PMP EXAM WORKSHOP – WINTER 2008




Communications Management
Timothy J. Krikau, MBA, PMP
COMMUNICATIONS
       MANAGEMENT
The PMBOK defines Project Communication
           Management as…

“The Knowledge Area that employs the processes
    required to ensure timely and appropriate
   generation, collection, distribution, storage,
   retrieval, and ultimate disposition of project
                   information.”
COMMUNICATIONS
         MANAGEMENT

               SCARY FACT!!!

70% of all failed projects are due to ineffective
                 communication!!!
COMMUNICATIONS
      MANAGEMENT

10.1 – Communications Planning
10.2 – Information Distribution
10.3 – Performance Reporting
10.4 – Manage Stakeholders
COMMUNICATIONS
            MANAGEMENT
               10.1 Communication
                     Planning




                    Project
10.4 Manage                         10.2 Information
                 Communication
Stakeholders                           Distribution
                  Management




               10.3 Performance
                   Reporting
COMMUNICATIONS
            MANAGEMENT
The art of communications is a broad subject and
   involves a substantial body of knowledge
   including:
1.   Sender-Receiver Models: Feedback Loops and Barriers to
     Communication.
2.   Choice of Media: Written vs. Oral, Informal vs. Formal, Face-
     to-face vs. E-mail/Voicemail.
3.   Writing Style: Active vs. Passive, Sentence Structure, and
     Choice of Words
4.   Presentation Techniques: Body language and Visual aids.
5.   Meeting Management Techniques: Preparing an agenda and
     dealing with conflict.
COMMUNICATIONS
     MANAGEMENT
         Communications Model
           Noise

                   Feedback - Message
Decode                                           Encode


Sender              Medium??                    Receiver

Encode                 Message                   Decode

                                        Noise
COMMUNICATIONS
        MANAGEMENT
                Model Definitions
Encode: To translate thoughts or ideas into a language
that is understood by others.
Message: The output of encoding.
Medium: The method used to convey the message.
Noise: Anything that interferes with the transmission
and understanding of the message.
Decode: To translate the message back into
meaningful thoughts or ideas.
COMMUNICATIONS
         MANAGEMENT
        10.1 Communication Planning
This process determines the information and
  communications needs of the stakeholders.
    Who needs what information?
    When will they need it?
    By whom?
COMMUNICATIONS
                MANAGEMENT
                   10. 1 Communications Planning

          Inputs             Tools & Techniques         Outputs
1. Enterprise               1. Communications     1. Communications
   Environmental Factors       Requirements          Management Plan
                               Analysis
2. Organizational Process
   Assets                   2. Communications
                               Technology
3. Project Scope
   Statement
4. Project Management
   Plan
    •   Constraints
    •   Assumptions
COMMUNICATIONS
        MANAGEMENT
          Tools and Techniques
    Communications Requirements Analysis
The analysis of the communications requirements in the
sums of the information needs of the stakeholders.
Requirements are defined by combining the type and
format of information needed with analysis of the value
of the information.
Project resources are expended only on communicating
information that contributes to success, or where a lack
of communication can lead to failure.
COMMUNICATIONS
        MANAGEMENT
     Tools and Techniques
Communications Requirements Analysis
This does not mean that “bad news” should not be
shared…
The intent is prevent overwhelming stakeholders with
minutiae.
COMMUNICATIONS
         MANAGEMENT
           Tools and Techniques
  Communications Requirements Analysis
The project manager should consider the number
  of potential communication channels or paths as
  an indicator of the complexity of a project’s
  communications.


                   n(n-1)/2
COMMUNICATIONS
     MANAGEMENT
        Tools and Techniques
 Communications Requirements Analysis
“You have a team of four people, how many
    communication channels are there?”
COMMUNICATIONS
     MANAGEMENT
        Tools and Techniques
 Communications Requirements Analysis
“You have a team of four people, how many
    communication channels are there?”

            The answer is six
                 Or…
             4(4-1)/2 = 6
COMMUNICATIONS
      MANAGEMENT
        Tools and Techniques
  Communications Requirements Analysis
“What if you add one more? How many more
           channels would you have?

          The answer is 10, right?

