October	
  2012	
  
MANAGEMENT	
  BRIEF	
  
IBM i for Enterprise Businesses
Quantifying the Value of Resilience
International Technology Group
609 Pacific Avenue, Suite 102
Santa Cruz, California 95060-4406
Telephone: + 831-427-9260
Email: Contact@ITGforInfo.com
Website: ITGforInfo.com
Copyright © 2012 by the International Technology Group. All rights reserved. Material, in whole or part, contained in this document may not be
reproduced or distributed by any means or in any form, including original, without the prior written permission of the International Technology
Group (ITG). Information has been obtained from sources assumed to be reliable and reflects conclusions at the time. This document was
developed with International Business Machines Corporation (IBM) funding. Although the document may utilize publicly available material from
various sources, including IBM, it does not necessarily reflect the positions of such sources on the issues addressed in this document. Material
contained and conclusions presented in this document are subject to change without notice. All warranties as to the accuracy, completeness or
adequacy of such material are disclaimed. There shall be no liability for errors, omissions or inadequacies in the material contained in this
document or for interpretations thereof. Trademarks included in this document are the property of their respective owners.
International Technology Group i
TABLE OF CONTENTS
EXECUTIVE SUMMARY 1
Value Proposition 1
Costs Of Downtime 2
Severe Unplanned Outages 5
Security and Malware Protection 7
Conclusions 8
RISK TRENDS 9
Overview 9
Supply Chain Disruption 9
Retail Vulnerabilities 12
Financial Services 13
Risk Sensitivities 13
Availability and Recovery 13
Security and Malware 14
Data Breaches 15
PLATFORM DIFFERENTIATORS 16
Overview 16
IBM i 17
Principal Characteristics 17
High-end Storage Support 19
Power Systems 21
Overview 21
Virtualization 21
PowerVM and x86 Virtualization 23
Availability Optimization 24
Power Systems 24
Software Solutions 25
DETAILED DATA 27
Company Profiles 27
Costs of Downtime 28
Calculation Process 28
Supply Chain Companies 28
Financial Services Companies 29
Severe Unplanned Outages 29
List of Figures
1. Average Costs of Downtime per Hour – Supply Chain Companies 3
2. Average Costs of Downtime per Hour – Financial Services Companies 4
3. Three-year Costs of Downtime by Platform – Supply Chain Companies 4
4. Three-year Costs of Downtime by Platform – Financial Services Companies 5
5. Three-year Risk Exposure to Severe Unplanned Outages
– Averages for Supply Chain Companies 6
6. Three-year Risk Exposure to Severe Unplanned Outages
– Averages for Financial Services Companies 6
7. Comparative Vulnerability Data – January 2008 Through June 2012 7
8. Comparative Vulnerability Data – Lifetime Totals 7
9. Basic Manufacturing Supply Chain Processes – SCOR Model 10
10. Potential Costs of Outages – Manufacturing Companies 11
11. Data Breach Costs – U.S. Examples 15
12. IBM i Single-level Storage Structure 17
13. IBM i and Power Systems Autonomic Functions 20
14. IBM i and Power Systems Architecture 22
15. System Environment Layers – Example 24
16. Key Power Systems Availability Optimization Technologies 26
17. Company Profiles 27
18. Average Costs of Outages per Hour Detail 29
International Technology Group 1
EXECUTIVE SUMMARY
Value Proposition
The IBM i operating environment has a longstanding track record of maintaining extremely high levels of
availability, security and disaster recovery. Users routinely describe it as “highly stable...extremely
robust…completely dependable…rock-solid” and comparable terms.
This has been the experience not only of midsize businesses, but also of large organizations requiring
enterprise-class capabilities. Among IBM i users are some of the world’s largest corporations, including
members of the Fortune 100 and FTSE 100.
Among this group, IBM i typically supports high-volume business-critical systems. Examples include
enterprise resource planning (ERP) systems, along with supply chain management, core banking and
retail, e-commerce and equivalents in a wide range of industries. IBM i offers levels of availability,
security and recoverability that are – by wide margins – greater than any competitive platform.
What is the value of these strengths? Few would dispute that disruption of core enterprise systems can
affect the bottom line. Many organizations, however, do not factor costs of downtime into their platform
selection processes. This may be a serious mistake. Business damage due to planned as well as unplanned
outages may vary significantly between platforms.
This report presents two sets of three-year cost comparisons for use of IBM i, Microsoft Windows Server
Failover Clusters (WSFC), and Oracle Exadata Database Machine to support core enterprise systems in
six companies. Comparisons are presented for companies operating supply chains, and for financial
services companies with revenues of between $1 billion and $10 billion.
Results may be summarized as follows:
• Costs of downtime – i.e., business costs due to outages – averaged 90 percent less for use of IBM
i than for Windows server clusters, and 71 percent less than for Oracle Exadata. This calculation
is for planned outages and unplanned outages of less than three hours duration.
Lower IBM i costs of downtime translated into three-year business savings of $2.8 million to
$35.3 million compared to use of clustered Windows servers, and $700,000 to $8.6 million
compared to use of Oracle Exadata.
• Risk exposure to severe unplanned outages of 6 to 24 hours duration is also significantly lower
for use of IBM i. These calculations, which employ a standard probability/impact methodology,
indicate that risks of severe business damage for use IBM i average 93 percent less than for use of
clustered Windows servers and 73 percent less than for use of Oracle Exadata.
These variances translated into $257,000 to $7.43 million in higher risk exposure for use of
clustered Windows servers and $56,000 to $1.69 million for use of Oracle Exadata.
Comparisons are based on use of IBM i 7.1 with IBM PowerHA SystemMirror for i high availability
clusters on latest-generation Power Systems; Windows Server 2008 R2, SQL Server 2008 R2 and WSFC
on latest-generation Intel E5- and E7-based platforms; and current Oracle Exadata models with Oracle
11g Database including Real Application Clusters (RAC).
Lower costs of downtime and risk exposure for use of IBM i are due to fundamental differences in
architecture and technology.
International Technology Group 2
IBM i is designed specifically to run business-critical systems. High levels of availability reflect features
built into the IBM i kernel, and embedded into Power Systems hardware and firmware. IBM i is the most
tightly integrated and automated operating environment in existence. The potential for system, operator or
administrator errors is minimal.
The strengths of IBM i in security and malware protection reflect the system’s distinctive object-based
architecture. Objects are encapsulated in a manner that places strict controls on data as well as system
code, making it extremely difficult for unauthorized instructions to execute. Security violations are rare,
and malware incidents are virtually unknown. There are no known native IBM i viruses.
Disaster recovery capabilities are built into the IBM i kernel and tightly integrated with IBM PowerHA
and third-party failover and recovery solutions. These have supported high-volume business-critical
systems for decades.
IBM i and Power Systems routinely handle enterprise-class workloads requiring high levels of scalability
and performance – many users employ IBM Power 770, 780 and 795 models with up to 64, 96 and 256
POWER7 cores respectively – and offer highly granular, real-time virtualization even in demanding
production environments.
In terms of technological currency, IBM i implements the full function SQL-compliant DB2 relational
database, Internet standards and interfaces to tablets and smartphones. It also supports a wide range of
development languages, including C/C++, COBOL, RPG, Java, PHP, XML and others.
IBM i users have been able to take full advantage of Internet and, more recently, mobile technologies to
employ popular “open” development tools and to exploit growing pools of developer skills.
A further point should be noted. The virtualization strengths of IBM i and PowerVM provide a strong
base for realization of public as well as private clouds. IBM i and PowerVM are central platforms in IBM
cloud strategy, and will be fully supported in the future evolution of IBM cloud solutions and services.
In most organizations – including those upon which comparisons presented in this report are based – IBM
i systems coexist with a variety of UNIX and x86 servers. IBM i may not be appropriate for all
applications. But for core systems that “run the business,” its distinctive strengths are unmatched.
Costs Of Downtime
The comparisons presented in this report are based on detailed financial and operational data supplied by
60 companies employing IBM i, WSFC or Oracle Exadata to run core enterprise systems.
Based on this input, six composite company profiles were created. These included companies operating
supply chains (an auto parts manufacturer, a retail chain and an industrial distributor) as well as financial
services companies (a diversified retail bank, a property and casualty insurer and a services company).
Average costs of downtime per hour were first calculated for these companies, and then multiplied by
numbers of hours of downtime for each of the three platform options. The focus was placed on underlying
hardware and software platform outages, rather than application-level downtime.
For supply chain companies, average costs of downtime ranged from $549,000 to $1.21 million to per
hour. Figure 1 summarizes these results.
International Technology Group 3
Figure 1: Average Costs of Downtime per Hour – Supply Chain Companies
Costs of downtime allow for cascading effects. In tightly integrated supply chains characterized by lean
operating models (i.e., there are few or no inventory buffers) and real-time operations, evidence has shown
that the effects of disruption at any point may cascade across the entire supply chain.
This significantly changes the costs of downtime equation. In the past, for example, companies often
calculated that, if annual sales were $5 billion, the cost of an hour of downtime was $5 billion divided by
8,760 hours per year = $570,000. In practice, however, the cost may be four or five times higher, and the
effects may continue to felt for days or even weeks.
For supply chain companies, allowance was also made for lost sales, increases in operational costs,
remedial costs such as late delivery and imperfect order penalties, and related effects. Selling, general and
administrative (SG&A) costs for the retail chain are due to disruption of store operations.
Costs of downtime may be substantial in other industries where cascading occurs. These include
transportation, where schedule disruption may have major bottom-line impacts; third-party logistics
services; engineering and construction; energy companies and public sector organizations.
For financial services companies, costs of downtime varied by type of business. For the bank, costs of
downtime include lost or delayed transaction fees, lost interest income and lost productivity for branch
and call center staff.
For the insurer and services company, costs include lost policy income (the company transacted a large
volume of business over the Internet, and was thus exceptionally vulnerable to effects of outages) and lost
services income respectively. Other items include lost interest income and lost productivity for customer-
facing staff.
Costs of downtime for all three companies allow for the effects customer attrition, calculated using
appropriate customer lifetime value (CLV) metrics, and lost customer acquisition costs.
Average costs of downtime ranged from $128,000 to $259,000 per hour. Figure 2 summarizes these
results.
Retail	
  Chain	
  
Lost	
  sales	
  
Supply	
  chain	
  disrupCon	
  
SG&A	
  costs	
  
685.03
Auto	
  Parts	
  Manufacturer	
  
Outbound	
  supply	
  chain	
  disrupCon	
  
Inbound	
  supply	
  chain	
  &	
  producCon	
  disrupCon	
  
Customer	
  penalCes	
  &	
  remedial	
  costs	
  
1,213.71
Industrial	
  Distributor	
  
Lost	
  sales	
  
Supply	
  chain	
  disrupCon	
  
549.16
$	
  thousands	
  
SUPPLY	
  CHAIN	
  COMPANIES	
  
International Technology Group 4
Figure 2: Average Costs of Downtime per Hour – Financial Services Companies
Based on these values, three-year costs of downtime for the three platform options were as shown in
figures 3 and 4.
Figure 3: Three-year Costs of Downtime by Platform – Supply Chain Companies
Comparatively high WSFC costs of downtime are notable in that “five nines” (99.999 percent)
availability is commonly claimed for this platform. There are several reasons for this disparity.
One is that such claims commonly refer to low-volume environments and/or applications whose
characteristics are significantly different to those of enterprise business systems. The technical challenges
of maintaining high levels of availability for, say, email or collaborative networks are not the same as
those for high-volume transactional and mixed workloads.
Insurance	
  Company	
  
Lost	
  income	
  
Other	
  costs	
  
150.36
Bank	
  
Customer	
  aNriCon	
  	
  
Lost	
  fee	
  income	
  
Other	
  costs	
  
259.45
Services	
  Companies	
  
Lost	
  income	
  	
  
Other	
  costs	
  
127.86
$	
  thousands	
  
FINANCIAL	
  SERVICES	
  COMPANIES	
  
Industrial	
  Distributor	
  
Retail	
  Chain	
  
Auto	
  Parts	
  Manufacturer	
  
	
  1.10	
  	
  
	
  2.77	
  	
  
	
  3.52	
  	
  
	
  4.39	
  	
  
	
  8.56	
  	
  
	
  12.14	
  	
  
	
  9.88	
  	
  
	
  20.55	
  	
  
	
  38.84	
  	
  
MicrosoY	
  WSFC	
  
Oracle	
  Exadata	
  
IBM	
  i/Power	
  
$	
  millions	
  
International Technology Group 5
Figure 4: Three-year Costs of Downtime by Platform – Financial Services Companies
A second reason is that claims typically refer to avoidance of unplanned outages rather than overall
downtime. Windows cluster environments tend to be highly complex, and in practice require extensive
software maintenance. Complexity also increases risks that unplanned outages will occur – there are more
potential points of failure.
WSFC deployments supporting enterprise-class systems are typically customized by professional services
firms. Modifications, as well as testing of these, tend to be more difficult and time-consuming than might
be the case in a less complex Microsoft environment.
Higher levels of availability for Oracle Exadata reflect more resilient hardware and use of the company’s
RAC cluster technology. Planned outages, however, tend to be longer and more frequent than for IBM i.
Oracle Exadata systems have been variously deployed for business intelligence (BI), transactional
applications and consolidation of Oracle database servers. The underlying architecture is, however,
primarily optimized for high-performance analytics.
Severe Unplanned Outages
There is a great deal of evidence that, when severe unplanned outages occur, the bottom-line impact
increases in a manner that is as much exponential as arithmetic. A 24-hour outage, for example, may not
have four times the impact of a 6-hour outage. It may have 20 times more.
Experience with major supply chain failures has shown that effects may extend beyond operational costs
and lost sales to include reputational damage, impaired corporate financial performance, share price
declines, reduced investor confidence and other negative effects.
Financial services companies are equally if not more vulnerable. Customer attrition and remedial costs are
likely to be substantial, reputational damage may be immediate and massive, and regulatory penalties and
legal costs may be incurred.
Services	
  Company	
  
Insurance	
  Company	
  
Bank	
  
	
  0.32	
  	
  
	
  0.45	
  	
  
	
  0.78	
  	
  
	
  1.02	
  	
  
	
  1.50	
  	
  
	
  2.98	
  	
  
	
  3.07	
  	
  
	
  4.81	
  	
  
	
  9.34	
  	
  
MicrosoY	
  WSFC	
  
Oracle	
  Exadata	
  
IBM	
  i/Power	
  
$	
  millions	
  
International Technology Group 6
The example of the recent (June 2012) core banking system outage affecting the UK’s Royal Bank of
Scotland (RBS) is instructive. The outage left 17 million of the company’s 23 million customers unable to
access account information, withdraw or transfer funds, or process payments for up to six days. Media
coverage was massive and predominantly negative.
In August 2012, RBS projected more than $200 million in remedial costs for customer reimbursements,
overdraft extensions and related actions. The company was also obliged to extend hours at more than
1,200 out of 2,500 branches and double call center staff in order to handle customer queries. The extent of
customer attrition is still unclear.
Like costs of downtime, risk exposure is materially affected by platform choices. In supply chain
companies, three-year exposure for use of IBM i on Power Systems averaged 93 percent less than for
WSFC, and 73 percent less than for use of Oracle Exadata.
Disparities for financial services companies were generally similar. Comparable averages were 95 percent
and 76 percent less respectively. Figures 5 and 6 illustrate these results.
Figure 5: Three-year Risk Exposure to Severe Unplanned Outages
– Averages for Supply Chain Companies
Figure 6: Three-year Risk Exposure to Severe Unplanned Outages
– Averages for Financial Services Companies
IBM	
  i/Power	
  
Oracle	
  Exadata	
  
MicrosoY	
  WSFC	
  
357.63	
  
1,319.79	
  
4,858.51	
  
$	
  thousands	
  
IBM	
  i/Power	
  
Oracle	
  Exadata	
  
MicrosoY	
  WSFC	
  
	
  34.25	
  	
  
	
  140.76	
  	
  
	
  604.54	
  	
  
$	
  thousands	
  
International Technology Group 7
Security and Malware Protection
A further area of risk exposure should be highlighted. Hacking and infection by malware (malicious code)
remain ubiquitous threats for all large organizations.
Companies that experience customer data breaches may incur fines and other regulatory penalties, along
with costs of remedial actions such as notifications, monitoring for identity theft, query handling, and
investigation and resolution of security flaws. In the event of a publicized breach, customer attrition and
reputational damage may also be substantial.
Even if customer data is not compromised, other types of sensitive information may be compromised, and
damage to systems and software may occur.
In security and malware protection, differences between IBM and competitive platforms are not merely
significant – they are dramatic. These differences are reflected in data compiled by Secunia, one of the
industry’s leading authorities on security and malware exposure.
Figure 7 shows numbers of advisory notices issued by the company between January 2008 and June 2012
inclusive for the most recent versions of IBM i, the two principal Linux distributions – Red Hat
Enterprise Linux (RHEL) and SUSE Linux Enterprise Server (SLES) – and for Windows Server 2008.
SEVERITY	
  
WINDOWS	
  
SERVER	
  2008	
  
RHEL	
  
Server	
  5	
  
RHEL	
  
Server	
  6	
  
SLES	
  10	
   SLES	
  11	
   IBM	
  i	
  7.1	
   i5/OS	
  6.x	
  
Extremely	
  critical	
   3	
   1	
   0	
   0	
   0	
   0	
   0	
  
Highly	
  critical	
   64	
   93	
   61	
   134	
   88	
   0	
   0	
  
Moderately	
  critical	
   34	
   185	
   84	
   79	
   53	
   0	
   6	
  
Less	
  critical	
   73	
   175	
   85	
   60	
   66	
   0	
   5	
  
Not	
  critical	
   5	
   53	
   31	
   18	
   14	
   0	
   0	
  
TOTAL	
  ADVISORIES	
  	
   179	
   507	
   261	
   291	
   221	
   0	
   11	
  
Source:	
  Secunia	
  
Figure 7: Comparative Vulnerability Data – January 2008 Through June 2012
Figure 8 shows lifetime vulnerabilities; i.e., the number of vulnerabilities recorded by the company since
each version was introduced. Multiple vulnerabilities may be documented in a single advisory notice.
	
