SlideShare a Scribd company logo
1 of 5
Download to read offline
@ozgindia ozgindia.com.com 1
@ozgindia
OSP LICENSE:
BETWEEN INTERNATIONAL OSP & DOMESTIC OSP
Ozg Lawyers
1. General Conditions:
Sharing of the infrastructure by the Domestic OSP and the International
OSP shall require prior written approval of the Authority.
may be granted on fulfilment of the following conditions:
(a) The domestic OSP Centre
the same Company.
(b) The OSP shall set up call centre having at least 50 seats.
(c) The OSP shall be responsible for any violation of the terms & conditions
of OSP registration by anyone includin
(d) The Authority reserves the right to carry out the audit periodically.
(e) If the Authority is satisfied that there has been a violation of the
conditions, it reserves the right to take punitive action
forfeiture of the security deposit and / or the cancellation of the
registration held by OSP and the company shall be debarred from taking
OSP registration for 3 years from the date of cancellation of such
registration.
DoT OSP License C
Ozg Lawyers
Email: ask@osplicense.com
ozgindia.com
OSP LICENSE: SHARING THE INFRASTRUCTURE
BETWEEN INTERNATIONAL OSP & DOMESTIC OSP
Lawyers @ Ozg Lawyers @ Ozg Lawyers @ Ozg Lawyers
General Conditions:
Sharing of the infrastructure by the Domestic OSP and the International
OSP shall require prior written approval of the Authority. Such Registration
may be granted on fulfilment of the following conditions:-
The domestic OSP Centre and International OSP Centre shall belong to
the same Company.
The OSP shall set up call centre having at least 50 seats.
The OSP shall be responsible for any violation of the terms & conditions
of OSP registration by anyone including but not limited to its employees.
The Authority reserves the right to carry out the audit periodically.
If the Authority is satisfied that there has been a violation of the
conditions, it reserves the right to take punitive action
forfeiture of the security deposit and / or the cancellation of the
registration held by OSP and the company shall be debarred from taking
OSP registration for 3 years from the date of cancellation of such
DoT License & Compliance
DoT OSP License Consultant in Mumbai / Bangalore / Hyderabad
Lawyers @ Ozg Lawyers @ Ozg Lawyers @ Ozg Lawyers
Email: ask@osplicense.com
.com 2
SHARING THE INFRASTRUCTURE
BETWEEN INTERNATIONAL OSP & DOMESTIC OSP
Sharing of the infrastructure by the Domestic OSP and the International
Such Registration
and International OSP Centre shall belong to
The OSP shall be responsible for any violation of the terms & conditions
g but not limited to its employees.
The Authority reserves the right to carry out the audit periodically.
If the Authority is satisfied that there has been a violation of the
conditions, it reserves the right to take punitive action including
forfeiture of the security deposit and / or the cancellation of the
registration held by OSP and the company shall be debarred from taking
OSP registration for 3 years from the date of cancellation of such
@ozgindia
2. Duration of Registration for Sharing the Infrastructure & Bank Guarantee
(a) This registration shall be valid for a period of 3 years from the effective
date unless revoked earlier for reasons as specified elsewhere in the
document.
(b) The Company shall submit a security deposit in the form of a Bank
Guarantee in the specified format for Rs.
term 4(A) of this chapter or Rs. 1 crore for option 2 under term 4(B) of
this chapter in favour of the Authority for the period of such
Registration. In addition, the Company will sign an agreement with the
Authority in the pres
(c) Any failure to abide by the terms & conditions of Registration shall
entitle the Authority to encash the Bank Guarantees and to convert into
a cash security without any reference to the OSP at his risk and cost.
interest or compensation whatsoever shall be payable by the Authority
on such encashment.
(d) Without prejudice to its rights of any other remedy, the Authority may
encash Bank Guarantee and forfeit the security deposit in case of any
breach in terms & condition
3. Extension of Registration for Sharing the Infrastructure
(a) Registration for such facility shall be for a period of 3 years. This may be
extended for a further periods of maximum 3 years after expiry.
