PROJECT
SUMMARY
2013 - 2015
Ihwan Suryadi – Project Engineer
Jan. 2016
Information Site Survey
Cost EstimateProject Control
Maintenance Design
Chart of Annual Tasks
2013 2014 2015
Equipment $368,000.00 $214,800.00 $571,000.00
Facility $175,000.00 $218,000.00 $1,049,700.00
$368,000.00 $214,800.00
$571,000.00
$175,000.00
$218,000.00
$1,049,700.00
FACILITY & EQUIPMENT VALUE
2013
2014
2015
7
6
15
4 5 7
FACLITY & EQUIPMENT QTY
Equipment Facility
32%
18%
18%
14%
7% 11%
AREA DEPLOYMENT
East Indonesia Kalimantan
Sumatra Java
HO Mining
Project List 2013
NO AREA BRANCH TITLE START END COST CATEGORIES STATUS
1 East Indonesia Soroako Dyno control repair 2/16/2013 6/16/2013 $ 10,000.00 Equipment Done
2 Kalimantan Kariangau Grit blast asset transfer 2/20/2013 7/20/2013 $ 65,000.00 Facility Done
3 Sumatera Pekanbaru Dyno achor base replacement 3/4/2013 5/3/2013 $ 3,000.00 Equipment Done
4 East Indonesia Makassar Overlay Ashpalt 4/10/2013 7/9/2013 $ 45,000.00 Facility Done
5 East Indonesia Makassar Loading & unloading ramp 6/10/2013 9/8/2013 $ 15,000.00 Facility Done
6 Java BSD New Hose Reel 8/20/2013 11/18/2013 $ 90,000.00 Equipment Done
7 Java BSD
Dyno control upgrade include
control valve, penn valve, load cell &
rewiring cable
2/15/2013 7/15/2013 $ 25,000.00 Equipment Done
8 Kalimantan Kariangau
785 Rear Axle Group Remove &
Install Tool
6/20/2013 TBD $ 20,000.00 Equipment Cancelled
9 Kalimantan Kariangau
20 Tones Capacities Rotator
Welding Frame
9/24/2013 12/23/2013 $ 200,000.00 Equipment Cancelled
10 Kalimantan Kariangau Air Compressor Repair 9/29/2013 11/28/2013 $ 20,000.00 Equipment Done
11 East Indonesia Makassar New Concrete Yard 10/18/2013 1/16/2014 $ 50,000.00 Facility Cancelled
TOTAL $ 543,000.0543,000.00
NO AREA BRANCH TITLE START END COST CATEGORIES STATUS
1 Kalimantan Samarida Downdraft Table Fabrication 1/6/2014 5/6/2014 $ 3,800.00 Equipment Done
2 Mining Batu Hijau
Trakindo Engineering - Facility
Development
2/20/2014 TBD $ 130,000.00 Facility Cancelled
3 Sumatera Pekanbaru FIP Test Bench Repair 3/6/2014 7/4/2014 $ 6,000.00 Equipment Done
4 East Indonesia Makassar New Hose Room 3/10/2014 TBD $ 21,000.00 Facility Cancelled
5 East Indonesia Luwuk Part Counter Standard 3/15/2014 TBD $ 12,000.00 Facility Cancelled
6 East Indonesia Sorong
New Air Compressor 4.1 m3/hours
@10 bar
3/20/2014 TBD $ 15,000.00 Equipment Cancelled
7 East Indonesia Sorong Office Relayout 3/25/2014 6/23/2014 $ 30,000.00 Facility Done
8 East Indonesia Jayapura New Genset 22 kVA 6/20/2014 8/19/2014 $ 10,000.00 Equipment Done
9 Mining Kuala Kencana Dyno Upgrade to DX3012 9/24/2014 12/23/2014 $ 100,000.00 Equipment Done
10 HO SOS Jakarta Installation Piping for GC Machine 9/29/2014 11/28/2014 $ 10,000.00 Facility Done
11 Sumatera Palembang Dyno Room Upgrade 10/18/2014 1/16/2015 $ 95,000.00 Equipment Done
TOTAL $ 432,800.0
Project List 2014
432,800.00
NO AREA BRANCH TITLE START END COST CATEGORIES STATUS
1 Sumatera Palembang
Replacement Power Supply for
Dyno Control on SCC Module
1/5/2015 2/19/2015 $ 2,000.00 Equipment Done
2 Sumatera Palembang Dyno Configuration 1/16/2015 2/5/2015 $ 1,000.00 Equipment Done
3 Java BSD
Dyno Problem (load cell
replacment)
1/19/2015 2/18/2015 $ 1,500.00 Equipment Done
4 East Indonesia Soroako Telecomunication Tower 2/23/2015 TBD $ 15,000.00 Facility Waiting IO
5 Kalimantan
CRC
Samarinda
Downdraft table 1/5/2015 3/6/2015 $ 5,000.00 Equipment Done
6 Sumatera Palembang
Upgraded dyno control include PCI
card 6229, UPS & cable
3/23/2015 6/21/2015 $ 10,000.00 Equipment Done
7 Sumatera Pekanbaru Neoprene ball 3/24/2015 4/23/2015 $ 200.00 Equipment Done
8 East Indonesia Sorong Direction sign 3/31/2015 4/30/2015 $ 2,000.00 Facility Done
