Page3-59 16. The attributable proportion for wedding cake is: A. 6.1% B. 7.7% C. 68.4% D. 83.7% E. 91.7% F. 94.3% Use the following diagram for Questions 17 and 18. Assume that the horizontal lines in the diagram represent duration of illness in 8 different people, out of a community of 700. 17. What is the prevalence of disease during July? A. 3 / 700 B. 4 / 700 C. 5 / 700 D. 8 / 700 18. What is the incidence of disease during July? A. 3 / 700 B. 4 / 700 C. 5 / 700 D. 8 / 700 19. What is the following fraction? Number of children < 365 days of age who died in Country A in 2004 Number of live births in Country A in 2004 A. Ratio B. Proportion C. Incidence proportion D. Mortality rate
  • 239.
    Measures of Risk Page3-60 20. Using only the data shown below for deaths attributed to Alzheimer’s disease and to pneumonia/influenza, which measure(s) can be calculated? A. Proportionate mortality B. Cause-specific mortality rate C. Age-specific mortality rate D. Mortality rate ratio E. Years of potential life lost Table 3.16 Number of Deaths Due to Alzheimer’s Disease and Pneumonia/Influenza — United States, 2002 Age Group (years) Alzheimer’s disease Pneumonia/ Influenza < 5 0 373 5–14 1 91 15–24 0 167 <34 32 345 35–44 12 971 45–54 52 1,918 55–64 51 2,987 65–74 3,602 6,847 75–84 20,135 19,984 85+ 34,552 31,995 Total 58,866 65,681 Source: Kochanek KD, Murphy SL, Anderson RN, Scott C. Deaths: Final data for 2002. National vital statistics reports; vol 53, no 5. Hyattsville, Maryland: National Center for Health Statistics, 2004. 21. Which of the following mortality rates use the estimated total mid-year population as its denominator? A. Age-specific mortality rate B. Sex-specific mortality rate C. Crude mortality rate D. Cause-specific mortality rate 22. What is the following fraction? Number of deaths due to septicemia among men aged 65–74 years in 2004 Estimated number of men aged 65–74 years alive on July 1, 2004 A. Age-specific mortality rate B. Age-adjusted mortality rate C. Cause-specific mortality rate D. Sex-specific mortality rate
  • 240.
    Measures of Risk Page3-61 23. Vaccine efficacy measures are: A. The proportion of vaccinees who do not get the disease B. 1 – the attack rate among vaccinees C. The proportionate reduction in disease among vaccinees D. 1 – disease attributable to the vaccine 24. To study the causes of an outbreak of aflatoxin poisoning in Africa, investigators conducted a case-control study with 40 case-patients and 80 controls. Among the 40 poisoning victims, 32 reported storing their maize inside rather than outside. Among the 80 controls, 20 stored their maize inside. The resulting odds ratio for the association between inside storage of maize and illness is: A. 3.2 B. 5.2 C. 12.0 D. 33.3 25. The crude mortality rate in Community A was higher than the crude mortality rate in Community B, but the age-adjusted mortality rate was higher in Community B than in Community A. This indicates that: A. Investigators made a calculation error B. No inferences can be made about the comparative age of the populations from these data C. The population of Community A is, on average, older than that of Community B D. The population of Community B is, on average, older than that of Community A
  • 241.
    Measures of Risk Page3-62 Answers to Self-Assessment Quiz 1. A, B, C, D. Frequency measures of health and disease include those related to birth, death, and morbidity (incidence and prevalence). 2. A, B. All fractions are ratios. This fraction is also a proportion, because all of the deaths from lung cancer in the numerator are included in the denominator. It is not an incidence proportion, because the denominator is not the size of the population at the start of the period. It is not a mortality rate because the denominator is not the estimated midpoint population. 3. A. All fractions are ratios. This fraction is not a proportion, because lung cancer deaths in the numerator are not included in the denominator. It is not an incidence proportion, because the denominator is not the size of the population at the start of the period. It is not a mortality rate because the denominator is not the estimated midpoint population. 4. A, D. All fractions are ratios. This fraction is not a proportion, because some of the deaths occurred before July 1, so those women are not included in the calculation. It is not an incidence proportion, because the denominator is not the size of the population at the start of the period. It is a mortality rate because the denominator is the estimated midpoint population. 5. A. All fractions, including proportions, are ratios. But only ratios in which the numerator is included in the denominator is a proportions. 6. C. Probability or risk are estimated by the incidence proportion, calculated as the number of new cases during a specified period divided by the size of the population at the start of that period. 7. B. The secondary attack rate is calculated as the number of cases among contacts (4) divided by the number of contacts (10). 8. D. During year 1, 92 returning patients contributed 92 person-years; 8 patients lost to follow-up contributed 8 x ½ or 4 years, for a total of 96. During the second year, 78 disease-free patients contributed 78 person-years, plus ½ years for the 2 with newly diagnosed eye disease, the 2 who had died, and the 10 lost to follow-up (all events are assumed to have occurred randomly during the year, or an average, at the half-year point), for a total of 78 + 14 x ½ years, for another 85 years. During the third year, returning healthy patients contributed 60 years; the 3 with eye disease, the 4 who died, and the 11 lost to follow-up contributed 18 x ½ years or 9 years, for a total of 69 years during the 3rd year. The total person-years is therefore 96 + 85 + 69 = 250 person-years. 9. C, D. The person-time rate presented in Question 8 should be reported as 5 cases per 250 person-years. Usually person-time rates are expressed per 1,000 or 10,000 or 100,000, depending on the rarity of the disease, so the rate in Question 8 could
  • 242.
    Measures of Risk Page3-63 be expressed as 2 cases per 100 person-years of follow-up. One could express this more colloquially as 2 new cases of eye disease per 100 diabetics per year. 10. A. Measure of risk B. Generally preferred for chronic diseases without clear date of onset A. Used in calculation of risk ratio B. Affected by duration of illness Incidence reflects new cases only; incidence proportion is a measure of risk. A risk ratio is simply the ratio of two incidence proportions. Prevalence reflects existing cases at a given point or period of time, so one does not need to know the date of onset. Prevalence is influenced by both incidence and duration of disease — the more cases that occur and the longer the disease lasts, the greater the prevalence at any given time. Ill Well Total Ate wedding cake? Yes 50 3 53 No 4 22 26 Total 54 25 79 11. B, C, D. The fraction 54 / 79 (see bottom row of the table) reflects the overall attack rate among persons who attended the wedding and were interviewed. Attack rate is a synonym for incidence proportion. 12. D. The fraction 50 / 54 (under the Ill column) is the proportion of case-patients who ate wedding cake. It is not an attack rate, because the denominator of an attack rate is the size of the population at the start of the period, not all cases. 13. A, B, C, D. The fraction 50 / 53 (see top row of table) is the proportion of wedding cake eaters who became ill, which is a food-specific attack rate. A food-specific attack rate is a type of attack rate, which in turn is synonymous with incidence proportion. 14. C. Investigators were able to interview almost everyone who attended the wedding, so incidence proportions (measure of risk) were calculated. When incidence proportions (risks) can be calculated, the best measure of association to use is the ratio of incidence proportions (risks), i.e., risk ratio. 15. A. The risk ratio is calculated as the attack rate among cake eaters divided by the attack rate among those who did not eat cake, or (50 / 53) / (4 / 26), or 94.3% / 15.4%, which equals 6.1. 16. D. The attributable proportion is calculated as the attack rate among cake eaters minus the attack rate among non-eaters, divided by the attack rate among cake eaters, or 94.3 – 15.4) / 94.3, which equals 83.7%. This attributable proportion means that 83.7% of the illness might be attributable to eating the wedding cake (note that some people got sick without eating cake, so the attributable proportion is not 100%). 17. D. A total of 8 cases are present at some time during the month of July.
  • 243.
    Measures of Risk Page3-64 18. C. Five new cases occurred during the month of July. 19. A, D. The fraction shown is the infant mortality rate. It is a ratio, because all fractions are ratios. It is not a proportion because some of the children who died in early 2004 may have been born in late 2003, so some of those in the numerator are not in the denominator. Technically, the mortality rate for infants is the number of infants who died in 2004 divided by the estimated midyear population of infants, so the fraction shown is not a mortality rate in that sense. However, the fraction is known throughout the world as the infant mortality rate, despite the technical inaccuracy. 20. E. The data shown in the table are numbers of deaths. No denominators are provided from which to calculate rates. Neither is the total number of deaths given, so proportionate mortality cannot be calculated. However, calculation of potential life lost need only the numbers of deaths by age, as shown. 21. C, D. Only crude and cause-specific mortality rates use the estimated total mid-year population as its denominator. The denominator for an age-specific mortality rate is the estimated mid-year size of that particular age group. The denominator for a sex- specific mortality rate is the estimated mid-year male or female population. 22. A, C, D. The fraction is the mortality rate due to septicemia (cause) among men (sex) aged 65–74 years (age). Age-specific mortality rates are narrowly defined (in this fraction, limited to 10 years of age), so are generally valid for comparing two populations without any adjustment. 23. C. Vaccine efficacy measures the proportionate reduction in disease among vaccinees. 24. C. The results of this study could be summarized in a two-by-two table as follows: Cases Controls Total Stored maize inside? Yes a = 32 c = 20 52 No b = 8 d = 60 68 Total 40 80 120 The odds ratio is calculated as ad/bc, or (32 x 60) / (8 x 20), which equals 1,920 / 160 or 12.0. 25. C. The crude mortality rate reflects the mortality experience and the age distribution of a community, whereas the age-adjusted mortality rate eliminates any differences in the age distribution. So if Community A’s age-adjusted mortality rate was lower than its crude rate, that indicates that its population is older.
  • 244.
    Measures of Risk Page3-65 References 1. Kleinman JC, Donahue RP, Harris MI, Finucane FF, Madans JH, Brock DB. Mortality among diabetics in a national sample. Am J Epidemiol 1988;128:389–401. 2. Arias E, Anderson RN, Kung H-C, Murphy SL, Kochanek KD. Deaths: final data for 2001. National vital statistics reports; vol. 52 no. 3. Hyattsville, Maryland: National Center for Health Statistics, 2003; 9:30–3. 3. Centers for Disease Control and Prevention. Reported tuberculosis in the United States, 2003. Atlanta, GA: U.S. Department of Health and Human Services, CDC, September 2004. 4. Last JM. A dictionary of epidemiology, 4th ed. New York: Oxford U. Press; 2001. 5. Hopkins RS, Jajosky RA, Hall PA, Adams DA, Connor FJ, Sharp P, et. al. Summary of notifiable diseases — United States, 2003. MMWR 2003;52(No 54):1–85. 6. U.S. Census Bureau [Internet]. Washington, DC: [updated 11 Jul 2006; cited 2005 Oct 2]. Population Estimates. Available from: http://www.census.gov/popest. 7. Williams LM, Morrow B, Lansky A. Surveillance for selected maternal behaviors and experiences before, during, and after pregnancy: Pregnancy Risk Assessment Monitoring System (PRAMS). In: Surveillance Summaries, November 14, 2003. MMWR 2003;52(No. SS-11):1–14. 8. Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 1]. Available from: http://www.cdc.gov/injury/wisqars. 9. Centers for Disease Control and Prevention. Health, United States, 2004. Hyattsville, MD.; 2004. 10. Wise RP, Livengood JR, Berkelman RL, Goodman RA. Methodologic alternatives for measuring premature mortality. Am J Prev Med 1988;4:268–273. 11. McLaughlin SI, Spradling P, Drociuk D, Ridzon R, Pozsik CJ, Onorato I. Extensive transmission of Mycobacterium tuberculosis among congregated, HIV-infected prison inmates in South Carolina, United States. Int J Tuberc Lung Dis 2003;7:665–72. 12. Tugwell BD, Lee LE, Gillette H, Lorber EM, Hedberg K, Cieslak PR. Chickenpox outbreak in a highly vaccinated school population. Pediatrics 2004 Mar;113(3 Pt 1):455–9. 13. Uyeki TM, Zane SB, Bodnar UR, Fielding KL, Buxton JA, Miller JM, et al. Large summertime Influenza A outbreak among tourists in Alaska and the Yukon Territory. Clin Infect Dis 2003;36:1095–1102. 14. Doll R, Hill AB. Smoking and carcinoma of the lung. Br Med J 1950;1:739–48.
  • 245.
    Displaying Public HealthData Page 4-1 DISPLAYING PUBLIC HEALTH DATA Imagine that you work in a county or state health department. The department must prepare an annual summary of the individual surveillance reports and other public health data from the year that just ended. This summary needs to display trends and patterns in a concise and understandable manner. You have been selected to prepare this annual summary. What tools might you use to organize and display the data? Most annual reports use a combination of tables, graphs, and charts to summarize and display data clearly and effectively. Tables and graphs can be used to summarize a few dozen records or a few million. They are used every day by epidemiologists to summarize and better understand the data they or others have collected. They can demonstrate distributions, trends, and relationships in the data that are not apparent from looking at individual records. Thus, tables and graphs are critical tools for descriptive and analytic epidemiology. In addition, remembering the adage that a picture is worth a thousand words, you can use tables and graphs to communicate epidemiologic findings to others efficiently and effectively. This lesson covers tabular and graphic techniques for data display; interpretation was covered in Lessons 2 and 3. Objectives After completing this lesson and answering the questions in the exercises, you will be able to: • Prepare and interpret one, two, or three variable tables and composite tables (including creating class intervals) • Prepare and interpret arithmetic-scale line graphs, semilogarithmic-scale line graphs, histograms, frequency polygons, bar charts, pie charts, maps, and area maps • State the value and proper use of population pyramids, cumulative frequency graphs, survival curves, scatter diagrams, box plots, dot plots, forest plots, and tree plots • Identify when to use each type of table and graph Major Sections Introduction to Tables and Graphs............................................................................................... 4-2 Tables........................................................................................................................................... 4-4 Graphs........................................................................................................................................ 4-23 Other Data Displays................................................................................................................... 4-43 Using Computer Technology..................................................................................................... 4-64 Summary.................................................................................................................................... 4-67 3134
  • 246.
    Displaying Public HealthData Page 4-2 Introduction to Tables and Graphs Data analysis is an important component of public health practice. In examining data, one must first determine the data type in order to select the appropriate display format. The data to be displayed will be in one of the following categories: • Nominal • Ordinal • Discrete • Continuous Nominal measurements have no intrinsic order and the difference between levels of the variable have no meaning. In epidemiology, sex, race, or exposure category (yes/no) are examples of nominal measurements. Ordinal variables do have an intrinsic order, but, again, differences between levels are not relevant. Examples of ordinal variables are “low, medium, high” or perhaps categories of other variables (e.g., age ranges). Discrete variables have values that are integers (e.g., number of ill persons who were exposed to a risk factor). Finally, continuous variables can have any value in a range (e.g., amount of time between meal being served and onset of gastro-intestinal symptoms; infant mortality rate). Before constructing any display of epidemiologic data, it is important to first determine the point to be conveyed. Are you highlighting a change from past patterns in the data? Are you showing a difference in incidence by geographic area or by some predetermined risk factor? What is the interpretation you want the reader to reach? Your answer to these questions will help to determine the choice of display. To analyze data effectively, an epidemiologist must become familiar with the data before applying analytic techniques. The epidemiologist may begin by examining individual records such as those contained in a line listing. This review will be followed by production of a table to summarize the data. Sometimes, the resulting tables are the only analysis that is needed, particularly when the amount of data is small and relationships are straightforward. When the data are more complex, graphs and charts can help the epidemiologist visualize broader patterns and trends and identify variations from those trends. Variations in data may represent important new findings or only errors in typing or coding which need to be corrected. Thus, tables and graphs can be helpful tools to aid in verifying and analyzing the data.
  • 247.
    Displaying Public HealthData Page 4-3 Once an analysis is complete, tables and graphs further serve as useful visual aids for describing the data to others. When preparing tables and graphs, keep in mind that your primary purpose is to communicate information. Tables and graphs can be presented using a variety of media. In epidemiology, the most common media are print and projection. This lesson will focus on creating effective and attractive tables and graphs for print and will also offer suggestions for projection. At the end, we present tables that summarize all techniques presented and guidelines for use.
  • 248.
    Displaying Public HealthData Page 4-4 Tables If a table is taken out of its original context, it should still convey all the information necessary for the reader to understand the data. A table is a set of data arranged in rows and columns. Almost any quantitative information can be organized into a table. Tables are useful for demonstrating patterns, exceptions, differences, and other relationships. In addition, tables usually serve as the basis for preparing additional visual displays of data, such as graphs and charts, in which some of the details may be lost. Tables designed to present data to others should be as simple as possible.1 Two or three small tables, each focusing on a different aspect of the data, are easier to understand than a single large table that contains many details or variables. A table in a printed publication should be self-explanatory. If a table is taken out of its original context, it should still convey all the information necessary for the reader to understand the data. To create a table that is self-explanatory, follow the guidelines below. More About Constructing Tables • Use a clear and concise title that describes person, place and time — what, where, and when — of the data in the table. Precede the title with a table number. • Label each row and each column and include the units of measurement for the data (for example, years, mm Hg, mg/dl, rate per 100,000). • Show totals for rows and columns, where appropriate. If you show percentages (%), also give their total (always 100). • Identify missing or unknown data either within the table (for example, Table 4.11) or in a footnote below the table. • Explain any codes, abbreviations, or symbols in a footnote (for example, Syphilis P&S = primary and secondary syphilis). • Note exclusions in a footnote (e.g., 1 case and 2 controls with unknown family history were excluded from this analysis). • Note the source of the data below the table or in a footnote if the data are not original. One-variable tables In descriptive epidemiology, the most basic table is a simple frequency distribution with only one variable, such as Table 4.1a, which displays number of reported syphilis cases in the United States in 2002 by age group.2 (Frequency distributions are discussed in Lesson 2.) In this type of frequency distribution table, the first column shows the values or categories of the variable represented by the data, such as age or sex. The second column shows the number of persons or events that fall into each category. In constructing any table, the choice of columns results from the
  • 249.
    Displaying Public HealthData Page 4-5 interpretation to be made. In Table 4.1a, the point the analyst wishes to make is the role of age as a risk factor of syphilis. Thus, age group is chosen as column 1 and case count as column 2. To create a frequency distribution from a data set in Analysis Module: Select frequencies, then choose variable under Frequencies of. (Since Epi Info 3 is the recommended version, only commands for this version are provided in the text; corresponding commands for Epi Info 6 are offered at the end of the lesson.) Often, an additional column lists the percentage of persons or events in each category (see Table 4.1b). The percentages shown in Table 4.1b actually add up to 99.9% rather than 100.0% due to rounding to one decimal place. Rounding that results in totals of 99.9% or 100.1% is common in tables that show percentages. Nonetheless, the total percentage should be displayed as 100.0%, and a footnote explaining that the difference is due to rounding should be included. The addition of percent to a table shows the relative burden of illness; for example, in Table 4.1b, we see that the largest contribution to illness for any single age category is from 35–39 year olds. The subsequent addition of cumulative percent (e.g., Table 4.1c) allows the public health analyst to illustrate the impact of a targeted intervention. Here, any intervention effective at preventing syphilis among young people and young adults (under age 35) would prevent almost half of the cases in this population. The one-variable table can be further modified to show cumulative frequency and/or cumulative percentage, as in Table 4.1c. From this table, you can see at a glance that 46.7% of the primary and secondary syphilis cases occurred in persons younger than age 35 years, meaning that over half of the syphilis cases occurred in persons age 35 years or older. Note that the choice of age- groupings will affect the interpretation of your data.3 Table 4.1a Reported Cases of Primary and Secondary Syphilis by Age — United States, 2002 Age Group (years) Number of Cases <14 21 15–19 351 20–24 842 25–29 895 30–34 1,097 35–39 1,367 40–44 1,023 45–54 982 ≥55 284 Total 6,862 Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department of Health and Human Services; 2003.
  • 250.
    Displaying Public HealthData Page 4-6 Table 4.1b Reported Cases of Primary and Secondary Syphilis by Age — United States, 2002 CASES Age Group (years) Number Percent <14 21 0.3 15–19 351 5.1 20–24 842 12.3 25–29 895 13.0 30–34 1,097 16.0 35–39 1,367 19.9 40–44 1,023 14.9 45–54 982 14.3 ≥55 284 4.1 Total 6,862 100.0* * Actual total of percentages for this table is 99.9% and does not add to 100.0% due to rounding error. Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department of Health and Human Services; 2003. Table 4.1c Reported Cases of Primary and Secondary Syphilis by Age — United States, 2002 CASES Age Group (years) Number Percent Cumulative Percent <14 21 0.3 0.3 15–19 351 5.1 5.4 20–24 842 12.3 17.7 25–29 895 13.0 30.7 30–34 1,097 16.0 46.7 35–39 1,367 19.9 66.6 40–44 1,023 14.9 81.6 45–54 982 14.3 95.9 ≥55 284 4.1 100.0 Total 6,862 100.0* 100.0* * Percentages do not add to 100.0% due to rounding error. Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department of Health and Human Services; 2003. Two- and three-variable tables Tables 4.1a, 4.1b, and 4.1c show case counts (frequency) by a single variable, e.g., age. Data can also be cross-tabulated to show counts by an additional variable. Table 4.2 shows the number of syphilis cases cross-classified by both age group and sex of the patient.
  • 251.
    Displaying Public HealthData Page 4-7 Table 4.2 Reported Cases of Primary and Secondary Syphilis by Age and Sex — United States, 2002 NUMBER OF CASES Age Group (years) Male Female Total <14 9 12 21 15–19 135 216 351 20–24 533 309 842 25–29 668 227 895 30–34 877 220 1,097 35–39 1,121 246 1,367 40–44 845 178 1,023 45–54 825 157 982 ≥55 255 29 284 Total 5,268 1,594 6,862 Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department of Health and Human Services; 2003. To create a two-variable table from a data set in Analysis Module: Select frequencies, then choose variable under Frequencies of. Output shows table with row and column percentages, plus chi-square and p-value. For a two-by-two table, output also provides odds ratio, risk ratio, risk difference and confidence intervals. Note that for a cohort study, the row percentage in cells of ill patients is the attack proportion, sometimes called the attack rate. A two-variable table with data categorized jointly by those two variables is known as a contingency table. Table 4.3 is an example of a special type of contingency table, in which each of the two variables has two categories. This type of table is called a two-by-two table and is a favorite among epidemiologists. Two- by-two tables are convenient for comparing persons with and without the exposure and those with and without the disease. From these data, epidemiologists can assess the relationship, if any, between the exposure and the disease. Table 4.3 is a two-by-two table that shows one of the key findings from an investigation of carbon monoxide poisoning following an ice storm and prolonged power failure in Maine.4 In the table, the exposure variable, location of power generator, has two categories — inside or outside the home. Similarly the outcome variable, carbon monoxide poisoning, has two categories — cases (number of persons who became ill) and controls (number of persons who did not become ill).
  • 252.
    Displaying Public HealthData Page 4-8 Table 4.3 Generator Location and Risk of Carbon Monoxide Poisoning After an Ice Storm — Maine, 1998 NUMBER OF Cases Controls Total Generator location Inside home or attached structure 23 23 46 Outside home 4 139 143 Total 27 162 189 Data Source: Daley RW, Smith A, Paz-Argandona E, Mallilay J, McGeehin M. An outbreak of carbon monoxide poisoning after a major ice storm in Maine. J Emerg Med 2000;18:87–93. Table 4.4 illustrates a generic format and standard notation for a two-by-two table. Disease status (e.g., ill versus well, sometimes denoted cases vs. controls if a case-control study) is usually designated along the top of the table, and exposure status (e.g., exposed versus not exposed) is designated along the side. The letters a, b, c, and d within the 4 cells of the two-by-two table refer to the number of persons with the disease status indicated above and the exposure status indicated to its left. For example, in Table 4.4, “c” represents the number of persons in the study who are ill but who did not have the exposure being studied. Note that the “Hi” represents horizontal totals; H1 and H0 represent the total number of exposed and unexposed persons, respectively. The “Vi” represents vertical totals; V1 and V0 represent the total number of ill and well persons (or cases and controls), respectively. The total number of subjects included in the two-by-two table is represented by the letter T (or N). Table 4.4 General Format and Notation for a Two-by-Two Table Ill Well Total Attack Rate (Risk) Exposed a b a + b = H1 a / a+b Unexposed c d c + d = H0 c / c+d Total a + c = V1 b + d = V0 T V1 / T When producing a table to display either in print or projection, it is best, generally, to limit the number of variables to one or two. One exception to this rule occurs when a third variable modifies the effect (technically, produces an interaction) of the first two. Table 4.5 is intended to convey the way in which race/ethnicity may modify the effect of age and sex on incidence of syphilis. Because three-way tables are often hard to understand, they should be used only when ample explanation and discussion is possible.
  • 253.
    Displaying Public HealthData Page 4-9 Table 4.5 Number of Reported Cases of Primary and Secondary Syphilis, by Race/Ethnicity, Age, and Sex — United States, 2002 Race/ethnicity Age Group (years) Male Female Total American Indian/ Alaskan Native <14 1 0 1 15–19 0 1 1 20–24 5 3 8 25–29 3 1 4 30–34 1 2 3 35–39 3 5 8 40–44 4 3 7 45–54 8 8 16 ≥55 2 1 3 Total 27 24 51 Asian/Pacific Islander <14 1 1 2 15–19 0 2 2 20–24 9 4 13 25–29 16 1 17 30–34 21 1 22 35–39 14 1 15 40–44 14 1 15 45–54 8 0 8 ≥55 0 0 0 Total 83 11 94 Black, Non-Hispanic <14 3 9 12 15–19 89 164 253 20–24 313 233 546 25–29 322 163 485 30–34 310 166 476 35–39 385 183 568 40–44 305 142 447 45–54 370 112 482 ≥55 129 23 152 Total 2,226 1,195 3,421 Hispanic <14 1 1 2 15–19 37 25 62 20–24 117 29 146 25–29 139 26 165 30–34 172 20 192 35–39 178 22 200 40–44 93 9 102 45–54 69 14 83 ≥55 18 1 19 Total 824 147 971 White, Non-Hispanic <14 3 1 4 15–19 9 24 33 20–24 89 40 129 25–29 188 36 224 30–34 373 31 404 35–39 541 35 576 40–44 429 23 452 45–54 370 23 393 ≥55 106 4 110 Total 2,108 217 2,325 Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department of Health and Human Services; 2003. p. 118.
  • 254.
    Displaying Public HealthData Page 4-10 Exercise 4.1 The data in Table 4.6 describe characteristics of the 38 persons who ate food at or from a church supper in Texas in August 2001. Fifteen of these persons later developed botulism. 5 1. Construct a table of the illness (botulism) by age group. Use botulism status (yes/no) as the column labels and age groups as the row labels. 2. Construct a two-by-two table of the illness (botulism) by exposure to chicken. 3. Construct a two-by-two table of the illness (botulism) by exposure to chili. 4. Construct a three-way table of illness (botulism) by exposure to chili and chili leftovers. Check your answers on page 4-72
  • 255.
    Displaying Public HealthData Page 4-11 Table 4.6 Line Listing for Exercise 4.1 ID Age Attended Supper Case Date of Onset Case Status Ate Any Food Ate Chili Ate Chicken Ate Chili Leftovers 1 1 Y N - Y Y Y N 2 3 Y Y 8/27 Lab-confirmed Y Y N N 3 7 Y Y 8/31 Lab-confirmed Y Y N N 4 7 Y N - Y Y Y N 5 10 Y N - Y Y N Y 6 17 Y Y 8/28 Lab-confirmed Y Y Y N 7 21 Y N - N N N N 8 23 Y N - Y Y N N 9 25 Y Y 8/26 Epi-linked Y Y N N 10 29 N Y 8/28 Lab-confirmed Y Unk Unk Y 11 38 Y N - N N N N 12 39 Y N - N N N N 13 41 Y N - Y Y Y N 14 41 Y N - N N N N 15 42 Y Y 8/26 Lab-confirmed Y Y Unk N 16 45 Y Y 8/26 Lab-confirmed Y Y Y Y 17 45 Y Y 8/27 Epi-linked Y Y Y N 18 46 Y N - Y N Y N 19 47 Y N - Y N Y N 20 48 Y Y 9/1 Lab-confirmed Y Y Unk N 21 50 Y Y 8/29 Epi-linked Y Y N N 22 50 Y N - Y N Y N 23 50 Y N - Y N N Y 24 52 Y Y 8/28 Lab-confirmed Y Y Y N 25 52 Y N - N N N N 26 53 Y Y 8/27 Epi-linked Y Y Y N 27 53 Y N - Y Y Y N 28 62 Y Y 8/27 Epi-linked Y Y Y N 29 62 Y N - Y N Y N 30 63 Y N - N N N N 31 67 Y N - N N N N 32 68 Y N - N N N N 33 69 Y N - Y Y Y N 34 71 Y N - Y N Y N 35 72 Y Y 8/27 Lab-confirmed Y Y Y N 36 74 Y N - Y Y N N 37 74 Y N - Y N Y N 38 78 Y Y 8/25 Epi-linked Y Y Y N Data Source: Kalluri P, Crowe C, Reller M, Gaul L, Hayslett J, Barth S, Eliasberg S, Ferreira J, Holt K, Bengston S, Hendricks K, Sobel J. An outbreak of foodborne botulism associated with food sold at a salvage store in Texas. Clin Infect Dis 2003;37:1490–5.
  • 256.
    Displaying Public HealthData Page 4-12 Tables of statistical measures other than frequency Tables 4.1–4.5 show case counts (frequency). The cells of a table could also display averages, rates, relative risks, or other epidemiological measures. As with any table, the title and/or headings must clearly identify what data are presented. For example, the title of Table 4.7 indicates that the data for reported cases of primary and secondary syphilis are rates rather than numbers. Table 4.7 Rate per 100,000 Population for Reported Cases of Primary and Secondary Syphilis, by Age and Race — United States, 2002 Age Group (years) Am. Indian/ Alaska Native Asian/ Pacific Is. Black, Non- Hispanic Hispanic White, Non- Hispanic Total 10–14 0.0 0.1 0.3 0.1 0.0 0.1 15–19 0.5 0.2 8.6 1.9 0.3 1.7 20–24 5.0 1.5 20.7 4.3 1.1 4.4 25–29 2.7 1.6 19.1 4.9 1.8 4.6 30–34 2.0 2.2 18.2 6.1 3.0 5.4 35–39 4.8 1.6 20.1 7.1 3.6 6.0 40–44 4.5 1.6 16.6 4.4 2.8 4.6 45–54 6.1 0.6 11.8 2.7 1.4 2.6 55–64 1.4 0.0 4.6 0.6 0.5 0.9 65+ 0.8 0.0 1.5 0.5 0.1 0.2 Totals 2.4 0.9 9.8 2.7 1.2 2.4 Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department of Health and Human Services; 2003. Composite tables To conserve space in a report or manuscript, several tables are sometimes combined into one. For example, epidemiologists often create simple frequency distributions by age, sex, and other demographic variables as separate tables, but editors may combine them into one large composite table for publication. Table 4.8 is an example of a composite table from the investigation of carbon monoxide poisoning following the power failure in Maine.4 It is important to realize that this type of table should not be interpreted as for a three-way table. The data in Table 4.8 have not been arrayed to indicate the interrelationship of sex, age, smoking, and disposition from medical care. Merely, several one variable tables (independently assessing the number of cases by each of these variables) have been concatenated for space conservation. So this table would not help in assessing the modification that smoking has on the risk of illness by age, for example. This difference also explains why portraying total values would be inappropriate and meaningless for Table 4.8.
  • 257.
    Displaying Public HealthData Page 4-13 Table 4.8 Number and Percentage of Confirmed Cases of Carbon Monoxide Poisoning Identified from Four Hospitals, by Selected Characteristics — Maine, January 1998 CASES Characteristic Number Percent Total cases 100 100 Sex (female) 59 59 Age (years) 0–3 5 5 4–12 17 17 13–18 9 9 19–64 52 52 ≥65 17 17 Smokers 20 20 Disposition Released from ED* 83 83 Admitted to hospital 11 11 Transferred 5 5 Died 1 1 * ED = Emergency department Data Source: Daley RW, Smith A, Paz-Argandona E, Mallilay J, McGeehin M. An outbreak of carbon monoxide poisoning after a major ice storm in Maine. J Emerg Med 2000;18:87–93. Table shells Although you cannot analyze data before you have collected them, epidemiologists anticipate and design their analyses in advance to delineate what the study is going to convey, and to expedite the analysis once the data are collected. In fact, most protocols, which are written before a study can be conducted, require a description of how the data will be analyzed. As part of the analysis plan, you can develop table shells that show how the data will be organized and displayed. Table shells are tables that are complete except for the data. They show titles, headings, and categories. In developing table shells that include continuous variables such as age, we create more categories than we may later use, in order to disclose any interesting patterns and quirks in the data. The following table shells were designed before conducting a case-control study of fractures related to falls in community- dwelling elderly persons. The researchers were particularly interested in assessing whether vigorous and/or mild physical activity was associated with a lower risk of fall-related fractures. Table shells of epidemiologic studies usually follow a standard sequence from descriptive to analytic. The first and second tables in the sequence usually cover clinical features of the health event and demographic characteristics of the subjects. Next, the analyst portrays the association of most interest to the researchers, in this
  • 258.
    Displaying Public HealthData Page 4-14 case, the association between physical activity and fracture. Subsequent tables may present stratified or adjusted analyses, refinements, and subset analyses. Of course, once the data are available and used for these tables, additional analyses will come to mind and should be pursued. This sequence of table shells provides a systematic and logical approach to the analysis. The first two tables (Table shells 4.9a and 4.9b), describing the health problem of interest and the population studied, provide the background a reader would need to put the analytic results in perspective. Table Shell 4.9a Anatomic Site of Fall-related Fractures Sustained by Participants, SAFE Study — Miami, 1987–1989 Fracture Site Number (Percent) Skull ____ ( ) Spine ____ ( ) Clavicle (collarbone) ____ ( ) Scapula (shoulderblade) ____ ( ) Humerus (upper arm) ____ ( ) Radius / ulna (lower arm) ____ ( ) Bones of the hand ____ ( ) Ribs, sternum ____ ( ) Pelvis ____ ( ) Neck of femur (hip) ____ ( ) Other parts of femur (upper leg) ____ ( ) Patella (knee) ____ ( ) Tibia / fibula (lower leg) ____ ( ) Ankle ____ ( ) Bones of the foot ____ ( ) Adapted from: Stevens, JA, Powell KE, Smith SM, Wingo PA, Sattin RW. Physical activity, functional limitations, and the risk of fall- related fractures in community-dwelling elderly. Annals of Epidemiology 1997;7:54–61.
  • 259.
    Displaying Public HealthData Page 4-15 Table Shell 4.9b Selected Characteristics of Case and Control Participants, SAFE Study — Miami, 1987– 1989 CASES CONTROLS Number (Percent) Number (Percent) Age 65–74 ____ ( ) ____ ( ) 75–84 ____ ( ) ____ ( ) ≥85 ____ ( ) ____ ( ) Sex Male ____ ( ) ____ ( ) Female ____ ( ) ____ ( ) Race White ____ ( ) ____ ( ) Black ____ ( ) ____ ( ) Other ____ ( ) ____ ( ) Unknown ____ ( ) ____ ( ) Ethnicity Hispanic ____ ( ) ____ ( ) Non-Hispanic ____ ( ) ____ ( ) Unknown ____ ( ) ____ ( ) Hours/day spent on feet <1 ____ ( ) ____ ( ) 2–4 ____ ( ) ____ ( ) 5–7 ____ ( ) ____ ( ) >8 ____ ( ) ____ ( ) Smoking status Never smoked ____ ( ) ____ ( ) Former smoker ____ ( ) ____ ( ) Current smoker ____ ( ) ____ ( ) Unknown ____ ( ) ____ ( ) Alcohol use (drinks / week) None ____ ( ) ____ ( ) <1 ____ ( ) ____ ( ) 1–3 ____ ( ) ____ ( ) >4 ____ ( ) ____ ( ) Unknown ____ ( ) ____ ( ) Adapted from: Stevens, JA, Powell KE, Smith SM, Wingo PA, Sattin RW. Physical activity, functional limitations, and the risk of fall- related fractures in community-dwelling elderly. Annals of Epidemiology 1997;7:54–61. Now that the data in Table shells 4.9a and 4.9b have illustrated descriptive characteristics of cases and controls in this study, we are ready to refine the analysis by demonstrating the variability of the data as assessed by statistical confidence intervals. Because of the study design in this example, we have chosen the odds ratio to assess statistical differences (see Lesson 3). Table shell 4.9c illustrates a useful display for this information.
  • 260.
    Displaying Public HealthData Page 4-16 Table Shell 4.9c Relationship Between Physical Activity (Vigorous and Mild) and Fracture, SAFE Study — Miami, 1987–1989 CASES CONTROLS Odds Ratio (95% Confidence Interval) Number (Percent) Number (Percent) Vigorous Activity Yes ____ ( ) ____ ( ) _____ (____ – ____) No ____ ( ) ____ ( ) Mild Activity Yes ____ ( ) ____ ( ) _____ (____ – ____) No ____ ( ) ____ ( ) Adapted from: Stevens, JA, Powell KE, Smith SM, Wingo PA, Sattin RW. Physical activity, functional limitations, and the risk of fall- related fractures in community-dwelling elderly. Annals of Epidemiology 1997;7:54–61. Creating class intervals Conventional Rounding Rules If a fraction is greater than .5, round it up (e.g., round 6.6 to 7). If a fraction is less than .5, round it down (e.g., round 6.4 to 6). If a fraction is exactly .5, it is recommended that you round it to the even value (e.g., round both 5.5 and 6.5 to 6). More common and also acceptable is to round it up (e.g., round 6.5 to 7) If the epidemiologic hypothesis for the investigation involves variables such as “gender” or “exposure to a risk factor (yes/no),” the construction of tables as described thus far in this chapter should be straightforward. Often, however, the presumed risk factor may not be so conveniently packaged. We may need to investigate an infection acquired as a result of hospitalization and “days of hospitalization” may be relevant; for many chronic conditions, blood pressure is an important factor; if we are interested in the effect of alcohol consumption on health risk, number of drinks per week may be an important measurement. These examples illustrate relevant variables that have a broader range of possible responses than are easily handled by the methods described earlier in this chapter. One solution in this case is to create class intervals for your data, keeping the following guidelines in mind: • Class intervals should be mutually exclusive and exhaustive. In plain language, that means that each individual in your data set should fit uniquely into one class interval, and all persons should fit into some class interval. So, for example, age ranges should not overlap. Most measures follow conventional rounding rules (see sidebar). A general tip is to use a large number of class intervals for the initial analysis to gain an appreciation for the variability of your data. You can combine your categories later. • Use principles of biologic plausibility when constructing categories. For example, when analyzing infant and childhood mortality, we might use categories of 0–12 months (since neonatal problems are different epidemiologically from those of other childhood problems), 1–5 years (since these result
  • 261.
    Displaying Public HealthData Page 4-17 CDC’s National Center for Health Statistics uses the following age categorizations: <1 infants 1–4 toddlers 5–14 adolescents 15–24 teens and young adults 25–44 adults 45–64 older adults >65 elderly from causes of death primarily outside of institutions), and 5– 10 years (since these may result from risks in school settings). Table 4.10 illustrates age groups that are sensible for the study of various health conditions that are behaviorally-related. • A natural baseline group should be kept as a distinct category. Often the baseline group will include those who have not had an exposure, e.g., non-smokers (0 cigarettes per day). • If you wish to calculate rates to illustrate the relative risk of adverse health events by these categories of risk factors, be sure that the intervals you choose for the classes of your data are the same as the intervals for the denominators that you will find for readily available data. For example, to compute rates of infant mortality by maternal age, you must find data on the number of live-born infants to women; in determining age groupings, consider what categories are used by the United States Census Bureau. • Always consider a category for “unknown” or “not stated.” Table 4.10 Age Groupings Used for Different Conditions, as Reported in Surveillance Summaries, CDC, 2003 Overweight In Adults7 Traumatic Brain Injury8 Pregnancy- Related Mortality9 HIV/AIDS10 Vaccine Adverse Events11 18–24 years <4 years <19 years <13 years <1 year 25–34 5–14 20–24 13–14 1–6 35–44 15–19 25–29 15–24 7–17 45–54 20–24 30–34 25–34 18–64 55–64 25–34 35–39 35–44 >65 65–74 35–44 >40 45–54 >75 45–64 55–64 >65 >65 Total Total Total Total Total In addition to these guidelines for creating class intervals, the analyst must decide how many intervals to portray. If no natural or standard class intervals are apparent, the strategies below may be helpful. Strategy 1: Divide the data into groups of similar size A particularly appropriate approach if you plan to create area maps (see later section on Maps) is to create a number of class intervals, each with the same number of observations. For example, to portray the rates of incidence of lung cancer by state (for men, 2001), one might group the rates into four class intervals, each with 10–12 observations:
  • 262.
    Displaying Public HealthData Page 4-18 Table 4.11 Rates of Lung Cancer in Men, 2001 by State (and the District of Columbia) Rate Number of States in the US Cumulative Frequency 22.1–48.3 11 11 48.4–53.3 11 22 53.4–58.7 12 34 58.8–73.3 10 44 Missing data 7 51 Data Source: U.S. Cancer Statistics Working Group. United States Cancer Statistics: 2002 Incidence and Mortality. Atlanta: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention and National Cancer Institute; 2005. Strategy 2: Base intervals on mean and standard deviation With this strategy, you can create three, four, or six class intervals. First, calculate the mean and standard deviation of the distribution of data. (Lesson 2 covers the calculation of these measures.) Then use the mean plus or minus different multiples of the standard deviation to establish the upper limits for the intervals. This strategy is most appropriate for large data sets. For example, let’s suppose you are investigating a scoring system for preparedness of health departments to respond to emerging and urgent threats. You have devised a series of evaluation questions ranging from 0 to 100, with 100 being highest. You conduct a survey and find that the scores for health departments in your jurisdiction range from 19 to 82; the mean of the scores is 50, and the standard deviation is 10. Here, the strategy for establishing six intervals for these data specifies: Upper limit of interval 6 = maximum value = 82 Upper limit of interval 5 = 50 + 20 = 70 Upper limit of interval 4 = 50 + 10 = 60 Upper limit of interval 3 = 50 Upper limit of interval 2 = 50 − 10 = 40 Upper limit of interval 1 = 50 − 20 = 30 Lower limit of interval 1 = 19 If you then select the obvious lower limit for each upper limit, you have the six intervals: Interval 6 = 71–82 Interval 5 = 61–70 Interval 4 = 51–60 Interval 3 = 41–50 Interval 2 = 31–40 Interval 1 = 19–30 You can create three or four intervals by combining some of the adjacent six-interval limits. Strategy 3: Divide the range into equal class intervals This method is the simplest and most commonly used, and is most readily adapted to graphs. The selection of groups or categories is often arbitrary, but must be consistent (for example, age groups by
  • 263.
    Displaying Public HealthData Page 4-19 5 or 10 years throughout the data set). To use equal class intervals, do the following: Find the range of the values in your data set. That is, find the difference between the maximum value (or some slightly larger convenient value) and zero (or the minimum value). Decide how many class intervals (groups or categories) you want to have. For tables, choose between four and eight class intervals. For graphs and maps, choose between three and six class intervals. The number will depend on what aspects of the data you want to highlight. Find what size of class interval to use by dividing the range by the number of class intervals you have decided on. Begin with the minimum value as the lower limit of your first interval and specify class intervals of whatever size you calculated until you reach the maximum value in your data. For example, to display 52 observations, say the percentage of men over age 40 screened for prostate cancer within the past two years in 2004 by state (including Puerto Rico and the District of Columbia), you could create five categories, each containing the number of states with percentages of screened men in the given range. Table 4.12 Percentage of Men Over Age 40 Screened for Prostate Cancer, by State (including Puerto Rico and the District of Columbia), 2004 Percentage Number of States Cumulative Frequency 40.0–44.9 3 3 45.0–49.9 18 21 50.0–54.9 25 46 55.0–59.9 5 51 60.0–64.9 1 52 Data Source: Behavioral Risk Factor Surveillance System [Internet]. Atlanta: Centers for Disease Control and Prevention. Available from: http://www.cdc.gov/brfss/.
  • 264.
    Displaying Public HealthData Page 4-20 EXAMPLE: Creating Class Interval Categories Use each strategy to create four class interval categories by using the lung cancer mortality rates shown in Table 4.13. Table 4.13 Age-adjusted Lung Cancer Death Rates per 100,000 population, in Rank Order by State — United States, 2000 Rate per Rate per Rank State 100,000 Rank State 100,000 1 Kentucky 116.1 26 Florida 75.3 2 Mississippi 111.7 27 Kansas 74.5 3 West Virginia 104.1 28 Massachusetts 73.6 4 Tennessee 103.4 29 Alaska 72.9 5 Alabama 100.8 30 Oregon 72.7 6 Louisiana 99.2 31 New Hampshire 71.2 7 Arkansas 99.1 32 New Jersey 71.2 8 North Carolina 94.6 33 Washington 71.2 9 Georgia 93.2 34 Vermont 70.2 10 South Carolina 92.4 35 South Dakota 68.1 11 Indiana 91.6 36 Wisconsin 67.0 12 Oklahoma 89.4 37 Montana 66.5 13 Missouri 88.5 38 Connecticut 66.4 14 Ohio 85.6 39 New York 66.2 15 Virginia 83.0 40 Nebraska 65.6 16 Maine 80.2 41 North Dakota 64.9 17 Illinois 80.0 42 Wyoming 64.4 18 Texas 79.3 43 Arizona 62.0 19 Maryland 79.2 44 Minnesota 60.7 20 Nevada 78.7 45 California 60.1 21 Delaware 78.2 46 Idaho 59.7 22 Rhode Island 77.9 47 New Mexico 52.3 23 Iowa 77.0 48 Colorado 52.1 24 Michigan 76.7 49 Hawaii 49.8 25 Pennsylvania 76.5 50 Utah 39.7 Total United States 76.9 Data Source: Stewart SL, King JB, Thompson TD, Friedman C, Wingo PA. Cancer Mortality–United States, 1990-2000. In: Surveillance Summaries, June 4, 2004. MMWR 2004;53 (No. SS-3):23–30. Strategy 1: Divide the data into groups of similar size (Note: If the states in Table 4.13 had been listed alphabetically rather than in rank order, the first step would have been to sort the data into rank order by rate. Fortunately, this has already been done.) 1. Divide the list into four equal sized groups of places: 50 states / 4 = 12.5 states per group. Because states can’t be cut in half, use two groups of 12 states and two groups of 13 states. Missouri (#13) could go into either the first or second group and Connecticut (#38) could go into either third or fourth group. Arbitrarily putting Missouri in the second category and Connecticut into the third results in the following groups: a. Kentucky through Oklahoma (States 1–12) b. Missouri through Pennsylvania (States 13–25) c. Florida through Connecticut (States 26–38) d. New York through Utah (States 39–50) 2. Identify the rate for the first and last state in each group: a. Oklahoma through Kentucky 89.4–116.1 b. Pennsylvania through Missouri 76.5–88.5 c. Connecticut through Florida 66.4–75.3 d. Utah through New York 39.7–66.2
  • 265.
    Displaying Public HealthData Page 4-21 EXAMPLE: Creating Class Interval Categories (Continued) 3. Adjust the limits of each interval so no gap exists between the end of one class interval and beginning of the next. Deciding how to adjust the limits is somewhat arbitrary — you could split the difference, or use a convenient round number. a. Oklahoma through Kentucky 89.0–116.1 b. Pennsylvania through Missouri 76.0–88.9 c. Connecticut through Florida 66.3–75.9 d. Utah through New York 39.7–66.2 Strategy 2: Base intervals on mean and standard deviation 1. Calculate the mean and standard deviation (see Lesson 2 for instructions in calculating these measures.): Mean = 77.1 Standard deviation = 16.1 2. Find the upper limits of four intervals a. Upper limit of interval 4 = maximum value = 116.1 b. Upper limit of interval 3 = mean + 1 standard deviation = 77.1 + 16.1 = 93.2 c. Upper limit of interval 2 = mean = 77.1 d. Upper limit of interval 1 = mean – 1 standard deviation = 77.1 – 16.1 = 61.0 e. Lower limit of interval 1 = minimum value = 39.7 3. Select the lower limit for each upper limit to define four full intervals. Specify the states that fall into each interval. (Note: To place the states with the highest rates first, reverse the order of the intervals): a. North Carolina through Kentucky (8 states) 93.3–116.1 b. Rhode Island through Georgia (14 states) 77.1–93.2 c. Arizona through Iowa (21 states) 61.1–77.1 d. Utah through Minnesota (7 states) 39.7–61.0 Strategy 3: Divide the range into equal class intervals 4. Divide the range from zero (or the minimum value) to the maximum by 4: a. (116.1 – 39.7) / 4 = 76.4 / 4 = 19.1 5. Use multiples of 19.1 to create four categories, starting with 39.7: a. 39.7 through (39.7 + 19.1) = 39.7 through 58.8 b. 58.9 through (39.7 + [2 x 19.1]) = 58.9 through 77.9 c. 78.0 through (39.7 + [3 x 19.1]) = 78.0 through 97.0 d. 97.1 through (39.7 + [4 x 19.1]) = 97.1 through 116.1 6. Final categories: a. Arkansas through Kentucky (7 states) 97.1–116.1 b. Delaware through North Carolina (14 states) 78.0–97.0 c. Idaho through Rhode Island (25 states) 58.9–77.9 d. Utah through New Mexico (4 states) 39.7–58.8 7. Alternatively, since 19.1 is close to 20, multiples of 20 might be used to create the four categories that might look cleaner. For example, the final categories could look like: a. Arkansas through Kentucky (7 states) 97.0–116.9 b. Iowa through North Carolina (16 states) 77.0–96.9 c. Idaho through Michigan (23 states) 57.0–76.9 d. Utah through New Mexico (4 states) 37.0–56.9 OR a. Alabama through Kentucky (5 states) 100.0–119.9 b. Illinois through Louisiana (12 states) 80.0–99.9 c. California through Texas (28 states) 60.0–79.9 d. Utah through Idaho (5 states) 39.7–59.9
  • 266.
    Displaying Public HealthData Page 4-22 Exercise 4.2 With the data on lung cancer mortality rates presented in Table 4.13, use each strategy to create three class intervals for the rates. Check your answers on page 4-73
  • 267.
    Displaying Public HealthData Page 4-23 “Charts…should fulfill certain basic objectives: they should be: (1) accurate representations of the facts, (2) clear, easily read, and understood, and (3) so designed and constructed as to attract and hold attention.”12 - CF Schmid and SE Schmid “Make the data stand out. Avoid superfluity.”13 - WS Cleveland Graphs A graph (used here interchangeably with chart) displays numeric data in visual form. It can display patterns, trends, aberrations, similarities, and differences in the data that may not be evident in tables. As such, a graph can be an essential tool for analyzing and trying to make sense of data. In addition, a graph is often an effective way to present data to others less familiar with the data. When designing graphs, the guidelines for categorizing data for tables also apply. In addition, some best practices for graphics include: • Ensure that a graphic can stand alone by clear labeling of title, source, axes, scales, and legends; • Clearly identify variables portrayed (legends or keys), including units of measure; • Minimize number of lines on a graph; • Generally, portray frequency on the vertical scale, starting at zero, and classification variable on horizontal scale; • Ensure that scales for each axis are appropriate for data presented; • Define any abbreviations or symbols; and • Specify any data excluded. In epidemiology, most graphs have two scales or axes, one horizontal and one vertical, that intersect at a right angle. The horizontal axis is known as the x-axis and generally shows values of the independent (or x) variable, such as time or age group. The vertical axis is the y-axis and shows the dependent (or y) variable, which, in epidemiology, is usually a frequency measure such as number of cases or rate of disease. Each axis should be labeled to show what it represents (both the name of the variable and the units in which it is measured) and marked by a scale of measurement along the line. In constructing a useful graph, the guidelines for categorizing data for tables by types of data also apply. For example, the number of reported measles cases by year of report is technically a nominal variable, but because of the large number of cases when aggregated over the United States, we can treat this variable as a continuous one. As such, a line graph is appropriate to display these data.
  • 268.
    Displaying Public HealthData Page 4-24 Try It: Plotting a Graph Scenario: Table 4.14 shows the number of measles cases by year of report from 1950 to 2003. The number of measles cases in years 1950 through 1954 has been plotted in Figure 4.1, below. The independent variable, years, is shown on the horizontal axis. The dependent variable, number of cases, is shown on the vertical axis. A grid is included in Figure 4.1 to illustrate how points are plotted. For example, to plot the point on the graph for the number of cases in 1953, draw a line up from 1953, and then draw a line from 449 cases to the right. The point where these lines intersect is the point for 1953 on the graph. Your Turn: Use the data in Table 4.14 to plot the points for 1955 to 1959 and complete the graph in Figure 4.1. Figure 4.1 Partial Graph of Measles by Year of Report — United States, 1950–1959 Table 4.14 Number of Reported Measles Cases, by Year of Report — United States, 1950–2003 Year Cases Year Cases Year Cases 1950 319,000 1970 47,351 1990 27,786 1951 530,000 1971 75,290 1991 9,643 1952 683,000 1972 32,275 1992 2,237 1953 449,000 1973 26,690 1993 312 1954 683,000 1974 22,094 1994 963 1955 555,000 1975 24,374 1995 309 1956 612,000 1976 41,126 1996 508 1957 487,000 1977 57,345 1997 138 1958 763,000 1978 26,871 1998 100 1959 406,000 1979 13,597 1999 100 1960 442,000 1980 13,506 2000 86 1961 424,000 1981 3,124 2001 116 1962 482,000 1982 1,714 2002 44 1963 385,000 1983 1,497 2003 56 1964 458,000 1984 2,587 1965 262,000 1985 2,822 1966 204,000 1986 6,282 1967 62,705 1987 3,655 1968 22,231 1988 3,396 1969 25,826 1989 18,193 Data Sources: Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 1989. MMWR 1989;38(No. 54). Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2002. MMWR 2002;51(No. 53) Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2003. MMWR 2005;52(No. 54)
  • 269.