(b) For extension of registration period beyond 3 years, the OSP shall
submit such request for extension along with extended validity period of
Bank Guarantee, 60 days prior to the expiry date, failing which the
registration will lapse without notice
ozgindia.com
Duration of Registration for Sharing the Infrastructure & Bank Guarantee
shall be valid for a period of 3 years from the effective
date unless revoked earlier for reasons as specified elsewhere in the
The Company shall submit a security deposit in the form of a Bank
Guarantee in the specified format for Rs.50 Lakhs for option 1 under
term 4(A) of this chapter or Rs. 1 crore for option 2 under term 4(B) of
this chapter in favour of the Authority for the period of such
Registration. In addition, the Company will sign an agreement with the
Authority in the prescribed format.
Any failure to abide by the terms & conditions of Registration shall
entitle the Authority to encash the Bank Guarantees and to convert into
a cash security without any reference to the OSP at his risk and cost.
ompensation whatsoever shall be payable by the Authority
on such encashment.
Without prejudice to its rights of any other remedy, the Authority may
encash Bank Guarantee and forfeit the security deposit in case of any
breach in terms & conditions of the Registration by the OSP.
Extension of Registration for Sharing the Infrastructure
Registration for such facility shall be for a period of 3 years. This may be
extended for a further periods of maximum 3 years after expiry.
For extension of registration period beyond 3 years, the OSP shall
submit such request for extension along with extended validity period of
Bank Guarantee, 60 days prior to the expiry date, failing which the
registration will lapse without notice.
.com 3
Duration of Registration for Sharing the Infrastructure & Bank Guarantee
shall be valid for a period of 3 years from the effective
date unless revoked earlier for reasons as specified elsewhere in the
The Company shall submit a security deposit in the form of a Bank
50 Lakhs for option 1 under
term 4(A) of this chapter or Rs. 1 crore for option 2 under term 4(B) of
this chapter in favour of the Authority for the period of such
Registration. In addition, the Company will sign an agreement with the
Any failure to abide by the terms & conditions of Registration shall
entitle the Authority to encash the Bank Guarantees and to convert into
a cash security without any reference to the OSP at his risk and cost. No
ompensation whatsoever shall be payable by the Authority
Without prejudice to its rights of any other remedy, the Authority may
encash Bank Guarantee and forfeit the security deposit in case of any
s of the Registration by the OSP.
Extension of Registration for Sharing the Infrastructure
Registration for such facility shall be for a period of 3 years. This may be
extended for a further periods of maximum 3 years after expiry.
For extension of registration period beyond 3 years, the OSP shall
submit such request for extension along with extended validity period of
Bank Guarantee, 60 days prior to the expiry date, failing which the
@ozgindia
(c) The decision of the Authority shall be final in regard to the grant of
extension.
4. Technical Terms & Conditions for sharing the Infrastructure between
International OSP & Domestic OSP
(A). OPTION - 1
(Separate & Independent EPABX
Centres with sharing of same operator position)
1. Interconnectivity of the International OSP with Domestic OSP is not
permitted.
2. The Domestic OSP centre and international OSP centre shall ha
sharing separate and independent EPABX but may have the common
operator position.
3. OSP shall ensure that only one call shall be offered to the operator
position at a time, be it domestic or international, incoming or outgoing.
4. No voice traffic shall flow between the Domestic and international OSP
centres and/or cause bypass of the network of the Authorised Telecom
Service Providers.
5. OSP shall ensure that the system logs are tamper
are preserved at least for six months. The Authority reserves the right to
call for these system logs on demand and also inspect them at site.
ozgindia.com
The decision of the Authority shall be final in regard to the grant of