               WRONG!!!!
COMMUNICATIONS
      MANAGEMENT
        Tools and Techniques
  Communications Requirements Analysis
“What if you add one more? How many more
           channels would you have?
COMMUNICATIONS
      MANAGEMENT
          Tools and Techniques
  Communications Requirements Analysis
“What if you add one more? How many more
           channels would you have?

          The answer would be four.

  Remember to read the exams questions carefully!
COMMUNICATIONS
          MANAGEMENT
             Tools and Techniques
     Communications Requirements Analysis
A key component of planning the projects communications
    is to determine and limit who will communicate with
        whom and who will receive what information.
COMMUNICATIONS
             MANAGEMENT
                  Tools and Techniques
Information typically required to determine project
    communication requirements are:
1.   Organization charts
2.   Project organization and stakeholder responsibility relationships
3.   Disciplines, departments, and specialties involved in the project
4.   Logistics of how many persons will be involved with the project
     and at which locations
5.   Internal information needs (within an organization)
6.   External information needs (with contractors, media, etc.)
7.   Stakeholder information
COMMUNICATIONS
        MANAGEMENT
         Effective Communication
Messages should be encoded carefully, determine
 what the best communication method is to send,
 and to confirm that the message is understood.
COMMUNICATIONS
           MANAGEMENT
             Effective Communication
1.   Nonverbal: About 55% of all communications are
     nonverbal (based on physical mannerisms)
2.   Paralingual: Pitch and tone of voice also helps (and
     hinders) the conveyance of a message
3.   Feedback: “Do you understand what I’ve
     explained?”
COMMUNICATIONS
         MANAGEMENT
             Effective Listening
The receiver should decode the message carefully
   and confirm that the message is understood.
COMMUNICATIONS
           MANAGEMENT
                  Effective Listening
1.   Feedback: “I understand.” or “I’m sure I
     understand, can you repeat what you just said?”
2.   Active Listening: The receiver confirms that
     he/she is listening, confirms agreement, or asks for
     clarification.
3.   Paralingual
COMMUNICATIONS
        MANAGEMENT
       Communications Technology
The methodologies used to transfer information
      among project stakeholders can vary
                  significantly.
COMMUNICATIONS
              MANAGEMENT
                 Communications Technology
     Technological factors that can affect a project include:

1.    The urgency of the need for information (immediate or in intervals?)
2.    The availability of technology (systems in place or is a change needed?)
3.    The expected project staffing (system compatible with participants or is
      training required?)
4.    The length of the project (will the current technology change before the
      project closes?)
5.    The project environment (is the team co-located or virtual?)
COMMUNICATIONS
           MANAGEMENT
           Communication Technology
                         Methods
1.   Formal Written: Used for complex problems, PM
     plans, project charter, long distance communications
2.   Formal Verbal: Presentations, speeches
3.   Informal Written: Memos, e-mail, notes
4.   Informal Verbal: Meetings, conversations
COMMUNICATIONS
      MANAGEMENT
      Communications Technology

Can a project manager control all communications?
                       No.
   Should the project manager try to control all
                  communications?
                       Yes.
How much of a PM’s time is spent communicating?
                      90%
COMMUNICATIONS
         MANAGEMENT
       Communications Management Plan

The inputs and tools and techniques in this process will
                         yield the
          Communications Management Plan
COMMUNICATIONS
                 MANAGEMENT
                          Communications Management Plan
     The communications management plan is contained, or is a subsidiary plan of, the
                                       project management plan.
                      The communications management plan provides:
1.     Stakeholder communication requirements
2.     Information to be communicated, including format, content, and level of detail
3.     Person responsible for communicating all information
4.     Person/groups who will receive the information
5.     Methods/technologies used to convey the information (memos, email, etc.)
6.     Frequency of communication
7.     Escalation process-identifying time frames and the management chain (names) for
       escalation of issues that can’t be resolved at a lower staff level.
8.     Method for updating and refining the communications management plan as the
       project develops.
9.     Glossary of common terminology
COMMUNICATIONS
         MANAGEMENT
        10. 2 Information Distribution
This process involves making information available
  to project stakeholders in a timely manner.
    Distribution of the communications management plan.
    Responding to unexpected requests for information
COMMUNICATIONS
             MANAGEMENT
                     Information Distribution

