Corey Cech, Craig Brochu and Tim Sullivan founded Novicor Corp. in 2010 after realizing that a lack of communication between engineering, construction, and commissioning was causing delays in oil and gas plant start-ups. Novicor aims to incorporate commissioning principles from the engineering phase through operations handover to close communication gaps. Novicor's "cradle-to-grave" approach proved successful on Devon Canada's Jackfish 3 SAGD project, reducing start-up time by five weeks and deficiencies. While facing resistance to changing established processes, Novicor has secured contracts with energy companies such as Devon Canada, Enbridge and Syncrude by focusing on efficiency and cost-cutting.
These are very low-fi slides that accompanied my talk for Head 2008. The aim of my session was to get folks thinking and discussing; I've noticed that on the subject of project/team management, everyone has stories from the trenches, and true to the nature of the problem, there is not one solution.
Most of the meat of the talk was during the session and within the session chatroom. Alas, the recording didn't work well, a re-recording hasn't been scheduled. So this is all I have for now!
Masters of Process Episode 1: On Deck with Michael Gill and Curtis CummingsLizzyManz
Masters of Process brings you the no-code revolution in full. Join us as we meet with top innovators in the space and explore how they are reinventing the way a modern business operates. Brought to you by industry insiders from No Code Ops and Process Street, each half hour episode is a goldmine of productivity, products, and scaling.
These are very low-fi slides that accompanied my talk for Head 2008. The aim of my session was to get folks thinking and discussing; I've noticed that on the subject of project/team management, everyone has stories from the trenches, and true to the nature of the problem, there is not one solution.
Most of the meat of the talk was during the session and within the session chatroom. Alas, the recording didn't work well, a re-recording hasn't been scheduled. So this is all I have for now!
Masters of Process Episode 1: On Deck with Michael Gill and Curtis CummingsLizzyManz
Masters of Process brings you the no-code revolution in full. Join us as we meet with top innovators in the space and explore how they are reinventing the way a modern business operates. Brought to you by industry insiders from No Code Ops and Process Street, each half hour episode is a goldmine of productivity, products, and scaling.
The ROI of BIM 360 Design - Customers Share Their StoriesAutodesk AEC
In this collection of quotes on Autodesk BIM 360 Design, customers share how the product has helped them save time, money, and helped reduce or eliminate coordination challenges.
A Practical Guide to Answering This Question in an Agile Project. Software project estimation is hard. But our stakeholders need answers. In this presentation we seek to give our stakeholders the information that they need.
Some days it feels like a roller coaster. Even a crystal ball would do little good because things change so fast. With the
power of the internet, we can get the changing pulse of the economy – from around the world and in our backyards – within seconds of something happening; all adding to the sense of what next? I’m like everyone else: seeing, reading and hearing all the economic news and thinking, “What can I do to help?”
Raywell Studio is an indipendent BIM and Engineering consulting Firm located in India. Our core business in to provide BIM solution for client from all sectors of AEC industry. In addition to this we also focus on providing a helping hand for the Engineering Design Consultants.
Kindly take a moment to go through our Portfolio here to get an overview about our offerings.
Please get in touch with us for more information as well as any project related inquires.
Thank you in advance for taking time to look on this.
How to lose a project in 5 ways and how consultants, admins and end users can...CzechDreamin
How to lose a project in 5 ways is a telling of scenarios and examples of 5 core activities present in a project that influence its outcomes. Roles, Communication, Tools, Testing and Documentation.
This session provides perspective from both the customer and the consultant experience, for customers who may be starting their salesforce journey it provides and checklist and insight into what they should expect when engaging with a consultant. For the consultant that has experienced one or many projects, it gives insight into the position of a customer, nostalgia for past project experiences and reinforces already established best practices.
This is for the consultant, customer and end-user to understand each other's position and expectations when starting a project to ensure the project's success.
If we all keep each other in check with these 5 core activities, we create success with a better project environment and the salesforce ohana that we strive for.
Instructions - Read FirstInstructions The following worksheets .docxdirkrplav
Instructions - Read First
Instructions: The following worksheets describe two problems – the first problem is for independent samples and the second problem is for dependent samples. Your job is to demonstrate the solution to each scenario by showing how to work through each problem in detail. You are expected to explain all of the steps in your own words.
Independent SamplesLow Lead LevelHigh Lead Leveln178n22192.8886.9s115.34s28.99Critical Value:Test Statistic:p-value:
1. Write the hypotheses in symbolic form, determine if the test is right-tailed, left-tailed, or two tailed and explain why.