9 Mining Kuala Dyno Problem (repair FMU) 4/6/2015 4/16/2015 $ 6,000.00 Equipment Done
10 Java BSD
Dyno Problem (unstable control
valve)
4/17/2015 4/19/2015 $ 3,000.00 Equipment Done
11 HO HO Asset Dispose ex Jakarta Branch 4/20/2015 5/20/2015 $ 15,000.00 Facility Done
12 Kalimantan Balikpapan Rough Train Crane 60 Ton 6/5/2015 TBD $ 500,000.00 Equipment Waiting IO
13 Java Surabaya New Warehouse 6/10/2015 TBD $ 345,000.00 Facility Waiting IO
14 Sumatera Pekanbaru PM Platform for Multidocker 385 7/5/2015 TBD $ 200,000.00 Equipment Waiting IO
15 Mining Batu Hijau Welding Truck 8/5/2015 TBD $ 115,000.00 Equipment Waiting IO
16 East Indonesia Kendari Genset 13.5 kVA 9/10/2015 11/9/2015 $ 10,000.00 Equipment Waiting IO
17 HO HO Service Truck Standard 9/29/2015 12/28/2015 $ 10,000.00 Equipment Waiting IO
18 Mining Batu Hijau SOS Facility Upgrade 10/8/2015 1/6/2016 $ 90,000.00 Facility On Progres
19 Kalimantan Kariangau TUE Facility Upgrade 10/10/2015 3/8/2016 $ 230,000.00 Facility On Progres
20 East Indonesia Sorong Office Re-layout 11/30/2015 3/9/2016 $ 55,000.00 Facility Waiting PR
21 Java BSD Dyno Problem (repair FMU) 12/1/2015 12/2/2015 $ 1,000.00 Equipment Done
22 East Indonesia Soroako
Dyno Problem (load cell
replacment)
12/15/2015 3/14/2016 $ 4,000.00 Equipment Done
TOTAL $ 1,620,700.
Project List 2015
1,620,700.00
SOS LAB Facility Upgrade
Figure
Location : Batu Hijau
Cost : $90,000.-
Time Line : Oct 2015 – Mar 2016
Scope of Work : Lab room expansion, office re-layout, additional Lab equipment, fresh air
conditioning, mechanical & electrical works (piping lines, rack storage & electrical panel).
Obstacle : Different material standard between NNT and Trakindo
Vendor : PT TGTN
Current Condition On progress On progress
Project Description
Workshop Facilities Upgrade
Project Description
Figure
Location : Balikpapan
Cost : $230,000.-
Time Line : 6 Month
Scope of Work : Sub Structure, Crane Retrofit, Civil works (bollard, demarcation line,
compressor shelter, security post & fencing), Office Fit Out, Signage, Mechanical & Electrical
Works (piping lines, air compressor, safety equipment & electrical panel).
Vendor : TBD
Current Condition Plan Condition
Dyno Problem (Reparation Fuel
Measurement Unit)
Project Description
Figure
Location : Kuala Kencana Timika
Cost : $6,000.-
Time Line : Apr 2015
Scope of Work : Checked software configuration & DAQ hardware condition
Obstacle : While checked default cabling is wrong connected and one of cable is not
installed
Before Troubleshooting After
Multidocker 385 PM Platform
Project Description
Figure
Location : Pekanbaru
Cost : $200,000.-
Time Line :TBD
Scope of Work : Design, cost estimate and project control
Obstacle : PM activity should be provide, size of platform & lubrication equipment
Plan
Dyno Upgrade DX3010-DX3012
Project Description
Figure
Location : Kuala Kencana
Cost : $100,000.-
Time Line : Sept 2014
Scope of Work : Determine capacity of equipment, bill of material, installation, site
commissioning and testing
Dynamometer Systems
Data Acquisition & Control
Thermocouple
Speed sensor
Pressure sensor
Engine Cooling
Throttle
Control
Strain
gage
Engine
Control Valve
Universal
Joint Shaft
Analog Output
Analog Input
Absorbent
Conveyor Casting
Performance Plan
Support
- Encourage sales
- Fast response service
Maintenance
- Maintenance program
- Maintenance repair
- Interactive communication
- Sharing product knowledge
- Professional serving
Engineering
- Design drive package
- Engineering solution
Project
- Cost estimate
- Project control
Relationship
Thank you
ihwansuryadi@gmail.com
dynoservice.wordpress.com

