Creating Sustainable Value Through High Quality Long Life Deposits
This presentation discusses HBM's strategy of creating value through high quality, long life mining deposits. It notes that HBM focuses on quality over quantity and aims to operate mines for decades through extensive exploration and development of its projects. The presentation provides forward-looking information on HBM's production forecasts and development plans for its projects. It outlines various risks and uncertainties that could affect HBM's projects.
Macquarie Global Metals & Mining ConferenceHudbayMinerals
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The company aims to achieve growth through a disciplined focus on per share metrics by developing its portfolio of copper and zinc assets located in mining friendly jurisdictions in the Americas. This includes expanding and extending the life of its flagship 777 mine in Manitoba, advancing the Lalor and Reed projects also in Manitoba, and constructing its large Constancia copper project in Peru.
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The company is growing copper, zinc and precious metals production through its existing operations in Manitoba and development projects in Manitoba, Peru and Colombia. Hudbay aims to leverage its expertise in exploration, project development and mining to become the partner of choice for promising junior mining companies.
This document discusses HBM's strategy of creating sustainable value through high quality, long life mining deposits. It notes that HBM focuses on quality over quantity by developing projects with long mine lives located in stable jurisdictions. The document also contains forward-looking statements and information about HBM's projects and provides cautionary notes about the risks and uncertainties inherent in forward-looking statements.
Hudbay Minerals Inc. held a Q3 2012 conference call to discuss its strategy of creating sustainable value through high quality, long-life mining deposits. The presentation discussed forward-looking production forecasts for its Constancia, Lalor and Reed projects and estimated capital costs. It also noted key assumptions around commodity prices, energy costs, permitting, and community relations that could impact projected results. Risk factors that could cause actual results to differ from projections included economic, operational, regulatory and community relationship challenges facing the mining industry.
GMP Latin American Mining Conference PresentationHudbayMinerals
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The company is focused on developing copper and zinc projects in mining friendly jurisdictions in the Americas, including its flagship 777 mine in Manitoba, the Lalor mine also in Manitoba, the Reed copper project in Manitoba, and the large scale Constancia copper project in Peru. Hudbay aims to grow production of copper, zinc and precious metals through developing its pipeline of projects while maintaining a disciplined focus on per share metrics.
Hudbay provided a quarterly presentation on its Q2 2013 results and outlook. Key points include:
- Production targets were met at Hudbay's 777 and Lalor mines for the seventh consecutive year.
- The Lalor and Reed mines are nearing completion on time and on budget.
- Constancia achieved 90% detailed engineering and 40% construction milestones.
- Capital costs for Constancia are expected to increase and will be funded by expenditure reductions, expanding the Snow Lake concentrator, and deferring the Lalor concentrator.
- Financial results for Q2 2013 showed steady production levels from Manitoba operations.
This document provides an overview of HBM's strategy to create sustainable value through high quality, long-life mining deposits. It discusses HBM's objectives to develop its Lalor, Constancia and Reed projects, with re-estimated costs for Constancia and plans for Lalor and Reed. However, the document also cautions that forward-looking information is subject to risks and uncertainties that could cause actual results to differ materially from expectations.
Barclays Select Series 2013: Americas Mining and Materials ForumHudbayMinerals
This document discusses Hudbay's goal of creating sustainable value through high quality, long-life mining deposits. It notes that Hudbay aims to continue production at its existing 777 and Lalor mines in Manitoba as well as processing facilities. The company also plans to develop its Lalor, Constancia, and Reed projects, with the document outlining anticipated timelines and costs for these projects. However, it cautions that forward-looking projections are subject to significant risks and uncertainties.
Macquarie Global Metals & Mining ConferenceHudbayMinerals
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The company aims to achieve growth through a disciplined focus on per share metrics by developing its portfolio of copper and zinc assets located in mining friendly jurisdictions in the Americas. This includes expanding and extending the life of its flagship 777 mine in Manitoba, advancing the Lalor and Reed projects also in Manitoba, and constructing its large Constancia copper project in Peru.