2. Calculate the critical value, the test statistic, and p-value. Show calculations below.
3. Make a decision about the null hypothesis and explain your reasoning, then make a conclusion about the claim in nontechnical terms.
Independent Samples
A researcher conducted a test to learn the effect of lead levels in human bodies. He collected the IQ scores for a random sample of subjects with low lead levels in their blood and another random sample of subjects with high lead levels in their blood. The summary of finding is listed below. Use a 0.05 significance level to test the claim that the mean IQ score of people with low lead levels is higher than the mean IQ score of people with low lead levels.
We do not know the values of the population standard deviations.
Dependent SamplesDays of Release/BookPhoenixPrince144.258.2218.422.0325.826.8428.329.2523.021.8610.49.979.19.588.47.597.66.91010.29.3Critical Value:Test Statistic:p-value:
4. Write the hypotheses in symbolic form, determine if the test is right-tailed, left-tailed, or two tailed and explain why.
5. Calculate the critical value, the test statistic, and p-value. Show calculations below.
6. Make a decision about the null hypothesis and explain your reasoning, then make a conclusion about the claim in nontechnical terms.
Dependent Samples
The Harry Potter books and movies made a lot of money. A fan wanted to learn which of his favorite movies made more money. He collected the amounts grossed in millions during the first few days of releases of the movies Harry Potter and the Half-Blood Prince and Harry Potter and the Order of the Phoenix. Use a 0.05 significance level to test his claim that the Prince movie did better at the box office.
Use the p-value method to determine whether or not to reject the null hypothesis and state your conclusion.
Running head: PROJECT PROPOSAL 1
PROJECT PROPOSAL 2
Acquisition Project Plan
Mekdes Asaminew
Rasmussen College
04/8/2020
Acquisition Project Plan
Project Description
Kingston-Bryce Limited (KBL) is a custom furniture manufacturer. The company specializes in the production of hand-crafted dining room tables. As an attempt to enhance its competitive advantage, KBL has decided to acquire one of its closest competitors that deal with custom furniture. The acquisition of the company will allow KBL to expand its operat.
A case study like no other. In this series of sessions at BoS Conference USA 2023 we deep dived into how Autobooks retooled their business and ask the question, “What Happens if Product, Sales & Marketing Work Together?”
By focussing everything they did on the needs of their customers and helping them grow, they also grew faster, made their lives easier and changed the way they think about collaboration across the company.
https://businessofsoftware.org/events/business-of-software-conference-usa-2023/how-autobooks-reinvented-itself-2/
The ROI of BIM 360 Design - Customers Share Their StoriesAutodesk AEC
In this collection of quotes on Autodesk BIM 360 Design, customers share how the product has helped them save time, money, and helped reduce or eliminate coordination challenges.
A Practical Guide to Answering This Question in an Agile Project. Software project estimation is hard. But our stakeholders need answers. In this presentation we seek to give our stakeholders the information that they need.
Some days it feels like a roller coaster. Even a crystal ball would do little good because things change so fast. With the
power of the internet, we can get the changing pulse of the economy – from around the world and in our backyards – within seconds of something happening; all adding to the sense of what next? I’m like everyone else: seeing, reading and hearing all the economic news and thinking, “What can I do to help?”
Raywell Studio is an indipendent BIM and Engineering consulting Firm located in India. Our core business in to provide BIM solution for client from all sectors of AEC industry. In addition to this we also focus on providing a helping hand for the Engineering Design Consultants.
Kindly take a moment to go through our Portfolio here to get an overview about our offerings.
Please get in touch with us for more information as well as any project related inquires.
Thank you in advance for taking time to look on this.
How to lose a project in 5 ways and how consultants, admins and end users can...CzechDreamin
How to lose a project in 5 ways is a telling of scenarios and examples of 5 core activities present in a project that influence its outcomes. Roles, Communication, Tools, Testing and Documentation.
This session provides perspective from both the customer and the consultant experience, for customers who may be starting their salesforce journey it provides and checklist and insight into what they should expect when engaging with a consultant. For the consultant that has experienced one or many projects, it gives insight into the position of a customer, nostalgia for past project experiences and reinforces already established best practices.
This is for the consultant, customer and end-user to understand each other's position and expectations when starting a project to ensure the project's success.
If we all keep each other in check with these 5 core activities, we create success with a better project environment and the salesforce ohana that we strive for.