Technical Terms & Conditions for sharing the Infrastructure between
International OSP & Domestic OSP
(Separate & Independent EPABX to be used for International & Domestic OSP
Centres with sharing of same operator position)
Interconnectivity of the International OSP with Domestic OSP is not
The Domestic OSP centre and international OSP centre shall ha
sharing separate and independent EPABX but may have the common
OSP shall ensure that only one call shall be offered to the operator
position at a time, be it domestic or international, incoming or outgoing.
No voice traffic shall flow between the Domestic and international OSP
centres and/or cause bypass of the network of the Authorised Telecom
OSP shall ensure that the system logs are tamper-proof and system logs
at least for six months. The Authority reserves the right to
call for these system logs on demand and also inspect them at site.
.com 4
The decision of the Authority shall be final in regard to the grant of
Technical Terms & Conditions for sharing the Infrastructure between
to be used for International & Domestic OSP
Interconnectivity of the International OSP with Domestic OSP is not
The Domestic OSP centre and international OSP centre shall have non-
sharing separate and independent EPABX but may have the common
OSP shall ensure that only one call shall be offered to the operator
position at a time, be it domestic or international, incoming or outgoing.
No voice traffic shall flow between the Domestic and international OSP
centres and/or cause bypass of the network of the Authorised Telecom
proof and system logs
at least for six months. The Authority reserves the right to
call for these system logs on demand and also inspect them at site.
@ozgindia
(B). OPTION - 2
(International & Domestic OSP Centres to share the common EPABX with
logical partitioning)
1. Interconnectivity of the International OSP with Domestic OSP is not
permitted.
2. The Company shall submit a certificate from the Vendors of the
equipment that the software is capable of logically bifurcating
common infrastructure into two separate and independent
environments for the Domestic OSP and International OSP Centres.
3. The Company shall ensure the complete logical separation between the
activities of the domestic and International appl
shall flow between the Domestic and international OSP centres and/or
cause bypass of the network of the Authorised Telecom Service
Providers.
4. OSP shall ensure that the system logs are tamper
are preserved at least for six months. The Authority reserves the right to
call for these system logs on demand and also inspect them at site.
ozgindia.com
(International & Domestic OSP Centres to share the common EPABX with
Interconnectivity of the International OSP with Domestic OSP is not
The Company shall submit a certificate from the Vendors of the
equipment that the software is capable of logically bifurcating
common infrastructure into two separate and independent
environments for the Domestic OSP and International OSP Centres.
The Company shall ensure the complete logical separation between the
activities of the domestic and International applications. No voice traffic
shall flow between the Domestic and international OSP centres and/or
cause bypass of the network of the Authorised Telecom Service
OSP shall ensure that the system logs are tamper-proof and system logs
preserved at least for six months. The Authority reserves the right to
call for these system logs on demand and also inspect them at site.
.com 5
(International & Domestic OSP Centres to share the common EPABX with
Interconnectivity of the International OSP with Domestic OSP is not
The Company shall submit a certificate from the Vendors of the
equipment that the software is capable of logically bifurcating the
common infrastructure into two separate and independent
environments for the Domestic OSP and International OSP Centres.
The Company shall ensure the complete logical separation between the
ications. No voice traffic
shall flow between the Domestic and international OSP centres and/or
cause bypass of the network of the Authorised Telecom Service
proof and system logs
preserved at least for six months. The Authority reserves the right to
call for these system logs on demand and also inspect them at site.

