Owenton HSE Presentation
October 13, 2011
Itron Inc.
Carroll Sams Greenwood, SC
Agenda
 What are our HSE goals?
> Our linkage to Corporate Sustainability Goals
 Q3 accidents
> Current metrics
 HSE Annual Planning Requirements
 Review annual plans for EMS and OHSMS
 Annual reporting requirements and External audits
> Submitted reports & audit corrective action updates
 Changes in facility including sub-metering status
> 2011 improvements
 Accomplishments
> Linked to HSE goals
Our Sustainability Goals
2010 – 2011
Compile and analyze Itron’s worldwide energy
and water footprint at all major facilities. Raise
awareness of Itron’s sustainability initiatives and
expectations among our employees.
2012
Achieve LEED certification for corporate
headquarters.
All US manufacturing sites are ISO 14001 certified.
2013
Reduce US occupational injury/illness rates by
15%.
2014
All major worldwide manufacturing sites are ISO
14001 certified.
Itron was named by Seattle Business magazine
as one of Washington state’s top 50 green
companies at the 2011 Green Washington
Awards. The Green Washington Awards identify
and honor those companies that are
demonstrating an extraordinary commitment to
making their businesses sustainable.
2011 Accident Review
OHSA REPORTABLE ACCIDENTS - 2011
» No Q1 2011 Accidents
» (1) Q2 2011 Accident
» No Q3 2011 Accidents
HSE Annual Planning Requirements
ISO 18001 SAFETY MANUAL CREATED & RELEASED
» SM 4.1-01 General – Occupational Health and Safety Management System Manual
» SM 4.2-01 OH&S Policy & Guiding Principles
» SM 4.3-01 Planning
» SM 4.3-02 Legal and other Requirements
» SM 4.3-03 Objectives and Programs
» SM 4.4-01 Implementation and Operation
» SM 4.4-02 Competence , Training, and Awareness
» SM 4.4-03 Communication, Participation and Consultation
» SM 4.4-04 OH&S Management System Documentation
» SM 4.4-05 Safety Document Control
» SM 4.4-06 Operational Control
» SM 4.4-07 Emergency Preparedness and Response
» SM 4.5-01 Performance, Measurement and Monitoring
» SM 4.5-02 Evaluation of Compliance
» SM 4.5-03 Incident Investigation, Nonconformity & Corrective and Preventive Action
» SM 4.5-04 Safety Management System Records
» SM 4.5-05 Safety Management System Audit
» SM 4.6-01 Safety Management Review
EMS Audit Schedule
OHSMS Audit Schedule
• All current through
September 2011
Annual Reporting Requirements and External Audits
EPCRA 313 REPORT AND CORPORATE HSE AUDIT
» Form R Report
• Awaiting Davis & Floyd
Sampling in Q4 2011 for
Copper
» 12 open items from July 2011
HSE Audit Code 2 and 3 items
• All code 1 completed.
• Responses given for all
code 2 and 3.
• I need to sit with Facility
Manager and review some
of the requested items.
• I still have some items that
must be completed.
Install vent line on 500 gallon LP Gas Tank located
outside maintenance – Run vent from pressure relief
valve on tank through roof and goose neck down.
NFPA 58 2008 6.11.4 Internal Valves Violation: At least one remote
shutdown station for internal valves in liquid service not < 25’ or
more >100’ from the liquid transfer point. This shall be retroactive
to all internal valves required by the code.
FIRE MARSHALL AUDIT – DUE BY JULY 2011
500 USG Propane Tank [forklifts] 2,500 USG Propane Tank
Hazardous Waste Oil/Coolant Separator
» Waste Oil/Coolant Drain-off » Oil/Coolant Separator
HAZARDOUS WASTE OIL/COOLANT SEPARATOR
$2,100 less oil pick up
