This document contains notes and drawings related to a construction project at 82A Colney Hatch Lane. The notes specify that the contractor is responsible for checking all dimensions, tolerances, and references, and reporting any errors or discrepancies to the architects. All structural information must be taken from the engineers' drawings. The drawings show section views of the building at different levels, including the ground floor, basement, and street level.
1. SP JULY 2009
NOTES:
Report all errors and discrepancies promptly to architects before proceeding with
the works.
Do not scale drawing. Figured dimensions to be worked to in all cases.
The contractor is responsible for checking dimensions, tolerances and references.
All structural information to be taken from engineers drawings.
NOTES:
Report all errors and discrepancies promptly to architects before proceeding with
the works.
Do not scale drawing. Figured dimensions to be worked to in all cases.
The contractor is responsible for checking dimensions, tolerances and references.
All structural information to be taken from engineers drawings. www.crawfordpartnership.co.uk
Company number 3499361
info@crawfordpartnership.co.uk
Tel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
Architecture Interior Design Development
crawford partnership
www.crawfordpartnership.co.uk
Company number 3499361
info@crawfordpartnership.co.uk
Tel: 020 8444 2070 · Fax: 020 8444 1180
1a Muswell Hill, London, N10 3TH
Architecture Interior Design Development
crawford partnership
WORKING DRAWINGS UNLESS LABELLED OTHERWISE
82A Colney Hatch Lane.plnK:0000 Crawford Partnership Projects2009-236 (82a Colney Hatch Lane)000.15.drawings000.15.02 drawings2 - Planning82A Colney Hatch Lane.pln
1:50 @ A2
Sections
AC
82A COLNEY HATCH LANE
2009-236-2-106
MR K. WILSON & MS C. HARDMAN
CHECKED:
REV REVISION / AUTHORDATE
DRAWING NO.:
DRAWING TITLE:
PROJECT:
REV:
CLIENT:
STATUS:
DRAWN: DATE:
SCALE:
+3015 GROUND FLOOR CEILING
-2156 STREET LEVEL
BE DRO OM
BEDROOM BATHROOM HALL CUPBOARD LIVING ROOM
-220 BASEMENT CEILING
SECTION AA
0 GROUND FLOOR LEVEL
-2500 NEW BASEMENT FLOOR
SECTION BB