Instructions - Read FirstInstructions The following worksheets .docxdirkrplav
Instructions - Read First
Instructions: The following worksheets describe two problems – the first problem is for independent samples and the second problem is for dependent samples. Your job is to demonstrate the solution to each scenario by showing how to work through each problem in detail. You are expected to explain all of the steps in your own words.
Independent SamplesLow Lead LevelHigh Lead Leveln178n22192.8886.9s115.34s28.99Critical Value:Test Statistic:p-value:
1. Write the hypotheses in symbolic form, determine if the test is right-tailed, left-tailed, or two tailed and explain why.
2. Calculate the critical value, the test statistic, and p-value. Show calculations below.
3. Make a decision about the null hypothesis and explain your reasoning, then make a conclusion about the claim in nontechnical terms.
Independent Samples
A researcher conducted a test to learn the effect of lead levels in human bodies. He collected the IQ scores for a random sample of subjects with low lead levels in their blood and another random sample of subjects with high lead levels in their blood. The summary of finding is listed below. Use a 0.05 significance level to test the claim that the mean IQ score of people with low lead levels is higher than the mean IQ score of people with low lead levels.
We do not know the values of the population standard deviations.
Dependent SamplesDays of Release/BookPhoenixPrince144.258.2218.422.0325.826.8428.329.2523.021.8610.49.979.19.588.47.597.66.91010.29.3Critical Value:Test Statistic:p-value:
4. Write the hypotheses in symbolic form, determine if the test is right-tailed, left-tailed, or two tailed and explain why.
5. Calculate the critical value, the test statistic, and p-value. Show calculations below.
6. Make a decision about the null hypothesis and explain your reasoning, then make a conclusion about the claim in nontechnical terms.
Dependent Samples
The Harry Potter books and movies made a lot of money. A fan wanted to learn which of his favorite movies made more money. He collected the amounts grossed in millions during the first few days of releases of the movies Harry Potter and the Half-Blood Prince and Harry Potter and the Order of the Phoenix. Use a 0.05 significance level to test his claim that the Prince movie did better at the box office.
Use the p-value method to determine whether or not to reject the null hypothesis and state your conclusion.
Running head: PROJECT PROPOSAL 1
PROJECT PROPOSAL 2
Acquisition Project Plan
Mekdes Asaminew
Rasmussen College
04/8/2020
Acquisition Project Plan
Project Description
Kingston-Bryce Limited (KBL) is a custom furniture manufacturer. The company specializes in the production of hand-crafted dining room tables. As an attempt to enhance its competitive advantage, KBL has decided to acquire one of its closest competitors that deal with custom furniture. The acquisition of the company will allow KBL to expand its operat.
A case study like no other. In this series of sessions at BoS Conference USA 2023 we deep dived into how Autobooks retooled their business and ask the question, “What Happens if Product, Sales & Marketing Work Together?”
By focussing everything they did on the needs of their customers and helping them grow, they also grew faster, made their lives easier and changed the way they think about collaboration across the company.
https://businessofsoftware.org/events/business-of-software-conference-usa-2023/how-autobooks-reinvented-itself-2/
1. 24 PROCESSWest June 2015
C
orey Cech, Craig Brochu and Tim
Sullivan first met just under a decade
ago working as contractors in the
commissioning of plants in the oil and gas
industry.
Going from job to job, the trio quickly
realized the system was broken. Engineering
wasn't talking with construction, construction
wasn't talking with commissioning and
operators were understandably antsy over
delayed start-ups as a result.
So Cech, Brouch and Sullivan branched off
on their own, creating Novicor Corp. in 2010.
The concept was simple: work with clients
to incorporate commissioning principles
and ideals at the engineering phase, and
follow along with the project right through
to operations — a "cradle-to-the-grave"
approach.
Five years later, Novicor has already secured
some big wins, incorporating their strategy
into the operations of energy giants such as
Devon Canada, Enbridge and Syncrude, to
name a few.
PROCESSWest recently caught up with the
team, including business development lead
Joanna Leonard. Here's what they had to say:
How did Novicor come to be?
Craig: "We incorporated in February 2010.
Up to that point, we were still working as
contractors, doing commissioning for differ-
ent companies, but generally together. That's
when we decided that, if it's the same group
of guys helping these companies out, why not
do it for ourselves and change how it's done
— not at the last minute and by throwing a
whole lot of manpower at it."
What does 'cradle-to-grave' com-
missioning mean?
Corey: "Our vision closes the gap between
project stage milestones. Those milestones
are engineering, construction, commissioning
and then operations turnover."
