FND BRIEF DESCRIPTION OF PARADIP-HYDERABAD PIPELINE PROJECT
Indian Oil Corporation Limited (IOCL), a Govt. of India Undertaking is engaged in
petroleum refining, marketing and transportation of crude and petroleum products
pipeline throughout the length and breadth of the country. IOCL operates a network of
11221 Km. long crude oil, petroleum products and gas pipelines with a capacity of
80.490 million metric tons per annum of oil and 10 million metric standard cubic
meter per day of gas. Cross-country pipelines are globally recognized as the safest, cost-
effective, energy efficient and environment-friendly mode of transportation.
Indian Oil Corporation Limited (Pipelines Division) intends to lay 1150 KM long Paradip –
Hyderabad Product Pipeline (PHPL), originating from Paradip in the state of Odisha and
terminating at Hyedrabad in the state of Telangana with intermediate pumping – cum –
delivery station at Berhampur (Odisha) and at Visakhapatnam, Rajahmundry &
Vijaywada (Andhra Pradesh). This Paradip-Hyderabad pipeline would be laid for
evacuation of white oil products (i.e.MS, HSD, SKO & ATF) from the Paradip refinery to
depots in Odisha, Andhra Pradesh and Telangana; hence is a time bound project of
national importance.
The initial pipeline length of 91.4 Km from Paradip shall be laid in existing Right of Way
of Paradip Raipur Ranchi Pipeline in the districts of Jagatsinghpur, Cuttack, Khorda and
Puri in the state of Odisha. Approval for re-diversion of 2.8046 ha of revenue forest land
in this stretch of 91.4 Km is required for Paradip Hyderabad pipeline. This 2.8046 Ha
forest land is a part of 70.4221 ha of forest land for which diversion proposal was
approved for Paradip Raipur Ranchi Pipeline vide letter
• F.No.8-01/2013-FC dated 22.2.2013 (Stage-I)
• F.No.8-01/2013-FC dated 4.9.2013 (Stage-II), under section 2 of Forest
(Conservation) Act, 1980
• 10F(Con)280/201220682/F&E, Bhubaneswar dated 5.10.2013, Government of
Odisha has allowed for this diversion of forest land for Paradip Raipur Ranchi
Pipeline
The remaining 235.609 Km length of pipeline in state of Odisha shall be laid in
independent Right of Way which shall be acquired for right of use of Paradip Hyderabad
pipeline in the districts of Puri, Khorda, Nayagarh and Ganjam. No reserve forest or
revenue forest is involved in this stretch of new independent Right of Way of Paradip
Hyderabad Pipeline.
The proposed project involves the following activities:
➢ Laying of about 1150 Km pipeline
➢ Installation of Originating pump station at Paradip
➢ Installation of Delivery cum pumping facilities at Berhampur in Odisha
➢ Installation of Delivery cum pumping facilities at Vizag, Rajahmundry and
Vijayawada in Andhra Pradesh
➢ Installation of pipeline delivery station facilities at Hyderabad
The pipeline length in the state of Odisha is about 327.009 Km. The existing Right of
Way (width of 18 meters) of Paradip Raipur Ranchi Pipeline from originating point
Paradip to Chainage 91.4 Km near Bhubaneswar-Puri National highway crossing, shall be
utilized for the subject purpose. New Right of Way of 18 meters shall be acquired for the
remaining stretch from 91.4 Km to Odisha border in state of Odisha as per the
provisions of Petroleum & Minerals Pipeline Act, 1962. The pipeline shall be laid at a
depth of about 1.25 to 1.5 meters from ground level. After laying of pipeline, the area
will be restored back and the corridor will be demarcated with boundary pillars at
regular intervals.
The forest divisions through which the pipeline is passing through are as follows:
1) Rajnagar Wildlife division
2) Cuttack Division
3) Puri Division
4) City Forest Division
5) Khurda Division
6) Nayagarh Division
7) Ghumsur North Division
8) Ghumsur South Division
9) Berhampur Division
Out of these nine divisions, in five division’s viz. Puri, Nayagarh, Gumshur North,
Gumshur South and Berhampur Divisions, the pipeline is not passing through any forest
plots.