$2,354 less coolant purchase
$4,454 savings to date
$4,454 savings to date [6 months]
Oil
Coolant
Sub-metering project status - completed
SUB-METERING PROJECT
» Water sub-meter operational » Electricity sub-metering operational
– Data must be transferred to MV-Web
Air Compressor Room s/n
88833051
Wall next to new switchgear
1.Incoming power s/n
88833053
2.Chiller s/n 8883305454
Engineering
http://172.23.18.158/status.html
http://172.23.18.205/status.html
http://172.23.18.206/status.html
Air Compressor
Incoming Power
Chiller
Sustainability Improvement - QIP Team
SUSTAINABILITY IMPROVEMENT - QIP TEAM
•TEAM: Deron Johnson, Howard Berry, Pickens Polatty, Kathy Maez, Chuck Strawn, Curtis Fennell
–Tory Acker [Leader]
–Carroll Sams [Facilitator]
–Paul Brooks [Sponsor]
•Problem: Itron Corporate is promoting “Sustainability” or Itron’s ability to achieve and maintain its objectives
in the long term. Our 8 green wastes team has met its objectives for 2010. New HSE focus is energy and water
consumption for 2011.
•GOAL: We shall reduce consumption of energy and water by a combined total of 5% by the end of Q4 2011. We
shall monitor consumption and/or waste generation of the 8 green wastes each month in 2011, with focus on
energy and water [electricity, fuel oil, propane, water] .
•ACTION ITEMS:.
•Evaluating new water meter on Cooling tower water to lower consumption
•CAR written for gas heater project to change from fuel oil to natural gas heat.
2010 Dollars 2011 dollars Improvement
$105 thousand $81 thousand -23%
SUSTAINABILITY QIP TEAM’S RESULTS IN 2011
» 23% Normalized Reduction » January – August 2010/2011
2011 SUSTAINABILITY SCORECARD
2011 Itron Greenwood Sustainability Scorecard
Category Sub-Category Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec.
Energy Consumption 109,812 [15th
to 15th
Bill]
Electricity (KWH) 109,812 114,812 85,812 94,812 94,812 138,812 134,812 162,812
Natural Gas (Therms)
Natural Gas (Cubic Feet)
#2 Diesel Fuel Oil
(Gallons) 7,500 0 0 0 0 0 0 0
Propane (Gallons) 0 0 27 750 0 0 0 0
Water
Domestic (Gallons) 33,428 44,135 45,628 68,820 74,057 159,325 128,664 154,836
Irrigation (Gallons)
ENERGY [BTU/$ Revenue]
• Installed 12.5 ton & (2) 10 ton HVAC units [16/13/17 years old replacements]
• Evaluating Natural Gas replacement system [$3,700 per year savings (14.6 ROI) up to $23,500 per year (2.3 ROI)]
WATER
• Found sprinkler valve leaking after quarterly test [30 days]
• Found chiller float was stuck running full time [located leak in piping in yard]
• Evaluating reducing chiller sewer charges by metering incoming chiller water [subtract incoming from water usage bill]
27% Reduction
6% Reduction
17% Increase
Presentation Review
Agenda
 What are our HSE goals?
> We are concentrating on energy and water in 2011
 Q3 accidents
> (1) accident YTD in 2011
 HSE Annual Planning Requirements
 2011 EMS and OHSMS requirements are on track and ISO 18001 is being developed
 Annual reporting requirements and External audits
> Form R response still left to complete and (12) EMS HSE action items
 Changes in facility including sub-metering status
> 2011 LP Gas improvements and hazardous waste generation reductions
> Sub-metering project completed
 Accomplishments
> 2011 sustainability initiatives - 23% improvement
THANK YOU
www.itron.com
Carroll Sams - Greenwood
Matt Marron & Jeff Stewart
Mike Mason
Mike Reese
Chris Smith
Paul Anderson

