Formation Evaluation | Well Construction | Completion & Stimulation | Production
©2015Weatherford.Allrightsreserved.
Say goodbye to freshwater fracking.
Our WaterSure™
fuid system completely
eliminates fresh water from your operations.
With the WaterSure system, you can use produced
and frac fowback water—fltered or unfltered—to
create low-residue stimulation fuids. Effective in a
variety of downhole conditions, WaterSure fuids imitate
the conductivity and permeability of fresh water and
protect against formation damage. So you can reuse
your wastewater and conserve our natural resources
without sacrifcing stimulation performance.
Learn more about making your fracturing more effcient and
environmentally friendly at watersure@weatherford.com.
Fracture with
100% produced water
and no fresh water.
PRESSURE PUMPING – STIMULATION
Natural Produced Water
(Unfltered)
Natural Produced Water
(Filtered)
Fresh Water
Visit us at the
SPE Hydraulic Fracturing
Technology Conference
at Booth #301

Pages from 2015-02

  • 1.
    Formation Evaluation |Well Construction | Completion & Stimulation | Production ©2015Weatherford.Allrightsreserved. Say goodbye to freshwater fracking. Our WaterSure™ fuid system completely eliminates fresh water from your operations. With the WaterSure system, you can use produced and frac fowback water—fltered or unfltered—to create low-residue stimulation fuids. Effective in a variety of downhole conditions, WaterSure fuids imitate the conductivity and permeability of fresh water and protect against formation damage. So you can reuse your wastewater and conserve our natural resources without sacrifcing stimulation performance. Learn more about making your fracturing more effcient and environmentally friendly at watersure@weatherford.com. Fracture with 100% produced water and no fresh water. PRESSURE PUMPING – STIMULATION Natural Produced Water (Unfltered) Natural Produced Water (Filtered) Fresh Water Visit us at the SPE Hydraulic Fracturing Technology Conference at Booth #301