  
WINDOWS	
  
SERVER	
  2008	
  
RHEL	
  
Server	
  5	
  
RHEL	
  
Server	
  6	
  
SLES	
  10	
   SLES	
  11	
   IBM	
  i	
  7.1	
   i5/OS	
  6.x	
  
Release	
  Date	
  
February	
  
2008	
  
March	
  
2007	
  
November	
  
2010	
  
July	
  	
  
2006	
  
March	
  
2009	
  
April	
  	
  
2010	
  
January	
  
2008	
  
Lifetime	
  Vulnerabilities	
   352	
   1,871	
   906	
   3,557	
   1,889	
   0	
   16	
  
Source:	
  Secunia	
  
Figure 8: Comparative Vulnerability Data – Lifetime Totals
(Oracle Enterprise Linux, the most commonly employed Exadata operating system, is not tracked
separately. It is based on RHEL. Windows Server 2012 became generally available in September 2012.)
Disparities are confirmed by other sources. During 2011, for example, the National Vulnerability Database
maintained the U.S. National Institute of Standards and Technology (NIST), recorded 197 medium and
high security vulnerabilities for Linux, and 130 for Windows Server. None were recorded for IBM i.
International Technology Group 8
The significance of IBM i security strengths is reinforced by two factors. One is that, most security
authorities recognize, firewall-based perimeter defenses are no longer enough. Penetration of these has
become increasingly common, and they do not prevent escalating threats of insider abuse. Higher levels
of protection are required for core business databases.
The second is that, since the onset of recession, businesses have become reluctant to increase spending on
IT security, and many have reduced it. Threats, however, have continued to increase. Organizations have
been faced with a choice between greater expenditure or greater risk. IBM i enables them to avoid this
choice. Better security may be maintained at a lower cost.
Conclusions
No matter how one rates the value of IBM i’s distinctive strengths, that value is increasing over time.
Industry trends are magnifying the effects of downtime. Among companies operating supply chains,
economic conditions have accelerated inventory drawdowns, while moves to lower-cost offshore sites
increase supply chain complexity and geographic dispersion. Adoption of real-time business analytics and
technologies such as RFID will further reduce cycle times.
For financial services companies, mergers and acquisitions mean that core systems outages affect larger
numbers of customers. Growth of online and – increasingly – mobile services has introduced new points
of vulnerability. Competitive pressures have increased risks of customer attrition. In these and other
industries, use of social media has increased security and malware exposure.
IBM i has been employed, in some cases for more than 20 years, by large users worldwide. It was
designed to offer a simple, reliable, secure and easy-to-administer platform to support core business
systems.
In an era when the IT world has veered toward ever-greater complexity, IBM i has retained these
characteristics. More than any other server environment available today, it is designed to minimize the
complexities with which organizations must deal.
Over the last few years the IT industry has, ironically, rediscovered the advantages of complexity
reduction. The principal value propositions for cloud computing – faster deployment and provisioning,
more effective use of virtualization to enable consolidation and reduced administrative overhead – have
been enjoyed by IBM i users for decades.
Others may enjoy the same benefits.
International Technology Group 9
RISK TRENDS
Overview
Key industry trends mean that the significance of IBM i strengths in availability and disaster recovery,
and in security and malware resistance are increasing over time. These trends are discussed in this section.
The following section, Platform Differentiators, deals with differences in architecture and technology
between IBM i and Power Systems, and competitive hardware and software platforms. The last section,
Detailed Data, provides additional information on the methodology employed for calculations. Detailed
cost breakdowns are also provided.
Supply Chain Disruption
Decades of experience have shown that, in industries operating supply chains, downtime costs money.
Risks of supply chain disruption have, however, been the subject of greatly increased attention since the
mid 2000s. This shift been driven by a number of trends, including the following:
1. Integration. ERP systems have progressively expanded to integrate a broader range of
transactional processes, as well as new analytical and collaborative functions.
ERP environments now commonly include customer relationship management (CRM), e-
commerce, supply chain management (SCM), product data management (PDM) and product
lifecycle management (PLM), supplier relationship management (SRM), BI and a wide range of
other applications.
Businesses, however, have found that the benefits of broader functionality and organization-wide
process integration have a side effect: they become fundamentally dependent upon their systems.
Quite simply, an outage may grind the entire business to a halt.
Vulnerabilities are magnified by consolidation of systems. Mergers and acquisitions, as well as
adoption of shared services structures for order processing, finance, human resources (HR),
customer service and other functions have contributed to this trend.
Exposure extends to solutions for planning and forecasting, analytics, mobile computing and
other informational applications. Even if applications are deployed on different platforms, they
draw upon core databases – if these are down, they will at best be working with stale data.
2. Globalization. The growth of offshore sourcing has caused procurement and logistics operations
to grow more complex, while transportation times have increased.
The impact of disruptions tends to be greater for regional and global supply chains than for those
in more restricted geographies. A delay in shipping from a local plant to a nearby distribution
center, for example, may mean waiting for another truck. A delay in shipping from a Chinese
plant to North America or Europe may mean waiting 10 days for the next ship.
3. Supply chain strategies. Adoption of just in time, lean and real-time operating models has further
increased vulnerability.
In most supply chain industries, lean strategies have become the norm. In consumer products and
retailing, they have been reflected in techniques such as Efficient Customer Response (ECR),
Collaborative Planning, Forecasting and Replenishment (CPFR), Continuous Replenishment and
Vendor Managed Inventory (VMI).
International Technology Group 10
The effects of lean strategies may permeate the entire supply chain. At the corporate or business
unit level, for example, forecasting and planning cycles may be reduced from weeks to days, or to
24 hours or less.
At the other end of the spectrum, cross docking (i.e., the immediate transshipment of goods
between arriving and departing vehicles, without intermediate storage) in distribution centers may
increase both efficiency and vulnerability to disruption.
In the automotive industry, for example, suppliers now receive continuous demand signals from
their customers, recalibrate plans and forecasts, and initiate procurement, production and logistics
actions in real-time. In a fiercely competitive industry, supplier shortfalls are rarely tolerated.
The automotive parts company profiled in this report, for example, delivers to its customers’
manufacturing plants on a just-in-time basis, often several times a day. Orders are typically
processed in minutes and deliveries dispatched within two to five hours.
4. Cascading effects. These may be simply illustrated. Even a basic manufacturing supply chain
will typically involve most or all of the processes summarized in figure 9.
SOURCE	
  
§ Identify	
  sources	
  of	
  supply	
  
§ Select	
  supplier(s)	
  
§ Negotiate	
  with	
  supplier(s)	
  
§ Schedule	
  product	
  deliveries	
  	
  
§ Receive	
  product	
  
§ Verify	
  product	
  
§ Transfer	
  product	
  
§ Authorize	
  supplier	
  payment	
  
MAKE	
  
§ Schedule	
  production	
  
§ Set	
  up	
  production	
  
§ Issue	
  product	
  
§ Produce	
  	
  
§ Inspect/test	
  product	
  
§ Package	
  product	
  
§ Stage	
  product	
  
§ Release	
  to	
  delivery	
  
DELIVER	
  
§ Process	
  inquiry	
  &	
  quote	
  
§ Receive,	
  enter	
  &	
  validate	
  order	
  
§ Reserve	
  inventory	
  resources	
  
§ Reserve	
  delivery	
  resources	
  
§ Determine	
  delivery	
  date	
  
§ Consolidate	
  orders	
  
§ Build	
  loads	
  
§ Route	
  shipments	
  
§ Select	
  carrier(s)/rate(s)	
  
§ Receive	
  product	
  
§ Pick	
  product	
  
§ Pack	
  product	
  
§ Load	
  product	
  	
  
§ Generate	
  shipping	
  docs	
  
§ Ship	
  product	
  
§ Customer	
  receipt	
  &	
  verify	
  
§ Install	
  product	
  
§ Invoice	
  customer	
  
Figure 9: Basic Manufacturing Supply Chain Processes – SCOR Model
The figure above is based on selected segments of the Supply Chain Operations Reference
(SCOR) model developed by the Supply Chain Council.
Delays in one process can spread rapidly to others. For example, a delay in delivering parts to a
plant may cause finished product shipment deadlines to be missed. This may affect transportation
schedules and distribution center operations, affecting other deliveries. The impact is cumulative.
5. Customer responses. Economic conditions, changing expectations and mounting competition
have made customers less tolerant of supplier failures. Although the costs of operational
disruption may be substantial, the largest bottom-line impact often involves customers.
Sales may be lost, and customers may defect. Even if this does not occur, suppliers may be
subject to late delivery, imperfect order and other penalties. It may also be necessary to offer
special discounts or terms and conditions in order to win back the customer’s business.
International Technology Group 11
A less visible, but potentially more damaging erosion of confidence may also occur. This could
cause the customer to hedge by diverting some future purchases to other suppliers in order to
reduce dependence. In addition, the customer might be reluctant to rely upon the company for
future strategic orders, particularly where these were time-sensitive.
No manufacturer wants to learn that customers now consider them a high-risk supplier.
An additional set of “strategic” costs may be incurred if outages are severe, protracted or both. Share
prices may be affected. Other effects such as reduced brand value; increased risk provision; higher
insurance premiums; and a variety of reputational, legal and compliance problems may be experienced.
System outages may have a wide range of potential cost impacts. Figure 10, for example, shows a
representative list of these for manufacturing companies.
	
  STRATEGIC	
  COSTS
Charge	
  against	
  earnings	
  
Financial	
  metrics/ratios	
  
Share	
  price	
  decline	
  
Share	
  price	
  volatility	
  
Cost	
  of	
  capital	
  
Increased	
  risk	
  provision	
  	
  
Reduced	
  brand	
  value	
  
Insurance	
  premiums	
  
Damaged	
  reputation	
  	
  
- Financial	
  markets	
  
- Customers/prospects	
  
- Banks	
  
- Business	
  partners
- M&A	
  candidates
Impaired	
  credit	
  
Liquidity	
  exposure
Legal	
  exposure	
  
- Customers	
  
- Third	
  parties	
  
- Shareholders	
  
Compliance	
  exposure	
  
- Regulatory	
  reporting	
  
- Impaired	
  inspection	
  
- Impaired	
  traceability
CUSTOMER-­‐RELATED	
  COSTS
Lost	
  short-­‐term	
  sales	
  
Lost	
  short-­‐term	
  profit	
  
Lost	
  future	
  sales/profit	
  
Late	
  delivery	
  penalties	
  
Imperfect	
  order	
  penalties	
  
Product	
  defect	
  penalties
Customer	
  rebates	
  
Buyback	
  pricing/concessions	
  
Additional	
  customer	
  service	
  cost
OPERATIONAL	
  COSTS
Idle	
  capacity	
  
- Overall	
  supply	
  chain	
  
- Procurement	
  
- Plant	
  operations	
  
- Logistics/distribution	
  
- Transportation	
  	
  
- Warehouses	
  
- Third-­‐party	
  services	
  
Personnel	
  costs	
  
- Idleness/underutilization	
  
- Reduced	
  productivity	
  
- Additional	
  work	
  required	
  
- Overtime/shift	
  premiums	
  
- Additional	
  T&E	
  costs	
  
Finance	
  processes	
  
- Delayed	
  billing/receivables	
  
- Inventory	
  carrying	
  cost	
  
- Cash	
  flow	
  cost	
  
- Delayed	
  close	
  
Costs	
  of	
  change	
  
- Procurement	
  change	
  
- Revised	
  order	
  processing	
  
- Special	
  order	
  cost	
  
- Production	
  schedule	
  change	
  
- Line	
  change	
  cost	
  
- Costs	
  of	
  logistics	
  change	
  
- Supplier	
  premiums	
  
- Expedited	
  transportation	
  	
  
- Additional	
  handling	
  cost	
  
- Additional	
  inventory	
  cost	
  
- Additional	
  checking	
  cost	
  
Error-­‐related	
  costs	
  
- Order	
  processing	
  errors	
  
- Product	
  defect	
  
- Specification	
  error	
  
- Manufacturing	
  error	
  
- Quality	
  failure	
  
- Shipment	
  error	
  
- Damaged	
  product	
  
- Wrong	
  packaging	
  
- Routing	
  error	
  
- Wrong	
  delivery	
  time	
  
Other	
  costs	
  
- Lost	
  promotional	
  expenditure	
  
- Lost	
  marketing	
  expenditure	
  
- IT	
  costs	
  	
  
- Administrative	
  costs	
  
- Overhead
Figure 10: Potential Costs of Outages – Manufacturing Companies
The potential significance of such effects was highlighted by a study co-authored by Kevin Hendricks of
the University of Western Ontario and Vinod Singhal of the Georgia Institute of Technology. After
reviewing the financial results of more than 800 public companies that had experienced severe supply
chain disruptions, the authors concluded that company stocks experienced 33 to 40 percent lower returns
relative to industry benchmarks over a three-year period because of these.
International Technology Group 12
The study also reported declines of 7 percent in sales growth, 107 percent in operating income, 114
percent in return on sales, 93 percent in return on assets, and increases in cost of sales, selling, SG&A
expenses and inventory levels.
A further implication should be highlighted. Disruptions tend to raise error rates across any or all stages
of supply chains. This is particularly likely if there is a rush to catch up with backlogs. Results may
include dissatisfied customers, remedial costs, legal and regulatory exposure and other negative effects.
A clear conclusion emerges. Whether outages result in operational disruption, customer-related costs
and/or strategic costs, they have a significant impact. Maintenance of the highest possible level of
availability and recovery for core supply chain systems should be a central goal of IT strategy.
Retail Vulnerabilities
Retailers worldwide have experienced many of the same trends as manufacturers. Supply chains have
become more complex and fragile, logistics structures have been consolidated and cycle times have been
cut across the board.
Acceleration has affected processes such as sales and inventory tracking, and merchandising decisions.
Although the pace has varied between retail lines and geographies, there has been a steady trend toward
more frequent new product launches, and greater use of time-sensitive promotions and markdowns.
System downtime occurring during such periods may have particularly serious effects.
Service interruptions may also cause lost sales and customers. In conventional storefront retailing, the
industry “rule of thumb” is 40 to 80 percent of stockouts result in lost sales rather than purchases of an
alternative in-store product. Additional costs may be incurred for changes to store displays, backorders,
restocking, markdowns and other remedial actions.
Online sales are even more vulnerable. More than 20 years of experience with retail websites has shown
that 24x365 usage is the norm, and that even short outages during off-peak periods may cause significant
loss of business. If protracted outages occur at times of high usage (e.g., during seasonal sales peaks, or in
response to new product launches, promotions or Internet buzz), losses may be massive.
It has become a truism that, in online retailing, shoppers who are diverted to another supplier because
they are unable to research a product, determine availability or place an order may not return. Even if they
do, they are more likely to buy from multiple sources in the future.
Retailers also face growing use of mobile devices in stores. In the United States, for example, more than
40 percent of tablet and smartphone owners use these for comparison-shopping while visiting retail
outlets, and some estimates put the ratio at over 60 percent. There are similar trends in other geographies.
It has long been a principle that, in e-commerce, “customers are only a few clicks away from
competitors” and that online outages translate rapidly into lost sales. Mobility extends this effect to stores.
Increasingly, any customer may be “only a few clicks away from competitors.”
International Technology Group 13
Financial Services
Risk Sensitivities
Financial services are, more than any other industry, sensitive to risk. Financial institutions are equipped
with highly sophisticated risk management processes and systems. Cultures of risk awareness and
mitigation are well established.
This extends to IT. Most companies have developed high availability, disaster recovery and security
infrastructures over decades. Risk sensitivity, however, has its blind spots. While the importance of such
infrastructures is generally understood, there is less awareness that the platforms around which they are
built may themselves be risk factors.
In large banks, core systems are typically mainframe-based. A significant minority, however, run on IBM
i. Worldwide, more than 15,000 banks, including large as well as small and midsize institutions, run core
systems on this platform. The general industry recognition is that IBM i offers mainframe-class levels of
availability, security and recoverability.
IBM i is supported by most of the industry’s major ISVs offering core banking and electronic funds
transfer (EFT) solutions, and has also been deployed by numerous insurance and other financial services
companies.
As the results presented in this report indicate, risk exposure may be significantly greater for other
platforms with which there is less experience in large-scale core system deployments.
Availability and Recovery
The financial services industry has long been sensitive to outages. The cost per hour of downtime for
trading, credit card processing, ATM and debit card networks, and other high-volume EFT systems has
often run to hundreds of thousands or millions of dollars.
With the growth of Internet services, vulnerability has increased further. “Normal business hours” no
longer exist. Most companies experience some level of activity at all hours of the day and night, 365 days
per year. Any interruption of service, at any time, may affect customers. An outage at times of high
activity may impact millions.
Apart from lost fee income, lost or delayed payments and other financial effects, customer loss may also
occur. Even if defections cannot be attributed to a specific incident, their effects will show up in overall
attrition statistics.
Outages may accelerate trends that are already causing concern among many companies. Bank customer
attrition rates, for example, continue to increase. In North America and Western Europe, annual rates are
already in the 5 to 10 percent per year range, while in many developing economies rates of 10 to 20
percent are becoming the norm.
Similar trends have been reported in insurance and other financial services businesses. For these, as for
banks, service issues are – by a wide margin – the most common cause of attrition.
Customer loss is magnified if it measured in terms of CLV. In banking, insurance and other lines of
business, the effects are magnified by the growing numbers of products held per customer, and by the fact
that relationships tend to become more profitable the longer they last.
International Technology Group 14
Allowance should also be made for lost customer acquisition costs. In banking, for example, acquisition
costs in developed countries are routinely $200 to $400 per customer, and average costs are escalating in
developing geographies. This expenditure is inevitably lost if a customer defects.
Disruption of core banking systems may be exceptionally damaging. Over time, these have developed
links to a wide range of other systems within banking infrastructures. A disruption may create cascading
effects as severe and long lasting as those in supply chain companies.
The recent Royal Bank of Scotland core banking system outage, for example, affected not only batch
processing but also all branch systems, ATMs, debit and credit cards, online banking and call center
systems. All channels and customer touch points were affected.
Vulnerability to such disruptions has tended to increase. Mergers and acquisitions have led many banks in
developed countries to merge legacy core banking systems (this was notably the case for Royal Bank of
Scotland), while in developing economies new deployments have often been driven by the need to
support business growth and offer new services.
The replacement of a core banking system is, under any scenario, a high-risk proposition. Risks increase
in proportion to the size of institutions. They increase further if new systems are deployed on platforms
whose stability and robustness is problematic.
Security and Malware
Financial services companies are the preferred target of the most sophisticated cybercriminals, including
organized gangs operating worldwide.
Hacking as well as malware attacks are growing more sophisticated over time. Companies also face a
growing threat from “hacktivists” promoting social and political agendas. During 2011, groups such as
Anonymous and its affiliates are believed to have exposed more confidential records in the U.S. than
cybercriminals. Despite occasional law enforcement successes, the problem continues to grow.
Financial services companies continue to invest heavily in perimeter defenses. These are, increasingly,
by-passed by two forms of threat:
1. Advanced persistent threats (APTs) involve malware that illicitly collects and forwards
confidential information over time. In many cases, APTs, which operate inside firewalls, have
functioned for months or years before being detected. No doubt, many have not been detected.
Increasingly, APTs have been directed to theft of funds rather than identify information. During
late 2011 and 2012, for example, a growing number of banks have reported “High Roller” attacks
which target high balance customer accounts and transfer funds elsewhere.
2. Insider abuse also appears to be expanding, and some industry sources estimate that insiders now
account for between a quarter and a third of all cybercrime incidents in financial services
companies. Perpetrators range from low-level employees to high-level executives, often
cooperating with external cybercriminals. Schemes routinely, again, operate for months or years.
Economic conditions have contributed to growth in all types of cybercrime.
Growing attention is also being paid to the threat of nation-state attacks. Rogue nations are capable of
assembling and protecting larger numbers of computer specialists, and their activities may have access to
greater resources and more advanced skills than cybercriminals. Financial services companies and
payments infrastructures are natural targets.
International Technology Group 15
Data Breaches
Despite increasingly stringent privacy laws in most countries, data breaches remain pervasive.
In the United States, for example, credit card processor Global Payments reported in March 2012 that
hackers had compromised more than 1.5 million accounts of American Express, Discover, MasterCard
and Visa cardholders. Some external estimates put the number of accounts compromised at over 7
million. It is believed that hackers first penetrated Global Payments during 2011.
Penetration over long periods would not be unusual. For example, services company Heartland Data
Systems recently revealed that a Ukraine-based hacker group operated inside the company’s perimeter
defenses for around six months. The company experienced a major breach in 2008 that exposed 134
million credit card accounts.
In June 2011, Citicorp disclosed that a hacker attack had compromised more than 360,000 customer
accounts. Numerous other such incidents have been reported during 2011 and 2012 worldwide.
In most countries, privacy laws expose businesses to regulatory penalties in the event of data breaches,
and other costs may be substantial. Figure 11 shows examples.
ACTIVITY	
   COSTS	
  