    Displaying Public HealthData Page 4-25 Arithmetic-scale line graphs An arithmetic-scale line graph (such as Figure 4.1) shows patterns or trends over some variable, often time. In epidemiology, this type of graph is used to show long series of data and to compare several series. It is the method of choice for plotting rates over time. In an arithmetic-scale line graph, a set distance along any axis represents the same quantity anywhere on that axis. In Figure 4.2, for example, the space between tick marks along the y-axis (vertical axis) represents an increase of 10,000 (10 x 1,000) cases anywhere along the axis — a continuous variable. Furthermore, the distance between any two tick marks on the x- axis (horizontal axis) represents a period of time of one year. This represents an example of a discrete variable. Thus an arithmetic- scale line graph is one in which equal distances along either the x- or y- axis portray equal values. Arithmetic-scale line graphs can display numbers, rates, proportions, or other quantitative measures on the y-axis. Generally, the x-axis for these graphs is used to portray the time period of data occurrence, collection, or reporting (e.g., days, weeks, months, or years). Thus, these graphs are primarily used to portray an overall trend over time, rather than an analysis of particular observations (single data points). For example, Figure 4.2 shows prevalence (of neural tube defects) per 100,000 births. Figure 4.2 Trends in Neural Tube Defects (Anencephaly and Spina Bifida) Among All Births, 45 States and District of Columbia, 1990– 1999 Source: Honein MA, Paulozzi LJ, Mathews TJ, Erickson JD, Wong L-Y. Impact of folic acid fortification of the US food supply on the occurrence of neural tube defects. JAMA 2001;285:2981–6.
  • 270.
    Displaying Public HealthData Page 4-26 Figure 4.3 shows another example of an arithmetic-scale line graph. Here the y-axis is a calculated variable, median age at death of people born with Down’s syndrome from 1983–1997. Here also, we see the value of showing two data series on one graph; we can compare the mortality risk for males and females. Figure 4.3 Median Age at Death of People with Down’s Syndrome by Sex — United States, 1983–1997 Source: Yang Q, Rasmussen A, Friedman JM. Mortality associated with Down’s syndrome in the USA from 1983 to 1997: a population-based study. Lancet 2002;359:1019–25. More About the X-axis and the Y-axis When you create an arithmetic-scale line graph, you need to select a scale for the x- and y-axes. The scale should reflect both the data and the point of the graph. For example, if you use the data in Table 4.14 to graph the number of cases of measles cases by year from 1990 to 2002, then the scale of the x-axis will most likely be year of report, because that is how the data are available. Consider, however, if you had line-listed data with the actual dates of onset or report that spanned several years. You might prefer to plot these data by week, month, quarter, or even year, depending on the point you wish to make. The following steps are recommended for creating a scale for the y-axis. • Make the length of the y-axis shorter than the x-axis so that your graph is horizontal or “landscape.” A 5:3 ratio is often recommended for the length of the x-axis to y-axis. • Always start the y-axis with 0. While this recommendation is not followed in all fields, it is the standard practice in epidemiology. • Determine the range of values you need to show on the y-axis by identifying the largest value you need to graph on the y-axis and rounding that figure off to a slightly larger number. For example, the largest y-value in Figure 4.3 is 49 years in 1997, so the scale on the y-axis goes up to 50. If median age continues to increase and exceeds 50 in future years, a future graph will have to extend the scale on the y-axis to 60 years. • Space the tick marks and their labels to describe the data in sufficient detail for your purposes. In Figure 4.3, five intervals of 10 years each were considered adequate to give the reader a good sense of the data points and pattern.
  • 271.
    Displaying Public HealthData Page 4-27 Exercise 4.3 Using the data on measles rates (per 100,000) from 1955 to 2002 in Table 4.15: 1. Construct an arithmetic-scale line graph of rate by year. Use intervals on the y-axis that are appropriate for the range of data you are graphing. 2. Construct a separate arithmetic-scale line graph of the measles rates from 1985 to 2002. Use intervals on the y-axis that are appropriate for the range of data you are graphing. Graph paper is provided at the end of this lesson. Table 4.15 Rate (per 100,000 Population) of Reported Measles Cases by Year of Report — United States, 1955–2002 Year Rate per 100,000 Year Rate per 100,000 Year Rate per 100,000 1955 336.3 1971 36.5 1987 1.5 1956 364.1 1972 15.5 1988 1.4 1957 283.4 1973 12.7 1989 7.3 1958 438.2 1974 10.5 1990 11.2 1959 229.3 1975 11.4 1991 3.8 1960 246.3 1976 19.2 1992 0.9 1961 231.6 1977 26.5 1993 0.1 1962 259.0 1978 12.3 1994 0.4 1963 204.2 1979 6.2 1995 0.1 1964 239.4 1980 6.0 1996 0.2 1965 135.1 1981 1.4 1997 0.06 1966 104.2 1982 0.7 1998 0.04 1967 31.7 1983 0.6 1999 0.04 1968 11.1 1984 1.1 2000 0.03 1969 12.8 1985 1.2 2001 0.04 1970 23.2 1986 2.6 2002 0.02 Data Sources: Centers for Disease Control. Summary of notifiable diseases–United States, 1989. MMWR 1989;38(No. 54). Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2002. Published April 30, 2004 for MMWR 2002;51(No. 53). Check your answers on page 4-75
  • 272.
    Displaying Public HealthData Page 4-28 Semilogarithmic-scale line graphs In some cases, the range of data observed may be so large that proper construction of an arithmetic-scale graph is problematic. For example, in the United States, vaccination policies have greatly reduced the incidence of mumps; however, outbreaks can still occur in unvaccinated populations. To portray these competing forces, an arithmetic graph is insufficient without an inset amplifying the problem years (Figure 4.4). Figure 4.4 Mumps by Year — United States, 1978–2003 Source: Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2003. Published April 22, 2005, for MMWR 2003;52(No. 54):54. An alternative approach to this problem of incompatible scales is to use a logarithmic transformation for the y-axis. Termed a “semi-log” graph, this technique is useful for displaying a variable with a wide range of values (as illustrated in Figure 4.5). The x- axis uses the usual arithmetic-scale, but the y-axis is measured on a logarithmic rather than an arithmetic scale. As a result, the distance from 1 to 10 on the y- axis is the same as the distance from 10 to 100 or 100 to 1,000. *
  • 273.
    Displaying Public HealthData Page 4-29 Another use for the semi-log graph is when you are interested in portraying the relative rate of change of several series, rather than the absolute value. Figure 4.5 shows this application. Note several aspects of this graph: Cycle = order of magnitude That is, from 1 to 10 is one cycle; from 10 to 100 is another cycle. • The y-axis includes four cycles of the order of magnitude, each a multiple of ten (e.g., 0.1 to 1, 1 to 10, etc.) — each a constant multiple. • Within a cycle, the ten tick-marks are spaced so that spaces become smaller as the value increases. Notice that the absolute distance from 1.0 to 2.0 is wider than the distance from 2.0 to 3.0, which is, in turn, wider than the distance from 8.0 to 9.0. This results from the fact that we are graphing the logarithmic transformation of numbers, which, in fact, shrinks them as they become larger. We can still compare series, however, since the shrinking process preserves the relative change between series. Figure 4.5 Age-adjusted Death Rates for 5 of the 15 Leading Causes of Death — United States, 1958–2002 Adapted from: Kochanek KD, Murphy SL, Anderson RN, Scott C. Deaths: final data for 2002. National vital statistics report; vol 53, no 5. Hyattsville, Maryland: National Center for Health Statistics, 2004. p. 9.
  • 274.
    Displaying Public HealthData Page 4-30 Consider the data shown in Table 4.16. Two hypothetical countries begin with a population of 1,000,000. The population of Country A grows by 100,000 persons each year. The population of Country B grows by 10% each year. Figure 4.6 displays data from Country A on the left, and Country B on the right. Arithmetic-scale line graphs are above semilog-scale line graphs of the same data. Look at the left side of the figure. Because the population of Country A grows by a constant number of persons each year, the data on the arithmetic-scale line graph fall on a straight line. However, because the percentage growth in Country A declines each year, the curve on the semilog-scale line graph flattens. On the right side of the figure the population of Country B curves upward on the arithmetic-scale line graph but is a straight line on the semilog graph. In summary, a straight line on an arithmetic-scale line graph represents a constant change in the number or amount. A straight line on a semilog-scale line graph represents a constant percent change from a constant rate. Table 4.16 Hypothetical Population Growth in Two Countries COUNTRY A (Constant Growth by 100,000) COUNTRY B (Constant Growth by 10%) Year Population Growth Rate Population Growth Rate 0 1,000,000 1,000,000 1 1,100,000 10.0% 1,100,000 10.0% 2 1,200,000 9.1% 1,210,000 10.0% 3 1,300,000 8.3% 1,331,000 10.0% 4 1,400,000 7.7% 1,464,100 10.0% 5 1,500,000 7.1% 1,610,510 10.0% 6 1,600,000 6.7% 1,771,561 10.0% 7 1,700,000 6.3% 1,948,717 10.0% 8 1,800,000 5.9% 2,143,589 10.0% 9 1,900,000 5.6% 2,357,948 10.0% 10 2,000,000 5.3% 2,593,742 10.0% 11 2,100,000 5.0% 2,853,117 10.0% 12 2,200,000 4.8% 3,138,428 10.0% 13 2,300,000 4.4% 3,452,271 10.0% 14 2,400,000 4.3% 3,797,498 10.0% 15 2,500,000 4.2% 4,177,248 10.0% 16 2,600,000 4.0% 4,594,973 10.0% 17 2,700,000 3.8% 5,054,470 10.0% 18 2,800,000 3.7% 5,559,917 10.0% 19 2,900,000 3.6% 6,115,909 10.0% 20 3,000,000 3.4% 6,727,500 10.0%
  • 275.
    Displaying Public HealthData Page 4-31 To create a semilogarithmic graph from a data set in Analysis Module: To calculate data for plotting, you must define a new variable. For example, if you want a semilog plot for annual measles surveillance data in a variable called MEASLES, under the VARIABLES section of the Analysis commands: • Select Define. • Type logmeasles into the Variable Name box. • Since your new variable is not used by other programs, the Scope should be Standard. • Click on OK to define the new variable. Note that logmeasles now appears in the pull-down list of Variables. • Under the Variables section of the Analysis commands, select Assign. Types of variables and class intervals are discussed in Lesson 2. Figure 4.6 Comparison of Arithmetic-scale Line Graph and Semilogarithmic-scale Line Graph for Hypothetical Country A (Constant Increase in Number of People) and Country B (Constant Increase in Rate of Growth) Consequently, a semilog-scale line graph has the following features: • The slope of the line indicates the rate of increase or decrease. • A straight line indicates a constant rate (not amount) of increase or decrease in the values. • A horizontal line indicates no change. • Two or more lines following parallel paths show identical rates of change. Semilog graph paper is available commercially, and most include at least three cycles. Histograms A histogram is a graph of the frequency distribution of a continuous variable, based on class intervals. It uses adjoining columns to represent the number of observations for each class interval in the distribution. The area of each column is proportional to the number of observations in that interval. Figures 4.7a and 4.7b show two versions of a histogram of frequency distributions with equal class intervals. Since all class intervals are equal in this histogram, the height of each column is in proportion to the number of observations it depicts. Figures 4.7a, 4.7b, and 4.7c are examples of a particular type of histogram that is commonly used in field epidemiology — the
  • 276.
    Displaying Public HealthData Page 4-32 epidemic curve. An epidemic curve is a histogram that displays the number of cases of disease during an outbreak or epidemic by times of onset. The y-axis represents the number of cases; the x- axis represents date and/or time of onset of illness. Figure 4.7a is a perfectly acceptable epidemic curve, but some epidemiologists prefer drawing the histogram as stacks of squares, with each square representing one case (Figure 4.7b). Additional information may be added to the histogram. The rendition of the epidemic curve shown in Figure 4.7c shades the individual boxes in each time period to denote which cases have been confirmed with culture results. Other information such as gender or presence of a related risk factor could be portrayed in this fashion. Conventionally, the numbers on the x-axis are centered between the tick marks of the appropriate interval. The interval of time should be appropriate for the disease in question, the duration of the outbreak, and the purpose of the graph. If the purpose is to show the temporal relationship between time of exposure and onset of disease, then a widely accepted rule of thumb is to use intervals approximately one-fourth (or between one-eighth and one-third) of the incubation period of the disease shown. The incubation period for salmonellosis is usually 12–36 hours, so the x-axis of this epidemic curve has 12-hour intervals. Figure 4.7a Number of Cases of Salmonella Enteriditis Among Party Attendees by Date and Time of Onset — Chicago, Illinois, February 2000 Source: Cortese M, Gerber S, Jones E, Fernandez J. A Salmonella Enteriditis outbreak in Chicago. Presented at the Eastern Regional Epidemic Intelligence Service Conference, March 23, 2000, Boston, Massachusetts.
  • 277.
    Displaying Public HealthData Page 4-33 Figure 4.7b Number of Cases of Salmonella Enteriditis Among Party Attendees by Date and Time of Onset — Chicago, Illinois, February 2000 Source: Cortese M, Gerber S, Jones E, Fernandez J. A Salmonella Enteriditis outbreak in Chicago. Presented at the Eastern Regional Epidemic Intelligence Service Conference, March 23, 2000, Boston, Massachusetts. The most common choice for the x-axis variable in field epidemiology is calendar time, as shown in Figures 4.7a–c. However, age, cholesterol level or another continuous-scale variable may be used on the x-axis of an epidemic curve. Figure 4.7c Number of Cases of Salmonella Enteriditis Among Party Attendees by Date and Time of Onset — Chicago, Illinois, February 2000 Source: Cortese M, Gerber S, Jones E, Fernandez J. A Salmonella Enteriditis outbreak in Chicago. Presented at the Eastern Regional Epidemic Intelligence Service Conference, March 23, 2000, Boston, Massachusetts.
  • 278.
    Displaying Public HealthData Page 4-34 In Figure 4.8, which shows a frequency distribution of adults with diagnosed diabetes in the United States, the x-axis displays a measure of body mass — weight (in kilograms) divided by height (in meters) squared. The choice of variable for the x-axis of an epidemic curve is clearly dependent on the point of the display. Figures 4.7a, 4.7b, or 4.7c are constructed to show the natural course of the epidemic over time; Figure 4.8 conveys the burden of the problem of overweight and obesity. Figure 4.8 Distribution of Body Mass Index Among Adults with Diagnosed Diabetes — United States, 1999–2002 Data Source: Centers for Disease Control and Prevention. Prevalence of overweight and obesity among adults with diagnosed diabetes–United States, 1988-1994 and 1999-2002. MMWR 2004;53:1066–8. The component of most interest should always be put at the bottom because the upper component usually has a jagged baseline that may make comparison difficult. Consider the data on pneumoconiosis in Figure 4.9a. The graph clearly displays a gradual decline in deaths from all pneumoconiosis between 1972 and 1999. It appears that deaths from asbestosis (top subgroup in Figure 4.9a) went against the overall trend, by increasing over the same period. However, Figure 4.9b makes this point more clearly by placing asbestosis along the baseline.
  • 279.
    Displaying Public HealthData Page 4-35 Figure 4.9a Number of Deaths with Any Death Certificate Mention of Asbestosis, Coal Worker’s Pneumoconiosis (CWP), Silicosis, and Unspecified/Other Pneumoconiosis Among Persons Aged > 15 Years, by Year — United States, 1968–2000 Adapted from: Centers for Disease Control and Prevention. Changing patterns of pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–31. Figure 4.9b Number of Deaths with Any Death Certificate Mention of Asbestosis, Coal Worker’s Pneumoconiosis (CWP), Silicosis, and Unspecified/Other Pneumoconiosis Among Persons Aged > 15 Years, by Year — United States, 1968–2000 Data Source: Centers for Disease Control and Prevention. Changing patterns of pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–31. Epidemic curves are discussed in more detail in Lesson 6. Some histograms, particularly those that are drawn as stacks of squares, include a box that indicates how many cases are represented by each square. While a square usually represents one case in a relatively small outbreak, a square may represent five or ten cases in a relatively large outbreak.
  • 280.
    Displaying Public HealthData Page 4-36 Exercise 4.4 Using the botulism data presented in Exercise 4.1, draw an epidemic curve. Then use this epidemic curve to describe this outbreak as if you were speaking over the telephone to someone who cannot see the graph. Graph paper is provided at the end of this lesson. Check your answers on page 4-76
  • 281.
    Displaying Public HealthData Page 4-37 Population pyramid A population pyramid displays the count or percentage of a population by age and sex. It does so by using two histograms — most often one for females and one for males, each by age group — turned sideways so the bars are horizontal, and placed base to base (Figures 4.10 and 4.11). Notice the overall pyramidal shape of the population distribution of a developing country with many births, relatively high infant mortality, and relatively low life expectancy (Figure 4.10). Compare that with the shape of the population distribution of a more developed country with fewer births, lower infant mortality, and higher life expectancy (Figure 4.11). Figure 4.10 Population Distribution of Zambia by Age and Sex, 2000 Source: U.S. Census Bureau [Internet]. Washington, DC: IDB Population Pyramids [cited 2004 Sep 10]. Available from: http://www.census.gov/population/international/. Figure 4.11 Population Distribution of Sweden by Age and Sex, 1997 Source: U.S. Census Bureau [Internet]. Washington, DC: IDB Population Pyramids [cited 2004 Sep 10]. Available from: http://www.census.gov/population/international/. While population pyramids are used most often to display the distribution of a national population, they can also be used to display other data such as disease or a health characteristic by age
  • 282.
    Displaying Public HealthData Page 4-38 and sex. For example, smoking prevalence by age and sex is shown in Figure 4.12. This pyramid clearly shows that, at every age, females are less likely to be current smokers than males. Figure 4.12 Percentage of Persons >18 Years Who Were Current Smokers,* by Age and Sex — United States, 2002 Answer “yes” to both questions: “Do you now smoke cigarettes everyday or some days?” and “Have you smoked at least 100 cigarettes in your entire life?” Data Source: Centers for Disease Control and Prevention. Cigarette smoking among adults– United States, 2002. MMWR 2004;53:427–31. Frequency polygons A frequency polygon, like a histogram, is the graph of a frequency distribution. In a frequency polygon, the number of observations within an interval is marked with a single point placed at the midpoint of the interval. Each point is then connected to the next with a straight line. Figure 4.13 shows an example of a frequency polygon over the outline of a histogram for the same data. This graph makes it easy to identify the peak of the epidemic (4 weeks). Figure 4.13 Comparison of Frequency Polygon and Histogram
  • 283.
    Displaying Public HealthData Page 4-39 A frequency polygon contains the same area under the line as does a histogram of the same data. Indeed, the data that were displayed as a histogram in Figure 4.9a are displayed as a frequency polygon in Figure 4.14. Figure 4.14 Number of Deaths with Any Death Certificate Mention of Asbestosis, Coal Worker’s Pneumoconiosis (CWP), Silicosis, and Unspecified/Other Pneumoconiosis Among Persons Aged > 15 Years, by Year — United States, 1968–2000 Data Source: Centers for Disease Control and Prevention. Changing patterns of pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–31. A frequency polygon differs from an arithmetic-scale line graph in several ways. A frequency polygon (or histogram) is used to display the entire frequency distribution (counts) of a continuous variable. An arithmetic-scale line graph is used to plot a series of observed data points (counts or rates), usually over time. A frequency polygon must be closed at both ends because the area under the curve is representative of the data; an arithmetic-scale line graph simply plots the data points. Compare the pneumoconiosis mortality data displayed as a frequency polygon in Figure 4.14 and as a line graph in Figure 4.15. Figure 4.15 Number of Deaths with Any Death Certificate Mention of Asbestosis, Coal Worker’s Pneumoconiosis (CWP), Silicosis, and Unspecified/Other Pneumoconiosis Among Persons Aged > 15 Years, by Year — United States, 1968–2000 Data Source: Centers for Disease Control and Prevention. Changing patterns of pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–31.
  • 284.
    Displaying Public HealthData Page 4-40 Exercise 4.5 Consider the epidemic curve constructed for Exercise 4.4. Prepare a frequency polygon for these same data. Compare the interpretations of the two graphs. Check your answers on page 4-76
  • 285.
    Displaying Public HealthData Page 4-41 Ogive (pronounced O’-jive) is another name for a cumulative frequency curve. Ogive also means the diagonal rib of a Gothic vault, a pointed arc, or the curved area making up the nose of a projectile. Cumulative frequency and survival curves As its name implies, a cumulative frequency curve plots the cumulative frequency rather than the actual frequency distribution of a variable. This type of graph is useful for identifying medians, quartiles, and other percentiles. The x-axis records the class intervals, while the y-axis shows the cumulative frequency either on an absolute scale (e.g., number of cases) or, more commonly, as percentages from 0% to 100%. The median (50% or half-way point) can be found by drawing a horizontal line from the 50% tick mark on the y-axis to the cumulative frequency curve, then drawing a vertical line from that spot down to the x-axis. Figure 4.16 is a cumulative frequency graph showing the number of days until smallpox vaccination scab separation among persons who had never received smallpox vaccination previously (primary vaccinees) and among persons who had been previously vaccinated (revaccinees). The median number of days until scab separation was 19 days among revaccinees, and 22 days among primary vaccinees. Figure 4.16 Days to Smallpox Vaccination Scab Separation Among Primary Vaccinees (n=29) and Revaccinees (n=328) — West Virginia, 2003 Source: Kaydos-Daniels S, Bixler D, Colsher P, Haddy L. Symptoms following smallpox vaccination–West Virginia, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta, Georgia. A survival curve can be used with follow-up studies to display the proportion of one or more groups still alive at different time periods. Similar to the axes of the cumulative frequency curve, the x-axis records the time periods, and the y-axis shows percentages, from 0% to 100%, still alive.
  • 286.
    Displaying Public HealthData Page 4-42 Kaplan-Meier is a well accepted method for estimating survival probabilities.14 The most striking difference is in the plotted curves themselves. While a cumulative frequency starts at zero in the lower left corner of the graph and approaches 100% in the upper right corner, a survival curve begins at 100% in the upper left corner and proceeds toward the lower right corner as members of the group die. The survival curve in Figure 4.17 shows the difference in survival in the early 1900s, mid-1900s, and late 1900s. The survival curve for 1900–1902 shows a rapid decline in survival during the first few years of life, followed by a relatively steady decline. In contrast, the curve for 1949–1951 is shifted right, showing substantially better survival among the young. The curve for 1997 shows improved survival among the older population. Figure 4.17 Percent Surviving by Age in Death-registration States, 1900–1902 and United States, 1949–1951 and 1997 Source: Anderson RN. United States life tables, 1997. National vital statistics reports; vol 47, no. 28. Hyattsville, Maryland: National Center for Health Statistics, 1999. Note that the smallpox scab separation data plotted as a cumulative frequency graph in Figure 4.16 can be plotted as a smallpox scab survival curve, as shown in Figure 4.18. Figure 4.18 “Survival” of Smallpox Vaccination Scabs Among Primary Vaccines (n=29) and Revaccinees (n=328) — West Virginia, 2003 Source: Kaydos-Daniels S, Bixler D, Colsher P, Haddy L. Symptoms following smallpox vaccination–West Virginia, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta, Georgia.
  • 287.
    Displaying Public HealthData Page 4-43 Other Data Displays Thus far in this lesson, we have covered the most common ways that epidemiologists and other public health analysts display data in tables and graphs. We now cover some additional graphical techniques that are useful in specific situations. While you may not find yourself constructing these figures often, our objective is to equip you to properly interpret these displays when you encounter them. Scatter diagrams A scatter diagram (or “scattergram”) is a graph that portrays the relationship between two continuous variables, with the x-axis representing one variable and the y-axis representing the other.15 To create a scatter diagram you must have a pair of values (one for each variable) for each person, group, country, or other entity in the data set, one value for each variable. A point is placed on the graph where the two values intersect. For example, demographers may be interested in the relationship between infant mortality and total fertility in various nations. Figure 4.19 plots the total fertility rate (estimated average number of children per woman) by the infant mortality rate in 194 countries, so this scatter diagram has 194 data points. To interpret a scatter diagram, look at the overall pattern made by the plotted points. A fairly compact pattern of points from the lower left to the upper right indicates a positive correlation, in which one variable increases as the other increases. A compact pattern from the upper left to lower right indicates a negative or inverse correlation, in which one variable decreases as the other increases. Widely scattered points or a relatively flat pattern indicates little correlation. The data in Figure 4.19 seem to show a positive correlation between infant mortality and total fertility, that is, countries with high infant mortality seem to have high total fertility as well. Statistical tools such as linear regression can be applied to such data to quantify the correlation between variables in a scatter diagram. Similarly, scatter diagrams often display correlations that may provoke intriguing hypotheses about causal relationships, but additional investigation is almost always needed before any causal hypotheses should be accepted.
  • 288.
    Displaying Public HealthData Page 4-44 Figure 4.19 Correlation of Infant Mortality Rate and Total Fertility Rate Among 194 Nations, 1997 Data Source: Population Reference Bureau [Internet]. Datafinder [cited 2004 Dec 13]. Available from: http://www.prb.org/datafind/datafinder7.htm. Bar charts A bar chart uses bars of equal width to display comparative data. Comparison of categories is based on the fact that the length of the bar is proportional to the frequency of the event in that category. Therefore, breaks in the scale could cause the data to be misinterpreted and should not be used in bar charts. Bars for different categories are separated by spaces (unlike the bars in a histogram). The bar chart can be portrayed with the bars either vertical or horizontal. (This choice is usually made based on the length of text labels — long labels fit better on a horizontal chart than a vertical one) The bars are usually arranged in ascending or descending length, or in some other systematic order dictated by any intrinsic order of the categories. Appropriate data for bar charts include discrete data (e.g., race or cause of death) or variables treated as though they were discrete (age groups). (Recall that a histogram shows frequency of a continuous variable, such as dates of onset of symptoms).
  • 289.
    Displaying Public HealthData Page 4-45 More About Constructing Bar Charts • Arrange the categories that define the bars or groups of bars in a natural order, such as alphabetical or increasing age, or in an order that will produce increasing or decreasing bar lengths. • Choose whether to display the bars vertically or horizontally. • Make all of the bars the same width. • Make the length of bars in proportion to the frequency of the event. Do not use a scale break, because the reader could easily misinterpret the relative size of different categories. • Show no more than five bars within a group of bars, if possible. • Leave a space between adjacent groups of bars but not between bars within a group (see Figure 4.22). • Within a group, code different variables by differences in bar color, shading, cross hatching, etc. and include a legend that interprets your code. The simplest bar chart is used to display the data from a one-variable table (see page 4-4). Figure 4.20 shows the number of deaths among persons ages 25–34 years for the six most common causes, plus all other causes grouped together, in the United States in 2003. Note that this bar chart is aligned horizontally to allow for long labels. Figure 4.20 Number of Deaths by Cause Among 25–34 Year Olds — United States, 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/. Grouped bar charts A grouped bar chart is used to illustrate data from two-variable or three-variable tables. A grouped bar chart is particularly useful when you want to compare the subgroups within a group. Bars within a group are adjoining. The bars should be illustrated distinctively and described in a legend. For example, consider the data for Figure 4.12 — current smokers by age and sex. In Figure
  • 290.
    Displaying Public HealthData Page 4-46 4.21, each bar grouping represents an age group. Within the group, separate bars are used to represent data for males and females. This shows graphically that regardless of age, men are more likely to be current smokers than are women, but that difference declines with age. Figure 4.21 Percentage of Persons Aged >18 Years Who Were Current Smokers, by Age and Sex — United States, 2002 Data Source: Centers for Disease Control and Prevention. Cigarette smoking among adults– United States, 2002. MMWR 2004;53:427–31. The bar chart in Figure 4.22a shows the leading causes of death in 1997 and 2003 among persons ages 25–34 years. The graph is more effective at showing the differences in causes of death during the same year than in showing differences in a single cause between years. While the decline in deaths due to HIV infection between 1997 and 2003 is quite apparent, the smaller drop in heart disease is more difficult to see. If the goal of the figure is to compare specific causes between the two years, the bar chart in Figure 4.22b is a better choice.
  • 291.
    Displaying Public HealthData Page 4-47 Figure 4.22a Number of Deaths by Cause Among 25–34 Year Olds — United States, 1997 and 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/. Figure 4.22b Number of Deaths by Cause Among 25–34 Year Olds — United States, 1997 and 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/.
  • 292.
    Displaying Public HealthData Page 4-48 Stacked bar charts A stacked bar chart is used to show the same data as a grouped bar chart but stacks the subgroups of the second variable into a single bar of the first variable. It deviates from the grouped bar chart in that the different groups are differentiated not with separate bars, but with different segments within a single bar for each category. A stacked bar chart is more effective than a grouped bar chart at displaying the overall pattern of the first variable but less effective at displaying the relative size of each subgroup. The trends or patterns of the subgroups can be difficult to decipher because, except for the bottom categories, the categories do not rest on a flat baseline. To see the difference between grouped and stacked bar charts, look at Figure 4.23. This figure shows the same data as Figures 4.22a and 4.22b. With the stacked bar chart, you can easily see the change in the total number of deaths between the two years; however, it is difficult to see the values of each cause of death. On the other hand, with the grouped bar chart, you can more easily see the changes by cause of death. Figure 4.23 Number of Deaths by Cause Among 25–44 Year Olds — United States, 1997 and 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/.
  • 293.
    Displaying Public HealthData Page 4-49 100% component bar charts A 100% component bar chart is a variant of a stacked bar chart, in which all of the bars are pulled to the same height (100%) and show the components as percentages of the total rather than as actual values. This type of chart is useful for comparing the contribution of different subgroups within the categories of the main variable. Figure 4.24 shows a 100% component bar chart that compares lengths of hospital stay by age group. The figure clearly shows that the percentage of people who stay in the hospital for 1 day or less (bottom component) is greatest for children ages 0–4 years, and declines with increasing age. Concomitantly, lengths of stay of 7 or more days increase with age. However, because the columns are the same height, you cannot tell from the columns how many people in each age group were hospitalized for traumatic brain injury — putting numbers above the bars to indicate the totals in each age group would solve that problem. Figure 4.24 Length of Hospital Stay for Traumatic Brain Injury-related Discharges — 14 States*, 1997 Source: Langlois JA, Kegler SR, Butler JA, Gotsch KE, Johnson RL, Reichard AA, et al. Traumatic brain injury-related hospital discharges: results from a 14-state surveillance system. In: Surveillance Summaries, June 27, 2003. MMWR 2003;52(No. SS-04):1–18.
  • 294.
    Displaying Public HealthData Page 4-50 Deviation bar charts While many bar charts show only positive values, a deviation bar chart displays both positive and negative changes from a baseline. (Imagine profit/loss data at different times.) Figure 4.25 shows such a deviation bar chart of selected reportable diseases in the United States. A similar chart appears in each issue of CDC’s Morbidity and Mortality Weekly Report. In this chart, the number of cases reported during the past 4 weeks is compared to the average number reported during comparable periods of the past few years. The deviations to the right for hepatitis B and pertussis indicate increases over historical levels. The deviations to the left for measles, rubella, and most of the other diseases indicate declines in reported cases compared to past levels. In this particular chart, the x-axis is on a logarithmic scale, so that a 50% reduction (one-half of the cases) and a doubling (50% increase) of cases are represented by bars of the same length, though in opposite directions. Values beyond historical limits (comparable to 95% confidence limits) are highlighted for special attention. Figure 4.25 Comparison of Current Four-week Totals with Historical Data for Selected Notifiable Diseases — United States, 4-weeks Ending December 11, 2004 Source: Centers for Disease Control and Prevention. Figure 1. Selected notifiable disease reports, United States, comparison of provisional 4-week totals ending December 11, 2004, with historical data. MMWR 2004;53:1161.
  • 295.
    Displaying Public HealthData Page 4-51 Exercise 4.6 Use the data in Table 4.17 to draw a stacked bar chart, a grouped bar chart, and a 100% component bar chart to illustrate the differences in the age distribution of syphilis cases among white males, white females, black males, and black females. What information is best conveyed by each chart? Graph paper is provided at the end of this lesson. Table 4.17 Number of Reported Cases of Primary and Secondary Syphilis, by Age Group, Among Non- Hispanic Black and White Men and Women — United States, 2002 Age Group (Years) Black Men White Men Black Women White Women <20 804 905 277 50 20–29 695 914 349 66 30–39 635 277 396 76 ≥40 92 12 173 25 Data Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta: U.S. Department of Health and Human Services; 2003. Check your answers on page 4-77
  • 296.
    Displaying Public HealthData Page 4-52 Pie charts Pie graphs are used for proportional assessment by comparing data elements as percentages or counts against other data elements and against the sum of the data elements. Displaying data using a pie graph is easy using Epi Info. 1. Read (import) the file containing the data. 2. Click on the Graph command under the Statistics folder. 3. Under Graph Type, select type of graph you would like to create (Pie). 4. Under 1st Title/2nd Title, write a page title for the pie chart. 5. Select the variable you wish to graph from the X-Axis (Main variables) drop- down box. 6. Select the value you want to show from the Y-Axis (Shown value of) drop- down box. Usually you want to show percentages. Then, select Count %. 7. Click OK and the pie chart will be displayed. A pie chart is a simple, easily understood chart in which the size of the “slices” or wedges shows the proportional contribution of each component part.16 Pie charts are useful for showing the proportions of a single variable’s frequency distribution. Figure 4.26 shows a simple pie chart of the leading causes of death in 2003 among persons aged 25–34 years. Figure 4.26 Number of Deaths by Cause Among 25–34 Year Olds — United States, 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/. More About Constructing Pie Charts • Conventionally, pie charts begin at 12 o’clock. • The wedges should be labeled and arranged from largest to smallest, proceeding clockwise, although the “other” or “unknown” may be last. • Shading may be used to distinguish between slices but is not always necessary. • Because the eye cannot accurately gauge the area of the slices, the chart should indicate what percentage each slice represents either inside or near each slice.
  • 297.
    Displaying Public HealthData Page 4-53 Given current technology, pie charts are almost always generated by computer rather than drawn by hand. But the default settings of many computer programs differ from recommended epidemiologic practice. Many computer programs allow one or more slices to “explode” or be pulled out of the pie. In general, this technique should be limited to situations when you want to place special emphasis on one wedge, particularly when additional detail is provided about that wedge (Figure 4.27). Figure 4.27 Number of Deaths by Cause Among 25–34 Year Olds — United States, 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/. Multiple pie charts are occasionally used in place of a 100% component bar chart, that is, to display differences in proportional distributions. In some figures the size of each pie is proportional to the number of observations, but in others the pies are the same size despite representing different numbers of observations (Figure 4.28a and 4.28b).
  • 298.
    Displaying Public HealthData Page 4-54 Figure 4.28a Number of Deaths by Cause Among 25–34 and 35-44 Year Olds — United States, 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/. Figure 4.28b Number of Deaths by Cause Among 25–34 and 35-44 Year Olds — United States, 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/. Dot plots and box plots A dot plot uses dots to show the relationship between a categorical variable on the x-axis and a continuous variable on the y-axis. A dot is positioned at the appropriate place for each observation. The dot plot displays not only the clustering and spread of observations for each category of the x-axis variable but also differences in the patterns between categories. In Figure 4.29 the villages using either antibacterial soap or plain soap have lower incidence rates of diarrhea than do the control (no soap) villages.17
  • 299.
    Displaying Public HealthData Page 4-55 Figure 4.29 Incidence of Childhood Diarrhea in Each Neighborhood by Hygiene Intervention Group — Pakistan, 2002–2003 Source: Luby SP, Agboatwalla M, Painter J, Altaf A, Billhimer WL, Hoekstra RM. Effect of intensive handwashing promotion on childhood diarrhea in high-risk communities in Pakistan: a randomized controlled trial. JAMA 2004;291:2547–54. A dot plot shows the relationship between a continuous and a categorical variable. The same data could also be displayed in a box plot, in which the data are summarized by using “box-and- whiskers.” Figure 4.30 is an example of a box plot. The “box” represents values of the middle 50% (or interquartile range) of the data points, and the “whiskers” extend to the minimum and maximum values that the data assume. The median is usually marked with a horizontal line inside the box. As a result, you can use a box plot to show and compare the central location (median), dispersion (interquartile range and range), and skewness (indicated by a median line not centered in the box, such as for the cases in Figure 4.30).18
  • 300.
    Displaying Public HealthData Page 4-56 Figure 4.30 Risk Score for Alveolar Echinococcosis Among Cases and Controls — Germany, 1999–2000 Adapted from: Kern P, Ammon A, Kron M, Sinn G, Sander S, Petersen LR, et al. Risk factors for alveolar echinococcosis in humans. Emerg Infect Dis 2004;10:2089-93. Forest plots A forest plot, also called a confidence interval plot, is used to display the point estimates and confidence intervals of individual studies assembled for a meta-analysis or systematic review.19 In the forest plot, the variable on the x-axis is the primary outcome measure from each study (relative risk, treatment effects, etc.). If risk ratio, odds ratio, or another ratio measure is used, the x-axis uses a logarithmic-scale. This is because the logarithmic transformation of these risk estimates has a more symmetric distribution than do the risk estimates themselves (since the risk estimates can vary from zero to an arbitrarily large number). Each study is represented by a horizontal line — reflecting the confidence interval — and a dot or square — reflecting the point estimate — usually due to study size or some other aspect of study design (Figure 4.31). The shorter the horizontal line, the more precise the study’s estimate. Point estimates (dots or squares) that line up reasonably well indicate that the studies show a relatively consistent effect. A vertical line indicates where no effect (relative risk = 1 or treatment effect = 0) falls on the x-axis. If a study’s horizontal line does not cross the vertical line, that study’s result is statistically significant. From a forest plot, one can easily ascertain patterns among studies as well as outliers.
  • 301.
    Displaying Public HealthData Page 4-57 Figure 4.31 Net Change in Glycohemoglobin (GHb) Following Self- management Education Intervention for Adults with Type 2 Diabetes, by Different Studies and Follow-up Intervals, 1980–1999 Source: Norris SL, Lau J, Smith SJ, Schmid CH, Engelgau MM. Self-management education for adults with type 2 diabetes. Diabetes Care 2002;25:1159–71. Phylogenetic trees A phylogenetic tree, a type of dendrogram, is a branching chart that indicates the evolutionary lineage or genetic relatedness of organisms involved in outbreaks of illness. Distance on the tree reflects genetic differences, so organisms that are close to one another on the tree are more related than organisms that are further apart. The phylogenetic tree in Figure 4.32 shows that the organisms isolated from patients with restaurant-associated hepatitis A in Georgia and North Carolina were identical and closely related to those from patients in Tennessee.20 Furthermore, these organisms were similar to those typically seen in patients from Mexico. These microbiologic data supported epidemiologic data which implicated green onions from Mexico.
  • 302.
    Displaying Public HealthData Page 4-58 Figure 4.32 Comparison of Genetic Sequences of Hepatitis A Virus Isolates from Outbreaks in Georgia, North Carolina, and Tennessee in 2003 with Isolates from National Surveillance Source: Amon JJ, Devasia R, Guoliang X, Vaughan G, Gabel J, MacDonald P, et al. Multiple hepatitis A outbreaks associated with green onions among restaurant patrons–Tennessee, Georgia, and North Carolina, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta, Georgia. Decision trees A decision tree is a branching chart that represents the logical sequence or pathway of a clinical or public health decision.21 Decision analysis is a systematic method for making decisions when outcomes are uncertain. The basic building blocks of a decision analysis are (1) decisions, (2) outcomes, and (3) probabilities. A decision is a choice made by a person, group, or organization to select a course of action from among a set of mutually exclusive alternatives. The decision maker compares expected outcomes of available alternatives and chooses the best among them. This choice is represented by a decision node, a square, with branches representing the choices in the decision-tree diagram (for example, see Figure 4.33). For example, after receiving information that a person has a family history of a disease (colorectal cancer for this example), that person may decide (choose) to seek medical advice or choose not to do so. Outcomes are the chance events that occur in response to a decision. Outcomes can be intermediate or final. Intermediate outcomes are followed by more decisions or chance events. For example, if a person decides to seek medical care for colorectal
  • 303.
    Displaying Public HealthData Page 4-59 cancer screening, depending on the findings (outcomes) of the screening, his or her physician may advise diet or more frequent screenings; some combination of these two; or treatment. From the person’s perspective, this is a chance outcome; from a health-care provider’s perspective, it is a decision. Whether an outcome is intermediate or final may depend on the context of the decision problem. For example, colorectal cancer screening may be the final outcome in a decision analysis focusing on colorectal cancer as the health condition of interest, but it may be an intermediate outcome in a decision analysis focusing on more invasive cancer treatment. In a decision tree, outcomes follow a chance node, a circle, with branches representing different outcomes that occur by chance, one and only one of which occurs. Each chance outcome has a probability by which it can occur written below the branch in a decision-tree diagram. The sum of probabilities for all outcomes that can occur at a chance node is one. The building blocks of decision analysis –– decisions, outcomes, and probabilities — can be used to represent and examine complex decision problems. Figure 4.33 Decision Tree Comparing Colorectal Screening Current Practice with a Targeted Family History Strategy Source: Tyagi A, Morris J. Using decision analytic methods to assess the utility of family history tools. Am J Prev Med 2003;24:199–207. Maps Maps are used to show the geographic location of events or attributes. Two types of maps commonly used in field epidemiology are spot maps and area maps. Spot maps use dots or other symbols to show where each case-patient lived or was
  • 304.
    Displaying Public HealthData Page 4-60 EpiMap is an application of Epi Info for creating maps and overlaying survey data, and is available for download. exposed. Figure 4.34 is a spot map of the residences of persons with West Nile Virus encephalitis during the outbreak in the New York City area in 1999.A spot map is useful for showing the geographic distribution of cases, but because it does not take the size of the population at risk into account a spot map does not show risk of disease. Even when a spot map shows a large number of dots in the same area, the risk of acquiring disease may not be particularly high if that area is densely populated. More About Constructing Maps • Excellent examples of the use of maps to display public health data are available in these selected publications: • Atlas of United States Mortality, U. S. Department of Health and Human Services, Centers for Disease Control and Prevention, Hyattsville, MD, 1996 (DHHS Publication No. (PHS) 97-1015) • Atlas of AIDS. Matthew Smallman-Raynor, Andrew Cliff, and Peter Haggett. Blackwell Publishers, Oxford, UK, 1992 • An Historical Geography of a Major Human Viral Disease: From Global Expansion to Local Retreat, 1840-1990. Andrew Cliff, Peter Haggett, Matthew Smallman-Raynor. Blackwell Publishers, Oxford, UK, 1988 Figure 4.34 Laboratory-confirmed Cases of West Nile Virus Disease — New York City, August–September 1999 Source: Nash D, Mostashari F, Murray K, et al. Recognition of an outbreak of West Nile Virus disease. Presented at 49th Annual Epidemic Intelligence Service Conference, April 10– 14, 2000, Atlanta, Georgia. An area map, also called a chloropleth map, can be used to show rates of disease or other health conditions in different areas by using different shades or colors (Figure 4.35). When choosing
  • 305.
    Displaying Public HealthData Page 4-61 shades or colors for each category, ensure that the intensity of shade or color reflects increasing disease burden. In Figure 4.35, as mortality rates increase, the shading becomes darker. Figure 4.35 Mortality Rates (per 100,000) for Asbestosis by State — United States, 1982–2000 Source: Centers for Disease Control and Prevention. Changing patterns of pneumoconiosis mortality–United States, 1968-2000. MMWR 2004;53:627–31.
  • 306.
    Displaying Public HealthData Page 4-62 Exercise 4.7 Using the cancer mortality data in Table 4.13, construct an area map based on dividing the states into four quartiles as follows: 1. Oklahoma through Kentucky 2. Pennsylvania through Missouri 3. Connecticut through Florida 4. Utah through New York A map of the United States is provided below for your use. Check your answers on page 4-78
  • 307.
    Displaying Public HealthData Page 4-63 More About Geographic Information Systems (GIS) A geographic information system is a computer system for the input, editing, storage, retrieval, analysis, synthesis, and output of location-based information.22 In public health, GIS may use geographic distribution of cases or risk factors, health service availability or utilization, presence of insect vectors, environmental factors, and other location-based variables. GIS can be particularly effective when layers of information or different types of information about place are combined to identify or clarify geographic relationships. For example, in Figure 4.36, human cases of West Nile virus are shown as dots superimposed over areas of high crow mortality within the Chicago city limits. Figure 4.36 High Crow-mortality Areas (HCMAs) and Reported Residences of A) West Nile Virus (WNV)-infected Case-patients, or B) WNV Meningoencephalitis Case-patients (WNV Fever Cases Excluded) — Chicago, Illinois, 2002 Source: Watson JT, Jones RC, Gibbs K, Paul W. Dead crow reports and location of human West Nile virus cases, Chicago, 2002. Emerg Infect Dis 2004;10:938–40.
  • 308.
    Displaying Public HealthData Page 4-64 Using Computer Technology Many computer software packages are available to create tables and graphs. Most of these packages are quite useful, particularly in allowing the user to redraw a graph with only a few keystrokes. With these packages, you can now quickly and easily draw a number of graphs of different types and see for yourself which one best illustrates the point you wish to make when you present your data.23-28 Many software packages are available for producing all the tables and charts discussed in this chapter. One particularly helpful one is R, 29 used by universities and available for no charge around the world. In addition to graphical techniques, R provides a wide variety of statistical techniques (including linear and nonlinear modeling, classical statistical tests, time-series analysis, classification, and clustering). On the other hand, these packages tend to have default values that differ from standard epidemiologic practice. Do not let the software package dictate the appearance of the graph. Remember the adage: let the computer do the work, but you still must do the thinking. Keep in mind the primary purpose of the graph — to communicate information to others. For example, many packages can draw bar charts and pie charts that appear three-dimensional. Will a three-dimensional chart communicate the information better than a two-dimensional one? Compare and contrast the effectiveness of Figure 4.37a and 4.37b in communicating information. Figure 4.37a Past Month Marijuana Use Among Youths Aged 12–17, by Geographic Region — United States, 2003 and 2004 Data Source: Substance Abuse and Mental Health Services Administration. (2005). Results from the 2004 National Survey on Drug Use and Health: National Findings (Office of Applied Studies, NSDUH Series H-28, DHHS Publication No. SMA 05-4062). Rockville, MD.
  • 309.
    Displaying Public HealthData Page 4-65 Figure 4.37b Past Month Marijuana Use Among Youths Aged 12–17, by Geographic Region — United States, 2003 and 2004 Data Source: Substance Abuse and Mental Health Services Administration. (2005). Results from the 2004 National Survey on Drug Use and Health: National Findings (Office of Applied Studies, NSDUH Series H-28, DHHS Publication No. SMA 05-4062). Rockville, MD. “The problem with presenting information is simple — the world is high-dimensional, but our displays are not. To address this basic problem, answer 5 questions: 1. Quantitative thinking comes down to one question: Compared to what? 2. Try very hard to show cause and effect. 3. Don't break up evidence by accidents of means of production. 4. The world is multivariant, so the display should be high- dimensional. 5. The presentation stands and falls on the quality, relevance, and integrity of the content.”30 - ER Tufte Most observers and analysts would agree that the three- dimensional graph does not communicate the information as effectively as the two-dimensional graph. For example, can you tell by a glance at the three-dimensional graph that marijuana use declined slightly in the Northeast in 2004? These differences are more distinct in the two-dimensional graph. Similarly, does the three-dimensional pie chart in Figure 4.38a provide any more information than the two-dimensional chart in Figure 4.38b? The relative sizes of the components may be difficult to judge because of the tilting in the three-dimensional version. From Figure 4.38a, can you tell whether the wedge for heart disease is larger, smaller, or about the same as the wedge for malignant neoplasms? Now look at Figure 4.38b. The wedge for malignant neoplasms is larger. Remember that communicating the names and relative sizes of the components (wedges) is the primary purpose of a pie chart. Keep the number of dimensions as small as possible to clearly convey the important points, and avoid using gimmicks that do not add information.
  • 310.
    Displaying Public HealthData Page 4-66 More About Using Color in Graphs Many people misuse technology in selecting color, particularly for slides that accompany oral presentations.32 If you use colors, follow these recommendations. • Select colors so that all components of the graph — title, axes, data plots, and legends — stand out clearly from the background and each plotted series of data can be distinguished from the others. • Avoid contrasting red and green, because up to 10% of males in the audience may have some degree of color blindness. • Use colors or shades to communicate information, particularly with area maps. For example, for an area map in which states are divided into four groups according to their rates for a particular disease, use a light color or shade for the states with the lowest rates and use progressively darker colors or shades for the groups with progressively higher rates. In this way, the colors or shades contribute directly to the impression you want the viewer to have about the data. Figure 4.38a Leading Causes of Death in 25–34 Year Olds — United States, 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/. Figure 4.38b Leading Causes of Death in 25–34 Year Olds — United States, 2003 Data Source: Web-based Injury Statistics Query and Reporting System (WISQARS) [online database] Atlanta; National Center for Injury Prevention and Control. [cited 2006 Feb 15]. Available from: http://www.cdc.gov/injury/wisqars/.
  • 311.
    Displaying Public HealthData Page 4-67 Summary Much work has been done on other graphical methods of presentation.33 One of the more creative is face plots.34 Originally developed by Chernoff,35 these give a way to display n variables on a two-dimensional surface. For instance, suppose you have several variables (x, y, z, etc.) that you have collected on each of n people, and for purposes of this illustration, suppose each variable can have one of 10 possible values. We can let x be eyebrow slant, y be eye size, z be nose length, etc. The figures below show faces produced using 10 characteristics — head eccentricity, eye size, eye spacing, eye eccentricity, pupil size, eyebrow slant, nose size, mouth shape, mouth size, and mouth opening) — each assigned one of 10 possible values. Figure 4.39 Example of Face Plot Faces Produced Using 10 Characteristics Source: Weisstein, Eric W. Chernoff Face. From MathWorld — A Wolfram Web Resource. http://mathworld.wolfram.com/ChernoffFace.html. To convey the messages of epidemiologic findings, you must first select the best illustration method. Tables are commonly used to display numbers, rates, proportions, and cumulative percents. Because tables are intended to communicate information, most tables should have no more than two variables and no more than eight categories (class intervals) for any variable. Printed tables should be properly titled, labeled, and referenced; that is, they should be able to stand alone if separated from the text. Tables can be used with either nominal or continuous ordinal data. Nominal variables such as sex and state of residence have obvious categories. For continuous variables that do not have obvious categories, class intervals must be created. For some diseases, standard class intervals for age have been adopted. Otherwise a variety of methods are available for establishing reasonable class intervals. These include class intervals with an equal number of people or observations in each; class intervals with a constant width; and class intervals based on the mean and standard deviation. Graphs can visually communicate data rapidly. Arithmetic-scale line graphs have traditionally been used to show trends in disease rates over time. Semilogarithmic-scale line graphs are preferred when the disease rates vary over two or more orders of magnitude. Histograms and frequency polygons are used to display frequency distributions. A special type of histogram
  • 312.
    Displaying Public HealthData Page 4-68 known as an epidemic curve shows the number of cases by time of onset of illness or time of diagnosis during an epidemic period. The cases may be represented by squares that are stacked to form the columns of the histogram; the squares may be shaded to distinguish important characteristics of cases, such as fatal outcome. Simple bar charts and pie charts are used to display the frequency distribution of a single variable. Grouped and stacked bar charts can display two or even three variables. Spot maps pinpoint the location of each case or event. An area map uses shading or coloring to show different levels of disease numbers or rates in different areas. The final pages of this lesson provide guidance in the selection of illustration methods and construction of tables and graphs. When using each of these methods, it is important to remember their purpose: to summarize and to communicate. Even the best method must be constructed properly or the message will be lost. Glitzy and colorful are not necessarily better; sometimes less is more!
  • 313.
    Displaying Public HealthData Page 4-69 Guide to Selecting a Graph or Chart to Illustrate Epidemiologic Data Type of Graph or Chart When to Use Arithmetic scale line graph Show trends in numbers or rates over time Semilogarithmic scale line graph Display rate of change over time; appropriate for values ranging over more than 2 orders of magnitude Histogram Show frequency distribution of continuous variable; for example, number of cases during epidemic (epidemic curve) or over longer period of time Frequency polygon Show frequency distribution of continuous variable, especially to show components Cumulative frequency Display cumulative frequency for continuous variables Scatter diagram Plot association between two variables Simple bar chart Compare size or frequency of different categories of a single variable Grouped bar chart Compare size or frequency of different categories of 2 4 series of data Stacked bar chart Compare totals and illustrate component parts of the total among different groups Deviation bar chart Illustrate differences, both positive and negative, from baseline 100% component bar chart Compare how components contribute to the whole in different groups Pie chart Show components of a whole Spot map Show location of cases or events Area map Display events or rates geographically Box plot Visualize statistical characteristics (median, range, asymmetry) of a variable’s distribution
  • 314.
    Displaying Public HealthData Page 4-70 Guide to Selecting a Method of Illustrating Epidemiologic Data If data are: And these conditions apply: Then use: Numbers or rates over time Numbers • 1 or 2 sets Histogram • 2 or more sets Frequency polygon Rates • Range of values ≤ 2 orders of magnitude Arithmetic-scale line graph • Range of values ≥ 2 orders of magnitude Semilogarithmic-scale line graph Continuous data other than time series Frequency distribution Histogram or frequency polygon Data with discrete categories Bar chart or pie chart Place data Numbers Not readily identifiable on map Bar chart or pie chart Readily identifiable on map • Specific site important Spot map • Specific site unimportant Area map Rates Area map Checklist for Constructing Printed Tables 1. Title • Does the table have a title? • Does the title describe the objective of the data display and its content, including subject, person, place, and time? • Is the title preceded by the designation “Table #''? (“Table'' is used for typed text; “Figure'' is used for graphs, maps, and illustrations. Separate numerical sequences are used for tables and figures in the same document (e.g., Table 4.1, Table 4.2; Figure 4.1, Figure 4.2). 2. Rows and Columns • Is each row and column labeled clearly and concisely? • Are the specific units of measurement shown? (e.g., years, mg/dl, rate per 100,000). • Are the categories appropriate for the data? • Are the row and column totals provided? 3. Footnotes • Are all codes, abbreviations, or symbols explained? • Are all exclusions noted? • If the data are not original, is the source provided? • If source is from website, is complete address specified; and is current, active, and reference date cited?
  • 315.