More Related Content

Similar to porject summary

Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016Azman Salleh
 
CV Tulus Widianto Update
CV Tulus Widianto UpdateCV Tulus Widianto Update
CV Tulus Widianto UpdateTulus Widianto
 
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri SiswantoHendri Siswanto
 
Venthan cv rov supervisor - submersible engineer-tmt
Venthan cv rov supervisor - submersible engineer-tmtVenthan cv rov supervisor - submersible engineer-tmt
Venthan cv rov supervisor - submersible engineer-tmt
Venthan Murugaya
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
Thomas Vincent
 
CV_SUPARMAN_TERUPDATE.pdf baru
CV_SUPARMAN_TERUPDATE.pdf baruCV_SUPARMAN_TERUPDATE.pdf baru
CV_SUPARMAN_TERUPDATE.pdf baruAchmad Suparman
 
Achmad soewarso _ CV
Achmad soewarso _ CVAchmad soewarso _ CV
Achmad soewarso _ CV
Achmad Soewarso
 
Curicculum Vitae Mardianto
Curicculum Vitae MardiantoCuricculum Vitae Mardianto
Curicculum Vitae MardiantoMardianto Piping
 

Similar to porject summary (20)

Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016
 
File
FileFile
File
 
File
FileFile
File
 
File
FileFile
File
 
File
FileFile
File
 
CV Tulus Widianto Update
CV Tulus Widianto UpdateCV Tulus Widianto Update
CV Tulus Widianto Update
 
CV
CVCV
CV
 
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
 
1 Fajar Siddik N CV
1 Fajar Siddik N CV1 Fajar Siddik N CV
1 Fajar Siddik N CV
 
Projects Involved
Projects InvolvedProjects Involved
Projects Involved
 
CV.2016
CV.2016CV.2016
CV.2016
 
Venthan cv rov supervisor - submersible engineer-tmt
Venthan cv rov supervisor - submersible engineer-tmtVenthan cv rov supervisor - submersible engineer-tmt
Venthan cv rov supervisor - submersible engineer-tmt
 