More Related Content

What's hot

Quality Installation Check list
Quality Installation Check listQuality Installation Check list
Quality Installation Check listGary Tate
 
ECA Conference Session 3: Stu Jerue
ECA Conference Session 3: Stu JerueECA Conference Session 3: Stu Jerue
ECA Conference Session 3: Stu JerueThomas Flaherty
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony Vitola
 
What Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa FeWhat Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa FePalo Santo Designs
 
Natural Gas Roundtable - ET Environmental Presentation
Natural Gas Roundtable - ET Environmental PresentationNatural Gas Roundtable - ET Environmental Presentation
Natural Gas Roundtable - ET Environmental PresentationWisconsin Clean Cities
 
Project Planning and Air Permit Issues
Project Planning and Air Permit IssuesProject Planning and Air Permit Issues
Project Planning and Air Permit IssuesAll4 Inc.
 
Stimulus Package Energy Efficiency Credits White Paper
Stimulus Package Energy Efficiency Credits White PaperStimulus Package Energy Efficiency Credits White Paper
Stimulus Package Energy Efficiency Credits White PaperMarky Moore
 
Field Study of an Intelligent, Networked, Retrofittable Water Heater Controller
Field Study of an Intelligent, Networked, Retrofittable Water Heater ControllerField Study of an Intelligent, Networked, Retrofittable Water Heater Controller
Field Study of an Intelligent, Networked, Retrofittable Water Heater ControllerCenter for Energy and Environment
 
Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16Eric Bostwick
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioenergytrustor
 
DOE NREL TEST Report 2014
DOE NREL TEST Report 2014DOE NREL TEST Report 2014
DOE NREL TEST Report 2014Charles Rice
 
Genge, kerr assessing the effects of climate change on buildings using the pi...
Genge, kerr assessing the effects of climate change on buildings using the pi...Genge, kerr assessing the effects of climate change on buildings using the pi...
Genge, kerr assessing the effects of climate change on buildings using the pi...Gerald R. (Jerry) Genge
 
SO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesSO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesAll4 Inc.
 
Energy Trust New Buildings: Technical Updates for Modelers and Engineers
Energy Trust New Buildings: Technical Updates for Modelers and EngineersEnergy Trust New Buildings: Technical Updates for Modelers and Engineers
Energy Trust New Buildings: Technical Updates for Modelers and Engineersenergytrustor
 
Past Experience
Past ExperiencePast Experience
Past Experienceomshawn
 
Home Energy Assessments
Home Energy AssessmentsHome Energy Assessments
Home Energy AssessmentsGreg Bennett
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116All4 Inc.
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...All4 Inc.
 

What's hot (20)

Quality Installation Check list
Quality Installation Check listQuality Installation Check list
Quality Installation Check list
 
ECA Conference Session 3: Stu Jerue
ECA Conference Session 3: Stu JerueECA Conference Session 3: Stu Jerue
ECA Conference Session 3: Stu Jerue
 
Cooling tower Inspection Guide
Cooling tower Inspection GuideCooling tower Inspection Guide
Cooling tower Inspection Guide
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
 
What Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa FeWhat Is a HERS Rating? | Home Efficiency Santa Fe
What Is a HERS Rating? | Home Efficiency Santa Fe
 
Natural Gas Roundtable - ET Environmental Presentation
Natural Gas Roundtable - ET Environmental PresentationNatural Gas Roundtable - ET Environmental Presentation
Natural Gas Roundtable - ET Environmental Presentation
 
Project Planning and Air Permit Issues
Project Planning and Air Permit IssuesProject Planning and Air Permit Issues
Project Planning and Air Permit Issues
 
Stimulus Package Energy Efficiency Credits White Paper
Stimulus Package Energy Efficiency Credits White PaperStimulus Package Energy Efficiency Credits White Paper
Stimulus Package Energy Efficiency Credits White Paper
 
Field Study of an Intelligent, Networked, Retrofittable Water Heater Controller
Field Study of an Intelligent, Networked, Retrofittable Water Heater ControllerField Study of an Intelligent, Networked, Retrofittable Water Heater Controller
Field Study of an Intelligent, Networked, Retrofittable Water Heater Controller
 
Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudio
 
DOE NREL TEST Report 2014
DOE NREL TEST Report 2014DOE NREL TEST Report 2014
DOE NREL TEST Report 2014
 
Genge, kerr assessing the effects of climate change on buildings using the pi...
Genge, kerr assessing the effects of climate change on buildings using the pi...Genge, kerr assessing the effects of climate change on buildings using the pi...
Genge, kerr assessing the effects of climate change on buildings using the pi...
 