    Displaying Public HealthData Page 4-71 Checklist for Constructing Printed Graphs 1. Title • Does the graph or chart have a title? • Does the title describe the content, including subject, person, place, and time? • Is the title preceded by the designation “Figure #''? (“Table'' is used for typed text; “Figure'' is used for graphs, charts, maps, and illustrations. Separate numerical sequences are used for tables and figures in the same document (e.g., Table 1, Table 2; Figure 1, Figure 2). 2. Axes • Is each axis labeled clearly and concisely? • Are the specific units of measurement included as part of the label? (e.g., years, mg/dl, rate per 100,000) • Are the scale divisions on the axes clearly indicated? • Are the scales for each axis appropriate for the data? • Does the y axis start at zero? • If a scale break is used with an arithmetic-scale line graph, is it clearly identified? • Has a scale break been used with a histogram, frequency polygon, or bar chart? (Answer should be NO!) • Are the axes drawn heavier than the other coordinate lines? • If two or more graphs are to be compared directly, are the scales identical? 3. Grid Lines • Does the figure include only as many grid lines as are necessary to guide the eye? (Often, these are unnecessary.) 4. Data plots • Does the table have a title? • Are the plots drawn clearly? • Are the data lines drawn more heavily than the grid lines? • If more than one series of data or components is shown, are they clearly distinguishable on the graph? • Is each series or component labeled on the graph, or in a legend or key? • If color or shading is used on an area map, does an increase in color or shading correspond to an increase in the variable being shown? • Is the main point of the graph obvious, and is it the point you wish to make? 5. Footnotes • Are all codes, abbreviations, or symbols explained? • Are all exclusions noted? • If the data are not original, is the source provided? 6. Visual Display • Does the figure include any information that is not necessary? • Is the figure positioned on the page for optimal readability? • Do font sizes and colors improve readability?
  • 316.
    Displaying Public HealthData Page 4-72 Guide to Preparing Projected Slides 1. Legibility (make sure your audience can easily read your visuals) • When projected, can your visuals be read from the farthest parts of the room? 2. Simplicity (keep the message simple) • Have you used plain words? • Is the information presented in the language of the audience? • Have you used only key words? • Have you omitted conjunctions, prepositions, etc.? • Is each slide limited to only one major idea/concept/theme? • Is the text on each slide limited to 2 or 3 colors (e.g., 1 color for title, another for text)? • Are there no more than 6–8 lines of text and 6–8 words per line? 3. Color • Colors have an impact on the effect of your visuals. Use warm/hot colors to emphasize, to highlight, to focus, or to reinforce key concepts. Use cool/cold colors for background or to separate items. The following table describes the effect of different colors. Hot Warm Cool Cold Colors: Red Light orange Light blue Dark blue Bright orange Light yellow Light green Dark green Bright yellow Light gold Light purple Dark purple Bright gold Browns Light gray Dark gray Effect: Exciting Mild Subdued Somber • Are you using the best color combinations? The most important item should be in the text color that has the greatest contrast with its background. The most legible color combinations are: Black on yellow Black on white Dark Green on white Dark Blue on white White on dark blue (yellow titles and white text on a dark blue background is a favorite choice among epidemiologists) • Restrict use of red except as an accent. 4. Accuracy • Slides are distracting when mistakes are spotted. Have someone who has not seen the slide before check for typos, inaccuracies, and errors in general.
  • 317.
    Displaying Public HealthData Page 4-73 Exercise Answers Exercise 4.1 1. Botulism Status by Age Group, Texas Church Supper Outbreak, 2001 Botulism Status Age Group (Years) Yes No ≤9 2 2 10–19 1 1 20–29 2 2 30–39 0 2 40–49 4 4 50–59 3 4 60–69 1 5 70–79 2 3 ≥80 0 0 Total 15 23 2. Botulism Status by Exposure to Chicken,* Texas Church Supper Outbreak, 2001 Botulism? Yes No Total Ate chicken? Yes 8 11 19 No 4 12 16 Total 12 23 35 * Excludes 3 botulism case-patients with unknown exposure to chicken 3. Botulism Status by Exposure to Chili,* Texas Church Supper Outbreak, 2001 Botulism? Yes No Total Ate chili? Yes 14 8 22 No 0 15 15 Total 14 23 37 * Excludes 1 botulism case-patient with unknown exposure to chili
  • 318.
    Displaying Public HealthData Page 4-74 4. Number of Botulism Cases/Controls by Exposure to Chili and Leftover Chili Ate Leftover Chili Yes No Total Ate chili? Yes 1 / 1 13 / 7 22 No 0 / 1 0 / 14 15 Total* 3 34 37* * One case with unknown exposure to initial chili consumption Exercise 4.2 Strategy 1: Divide the data into groups of similar size 1. Divide the list into three equal-sized groups of places: 50 states ÷ 3 = 16.67 states per group. Because states can’t be cut in thirds, two groups will contain 17 states and one group will contain 16 states. Illinois (#17) could go into either the first or second group, but its rate (80.0) is closer to #16 Maine’s rate (80.2) than Texas’ rate (79.3), so it makes sense to put Illinois in the first group. Similarly, #34 Vermont could go into either the second or third group. Arbitrarily putting Illinois into the first category and Vermont into the second results in the following groups: a. Kentucky through Illinois (States 1–17) b. Texas through Vermont (States 18–34) c. South Dakota through Utah (States 35–50) 2. Identify the rate for the first and last state in each group: a. Kentucky through Illinois 80.0–116.1 b. Texas through Vermont 70.2–79.3 c. South Dakota through Utah 39.7–68.1 3. Adjust the limits of each interval so no gap exists between the end of one class interval and beginning of the next. Deciding how to adjust the limits is somewhat arbitrary — you could split the difference, or use a convenient round number. a. Kentucky through Illinois 80.0–116.1 b. Texas through Vermont 70.0–79.9 c. South Dakota through Utah 39.7–69.9 Strategy 2: Base intervals on mean and standard deviation 1. Create three categories based on the mean (77.1) and standard deviation (16.1) by finding the upper limits of three intervals: a. Upper limit of interval 3 = maximum value = 116.1 b. Upper limit of interval 2 = mean + 1 standard deviation = 77.1 + 16.1 = 93.2
  • 319.
    Displaying Public HealthData Page 4-75 c. Upper limit of interval 1 = mean – 1 standard deviation = 77.1 – 16.1 = 61.0 d. Lower limit of interval 1 = minimum value = 39.7 2. Select the lower limit for each upper limit to define three full intervals. Specify the states that fall into each interval. (Note: To place the states with the highest rates first, reverse the order of the intervals): a. North Carolina through Kentucky (8 states) 93.3–116.1 b. Arizona through Georgia (35 states) 61.1–93.2 c. Utah through Minnesota (7 states) 39.7–61.0 Strategy 3: Divide the range into equal class intervals 1. Divide the range from zero (or the minimum value) to the maximum by 3: (116.1 – 39.7) / 3 = 76.4 / 3 = 25.467 2. Use multiples of 25.467 to create three categories, starting with 39.7: 39.7 through (39.7 + 1 x 25.467) = 39.7 through 65.2 65.3 through (39.7 + 2 x 25.467) = 65.3 through 90.6 90.7 through (39.7 + 3 x 25.467) = 90.7 through 116.1 3. Final categories: a. Indiana through Kentucky (11 states) 90.7–116.1 b. Nebraska through Oklahoma (29 states) 65.3–90.6 c. Utah through North Dakota (10 states) 39.7–65.2 4. Alternatively, since 90.6 is close to 90 and 65.2 is close to 65.0, the categories could be reconfigured with no change in state assignments. For example, the final categories could look like: Indiana through Kentucky (11 states) 90.1–116.1 Nebraska through Oklahoma (29 states) 65.1–90.0 Utah through North Dakota (10 states) 39.7–65.0
  • 320.
    Displaying Public HealthData Page 4-76 Exercise 4.3 1. Highest rate is 438.2 per 100,000 (in 1958), so maximum on y-axis should be 450 or 500 per 100,000. Rate (per 100,000 Population) of Reported Measles Cases by Year of Report — United States, 1955–2002 2. Highest rate between 1985 and 2002 was 11.2 (per 100,000 in 1990), so maximum on y-axis should be 12 per 100,000. Rate (per 100,000 Population) of Reported Measles Cases by Year of Report — United States, 1985–2002
  • 321.
    Displaying Public HealthData Page 4-77 Exercise 4.4 Number of Cases of Botulism by Date of Onset of Symptoms, Texas Church Supper Outbreak, 2001 The first case occurs on August 25, rises to a peak two days later on August 27, then declines symmetrically to 1 case on August 29. A late case occurs on August 31 and September 1. Exercise 4.5 Number of Cases of Botulism by Date of Onset of Symptoms, Texas Church Supper Outbreak, 2001 The area under the line in this frequency polygon is the same as the area in the answer to Exercise 4.4. The peak of the epidemic (8/27) is easier to identify.
  • 322.
    Displaying Public HealthData Page 4-78 Exercise 4.6 Number of Reported Cases of Primary and Secondary Syphilis, by Age Group, Among Non-Hispanic Black and White Men and Women — United States, 2002 (Stacked Bar Chart) Number of Reported Cases of Primary and Secondary Syphilis,by Age Group, Among Non-Hispanic Black and White Men and Women — United States, 2002 (Grouped Bar Chart) Percent of Reported Cases of Primary and Secondary Syphilis, by Age Group, Among Non-Hispanic Black and White Men and Women — United States, 2002 (100% Component Bar Chart) Source: Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance 2002. Atlanta, Georgia. U.S. Department of Health and Human Services; 2003. The stacked bar chart clearly displays the differences in total number of cases, as reflected by the overall height of each column. The number of cases in the lowest category (age <20 years) is
  • 323.
    Displaying Public HealthData Page 4-79 also easy to compare across race-sex groups, because it rests on the x-axis. Other categories might be a little harder to compare because they do not have a consistent baseline. If the size of each category in a given column is different enough and the column is tall enough, the categories within a column can be compared. The grouped bar chart clearly displays the size of each category within a given group. You can also discern different patterns across the groups. Comparing categories across groups takes work. The 100% component bar chart is best for comparing the percent distribution of categories across groups. You must keep in mind that the distribution represents percentages, so while the 30-39 year category in white females appears larger than the 30-39 year category in the other race-sex groups, the actual numbers are much smaller. Exercise 4.7 Age-adjusted Lung Cancer Death Rates per 100,000 Population, by State — United States, 2002
  • 324.
    Displaying Public HealthData Page 4-80 Self-Assessment Quiz Now that you have read Lesson 4 and have completed the exercises, you should be ready to take the self-assessment quiz. This quiz is designed to help you assess how well you have learned the content of this lesson. You may refer to the lesson text whenever you are unsure of the answer. Unless otherwise instructed, choose ALL correct choices for each question. 1. Tables and graphs are important tools for which tasks of an epidemiologist? A. Data collection B. Data summarization (descriptive epidemiology) C. Data analysis D. Data presentation 2. A table in a report or manuscript should include: A. Title B. Row and column labels C. Footnotes that explain abbreviations, symbols, exclusions D. Source of the data E. Explanation of the key findings 3. The following table is unacceptable because the percentages add up to 99.9% rather than 100.0% Age group No. Percent < 1 year 10 19.6 1–4 9 17.6 5–9 9 17.6 10–14 17 33.3 ≥ 15 6 11.8 Total 53 A. True B. False 4. In the following table, the total number of persons with the disease is: Cases Controls Total Exposed 22 12 34 Unexposed 3 13 16 Total 25 25 50 A. 3 B. 22 C. 25 D. 34 E. 50
  • 325.
    Displaying Public HealthData Page 4-81 5. A table shell is the: A. Box around the outside of a table B. Lines (“skeleton”) of a table without the labels or title C. Table with data but without the title, labels or data D. Table with labels and title but without the data 6. The best time to create table shells is: A. Just before planning a study B. As part of planning the study C. Just after collecting the data D. Just before analyzing the data E. As part of analyzing the data 7. Recommended methods for creating categories for continuous variables include: A. Basing the categories on the mean and standard deviation B. Dividing the data into categories with similar numbers of observations in each C. Dividing the range into equal class intervals D. Using categories that have been used in national surveillance summary reports E. Using the same categories as your population data are grouped 8. In frequency distributions, observations with missing values should be excluded. A. True B. False 9. The following are reasonable categories for a disease that mostly affects people over age 65 years: Age Group < 65 years 65–70 70–75 75–80 80–85 85 A. True B. False 10. In general, before you create a graph to display data, you should put the data into a table. A. True B. False 11. On an arithmetic-scale line graph, the x-axis and y-axis each should: A. Begin at zero on each axis B. Have labels for the tick marks and each axis C. Use equal distances along the axis to represent equal quantities (although the quantities measured on each axis may differ) D. Use the same tick mark spacing on the two axes
  • 326.
    Displaying Public HealthData Page 4-82 12. Use the following choices for Questions 12a–d: A. Arithmetic-scale line graph B. Semilogarithmic-scale line graph C. Both D. Neither 12a. ____ A wide range of values can be plotted and seen clearly, regardless of magnitude 12b. ____ A constant rate of change would be represented by a curved line 12c. ____ The y-axis tick labels could be 0.1, 1, 10, and 100 12d. ____ Can plot numbers or rates 13. Use the following choices for Questions 13a–d: A. Histogram B. Bar chart C. Both D. Neither 13a. ____ Used for categorical variables on the x-axis 13b. ____ Columns can be subdivided with color or shading to show subgroups 13c. ____ Displays continuous data 13d. ____ Epidemic curve 14. Which of the following shapes of a population pyramid is most consistent with a young population? A. Tall, narrow rectangle B. Short, wide rectangle C. Triangle base down D. Triangle base up 15. A frequency polygon differs from a line graph because a frequency polygon: A. Displays a frequency distribution; a line graph plots data points B. Must be closed (plotted line much touch x-axis) at both ends C. Cannot be used to plot data over time D. Can show percentages on the y-axis; a line graph cannot 16. Use the following choices for Questions 16a–d: A. Cumulative frequency curve B. Survival curve C. Both D. Neither 16a. ____ Y-axis shows percentages from 0% to 100% 16b. ____ Plotted curve usually begins in the upper left corner 16c. ____ Plotted curve usually begins in the lower left corner 16d. ____ Horizontal line drawn from 50% tick mark to plotted curve intersects at median
  • 327.
    Displaying Public HealthData Page 4-83 17. A scatter diagram is the graph of choice for plotting: A. Anabolic steroid levels measured in both blood and urine among a group of athletes B. Mean cholesterol levels over time in a population C. Infant mortality rates by mean annual income among different countries D. Systolic blood pressure by eye color (brown, blue, green, other) measured in each person 18. Which of the following requires more than one variable? A. Frequency distribution B. One-variable table C. Pie chart D. Scatter diagram E. Simple bar chart 19. Compared with a scatter diagram, a dot plot: A. Is another name for the same type of graph B. Differ because a scatter diagram plots two continuous variables; a dot plot plots one continuous and one categorical variable C. Differ because a scatter diagram plots one continuous and one categorical variable; a dot plot plots two continuous variables D. Plots location of cases on a map 20. A spot map must reflect numbers; an area map must reflect rates. A. True B. False 21. To display different rates on an area map using different colors, select different colors that have the same intensity, so as not to bias the audience. A. True B. False 22. In an oral presentation, three-dimensional pie charts and three-dimensional columns in bar charts are desirable because they add visual interest to a slide. A. True B. False 23. A 100% component bar chart shows the same data as a stacked bar chart. The key difference is in the units on the x-axis. A. True B. False 24. When creating a bar chart, the decision to use vertical or horizontal bars is usually based on: A. The magnitude of the data being graphed and hence the scale of the axis B. Whether the data being graphed represent numbers or percentages C. Whether the creator is an epidemiologist (who almost always use vertical bars) D. Which looks better, such as whether the label fits below the bar
  • 328.
    Displaying Public HealthData Page 4-84 25. Use the following choices for Questions 25a–d (match all that apply): A. Grouped bar chart B. Histogram C. Line graph D. Pie chart 25a. ____ Number of cases of dog bites over time 25b. ____ Number of cases of dog bites by age group (adult or child) and sex of the victim 25c. ____ Number of cases of dog bites by breed of the dog 25d. ____ Number of cases of dog bites per 100,000 population over time
  • 329.
    Displaying Public HealthData Page 4-85 Answers to Self-Assessment Quiz 1. B, C, D. Tables and graphs are important tools for summarizing, analyzing, and presenting data. While data are occasionally collected using a table (for example, counting observations by putting tick marks into particular cells in table), this is not a common epidemiologic practice. 2. A, B, C, D. A table in a printed publication should be self-explanatory. If a table is taken out of its original context, it should still convey all the information necessary for the reader to understand the data. Therefore, a table should include, in addition to the data, a proper title, row and column labels, source of the data, and footnotes that explain abbreviations, symbols, and exclusions, if any. Tables generally present the data, while the accompanying text of the report may contain an explanation of key findings. 3. B (False). Rounding that results in totals of 99.9% or 100.1% is common in tables that show percentages. Nonetheless, the total percentage should be displayed as 100.0%, and a footnote explaining that the difference is due to rounding should be included. 4. C. In the two-by-two table presented in Question 4, the total number of cases is shown as the total of the left column (labeled “Cases”). That column total number is 25. 5. D. A table shell is the skeleton of a table, complete with titles and labels, but without the data. It is created when designing the analysis phase of an investigation. Table shells help guide what data to collect and how to analyze the data. 6. B. Creation of table shells should be part of the overall study plan or protocol. Creation of table shells requires the investigator to decide how to analyze the data, which dictates what questions should be asked on the questionnaire. 7. A, B, C, D, E. All of the methods listed are in Question 6 are appropriate and commonly used by epidemiologists 8. B (False). The number of observations with missing values is important when interpreting the data, particularly for making generalizations. 9. B (False). The limits of the class intervals must not overlap. For example, would a 70- year-old be counted in the 65–70 category or in the 70–75 category? 10. A (True). In general, before you create a graph, you should observe the data in a table. By reviewing the data in the table, you can anticipate the range of values that must be covered by the axes of a graph. You can also get a sense of the patterns in the data, so you can anticipate what the graph should look like. 11. B, C. On an arithmetic-scale line graph, the axes and tick marks should be clearly labeled. For both the x- and y-axis, a particular distance anywhere along the axis should represent the same increase in quantity, although the x- and y-axis usually differ in what is measured. The y-axis, measuring frequency, should begin at zero. But the x-axis, which often measures time, need not start at zero. 12. a. B. One of the key advantages of a semilogarithmic-scale line graph is that it can display
  • 330.
    Displaying Public HealthData Page 4-86 a wide range of values clearly. 12b. A. A starting value of, say, 100,000 and a constant rate of change of, say, 10%, would result in observations of 100,000, 110,000, 121,000, 133,100, 146, 410, 161,051, etc. The resulting plotted line on an arithmetic-scale line graph would curve upwards. The resulting plotted line on a semilogarithmic-scale line graph would be a straight line. 12c. B. Values of 0.1, 1,10, and 100 represent orders of magnitude typical of the y-axis of a semilogarithmic-scale line graph. 12d. C. Both arithmetic-scale and semilogarithmic-scale line graphs can be used to plot numbers or rates. 13. a. B. A bar chart is used to graph the frequency of events of a categorical variable such as sex, or geographic region. 13b. C. The columns of either a histogram or a bar chart can be shaded to distinguish subgroups. Note that a bar chart with shaded subgroups is called a stacked bar chart. 13c. A. A histogram is used to graph the frequency of events of a continuous variable such as time. 13d. A. An epidemic curve is a particular type of histogram in which the number of cases (on the y-axis) that occur during an outbreak or epidemic are graphed over time (on the x- axis). 14. C. A typical population pyramid usually displays the youngest age group at the bottom and the oldest age group at the top, with males on one side and females on the other side. A young population would therefore have a wide bar at the bottom with gradually narrowing bars above. 15. A, B. A frequency polygon differs from a line graph in that a frequency polygon represents a frequency distribution, with the area under the curve proportionate to the frequency. Because the total area must represent 100%, the ends of the frequency polygon must be closed. Although a line graph is commonly used to display frequencies over time, a frequency polygon can display the frequency distribution of a given period of time as well. Similarly, the y-axis of both types of graph can measure percentages. 16. a. C. The y-axis of both cumulative frequency curves and survival curves typically display percentages from 0% at the bottom to 100% at the top. The main difference is that a cumulative frequency curve begins at 0% and increases, whereas a survival curve begins at 100% and decreases. 16b. B. Because a survival curve begins at 100%, the plotted curve begins at the top of the y-axis and at the beginning time interval (sometimes referred to as time-zero) of the x- axis, i.e., in the upper left corner. 16c. A. Because a cumulative frequency curve begins at 0%., the plotted curve begins at the base of the y-axis and at the beginning time interval (sometimes referred to as time- zero) of the x-axis, i.e., in the lower left corner.
  • 331.
    Displaying Public HealthData Page 4-87 16d. C. Because the y-axis represents proportions, a horizontal line drawn from the 50% tick mark to the plotted curve will indicate 50% survival or 50% cumulative frequency. The median is another name for the 50% mark of a distribution of data. 17. A, C. A scatter diagram graphs simultaneous data points of two continuous variables for individuals or communities. Drug levels, infant mortality, and mean annual income are all examples of continuous variables. Eye color, at least as presented in the question, is a categorical variable. 18. D. A frequency distribution, one-variable table, pie chart, and simple bar chart are all used to display the frequency of categories of a single variable. A scatter diagram requires two variables. 19. B. A scatter diagram graphs simultaneous data points of two continuous variables for individuals or communities; whereas a dot plot graphs data points of a continuous variable according to categories of a second, categorical variable. 20. B (False). The spots on a spot map usually reflect one or more cases, i.e., numbers. The shading on an area map may represent numbers, proportions, rates, or other measures. 21. B (False). Shading should be consistent with frequency. So rather than using different colors of the same intensity, increasing shades of the same color or family of colors should be used. 22. B (False). The primary purpose of any visual is to communicate information clearly. 3-D columns, bars, and pies may have pizzazz, but they rarely help communicate information, and sometimes they mislead. 23. A (False). The difference between a stacked bar chart and a 100% component bar chart is that the bars of a 100% component bar chart are all pulled to the top of the y-axis (100%). The units on the x-axis are the same. 24. D. Any bar chart can be oriented vertically or horizontally. The creator of the chart can choose, and often does so on the basis of consistency with other graphs in a series, opinion about which orientation looks better or fits better, and whether the labels fit adequately below vertical bars or need to placed beside horizontal bars. 25. a. B, C. Both line graphs and histograms are commonly used to graph numbers of cases over time. Line graphs are commonly used to graph secular trends over longer time periods; histograms are often used to graph cases over a short period of observation, such as during an epidemic. 25b. A. A grouped bar chart (or a stacked bar chart) is ideal for graphing frequency over two categorical variables. A pie chart is used for a single variable. 25c. D. A pie chart (or a simple bar chart) is used for graphing the frequency of categories of a single categorical variable such as breed of dog. 25d. C. Rates over time are traditionally plotted by using a line graph.
  • 332.
    Displaying Public HealthData Page 4-88 References 1. Koschat MA. A case for simple tables. The American Statistician 2005;59:31–40. 2. Centers for Disease Control and Prevention. Sexually Transmitted Disease Surveillance, 2002. Atlanta, GA: U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, September 2003. 3. Pierchala C. The choice of age groupings may affect the quality of tabular presentations. ASA Proceedings of the Joint Statistical Meetings; 2002; Alexandria, VA: American Statistical Association; 2002:2697–702. 4. Daley RW, Smith A, Paz-Argandona E, Mallilay J, McGeehin M. An outbreak of carbon monoxide poisoning after a major ice storm in Maine. J Emerg Med 2000;18:87–93. 5. Kalluri P, Crowe C, Reller M, Gaul L, Hayslett J, Barth S, Eliasberg S, Ferreira J, Holt K, Bengston S, Hendricks K, Sobel J. An outbreak of foodborne botulism associated with food sold at a salvage store in Texas. Clin Infect Dis 2003;37:1490–5. 6. Stevens JA, Powell KE, Smith SM, Wingo PA, Sattin RW. Physical activity, functional limitations, and the risk of fall-related fractures in community-dwelling elderly. Ann Epidemiol 1997;7:54–61. 7. Ahluwalia IB, Mack K, Murphy W, Mokdad AH, Bales VH. State-specific prevalence of selected chronic disease-related characteristics–Behavioral Risk Factor Surveillance System, 2001. In: Surveillance Summaries, August 22, 2003. MMWR 2003;52(No. SS-08):1–80. 8. Langlois JA, Kegler SR, Butler JA, Gotsch KE, Johnson RL, Reichard AA, et al. Traumatic brain injury-related hospital discharges: results from a 14-state surveillance system. In: Surveillance Summaries, June 27, 2003. MMWR 2003;52(No. SS-04):1–18. 9. Chang J, Elam-Evans LD, Berg CJ, Herndon J, Flowers L, Seed KA, Syverson CJ. Pregnancy-related mortality surveillance–United States, 1991-1999. In: Surveillance Summaries, February 22, 2003. MMWR 2003;52(No. SS-02):1–8. 10. Centers for Disease Control and Prevention. HIV/AIDS Surveillance Report, 2003 (Vol. 15). Atlanta, Georgia: US Department of Health and Human Services;2004:1–46. 11. Zhou W, Pool V, Iskander JK, English-Bullard R, Ball R, Wise RP, et al. Surveillance for safety after immunization: Vaccine Adverse Event Reporting System (VAERS)–1991-2001. In: Surveillance Summaries, January 24, 2003. MMWR 2003;52(No. SS-01):1–24. 12. Schmid CF, Schmid SE. Handbook of graphic presentation. New York: John Wiley & Sons, 1954. 13. Cleveland WS. The elements of graphing data. Summit, NJ: Hobart Press, 1994. 14. Brookmeyer R, Curriero FC. Survival curve estimation with partial non-random exposure information. Statistics in Medicine 2002;21:2671–83.
  • 333.
    Displaying Public HealthData Page 4-89 15. Korn EL, Graubard BI. Scatterplots with survey data. The American Statistician 1998;52,58– 69. 16. Souvaine DL, Van Wyk CJ. How hard can it be to draw a pie chart? Mathematics Magazine 1990;63:165–72. 17. Luby SP, Agboatwalla M, Painter J, Altaf A, Billhimer WL, Hoekstra RM. Effect of intensive handwashing promotion on childhood diarrhea in high-risk communities in Pakistan: a randomized controlled trial. JAMA 2004; 291(21):2547–54. 18. Kafadar K. John Tkey and robustness. Statistical Science 2003:18:319–31. 19. Urbank S. Exploring statistical forests. ASA Proceedings of the Join Statistical Meetings; 2002; Alexandria, VA: American Statistical Association, 2002: 3535–40. 20. Amon J, Devasia R, Guoliang X, Vaughan G, Gabel J, MacDonald P, et al. Multiple hepatitis A outbreaks associated with green onions among restaurant patrons–Tennessee, Georgia, and North Carolina, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta, Georgia. 21. Haddix AC, Teutsch SM, Corso PS. Prevention effectiveness: a guide to decision analysis and economic evaluation. 2nd ed. New York, New York: Oxford University Press; October 2002. 22. Croner CM. Public health GIS and the internet. Annu Rev Public Health 2003;24:57–82. 23. Hilbe JM. Statistical computing software reviews. The American Statistician 2004;58:92. 24. Devlin SJ. Statistical graphs in customer survey research. ASA Proceedings of the Joint Statistical Meetings 2003:1212–16. 25. Taub GE. A review of {it ActivStats for SPSS/}: Integrating SPSS instruction and multimedia in an introductory statistics course. Journal of Educational and Behavioral Statistics 2003;28:291–3. 26. Hilbe J. Computing and software: editor’s notes. Health Services & Outcomes Research Methodology 2000;1:75–9. 27. Oster RA. An examination of five statistical software packages for epidemiology. The American Statistician 1998;52:267–80. 28. Morgan WT. A review of eight statistics software packages for general use. The American Statistician 1998;52:70–82. 29. Anderson-Cook CM. Data analysis and graphics using R: an example-based approach. Journal of the American Statistical Association 2004;99:901–2. 30. Tufte ER. The visual display of quantitative information. Cheshire CT: Graphics Press, LLC; 2002. 31. Tufte ER. The visual display of quantitative information. Cheshire, CT: Graphics Press; 1983.
  • 334.
    Displaying Public HealthData Page 4-90 32. Olsen J. 2002. Using color in statistical graphs and maps. ASA Proceedings of the Joint Statistical Meetings; 2002; Alexandria, VA: American Statistical Association; 2002: 2524-9. 33. Wainer H, Velleman PF. Statistical Graphics: mapping the pathways of science. Annual Review of Psychology 2001;52:305–35. 34. Benedetto DD. Faces and the others: interactive expressions for observations. ASA Proceedings of the Joint Statistical Meetings; 2003; Alexandria, VA: American Statistical Association; 2003:520–7. 35. Weisstein EW. [Internet] MathWorld–A Wolfram Web Resource [updated 2006]. Chernoff Face. Available from: http://mathworld.wolfram.com/ChernoffFace.html. Websites For more information on: Visit the following websites: Age categorization used by CDC’s National Center for Health Statistics http://www.cdc.gov/nchs/ Age groupings used by the United States Census Bureau http://www.census.gov CDC’s Morbidity and Mortality Weekly Report http://www.cdc.gov/mmwr/ Epi Info and EpiMap http://www.cdc.gov/epiinfo/ GIS at CDC http://www.cdc.gov/gis/ The R Project for Statistical Computing http://www.r-project.org ColorBrewer: color advice for cartography http://www.colorbrewer.org Instructions for Epi Info 6 (DOS) To create a frequency distribution from a data set in Analysis Module: EpiInfo6: >freq variable. Output provides columns for number, percentage, and cumulative percentage. To create a two-variable table from a data set in Analysis Module: EpiInfo6: >Tables exposure_variable outcome_variable. Output shows table plus chi- square and p-value. For a two-by-two table, output also provides risk ratio, odds ratio, and confidence intervals.
  • 335.
  • 336.
    Public Health Surveillance Page5-1 PUBLIC HEALTH SURVEILLANCE The health department is responsible for protecting the public’s health, but how does it learn about cases of communicable diseases from which the public might need protection? How might health officials track behaviors that place citizens at increased risk of heart disease or diabetes? If a highly publicized mass gathering potentially attracts terrorists (e.g., a championship sporting event or political convention), how might a health department detect the presence of biologic agents or the outbreak of a disease the agent might cause? The answer is public health surveillance. Objectives After studying this lesson and answering the questions in the exercises, you will be able to: • Define public health surveillance • List the essential activities of surveillance • List the desirable characteristics of well-conducted surveillance activities • Describe sources of data and data systems commonly used for public health surveillance • Describe the principal methods of analyzing and presenting surveillance data • Describe selected examples of surveillance in the United States • Given a scenario and a specific health problem, design a plan for conducting surveillance of the problem Major Sections Introduction.................................................................................................................................. 5-2 Purpose and Characteristics of Public Health Surveillance......................................................... 5-4 Identifying Health Problems for Surveillance ............................................................................. 5-6 Identifying or Collecting Data for Surveillance......................................................................... 5-13 Analyzing and Interpreting Data................................................................................................ 5-23 Disseminating Data and Interpretation ...................................................................................... 5-34 Evaluating and Improving Surveillance..................................................................................... 5-38 Summary.................................................................................................................................... 5-42 Appendix A. Characteristics of Well-Conducted Surveillance ................................................ 5-43 Appendix B. CDC Fact Sheet on Chlamydia ........................................................................... 5-45 Appendix C. Examples of Surveillance.................................................................................... 5-48 Appendix D. Major Health Data Systems in the United States ................................................ 5-52 Appendix E. Limitations of Notifiable Disease Surveillance and Recommendations for Improvement................................................................... 5-53 3135
  • 337.
    Public Health Surveillance Page5-2 Introduction Surveillance — from the French sur (over) and veiller (to watch) — is the “close and continuous observation of one or more persons for the purpose of direction, supervision, or control.”1 In his classic 1963 paper, Alexander Langmuir applied surveillance for a disease to mean “the continued watchfulness over the distribution and trends of incidence [of a disease] through the systematic collection, consolidation, and evaluation of morbidity and mortality reports and other relevant data.” He illustrated this application with four communicable diseases: malaria, poliomyelitis, influenza, and hepatitis.2 Since then, surveillance has been extended to non-communicable diseases and injuries (and to their risk factors), and we now use the term public health surveillance to describe the general application of surveillance to public health problems.3 Evolution of Surveillance The term surveillance was used initially in public health to describe the close monitoring of persons who, because of an exposure, were at risk for developing highly contagious and virulent infectious diseases that had been controlled or eradicated in a geographic area or among a certain population (e.g., cholera, plague, and yellow fever in the United States in the latter 1800s). These persons were monitored so that, if they exhibited evidence of disease, they could be quarantined to prevent spreading the disease to others. In 1952, the U.S. Communicable Disease Center described its effort to redirect large-scale control programs for multiple infectious diseases, which had achieved their purpose, "toward the establishment of a continuing surveillance program. The objective of this redirected program is to maintain constant vigilance to detect the presence of serious infectious diseases anywhere in the country, and when necessary, to mobilize all available forces to control them."4 In 1968 at the 21st World Health Assembly, surveillance was defined as "the systematic collection and use of epidemiologic information for the planning, implementation, and assessment of disease control."5 In the 1980s and 1990s, Thacker3 and others6-8 expanded the term to encompass not just disease, but any outcome, hazard, or exposure. In fact, the term surveillance is often applied to almost any effort to monitor, observe, or determine health status, diseases, or risk factors within a population. Care should be taken, however, in applying the term surveillance to virtually any program for or method of gathering information about a population's health, because this might lead to disagreement and confusion among public health policymakers and practitioners. Other terms (e.g., survey, health statistics, and health information system) might be more appropriate for describing specific information-gathering activities or programs.9 The essence of public health surveillance is the use of data to monitor health problems to facilitate their prevention or control. Data, and interpretations derived from the evaluation of surveillance data, can be useful in setting priorities, planning, and conducting disease control programs, and in assessing the effectiveness of control efforts. For example, identifying geographic areas or populations with higher rates of disease can be helpful in planning control programs and targeting interventions,
  • 338.
    Public Health Surveillance Page5-3 and monitoring the temporal trend of the rate of disease after implementation of control efforts. Those persons conducting surveillance should: (1) identify, define, and measure the health problem of interest; (2) collect and compile data about the problem (and if possible, factors that influence it); (3) analyze and interpret these data; (4) provide these data and their interpretation to those responsible for controlling the health problem; and (5) monitor and periodically evaluate the usefulness and quality of surveillance to improve it for future use. Note that surveillance of a problem does not include actions to control the problem.2 In this lesson, we describe these five essential activities of surveillance, enumerate the desirable characteristics of surveillance, and provide examples of surveillance for multiple health problems.
  • 339.
    Public Health Surveillance Page5-4 Purpose and Characteristics of Public Health Surveillance Public health surveillance provides and interprets data to facilitate the prevention and control of disease. To achieve this purpose, surveillance for a disease or other health problem should have clear objectives. These objectives should include a clear description of how data that are collected, consolidated, and analyzed for surveillance will be used to prevent or control the disease. For example, the objective of surveillance for tuberculosis might be to identify persons with active disease to ensure that their disease is adequately treated. For such an objective, data collection should be sufficiently frequent, timely, and complete to allow effective treatment. Alternatively, the objective might be to determine whether control measures for tuberculosis are effective. To meet this objective, one might track the temporal trend of tuberculosis, and data might not need to be collected as quickly or as frequently. Surveillance for a health problem can have more than one objective. After the objectives for surveillance have been determined, critical characteristics of surveillance are usually apparent, including: • Timeliness, to implement effective control measures; • Representation, to provide an accurate picture of the temporal trend of the disease; • Sensitivity, to allow identification of individual persons with disease to facilitate treatment; quarantine, or other appropriate control measures; and • Specificity, to exclude persons not having disease. Other characteristics of well-conducted surveillance are described in Appendix A. The importance of each of these characteristics can vary according to the purpose of surveillance, the disease under surveillance, and the planned use of surveillance data (See Table 5.7 in Appendix A). To establish the objectives of surveillance for a particular disease in a specific setting and to select an appropriate method of conducting surveillance for that disease, asking and answering the following questions will be helpful. • What is the health-related event under surveillance? What is its case definition? • What is the purpose and what are the objectives of surveillance? • What are the planned uses of the surveillance data? • What is the legal authority for any data collection?
  • 340.
    Public Health Surveillance Page5-5 • Where is the organizational home of the surveillance? • Is the system integrated with other surveillance and health information systems? • What is the population under surveillance? • What is the frequency of data collection (weekly, monthly, annually)? • What data are collected and how? Would a sentinel approach or sampling be more effective? • What are the data sources? What approach is used to obtain data? • During what period should surveillance be conducted? Does it need to be continuous, or can it be intermittent or short- term? • How are the data processed and managed? How are they routed, transferred, stored? Does the system comply with applicable standards for data formats and coding schemes? How is confidentiality maintained? • How are the data analyzed? By whom? How often? How thoroughly? • How is the information disseminated? How often are reports distributed? To whom? Does it get to all those who need to know, including the medical and public health communities and policymakers? 9,10
  • 341.
    Public Health Surveillance Page5-6 Identifying Health Problems for Surveillance Multiple health problems confront the populations of the world. Certain problems present an immediate threat to health, whereas others are persistent, long-term problems with relatively stable incidence and prevalence among the populations they affect. Examples of the former include influenza epidemics and hurricanes; the latter include atherosclerotic cardiovascular disease and colon cancer. Health problems also vary for different populations and settings, and an immediate threat among one population might be a chronic problem among another. For example, an outbreak of malaria in the United States in 2006 would be an immediate threat, but malaria in Africa is a chronic problem. Selecting a Health Problem for Surveillance Because conducting surveillance for a health problem consumes time and resources, taking care in selecting health problems for surveillance is critical. In certain countries, selection is based on criteria developed for prioritizing diseases, review of available morbidity and mortality data, knowledge of diseases and their geographic and temporal patterns, and impressions of public and political concerns, sometimes augmented with surveys of the general public or nonhealth-associated government officials. Criteria developed for selecting and prioritizing health problems for surveillance include the following: 9,10,11,12 Public health importance of the problem: • incidence, prevalence, • severity, sequela, disabilities, • mortality caused by the problem, • socioeconomic impact, • communicability, • potential for an outbreak, • public perception and concern, and • international requirements. Ability to prevent, control, or treat the health problem: • preventability and • control measures and treatment. Capacity of health system to implement control measures for the health problem: • speed of response, • economics, • availability of resources, and • what surveillance of this event requires.
  • 342.
    Public Health Surveillance Page5-7 In the United States, the Centers for Disease Control and Prevention (CDC) and the Council of State and Territorial Epidemiologists (CSTE) periodically review communicable diseases and other health conditions to determine which ones should be reported to federal authorities by the states. Because of their greater likelihood of producing immediate, increased threats to public health, communicable diseases are the most common diseases under surveillance. Table 5.1 presents nationally notifiable infectious diseases for the United States for 2006. The Morbidity and Mortality Weekly Report (MMWR) presents a weekly and annual summary of nationally notifiable infectious diseases in the U.S. After priorities have been set, the extent to which a state or local health department can conduct surveillance for particular diseases is dependent on available resources. Table 5.1 Nationally Notifiable Infectious Diseases — United States, 2006 Acquired immunodeficiency syndrome (AIDS) Anthrax Arboviral neuroinvasive and nonneuroinvasive diseases • California serogroup virus disease • Eastern equine encephalitis virus disease • Powassan virus disease • St. Louis encephalitis virus disease • West Nile virus disease • Western equine encephalitis virus disease Botulism • Botulism, foodborne • Botulism, infant • Botulism, other (wound and unspecified) Brucellosis Chancroid Chlamydia trachomatis, genital infections Cholera Coccidioidomycosis Cryptosporidiosis Cyclosporiasis Diphtheria Ehrlichiosis • Ehrlichiosis, human granulocytic • Ehrlichiosis, human monocytic • Ehrlichiosis, human, other or unspecified agent Giardiasis Gonorrhea Haemophilus influenzae, invasive disease Hansen disease (leprosy) Hantavirus pulmonary syndrome Hemolytic uremic syndrome, postdiarrheal Hepatitis, viral, acute • Hepatitis A, acute • Hepatitis B, acute • Hepatitis B virus, perinatal infection • Hepatitis, C, acute Hepatitis, viral, chronic • Chronic Hepatitis B • Hepatitis C Virus Infection (past or present) HIV infection • HIV infection, adult (aged ≥13 years) • HIV infection, pediatric (aged <13 years) Influenza-associated pediatric mortality Legionellosis Listeriosis Lyme disease Malaria Measles Meningococcal disease Mumps Pertussis Plague Poliomyelitis, paralytic Psittacosis Q Fever Rabies • Rabies, animal • Rabies, human Rocky Mountain spotted fever Rubella Rubella, congenital syndrome Salmonellosis Severe acute respiratory syndrome- associated coronavirus (SARS-CoV) disease Shiga toxin-producing Escherichia coli (STEC) Shigellosis Smallpox Streptococcal disease, invasive, Group A Streptococcal toxic-shock syndrome Streptococcus pneumoniae, drug resistant, invasive disease Streptococcus pneumoniae, invasive in children aged <5 years Syphilis • Syphilis, primary • Syphilis, secondary • Syphilis, latent • Syphilis, early latent • Syphilis, late latent • Syphilis, latent, unknown duration • Neurosyphilis • Syphilis, latent, nonneurological Syphilis, congenital • Syphilitic stillbirth Tetanus Toxic-shock syndrome (other than streptococcal) Trichinellosis (trichinosis) Tuberculosis Tularemia Typhoid fever Vancomycin — intermediate Staphylococcus aureus (VISA) Vancomycin-resistant Staphylococcus aureus (VRSA) Varicella (morbidity) Varicella (deaths only) Yellow fever Adapted from: National Notifiable Diseases Surveillance System [Internet]. Atlanta: CDC [updated 2006 Jan 13]. Nationally Notifiable Infectious Diseases United States 2006 . Available from: http://www.cdc.gov/osels/ph_surveillance/nndss/phs/infdis2006.htm.
  • 343.
    Public Health Surveillance Page5-8 Exercise 5.1 A researcher at the state university’s medical center is urging the state health department to add chlamydial infections to the state's list of diseases for which surveillance is required. On the basis of the information about chlamydial infections provided in Appendix B, draw conclusions on the table below and discuss the advantages and disadvantages of adding chlamydia infections to the state’s list of notifiable diseases. Public health importance of chlamydia Incidence Severity Mortality caused by chlamydia Socioeconomic impact Communicability Potential for an outbreak Public perception and concern International requirements Ability to prevent, control, or treat chlamydia Preventability Control measures and treatment Capacity of health system to implement control measures for chlamydia Speed of response Economics Availability of resources What does surveillance for this event require? Advantages Disadvantages Check your answers on page 5-57
  • 344.
    Public Health Surveillance Page5-9 Defining the health problem, identifying needed information, and establishing the scope for surveillance After a decision has been made to undertake surveillance for a particular health problem, adopting — or, if necessary, developing — an operational definition of the health problem for surveillance is necessary for the health problem to be accurately and reliably recognized and counted. The operational definition consists of one or more criteria and is known as the case definition for surveillance. The case definition criteria might differ from the clinical criteria for diagnosing the disease and from the case definition of the disease used in outbreak investigations. For example, the case definition of listeriosis for surveillance is provided in the box below. (See Lesson 1 for further discussion of case definitions and for an example of a case definition of listeriosis for outbreak investigation). CDC and CSTE have developed case definitions for common communicable diseases,13 certain chronic diseases, and selected injuries. Case Definition of Listeriosis for Surveillance Purposes Clinical description Infection caused by Listeria monocytogenes, which can produce any of multiple clinical syndromes, including stillbirth, listeriosis of the newborn, meningitis, bacteremia, or localized infections. Laboratory criteria for diagnosis Isolation of L. monocytogenes from a normally sterile site (e.g., blood or cerebrospinal fluid or, less commonly, joint, pleural, or pericardial fluid). Case classification Confirmed: A clinically compatible case that is laboratory-confirmed. Source: Centers for Disease Control and Prevention. Case definitions for infectious conditions under public health surveillance. MMWR 1997;46(No.RR-10):p. 43. Situations might exist in which the criteria for identifying and counting occurrences of a disease consist of a constellation of signs and symptoms, chief complaints or presumptive diagnoses, or other characteristics of the disease, rather than specific clinical or laboratory diagnostic criteria. Surveillance using less specific criteria is sometimes referred as syndromic surveillance. For example, a syndromic surveillance system was put in place in New York City after the World Trade Center (WTC) attacks in 2001. Here, the objectives were to detect illness related to either a bioterrorist event or an outbreak because of concern that the WTC attack could be followed by terrorists’ use of biological or
  • 345.
    Public Health Surveillance Page5-10 chemical agents in the city. One example of non-bioterrorist syndromic surveillance is surveillance for acute flaccid paralysis (syndrome) in order to capture possible cases of poliomyelitis. This is an example where the syndrome is monitored as a proxy for the disease, and the syndrome is infrequent and severe enough to warrant investigation of each identified case. The goal of syndromic surveillance is to provide an earlier indication of an unusual increase in illnesses than traditional surveillance might, to facilitate early intervention (e.g., vaccination or chemoprophylaxis). For syndromic surveillance, a syndrome is a constellation of signs and symptoms. Signs and symptoms are grouped into syndrome categories (e.g., the category of “respiratory” includes cough, shortness of breath, difficulty breathing, and so forth). The term, as used in the United States, often refers to observing emergency department visits for multiple syndromes (e.g., “respiratory disease with fever”) as an early detection system for a biologic or chemical terrorism event. The advantage of syndromic surveillance is that persons can be identified when they seek medical attention, which is often 1–2 days before a diagnosis is made. In addition, syndromic surveillance does not rely on a clinician’s ability to think of and test for a specific disease or on the availability of local laboratory or other diagnostic resources. Because syndromic surveillance focuses on syndromes instead of diagnoses and suspect diagnoses, it is less specific and more likely to identify multiple persons without the disease of interest. As a result, more data have to be handled, and the analyses tend to be more complex. Syndromic surveillance relies on computer methods to look for deviations above baseline (certain methods look for space-time clusters). Emergency department data are the most common data source for syndromic surveillance systems. You might use syndromic surveillance when: • Timeliness is key either for naturally occurring infectious diseases (e.g., severe acute respiratory syndrome [SARS]), or a terrorism event; • Making a diagnosis is difficult or time-consuming (e.g., a new, emerging, or rare pathogen); • Trying to detect outbreaks (e.g., when syndromic surveillance identified an increase in gastroenteritis after a widespread electrical blackout, probably from consuming spoiled food); or • Defining the scope of an outbreak (e.g., investigators quickly having information on the age breakdown of patients or being able to determine geographic clustering).
  • 346.
    Public Health Surveillance Page5-11 Syndromic surveillance is a key adjunct reporting system that can detect terrorism events early. Syndromic surveillance is not intended to replace traditional surveillance, but rather to supplement it. However, evaluation of these approaches is needed because syndromic surveillance is largely untested (fortunately, no terrorism events have occurred that test the available models); its usefulness has not been proven, given the early stage of the science and the relative lack of specificity of the systems. Criticism and concern have arisen regarding the associated costs and the number of false alarms that will be fruitlessly pursued and whether syndromic surveillance will work to detect outbreaks (See below for a possible scenario). Possible Scenario for Syndromic Surveillance Consider the time sequence of an unsuspecting person exposed to an aerosolized agent (e.g., anthrax). • Two days after exposure, the person experiences a prodrome of headache and fever and visits a local pharmacy to buy acetaminophen or another over-the-counter medicine. • On day 3, he develops a cough and calls his health-care provider. • On day 4, feeling worse, he visits his physician’s office and receives a diagnosis of influenza. • On day 5, he feels weaker, calls 9-1-1, and is taken by ambulance to his local hospital’s emergency department, but is then sent home. • By day 6, he is admitted to the hospital with a diagnosis of pneumonia. • The following day, the radiologist identifies the characteristic feature of pulmonary anthrax on the chest radiograph and indicates a diagnosis. Laboratory tests are also positive. The infection-control practitioner, familiar with notifiable disease reporting, immediately calls the health department, which is on day 7 after exposure. Thus, the health department learns about this case and perhaps others a full 7 days after exposure. However, if enough persons had been exposed on day 0, the health department might have detected an increase days earlier by using a syndromic surveillance system that tracks pharmacy over-the-counter medicine sales, nurses’ hotlines, managed care office visits, school or work absenteeism, ambulance dispatches, emergency medical system or 9-1-1 calls, or emergency room visits. After a case definition has been developed, the persons conducting surveillance should determine the specific information needed from surveillance to implement control measures. For example, the geographic distribution of a health problem at the county level might be sufficient to identify counties to be targeted for control measures, whereas the names and addresses of persons affected with sexually transmitted diseases are needed to identify contacts for follow-up investigation and treatment. How quickly this information must be available for effective control is also critical in planning surveillance. For example, knowing of new cases of hepatitis A within a week of diagnosis is helpful in preventing further spread, but knowing of new cases of colon cancer within a year might be sufficient for tracking its long-term trend and the effectiveness of prevention strategies and treatment regimens.
  • 347.
    Public Health Surveillance Page5-12 Another key component of establishing surveillance for a health problem is defining the scope of surveillance, including the geographic area and population to be covered by surveillance. Establishing a period during which surveillance initially will be conducted is also useful. At the end of this period, the results of surveillance can be reviewed to determine whether surveillance should be continued. This approach might prevent the continuation of surveillance when it is no longer needed.
  • 348.
    Public Health Surveillance Page5-13 Identifying or Collecting Data for Surveillance After the problem for surveillance has been identified and defined and the needs and scope determined, available reports and other relevant data should be located that can be used to conduct surveillance. These reports and data are gathered for different purposes from multiple sources by using selected methods. Data might be collected initially to serve health-related purposes, whereas data might later serve administrative, legal, political, or economic purposes. Examples of the former include collecting data from death certificates regarding the cause and circumstances of death and collecting data from national health surveys regarding health-related behaviors; examples of the latter include collecting data on cigarette and alcohol sales and administrative data generated from the reimbursement of health-care providers. Before describing available local and national data resources for surveillance, understanding the principal sources and methods of obtaining data about health problems is helpful. As you recall from Lesson 1, the majority of diseases have a characteristic natural history. An understanding of the natural history of a disease is critical to conducting surveillance for that disease because someone — either the patient or a health-care provider — must recognize, or diagnose, the disease and create a record of its existence for it to be identified and counted for surveillance. For diseases that cause severe illness or death (e.g., lung cancer or rabies), the likelihood that the disease will be diagnosed and recorded by a health-care provider is high. For diseases that produce limited or no symptoms in the majority of those affected, the likelihood that the disease will be recognized is low. Certain diseases fall between these extremes. The characteristics and natural history of a disease determine how best to conduct surveillance for that disease. Examples of documentation of financial, legal, and administrative activities that might be used for surveillance • Receipts for cigarette and other tobacco product sales. • Automated reports of pharmaceutical sales. • Electronic records of billing and payment for health-care services. • Laws and regulations related to drug use. Sources and Methods for Gathering Data Data collected for health-related purposes typically come from three sources, individual persons, the environment, and health-care providers and facilities. Moreover, data collected for nonhealth– related purposes (e.g., taxes, sales, or administrative data) might also be used for surveillance of health-related problems. Because a researcher might wish to calculate rates of disease, information about the size of the population under surveillance and its geographic distribution are also helpful. Table 5.2 summarizes health and nonhealth-related sources of data, and the box to the left provides examples of nonhealth-related data that can be used for surveillance of specific health problems.
  • 349.
    Public Health Surveillance Page5-14 Table 5.2 Typical Sources of Data Individual persons Health-care providers, facilities, and records • Physician offices • Hospitals • Outpatient departments • Emergency departments • Inpatient settings • Laboratories Environmental conditions • Air • Water • Animal vectors Administrative actions Financial transactions • Sales of goods and services • Taxation Legal actions Laws and regulations A limited number of methods are used to collect the majority of health-related data, including environmental monitoring, surveys, notifications, and registries. These methods can be further characterized by the approach used to obtain information from the sources described previously. For example, the method of collecting information might be an annual population survey that uses an in-person interview and a standardized questionnaire for obtaining data from women aged 18–45 years; or the method might be a notification that requires completion and submission of a form by health-care providers about occurrences of specific diseases that they see in their practices. Depending on the situation, these methods might be used to obtain information about a sample of a population or events or about all members of the population or all occurrences of a specific event (e.g., birth or death). Information might be collected continuously, periodically, or for a defined period, depending on the need. Careful consideration of the objectives of surveillance for a particular disease and a thorough understanding of the advantages and disadvantages of different sources and methods for gathering data are critical in deciding what data are needed for surveillance and the most appropriate sources and methods for obtaining it.9,14 We now discuss each of these four methods.
  • 350.
    Public Health Surveillance Page5-15 Environmental Monitoring Examples of environmental monitoring • Cities and states monitor air pollutants. • Cities and towns monitor public water supplies for bacterial and chemical contaminants. • State and local health authorities monitor beaches, lakes, and swimming pools for increased levels of harmful bacteria and other biologic and chemical hazards. • Health agencies monitor animal and insect vectors for the presence of viruses and parasites that are harmful to humans. • National, state, and local departments of transportation monitor roads, highways, and bridges to ensure that they are safe for traffic; they also monitor traffic to ensure that speed limits and other traffic laws are observed. • Public safety and health departments periodically monitor compliance with laws requiring seat belt use. • Occupational health authorities monitor noise levels in the workplace to prevent hearing loss among employees. Monitoring the environment is critical for ensuring that it is healthy and safe (see Examples of Environmental Monitoring). Multiple qualitative and quantitative approaches are used to monitor the environment, depending on the problem, setting, and planned use of the monitoring data. Survey A survey is an investigation that uses a “structured and systematic gathering of information” from a sample of “a population of interest to describe the population in quantitative terms.”15 The majority of surveys gather information from a representative sample of a population so that the results of the survey can be generalized to the entire population. Surveys are probably the most common method used for gathering information about populations. The subjects of a survey can be members of the general public, patients, health-care providers, or organizations. Although their topics might vary widely, surveys are typically designed to obtain specific information about a population and can be conducted once or on a periodic basis. Notification A notification is the reporting of certain diseases or other health- related conditions by a specific group, as specified by law, regulation, or agreement. Notifications are typically made to the state or local health agency. Notifications are often used for surveillance, and they aid in the timely control of specific health problems or hazardous conditions. When reporting is required by law, the diseases or conditions to be reported are known as notifiable diseases or conditions. Individual notifiable disease case reports are considered confidential and are not available for public inspection. In most states, a case report from a physician or hospital is sent to the local health department, which has primary responsibility for taking appropriate action. The local health department then forwards a copy of the case report to the state health department. In states that have no local health departments or in which the state heath department has primary responsibility for collecting and investigating case reports, initial case reports go directly to the state health department. In some states all laboratory reports are sent to the state health department, which informs the local health department responsible for following up with the physician.
  • 351.