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The company is growing copper, zinc and precious metals production through its existing operations in Manitoba and development projects in Manitoba, Peru and Colombia. Hudbay aims to leverage its expertise in exploration, project development and mining to become the partner of choice for promising junior mining companies.
This document discusses HBM's strategy of creating sustainable value through high quality, long life mining deposits. It notes that HBM focuses on quality over quantity by developing projects with long mine lives located in stable jurisdictions. The document also contains forward-looking statements and information about HBM's projects and provides cautionary notes about the risks and uncertainties inherent in forward-looking statements.
Hudbay Minerals Inc. held a Q3 2012 conference call to discuss its strategy of creating sustainable value through high quality, long-life mining deposits. The presentation discussed forward-looking production forecasts for its Constancia, Lalor and Reed projects and estimated capital costs. It also noted key assumptions around commodity prices, energy costs, permitting, and community relations that could impact projected results. Risk factors that could cause actual results to differ from projections included economic, operational, regulatory and community relationship challenges facing the mining industry.
GMP Latin American Mining Conference PresentationHudbayMinerals
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The company is focused on developing copper and zinc projects in mining friendly jurisdictions in the Americas, including its flagship 777 mine in Manitoba, the Lalor mine also in Manitoba, the Reed copper project in Manitoba, and the large scale Constancia copper project in Peru. Hudbay aims to grow production of copper, zinc and precious metals through developing its pipeline of projects while maintaining a disciplined focus on per share metrics.
Hudbay provided a quarterly presentation on its Q2 2013 results and outlook. Key points include:
- Production targets were met at Hudbay's 777 and Lalor mines for the seventh consecutive year.
- The Lalor and Reed mines are nearing completion on time and on budget.
- Constancia achieved 90% detailed engineering and 40% construction milestones.
- Capital costs for Constancia are expected to increase and will be funded by expenditure reductions, expanding the Snow Lake concentrator, and deferring the Lalor concentrator.
- Financial results for Q2 2013 showed steady production levels from Manitoba operations.
This document provides an overview of HBM's strategy to create sustainable value through high quality, long-life mining deposits. It discusses HBM's objectives to develop its Lalor, Constancia and Reed projects, with re-estimated costs for Constancia and plans for Lalor and Reed. However, the document also cautions that forward-looking information is subject to risks and uncertainties that could cause actual results to differ materially from expectations.
Barclays Select Series 2013: Americas Mining and Materials ForumHudbayMinerals
This document discusses Hudbay's goal of creating sustainable value through high quality, long-life mining deposits. It notes that Hudbay aims to continue production at its existing 777 and Lalor mines in Manitoba as well as processing facilities. The company also plans to develop its Lalor, Constancia, and Reed projects, with the document outlining anticipated timelines and costs for these projects. However, it cautions that forward-looking projections are subject to significant risks and uncertainties.
Creating Sustainable Value Through High Quality Long Life Deposits
Hudbay Minerals Inc. presented at the CIBC 2013 Whistler Institutional Investor Conference on January 23-26, 2013. The presentation focused on Hudbay's strategy of creating sustainable value through high quality, long life mining deposits. It discussed Hudbay's production forecasts, development plans for its projects, and anticipated timing. The presentation also noted some of the risks and uncertainties inherent in the mining industry and Hudbay's business.
Hudbay Capital Markets discusses creating sustainable value through high quality, long-life mining deposits. The presentation focuses on Hudbay's strategy of acquiring and developing quality VMS and porphyry deposits in mining-friendly jurisdictions in the Americas to leverage its expertise. Hudbay aims to invest patiently in projects like its 777, Lalor and Reed mines to maximize growth in key metrics like net asset value, earnings and cash flow per share over the long term.
Raymond James 8th Annual European Investors North American Equities ConferenceHudbayMinerals
Hudbay Minerals is creating sustainable value through high quality, long life mining deposits. The company focuses on quality deposits that can provide long production lives. Hudbay's strategy is to grow its production of copper, zinc, and precious metals through 2022 by leveraging its expertise in exploration, project development, and operations. Key projects include the Lalor mine in Manitoba, the Reed copper deposit in Manitoba, and the large Constancia copper project in Peru.