        Inputs             Tools & Techniques          Outputs
1. Communication         1. Communications      1. Organizational
   Management Plan          Skills                 Process Assets
                                                   (Updates)
                         2. Information
                            Gathering and       2. Requested Changes
                            Retrieval Systems
                         3. Information
                            Distribution
                            Methods
                         4. Lessons Learned
                            Process
COMMUNICATIONS
           MANAGEMENT
              Tools and Techniques
                 Communication Skills
Communication skills are part of general management skills
   and are used to exchange information.
COMMUNICATIONS
            MANAGEMENT
                 Tools and Techniques
                   Communication Skills
             Communicating has many dimensions:
1.   Written and oral, listening, and speaking
2.   Internal (within the project) and external (customer, media,
     public)
3.   Formal (reports, briefings) and informal (memos, ad hoc
     conversations)
4.   Vertical (up and down the organization) and horizontal (peer)
COMMUNICATIONS
           MANAGEMENT
               Tools and Techniques
   Information Gathering and Retrieval Systems
   Information can gathered and retrieved through a variety
                           of media including:
1.    Manual filing systems
2.    Electronic databases
3.    PM software
4.    Systems that allow access to technical documentation
      (blueprints, design specs, etc.)
COMMUNICATIONS
              MANAGEMENT
                    Tools and Techniques
              Information Distribution Methods
     These methods involve information collection, sharing, and
      distribution to project stakeholders in a timely manner across the
      project life cycle.
1.    Project meetings, hard-copy document distribution, manual filing systems,
      and shared-access electronic databases.
2.    Electronic communication and conferencing tools, such as e-mail, fax,
      voicemail, telephone, video and Web conferencing, and Web publishing.
3.    Electronic tools for PM, such as Web interfaces to scheduling and PM
      software, meeting and virtual office support software, portals, and
      collaborative work management tools.
COMMUNICATIONS
         MANAGEMENT
                           Lessons Learned

A lessons learned session focuses on identifying project successes and project failures,
and includes recommendations to improve future performance on projects.

Lessons learned provide future project teams with the information that can increase
effectiveness and efficiency of project management.

Lessons learned are so valuable that a project cannot be considered complete unless
the lessons learned are completed.

Continuous Improvement cannot exist without lessons learned
COMMUNICATIONS
            MANAGEMENT
               Tools and Techniques
                        Lessons Learned
Don’t wait until the project is over to share lessons learned with other
                                   projects!
COMMUNICATIONS
        MANAGEMENT
             Tools and Techniques
                   Lessons Learned
         Specific results from lessons learned include:
Update of the lessons learned knowledge base
Input to knowledge management system
Updated corporate policies, procedures, and processes
Improved business skills
Overall product and service improvements
Updates to the risk management plan
COMMUNICATIONS
         MANAGEMENT
                 Lessons Learned
                    Question…
Lessons learned are BEST completed by:
          a.   Project manager
          b.   Team
          c.   Sponsor
          d.   Stakeholders
COMMUNICATIONS
         MANAGEMENT
               Lessons Learned

The best answer is STAKEHOLDERS as their
 input is critical for collecting all the lessons
 learned on each project.
COMMUNICATIONS
       MANAGEMENT
          Information Distribution Outputs

Organizational Process Assets (updates)
   Project records
   Project reports
   Lessons learned documentation
   Project presentations
   Feedback from stakeholders
   Stakeholder notifications
COMMUNICATIONS
           MANAGEMENT
     Information Distribution Outputs

Requested Changes: Changes to the Information
    Distribution process should trigger changes to the PM
    plan and thecommunications management plan.
COMMUNICATIONS
             MANAGEMENT
             10.3 Performance Reporting
The performance reporting process involves the collection of all
     baseline data, and distribution of performance information to
     stakeholders.