    Public Health Surveillance Page5-16 This form of data collection, in which health-care providers send reports to a health department on the basis of a known set of rules and regulations, is called passive surveillance (provider-initiated). Less commonly, health department staff may contact healthcare providers to solicit reports. This active surveillance (health department- initiated) is usually limited to specific diseases over a limited period of time, such as after a community exposure or during an outbreak. Table 5.3 shows the types of notification and examples. Table 5.3 Types of Notification and Examples 1. Disease or hazard-specific notifications a. Communicable diseases i. World Health Organization: International health regulations require reporting of cholera, plague, and yellow fever ii. National: United States and Canada specify diseases that require notification by all states and provinces, respectively iii. Provincial, state, or subnational: for example, coccidioidomycosis in California b. Chemical and physical hazards in the environment i. Childhood lead poisoning ii. Occupational hazards iii. Firearm-related injury iv. Consumer product-related injury 2. Notifications related to treatment administration a. Adverse effect of drugs or medical products b. Adverse effect from vaccines 3. Notifications related to persons at risk a. Elevated blood lead among adults b. Elevated blood lead among children Adapted from: Koo D, Wingo P, Rothwell C. Health Statistics from Notifications, Registration Systems, and Registries. In: Friedman D, Parrish RG, Hunter E (editors). Health Statistics: Shaping Policy and Practice to Improve the Population’s Health. New York: Oxford University Press; 2005, p. 82.
  • 352.
    Public Health Surveillance Page5-17 Use of sentinel sites has become the preferred approach for human immunodeficiency virus/acquired immunodeficiency syndrome (HIV/AIDS) surveillance for certain countries where national population-based surveillance for HIV infection is not feasible. This approach is based on periodic serologic surveys conducted at selected sites with well-defined population subgroups (e.g., prenatal clinics). Under this strategy, health officials define the population subgroups and the regions to study and then identify health-care facilities serving those populations that are capable and willing to participate. These facilities then conduct serologic surveys at least annually to provide statistically valid estimates of HIV prevalence. Because underreporting is common for certain diseases, an alternative to traditional reporting is sentinel reporting, which relies on a prearranged sample of health-care providers who agree to report all cases of certain conditions. These sentinel providers are clinics, hospitals, or physicians who are likely to observe cases of the condition of interest. The network of physicians reporting influenza-like illness, as described in one of the examples in Appendix C,is an example of surveillance that uses sentinel providers. Although the sample used in sentinel surveillance might not be representative of the entire population, reporting is probably consistent over time because the sample is stable and the participants are committed to providing high-quality data. Registries Maintaining registries is a method for documenting or tracking events or persons over time (Table 5.4). Certain registries are required by law (e.g., registries of vital events). Although similar to notifications, registries are more specific because they are intended to be a permanent record of persons or events. For example, birth and death certificates are permanent legal records that also contain important health-related information. A disease registry (e.g., a cancer registry) tracks a person with disease over time and usually includes diagnostic, treatment, and outcome information. Although the majority of disease registries require health facilities to report information on patients with disease, an active component might exist in which the registry periodically updates patient information through review of health, vital, or other records. Reanalysis or Secondary Use of Data Surveillance for a health problem can use data originally collected for other purposes — a practice known as the reanalysis or secondary use of data. This approach is efficient but can suffer from a lack of timeliness, or it can lack sufficient detail to address the problem under surveillance. Because the primary collection of data for surveillance is time-consuming and resource-intensive if done well, it should be undertaken only if the health problem is of high priority and no other adequate source of data exists.
  • 353.
    Public Health Surveillance Page5-18 Table 5.4 Types of Registries and Examples of Selected Types 1. Vital event registration a. Birth registration b. Marriage and divorce registration c. Death registration 2. Registries used in preventive medicine a. Immunization registries b. Registries of persons at risk for selected conditions c. Registries of persons positive for genetic conditions 3. Disease-specific registries a. Blind registries b. Birth defects registries c. Cancer registries d. Psychiatric case registries e. Ischemic heart disease registries 4. Treatment registries a. Radiotherapy registries b. Follow-up registries for detection of iatrogenic thyroid disease 5. After-treatment registries a. Handicapped children b. Disabled persons 6. Registries of persons at risk or exposed a. Children at high risk for developing a health problem b. Occupational hazards registries c. Medical hazards registries d. Older persons or chronically ill registries e. Atomic bomb survivors (Japan) f. World Trade Center survivors (New York City) 7. Skills and resources registries 8. Prospective research studies 9. Specific information registries Adapted from: Koo D, Wingo P, Rothwell C. Health Statistics from Notifications, Registration Systems, and Registries. In: Friedman D, Parrish RG, Hunter E (editors). Health Statistics: Shaping Policy and Practice to Improve the Population’s Health. New York: Oxford University Press; 2005, p. 91. Weddell JM. Registers and registries: a review. Int J Epid 1973;2:221–8.
  • 354.
    Public Health Surveillance Page5-19 Exercise 5.2 State funding for a childhood asthma program has just become available. To initiate surveillance for childhood asthma, the staff is reviewing different sources of data on asthma. Discuss the advantages and disadvantages of the following sources of data and methods for conducting surveillance for asthma. (Figure 5.12 in Appendix C indicates national data for these different sources.) • Self-reported asthma prevalence and asthmatic attacks obtained by a telephone survey of the general population. • Asthma-associated outpatient visits obtained from periodic surveys of local health-care providers, including emergency departments and hospital outpatient clinics. Check your answers on page 5-58
  • 355.
    Public Health Surveillance Page5-20 Major health data systems Data regarding the characteristics of diseases and injuries are critical for guiding efforts for preventing and controlling those diseases. Multiple systems exist in the United States to gather such data, as well as other health-related data, at national, state, and local levels. These systems provide the “morbidity and mortality reports and other relevant data” for surveillance, as described by Langmuir, and examples of such systems are listed in Appendix E. Remember, however, that surveillance is an activity — the continued watchfulness over a disease by using data collected about it — and not the data about a disease or the different data systems used to collect or manage such data. Surveillance for communicable diseases principally relies upon reports of notifiable diseases from health-care providers and laboratories and the registration of deaths. Because the most common use of surveillance for communicable diseases at the local level is to prevent or control cases of disease, local surveillance relies on finding individual cases of disease through notifications or, where more complete reporting is required, actively contacting health-care facilities or providers on a regular basis.10 At the state and national level, the principal notification system in the United States is the National Notifiable Disease Surveillance System (NNDSS). State and local vital registration provides data for monitoring deaths from certain infectious diseases (e.g., influenza and AIDS). More About the National Notifiable Disease Surveillance System A notifiable disease is one for which regular, frequent, and timely information regarding individual cases is considered necessary for preventing and controlling the disease. The list of nationally notifiable diseases is revised periodically. For example, a disease might be added to the list as a new pathogen emerges, and diseases are deleted as incidence declines. Public health officials at state health departments and CDC collaborate in determining which diseases should be nationally notifiable. The Council of State and Territorial Epidemiologists, with input from CDC, makes recommendations annually for additions and deletions. However, reporting of nationally notifiable diseases to CDC by the states is voluntary. Reporting is mandated (i.e., by legislation or regulation) only at the state and local levels. Thus, the list of diseases considered notifiable varies slightly by state. All states typically report diseases for which the patients must be quarantined (i.e., cholera, plague, and yellow fever) in compliance with the World Health Organization's International Health Regulations. Data in the National Notifiable Disease Surveillance System (NNDSS) are derived primarily from reports transmitted to CDC by the 50 states, two cities, and five territorial health departments. Source: National Notifiable Diseases Surveillance System [Internet]. Atlanta: CDC [updated 2006 Jan 13]. Available from: http://www.cdc.gov/osels/ph_surveillance/nndss/nndsshis.htm.
  • 356.
    Public Health Surveillance Page5-21 Surveillance for chronic diseases usually relies upon health-care– related data (e.g., hospital discharges, surveys of the public, and mortality data from the vital statistics system). Given the slow rate of change in the incidence and prevalence of these diseases, data for surveillance of chronic conditions need not be as timely as those for acute infectious diseases. Surveillance for behaviors that influence health and for other markers for health (e.g., smoking, blood pressure, and serum cholesterol) is accomplished by population surveys, which might be supplemented with health-care related data. The Behavioral Risk Factor Surveillance System (BRFSS), the Youth Risk Behavior Surveillance System (YRBSS), the National Health Interview Survey (NHIS), and the National Household Survey on Drug Abuse are all surveys that gather data regarding behaviors that influence health. The National Health and Nutrition Examination Survey (NHANES), probably the most comprehensive survey in the United States of health and the factors that influence it, gathers extensive data on physiologic and biochemical measures of the population and on the presence of chemicals among the population resulting from environmental exposures (e.g., lead, pesticides, and cotinine from secondhand smoke).Data from NHANES have been used for approximately 40 years to monitor the lead burden among the general public, demonstrating its marked elevation and then substantial decline after the mandated removal of lead from gasoline and paint.
  • 357.
    Public Health Surveillance Page5-22 Exercise 5.3 Assume you work in a state in which none of the following conditions is on the state list of notifiable diseases. For each condition, list at least one existing source of data that you need for conducting surveillance on the condition. What factors make the selected source or data system more appropriate than another? Listeriosis: A serious infection can result from eating food contaminated with the bacterium Listeria monocytogenes. The disease affects primarily pregnant women, newborns, and adults with weakened immune systems. A person with listeriosis has fever, muscle aches, and sometimes gastrointestinal symptoms (e.g., nausea or diarrhea). If infection spreads to the nervous system, such symptoms as headache, stiff neck, confusion, loss of balance, or convulsions can occur. Infected pregnant women might experience only a mild influenza-like illness; however, infections during pregnancy can lead to miscarriage or stillbirth, premature delivery, or infection of the newborn. In the United States, approximately 800 cases of listeriosis are reported each year. Of those with serious illness, 15% die; newborns and immunocompromised persons are at greatest risk for serious illness and death. Spinal cord injury: Approximately 11,000 persons sustain a spinal cord injury (SCI) each year in the United States, and 200,000 persons in the United States live with a disability related to an SCI. More than half of the persons who sustain SCIs are aged 15–29 years. The leading cause of SCI varies by age. Motor vehicle crashes are the leading cause of SCIs among persons aged <65 years. Among persons aged ≥65 years, falls cause the majority of spinal cord injuries. Sports and recreation activities cause an estimated 18% of spinal cord injuries. Lung cancer among nonsmokers: A usually fatal cancer of the lung can occur in a person who has never smoked. An estimated 10%–15% of lung cancer cases occur among nonsmokers, and this type of cancer appears to be more common among women and persons of East Asian ancestry. Check your answers on page 5-60
  • 358.
    Public Health Surveillance Page5-23 Analyzing and Interpreting Data After morbidity, mortality, and other relevant data about a health problem have been gathered and compiled, the data should be analyzed by time, place, and person. Different types of data are used for surveillance, and different types of analyses might be needed for each. For example, data on individual cases of disease are analyzed differently than data aggregated from multiple records; data received as text must be sorted, categorized, and coded for statistical analysis; and data from surveys might need to be weighted to produce valid estimates for sampled populations. For analysis of the majority of surveillance data, descriptive methods are usually appropriate. The display of frequencies (counts) or rates of the health problem in simple tables and graphs, as discussed in Lesson 4, is the most common method of analyzing data for surveillance. Rates are useful — and frequently preferred — for comparing occurrence of disease for different geographic areas or periods because they take into account the size of the population from which the cases arose. One critical step before calculating a rate is constructing a denominator from appropriate population data. For state- or countywide rates, general population data are used. These data are available from the U.S. Census Bureau or from a state planning agency. For other calculations, the population at risk can dictate an alternative denominator. For example, an infant mortality rate uses the number of live-born infants; rates of surgical wound infections in a hospital requires the number of such procedures performed. In addition to calculating frequencies and rates, more sophisticated methods (e.g., space-time cluster analysis, time series analysis, or computer mapping) can be applied. To determine whether the incidence or prevalence of a health problem has increased, data must be compared either over time or across areas. The selection of data for comparison depends on the health problem under surveillance and what is known about its typical temporal and geographic patterns of occurrence. For example, data for diseases that indicate a seasonal pattern (e.g., influenza and mosquito-borne diseases) are usually compared with data for the corresponding season from past years. Data for diseases without a seasonal pattern are commonly compared with data for previous weeks, months, or years, depending on the nature of the disease. Surveillance for chronic diseases typically requires data covering multiple years. Data for acute infectious diseases might only require data covering weeks or months, although data
  • 359.
    Public Health Surveillance Page5-24 extending over multiple years can also be helpful in the analysis of the natural history of disease. Data from one geographic area are sometimes compared with data from another area. For example, data from a county might be compared with data from adjacent counties or with data from the state. We now describe common methods for, and provide examples of, the analysis of data by time, place, and person. Analyzing by time Basic analysis of surveillance data by time is usually conducted to characterize trends and detect changes in disease incidence. For notifiable diseases, the first analysis is usually a comparison of the number of case reports received for the current week with the number received in the preceding weeks. These data can be organized into a table, a graph, or both (Table 5.5 and Figures 5.2 and 5.3). An abrupt increase or a gradual buildup in the number of cases can be detected by looking at the table or graph. For example, health officials reviewing the data for Clark County in Table 5.5 and Figures 5.2 and 5.3 will have noticed that the number of cases of hepatitis A reported during week 4 exceeded the numbers in the previous weeks. This method works well when new cases are reported promptly. Table 5.5 Reported Cases of Hepatitis A, by County and Week of Report, 1991 Week of report County 1 2 3 4 5 6 7 8 9 Adams — — — 1 — — 1 — — Asotin — — — — — — — — — Benton — — — 2 1 — 2 — 3 Chelen — — 1 3 1 1 — — 1 Clallam — — 1 — — — — 2 — Clark — — 3 8 14 13 11 6 — Columbia — — — — — — — — — Cowlitz 2 — 3 — — 6 4 9 — Douglas — — — — — — — — — Ferry — — — — — — — — — Franklin — — 3 2 3 — 5 — 4 Garfield — — — — — — — 1 — Etc. Another common analysis is a comparison of the number of cases during the current period to the number reported during the same period for the last 2–10 years (Table 5.6). For example, health officials will have noted that the 11 cases reported for Clark County during weeks 1–4 during 1991 exceeded the numbers reported during the same 4-week period during the previous 3 years. A related method involves comparing the cumulative
  • 360.
    Public Health Surveillance Page5-25 number of cases reported to date during the current year (or during the previous 52 weeks) to the cumulative number reported to the same date during previous years. Table 5.6 Reported Cases of Hepatitis A, by County for Weeks 1–4, 1988–1991 Year County 1988 1989 1990 1991 Adams — — — 1 Asotin — — — — Benton — — 3 2 Chelen — 1 2 4 Clallam — 1 1 1 Clark 6 3 — 11 Columbia — — — — Cowlitz — 5 — 5 Douglas — — 2 — Ferry 1 — — — Franklin — 2 3 5 Garfield — — — — Etc. Analysis of long-term time trends, also known as secular trends, usually involves graphing occurrence of disease by year. Figure 5.1 illustrates the rate of reported cases of malaria for the United States during 1932–2003. Graphs can also indicate the occurrence of events thought to have an impact on the secular trend (e.g., implementation or cessation of a control program or a change in the method of conducting surveillance). Figure 5.2 illustrates reported morbidity from malaria for 1932–1962, along with events and control activities that influenced its incidence.2
  • 361.
    Public Health Surveillance Page5-26 Figure 5.1 Rate (per 100,000 Persons) of Reported Cases of Malaria, By Year — United States, 1932– 2003 Adapted from: Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 1993b. MMWR 1993; 42(53):38, and Langmuir AD. The surveillance of communicable diseases of national importance. N Engl J Med 1963;268:182–92. Figure 5.2 Reported Malaria Morbidity — United States, 1932–1962 Adapted from: Centers for Disease Control and Prevention. Summary of notifiable diseases, United States, 1993b. MMWR 1993;42(53):38, and National Notifiable Diseases Surveillance System [Internet]. Atlanta: CDC [updated 2005 Oct 14; cited 2005 Nov 16]. Available from: http://www.cdc.gov/mmwr/preview/mmwrhtml/00035381.htm, Langmuir AD. The surveillance of communicable diseases of national importance. N Engl J Med 1963;268:184.
  • 362.
    Public Health Surveillance Page5-27 Statistical methods can be used to detect changes in disease occurrence. The Early Aberration Detection System (EARS) is a package of statistical analysis programs for detecting aberrations or deviations from the baseline, by using either long- (3–5 years) or short-term (as short as 1–6 days) baselines.16 Analyzing by place The analysis of cases by place is usually displayed in a table or a map. State and local health departments usually analyze surveillance data by neighborhood or by county. CDC routinely analyzes surveillance data by state. Rates are often calculated by adjusting for differences in the size of the population of different counties, states, or other geographic areas. Figure 5.3 illustrates lung cancer mortality rates for white males for all U.S. counties for 1998–2002. To deal with county-to-county variations in population size and age distribution, age-adjusted rates are displayed. Figure 5.3 Age-Adjusted Lung and Bronchus Cancer Mortality Rates (per 100,000 Population) By State — United States, 1998–2002 Data Source: National Cancer Institute [Internet] Bethesda: NCI [cited 2006 Mar 22] Surveillance Epidemiology and End Results (SEER). Available from: http://seer.cancer.gov/faststats/. The advent of geographic information systems (GIS) allows more robust analysis of data by place and has moved spot and shaded, or choropleth, maps to much more sophisticated applications.17 Using GIS is particularly effective when different types of information about place are combined to identify or clarify geographic relationships. For example, in Figure 5.4, the absence or presence of the tick that transmits Lyme disease, Ixodes scapularis, are illustrated superimposed over habitat suitability.18 Such software packages as SatScan™ (Martin Kulldorff, Harvard
  • 363.
    Public Health Surveillance Page5-28 University and Information Management System, Inc., Silver Spring, Maryland), EpiInfo™ (CDC, Atlanta, Georgia), and Health Mapper (World Health Organization, Geneva, Switzerland) provide GIS functionality and can be useful when analyzing surveillance data.19-21 Figure 5.4 Predictive Risk Map of Habitat Suitability for Ixodes scapularis in Wisconsin and Illinois Source: Guerra M, Walker E, Jones C, Paskewitz S, Cortinas MR, Stancil A, Beck L, Bobo M, Kitron U. Predicting the risk of Lyme disease: habitat suitability for Ixodes scapularis in the north central United States. Emerg Infect Dis. 2002;8:289–97. Analyzing by time and place As a practical matter, disease occurrence is often analyzed by time and place simultaneously. An analysis by time and place can be organized and presented in a table or in a series of maps highlighting different periods or populations (Figures 5.5 and 5.6).
  • 364.
    Public Health Surveillance Page5-29 Figure 5.5 Age-Adjusted Colon Cancer Mortality Rates* for White Females by State — United States, 1950–1954, 1970–1974, and 1990–1994 *Scale based on 1950–1994 rates (per 100,000 person years). Data Source: Customizable Mortality Maps [Internet] Bethesda: National Cancer Institute [cited 2006 Mar 22]. Available from: http://ratecalc.cancer.gov/ratecalc//. Figure 5.6 Age-Adjusted Colon Cancer Mortality Rates* for White Males by State — United States, 1950–1954, 1970–1974, and 1990–1994 *Scale based on 1950–1994 rates (per 100,000 person years). Data Source: Customizable Mortality Maps [Internet] Bethesda: National Cancer Institute [cited 2006 Mar 22]. Available from: http://ratecalc.cancer.gov/ratecalc//. Analyzing by person The most commonly collected and analyzed person characteristics are age and sex. Data regarding race and ethnicity are less consistently available for analysis. Other characteristics (e.g., school or workplace, recent hospitalization, and the presence of such risk factors for specific diseases as recent travel or history of cigarette smoking) might also be available and useful for analysis, depending on the health problem. Age Meaningful age categories for analysis depend on the disease of interest. Categories should be mutually exclusive and all-inclusive. Mutually exclusive means the end of one category cannot overlap with the beginning of the next category (e.g., 1–4 years and 5–9 years rather than 1–5 and 5–9). All-inclusive means that the categories should include all possibilities, including the extremes
  • 365.
    Public Health Surveillance Page5-30 of age (e.g., <1 year and ≥84 years) and unknowns. Standard age categories for childhood illnesses are usually <1 year and ages 1–4, 5–9, 10–14, 15–19, and ≥20 years. For pneumonia and influenza mortality, which usually disproportionally affects older persons, the standard categories are <1 year and 1–24, 25–44, 45–64, and ≥65 years. Because two-thirds of all deaths in the United States occur among persons aged ≥65 years, researchers often divide the last category into ages 65–74, 75–84, and ≥85 years. The characteristic age distribution of a disease should be used in deciding the age categories — multiple narrow categories for the peak ages, broader categories for the remainder. If the age distribution changes over time or differs geographically, the categories can be modified to accommodate those differences. To use data in the calculation of rates, the age categories must be consistent with the age categories available for the population at risk. For example, census data are usually published as <5 years, 5–9, 10–14, and so on in 5-year age groups. These denominators could not be used if the surveillance data had been categorized in different 5-year age groups (e.g., 1–5 years, 6–10, 11–15, and so forth). Other Person- or Disease-Related Risk Factor For certain diseases, information on other specific risk factors (e.g., race, ethnicity, and occupation) are routinely collected and regularly analyzed. For example, have any of the reported cases of hepatitis A occurred among food-handlers who might expose (or might have exposed) unsuspecting patrons? For hepatitis B case reports, have two or more reports listed the same dentist as a potential source? For a varicella (chickenpox) case report, had the patient been vaccinated? Analysis of risk-factor data can provide information useful for disease control and prevention. Unfortunately, data regarding risk factors are often not available for analysis, particularly if a generic form (i.e., one report form for all diseases) or a secondary data source is used. Interpreting results of analyses When the incidence of a disease increases or its pattern among a specific population at a particular time and place varies from its expected pattern, further investigation or increased emphasis on prevention or control measures is usually indicated. The amount of increase or variation required for action is usually determined locally and reflects the priorities assigned to different diseases, the
  • 366.
    Public Health Surveillance Page5-31 local health department’s capabilities and resources, and sometimes, public, political, or media attention or pressure. For certain diseases (e.g., botulism), a single case of an illness of public health importance or suspicion of a common source of infection for two or more cases is often sufficient reason for initiating an investigation. Suspicion might also be aroused from finding that patients have something in common (e.g., place of residence, school, occupation, racial/ethnic background, or time of onset of illness). Or a physician or other knowledgeable person might report that multiple current or recent cases of the same disease have been observed and are suspected of being related (e.g., a report of multiple cases of hepatitis A within the past 2 weeks from one county). Observed increases or decreases in incidence or prevalence might, however, be the result of an aspect of the way in which surveillance was conducted rather than a true change in disease occurrence. Common causes of such artifactual changes are: • Changes in local reporting procedures or policies (e.g., a change from passive to active surveillance). • Changes in case definition (e.g., AIDS in 1993). • Increased health-seeking behavior (e.g., media publicity prompts persons with symptoms to seek medical care). • Increase in diagnosis. • New laboratory test or diagnostic procedure. • Increased physician awareness of the condition, or a new physician is in town. • Increase in reporting (i.e., improved awareness of requirement to report). • Outbreak of similar disease, misdiagnosed as disease of interest. • Laboratory error. • Batch reporting in which reports from previous periods are held and reported all at once during another reporting period (e.g., reporting all cases received during December and the first week of January during the second week of January). Artifactual changes include an increase in population size, improved diagnostic procedures, enhanced reporting, and duplicate reporting. Compare the sharp increases in disease incidence illustrated in Figures 5.7 and 5.8. Although they appear similar, the increase displayed in Figure 5.7 represents a true increase in incidence, whereas the increase displayed in Figure 5.8 resulted from a change in the case definition.22,23 Nonetheless, because a health department’s primary responsibility is to protect the health of the public, public health officials usually consider an apparent increase real, and respond accordingly, until proven otherwise.
  • 367.
    Public Health Surveillance Page5-32 Figure 5.7 Reported Cases of Salmonellosis per 100,000 Population, By Year — United States, 1972–2002 Source: Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2002. Published April 30, 2004, for MMWR 2002;51(No. 53): p. 59. Figure 5.8 Reported Cases of AIDS, by Year — United States* and U.S. Territories, 1982– 2002 * Total number of AIDS cases includes all cases reported to CDC as of December 31, 2002. Total includes cases among residents in the U.S. territories and 94 cases among persons with unknown state of residence. Source: Centers for Disease Control and Prevention. Summary of notifiable diseases–United States, 2002. Published April 30, 2004, for MMWR 2002;51(No. 53): p. 59.
  • 368.
    Public Health Surveillance Page5-33 Exercise 5.4 During the previous 6 years, one to three cases per year of tuberculosis had been reported to a state health department. During the past 3 months, 17 cases have been reported. All but two of these cases have been reported from one county. The local newspaper published an article about one of the first reported cases, which occurred in a girl aged 3 years. Describe the possible causes of the increase in reported cases. Check your answers on page 5-60
  • 369.
    Public Health Surveillance Page5-34 Disseminating Data and Interpretations “Development of a reasonably effective primary surveillance system took time. Usually, 2 full years were required. Experience showed that development was best achieved by establishing for each administrative unit of perhaps 2–5 million population, a surveillance team of perhaps two to four persons with transport. Each team, in addition to its other duties in outbreak containment, visited each reporting unit regularly to explain and discuss the program, to distribute forms (and often vaccine), and to check on those who were delinquent in reporting. Regularly distributed surveillance reports also helped to motivate these units. Undoubtedly, the greatest stimulus to reporting was the prompt visit of the surveillance team for outbreak investigations and control whenever cases were reported. This simple, obvious, and direct indication that the routine weekly reports were actually seen and were a cause for public health action did more, I am sure, than the multitude of government directives which were issued.” [Emphasis added]25 As Langmuir2 emphasized, the timely, regular dissemination of basic data and their interpretations is a critical component of surveillance. Data and interpretations should be sent to those who provided reports or other data (e.g., health-care providers and laboratory directors). They should also be sent to those who use them for planning or managing control programs, administrative purposes, or other health-related decision-making. Dissemination of surveillance information can take different forms. Perhaps the most common is a surveillance report or summary, which serves two purposes: to inform and to motivate. Information on the occurrence of health problems by time, place, and person informs local physicians about their risk for their encountering the problem among their patients. Other useful information accompanying surveillance data might include prevention and control strategies and summaries of investigations or other studies of the health problem. A report should be prepared on a regular basis and distributed by mail or e-mail and posted on the health department’s Internet or intranet site, as appropriate. Increasingly, surveillance data are available in a form that can be queried by the general public on health departments’ Internet sites.24 A surveillance report can also be a strong motivational factor in that it demonstrates that the health department actually looks at the case reports that are submitted and acts on those reports. Such efforts are important in maintaining a spirit of collaboration among the public health and medical communities, which in turn, improves the reporting of diseases to health authorities. State and local health departments often publish a weekly or monthly newsletter that is distributed to the local medical and public health community. These newsletters usually provide tables of current surveillance data (e.g., the number of cases of disease identified since the last report for each disease and geographic area under surveillance), the number of cases previously identified (for comparison with current numbers), and other relevant information. They also usually contain information of current interest about the prevention, diagnosis, and treatment of selected diseases and summarize current or recently completed epidemiologic investigations. At the national level, CDC provides similar information through the MMWR, MMWR Annual Summary of Notifiable Diseases, MMWR Surveillance Summaries, and individual surveillance
  • 370.
    Public Health Surveillance Page5-35 reports published either by CDC or in peer-reviewed public health and medical journals. When faced with a health problem of immediate public concern, whether it is a rapid increase in the number of heroin-related deaths in a city or the appearance of a new disease (e.g., AIDS in the early 1980s or West Nile Virus in the United States in 1999), a health department might need to disseminate information more quickly and to a wider audience than is possible with routine reports, summaries, or newsletters. Following the appearance of West Nile Virus in New York City in late August 1999, the following measures were taken: “Emergency telephone hotlines were established in New York City on September 3 and in Westchester County on September 21 to address public inquiries about the encephalitis outbreak and pesticide application. As of September 28, approximately 130,000 calls [had] been received by the New York City hotline and 12,000 by the WCDH [Westchester County Health Department] hotline. Approximately 300,000 cans of DEET-based mosquito repellant were distributed citywide through local firehouses, and 750,000 public health leaflets were distributed with information about personal protection against mosquito bites. Recurring public messages were announced on radio, television, on the New York City and WCDH World-Wide Web sites, and in newspapers, urging personal protection against mosquito bites, including limiting outdoor activity during peak hours of mosquito activity, wearing long-sleeved shirts and long pants, using DEET-based insect repellents, and eliminating any potential mosquito breeding niches. Spraying schedules also were publicized with recommendations for persons to remain indoors while spraying occurred to reduce pesticide exposure.” 26 Depending on the circumstances, reports of surveillance data and their interpretation might also be directed at the general public, particularly when a need exists for a public response to a particular problem.
  • 371.
    Public Health Surveillance Page5-36 Exercise 5.5 You have recently been hired by a state health department to direct surveillance activities for notifiable diseases, among other tasks. All notifiable disease surveillance data are entered and stored in computer files at the state and transmitted to CDC once each week. CDC publishes these data for all states in the MMWR each week, but health department staff do not routinely review these data in the MMWR. The state has never generated its own set of tables for analysis and dissemination, and you believe that it would be valuable to do so to educate and increase interest among health department staff. 1. What three tables might you want to generate by computer each week for use by health department staff? 2. You next decide that it would be a good idea to share these data with health-care providers, as well. What tables or figures might you generate for distribution to health-care providers, and how frequently would you distribute them? Check your answers on page 5-61
  • 372.
    Public Health Surveillance Page5-37 Exercise 5.6 Last week, the state public health laboratory diagnosed rabies among four raccoons that had been captured in a wooded residential neighborhood. This information will be duly reported in the tables of the monthly state health department newsletter. Who needs to know this information? Check your answers on page 5-62
  • 373.
    Public Health Surveillance Page5-38 Evaluating and Improving Surveillance Surveillance for a disease or other health-related problem should be evaluated periodically to ensure that it is serving a useful public health function and is meeting its objectives. Such an evaluation: (1) identifies elements of surveillance that should be enhanced to improve its attributes, (2) assesses how surveillance findings affect control efforts, and (3) improves the quality of data and interpretations provided by surveillance. Although the aspects of surveillance that are emphasized in an evaluation can differ, depending on the purpose and objectives of surveillance, the evaluation’s overall scope and approach should be similar for any health-related problem. The evaluation usually begins by identifying and interviewing key stakeholders and by collecting background documents, forms, and reports. The evaluation should address the purpose of surveillance, objectives, and mechanics of conducting surveillance; the resources needed to conduct surveillance; the usefulness of surveillance; and the presence or absence of the characteristics or qualities of optimal surveillance. The outcome of the evaluation should provide recommendations for improvement.9,27,28 We discuss these main components in the following sections. Stakeholders Stakeholders are the persons and organizations who contribute to, use, and benefit from surveillance. They typically include public health officials and staff, health-care providers, data providers and users, community representatives, government officials, and others interested in the health condition under surveillance. Stakeholders should be identified not only because they contribute to or use surveillance results, but also because they might be interested in, and can contribute to the evaluation. Stakeholders should be engaged early in the evaluation process because some might have a hand in implementing recommendations that emerge from the evaluation. Evaluations conducted without early buy-in from those responsible for conducting surveillance are often viewed as unwanted criticism and interference from outsiders and are usually ignored. Purpose, objectives, and operations The evaluation should start with a clear statement of the purpose of surveillance, which usually facilitates prevention or control of a health-related problem. The purpose should be followed by clearly stated objectives describing how surveillance data and their
  • 374.
    Public Health Surveillance Page5-39 interpretations are used. Considering the information needed for effective prevention and control of the health problem is also helpful. For example, an objective of surveillance for gonorrhea might be to detect individual cases and their contacts so that both can be treated. To meet this objective, sufficient information will be needed to identify cases and contacts for follow-up. To characterize the purpose, objectives, and operations of surveillance, addressing the questions at the beginning of this lesson will be helpful. Sketching a flow chart of the method of conducting surveillance is recommended. First, identify gaps in the evaluator’s knowledge of how surveillance is being conducted. Second, provide a clear visual display of the activities of and flow of data for surveillance for those not familiar with it (Figure 5.9). Usefulness Usefulness refers to whether surveillance contributes to prevention and control of a health-related problem. Note that usefulness can include improved understanding of the public health implications of the health problem. Usefulness is typically assessed by determining whether surveillance meets its objectives. For example, if the primary objective of surveillance is to identify individual cases of disease to facilitate timely and effective control measures, does surveillance permit timely and accurate identification, diagnosis, treatment, or other handling of contacts when appropriate? Usefulness of surveillance is influenced greatly by its operation, including its feedback mechanism to those who need to know, and by the presence or absence of the characteristics of optimal surveillance. Qualities or characteristics described previously in this lesson and in Appendix A affect the operation and usefulness of surveillance. Evaluation of surveillance requires assessment, either qualitatively or quantitatively, of each characteristic.
  • 375.
    Public Health Surveillance Page5-40 Figure 5.9 Simplified Diagram of Surveillance for a Health Problem Source: Centers for Disease Control and Prevention. Updated guidelines for evaluating public health surveillance systems: recommendations from the guidelines working group. MMWR 2001;50(No. RR-13): p. 8.
  • 376.
    Public Health Surveillance Page5-41 Resource requirements (personnel and other costs) In the context of surveillance evaluation, resources refers to finances, personnel, and other direct costs needed to operate all phases of surveillance, including any collection, analysis, and dissemination of data. The following should be identified and quantified: • Funding sources and budget; • Personnel requirements to collect, compile, edit, analyze, interpret, or disseminate data; and • Other resources (e.g., training, travel, supplies, and computers and related equipment). These costs are usually assessed in light of the objectives of surveillance and its usefulness and against the expected costs of possible modifications or alternatives to the way in which surveillance is conducted. Recommendations The purpose of evaluating surveillance for a specific disease is to draw conclusions and make recommendations about its present state and future potential. The conclusions should state whether surveillance as it is being conducted is meeting its objectives and whether it is operating efficiently. If it is not, recommendations should address what modifications should be made to do so. Recommendations must recognize that the characteristics and costs of conducting surveillance are interrelated and potentially conflicting. For example, improving sensitivity can reduce predictive value positive and increase costs. For surveillance, recommendations should be prioritized on the basis of needs and objectives. For example, for syndromic surveillance, timeliness and sensitivity are critical, but high sensitivity increases false alarms, which can drain limited public health resources. Each characteristic must be considered and balanced to ensure that the objectives of surveillance are met. (See Appendix E for an assessment of and recommendations for notifiable disease surveillance.) Recommendations should be realistic, feasible, and clearly explained. Feedback to health facilities and stakeholders is an important, but sometimes neglected, part of the evaluation. Certain recommendations might be unpopular and will need convincing justification. When possible, include an estimate of the time and resources needed to implement the changes. Prioritizing plans and developing a timetable for surveillance improvements might be helpful. A method for ensuring that improvements are initiated in a timely fashion is critical to the evaluation’s ultimate success.9,29
  • 377.
    Public Health Surveillance Page5-42 Summary Surveillance has a long history of value to the health of populations and continues to evolve as new health-related problems arise. In this lesson, we have defined public health surveillance as continued watchfulness over health-related problems through systematic collection, consolidation, and evaluation of relevant data.2 Data and interpretations derived from surveillance activities are useful in setting priorities, planning and conducting disease control programs, and assessing the effectiveness of control efforts. We have reviewed the identification and prioritization of health problems for surveillance; the need for a clear, functional definition of a health problem to facilitate surveillance for it; and various approaches for gathering data about health problems, including environmental monitoring, surveys, notifications, and registries. Sources of data are often available and used for surveillance at the national, state, and local levels. We have described and illustrated basic methods for analyzing and interpreting data and have focused on time, place, and person as the foundation for characterizing a health-related problem through surveillance. Potential problems with surveillance data that can lead to errors in their analysis or interpretation have been presented. We have emphasized the importance of the timely, regular dissemination of basic data and their interpretation as a critical component of surveillance. These data and surveillance reports must be shared with those who supplied the data and those responsible for the control of health problems. Critical to maintaining useful, cost-effective surveillance is periodic evaluation and implementation of recommended improvements. Stakeholders should be identified and included in evaluation processes; a clear description and diagram of surveillance activities should be developed; and the usefulness, resource requirements, and characteristics of optimal surveillance should be individually assessed. This lesson ends with examples of surveillance and recommendations for further reading.
  • 378.
    Public Health Surveillance Page5-43 Appendix A. Characteristics of Well-Conducted Surveillance Acceptability reflects the willingness of individual persons and organizations to participate in surveillance. Acceptability is influenced substantially by the time and effort required to complete and submit reports or perform other surveillance tasks. Flexibility refers to the ability of the method used for surveillance to accommodate changes in operating conditions or information needs with little additional cost in time, personnel, or funds. Flexibility might include the ability of an information system, whose data are used for surveillance of a particular health condition, to be used for surveillance of a new health problem. Predictive Value Positive is the proportion of reported or identified cases that truly are cases, or the proportion of reported or identified epidemics that were actual epidemics. Conducting surveillance that has poor predictive value positive is wasteful, because the unsubstantiated or false-positive reports result in unnecessary investigations, wasteful allocation of resources, and especially for false reports of epidemics, unwarranted public anxiety (see Figure 5.10 for how to calculate predictive value positive.) Quality reflects the completeness and validity of the data used for surveillance. One simple measure is the percentage of unknown or blank values for a particular variable (e.g., age) in the data used for surveillance. Representativeness is the extent to which the findings of surveillance accurately portray the incidence of a health event among a population by person, place, or time. Representativeness is influenced by the acceptability and sensitivity (see the following) of the method used to obtain data for surveillance. Too often, epidemiologists who calculate incidence rates from surveillance data incorrectly assume that those data are representative of the population. Sensitivity is the ability of surveillance to detect the health problem that it is intended to detect. (see Figure 5.10 for how to calculate sensitivity.) Surveillance for the majority of health problems might detect a relatively limited proportion of those that actually occur. The critical question is whether surveillance is sufficiently sensitive to be useful in preventing or controlling the health problem. Simplicity refers to the ease of operation of surveillance as a whole and of each of its components (e.g., how easily case definitions can be applied or how easily data for surveillance can be obtained). The method for conducting surveillance typically should be as simple as possible while still meeting its objectives. Stability refers to the reliability of the methods for obtaining and managing surveillance data and to the availability of those data. This characteristic is usually related to the reliability of computer systems that support surveillance but might also reflect the availability of resources and personnel for conducting surveillance.
  • 379.
    Public Health Surveillance Page5-44 Timeliness refers to the availability of data rapidly enough for public health authorities to take appropriate action. Any unnecessary delay in the collection, management, analysis, nterpretation, or dissemination of data for surveillance might affect a public health agency's ability to initiate prompt intervention or provide timely feedback. Validity refers to whether surveillance data are measuring what they are intended to measure. As such, validity is related to sensitivity and predictive value positive: Is surveillance detecting the outbreaks it should? Is it detecting any nonoutbreaks? Figure 5.10 Calculation of Predictive Value Positive, Sensitivity, and Specificity for Surveillance True case or outbreak True case or outbreak Yes True case or outbreak No True case or outbreak Total Detected by surveillance? Detected by surveillance? Yes True positive (A) False positive (B) Total detected by surveillance (A + B) Detected by surveillance? No False negative (C) True negative (D) Total missed by surveillance (C + D) Detected by surveillance? Total Total true cases or outbreaks (A + C) Total noncases or non- outbreaks (B + D) Total (A + B + C + D) Predictive value positive = A / (A+B) Sensitivity = A / (A+C) Specificity = D / (B+D) Adapted from: Centers for Disease Control and Prevention. Updated guidelines for evaluating public health surveillance systems: recommendations from the guidelines working group. MMWR 2001;50(No. RR-13): p. 18. Protocol for the evaluation of epidemiological surveillance systems [monograph on the Internet]. Geneva: World Health Organization [updated 1997; cited 2006 Jan 20]. Available from: http://whqlibdoc.who.int/hq/1997/WHO_EMC_DIS_97.2.pdf. Table 5.7 Relative Importance of Selected Surveillance Characteristics By Use of Surveillance Findings Use of surveillance Characteristic Use of surveillance for Managing individual cases of disease Use of surveillance for Detecting outbreaks of disease Use of surveillance for Planning and evaluating health programs Flexibility *** **** * Predictive value positive **** *** **** Quality ***** *** **** Representativeness ** ** **** Sensitivity **** **** *** Stability **** ***** *** Timeliness **** ***** * The number of asterisks reflects the relative importance of each characteristic with more asterisks signifying greater importance. Adapted from: Sosin DM, Hopkins RS. Monitoring disease and risk factors: surveillance. In: Pencheon D, Melzer D, Gray M, Guest C (editors). Oxford Handbook of Public Health, 2nd ed. Oxford: Oxford University Press; 2006 (in Press).
  • 380.
    Public Health Surveillance Page5-45 Appendix B. CDC Fact Sheet on Chlamydia What is chlamydia? Chlamydia is a common sexually transmitted disease (STD) caused by the bacterium, Chlamydia trachomatis, which can damage a woman's reproductive organs. Even though symptoms of chlamydia are usually mild or absent, serious complications that can cause irreversible damage, including infertility, can occur without notice before a woman ever recognizes a problem. Chlamydia also can cause discharge from the penis of an infected man. How common is chlamydia? Chlamydia is the most frequently reported bacterial STD in the United States. In 2002, a total of 834,555 chlamydial infections were reported to CDC from 50 states and the District of Columbia. Underreporting is substantial because the majority of persons with chlamydia are not aware of their infections and do not seek testing. Also, testing is not often performed if patients are treated for their symptoms. An estimated 2.8 million Americans are infected with chlamydia each year. Women are frequently re-infected if their sex partners are not treated. How do people contract chlamydia? Chlamydia can be transmitted during vaginal, anal, or oral sex. Chlamydia can also be passed from an infected mother to her baby during vaginal childbirth. Any sexually active person can be infected with chlamydia. The greater the number of sex partners, the greater the risk for infection. Because the cervix (opening to the uterus) of teenage females and young women is not fully matured, they are at particularly high risk for infection if sexually active. Because chlamydia can be transmitted by oral or anal sex, men who have sex with men are also at risk for chlamydial infection. What are the symptoms of chlamydia? Chlamydia is known as a "silent" disease because approximately three quarters of infected women and half of infected men have no symptoms. If symptoms do occur, they usually appear within 1–3 weeks after exposure. Among women, the bacteria initially infect the cervix and the urethra (urine canal). Women who have symptoms might have an abnormal vaginal discharge or a burning sensation when urinating. When the infection spreads from the cervix to the fallopian tubes (the tubes that carry eggs from the ovaries to the uterus), certain women still have no signs or symptoms; others have lower abdominal pain, low back pain, nausea, fever, pain during intercourse, or bleeding between menstrual periods. Chlamydial infection of the cervix can spread to the rectum. Men with signs or symptoms might have a discharge from their penis or a burning sensation when urinating. Men might also have burning and itching around the opening of the penis. Pain and swelling in the testicles are uncommon symptoms. Men or women who have receptive anal intercourse might acquire chlamydial infection in the rectum, causing rectal pain, discharge, or bleeding. Chlamydia has also been identified in the throats of women and men having oral sex with an infected partner. What complications can result from untreated chlamydia? If untreated, chlamydial infections can progress to serious reproductive and other health problems with both short- and long-term consequences. Similar to the disease itself, the damage that chlamydia causes is often
  • 381.
    Public Health Surveillance Page5-46 asymptomatic. Among women, untreated infection can spread into the uterus or fallopian tubes and cause pelvic inflammatory disease (PID). This happens among ≤40% of women with untreated chlamydia. PID can cause permanent damage to the fallopian tubes, uterus, and surrounding tissues. The damage can lead to chronic pelvic pain, infertility, and potentially fatal ectopic pregnancy (pregnancy outside the uterus). Women infected with chlamydia are ≤5 times more likely to become infected with HIV, if exposed. To help prevent the serious consequences of chlamydia, screening at least annually for chlamydia is recommended for all sexually active women aged ≤25 years. An annual screening test also is recommended for women aged ≥25 years who have risk factors for chlamydia (a new sex partner or multiple sex partners). All pregnant women should have a screening test for chlamydia. Complications among men are rare. Infection sometimes spreads to the epididymis (a tube that carries sperm from the testis), causing pain, fever, and, rarely, sterility. Rarely, genital chlamydial infection can cause arthritis that can be accompanied by skin lesions and inflammation of the eye and urethra (Reiter syndrome). How does chlamydia affect a pregnant woman and her baby? Among pregnant women, evidence exists that untreated chlamydial infections can lead to premature delivery. Babies who are born to infected mothers can contract chlamydial infections in their eyes and respiratory tracts. Chlamydia is a leading cause of early infant pneumonia and conjunctivitis (pink eye) among newborns. How is chlamydia diagnosed? Laboratory tests are used to diagnose chlamydia. Diagnostic tests can be performed on urine; other tests require that a specimen be collected from such sites as the penis or cervix. What is the treatment for chlamydia? Chlamydia can be easily treated and cured with antibiotics. A single dose of azithromycin or a week of doxycycline (twice daily) are the most commonly used treatments. HIV-positive persons with chlamydia should receive the same treatment as those who are HIV-negative. All sex partners should be evaluated, tested, and treated. Persons with chlamydia should abstain from sexual intercourse until they and their sex partners have completed treatment; otherwise re- infection is possible. Women whose sex partners have not been appropriately treated are at high risk for re-infection. Having multiple infections increases a woman's risk for serious reproductive health complications, including infertility. Retesting should be considered for females, especially adolescents, 3–4 months after treatment. This is especially true if a woman does not know if her sex partner has received treatment. How can chlamydia be prevented? The surest way to avoid transmission of STDs is to abstain
  • 382.
    Public Health Surveillance Page5-47 from sexual contact or to be in a long-term mutually monogamous relationship with a partner who has been tested and is known to be uninfected. Latex male condoms, when used consistently and correctly, can reduce the risk of transmission of chlamydia. Chlamydia screening is recommended annually for all sexually active women aged ≤25 years. An annual screening test also is recommended for older women with risk factors for chlamydia (a new sex partner or multiple sex partners). All pregnant women should have a screening test for chlamydia. Any genital symptoms (e.g., discharge or burning during urination or unusual sores or rashes) should be a signal to stop having sex and to consult a health-care provider immediately. If a person has been treated for chlamydia (or any other STD), he or she should notify all recent sex partners so they can see a health-care provider and be treated. This will reduce the risk that the sex partners will experience serious complications from chlamydia and will also reduce the person's risk for becoming re-infected. The person and all of his or her sex partners should avoid sex until they have completed their treatment for chlamydia. Adapted from: Chlamydia - CDC Fact Sheet [Internet]. Atlanta: CDC [updated 2006 April; cited 2006 May 17]. Available from: http://www.cdc.gov/std/chlamydia/STDFact-Chlamydia.htm.
  • 383.
    Public Health Surveillance Page5-48 Appendix C. Examples of Surveillance Surveillance for Consumer Product-Related Injuries The U.S. Consumer Product Safety Commission’s (CPSC) National Electronic Injury Surveillance System (NEISS) is a national probability sample of hospitals in the United States and its territories (Figure 5.11). Patient information is collected from each NEISS hospital for every emergency department (ED)visit involving an injury associated with consumer products. From this sample, the total number of product-related injuries treated in hospital EDs nationwide can be estimated. Figure 5.11 U.S. Consumer Product Safety Commission NEISS Hospitals, 2003 Source: NEISS: The National Electronic Injury Surveillance System - A Tool for Researchers [monograph on the Internet]. Washington (DC): U.S. Consumer Product Safety Commission, Division of Hazard and Injury Data Systems [updated 2000 Mar; cited 2005 Dec 2]. Available from: http://www.cpsc.gov/neiss/2000d015.pdf. The data-collection process begins when a patient in the ED of an NEISS hospital relates to a clerk, nurse, or physician how the injury occurred. The ED staff enters this information in the patient's medical record. Each day, a person designated as an NEISS coordinator examines the records for within-scope cases. The NEISS coordinator is someone designated by the hospital who is given access to the ED records. NEISS coordinator duties are sometimes performed by an ED staff member and sometimes by a person under contract to CPSC. CPSC data-collection specialists train NEISS coordinators and conduct ED staff orientation during on-site hospital visits. For all within-scope cases, the NEISS coordinator abstracts information for the specified NEISS variables. The coordinator uses an NEISS coding manual to apply numerical codes to the NEISS variables. For CPSC, the key variable is the one that identifies any consumer product mentioned. The coordinator is trained to be as specific as possible in selecting among the approximately 900 product codes in the NEISS coding manual. Another essential variable is the free-text narrative description from the ED record of the incident scenario. Up to two lines of text are provided for this narrative that often describes what the patient was doing at the time of the accident. The specific NEISS variables are listed as follows:
  • 384.
    Public Health Surveillance Page5-49 Basic Surveillance Record Variables (before year 2000 expansion) • Treatment date. • Case record number. • Patient's age. • Patient's sex. • Injury diagnosis. • Body part affected. • Disposition (e.g., treated and released or hospitalized). • Product(s) mentioned. • Locale. • Fire or motor-vehicle involvement. • Whether work-related. • Race or ethnicity. • Incident scenario. • Whether intentionally inflicted (year 2000 expansion). NEISS continuously monitors product-related injuries treated in the 100 hospital EDs that comprise the probability sample. Within-scope injuries examined in these EDs are reported to CPSC year-round on a daily basis. Thus, daily, weekly, monthly, seasonal, or episodic trends can be observed. Numerous published articles have used NEISS data to characterize consumer product-related injuries.30-32 Surveillance for Asthma CDC conducts national surveillance for asthma, a chronic disease that affects the respiratory system among both children and adults. Because of its high prevalence and substantial morbidity, asthma has been the focus of clinical and public health interventions, and surveillance has been helpful in quantifying its prevalence and tracking its trend. In conducting surveillance, CDC uses multiple sources of data because of asthma’s broad spectrum of severity, which ranges from occasional, self-managed episodes to attacks requiring hospitalization, and rarely, resulting in death. Asthma-related health effects under surveillance and the data systems used to monitor them are as follows: • Self-reported asthma prevalence, self-reported asthma episodes or attacks, school and work days lost because of asthma, and asthma-associated activity limitations are obtained from the National Health Interview Survey. • Asthma-associated outpatient visits are obtained from the National Ambulatory Medical Care Survey. • Asthma-associated ED and hospital outpatient visits are obtained from the National Hospital Ambulatory Medical Care Survey. • Asthma-associated hospitalizations are obtained from the National Hospital Discharge Survey. • Asthma-associated deaths are obtained from the Mortality Component of the National Vital Statistics System. Data from these systems and from the U.S. Census Bureau are analyzed to produce national and regional estimates of asthma-related effects, including rates (see Figure 5.12 for examples of
  • 385.
    Public Health Surveillance Page5-50 these estimates). Two reports summarizing the findings of surveillance for asthma have been published; the first, in 199833 and the second in 200234 . The reports present findings in a series of tables and graphs. Efforts are under way to improve surveillance for asthma by obtaining state-level data on its prevalence, developing methods to estimate the incidence of asthma by using data from EDs, and improving the timeliness of reporting of asthma-related deaths so that they can be investigated to determine how such deaths might have been prevented. Figure 5.12. Asthma Prevalence, Morbidity, and Mortality Rates — United States, 1960– 1999 Data Sources: Mannino DM, Homa DM, Pertowski CA, et al. Surveillance for asthma—United States, 1960–1995. In: Surveillance Summaries, April 24, 1998. MMWR 1998;47(No. SS-1):1–28, and Mannino DM, Homa DM, Akinbami LJ, Moorman JE, Gwynn C, Redd SC. Surveillance for Asthma—United States, 1980–1999. In: Surveillance Summaries, March 29, 2002. MMWR 2002;51(No. SS-1):1–13. )
  • 386.
    Public Health Surveillance Page5-51 Surveillance for Influenza Reporting from states to the Centers for Disease Control and Prevention (CDC) is not limited to notifiable diseases. Surveillance for influenza is one such example. Because influenza can be widespread during the winter but its diagnosis is rarely confirmed by laboratory test, surveillance for influenza has presented challenges that have been met by using a combination of different sources of data. At the state and local levels, health authorities receive reports of outbreaks of influenza-like illness, laboratory identification of influenza virus from nasopharyngeal swabs, and reports from schools of excess absenteeism (e.g., >10% of a school's student body). In addition, certain local systems monitor death certificates for pneumonia and influenza, arrange for selected physicians to report the number of patients they examine with influenza-like illness each week, and ask selected businesses and schools to report excessive employee absenteeism. At least one type of surveillance for influenza includes pharmacy reports of the number of prescriptions of antiviral drugs used to treat influenza. Another health department monitors the number of chest radiographs a mobile radiology group performs of nursing home patients; >50% of the total chest radiographs ordered is used as a marker of increased influenza activity. At the national level, CDC collects and analyzes data weekly from seven different data systems to assess influenza activity. • The laboratory-based system receives reports of the number of percentage of influenza isolates from approximately 125 laboratories located throughout the United States. Selected isolates are sent to CDC for additional testing. • The U.S. Influenza Sentinel Providers Surveillance Network receives reports of the number and percentage of patients examined with influenza-like illness by age group from a network of approximately 1,000 health-care providers. • The 122 City Mortality Reporting System receives counts of deaths and the proportion of those deaths attributable to pneumonia and influenza from 122 cities and counties across the country. • Each state and territorial health department provides an assessment of influenza activity in the state as either “No Activity,” “Sporadic,” “Local,” “Regional,” or “Widespread.” • Influenza-associated pediatric mortality (defined as laboratory-confirmed influenza- associated death among children aged <18 years) is now a nationally notifiable condition and is reported through the National Notifiable Disease Surveillance System. • Emerging Infections Program conducts surveillance for laboratory-confirmed influenza- related hospitalizations among persons aged <18 years in 11 metropolitan areas in 10 states. By using multiple data sources at all levels — local, state, and national — public health officials are able to assess influenza activity reliably throughout the United States without asking every health-care provider to report each individual case.
  • 387.