Forensic	
  examination	
  &	
  fixes	
   Weeks	
  to	
  months	
  using	
  specialists	
  at	
  $1,000-­‐5,000	
  per	
  person/day	
  
(1)
	
  
Customer	
  notification	
   $0.20	
  to	
  $5	
  per	
  customer,	
  depending	
  on	
  medium	
  
(1)
	
  
Query-­‐handling	
   $10	
  to	
  $25	
  per	
  customer	
  (call	
  center)	
  
(1)
	
  
Credit/identity	
  monitoring	
   $100 to $300 per customer per year
(1)
Other	
  customer	
  remedial	
  actions	
  	
   $15	
  to	
  $1,000+	
  per	
  customer	
  
(1)
	
  
Reissue	
  payment	
  card	
   $12-­‐22	
  per	
  card	
  
(2)
	
  
Legal	
  costs	
   Average	
  legal	
  defense	
  cost:	
  $500,000	
  
Average	
  legal	
  settlement:	
  $1	
  million	
  
(3)
	
  
Regulatory	
  fines	
  &	
  penalties	
   Variable
Management,	
  PR	
  costs	
   Variable	
  
Customer	
  attrition,	
  brand	
  damage	
   Variable	
  
Sources:	
  
(1)	
  
International	
  Technology	
  Group	
  
(2)
	
  “Data	
  Breach	
  Cost,”	
  Zurich	
  Insurance	
  Group	
  2011	
  
(3)
	
  “Cyber	
  Liability	
  &	
  Data	
  Breach	
  Insurance	
  Claims,	
  A	
  Study	
  of	
  Actual	
  Payouts	
  for	
  Covered	
  Data	
  Breaches,”	
  	
  
	
  	
  	
  	
  	
  June	
  2011,	
  NetDiligence	
  
Figure 11: Data Breach Costs – U.S. Examples
Companies that have quantified breach costs report that customer attrition and brand damage represent the
largest cost components.
International Technology Group 16
PLATFORM DIFFERENTIATORS
Overview
IBM i and Power Systems represent the convergence of two major technology streams:
1. IBM i originated with the AS/400 in 1988, and has been progressively enhanced to incorporate
new technologies.
According to the company, IBM i is employed by more than 150,000 organizations worldwide.
Although the installed base has decreased since the early 2000s, most of this has been due to
system consolidation. Many organizations that had initially deployed AS/400s to remote sites
later replaced these with larger centralized systems.
IBM i is supported by more than 2,500 ISVs – including most major vendors of ERP and
industry-specific core business systems – along with systems integrators and professional services
firms worldwide. It enjoys one of the highest levels of customer loyalty of any platform.
Many organizations continue to employ custom-developed RPG- and COBOL-based systems.
Among this group, application modernization initiatives – ranging from simple addition of
browser-based interfaces to large-scale re-engineering projects employing service oriented
architecture (SOA) – have been common.
IBM’s policy on i technology upgrades is distinctive. As a general principle, the company
introduces new i releases every two years.
New technology is also implemented in Technology Updates, which are introduced every six
months, and may be applied in a simple and non-disruptive manner. This approach, which was
widely requested by customers, enables them to implement new capabilities in an incremental
manner rather than though major migrations every few years.
2. Power Systems are built upon the seventh generation of IBM POWER reduced instruction set
computing (RISC) architecture. POWER7-based systems, which also support the IBM AIX
UNIX-based operating system and Power versions of RHEL and SLES Linux, have consistently
outperformed competitive platforms in a wide range of industry benchmarks.
POWER7-based systems incorporate industry-leading advances in chip density, memory
technology, multithreading virtualization, workload management, availability optimization,
energy efficiency and other areas.
In the UNIX server market, Power Systems have progressively increased their share since 2008,
and by the end of 2011 had reached the 50 percent mark. This share has continued to expand
during 2012 in both developed and growth markets worldwide.
In addition, IBM i runs on Power processors in new IBM PureFlex Systems, which combine IBM
Power, System x (x86) and midrange Storwize V7000 disk arrays in a single integrated platform.
PureFlex Systems implement common management services across the full range of operating
systems, systems software and hypervisors supported by the platform.
For large organizations considering whether to deploy new enterprise business systems on IBM i or
competitive servers, or debating whether to maintain commitments to existing i-based systems, it is
important to understand the differences between these platforms.
International Technology Group 17
IBM i
Principal Characteristics
Major IBM i features include the following:
1. Core design. The core IBM i design is built around an object-based kernel in which all system
resources are defined and managed as objects.
The kernel incorporates single-level storage capability, meaning that the system treats all storage
resources, including main memory and disks, as a single logical entity. Placement and
management of data on all resources is handled automatically by the system, minimizing tasks
that must be handled by administrators.
This capability, illustrated in figure 12, enables high levels of configuration flexibility; improves
system administrator productivity; and materially improves the efficiency with which processor
and storage resources are used, improving performance and capacity utilization.
Figure 12: IBM i Single-level Storage Structure
A further benefit is that integration and management of solid-state drives (SSDs) is comparatively
simple. IBM i automatically places the most frequently accessed data on SSDs, reallocates data to
SSDs or hard drives as workloads evolve, and optimizes performance on an ongoing basis.
IBM i users have realized performance gains from use of SSDs in high-throughput applications
such as large batch runs (reductions of 20 to 50 percent in elapsed time are common) and initial
program loads (IPLs).
The IBM i kernel also embeds the Technology Independent Machine Interface (TIMI), a unique
IBM i feature that acts as a “virtual” instruction set with which applications interact regardless of
the instruction set of underlying processor hardware.
The TIMI has enabled IBM to update underlying hardware platforms without obliging users to
recompile applications software. Organizations have found avoidance of costs, workloads and
disruptions of application migration to be major benefits.
	
  
SINGLE-­‐LEVEL	
  STORAGE	
  
	
  
STORAGE	
  MANAGEMENT	
  
Objects	
  
Main	
  memory	
  (RAM)	
   Disk	
  storage	
  
Solid	
  state	
  
International Technology Group 18
2. System integration. IBM i includes not only operating system functions, but also DB2 for i, an
integrated file system, WebSphere Application Server (WAS), Tivoli Directory Server, Java
Virtual Machine (JVM) environments, and more than 300 tools handling system, database,
storage, backup and recovery, communications, security, operations and other management tasks.
DB2 for i is an i-optimized version of IBM DB2 platform, which is offered by the company for
Windows, Linux, UNIX and mainframe systems. It is a full-functional SQL relational database
enabling high levels of transactional as well as query performance, along with industry-leading
data compression, encryption and Extensible Markup Language (XML) compatibility.
IBM i components are not simply bundled. They are engineered to interact with each other in a
simple and efficient manner, and extensive testing is carried out to ensure that they do so. This
testing extends not only across IBM hardware and software, but also across key independent
software vendor (ISV) solutions.
The implications are important. Integration affects performance – efficient software structures
generate lower system overhead – as well as availability. Tightly integrated, tested systems are
less likely to experience outages.
Equivalent functionality in Windows and x86 Linux server environments typically requires that
users acquire, install, configure and administer multiple software products from different vendors.
Integration and testing of these is less coordinated, and version upgrades rarely follow the same
schedule. Deployment complexity and management challenges are increased.
In addition to increasing full time equivalent (FTE) staffing for system, database and security
administration, less integrated environments are more likely to degrade performance.
Maintenance of availability, security and disaster recovery also become a great deal more
problematic.
3. Workload management. Since its inception, IBM i has incorporated industry-leading workload
management (in IBM i terminology, work management) capabilities designed to handle diverse
workloads such as online, batch and collaborative processing in a highly efficient manner.
The backbone of these capabilities is provided by IBM i subsystems, which leverage the IBM i
object-based architecture – individual workloads or applications (e.g., ERP, CRM, e-mail, Web
serving) are described and managed independently. The system allocates memory, limits
consumption of resources by individual workloads, and manages scheduling, tuning and other
tasks automatically, or based on priorities set by users.
Subsystems are integral to the IBM i design, and may be employed independently of or in
conjunction with PowerVM virtualization. This approach represents one of the most elegant and
sophisticated forms of workload management available for any server platform.
4. Automation. IBM i was designed to automatically handle a wide range of functions – including
configuration, tuning, software updates, availability and security optimization and other common
operational tasks – for which most other systems require extensive manual intervention.
Although the most visible effect of automation is that it reduces FTE staffing (users report that
IBM i typically requires two to five times fewer administrators than Windows and x86 Linux
equivalents), other benefits may be expected.
A system that can determine workload requirements and reallocate system resources in a matter
of milliseconds, for example, will use capacity more efficiently than one that is dependent on
administrator or operator intervention. Automation reduces the potential for human errors leading
to performance bottlenecks, outages, data loss or corruption and other negative effects.
International Technology Group 19
IBM i automation strengths have been reinforced by autonomic technologies. Autonomic
computing – meaning the application of artificial intelligence technologies to IT administration
and optimization tasks – has been a major IBM development focus since the 1990s, and the
company is the recognized industry leader in this area.
Four categories of autonomic functions – self-configuring, self-optimizing, self-protecting and
self-healing – are implemented in IBM i and Power Systems. These functions, which represent
one of the most advanced implementations of autonomic technologies within the IBM product
line, are summarized in figure 13.
5. Security and malware resistance. The strengths of IBM i’s object-based design are reinforced by
tight integration of security functions with compiler, directory server and object-based file system
structures. In contrast, security functions for Windows and x86 Linux are implemented as
software subsystems. The level of integration is significantly less.
IBM i also contains a full IP security suite, including support for the principal industry security
standards and encryption techniques; and extensive access control and audit facilities. Single
sign-on is enabled using an industry-leading IBM autonomic technology, Enterprise Identity
Mapping (EIM), which maps user IDs across all middleware and application components.
The time and effort that must be spent on routine security and malware protection tasks, and in
patching and auditing is a great deal less than for Windows and x86 Linux servers.
A broader IBM i characteristic is that its different components are implemented in a highly synergistic
manner. For example, DB2 for i exploits the underlying object-based structure and single level storage
capabilities of the operating system. Multithreading, virtualization, workload management and other
functions are closely integrated.
High-end Storage Support
The IBM i presence in the high-end systems market is reflected in support by the industry’s principal
vendors of enterprise-class disk arrays and software.
IBM’s System Storage DS8000, which offers the highest levels of performance and availability within the
IBM storage product line, may be attached to IBM i systems. The DS8000 platform is commonly
employed for the most business-critical mainframe- and UNIX server-based systems worldwide.
Easy Tier, IBM’s solution for automated storage tiering, is supported by IBM i for DS8000 as well as
other IBM disk arrays. Easy Tier has a reputation for enabling full-function tiering while minimizing the
complexities with which storage administrators must deal.
IBM PowerHA SystemMirror for i integrates IBM’s top-of-the-line Metro Mirror and Global Mirror tools
for synchronous and asynchronous remote replication respectively. Metro Mirror supports failover and
recovery at distances of up to 300 kilometers, while there is no distance limit to Global Mirror coverage.
IBM i users have also deployed the company’s XIV Storage System. Built around an innovative parallel
processing design, the XIV system has demonstrated exceptional reliability, high-volume snapshot
copying and disk-caching capabilities. Integrated software and low management overheads have also
contributed to its popularity.
IBM i is supported by EMC for its high-end VMAX arrays, including the multiple-petabyte VMAX 40K.
EMC announced in May 2012 that its automated storage tiering technology, FAST VP (Fully Automated
Storage Tiering for Virtual Pools), could be exploited by VMAX arrays attached to IBM i systems.
International Technology Group 20
SYSTEM	
  
Self-­‐configuring	
   Self-­‐protecting	
  
Connect	
  automated	
  services	
  
CPU	
  capacity	
  upgrade	
  on	
  demand	
  
Enterprise	
  Identity	
  Mapping	
  
EZSetup	
  Wizards	
  
Hot	
  plug	
  disk	
  &	
  I/O	
  
Linux	
  &	
  Windows	
  Virtual	
  I/O	
  
RAID	
  subsystem	
  
Switchable	
  auxiliary	
  storage	
  pools	
  
Windows	
  file/print	
  support	
  
Windows	
  dynamic	
  storage	
  addition	
  
Wireless	
  system	
  management	
  access	
  
Automatic	
  virus	
  removal	
  
Chipkill	
  Memory	
  
Digital	
  certificates	
  
Digital	
  object	
  tagging	
  
Enterprise	
  Identity	
  Mapping	
  
Integrated	
  Kerberos	
  support	
  
Integrated	
  SSL	
  support	
  	
  
IP	
  takeover	
  
RAID	
  subsystem	
  
Self-­‐protecting	
  kernel	
  
Tagged	
  storage	
  
Self-­‐optimizing	
   Self-­‐healing	
  
Adaptive	
  e-­‐transaction	
  services	
  
Automatic	
  performance	
  management	
  
Automatic	
  workload	
  balancing	
  	
  
Dynamic	
  disk	
  load	
  balancing	
  
Dynamic	
  LPAR	
  for	
  i	
  &	
  Linux	
  
Expert	
  Cache	
  	
  
Global	
  resource	
  manager	
  	
  
Heterogeneous	
  workload	
  manager	
  	
  
Quality	
  of	
  service	
  optimization	
  
Single-­‐level	
  storage	
  
ABLE	
  problem	
  management	
  engine	
  
Auto-­‐fix	
  defective	
  PTFs	
  	
  
Automatic	
  performance	
  adjuster	
  	
  
Chipkill	
  Memory,	
  dynamic	
  bit	
  steering	
  
Concurrent	
  maintenance	
  	
  
Domino	
  auto	
  restart,	
  clustering	
  
Dynamic	
  IP	
  takeover,	
  clustering	
  
Electronic	
  Service	
  Agent	
  (“call	
  home”)	
  
First-­‐failure	
  data	
  capture	
  &	
  alerts	
  	
  
Service	
  director	
  	
  
DATABASE	
  
Self-­‐configuring	
   Self-­‐protecting	
  
Automatic	
  collection	
  of	
  object	
  relationships	
  	
  
Automatic	
  data	
  spreading	
  &	
  disk	
  allocation	
  
Automatic	
  data	
  striping	
  &	
  disk	
  balancing	
  
Automatic	
  disk	
  space	
  allocation	
  
Automatic	
  distributed	
  access	
  configuration	
  	
  
Automatic	
  object	
  placement	
  	
  
Automatic	
  self-­‐balancing	
  indexes	
  
Automatic	
  tablespace	
  allocation	
  
Automatic	
  TCP/IP	
  startup	
  
Graphical	
  database	
  monitor	
  
Automatic	
  Encryption	
  management	
  
Automatic	
  enforcement	
  of	
  user	
  query	
  	
  
	
  	
  	
  	
  	
  	
  	