Sears
SearsSears
Sears
 
CV-Windi_eka_putra[1]
CV-Windi_eka_putra[1]CV-Windi_eka_putra[1]
CV-Windi_eka_putra[1]
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
 
CV_SUPARMAN_TERUPDATE.pdf baru
CV_SUPARMAN_TERUPDATE.pdf baruCV_SUPARMAN_TERUPDATE.pdf baru
CV_SUPARMAN_TERUPDATE.pdf baru
 
REPORT 6 MONTH Final
REPORT 6 MONTH FinalREPORT 6 MONTH Final
REPORT 6 MONTH Final
 
Achmad soewarso _ CV
Achmad soewarso _ CVAchmad soewarso _ CV
Achmad soewarso _ CV
 
Ang kwang Wee_CV-Hertel
Ang kwang Wee_CV-HertelAng kwang Wee_CV-Hertel
Ang kwang Wee_CV-Hertel
 
Curicculum Vitae Mardianto
Curicculum Vitae MardiantoCuricculum Vitae Mardianto
Curicculum Vitae Mardianto
 

porject summary

  • 1. PROJECT SUMMARY 2013 - 2015 Ihwan Suryadi – Project Engineer Jan. 2016
  • 2. Information Site Survey Cost EstimateProject Control Maintenance Design
  • 3. Chart of Annual Tasks 2013 2014 2015 Equipment $368,000.00 $214,800.00 $571,000.00 Facility $175,000.00 $218,000.00 $1,049,700.00 $368,000.00 $214,800.00 $571,000.00 $175,000.00 $218,000.00 $1,049,700.00 FACILITY & EQUIPMENT VALUE 2013 2014 2015 7 6 15 4 5 7 FACLITY & EQUIPMENT QTY Equipment Facility 32% 18% 18% 14% 7% 11% AREA DEPLOYMENT East Indonesia Kalimantan Sumatra Java HO Mining
  • 4. Project List 2013 NO AREA BRANCH TITLE START END COST CATEGORIES STATUS 1 East Indonesia Soroako Dyno control repair 2/16/2013 6/16/2013 $ 10,000.00 Equipment Done 2 Kalimantan Kariangau Grit blast asset transfer 2/20/2013 7/20/2013 $ 65,000.00 Facility Done 3 Sumatera Pekanbaru Dyno achor base replacement 3/4/2013 5/3/2013 $ 3,000.00 Equipment Done 4 East Indonesia Makassar Overlay Ashpalt 4/10/2013 7/9/2013 $ 45,000.00 Facility Done 5 East Indonesia Makassar Loading & unloading ramp 6/10/2013 9/8/2013 $ 15,000.00 Facility Done 6 Java BSD New Hose Reel 8/20/2013 11/18/2013 $ 90,000.00 Equipment Done 7 Java BSD Dyno control upgrade include control valve, penn valve, load cell & rewiring cable 2/15/2013 7/15/2013 $ 25,000.00 Equipment Done 8 Kalimantan Kariangau 785 Rear Axle Group Remove & Install Tool 6/20/2013 TBD $ 20,000.00 Equipment Cancelled 9 Kalimantan Kariangau 20 Tones Capacities Rotator Welding Frame 9/24/2013 12/23/2013 $ 200,000.00 Equipment Cancelled 10 Kalimantan Kariangau Air Compressor Repair 9/29/2013 11/28/2013 $ 20,000.00 Equipment Done 11 East Indonesia Makassar New Concrete Yard 10/18/2013 1/16/2014 $ 50,000.00 Facility Cancelled TOTAL $ 543,000.0543,000.00