    Public Health Surveillance Page5-52 Appendix D. Major Health Data Systems in the United States Note: For additional information on data systems see the sources listed just below the table. Title Topic Method Approach Geographic Level* AirData Air pollution Environmental monitoring Sampling and measurement L Behavioral Risk Factor Surveillance System Behavior Population survey Telephone interview N, S, Ci Continuing Survey of Food Intake by Individuals Nutrition Population survey Personal interview N Fatal Analysis Reporting System Fatal traffic crashes Agency and health- care provider survey Police, driving, and health records review N, S, L HIV/AIDS Surveillance System HIV/AIDS Disease notification Reports by physicians N, S, L Medical Expenditure Panel Survey Health costs Population and provider surveys Personal interview Telephone interview N Monitoring the Future Study Drug use Population survey School questionnaire N, S, Ci National Ambulatory Medical Care Survey Ambulatory care Health-care provider survey Health record review N, R National Crime Victimization Survey Victims of crime Population survey Telephone interview N, S National Electronic Injury Surveillance System Consumer product- related injuries Health-care provider survey Reports by emergency department staff N National Health and Nutrition Examination Survey General health Population survey Personal interview and exam N National Health Interview Survey General health Population survey Personal Interview N, R National Hospital Ambulatory Medical Care Survey Ambulatory care Health-care provider survey Health record review N, R National Hospital Discharge Survey Hospitalizations Health-care provider survey Health record review N, S National Immunization Survey Immunizations Population survey Telephone interview N, S, L National Notifiable Disease Surveillance System Infectious diseases Disease notification Reports by physicians and laboratories N, S, L National Profile of Local Health Departments Local public health agencies Agency survey Mailed questionnaire N, L National Program of Cancer Registries Cancer incidence and mortality Registry Health record review N, S National Survey on Drug Use and Health Drug use Population survey Personal interview N National Survey of Family Growth Pregnancy and women's health Population survey Personal interview National Vital Statistics System Birth and Death Vital registration Reports by physicians N, S, Co School Health Policies and Programs Study School health policies and programs Administrative data Population survey Mailed questionnaire Personal interview S, L State and Local Area Integrated Telephone Survey Health care Population survey Telephone interview N, S, L State Tobacco Activities Tracking and Evaluation System Tobacco-related activities Multiple S STD Case Surveillance Reporting System Sexually transmitted diseases Disease notification Reports by physicians N, S, L STORET Water quality Environmental monitoring Sampling and measurement L Surveillance, Epidemiology, and End Results Cancer incidence and survival Registry Health record review N, S, Ci United States Renal Data System End stage renal disease Multiple Youth Risk Behavior Surveillance System Behavior Population survey School questionnaire N, S *N = national; R = regional; S = state; L = local (county, city, or town); Co = county; Ci = city. Sources: Healthy People 2010: Tracking Healthy People 2010 [Internet]. Washington, DC: Department of Health and Human Services; Part C. Major Data Sources for Healthy People 2010 [updated 2001 Jan 30; cited 2006 Jan 16]. Available from: http://www.cdc.gov/nchs/data/hpdata2010/tracking_healthy_people/part_c.pdf. Stroup DF, Brookmeyer R, Kalsbeek WD. Public health surveillance in action: a framework. In: Brookmeyer R, Stroup DF (editors). Monitoring the Health of Populations: Statistical Principles and Methods for Public Health Surveillance. Oxford: Oxford University Press; 2004, p. 1–35.
  • 388.
    Public Health Surveillance Page5-53 Appendix E. Limitations of Notifiable Disease Surveillance and Recommendations for Improvement Surveillance need not be perfect to be useful. However, surveillance might have limitations, particularly as a result of underreporting, lack of representativeness, and lack of timeliness, that compromise its usefulness. Fortunately, health departments can implement measures to overcome these hurdles. Although the intention of the laws and regulations of each state in the United States is that every case of a notifiable disease be reported, the reality is otherwise. For rare, serious diseases of public health importance (e.g., rabies, plague, or botulism), the percentage of cases actually reported might approach 100% of diagnosed cases. Reporting completeness for diseases that have local programs that specifically look for cases of the disease to aid in their prevention or control (e.g., AIDS, tuberculosis, and sexually transmitted diseases [STDs]) has been identified as being higher than for other, nonlife-threatening diseases.35 For other diseases, reporting has been reported to be as low as 9%.35 Table 5.8 illustrates this situation for the identification and reporting of shigellosis. The authors of the study from which these data are derived concluded that the number of Shigella cases reported nationally should be multiplied by 20 to obtain a more realistic estimate of the actual number of infections.36 Others have proposed multiplication factors of 38 for infectious agents that cause nonbloody diarrhea, 20 for agents that cause bloody diarrhea, and two for pathogens that typically cause severe gastrointestinal illness.37 Limitations Underreporting. For the majority of notifiable diseases, data for surveillance are based on passive reporting by physicians and other health-care providers. Studies have demonstrated that in the majority of jurisdictions, only a fraction of cases of the notifiable diseases overall are ever reported.37-39 The most obvious result of such underreporting is that effective action is delayed, and cases occur that might have been prevented by prompt reporting and prompt initiation of control measures. For example, if a case of hepatitis A in a food handler goes unreported, the opportunity to provide protective immune globulin to restaurant patrons will be missed, and cases or an outbreak of hepatitis A that should have been prevented will instead occur. However, underreported data might still be useful for assessing trends or other patterns reflecting the occurrence or burden of disease. Health-care providers cite a number of reasons for not reporting.40 Selected reasons are listed in the following text. Public health agencies must recognize these barriers to reporting, because the majority are within an agency's power to address or correct. Table 5.8. Rosenberg’s Shigellosis Cascade Event Percentage of Patients Cumulative Days Elapsed from Onset of Symptoms Infected 100 — Symptomatic 76 — Consulted physician 28 — Culture obtained 9 7 Culture positive 7 10 Reported to local health department 6 11 Reported to CDC 6 29 Patient contacted 6 — Negative follow-up culture obtained 2 39 Adapted from: Rosenberg MJ, Marr JS, Gangarosa EJ, Pollard RA, Wallace M, Brolnitsky O. Shigella surveillance in the United States, 1975. J Infect Dis 1977;136:458–60.
  • 389.
    Public Health Surveillance Page5-54 Lack of knowledge of reporting requirements: • Lack of awareness of responsibility to report. • Lack of awareness of which diseases must be reported. • Lack of awareness of how or to whom to report. • Assumption that someone else (e.g., the laboratory) will report. Negative attitude toward reporting: • Time consuming. • Hassle (e.g., a lengthy or complex report form or procedure). • Lack of incentive. • Lack of feedback. • Distrust of government. Misconceptions that result from lack of knowledge or negative attitude: • Compromises patient-physician relationship. • Concern that report might result in a breach of confidentiality (e.g., HIPAA concerns). • Disagreement with need to report. • Judgment that the disease is not that serious. • Belief that no effective public health measures exist. • Perception that health department does not act on the reports. Lack of representativeness of reported cases. Underreporting is not uniform or random. Two important biases distort the completeness of reporting. First, health-care providers are more likely to report a case that results in severe illness and hospitalization than a mild case, even though a person with mild illness might be more likely to transmit infection to others because the person might not be confined at home or in the hospital. This bias results in an inflated estimate of disease severity in such measures as the death-to-case ratio. Second, health-care providers are more likely to report cases when the disease is receiving media attention. This bias results in an underestimate of the baseline incidence of disease after media attention wanes. Both biases were operating in 1981 during the national epidemic of tampon-associated toxic shock syndrome. Early reports indicated a death-to-case ratio much higher than the ratio determined by subsequent studies, and reported cases declined more than incident cases after the publicity waned.41 Lack of timeliness. Lack of timeliness can occur at almost any step in the collection, analysis, and dissemination of data on notifiable diseases. The reasons for the delays vary. Certain delays are disease-dependent. For example, physicians cannot diagnose certain diseases until confirmatory laboratory and other tests have been completed. Certain delays are caused by cumbersome or inefficient reporting procedures. Delays in analysis are common when surveillance is believed to be a rote function rather than as one that provides information for action. Finally, delays at any step might culminate in delays in dissemination, with the result that the medical and public health communities do not have the information they need to take prompt action.
  • 390.
    Public Health Surveillance Page5-55 Recommendations for Improving Notifiable Disease Surveillance The preceding limitations of reporting systems demonstrate multiple steps that can be taken by a local or state health department to improve reporting. Improving awareness of practitioners. Most important, all persons who have a responsibility to report must be aware of this responsibility. The health department should actively publicize the list of notifiable diseases and the reporting mechanisms. Certain states send the reporting requirements in a packet when a physician becomes licensed to practice in the state. Other state health officials visit hospitals and speak at medical presentations or seminars to increase the visibility of surveillance. Incentives. Health-care providers might need services or therapeutic agents that are only available from the health department, which might be able to use this need to obtain reports of certain diseases. Services can include laboratory testing and consultation on diagnosis and treatment of certain diseases. Agents might include immune globulin for human rabies and hepatitis B and antitoxin for diphtheria and botulism. These services and agents might be particularly effective incentives if they are available promptly and delivered in a professional, authoritative manner.10 Simplify reporting. Reporting should be as simple as possible. Health departments often accept telephone reports or have toll-free telephone numbers. If paper forms are used, they should be widely available and easy to complete, and they should ask only for relevant information. Certain state health departments have arranged for electronic transfer of laboratory or other patient- or case-related data; therefore, reporting is accomplished automatically at scheduled times or at the push of a computer key. Frequent feedback. The role of feedback cannot be overemphasized. Feedback can be written (e.g., a monthly newsletter) or oral (e.g., updates at regular meetings of medical staff or at rounds). The feedback should be timely, informative, interesting, and relevant to each reporter's practice. Feedback should include information about disease patterns and control activities to increase awareness and to reinforce the importance of participating in a meaningful public health activity. Widening the net. Traditionally, surveillance for notifiable diseases has relied on reporting by physicians. Almost every state now requires reporting of positive cultures or diagnostic tests for notifiable diseases by commercial and hospital laboratories. For certain states, the number of laboratory reports exceeds the number of reports from physicians, hospitals, clinics, and other sources. Other health-care staff (e.g., infection control personnel and school nurses) can be used as sources of data for surveillance. Another way to widen the net is to develop alternative methods for conducting surveillance (e.g., using secondary sources of data). This method has been used effectively for surveillance of influenza and certain injuries. Shifting the burden. Another effective approach is to shift the burden for gathering data from the health-care provider to the health department. In essence, this approach involves ongoing surveys of providers to more completely identify cases of disease, and it has been demonstrated to increase the number of cases and the proportion of identified-to-incident cases. Because health
  • 391.
    Public Health Surveillance Page5-56 department staff contact health-care providers regularly, this approach also promotes closer personal ties among providers and health department staff. As with surveys in general, this approach is relatively expensive, and its cost-effectiveness is not entirely clear. In practice, it is usually limited to disease elimination programs, short-term intensive investigation and control activities, or seasonal problems (e.g., certain arboviral diseases).
  • 392.
    Public Health Surveillance Page5-57 Exercise Answers Exercise 5.1 Public health importance of chlamydia Incidence Estimated to be 2.8 million new cases each year in the United States. Severity Approximately 40% of infected, untreated women experience pelvic inflammatory disease. Five-fold increase in risk among women of experiencing HIV infection, if exposed. Mortality caused by chlamydia Ectopic pregnancy, a potential complication of chlamydial infection, can cause death, but frequency is unknown. Socioeconomic impact Complications of chlamydial infections among women have impact on their reproductive ability and can cause chronic illness among certain women, resulting in an undue burden on them, their families, and the health-care system. Communicability Passed person to person through sexual contact or from mother to baby during birth. Potential for an outbreak Varies with population sexual activity and practices, as well as underlying prevalence. Public perception and concern Not described in fact sheet provided. Different readers might have differing perceptions of the level of public concern. International requirements None. Ability to prevent, control, or treat chlamydia Preventability Preventable by sexual abstinence, sexual contact with uninfected partners, and use of latex male condoms. Control measures and treatment Secondary prevention through annual screening for chlamydia, which is recommended for all sexually active women aged ≤25 years. An annual screening test is also recommended for women aged ≥25 years who have risk factors for chlamydia (e.g., a new sex partner or multiple sex partners). All pregnant women should have a screening test for chlamydia. Chlamydia is highly responsive to antibiotic treatment. Sexual partners should be evaluated, tested, and treated, if infected.
  • 393.
    Public Health Surveillance Page5-58 Capacity of health-care system to implement control measures for Chlamydia Speed of response Disease is often asymptomatic, resulting in delayed diagnosis. Annual screening for chlamydia is recommended for all sexually active women aged ≤25 years and for women aged ≥25 years who have risk factors for chlamydia. Economics Treatment is typically through the health-care system, and the costs are paid by insurers, employers, or the government. Follow-up of patients to identify contacts is the responsibility of the health department. Given the frequency of the disease, this might require substantial resources that are not be available in certain places. Availability of resources Dependent on location. What does surveillance for this event require? Screening and diagnosis of men and women with chlamydial disease and then reporting of disease by health-care providers to the state health department by using a standard form. The percentage of women who actually receive recommended screening is unknown. Surveillance can also be conducted by using reporting of positive diagnostic tests by laboratory facilities. Advantages • Surveillance provides an estimate of the true prevalence of this important but often overlooked condition. • Infection is treatable, and transmission is preventable. • Untreated chlamydial infection is a major cause of pelvic inflammatory disease and infertility. • Surveillance can be conducted through routine laboratory reporting of all positive tests for chlamydia, which might reduce the reporting burden on health-care providers. Disadvantages • Clinicians might ignore the requirement to report chlamydia, even if it is added to the list of notifiable diseases, if they believe the list is already too long. They might believe they should only be required to report communicable diseases with statistically significant morbidity or mortality that can lead to immediate intervention by the health department. • Clinicians might not adhere to screening recommendations, and therefore, recognition of disease might be low. • Adding chlamydia to the list will not lead to better diagnosis and treatment, because the majority of infections are asymptomatic. Exercise 5.2 Asthma is a chronic illness that can vary in severity. Using just one source of data or just one dataset to monitor it provides limited knowledge of its extent and the potential effect of treatment and other interventions on it. Thus, using multiple sources of data with information on asthma's
  • 394.
    Public Health Surveillance Page5-59 incidence, prevalence, morbidity, and mortality is the best way to conduct surveillance for this illness. • Self-reported asthma prevalence or attacks provides information on its occurrence among the entire population, even those who might not seek or receive medical care for it. • The majority of cases of asthma requiring medical attention are observed in physician offices, emergency departments, or outpatient clinics. Thus, obtaining information from these sources provides optimal knowledge of its occurrence and morbidity among the majority of persons. • Severe episodes of illness can require hospitalization and be an indicator that routine treatment in outpatient settings is not being delivered effectively to the whole population. Thus, data on hospitalizations caused by asthma is helpful in monitoring effectiveness of interventions. • Deaths from asthma are similar to hospitalizations and might represent a failure of the health-care system to deal effectively with the illness. In addition to the usefulness of different sources, as described previously, certain advantages and disadvantages of different methods of gathering data from these sources are described in the following sections. Surveys Advantages • More control over the quality of the data. • More in-depth data possibly collected on each case than is usually possible with notifications. • Can identify the spectrum of illness, including cases that do not warrant medical care. • More accurate assessment of true incidence and prevalence. Disadvantages • More costly to perform because surveys usually require development of de-novo data- collection systems and hiring of interviewers who require training and supervision. • Might represent only a single point in time (“snapshot''), if survey is not periodically repeated; might miss seasonal trends, rare diseases, or rapidly fatal diseases. • Recall bias more likely to affect results because data collected retrospectively (notifications are usually prospective). Notifications (Reporting of illness by health-care providers) Advantages • Cheaper (for the health department). • Typically use existing systems and health-care personnel for collecting data. • Allows monitoring of trends over time. • Ongoing data collection might allow collection of an adequate number of cases to study those at risk. With surveys, an event might be too infrequent to gather enough cases for study; with notifications, the observation period can be extended until sufficient numbers of cases are collected. Disadvantages • Might not provide a representative picture of the incidence or prevalence unless care is taken in selecting reporting sites and ensuring complete reporting.
  • 395.
    Public Health Surveillance Page5-60 • Data that can be collected are limited by the skill, time, and willingness of the data collectors, who usually have other responsibilities. • Quality control might be a major problem in data collection. • The quality of data might vary among collection sites. • As a result, notifications usually provide a substandard estimate of the true incidence and prevalence. An alternative to notification might be to enroll interested and appropriate health-care providers and clinics in a sentinel system to gather case numbers of asthma. Exercise 5.3 Factors that influence the choice of one source of data or one dataset over another include severity of illness (e.g., hospitalization and mortality); need for laboratory confirmation of diagnosis; rarity of the condition; specialization, if any, of the health-care providers who commonly examine patients with the condition under surveillance; quality, reliability, or availability of relevant data; and timeliness of the data in terms of need for response. Listeriosis: A wide spectrum of nonspecific clinical illness and a low case fatality rate exists (except among newborns and immunocompromised persons). Therefore, surveillance should be based on morbidity rather than mortality data; diagnoses should be confirmed in the laboratory. Possible sources of surveillance data include laboratory reports, hospital discharge data (although patients with listeriosis are often not hospitalized), or adding listeriosis to the notifiable disease list. Spinal cord injury: This is a severe health event with substantial mortality; almost all persons who sustain a spinal cord injury are brought to a hospital. Therefore, surveillance would most logically be based on hospital records and mortality data (e.g., death certificates or medical examiner data). Special efforts might be directed to obtaining data from regional trauma centers. Using data from emergency medical services and rehabilitation centers might also be explored. Lung cancer among nonsmokers: Similar to spinal cord injury, lung cancer is a severe health event with high morbidity and mortality. Unfortunately, hospital discharge records and vital records do not routinely provide smoking information. For this condition, cancer registries might provide the best opportunity for surveillance, if smoking information is routinely collected. Alternatively, surveillance might be established by using interested internists, oncologists, and other health-care providers likely to interact with lung cancer patients. Exercise 5.4 Possible explanations for the sudden increase include those listed in the following. Each possibility should be investigated before deciding that the increase is a true increase in incidence. 1. Change in surveillance system or policy of reporting. 2. Change in case definition. 3. Improved or incorrect diagnosis.
  • 396.
    Public Health Surveillance Page5-61 • New laboratory test. • Increased physician awareness of the need to test for tuberculosis, new physician in town, and so forth. • Increase in publicity or public awareness that might have prompted persons or parents to seek medical attention for compatible illness. • New population subgroup (e.g., refugees) in state A who have previous recent vaccination against tuberculosis using the bacille de Calmette-Guérin (BCG) vaccine. • New or untrained staff conducting testing for tuberculosis and incorrect interpretation of skin reaction to tuberculin. 4. Increase in reporting (i.e., improved awareness of requirement to report). 5. Batch reporting (unlikely in this scenario). 6. True increase in incidence. Exercise 5.5 No right answer exists, but one set of tables for health department staff might be as follows: Table 1. Number of reported cases of each notifiable disease this week for each county in the state. Table 2. Number of reported cases of each notifiable disease by week for the entire state for the current and the previous 6–8 weeks for comparison. Table 3. Number of reported cases of each notifiable disease for the past 4 weeks (current week and previous 3 weeks) and for comparison, the number of cases during the same period during the previous 5 years. Table 1 addresses disease occurrence by place. Tables 2 and 3 address disease occurrence by time. Together, these tables should provide an indication of whether an unusual cluster or pattern of disease is occurring. If such a pattern is detected, person characteristics might then be explored. A report for health-care providers does not need to be distributed as frequently and does not need to include all of the notifiable diseases. One approach might be to distribute a report every 6 months and include notifiable diseases that have demonstrated substantial change since the last report, with a discussion of possible causes for the change. Maps of the geographic distribution and figures illustrating the trends over time of selected diseases might be more appealing and informative to health-care providers than tables of frequencies. Information on the diagnosis and treatment of highlighted diseases might also be of interest to health-care providers. Reports for the media and public typically should be issued to inform them of outbreaks, of new diseases, or of diseases of particular concern. These reports should include basic information about the diseases, the location and frequency of their occurrence, and information on recognition, prevention, and treatment of the diseases. Exercise 5.6 State health department newsletters do not always go to all those who have a need to know. Even among those who receive the newsletter, some do not read it, and many others skim the articles
  • 397.
    Public Health Surveillance Page5-62 and ignore the tables. In addition, depending on the timing of the laboratory report and publication deadlines, the information might be delayed by weeks or months. This information about finding rabid raccoons in a residential area is important for those who might be affected and for those who might be able to take preventive measures, including the following: • Other public health agencies (e.g., neighboring local health departments or animal control staff) — Contact and inform by telephone or e-mail message. • Health-care providers serving the population in the affected area — Contact and inform through a special mailing. • Veterinarians — Inform through a mailing so that they can be on alert for pets that might have come into contact with rabid wildlife; veterinarians can provide specimens, as appropriate, of both wild animals and pets to the state laboratory for testing for rabies. • The public — Inform by issuing press release to the media asking the public to avoid wild animals and to have their pets vaccinated.
  • 398.
    Public Health Surveillance Page5-63 SELF-ASSESSMENT QUIZ Now that you have read Lesson 5 and have completed the exercises, you should be ready to take the self-assessment quiz. This quiz is designed to help you assess how well you have learned the content of this lesson. You may refer to the lesson text whenever you are unsure of the answer. Unless instructed otherwise, choose ALL correct answers for each question. 1. As described in this lesson, public health surveillance includes which activities? A. Data collection. B. Data analysis. C. Data interpretation. D. Data dissemination. E. Disease control. 2. Current public health surveillance targets which of the following? A. Chronic diseases. B. Communicable diseases. C. Health-related behaviors. D. Occupational hazards. E. Presence of viruses in mosquitoes. 3. Public health surveillance can be described primarily as which of the following? A. A method to monitor occurrences of public health problems. B. A program to control disease outbreaks. C. A system for collecting health-related information. D. A system for monitoring persons who have been exposed to a communicable disease. 4. Public health surveillance is only conducted by public health agencies. A. True. B. False. 5. Common uses and applications of public health surveillance include which of the following? A. Detecting individual persons with malaria so that they can receive prompt and appropriate treatment. B. Helping public health officials decide how to allocate their disease control resources. C. Identifying changes over time in the proportion of children with elevated blood lead levels in a community. D. Documenting changes in the incidence of varicella (chickenpox), if any, after a law requiring varicella vaccination took effect. 6. Data collected through which of the following methods is commonly used for surveillance? A. Vital registration. B. Randomized clinical trials. C. Disease notifications. D. Population surveys.
  • 399.
    Public Health Surveillance Page5-64 7. Health-care providers might be important sources of surveillance data used by public health officials, and they should receive feedback to close the surveillance loop as a courtesy; however, the results almost never have any relevance to patient care provided by those health-care providers. A. True. B. False. 8. Vital statistics are important sources of data on which of the following? A. Morbidity. B. Mortality. C. Health-related behaviors. D. Injury and disability. E. Outpatient health-care usage. 9. Vital statistics provide an archive of certain health data. These data do not become surveillance data until they are analyzed, interpreted, and disseminated with the intent of influencing public health decision-making or action. A. True. B. False. 10. Key sources of morbidity data include which of the following? A. Environmental monitoring data. B. Hospital discharge data. C. Laboratory results. D. Notifiable disease reports. E. Vital records. 11. Notifiable disease surveillance usually focuses on morbidity from the diseases on the list and does not cover mortality from those diseases. A. True. B. False. 12. The list of diseases that a physician must report to the local health department is typically compiled by the . . . A. Local health department. B. State health department. C. Centers for Disease Control and Prevention (CDC). D. Council of State and Territorial Epidemiologists (CSTE). E. Medical licensing board. 13. A physician working in an emergency room in Town A, USA, has just examined a tourist from Southeast Asia with watery diarrhea. The physician suspects the man might have cholera. The physician should notify the . . . A. Local (town or county) health agency. B. State health department. C. Centers for Disease Control and Prevention (CDC). D. U.S. Department of State. E. Washington, D.C., embassy of country of origin (ask for health attaché).
  • 400.
    Public Health Surveillance Page5-65 14. Use the following choices for Questions 14a–e. A. Notifiable disease surveillance B. Surveillance for consumer product-related injuries C. Both. D. Neither. 14a. ____ State-based, with subsequent reporting to CDC. 14b. ____ Focused on identifying individual cases. 14c. ____ Can monitor trends over time. 14d. ____ Based on statistically valid sample. 14e. ____ Complete, unbiased reporting. 15. Evaluating and improving surveillance should address which of the following? A. Purpose and objectives of surveillance. B. Resources needed to conduct surveillance. C. Effectiveness of measures for controlling the disease under surveillance. D. Presence of characteristics of well-conducted surveillance. 16. Criteria for prioritizing health problems for surveillance include which of the following? A. Incidence of the problem. B. Public concern about the problem. C. Number of previous studies of the problem. D. Social and economic impact of the problem. 17. Use the following choices for Questions 17a–d. A. Surveillance based on a specific case definition for a disease (e.g., listeriosis). B. Syndromic surveillance based on symptoms, signs, or other characteristics of a disease, rather than specific clinical or laboratory diagnostic criteria. C. Both. D. Neither. 17a. ____ Watches for individual cases of disease of public health importance. 17b. ____ Watches for diseases that might be caused by acts of biologic or chemical terrorism. 17c. ____ Can watch for disease before a patient seeks care from a health-care provider. 17d. ____ Requires little effort on the part of the health department. 18. Routine analysis of notifiable disease surveillance data at the state health department might include looking at the number of cases of a disease reported this week . . . A. and during the previous 2–4 weeks. B. and the number reported during the comparable weeks of the previous 2–5 years. C. simultaneously by age, race, and sex of the patient. D. by county. E. by county, divided by each county’s population (i.e., county rates).
  • 401.
    Public Health Surveillance Page5-66 19. One week, a state health department received substantially more case reports of a disease in one county than had been reported during the previous 2 weeks. No increase was reported in neighboring counties. Possible explanations for this increase include which of the following? A. An outbreak in the county. B. Batch reports. C. Duplicate reports. D. Increase in the county’s population. E. Laboratory error. 20. The primary reason for preparing and distributing periodic surveillance summaries is which of the following? A. Document recent epidemiologic investigations. B. Provide timely information on disease patterns and trends to those who need to know it. C. Provide reprints of MMWR articles, reports, and recommendations. D. Acknowledge the contributions of those who submitted case reports. 21. Use the following choices for Questions 21a–b. A. Predictive value positive. B. Sensitivity. C. Specificity. D. Validity. 21a. ____ Surveillance detected 23 of 30 actual cases of a disease. 21b. ____ Of 16 statistically significant aberrations (deviations from baseline) detected by syndromic surveillance, only one represented an actual outbreak of disease. 22. Underreporting is not a problem for detecting outbreaks of notifiable diseases because the proportion of cases reported tends to remain relatively stable over time. A. True. B. False. 23. Initiating surveillance for a public health problem or adding a disease to the notifiable disease list is justified for which of the following reasons? A. If it is a communicable disease with a high case-fatality rate. B. If the problem is new and systematically collected data are needed to characterize the disease and its impact on the public. C. If a program at CDC has recommended its addition to better understand national trends and patterns. D. To guide, monitor, and evaluate programs to prevent or control the problem. 24. The case definition used for surveillance of a health problem should be the same as the case definition used for clinical (treatment) purposes. A. True. B. False.
  • 402.
    Public Health Surveillance Page5-67 25. A state health department decides to strengthen its notifiable disease reporting. The one best action to take is to . . . A. allow reporting through use of the Internet. B. require more disease-specific forms from local health departments. C. ensure that all persons with a responsibility to report understand the requirements and reasons for reporting and how reports will be used. D. reduce the number of diseases on the list.
  • 403.
    Public Health Surveillance Page5-68 Answers to Self-Assessment Quiz 1. A, B, C, D. The term public health surveillance includes data collection, analysis, interpretation, and dissemination to help guide health officials and programs in directing and conducting disease control and prevention activities. However, surveillance does not include control or prevention activities themselves. 2. A, B, C, D, E. Current public health surveillance targets health-related conditions among humans, including chronic diseases (e.g., cancer), communicable diseases (e.g., those on the notifiable disease list), health-related behaviors, and occupationally related conditions (e.g., black lung disease and other pneumoconioses). Surveillance also focuses on indicators of disease potential (e.g., such diseases among animals as rabies) or presence of an infectious agent among animals or insects (e.g., West Nile virus among mosquitoes). 3. A. Public health surveillance can be thought of as one of the methods that a community has available to monitor the health among its population by detecting problems, communicating alerts as needed, guiding the appropriate response, and evaluating the effect of the response. Surveillance should not be confused with medical surveillance, which is monitoring of exposed persons to detect early evidence of disease. Public health surveillance is the continued watchfulness for public health problems; it is not a data- collection system. 4. B (False). The practice of surveillance is not limited to public health agencies. Hospitals, nursing homes, the military, and other institutions have long conducted surveillance of their populations. 5. A, B, C, D. Among the uses of surveillance are detecting individual cases of diseases of public health importance (e.g., malaria), supporting planning (e.g., priority setting), monitoring trends and patterns of health-related conditions (e.g., elevated blood lead levels), and supporting evaluation of prevention and control measures (e.g., a vaccination requirement). 6. A, C, D. Data collected through vital registration, disease notifications, and population surveys are commonly used for surveillance of health-related problems. Data from randomized clinical trials typically cover only a specially selected population and are used to answer specific questions about the effectiveness of a particular treatment. They are not useful for surveillance. 7. B (False). One of the important uses of surveillance data and one of the key reasons to close the surveillance loop by disseminating surveillance data back to health-care providers, is to provide clinically relevant information about disease occurrence, trends, and patterns. For example, health departments alert clinicians to the presence of new diseases (e.g., severe acute respiratory syndrome [SARS]) and provide information so that clinicians can make diagnoses. Health departments also advise clinicians about changing patterns of antibiotic resistance so that clinicians can choose the right treatment regimen.
  • 404.
    Public Health Surveillance Page5-69 8. B. Vital statistics refer to data on birth, death, marriage, and divorce. Therefore, vital statistics are the primary source of data on mortality, but not on morbidity (illness), behaviors, injury (other than fatal injuries), and health-care usage. Before development of population health surveys and disease registries and the use of health-care records to assess morbidity, vital statistics were the primary source of data on the health of populations. During recent years, administrative, financial, and other health-care–related records have supplemented the information from vital statistics, especially for assessing morbidity within populations. National, state, and local population-based health surveys, some of which are conducted on a regular or continuing basis, provide another important part of our view of the health of populations. 9. A (True). Vital statistics are usually thought of as an archive of births, deaths, marriages, and divorces. Vital statistics offices in health departments typically are not linked to disease prevention and control activities. However, surveillance for certain health problems might rely on vital statistics as its primary source of data. When these data undergo timely and systematic analysis, interpretation, and dissemination with the intent of influencing public health decision-making and action, they become surveillance data. 10. B, C, D. Sources of morbidity (illness) data include notifiable disease reports, laboratory data, hospital discharge data, outpatient health-care data, and surveillance for specific conditions (e.g., cancer). Vital records are an important source of mortality data, and even though a patient first gets sick from a disease before dying from it, vital records are not regarded as a source of data for the surveillance of morbidity from the disease. Environmental monitoring is used to evaluate disease potential or risk. 11. B (False). Notifiable disease surveillance targets occurrence or death from any of the diseases on the list. 12. B. The list of nationally notifiable diseases is compiled by the Council of State and Territorial Epidemiologists (CSTE) and the Centers for Disease Control and Prevention. The list of notifiable diseases that physicians must report to their state or local health department is set by the state, either by the state legislature, the state board of health, the state health department, the state health officer, or the state epidemiologist. CSTE votes on the diseases that should be nationally notifiable, but the states have the ultimate authority whether to add any newly voted diseases to their state list. 13. A or B, depending on the state. The agency that a physician should notify is determined by the state, just as the list of notifiable diseases is set by the state (see answer to question 12). The manner in which notification should occur and how rapidly reports should be made are also defined by the state and can vary by disease. For example, the state might require that a case of cholera be reported immediately by telephone or fax to the local or state health department, whereas reporting of varicella (chickenpox) might only be required monthly, by using a paper form. Regardless of the disease and reporting requirements, reporting should proceed through established channels. In certain states, physicians should notify the county health department, which will then notify the state health department, which will notify CDC, which will notify the World Health Organization. In states with no or limited local health departments, physicians are usually required to notify the state health department. The seriousness of the disease might influence how rapidly these communications take place but should not influence the sequence.
  • 405.
    Public Health Surveillance Page5-70 14a. A. Notifiable disease surveillance is state-based, with subsequent reporting to CDC. Surveillance for consumer product-related injuries is hospital emergency department- based with subsequent reporting to the Consumer Product Safety Commission. 14b. A. Notifiable disease surveillance attempts to identify every case of a notifiable disease. Surveillance for consumer product-related injuries relies on a sample of hospital emergency departments to characterize the incidence and types of these injuries. 14c. C. Because surveillance for notifiable diseases and surveillance for consumer product- related injuries are both ongoing, both can monitor trends over time. 14d. B. Surveillance for consumer product-related injuries is based on a statistically valid sample of hospital emergency departments in the United States. Notifiable disease surveillance covers the entire population. 14e. D. Neither approach to surveillance is perfect. Underreporting is a serious problem in the majority of states for notifiable disease surveillance. Surveillance for consumer product- related injuries is based on visits to a sample of emergency departments; therefore, persons who do not seek care at an emergency department are not represented. 15. A, B, D. Evaluation of surveillance for a health-related problem should include review of the purpose and objectives of surveillance, the resources needed to conduct surveillance for the problem, and whether the characteristics of well-conducted surveillance are present. Because surveillance does not have direct responsibility for the control of the health problem, this is not part of evaluating a surveillance system. Whether effective measures for preventing or controlling a health-related problem are available can be a useful criterion in prioritizing diseases for surveillance. 16. A, B, D. The incidence of, public concern about, and social and economic impact of a health problem are all important in assessing its suitability for surveillance. Although previous studies of the problem might have helped to characterize its natural history, cause, and impact, the number of such studies is not used as a criterion for prioritization. 17a. C (Both). Surveillance based on specific case definition for a disease attempts to identify individual cases of disease of public health importance, and syndromic surveillance, depending on its purpose, might also attempt to identify cases of disease of public health importance. In certain situations, the goal of syndromic surveillance might be to identify clusters or outbreaks (more cases than expected) of disease rather than individual cases. 17b. C (Both). Both syndromic surveillance and surveillance based on a specific case definition for a disease can be used to watch for diseases caused by acts of biologic or chemical terrorism. Which approach is used depends on the disease and the setting. 17c. B. Syndromic surveillance that targets sales of over-the-counter medications, calls to hotlines, and school or work absenteeism all watch for disease before a patient seeks care from a health-care provider. Surveillance based on a specific case definition for a disease is usually based on reporting by a health-care provider.
  • 406.
    Public Health Surveillance Page5-71 17d. D. Neither type of surveillance can function properly without attention and effort on the part of the health department. Health department staff should review the case report forms and conduct follow-up of cases reported through surveillance based on specific case definitions for diseases. Health department staff should review the cases identified by syndromic surveillance and determine whether they reflect true outbreaks or not. Additionally, health department staff should compile and communicate the results. These tasks are a minimum. 18. A, B, D, E. Analysis by time often includes comparison with previous weeks and previous years. Analysis by place can include analysis of both numbers and rates. Routine analysis by person includes age and sex, but a three-variable table of age by race and sex is probably too much stratification for routine analysis. 19. A, B, C, D, E. An increase in case reports during a single week might represent a true increase in disease (i.e., an outbreak). However, the increase can also represent an increase in the population (e.g., from an influx of tourists, migrant workers, refugees, or students); reporting of cases in a batch, particularly after a holiday season; duplicate reports of the same case; laboratory or computer error; a new clinic or health-care provider that is more likely to make a particular diagnosis or is more conscientious about reporting; or other sudden changes in the method of conducting surveillance. 20. B. The primary purpose of preparing and distributing surveillance summaries is to provide timely information about disease occurrence to those in the community who need to know. The report also serves to motivate those who report by demonstrating that their efforts are valued and to inform health-care providers and others in the community about health department activities and general public health concerns. 21a. B. Sensitivity is the ability of surveillance (or laboratory tests or case definitions) to detect a true case (or, for certain systems, a true outbreak). Specificity is the ability of surveillance (or laboratory tests or case definitions) to rule out disease among persons who do not have it. 21b. A. Predictive value positive is the proportion of patients (or outbreaks) detected by surveillance who truly have the disease (or are true outbreaks). Predictive value positive is a function of both the sensitivity of surveillance and the prevalence of the disease (or prevalence of real outbreaks). 22. B (False). Underreporting is a serious problem for surveillance that relies on notifications. Because the notifiable disease surveillance is supposed to identify individual cases of disease of public health importance, underreporting of even a single case of, for example, hepatitis A in a food handler, can result in an outbreak that should have been prevented. Similarly, if a limited number of cases are reported at all, even outbreaks can be missed. 23. B, D. Initiating surveillance for a health-related problem can be justified for multiple reasons. These reasons include if a disease is new and surveillance is the most effective means for collecting information on cases to learn more about its clinical and epidemiologic features (e.g., SARS); if a new prevention or control measure is about to be implemented and surveillance is the most effective means for assessing its impact (e.g.,
  • 407.
    Public Health Surveillance Page5-72 varicella vaccination regulations); or if surveillance is needed to guide, monitor, and evaluate prevention or control measures. Surveillance is more difficult to justify if a disease does not occur locally, even if it is a communicable disease with a high case fatality rate (e.g., Ebola or Marburg virus infection), or simply because CDC requests it (without funding). 24. B (False). A case definition for surveillance should be clear, understandable, acceptable, and implementable by those who are required to apply it. However, it need not use the same criteria that are used for clinical purposes. For example, health-care providers might treat patients on the basis of clinical features without laboratory confirmation, whereas a surveillance case definition might require confirmation, or vice versa. 25. C. The most important way to improve notifiable disease surveillance is to ensure that everyone who is supposed to report knows • that they are supposed to report, • what to report (i.e., which diseases are on the list), and • how, to whom, and how quickly to report. In addition, they will be more likely to report if they know that the health department is actually doing something with the reports. No data are available that demonstrate that reporting through the Internet improves reporting; in fact, for certain health-care providers, reporting might involve extra work. Requiring more disease-specific forms tends to reduce reporting, because it requires more time and effort for those reporting. Reducing the number of diseases on the list might be part of a strategy to improve reporting, but it is not the most important way to do so.
  • 408.
    Public Health Surveillance Page5-73 References 1. Merriam-Webster. Merriam-Webster's Dictionary of English Usage. Springfield (MA): Merriam-Webster, Inc. 1976. 2. Langmuir AD. The surveillance of communicable diseases of national importance. N Engl J Med 1963;268:182–92. 3. Thacker SB, Berkelman RL. Public health surveillance in the United States. Epidemiol Rev 1988;10:164-190. 4. Communicable Disease Center. Communicable Disease Center Activities 1952-1953. Atlanta: Department of Health, Education, and Welfare; 1953. Public Health Service Publication Number 391, p. 17. 5. World Health Organization. Report of the technical discussions at the twenty-first World Health Assembly on 'national and global surveillance of communicable diseases.' Geneva: World Health Organization; 18 May 1968, p. A21. 6. Thacker SB, Stroup DF, Parrish RG, Anderson HA. Surveillance in environmental public health: issues, systems, and sources. Am J Public Health 1996;86:633–8. 7. Vaughan JP, Morrow RH. Manual of epidemiology for district health management. Geneva: World Health Organization; 1989. 8. Wegman DH. Hazard Surveillance. In: Halperin W, Baker E, Monson R (editors). Public Health Surveillance. New York: Van Nostrand Reinhold; 1992, pp. 62–75. 9. Protocol for the evaluation of epidemiological surveillance systems [monograph on the Internet]. Geneva: World Health Organization [updated 1997; cited 2006 Jan 20]. Available from: http://whqlibdoc.who.int/hq/1997/WHO_EMC_DIS_97.2.pdf. 10. Hopkins RS. Design and operation of state and local infectious disease surveillance systems. J Public Health Management Practice 2005;11(3):184–90. 11. Doherty JA. Establishing priorities for national communicable disease surveillance. Can J Infect Dis 2000;11(1):21–4. 12. Rushdy A, O’Mahony M. PHLS overview of communicable diseases 1997: results of a priority setting exercise. Commun Dis Rep CDR Suppl 1998;8 (suppl 5):S1–12. 13. Centers for Disease Control and Prevention. Case Definitions for Infectious Conditions Under Public Health Surveillance. MMWR 1997;46(No. RR-10):1–55. . 14. Parrish RG, McDonnell SM. Sources of health-related information. In: Teutsch SM, Churchill RE, editors. Principles and practice of Public Health Surveillance, 2nd ed. New York: Oxford University Press; 2000, pp. 30–75. 15. Groves RM, Fowler FJ, Couper MP, Lepkowski J, Singer E, Tourangeau R. Survey methodology. New York: John Wiley; 2004.
  • 409.
    Public Health Surveillance Page5-74 16. Hutwagner L, Thompson W, Seeman GM, Treadwell T. The bioterrorism preparedness and response Early Aberration Reporting System (EARS). J Urban Health 2003;80:89–96. 17. Croner CM. Public health GIS and the Internet. Annu Rev Public Health 2003;24:57–82. 18. Guerra M, Walker E, Jones C, Paskewitz S, Cortinas MR, Stancil A, Beck L, Bobo M, Kitron U. Predicting the risk of Lyme disease: habitat suitability for Ixodes scapularis in the north central United States. Emerg Infect Dis. 2002;8:289–97. 19. SaTScan [Internet]. Boston: SaTScan [updated 2006 Aug 14] Available from: http://www.satscan.org/. 20. Centers for Disease Control and Prevention [Internet]. Atlanta: CDC [updated 2005 Nov 8; cited 2006 Jan 31]. EpiInfo. Available from: http://wwwn.cdc.gov/epiinfo/ 21. The HealthMapper [Internet] Geneva: World Health Organization [updated 2006; cited 2006 Jan 31]. 22. Centers for Disease Control and Prevention. Current Trends Update: Impact of the expanded AIDS surveillance case definition for adolescents and adults on case reporting— United States, 1993a. MMWR 1994;43:160–1,167–70. 23. Ryan CA, Nickels MK, Hargrett-Bean NT, et al. Massive outbreak of antimicrobial- resistant salmonellosis traced to pasteurized milk. JAMA 1987;258:3269–74. 24. Friedman DJ, Parrish RG. Characteristics, desired functionalities, and datasets of state webbased data query systems. J Public Health Management Practice 2006;12(2):119–129. In press. 25. Henderson DA. Surveillance of smallpox. Int J Epidemiol 1976;5(1):19-28. 26. Centers for Disease Control and Prevention. Outbreak of West Nile-Like Viral Encephalitis—New York, 1999. MMWR 1999;48(38):845–9. 27. Centers for Disease Control and Prevention. Updated guidelines for evaluating public health surveillance systems: recommendations from the guidelines working group. MMWR 2001;50(No. RR-13):1–35. 28. Centers for Disease Control and Prevention. Framework for evaluating public health surveillance systems for early detection of outbreaks; recommendations from the CDC Working Group. MMWR 2004;53(No. RR-5):1-13. 29. World Health Organization Regional Office for Africa and the Centers for Disease Control and Prevention. Technical Guidelines for Integrated Disease Surveillance and Response in the African Region. Harare, Zimbabwe and Atlanta, Georgia, USA. July 2001: 1–229. 30. Hopkins RS. Consumer product-related injuries in Athens, Ohio, 1980-85: assessment of emergency room-based surveillance. Am J Prev Med 1989 Mar-Apr;5(2):104–12. 31. Schrieber, R.A., Branche-Dorsey, C.M., Ryan, G.W. et al. Risk factors for injuries from in- line skating and the effectiveness of safety gear. N Engl J Med 1996;335:1630–1635.
  • 410.
    Public Health Surveillance Page5-75 32. NEISS: The National Electronic Injury Surveillance System - A Tool for Researchers [monograph on the Internet]. Washington (DC): U.S. Consumer Product Safety Commission, Division of Hazard and Injury Data Systems [updated 2000 Mar; cited 2005 Dec 2]. Available from: http://www.cpsc.gov/neiss/2000d015.pdf. 33. Mannino DM, Homa DM, Pertowski CA, et al. Surveillance for asthma—United States, 1960–1995. In: Surveillance Summaries, April 24, 1998. MMWR 1998;47(No. SS- 1):1–28. 34. Mannino DM, Homa DM, Akinbami LJ, Moorman JE, Gwynn C, Redd SC. Surveillance for Asthma—United States, 1980–1999. In: Surveillance Summaries, March 29, 2002. MMWR 2002;51(No. SS-1):1–13. 35. Doyle TJ, Glynn MK, Groseclose SL. Completeness of notifiable infectious disease reporting in the United States: an analytic literature review. Am J Epidemiol 2002;155:866– 74. 36. Rosenberg MJ, Marr JS, Gangarosa EJ, Pollard RA, Wallace M, Brolnitsky O. Shigella surveillance in the United States, 1975. J Infect Dis 1977;136:458–60. 37. Mead PS, Slutsker L, Dietz V, et al. Food-related illness and death in the United States. Emerg Infect Dis 1999;5:607–25. 38. Campos-Outcalt D, England R, Porter B. Reporting of communicable diseases by university physicians. Public Health Rep 1991;106:579–83. 39. Marier R. The reporting of communicable diseases. Am J Epidemiol 1977;105:587–90. 40. Konowitz PM, Petrossian GA, Rose DN. The underreporting of disease and physicians' knowledge of reporting requirements. Public Health Rep 1984;99:31–5. 41. Hajjeh R, Reingold A, Weil A, Shutt K, Schuchat A, Perkins BA. Toxic shock syndrome in the United States: surveillance update, 1979–1996. Emerg Infect Dis 1999;5:807–10. Further Reading Buehler JW. Surveillance. In: Rothman KJ, Greenland S, editors. Modern Epidemiology, 2nd ed. Philadelphia: Williams and Wilkins; 1988, pp. 435–57. Eylenbosch WJ, Noah ND, editors. Surveillance in health and disease. Oxford: Oxford University Press; 1988. Langmuir AD. Evolution of the concept of surveillance in the United States. Proc R Soc Med. 1971;64:681–4. Langmuir AD. William Farr: founder of modern concepts of surveillance. Int J Epidemiol 1976;5(1):13–8. Orenstein WA, Bernier RH. Surveillance: information for action. Pediatr Clin N Amer 1990;37:709–734. Rothman KJ. Lessons from John Graunt. Lancet. 1996;347(8993):37–9.
  • 411.
    Public Health Surveillance Page5-76 Sandiford P, Annett H, Cibulskis R. What can information systems do for primary health care? An international perspective. Soc Sci Med 1992:34(10):1077–87. Teutsch SM, Churchill RE, editors. Principles and practice of public health surveillance, 2nd ed. New York: Oxford University Press; 2000. Websites For more information on: Visit the following websites: CDC Case Definitions http://www.cdc.gov/osels/ph_surveillance/nndss/casedef/index.htm CPSC National Electronic Injury Surveillance System (NEISS) On-line http://www.cpsc.gov/library/neiss.html Emergency Preparedness and Response: A-Z Index http://emergency.cdc.gov/az/a.asp FDA Adverse Event Reporting System (AERS) http://www.fda.gov/cder/aers/default.htm Healthy People 2010: Tracking Healthy People 2010: Part C. Major Data Sources for Healthy People 2010 http://www.cdc.gov/nchs/data/hpdata2010/tracking_healthy_people/part_c.pdf MedWatch, The FDA Safety Information and Adverse Event Reporting Program http://www.fda.gov/medwatch/index.html National Health and Nutrition Examination Survey http://www.cdc.gov/nchs/nhanes.htm Nationally Notifiable Infectious Diseases http://www.cdc.gov/osels/ph_surveillance/nndss/phs/infdis.htm NCI cancer mortality maps & graphs http://ratecalc.cancer.gov/ratecalc/index.html NCI SEER http://seer.cancer.gov/faststats/ NIDA DAWN http://www.samhsa.gov/data/DAWN.aspx NIDA Monitoring the Future Survey http://www.drugabuse.gov/related-topics/trends-statistics/monitoring-future/ SAMHSA Drug Abuse Statistics http://www.samhsa.gov/data/ Summary of notifiable diseases – United States, 2004 http://www.cdc.gov/mmwr/preview/mmwrhtml/mm5353a1.htm World Health Organization International Classification of Diseases, 10th revision http://www.who.int/classifications/icd/en/
  • 412.
    Investigating an Outbreak Page6-1 INVESTIGATING AN OUTBREAK Public health department staff responsible for reviewing disease report forms notice that the number of forms for shigellosis seems higher than usual this week. Someone from a nursing home calls to report several cases of pneumonia among its residents. Is the number of cases in either of these situations actually higher than usual? What should be used to estimate “usual?” If it is higher than usual, should the health department staff call the situation a cluster, an outbreak, an epidemic? Is a field investigation needed? What criteria should they use to decide? And if they decide that a field investigation is indeed warranted, how do they go about conducting such an investigation? These and related questions will be addressed in this lesson. Objectives After studying this lesson and answering the questions in the exercises, you will be able to: • List the reasons that health agencies investigate reported outbreaks • List the steps in the investigation of an outbreak • Define cluster, outbreak, and epidemic • Given the initial information of a possible disease outbreak, describe how to determine whether an epidemic exists • State the purpose of a line listing • Given information about a community outbreak of disease, list the initial steps of an investigation • Given the appropriate information from the initial steps of an outbreak investigation, develop biologically plausible hypotheses • Draw and interpret an epidemic curve • Given data in a two-by-two table, calculate the appropriate measure of association Major Sections Introduction to Investigating an Outbreak...................................................................................... 2 Steps of an Outbreak Investigation................................................................................................. 8 Summary....................................................................................................................................... 57 3136
  • 413.
    Investigating an Outbreak Page6-2 Introduction to Investigating an Outbreak To uncover outbreaks: • Review routinely collected surveillance data • Astutely observe single events or clusters by clinicians, infection control practitioners, or laboratorians • Review reports by one or more patients or members of the public Uncovering outbreaks Outbreaks of disease — the occurrence of more cases than expected — occur frequently. Each day, health departments learn about cases or outbreaks that require investigation. While CDC recorded over 500 outbreaks of foodborne illness alone each year during the 1990s,1 recognized outbreaks of respiratory and other diseases are also common, and many more outbreaks may go undetected. So how are outbreaks uncovered? One way is to analyze surveillance data — reports of cases of communicable diseases that are routinely sent by laboratories and healthcare providers to health departments (see Lesson 5). Some health departments regularly review exposure information from individual case reports to look for common factors. For example, health department staff in Oregon uncovered an outbreak of E. coli O157:H7 in 1997 by noticing that three patients with the infection all had reported drinking raw milk.2 Alternatively, outbreaks may be detected when health department staff conduct regular, timely analysis of surveillance data that reveals an increase in reported cases or an unusual clustering of cases by time and place. For example, by analyzing data from four different syndromic surveillance systems, health department staff in New York City noted a consistent increase in gastroenteritis in the days following a prolonged blackout in August 2003.3 Investigation indicated that the increase in gastroenteritis was probably attributable to the consumption of meat that had spoiled during the power failure. Review of surveillance data to detect outbreaks is not limited to health departments. Many hospital infection control practitioners review microbiologic isolates from patients by organism and ward each week to detect an increase in the number of, say, surgical wound infections or nosocomial (hospital-acquired) cases of legionellosis. In the same way, staff at CDC regularly review laboratory patterns of organisms and are able to detect clusters of illness caused by the same organism, even if the victims are geographically scattered.4 Nonetheless, most outbreaks come to the attention of health authorities because an alert clinician is concerned enough to call the health department. The emergence of West Nile virus infection in North America in 1999 was uncovered only after the New York City health department responded to a call from a physician who had recently seen two patients with encephalitis.5 Similarly, a single case
  • 414.
    Investigating an Outbreak Page6-3 of inhalational anthrax of suspicious origin in Florida in 2001 resulted in a massive investigation involving multiple government agencies, but it all started with an astute diagnosis and prompt report to the health department by a physician.6 Epidemic: the occurrence of more cases of disease than expected in a given area or among a specific group of people over a particular period of time. Usually, the cases are presumed to have a common cause or to be related to one another in some way Outbreak: epidemic limited to localized increase in the incidence of disease Cluster: aggregation of cases in a given area over a particular period without regard to whether the number of cases is more than expected Another reporting source for apparent clusters of both infectious and noninfectious disease is patients or other members of the community. For example, an individual may call the health department and report that she and some friends came down with severe gastroenteritis after attending a banquet a night or two earlier. Similarly, a local citizen may call about several cases of cancer diagnosed among his neighbors and express concern that these are more than coincidental. Most health departments have routine procedures for handling calls from the public regarding potential communicable disease outbreaks, and some states have guidelines for how to respond to noninfectious disease cluster reports.7-9 Deciding whether to investigate a possible outbreak Different health departments respond to these reports in different ways. The decisions regarding whether and how extensively to investigate a potential outbreak depend on a variety of factors. These usually include some factors related to the health problem, some related to the health department, and some related to external concerns. Factors related to the problem itself include the severity of the illness, the number of cases, the source, mode or ease of transmission, and the availability of prevention and control measures. Most local health departments are more likely to investigate an apparent outbreak when the number of affected (or exposed) persons is large, when the disease is severe (serious illness with high risk of hospitalization, complications, or death), when effective control measures exist, and when the outbreak has the potential to affect others unless prompt control measures are taken. For example, a single case of gastroenteritis is unlikely to prompt a field investigation, but a cluster of cases may. On the other hand, even a single case of botulism is likely to be investigated immediately to identify and eliminate the source, because it is both potentially fatal and preventable, and the source can usually be identified. At the state or national level, the unusual presentation of disease may spur an investigation. Occurrence of a new or rare disease or a change in the pattern of disease in an area is more likely to prompt an investigation than occurrence of a common disease with well-established transmission patterns and control measures. However, field investigations place a burden on a health department, so the decision also hinges on the availability of staff
  • 415.