More Related Content

What's hot

What's hot (20)

State bank of_india_v__ajay_kumar_sood
State bank of_india_v__ajay_kumar_soodState bank of_india_v__ajay_kumar_sood
State bank of_india_v__ajay_kumar_sood
 
Bail
Bail Bail
Bail
 
Texas Drivers License Suspension Periods, Texas DWI Statutes, Ignition Interl...
Texas Drivers License Suspension Periods, Texas DWI Statutes, Ignition Interl...Texas Drivers License Suspension Periods, Texas DWI Statutes, Ignition Interl...
Texas Drivers License Suspension Periods, Texas DWI Statutes, Ignition Interl...
 
H494v6
H494v6H494v6
H494v6
 
Conditional release of accused on bond
Conditional release of accused on bondConditional release of accused on bond
Conditional release of accused on bond
 
ANTICIPATORY BAIL- Section 438 in The Code Of Criminal Procedure, 1973
ANTICIPATORY BAIL- Section 438 in The Code Of Criminal Procedure, 1973ANTICIPATORY BAIL- Section 438 in The Code Of Criminal Procedure, 1973
ANTICIPATORY BAIL- Section 438 in The Code Of Criminal Procedure, 1973
 
Inherent Power of the Court of Bangladesh
Inherent Power of the Court of BangladeshInherent Power of the Court of Bangladesh
Inherent Power of the Court of Bangladesh
 
Powers of the Special Court to Remand the Accused
Powers of the Special Court to Remand the AccusedPowers of the Special Court to Remand the Accused
Powers of the Special Court to Remand the Accused
 
40158 2019 32_1501_25867_judgement_01-feb-2021
40158 2019 32_1501_25867_judgement_01-feb-202140158 2019 32_1501_25867_judgement_01-feb-2021
40158 2019 32_1501_25867_judgement_01-feb-2021
 
Uapa bail sc judgement 09-apr-2021
Uapa bail sc judgement 09-apr-2021Uapa bail sc judgement 09-apr-2021
Uapa bail sc judgement 09-apr-2021
 
#Remand and its kinds
#Remand and its kinds#Remand and its kinds
#Remand and its kinds
 
DoT LICENSE CONSULTANT - HOT SITES IN OPERATION OF INTERNATIONAL & DOMESTIC O...
DoT LICENSE CONSULTANT - HOT SITES IN OPERATION OF INTERNATIONAL & DOMESTIC O...DoT LICENSE CONSULTANT - HOT SITES IN OPERATION OF INTERNATIONAL & DOMESTIC O...
DoT LICENSE CONSULTANT - HOT SITES IN OPERATION OF INTERNATIONAL & DOMESTIC O...
 
Misher ali-judgment-24-mar-2021 (1)
Misher ali-judgment-24-mar-2021 (1)Misher ali-judgment-24-mar-2021 (1)
Misher ali-judgment-24-mar-2021 (1)
 
Bail in India
Bail in IndiaBail in India
Bail in India
 
Media statement pravin gordhan_pp_judgment
Media statement pravin gordhan_pp_judgmentMedia statement pravin gordhan_pp_judgment
Media statement pravin gordhan_pp_judgment
 
Sc order cctv in ps judgement 02-dec-2020
Sc order cctv in ps judgement 02-dec-2020Sc order cctv in ps judgement 02-dec-2020
Sc order cctv in ps judgement 02-dec-2020
 
Whether bail is right or privilege
Whether bail is right or privilegeWhether bail is right or privilege
Whether bail is right or privilege
 
Warehousing 2016
Warehousing 2016Warehousing 2016
Warehousing 2016
 
1636631174451 ed 210830 assam memo cctv in police stations
1636631174451 ed 210830 assam memo cctv in police stations1636631174451 ed 210830 assam memo cctv in police stations
1636631174451 ed 210830 assam memo cctv in police stations
 
Crpc sec 167
Crpc sec 167Crpc sec 167
Crpc sec 167
 

Similar to OSP LICENSE CONSULTANT - SHARING THE INFRASTRUCTURE BETWEEN INTERNATIONAL OSP & DOMESTIC OSP - OZG INDIA

Eros Int'l Form of Proxy for AGM 2013
Eros Int'l Form of Proxy for AGM 2013 Eros Int'l Form of Proxy for AGM 2013
Eros Int'l Form of Proxy for AGM 2013
Eros_International
 
Compromise ,reconstruction or amalgamation
Compromise ,reconstruction or amalgamationCompromise ,reconstruction or amalgamation
Compromise ,reconstruction or amalgamation
Yudhvir Saini
 

Similar to OSP LICENSE CONSULTANT - SHARING THE INFRASTRUCTURE BETWEEN INTERNATIONAL OSP & DOMESTIC OSP - OZG INDIA (20)

OSP LICENSE CONSULTANTS, MUMBAI / BANGALORE - AGREEMENT FOR WORK FROM HOME FA...
OSP LICENSE CONSULTANTS, MUMBAI / BANGALORE - AGREEMENT FOR WORK FROM HOME FA...OSP LICENSE CONSULTANTS, MUMBAI / BANGALORE - AGREEMENT FOR WORK FROM HOME FA...
OSP LICENSE CONSULTANTS, MUMBAI / BANGALORE - AGREEMENT FOR WORK FROM HOME FA...
 