  &	
  storage	
  limits	
  
Automatic	
  synchronization	
  of	
  user	
  security	
  
Digital	
  object	
  signing	
  	
  
Object	
  auditing	
  
OS-­‐controlled	
  resource	
  management	
  
Self-­‐optimizing	
   Self-­‐healing	
  
Adaptive	
  Query	
  Processing	
  
Automatic	
  Index	
  Advisor	
  
Automatic	
  memory	
  pool	
  tuning	
  	
  
Automatic	
  query	
  plan	
  adjustment	
  	
  
Automatic	
  rebind	
  &	
  reoptimization	
  	
  
Automatic	
  statistics	
  collection	
  
Auto	
  Tuner	
  
Caching	
  of	
  open	
  data	
  paths	
  &	
  statements	
  
Cost-­‐based	
  Query	
  Optimizer	
  
On	
  Demand	
  Performance	
  Center	
  	
  
Performance	
  monitoring	
  &	
  analysis	
  
Automatic	
  object	
  backup/restore	
  
Automatic	
  database	
  object	
  extents	
  
Automatic	
  database	
  restart	
  	
  
Automatic	
  index	
  rebalancing	
  
Automatic	
  journaling	
  of	
  indexes	
  &	
  objects	
  
Automatic	
  rebuild	
  of	
  catalog	
  views	
  
Automatic	
  restart	
  of	
  journal	
  processing	
  
Self	
  managed	
  database	
  logging	
  
Self-­‐managed	
  journal	
  receivers	
  
Systems	
  managed	
  access	
  path	
  protection	
  
Figure 13: IBM i and Power Systems Autonomic Functions
EMC and IBM cooperate under an agreement first concluded in 2006, and recently extended to 2016, to
ensure full integration of IBM i with VMAX arrays.
A wide range of other IBM and third-party disk arrays may be used with IBM i systems.
International Technology Group 21
Power Systems
Overview
Power Systems have been the recognized industry leader in server performance since the mid-2000s. To
some extent, this has been a function of the performance delivered by successive generations of POWER
processors. However, other factors come into play.
In Power Systems, system-level performance potential has been optimized at all levels of design and
implementation – including microelectronics, module- and subsystem-level components, internal
communications, I/O and system-level hardware and software.
Key features include highly effective compiler- and operating system-level performance acceleration,
including chip simultaneous multithreading; low levels of symmetric multiprocessing (SMP) overhead;
and extensive system-level integration and optimization of performance-related features.
Intelligent Cache and Intelligent Threads in Power Systems allow cache allocation and numbers of
threads (two to four may be employed) to be varied according to workload requirements. Parameters may
be set by administrators, or determined automatically by the system based on application priorities.
The overall architecture, illustrated in figure 14, integrates with IBM i to allow users to manipulate a
wider range of variables – including subsystems, threads, processors, cache, main memory and I/O,
multiple types of partition, multiple threads and dedicated or pooled processors – with higher levels of
granularity and flexibility than any competitive platform.
Power Systems are optimized not only to deliver high levels of performance for single applications and
workloads, but also for the mixed workload environments that are typically generated by core enterprise
systems. Transactional as well as query and collaborative workloads may be handled concurrently in a
highly efficient manner.
Current-generation Power Systems include single-socket (710 and 720), two-socket (730 and 740) and
four-socket (750, 770 and 780) models covering a wide range of prices, and performance and
expandability levels; and the high-end Power 795, which is configurable up to 32 sockets (256 cores).
There are also single- and two-socket POWER7-based blade models.
Virtualization
Effective virtualization consists of more than the ability to create virtual machines.
Multiple mechanisms are required to create and modify partitions; share system resources between these,
and change resource allocations as needs change. It is also necessary to prioritize availability of resources
to different applications based on business criticality; monitor and control workload execution processes;
and meet service-level performance and uptime targets.
PowerVM virtualization meets these requirements. Capabilities include three types of partitioning:
1. Logical partitions (LPARs) are microcode-based partitions that may be configured in increments
as small as 1/10th
core. The technology was originally developed for IBM mainframes.
As a general principle, this approach (often referred to as hard partitioning) offers better isolation
of workloads than software-based techniques. Workloads running in different partitions are less
likely to interfere with each other, enabling higher levels of concentration. LPARs provide
additional security functions.
International Technology Group 22
Figure 14: IBM i and Power Systems Architecture
No equivalent capability is available for Intel-based servers with Windows, x86 Linux and/or x86
virtualization tools, or for newer Oracle Sun servers.
2. Micro-partitions are software-based partitions. They are typically employed to support instances
requiring limited system resources, and to improve load balancing for large, complex workloads.
Micro-partitions may be configured in initial increments of 1/20th
core, and subsequent
increments as small as 1/100th
core.
International Technology Group Approval Version – August 3, 2012 1
Figure 12: Power Systems Architecture
RESOURCE'SHARING'
Processors,'Cache,'Memory,'I/O'
Threads'
!
VIRTUAL'I/O'SERVER' VIRTUAL'I/O'SERVER'
Physical processors
DEDICATED''
PROCESSORS'
'
'
'
'
'
'
Physical'processors'
SHARED'
PROCESSOR'POOL'
'
'
'
'
Virtual'processors'
'
SHARED'
PROCESSOR'POOL'
'
'
'
'
Virtual'processors'
'
Virtual'LAN'
'
LPAR
Micro-partitions
Virtual'tape'
'
LPAR'
Virtual'disks'
LPAR'
LPAR'
LPAR
Micro-partitions
LPAR'
'
POWERVM HYPERVISOR
IBM'i'7.1'
ObjectMbased'architecture''•''SingleMlevel'storage'
System'integration'&'automation'
WORKLOAD'MANAGEMENT'
Subsystem' Subsystem' Subsystem' Subsystem'
International Technology Group 23
LPARs and micro-partitions are supported by mechanisms that allow processor, memory and I/O
resources to be pooled and reallocated in an extremely granular manner. The system monitors
resource utilization every 10 milliseconds, and may change allocations as rapidly.
Business-critical workloads may run in dedicated LPARs, using dedicated physical processors.
However, other workloads may be executed based on assigned priorities using combinations of
threads, partitions and shared processor pools. The system allows workloads to run on one or
more processor cores within shared pools.
3. Virtual I/O Servers allow operating system instances running in multiple LPARs to share a
common pool of LAN adapters as well as Fiber Channel, SCSI and RAID devices; i.e., it is not
necessary to dedicate adapters to individual partitions. Hardware, maintenance and energy cost
savings may be realized. Virtual I/O Servers may be duplexed to provide redundancy.
PowerVM also provides key availability optimization features. Live Partition Mobility, introduced for
IBM i 7.1 in April 2012, allows movement of active LPARs between Power Systems without disrupting
operations. Service interruptions of one or two seconds may occur due to network latency. These are,
however, rarely noticeable to users.
This capability has proved particularly attractive to organizations that need to perform scheduled
maintenance and software upgrades without downtime.
The PowerHA SystemMirror for i clustering solution enables failover and recovery of even large-scale,
highly granular PowerVM environments in a highly efficient and reliable manner.
PowerVM and x86 Virtualization
x86 virtualization tools such as VMware, Microsoft Hyper-V, Xen KVM and Oracle VM employ only a
single, software-based partitioning method. While they may be able to support diverse workloads, they do
so less efficiently. System overhead may be significantly larger.
(Hard partitioning is supported on the Intel Itanium-based HP Integrity with HP-UX and RHEL, and on
older Oracle Sun SPARC-based M-Series with the Solaris operating system. New installations of these
are, however, now comparatively rare.)
Differences in other areas should also be highlighted.
• Workload management. Most workloads experience fluctuations, and processes (e.g., online,
batch, collaborative) may vary. Unexpected spikes may occur. When multiple applications are
concentrated on a single physical platform – particularly if these generate mixed workloads –
highly granular, real-time monitoring and resource assignment will be required.
If systems cannot provide such capabilities, administrators will tend to limit the number and size
of partitions to prevent workloads interfering with each other. This is one of the key weaknesses
of VMware and other x86 hypervisors, and helps explain why most installations of these realize
only a fraction of their architectural potential.
• Complexity. Ironically, solutions intended to reduce complexity by enabling consolidation of
physical x86 servers have often had the reverse effect. As figure 15 illustrates, virtualization
introduces a new layer of architecture into system environments.
International Technology Group 24
Figure 15: System Environment Layers – Example
In an IBM i environment, the bottom four layers shown in the figure above are integrated by
IBM. In addition, the company’s close relationships with ISVs mean that the applications layer
is better tested and optimized for the overall IBM stack than is the case for Windows and x86
Linux servers.
A VMware environment, in contrast, will typically include components from Intel or Advanced
Micro Devices (AMD); the server hardware manufacturer; operating system, database and/or
application suppliers; and VMware itself. The number of vendors may be significantly larger if
storage and networks, and third-party tools are included.
Integration among these vendors may leave much to be desired and, even though they cooperate,
overall complexity in customer installations will still be significantly greater than for IBM i on
Power Systems.
Attention should be drawn to a further differentiator. VMware and other x86 tools have become common
hacker and malware targets. Businesses that deploy them have often found that their vulnerabilities
increase, while patching workloads expand.
IBM i is less vulnerable, as is PowerVM. National Vulnerability Database maintained by the U.S.
National Institute of Standards and Technology (NIST), for example recorded 39 medium and high
severity vulnerabilities for VMware, and 13 for Xen and KVM during 2011. None were reported for
PowerVM over the same period.
Lower PowerVM vulnerability reflects, to some extent, the fact that it is less targeted than x86
equivalents. However, security and malware protection mechanisms are more closely embedded and
integrated across IBM i, Power Systems and PowerVM than is the case for competitive platforms.
Availability Optimization
Power Systems
A first set of availability optimization features is built into Power Systems hardware and microcode. It
includes the following:
• Basic capabilities include high levels of component reliability and redundancy, along with hot
swap capabilities enabling devices to be replaced without taking systems offline. Redundant and
hot swap components include disk drives, PCI adapters, fans, blowers, power supplies, on high-
end models, system clocks, service processors, and power regulators.
HARDWARE
VIRTUALIZATION
OPERATING	
  SYSTEM
DATABASES/MIDDLEWARE
APPLICATIONS
International Technology Group 25
• Monitoring, diagnostic and fault isolation and resolution facilities are built into all major
components, including processors, main memory, cache and packaging modules, as well as
adapters, power supplies, cooling and other devices. In many cases, multiple layers of protection
and self-test are implemented.
Key functionality is provided by IBM-developed Chipkill and First Failure Data Capture
(FFDC) technologies. Chipkill is significantly more reliable than conventional error correction
code (ECC) techniques. FFDC employs embedded sensors that identify and report failures to a
separately powered Service Processor, which also monitors environmental conditions.
The Service Processor can automatically notify system administrators or contact an IBM Support
Center (electronic support or call home service) to report events requiring service intervention.
• Fault masking capabilities prevent outages in case failures do occur. For example, in the event
an instruction fails to execute due to a hardware or software fault, the system will automatically
repeat the operation. If the failure persists, the operation will be repeated on a different processor
and, if this does not succeed, the failed processor will be taken out of service.
In addition, memory sparing enables alternate memory modules to be activated in the event of
failures; and enhanced memory subsystem enables memory controller and cache sparing.
Availability optimization features of Power Systems are summarized in figure 16. Additional capabilities
are provided for high-end Power 770, 780 and 795 models.
LPARs contribute to reduction of planned outages. Software modifications may be made and new
versions installed and assured without disrupting operations. Backups may be performed, and batch
workloads executed concurrently with online processes.
Software Solutions
Avoidance of planned as well as unplanned outages is a central IBM i design parameter. High levels of
stability, integration and automation minimize risks of unplanned outages caused by software failures and
human error, and reduce both the frequency and duration of planned outages.
Specialized features further minimize risks of data loss in the event of an unplanned outage. These
include Remote Journaling (file and system changes may be automatically copied to a second server),
Save While Active (backups may be performed without taking systems offline) and Independent
Auxiliary Storage Pools (IASPs) (data may be mirrored to local or remotely located alternate systems).
Additional protection may be provided by IBM or third-party clustered failover solutions, IBM PowerHA
SystemMirror for i, for example, builds upon IASP technology to provide more advanced database
mirroring, failover and recovery. Synchronous or asynchronous replication may be employed.
Although the amount of time required to failover and restart systems and reinstate data may vary, the best
practice norm for use of PowerHA SystemMirror for i is that operations may be resumed in a matter of
seconds, and data fully restored within an hour. Users have routinely achieved mainframe-class failover
and recovery even for complex large-scale transactional workloads.
International Technology Group 26
BASIC	
  CAPABILITIES	
  
Redundancy,	
  hot-­‐swap	
  &	
  related	
   Redundant/hot-­‐swap	
   disks,	
   PCI	
   adapters,	
   GX	
   buses,	
   fans	
   &	
   blowers,	
   power	
  
supplies,	
  power	
  regulators	
  &	
  other	
  components.	
  
Redundant	
  disk	
  controllers.	
  I/O	
  paths	
  &	
  oscillators.	
  
Concurrent	
  system	
  clock	
  repair.	
  
Concurrent	
  firmware	
  update	
   Server	
  microcode	
  may	
  be	
  updated	
  without	
  taking	
  systems	
  offline.	
  
Concurrent	
  maintenance	
   Allows	
  processors,	
  memory	
  cards	
  &	
  adapters	
  to	
  be	
  replaced,	
  upgraded	
  or	
  serviced	
  
without	
  taking	
  systems	
  offline.	
  
MONITORING,	
  DIAGNOSTICS	
  &	
  FAULT	
  ISOLATION/RESOLUTION	
  
Hardware-­‐assisted	
  memory	
  
scrubbing	
  
Automatic	
  daily	
  test	
  of	
  all	
  system	
  memory.	
  Detects	
  &	
  reports	
  developing	
  memory	
  
errors	
  before	
  they	
  cause	
  problems.	
  	
  
Chipkill	
  error	
  checking	
   Employs	
  RAID-­‐like	
  striping	
  of	
  data	
  across	
  memory	
  devices	
  to	
  provide	
  redundancy	
  
&	
  enable	
  reinstatement	
  of	
  original	
  data.	
  Significantly	
  more	
  reliable	
  than	
  
conventional	
  error	
  correction	
  code	
  (ECC)	
  technology.	
  	
  
First	
  Failure	
  Data	
  Capture	
  (FFDC)	
  	
   Employs	
  1,000+	
  embedded	
  sensors	
  that	
  identify	
  errors	
  in	
  any	
  system	
  component.	
  
Root	
  causes	
  of	
  errors	
  are	
  determined	
  without	
  the	
  need	
  to	
  recreate	
  problems	
  or	
  
run	
  tracing	
  or	
  diagnostics	
  programs.	
  	
  
FAULT	
  MASKING	
  
Processor	
  instruction	
  retry	
  
Alternate	
  processor	
  recovery	
  
Processor-­‐contained	
  checkstop	
  
If	
  an	
  instruction	
  fails	
  to	
  execute	
  due	
  to	
  a	
  hardware	
  or	
  software	
  fault,	
  the	
  system	
  
automatically	
  retries	
  the	
  operation.	
  If	
  the	
  failure	
  persists,	
  the	
  operation	
  is	
  
repeated	
  on	
  a	
  different	
  processor	
  &,	
  if	
  this	
  does	
  not	
  succeed,	
  the	
  failed	
  processor	
  
is	
  taken	
  out	
  of	
  service	
  (checkstopped).	
  Only	
  LPARs	
  supported	
  by	
  the	
  failed	
  
processor	
  are	
  affected.	
  	
  
Dynamic	
  processor	
  sparing	
   Allows	
  idle	
  Capacity	
  Upgrade	
  on	
  Demand	
  (CUoD)	
  processors	
  to	
  be	
  automatically	
  
activated	
  as	
  replacements	
  for	
  failed	
  processors.	
  
Partition	
  availability	
  priority	
   In	
  the	
  event	
  of	
  a	
  processor	
  failure,	
  maintains	
  LPAR-­‐based	
  workloads	
  based	
  on	
  
assigned	
  priorities;	
  i.e.,	
  remaining	
  processor	
  capacity	
  is	
  assigned	
  to	
  the	
  highest-­‐
priority	
  workloads.	
  
Memory	
  sparing	
   Enables	
  redundant	
  memory	
  to	
  be	
  activated	
  in	
  the	
  event	
  of	
  failure.	
  
Enhanced	
  memory	
  subsystem	
   Enables	
  memory	
  controller	
  &	
  cache	
  sparing.	
  
Enhanced	
  cache	
  recovery	
   Detects	
  &	
  purges	
  processor	
  &	
  cache	
  errors.	
  Recovers	
  original	
  data.	
  
Dynamic	
  I/O	
  line	
  bit	
  repair	
  (eRepair)	
   Detects	
  &	
  bypasses	
  failed	
  memory	
  pins.	
  
PCI	
  bus	
  parity	
  error	
  retry	
   Retries	
  an	
  I/O	
  operation	
  if	
  an	
  error	
  occurs.	
  
Figure 16: Key Power Systems Availability Optimization Technologies
International Technology Group 27
DETAILED DATA
Company Profiles
The results presented in this report were based on the company profiles summarized in figure 17.
SUPPLY	
  CHAIN	
  COMPANIES	
  
Auto	
  Parts	
  Manufacturer	
   Retail	
  Chain	
   Industrial	
  Distributor	
  
Business	
  Profile	
  
Tier	
  1	
  automotive	
  parts	
  manufacturer	
  
$8	
  billion	
  sales	
  
50,000	
  employees	
  
80	
  manufacturing	
  &	
  distribution	
  centers	
  
worldwide	
  
Hard	
  lines	
  retailer	
  
$5	
  billion	
  sales	
  
25,000	
  full-­‐time	
  employees	
  
500	
  stores	
  +	
  Internet,	
  catalog	
  &	
  call	
  
center	
  channels	
  
5	
  distribution	
  centers	
  
Industrial	
  distributor	
  
$3	
  billion	
  sales	
  
7,000+	
  employees	
  
400	
  branches	
  
10	
  distribution	
  centers	
  
Applications	
  
Automotive	
  ERP	
  system	
   Core	
  merchandise	
  management,	
  
logistics	
  management,	
  finance	
  &	
  HR	
  
ERP	
  system,	
  e-­‐commerce	
  
FINANCIAL	
  SERVICES	
  COMPANIES	
  
Bank	
   Insurance	
  Company	
   Services	
  Company	
  
Business	
  Profile	
  
Diversified	
  retail	
  bank	
  
$10	
  billion	
  revenues	
  
$300	
  billion	
  assets	
  
30,000+	
  employees	
  
1,150	
  branches	
  +	
  ATMs,	
  Internet	
  &	
  
mobile	
  banking	
  services	
  
Property	
  &	
  casualty	
  insurer	
  
$3	
  billion	
  revenues	
  
$5	
  billion	
  assets	
  
5,000+	
  employees	
  
3	
  million	
  customers	
  
Agent,	
  Internet	
  &	
  call	
  center	
  channels	
  	
  
Loan	
  processing	
  services	
  
$1	
  billion	
  revenues	
  
5,000+	
  customers	
  
2,500+	
  employees	
  
Applications	
  
Core	
  banking,	
  EFT/POS,	
  online	
  banking,	
  
card	
  management,	
  financial	
  
Core	
  policy	
  &	
  claims	
  management,	
  
customer-­‐facing	
  Web	
  services,	
  call	
  
center	
  operations,	
  finance	
  &	
  
compliance	
  
Core	
  processing,	
  customer	
  service,	
  
online	
  billing	
  &	
  payments	
  
Figure 17: Company Profiles
Profiles were constructed using survey data from 60 companies in the same industries: i.e., automotive
parts manufacturing, hard lines retail industrial distribution for supply chain companies; and retail
banking, property and casualty insurance and financial IT services. Companies employed IBM i, WSFC
and Oracle Exadata clusters.
Companies employed systems that could be realistically compared across platforms; e.g., the same ERP
suites were used for comparisons where these were supported on IBM i and Windows servers.
Data was collected on business operations including, where appropriate, vulnerability to cascading
effects; applications employed including packaged as well as custom software, and workloads;
availability experiences including frequency and duration of planned as well as unplanned outages;
security and disaster recovery arrangements, and other subjects.
International Technology Group 28
Costs of Downtime
Calculation Process
Costs of downtime were calculated using a two-phase process. First, average costs per hour of downtime
were calculated for all companies using appropriate industry- and organization-specific values.
“Average,” in this context, means that costs are based on overall annual volumes of business activity
divided by hours of operation (in all cases, 24 x 365 = 8,760). Values were as described below.
Second, average costs of downtime per hour were multiplied by numbers of hours of downtime per year
for each platform. These were calculated based on user input.
Supply Chain Companies
Values for these were as follows:
• For all companies, supply chain disruption costs include costs incurred for planning and
operational processes between initial customer queries and final delivery.
Calculations include costs of idle and underutilized capacity, including personnel; handling of
delivery delays (including distribution center and transportation costs); additional inventory
carrying costs; costs of customer billing and payments processing delays; costs of change for
affected processes; and, for the retail chain, increased markdown costs.
• For the automotive parts manufacturer, supply chain disruption costs are divided between
inbound supply chain and production disruption, consisting of costs incurred between supplier
queries and factory release; and outbound supply chain disruption, consisting of costs incurred
between factory release and final customer delivery.
These categories generally correspond to the “Source and Make” and “Deliver” segments
respectively of the Supply Chain Operations Reference (SCOR) model developed by the Supply
Chain Council. Inbound supply chain and production disruption calculations include the effects
of delays on production operations, including costs of production scheduling and setup changes.
Because the company has achieved high levels of vertical integration, inbound supply chain costs
are comparatively low. Other costs include customer penalties and remedial costs including
penalties for late delivery and imperfect orders, along with buyback costs such as additional
discounts and rebates.
• For the retail chain, costs of downtime include Lost Sales due to stockouts and, for the
company’s Internet channel, inability to quote product availability and process customer orders
due to outages; and selling, general and administrative (SG&A) costs primarily due to disruption
of store operations. SG&A costs include idle capacity, handling and administrative costs for late
and imperfect deliveries, and reordering, display changes and restocking.
• For the industrial distributor, costs of downtime include lost sales due to inventory shortages,
inability to process customer queries and orders due to outages and related effects. Customer
penalties and remedial costs are included in supply chain disruption costs.
Values were calculated based on user input as well as published material such as company financial
reports and presentations.
International Technology Group 29
Financial Services Companies
Values for these were as follows:
• For the bank, costs of downtime include customer attrition (lost customer income), lost
transaction fees (including ATM/debit fees, and fees for transactions conducted online and
through call centers) and other costs, including lost interest, lost customer acquisition expenditure
and productivity loss by branch, call center and other customer-facing staff during outages.
• For the insurance company, costs include lost policy income due to customer attrition, missed
sales opportunities and payment delays caused by outages, and other costs, including lost interest,
lost customer acquisition expenditure and productivity loss by call center and other customer-
facing staff during outages.
• For the services company, costs include lost fee income, customer attrition, lost interest and
productivity loss by customer interaction center staff during outages.
Values for customer loss and missed sales opportunities were calculated based on CLV. Published
materials were again employed where appropriate.
Breakdowns of costs of downtime per hour for individual companies are shown in figure 18.
Cost	
  Category	
  