More Related Content

Similar to Phpl

India (6).pdf
India (6).pdfIndia (6).pdf
India (6).pdf
nayanaNMH
 
Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015
Gyan Research And Analytics
 
Uttara Kannada district profile
Uttara Kannada district profileUttara Kannada district profile
final-170310124056.pdf
final-170310124056.pdffinal-170310124056.pdf
final-170310124056.pdf
PravinaMistry2
 
Dharwad District profile
Dharwad District profileDharwad District profile
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.
Nikul Gopani
 
Resources Of Odisha And Maharashtra | Art Integrated Project | Social Science...
Resources Of Odisha And Maharashtra | Art Integrated Project | Social Science...Resources Of Odisha And Maharashtra | Art Integrated Project | Social Science...
Resources Of Odisha And Maharashtra | Art Integrated Project | Social Science...
PritamPriyambadSahoo
 
Adani Group Presentation_Dec 2014
Adani Group Presentation_Dec 2014Adani Group Presentation_Dec 2014
Adani Group Presentation_Dec 2014
absmartkarma
 
Gadag District profile
Gadag District profileGadag District profile

Similar to Phpl (9)

India (6).pdf
India (6).pdfIndia (6).pdf
India (6).pdf
 
Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015
 
Uttara Kannada district profile
Uttara Kannada district profileUttara Kannada district profile
Uttara Kannada district profile
 
final-170310124056.pdf
final-170310124056.pdffinal-170310124056.pdf
final-170310124056.pdf
 
Dharwad District profile
Dharwad District profileDharwad District profile
Dharwad District profile
 
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.
 
Resources Of Odisha And Maharashtra | Art Integrated Project | Social Science...
Resources Of Odisha And Maharashtra | Art Integrated Project | Social Science...Resources Of Odisha And Maharashtra | Art Integrated Project | Social Science...
Resources Of Odisha And Maharashtra | Art Integrated Project | Social Science...
 
Adani Group Presentation_Dec 2014
Adani Group Presentation_Dec 2014Adani Group Presentation_Dec 2014
Adani Group Presentation_Dec 2014
 
Gadag District profile
Gadag District profileGadag District profile
Gadag District profile
 

Recently uploaded

What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
DianaGray10
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
BibashShahi
 
The Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptxThe Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptx
operationspcvita
 
Y-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PPY-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PP
c5vrf27qcz
 
Fueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte WebinarFueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte Webinar
Zilliz
 
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
Edge AI and Vision Alliance
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
Pablo Gómez Abajo
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
Ivo Velitchkov
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Alpen-Adria-Universität
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
ssuserfac0301
 
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid ResearchHarnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
Neo4j
 
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectorsConnector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
DianaGray10
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
Zilliz
 
Essentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation ParametersEssentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation Parameters
Safe Software
 
"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota
Fwdays
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
Javier Junquera
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
ScyllaDB
 

Recently uploaded (20)

What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
 
The Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptxThe Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptx
 
Y-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PPY-Combinator seed pitch deck template PP
Y-Combinator seed pitch deck template PP
 
Fueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte WebinarFueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte Webinar
 
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
“Temporal Event Neural Networks: A More Efficient Alternative to the Transfor...
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
 
Artificial Intelligence and Electronic Warfare
Artificial Intelligence and Electronic WarfareArtificial Intelligence and Electronic Warfare
Artificial Intelligence and Electronic Warfare
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
 
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid ResearchHarnessing the Power of NLP and Knowledge Graphs for Opioid Research
Harnessing the Power of NLP and Knowledge Graphs for Opioid Research
 
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectorsConnector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
 
Programming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup SlidesProgramming Foundation Models with DSPy - Meetup Slides
Programming Foundation Models with DSPy - Meetup Slides
 
Essentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation ParametersEssentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation Parameters
 
"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
 
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-EfficiencyFreshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
Freshworks Rethinks NoSQL for Rapid Scaling & Cost-Efficiency
 

