Mobile stations      configurator IonitaGeorge-Catalin An IV, CTI
The aim The aim of this project is to create a tool that could provide an offer based on diferent configurators for mobile stations and after that you could export it in xls format. This will be done in order to simplify the work for creating the diferent configurations for  mobile stations The tool will be used by telecom engineers
Resources The team will contain only 4 members, but they will work together at all the tasks and subtasks for analyses, design, develop and testing as well. The team leader is Daniel.
Constraint The project have to be done until 22.04.2011, according with the specifications provided by the CC team (competence center). This date is an approximation of the date of finishing of the project. This date could be overcome in special conditions, discussed with CC team.
Project phases Analysis software requirements Design Development Testing Deployment
Analysis software requirementsphase
Design phase
Development phase
Testing phase
Deployment phase
Task usage
Conclusions There are tasks that are done in parallel Give you an overview of the whole project The tasks of all the members of the team is planned better A finish date of the project could be approximated

More Related Content

Viewers also liked

Comenius meeting (24.11.2011)
Comenius meeting (24.11.2011)Comenius meeting (24.11.2011)
Comenius meeting (24.11.2011)
lamiraklis
 
файл послание за жизнь
файл послание за жизньфайл послание за жизнь
файл послание за жизньostulya
 
Smile photo
Smile photoSmile photo
Smile photoostulya
 
Improving quality through software inspections
Improving quality through software inspectionsImproving quality through software inspections
Improving quality through software inspectionsgeorge_ionita
 
презентация
презентацияпрезентация
презентацияostulya
 
улыбки наши меньшие
улыбки наши меньшиеулыбки наши меньшие
улыбки наши меньшиеostulya
 
Portafolio profesional WM
Portafolio profesional WMPortafolio profesional WM
Portafolio profesional WM
Tania Muñoa
 

Viewers also liked (8)

Comenius meeting (24.11.2011)
Comenius meeting (24.11.2011)Comenius meeting (24.11.2011)
Comenius meeting (24.11.2011)
 
файл послание за жизнь
файл послание за жизньфайл послание за жизнь
файл послание за жизнь
 
Smile photo
Smile photoSmile photo
Smile photo
 
Improving quality through software inspections
Improving quality through software inspectionsImproving quality through software inspections
Improving quality through software inspections
 
презентация
презентацияпрезентация
презентация
 
улыбки наши меньшие
улыбки наши меньшиеулыбки наши меньшие
улыбки наши меньшие
 
Portafolio profesional WM
Portafolio profesional WMPortafolio profesional WM
Portafolio profesional WM
 
Mps project
Mps projectMps project
Mps project
 

Similar to Mps project

Kumar kunal
Kumar kunalKumar kunal
Kumar kunal
kumar kunal
 
Mandar_Kamate_Resume _DotNet
Mandar_Kamate_Resume _DotNetMandar_Kamate_Resume _DotNet
Mandar_Kamate_Resume _DotNetMandar Kamate
 
SathishKumar Natarajan
SathishKumar NatarajanSathishKumar Natarajan
SathishKumar NatarajanSathish Kumar
 
Lect9
Lect9Lect9
RajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeev Gautam
 
design of g building.pdf
design of g building.pdfdesign of g building.pdf
design of g building.pdf
NikhilMoviechanger
 
Code campiasi scm-project-gabriel-cristescu-ditech
Code campiasi scm-project-gabriel-cristescu-ditechCode campiasi scm-project-gabriel-cristescu-ditech
Code campiasi scm-project-gabriel-cristescu-ditech
Codecamp Romania
 

Similar to Mps project (20)

Kumar kunal
Kumar kunalKumar kunal
Kumar kunal
 
Mandar_Kamate_Resume _DotNet
Mandar_Kamate_Resume _DotNetMandar_Kamate_Resume _DotNet
Mandar_Kamate_Resume _DotNet
 
project_details
project_detailsproject_details
project_details
 
Prasanth_CV
Prasanth_CVPrasanth_CV
Prasanth_CV
 
Resume
ResumeResume
Resume
 
Vivek_MK
Vivek_MKVivek_MK
Vivek_MK
 
Raghavendra Gupta Resume
Raghavendra  Gupta  ResumeRaghavendra  Gupta  Resume
Raghavendra Gupta Resume
 
Resume _ios
Resume _iosResume _ios
Resume _ios
 
Rashmi_TL
Rashmi_TLRashmi_TL
Rashmi_TL
 
SathishKumar Natarajan
SathishKumar NatarajanSathishKumar Natarajan
SathishKumar Natarajan
 
Alpana_Srivastava
Alpana_SrivastavaAlpana_Srivastava
Alpana_Srivastava
 
Rahul_Resume_2106
Rahul_Resume_2106Rahul_Resume_2106
Rahul_Resume_2106
 
AlekyaNyalakonda_Resume
AlekyaNyalakonda_ResumeAlekyaNyalakonda_Resume
AlekyaNyalakonda_Resume
 
Lect9
Lect9Lect9
Lect9
 
Bhanu_Pottipareddy_CV
Bhanu_Pottipareddy_CVBhanu_Pottipareddy_CV
Bhanu_Pottipareddy_CV
 
Hitendra_Singh
Hitendra_SinghHitendra_Singh
Hitendra_Singh
 
Anastasios_Fakas
Anastasios_FakasAnastasios_Fakas
Anastasios_Fakas
 
RajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_InfosysRajeevGautam_PeopleSoft Technology Lead_Infosys
RajeevGautam_PeopleSoft Technology Lead_Infosys
 
design of g building.pdf
design of g building.pdfdesign of g building.pdf
design of g building.pdf
 
Code campiasi scm-project-gabriel-cristescu-ditech
Code campiasi scm-project-gabriel-cristescu-ditechCode campiasi scm-project-gabriel-cristescu-ditech
Code campiasi scm-project-gabriel-cristescu-ditech
 

Mps project

  • 1. Mobile stations configurator IonitaGeorge-Catalin An IV, CTI
  • 2. The aim The aim of this project is to create a tool that could provide an offer based on diferent configurators for mobile stations and after that you could export it in xls format. This will be done in order to simplify the work for creating the diferent configurations for mobile stations The tool will be used by telecom engineers
  • 3. Resources The team will contain only 4 members, but they will work together at all the tasks and subtasks for analyses, design, develop and testing as well. The team leader is Daniel.
  • 4. Constraint The project have to be done until 22.04.2011, according with the specifications provided by the CC team (competence center). This date is an approximation of the date of finishing of the project. This date could be overcome in special conditions, discussed with CC team.
  • 5. Project phases Analysis software requirements Design Development Testing Deployment
  • 12. Conclusions There are tasks that are done in parallel Give you an overview of the whole project The tasks of all the members of the team is planned better A finish date of the project could be approximated