Table Of Contents
Click to add Title
HANDING OVER OF COMPLAINT PAPER
VISUAL INSPECTION OF EQUIPMENT
FAILURE ANALYSIS
CLEANING OF EQUIPMENT
REPAIR ESTIMATION
DISCUSSION AND APPROVAL FOR REPAIR
Table Of Contents
Click to add Title
MANPOWER PLAN FOR REPAIR
SPARE PARTS PLANNING
REPAIRING PROCEDURE
FINAL INSPECTION Q/A & QC
CLIENT INSPECTION
HANDING OVER OF FINISH EQUIPMENT
REPAIR PROCEDURE
WORKSHOP
FOREMAN SHOULD
PERFORM VISUAL
INSPECTION O
IDENTIFY ALL
EXCISTING
COMPLAINT OF
EQUIPMENT
OPERATION
DEPARTMENT
SHOULD HANDOVER
THE COMPLAINT TO
WORKSHOP PRIOR
FOR ENTERING THE
EQUIPMENT INSIDE
THE WORKSHOP
Phase 1 Phase 2
HANDING OVER OF COMPLAINT PAPER VISUAL INSPECTION
REPAIR PROCEDURE
EQUIPMENT SHOULD
CLEAN PRIOR TO THE
STARTING OF THE
REPAIR,
WORKSHOP IN
CHARGE SHOULD
PREPARE THE
PROPER TECHNICAL
REPORT OF ALL
FAULTS,ERROR’S AND
ALL COMPLAINTS
EXISTING IN THAT
PARTICULAR
EQUIPMENT
Phase 3 Phase 4
FAILURE ANALYSIS CLEANING OF EQUIPMENT
REPAIR ESTIMATION
PARTS COST
MORE THAN
1000 RIYALS
WORKSHOP MANAGER
CAN ASK FOR THE
APPROVAL OF DIRECT
PURCHASE OR THEY
WILL CREATE IRF
DEPENDS ON THE
URGENCY OF
EQUIPMENT
PARTS COST
LESS THAN
1000 RIYALS
WORKSHOP
MANAGER WILL
DECIDE IF THEY
WILL GO FOR
DIRECT PURCHASE
REPAIR
COST
OPTION
PARTS COST
MORE THAN
10.000
RIYALS
WORKSHOP MANAGER
CAN RECOMMEND
EQUIPMENT DISPOSAL
DEPEND ON ITS
MODEL YEAR
Phase 5
REPAIR PROCEDURE
SECTION IN
CHARGE SHOULD
PLAN ALSO THE
MANPOWER
NEEDED FOR THE
REPAIR OF THAT
PARTICULAR
EQUIPMENTPLAN
SHOULD DEPENDS
ON IT’S FAULT OR
THE MANPOWER
REQUIRED ,
AFTER GETTING
THE ESTIMATED
COST OF REPAIR,
WORKSHOP TEAM
WILL DECIDE WHAT
OPTION THEY WILL
MAKE EITHER
DIRECT
PURCHASE,CEATE
IRF,DISPOSAL
DEPENDS ON THE
PARTS REQUIRED
FOR REPAIR
Phase 6 Phase 7
DISCUSSION OF REPAIR MANPOWER PLAN
REPAIR PROCEDURE
SECTION IN CHARGE
SHOULD PLAN ALSO THE
REPAIR AND FROM WHERE
SECTION HE HAVE TO
SEND FIRST THE SAID
EQUIPMENT BY THIS PLANS
WORKSHOP CAN SAVE
REPAIR TIME, (EX, WHILE
WAITING FOR MECHANICAL
PARTS THE ELECTRICAL
SECTION CAN DO THEIR
WORK)
THIS PLAN WILL COME
IF THE EQUIPMENT
HAVE MORE PARTS
REQUIRED AND
CANNOT GO FOR
DIRECT PURCHASE.
SECTION IN CHARGE
SHOULD CREATE IRF
FOR ALL PARTS
REQUIRED AND MAKE
SURE THAT NO PARTS
WILL BE MISSED
Phase 8 Phase 9
SPARE PARTS PLANNING REPAIR PLANNING
REPAIR PROCEDURE
WORKSHOP IN
CHARGE CAN
REQUEST TO CLIENT
TO SEND THEIR QC
REPRESENTATIVE
TO CHECK THE
EQUIPEMENT PRIOR
FOR THE HANDING
OVER OF THE SAID
EQUIPMENT,
AFTER
ACCOMPLISHING ALL
THE REPAIR NEEDED
FOR THE EQUIPMENT.
WORKSHOP IN
CHARGE AND
FOREMAN SHOULD
PERFORM FINAL
INSPECTION
INCLUDING ACTUAL
EQUIPMENT
OPERATION
Phase 10 Phase 11
WORKSHOP FINAL INSPECTION CLIENT FINAL INSPECTION
REPAIR PROCEDURE
IF THE CLIENT IS
SATISFIED FOR THE
PERFORMANCE OF
THEIR EQUIPMENT,
WORKSHOP IN
CHARGE SHOULD
ARRANGE THE
EQUIPMENT HANDING
OVER FORM AND GET
SIGNATURE FROM
CLIENT
Phase 12
HANDING OVER OF EQUIPMENT TO CLIENT
Company
LOGO
TEAMWORK IS THE ABILITY TO WORK
TOGETHER TOWARD COMMON VISION