2013 Bank of America Merrill Lynch Global Metals, Mining & Steel ConferenceHudbayMinerals
Hudbay Minerals Inc. presented information on its mining projects and provided forward-looking statements regarding anticipated production levels and costs. The presentation discussed Hudbay's 777 mine in Manitoba, its Lalor and Reed projects also in Manitoba, and its Constancia project in Peru. Hudbay stated it expects substantial production growth at its operations between 2012 and 2015, with copper production anticipated to increase 390% and precious metals production projected to rise 115% over that period.
- The document is a presentation from CIBC's Mining Royalty Sector Conference in 2013 about creating sustainable value through high quality, long-life deposits.
- It discusses Hudbay Mineral's forward-looking statements and assumptions, projects in Manitoba and Peru, production growth expectations, mineral reserves and resources, funding options including a precious metals stream, and an overview of the Constancia copper project.
The document discusses Hudbay Minerals' strategy of creating sustainable value through high quality, long life mining deposits. It highlights some of Hudbay's key assets including the 777 mine in Manitoba, the Lalor project in Manitoba which is on track to begin full production in 2015, and the Constancia project in Peru. The document also notes Hudbay's focus on growing mineral reserves and resources on a per share basis through disciplined acquisitions and investments.
The presentation provides forward-looking information about Hudbay Minerals' projects and operations, noting that actual results may differ materially from projections. It discusses key assumptions around mining, processing, costs, commodity prices, regulations, and other operational and economic factors. The presentation also notes risks including uncertainties in project development, depletion of reserves, operational hazards, compliance with laws, and dependence on key personnel and markets. Financial information is prepared under Canadian, not U.S. standards.
RBC Capital Markets' Global Mining & Materials Conference HudbayMinerals
This document provides forward-looking information for Hudbay Minerals regarding its mining projects and production forecasts. It discusses Hudbay's 777, Lalor, and Reed mines in Manitoba and its Constancia project in Peru. The document notes that Hudbay expects to see significant production growth at its projects between 2012 and 2015, with copper production forecast to increase 390% and precious metals production 115%. It also provides an overview of recent developments and milestones at Hudbay's key projects.
Hudbay's Annual And Special Meeting of ShareholdersHudbayMinerals
1. The document discusses Hudbay Minerals Inc., a mining company that applies 360-degree expertise to develop long-life, low-cost mines in the Americas.
2. It contains forward-looking statements about Hudbay's projects, operations, and financial and operating performance that are subject to risks and uncertainties.
3. The document provides cautionary notes about the risks of relying on forward-looking statements and explains key assumptions and risk factors that could cause actual results to differ materially.
Hudbay Minerals is creating sustainable value through high quality, long-life mining deposits. The company achieved several significant milestones in the second quarter of 2012, including beginning initial production at the Lalor mine and accelerating construction activities at the Reed project. Hudbay is on track to meet its 2012 production targets and cost guidance. Construction of the $1.5 billion Constancia project is underway, with financing secured.
Canaccord Genuity Global Resources ConferenceHudbayMinerals
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The document discusses Hudbay's strategy of focusing on VMS and porphyry deposits in mining-friendly jurisdictions in the Americas. It provides an overview of Hudbay's key assets including its flagship 777 mine in Manitoba, the Lalor and Reed projects also in Manitoba, and the large-scale Constancia copper project in Peru which is currently under construction.
Hudbay's Annual and Special Meeting of ShareholdersHudbayMinerals
This document summarizes the annual and special meeting of shareholders for Hudbay Minerals Inc. held on May 10, 2013. It recognizes the passing of Bruce Barraclough in 1947-2013. It provides forward-looking information on Hudbay's production, projects, and financial expectations. However, it notes that actual results may differ due to risks in the mining industry and other factors beyond the company's control.