Generally, this performance information includes how resources are
    being used to achieve project objectives and should include
    information on scope, schedule, cost, and quality.
COMMUNICATIONS
                    MANAGEMENT
                        10.3 Performance Reporting

               Inputs                    Tools & Techniques                     Outputs
1.   Work performance               1.    Information presentation    1.   Performance reports
     information                          tools
                                                                      2.   Forecasts
2.   Performance measurements       2.    Performance information
                                                                      3.   Requested changes
                                          gathering and compilation
3.   Forecasted completion
                                                                      4.   Recommended corrective
                                    3.    Status review meetings
4.   Quality control measurements                                          actions
                                    4.    Time reporting systems
5.   PM plan                                                          5.   Organizational process
                                    5.    Cost reporting systems           assets
      •   Performance
          measurement baseline.
6. Approved change requests.
7. Deliverables
COMMUNICATIONS
        MANAGEMENT
        10.3 Performance Reporting
Status reports: Describe where project now stands in terms of cost,
time, and scope, and quality.
Progress reports: Describe what has been accomplished.
   Gantt Charts in MS Project
Trend reports: Examine project results over time to see if performance
is improving or deteriorating.
Forecasting reports: Predict future project status and performance
Variance reports: Compare actual results to baselines
Earned value: Integrates scope, cost and schedule measures to assess
project performance (see the Cost Management process in the PMBOK)
Lessons learned
COMMUNICATIONS
           MANAGEMENT
                        Inputs
           Work Performance Information

Work performance information on the completion status of
   the deliverables and what has been accomplished is
   collected as part of project execution, and is fed into
   the Performance Reporting process.
COMMUNICATIONS
             MANAGEMENT
               Tools and Techniques
   PM Plan: Performance Measurement Baseline.

An approved plan for the project work against which project execution
     is compared, and deviations are measured for management
     control.

The performance measurement baseline typically integrates scope,
     schedule, and cost parameters of the project, but may include
     technical and quality parameters.
COMMUNICATIONS
             MANAGEMENT
                     Tools and Techniques
1.   Information Presentation Tools: Software packages that include table
     reporting, spreadsheet analysis, presentations, etc. (MS Office)
2.   Performance Information Gathering and Compilation: Information can
     be gathered and compiled from a variety of media including manual filing
     systems, electronic databases, PM software, and systems that allow
     technical documentation
3.   Status Review Meetings: Regularly scheduled events to exchange
     information about the project. Frequency and levels can vary with these.
4.   Time Reporting Systems: Record and provide time expended on the
     project.
5.   Cost Reporting Systems: Record and provide cost expended on the
     project.
COMMUNICATIONS
            MANAGEMENT
                           Outputs

1.   Performance Reports: Organize and summarize the
     information gathered, and present the results of any analysis as
     compared to the performance measurement baseline.
2.   Forecasts: Forecasts are updated and reissued based on work
     performance information provided as the project is executed.
3.   Requested Changes: Analysis of project performance often
     generates requested changes.
4.   Recommended Corrective Actions
5.   Organizational Process Assets
COMMUNICATIONS
           MANAGEMENT
                          Outputs
When completed, performance reporting should result in:
    The issuing of reports from other knowledge areas
    Feedback from those who received the reports
    Lessons learned
    Requested changes to both the project and communications
    management plan
    Reports, forecasts, requested changes and corrective actions and
    lessons learned documentation
COMMUNICATIONS
                  MANAGEMENT
                   10.4 Manage Stakeholders
1.        Stakeholder management refers to managing communications to
          satisfy the needs of, and resolve issues with, project stakeholders.
2.        Actively managing stakeholders:
     1.      Increases the likelihood that the project will not veer off track due to
             unresolved stakeholder issues.
     2.      Enhances the ability of persons to operate synergistically
     3.      Limits disruptions during the project
COMMUNICATIONS
                    MANAGEMENT
                          10.4 Manage Stakeholders