Outage	
  cost	
  	
  
per	
  hour	
  
Cost	
  Category	
  
Outage	
  cost	
  	
  
per	
  hour	
  
SUPPLY	
  CHAIN	
  COMPANIES	
   FINANCIAL	
  SERVICES	
  COMPANIES	
  
AUTO	
  PARTS	
  MANUFACTURER	
   BANK	
  	
  
Outbound	
  supply	
  chain	
  disruption	
   759.06	
   Customer	
  attrition	
  	
   108.21	
  
Inbound	
  supply	
  chain	
  &	
  production	
  disruption	
   185.03	
   Lost	
  fee	
  income	
   126.01	
  
Customer	
  penalties	
  &	
  remedial	
  costs	
   269.62	
   Other	
  costs	
   	
  25.23	
  
TOTAL	
  ($000)	
   1,213.71	
   TOTAL	
  ($000)	
   259.45	
  
RETAIL	
  CHAIN	
  	
   INSURANCE	
  COMPANY	
  
Lost	
  sales	
   383.10	
   Lost	
  income	
  	
   146.31	
  
Supply	
  chain	
  disruption	
   218.62	
   Other	
  costs	
   4.05	
  
SG&A	
  costs	
   83.31	
   TOTAL	
  ($000)	
   150.36	
  
TOTAL	
  ($000)	
   685.03	
  
INDUSTRIAL	
  DISTRIBUTOR	
  	
   SERVICES	
  COMPANY	
  
Lost	
  sales	
   265.80	
   Lost	
  income	
  	
   79.18	
  
Supply	
  chain	
  disruption	
   283.36	
   Other	
  costs	
   48.68	
  
TOTAL	
  ($000)	
   549.16	
   TOTAL	
  ($000)	
   127.86	
  
Figure 18: Average Costs of Outages per Hour Detail
Severe Unplanned Outages
Calculations for exposure to these were based on two sets of estimates:
1. Probability of 6-, 12- or 24-hour outages for each platform for each company. Probabilities
were calculated based on user input as well as general industry data for the frequency and severity
of outages for IBM i on Power Systems, WSFC and Oracle Exadata.
International Technology Group 30
2. Costs of downtime for 6-, 12- and 24-hour outages for each company. Costs include the same
components as for average costs of downtime per hour calculations, although the proportions of
different components varied, in some cases significantly. For supply chain companies, allowance
was made for cascading effects.
For 12- and 24-hour outages affecting financial services companies, costs also include customer
notification, query- and complaint-handling, along with customer reimbursements, extended
overdrafts and payment deadlines, and other remedial costs.
The probability of severe unplanned outages was then multiplied by projected business impact; e.g., if the
probability of a six-hour outage was 0.18, and the cost of such an outage was $10.46 million, the
calculation was 0.18 x $10.46 million = $1.883 million. Overall totals were calculated as the sum of
business impact for all outages over a three-year period.
All values for costs of downtime as well as severe unplanned outage exposure were for the United States.
ABOUT THE INTERNATIONAL TECHNOLOGY GROUP
ITG sharpens your awareness of what’s happening and your competitive edge
. . . this could affect your future growth and profit prospects
International Technology Group (ITG), established in 1983, is an independent research and management
consulting firm specializing in information technology (IT) investment strategy, cost/benefit metrics,
infrastructure studies, deployment tactics, business alignment and financial analysis.
ITG was an early innovator and pioneer in developing total cost of ownership (TCO) and return on
investment (ROI) processes and methodologies. In 2004, the firm received a Decade of Education Award
from the Information Technology Financial Management Association (ITFMA), the leading professional
association dedicated to education and advancement of financial management practices in end-user IT
organizations.
The firm has undertaken more than 120 major consulting projects, released more than 250 management
reports and white papers and more than 1,800 briefings and presentations to individual clients, user
groups, industry conferences and seminars throughout the world.
Client services are designed to provide factual data and reliable documentation to assist in the decision-
making process. Information provided establishes the basis for developing tactical and strategic plans.
Important developments are analyzed and practical guidance is offered on the most effective ways to
respond to changes that may impact complex IT deployment agendas.
A broad range of services is offered, furnishing clients with the information necessary to complement
their internal capabilities and resources. Customized client programs involve various combinations of the
following deliverables:
Status Reports In-depth studies of important issues
Management Briefs Detailed analysis of significant developments
Management Briefings Periodic interactive meetings with management
Executive Presentations Scheduled strategic presentations for decision-makers
Email Communications Timely replies to informational requests
Telephone Consultation Immediate response to informational needs
Clients include a cross section of IT end users in the private and public sectors representing multinational
corporations, industrial companies, financial institutions, service organizations, educational institutions,
federal and state government agencies as well as IT system suppliers, software vendors and service firms.
Federal government clients have included agencies within the Department of Defense (e.g., DISA),
Department of Transportation (e.g., FAA) and Department of Treasury (e.g., US Mint).
International Technology Group
609 Pacific Avenue, Suite 102
Santa Cruz, California 95060-4406
Telephone: + 831-427-9260
Email: Contact@ITGforInfo.com
Website: ITGforInfo.com