This document provides an overview of Hudbay Minerals Inc.'s Q4 2012 conference call. It discusses Hudbay achieving production targets for the 6th consecutive year while maintaining steady costs in 2012. It also provides updates on the construction progress of Hudbay's three major development projects - Lalor, Constancia, and Reed - which are advancing on schedule and on budget. These new mines are expected to drive significant production growth over the next two years, with copper production projected to increase by 390%, precious metals by 115%, and zinc by 30% by 2014.
The Company is a well-funded gold project developer. Our principal asset is our flagship Mt Todd gold project in Northern Territory, Australia. Mt Todd is one of the largest undeveloped gold projects in Australia.
The document discusses HBM's Q1 2012 conference call and provides an overview of their key projects and financial results. It summarizes that production is on track to meet guidance, earnings per share was $0.05 including non-cash items, and operating cash flow increased slightly. It also provides updates on advancing the Lalor, Constancia, and Reed projects toward production.
This document provides an overview of Osisko Gold Royalties Ltd, which is described as the leading growth-oriented royalty company. Some key points:
- Osisko has over 160 royalties, streams and offtakes focused in North America, including a cornerstone royalty on Canada's largest gold mine, Canadian Malartic.
- In 2021, Osisko is expected to deliver 80,000 GEOs from its portfolio.
- The company has a high margin business model with 97% of revenue coming from royalties and streams, no capital costs, and leverage to rising gold prices.
- Osisko's portfolio is well-diversified by asset, commodity, and
This presentation summarizes Solaris Resources' copper and gold exploration projects in the Americas. Solaris has assembled a portfolio of projects focused on its flagship high-grade Warintza copper project in Ecuador. Warintza has an open pit resource within a 7km x 5km cluster that remains open for expansion and untested for gold potential. Solaris is also exploring for discoveries at its Tamarugo and Ricardo projects in Chile and Peru JV projects. The company has strong financial support from insiders and strategic partners like Equinox Gold. Solaris is managed by the experienced Augusta Group and led by a board and management with extensive mining industry experience developing and selling projects in the Americas.
This document provides a cautionary note and introduces a corporate presentation discussing plans to create value. It contains forward-looking statements regarding production, costs, prices, expenditures, reserves, successful development of projects, financing, and economic returns. These statements are subject to risks including uncertainty in production, development costs, commodity prices, political instability, and inability to obtain permits. Qualified persons reviewed and approved the scientific and technical information relating to the Marigold mine, Seabee Gold Operation PEA, and Seabee Gold Operation and Puna Operations.
Macquarie Global Metals & Mining ConferenceHudbayMinerals
This document discusses creating sustainable value through high quality, long life mining deposits. It focuses on quality and longevity of deposits. The document contains forward-looking statements regarding production forecasts, development plans, capital costs, anticipated timing of projects, and other expectations. It notes various risks and uncertainties that could cause actual results to differ from expectations. These risks include economic factors, operational risks, compliance with regulations, dependence on key personnel, and volatility in financial markets.
Hudbay is focused on creating sustainable value through high quality, long life mining deposits. The company is focused on copper and zinc production from its mines in Manitoba, including its flagship 777 mine, as well as future production from its Lalor and Constancia projects. Hudbay has achieved steady production and low operating costs in recent years and expects production of copper, zinc, and precious metals to increase substantially through 2015 as new projects come online.
Canaccord Genuity Global Resources ConferenceHudbayMinerals
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The document discusses Hudbay's strategy of focusing on VMS and porphyry deposits in mining-friendly jurisdictions in the Americas. It provides an overview of Hudbay's key assets including its flagship 777 mine in Manitoba, the Lalor mine also in Manitoba which is set to begin production in 2012, the Reed copper deposit in Manitoba with production starting in late 2013, and the large-scale Constancia copper project in Peru which is currently under construction with initial production expected in late 2014.
This document provides a summary of the 2019 Annual General Meeting for a mining company. It includes cautionary statements regarding forward-looking information in the presentation, such as production estimates, economic analyses, and assumptions underlying resource estimates. It notes that mineral resource and reserve estimates have been prepared according to Canadian standards which may not be comparable to US standards. The document also discusses non-IFRS financial measures presented and identifies the qualified persons who reviewed and approved the scientific and technical information in the presentation.