Rera act 2016 ppt
Rera act 2016 pptRera act 2016 ppt
Rera act 2016 ppt
 
Presentation on Companies Act 2013 (before enactment)
Presentation on Companies Act 2013 (before enactment)Presentation on Companies Act 2013 (before enactment)
Presentation on Companies Act 2013 (before enactment)
 
Cos act,2013
Cos act,2013Cos act,2013
Cos act,2013
 
Eros Int'l Form of Proxy for AGM 2013
Eros Int'l Form of Proxy for AGM 2013 Eros Int'l Form of Proxy for AGM 2013
Eros Int'l Form of Proxy for AGM 2013
 
Powers of nclt & transitional provisions - NCLT
Powers of nclt & transitional provisions - NCLTPowers of nclt & transitional provisions - NCLT
Powers of nclt & transitional provisions - NCLT
 
Powers of nclt and transitional provisions - NCLT
Powers of nclt and transitional provisions - NCLT Powers of nclt and transitional provisions - NCLT
Powers of nclt and transitional provisions - NCLT
 
Presentation on Merger
Presentation on MergerPresentation on Merger
Presentation on Merger
 
118/2011 On conditions and procedures to grant authorization to offer access ...
118/2011 On conditions and procedures to grant authorization to offer access ...118/2011 On conditions and procedures to grant authorization to offer access ...
118/2011 On conditions and procedures to grant authorization to offer access ...
 
Rera act 2016 ppt final
Rera act 2016 ppt finalRera act 2016 ppt final
Rera act 2016 ppt final
 
Prospectus and Private placement
Prospectus and Private placementProspectus and Private placement
Prospectus and Private placement
 
Compromise ,reconstruction or amalgamation
Compromise ,reconstruction or amalgamationCompromise ,reconstruction or amalgamation
Compromise ,reconstruction or amalgamation
 
Fast track merger and cross border merger under companies act, 2013
Fast track merger and cross border merger under companies act, 2013Fast track merger and cross border merger under companies act, 2013
Fast track merger and cross border merger under companies act, 2013
 
Prospectus
ProspectusProspectus
Prospectus
 
Axis bank sanction letter
Axis bank sanction letterAxis bank sanction letter
Axis bank sanction letter
 
CII Global Regulatory Update, October 2013
CII Global Regulatory Update, October 2013CII Global Regulatory Update, October 2013
CII Global Regulatory Update, October 2013
 
E voting procedure-companies act 2013
E voting procedure-companies act 2013E voting procedure-companies act 2013
E voting procedure-companies act 2013
 
How to wind up a company part-5
How to wind up a company part-5How to wind up a company part-5
How to wind up a company part-5
 
Transfer and Transmission of Shares.pptx
Transfer and Transmission of Shares.pptxTransfer and Transmission of Shares.pptx
Transfer and Transmission of Shares.pptx
 
Statory diy
Statory diyStatory diy
Statory diy
 

More from Ozg India

More from Ozg India (6)

Saral Sanchar Portal and OSP Manual: DoT License & Compliance Consultant in M...
Saral Sanchar Portal and OSP Manual: DoT License & Compliance Consultant in M...Saral Sanchar Portal and OSP Manual: DoT License & Compliance Consultant in M...
Saral Sanchar Portal and OSP Manual: DoT License & Compliance Consultant in M...
 
Procedure to Cancel the Osp License - Ozg Law - WhatsApp # 8779696580 - DoT C...
Procedure to Cancel the Osp License - Ozg Law - WhatsApp # 8779696580 - DoT C...Procedure to Cancel the Osp License - Ozg Law - WhatsApp # 8779696580 - DoT C...
Procedure to Cancel the Osp License - Ozg Law - WhatsApp # 8779696580 - DoT C...
 