  • 5. NO AREA BRANCH TITLE START END COST CATEGORIES STATUS 1 Kalimantan Samarida Downdraft Table Fabrication 1/6/2014 5/6/2014 $ 3,800.00 Equipment Done 2 Mining Batu Hijau Trakindo Engineering - Facility Development 2/20/2014 TBD $ 130,000.00 Facility Cancelled 3 Sumatera Pekanbaru FIP Test Bench Repair 3/6/2014 7/4/2014 $ 6,000.00 Equipment Done 4 East Indonesia Makassar New Hose Room 3/10/2014 TBD $ 21,000.00 Facility Cancelled 5 East Indonesia Luwuk Part Counter Standard 3/15/2014 TBD $ 12,000.00 Facility Cancelled 6 East Indonesia Sorong New Air Compressor 4.1 m3/hours @10 bar 3/20/2014 TBD $ 15,000.00 Equipment Cancelled 7 East Indonesia Sorong Office Relayout 3/25/2014 6/23/2014 $ 30,000.00 Facility Done 8 East Indonesia Jayapura New Genset 22 kVA 6/20/2014 8/19/2014 $ 10,000.00 Equipment Done 9 Mining Kuala Kencana Dyno Upgrade to DX3012 9/24/2014 12/23/2014 $ 100,000.00 Equipment Done 10 HO SOS Jakarta Installation Piping for GC Machine 9/29/2014 11/28/2014 $ 10,000.00 Facility Done 11 Sumatera Palembang Dyno Room Upgrade 10/18/2014 1/16/2015 $ 95,000.00 Equipment Done TOTAL $ 432,800.0 Project List 2014 432,800.00
  • 6. NO AREA BRANCH TITLE START END COST CATEGORIES STATUS 1 Sumatera Palembang Replacement Power Supply for Dyno Control on SCC Module 1/5/2015 2/19/2015 $ 2,000.00 Equipment Done 2 Sumatera Palembang Dyno Configuration 1/16/2015 2/5/2015 $ 1,000.00 Equipment Done 3 Java BSD Dyno Problem (load cell replacment) 1/19/2015 2/18/2015 $ 1,500.00 Equipment Done 4 East Indonesia Soroako Telecomunication Tower 2/23/2015 TBD $ 15,000.00 Facility Waiting IO 5 Kalimantan CRC Samarinda Downdraft table 1/5/2015 3/6/2015 $ 5,000.00 Equipment Done 6 Sumatera Palembang Upgraded dyno control include PCI card 6229, UPS & cable 3/23/2015 6/21/2015 $ 10,000.00 Equipment Done 7 Sumatera Pekanbaru Neoprene ball 3/24/2015 4/23/2015 $ 200.00 Equipment Done 8 East Indonesia Sorong Direction sign 3/31/2015 4/30/2015 $ 2,000.00 Facility Done 9 Mining Kuala Dyno Problem (repair FMU) 4/6/2015 4/16/2015 $ 6,000.00 Equipment Done 10 Java BSD Dyno Problem (unstable control valve) 4/17/2015 4/19/2015 $ 3,000.00 Equipment Done 11 HO HO Asset Dispose ex Jakarta Branch 4/20/2015 5/20/2015 $ 15,000.00 Facility Done 12 Kalimantan Balikpapan Rough Train Crane 60 Ton 6/5/2015 TBD $ 500,000.00 Equipment Waiting IO 13 Java Surabaya New Warehouse 6/10/2015 TBD $ 345,000.00 Facility Waiting IO 14 Sumatera Pekanbaru PM Platform for Multidocker 385 7/5/2015 TBD $ 200,000.00 Equipment Waiting IO 15 Mining Batu Hijau Welding Truck 8/5/2015 TBD $ 115,000.00 Equipment Waiting IO 16 East Indonesia Kendari Genset 13.5 kVA 9/10/2015 11/9/2015 $ 10,000.00 Equipment Waiting IO 17 HO HO Service Truck Standard 9/29/2015 12/28/2015 $ 10,000.00 Equipment Waiting IO 18 Mining Batu Hijau SOS Facility Upgrade 10/8/2015 1/6/2016 $ 90,000.00 Facility On Progres 19 Kalimantan