Creating Sustainable Value Through High Quality Long Life Deposits
Hudbay Minerals Inc. presented at the CIBC 2013 Whistler Institutional Investor Conference on January 23-26, 2013. The presentation focused on Hudbay's strategy of creating sustainable value through high quality, long life mining deposits. It discussed Hudbay's production forecasts, development plans for its projects, and anticipated timing. The presentation also noted some of the risks and uncertainties inherent in the mining industry and Hudbay's business.
Hudbay Capital Markets discusses creating sustainable value through high quality, long-life mining deposits. The presentation focuses on Hudbay's strategy of acquiring and developing quality VMS and porphyry deposits in mining-friendly jurisdictions in the Americas to leverage its expertise. Hudbay aims to invest patiently in projects like its 777, Lalor and Reed mines to maximize growth in key metrics like net asset value, earnings and cash flow per share over the long term.
Raymond James 8th Annual European Investors North American Equities ConferenceHudbayMinerals
Hudbay Minerals is creating sustainable value through high quality, long life mining deposits. The company focuses on quality deposits that can provide long production lives. Hudbay's strategy is to grow its production of copper, zinc, and precious metals through 2022 by leveraging its expertise in exploration, project development, and operations. Key projects include the Lalor mine in Manitoba, the Reed copper deposit in Manitoba, and the large Constancia copper project in Peru.
2013 Bank of America Merrill Lynch Global Metals, Mining & Steel ConferenceHudbayMinerals
Hudbay Minerals Inc. presented information on its mining projects and provided forward-looking statements regarding anticipated production levels and costs. The presentation discussed Hudbay's 777 mine in Manitoba, its Lalor and Reed projects also in Manitoba, and its Constancia project in Peru. Hudbay stated it expects substantial production growth at its operations between 2012 and 2015, with copper production anticipated to increase 390% and precious metals production projected to rise 115% over that period.
- The document is a presentation from CIBC's Mining Royalty Sector Conference in 2013 about creating sustainable value through high quality, long-life deposits.
- It discusses Hudbay Mineral's forward-looking statements and assumptions, projects in Manitoba and Peru, production growth expectations, mineral reserves and resources, funding options including a precious metals stream, and an overview of the Constancia copper project.
The document discusses Hudbay Minerals' strategy of creating sustainable value through high quality, long life mining deposits. It highlights some of Hudbay's key assets including the 777 mine in Manitoba, the Lalor project in Manitoba which is on track to begin full production in 2015, and the Constancia project in Peru. The document also notes Hudbay's focus on growing mineral reserves and resources on a per share basis through disciplined acquisitions and investments.
The presentation provides forward-looking information about Hudbay Minerals' projects and operations, noting that actual results may differ materially from projections. It discusses key assumptions around mining, processing, costs, commodity prices, regulations, and other operational and economic factors. The presentation also notes risks including uncertainties in project development, depletion of reserves, operational hazards, compliance with laws, and dependence on key personnel and markets. Financial information is prepared under Canadian, not U.S. standards.
RBC Capital Markets' Global Mining & Materials Conference HudbayMinerals
This document provides forward-looking information for Hudbay Minerals regarding its mining projects and production forecasts. It discusses Hudbay's 777, Lalor, and Reed mines in Manitoba and its Constancia project in Peru. The document notes that Hudbay expects to see significant production growth at its projects between 2012 and 2015, with copper production forecast to increase 390% and precious metals production 115%. It also provides an overview of recent developments and milestones at Hudbay's key projects.
Hudbay's Annual And Special Meeting of ShareholdersHudbayMinerals
1. The document discusses Hudbay Minerals Inc., a mining company that applies 360-degree expertise to develop long-life, low-cost mines in the Americas.
2. It contains forward-looking statements about Hudbay's projects, operations, and financial and operating performance that are subject to risks and uncertainties.