More Related Content

Viewers also liked

presentatie Sentimo Engels
presentatie Sentimo Engelspresentatie Sentimo Engels
presentatie Sentimo Engels
Hilda van der Wal
 
Tusco003
Tusco003Tusco003
StrategicLeadership-EMBA%2520course-Bized
StrategicLeadership-EMBA%2520course-BizedStrategicLeadership-EMBA%2520course-Bized
StrategicLeadership-EMBA%2520course-BizedHema Krishnan, Ph.D.
 
Cover It Live Training Presentation
Cover It Live Training PresentationCover It Live Training Presentation
Cover It Live Training Presentation
Britney Wright
 
Getting Started with Social Media Monitoring - Celia Pronto
Getting Started with Social Media Monitoring - Celia ProntoGetting Started with Social Media Monitoring - Celia Pronto
Getting Started with Social Media Monitoring - Celia Pronto
Our Social Times
 
José de la cruz porfirio díaz morí
José de la cruz porfirio díaz moríJosé de la cruz porfirio díaz morí
José de la cruz porfirio díaz morí
Ernesto Arrevillaga Cruz
 
Análisis morfológico nivel inicial 3
Análisis morfológico nivel inicial 3Análisis morfológico nivel inicial 3
Análisis morfológico nivel inicial 3
Marga Casaus
 
Manualde 5
Manualde 5Manualde 5
WebCamp 2016: Python. Вячеслав Каковский: Real-time мессенджер на Python. Осо...
WebCamp 2016: Python. Вячеслав Каковский: Real-time мессенджер на Python. Осо...WebCamp 2016: Python. Вячеслав Каковский: Real-time мессенджер на Python. Осо...
WebCamp 2016: Python. Вячеслав Каковский: Real-time мессенджер на Python. Осо...
WebCamp
 
Water droplet stories
Water droplet storiesWater droplet stories
Water droplet stories
y4climericks
 
Gestión de la Convivencia Escolar ccesa007
Gestión de la Convivencia Escolar  ccesa007Gestión de la Convivencia Escolar  ccesa007
Gestión de la Convivencia Escolar ccesa007
Demetrio Ccesa Rayme
 
Measuring the Unmeasureable Ragan 0517
Measuring the Unmeasureable Ragan 0517Measuring the Unmeasureable Ragan 0517
Measuring the Unmeasureable Ragan 0517
Gene King, APR
 
Principlesofpassivehousedesign
PrinciplesofpassivehousedesignPrinciplesofpassivehousedesign
Principlesofpassivehousedesign
Jayakumar Paramasivam
 