IBM i for Enterprise Businesses Quantifying the Value of Resilience

  • 1.
    October  2012   MANAGEMENT  BRIEF   IBM i for Enterprise Businesses Quantifying the Value of Resilience International Technology Group 609 Pacific Avenue, Suite 102 Santa Cruz, California 95060-4406 Telephone: + 831-427-9260 Email: Contact@ITGforInfo.com Website: ITGforInfo.com
  • 2.
    Copyright © 2012by the International Technology Group. All rights reserved. Material, in whole or part, contained in this document may not be reproduced or distributed by any means or in any form, including original, without the prior written permission of the International Technology Group (ITG). Information has been obtained from sources assumed to be reliable and reflects conclusions at the time. This document was developed with International Business Machines Corporation (IBM) funding. Although the document may utilize publicly available material from various sources, including IBM, it does not necessarily reflect the positions of such sources on the issues addressed in this document. Material contained and conclusions presented in this document are subject to change without notice. All warranties as to the accuracy, completeness or adequacy of such material are disclaimed. There shall be no liability for errors, omissions or inadequacies in the material contained in this document or for interpretations thereof. Trademarks included in this document are the property of their respective owners.
  • 3.
    International Technology Groupi TABLE OF CONTENTS EXECUTIVE SUMMARY 1 Value Proposition 1 Costs Of Downtime 2 Severe Unplanned Outages 5 Security and Malware Protection 7 Conclusions 8 RISK TRENDS 9 Overview 9 Supply Chain Disruption 9 Retail Vulnerabilities 12 Financial Services 13 Risk Sensitivities 13 Availability and Recovery 13 Security and Malware 14 Data Breaches 15 PLATFORM DIFFERENTIATORS 16 Overview 16 IBM i 17 Principal Characteristics 17 High-end Storage Support 19 Power Systems 21 Overview 21 Virtualization 21 PowerVM and x86 Virtualization 23 Availability Optimization 24 Power Systems 24 Software Solutions 25 DETAILED DATA 27 Company Profiles 27 Costs of Downtime 28 Calculation Process 28 Supply Chain Companies 28 Financial Services Companies 29 Severe Unplanned Outages 29 List of Figures 1. Average Costs of Downtime per Hour – Supply Chain Companies 3 2. Average Costs of Downtime per Hour – Financial Services Companies 4 3. Three-year Costs of Downtime by Platform – Supply Chain Companies 4 4. Three-year Costs of Downtime by Platform – Financial Services Companies 5 5. Three-year Risk Exposure to Severe Unplanned Outages – Averages for Supply Chain Companies 6 6. Three-year Risk Exposure to Severe Unplanned Outages – Averages for Financial Services Companies 6 7. Comparative Vulnerability Data – January 2008 Through June 2012 7 8. Comparative Vulnerability Data – Lifetime Totals 7 9. Basic Manufacturing Supply Chain Processes – SCOR Model 10 10. Potential Costs of Outages – Manufacturing Companies 11 11. Data Breach Costs – U.S. Examples 15 12. IBM i Single-level Storage Structure 17 13. IBM i and Power Systems Autonomic Functions 20 14. IBM i and Power Systems Architecture 22 15. System Environment Layers – Example 24 16. Key Power Systems Availability Optimization Technologies 26 17. Company Profiles 27 18. Average Costs of Outages per Hour Detail 29
  • 4.
    International Technology Group1 EXECUTIVE SUMMARY Value Proposition The IBM i operating environment has a longstanding track record of maintaining extremely high levels of availability, security and disaster recovery. Users routinely describe it as “highly stable...extremely robust…completely dependable…rock-solid” and comparable terms. This has been the experience not only of midsize businesses, but also of large organizations requiring enterprise-class capabilities. Among IBM i users are some of the world’s largest corporations, including members of the Fortune 100 and FTSE 100. Among this group, IBM i typically supports high-volume business-critical systems. Examples include enterprise resource planning (ERP) systems, along with supply chain management, core banking and retail, e-commerce and equivalents in a wide range of industries. IBM i offers levels of availability, security and recoverability that are – by wide margins – greater than any competitive platform. What is the value of these strengths? Few would dispute that disruption of core enterprise systems can affect the bottom line. Many organizations, however, do not factor costs of downtime into their platform selection processes. This may be a serious mistake. Business damage due to planned as well as unplanned outages may vary significantly between platforms. This report presents two sets of three-year cost comparisons for use of IBM i, Microsoft Windows Server Failover Clusters (WSFC), and Oracle Exadata Database Machine to support core enterprise systems in six companies. Comparisons are presented for companies operating supply chains, and for financial services companies with revenues of between $1 billion and $10 billion. Results may be summarized as follows: • Costs of downtime – i.e., business costs due to outages – averaged 90 percent less for use of IBM i than for Windows server clusters, and 71 percent less than for Oracle Exadata. This calculation is for planned outages and unplanned outages of less than three hours duration. Lower IBM i costs of downtime translated into three-year business savings of $2.8 million to $35.3 million compared to use of clustered Windows servers, and $700,000 to $8.6 million compared to use of Oracle Exadata. • Risk exposure to severe unplanned outages of 6 to 24 hours duration is also significantly lower for use of IBM i. These calculations, which employ a standard probability/impact methodology, indicate that risks of severe business damage for use IBM i average 93 percent less than for use of clustered Windows servers and 73 percent less than for use of Oracle Exadata. These variances translated into $257,000 to $7.43 million in higher risk exposure for use of clustered Windows servers and $56,000 to $1.69 million for use of Oracle Exadata. Comparisons are based on use of IBM i 7.1 with IBM PowerHA SystemMirror for i high availability clusters on latest-generation Power Systems; Windows Server 2008 R2, SQL Server 2008 R2 and WSFC on latest-generation Intel E5- and E7-based platforms; and current Oracle Exadata models with Oracle 11g Database including Real Application Clusters (RAC). Lower costs of downtime and risk exposure for use of IBM i are due to fundamental differences in architecture and technology.
  • 5.
    International Technology Group2 IBM i is designed specifically to run business-critical systems. High levels of availability reflect features built into the IBM i kernel, and embedded into Power Systems hardware and firmware. IBM i is the most tightly integrated and automated operating environment in existence. The potential for system, operator or administrator errors is minimal. The strengths of IBM i in security and malware protection reflect the system’s distinctive object-based architecture. Objects are encapsulated in a manner that places strict controls on data as well as system code, making it extremely difficult for unauthorized instructions to execute. Security violations are rare, and malware incidents are virtually unknown. There are no known native IBM i viruses. Disaster recovery capabilities are built into the IBM i kernel and tightly integrated with IBM PowerHA and third-party failover and recovery solutions. These have supported high-volume business-critical systems for decades. IBM i and Power Systems routinely handle enterprise-class workloads requiring high levels of scalability and performance – many users employ IBM Power 770, 780 and 795 models with up to 64, 96 and 256 POWER7 cores respectively – and offer highly granular, real-time virtualization even in demanding production environments. In terms of technological currency, IBM i implements the full function SQL-compliant DB2 relational database, Internet standards and interfaces to tablets and smartphones. It also supports a wide range of development languages, including C/C++, COBOL, RPG, Java, PHP, XML and others. IBM i users have been able to take full advantage of Internet and, more recently, mobile technologies to employ popular “open” development tools and to exploit growing pools of developer skills. A further point should be noted. The virtualization strengths of IBM i and PowerVM provide a strong base for realization of public as well as private clouds. IBM i and PowerVM are central platforms in IBM cloud strategy, and will be fully supported in the future evolution of IBM cloud solutions and services. In most organizations – including those upon which comparisons presented in this report are based – IBM i systems coexist with a variety of UNIX and x86 servers. IBM i may not be appropriate for all applications. But for core systems that “run the business,” its distinctive strengths are unmatched. Costs Of Downtime The comparisons presented in this report are based on detailed financial and operational data supplied by 60 companies employing IBM i, WSFC or Oracle Exadata to run core enterprise systems. Based on this input, six composite company profiles were created. These included companies operating supply chains (an auto parts manufacturer, a retail chain and an industrial distributor) as well as financial services companies (a diversified retail bank, a property and casualty insurer and a services company). Average costs of downtime per hour were first calculated for these companies, and then multiplied by numbers of hours of downtime for each of the three platform options. The focus was placed on underlying hardware and software platform outages, rather than application-level downtime. For supply chain companies, average costs of downtime ranged from $549,000 to $1.21 million to per hour. Figure 1 summarizes these results.
  • 6.
    International Technology Group3 Figure 1: Average Costs of Downtime per Hour – Supply Chain Companies Costs of downtime allow for cascading effects. In tightly integrated supply chains characterized by lean operating models (i.e., there are few or no inventory buffers) and real-time operations, evidence has shown that the effects of disruption at any point may cascade across the entire supply chain. This significantly changes the costs of downtime equation. In the past, for example, companies often calculated that, if annual sales were $5 billion, the cost of an hour of downtime was $5 billion divided by 8,760 hours per year = $570,000. In practice, however, the cost may be four or five times higher, and the effects may continue to felt for days or even weeks. For supply chain companies, allowance was also made for lost sales, increases in operational costs, remedial costs such as late delivery and imperfect order penalties, and related effects. Selling, general and administrative (SG&A) costs for the retail chain are due to disruption of store operations. Costs of downtime may be substantial in other industries where cascading occurs. These include transportation, where schedule disruption may have major bottom-line impacts; third-party logistics services; engineering and construction; energy companies and public sector organizations. For financial services companies, costs of downtime varied by type of business. For the bank, costs of downtime include lost or delayed transaction fees, lost interest income and lost productivity for branch and call center staff. For the insurer and services company, costs include lost policy income (the company transacted a large volume of business over the Internet, and was thus exceptionally vulnerable to effects of outages) and lost services income respectively. Other items include lost interest income and lost productivity for customer- facing staff. Costs of downtime for all three companies allow for the effects customer attrition, calculated using appropriate customer lifetime value (CLV) metrics, and lost customer acquisition costs. Average costs of downtime ranged from $128,000 to $259,000 per hour. Figure 2 summarizes these results. Retail  Chain   Lost  sales   Supply  chain  disrupCon   SG&A  costs   685.03 Auto  Parts  Manufacturer   Outbound  supply  chain  disrupCon   Inbound  supply  chain  &  producCon  disrupCon   Customer  penalCes  &  remedial  costs   1,213.71 Industrial  Distributor   Lost  sales   Supply  chain  disrupCon   549.16 $  thousands   SUPPLY  CHAIN  COMPANIES  
  • 7.
    International Technology Group4 Figure 2: Average Costs of Downtime per Hour – Financial Services Companies Based on these values, three-year costs of downtime for the three platform options were as shown in figures 3 and 4. Figure 3: Three-year Costs of Downtime by Platform – Supply Chain Companies Comparatively high WSFC costs of downtime are notable in that “five nines” (99.999 percent) availability is commonly claimed for this platform. There are several reasons for this disparity. One is that such claims commonly refer to low-volume environments and/or applications whose characteristics are significantly different to those of enterprise business systems. The technical challenges of maintaining high levels of availability for, say, email or collaborative networks are not the same as those for high-volume transactional and mixed workloads. Insurance  Company   Lost  income   Other  costs   150.36 Bank   Customer  aNriCon     Lost  fee  income   Other  costs   259.45 Services  Companies   Lost  income     Other  costs   127.86 $  thousands   FINANCIAL  SERVICES  COMPANIES   Industrial  Distributor   Retail  Chain   Auto  Parts  Manufacturer    1.10      2.77      3.52      4.39      8.56      12.14      9.88      20.55      38.84     MicrosoY  WSFC   Oracle  Exadata   IBM  i/Power   $  millions  
  • 8.
    International Technology Group5 Figure 4: Three-year Costs of Downtime by Platform – Financial Services Companies A second reason is that claims typically refer to avoidance of unplanned outages rather than overall downtime. Windows cluster environments tend to be highly complex, and in practice require extensive software maintenance. Complexity also increases risks that unplanned outages will occur – there are more potential points of failure. WSFC deployments supporting enterprise-class systems are typically customized by professional services firms. Modifications, as well as testing of these, tend to be more difficult and time-consuming than might be the case in a less complex Microsoft environment. Higher levels of availability for Oracle Exadata reflect more resilient hardware and use of the company’s RAC cluster technology. Planned outages, however, tend to be longer and more frequent than for IBM i. Oracle Exadata systems have been variously deployed for business intelligence (BI), transactional applications and consolidation of Oracle database servers. The underlying architecture is, however, primarily optimized for high-performance analytics. Severe Unplanned Outages There is a great deal of evidence that, when severe unplanned outages occur, the bottom-line impact increases in a manner that is as much exponential as arithmetic. A 24-hour outage, for example, may not have four times the impact of a 6-hour outage. It may have 20 times more. Experience with major supply chain failures has shown that effects may extend beyond operational costs and lost sales to include reputational damage, impaired corporate financial performance, share price declines, reduced investor confidence and other negative effects. Financial services companies are equally if not more vulnerable. Customer attrition and remedial costs are likely to be substantial, reputational damage may be immediate and massive, and regulatory penalties and legal costs may be incurred. Services  Company   Insurance  Company   Bank    0.32      0.45      0.78      1.02      1.50      2.98      3.07      4.81      9.34     MicrosoY  WSFC   Oracle  Exadata   IBM  i/Power   $  millions  
  • 9.
    International Technology Group6 The example of the recent (June 2012) core banking system outage affecting the UK’s Royal Bank of Scotland (RBS) is instructive. The outage left 17 million of the company’s 23 million customers unable to access account information, withdraw or transfer funds, or process payments for up to six days. Media coverage was massive and predominantly negative. In August 2012, RBS projected more than $200 million in remedial costs for customer reimbursements, overdraft extensions and related actions. The company was also obliged to extend hours at more than 1,200 out of 2,500 branches and double call center staff in order to handle customer queries. The extent of customer attrition is still unclear. Like costs of downtime, risk exposure is materially affected by platform choices. In supply chain companies, three-year exposure for use of IBM i on Power Systems averaged 93 percent less than for WSFC, and 73 percent less than for use of Oracle Exadata. Disparities for financial services companies were generally similar. Comparable averages were 95 percent and 76 percent less respectively. Figures 5 and 6 illustrate these results. Figure 5: Three-year Risk Exposure to Severe Unplanned Outages – Averages for Supply Chain Companies Figure 6: Three-year Risk Exposure to Severe Unplanned Outages – Averages for Financial Services Companies IBM  i/Power   Oracle  Exadata   MicrosoY  WSFC   357.63   1,319.79   4,858.51   $  thousands   IBM  i/Power   Oracle  Exadata   MicrosoY  WSFC    34.25      140.76      604.54     $  thousands  
  • 10.
    International Technology Group7 Security and Malware Protection A further area of risk exposure should be highlighted. Hacking and infection by malware (malicious code) remain ubiquitous threats for all large organizations. Companies that experience customer data breaches may incur fines and other regulatory penalties, along with costs of remedial actions such as notifications, monitoring for identity theft, query handling, and investigation and resolution of security flaws. In the event of a publicized breach, customer attrition and reputational damage may also be substantial. Even if customer data is not compromised, other types of sensitive information may be compromised, and damage to systems and software may occur. In security and malware protection, differences between IBM and competitive platforms are not merely significant – they are dramatic. These differences are reflected in data compiled by Secunia, one of the industry’s leading authorities on security and malware exposure. Figure 7 shows numbers of advisory notices issued by the company between January 2008 and June 2012 inclusive for the most recent versions of IBM i, the two principal Linux distributions – Red Hat Enterprise Linux (RHEL) and SUSE Linux Enterprise Server (SLES) – and for Windows Server 2008. SEVERITY   WINDOWS   SERVER  2008   RHEL   Server  5   RHEL   Server  6   SLES  10   SLES  11   IBM  i  7.1   i5/OS  6.x   Extremely  critical   3   1   0   0   0   0   0   Highly  critical   64   93   61   134   88   0   0   Moderately  critical   34   185   84   79   53   0   6   Less  critical   73   175   85   60   66   0   5   Not  critical   5   53   31   18   14   0   0   TOTAL  ADVISORIES     179   507   261   291   221   0   11   Source:  Secunia   Figure 7: Comparative Vulnerability Data – January 2008 Through June 2012 Figure 8 shows lifetime vulnerabilities; i.e., the number of vulnerabilities recorded by the company since each version was introduced. Multiple vulnerabilities may be documented in a single advisory notice.   WINDOWS   SERVER  2008   RHEL   Server  5   RHEL   Server  6   SLES  10   SLES  11   IBM  i  7.1   i5/OS  6.x   Release  Date   February   2008   March   2007   November   2010   July     2006   March   2009   April     2010   January   2008   Lifetime  Vulnerabilities   352   1,871   906   3,557   1,889   0   16   Source:  Secunia   Figure 8: Comparative Vulnerability Data – Lifetime Totals (Oracle Enterprise Linux, the most commonly employed Exadata operating system, is not tracked separately. It is based on RHEL. Windows Server 2012 became generally available in September 2012.) Disparities are confirmed by other sources. During 2011, for example, the National Vulnerability Database maintained the U.S. National Institute of Standards and Technology (NIST), recorded 197 medium and high security vulnerabilities for Linux, and 130 for Windows Server. None were recorded for IBM i.
  • 11.
    International Technology Group8 The significance of IBM i security strengths is reinforced by two factors. One is that, most security authorities recognize, firewall-based perimeter defenses are no longer enough. Penetration of these has become increasingly common, and they do not prevent escalating threats of insider abuse. Higher levels of protection are required for core business databases. The second is that, since the onset of recession, businesses have become reluctant to increase spending on IT security, and many have reduced it. Threats, however, have continued to increase. Organizations have been faced with a choice between greater expenditure or greater risk. IBM i enables them to avoid this choice. Better security may be maintained at a lower cost. Conclusions No matter how one rates the value of IBM i’s distinctive strengths, that value is increasing over time. Industry trends are magnifying the effects of downtime. Among companies operating supply chains, economic conditions have accelerated inventory drawdowns, while moves to lower-cost offshore sites increase supply chain complexity and geographic dispersion. Adoption of real-time business analytics and technologies such as RFID will further reduce cycle times. For financial services companies, mergers and acquisitions mean that core systems outages affect larger numbers of customers. Growth of online and – increasingly – mobile services has introduced new points of vulnerability. Competitive pressures have increased risks of customer attrition. In these and other industries, use of social media has increased security and malware exposure. IBM i has been employed, in some cases for more than 20 years, by large users worldwide. It was designed to offer a simple, reliable, secure and easy-to-administer platform to support core business systems. In an era when the IT world has veered toward ever-greater complexity, IBM i has retained these characteristics. More than any other server environment available today, it is designed to minimize the complexities with which organizations must deal. Over the last few years the IT industry has, ironically, rediscovered the advantages of complexity reduction. The principal value propositions for cloud computing – faster deployment and provisioning, more effective use of virtualization to enable consolidation and reduced administrative overhead – have been enjoyed by IBM i users for decades. Others may enjoy the same benefits.
  • 12.
    International Technology Group9 RISK TRENDS Overview Key industry trends mean that the significance of IBM i strengths in availability and disaster recovery, and in security and malware resistance are increasing over time. These trends are discussed in this section. The following section, Platform Differentiators, deals with differences in architecture and technology between IBM i and Power Systems, and competitive hardware and software platforms. The last section, Detailed Data, provides additional information on the methodology employed for calculations. Detailed cost breakdowns are also provided. Supply Chain Disruption Decades of experience have shown that, in industries operating supply chains, downtime costs money. Risks of supply chain disruption have, however, been the subject of greatly increased attention since the mid 2000s. This shift been driven by a number of trends, including the following: 1. Integration. ERP systems have progressively expanded to integrate a broader range of transactional processes, as well as new analytical and collaborative functions. ERP environments now commonly include customer relationship management (CRM), e- commerce, supply chain management (SCM), product data management (PDM) and product lifecycle management (PLM), supplier relationship management (SRM), BI and a wide range of other applications. Businesses, however, have found that the benefits of broader functionality and organization-wide process integration have a side effect: they become fundamentally dependent upon their systems. Quite simply, an outage may grind the entire business to a halt. Vulnerabilities are magnified by consolidation of systems. Mergers and acquisitions, as well as adoption of shared services structures for order processing, finance, human resources (HR), customer service and other functions have contributed to this trend. Exposure extends to solutions for planning and forecasting, analytics, mobile computing and other informational applications. Even if applications are deployed on different platforms, they draw upon core databases – if these are down, they will at best be working with stale data. 2. Globalization. The growth of offshore sourcing has caused procurement and logistics operations to grow more complex, while transportation times have increased. The impact of disruptions tends to be greater for regional and global supply chains than for those in more restricted geographies. A delay in shipping from a local plant to a nearby distribution center, for example, may mean waiting for another truck. A delay in shipping from a Chinese plant to North America or Europe may mean waiting 10 days for the next ship. 3. Supply chain strategies. Adoption of just in time, lean and real-time operating models has further increased vulnerability. In most supply chain industries, lean strategies have become the norm. In consumer products and retailing, they have been reflected in techniques such as Efficient Customer Response (ECR), Collaborative Planning, Forecasting and Replenishment (CPFR), Continuous Replenishment and Vendor Managed Inventory (VMI).
  • 13.
    International Technology Group10 The effects of lean strategies may permeate the entire supply chain. At the corporate or business unit level, for example, forecasting and planning cycles may be reduced from weeks to days, or to 24 hours or less. At the other end of the spectrum, cross docking (i.e., the immediate transshipment of goods between arriving and departing vehicles, without intermediate storage) in distribution centers may increase both efficiency and vulnerability to disruption. In the automotive industry, for example, suppliers now receive continuous demand signals from their customers, recalibrate plans and forecasts, and initiate procurement, production and logistics actions in real-time. In a fiercely competitive industry, supplier shortfalls are rarely tolerated. The automotive parts company profiled in this report, for example, delivers to its customers’ manufacturing plants on a just-in-time basis, often several times a day. Orders are typically processed in minutes and deliveries dispatched within two to five hours. 4. Cascading effects. These may be simply illustrated. Even a basic manufacturing supply chain will typically involve most or all of the processes summarized in figure 9. SOURCE   § Identify  sources  of  supply   § Select  supplier(s)   § Negotiate  with  supplier(s)   § Schedule  product  deliveries     § Receive  product   § Verify  product   § Transfer  product   § Authorize  supplier  payment   MAKE   § Schedule  production   § Set  up  production   § Issue  product   § Produce     § Inspect/test  product   § Package  product   § Stage  product   § Release  to  delivery   DELIVER   § Process  inquiry  &  quote   § Receive,  enter  &  validate  order   § Reserve  inventory  resources   § Reserve  delivery  resources   § Determine  delivery  date   § Consolidate  orders   § Build  loads   § Route  shipments   § Select  carrier(s)/rate(s)   § Receive  product   § Pick  product   § Pack  product   § Load  product     § Generate  shipping  docs   § Ship  product   § Customer  receipt  &  verify   § Install  product   § Invoice  customer   Figure 9: Basic Manufacturing Supply Chain Processes – SCOR Model The figure above is based on selected segments of the Supply Chain Operations Reference (SCOR) model developed by the Supply Chain Council. Delays in one process can spread rapidly to others. For example, a delay in delivering parts to a plant may cause finished product shipment deadlines to be missed. This may affect transportation schedules and distribution center operations, affecting other deliveries. The impact is cumulative. 5. Customer responses. Economic conditions, changing expectations and mounting competition have made customers less tolerant of supplier failures. Although the costs of operational disruption may be substantial, the largest bottom-line impact often involves customers. Sales may be lost, and customers may defect. Even if this does not occur, suppliers may be subject to late delivery, imperfect order and other penalties. It may also be necessary to offer special discounts or terms and conditions in order to win back the customer’s business.
  • 14.