Kariangau TUE Facility Upgrade 10/10/2015 3/8/2016 $ 230,000.00 Facility On Progres 20 East Indonesia Sorong Office Re-layout 11/30/2015 3/9/2016 $ 55,000.00 Facility Waiting PR 21 Java BSD Dyno Problem (repair FMU) 12/1/2015 12/2/2015 $ 1,000.00 Equipment Done 22 East Indonesia Soroako Dyno Problem (load cell replacment) 12/15/2015 3/14/2016 $ 4,000.00 Equipment Done TOTAL $ 1,620,700. Project List 2015 1,620,700.00
  • 7. SOS LAB Facility Upgrade Figure Location : Batu Hijau Cost : $90,000.- Time Line : Oct 2015 – Mar 2016 Scope of Work : Lab room expansion, office re-layout, additional Lab equipment, fresh air conditioning, mechanical & electrical works (piping lines, rack storage & electrical panel). Obstacle : Different material standard between NNT and Trakindo Vendor : PT TGTN Current Condition On progress On progress Project Description
  • 8. Workshop Facilities Upgrade Project Description Figure Location : Balikpapan Cost : $230,000.- Time Line : 6 Month Scope of Work : Sub Structure, Crane Retrofit, Civil works (bollard, demarcation line, compressor shelter, security post & fencing), Office Fit Out, Signage, Mechanical & Electrical Works (piping lines, air compressor, safety equipment & electrical panel). Vendor : TBD Current Condition Plan Condition
  • 9. Dyno Problem (Reparation Fuel Measurement Unit) Project Description Figure Location : Kuala Kencana Timika Cost : $6,000.- Time Line : Apr 2015 Scope of Work : Checked software configuration & DAQ hardware condition Obstacle : While checked default cabling is wrong connected and one of cable is not installed Before Troubleshooting After
  • 10. Multidocker 385 PM Platform Project Description Figure Location : Pekanbaru Cost : $200,000.- Time Line :TBD Scope of Work : Design, cost estimate and project control Obstacle : PM activity should be provide, size of platform & lubrication equipment Plan
  • 11. Dyno Upgrade DX3010-DX3012 Project Description Figure Location : Kuala Kencana Cost : $100,000.- Time Line : Sept 2014 Scope of Work : Determine capacity of equipment, bill of material, installation, site commissioning and testing
  • 12. Dynamometer Systems Data Acquisition & Control Thermocouple Speed sensor Pressure sensor Engine Cooling Throttle Control Strain gage Engine Control Valve Universal Joint Shaft Analog Output Analog Input Absorbent
  • 14. Performance Plan Support - Encourage sales - Fast response service Maintenance - Maintenance program - Maintenance repair - Interactive communication - Sharing product knowledge - Professional serving Engineering - Design drive package - Engineering solution Project - Cost estimate - Project control Relationship