SO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesSO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling Strategies
 
Energy Trust New Buildings: Technical Updates for Modelers and Engineers
Energy Trust New Buildings: Technical Updates for Modelers and EngineersEnergy Trust New Buildings: Technical Updates for Modelers and Engineers
Energy Trust New Buildings: Technical Updates for Modelers and Engineers
 
Past Experience
Past ExperiencePast Experience
Past Experience
 
Quality maintenance
Quality maintenanceQuality maintenance
Quality maintenance
 
Home Energy Assessments
Home Energy AssessmentsHome Energy Assessments
Home Energy Assessments
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
 

Similar to Owenton HSE Presentation Greenwood October 2011

Andrew Chant\'s CanWEA O &amp; M Presentation
Andrew Chant\'s CanWEA  O  &amp; M  PresentationAndrew Chant\'s CanWEA  O  &amp; M  Presentation
Andrew Chant\'s CanWEA O &amp; M Presentationmtingle
 
Atlas Energy Group_REF 3.0 061615 v2 - Ukrainian
Atlas Energy Group_REF 3.0 061615 v2 - UkrainianAtlas Energy Group_REF 3.0 061615 v2 - Ukrainian
Atlas Energy Group_REF 3.0 061615 v2 - UkrainianCarter D. Johnson
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talkPhucPhamThanh
 
Keepmoat, Fuel Poverty: Warm Homes Oldham Service
Keepmoat, Fuel Poverty: Warm Homes Oldham ServiceKeepmoat, Fuel Poverty: Warm Homes Oldham Service
Keepmoat, Fuel Poverty: Warm Homes Oldham ServiceKeepmoat
 
Containing Cost Through Iso14001 2003
Containing Cost Through Iso14001 2003Containing Cost Through Iso14001 2003
Containing Cost Through Iso14001 2003cdelzer
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptxSayeedHvac
 
Ice cold ppt 9 3-2010
Ice cold ppt 9 3-2010Ice cold ppt 9 3-2010
Ice cold ppt 9 3-2010efficientms
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...guest3e1229f
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Alliance To Save Energy
 
Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)ravindradatar
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operationsSchneider Electric
 
New Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementNew Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementPeter Armstrong
 
ETS Slide Presentation
ETS Slide PresentationETS Slide Presentation
ETS Slide PresentationRyan Slack
 
ETS Specialty Tax Update & Final Repair Overview
ETS Specialty Tax Update & Final Repair OverviewETS Specialty Tax Update & Final Repair Overview
ETS Specialty Tax Update & Final Repair OverviewRyan Slack
 
Energy management & audit
Energy management & auditEnergy management & audit
Energy management & auditPINAKI ROY
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designSustainableEnergyAut
 

Similar to Owenton HSE Presentation Greenwood October 2011 (20)

Andrew Chant\'s CanWEA O &amp; M Presentation
Andrew Chant\'s CanWEA  O  &amp; M  PresentationAndrew Chant\'s CanWEA  O  &amp; M  Presentation
Andrew Chant\'s CanWEA O &amp; M Presentation
 
Atlas Energy Group_REF 3.0 061615 v2 - Ukrainian
Atlas Energy Group_REF 3.0 061615 v2 - UkrainianAtlas Energy Group_REF 3.0 061615 v2 - Ukrainian
Atlas Energy Group_REF 3.0 061615 v2 - Ukrainian
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talk
 
Keepmoat, Fuel Poverty: Warm Homes Oldham Service
Keepmoat, Fuel Poverty: Warm Homes Oldham ServiceKeepmoat, Fuel Poverty: Warm Homes Oldham Service
Keepmoat, Fuel Poverty: Warm Homes Oldham Service
 
Containing Cost Through Iso14001 2003
Containing Cost Through Iso14001 2003Containing Cost Through Iso14001 2003
Containing Cost Through Iso14001 2003
 
Energy management and audit
Energy management and auditEnergy management and audit
Energy management and audit
 
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
1-fmm-11-9-16-jcc-ppt-jw-final-11-8-16.pptx
 
Ice cold ppt 9 3-2010
Ice cold ppt 9 3-2010Ice cold ppt 9 3-2010
Ice cold ppt 9 3-2010
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
Innovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy SavingsInnovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy Savings
 
New Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementNew Era of Energy-Efficiency Management
New Era of Energy-Efficiency Management
 
ETS Slide Presentation
ETS Slide PresentationETS Slide Presentation
ETS Slide Presentation
 
ETS Specialty Tax Update & Final Repair Overview
ETS Specialty Tax Update & Final Repair OverviewETS Specialty Tax Update & Final Repair Overview
ETS Specialty Tax Update & Final Repair Overview
 
PIA REPORT PRESENTATION
PIA REPORT PRESENTATIONPIA REPORT PRESENTATION
PIA REPORT PRESENTATION
 
Energy management & audit
Energy management & auditEnergy management & audit
Energy management & audit
 
Combi Systems: Lessons Learned from the Field
Combi Systems: Lessons Learned from the FieldCombi Systems: Lessons Learned from the Field
Combi Systems: Lessons Learned from the Field
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
 

Owenton HSE Presentation Greenwood October 2011

  • 1. Owenton HSE Presentation October 13, 2011 Itron Inc. Carroll Sams Greenwood, SC
  • 2. Agenda  What are our HSE goals? > Our linkage to Corporate Sustainability Goals  Q3 accidents > Current metrics  HSE Annual Planning Requirements  Review annual plans for EMS and OHSMS  Annual reporting requirements and External audits > Submitted reports & audit corrective action updates  Changes in facility including sub-metering status > 2011 improvements  Accomplishments > Linked to HSE goals
  • 4. 2010 – 2011 Compile and analyze Itron’s worldwide energy and water footprint at all major facilities. Raise awareness of Itron’s sustainability initiatives and expectations among our employees. 2012 Achieve LEED certification for corporate headquarters. All US manufacturing sites are ISO 14001 certified. 2013 Reduce US occupational injury/illness rates by 15%. 2014 All major worldwide manufacturing sites are ISO 14001 certified. Itron was named by Seattle Business magazine as one of Washington state’s top 50 green companies at the 2011 Green Washington Awards. The Green Washington Awards identify and honor those companies that are demonstrating an extraordinary commitment to making their businesses sustainable.
  • 6. OHSA REPORTABLE ACCIDENTS - 2011 » No Q1 2011 Accidents » (1) Q2 2011 Accident » No Q3 2011 Accidents
  • 7. HSE Annual Planning Requirements
  • 8. ISO 18001 SAFETY MANUAL CREATED & RELEASED » SM 4.1-01 General – Occupational Health and Safety Management System Manual » SM 4.2-01 OH&S Policy & Guiding Principles » SM 4.3-01 Planning » SM 4.3-02 Legal and other Requirements » SM 4.3-03 Objectives and Programs » SM 4.4-01 Implementation and Operation » SM 4.4-02 Competence , Training, and Awareness » SM 4.4-03 Communication, Participation and Consultation » SM 4.4-04 OH&S Management System Documentation » SM 4.4-05 Safety Document Control » SM 4.4-06 Operational Control » SM 4.4-07 Emergency Preparedness and Response » SM 4.5-01 Performance, Measurement and Monitoring » SM 4.5-02 Evaluation of Compliance » SM 4.5-03 Incident Investigation, Nonconformity & Corrective and Preventive Action » SM 4.5-04 Safety Management System Records » SM 4.5-05 Safety Management System Audit » SM 4.6-01 Safety Management Review EMS Audit Schedule OHSMS Audit Schedule • All current through September 2011
  • 9. Annual Reporting Requirements and External Audits
  • 10. EPCRA 313 REPORT AND CORPORATE HSE AUDIT » Form R Report • Awaiting Davis & Floyd Sampling in Q4 2011 for Copper » 12 open items from July 2011 HSE Audit Code 2 and 3 items • All code 1 completed. • Responses given for all code 2 and 3. • I need to sit with Facility Manager and review some of the requested items. • I still have some items that must be completed.