    International Technology Group11 A less visible, but potentially more damaging erosion of confidence may also occur. This could cause the customer to hedge by diverting some future purchases to other suppliers in order to reduce dependence. In addition, the customer might be reluctant to rely upon the company for future strategic orders, particularly where these were time-sensitive. No manufacturer wants to learn that customers now consider them a high-risk supplier. An additional set of “strategic” costs may be incurred if outages are severe, protracted or both. Share prices may be affected. Other effects such as reduced brand value; increased risk provision; higher insurance premiums; and a variety of reputational, legal and compliance problems may be experienced. System outages may have a wide range of potential cost impacts. Figure 10, for example, shows a representative list of these for manufacturing companies.  STRATEGIC  COSTS Charge  against  earnings   Financial  metrics/ratios   Share  price  decline   Share  price  volatility   Cost  of  capital   Increased  risk  provision     Reduced  brand  value   Insurance  premiums   Damaged  reputation     - Financial  markets   - Customers/prospects   - Banks   - Business  partners - M&A  candidates Impaired  credit   Liquidity  exposure Legal  exposure   - Customers   - Third  parties   - Shareholders   Compliance  exposure   - Regulatory  reporting   - Impaired  inspection   - Impaired  traceability CUSTOMER-­‐RELATED  COSTS Lost  short-­‐term  sales   Lost  short-­‐term  profit   Lost  future  sales/profit   Late  delivery  penalties   Imperfect  order  penalties   Product  defect  penalties Customer  rebates   Buyback  pricing/concessions   Additional  customer  service  cost OPERATIONAL  COSTS Idle  capacity   - Overall  supply  chain   - Procurement   - Plant  operations   - Logistics/distribution   - Transportation     - Warehouses   - Third-­‐party  services   Personnel  costs   - Idleness/underutilization   - Reduced  productivity   - Additional  work  required   - Overtime/shift  premiums   - Additional  T&E  costs   Finance  processes   - Delayed  billing/receivables   - Inventory  carrying  cost   - Cash  flow  cost   - Delayed  close   Costs  of  change   - Procurement  change   - Revised  order  processing   - Special  order  cost   - Production  schedule  change   - Line  change  cost   - Costs  of  logistics  change   - Supplier  premiums   - Expedited  transportation     - Additional  handling  cost   - Additional  inventory  cost   - Additional  checking  cost   Error-­‐related  costs   - Order  processing  errors   - Product  defect   - Specification  error   - Manufacturing  error   - Quality  failure   - Shipment  error   - Damaged  product   - Wrong  packaging   - Routing  error   - Wrong  delivery  time   Other  costs   - Lost  promotional  expenditure   - Lost  marketing  expenditure   - IT  costs     - Administrative  costs   - Overhead Figure 10: Potential Costs of Outages – Manufacturing Companies The potential significance of such effects was highlighted by a study co-authored by Kevin Hendricks of the University of Western Ontario and Vinod Singhal of the Georgia Institute of Technology. After reviewing the financial results of more than 800 public companies that had experienced severe supply chain disruptions, the authors concluded that company stocks experienced 33 to 40 percent lower returns relative to industry benchmarks over a three-year period because of these.
  • 15.
    International Technology Group12 The study also reported declines of 7 percent in sales growth, 107 percent in operating income, 114 percent in return on sales, 93 percent in return on assets, and increases in cost of sales, selling, SG&A expenses and inventory levels. A further implication should be highlighted. Disruptions tend to raise error rates across any or all stages of supply chains. This is particularly likely if there is a rush to catch up with backlogs. Results may include dissatisfied customers, remedial costs, legal and regulatory exposure and other negative effects. A clear conclusion emerges. Whether outages result in operational disruption, customer-related costs and/or strategic costs, they have a significant impact. Maintenance of the highest possible level of availability and recovery for core supply chain systems should be a central goal of IT strategy. Retail Vulnerabilities Retailers worldwide have experienced many of the same trends as manufacturers. Supply chains have become more complex and fragile, logistics structures have been consolidated and cycle times have been cut across the board. Acceleration has affected processes such as sales and inventory tracking, and merchandising decisions. Although the pace has varied between retail lines and geographies, there has been a steady trend toward more frequent new product launches, and greater use of time-sensitive promotions and markdowns. System downtime occurring during such periods may have particularly serious effects. Service interruptions may also cause lost sales and customers. In conventional storefront retailing, the industry “rule of thumb” is 40 to 80 percent of stockouts result in lost sales rather than purchases of an alternative in-store product. Additional costs may be incurred for changes to store displays, backorders, restocking, markdowns and other remedial actions. Online sales are even more vulnerable. More than 20 years of experience with retail websites has shown that 24x365 usage is the norm, and that even short outages during off-peak periods may cause significant loss of business. If protracted outages occur at times of high usage (e.g., during seasonal sales peaks, or in response to new product launches, promotions or Internet buzz), losses may be massive. It has become a truism that, in online retailing, shoppers who are diverted to another supplier because they are unable to research a product, determine availability or place an order may not return. Even if they do, they are more likely to buy from multiple sources in the future. Retailers also face growing use of mobile devices in stores. In the United States, for example, more than 40 percent of tablet and smartphone owners use these for comparison-shopping while visiting retail outlets, and some estimates put the ratio at over 60 percent. There are similar trends in other geographies. It has long been a principle that, in e-commerce, “customers are only a few clicks away from competitors” and that online outages translate rapidly into lost sales. Mobility extends this effect to stores. Increasingly, any customer may be “only a few clicks away from competitors.”
  • 16.
    International Technology Group13 Financial Services Risk Sensitivities Financial services are, more than any other industry, sensitive to risk. Financial institutions are equipped with highly sophisticated risk management processes and systems. Cultures of risk awareness and mitigation are well established. This extends to IT. Most companies have developed high availability, disaster recovery and security infrastructures over decades. Risk sensitivity, however, has its blind spots. While the importance of such infrastructures is generally understood, there is less awareness that the platforms around which they are built may themselves be risk factors. In large banks, core systems are typically mainframe-based. A significant minority, however, run on IBM i. Worldwide, more than 15,000 banks, including large as well as small and midsize institutions, run core systems on this platform. The general industry recognition is that IBM i offers mainframe-class levels of availability, security and recoverability. IBM i is supported by most of the industry’s major ISVs offering core banking and electronic funds transfer (EFT) solutions, and has also been deployed by numerous insurance and other financial services companies. As the results presented in this report indicate, risk exposure may be significantly greater for other platforms with which there is less experience in large-scale core system deployments. Availability and Recovery The financial services industry has long been sensitive to outages. The cost per hour of downtime for trading, credit card processing, ATM and debit card networks, and other high-volume EFT systems has often run to hundreds of thousands or millions of dollars. With the growth of Internet services, vulnerability has increased further. “Normal business hours” no longer exist. Most companies experience some level of activity at all hours of the day and night, 365 days per year. Any interruption of service, at any time, may affect customers. An outage at times of high activity may impact millions. Apart from lost fee income, lost or delayed payments and other financial effects, customer loss may also occur. Even if defections cannot be attributed to a specific incident, their effects will show up in overall attrition statistics. Outages may accelerate trends that are already causing concern among many companies. Bank customer attrition rates, for example, continue to increase. In North America and Western Europe, annual rates are already in the 5 to 10 percent per year range, while in many developing economies rates of 10 to 20 percent are becoming the norm. Similar trends have been reported in insurance and other financial services businesses. For these, as for banks, service issues are – by a wide margin – the most common cause of attrition. Customer loss is magnified if it measured in terms of CLV. In banking, insurance and other lines of business, the effects are magnified by the growing numbers of products held per customer, and by the fact that relationships tend to become more profitable the longer they last.
  • 17.
    International Technology Group14 Allowance should also be made for lost customer acquisition costs. In banking, for example, acquisition costs in developed countries are routinely $200 to $400 per customer, and average costs are escalating in developing geographies. This expenditure is inevitably lost if a customer defects. Disruption of core banking systems may be exceptionally damaging. Over time, these have developed links to a wide range of other systems within banking infrastructures. A disruption may create cascading effects as severe and long lasting as those in supply chain companies. The recent Royal Bank of Scotland core banking system outage, for example, affected not only batch processing but also all branch systems, ATMs, debit and credit cards, online banking and call center systems. All channels and customer touch points were affected. Vulnerability to such disruptions has tended to increase. Mergers and acquisitions have led many banks in developed countries to merge legacy core banking systems (this was notably the case for Royal Bank of Scotland), while in developing economies new deployments have often been driven by the need to support business growth and offer new services. The replacement of a core banking system is, under any scenario, a high-risk proposition. Risks increase in proportion to the size of institutions. They increase further if new systems are deployed on platforms whose stability and robustness is problematic. Security and Malware Financial services companies are the preferred target of the most sophisticated cybercriminals, including organized gangs operating worldwide. Hacking as well as malware attacks are growing more sophisticated over time. Companies also face a growing threat from “hacktivists” promoting social and political agendas. During 2011, groups such as Anonymous and its affiliates are believed to have exposed more confidential records in the U.S. than cybercriminals. Despite occasional law enforcement successes, the problem continues to grow. Financial services companies continue to invest heavily in perimeter defenses. These are, increasingly, by-passed by two forms of threat: 1. Advanced persistent threats (APTs) involve malware that illicitly collects and forwards confidential information over time. In many cases, APTs, which operate inside firewalls, have functioned for months or years before being detected. No doubt, many have not been detected. Increasingly, APTs have been directed to theft of funds rather than identify information. During late 2011 and 2012, for example, a growing number of banks have reported “High Roller” attacks which target high balance customer accounts and transfer funds elsewhere. 2. Insider abuse also appears to be expanding, and some industry sources estimate that insiders now account for between a quarter and a third of all cybercrime incidents in financial services companies. Perpetrators range from low-level employees to high-level executives, often cooperating with external cybercriminals. Schemes routinely, again, operate for months or years. Economic conditions have contributed to growth in all types of cybercrime. Growing attention is also being paid to the threat of nation-state attacks. Rogue nations are capable of assembling and protecting larger numbers of computer specialists, and their activities may have access to greater resources and more advanced skills than cybercriminals. Financial services companies and payments infrastructures are natural targets.
  • 18.
    International Technology Group15 Data Breaches Despite increasingly stringent privacy laws in most countries, data breaches remain pervasive. In the United States, for example, credit card processor Global Payments reported in March 2012 that hackers had compromised more than 1.5 million accounts of American Express, Discover, MasterCard and Visa cardholders. Some external estimates put the number of accounts compromised at over 7 million. It is believed that hackers first penetrated Global Payments during 2011. Penetration over long periods would not be unusual. For example, services company Heartland Data Systems recently revealed that a Ukraine-based hacker group operated inside the company’s perimeter defenses for around six months. The company experienced a major breach in 2008 that exposed 134 million credit card accounts. In June 2011, Citicorp disclosed that a hacker attack had compromised more than 360,000 customer accounts. Numerous other such incidents have been reported during 2011 and 2012 worldwide. In most countries, privacy laws expose businesses to regulatory penalties in the event of data breaches, and other costs may be substantial. Figure 11 shows examples. ACTIVITY   COSTS   Forensic  examination  &  fixes   Weeks  to  months  using  specialists  at  $1,000-­‐5,000  per  person/day   (1)   Customer  notification   $0.20  to  $5  per  customer,  depending  on  medium   (1)   Query-­‐handling   $10  to  $25  per  customer  (call  center)   (1)   Credit/identity  monitoring   $100 to $300 per customer per year (1) Other  customer  remedial  actions     $15  to  $1,000+  per  customer   (1)   Reissue  payment  card   $12-­‐22  per  card   (2)   Legal  costs   Average  legal  defense  cost:  $500,000   Average  legal  settlement:  $1  million   (3)   Regulatory  fines  &  penalties   Variable Management,  PR  costs   Variable   Customer  attrition,  brand  damage   Variable   Sources:   (1)   International  Technology  Group   (2)  “Data  Breach  Cost,”  Zurich  Insurance  Group  2011   (3)  “Cyber  Liability  &  Data  Breach  Insurance  Claims,  A  Study  of  Actual  Payouts  for  Covered  Data  Breaches,”              June  2011,  NetDiligence   Figure 11: Data Breach Costs – U.S. Examples Companies that have quantified breach costs report that customer attrition and brand damage represent the largest cost components.
  • 19.
    International Technology Group16 PLATFORM DIFFERENTIATORS Overview IBM i and Power Systems represent the convergence of two major technology streams: 1. IBM i originated with the AS/400 in 1988, and has been progressively enhanced to incorporate new technologies. According to the company, IBM i is employed by more than 150,000 organizations worldwide. Although the installed base has decreased since the early 2000s, most of this has been due to system consolidation. Many organizations that had initially deployed AS/400s to remote sites later replaced these with larger centralized systems. IBM i is supported by more than 2,500 ISVs – including most major vendors of ERP and industry-specific core business systems – along with systems integrators and professional services firms worldwide. It enjoys one of the highest levels of customer loyalty of any platform. Many organizations continue to employ custom-developed RPG- and COBOL-based systems. Among this group, application modernization initiatives – ranging from simple addition of browser-based interfaces to large-scale re-engineering projects employing service oriented architecture (SOA) – have been common. IBM’s policy on i technology upgrades is distinctive. As a general principle, the company introduces new i releases every two years. New technology is also implemented in Technology Updates, which are introduced every six months, and may be applied in a simple and non-disruptive manner. This approach, which was widely requested by customers, enables them to implement new capabilities in an incremental manner rather than though major migrations every few years. 2. Power Systems are built upon the seventh generation of IBM POWER reduced instruction set computing (RISC) architecture. POWER7-based systems, which also support the IBM AIX UNIX-based operating system and Power versions of RHEL and SLES Linux, have consistently outperformed competitive platforms in a wide range of industry benchmarks. POWER7-based systems incorporate industry-leading advances in chip density, memory technology, multithreading virtualization, workload management, availability optimization, energy efficiency and other areas. In the UNIX server market, Power Systems have progressively increased their share since 2008, and by the end of 2011 had reached the 50 percent mark. This share has continued to expand during 2012 in both developed and growth markets worldwide. In addition, IBM i runs on Power processors in new IBM PureFlex Systems, which combine IBM Power, System x (x86) and midrange Storwize V7000 disk arrays in a single integrated platform. PureFlex Systems implement common management services across the full range of operating systems, systems software and hypervisors supported by the platform. For large organizations considering whether to deploy new enterprise business systems on IBM i or competitive servers, or debating whether to maintain commitments to existing i-based systems, it is important to understand the differences between these platforms.
  • 20.
    International Technology Group17 IBM i Principal Characteristics Major IBM i features include the following: 1. Core design. The core IBM i design is built around an object-based kernel in which all system resources are defined and managed as objects. The kernel incorporates single-level storage capability, meaning that the system treats all storage resources, including main memory and disks, as a single logical entity. Placement and management of data on all resources is handled automatically by the system, minimizing tasks that must be handled by administrators. This capability, illustrated in figure 12, enables high levels of configuration flexibility; improves system administrator productivity; and materially improves the efficiency with which processor and storage resources are used, improving performance and capacity utilization. Figure 12: IBM i Single-level Storage Structure A further benefit is that integration and management of solid-state drives (SSDs) is comparatively simple. IBM i automatically places the most frequently accessed data on SSDs, reallocates data to SSDs or hard drives as workloads evolve, and optimizes performance on an ongoing basis. IBM i users have realized performance gains from use of SSDs in high-throughput applications such as large batch runs (reductions of 20 to 50 percent in elapsed time are common) and initial program loads (IPLs). The IBM i kernel also embeds the Technology Independent Machine Interface (TIMI), a unique IBM i feature that acts as a “virtual” instruction set with which applications interact regardless of the instruction set of underlying processor hardware. The TIMI has enabled IBM to update underlying hardware platforms without obliging users to recompile applications software. Organizations have found avoidance of costs, workloads and disruptions of application migration to be major benefits.   SINGLE-­‐LEVEL  STORAGE     STORAGE  MANAGEMENT   Objects   Main  memory  (RAM)   Disk  storage   Solid  state  
  • 21.
    International Technology Group18 2. System integration. IBM i includes not only operating system functions, but also DB2 for i, an integrated file system, WebSphere Application Server (WAS), Tivoli Directory Server, Java Virtual Machine (JVM) environments, and more than 300 tools handling system, database, storage, backup and recovery, communications, security, operations and other management tasks. DB2 for i is an i-optimized version of IBM DB2 platform, which is offered by the company for Windows, Linux, UNIX and mainframe systems. It is a full-functional SQL relational database enabling high levels of transactional as well as query performance, along with industry-leading data compression, encryption and Extensible Markup Language (XML) compatibility. IBM i components are not simply bundled. They are engineered to interact with each other in a simple and efficient manner, and extensive testing is carried out to ensure that they do so. This testing extends not only across IBM hardware and software, but also across key independent software vendor (ISV) solutions. The implications are important. Integration affects performance – efficient software structures generate lower system overhead – as well as availability. Tightly integrated, tested systems are less likely to experience outages. Equivalent functionality in Windows and x86 Linux server environments typically requires that users acquire, install, configure and administer multiple software products from different vendors. Integration and testing of these is less coordinated, and version upgrades rarely follow the same schedule. Deployment complexity and management challenges are increased. In addition to increasing full time equivalent (FTE) staffing for system, database and security administration, less integrated environments are more likely to degrade performance. Maintenance of availability, security and disaster recovery also become a great deal more problematic. 3. Workload management. Since its inception, IBM i has incorporated industry-leading workload management (in IBM i terminology, work management) capabilities designed to handle diverse workloads such as online, batch and collaborative processing in a highly efficient manner. The backbone of these capabilities is provided by IBM i subsystems, which leverage the IBM i object-based architecture – individual workloads or applications (e.g., ERP, CRM, e-mail, Web serving) are described and managed independently. The system allocates memory, limits consumption of resources by individual workloads, and manages scheduling, tuning and other tasks automatically, or based on priorities set by users. Subsystems are integral to the IBM i design, and may be employed independently of or in conjunction with PowerVM virtualization. This approach represents one of the most elegant and sophisticated forms of workload management available for any server platform. 4. Automation. IBM i was designed to automatically handle a wide range of functions – including configuration, tuning, software updates, availability and security optimization and other common operational tasks – for which most other systems require extensive manual intervention. Although the most visible effect of automation is that it reduces FTE staffing (users report that IBM i typically requires two to five times fewer administrators than Windows and x86 Linux equivalents), other benefits may be expected. A system that can determine workload requirements and reallocate system resources in a matter of milliseconds, for example, will use capacity more efficiently than one that is dependent on administrator or operator intervention. Automation reduces the potential for human errors leading to performance bottlenecks, outages, data loss or corruption and other negative effects.
  • 22.
    International Technology Group19 IBM i automation strengths have been reinforced by autonomic technologies. Autonomic computing – meaning the application of artificial intelligence technologies to IT administration and optimization tasks – has been a major IBM development focus since the 1990s, and the company is the recognized industry leader in this area. Four categories of autonomic functions – self-configuring, self-optimizing, self-protecting and self-healing – are implemented in IBM i and Power Systems. These functions, which represent one of the most advanced implementations of autonomic technologies within the IBM product line, are summarized in figure 13. 5. Security and malware resistance. The strengths of IBM i’s object-based design are reinforced by tight integration of security functions with compiler, directory server and object-based file system structures. In contrast, security functions for Windows and x86 Linux are implemented as software subsystems. The level of integration is significantly less. IBM i also contains a full IP security suite, including support for the principal industry security standards and encryption techniques; and extensive access control and audit facilities. Single sign-on is enabled using an industry-leading IBM autonomic technology, Enterprise Identity Mapping (EIM), which maps user IDs across all middleware and application components. The time and effort that must be spent on routine security and malware protection tasks, and in patching and auditing is a great deal less than for Windows and x86 Linux servers. A broader IBM i characteristic is that its different components are implemented in a highly synergistic manner. For example, DB2 for i exploits the underlying object-based structure and single level storage capabilities of the operating system. Multithreading, virtualization, workload management and other functions are closely integrated. High-end Storage Support The IBM i presence in the high-end systems market is reflected in support by the industry’s principal vendors of enterprise-class disk arrays and software. IBM’s System Storage DS8000, which offers the highest levels of performance and availability within the IBM storage product line, may be attached to IBM i systems. The DS8000 platform is commonly employed for the most business-critical mainframe- and UNIX server-based systems worldwide. Easy Tier, IBM’s solution for automated storage tiering, is supported by IBM i for DS8000 as well as other IBM disk arrays. Easy Tier has a reputation for enabling full-function tiering while minimizing the complexities with which storage administrators must deal. IBM PowerHA SystemMirror for i integrates IBM’s top-of-the-line Metro Mirror and Global Mirror tools for synchronous and asynchronous remote replication respectively. Metro Mirror supports failover and recovery at distances of up to 300 kilometers, while there is no distance limit to Global Mirror coverage. IBM i users have also deployed the company’s XIV Storage System. Built around an innovative parallel processing design, the XIV system has demonstrated exceptional reliability, high-volume snapshot copying and disk-caching capabilities. Integrated software and low management overheads have also contributed to its popularity. IBM i is supported by EMC for its high-end VMAX arrays, including the multiple-petabyte VMAX 40K. EMC announced in May 2012 that its automated storage tiering technology, FAST VP (Fully Automated Storage Tiering for Virtual Pools), could be exploited by VMAX arrays attached to IBM i systems.
  • 23.
    International Technology Group20 SYSTEM   Self-­‐configuring   Self-­‐protecting   Connect  automated  services   CPU  capacity  upgrade  on  demand   Enterprise  Identity  Mapping   EZSetup  Wizards   Hot  plug  disk  &  I/O   Linux  &  Windows  Virtual  I/O   RAID  subsystem   Switchable  auxiliary  storage  pools   Windows  file/print  support   Windows  dynamic  storage  addition   Wireless  system  management  access   Automatic  virus  removal   Chipkill  Memory   Digital  certificates   Digital  object  tagging   Enterprise  Identity  Mapping   Integrated  Kerberos  support   Integrated  SSL  support     IP  takeover   RAID  subsystem   Self-­‐protecting  kernel   Tagged  storage   Self-­‐optimizing   Self-­‐healing   Adaptive  e-­‐transaction  services   Automatic  performance  management   Automatic  workload  balancing     Dynamic  disk  load  balancing   Dynamic  LPAR  for  i  &  Linux   Expert  Cache     Global  resource  manager     Heterogeneous  workload  manager     Quality  of  service  optimization   Single-­‐level  storage   ABLE  problem  management  engine   Auto-­‐fix  defective  PTFs     Automatic  performance  adjuster     Chipkill  Memory,  dynamic  bit  steering   Concurrent  maintenance     Domino  auto  restart,  clustering   Dynamic  IP  takeover,  clustering   Electronic  Service  Agent  (“call  home”)   First-­‐failure  data  capture  &  alerts     Service  director     DATABASE   Self-­‐configuring   Self-­‐protecting   Automatic  collection  of  object  relationships     Automatic  data  spreading  &  disk  allocation   Automatic  data  striping  &  disk  balancing   Automatic  disk  space  allocation   Automatic  distributed  access  configuration     Automatic  object  placement     Automatic  self-­‐balancing  indexes   Automatic  tablespace  allocation   Automatic  TCP/IP  startup   Graphical  database  monitor   Automatic  Encryption  management   Automatic  enforcement  of  user  query                  &  storage  limits   Automatic  synchronization  of  user  security   Digital  object  signing     Object  auditing   OS-­‐controlled  resource  management   Self-­‐optimizing   Self-­‐healing   Adaptive  Query  Processing   Automatic  Index  Advisor   Automatic  memory  pool  tuning     Automatic  query  plan  adjustment     Automatic  rebind  &  reoptimization     Automatic  statistics  collection   Auto  Tuner   Caching  of  open  data  paths  &  statements   Cost-­‐based  Query  Optimizer   On  Demand  Performance  Center     Performance  monitoring  &  analysis   Automatic  object  backup/restore   Automatic  database  object  extents   Automatic  database  restart     Automatic  index  rebalancing   Automatic  journaling  of  indexes  &  objects   Automatic  rebuild  of  catalog  views   Automatic  restart  of  journal  processing   Self  managed  database  logging   Self-­‐managed  journal  receivers   Systems  managed  access  path  protection   Figure 13: IBM i and Power Systems Autonomic Functions EMC and IBM cooperate under an agreement first concluded in 2006, and recently extended to 2016, to ensure full integration of IBM i with VMAX arrays. A wide range of other IBM and third-party disk arrays may be used with IBM i systems.