Editor's Notes

  1. Selamat pagi bapak dan ibu Terimakasih atas undangan interviewnya Perkenalkan nama ihwan suryadi, umur saya 32 tahun, tinggal di depok, mempunyai 2 anak dan 1 wife Sekarang saya bekerja di pt trakindo utama sebagai project engineer selama 5 tahun Tugas saya adalah memage facility & equipment project, facility & equipment maintenace dan desain tool
  2. Skope pekerjaan yang saya lakukan? Survey, saya melakukan untuk mendapatkan menggali informasi dari kebutuhan projek Desain, saya melakukan desain untuk menggambarkan kebutuhan projek. Desain yang dimaksud membuat gambar mekanikal, elektrikal dan juga kontruksi sipil Estimasi biaya untuk mengetahui berapa besar biaya projek dengan menentukan jenis material, volume yang dibutuhkan, jenis peralatan dan skedule pekerjaan Projek control, saya melakukan monitoring projek dengan meminta weekly report, site commissioning and testing sampai hand over Maintenance, saya membuat program perawatan seperti preventive maintenance, SOP dan WIN What is scope of work I do? site survey, to dig information of project requirements Design to describe of project requirements. The design included drawing of mechanical, electrical and also civil construction Cost estimate to know how much cost of project by determine the type of material, the volume required, the type of equipment and work schedule Project control, I did project monitoring by asking the weekly reports, site commissioning and testing until hand over Maintenance, I did maintenance program such as preventive maintenance, SOP and WIN
  3. Grafik pertama adalah menjelaskan jumlah projek dari facility dan equipment Grafik kedua adalah menjelaskan penyebaran area projek Grafik ketiga adalah menjelaskan nilai pojek dimulai pada tahun 2013 - 2015 These are Chart of annual tasks? The first chart describes the number of products from the facility and equipment - The second graph is describing the deployment of the project area Area deployment is divided into 6, east indonesia, kalimantan, sumatra, java, head office and mining The third chart to explain the value of the project started in the year 2013 - 2015
  4. Berikut list projek 2013 Total 11 projek dengan nilai $ 543,000 The following list of projects in 2013 A total of 11 projects by a value of $ 543,000
  5. Dan berikut list projek 2014 Total 11 projek dengan nilai $ 432,000 And the following list of projects in 2014 A total of 11 projects with a value of $ 432,000
  6. Kemudian berikut list projek 2015 Total 22 projek dengan nilai $ 1,620,700 Then follows a list of projects in 2015 A total of 22 projects with a value of $ 1,620,700
  7. Ada beberapa contoh projek yang telah saya kerjakan yaitu sebagai berikut: Projek ini di lokasi Newmont, dibutuhkan karena ada penambahan peralatan lab dan safety issue menyenai udara di dalam ruangan terkontaminasi dengan chemical. There are several examples of projects I have done is as follows: This project at the site of Newmont, is needed because there are additional lab equipment and safety issue menyenai indoor air contaminated with the chemical.
  8. Selanjutnya: Projek ini di lokasi Balikpapan, dibutuhkan karena ada pekerjaan machine rebuilt untuk off high truck yang dilakukan oleh departement trakindo engineering. Next: This project at the site of Balikpapan, is needed because there is a job for the rebuilt machine off high truck carried by Trakindo engineering department.
  9. Pekerjaan ini hampir sama dengan pekerjaan sebelumya yaitu melakukan troubleshooting dari cable connection. Permasalahannya adalah tidak terbaca pada sistem konsumsi bahan bakar. This work is almost the same as the previous job is to do the troubleshooting of cable connection. The problem is not legible on the system fuel consumption.
  10. Desain platfom ini untuk melakukan pekerjaan PM. Ukuran platform yang tinggi dikarenakan excavator 385 digabung dengan multidocker frame. Tingginya sekitar 12 meter. Penggunaan platform ini untuk industri kertas. This ceiling design to do the job PM. Size due to the high platform combined with multidocker 385 excavator frame. Height of about 12 meters. The use of this platform for the paper industry.
  11. Pekerjaan upgrade ini dibutuhkan dikarenakan terjadi keretakan shaft dyno dan kapasitas dyno perlu lebih besar untuk menyesuaikan pengujian engine besar. This upgrade work is needed because the case rift shaft dyno and capacity needs to be larger to fit a large engine testing.