Viewers also liked (13)

presentatie Sentimo Engels
presentatie Sentimo Engelspresentatie Sentimo Engels
presentatie Sentimo Engels
 
Tusco003
Tusco003Tusco003
Tusco003
 
StrategicLeadership-EMBA%2520course-Bized
StrategicLeadership-EMBA%2520course-BizedStrategicLeadership-EMBA%2520course-Bized
StrategicLeadership-EMBA%2520course-Bized
 
Cover It Live Training Presentation
Cover It Live Training PresentationCover It Live Training Presentation
Cover It Live Training Presentation
 
Getting Started with Social Media Monitoring - Celia Pronto
Getting Started with Social Media Monitoring - Celia ProntoGetting Started with Social Media Monitoring - Celia Pronto
Getting Started with Social Media Monitoring - Celia Pronto
 
José de la cruz porfirio díaz morí
José de la cruz porfirio díaz moríJosé de la cruz porfirio díaz morí
José de la cruz porfirio díaz morí
 
Análisis morfológico nivel inicial 3
Análisis morfológico nivel inicial 3Análisis morfológico nivel inicial 3
Análisis morfológico nivel inicial 3
 
Manualde 5
Manualde 5Manualde 5
Manualde 5
 
WebCamp 2016: Python. Вячеслав Каковский: Real-time мессенджер на Python. Осо...
WebCamp 2016: Python. Вячеслав Каковский: Real-time мессенджер на Python. Осо...WebCamp 2016: Python. Вячеслав Каковский: Real-time мессенджер на Python. Осо...
WebCamp 2016: Python. Вячеслав Каковский: Real-time мессенджер на Python. Осо...
 
Water droplet stories
Water droplet storiesWater droplet stories
Water droplet stories
 
Gestión de la Convivencia Escolar ccesa007
Gestión de la Convivencia Escolar  ccesa007Gestión de la Convivencia Escolar  ccesa007
Gestión de la Convivencia Escolar ccesa007
 
Measuring the Unmeasureable Ragan 0517
Measuring the Unmeasureable Ragan 0517Measuring the Unmeasureable Ragan 0517
Measuring the Unmeasureable Ragan 0517
 
Principlesofpassivehousedesign
PrinciplesofpassivehousedesignPrinciplesofpassivehousedesign
Principlesofpassivehousedesign
 

Similar to PRESENTION

My Project
My ProjectMy Project
productivity improvement and increase in the material flow
productivity improvement and increase in the material flowproductivity improvement and increase in the material flow
productivity improvement and increase in the material flow
mahendran mahendran.m
 
Body Shop Process Overview
Body Shop Process Overview Body Shop Process Overview
Body Shop Process Overview
RANDY FERRESE
 
Aircraft Inspection and Maintenance Records
Aircraft Inspection and Maintenance RecordsAircraft Inspection and Maintenance Records
Aircraft Inspection and Maintenance Records
Fernando Araujo
 
IRJET- Leakage Testing Machine
IRJET- Leakage Testing MachineIRJET- Leakage Testing Machine
IRJET- Leakage Testing Machine
IRJET Journal
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and management
bahir dar university
 
Contract maintenance
Contract maintenanceContract maintenance
Contract maintenance
Dr. Sunil Kumar
 
Work Project 1-latest
Work Project 1-latestWork Project 1-latest
Work Project 1-latest
Ranjit David
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
Santosh Winfred
 
Abdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application EngineerAbdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim
 
Proposal Version 5
Proposal  Version 5Proposal  Version 5
Proposal Version 5
Mark Forster
 
PPAP.ppt
PPAP.pptPPAP.ppt
PPAP.ppt
pjanakiraman3
 
Ajay_Training_Report[1]
Ajay_Training_Report[1]Ajay_Training_Report[1]
Ajay_Training_Report[1]
AJAY KUMAR
 
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.pptGEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
ssuser856cc8
 