  • 24.
    International Technology Group21 Power Systems Overview Power Systems have been the recognized industry leader in server performance since the mid-2000s. To some extent, this has been a function of the performance delivered by successive generations of POWER processors. However, other factors come into play. In Power Systems, system-level performance potential has been optimized at all levels of design and implementation – including microelectronics, module- and subsystem-level components, internal communications, I/O and system-level hardware and software. Key features include highly effective compiler- and operating system-level performance acceleration, including chip simultaneous multithreading; low levels of symmetric multiprocessing (SMP) overhead; and extensive system-level integration and optimization of performance-related features. Intelligent Cache and Intelligent Threads in Power Systems allow cache allocation and numbers of threads (two to four may be employed) to be varied according to workload requirements. Parameters may be set by administrators, or determined automatically by the system based on application priorities. The overall architecture, illustrated in figure 14, integrates with IBM i to allow users to manipulate a wider range of variables – including subsystems, threads, processors, cache, main memory and I/O, multiple types of partition, multiple threads and dedicated or pooled processors – with higher levels of granularity and flexibility than any competitive platform. Power Systems are optimized not only to deliver high levels of performance for single applications and workloads, but also for the mixed workload environments that are typically generated by core enterprise systems. Transactional as well as query and collaborative workloads may be handled concurrently in a highly efficient manner. Current-generation Power Systems include single-socket (710 and 720), two-socket (730 and 740) and four-socket (750, 770 and 780) models covering a wide range of prices, and performance and expandability levels; and the high-end Power 795, which is configurable up to 32 sockets (256 cores). There are also single- and two-socket POWER7-based blade models. Virtualization Effective virtualization consists of more than the ability to create virtual machines. Multiple mechanisms are required to create and modify partitions; share system resources between these, and change resource allocations as needs change. It is also necessary to prioritize availability of resources to different applications based on business criticality; monitor and control workload execution processes; and meet service-level performance and uptime targets. PowerVM virtualization meets these requirements. Capabilities include three types of partitioning: 1. Logical partitions (LPARs) are microcode-based partitions that may be configured in increments as small as 1/10th core. The technology was originally developed for IBM mainframes. As a general principle, this approach (often referred to as hard partitioning) offers better isolation of workloads than software-based techniques. Workloads running in different partitions are less likely to interfere with each other, enabling higher levels of concentration. LPARs provide additional security functions.
  • 25.
    International Technology Group22 Figure 14: IBM i and Power Systems Architecture No equivalent capability is available for Intel-based servers with Windows, x86 Linux and/or x86 virtualization tools, or for newer Oracle Sun servers. 2. Micro-partitions are software-based partitions. They are typically employed to support instances requiring limited system resources, and to improve load balancing for large, complex workloads. Micro-partitions may be configured in initial increments of 1/20th core, and subsequent increments as small as 1/100th core. International Technology Group Approval Version – August 3, 2012 1 Figure 12: Power Systems Architecture RESOURCE'SHARING' Processors,'Cache,'Memory,'I/O' Threads' ! VIRTUAL'I/O'SERVER' VIRTUAL'I/O'SERVER' Physical processors DEDICATED'' PROCESSORS' ' ' ' ' ' ' Physical'processors' SHARED' PROCESSOR'POOL' ' ' ' ' Virtual'processors' ' SHARED' PROCESSOR'POOL' ' ' ' ' Virtual'processors' ' Virtual'LAN' ' LPAR Micro-partitions Virtual'tape' ' LPAR' Virtual'disks' LPAR' LPAR' LPAR Micro-partitions LPAR' ' POWERVM HYPERVISOR IBM'i'7.1' ObjectMbased'architecture''•''SingleMlevel'storage' System'integration'&'automation' WORKLOAD'MANAGEMENT' Subsystem' Subsystem' Subsystem' Subsystem'
  • 26.
    International Technology Group23 LPARs and micro-partitions are supported by mechanisms that allow processor, memory and I/O resources to be pooled and reallocated in an extremely granular manner. The system monitors resource utilization every 10 milliseconds, and may change allocations as rapidly. Business-critical workloads may run in dedicated LPARs, using dedicated physical processors. However, other workloads may be executed based on assigned priorities using combinations of threads, partitions and shared processor pools. The system allows workloads to run on one or more processor cores within shared pools. 3. Virtual I/O Servers allow operating system instances running in multiple LPARs to share a common pool of LAN adapters as well as Fiber Channel, SCSI and RAID devices; i.e., it is not necessary to dedicate adapters to individual partitions. Hardware, maintenance and energy cost savings may be realized. Virtual I/O Servers may be duplexed to provide redundancy. PowerVM also provides key availability optimization features. Live Partition Mobility, introduced for IBM i 7.1 in April 2012, allows movement of active LPARs between Power Systems without disrupting operations. Service interruptions of one or two seconds may occur due to network latency. These are, however, rarely noticeable to users. This capability has proved particularly attractive to organizations that need to perform scheduled maintenance and software upgrades without downtime. The PowerHA SystemMirror for i clustering solution enables failover and recovery of even large-scale, highly granular PowerVM environments in a highly efficient and reliable manner. PowerVM and x86 Virtualization x86 virtualization tools such as VMware, Microsoft Hyper-V, Xen KVM and Oracle VM employ only a single, software-based partitioning method. While they may be able to support diverse workloads, they do so less efficiently. System overhead may be significantly larger. (Hard partitioning is supported on the Intel Itanium-based HP Integrity with HP-UX and RHEL, and on older Oracle Sun SPARC-based M-Series with the Solaris operating system. New installations of these are, however, now comparatively rare.) Differences in other areas should also be highlighted. • Workload management. Most workloads experience fluctuations, and processes (e.g., online, batch, collaborative) may vary. Unexpected spikes may occur. When multiple applications are concentrated on a single physical platform – particularly if these generate mixed workloads – highly granular, real-time monitoring and resource assignment will be required. If systems cannot provide such capabilities, administrators will tend to limit the number and size of partitions to prevent workloads interfering with each other. This is one of the key weaknesses of VMware and other x86 hypervisors, and helps explain why most installations of these realize only a fraction of their architectural potential. • Complexity. Ironically, solutions intended to reduce complexity by enabling consolidation of physical x86 servers have often had the reverse effect. As figure 15 illustrates, virtualization introduces a new layer of architecture into system environments.
  • 27.
    International Technology Group24 Figure 15: System Environment Layers – Example In an IBM i environment, the bottom four layers shown in the figure above are integrated by IBM. In addition, the company’s close relationships with ISVs mean that the applications layer is better tested and optimized for the overall IBM stack than is the case for Windows and x86 Linux servers. A VMware environment, in contrast, will typically include components from Intel or Advanced Micro Devices (AMD); the server hardware manufacturer; operating system, database and/or application suppliers; and VMware itself. The number of vendors may be significantly larger if storage and networks, and third-party tools are included. Integration among these vendors may leave much to be desired and, even though they cooperate, overall complexity in customer installations will still be significantly greater than for IBM i on Power Systems. Attention should be drawn to a further differentiator. VMware and other x86 tools have become common hacker and malware targets. Businesses that deploy them have often found that their vulnerabilities increase, while patching workloads expand. IBM i is less vulnerable, as is PowerVM. National Vulnerability Database maintained by the U.S. National Institute of Standards and Technology (NIST), for example recorded 39 medium and high severity vulnerabilities for VMware, and 13 for Xen and KVM during 2011. None were reported for PowerVM over the same period. Lower PowerVM vulnerability reflects, to some extent, the fact that it is less targeted than x86 equivalents. However, security and malware protection mechanisms are more closely embedded and integrated across IBM i, Power Systems and PowerVM than is the case for competitive platforms. Availability Optimization Power Systems A first set of availability optimization features is built into Power Systems hardware and microcode. It includes the following: • Basic capabilities include high levels of component reliability and redundancy, along with hot swap capabilities enabling devices to be replaced without taking systems offline. Redundant and hot swap components include disk drives, PCI adapters, fans, blowers, power supplies, on high- end models, system clocks, service processors, and power regulators. HARDWARE VIRTUALIZATION OPERATING  SYSTEM DATABASES/MIDDLEWARE APPLICATIONS
  • 28.
    International Technology Group25 • Monitoring, diagnostic and fault isolation and resolution facilities are built into all major components, including processors, main memory, cache and packaging modules, as well as adapters, power supplies, cooling and other devices. In many cases, multiple layers of protection and self-test are implemented. Key functionality is provided by IBM-developed Chipkill and First Failure Data Capture (FFDC) technologies. Chipkill is significantly more reliable than conventional error correction code (ECC) techniques. FFDC employs embedded sensors that identify and report failures to a separately powered Service Processor, which also monitors environmental conditions. The Service Processor can automatically notify system administrators or contact an IBM Support Center (electronic support or call home service) to report events requiring service intervention. • Fault masking capabilities prevent outages in case failures do occur. For example, in the event an instruction fails to execute due to a hardware or software fault, the system will automatically repeat the operation. If the failure persists, the operation will be repeated on a different processor and, if this does not succeed, the failed processor will be taken out of service. In addition, memory sparing enables alternate memory modules to be activated in the event of failures; and enhanced memory subsystem enables memory controller and cache sparing. Availability optimization features of Power Systems are summarized in figure 16. Additional capabilities are provided for high-end Power 770, 780 and 795 models. LPARs contribute to reduction of planned outages. Software modifications may be made and new versions installed and assured without disrupting operations. Backups may be performed, and batch workloads executed concurrently with online processes. Software Solutions Avoidance of planned as well as unplanned outages is a central IBM i design parameter. High levels of stability, integration and automation minimize risks of unplanned outages caused by software failures and human error, and reduce both the frequency and duration of planned outages. Specialized features further minimize risks of data loss in the event of an unplanned outage. These include Remote Journaling (file and system changes may be automatically copied to a second server), Save While Active (backups may be performed without taking systems offline) and Independent Auxiliary Storage Pools (IASPs) (data may be mirrored to local or remotely located alternate systems). Additional protection may be provided by IBM or third-party clustered failover solutions, IBM PowerHA SystemMirror for i, for example, builds upon IASP technology to provide more advanced database mirroring, failover and recovery. Synchronous or asynchronous replication may be employed. Although the amount of time required to failover and restart systems and reinstate data may vary, the best practice norm for use of PowerHA SystemMirror for i is that operations may be resumed in a matter of seconds, and data fully restored within an hour. Users have routinely achieved mainframe-class failover and recovery even for complex large-scale transactional workloads.
  • 29.
    International Technology Group26 BASIC  CAPABILITIES   Redundancy,  hot-­‐swap  &  related   Redundant/hot-­‐swap   disks,   PCI   adapters,   GX   buses,   fans   &   blowers,   power   supplies,  power  regulators  &  other  components.   Redundant  disk  controllers.  I/O  paths  &  oscillators.   Concurrent  system  clock  repair.   Concurrent  firmware  update   Server  microcode  may  be  updated  without  taking  systems  offline.   Concurrent  maintenance   Allows  processors,  memory  cards  &  adapters  to  be  replaced,  upgraded  or  serviced   without  taking  systems  offline.   MONITORING,  DIAGNOSTICS  &  FAULT  ISOLATION/RESOLUTION   Hardware-­‐assisted  memory   scrubbing   Automatic  daily  test  of  all  system  memory.  Detects  &  reports  developing  memory   errors  before  they  cause  problems.     Chipkill  error  checking   Employs  RAID-­‐like  striping  of  data  across  memory  devices  to  provide  redundancy   &  enable  reinstatement  of  original  data.  Significantly  more  reliable  than   conventional  error  correction  code  (ECC)  technology.     First  Failure  Data  Capture  (FFDC)     Employs  1,000+  embedded  sensors  that  identify  errors  in  any  system  component.   Root  causes  of  errors  are  determined  without  the  need  to  recreate  problems  or   run  tracing  or  diagnostics  programs.     FAULT  MASKING   Processor  instruction  retry   Alternate  processor  recovery   Processor-­‐contained  checkstop   If  an  instruction  fails  to  execute  due  to  a  hardware  or  software  fault,  the  system   automatically  retries  the  operation.  If  the  failure  persists,  the  operation  is   repeated  on  a  different  processor  &,  if  this  does  not  succeed,  the  failed  processor   is  taken  out  of  service  (checkstopped).  Only  LPARs  supported  by  the  failed   processor  are  affected.     Dynamic  processor  sparing   Allows  idle  Capacity  Upgrade  on  Demand  (CUoD)  processors  to  be  automatically   activated  as  replacements  for  failed  processors.   Partition  availability  priority   In  the  event  of  a  processor  failure,  maintains  LPAR-­‐based  workloads  based  on   assigned  priorities;  i.e.,  remaining  processor  capacity  is  assigned  to  the  highest-­‐ priority  workloads.   Memory  sparing   Enables  redundant  memory  to  be  activated  in  the  event  of  failure.   Enhanced  memory  subsystem   Enables  memory  controller  &  cache  sparing.   Enhanced  cache  recovery   Detects  &  purges  processor  &  cache  errors.  Recovers  original  data.   Dynamic  I/O  line  bit  repair  (eRepair)   Detects  &  bypasses  failed  memory  pins.   PCI  bus  parity  error  retry   Retries  an  I/O  operation  if  an  error  occurs.   Figure 16: Key Power Systems Availability Optimization Technologies
  • 30.
    International Technology Group27 DETAILED DATA Company Profiles The results presented in this report were based on the company profiles summarized in figure 17. SUPPLY  CHAIN  COMPANIES   Auto  Parts  Manufacturer   Retail  Chain   Industrial  Distributor   Business  Profile   Tier  1  automotive  parts  manufacturer   $8  billion  sales   50,000  employees   80  manufacturing  &  distribution  centers   worldwide   Hard  lines  retailer   $5  billion  sales   25,000  full-­‐time  employees   500  stores  +  Internet,  catalog  &  call   center  channels   5  distribution  centers   Industrial  distributor   $3  billion  sales   7,000+  employees   400  branches   10  distribution  centers   Applications   Automotive  ERP  system   Core  merchandise  management,   logistics  management,  finance  &  HR   ERP  system,  e-­‐commerce   FINANCIAL  SERVICES  COMPANIES   Bank   Insurance  Company   Services  Company   Business  Profile   Diversified  retail  bank   $10  billion  revenues   $300  billion  assets   30,000+  employees   1,150  branches  +  ATMs,  Internet  &   mobile  banking  services   Property  &  casualty  insurer   $3  billion  revenues   $5  billion  assets   5,000+  employees   3  million  customers   Agent,  Internet  &  call  center  channels     Loan  processing  services   $1  billion  revenues   5,000+  customers   2,500+  employees   Applications   Core  banking,  EFT/POS,  online  banking,   card  management,  financial   Core  policy  &  claims  management,   customer-­‐facing  Web  services,  call   center  operations,  finance  &   compliance   Core  processing,  customer  service,   online  billing  &  payments   Figure 17: Company Profiles Profiles were constructed using survey data from 60 companies in the same industries: i.e., automotive parts manufacturing, hard lines retail industrial distribution for supply chain companies; and retail banking, property and casualty insurance and financial IT services. Companies employed IBM i, WSFC and Oracle Exadata clusters. Companies employed systems that could be realistically compared across platforms; e.g., the same ERP suites were used for comparisons where these were supported on IBM i and Windows servers. Data was collected on business operations including, where appropriate, vulnerability to cascading effects; applications employed including packaged as well as custom software, and workloads; availability experiences including frequency and duration of planned as well as unplanned outages; security and disaster recovery arrangements, and other subjects.
  • 31.
    International Technology Group28 Costs of Downtime Calculation Process Costs of downtime were calculated using a two-phase process. First, average costs per hour of downtime were calculated for all companies using appropriate industry- and organization-specific values. “Average,” in this context, means that costs are based on overall annual volumes of business activity divided by hours of operation (in all cases, 24 x 365 = 8,760). Values were as described below. Second, average costs of downtime per hour were multiplied by numbers of hours of downtime per year for each platform. These were calculated based on user input. Supply Chain Companies Values for these were as follows: • For all companies, supply chain disruption costs include costs incurred for planning and operational processes between initial customer queries and final delivery. Calculations include costs of idle and underutilized capacity, including personnel; handling of delivery delays (including distribution center and transportation costs); additional inventory carrying costs; costs of customer billing and payments processing delays; costs of change for affected processes; and, for the retail chain, increased markdown costs. • For the automotive parts manufacturer, supply chain disruption costs are divided between inbound supply chain and production disruption, consisting of costs incurred between supplier queries and factory release; and outbound supply chain disruption, consisting of costs incurred between factory release and final customer delivery. These categories generally correspond to the “Source and Make” and “Deliver” segments respectively of the Supply Chain Operations Reference (SCOR) model developed by the Supply Chain Council. Inbound supply chain and production disruption calculations include the effects of delays on production operations, including costs of production scheduling and setup changes. Because the company has achieved high levels of vertical integration, inbound supply chain costs are comparatively low. Other costs include customer penalties and remedial costs including penalties for late delivery and imperfect orders, along with buyback costs such as additional discounts and rebates. • For the retail chain, costs of downtime include Lost Sales due to stockouts and, for the company’s Internet channel, inability to quote product availability and process customer orders due to outages; and selling, general and administrative (SG&A) costs primarily due to disruption of store operations. SG&A costs include idle capacity, handling and administrative costs for late and imperfect deliveries, and reordering, display changes and restocking. • For the industrial distributor, costs of downtime include lost sales due to inventory shortages, inability to process customer queries and orders due to outages and related effects. Customer penalties and remedial costs are included in supply chain disruption costs. Values were calculated based on user input as well as published material such as company financial reports and presentations.
  • 32.
    International Technology Group29 Financial Services Companies Values for these were as follows: • For the bank, costs of downtime include customer attrition (lost customer income), lost transaction fees (including ATM/debit fees, and fees for transactions conducted online and through call centers) and other costs, including lost interest, lost customer acquisition expenditure and productivity loss by branch, call center and other customer-facing staff during outages. • For the insurance company, costs include lost policy income due to customer attrition, missed sales opportunities and payment delays caused by outages, and other costs, including lost interest, lost customer acquisition expenditure and productivity loss by call center and other customer- facing staff during outages. • For the services company, costs include lost fee income, customer attrition, lost interest and productivity loss by customer interaction center staff during outages. Values for customer loss and missed sales opportunities were calculated based on CLV. Published materials were again employed where appropriate. Breakdowns of costs of downtime per hour for individual companies are shown in figure 18. Cost  Category   Outage  cost     per  hour   Cost  Category   Outage  cost     per  hour   SUPPLY  CHAIN  COMPANIES   FINANCIAL  SERVICES  COMPANIES   AUTO  PARTS  MANUFACTURER   BANK     Outbound  supply  chain  disruption   759.06   Customer  attrition     108.21   Inbound  supply  chain  &  production  disruption   185.03   Lost  fee  income   126.01   Customer  penalties  &  remedial  costs   269.62   Other  costs    25.23   TOTAL  ($000)   1,213.71   TOTAL  ($000)   259.45   RETAIL  CHAIN     INSURANCE  COMPANY   Lost  sales   383.10   Lost  income     146.31   Supply  chain  disruption   218.62   Other  costs   4.05   SG&A  costs   83.31   TOTAL  ($000)   150.36   TOTAL  ($000)   685.03   INDUSTRIAL  DISTRIBUTOR     SERVICES  COMPANY   Lost  sales   265.80   Lost  income     79.18   Supply  chain  disruption   283.36   Other  costs   48.68   TOTAL  ($000)   549.16   TOTAL  ($000)   127.86   Figure 18: Average Costs of Outages per Hour Detail Severe Unplanned Outages Calculations for exposure to these were based on two sets of estimates: 1. Probability of 6-, 12- or 24-hour outages for each platform for each company. Probabilities were calculated based on user input as well as general industry data for the frequency and severity of outages for IBM i on Power Systems, WSFC and Oracle Exadata.
  • 33.
    International Technology Group30 2. Costs of downtime for 6-, 12- and 24-hour outages for each company. Costs include the same components as for average costs of downtime per hour calculations, although the proportions of different components varied, in some cases significantly. For supply chain companies, allowance was made for cascading effects. For 12- and 24-hour outages affecting financial services companies, costs also include customer notification, query- and complaint-handling, along with customer reimbursements, extended overdrafts and payment deadlines, and other remedial costs. The probability of severe unplanned outages was then multiplied by projected business impact; e.g., if the probability of a six-hour outage was 0.18, and the cost of such an outage was $10.46 million, the calculation was 0.18 x $10.46 million = $1.883 million. Overall totals were calculated as the sum of business impact for all outages over a three-year period. All values for costs of downtime as well as severe unplanned outage exposure were for the United States.
  • 34.
    ABOUT THE INTERNATIONALTECHNOLOGY GROUP ITG sharpens your awareness of what’s happening and your competitive edge . . . this could affect your future growth and profit prospects International Technology Group (ITG), established in 1983, is an independent research and management consulting firm specializing in information technology (IT) investment strategy, cost/benefit metrics, infrastructure studies, deployment tactics, business alignment and financial analysis. ITG was an early innovator and pioneer in developing total cost of ownership (TCO) and return on investment (ROI) processes and methodologies. In 2004, the firm received a Decade of Education Award from the Information Technology Financial Management Association (ITFMA), the leading professional association dedicated to education and advancement of financial management practices in end-user IT organizations. The firm has undertaken more than 120 major consulting projects, released more than 250 management reports and white papers and more than 1,800 briefings and presentations to individual clients, user groups, industry conferences and seminars throughout the world. Client services are designed to provide factual data and reliable documentation to assist in the decision- making process. Information provided establishes the basis for developing tactical and strategic plans. Important developments are analyzed and practical guidance is offered on the most effective ways to respond to changes that may impact complex IT deployment agendas. A broad range of services is offered, furnishing clients with the information necessary to complement their internal capabilities and resources. Customized client programs involve various combinations of the following deliverables: Status Reports In-depth studies of important issues Management Briefs Detailed analysis of significant developments Management Briefings Periodic interactive meetings with management Executive Presentations Scheduled strategic presentations for decision-makers Email Communications Timely replies to informational requests Telephone Consultation Immediate response to informational needs Clients include a cross section of IT end users in the private and public sectors representing multinational corporations, industrial companies, financial institutions, service organizations, educational institutions, federal and state government agencies as well as IT system suppliers, software vendors and service firms. Federal government clients have included agencies within the Department of Defense (e.g., DISA), Department of Transportation (e.g., FAA) and Department of Treasury (e.g., US Mint). International Technology Group 609 Pacific Avenue, Suite 102 Santa Cruz, California 95060-4406 Telephone: + 831-427-9260 Email: Contact@ITGforInfo.com Website: ITGforInfo.com