             Inputs                       Tools & Techniques                  Outputs
1.   Communications                  1.    Communications methods   1.   Resolved issues
     management plan
                                     2.    Issue logs               2.   Approved change
2.   Organizational process assets                                       requests
                                                                    3.   Approved corrective
                                                                         actions
                                                                    4.   Organizational process
                                                                         assets (updated)
                                                                    5.   Project Management plan
                                                                         (updated)
COMMUNICATIONS
                MANAGEMENT
               10.4 Manage Stakeholders
                      Tools and Techniques
1.        Communication Methods
     1.     Face-to-face meetings are the most effective means for
            communicating and resolving issues with stakeholders.
     2.     If face-to-face meetings aren’t possible or practical
            (international projects), telephone calls, e-mail, and other
            electronic tools are useful for exchanging information and
            dialoguing.
COMMUNICATIONS
                MANAGEMENT
               10.4 Manage Stakeholders
                        Tools and Techniques
1.        Issue Logs
     1.     A tool that can be used to document and monitor the
            resolution of issues.
     2.     Discussed more in the Human Resource Management process.
COMMUNICATIONS
           MANAGEMENT
       10.4 Manage Stakeholders
                      Outputs
1.   Resolved Issues (placed in the issue log)
COMMUNICATIONS
              MANAGEMENT
                                  Other Stuff
                              Communication Blockers
1.   Use of slang, jargon, or phraseology that is indigenous to our culture can cause
     miscommunication with other cultures.

                              “What’s your game plan?”

                            “The nuts and bolts of the…”

                              “Zero in on the problem”

                                   “Kill the weed”
COMMUNICATIONS
        MANAGEMENT
                Other Stuff
Helpful websites in preparing for the PMP Exam


   PMPINABOX: www.pmpinabox.com
    PreparePM: www.preparepm.com
   PMPrepcast: www.pmprepcast.com
COMMUNICATIONS
  MANAGEMENT
     Other Stuff