  12. Dynamometer adalah untuk pengujian performan engine dengan cara mengatur kapasitas aliran air ke dalam housing absorbent. Absorbent terdiri stator and rotor yang bisa membuat momentum gesekan air. Gaya momentum tersebut dimanfaatkan untuk dihubungkan ke strain gage. Data acquisition terdiri dari analog output dan analog output Contoh analog input adalah seperti pressure sensor, temperature sensor, speed sensor dan strain gage. Contoh analog output adalah seperti control valve control dan engine throttle control. Semua parameter akan terbaca di layar desktop untuk mempermudah proses pengujian. Dynamometer is for testing engine performance by regulating the capacity of water flow into the absorbent housing . Absorbent consists of a stator and rotor that can be water friction momentum. The momentum force used to be connected to the strain gage. Data acquisition consists of analog output and analog output Examples of analog inputs such as pressure sensors, temperature sensors, speed sensors and strain gage. Examples of analog output such is the control valve control and engine throttle control. All parameters will be read on the desktop screen to simplify the testing process.
  13. Sebelum saya bekerja di PT Trakindo, saya pernah bekerja sebagai design engineer di PT Ostenco. Salah satu projek yang saya lakukan membuat gambar conveyor ingot. Conveyor ingot terdiri dari motor, helical gear dan worm gear sebagai penggerak. Furnace mengalirkan cairan aluminum ke rool distributor kemudian membagikan ke casting. Casting membawa cairan aluminum ke ground water tank sampai ke ingot hammer. Ingot hammer berfungsi untuk mempermudah melepaskan solid aluminum. Ingot hammer bekerja dengan pergerakan mekanikal cam Before I worked at PT Trakindo, I've worked as a design engineer at PT Ostenco. One project that I did make the image ingot conveyor. Conveyor ingot consists of a motor, helical gear and worm gear as the driving force. Furnace drain the liquid aluminum to rool distributors then distribute to casting. Casting aluminum carrying liquids into ground water tank up to the ingot hammer. Ingot hammer serves to easy the release of solid aluminum. Ingot hammer works with the mechanical movement of the cam
  14. Relationship Carry out interactive communicate with 2 way direction Sharing product knowledge Give professional services Engineering - Designing drive package of motor and gear box Make engineering solution to handle costume design Project Create cost estimate to know project cost and for submitting quotation rate Project control by handling installation, commissioning and testing Maintenance Create maintenance program such as PM, SOP and WIN Conduct repair and troubleshooting Support Encourage sales to better profit include new unit purchase, installation serve and maintenance serve Fast response service in 1day/24hour to reply inquires
  15. Interview contains are:  Self introduction Selling point over 40 project was handled by me, and I’m agile operating design software and I believe can be professional engineer and sales product together with Voith Weakness point I’m not smart people so before I doing, I was preparing information and literature regarding problems solve. I’m often annoyed if work yet has been done Knowing what has become the company service Voith is mechanical company and the product are hydropower, power transmission and paper machine Solving problem Knowing root cause of problem Identified cause of problem Find the way out to clear the problems Why you suitable with our company I have some experience which relevant of your requirement I’m ready for handle multiple tasks and achieve your target / goal How much salary do you want Around 12 million rupiah, it is fair to me cause I have plan for education fund my children Why you interesting joint I exciting with Voith technology, since 18 century has began research & development and I think Vioth one of biggest mechanical company so I hope can joint How long you will works I’m typically loyal with company As long the company pin fait to me Reason moving other company I look better income and advancing my engineering skill Ambitions to achieve? Within 3-4 years, I’m going to generate Voith product market share will increase. As project engineer I support technical and product sales. Idea or strategies to this company? - My idea to make good relationship between voith and costumer by sharing product knowledge, training class or even free inspection services Conflict to superior Iya saya pernah, ketika saya ada perbedaan pendapat dalam menyelesaikan masalah tapi dengan kesabaran dan waktu maka akan didapatkan solusi yang terbaik. When you ready if you be accepted at Voith? 1 month after agreement by voith Whether your colleague is not like you? I believe in teamwork, but if anyone not like me then I would avoid it How you work if under pressure? Keep relaxed and I think patience and focus will help me to accomplish the task Question to voith? Who are the competitor of Voith? How Voith do, can be survive at this moment that economic is still crisis? When I begin joint at voith? What kind facility project? Facility project is a project that improvement, development and addition of office facilities and workshop facilities What kind equipment project? Equipment project is a project that maintenance, replacement and new purchases of workshop equipment and test bench equipment Benefit & question Transportation Medical Business trip allowance Employment status Education funds Basic salary