    Investigating an Outbreak Page6-4 and resources, and competing priorities. In addition, some health departments have a practice of aggressively investigating outbreaks and hence have experience in doing so, while other health departments may lack such experience. Regardless, field investigations are usually justified for one or more of the following reasons: • Control or prevention of the health problem • Opportunity to learn (research opportunity) • Public, political, or legal concerns • Public health program considerations • Training Each of these reasons is discussed in more detail below. Control and prevention The most important public health reasons for investigating an outbreak are to help guide disease prevention and control strategies. These disease control efforts depend on several factors, including knowledge of the agent, the natural course of the outbreak, the usual transmission mechanism of the disease, and available control measures. For example, if a health department learns of an outbreak of hepatitis A (known agent) in which one of the victims is a restaurant cook, the department can offer immune globulin to the restaurant patrons to prevent a second wave of cases (control measure), but only if they are within 14 days of exposure (timing). On the other hand, if an outbreak appears to be almost over, the health agency may not need to implement control measures, but may be interested in identifying factors that contributed to the outbreak in order to develop strategies to prevent similar outbreaks in the future. For that outbreak of hepatitis A, investigators may find that the poor personal hygiene that led to the outbreak was the result of lack of soap or water in the workplace washroom, which could be addressed in public health messages to other worksites. The balance between control measures and further investigation depends on how much is known about the cause, the source, and the mode of transmission of the agent.10 Table 6.1 illustrates how public health emphasis on investigation versus control is influenced by these factors. In particular, if the source and/or mode of transmission are known, then control measures that target the source or interrupt transmission can be implemented. If the source and/or mode of transmission are not known, then you can’t know what control measures to implement, so investigation takes priority.
  • 416.
    Investigating an Outbreak Page6-5 Table 6.1 Relative Priority of Investigative and Control Efforts During an Outbreak, Based on Knowledge of the Source, Mode of Transmission, and Causative Agent Source/Mode of Transmission (How people are getting exposed to the agent) Known Unknown Causative Agent Known Investigation + Control +++ Investigation +++ Control + Unknown Investigation +++ Control +++ Investigation +++ Control + +++ = highest priority + = lowest priority Source: Goodman RA, Buehler JW, Koplan JP. The epidemiologic field investigation: science and judgment in public health practice. Am J Epidemiol 1990;132:9–16. Opportunity to learn (research opportunity) Another important objective of many outbreak investigations is to advance research. For most public health problems, health officials cannot conduct randomized trials. We cannot randomize who eats the undercooked hamburger or sits near the ice resurfacing machine that emits carbon monoxide, nor should we randomize who receives preventive health benefits (e.g., mammogram screening). However, we can take advantage of what has already happened and learn from it. Some view an outbreak as an experiment of nature waiting to be analyzed and exploited. For a newly recognized disease, field investigation provides an opportunity to characterize the natural history — including agent, mode of transmission, and incubation period — and the clinical spectrum of disease. Investigators also attempt to characterize the populations at greatest risk and to identify specific risk factors. Acquiring such information was an important motivation for investigators studying such newly recognized diseases as Legionnaires’ disease in Philadelphia in 1976, AIDS in the early 1980s, hantavirus in 1993, severe acute respiratory syndrome (SARS) in 2003, and avian flu in 2005. Even for diseases that are well characterized, an outbreak may provide opportunities to gain additional knowledge by assessing the impact of control measures and the usefulness of new epidemiology and laboratory techniques. For example, outbreaks of varicella (chickenpox) in highly immunized communities allowed investigators to determine effectiveness of the new vaccine and immunization recommendations.11,12 An outbreak of giardiasis provided the opportunity to study the appropriateness of a clinical case definition,13 while an outbreak of rotavirus was used to study the performance of a novel diagnostic method.14 With increased access to the Internet and e-mail in the 1990s, outbreak
  • 417.
    Investigating an Outbreak Page6-6 investigations were used to evaluate whether potential controls would respond to e-mail solicitations to participate.15-17 Public, political, or legal concerns Public, political, or legal concerns can be the driving force behind the decision to conduct an investigation. A cluster of cancer cases in a neighborhood may prompt concerned residents to advocate for an investigation. Sometimes the public is concerned that the disease cluster is the result of an environmental exposure such as toxic waste. Investigations of such clusters almost never identify a causal link between exposure and disease.18,19 Nevertheless, many health departments have learned that they must be “responsibly responsive” to public concerns, even if they think that an epidemiologic link is unlikely.7,8,20 Similarly, the public may fear that an outbreak is the result of an intentional criminal or bioterrorist act. The health department may be able to allay those fears by documenting that the outbreak was the result of an inadvertent or naturally occurring exposure. Some investigations are conducted because they are required by law. For example, CDC’s National Institute for Occupational Safety and Health (NIOSH) is required to evaluate the risks to health and safety in a workplace if requested to do so by a union, three or more workers, or an employer.21 Program considerations Many health departments run programs to control and prevent communicable diseases such as influenza, tuberculosis, vaccine- preventable diseases, and sexually transmitted diseases. An outbreak of a disease targeted by a public health program may reveal a weakness in that program and an opportunity to change or strengthen program efforts. Investigating the outbreak’s causes may identify populations that have been overlooked, failures in intervention strategies, or changes in the agent. Using the outbreak to evaluate program effectiveness can help program directors improve future directions and strategies. Training Investigating an outbreak requires a combination of diplomacy, logical thinking, problem-solving ability, quantitative skills, epidemiologic know-how, and judgment. These skills improve with practice and experience. Thus, many investigative teams pair a seasoned epidemiologist with an epidemiologist-in-training. The latter gains valuable on-the-job training and experience while providing assistance in the investigation and control of the outbreak.
  • 418.
    Investigating an Outbreak Page6-7 Exercise 6.1 During the previous year, nine residents of a community died from cervical cancer. List at least 4 reasons that might justify an investigation. Check your answers on page 6-59
  • 419.
    Investigating an Outbreak Page6-8 Steps of an Outbreak Investigation Once the decision to conduct a field investigation of an acute outbreak has been made, working quickly is essential — as is getting the right answer. In other words, epidemiologists cannot afford to conduct an investigation that is “quick and dirty.” They must conduct investigations that are “quick and clean.”22 Under such circumstances, epidemiologists find it useful to have a systematic approach to follow, such as the sequence listed in Table 6.2. This approach ensures that the investigation proceeds without missing important steps along the way. Table 6.2 Epidemiologic Steps of an Outbreak Investigation 1. Prepare for field work 2. Establish the existence of an outbreak 3. Verify the diagnosis 4. Construct a working case definition 5. Find cases systematically and record information 6. Perform descriptive epidemiology 7. Develop hypotheses 8. Evaluate hypotheses epidemiologically 9. As necessary, reconsider, refine, and re-evaluate hypotheses 10. Compare and reconcile with laboratory and/or environmental studies 11. Implement control and prevention measures 12. Initiate or maintain surveillance 13. Communicate findings The steps listed in Table 6.2 are presented in conceptual order; in practice, however, several steps may be done at the same time, or the circumstances of the outbreak may dictate that a different order be followed. For example, the order of the first three listed steps is highly variable — a health department often verifies the diagnosis and establishes the existence of an outbreak before deciding that a field investigation is warranted. Conceptually, control measures come after hypotheses have been confirmed, but in practice control measures are usually implemented as soon as the source and mode of transmission are known, which may be early or late in any particular outbreak investigation. Each of the steps is described below in more detail, based on the assumption that you are the health department staff member scheduled to conduct the next field investigation. Step 1: Prepare for field work The numbering scheme for this step is problematic, because preparing for field work often is not the first step. Only occasionally do public health officials decide to conduct a field investigation before confirming an increase in cases and verifying
  • 420.
    Investigating an Outbreak Page6-9 the diagnosis. More commonly, officials discover an increase in the number of cases of a particular disease and then decide that a field investigation is warranted. Sometimes investigators collect enough information to perform descriptive epidemiology without leaving their desks, and decide that a field investigation is necessary only if they cannot reach a convincing conclusion without one. Regardless of when the decision to conduct a field investigation is made, you should be well prepared before leaving for the field. The preparations can be grouped into two broad categories: (a) scientific and investigative issues, and (b) management and operational issues. Good preparation in both categories is needed to facilitate a smooth field experience. Scientific and investigative issues As a field investigator, you must have the appropriate scientific knowledge, supplies, and equipment to carry out the investigation before departing for the field. Discuss the situation with someone knowledgeable about the disease and about field investigations, and review the applicable literature. In previous similar outbreaks, what have been the sources, modes of transmission, and risk factors for the disease? Assemble useful references such as journal articles and sample questionnaires. Before leaving for a field investigation, consult laboratory staff to ensure that you take the proper laboratory material and know the proper collection, storage, and transportation techniques. By talking with the laboratory staff you are also informing them about the outbreak, and they can anticipate what type of laboratory resources will be needed. You also need to know what supplies or equipment to bring to protect yourself. Some outbreak investigations require no special equipment while an investigation of SARS or Ebola hemorrhagic fever may require personal protective equipment such as masks, gowns, and gloves. Finally, before departing, you should have a plan of action. What are the objectives of this investigation, i.e., what are you trying to accomplish? What will you do first, second, and third? Having a plan of action upon which everyone agrees will allow you to “hit the ground running” and avoid delays resulting from misunderstandings.
  • 421.
    Investigating an Outbreak Page6-10 Management and operational issues A good field investigator must be a good manager and collaborator as well as a good epidemiologist, because most investigations are conducted by a team rather than just one individual. The team members must be selected before departure and know their expected roles and responsibilities in the field. Does the team need a laboratorian, veterinarian, translator/interpreter, computer specialist, entomologist, or other specialist? What is the role of each? Who is in charge? If you have been invited to participate but do not work for the local health agency, are you expected to lead the investigation, provide consultation to the local staff who will conduct the investigation, or simply lend a hand to the local staff? And who are your local contacts? Depending on the type of outbreak, the number of involved agencies may be quite large. The investigation of an outbreak from an animal source may include state and federal departments of agriculture and/or the Food and Drug Administration (FDA). If criminal or bioterrorist intent is suspected, law enforcement agencies and the Federal Bureau of Investigation (FBI) may be in charge, or at least involved. In a natural disaster (hurricane or flood), the Federal Emergency Management Agency (FEMA) may be the lead. Staff from different agencies have different perspectives, approaches, and priorities that must be reconciled. For example, whereas the public health investigation may focus on identifying a pathogen, source, and mode of transmission, a criminal investigation is likely to focus on finding the perpetrator. Sorting out roles and responsibilities in such multi-agency investigations is critical to accomplishing the disparate objectives of the different agencies. A communications plan must be established. The need for communicating with the public health and clinical community has long been acknowledged, but the need for communicating quickly and effectively with elected officials and the public became obvious during the epidemics of West Nile Virus encephalitis, SARS, and anthrax. The plan should include how often and when to have conference calls with involved agencies, who will be the designated spokesperson, who will prepare health alerts and press releases, and the like. When a federal agency is involved in the survey of 10 or more individuals, the data collection instrument must first be cleared by the White House Office of Management and Budget (OMB). In addition, operational and logistical details are important.
  • 422.
    Investigating an Outbreak Page6-11 Arrange to bring a laptop computer, cell phone or phone card, camera, and other supplies. If you are arriving from outside the area, you should arrange in advance when and where you are to meet with local officials and contacts when you arrive in the field. You must arrange travel, lodging, and local transportation. Many agencies and organizations have strict approval processes and budgetary limits that you must follow. If you are traveling to another country, you will need a passport and often a visa. You should also take care of personal matters before you leave, especially if the investigation is likely to be lengthy. Step 2: Establish the existence of an outbreak An outbreak or an epidemic is the occurrence of more cases of disease than expected in a given area or among a specific group of people over a particular period of time. Usually, the cases are presumed to have a common cause or to be related to one another in some way. Many epidemiologists use the terms outbreak and epidemic interchangeably, but the public is more likely to think that epidemic implies a crisis situation. Some epidemiologists apply the term epidemic to situations involving larger numbers of people over a wide geographic area. Indeed, the Dictionary of Epidemiology defines outbreak as an epidemic limited to localized increase in the incidence of disease, e.g., village, town, or closed institution.23 In contrast to outbreak and epidemic, a cluster is an aggregation of cases in a given area over a particular period without regard to whether the number of cases is more than expected. This aggregation of cases seems to be unusual, but frequently the public (and sometimes the health agency) does not know the denominator. For example, the diagnosis in one neighborhood of four adults with cancer may be disturbing to residents but may well be within the expected level of cancer occurrence, depending on the size of the population, the types of cancer, and the prevalence of risk factors among the residents. One of the first tasks of the field investigator is to verify that a cluster of cases is indeed an outbreak. Some clusters turn out to be true outbreaks with a common cause, some are sporadic and unrelated cases of the same disease, and others are unrelated cases of similar but unrelated diseases. Even if the cases turn out to be the same disease, the number of cases may not exceed what the health department normally sees in a comparable time period. Here, as in other areas of epidemiology, the observed is compared with the expected. The expected number is usually the number from the previous few weeks or months, or
  • 423.
    Investigating an Outbreak Page6-12 from a comparable period during the previous few years. For a notifiable disease, the expected number is based on health department surveillance records. For other diseases and conditions, the expected number may be based on locally available data such as hospital discharge records, mortality statistics, or cancer or birth defect registries. When local data are not available, a health department may use rates from state or national data, or, alternatively, conduct a telephone survey of physicians to determine whether they are seeing more cases of the disease than usual. Finally, a survey of the community may be conducted to establish the background or historical level of disease. Even if the current number of reported cases exceeds the expected number, the excess may not necessarily indicate an outbreak. Reporting may rise because of changes in local reporting procedures, changes in the case definition, increased interest because of local or national awareness, or improvements in diagnostic procedures. A new physician, infection control nurse, or healthcare facility may more consistently report cases, when in fact there has been no change in the actual occurrence of the disease. Some apparent increases are actually the result of misdiagnosis or laboratory error. Finally, particularly in areas with sudden changes in population size such as resort areas, college towns, and migrant farming areas, changes in the numerator (number of reported cases) may simply reflect changes in the denominator (size of the population). Whether an apparent problem should be investigated further is not strictly tied to verifying the existence of an epidemic (more cases than expected). Sometimes, health agencies respond to small numbers of cases, or even a single case of disease, that may not exceed the expected or usual number of cases. As noted earlier, the severity of the illness, the potential for spread, availability of control measures, political considerations, public relations, available resources, and other factors all influence the decision to launch a field investigation.
  • 424.
    Investigating an Outbreak Page6-13 Exercise 6.2 For the month of August, 12 new cases of tuberculosis and 12 new cases of West Nile virus infection were reported to a county health department. You are not sure if either group of cases is a cluster or an outbreak. What additional information might be helpful in making this determination? Check your answers on page 6-60
  • 425.
    Investigating an Outbreak Page6-14 Step 3: Verify the diagnosis The next step, verifying the diagnosis, is closely linked to verifying the existence of an outbreak. In fact, often these two steps are addressed at the same time. Verifying the diagnosis is important: (a) to ensure that the disease has been properly identified, since control measures are often disease-specific; and (b) to rule out laboratory error as the basis for the increase in reported cases. First, review the clinical findings and laboratory results. If you have questions about the laboratory findings (for example, if the laboratory tests are inconsistent with the clinical and epidemiologic findings), ask a qualified laboratorian to review the laboratory techniques being used. If you need specialized laboratory work such as confirmation in a reference laboratory, DNA or other chemical or biological fingerprinting, or polymerase chain reaction, you must secure a sufficient number of appropriate specimens, isolates, and other laboratory material as soon as possible. Second, many investigators — clinicians and non-clinicians — find it useful to visit one or more patients with the disease. If you do not have the clinical background to verify the diagnosis, bring a qualified clinician with you. Talking directly with some patients gives you a better understanding of the clinical features, and helps you to develop a mental image of the disease and the patients affected by it. In addition, conversations with patients are very useful in generating hypotheses about disease etiology and spread. They may be able to answer some critical questions: What were their exposures before becoming ill? What do they think caused their illness? Do they know anyone else with the disease? Do they have anything in common with others who have the disease? Third, summarize the clinical features using frequency distributions. Are the clinical features consistent with the diagnosis? Frequency distributions of the clinical features are useful in characterizing the spectrum of illness, verifying the diagnosis, and developing case definitions. These clinical frequency distributions are considered so important in establishing the credibility of the diagnosis that they are frequently presented in the first table of an investigation’s report or manuscript.
  • 426.
    Investigating an Outbreak Page6-15 Step 4: Construct a working case definition A case definition is a standard set of criteria for deciding whether an individual should be classified as having the health condition of interest. A case definition is a standard set of criteria for deciding whether an individual should be classified as having the health condition of interest. A case definition includes clinical criteria and — particularly in the setting of an outbreak investigation — restrictions by time, place, and person. The clinical criteria should be based on simple and objective measures such as “fever ≥ 40°C (101°F),” “three or more loose bowel movements per day,” or “myalgias (muscle pain) severe enough to limit the patient’s usual activities.” The case definition may be restricted by time (for example, to persons with onset of illness within the past 2 months), by place (for example, to residents of the nine-county area or to employees of a particular plant) and by person (for example, to persons with no previous history of a positive tuberculin skin test, or to premenopausal women). Whatever the criteria, they must be applied consistently to all persons under investigation. The case definition must not include the exposure or risk factor you are interested in evaluating. This is a common mistake. For example, if one of the hypotheses under consideration is that persons who worked in the west wing were at greater risk of disease, do not define a case as “illness among persons who worked in the west wing with onset between…” Instead, define a case as “illness among persons who worked in the facility with onset between…” Then conduct the appropriate analysis to determine whether those who worked in the west wing were at greater risk than those who worked elsewhere. Diagnoses may be uncertain, particularly early in an investigation. As a result, investigators often create different categories of a case definition, such as confirmed, probable, and possible or suspect, that allow for uncertainty. To be classified as confirmed, a case usually must have laboratory verification. A case classified as probable usually has typical clinical features of the disease without laboratory confirmation. A case classified as possible usually has fewer of the typical clinical features. For example, in the box on page 6-16, you can see the Pan American Health Organization (PAHO) recommended case definition for meningococcal disease.24 Here you can see the different categories that PAHO uses for this diagnosis.
  • 427.
    Investigating an Outbreak Page6-16 In the outbreak setting, the investigators would need to specify time and place to complete the outbreak case definition. For example, if investigating an epidemic of meningococcal meningitis in Bamako, the case definition might be the clinical features as described in the box with onset between January and April of this year among residents and visitors of Bamako. Classifications such as confirmed-probable-possible are helpful because they provide flexibility to the investigators. A case might be temporarily classified as probable or possible while laboratory results are pending. Alternatively, a case may be permanently classified as probable or possible if the patient’s physician decided not to order the confirmatory laboratory test because the test is expensive, difficult to obtain, or unnecessary. For example, while investigating an outbreak of diarrhea on a cruise ship, investigators usually try to identify the causative organism from stool samples from a few afflicted persons. If the tests confirm that all of those case-patients were infected with the same organism, for example norovirus, the other persons with compatible clinical illness are all presumed to be part of the same outbreak and to be infected with the same organism. Note that while this approach is typical in the United States, some countries prefer to acquire laboratory samples from every affected person, and only those with a positive laboratory test are counted as true cases. A case definition is a tool for classifying someone as having or not having the disease of interest, but few case definitions are 100% accurate in their classifications. Some persons with mild illness may be missed, and some persons with a similar but not identical illness may be included. Generally, epidemiologists strive to ensure that a case definition includes most if not all of the actual Meningococcal Disease — PAHO Case Definition Clinical case definition An illness with sudden onset of fever (>38.5°C rectal or >38.0°C axillary) and one or more of the following: neck stiffness, altered consciousness, other meningeal sign or petechial or puerperal rash. Laboratory criteria for diagnosis Positive cerebrospinal fluid (CSF) antigen detection or positive culture. Case classification Suspected: A case that meets the clinical case definition. Probable: A suspected case as defined above and turbid CSF (with or without positive Gram stain) or ongoing epidemic and epidemiological link to a confirmed case. Confirmed: A suspected or probable case with laboratory confirmation. Source: Pan American Health Organization. Case Definitions Meningococcal Disease. Epidemiological Bulletin 2002; 22(4):14–5.
  • 428.
    Investigating an Outbreak Page6-17 cases, but very few or no false-positive cases. However, this ideal is not always met. For example, case definitions often miss infected people who have mild or no symptoms, because they have little reason to be tested. More About Case Definitions Early in an investigation, investigators may use a “loose” or sensitive case definition that includes confirmed, probable, and possible cases to characterize the extent of the problem, identify the populations affected, and develop hypotheses about possible causes. The strategy of being more inclusive early on is especially useful in investigations that require travel to different hospitals, homes, or other sites to gather information, because collecting extra data while you are there is more efficient than having to return a second time. This illustrates an important axiom of field epidemiology: Get it while you can. Later on, when hypotheses have come into sharper focus, the investigator may tighten the case definition by dropping the “possible” and sometimes the “probable” category. In analytic epidemiology, inclusion of false-positive cases can produce misleading results. Therefore, to test these hypotheses by using analytic epidemiology (see Step 8), specific or tight case definitions are recommended. Other investigations, particularly those of a newly recognized disease or syndrome, begin with a relatively specific or narrow case definition. For example, acquired immunodeficiency syndrome (AIDS) and severe acute respiratory syndrome (SARS) both began with relatively specific case definitions. This ensures that persons whose illness meets the case definition truly have the disease in question. As a result, investigators could accurately characterize the typical clinical features of the illness, risk factors for illness, and cause of the illness. After the cause was known and diagnostic tests were developed, investigators could use the laboratory test to learn about the true spectrum of illness, and could broaden the case definition to include those with early infection or mild symptoms.
  • 429.
    Investigating an Outbreak Page6-18 Exercise 6.3 In 1989, a worldwide epidemic of a previously unrecognized syndrome occurred. This condition was characterized by severe myalgias (muscle pains) and an elevated number of a particular type of white blood cell called an eosinophil. The illness was given the name eosinophilia-myalgia syndrome. Public health officials initially used the following case definition:25 Eosinophil count ≥2,000 cells/mm3 in the absence of any other known cause of eosinophilia (in particular, parasitic or fungal infection, end-stage renal disease, leukemia, allergic disorder, or drug reaction) Using the information in the line listing below, determine whether or not each should be classified as a case, according to the initial case definition above. Table 6.3 Line Listing of 7 Persons with Suspected Eosinophilia-myalgia Patient # Eosinophils (per mm3 ) Other Known Cause Severe Myalgias Myalgias* Case? (Initial Def) Case? (Revised Def) 1 535 No Yes No _____ _____ 2 12,100 No Yes Yes _____ _____ 3 2,310 No Yes Yes _____ _____ 4 2,064 No Yes No _____ _____ 5 2,250 No Yes Yes _____ _____ 6 1,670 No Yes Yes _____ _____ 7 2,115 Leukemia Yes Yes _____ _____ * Severe enough to affect the patient’s ability to pursue usual daily activities Eventually, public health officials agreed on the following revised case definition:26 1. A peripheral eosinophil count of >1,000 cells/mm3 ; 2. Generalized myalgia at some point during the illness severe enough to affect the patient's ability to pursue usual daily activities; 3. No infection or neoplasm that could account for #1 or #2. Reclassify each patient using the revised case definition. Check your answers on page 6-60
  • 430.
    Investigating an Outbreak Page6-19 Exercise 6.4 In December 2003, an outbreak of gastroenteritis occurred among tenth- grade students who had participated in a city-wide field trip. Half of the students traveled from December 2 to December 7 (Tour A); the other half traveled from December 3 to December 8 (Tour B). The itineraries were similar. Although teachers and other adult chaperones accompanied the students on both tours, no adult reported illness. In addition, no illness was reported among students who did not go on the field trip, and no cases of E. coli O157 were reported in the community that week. A line listing of 26 persons with symptoms of abdominal pain and/or diarrhea is presented below. Using the information in the line listing, develop a case definition that you might use for the outbreak investigation. [Note that persons infected with E. coli O157 typically experience severe abdominal cramps, bloody diarrhea, and low grade fever after a 1– to 8–day incubation period (usually 2–4 days).] Table 6.4 Line Listing of 26 Persons with Symptoms — School District A, December 2003 Patient # Grade & School Age Sex Tour Onset Date Severe Abdominal Pain? No. Times Diarrhea Stool Testing 1 10 — 1 17 M A Dec. 8 Y 3 Not done 2 10 — 1 16 F A Dec. 6 N 1 Negative 3 10 — 2 16 M A Dec. 10 Y 2 E. coli O157 4 10 — 2 17 F A Dec. 8 Y 3 Not done 5 10 — 2 16 F A Dec. 5 Y 8 E. coli O157 6 10 — 2 16 M A Dec. 6 Y 3 Not done 7 10 — 3 17 M A Dec. 7 Y 4 Not done 8 10 — 3 17 F A Dec. 8 Y 2 E. coli O157 9 10 — 3 16 F A Dec. 7 Y 3 Negative 10 10 — 4 17 F A Dec. 7 Y 2 E. coli O157 11 10 — 4 16 M A Dec. 8 Y 3 Not done 12 10 — 4 16 M A Dec. 9 Y 3 Negative 13 10 — 5 16 F A Dec. 8 Y 3 Not done 14 10 — 6 17 F B Dec. 8 Y 3 E. coli O157 15 10 — 6 16 F B Dec. 9 Y 2 Negative 16 10 — 7 17 F B Dec. 6 Y 3 Not done 17 10 — 7 17 F B Dec. 7 Y 5 E. coli O157 18 10 — 7 16 F B Dec. 8 Y 2 Negative 19 10 — 8 17 F B Dec. 6 Y 5 E. coli O157 20 10 — 8 17 F B Dec. 7 Y 3 Negative 21 10 — 9 16 M B Dec. 8 Y 2 Not done 22 10 — 9 16 F B Dec. 7 Y 3 Negative 23 10 — 9 16 F B Dec. 7 Y 3 E. coli O157 24 10 — 10 17 F B Dec. 9 Y 3 E. coli O157 25 10 — 10 17 M B Dec. 7 N 1 Negative 26 10 — 10 16 M B Dec. 6 Y 3 Not done Check your answers on page 6-60
  • 431.
    Investigating an Outbreak Page6-20 Step 5: Find cases systematically and record information As noted earlier, many outbreaks are brought to the attention of health authorities by concerned healthcare providers or citizens. However, the cases that prompt the concern are often only a small and unrepresentative fraction of the total number of cases. Public health workers must therefore look for additional cases to determine the true geographic extent of the problem and the populations affected by it. Usually, the first effort to identify cases is directed at healthcare practitioners and facilities — physicians’ clinics, hospitals, and laboratories — where a diagnosis is likely to be made. Investigators may conduct what is sometimes called stimulated or enhanced passive surveillance by sending a letter describing the situation and asking for reports of similar cases. Alternatively, they may conduct active surveillance by telephoning or visiting the facilities to collect information on any additional cases. In some outbreaks, public health officials may decide to alert the public directly, usually through the local media. In other situations, the media may have already spread the word. For example, in an outbreak of listeriosis in 2002 caused by contaminated sliceable turkey deli meat, announcements in the media alerted the public to avoid the implicated product and instructed them to see a physician if they developed symptoms compatible with the disease in question.27 If an outbreak affects a restricted population such as persons on a cruise ship, in a school, or at a work site, and if many cases are mild or asymptomatic and therefore undetected, a survey of the entire population is sometimes conducted to determine the extent of infection. A questionnaire could be distributed to determine the true occurrence of clinical symptoms, or laboratory specimens could be collected to determine the number of asymptomatic cases. Finally, investigators should ask case-patients if they know anyone else with the same condition. Frequently, one person with an illness knows or hears of others with the same illness. In some investigations, investigators develop a data collection form tailored to the specific details of that outbreak. In others, investigators use a generic case report form. Regardless of which form is used, the data collection form should include the following types of information about each case.
  • 432.
    Investigating an Outbreak Page6-21 • Identifying information. A name, address, and telephone number is essential if investigators need to contact patients for additional questions and to notify them of laboratory results and the outcome of the investigation. Names also help in checking for duplicate records, while the addresses allow for mapping the geographic extent of the problem. • Demographic information. Age, sex, race, occupation, etc. provide the person characteristics of descriptive epidemiology needed to characterize the populations at risk. • Clinical information. Signs and symptoms allow investigators to verify that the case definition has been met. Date of onset is needed to chart the time course of the outbreak. Supplementary clinical information, such as duration of illness and whether hospitalization or death occurred, helps characterize the spectrum of illness. • Risk factor information. This information must be tailored to the specific disease in question. For example, since food and water are common vehicles for hepatitis A but not hepatitis B, exposure to food and water sources must be ascertained in an outbreak of the former but not the latter. • Reporter information. The case report must include the reporter or source of the report, usually a physician, clinic, hospital, or laboratory. Investigators will sometimes need to contact the reporter, either to seek additional clinical information or report back the results of the investigation. Traditionally, the information described above is collected on a standard case report form, questionnaire, or data abstraction form. Examples of case report forms are shown in Figure 6.1 (in Exercise 6.5). Investigators then abstract selected critical items onto a form called a line listing (See Lesson 2 for more information on line listings.) An example of the line listing from the 2001 anthrax investigation is shown in Table 6.5.28 In a line listing, each column represents an important variable, such as name or identification number, age, sex, case classification, etc., while each row represents a different case. New cases are added to a line listing as they are identified. Thus, a line listing contains key information on every case and can be scanned and updated as necessary. Even in the era of computers, many epidemiologists still maintain a handwritten line listing of key data items, and turn to their computers for more complex manipulations and cross-tabulations.
  • 433.
    Investigating an Outbreak Page6-22 Table 6.5 Line Listing of Demographic, Clinical, and Exposure Characteristics of 22 Cases of Bioterrorism- Related Anthrax—United States, 2001 Case No. Onset Date, 2001 Date of Anthrax Diagnosis by Lab Testing Statea Age (yrs) Sexa Racea Occu- pationa Case Statusb Anthrax Presentationb Outcome Diagnostic Testsa 1 9/22 10/19 NY 31 F W NY Post employee Suspect Cutaneous Alive Serum IgG reactive 2 9/25 10/12 NY 38 F W NBC anchor assistant Confirmed Cutaneous Alive Skin biopsy IHC+ / serum IgG reactive 3 9/26 10/18 NJ 39 M W USPS machine mechanic Suspect Cutaneous Alive Serum IgG reactive 4 9/28 10/15 FL 73 M W, H AMI mailroom worker Confirmed Inhalational Alive Pleural biopsy IHC+ / serum IgG reactive 5 9/28 10/18 NJ 45 F W USPS mail carrier Confirmed Cutaneous Alive Skin biopsy IHC+ and PCR+ / serum IgG reac. 6 9/28 10/12 NY 23 F W NBC TV news intern Suspect Cutaneous Alive Serum IgG reactive 7 9/29 10/15 NY 0.6 M W Child of ABC employee Confirmed Cutaneous Alive Skin biopsy IHC+ / blood PCR+ 8 9/30 10/4 FL 63 M W AMI photo editor Confirmed Inhalational Dead Cerebrospinal fluid culture + 9 10/1 10/18 NY 27 F W CBS anchor assistant Confirmed Cutaneous Alive Skin biopsy IHC+ / serum IgG reactive 10 10/14 10/19 PA 35 M W USPS mail processor Confirmed Cutaneous Alive Blood culture + / serum IgG reactive 11 10/14 10/28 NJ 56 F B USPS mail processor Confirmed Inhalational Alive Blood PCR+ / pleural fluid cytology IHC+ / serum IgG reactive 12 10/15 10/29 NJ 43 F A USPS mail processor Confirmed Inhalational Alive Pleural fluid IHC+ / bronchial biopsy IHC+ / serum IgG reactive 13 10/16 10/21 VA 56 M B USPS mail worker Confirmed Inhalational Alive Blood culture + 14 10/16 10/23 MD 55 M B USPS mail worker Confirmed Inhalational Dead Blood culture + 15 10/16 10/26 MD 47 M B USPS mail worker Confirmed Inhalational Dead Blood culture + 16 10/16 10/22 MD 56 M B USPS mail worker Confirmed Inhalational Alive Blood culture + 17 10/17 10/29 NJ 51 F W Bookkeeper Confirmed Cutaneous Alive Skin biopsy IHC+ and PCR+ / serum IgG reactive 18 10/19 10/22 NY 34 M W, H NY Post mail handler Suspect Cutaneous Alive Skin biopsy IHC+ 19 10/22 10/25 VA 59 M W Government mail processor Confirmed Inhalational Alive Blood culture + 20 10/23 10/28 NY 38 M W NY Post employee Confirmed Cutaneous Alive Skin biopsy culture + 21 10/25 10/30 NY 61 F A Hospital supply worker Confirmed Inhalational Dead Pleural fluid and blood culture + 22 11/14 11/21 CT 94 F W Retired at home Confirmed Inhalational Dead Blood culture + a NY, New York; FL, Florida; NJ, New Jersey; PA, Pennsylvania; VA, Virginia; DC, District of Columbia; MD, Maryland; CT, Connecticut; F, female; M, male; W, white; B, black; A, Asian; W,H, white with Hispanic ethnicity; NY, New York; NBC, National Broadcasting Company; AMI, American Media Inc.; USPS, United States Postal Service; CBS, Columbia Broadcasting System; PCR, polymerase chain reaction; IHC, immunohistochemical staining; + positive; IgG, immunoglobulin G. b Case status and anthrax presentation are described in the anthrax surveillance case definition in the Methods section. Source: Jernigan DB, Raghunathan PL, Bell BP, Brechner R, Bresnitz EA, Butler JC, et al. Investigation of bioterrorism-related anthrax, United States, 2001: epidemiologic findings. Emerg Infect Dis 2002;8:1019–28.
  • 434.
    Investigating an Outbreak Page6-23 Exercise 6.5 Review the six case report forms in Figure 6.1. Create a line listing based on this information. Figure 6.1 Continued.
  • 435.
    Investigating an Outbreak Page6-24 Check your answers on page 6-61
  • 436.
    Investigating an Outbreak Page6-25 Step 6: Perform descriptive epidemiology Conceptually, the next step after identifying and gathering basic information on the persons with the disease is to systematically describe some of the key characteristics of those persons. This process, in which the outbreak is characterized by time, place, and person, is called descriptive epidemiology. It may be repeated several times during the course of an investigation as additional cases are identified or as new information becomes available. This step is critical for several reasons. • Summarizing data by key demographic variables provides a comprehensive characterization of the outbreak — trends over time, geographic distribution (place), and the populations (persons) affected by the disease. • From this characterization you can identify or infer the population at risk for the disease. • The characterization often provides clues about etiology, source, and modes of transmission that can be turned into testable hypotheses (see Step 7). • Descriptive epidemiology describes the where and whom of the disease, allowing you to begin intervention and prevention measures. • Early (and continuing) analysis of descriptive data helps you to become familiar with those data, enabling you to identify and correct errors and missing values. Time Traditionally, a special type of histogram is used to depict the time course of an epidemic. This graph, called an epidemic curve, or epi curve for short, provides a simple visual display of the outbreak’s magnitude and time trend. The classic epidemic curve, such as the one shown in Figure 6.2a from an outbreak of Salmonella enterica serotype Enteritidis, graphs the number of cases by date or time of onset of illness.
  • 437.
    Investigating an Outbreak Page6-26 Figure 6.2a Outbreak of Salmonella Enteritidis Gastroenteritis — Maryland, 2003 (Epidemic Curve by 12-Hour Intervals) Source: Castel AD, Blythe D, Edwards L, Totaro J, Shah D, Moore M. A large outbreak of Salmonella Enteritidis infections associated with crabcakes at a church fundraiser– Maryland, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta. Epidemic curves are a basic investigative tool because they are so informative (see Lesson 4). • The epi curve shows the magnitude of the epidemic over time as a simple, easily understood visual. It permits the investigator to distinguish epidemic from endemic disease. Potentially correlated events can be noted on the graph. • The shape of the epidemic curve may provide clues about the pattern of spread in the population, e.g., point versus intermittent source versus propagated. • The curve shows where you are in the course of the epidemic — still on the upswing, on the down slope, or after the epidemic has ended. This information forms the basis for predicting whether more or fewer cases will occur in the near future. • The curve can be used for evaluation, answering questions like: How long did it take for the health department to identify a problem? Are intervention measures working? • Outliers — cases that don’t fit into the body of the curve — may provide important clues. • If the disease and its incubation period are known, the epi curve can be used to deduce a probable time of exposure and help develop a questionnaire focused on that time period. Drawing an epidemic curve. To draw an epidemic curve, you first must know the time of onset of illness for each case. For some diseases, date of onset is sufficient. For other diseases, particularly
  • 438.
    Investigating an Outbreak Page6-27 those with a relatively short incubation period, hour of onset may be more suitable (see Lesson 4). Occasionally, you may be asked to draw an epidemic curve when you don’t know either the disease or its incubation time. In that situation, it may be useful to draw several epidemic curves with different units on the x-axis to find one that best portrays the data. For example, the epidemic curves shown in Figures 6.2b and 6.2c display the same data as in Figure 6.2a; the x-axis is measured in units of 12 hours in Figure 6.2a, 6 hours in Figure 6.2b, and 24 hours (1 day) in 6.2c. Figure 6.2d shows the same data one more time, but with stacks of squares that each represent one case. Figure 6.2b Outbreak of Salmonella Enteritidis Gastroenteritis — Maryland, 2003 (Epidemic Curve by 6-Hour Intervals) Source: Castel AD, Blythe D, Edwards L, Totaro J, Shah D, Moore M. A large outbreak of Salmonella Enteritidis infections associated with crabcakes at a church fundraiser– Maryland, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta. Figure 6.2c Outbreak of Salmonella Enteritidis Gastroenteritis — Maryland, 2003 (Epidemic Curve by One Day Intervals) Source: Castel AD, Blythe D, Edwards L, Totaro J, Shah D, Moore M. A large outbreak of Salmonella Enteritidis infections associated with crabcakes at a church fundraiser– Maryland, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta.
  • 439.
    Investigating an Outbreak Page6-28 Figure 6.2d Outbreak of Salmonella Enteritidis Gastroenteritis — Maryland, 2003 (Epidemic Curve by 6-Hour Intervals) Source: Castel AD, Blythe D, Edwards L, Totaro J, Shah D, Moore M. A large outbreak of Salmonella Enteritidis infections associated with crabcakes at a church fundraiser– Maryland, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta. Interpreting an epidemic curve. The first step in interpreting an epidemic curve is to consider its overall shape. The shape of the epidemic curve is determined by the epidemic pattern (for example, common source versus propagated), the period of time over which susceptible persons are exposed, and the minimum, average, and maximum incubation periods for the disease. An epidemic curve that has a steep upslope and a more gradual down slope (a so-called log-normal curve) is characteristic of a point-source epidemic in which persons are exposed to the same source over a relative brief period. In fact, any sudden rise in the number of cases suggests sudden exposure to a common source one incubation period earlier (Figure 6.3). In a point-source epidemic, all the cases occur within one incubation period. If the duration of exposure is prolonged, the epidemic is called a continuous common-source epidemic, and the epidemic curve has a plateau instead of a peak. An intermittent common-source epidemic (in which exposure to the causative agent is sporadic over time) usually produces an irregularly jagged epidemic curve reflecting the intermittence and duration of exposure and the number of persons exposed. In theory, a propagated epidemic — one spread from person-to-person with increasing numbers of cases in each generation — should have a series of progressively taller peaks one incubation period apart, but in reality few produce this classic pattern.
  • 440.
    Investigating an Outbreak Page6-29 Figure 6.3 Typical Epi Curves for Different Types of Spread Adapted from: European Programme for Intervention Epidemiology Training [Internet]. Solna, Sweden: Smittskyddsinstitutet [updated 2004 Sep 27; cited 2006 Sep 22] Figure 6.4 Number of Cases of Acute Hemorrhagic Conjunctivitis, By Month and Week of Report — Puerto Rico, August 7–October 30, 2003 Adapted from: Acute hemorrhagic conjunctivitis outbreak caused by Coxsackievirus A24– Puerto Rico, 2003. MMWR 2004;53:632–4. As noted above, the epidemic curve shows where you are in the natural course of the epidemic. Consider the epidemic curve of acute hemorrhagic conjunctivitis in Puerto Rico, shown in Figure 6.4. If you only had data through Week 35, that is, through point A, you might conclude that the outbreak is still on the upswing, with more cases to come. On the other hand, if you had data through point B, you might judge that the outbreak has peaked and may soon be over.
  • 441.
    Investigating an Outbreak Page6-30 The cases that stand apart may be just as informative as the overall pattern. An early case may represent a background or unrelated case, a source of the epidemic, or a person who was exposed earlier than most of the cases (for example, the cook who tasted a dish hours before bringing it to the big picnic). Similarly, late cases may represent unrelated cases, cases with long incubation periods, secondary cases, or persons exposed later than most others (for example, someone eating leftovers). On the other hand, these outlying cases sometimes represent miscoded or erroneous data. All outliers are worth examining carefully because if they are part of the outbreak, they may have an easily identifiable exposure that may point directly to the source. In a point-source epidemic of a known disease with a known incubation period, the epidemic curve can be used to identify a likely period of exposure. Knowing the likely period of exposure allows you to ask questions about the appropriate period of time so you can identify the source of the epidemic. To identify the likely period of exposure from an epidemic curve of an apparent point source epidemic: 1. Look up the average and minimum incubation periods of the disease. This information can be found on disease fact sheets available on the Internet or in the Control of Communicable Diseases Manual.29 2. Identify the peak of the outbreak or the median case and count back on the x-axis one average incubation period. Note the date. 3. Start at the earliest case of the epidemic and count back the minimum incubation period, and note this date as well. Ideally, the two dates will be similar, and represent the probable period of exposure. Since this technique is not precise, widen the probable period of exposure by, say, 20% to 50% on either side of these dates, and then ask about exposures during this widened period in an attempt to identify the source. In a similar fashion, if the time of exposure and the times of onset of illness are known but the cause has not yet been identified, the incubation period can be estimated from the epidemic curve. Subtract the time of onset of the earliest cases from the time of exposure to estimate the minimum incubation period. Subtract the time of onset of the median case from the time of exposure to estimate the median incubation period. These incubation periods can be compared with a list of incubation periods of known diseases to narrow the possibilities.
  • 442.
    Investigating an Outbreak Page6-31 EXAMPLE: Interpreting an Epidemic Curve Consider, for example, the outbreak of hepatitis A illustrated by the epidemic curve in Figure 6.5. The incubation period for hepatitis A ranges from 15 to 50 days (roughly 2 to 7 weeks), with an average incubation period of 28–30 days (roughly one month). Because cases can occur from 15 to 50 days after exposure, all cases from a point source exposure should occur within a span of 50 – 15 = 35 days. Figure 6.5 Hepatitis A from Sub Shop — Massachusetts, 2001 Adapted from: Foodborne transmission of hepatitis A — Massachusetts, 2001. MMWR 2003;52:565–7. Is this epidemic curve consistent with a point-source epidemic? (That is, do all of the cases occur with one incubation period?) Yes. The date of onset of the first case was during the week of October 28. The date of onset of the last known case was during the week of November 18, less than one month later. All of the cases occur within the range of incubation periods expected for a point source exposure. Therefore, the epidemic curve can be used to identify the likely period of exposure. What is the peak of the outbreak or the median date of onset? Both the peak of the outbreak and the median case occurred during the week of November 4. When is the likely date(s) of exposure, based on one average incubation period prior to the peak (median date) of the outbreak? Since both the peak and the median of the outbreak occurred during the week of November 4, the most likely period of exposure was a month earlier, in early October. When is the beginning of the outbreak? The earliest case occurred during the week of October 28. When is the likely dates of exposure, based on the minimum incubation period before the first case? Subtracting 2 weeks from the week of October 28 points to the week of October 14. Thus you would look for exposures during the weeks of October 7 and 14, plus or minus a few days. This turned out to be the exact period during which a restaurant employee, diagnosed with hepatitis A in mid-October, would have been shedding virus while still working. In summary, the graph reflects an outbreak (number of cases clearly in excess of usual) beginning during the week of October 28, peaking during the week of November 4, and ending during the week of November 18. Based on these data and knowledge of the incubation period of hepatitis A, the period of exposure was probably in early to mid-October.
  • 443.
    Investigating an Outbreak Page6-32 Exercise 6.6 An outbreak of an acute respiratory disease, coccidioidomycosis, occurred among volunteers, group leaders, and archaeologists who began working at a Native American archaeological site in Utah on June 18.30 1. Using the dates of onset listed below, draw an epidemic curve. Graph paper is provided at the end of this lesson. Case # Date of Onset Case # Date of Onset 1 6/28 6 6/29 2 6/28 7 6/29 3 6/29 8 6/30 4 6/29 9 7/1 5 6/29 10 7/1 2. The average incubation period for coccidioidomycosis is 12 days, with a minimum incubation period of 7 days. Using your epidemic curve and the average and minimum incubation periods for coccidioidomycosis, identify the likely exposure period. Check your answers on page 6-62
  • 444.
    Investigating an Outbreak Page6-33 Place Assessment of an outbreak by place not only provides information on the geographic extent of a problem, but may also demonstrate clusters or patterns that provide important etiologic clues. A spot map is a simple and useful technique for illustrating where cases live, work, or may have been exposed. Some spot maps indicate each patient’s residence. If the map shows a cluster or other pattern (such as cases along a road), the investigator must consider possible explanations — perhaps water supplies, wind currents, or proximity to a restaurant or grocery. A spot map, like that used by John Snow in London in 1854 (see Lesson 1, Figure 1.1), can give clues about mode of spread.31 For example, clustering of cases in a wing of a nursing home is consistent with either a focal source or person-to-person spread, whereas scattering of cases throughout the facility is more consistent with a widely disseminated vehicle or a source common to the residents that is not associated with room assignment, such as a common dining hall or water supply. In an outbreak of pneumococcal pneumonia in a nursing home in New Jersey, cases were more common in the north wing than in the south wing (Figure 6.6). Nursing home staff did report that the 2 residents of the south wing who developed pneumonia did spend much of their time in the north wing.32 Figure 6.6 Cases of Pneumonia by Room, Nursing Home A — New Jersey, 2001 Adapted from: Tan C. A preventable outbreak of pneumococcal pneumonia among unvaccinated nursing home residents in New Jersey during 2001. Infect Control Hosp Epidemiol 2003;24:848–52.
  • 445.
    Investigating an Outbreak Page6-34 Often, a spot map by site of presumed exposure is more informative than one by residence. Figure 6.7 shows the location of staff in two offices in the U.S. Senate’s Hart Building who had nasal swabs positive for B. anthracis after an envelope containing anthrax spores was opened in their presence.33 To look for clustering in an outbreak of surgical wound infections in a hospital, cases may be plotted by operating room, recovery room, and ward room. In studying “sick-building syndrome” and other disorders related to air-flow patterns in buildings, cases should be plotted by work location. A spot map may even plot sites of recreational or other outdoor exposures. Figure 6.7 Desk Locations of Persons with Nasal Swabs Positive for Bacillus anthracis, Hart Building — Washington, DC, 2001 Adapted from: Lukacs SL, Hsu V, Harper S, Handzel T, Hayslett J, Khabbaz R,,et al. Anthrax outbreak averted: public health response to a contaminated envelope on Capital Hill–Washington, DC, 2001. Presented at 51st Annual Epidemic Intelligence Service Conference, April 22-26, 2004, Atlanta. Spot maps are useful for demonstrating cases within a geographic area, but they do not take the size of the underlying population into account. To compare incidence between different areas with different population densities, an area map showing area-specific rates is preferable. Figure 6.8 shows the number of cases of human granulocytic ehrlichiosis by county in Wisconsin during 1996– 1998.34 The most cases occurred in Washburn (n=21) and Chippewa (n=17) Counties. By dividing the number of cases by the size of the population, county-specific rates of ehrlichiosis can be calculated (Figure 6.9). While Jackson (n=11) and Rusk (n=9) Counties had fewer cases than Chippewa, their populations are much smaller, and they turned out to have higher rates of disease.
  • 446.
    Investigating an Outbreak Page6-35 Figure 6.8 Cases of Human Granulocytic Ehrlichiosis by County — Wisconsin, May 1996–December 1998 Source: Ramsey AH, Belongia EA, Gale CM, Davis JP. Outcomes of treated human granulocytic ehrlichiosis cases. Emerg Infect Dis 2002;8:398-401. Figure 6.9 Rates of Human Granulocytic Ehrlichiosis by County — Wisconsin, May 1996–December 1998 Source: Ramsey AH, Belongia EA, Gale CM, Davis JP. Outcomes of treated human granulocytic ehrlichiosis cases. Emerg Infect Dis 2002;8:398-401.
  • 447.
    Investigating an Outbreak Page6-36 Person Characterization of the outbreak by person provides a description of whom the case-patients are and who is at risk. Person characteristics that are usually described include both host characteristics (age, race, sex, and medical status) and possible exposures (occupation, leisure activities, and use of medications, tobacco, and drugs). Both of these influence susceptibility to disease and opportunities for exposure. The two most commonly described host characteristics are age and sex because they are easily collected and because they are often related to exposure and to the risk of disease. Depending on the outbreak, occupation, race, or other personal characteristics specific to the disease under investigation and the setting of the outbreak may also be important. For example, investigators of an outbreak of hepatitis B might characterize the cases by intravenous drug use and sexual contacts, two of the high risk exposures for that disease. Investigators of a school-based gastroenteritis outbreak might describe occurrence by grade or classroom, and by student versus teacher or other staff. Early in an investigation, investigators may restrict the descriptive epidemiology to numbers of cases. However, in many circumstances the investigators also calculate rates (number of cases divided by the population or number of people at risk). Numbers indicate the burden of disease and are useful for planning and service delivery. Rates are essential for identifying groups with elevated risk of disease. Summarizing by time, place, and person After characterizing an outbreak by time, place, and person, it is useful to summarize what you know. For example, during an investigation of an outbreak of Legionnaires’ disease in Louisiana, members of the investigative team discussed what they knew based on the descriptive epidemiology.35 Specifically, the epidemic curve indicated that the outbreak was basically over, because no new case had been reported in the previous two weeks. The affected population had a greater proportion of persons who were black, female, young, and less likely to smoke than persons in a typical Legionnaires’ outbreak. There appeared to be no clustering by either residence or worksite, and no connection with exposure to the town’s cooling towers. Thus, the investigators were forced to develop new hypotheses about a source of Legionnaires’ disease to explain this outbreak.
  • 448.
    Investigating an Outbreak Page6-37 Step 7: Develop hypotheses “Round up the usual suspects.” - Capt. Renault (Claude Rains) to his policemen after Rick Blaine (Humphrey Bogart) had just shot a Nazi officer, Casablanca, 1942 Although the next conceptual step in an investigation is formulating hypotheses, in reality, investigators usually begin to generate hypotheses at the time of the initial telephone call. Depending on the outbreak, the hypotheses may address the source of the agent, the mode (and vehicle or vector) of transmission, and the exposures that caused the disease. The hypotheses should be testable, since evaluating hypotheses is the next step in the investigation. In an outbreak context, hypotheses are generated in a variety of ways. First, consider what you know about the disease itself: What is the agent’s usual reservoir? How is it usually transmitted? What vehicles are commonly implicated? What are the known risk factors? In other words, by being familiar with the disease, you can, at the very least, “round up the usual suspects.” Another useful way to generate hypotheses is to talk to a few of the case-patients, as discussed in Step 3. The conversations about possible exposures should be open-ended and wide-ranging, not necessarily confined to the known sources and vehicles. In some challenging investigations that yielded few clues, investigators have convened a meeting of several case-patients to search for common exposures. In addition, investigators have sometimes found it useful to visit the homes of case-patients and look through their refrigerators and shelves for clues to an apparent foodborne outbreak. Just as case-patients may have important insights into causes, so too may the local health department staff. The local staff know the people in the community and their practices, and often have hypotheses based on their knowledge. The descriptive epidemiology may provide useful clues that can be turned into hypotheses. If the epidemic curve points to a narrow period of exposure, what events occurred around that time? Why do the people living in one particular area have the highest attack rate? Why are some groups with particular age, sex, or other person characteristics at greater risk than other groups with different person characteristics? Such questions about the data may lead to hypotheses that can be tested by appropriate analytic techniques.
  • 449.
    Investigating an Outbreak Page6-38 When the epidemiology does not fit the natural pattern, think unnatural, i.e., intentional. Given recent concerns about bioterrorism, investigators should consider intentional dissemination of an infectious or chemical agent when trying to determine the cause of an outbreak. An intentional act, one with either terrorist or criminal intent, should be considered under a variety of circumstances listed in Table 6.6. Investigators of an outbreak of salmonellosis in The Dalles, Oregon, were stumped when they were able to implicate salad bars in several local restaurants, but could not identify any common ingredients or distribution system.36 A year later, a member of a local cult admitted that the cult had intentionally contaminated the salads bars with Salmonella organisms. The lesson learned is that when the epidemiology does not fit the usual or natural patterns of transmission, investigators should think about intentional modes of transmission. Table 6.6 Epidemiologic Clues to Bioterrorism 1. Single case of disease caused by an uncommon agent (e.g., glanders, smallpox, viral hemorrhagic fever, inhalational or cutaneous anthrax) without adequate epidemiologic explanation 2. Unusual, atypical, genetically engineered, or antiquated strain of an agent (or antibiotic-resistance pattern) 3. Higher morbidity and mortality in association with a common disease or syndrome or failure of such patients to respond to usual therapy 4. Unusual disease presentation (e.g., inhalational anthrax or pneumonic plague) 5. Disease with an unusual geographic or seasonal distribution (e.g., tularemia in a non-endemic area, influenza in the summer) 6. Stable endemic disease with an unexplained increase in incidence (e.g., tularemia, plague) 7. Atypical disease transmission through aerosols, food, or water, in a mode suggesting deliberate sabotage (i.e., no other physical explanation) 8. No illness in persons who are not exposed to common ventilation systems (have separate closed ventilation systems) when illness is seen in persons in close proximity who have a common ventilation system 9. Several unusual or unexplained diseases coexisting in the same patient without any other explanation 10. Unusual illness that affects a large, disparate population (e.g., respiratory disease in a large population may suggest exposure to an inhalational pathogen or chemical agent) 11. Illness that is unusual (or atypical) for a given population or age group (e.g., outbreak of measles-like rash in adults) 12. Unusual pattern of death or illness among animals (which may be unexplained or attributed to an agent of bioterrorism) that precedes or accompanies illness or death in humans 13. Unusual pattern of death or illness among humans (which may be unexplained or attributed to an agent of bioterrorism) that precedes or accompanies illness or death in animals 14. Ill persons who seek treatment at about the same time (point source with compressed epidemic curve) 15. Similar genetic type among agents isolated from temporally or spatially distinct sources 16. Simultaneous clusters of similar illness in noncontiguous areas, domestic or foreign 17. Large number of cases of unexplained diseases or deaths Source: Treadwell TA, Koo D, Kuker K, Khan AS. Epidemiologic clues to bioterrorism. Public Health Reports 2003; 118:92–8. Outliers also can provide important clues. In an outbreak of thyrotoxicosis in 1985, most cases came from Luverne, Minnesota, and the surrounding areas. Only one case was identified in Sioux Falls, South Dakota, 60 miles away. Did this person ever go to Luverne? Yes. Was she a friend or acquaintance of any of the Luverne cases? Not really. What does she do when she goes to Luverne? Visit my father and buy the locally produced ground beef that he sells in his store. Aha! The hypothesis that the locally produced ground beef was the vehicle could easily be tested by
  • 450.