00 AM Step 4 Overview V1.pptx
00 AM Step 4 Overview V1.pptx00 AM Step 4 Overview V1.pptx
00 AM Step 4 Overview V1.pptx
DarlenisRodriguez1
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET Journal
 
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
AlexanderRamos482228
 
Ques i
Ques iQues i
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET Journal
 
Producción inspeccionada de aeronaves
Producción inspeccionada de aeronavesProducción inspeccionada de aeronaves
Producción inspeccionada de aeronaves
Christian Meneses Montes
 

Similar to PRESENTION (20)

My Project
My ProjectMy Project
My Project
 
productivity improvement and increase in the material flow
productivity improvement and increase in the material flowproductivity improvement and increase in the material flow
productivity improvement and increase in the material flow
 
Body Shop Process Overview
Body Shop Process Overview Body Shop Process Overview
Body Shop Process Overview
 
Aircraft Inspection and Maintenance Records
Aircraft Inspection and Maintenance RecordsAircraft Inspection and Maintenance Records
Aircraft Inspection and Maintenance Records
 
IRJET- Leakage Testing Machine
IRJET- Leakage Testing MachineIRJET- Leakage Testing Machine
IRJET- Leakage Testing Machine
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and management
 
Contract maintenance
Contract maintenanceContract maintenance
Contract maintenance
 
Work Project 1-latest
Work Project 1-latestWork Project 1-latest
Work Project 1-latest
 
INTERNSHIP REPORT
INTERNSHIP REPORTINTERNSHIP REPORT
INTERNSHIP REPORT
 
Abdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application EngineerAbdelaziz Ibrahim CV Application Engineer
Abdelaziz Ibrahim CV Application Engineer
 
Proposal Version 5
Proposal  Version 5Proposal  Version 5
Proposal Version 5
 
PPAP.ppt
PPAP.pptPPAP.ppt
PPAP.ppt
 
Ajay_Training_Report[1]
Ajay_Training_Report[1]Ajay_Training_Report[1]
Ajay_Training_Report[1]
 
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.pptGEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
 
00 AM Step 4 Overview V1.pptx
00 AM Step 4 Overview V1.pptx00 AM Step 4 Overview V1.pptx
00 AM Step 4 Overview V1.pptx
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
 
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
2019 Caterpillar Mining Equipment Management Metrics Document V4.pdf
 
Ques i
Ques iQues i
Ques i
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
Producción inspeccionada de aeronaves
Producción inspeccionada de aeronavesProducción inspeccionada de aeronaves
Producción inspeccionada de aeronaves
 