3. The document provides cautionary notes about the risks of relying on forward-looking statements and explains key assumptions and risk factors that could cause actual results to differ materially.
Hudbay Minerals is creating sustainable value through high quality, long-life mining deposits. The company achieved several significant milestones in the second quarter of 2012, including beginning initial production at the Lalor mine and accelerating construction activities at the Reed project. Hudbay is on track to meet its 2012 production targets and cost guidance. Construction of the $1.5 billion Constancia project is underway, with financing secured.
Canaccord Genuity Global Resources ConferenceHudbayMinerals
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The document discusses Hudbay's strategy of focusing on VMS and porphyry deposits in mining-friendly jurisdictions in the Americas. It provides an overview of Hudbay's key assets including its flagship 777 mine in Manitoba, the Lalor and Reed projects also in Manitoba, and the large-scale Constancia copper project in Peru which is currently under construction.
Hudbay's Annual and Special Meeting of ShareholdersHudbayMinerals
This document summarizes the annual and special meeting of shareholders for Hudbay Minerals Inc. held on May 10, 2013. It recognizes the passing of Bruce Barraclough in 1947-2013. It provides forward-looking information on Hudbay's production, projects, and financial expectations. However, it notes that actual results may differ due to risks in the mining industry and other factors beyond the company's control.
This document provides an overview of Hudbay Minerals Inc.'s Q4 2012 conference call. It discusses Hudbay achieving production targets for the 6th consecutive year while maintaining steady costs in 2012. It also provides updates on the construction progress of Hudbay's three major development projects - Lalor, Constancia, and Reed - which are advancing on schedule and on budget. These new mines are expected to drive significant production growth over the next two years, with copper production projected to increase by 390%, precious metals by 115%, and zinc by 30% by 2014.
The Company is a well-funded gold project developer. Our principal asset is our flagship Mt Todd gold project in Northern Territory, Australia. Mt Todd is one of the largest undeveloped gold projects in Australia.
The document discusses HBM's Q1 2012 conference call and provides an overview of their key projects and financial results. It summarizes that production is on track to meet guidance, earnings per share was $0.05 including non-cash items, and operating cash flow increased slightly. It also provides updates on advancing the Lalor, Constancia, and Reed projects toward production.
This document provides an overview of Osisko Gold Royalties Ltd, which is described as the leading growth-oriented royalty company. Some key points:
- Osisko has over 160 royalties, streams and offtakes focused in North America, including a cornerstone royalty on Canada's largest gold mine, Canadian Malartic.
- In 2021, Osisko is expected to deliver 80,000 GEOs from its portfolio.
- The company has a high margin business model with 97% of revenue coming from royalties and streams, no capital costs, and leverage to rising gold prices.
- Osisko's portfolio is well-diversified by asset, commodity, and
This presentation summarizes Solaris Resources' copper and gold exploration projects in the Americas. Solaris has assembled a portfolio of projects focused on its flagship high-grade Warintza copper project in Ecuador. Warintza has an open pit resource within a 7km x 5km cluster that remains open for expansion and untested for gold potential. Solaris is also exploring for discoveries at its Tamarugo and Ricardo projects in Chile and Peru JV projects. The company has strong financial support from insiders and strategic partners like Equinox Gold. Solaris is managed by the experienced Augusta Group and led by a board and management with extensive mining industry experience developing and selling projects in the Americas.
This document provides a cautionary note and introduces a corporate presentation discussing plans to create value. It contains forward-looking statements regarding production, costs, prices, expenditures, reserves, successful development of projects, financing, and economic returns. These statements are subject to risks including uncertainty in production, development costs, commodity prices, political instability, and inability to obtain permits. Qualified persons reviewed and approved the scientific and technical information relating to the Marigold mine, Seabee Gold Operation PEA, and Seabee Gold Operation and Puna Operations.