    Investigating an Outbreak Page6-39 asking case-patients and controls (persons without thyrotoxicosis or other thyroid disease) whether they ate ground beef from the same source. Case-patients did, controls did not.37 Step 8: Evaluate hypotheses epidemiologically After a hypothesis that might explain an outbreak has been developed, the next step is to evaluate the plausibility of that hypothesis. Typically, hypotheses in a field investigation are evaluated using a combination of environmental evidence, laboratory science, and epidemiology. From an epidemiologic point of view, hypotheses are evaluated in one of two ways: either by comparing the hypotheses with the established facts or by using analytic epidemiology to quantify relationships and assess the role of chance. The first method is likely to be used when the clinical, laboratory, environmental, and/or epidemiologic evidence so obviously supports the hypotheses that formal hypothesis testing is unnecessary. For example, in an outbreak of hypervitaminosis D that occurred in Massachusetts in 1991, investigators found that all of the case-patients drank milk delivered to their homes by a local dairy. Therefore, investigators hypothesized that the dairy was the source and the milk was the vehicle. When they visited the dairy, they quickly recognized that the dairy was inadvertently adding far more than the recommended dose of vitamin D to the milk. No analytic epidemiology was really necessary to evaluate the basic hypothesis in this setting or to implement appropriate control measures, although investigators did conduct additional studies to identify additional risk factors.38,39 In many other investigations, however, the circumstances are not as straightforward, and information from the series of cases is not sufficiently compelling or convincing. In such investigations, epidemiologists use analytic epidemiology to test their hypotheses. The key feature of analytic epidemiology is a comparison group. The comparison group allows epidemiologists to compare the observed pattern among case-patients or a group of exposed persons with the expected pattern among noncases or unexposed persons. By comparing the observed with expected patterns, epidemiologists can determine whether the observed pattern differs substantially from what should be expected and, if so, by what degree. In other words, epidemiologists can use analytic epidemiology with its hallmark comparison group to quantify relationships between exposures and disease, and to test hypotheses about causal relationships. The two most common types of analytic epidemiology
  • 451.
    Investigating an Outbreak Page6-40 studies used in field investigations are retrospective cohort studies and case-control studies, as described in the following sections. Retrospective cohort studies A retrospective cohort study is the study of choice for an outbreak in a small, well-defined population, such as an outbreak of gastroenteritis among wedding guests for which a complete list of guests is available. In a cohort study, the investigator contacts each member of the defined population (e.g., wedding guests), determines each person’s exposure to possible sources and vehicles (e.g., what food and drinks each guest consumed), and notes whether the person later became ill with the disease in question (e.g., gastroenteritis). After collecting similar information from each attendee, the investigator calculates an attack rate for those exposed to (e.g., who ate) a particular item and an attack rate for those who were not exposed. Generally, an exposure that has the following three characteristics or criteria is considered a strong suspect: 1. The attack rate is high among those exposed to the item. 2. The attack rate is low among those not exposed, so the difference or ratio between attack rates is high. 3. Most of the case-patients were exposed to the item, so that the exposure could “explain” or account for most, if not all, of the cases. Method for calculating risk ratio: Attack rate (risk) in exposed group Attack rate (risk) in unexposed group Relative and attributable risk. Commonly, the investigator compares the attack rate in the exposed group to the attack rate in the unexposed group to measure the association between the exposure (e.g., the food item) and disease. This is called the risk ratio or the relative risk. When the attack rate for the exposed group is the same as the attack rate for the unexposed group, the relative risk is equal to 1.0, and the exposure is said not to be associated with disease. The greater the difference in attack rates between the exposed and unexposed groups, the larger the relative risk, and the stronger the association between exposure and disease. Table 6.7 includes data from an investigation of an outbreak of Salmonella Typhimurium gastroenteritis following a company’s holiday banquet in December 2003.40 Approximately 135 persons attended the party, and of 116 who were interviewed, 57 (49%) met the case definition. Food-specific attack rates for those who did and did not eat each of 9 items served only at this banquet are presented. Scan the column of attack rates among those who ate the specified items and consider the three criteria listed on the previous page. Which item shows the highest attack rate? Is the attack rate low
  • 452.
    Investigating an Outbreak Page6-41 among persons not exposed to that item? Were most of the 57 case- patients exposed to that food item? Table 6.7 Attack Rates By Items Served at Company A’s Holiday Banquet — Virginia, December 2003 Food Items Served Number of Persons who ATE Specified Food Number of Persons who DID NOT EAT Specified Food Risk Ratio Ill Not Ill Total Attack Rate Ill Not Ill Total Attack Rate Beef 53 28 81 65% 4 31 35 11% 5.7 Ravioli 43 35 78 55% 14 24 38 37% 1.5 Cajun sauce* 19 11 30 63% 37 48 85 44% 1.5 Pesto cream* 37 29 66 56% 19 30 49 39% 1.4 California rolls* 21 14 35 60% 34 44 78 44% 1.4 Mushrooms* 32 26 58 55% 24 31 55 44% 1.3 Broccoli* 34 30 64 53% 22 29 51 43% 1.2 Carrots* 34 30 64 53% 23 28 51 43% 1.2 Potatoes* 39 41 80 49% 17 17 34 50% 1.0 *Excludes 1 or more persons with indefinite history of consumption of that food. Source: Jani AA, Barrett E, Murphy J, Norton D, Novak C, Painter J, Toney D. A steamship full of trouble: an outbreak of Salmonella Typhimurium DT 104 gastroenteritis at a holiday banquet–Virginia, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta. Beef, which had the highest attack rate among those who ate it, the lowest attack rate among those who did not eat it, and could account for almost all (53 of 57) of the cases, was indeed the culprit. The data showing the relationship between an exposure and disease are often displayed in a two-by-two table. The following two-by-two table shows the data for beef and gastroenteritis. Table 6.8 Risk of Gastroenteritis By Consumption of Beef — Virginia, December 2003 Ill Not Ill Total Attack Rate (Risk) Ate beef? Ate beef Yes 53 28 81 65.4% Ate be No 4 31 35 11.4% Ate be Total 57 59 116 49.1% Risk ratio = 65.4 / 11.4 = 5.7 Proportion of cases exposed = 53 / 57 = 93.0% Population attributable risk percent = (49.1 - 11.4) / 49.1 = 76.7% Source; Jani AA, Barrett E, Murphy J, Norton D, Novak C, Painter J, Toney D. A steamship full of trouble: an outbreak of Salmonella Typhimurium DT 104 gastroenteritis at a holiday banquet–Virginia, 2003. Presented at 53rd Annual Epidemic Intelligence Service Conference, April 19-23, 2004, Atlanta. The risk ratio is calculated as the ratio of the attack rates or risks, i.e., 65.4% divided by 11.4%, which equals 5.7. This risk ratio indicates that persons who ate the beef were 5.7 times more likely to become ill than those who did not eat the beef. Considering the third criterion listed earlier, notice that almost all (53 out of 57) of the cases could be accounted for by the beef. Some investigators use a more quantitative approach and calculate
  • 453.
    Investigating an Outbreak Page6-42 Method for calculating population attributable risk percent: ( ARP - ARU ) ARP ARP = Attack rate (risk) in total population ARU = Attack rate (risk) in unexposed group a population attributable risk percent for each food. The population attributable risk percent describes the proportion of illness in the entire study population that could be attributable to a given exposure, assuming that those who became ill in the unexposed group and a similar proportion in the exposed group must be attributable to something else. The population attributable risk percent may actually be an underestimate in many outbreaks, since it does not take into account such common occurrences as cross- contamination of foods or sampling of a spouse’s dish. The population attributable risk percent for beef was 76.7% (see Table 6.8), much higher than that for any other food. Statistical significance testing. When an exposure is found to have a relative risk different from 1.0, many investigators calculate a chi-square or other test of statistical significance to determine the likelihood of finding an association as large or larger on the basis of chance alone. A detailed description of statistical testing is beyond the scope of this lesson, but the following text presents some key features and formulas. To test an association for statistical significance, assume first that the exposure is not related to disease, i.e., the relative risk (RR) equals 1.0. This assumption is known as the null hypothesis. The alternative hypothesis, which will be adopted if the null hypothesis proves to be implausible, is that exposure is associated with disease. Next, compute a measure of association, such as a risk ratio or odds ratio. Then calculate a chi-square or other statistical test. This test indicates the probability of finding an association as strong as or stronger than the one you have observed if the null hypothesis were really true, that is, if in reality the exposure being tested was not related to the disease. This probability is called the p-value. A very small p-value means that the observed association occurs only rarely if the null hypothesis is true. If the p-value is smaller than some cutoff that has been specified in advance, commonly 0.05 or 5%, you discard or reject the null hypothesis in favor of the alternative hypothesis. Table 6.9 shows the standard notation for a two-by-two table. Table 6.9 Standard Notation of a Two-By-Two Table Ill Well Total Attack Rate (Risk) Exposed a b a+b = H1 a / a+b Unexposed c d c+d = H0 c / c+d Total a+c=V1 b+d=V2 T V1 / T
  • 454.
    Investigating an Outbreak Page6-43 One formula for the chi-square test: T(ad-bc)2 H1 x H0 x V1 x V2 The most common statistical test for data in a two-by-two table from an outbreak is the chi-square test. To apply this test, calculate the chi-square statistic, then look up its corresponding p-value in a table of chi-squares, such as Table 6.10. Since a two-by-two table has 1 degree of freedom, a chi-square larger than 3.84 corresponds to a p-value smaller than 0.05. This means that if you planned to reject the null hypothesis if the p-value is less than 0.05, you can do so if your value for chi-square is greater than 3.84. Recognize, however, that the chi-square and similar tests are guides to help you make a decision about a hypothesis. Whichever decision you make, you may be right or you may be wrong. You could calculate a p-value that is not less than 0.05 and consequently fail to reject the null hypothesis, which may turn out to be true. This often occurs when a study has relatively few people. The opposite can also occur — a p-value less than 0.05 can actually be a chance finding rather than the true explanation of the outbreak. Table 6.10 Table of Chi-Squares Degrees of Freedom Probability .50 .20 .10 .05 .02 .01 .001 1 .455 1.642 2.706 3.841 5.412 6.635 10.827 2 1.386 3.219 4.605 5.991 7.824 9.210 13.815 3 2.366 4.642 6.251 7.815 9.837 11.345 16.268 4 3.357 5.989 7.779 9.488 11.668 13.277 18.465 5 4.351 7.289 9.236 11.070 13.388 15.086 20.517 10 9.342 13.442 15.987 18.307 21.161 23.209 29.588 15 14.339 19.311 22.307 24.996 28.259 30.578 37.697 20 19.337 25.038 28.412 31.410 35.020 37.566 43.315 25 24.337 30.675 34.382 37.652 41.566 44.314 52.620 30 29.336 36.250 40.256 43.773 47.962 50.892 59.703 Consider the gastroenteritis and beef consumption data presented in Table 6.8. The relative risk is 5.7, which most epidemiologists would deem a “strong” association between exposure and disease. In addition, the p-value is exceedingly small, less than 0.001, and far less than the commonly used cutoff of 0.05. So the investigators rejected the null hypothesis (that beef was not associated with illness) and adopted the alternative hypothesis (that beef was indeed associated with illness). In this outbreak, the association between eating beef at the banquet and gastroenteritis was both strong (RR=5.7) and statistically significant (p < 0.001). The chi-square test works well if the number of people in the study is greater than about 30. For smaller studies, a test called the Fisher Exact Test may be more appropriate. Because the Fisher Exact Test is tedious to calculate, let Epi Info or another computer program perform the calculations for you.
  • 455.
    Investigating an Outbreak Page6-44 Confidence intervals. An alternative to calculating a p-value is calculating a confidence interval. A 95% confidence interval, the interval used most commonly by epidemiologists, corresponds to a p=0.05 cut-off. In non-technical terms, a confidence interval for a risk ratio is the range of values of the risk ratio consistent with the data in a study. A wide confidence interval indicates that the study is consistent with a wide range of values, i.e., the study is not very precise in describing the strength of the association (risk ratio) between exposure and disease. A narrow confidence interval indicates that the risk ratio is fairly precise. Consider again the gastroenteritis data in Table 6.8. The 95% confidence interval for the risk ratio of 5.7 ranged from 2.2 to 14.6. This confidence interval indicates that the study is consistent with risk ratios for the beef/gastroenteritis association in that range. Because a confidence interval provides more information than a p- value does, many medical and epidemiologic journals now prefer confidence intervals to p-values. However, in the outbreak setting, the difference may be irrelevant. If the objective of an outbreak investigation is to identify the culprit such as a contaminated food, a relative risk and p-value may do just as well as a relative risk and confidence interval. Case-control studies A cohort study is feasible only when the population is well defined and can be followed over a period of time. However, in many outbreak settings, the population is not well defined and speed of investigation is important. In such settings, the case-control study becomes the study design of choice. In a case-control study, the investigator asks both case-patients and a comparison group of persons without disease (“controls”) about their exposures. Using the information about disease and exposure status, the investigator then calculates an odds ratio to quantify the relationship between exposure and disease. Finally, a p-value or confidence interval is calculated to assess statistical significance. Choosing controls. When designing a case-control study, one of the most important decisions is deciding who the controls should be. The controls must not have the disease being studied, but should represent the population in which the cases occurred. In other words, they should be similar to the cases except that they don’t have the disease. The controls provide the level of exposure you would expect to find among the case-patients if the null hypothesis were true. If exposure is much more common among the case-patients than among the controls, i.e., the observed exposure among case-patients is greater than expected exposure
  • 456.
    Investigating an Outbreak Page6-45 provided by the controls, then exposure is said to be associated with illness. In practice, choosing who the most appropriate control group is may be quite difficult. In addition, investigators must consider logistical issues, such as how to contact potential controls, gain their cooperation, ensure that they are free of disease, and obtain appropriate exposure data from them. In a community outbreak, a random sample of the healthy population may, in theory, be the best control group. In practice, however, persons in a random sample may be difficult to contact and enroll. Nonetheless, many investigators attempt to enroll such “population-based” controls through dialing of random telephone numbers in the community or through a household survey. Other common control groups consist of: • Neighbors of case-patients, • Patients from the same physician practice or hospital who do not have the disease in question, • Friends of case-patients. While controls from these groups may be more likely to participate in the study than randomly identified population-based controls, they may not be as representative of the population. If the control group is systematically different from the case group in certain ways, a true association between exposure and disease may be missed or a spurious association may be observed between a non- causal exposure and disease. A systematic difference between cases and controls that results in a mistaken estimate of the association between exposure and disease is called a bias. When designing a case-control study, you must consider a variety of other issues about controls, including how many to use. Sample size formulas are available to help you make this decision. In general, the more subjects (case-patients and controls) in a study, the easier it will be to find a statistically significant association. Often, the number of case-patients that can be enrolled in a study is limited by the size of the outbreak. For example, in a hospital, four or five cases may constitute an outbreak. Fortunately, potential controls are usually plentiful. In an outbreak of 50 or more cases, one control per case will usually suffice. In smaller outbreaks, you might use two, three, or four controls per case. Including more than four controls per case is rarely worth the effort in terms of increasing the statistical power of your investigation.
  • 457.
    Investigating an Outbreak Page6-46 As an example, consider again the outbreak of Legionnaires’ disease that occurred in Louisiana described at the end of Step 6. Investigators enrolled 27 case-patients into a case-control study. They also enrolled two controls per case, a total of 54 controls. Using descriptive epidemiology, the investigators did not see any connection with the town’s various cooling towers. Using analytic epidemiology, the investigators determined quantitatively that case-patients and controls were about equally exposed to cooling towers. However, case-patients were far more likely to shop at a particular grocery store, as shown in the following two-by-two table.35 Table 6.11 Exposure to Grocery Store A Among Cases and Controls, Legionellosis Outbreak — Louisiana, 1990 Cases Controls Total Exposed 25 28 53 Unexposed 2 26 28 Data Source: Mahoney FJ, Hoge CW, Farley TA, Barbaree JM, Breiman RF, Benson RF, McFarland LM. Communitywide outbreak of Legionnaires' disease associated with a grocery store mist machine. J Infect Dis 1992;165:736–9. Method for calculating the odds ratio: OR ad / bc Odds ratios. In most case-control studies, the population is not well defined, and the total number of people exposed (or unexposed) to a suspected vehicle or source is not known. Without a proper denominator, attack rates cannot be calculated. In the example above, since the investigators did not know how many community residents did or did not shop at Grocery Store A, they could not calculate attack rates or a risk ratio. For a case-control study, the measure of association of choice is the odds ratio. Fortunately, for a rare disease such as legionellosis and most other outbreak-associated diseases, the odds ratio from a case-control study approximates the relative risk that would have been found if a cohort study had been feasible. The odds ratio for Grocery Store A is calculated as: 25 x 26 / 28 x 2 = 11.6 An odds ratio of 11 is quite large, indicating that shopping at Grocery Store A was strongly associated with developing legionellosis. These data would seem to indicate that persons exposed to Grocery Store A had 11.6 times the odds of developing legionellosis than persons not exposed to that store. To test the statistical significance of this finding, a chi-square test can be computed using the formula shown earlier.
  • 458.
    Investigating an Outbreak Page6-47 For Grocery Store A, the chi-square is: = 81 x (25 x 26 – 28 x 2)2 53 x 28 x 27 x 54 = 28,579,716 / 2,163,672 = 13.02 Referring to Table 6.10, a chi-square of 13.02 corresponds to a p- value less than 0.001. A p-value this small indicates that the null hypothesis is highly improbable, and the investigators rejected the null hypothesis. The 95% confidence interval ranged from 2.3 to 78.7. Although this confidence interval is quite wide and includes a wide range of values compatible with the data in the study, it does not include the null hypothesis value of 1.0.
  • 459.
    Investigating an Outbreak Page6-48 Exercise 6.7 You are called to help investigate a cluster of 17 persons who developed brain cancer in an area over the past couple of years. Most, perhaps all, used cell phones. Which study design would you choose to investigate a possible association between cell phone use and brain cancer? Check your answers on page 6-62
  • 460.
    Investigating an Outbreak Page6-49 Exercise 6.8 Investigators conducted a case-control study of histoplasmosis among industrial plant workers in Nebraska.41 The following table shows the number of case-patients and controls who worked in Building X, near a recently excavated site. Cases Controls Total Building X 15 8 23 Other Building 7 23 30 Total 22 31 53 1. What is the appropriate measure of association? 2. Calculate this measure. 3. The chi-square is 9.41, and the 95% confidence interval is 1.6–25.1. How would you interpret your results? Check your answers on page 6-63
  • 461.
    Investigating an Outbreak Page6-50 Exercise 6.9 Consider the following data from an outbreak of gastroenteritis among college football players.42 At which meal do you think the critical exposure occurred? Ate Meal Did Not Eat Meal Meal #Ill (% Ill) Total #Ill (% Ill) Total 9/18 Breakfast 9 (90) 10 45 (46) 98 9/18 Lunch 50 (62) 81 4 (15) 27 9/18 Dinner 45 (52) 87 9 (43) 21 9/18 Late dinner 34 (54) 63 20 (44) 45 9/19 Breakfast 42 (49) 85 12 (52) 23 9/19 Lunch 39 (51) 76 15 (47) 32 Check your answers on page 6-63
  • 462.
    Investigating an Outbreak Page6-51 Step 9: Reconsider, refine, and re-evaluate hypotheses Unfortunately, analytic studies sometimes are unrevealing. This is particularly true if the hypotheses were not well founded at the outset. It is an axiom of field epidemiology that if you cannot generate good hypotheses (for example, by talking to some case- patients or local staff and examining the descriptive epidemiology and outliers), then proceeding to analytic epidemiology, such as a case-control study, is likely to be a waste of time. When analytic epidemiology is unrevealing, rethink your hypotheses. Consider convening a meeting of the case-patients to look for common links or visiting their homes to look at the products on their shelves. Consider new vehicles or modes of transmission. An investigation of an outbreak of Salmonella Muenchen in Ohio illustrates how a reexamination of hypotheses can be productive. In that investigation, a case-control study failed to implicate any plausible food source as a common vehicle. Interestingly, all case- households but only 41% of control households included persons aged 15–35 years. The investigators thus began to consider vehicles of transmission to which young adults were commonly exposed. By asking about drug use in a second case-control study, the investigators implicated marijuana as the likely vehicle. Laboratory analysts subsequently isolated the outbreak strain of S. Muenchen from several samples of marijuana provided by case- patients.43 Even when an analytic study identifies an association between an exposure and disease, the hypothesis may need to be honed. For example, in the investigation of Legionnaires’ disease (Table 6.11), what about Grocery Store A linked it to disease? The investigators asked case-patients and controls how much time they spent in the store and where they went in the store. Using the epidemiologic data, the investigators were able to implicate the ultrasonic mist machine that sprayed the fruits and vegetables. This association was confirmed in the laboratory, where the outbreak subtype of the Legionnaires’ disease bacillus was isolated from the water in the mist machine’s reservoir.35 Sometimes a more specific control group is needed to test a more specific hypothesis. For example, in many hospital outbreaks, investigators use an initial study to narrow their focus. They then conduct a second study, with more closely matched controls, to
  • 463.
    Investigating an Outbreak Page6-52 identify a more specific exposure or vehicle. In a large community outbreak of botulism in Illinois, investigators used three sequential case-control studies to identify the vehicle. In the first study, investigators compared exposures of case-patients and controls from the general public to implicate a restaurant. In a second study they compared restaurant exposures of case-patients and healthy restaurant patrons to identify a specific menu item, a meat and cheese sandwich. In a third study, investigators used radio broadcast appeals to identify healthy restaurant patrons who had eaten the implicated sandwich. Compared to case-patients who had also eaten the sandwich, controls were more likely to have avoided the onions that came with the sandwich. Type A Clostridium botulinum was then identified from a pan of leftover sautéed onions used to make only that particular sandwich.44 Finally, recall that one reason to investigate outbreaks is research. An outbreak may provide an “experiment of nature” that would be unethical to set up deliberately but from which the scientific community can learn when it does happen to occur. For example, the outbreak of West Nile virus in Queens, New York, in 1999 was promptly investigated to determine the extent of the outbreak and risk factors for disease so appropriate control measures could be developed and implemented.45 However, capitalizing on this unfortunate “experiment of nature,” investigators continued to follow the patients to determine the persistence of IgM and the prognosis of patients up to two years after infection.46, 47 Thus, the investigations resulted not only in the development of appropriate control and prevention strategies, but also in increased knowledge about a health problem not previously seen or studied in the Western hemisphere. When an outbreak occurs, whether it is routine or unusual, consider what questions remain unanswered about that particular disease and what kind of study you might do in this setting to answer some of those questions. The circumstances may allow you to learn more about the disease, its modes of transmission, the characteristics of the agent, host factors, and the like. Step 10: Compare and reconcile with laboratory and environmental studies While epidemiology can implicate vehicles and guide appropriate public health action, laboratory evidence can confirm the findings. The laboratory was essential in both the outbreak of salmonellosis linked to marijuana and in the Legionellosis outbreak traced to the grocery store mist machine. You may recall that the investigation of pneumonia among attendees of an American Legion conference
  • 464.
    Investigating an Outbreak Page6-53 in Philadelphia in 1976 that gave Legionnaires’ disease its name was not considered complete until a new organism was isolated in the laboratory some six months later.48 Environmental studies are equally important in some settings. They are often helpful in explaining why an outbreak occurred. For example, in the investigation of the outbreak of E. coli O157:H7 among visitors to a county fair, the epidemiologists were able to identify one very strong risk factor — consumption of beverages with ice purchased from a vendor in zone 6. Environmental inspection of the fairgrounds identified lack of chlorination of the well supplying water to that zone. Furthermore, the well was found to be close to the manure pits and a septic tank for the worker’s dormitory. Flourescein dye poured into the bathroom of the dorm found its way into the well water, revealing cross-contamination. Finally, laboratorians were able to culture E. coli from the well, the supply line, and the tap at zone 6.49 Thus the epidemiologic, environmental, and laboratory arms of the investigation complemented one another, and led to an inescapable conclusion that the well had been contaminated and was the source of the outbreak. While you may not be an expert in these other areas, you can help. Use a camera to photograph working or environmental conditions. Coordinate with the laboratory, and bring back physical evidence to be analyzed. Step 11: Implement control and prevention measures In most outbreak investigations, the primary goal is control of the outbreak and prevention of additional cases. Indeed, although implementing control and prevention measures is listed as Step 11 in the conceptual sequence, in practice control and prevention activities should be implemented as early as possible. The health department’s first responsibility is to protect the public’s health, so if appropriate control measures are known and available, they should be initiated even before an epidemiologic investigation is launched. For example, a child with measles in a community with other susceptible children may prompt a vaccination campaign before an investigation of how that child became infected. Confidentiality is an important issue in implementing control measures. Healthcare workers need to be aware of the confidentiality issues relevant to collection, management and sharing of data. For example, in the treatment of tuberculosis (TB), the relationship between the patient and the healthcare worker is extremely important because of the serious consequences of
  • 465.
    Investigating an Outbreak Page6-54 treatment failure. If patient information is disclosed to unauthorized persons without the patient’s permission, the patient may be stigmatized or experience rejection from family and friends, lose a job, or be evicted from housing. Moreover, the healthcare worker may lose the trust of the patient, which can affect adherence to TB treatment. Therefore, confidentiality — the responsibility to protect a patient’s private information — is critical in TB control and many other situations. 50 In general, control measures are usually directed against one or more segments in the chain of transmission (agent, source, mode of transmission, portal of entry, or host) that are susceptible to intervention. For some diseases, the most appropriate intervention may be directed at controlling or eliminating the agent at its source. A patient with a communicable disease such as tuberculosis, whether symptomatic or asymptomatic, may be treated with antibiotics both to clear the infection and to reduce the risk of transmission to others. For an environmental toxin or infectious agent that resides in soil, the soil may be decontaminated or covered to prevent escape of the agent. Some interventions are aimed at blocking the mode of transmission. Interruption of direct transmission may be accomplished by isolation of someone with infection, or counseling persons to avoid the specific type of contact associated with transmission. Similarly, to control an outbreak of influenza- like illness in a nursing home, affected residents could be cohorted, that is, put together in a separate area to prevent transmission to others. Vehicle borne transmission may be interrupted by elimination or decontamination of the vehicle. For example, contaminated foods should be discarded, and surgical equipment is routinely sterilized to prevent transmission. Efforts to prevent fecal-oral transmission often focus on rearranging the environment to reduce the risk of contamination in the future and on changing behaviors, such as promoting hand washing. For airborne diseases, strategies may be directed at modifying ventilation or air pressure, and filtering or treating the air. To interrupt vector borne transmission, measures may be directed toward controlling the vector population, such as spraying to reduce the mosquito population that may carry West Nile virus. Some simple and effective strategies protect portals of entry. For example, bed nets are used to protect sleeping persons from being bitten by mosquitoes that may transmit malaria. A dentist’s mask and gloves are intended to protect the dentist from a patient’s blood, secretions, and droplets, as well to protect the patient from
  • 466.
    Investigating an Outbreak Page6-55 the dentist. Wearing of long pants and sleeves and use of insect repellent are recommended to reduce the risk of Lyme disease and West Nile virus infection. Some interventions aim to increase a host’s defenses. Vaccinations promote development of specific antibodies that protect against infection. Similarly, prophylactic use of antimalarial drugs, recommended for visitors to malaria-endemic areas, does not prevent exposure through mosquito bites but does prevent infection from taking root. Step 12: Initiate or maintain surveillance Once control and prevention measures have been implemented, they must continue to be monitored. If surveillance has not been ongoing, now is the time to initiate active surveillance. If active surveillance was initiated as part of case finding efforts, it should be continued. The reasons for conducting active surveillance at this time are twofold. First, you must continue to monitor the situation and determine whether the prevention and control measures are working. Is the number of new cases slowing down or, better yet, stopping? Or are new cases continuing to occur? If so, where are the new cases? Are they occurring throughout the area, indicating that the interventions are generally ineffective, or are they occurring only in pockets, indicating that the interventions may be effective but that some areas were missed? Second, you need to know whether the outbreak has spread outside its original area or the area where the interventions were targeted. If so, effective disease control and prevention measures must be implemented in these new areas. Step 13: Communicate findings As noted in Step 1, development of a communications plan and communicating with those who need to know during the investigation is critical. The final task is to summarize the investigation, its findings, and its outcome in a report, and to communicate this report in an effective manner. This communication usually takes two forms: • An oral briefing for local authorities. If the field investigator is responsible for the epidemiology but not disease control, then the oral briefing should be attended by the local health authorities and persons responsible for implementing control and prevention measures. Often these persons are not epidemiologists, so findings must be presented in clear and convincing fashion with appropriate and justifiable recommendations for action. This
  • 467.
    Investigating an Outbreak Page6-56 presentation is an opportunity for the investigators to describe what they did, what they found, and what they think should be done about it. They should present their findings in a scientifically objective fashion, and they should be able to defend their conclusions and recommendations. • A written report. Investigators should also prepare a written report that follows the usual scientific format of introduction, background, methods, results, discussion, and recommendations. By formally presenting recommendations, the report provides a blueprint for action. It also serves as a record of performance and a document for potential legal issues. It serves as a reference if the health department encounters a similar situation in the future. Finally, a report that finds its way into the public health literature serves the broader purpose of contributing to the knowledge base of epidemiology and public health. In recent years, the public has become more aware of and interested in public health. In response, health departments have made great strides in attempting to keep the public informed. Many health departments strive to communicate directly with the public, usually through the media, both during an investigation and when the investigation is concluded. Epi-X is the CDC’s Web- based communications solution for public health professionals. Through Epi-X, CDC officials, state and local health departments, poison control centers, and other public health professionals can access and share preliminary health surveillance information quickly and securely. Users can also be actively notified of breaking health events as they occur. Key features of Epi-X include: • Scientific and editorial support • Controlled user access • Digital credentials and authentication • Rapid outbreak reporting • Peer-to-peer consultation.
  • 468.
    Investigating an Outbreak Page6-57 Summary Outbreaks occur frequently. Not every outbreak comes to light, but of those that do, public health agencies must decide whether to handle them without leaving the office, or spend the time, energy, and resources to conduct field investigations. The most important reason to investigate is to learn enough about the situation to implement appropriate control and prevention measures. Other reasons include taking the opportunity to advance knowledge about the disease, agent, risk factors, interventions and other scientific issues; responding to public, political, or legal concerns; evaluating a health program’s effectiveness and weaknesses; and to provide training. Outbreaks are almost always unexpected events. Sometimes they are the subject of media attention and public concern, so investigators feel pressured to work quickly to find answers. When multiple agencies are involved, coordination and communication become even more essential but are more complicated than usual. Often the investigation takes place in the field, far from the conveniences and routines one counts on in the office. Under these circumstances, it is essential to have a systematic plan for conducting the investigation. The steps listed in Table 6.2 comprise one such plan. Note that the order of the steps is conceptual, and investigators may decide that a different order is best suited for any given outbreak. To summarize, these are the steps of an outbreak investigation: • Planning for field work, establishing the existence of an outbreak, and verifying the diagnosis are usually the first steps, sometimes done in that order, sometimes done in reverse order, sometimes done simultaneously. (Steps 1–3) • After the diagnosis has been confirmed investigators create a workable case definition, then go out and look for additional cases. Information about these cases is organized either in a line listing or in a computer database that allows staffers to check for duplicate records, update records as additional information comes in, and perform descriptive epidemiology. (Steps 4-6) • Descriptive epidemiology — organizing the data by time, place, and person — is essential for characterizing the outbreak, identifying populations at risk, developing hypotheses about risk factors, and targeting control/prevention strategies. An epidemic curve — a histogram of number of cases by time of onset of illness — provides a handy visual display of the outbreak’s magnitude and time trend. (Step 6) • Hypotheses, based on what is known about the disease, descriptive epidemiology, and what others have postulated, must be developed before conducting any kind of epidemiologic study (what are you going to study if you don’t know what you are looking for?). (Step 7) • While not every outbreak requires an analytic study, those that do are usually addressed by either a cohort study or a case-control study. Both types of study attempt to identify associations between exposures (risk factors or causes) and the disease of interest. In a cohort study, best suited for an outbreak in a well-defined population such as guests at a wedding, investigators usually attempt to enroll everyone, determine exposures and outcomes, calculate attack rates, and compare attack rates with a risk ratio or relative risk to identify associations. In a case-control study, which is well suited for outbreaks without a well-defined population, investigators usually enroll all of the case-patients plus a
  • 469.
    Investigating an Outbreak Page6-58 sample of persons who did not get ill, then ask about exposures and compute an odds ratio to look for associations. (Step 8) • If needed, hypotheses can be refined and re-evaluated. In many investigations, while the epidemiologists are conducting their epidemiologic investigations, environmental health specialists and laboratorians are conducting studies and tests of their own. Ideally, this multidisciplinary approach points to a single conclusion. (Steps 9 and 10) • While implementing control and prevention measures is listed as Step 11, it is the primary goal of most outbreak investigations and usually occurs early in the investigation. Such measures can be implemented as soon as any link in the chain of disease transmission that is susceptible to intervention can be identified. If the source and mode of transmission is known, disease control measures need not wait. However, there is no guarantee that these measures will work, so continued surveillance is essential. (Steps 11 and 12) • Finally, communicating what was found and what should be or was done in a written report provides key public health, scientific, and legal documentation. (Step 13)
  • 470.
    Investigating an Outbreak Page6-59 Exercise Answers Exercise 6.1 Nine cases of cancer in a community represents a cluster — a group of cases in a given area over a particular period of time that seems to be unusual, although we do not actually know the size of the community, the background rate of cancer, and the number of cases that might be expected. Nonetheless, either the health department or the community or both is concerned enough to raise the issue. Under these circumstances, an investigation may be justified for several reasons. 1. Because the number of expected cases is not known (or at least not stated), one reason to investigate is to determine how many cases to expect in the community. In a large community, nine cases of a common cancer (for example, lung, breast, or colon cancer) would not be unusual. If the particular cancer is a rare type, nine cases even in a large community may be unusual. And in a very small community, nine cases of even a common cancer may be unusual. 2. If the number of cancer cases turns out to be high for that community, public health officials might choose to investigate further. They may have a research agenda — perhaps they can identify a new risk factor (workers exposed to a particular chemical) or predisposition (persons with a particular genetic trait) for the cancer. 3. Control and prevention may be the justification for additional investigation. If modifiable risk factors are known or identified, control and prevention measures can be developed. Alternatively, if the cancer is one that can treated successfully if found early, and a screening test is available, then investigation might focus on why these persons died from a treatable disease. If, for example, the nine cases were cancers of the cervix (detectable by Pap smear and generally nonfatal if identified and treated early), a study might identify: a) lack of access to healthcare; b) physicians not following the recommendations to screen women at appropriate intervals; and/or c) laboratory error in reading or reporting the test results. Measures to correct these problems, such as public screening clinics, physician education, and laboratory quality assurance, could then be developed. 4. If new staff need to gain experience in conducting cluster investigations, training might be a justification for investigating these cases. More commonly, cancer clusters generate public concern, which, in turn, often results in political pressure. Perhaps one of the affected persons is a member of the mayor’s family. A health department needs to be responsive to such concerns, and should investigate enough to address the concerns with facts. Finally, legal concerns may prompt an investigation, especially if a particular site (manufacturing plant, houses built on an old dump site, etc.) is accused of causing the cancers.
  • 471.
    Investigating an Outbreak Page6-60 Exercise 6.2 First, you should check the dates of onset rather than dates of report. The 12 reports could represent 12 recent cases, but could represent 12 cases scattered in time that were sent in as a batch. However, assuming that all 12 reports of tuberculosis and the 12 of West Nile virus infection represent recent cases in a single county, both situations could be called clusters (several new cases seen in a particular area during a relatively brief period of time). Classifying the cases as an outbreak depends on whether the 12 cases exceed the usual number of cases reported in August in that county. Tuberculosis does not have a striking seasonal distribution. The number of cases during August could be compared with: a) the numbers reported during the preceding several months; and b) the numbers reported during August of the preceding few years. West Nile virus infection is a highly seasonal disease that peaks during August-September- October. As a result, the number of cases in August is expected to be higher than the numbers reported during the preceding several months. To determine whether the number of cases reported in August is greater than expected, the number must be compared with the numbers reported during August of the preceding few years. Exercise 6.3 Initial Case Definition Patient 1: No, eosinophil count < 2,000 cells/mm3 Patient 2: Yes Patient 3: Yes Patient 4: Yes Patient 5: Yes Patient 6: No, eosinophil count < 2,000 cells/mm3 Patient 7: No, other known cancer of eosinophilia Revised Case Definition Patient 1: No, eosinophil count < 1,000 cells/mm3 and myalgias not severe Patient 2: Yes Patient 3: Yes Patient 4: No, myalgias not severe Patient 5: Yes Patient 6: Yes Patient 7: No, other known cancer of eosinophilia This illustrates that a case definition is a method for deciding whether to classify someone as having the disease of interest or not, not whether they actually do or do not have the disease. Patients 1 and 4 may have mild cases, and Patient 7 may have leukemia and eosinophilia- myalgia syndrome, but are classified as non-cases under the revised definition. Exercise 6.4 A case definition is a set of standard criteria for determining whether an individual should be categorized as having a particular disease or health-related condition. For an outbreak, a case definition consists of clinical criteria and specification of time, place, and person. A case definition can have degrees of certainty, e.g., suspect case (usually based on clinical and
  • 472.
    Investigating an Outbreak Page6-61 sometimes epidemiologic criteria) versus confirmed case (based on laboratory confirmation). The outbreak appeared to be limited to students (no adults reported illness), but included both tour groups. Some students had severe abdominal pain and diarrhea and stool cultures positive for E. coli O157. Clearly these should be counted as case-patients. Some students had the same symptoms but negative cultures. Should they be counted as case-patients? Still others had the same symptoms but no stool testing. Should they be counted as case-patients? Finally, two students had single bouts of diarrhea, but no abdominal pain and negative cultures. No one case definition is the absolutely correct case definition. One investigator could decide to include those with symptoms but without testing as suspect or probable cases, while another investigator could exclude them. Similarly, one investigator might put a great deal of faith in the stool culture and exclude those who tested negative, regardless of the presence of compatible symptoms, while another investigator might allow that some stool cultures could be “false negatives” (test negative even though the person actually has the infection) and include them in a suspect or probable or possible category. The two students with single bouts of diarrhea but no abdominal pain and negative cultures seem least likely to have true cases of E. coli infection. Similarly, the beginning time limit could be set on December 2, the date that Tour A departed, or could be set later, to account for the minimum incubation period. So, one case definition might be: PERSON: Any tenth-grade student who went on either tour PLACE: Limited to students at city high schools TIME: Onset since December 2? 3? 4? CLINICAL: Confirmed stool sample positive for E. coli O157:H7, regardless of symptoms SUSPECT: Self-reported severe abdominal pain and diarrhea >2 episodes/day, with stool culture not done; or self-reported abdominal pain and diarrhea >2 episodes/day and stool culture negative Exercise 6.5 ID # Age Sex Race Disease Date of Onset Lab Results Signs, Symptoms Physician 1 46 M W Lyme disease 8/1/2006 WB IgM+ EM,Fat,S,C Snow 2 56 F W Lyme disease 8/2/2006 WB IgM+, WB IgG+ EM,A,Fat,S,Fev Farr 3 40 F W Lyme disease 8/17/2006 WB IgM+, WB IgG+ EM Howard 4 53 M B Lyme disease 9/18/2006 WB IgM+, WB IgG- EM Fine 5 45 M W Lyme disease mid-May 2006 WB IgG+ A,Arthral, HA,Fat,S,C Howard 6 13 M B Lyme disease 2005 A,Arthral,Fat Steere A = arthritis Arthral = arthralgias C = chills EM = erythema migrans Fat = fatigue Fev = fever HA = headache S = sweats
  • 473.
    Investigating an Outbreak Page6-62 Exercise 6.6 1. 2. The date of onset of the earliest case was June 28. Subtracting the minimum incubation period (7 days) from June 28 points to June 21. The median and modal date of onset was June 29. Subtracting the average (say, 12 days) from June 29 points to June 17. So the most likely exposure period was sometime around June 17 through June 21, give or take a day or two on either side. Indeed, the investigators determined that exposure most likely occurred on June 19, when all ill persons either actively participated in or were nearby the sifting of dirt that probably harbored the organism. Exercise 6.7 Cell phones are quite popular. Noting that most if not all of the 17 patients had used cell phones does not indicate that cell phones are the cause of brain cancer. An epidemiologic study that compares the exposure experience of the case-patients with the exposure experience of persons without brain cancer is necessary. A case-control study is the design of choice, since 17 persons with the disease of interest have already been identified. As many as possible of the 17 persons with brain cancer should be enrolled in the case-control study as the case group. A group of persons without brain cancer need to be identified and enrolled as the control group. Whom would you enroll as controls? Remember that controls are supposed to represent the general exposure experience in the population from which the case- patients came. Controls could come from the same community (randomly selected telephone numbers, neighbors, friends) or the same healthcare providers (e.g., patients treated by the same neurologist but who do not have brain cancer). Once case-patients and controls are identified and enrolled, each would be questioned about exposure to cell phones. Finally, the exposure experience of case-patients and controls would be compared to determine whether case-patients were more likely to use cell phones, or use particular types of phones, or used them more frequently, or for longer cumulative time, etc.
  • 474.
    Investigating an Outbreak Page6-63 The alternative to a case-control study is a cohort study. For a cohort study you would have to enroll a group of cell phone users (“exposed group”) and a group of persons who do not use cell phones (“unexposed group”). You would then have to determine how many in each group develop brain cancer. Since brain cancer is a relatively rare event, you would need rather large groups in order to have enough brain cancer cases for the study to be useful. Therefore, a cohort study is less practical than a case-control study in this setting. Exercise 6.8 1. The appropriate measure of association for a case-control study is the odds ratio. 2. The odds ratio is calculated as the cross-product ratio: ad / bc. Odds ratio = 15 x 23 / 8 x 7 = 6.16 = 6.2 3. With a chi-square of 9.41 and a 95% confidence interval of 1.6–25.1, this study shows a very strong (odds ratio = 6.2) association between histoplasmosis and working in Building X. This finding is quite statistically significant (chi-square = 9.41 corresponds to a p-value between 0.01 and 0.001). And although the 95% confidence interval indicates that the study is compatible with a seemingly relatively wide range of values (1.6–25.1), most of these values indicate a strong if not stronger association than the one observed. Exercise 6.9 The first step in answering this question is to compare the attack rates (% ill) among those who ate the meal and those who did not eat the meal. Since the % ill is a measure of risk of illness, you could calculate a risk ratio for each meal. Date Risk Ratio 9/18 Breakfast 90% vs. 46% = 2.0 9/18 Lunch 62% vs. 15% = 4.1 9/18 Dinner 52% vs. 43% = 1.2 9/18 Late dinner 54% vs. 44% = 1.2 9/19 Breakfast 49% vs. 52% = 0.9 9/19 Lunch 51% vs. 47% = 1.1 Clearly, the September 18 lunch has the highest risk ratio. It has a relatively high attack rate (though not the highest) among those who ate the meal, and the lowest attack rate among those who did not eat the meal. Furthermore, almost all of the cases (50 out of 54) could be “accounted for” by that lunch. In contrast, although the September 18 breakfast has a high attack rate among those who ate that meal, it has a relatively high attack rate among those who did not eat that breakfast, and most importantly, it can only account for one-sixth (9 out of 54) of the cases. Perhaps the September 18 breakfast was a minor contributor, but most of the illness probably resulted from exposure that occurred at the September 18 lunch.
  • 475.
    Investigating an Outbreak Page6-64 SELF-ASSESSMENT QUIZ Now that you have read Lesson 6 and have completed the exercises, you should be ready to take the self-assessment quiz. This quiz is designed to help you assess how well you have learned the content of this lesson. You may refer to the lesson text whenever you are unsure of the answer. Unless instructed otherwise, choose ALL correct answers for each question. 1. Which are the most common ways that a local health department uncovers outbreaks? A. Performing descriptive analysis of surveillance data each week B. Performing time series analysis to detect deviations from expected values based on the previous few weeks and comparable periods during the previous few years C. Receiving calls from affected residents D. Receiving calls from healthcare providers E. Reviewing all case reports received each week to detect common features 2. Factors that influence a health department’s decision whether or not to conduct a field investigation in response to one or more cases of disease include: A. The nature of the disease B. The number of cases C. Resources available D. Health department’s traditional attitude toward conducting field investigations 3. If a particular outbreak presents an unusual opportunity to learn more about the disease and its epidemiology by conducting a study, but early disease control measures would interfere with the study, one should conduct the study quickly, then implement control measures immediately afterwards. A. True B. False 4. Use the following choices for Questions 14a–c. A. Disease control and prevention efforts take priority over investigation efforts B. Investigation efforts take priority over disease control and prevention efforts 4a. _____ Outbreak with known causative agent, source, and mode of transmission 4b. _____ Outbreak with known causative agent, but unknown source and mode of transmission 4c. _____ Outbreak with unknown causative agent, source, and mode of transmission
  • 476.
    Investigating an Outbreak Page6-65 5. Use the following steps of an outbreak investigation for Question 5: 1. Analyze data by time, place, and person 2. Conduct a case-control study 3. Generate hypotheses 4. Conduct active surveillance for additional cases 5. Verify the diagnosis 6. Confirm that the number of cases exceeds the expected number 7. Talk with laboratorians about specimen collection For an investigation of an outbreak, what is the logical conceptual order of the steps listed above? A. 1-2-3-4-5-6-7 B. 5-6-4-1-2-3-7 C. 6-5-3-1-2-7-4 D. 6-5-7-4-1-3-2 6. To avoid skipping a critical step, investigators should conduct the steps of an outbreak investigation in the precise order you answered in Question 5. A. True B. False 7. Use the following choices for Questions 7a–c. A. Cluster B. Epidemic C. Outbreak 7a. _____ 200 cases of Marburg virus infection in several districts in Angola over several months (usually none) 7b. _____ 40 cases of Salmonella Enteritidis in 1 week traced to a single meal served at a cafeteria (usually none) 7c. _____ 10 cases of cancer diagnosed over 2 years among residents of a single neighborhood (previous data not available) 8. Why should an investigator who has no clinical background nonetheless talk to a patient or two as an early step in the outbreak investigation? A. To advise the patient about common risk factors and the usual course of the illness, after reviewing such information in appropriate reference material B. To develop hypotheses about the cause of the outbreak C. To learn more about the clinical manifestations of the disease D. To verify the clinical findings as part of verifying the diagnosis E. To verify the laboratory findings as part of verifying the diagnosis 9. A case definition during an outbreak investigation should specify: A. Clinical features B. Time C. Place D. Person E. Hypothesized exposure
  • 477.
    Investigating an Outbreak Page6-66 10. Ideally, a case definition is 100% accurate in identifying who does and does not have the disease in question, but in reality few case definitions achieve this ideal. A. True B. False 11. Once a case definition for an outbreak investigation has been established, it should not be changed. A. True B. False 12. Common methods of identifying additional cases (expanding surveillance) as part of an outbreak investigation include: A. Advising the public through newspapers, TV, radio, and the health department’s website to contact the local health department B. Asking case-patients who they were with at the time of exposure (if known) C. Sending a fax to healthcare providers D. Telephoning the infection control practitioners at local hospitals 13. A case report form devised for an outbreak investigation usually includes which of the following types of information? A. Identifying information B. Demographic information C. Clinical information D. Risk factor information E. Reporter, interviewer, or data abstractor information 14. Descriptive epidemiology is essential for “characterizing the outbreak” by time, place, and person, but has little bearing on the analytic epidemiology. A. True B. False
  • 478.
    Investigating an Outbreak Page6-67 15. Use the following epi curves as choices for Questions 15a–c. Match the epi curve with the outbreak description. 15a._____ A malfunctioning space heater was used each time the outside temperature dropped below freezing 15b._____ At the Eclipse Restaurant, sodium nitrite was mistaken for table salt in the preparation of breakfast one morning only 15c._____ Common cold passed from classmate to classmate
  • 479.
    Investigating an Outbreak Page6-68 16. Use the following epidemic curve for Question 16. A group of tourists on a weeklong bus tour of a European country experienced an outbreak of norovirus. The group had followed a consistent meal time pattern: each morning they had breakfast together in whichever hotel they had stayed from 6:00 a.m. to 7:00 a.m., stopped for lunch from 1:00 p.m. to 2:00 p.m., then had dinner together either at the next hotel or at a restaurant at about 7:00 p.m. The incubation period for norovirus is about 24-48 hours, with a median of about 33 hours. On which day and at which meal was exposure most likely? A. April 19 Dinner B. April 20 Breakfast C. April 20 Lunch D. April 20 Dinner E. April 21 Breakfast 17. Possible explanations for a case that occurs substantially later than the other cases in an outbreak include: A. Similar but unrelated disease B. Secondary case C. Case with unusually long incubation period D. Time of exposure later than others E. Error in recording date 18. A spot map is particularly useful for displaying: A. Geographic location of exposure of each case-patient B. Residence of each case-patient C. Incidence rate of disease by area D. Prevalence rate of disease by area 19. Which of the following may be useful in generating hypotheses in an outbreak setting? A. Review the literature B. Look at the descriptive epidemiology C. Look at the outliers D. Talk with the local health authorities E. Talk with a few of the case-patients F. Talk with subject matter experts
  • 480.
    Investigating an Outbreak Page6-69 20. The key feature of an analytic (epidemiologic) study is: (Select only one answer) A. Analysis by time, place, and person B. Calculation of a risk ratio or odds ratio C. Use of Epi Info to analyze the data D. Presence of a comparison group 21. Disease control measures can be directed at the: A. Agent B. Source C. Mode of transmission D. Portal of entry E. Host susceptibility Use the information in the following paragraph and data in the table for Questions 22–25. An outbreak of gastrointestinal disease occurred 24-36 hours after people had attended a wedding. Of the 203 attendees (including the bride and groom), 200 completed questionnaires, and 50 reported illness compatible with the case definition. Tabulated food consumption histories are presented in the table below. Ate Specified Food Did Not Eat Specified Food Food Item Ill Well Total Ill Well Total Punch 46 (25%) 138 184 4 (25%) 12 16 Wedding Cake 45 (45%) 55 100 5 (5%) 95 100 Sushi 10 (91%) 1 11 40 (21%) 149 189 22. This study is an example of a retrospective cohort study. A. True B. False 23. The most appropriate measure of association for these data is the: A. Attributable risk percent B. Chi-square C. Odds ratio D. Risk ratio 24. Which food is the most likely culprit? A. Punch B. Wedding cake C. Sushi D. Can’t determine from the data presented. E. Must be more than one food.
  • 481.
    Investigating an Outbreak Page6-70 25. Results of this outbreak investigation should be communicated to: A. The caterer B. Local officials C. Wedding party family and attendees D. World Health Organization
  • 482.
    Investigating an Outbreak Page6-71 Answers to Self-Assessment Quiz 1. C, D. Most outbreaks come to the attention of health authorities because an alert clinician or a concerned case-patient (or parent of a case-patient) calls. The other methods listed occasionally detect outbreaks, but less frequently. 2. A, B, C, D. Factors influencing a health department’s decision to conduct a field investigation include some related to the health problem itself (e.g., severity of illness, number of cases, availability of prevention / control measures), some relate to the health department (e.g., “corporate culture” for conducting field investigations versus handling it by telephone, available staff and resources), and some relate to external concerns (e.g., public or political pressure). 3. B (False). The most important public health reason for investigating an outbreak is disease control and prevention. Protecting and promoting the public’s health is our primary mission, even if it interferes with our ability to conduct research. 4a. A. As in Answer 3, our primary mission is to protect the public’s health, so disease control and prevention measures should take priority whenever possible. Because disease prevention and control measures are often aimed at interrupting transmission, such measures can be implemented if the source and mode of transmission are known. 4b. B. If the agent is known but the source and mode of transmission are not known (example: Salmonella eventually traced to marijuana), then the health department does not know how to target its intervention. Investigation to learn the source and/or mode is necessary. 4c. B. As in Answer 4b, If the agent, source, and mode of transmission are not known (examples: Legionnaires’ Disease in Philadelphia in 1976; Kawasaki Syndrome — if it turns out to be an infectious disease), then the health department does not know how to target its intervention. Investigation to learn the source and/or mode is necessary. 5. D. Early steps include confirming that the number of cases exceeds the expected number, verifying the diagnosis, and preparing for field work (which includes talking with laboratorians about specimen collection). Next steps include conducting surveillance to identify additional cases; analyzing the data by time, place, and person; generating hypotheses; and evaluating those hypotheses (for example, by conducting a case-control study). 6. B (False). The order presented in this text is conceptual. In practice, the order can be different. For example, preparing for field work often follows establishing the existence of an outbreak and verifying the diagnosis. When possible, control measures are initiated at the same time the field investigation begins, or even earlier. 7a. B. Epidemic, the occurrence of more cases of disease than expected in a given area or among a specific group of people over a particular period of time, tends to refer to more widespread occurrence than outbreak. 7b. C. Outbreak tends to be used for an increase that is localized.
  • 483.