PRESENTION

  • 1. Company LOGO AL AYUNI INVESTMENT AND CONTRACTING COMPANY WORKSHOP EQUIPMENT RECEIVING AND REPAIR PROCEDURE TURAIF RAILWAYS WORKSHOP EQUIPMENT SECTOR
  • 2. Table Of Contents Click to add Title HANDING OVER OF COMPLAINT PAPER VISUAL INSPECTION OF EQUIPMENT FAILURE ANALYSIS CLEANING OF EQUIPMENT REPAIR ESTIMATION DISCUSSION AND APPROVAL FOR REPAIR
  • 3. Table Of Contents Click to add Title MANPOWER PLAN FOR REPAIR SPARE PARTS PLANNING REPAIRING PROCEDURE FINAL INSPECTION Q/A & QC CLIENT INSPECTION HANDING OVER OF FINISH EQUIPMENT
  • 4. REPAIR PROCEDURE WORKSHOP FOREMAN SHOULD PERFORM VISUAL INSPECTION O IDENTIFY ALL EXCISTING COMPLAINT OF EQUIPMENT OPERATION DEPARTMENT SHOULD HANDOVER THE COMPLAINT TO WORKSHOP PRIOR FOR ENTERING THE EQUIPMENT INSIDE THE WORKSHOP Phase 1 Phase 2 HANDING OVER OF COMPLAINT PAPER VISUAL INSPECTION
  • 5. REPAIR PROCEDURE EQUIPMENT SHOULD CLEAN PRIOR TO THE STARTING OF THE REPAIR, WORKSHOP IN CHARGE SHOULD PREPARE THE PROPER TECHNICAL REPORT OF ALL FAULTS,ERROR’S AND ALL COMPLAINTS EXISTING IN THAT PARTICULAR EQUIPMENT Phase 3 Phase 4 FAILURE ANALYSIS CLEANING OF EQUIPMENT
  • 6. REPAIR ESTIMATION PARTS COST MORE THAN 1000 RIYALS WORKSHOP MANAGER CAN ASK FOR THE APPROVAL OF DIRECT PURCHASE OR THEY WILL CREATE IRF DEPENDS ON THE URGENCY OF EQUIPMENT PARTS COST LESS THAN 1000 RIYALS WORKSHOP MANAGER WILL DECIDE IF THEY WILL GO FOR DIRECT PURCHASE REPAIR COST OPTION PARTS COST MORE THAN 10.000 RIYALS WORKSHOP MANAGER CAN RECOMMEND EQUIPMENT DISPOSAL DEPEND ON ITS MODEL YEAR Phase 5
  • 7. REPAIR PROCEDURE SECTION IN CHARGE SHOULD PLAN ALSO THE MANPOWER NEEDED FOR THE REPAIR OF THAT PARTICULAR EQUIPMENTPLAN SHOULD DEPENDS ON IT’S FAULT OR THE MANPOWER REQUIRED , AFTER GETTING THE ESTIMATED COST OF REPAIR, WORKSHOP TEAM WILL DECIDE WHAT OPTION THEY WILL MAKE EITHER DIRECT PURCHASE,CEATE IRF,DISPOSAL DEPENDS ON THE PARTS REQUIRED FOR REPAIR Phase 6 Phase 7 DISCUSSION OF REPAIR MANPOWER PLAN
  • 8. REPAIR PROCEDURE SECTION IN CHARGE SHOULD PLAN ALSO THE REPAIR AND FROM WHERE SECTION HE HAVE TO SEND FIRST THE SAID EQUIPMENT BY THIS PLANS WORKSHOP CAN SAVE REPAIR TIME, (EX, WHILE WAITING FOR MECHANICAL PARTS THE ELECTRICAL SECTION CAN DO THEIR WORK) THIS PLAN WILL COME IF THE EQUIPMENT HAVE MORE PARTS REQUIRED AND CANNOT GO FOR DIRECT PURCHASE. SECTION IN CHARGE SHOULD CREATE IRF FOR ALL PARTS REQUIRED AND MAKE SURE THAT NO PARTS WILL BE MISSED Phase 8 Phase 9 SPARE PARTS PLANNING REPAIR PLANNING
  • 9. REPAIR PROCEDURE WORKSHOP IN CHARGE CAN REQUEST TO CLIENT TO SEND THEIR QC REPRESENTATIVE TO CHECK THE EQUIPEMENT PRIOR FOR THE HANDING OVER OF THE SAID EQUIPMENT, AFTER ACCOMPLISHING ALL THE REPAIR NEEDED FOR THE EQUIPMENT. WORKSHOP IN CHARGE AND FOREMAN SHOULD PERFORM FINAL INSPECTION INCLUDING ACTUAL EQUIPMENT OPERATION Phase 10 Phase 11 WORKSHOP FINAL INSPECTION CLIENT FINAL INSPECTION
  • 10. REPAIR PROCEDURE IF THE CLIENT IS SATISFIED FOR THE PERFORMANCE OF THEIR EQUIPMENT, WORKSHOP IN CHARGE SHOULD ARRANGE THE EQUIPMENT HANDING OVER FORM AND GET SIGNATURE FROM CLIENT Phase 12 HANDING OVER OF EQUIPMENT TO CLIENT
  • 11. Company LOGO TEAMWORK IS THE ABILITY TO WORK TOGETHER TOWARD COMMON VISION