  • 11. Install vent line on 500 gallon LP Gas Tank located outside maintenance – Run vent from pressure relief valve on tank through roof and goose neck down. NFPA 58 2008 6.11.4 Internal Valves Violation: At least one remote shutdown station for internal valves in liquid service not < 25’ or more >100’ from the liquid transfer point. This shall be retroactive to all internal valves required by the code. FIRE MARSHALL AUDIT – DUE BY JULY 2011 500 USG Propane Tank [forklifts] 2,500 USG Propane Tank
  • 13. » Waste Oil/Coolant Drain-off » Oil/Coolant Separator HAZARDOUS WASTE OIL/COOLANT SEPARATOR $2,100 less oil pick up $2,354 less coolant purchase $4,454 savings to date $4,454 savings to date [6 months] Oil Coolant
  • 15. SUB-METERING PROJECT » Water sub-meter operational » Electricity sub-metering operational – Data must be transferred to MV-Web Air Compressor Room s/n 88833051 Wall next to new switchgear 1.Incoming power s/n 88833053 2.Chiller s/n 8883305454 Engineering http://172.23.18.158/status.html http://172.23.18.205/status.html http://172.23.18.206/status.html Air Compressor Incoming Power Chiller
  • 17. SUSTAINABILITY IMPROVEMENT - QIP TEAM •TEAM: Deron Johnson, Howard Berry, Pickens Polatty, Kathy Maez, Chuck Strawn, Curtis Fennell –Tory Acker [Leader] –Carroll Sams [Facilitator] –Paul Brooks [Sponsor] •Problem: Itron Corporate is promoting “Sustainability” or Itron’s ability to achieve and maintain its objectives in the long term. Our 8 green wastes team has met its objectives for 2010. New HSE focus is energy and water consumption for 2011. •GOAL: We shall reduce consumption of energy and water by a combined total of 5% by the end of Q4 2011. We shall monitor consumption and/or waste generation of the 8 green wastes each month in 2011, with focus on energy and water [electricity, fuel oil, propane, water] . •ACTION ITEMS:. •Evaluating new water meter on Cooling tower water to lower consumption •CAR written for gas heater project to change from fuel oil to natural gas heat. 2010 Dollars 2011 dollars Improvement $105 thousand $81 thousand -23%
  • 18. SUSTAINABILITY QIP TEAM’S RESULTS IN 2011 » 23% Normalized Reduction » January – August 2010/2011
  • 19. 2011 SUSTAINABILITY SCORECARD 2011 Itron Greenwood Sustainability Scorecard Category Sub-Category Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep. Oct. Nov. Dec. Energy Consumption 109,812 [15th to 15th Bill] Electricity (KWH) 109,812 114,812 85,812 94,812 94,812 138,812 134,812 162,812 Natural Gas (Therms) Natural Gas (Cubic Feet) #2 Diesel Fuel Oil (Gallons) 7,500 0 0 0 0 0 0 0 Propane (Gallons) 0 0 27 750 0 0 0 0 Water Domestic (Gallons) 33,428 44,135 45,628 68,820 74,057 159,325 128,664 154,836 Irrigation (Gallons) ENERGY [BTU/$ Revenue] • Installed 12.5 ton & (2) 10 ton HVAC units [16/13/17 years old replacements] • Evaluating Natural Gas replacement system [$3,700 per year savings (14.6 ROI) up to $23,500 per year (2.3 ROI)] WATER • Found sprinkler valve leaking after quarterly test [30 days] • Found chiller float was stuck running full time [located leak in piping in yard] • Evaluating reducing chiller sewer charges by metering incoming chiller water [subtract incoming from water usage bill] 27% Reduction 6% Reduction 17% Increase
  • 21. Agenda  What are our HSE goals? > We are concentrating on energy and water in 2011  Q3 accidents > (1) accident YTD in 2011  HSE Annual Planning Requirements  2011 EMS and OHSMS requirements are on track and ISO 18001 is being developed  Annual reporting requirements and External audits > Form R response still left to complete and (12) EMS HSE action items  Changes in facility including sub-metering status > 2011 LP Gas improvements and hazardous waste generation reductions > Sub-metering project completed  Accomplishments > 2011 sustainability initiatives - 23% improvement
  • 22. THANK YOU www.itron.com Carroll Sams - Greenwood Matt Marron & Jeff Stewart Mike Mason Mike Reese Chris Smith Paul Anderson