Phpl

  • 1. FND BRIEF DESCRIPTION OF PARADIP-HYDERABAD PIPELINE PROJECT Indian Oil Corporation Limited (IOCL), a Govt. of India Undertaking is engaged in petroleum refining, marketing and transportation of crude and petroleum products pipeline throughout the length and breadth of the country. IOCL operates a network of 11221 Km. long crude oil, petroleum products and gas pipelines with a capacity of 80.490 million metric tons per annum of oil and 10 million metric standard cubic meter per day of gas. Cross-country pipelines are globally recognized as the safest, cost- effective, energy efficient and environment-friendly mode of transportation. Indian Oil Corporation Limited (Pipelines Division) intends to lay 1150 KM long Paradip – Hyderabad Product Pipeline (PHPL), originating from Paradip in the state of Odisha and terminating at Hyedrabad in the state of Telangana with intermediate pumping – cum – delivery station at Berhampur (Odisha) and at Visakhapatnam, Rajahmundry & Vijaywada (Andhra Pradesh). This Paradip-Hyderabad pipeline would be laid for evacuation of white oil products (i.e.MS, HSD, SKO & ATF) from the Paradip refinery to depots in Odisha, Andhra Pradesh and Telangana; hence is a time bound project of national importance. The initial pipeline length of 91.4 Km from Paradip shall be laid in existing Right of Way of Paradip Raipur Ranchi Pipeline in the districts of Jagatsinghpur, Cuttack, Khorda and Puri in the state of Odisha. Approval for re-diversion of 2.8046 ha of revenue forest land in this stretch of 91.4 Km is required for Paradip Hyderabad pipeline. This 2.8046 Ha forest land is a part of 70.4221 ha of forest land for which diversion proposal was approved for Paradip Raipur Ranchi Pipeline vide letter • F.No.8-01/2013-FC dated 22.2.2013 (Stage-I) • F.No.8-01/2013-FC dated 4.9.2013 (Stage-II), under section 2 of Forest (Conservation) Act, 1980 • 10F(Con)280/201220682/F&E, Bhubaneswar dated 5.10.2013, Government of Odisha has allowed for this diversion of forest land for Paradip Raipur Ranchi Pipeline The remaining 235.609 Km length of pipeline in state of Odisha shall be laid in independent Right of Way which shall be acquired for right of use of Paradip Hyderabad pipeline in the districts of Puri, Khorda, Nayagarh and Ganjam. No reserve forest or revenue forest is involved in this stretch of new independent Right of Way of Paradip Hyderabad Pipeline.
  • 2. The proposed project involves the following activities: ➢ Laying of about 1150 Km pipeline ➢ Installation of Originating pump station at Paradip ➢ Installation of Delivery cum pumping facilities at Berhampur in Odisha ➢ Installation of Delivery cum pumping facilities at Vizag, Rajahmundry and Vijayawada in Andhra Pradesh ➢ Installation of pipeline delivery station facilities at Hyderabad The pipeline length in the state of Odisha is about 327.009 Km. The existing Right of Way (width of 18 meters) of Paradip Raipur Ranchi Pipeline from originating point Paradip to Chainage 91.4 Km near Bhubaneswar-Puri National highway crossing, shall be utilized for the subject purpose. New Right of Way of 18 meters shall be acquired for the remaining stretch from 91.4 Km to Odisha border in state of Odisha as per the provisions of Petroleum & Minerals Pipeline Act, 1962. The pipeline shall be laid at a depth of about 1.25 to 1.5 meters from ground level. After laying of pipeline, the area will be restored back and the corridor will be demarcated with boundary pillars at regular intervals. The forest divisions through which the pipeline is passing through are as follows: 1) Rajnagar Wildlife division 2) Cuttack Division 3) Puri Division 4) City Forest Division 5) Khurda Division 6) Nayagarh Division 7) Ghumsur North Division 8) Ghumsur South Division 9) Berhampur Division Out of these nine divisions, in five division’s viz. Puri, Nayagarh, Gumshur North, Gumshur South and Berhampur Divisions, the pipeline is not passing through any forest plots.