Macquarie Global Metals & Mining ConferenceHudbayMinerals
This document discusses creating sustainable value through high quality, long life mining deposits. It focuses on quality and longevity of deposits. The document contains forward-looking statements regarding production forecasts, development plans, capital costs, anticipated timing of projects, and other expectations. It notes various risks and uncertainties that could cause actual results to differ from expectations. These risks include economic factors, operational risks, compliance with regulations, dependence on key personnel, and volatility in financial markets.
Hudbay is focused on creating sustainable value through high quality, long life mining deposits. The company is focused on copper and zinc production from its mines in Manitoba, including its flagship 777 mine, as well as future production from its Lalor and Constancia projects. Hudbay has achieved steady production and low operating costs in recent years and expects production of copper, zinc, and precious metals to increase substantially through 2015 as new projects come online.
Canaccord Genuity Global Resources ConferenceHudbayMinerals
Hudbay Minerals is focused on creating sustainable value through high quality, long life mining deposits. The document discusses Hudbay's strategy of focusing on VMS and porphyry deposits in mining-friendly jurisdictions in the Americas. It provides an overview of Hudbay's key assets including its flagship 777 mine in Manitoba, the Lalor mine also in Manitoba which is set to begin production in 2012, the Reed copper deposit in Manitoba with production starting in late 2013, and the large-scale Constancia copper project in Peru which is currently under construction with initial production expected in late 2014.
This document provides a summary of the 2019 Annual General Meeting for a mining company. It includes cautionary statements regarding forward-looking information in the presentation, such as production estimates, economic analyses, and assumptions underlying resource estimates. It notes that mineral resource and reserve estimates have been prepared according to Canadian standards which may not be comparable to US standards. The document also discusses non-IFRS financial measures presented and identifies the qualified persons who reviewed and approved the scientific and technical information in the presentation.
The document summarizes Pretivm's 2019 Mineral Reserve update for its Brucejack Mine. Key points include:
- The Valley of Kings Reserves were updated using updated costs, stope design parameters, and net smelter return model. No changes were made to the West Zone reserves.
- Mining costs were updated based on projected costs for 3,800 tonnes per day production, and are greater than the life of mine costs. The net smelter return cut-off increased to $185/tonne from $165/tonne previously.
- Total mining costs increased to $127.20/tonne from $91.30/tonne previously due to factors like increased development and use of
The document discusses Pretivm's Brucejack Mine, which has been generating cash since start-up in November 2019. It provides cautionary statements regarding the use of forward-looking information in the presentation. It also notes that certain technical and scientific information is derived from Pretivm's NI 43-101 technical report on the Brucejack Gold Mine from April 2019.
- The presentation discusses SSR Mining's goal of creating value through its three mining operations and development projects. It produced a record 393,325 ounces of gold equivalent in 2016.
- SSR Mining is focused on maximizing the value of its mines through operational excellence, exploration, and strengthening its balance sheet. This includes developing the Chinchillas project to extend the life of the Pirquitas mine.
- Guidance for 2017 is improved over 2016 with production of 350,000-380,000 ounces of gold equivalent at a cash cost of $680-725 per ounce.
This document is a March 2017 corporate presentation that provides cautionary notes about forward-looking statements in the presentation. It discusses risks and uncertainties that could cause actual results to differ from expectations. It also notes that qualified persons reviewed and approved the scientific and technical information about the company's Marigold, Seabee, and Pirquitas mines. Finally, it provides cautionary notes about how mineral resource and reserve classifications differ between Canadian and U.S. standards.
Equinox Gold is a Canadian mining company with six producing gold mines, a multi-million-ounce gold reserve base and a clear path to achieve one million ounces of annual gold production from a pipeline of development and expansion projects. Equinox Gold operates entirely in the Americas, with two properties in the United States, one in Mexico and five in Brazil. Equinox Gold’s common shares are listed on the TSX and the NYSE American under the trading symbol EQX.