  tkrikau@yahoo.com
COMMUNICATIONS
  MANAGEMENT

PMP Exam Prep - Communications Management

  • 1.
    PMP EXAM WORKSHOP– WINTER 2008 Communications Management Timothy J. Krikau, MBA, PMP
  • 2.
    COMMUNICATIONS MANAGEMENT The PMBOK defines Project Communication Management as… “The Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.”
  • 3.
    COMMUNICATIONS MANAGEMENT SCARY FACT!!! 70% of all failed projects are due to ineffective communication!!!
  • 4.
    COMMUNICATIONS MANAGEMENT 10.1 – Communications Planning 10.2 – Information Distribution 10.3 – Performance Reporting 10.4 – Manage Stakeholders
  • 5.
    COMMUNICATIONS MANAGEMENT 10.1 Communication Planning Project 10.4 Manage 10.2 Information Communication Stakeholders Distribution Management 10.3 Performance Reporting
  • 6.
    COMMUNICATIONS MANAGEMENT The art of communications is a broad subject and involves a substantial body of knowledge including: 1. Sender-Receiver Models: Feedback Loops and Barriers to Communication. 2. Choice of Media: Written vs. Oral, Informal vs. Formal, Face- to-face vs. E-mail/Voicemail. 3. Writing Style: Active vs. Passive, Sentence Structure, and Choice of Words 4. Presentation Techniques: Body language and Visual aids. 5. Meeting Management Techniques: Preparing an agenda and dealing with conflict.
  • 7.
    COMMUNICATIONS MANAGEMENT Communications Model Noise Feedback - Message Decode Encode Sender Medium?? Receiver Encode Message Decode Noise
  • 8.
    COMMUNICATIONS MANAGEMENT Model Definitions Encode: To translate thoughts or ideas into a language that is understood by others. Message: The output of encoding. Medium: The method used to convey the message. Noise: Anything that interferes with the transmission and understanding of the message. Decode: To translate the message back into meaningful thoughts or ideas.
  • 9.
    COMMUNICATIONS MANAGEMENT 10.1 Communication Planning This process determines the information and communications needs of the stakeholders. Who needs what information? When will they need it? By whom?
  • 10.
    COMMUNICATIONS MANAGEMENT 10. 1 Communications Planning Inputs Tools & Techniques Outputs 1. Enterprise 1. Communications 1. Communications Environmental Factors Requirements Management Plan Analysis 2. Organizational Process Assets 2. Communications Technology 3. Project Scope Statement 4. Project Management Plan • Constraints • Assumptions
  • 11.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communications Requirements Analysis The analysis of the communications requirements in the sums of the information needs of the stakeholders. Requirements are defined by combining the type and format of information needed with analysis of the value of the information. Project resources are expended only on communicating information that contributes to success, or where a lack of communication can lead to failure.
  • 12.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communications Requirements Analysis This does not mean that “bad news” should not be shared… The intent is prevent overwhelming stakeholders with minutiae.
  • 13.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communications Requirements Analysis The project manager should consider the number of potential communication channels or paths as an indicator of the complexity of a project’s communications. n(n-1)/2
  • 14.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communications Requirements Analysis “You have a team of four people, how many communication channels are there?”
  • 15.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communications Requirements Analysis “You have a team of four people, how many communication channels are there?” The answer is six Or… 4(4-1)/2 = 6
  • 16.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communications Requirements Analysis “What if you add one more? How many more channels would you have? The answer is 10, right? WRONG!!!!
  • 17.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communications Requirements Analysis “What if you add one more? How many more channels would you have?
  • 18.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communications Requirements Analysis “What if you add one more? How many more channels would you have? The answer would be four. Remember to read the exams questions carefully!
  • 19.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communications Requirements Analysis A key component of planning the projects communications is to determine and limit who will communicate with whom and who will receive what information.
  • 20.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Information typically required to determine project communication requirements are: 1. Organization charts 2. Project organization and stakeholder responsibility relationships 3. Disciplines, departments, and specialties involved in the project 4. Logistics of how many persons will be involved with the project and at which locations 5. Internal information needs (within an organization) 6. External information needs (with contractors, media, etc.) 7. Stakeholder information
  • 21.
    COMMUNICATIONS MANAGEMENT Effective Communication Messages should be encoded carefully, determine what the best communication method is to send, and to confirm that the message is understood.
  • 22.
    COMMUNICATIONS MANAGEMENT Effective Communication 1. Nonverbal: About 55% of all communications are nonverbal (based on physical mannerisms) 2. Paralingual: Pitch and tone of voice also helps (and hinders) the conveyance of a message 3. Feedback: “Do you understand what I’ve explained?”
  • 23.
    COMMUNICATIONS MANAGEMENT Effective Listening The receiver should decode the message carefully and confirm that the message is understood.
  • 24.
    COMMUNICATIONS MANAGEMENT Effective Listening 1. Feedback: “I understand.” or “I’m sure I understand, can you repeat what you just said?” 2. Active Listening: The receiver confirms that he/she is listening, confirms agreement, or asks for clarification. 3. Paralingual
  • 25.