What is Saral Sanchar Portal? - Osp License / Compliance Consultant, Ozg Law,...
What is Saral Sanchar Portal? - Osp License / Compliance Consultant, Ozg Law,...What is Saral Sanchar Portal? - Osp License / Compliance Consultant, Ozg Law,...
What is Saral Sanchar Portal? - Osp License / Compliance Consultant, Ozg Law,...
 
Migration of Osp License - Ozg Law - WhatsApp # 8779696580 - DoT Compliance C...
Migration of Osp License - Ozg Law - WhatsApp # 8779696580 - DoT Compliance C...Migration of Osp License - Ozg Law - WhatsApp # 8779696580 - DoT Compliance C...
Migration of Osp License - Ozg Law - WhatsApp # 8779696580 - DoT Compliance C...
 
DoT VNO-ISP LICENSE CONSULTANT - Application Fee and Procedure – OZG INDIA
DoT VNO-ISP LICENSE CONSULTANT - Application Fee and Procedure – OZG INDIADoT VNO-ISP LICENSE CONSULTANT - Application Fee and Procedure – OZG INDIA
DoT VNO-ISP LICENSE CONSULTANT - Application Fee and Procedure – OZG INDIA
 
How to Draw Network Diagram for OSP License? Ozg India
How to Draw Network Diagram for OSP License? Ozg IndiaHow to Draw Network Diagram for OSP License? Ozg India
How to Draw Network Diagram for OSP License? Ozg India
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 