    Investigating an Outbreak Page6-72 7c. A. Cluster is an aggregation of cases in a given area over a particular period of time that seems unusual or suspicious, but often the usual or expected number of cases is not known. 8. B, C. Even an investigator without a clinical background should, if possible, see and talk to a patient or two to gain a better understanding of the clinical features of the disease (needed for developing a case definition) and to generate hypotheses by asking about possible exposures. 9. A, B, C, D. A case definition for an outbreak should specify clinical criteria as well as appropriate time, place, and person characteristics. The case definition should NOT include the hypothesized exposure of interest. First, the hypothesized exposure may not turn out to be the true exposure, so inclusion of the hypothesized exposure as part of the case definition during the case-finding step may result in missed cases. Second, during the analytic step, disease status and exposure must be determined independently to avoid bias. Including exposure as part of the case definition means that all cases will, by definition, be exposed, while only some of the controls will likely be exposed. As a result, the exposure will appear to be associated with disease, not necessarily because it is the true exposure, but because of the case definition. 10. A (True). A case definition is a decision making tool. It provides criteria for classifying illness as a “case” or “not a case.” However, few case definitions are 100% accurate, because people with mild or atypical or asymptomatic disease are likely to be missed, and people with similar but not the same disease may be included. Even a case definition that requires a laboratory test is not 100% perfect, because laboratory tests themselves are not perfect. 11. B (False). On the one hand, case definitions need to be applied consistently, so that everyone involved in an investigation defines a case in the same way. On the other hand, case definitions can change during the course of an outbreak. For example, for case finding purposes, a case definition might include categories such as confirmed, probable, and possible, to try to include as many cases as possible. Later on, in the analytic phase, the case definition may be restricted to the confirmed cases. As another example, a case definition may initially be restricted to a particular community. If the outbreak spreads beyond that geographic area, the “place” component of the case definition also would need to be expanded. 12. A, B, C, D. To identify additional cases as part of an outbreak investigation, health department staff contact (by telephone, broadcast fax, or e-mail) physicians’ offices, clinics, hospitals, and laboratories. Depending on the affected age group, staff might also contact day care centers, schools, employers, or nursing homes. Sometimes a press release is issued to local media outlets that inform the public and suggest that persons with particular symptoms or exposures contact their healthcare providers or health department. In addition, health department staff routinely interview case-patients and ask whether they know any persons with the same exposure, if known, or with the same illness. 13. A, B, C, D, E. A data collection form for an outbreak investigation should include patient identifying information (e.g., name, telephone number), demographic information (e.g., age, sex), clinical information (e.g., date of onset, laboratory confirmation, whether
  • 484.
    Investigating an Outbreak Page6-73 hospitalized), risk factor information (disease-specific, e.g., attended sports banquet (yes/no), previously vaccinated?), and information about who collected the data (e.g., interviewer or abstracter initials, date of collection). 14. B (False). Descriptive epidemiology is essential not only for characterizing the pattern and distribution of the outbreak, but also for generating testable hypotheses about the source, mode of transmission, and risk factors for illness. Two of the suggested ways for generating hypotheses are to review the descriptive epidemiology, particularly (1) the overall pattern of cases and develop hypotheses about what they have in common, and (2) the outliers to determine how they might be linked to the other cases. These hypotheses, in turn, are the ones that are tested using analytic epidemiology. 15a. C. This scenario represents an intermittent exposure. The resulting epidemic curve has cases that appear to be occurring sporadically, but in fact occur when the malfunctioning heater is turned on at irregular intervals. 15b. A. This scenario represents a point source exposure. The epidemic curve has a single peak, and all cases occur during a single incubation period. 15c. D. This scenario represents person-to-person transmission. The epidemic curve has a succession of “waves” of cases. 16 D. Subtracting 24 hours (the minimum incubation period) from the time of onset of the first case puts you in the April 20 Dinner interval. Subtracting 33 hours from the median case (which occurred in the 4-8 AM interval) on April 22), puts you in the April 20 4-7 pm interval, near both lunch and dinner that day. While the minimum method points to dinner on April 20, thorough investigators would probably investigate possible exposures at lunch that day, too. 17. A, B, C, D, E. A late case on an epidemic curve has several possible explanations, including a case of a similar but unrelated disease, a secondary case (assuming it occurs one incubation period after another case), a case with an unusually long incubation period, a case that resulted from exposure at a different time (for example, someone who ate leftovers the next day), or an error in recall or in recording the date. 18. A, B. A spot map is useful for pinpointing the geographic location of exposures, residences, employment sites, and the like. The spots represent occurrences, either of exposure or disease. Spot maps are not used to display rates. Rather, area maps (also called shaded or chloropleth maps) are used to display incidence and prevalence rates. 19. A, B, C, D, E, F. Hypotheses can be generated in a variety of ways. One way is based on subject matter knowledge derived by reviewing the literature or talking with experts – what are the usual causes, sources, vehicles, or modes of transmission? Other ways include reviewing the overall pattern and the outliers from the descriptive epidemiology, by asking case-patients if they have any suspicions about the cause of their illness, and by asking the same question of local authorities (if you are from out of town). 20. D. The key feature that characterizes an analytic (epidemiologic) study is presence of a comparison group. Single case reports and case series do not have comparison groups and are not analytic studies. Cohort studies (compares disease experience among exposed and
  • 485.
    Investigating an Outbreak Page6-74 unexposed groups) and case-control studies (compares exposure experience among persons with and without disease) have comparison groups and are analytic studies. 21. A, B, C, D, E. Disease control measures can be directed at the eliminating the agent (e.g., by sterilizing surgical equipment), interrupting transmission (e.g., reducing mosquito population, covering one’s mouth when coughing), preventing entry into a host (e.g., wearing a mask, using insect repellant), or improving host defenses (e.g., by immunization). 22. A. A retrospective cohort study is one in which disease has already occurred (hence, retrospective) and the investigator enrolls all (or almost all) of a population (hence, cohort). The investigator then determines exposures and calculates risks (attack rates) for different exposures and risk ratios (relative risks) for those exposed and unexposed. The study described for Questions 22-25 meets this characterization. 23. D. The measure of association recommended for a retrospective cohort study is a risk ratio, calculated as the ratio of the risk of disease among those exposed divided by the risk of disease among those not exposed. The attributable risk percent is a supplemental measure that quantifies how much of the disease could be “explained” or accounted for by a particular exposure. The chi-square is not a measure of association, but a test of statistical significance (which is affected both by the strength of association and number of subjects in the study). The odds ratio is used primarily as a measure of association in case-control studies. 24. B. The wedding cake (risk ratio = 45% / 5% = 9.0) is the most likely culprit. It has a high attack rate among the exposed group, a low attack rate among the unexposed group, and can account for 45 out of the 50 cases. The five “unaccounted for” cases are within the range that can be “explained away,” for example by misreporting (for example, a man takes a bite of his partner’s cake but reports “no” for cake because he didn’t take a whole piece himself), poor recall, etc. Punch is not associated with illness at all (risk ratio = 25% / 25% = 1.0). Sushi has an extremely high attack rate among those exposed (91%), but a relatively high attack rate among those unexposed (21%), and most importantly, could only account for 10 of the 50 cases. 25. A, B, C. The results should be communicated to all those who need or want to know, including the concerned family and wedding attendees, local governmental officials, the caterer, the church or facility where the wedding was held, et al. The outbreak is also reportable to the state health department, who in turn is likely to report it to CDC. However, local outbreaks do not need to be reported to the World Health Organization.
  • 486.
    Investigating an Outbreak Page6-75 References 1. Olsen SJ, MacKinon LC, Goulding JS, Bean NH, Slutsker L. Surveillance for foodborne disease outbreaks — United States, 1993-1997. In: Surveillance Summaries, March 27, 2000. MMWR 2000; 49(No. SS-1):1–59. 2. Keene WE, Hedberg K, Herriott DE, Hancock DD, McKay R, Barrett T, Fleming D. A prolonged outbreak of Escherichia coli O157:H7 infections caused by commercially distributed raw milk. J Infect Dis 1997;176:815–8. 3. Marx M. Diarrheal illness detected through syndromic surveillance after a massive blackout, New York City. Presented at 2003 National Syndromic Surveillance Conference. 4. Swaminathan B, Barrett TJ, Hunter SB, Tauxe RV. PulseNet: the molecular subtyping network for foodborne bacterial disease surveillance, United States. Emerg Infect Dis 2001; 7:382–9. 5. Preston R. West Nile mystery. The New Yorker, October 18–25,1999;90–107. 6. Bush LM, Abrams BH, Beall A, Johnson CC. Index case of fatal inhalational anthrax due to bioterrorism in the United States, N Engl J Med 2001;345:1607–10. 7. Bender AP, Williams AN, Johnson RA, Jagger HG. Appropriate public health responses to clusters: the art of being responsibly responsive. Am J Epidemiol 1990;132:S48–S52. 8. Fiore BJ, Hanrahan LP, Anderson HA. State health department response to disease cluster reports: a protocol for investigation. Am J Epidemiol 1990;132:S14–22. 9. Washington State Department of Health. Guidelines for investigating clusters of chronic disease and adverse birth outcomes [monograph on the Internet]. Olympia, Washington; 2001 [cited 2006 Sep 19]. 10. Goodman RA, Buehler JW, Koplan JP. The epidemiologic field investigation: science and judgment in public health practice. Am J Epidemiol 1990;132:9–16. 11. Galil K, Lee B, Strine T, Carraher C, Baughman AL, Eaton M, et al. Outbreak of varicella at a day-care center despite vaccination. New Engl J Med 2002;347:1909–15. 12. Tugwell BD, Lee LE, Gillette H, Lorber EM, Hedberg K, Cieslak PR. Chickenpox outbreak in a highly vaccinated school population. Pediatrics. 2004;113:455–9. 13. Hopkins RS, Juranek DD. Acute giardiasis: an improved clinical case definition for epidemiologic studies. Am J Epidemiol 1991;133:402–7. 14. Fischer TK, Gentsch J, Ashley D, et al. Evaluation and utility of a novel diagnostic method in the investigation of an unusual outbreak of rotavirus diarrhea among children — Jamaica, 2003. Presented at: 53rd Annual EIS Conference, CDC, Atlanta, Georgia, April 19-23, 2004.
  • 487.
    Investigating an Outbreak Page6-76 15. Raupach JC, Hundy RL. An outbreak of Campylobacter jejuni infection among conference delegates. Commun Dis Intell 2003;27:380–3. 16. Kuusi M, Nuorti JP, Maunula L, Miettinen I, Pesonen H, von Bonsdorff C-H. Internet use and epidemiologic investigation of gastroenteritis outbreak. Emerg Infect Dis 2004;10:447–50. 17. Pryor JH, Martin MT, Whitney CG, Turco JH, Baumgartner YY, Zegans ME. Rapid response to a conjunctivitis outbreak: the use of technology to leverage information. J Am Coll Health 2002;50:267–71. 18. Caldwell GG. Twenty-two years of cancer cluster investigations at the Centers for Disease Control. Am J Epidemiol 1990;132:S43–S47. 19. Schulte PA, Ehrenberg RL, Singal M. Investigation of occupational cancer clusters: theory and practice. Am J Public Health 1987;77:52–6. 20. Cartwright RA. Cluster investigations: are they worth it? Med J Aust 1999;171:p. 172. 21. Centers for Disease Control and Prevention. NIOSH health hazard evaluation program. Cincinnati, Ohio: Department of Health and Human Services (NIOSH) Publication No. 2000-132: p. 3 22. Palmer SR. Epidemiology in search of infectious diseases: methods in outbreak investigation. J Epidemiol Comm Health 1989;43:311–4. 23. Last JM. A dictionary of epidemiology, 4th ed. New York: Oxford U Press, 2001:129. 24. PAHO. Case definitions: meningococcal disease and viral meningitis. Epidemiol Bull 2001;22(4):14–6. 25. Centers for Disease Control and Prevention. Eosinophilia-myalgia syndrome — New Mexico. MMWR 1989;38:765–7. 26. Centers for Disease Control and Prevention. Eosinophilia-myalgia syndrome and L- tryptophan-containing products — New Mexico, Minnesota, Oregon, and New York, 1989. MMWR 1989;38:785–8. 27. Centers for Disease Control and Prevention. Public health dispatch: outbreak of listeriosis — northeastern United States, 2002. MMWR 2002;51:950–1. 28. Jernigan DB, Raghunathan PL, Bell BP, Brechner R, Bresnitz EA, Butler JC, et al. Investigation of bioterrorism-related anthrax, United States, 2001: epidemiologic findings. Emerg Infect Dis 2002;8:1019–28. 29. Heyman DL, ed. Control of communicable diseases manual, 18th ed. Washington, DC: American Public Health Association, 2004. 30. Peterson LR, Marshall SL, Barton-Dickson C, Hajjeh RA, Lindsley MD, Warnock DW, et al. Coccidioidomycosis among workers at an archaeologic site, northeast Utah. Emerg Infect Dis 2004;10:637–42.
  • 488.
    Investigating an Outbreak Page6-77 31. Snow J. Snow on cholera. London: Humphrey Milford: Oxford U Press, 1936. 32. Tan C. A preventable outbreak of pneumococcal pneumonia among unvaccinated nursing home residents–New Jersey, 2001. Presented at Northeast Regional Epidemic Intelligence Service Conference, March 14, 2002, New York City. 33. Lukacs SL, Hsu V, Harper S, Handzel T, Hayslett J, Khabbaz R, et al. Anthrax outbreak averted: public health response to a contaminated envelope on Capital Hill–Washington, DC, 2001. Presented at 51st Annual Epidemic Intelligence Service Conference, April 22- 26, 2004, Atlanta. 34. Ramsey AH, Belongia EA, Gale CM, Davis JP. Outcomes of treated human granulocytic ehrlichiosis cases. Emerg Infect Dis 2002;8:383–401. 35. Mahoney FJ, Hoge CW, Farley TA, Barbaree JM, Breiman RF, Benson RF, McFarland LM. Communitywide outbreak of Legionnaires’ disease associated with a grocery store mist machine. J Infect Dis 1992;165: 736–9. 36. Torok TJ, Tauxe RV, Wise RP, Livengood JR, Sokolow R, Mauvais S, et al. A large community outbreak of salmonellosis caused by intentional contamination of restaurant salad bars. JAMA 1997;278:389–95. 37. Hedberg CW, Fishbein DB, Janssen RS, Meyers B, McMillen JM, MacDonald KL, et al. An outbreak of thyrotoxicosis caused by the consumption of bovine thyroid gland in ground beef. N Engl J Med 1987;316:993–8. 38. Jacobus CH, Holick MF, Shao Q, Chen TC, Holm IA, Kolodny JM, et al. Hypervitaminosis D associated with drinking milk. New Engl J Med 1992;326:1173–7. 39. Blank S, Scanlon KS, Sinks TH, Lett S, Falk H. An outbreak of hypervitaminosis D associated with the overfortication of milk from a home-delivery dairy. Am J Public Health 1995;85:656–9. 40. Jani AA, Barrett E, Murphy J, Norton D, Novak C, Painter J, Toney D. A steamship full of trouble: an outbreak of Salmonella Typhimurium DT 104 gastroenteritis at a holiday banquet — Virginia, 2003. Presented at the 53rd Annual Epidemic Intelligence Service Conference; 2004 Apr 19-23; Atlanta. 41. Centers for Disease Control and Prevention. Outbreak of histoplasmosis among industrial plant workers — Nebraska, 2004. MMWR 2004;53:1020–2. 42. Becker KM, Moe CL, Southwick KL, MacCormack JN. Transmission of Norwalk virus during a football game. N Engl J Med 2000;343;1223–7. 43. Taylor DN, Wachsmuth IK, Shangkuan YH, Schmidt EV, Barrett TJ, Schrader JS, et al. Salmonellosis associated with marijuana: a multistate outbreak traced by plasmid fingerprinting. New Engl J Med 1982;306:1249–53. 44. MacDonald KL, Spengler RF, Hatheway CL, Hargrett NT, Cohen ML. Type A botulism from sauteed onions. JAMA 1985;253:1275–8.
  • 489.
    Investigating an Outbreak Page6-78 45. Nash D, Mostashari F, Fine A, Miller J, O’Leary D, Murray K, et al. The outbreak of West Nile virus infection in the New York City area in 1999. N Engl J Med 2001;344:1807–14. 46. Roehrig JT, Nash D, Maldin B, Labowitz A, Martin DA, Lanciotti RS, et al. Persistence of virus-reactive serum immunoglobulin M antibody in confirmed West Nile virus encephalitis cases. Emerg Infect Dis 2003;9:376–9. 47. Klee AL, Maldin B, Edwin B, IPoshni I, Mostashari F, Fine A, et al. Long-term prognosis for clinical West Nile Virus infection. Emerg Infect Dis 2004;10:1405–11. 48. Fraser DW, Tsai TF, Orenstein W, Parkin WE, Beecham HJ, Sharrar RG, et al. Legionnaires’ disease: description of an epidemic of pneumonia. N Engl J Med 1977;297:1189–97. 49. Bopp DJ, Saunders BD, Waring AL, Waring AL, Ackelsberg J, Dumas N, et al. Detection, isolation, and molecular subtyping of Escherichia coli O157:H7 and Campylobacter jejuni associated with a large waterborne outbreak. J Clin Microbiol 2003;41:174–80. 50. Division of Tuberculosis Elimination [Internet]. Atlanta: CDC; [updated 1999 Oct; cited 2006 Sep 19]. Self study modules on Tuberculosis, Module 7: Confidentiality in Tuberculosis Control: Background. Available from: http://www.cdc.gov/tb/education/ssmodules/module7/ss7contents.htm Websites For more information on: Visit the following websites: MMWR Guidelines for Confirmation for Foodborne-Disease Outbreaks http://www.cdc.gov/mmwr/preview/mmwrhtml/00044 239.htm Guide to Confirming a Diagnosis in Foodborne Disease http://www.cdc.gov/outbreaknet/references_resources/ guide_confirming_diagnosis.html
  • 490.
    Glossary Page 1 GLOSSARY A active immunitysee immunity, active. active surveillance see surveillance, active. age-adjusted mortality rate see mortality rate, age-adjusted. agent a factor (e.g., a microorganism or chemical substance) or form of energy whose presence, excessive presence, or in the case of deficiency diseases, relative absence is essential for the occurrence of a disease or other adverse health outcome. age-specific mortality rate see mortality rate, age-specific. alternative hypothesis see hypothesis, alternative. analytic epidemiology see epidemiology, analytic. analytic study see study, analytic. antibody any of a variety of proteins in the blood that are produced in response to an antigen as an immune response. antigen any substance (e.g., a toxin or the surface of a microorganism or transplanted organ) recognized as foreign by the human body and that stimulates the production of antibodies. applied epidemiology see epidemiology, applied. arbovirus any of a group of viruses that are transmitted between hosts by mosquitoes, ticks, and other arthropods. arithmetic mean see mean, arithmetic. arithmetic-scale line graph see line graph, arithmetic-scale. arthropod an organism that has jointed appendages and segmented external skeleton (e.g., flies, mosquitoes, ticks, or mites). association the statistical relation between two or more events, characteristics, or other variables. asymmetrical a type of distribution where the shape to the right and left of the central location is not the same. Often referred to as a skewed distribution; the mean, median, and mode of an asymmetrical distribution are not the same. asymptomatic without symptoms.
  • 491.
    Glossary Page 2 attack ratea form of incidence that measures the proportion of persons in a population who experience an acute health event during a limited period (e.g., during an outbreak), calculated as the number of new cases of a health problem during an outbreak divided by the size of the population at the beginning of the period, usually expressed as a percentage or per 1,000 or 100,000 population (see also incidence proportion). attack rate, secondary a measure of the frequency of new cases of a disease among the contacts of known patients. attributable proportion see proportion, attributable. attributable risk percent see proportion, attributable. attribute a risk factor that is an intrinsic characteristic of the individual person, animal, plant, or other type of organism under study (e.g., genetic susceptibility, age, sex, breed, weight). axis one of the dimensions of a graph in a rectangular graph, the x-axis is the horizontal axis, and the y-axis is the vertical axis. B bar chart a visual display in which each category of a variable is represented by a bar or column bar charts are used to illustrate variations in size among categories. bar chart, 100% component a stacked bar chart in which all bars or columns are the same length, and the measured axis represents 0%–100%. bar chart, deviation a bar chart displaying either positive or negative differences from a baseline. bar chart, grouped a bar chart displaying quantities of two variables, represented by adjoining bars or columns (i.e., a group) of categories of one variable, separated by space between groups. bar chart, stacked a bar chart displaying quantities of two variables, represented by subdivided bars or columns (the subdivisions representing the categories of one variable) separated by space between bars or columns. bias a systematic deviation of results or inferences from the truth or processes leading to such systematic deviation; any systematic tendency in the collection, analysis, interpretation, publication, or review of data that can lead to conclusions that are systematically different from the truth. In epidemiology, does not imply intentional deviation. bias, information systematic difference in the collection of data regarding the participants in a study (e.g., about exposures in a case-control study, or about health outcomes in a cohort study) that leads to an incorrect result (e.g., risk ratio or odds ratio) or inference. bias, selection systematic difference in the enrollment of participants in a study that leads to an incorrect result (e.g., risk ratio or odds ratio) or inference. bimodal having two data peaks.
  • 492.
    Glossary Page 3 biologic transmissionsee transmission, biologic. birth cohort see cohort, birth. birth rate, crude the number of live births during a specified period divided by the mid-period population, usually expressed per 1,000 population. box plot a visual display that summarizes data by using a "box and whiskers" format to indicate the minimum and maximum values (ends of the whiskers), interquartile range (length of the box), and median (line through the box). C carrier a person or animal that harbors the infectious agent for a disease and can transmit it to others, but does not demonstrate signs of the disease. A carrier can be asymptomatic (never indicate signs of the disease) or can display signs of the disease only during the incubation period, convalescence, or postconvalescence. The period of being a carrier can be short (a transient carrier) or long (a chronic carrier). case an instance of a particular disease, injury, or other health conditions that meets selected criteria (see also case definition). Using the term to describe the person rather than the health condition is discouraged (see also case-patient). case-control study see study, case-control. case definition a set of uniformly applied criteria for determining whether a person should be identified as having a particular disease, injury, or other health condition. In epidemiology, particularly for an outbreak investigation, a case definition specifies clinical criteria and details of time, place, and person. case-fatality rate (also called case-fatality ratio) the proportion of persons with a particular condition (e.g., patients) who die from that condition. The denominator is the number of persons with the condition; the numerator is the number of cause-specific deaths among those persons. case, index the first case or instance of a patient coming to the attention of health authorities. case-patient in a case-control study, a person who has the disease, injury, or other health condition that meets the case definition (see also case). case, source the case or instance of a patient responsible for transmitting infection to others; the instance of a patient who gives rise to an outbreak or epidemic. cause, component a factor that contributes to a sufficient cause (see also cause, sufficient). cause of disease a factor (e.g., characteristic, behavior, or event) that directly influences the occurrence of a disease. Reducing such a factor among a population should reduce occurrence of the disease. cause, necessary a factor that must be present for a disease or other health problem to occur.
  • 493.
    Glossary Page 4 cause-specific mortalityrate see mortality rate, cause-specific. cause, sufficient a factor or collection of factors whose presence is always followed by the occurrence of a particular health problem. census the enumeration of an entire population, usually including details on residence, age, sex, occupation, racial/ethnic group, marital status, birth history, and relationship to the head of household. central location (also called central tendency) a statistical measurement to quantify the middle or the center of a distribution. Of the multiple ways to define central tendency, the most common are the mean, median, and mode. chain of infection the progression of an infectious agent that leaves its reservoir or host through a portal of exit, is conveyed by a mode of transmission, and then enters through an appropriate portal of entry to infect a susceptible host. "chartjunk" unnecessary or confusing visual elements in charts, illustrations, or graphs. The term was first used by Edward Tufte in his book, The Visual Display of Quantitative Information (1983). class interval the span of values of a continuous variable that are grouped into a single category (see also class), usually to create a frequency distribution for that variable. class limits the values at the upper and lower ends of a class interval. clinical criteria the medical features (e.g., symptoms, medical examination findings, and laboratory results) that are used in a case definition. clinical disease a disease that has been manifested by its symptoms and features. clinical trial see trial, clinical. cluster an aggregation of cases of a disease, injury, or other health condition (particularly cancer and birth defects) in a circumscribed area during a particular period without regard to whether the number of cases is more than expected (often the expected number is not known). cohort a well-defined group of persons who have had a common experience or exposure and are then followed up, as in a cohort study or prospective study, to determine the incidence of new diseases or health events. cohort, birth a group of persons born during a particular period or year. cohort study see study, cohort. common-source outbreak see outbreak, common-source. community immunity see immunity, herd. community trial see trial, community.
  • 494.
    Glossary Page 5 comparison groupa group in an analytic study (e.g., a cohort or case-control study) with whom the primary group of interest (exposed group in a cohort study or case-patients in a case-control study) is compared. The comparison group provides an estimate of the background or expected incidence of disease (in a cohort study) or exposure (in a case-control study). confidence interval a range of values for a measure (e.g., rate or odds ratio) constructed so that the range has a specified probability (often, but not necessarily, 95%) of including the true value of the measure. confidence limits the end points (i.e., the minimum and maximum values) of a confidence. confounding the distortion of the association between an exposure and a health outcome by a third variable that is related to both. contact exposure to a source of an infection; a person who has been exposed. contact, direct exposure or transmission of an agent from a source to a susceptible host through touching (e.g., from a human host by kissing, sexual intercourse, or skin-to-skin contact) or from touching an infected animal or contaminated soil or vegetation. contagious capable of being transmitted from one person to another by contact or close proximity. contingency table a two-variable table of cross-tabulated data. continuous variable see variable, continuous. control in a case-control study, a member of the group of persons without the health problem under study (see also comparison group and study, case-control). crude when referring to a rate, an overall or summary rate for a population, without adjustment. crude birth rate see birth rate, crude. crude death rate see mortality rate, crude. crude mortality rate see mortality rate, crude. cumulative frequency in a frequency distribution, the number or proportion of observations with a particular value and any smaller value. cumulative frequency curve a plot of the cumulative frequency rather than the actual frequency for each class interval of a variable. This type of graph is useful for identifying medians and quartiles and other percentiles. D death-to-case ratio the number of deaths attributed to a particular disease, injury, or other health condition during a specified period, divided by the number of new cases of that disease, injury, or condition identified during the same period.
  • 495.
    Glossary Page 6 decision analysisapplication of quantitative methods to decision-making. decision tree a branching chart that represents the logical sequence or pathway of a clinical or public health decision. demographic information personal characteristics of a person or group (e.g., age, sex, race/ethnicity, residence, and occupation) demographic information is used in descriptive epidemiology to characterize patients or populations. dendrogram see phylogenetic tree. denominator the lower portion of a fraction; used in calculating a ratio, proportion, or rate. For a rate, the denominator is usually the midinterval population. dependent variable see variable, dependent. descriptive epidemiology see epidemiology, descriptive. determinant any factor that brings about change in a health condition or in other defined characteristics (see also cause and risk factor). direct transmission see transmission, direct. discrete variable (or data) see variable (or data), discrete. distribution in epidemiology, the frequency and pattern of health-related characteristics and events in a population. In statistics, the frequency and pattern of the values or categories of a variable. dose-response association between an exposure and health outcome that varies in a consistently increasing or decreasing fashion as the amount of exposure (dose) increases. dot plot a visual display of the specific data points of a variable. droplet nuclei the residue of dried droplets of infectious agents that is easily inhaled and exhaled and can remain suspended in air for relatively long periods or be blown over great distances. droplet spread the direct transmission of an infectious agent by means of the aerosols produced in sneezing, coughing, or talking that travel only a short distance before falling to the ground. E effect the result of a cause. effectiveness the ability of an intervention or program to produce the intended or expected results in the field. efficacy the ability of an intervention or program to produce the intended or expected results under ideal conditions. efficiency the ability of an intervention or program to produce the intended or expected results
  • 496.
    Glossary Page 7 with aminimum expenditure of time and resources. EIS Epidemic Intelligence Service; CDC’s 2-year training program in applied epidemiology for public health professionals (http://www.cdc.gov/eis/). endemic the constant presence of an agent or health condition within a given geographic area or population; can also refer to the usual prevalence of an agent or condition. environmental factor an extrinsic factor (e.g., geology, climate, insects, sanitation, or health services) that affects an agent and the opportunity for exposure. epidemic the occurrence of more cases of disease, injury, or other health condition than expected in a given area or among a specific group of persons during a particular period. Usually, the cases are presumed to have a common cause or to be related to one another in some way (see also outbreak). epidemic curve a histogram that displays the course of an outbreak or epidemic by plotting the number of cases according to time of onset. epidemic period the time span of an outbreak or epidemic. epidemiologic triad the traditional model of infectious disease causation having three components: an external agent, a susceptible host, and an environment that brings the host and agent together so that disease occurs. epidemiology the study of the distribution and determinants of health conditions or events among populations and the application of that study to control health problems. epidemiology, analytic the aspect of epidemiology concerned with why and how a health problem occurs. Analytic epidemiology uses comparison groups to provide baseline or expected values so that associations between exposures and outcomes can be quantified and hypotheses about the cause of the problem can be tested (see also study, analytic). epidemiology, applied the application or practice of epidemiology to control and prevent health problems. epidemiology, descriptive the aspect of epidemiology concerned with organizing and summarizing data regarding the persons affected (e.g., the characteristics of those who became ill), time (e.g., when they become ill), and place (e.g., where they might have been exposed to the cause of illness). epidemiology, field applied epidemiology (i.e., the application or practice of epidemiology to control and prevent health problems), particularly when the epidemiologist(s) must travel to and work in the community in which the health problem is occurring or has occurred. evaluation systematic and objective examination of activities to determine their relevance, effectiveness, and impact. excess risk risk difference, calculated as the risk among the exposed group minus the risk among the unexposed group.
  • 497.
    Glossary Page 8 experimental studysee study, experimental. exposed group a group whose members have had contact with a suspected cause of, or possess a characteristic that is a suspected determinant of, a particular health problem. exposure having come into contact with a cause of, or possessing a characteristic that is a determinant of, a particular health problem. F false-negative a negative test result for a person who actually has the condition similarly, a person who has the disease (perhaps mild or variant) but who does not fit the case definition, or a patient or outbreak not detected by a surveillance system. false-positive a positive test result for a person who actually does not have the condition. Similarly, a person who does not have the disease but who nonetheless fits the case definition, or a patient or outbreak erroneously identified by a surveillance system. field epidemiology see epidemiology, field. follow-up study see study, cohort. fomite an inanimate object that can be the vehicle for transmission of an infectious agent (e.g., bedding, towels, or surgical instruments). forest plot a graph that displays the point estimates and confidence intervals of individual studies included in a meta-analysis or systematic review as a series of parallel lines. frequency the amount or number of occurrences of an attribute or health outcome among a population. frequency distribution a complete summary of the frequencies of the values or categories of a variable, often displayed in a two-column table with the individual values or categories in the left column and the number of observations in each category in the right column. frequency polygon a graph of a frequency distribution in which values of the variable are plotted on the horizontal axis, and the number of observations are plotted on the vertical axis. Data points are plotted at the midpoints of the intervals and are connected with straight lines. G geometric mean see mean, geometric. graph a visual display of quantitative data arranged on a system of coordinates. H health a state of complete physical, mental, and social well-being and not merely the absence of
  • 498.
    Glossary Page 9 disease orother infirmity. health indicator any of a variety of measures (e.g., mortality rate) that indicate the state of health of a given population. health information system a combination of health statistics from different sources. Data from these systems are used to learn about health status, health care, provision and use of services, and the impact of services and programs on health. healthy worker effect the observation that employed persons generally have lower mortality rates than the general population, because persons with severe, disabling disease (who have higher mortality rates) tend to be excluded from the workforce. herd immunity see immunity, herd. high-risk group a group of persons whose risk for a particular disease, injury, or other health condition is greater than that of the rest of their community or population. HIPAA the Health Insurance Portability and Accountability Act, enacted in 1996, which addresses the privacy of a person’s medical information as well as postemployment insurance and other health-related concerns. histogram a visual representation of the frequency distribution of a continuous variable. The class intervals of the variable are grouped on a linear scale on the horizontal axis, and the class frequencies are grouped on the vertical axis. Columns are drawn so that their bases equal the class intervals (i.e., so that columns of adjacent intervals touch), and their heights correspond to the class frequencies. host a person or other living organism that is susceptible to or harbors an infectious agent under natural conditions. host factor an intrinsic factor (e.g., age, race/ethnicity, sex, or behaviors) that influences a person's exposure, susceptibility, or response to an agent. hyperendemic the constant presence at high incidence and prevalence of an agent or health condition within a given geographic area or population. hypothesis a supposition, arrived at from observation or reflection, that leads to refutable predictions; any conjecture cast in a form that will allow it to be tested and refuted. hypothesis, alternative the supposition that an exposure is associated with the health condition under study. The alternative is adopted if the null hypothesis (see also hypothesis, null) proves implausible. hypothesis, null the supposition that two (or more) groups do not differ in the measure of interest (e.g., incidence or proportion exposed); the supposition that an exposure is not associated with the health condition under study, so that the risk ratio or odds ratio equals 1. The null hypothesis is used in conjunction with statistical testing.
  • 499.
    Glossary Page 10 I immunity, activeresistance developed in response to an antigen (i.e., an infecting agent or vaccine), usually characterized by the presence of antibody produced by the host. immunity, herd the resistance to an infectious agent of an entire group or community (and, in particular, protection of susceptible persons) as a result of a substantial proportion of the population being immune to the agent. Herd immunity is based on having a substantial number of immune persons, thereby reducing the likelihood that an infected person will come in contact with a susceptible one among human populations, also called community immunity. immunity, passive immunity conferred by an antibody produced in another host This type of immunity can be acquired naturally by an infant from its mother or artificially by administration of an antibody-containing preparation (e.g., antiserum or immune globulin). incidence a measure of the frequency with which new cases of illness, injury, or other health condition occurs among a population during a specified period. incidence proportion the fraction of persons with new cases of illness, injury, or other health condition during a specified period, calculated as the number of new cases divided by the size of the population at the start of the study period (see also attack rate). incidence rate a measure of the frequency with which new cases of illness, injury, or other health condition occur, expressed explicitly per a time frame. Incidence rate is calculated as the number of new cases over a specified period divided either by the average population (usually mid-period) or by the cumulative person-time the population was at risk. incubation period the time interval from exposure to an infectious agent to the onset of symptoms of an infectious disease. independent variable see variable, independent. index case see case, index. indirect transmission see transmission, indirect. individual data values or observations from each record (also called raw data). infant mortality rate see mortality rate, infant. infection invasion of the body tissues of a host by an infectious agent, whether or not it causes disease. infectivity the ability of an infectious agent to cause infection, measured as the proportion of persons exposed to an infectious agent who become infected. information bias see bias, information. interquartile range a measure of spread representing the middle 50% of the observations, calculated as the difference between the third quartile (75th percentile) and the first quartile (25th
  • 500.
    Glossary Page 11 percentile). isolation theseparation of infected persons to prevent transmission to susceptible ones. Isolation refers to separation of ill persons; quarantine refers to separation of potentially exposed but well persons. L latency period the time from exposure to a causal agent to onset of symptoms of a (usually noninfectious) disease (see also incubation period). life expectancy a statistical projection of the average number of years a person of a given age is expected to live, if current mortality rates continue to apply. line graph, arithmetic-scale a graph that displays patterns or trends by plotting the frequency (e.g., number, proportion, or rate) of a characteristic or event during some variable, usually time. The y-axis, measuring frequency, uses an arithmetic scale. line graph, semilogarithmic-scale a graph that displays patterns or trends by plotting the frequency (e.g., number, proportion, or rate) of a characteristic or event during some variable, usually time. The y-axis, measuring frequency, uses a logarithmic scale. line listing a type of epidemiologic database, organized similar to a spreadsheet with rows and columns in which information from cases or patients are listed each column represents a variable, and each row represents an individual case or patient. logarithmic transformation conversion of nominal or ordinal data to logarithmic data. The purpose is to examine rate of change instead of amount of change only. M map, area (shaded, choropleth) a visual display of the geographic pattern of a health problem, in which a marker is placed on a map to indicate where each affected person lives, works, or might have been exposed. mean (or average) commonly called the average; it is the most common measure of central tendency. mean, arithmetic the measure of central location, commonly called the average, calculated by adding all the values in a group of measurements and dividing by the number of values in the group. mean, geometric the mean, or average, of a set of data measured on a logarithmic scale. measure of association a quantified relationship between exposure and a particular health problem (e.g., risk ratio, rate ratio, and odds ratio). measure of central location a central value that best represents a distribution of data. Common measures of central location are the mean, median, and mode also called the measure of central
  • 501.
    Glossary Page 12 tendency. measure ofdispersion see measure of spread. measure of spread a measure of the distribution of observations out from its central value. Measures of spread used in epidemiology include the interquartile range, variance, and the standard deviation. measurement scale the complete range of possible values for a measurement. mechanical transmission see transmission, mechanical. median the measure of central location that divides a set of data into two equal parts, above and below which lie an equal number of values (see also measure of central location). medical surveillance see surveillance, medical. midrange the halfway point, or midpoint, in a set of observations. For the majority of data, the midrange is calculated by adding the smallest observation and the largest observation and dividing by two. The midrange is usually calculated as an intermediate step in determining other measures. mode the most frequently occurring value in a set of observations (see also measure of central location). mode of transmission the manner in which an agent is transmitted from its reservoir to a susceptible host (see also transmission). morbidity disease; any departure, subjective or objective, from a state of physiological or psychological health and well-being. mortality death. mortality rate a measure of the frequency of occurrence of death among a defined population during a specified time interval. mortality rate, age-adjusted a mortality rate that has been statistically modified to eliminate the effect of different age distributions among different populations. mortality rate, age-specific a mortality rate limited to a particular age group, calculated as the number of deaths among the age group divided by the number of persons in that age group, usually expressed per 100,000. mortality rate, cause-specific the mortality rate from a specified cause, calculated as the number of deaths attributed to a specific cause during a specified time interval among a population divided by the size of the midinterval population. mortality rate, crude a mortality rate from all causes of death for an entire population, without adjustment. mortality rate, infant the mortality rate for children aged <1 year, calculated as the number of
  • 502.
    Glossary Page 13 deaths reportedamong this age group during a given period divided by the number of live births reported during the same period, and expressed per 1,000 live births. Infant mortality rate is a universally accepted indicator of the health of a nation’s population and the adequacy of its health-care system. mortality rate, neonatal the mortality rate for children from age birth up to, but not including, 28 days. In calculating neonatal mortality rates, the numerator is the number of deaths among this age group during a given period, and the denominator is the number of live births reported during the same period. The neonatal mortality rate is usually expressed per 1,000 live births. mortality rate, postneonatal the mortality rate for children from age 28 days up to, but not including, 1 year. In calculating postneonatal mortality rates, the numerator is the number of deaths among this age group during a given period, and the denominator is the number of live births during the same period.. The postneonatal mortality rate is usually expressed per 1,000 live births. mortality rate, race/ethnic-specific a mortality rate limited to a specified racial or ethnic group both numerator and denominator are limited to that group. mortality rate, sex-specific a mortality rate among either males or females. N natural history of disease the progression of a disease process in a person from the time it begins to the time it resolves, in the absence of treatment. NCHS The National Center for Health Statistics, the US governmental organization responsible for national vital statistics and multiple national health surveys. Organizationally, NCHS is a component of the Centers for Disease Control and Prevention, one of the agencies of the US Department of Health and Human Services. NHANES The National Health and Nutrition Examination Survey, a representative survey of the civilian, noninstitutionalized US population conducted by the National Center for Health Statistics, designed to (1) estimate the proportion of the US population and designated groups with selected disease and risk factors; (2) monitor trends in selected behaviors, exposures, and diseases; and (3) study the associations among diet, nutrition, and health. necessary cause see cause, necessary. neonatal mortality rate see mortality rate, neonatal. nominal scale see scale, nominal. normal curve the bell-shaped curve that results when a normal distribution is graphed. normal distribution a distribution represented as a bell shape, symmetrical on both sides of the peak, which is simultaneously the mean, median, and mode, and with both tails extending to infinity.
  • 503.
    Glossary Page 14 notifiable diseasea disease that, by law, must be reported to public health authorities upon diagnosis. null hypothesis see hypothesis, null. numerator the upper portion of a fraction (see also denominator). O observational study see study, observational. odds ratio a measure of association used in comparative studies, particularly case-control studies, that quantifies the association between an exposure and a health outcome; also called the cross-product ratio. ordinal scale see scale, ordinal. outbreak the occurrence of more cases of disease, injury, or other health condition than expected in a given area or among a specific group of persons during a specific period. Usually, the cases are presumed to have a common cause or to be related to one another in some way. Sometimes distinguished from an epidemic as more localized, or the term less likely to evoke public panic (see also epidemic). outbreak, common-source an outbreak that results from persons being exposed to the same harmful influence (e.g., an infectious agent or toxin). The exposure period can be brief or can extend over days, weeks, or longer, with the exposure being either intermittent or continuous. outbreak, point-source a common source outbreak in which the exposure period is relatively brief so that all cases occur within one incubation period. outbreak, propagated an outbreak that spreads from person to person rather than from a common source. outcome(s) any or all of the possible results that can stem from exposure to a causal factor or from preventive or therapeutic interventions; all identified changes in health status that result from the handling of a health problem. outlier a value substantively or statistically different from all (or approximately all) of the other values in a distribution. P P value the probability of observing an association between two variables or a difference between two or more groups as large or larger than that observed, if the null hypothesis were true. Used in statistical testing to evaluate the plausibility of the null hypothesis (i.e., whether the observed association or difference plausibly might have occurred by chance). pandemic an epidemic occurring over a widespread area (multiple countries or continents) and usually affecting a substantial proportion of the population.
  • 504.
    Glossary Page 15 passive immunitysee immunity, passive. passive surveillance see surveillance, passive. pathogenicity the ability of an agent to cause disease after infection, measured as the proportion of persons infected by an agent who then experience clinical disease. percentile a set of cut points used to divide a distribution or a set of ranked data into 100 parts of equal area with each interval between the points containing 1/100 or 1% of the observations. For example, the 5th percentile is a cut point with 5% of the observations below it and the remaining 95% above it. period prevalence see prevalence, period. person-time rate the incidence rate calculated as the number of new cases among a population divided by the cumulative person-time of that population, usually expressed as the number of events per persons per unit of time. person-time the amount of time each participant in a cohort study is observed and disease-free, often summed to provide the denominator for a person-time rate. phylogenetic tree a branching chart that indicates the evolutionary lineage or genetic relatedness of organisms. pie chart a circular graph of a frequency distribution in which each segment of the pie is proportional in size to the frequency of corresponding category. point prevalence see prevalence, point. point-source outbreak see outbreak, point-source. population the total number of inhabitants of a geographic area or the total number of persons in a particular group (e.g., the number of persons engaged in a certain occupation). population pyramid a graphical display of the age-sex distribution of a population, constructed with a horizontal histogram of the age distribution of males pointing to the left, and the corresponding horizontal histogram of age distribution of females pointing to the right. portal of entry a pathway into the host that gives an agent access to tissue that will allow it to multiply or act. portal of exit a pathway by which an agent can leave its host. postneonatal mortality rate see mortality rate, postneonatal. predictive value positive the proportion of cases identified by a test, reported by a surveillance system, or classified by a case definition that are true cases, calculated as the number of true- positives divided by the number of true-positives plus false-positives. prevalence the number or proportion of cases or events or attributes among a given population.
  • 505.
    Glossary Page 16 prevalence ratethe proportion of a population that has a particular disease, injury, other health condition, or attribute at a specified point in time (point prevalence) or during a specified period (period prevalence). prevalence, period the amount of a particular disease, chronic condition, or type of injury present among a population at any time during a particular period. prevalence, point the amount of a particular disease, chronic condition, or type of injury present among a population at a single point in time. privacy rule a set of regulations based on the Health Insurance Portability and Accountability Act to protect the privacy of individually identifiable health information. propagated outbreak see outbreak, propagated. proportion a ratio in which the numerator is included in the denominator; the ratio of a part to the whole, expressed as a "decimal fraction" (e.g., 0 2), a fraction (1/5), or a percentage (20%). proportion, attributable a measure of the impact of a causative factor on the public health; the proportion of a health state or event among exposed persons that can be attributed to the exposure also called attributable risk percent. proportionate mortality the proportion of deaths among a population attributable to a particular cause during a selected period. Each cause of death is expressed as a percentage of all deaths, and the sum of the proportionate mortality for all causes must equal 100%. These proportions are not mortality rates because, in proportionate mortality, the denominator is all deaths instead of the population among whom the deaths occurred. prospective study see study, prospective. Q quarantine the separation of well persons who have been exposed or are suspected to have been exposed to a communicable disease, to monitor for illness and to prevent potential transmission of infection to susceptible persons during the incubation period. Quarantine refers to separation of potentially exposed but well persons; isolation refers to separation of ill persons. R race/ethnic-specific mortality rate see mortality rate, race/ethnic-specific. random sample see sample, random. range in statistics, the difference between the largest and smallest values in a distribution; in common use, the span of values from smallest to largest. rate an expression of the relative frequency with which an event occurs among a defined population per unit of time, calculated as the number of new cases or deaths during a specified period divided by either person-time or the average (midinterval) population. In epidemiology, it
  • 506.
    Glossary Page 17 is oftenused more casually to refer to proportions that are not truly rates (e.g., attack rate or case-fatality rate). rate ratio a measure of association that quantifies the relation between an exposure and a health outcome from an epidemiologic study, calculated as the ratio of incidence rates or mortality rates of two groups. ratio the relative size of two quantities, calculated by dividing one quantity by the other. record in a line listing, each row is a record or observation. A record represents data related to a single case. relative risk a general term for measures of association calculated from the data in a two-by-two table, including risk ratio, rate ratio, and odds ratio (see also risk ratio). representative sample see sample, representative. reservoir the habitat in which an infectious agent normally lives, grows, and multiplies, which can include humans, animals, or the environment. retrospective study see study, retrospective. risk the probability that an event will occur (e.g., that a person will be affected by, or die from, an illness, injury, or other health condition within a specified time or age span). risk factor an aspect of personal behavior or lifestyle, an environmental exposure, or a hereditary characteristic that is associated with an increase in the occurrence of a particular disease, injury, or other health condition. risk ratio a measure of association that quantifies the association between an exposure and a health outcome from an epidemiologic study, calculated as the ratio of incidence proportions of two groups. S sample a selected subset of a population a sample can be random or nonrandom and representative or nonrepresentative. sample, random a sample of persons chosen in such a way that each one has the same (and known) probability of being selected. sample, representative a sample whose characteristics correspond to those of the original or reference population. scale, interval a measurement scale consisting of quantitative categories whose values are measured on a scale of equally spaced units, but without a true zero point (e.g., date of birth). scale, nominal a measurement scale consisting of qualitative categories whose values have no inherent statistical order or rank (e.g., categories of race/ethnicity, religion, or country of birth).
  • 507.
    Glossary Page 18 scale, ordinala measurement scale consisting of qualitative categories whose values have a distinct order but no numerical distance between their possible values (e.g., stage of cancer, I, II, III, or IV). scale, ratio a measurement scale consisting of quantitative categories whose values are intervals with a true zero point (e.g., height in centimeters or duration of illness). scatter diagram (or scattergram) a graphical display of the association between two variables in which a dot is plotted on the graph for each set of paired values for two continuous variables, with one variable plotted on the horizontal axis, and the other plotted on the vertical axis. seasonality change in physiologic status or in the occurrence of a disease, chronic condition, or type of injury that conforms to a regular seasonal pattern. secondary attack rate see attack rate, secondary. secular trend see trend, secular. selection bias see bias, selection. semilogarithmic-scale line graph see line graph, semilogarithmic-scale sensitivity the ability of a test, case definition, or surveillance system to identify true cases; the proportion of people with a health condition (or the proportion of outbreaks) that are identified by a screening test or case definition (or surveillance system). sentinel surveillance see surveillance, sentinel. sex-specific mortality rate see mortality rate, sex-specific. skewed a distribution that is not symmetrical. source (of infection) the person, animal, object, or substance from which an infectious agent is transmitted to a host. source case see case, source. specificity the ability or a test, case definition, or surveillance system to exclude persons without the health condition of interest; the proportion of persons without a health condition that are correctly identified as such by a screening test, case definition, or surveillance system. spectrum of illness the range of manifestations a disease process can take (e.g., from asymptomatic to mild clinical illness to severe illness and death). sporadic an event that occurs infrequently and irregularly. spot map a visual display of the geographic pattern of a health problem, in which a marker is placed on a map to indicate where each affected person lives, works, or might have been exposed. standard deviation a statistical summary of how dispersed the values of a variable are around
  • 508.
    Glossary Page 19 its mean,calculated as the square root of the variance. standard error (of the mean) the standard deviation of a theoretical distribution of sample means of a variable around the true population mean of that variable. Standard error is computed as the standard deviation of the variable divided by the square root of the sample size. statistical inference generalizations developed from sample data, usually with calculated degrees of uncertainty. statistical significance the measure of how likely it is that a set of study results could have occurred by chance alone. Statistical significance is based on an estimate of the probability of the observed or a greater degree of association between independent and dependent variables occurring under the null hypothesis (see also P value). study, analytic a study, usually observational, in which groups are compared to identify and quantify associations, test hypotheses, and identify causes. Two common types are cohort studies and case-control studies. study, case-control an observational analytic study that enrolls one group of persons with a certain disease, chronic condition, or type of injury (case-patients) and a group of persons without the health problem (control subjects) and compares differences in exposures, behaviors, and other characteristics to identify and quantify associations, test hypotheses, and identify causes. study, cohort an observational analytic study in which enrollment is based on status of exposure to a certain factor or membership in a certain group. Populations are followed, and disease, death, or other health-related outcomes are documented and compared. Cohort studies can be either prospective or retrospective. study, cross-sectional a study in which a sample of persons from a population are enrolled and their exposures and health outcomes are measured simultaneously; a survey. study, experimental a study in which the investigator specifies the type of exposure for each person (clinical trial) or community (community trial) then follows the persons' or communities' health status to determine the effects of the exposure. study, observational a study in which the investigator observes rather than influences exposure and disease among participants. Case-control and cohort studies are observational studies (see also study, experimental). study, prospective an analytic study in which participants are enrolled before the health outcome of interest has occurred. study, retrospective an analytic study in which participants are enrolled after the health outcome of interest has occurred. Case-control studies are inherently retrospective. subclinical without apparent symptoms. surveillance, active public health surveillance in which the health agency solicits reports.
  • 509.
    Glossary Page 20 surveillance, medicalmonitoring of a person who might have been exposed to an infectious, chemical, radiologic, or other potentially causal agent, for the purpose of detecting early symptoms. surveillance, passive public health surveillance in which data are sent to the health agency without prompting. surveillance, sentinel a surveillance system that uses a prearranged sample of sources (e.g., physicians, hospitals, or clinics) who have agreed to report all cases of one or more notifiable diseases. surveillance, syndromic (1) the monitoring of the frequency of illnesses with a specified set of clinical features among a given population without regard to the specific diagnoses, if any, that are assigned to them by clinicians. (2) A system for early detection of outbreaks whereby health department staff, assisted by automated acquisition of data routinely collected for other purposes and computer generation of statistical signals, monitor disease indicators, particularly those associated with possible terrorism-related biologic and chemical agents, continually or at least daily to detect outbreaks earlier than would otherwise be possible with traditional public health methods. survey a systematic canvassing of persons to collect information, often from a representative sample of the population. survival curve a line graph that begins with 100% of the study population and displays the percentage of the population still surviving at successive points in time. A survival curve can also be used to depict freedom from a health problem, complication, or another endpoint. symmetrical a type of distribution where the shapes to the right and left of the central location are the same. Normal, bell-shaped distributions are symmetrical; the mean, median, and mode are the same. symptom any indication of disease noticed or felt by a patient. syndrome a combination of symptoms characteristic of a disease or health condition; sometimes refers to a health condition without a clear cause (e.g., chronic fatigue syndrome). syndromic surveillance see surveillance, syndromic. T table an arrangement of data in rows and columns. In epidemiology, the data are usually summaries of the frequency of occurrence of an event or characteristic occurring among different groups. table shell a table that is completely drawn and labeled but contains no data. table, two-by-two a two-variable table with cross-tabulated data, in which each variable has only two categories. Usually, one variable represents a health outcome, and one represents an exposure or personal characteristic.
  • 510.
    Glossary Page 21 transmission (ofinfection) any mode or mechanism by which an infectious agent is spread to a susceptible host. transmission, airborne transfer of an agent suspended in the air, considered a type of indirect transmission. transmission, biologic indirect transmission by a vector in which the infectious agent undergoes biologic changes inside the vector as part of its life cycle before it is transmitted to the host (see also transmission, mechanical). transmission, direct immediate transfer of an agent from a reservoir to a host by direct contact or droplet spread. transmission, indirect transfer of an agent from a reservoir to a host either by being suspended in air particles (airborne), carried by an inanimate objects (vehicleborne), or carried by an animate intermediary (vectorborne). transmission, mechanical indirect transmission by a vector in which the infectious agent does not undergo physiologic changes inside the vector (see also transmission, biologic). transmission, vectorborne transmission of an agent by a living intermediary (e.g., tick, mosquito, or flea); considered a type of indirect transmission. transmission, vehicleborne transmission of an agent by an inanimate object; considered a type of indirect transmission; includes foodborne and waterborne transmission. trend movement or change in frequency over time, usually upwards or downwards. trend, secular changes occurring over a substantial period, generally years or decades. trial, clinical an experimental study that uses data from individual persons. The investigator specifies the type of exposure for each study participant and then follows each person's health status to determine the effects of the exposure. trial, community an experimental study that uses data from communities. The investigator specifies the type of exposure for each community and then follows the communities' health status to determine the effects of the exposure. trial, randomized clinical a clinical trial in which persons are randomly assigned to exposure or treatment groups. two-by-two table see table, two-by-two. V validity the degree to which a measurement, questionnaire, test, or study or any other data- collection tool measures what it is intended to measure. variable any characteristic or attribute that can be measured and can have different values.
  • 511.
    Glossary Page 22 variable (ordata), discrete a variable that is limited to a finite number of values; data for such a variable. variable, continuous a variable that has the potential for having an infinite number of values along a continuum (e.g., height and weight). variable, dependent in a statistical analysis, a variable whose values are a function of one or more other variables. variable, independent an exposure, risk factor, or other characteristic being observed or measured that is hypothesized to influence an event or manifestation (the dependent variable). variance a measure of the spread in a set of observations, calculated as the sum of the squares of deviations from the mean, divided by the number of observations minus 1 (see also standard deviation). vector a living intermediary that carries an agent from a reservoir to a susceptible host (see also transmission, biologic and transmission, mechanical) (e.g., mosquitoes, fleas, or ticks). vehicle an inanimate object that can carry an agent from a reservoir to a susceptible host (e.g., food, water, blood products, and bedding) (see also transmission, indirect). virulence the ability of an infectious agent to cause severe disease, measured as the proportion of persons with the disease who become severely ill or die. vital statistics systematically tabulated data about recorded births, marriages, divorces, and deaths. X x-axis the horizontal axis of a rectangular graph, usually displaying the independent variable (e.g., time). Y y-axis the vertical axis of a rectangular graph, usually displaying the dependent variable (e.g., frequency — number, proportion, or rate). years of potential life lost (YPLL) a measure of the impact of premature death on a population, calculated as the sum of the differences between a predetermined minimally acceptable age (e.g., 65 years or current life expectancy) and the age at death for everyone who died earlier than that age. Z zoonosis an infectious disease that is transmissible from animals to humans.