    COMMUNICATIONS MANAGEMENT Communications Technology The methodologies used to transfer information among project stakeholders can vary significantly.
  • 26.
    COMMUNICATIONS MANAGEMENT Communications Technology Technological factors that can affect a project include: 1. The urgency of the need for information (immediate or in intervals?) 2. The availability of technology (systems in place or is a change needed?) 3. The expected project staffing (system compatible with participants or is training required?) 4. The length of the project (will the current technology change before the project closes?) 5. The project environment (is the team co-located or virtual?)
  • 27.
    COMMUNICATIONS MANAGEMENT Communication Technology Methods 1. Formal Written: Used for complex problems, PM plans, project charter, long distance communications 2. Formal Verbal: Presentations, speeches 3. Informal Written: Memos, e-mail, notes 4. Informal Verbal: Meetings, conversations
  • 28.
    COMMUNICATIONS MANAGEMENT Communications Technology Can a project manager control all communications? No. Should the project manager try to control all communications? Yes. How much of a PM’s time is spent communicating? 90%
  • 29.
    COMMUNICATIONS MANAGEMENT Communications Management Plan The inputs and tools and techniques in this process will yield the Communications Management Plan
  • 30.
    COMMUNICATIONS MANAGEMENT Communications Management Plan The communications management plan is contained, or is a subsidiary plan of, the project management plan. The communications management plan provides: 1. Stakeholder communication requirements 2. Information to be communicated, including format, content, and level of detail 3. Person responsible for communicating all information 4. Person/groups who will receive the information 5. Methods/technologies used to convey the information (memos, email, etc.) 6. Frequency of communication 7. Escalation process-identifying time frames and the management chain (names) for escalation of issues that can’t be resolved at a lower staff level. 8. Method for updating and refining the communications management plan as the project develops. 9. Glossary of common terminology
  • 31.
    COMMUNICATIONS MANAGEMENT 10. 2 Information Distribution This process involves making information available to project stakeholders in a timely manner. Distribution of the communications management plan. Responding to unexpected requests for information
  • 32.
    COMMUNICATIONS MANAGEMENT Information Distribution Inputs Tools & Techniques Outputs 1. Communication 1. Communications 1. Organizational Management Plan Skills Process Assets (Updates) 2. Information Gathering and 2. Requested Changes Retrieval Systems 3. Information Distribution Methods 4. Lessons Learned Process
  • 33.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communication Skills Communication skills are part of general management skills and are used to exchange information.
  • 34.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Communication Skills Communicating has many dimensions: 1. Written and oral, listening, and speaking 2. Internal (within the project) and external (customer, media, public) 3. Formal (reports, briefings) and informal (memos, ad hoc conversations) 4. Vertical (up and down the organization) and horizontal (peer)
  • 35.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Information Gathering and Retrieval Systems Information can gathered and retrieved through a variety of media including: 1. Manual filing systems 2. Electronic databases 3. PM software 4. Systems that allow access to technical documentation (blueprints, design specs, etc.)
  • 36.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Information Distribution Methods These methods involve information collection, sharing, and distribution to project stakeholders in a timely manner across the project life cycle. 1. Project meetings, hard-copy document distribution, manual filing systems, and shared-access electronic databases. 2. Electronic communication and conferencing tools, such as e-mail, fax, voicemail, telephone, video and Web conferencing, and Web publishing. 3. Electronic tools for PM, such as Web interfaces to scheduling and PM software, meeting and virtual office support software, portals, and collaborative work management tools.
  • 37.
    COMMUNICATIONS MANAGEMENT Lessons Learned A lessons learned session focuses on identifying project successes and project failures, and includes recommendations to improve future performance on projects. Lessons learned provide future project teams with the information that can increase effectiveness and efficiency of project management. Lessons learned are so valuable that a project cannot be considered complete unless the lessons learned are completed. Continuous Improvement cannot exist without lessons learned
  • 38.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Lessons Learned Don’t wait until the project is over to share lessons learned with other projects!
  • 39.
    COMMUNICATIONS MANAGEMENT Tools and Techniques Lessons Learned Specific results from lessons learned include: Update of the lessons learned knowledge base Input to knowledge management system Updated corporate policies, procedures, and processes Improved business skills Overall product and service improvements Updates to the risk management plan
  • 40.
    COMMUNICATIONS MANAGEMENT Lessons Learned Question… Lessons learned are BEST completed by: a. Project manager b. Team c. Sponsor d. Stakeholders
  • 41.
    COMMUNICATIONS MANAGEMENT Lessons Learned The best answer is STAKEHOLDERS as their input is critical for collecting all the lessons learned on each project.
  • 42.
    COMMUNICATIONS MANAGEMENT Information Distribution Outputs Organizational Process Assets (updates) Project records Project reports Lessons learned documentation Project presentations Feedback from stakeholders Stakeholder notifications
  • 43.
