Tynberg LLC presented an overview of its proposed Northline development at a Leander city council meeting on Thursday, June 7.
Watch the video: http://leandertx.swagit.com/play/06082018-559/#26
Tynberg LLC: http://tynberg.com/projects/northline/
50. Northline Leander
VI.A.6 - 6.4.2 f
1. Facades built parallel to,
and located along, the
Principal Frontage Line
2. During Interim 15-Year
Condition, the Principal
Building Frontage Buildout
percentages in Table 7A
shall not apply
FRONTAGE BUILDOUT
58. Northline Leander
VI.A.5 - 6.3.1 b
The shopfront shall be 50% minimum glass between 2 feet and
12 feet above the sidewalk,
Shopfronts in Blocks P, Q, Y, and Z, however, are permitted
to have a 40% minimum glass area between 2 feet and 12
feet above the sidewalk.
59. Northline Leander
1. A-Street frontages:
parking permitted in 2nd
Layer during Interim 15-
Year Period
2. 65’ deep no-surface
parking zone along Mel
Mathis
EXHIBIT F – SHEET 11
2
1
VI.A.14 - 6.7.1
60. Northline Leander
Northline Team
David M. Schwarz Architects – National Land
Planner/Architecture Firm
Gibbs Planning Group – Urban Retail Planning
Design Workshop – Landscape Architect
Big Red Dog – Engineer
Civil Land Group – Construction Supervisor
Page/Dyal Branding & Graphics – Branding
Graves Dougherty Hearon & Moody – Land Use Counsel
The Retail Connection – Retail Brokerage
The Novy Company – Medical Office Brokerage
Alex Tynberg – AREA Leander 1 LP (Owner)