OSP LICENSE CONSULTANT - SHARING THE INFRASTRUCTURE BETWEEN INTERNATIONAL OSP & DOMESTIC OSP - OZG INDIA

  • 2. @ozgindia OSP LICENSE: BETWEEN INTERNATIONAL OSP & DOMESTIC OSP Ozg Lawyers 1. General Conditions: Sharing of the infrastructure by the Domestic OSP and the International OSP shall require prior written approval of the Authority. may be granted on fulfilment of the following conditions: (a) The domestic OSP Centre the same Company. (b) The OSP shall set up call centre having at least 50 seats. (c) The OSP shall be responsible for any violation of the terms & conditions of OSP registration by anyone includin (d) The Authority reserves the right to carry out the audit periodically. (e) If the Authority is satisfied that there has been a violation of the conditions, it reserves the right to take punitive action forfeiture of the security deposit and / or the cancellation of the registration held by OSP and the company shall be debarred from taking OSP registration for 3 years from the date of cancellation of such registration. DoT OSP License C Ozg Lawyers Email: ask@osplicense.com ozgindia.com OSP LICENSE: SHARING THE INFRASTRUCTURE BETWEEN INTERNATIONAL OSP & DOMESTIC OSP Lawyers @ Ozg Lawyers @ Ozg Lawyers @ Ozg Lawyers General Conditions: Sharing of the infrastructure by the Domestic OSP and the International OSP shall require prior written approval of the Authority. Such Registration may be granted on fulfilment of the following conditions:- The domestic OSP Centre and International OSP Centre shall belong to the same Company. The OSP shall set up call centre having at least 50 seats. The OSP shall be responsible for any violation of the terms & conditions of OSP registration by anyone including but not limited to its employees. The Authority reserves the right to carry out the audit periodically. If the Authority is satisfied that there has been a violation of the conditions, it reserves the right to take punitive action forfeiture of the security deposit and / or the cancellation of the registration held by OSP and the company shall be debarred from taking OSP registration for 3 years from the date of cancellation of such DoT License & Compliance DoT OSP License Consultant in Mumbai / Bangalore / Hyderabad Lawyers @ Ozg Lawyers @ Ozg Lawyers @ Ozg Lawyers Email: ask@osplicense.com .com 2 SHARING THE INFRASTRUCTURE BETWEEN INTERNATIONAL OSP & DOMESTIC OSP Sharing of the infrastructure by the Domestic OSP and the International Such Registration and International OSP Centre shall belong to The OSP shall be responsible for any violation of the terms & conditions g but not limited to its employees. The Authority reserves the right to carry out the audit periodically. If the Authority is satisfied that there has been a violation of the conditions, it reserves the right to take punitive action including forfeiture of the security deposit and / or the cancellation of the registration held by OSP and the company shall be debarred from taking OSP registration for 3 years from the date of cancellation of such
  • 3. @ozgindia 2. Duration of Registration for Sharing the Infrastructure & Bank Guarantee (a) This registration shall be valid for a period of 3 years from the effective date unless revoked earlier for reasons as specified elsewhere in the document. (b) The Company shall submit a security deposit in the form of a Bank Guarantee in the specified format for Rs. term 4(A) of this chapter or Rs. 1 crore for option 2 under term 4(B) of this chapter in favour of the Authority for the period of such Registration. In addition, the Company will sign an agreement with the Authority in the pres (c) Any failure to abide by the terms & conditions of Registration shall entitle the Authority to encash the Bank Guarantees and to convert into a cash security without any reference to the OSP at his risk and cost. interest or compensation whatsoever shall be payable by the Authority on such encashment. (d) Without prejudice to its rights of any other remedy, the Authority may encash Bank Guarantee and forfeit the security deposit in case of any breach in terms & condition 3. Extension of Registration for Sharing the Infrastructure (a) Registration for such facility shall be for a period of 3 years. This may be extended for a further periods of maximum 3 years after expiry. (b) For extension of registration period beyond 3 years, the OSP shall submit such request for extension along with extended validity period of Bank Guarantee, 60 days prior to the expiry date, failing which the registration will lapse without notice ozgindia.com Duration of Registration for Sharing the Infrastructure & Bank Guarantee shall be valid for a period of 3 years from the effective date unless revoked earlier for reasons as specified elsewhere in the The Company shall submit a security deposit in the form of a Bank Guarantee in the specified format for Rs.50 Lakhs for option 1 under term 4(A) of this chapter or Rs. 1 crore for option 2 under term 4(B) of this chapter in favour of the Authority for the period of such Registration. In addition, the Company will sign an agreement with the Authority in the prescribed format. Any failure to abide by the terms & conditions of Registration shall entitle the Authority to encash the Bank Guarantees and to convert into a cash security without any reference to the OSP at his risk and cost. ompensation whatsoever shall be payable by the Authority on such encashment. Without prejudice to its rights of any other remedy, the Authority may encash Bank Guarantee and forfeit the security deposit in case of any breach in terms & conditions of the Registration by the OSP. Extension of Registration for Sharing the Infrastructure Registration for such facility shall be for a period of 3 years. This may be extended for a further periods of maximum 3 years after expiry. For extension of registration period beyond 3 years, the OSP shall submit such request for extension along with extended validity period of Bank Guarantee, 60 days prior to the expiry date, failing which the registration will lapse without notice. .com 3 Duration of Registration for Sharing the Infrastructure & Bank Guarantee shall be valid for a period of 3 years from the effective date unless revoked earlier for reasons as specified elsewhere in the The Company shall submit a security deposit in the form of a Bank 50 Lakhs for option 1 under term 4(A) of this chapter or