Dr. David Ward managed a 320k project to develop a new media pressure filter over 3 years in collaboration between Industrial Purification Systems Ltd. and the University of Liverpool. This resulted in a patented design for a filter with a swirl inlet that suppresses cake buildup and reduces head loss, improving performance. Pilot and field prototypes were designed, built, and tested, demonstrating the effectiveness of the new design. The project was successfully completed on time and on budget.