From left, Tim Sullivan, director/president; Corey Cech, director/vice-president; Craig Brochu, director/CEO.
Photo courtesy Novicor Corp.
Content is copyright protected and provided for personal use only - not for reproduction or retransmission.
For reprints please contact the Publisher.
2. To clarify, 'grave' in this case means
handover?
Tim: "The 'grave' concept, while it might
sound morbid, is the end of the project. Now,
you have the project finished and you have an
operating plant."
How has commissioning been
approached historically?
Corey: "Typically what happens is the first
two phases really haven't changed for years.
It's been the same stick-built out in the field,
engineering leads into construction and then
it's constructed. But no one is thinking about
commissioning."
Craig: "Their final end game has been start-
ing up. Usually what we've seen is engineer-
ing will take 'x' amount of dollars to engineer
a project. They will get about 80 per cent
done and the client will say, 'OK, that's good
enough, get it to construction.' Construction
will then take it over and figure the rest out.
But there is no communication between engi-
neering and construction.
"And when construction is, again, about
80 per cent done, they will then switch to
commissioning. So commissioning then has
to deal with the gaps between engineering
and construction, yet not until near the end
stages. And clients will sit there asking, 'why
can't we start this up?'
"Our goal is to start by focusing engineers
(and construction) on getting the plant run-
ning rather than just doing their job(s) and
passing it on to someone else. We're there
right from the beginning asking the question,
'what are we doing here?' We're looking at
that end game right from the start."
With some wins already under your
belt, was there a breakthrough
moment now that you look back?
Corey: "Jackfish 3 (Devon Energy's third
phase of its steam-assisted gravity drainage
project in northern Alberta) was a good suc-
cess for us. The breakthrough was over the
three years. The model proved itself.
"It was also developed over that time.
When we first started, it was on paper. But
we actually did the entire project following
these guidelines that we came up with. Our
concept was developed and we achieved the
goals that were written."
Tim: "We built the model and we've now
proven the model and that there's cost sav-
ings."
What learnings did you take away
from the Jackfish 3 project?
Craig: "We were able to reduce the start-up
time by five weeks. We were also able to re-
duce deficiencies and warranty issues because
we were able to do the work in the yards (as
opposed to in the field).
"We reduced the site time and cost, which
comes into the five weeks and the cost of the
start-up. And we gave project managers the
ability to forecast budget and scheduling for
commissioning. Before, it was tough because
when you got to the end, no one knew how
much to budget for commissioning because no
one knew the issues they were walking into. So
we're identifying all those issues prior to that,
giving them some insight into accurate time-
lines and allowing them to budget accordingly."
With any new process, there's often
resistance. Did you experience that?
Corey: "Absolutely. You nailed it on the
head. There was a lot of resistance. We are
altering the status quo of processes already
in place. There was a big alternation for the
project itself.
"(The turning point) was underlying. There
was a thread throughout the project. It wasn't
like we went into a boardroom and everyone
said, 'wow, this turned out great.' It was a wo-
ven thread throughout the project. You could
see there were less deficiencies and less issues.
It was just better."
What challenges, if any, will
you face moving forward?
Craig: "Sustainable growth for the long-
term perspective. It's how we're looking at
the future. We want to grow at a rate that's
not too fast. A lot of companies do so, and
that's where the troubles come in. Right
now, we're focusing during this slow time on
building our company properly so that when
growth does happen again, we're not going
to scramble."
Does this slow period benefit you
in getting your message out?
Corey: "Cost-cutting and efficiency and
a lean-and-mean fighting concept is all try-
ing into everything we're about. Our plans
for growth are good. Yes, we do have a lot of
competition out there, but our mandate ties
in well with the way the economy and market
is right now."
At the end of the day, what set
Novicor apart?
Joanna: "Our team is really built from
four different personalities. Everyone brings
something to the table. That is a big part
of what makes us so different. We are a
close-knit team. We are also very passionate
about what we do. We are passionate about
that commissioning and pre-commissioning
work."
For more information about Novicor Corp., visit www.
novicor.ca or email info@novicor.ca. In Calgary, Novicor
is located at 402 - 1711 4th St. S.W. In Leduc, visit 203
- 5906 50th St.
PROCESSWest June 2015 25
Some of Novicor's early successes have been with Devon Canada's Jackfish
3 SAGD project in northern Alberta, as well as projects with Enbridge and
Syncrude. Photo courtesy Novicor Corp.
Content is copyright protected and provided for personal use only - not for reproduction or retransmission.