Rs. 1 crore for option 2 under term 4(B) of this chapter in favour of the Authority for the period of such Registration. In addition, the Company will sign an agreement with the Any failure to abide by the terms & conditions of Registration shall entitle the Authority to encash the Bank Guarantees and to convert into a cash security without any reference to the OSP at his risk and cost. No ompensation whatsoever shall be payable by the Authority Without prejudice to its rights of any other remedy, the Authority may encash Bank Guarantee and forfeit the security deposit in case of any s of the Registration by the OSP. Extension of Registration for Sharing the Infrastructure Registration for such facility shall be for a period of 3 years. This may be extended for a further periods of maximum 3 years after expiry. For extension of registration period beyond 3 years, the OSP shall submit such request for extension along with extended validity period of Bank Guarantee, 60 days prior to the expiry date, failing which the
  • 4. @ozgindia (c) The decision of the Authority shall be final in regard to the grant of extension. 4. Technical Terms & Conditions for sharing the Infrastructure between International OSP & Domestic OSP (A). OPTION - 1 (Separate & Independent EPABX Centres with sharing of same operator position) 1. Interconnectivity of the International OSP with Domestic OSP is not permitted. 2. The Domestic OSP centre and international OSP centre shall ha sharing separate and independent EPABX but may have the common operator position. 3. OSP shall ensure that only one call shall be offered to the operator position at a time, be it domestic or international, incoming or outgoing. 4. No voice traffic shall flow between the Domestic and international OSP centres and/or cause bypass of the network of the Authorised Telecom Service Providers. 5. OSP shall ensure that the system logs are tamper are preserved at least for six months. The Authority reserves the right to call for these system logs on demand and also inspect them at site. ozgindia.com The decision of the Authority shall be final in regard to the grant of Technical Terms & Conditions for sharing the Infrastructure between International OSP & Domestic OSP (Separate & Independent EPABX to be used for International & Domestic OSP Centres with sharing of same operator position) Interconnectivity of the International OSP with Domestic OSP is not The Domestic OSP centre and international OSP centre shall ha sharing separate and independent EPABX but may have the common OSP shall ensure that only one call shall be offered to the operator position at a time, be it domestic or international, incoming or outgoing. No voice traffic shall flow between the Domestic and international OSP centres and/or cause bypass of the network of the Authorised Telecom OSP shall ensure that the system logs are tamper-proof and system logs at least for six months. The Authority reserves the right to call for these system logs on demand and also inspect them at site. .com 4 The decision of the Authority shall be final in regard to the grant of Technical Terms & Conditions for sharing the Infrastructure between to be used for International & Domestic OSP Interconnectivity of the International OSP with Domestic OSP is not The Domestic OSP centre and international OSP centre shall have non- sharing separate and independent EPABX but may have the common OSP shall ensure that only one call shall be offered to the operator position at a time, be it domestic or international, incoming or outgoing. No voice traffic shall flow between the Domestic and international OSP centres and/or cause bypass of the network of the Authorised Telecom proof and system logs at least for six months. The Authority reserves the right to call for these system logs on demand and also inspect them at site.
  • 5. @ozgindia (B). OPTION - 2 (International & Domestic OSP Centres to share the common EPABX with logical partitioning) 1. Interconnectivity of the International OSP with Domestic OSP is not permitted. 2. The Company shall submit a certificate from the Vendors of the equipment that the software is capable of logically bifurcating common infrastructure into two separate and independent environments for the Domestic OSP and International OSP Centres. 3. The Company shall ensure the complete logical separation between the activities of the domestic and International appl shall flow between the Domestic and international OSP centres and/or cause bypass of the network of the Authorised Telecom Service Providers. 4. OSP shall ensure that the system logs are tamper are preserved at least for six months. The Authority reserves the right to call for these system logs on demand and also inspect them at site. ozgindia.com (International & Domestic OSP Centres to share the common EPABX with Interconnectivity of the International OSP with Domestic OSP is not The Company shall submit a certificate from the Vendors of the equipment that the software is capable of logically bifurcating common infrastructure into two separate and independent environments for the Domestic OSP and International OSP Centres. The Company shall ensure the complete logical separation between the activities of the domestic and International applications. No voice traffic shall flow between the Domestic and international OSP centres and/or cause bypass of the network of the Authorised Telecom Service OSP shall ensure that the system logs are tamper-proof and system logs preserved at least for six months. The Authority reserves the right to call for these system logs on demand and also inspect them at site. .com 5 (International & Domestic OSP Centres to share the common EPABX with Interconnectivity of the International OSP with Domestic OSP is not The Company shall submit a certificate from the Vendors of the equipment that the software is capable of logically bifurcating the common infrastructure into two separate and independent environments for the Domestic OSP and International OSP Centres. The Company shall ensure the complete logical separation between the ications. No voice traffic shall flow between the Domestic and international OSP centres and/or cause bypass of the network of the Authorised Telecom Service proof and system logs preserved at least for six months. The Authority reserves the right to call for these system logs on demand and also inspect them at site.