    COMMUNICATIONS MANAGEMENT Information Distribution Outputs Requested Changes: Changes to the Information Distribution process should trigger changes to the PM plan and thecommunications management plan.
  • 44.
    COMMUNICATIONS MANAGEMENT 10.3 Performance Reporting The performance reporting process involves the collection of all baseline data, and distribution of performance information to stakeholders. Generally, this performance information includes how resources are being used to achieve project objectives and should include information on scope, schedule, cost, and quality.
  • 45.
    COMMUNICATIONS MANAGEMENT 10.3 Performance Reporting Inputs Tools & Techniques Outputs 1. Work performance 1. Information presentation 1. Performance reports information tools 2. Forecasts 2. Performance measurements 2. Performance information 3. Requested changes gathering and compilation 3. Forecasted completion 4. Recommended corrective 3. Status review meetings 4. Quality control measurements actions 4. Time reporting systems 5. PM plan 5. Organizational process 5. Cost reporting systems assets • Performance measurement baseline. 6. Approved change requests. 7. Deliverables
  • 46.
    COMMUNICATIONS MANAGEMENT 10.3 Performance Reporting Status reports: Describe where project now stands in terms of cost, time, and scope, and quality. Progress reports: Describe what has been accomplished. Gantt Charts in MS Project Trend reports: Examine project results over time to see if performance is improving or deteriorating. Forecasting reports: Predict future project status and performance Variance reports: Compare actual results to baselines Earned value: Integrates scope, cost and schedule measures to assess project performance (see the Cost Management process in the PMBOK) Lessons learned
  • 47.
    COMMUNICATIONS MANAGEMENT Inputs Work Performance Information Work performance information on the completion status of the deliverables and what has been accomplished is collected as part of project execution, and is fed into the Performance Reporting process.
  • 48.
    COMMUNICATIONS MANAGEMENT Tools and Techniques PM Plan: Performance Measurement Baseline. An approved plan for the project work against which project execution is compared, and deviations are measured for management control. The performance measurement baseline typically integrates scope, schedule, and cost parameters of the project, but may include technical and quality parameters.
  • 49.
    COMMUNICATIONS MANAGEMENT Tools and Techniques 1. Information Presentation Tools: Software packages that include table reporting, spreadsheet analysis, presentations, etc. (MS Office) 2. Performance Information Gathering and Compilation: Information can be gathered and compiled from a variety of media including manual filing systems, electronic databases, PM software, and systems that allow technical documentation 3. Status Review Meetings: Regularly scheduled events to exchange information about the project. Frequency and levels can vary with these. 4. Time Reporting Systems: Record and provide time expended on the project. 5. Cost Reporting Systems: Record and provide cost expended on the project.
  • 50.
    COMMUNICATIONS MANAGEMENT Outputs 1. Performance Reports: Organize and summarize the information gathered, and present the results of any analysis as compared to the performance measurement baseline. 2. Forecasts: Forecasts are updated and reissued based on work performance information provided as the project is executed. 3. Requested Changes: Analysis of project performance often generates requested changes. 4. Recommended Corrective Actions 5. Organizational Process Assets
  • 51.
    COMMUNICATIONS MANAGEMENT Outputs When completed, performance reporting should result in: The issuing of reports from other knowledge areas Feedback from those who received the reports Lessons learned Requested changes to both the project and communications management plan Reports, forecasts, requested changes and corrective actions and lessons learned documentation
  • 52.
    COMMUNICATIONS MANAGEMENT 10.4 Manage Stakeholders 1. Stakeholder management refers to managing communications to satisfy the needs of, and resolve issues with, project stakeholders. 2. Actively managing stakeholders: 1. Increases the likelihood that the project will not veer off track due to unresolved stakeholder issues. 2. Enhances the ability of persons to operate synergistically 3. Limits disruptions during the project
  • 53.
    COMMUNICATIONS MANAGEMENT 10.4 Manage Stakeholders Inputs Tools & Techniques Outputs 1. Communications 1. Communications methods 1. Resolved issues management plan 2. Issue logs 2. Approved change 2. Organizational process assets requests 3. Approved corrective actions 4. Organizational process assets (updated) 5. Project Management plan (updated)
  • 54.
    COMMUNICATIONS MANAGEMENT 10.4 Manage Stakeholders Tools and Techniques 1. Communication Methods 1. Face-to-face meetings are the most effective means for communicating and resolving issues with stakeholders. 2. If face-to-face meetings aren’t possible or practical (international projects), telephone calls, e-mail, and other electronic tools are useful for exchanging information and dialoguing.
  • 55.
    COMMUNICATIONS MANAGEMENT 10.4 Manage Stakeholders Tools and Techniques 1. Issue Logs 1. A tool that can be used to document and monitor the resolution of issues. 2. Discussed more in the Human Resource Management process.
  • 56.
    COMMUNICATIONS MANAGEMENT 10.4 Manage Stakeholders Outputs 1. Resolved Issues (placed in the issue log)
  • 57.
    COMMUNICATIONS MANAGEMENT Other Stuff Communication Blockers 1. Use of slang, jargon, or phraseology that is indigenous to our culture can cause miscommunication with other cultures. “What’s your game plan?” “The nuts and bolts of the…” “Zero in on the problem” “Kill the weed”
  • 58.
    COMMUNICATIONS MANAGEMENT Other Stuff Helpful websites in preparing for the PMP Exam PMPINABOX: www.pmpinabox.com PreparePM: www.preparepm.com PMPrepcast: www.pmprepcast.com
  • 59.
    COMMUNICATIONS MANAGEMENT Other Stuff tkrikau@yahoo.com
  • 60.