Osisko Development Corp. - Corporate Presentation, January 2022Kevin Connan
This presentation provides an overview of Osisko Development Corp., a premier North American gold company. It contains forward-looking statements regarding Osisko's prospects, ability to obtain capital, positioning as a gold development company, mineral resource estimates, exploration opportunities, and cost estimates. All forward-looking statements are subject to risks and uncertainties that could cause actual results to differ materially from expectations. Osisko's mineral resources are not mineral reserves and have no demonstrated economic viability. The presentation also discusses Osisko's mineral resource estimates and preliminary economic assessments for its projects.
- The document is the year-end 2016 conference call for Silver Standard Resources Inc. discussing financial and operational results.
- Key highlights include record annual gold equivalent production of 393,325 ounces at lower cash costs of $653/oz. Exploration success extended reserve life at Marigold and Seabee mines.
- Financial results were strong with $115 million in cash generated and adjusted net income of $100.3 million.
This presentation provides forward-looking information about Constancia, Hudbay's copper project in Peru. It discusses Constancia's estimated capital costs and economics, Hudbay's plans to finalize project financing through streaming and credit agreements, and the construction schedule. It notes the many risks and uncertainties that could cause actual results to differ from expectations, including commodity prices, uncertainties in development and operations, permitting and community relations challenges, and financial market volatility.
Equinox Gold is a Canadian mining company with six producing gold mines, a multi-million-ounce gold reserve base and a clear path to achieve one million ounces of annual gold production from a pipeline of development and expansion projects. Equinox Gold operates entirely in the Americas, with two properties in the United States, one in Mexico and five in Brazil. Equinox Gold’s common shares are listed on the TSX and the NYSE American under the trading symbol EQX. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Equinox Gold is a Canadian mining company with six producing gold mines, a multi-million-ounce gold reserve base and a clear path to achieve one million ounces of annual gold production from a pipeline of development and expansion projects. Equinox Gold operates entirely in the Americas, with two properties in the United States, one in Mexico and five in Brazil. Equinox Gold’s common shares are listed on the TSX and the NYSE American under the trading symbol EQX. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
Equinox Gold is a Canadian mining company with six producing gold mines, a multi-million-ounce gold reserve base and a strong growth profile from two development projects and two expansion projects. Equinox Gold operates entirely in the Americas, with two properties in the United States, one in Mexico and five in Brazil. Equinox Gold’s common shares are listed on the TSX and the NYSE American under the trading symbol EQX. Further information about Equinox Gold’s portfolio of assets and long-term growth strategy is available at www.equinoxgold.com or by email at ir@equinoxgold.com.
This document is a corporate presentation from SSR Mining Inc. that contains forward-looking statements regarding future production, costs, exploration and development plans. It cautions readers that actual results may differ due to risks and uncertainties. It also provides qualifications for the scientific and technical information presented.
Similar to Morgan Stanley Digging Deeper Conference (16)
1. Creating Sustainable Value Through
High Quality Long Life Deposits
Quality, Long-Life
Morgan Stanley Digging Deeper Conference December 6, 2012
HBM
2. Forward-looking I f
F d l ki Information
ti
This presentation contains “forward-looking statements” and “forward-looking information” (collectively, “forward-looking information”) within the meaning of applicable Canadian and
United States securities legislation. All information contained in this press release, other than statements of current and historical fact, is forward-looking information. Forward-looking
information includes information that relates to, among other things, our objectives, strategies, and intentions and future financial and operating performance and prospects. Often,
but not always, forward-looking information can be identified by the use of words such as “plans”, “expects”, “budget”, “guidance”, “scheduled”, “estimates”, “forecasts”, “strategy”,
“target”, “intends”, “objective”, “goal”, “understands”, “anticipates” and “believes” (and variations of these or similar words) and statements that certain actions, events or results
target intends objective goal understands anticipates believes actions
‘‘may’’, ‘‘could’’, ‘‘would’’, ‘‘should’’, ‘‘might’’ ‘‘occur’’ or ‘‘be achieved’’ or ‘‘will be taken’’ (and variations of these or similar expressions). All of the forward-looking information in this
presentation is qualified by this cautionary statement.
Forward-looking information includes, but is not limited to, production forecasts, development plans for our Constancia, Lalor and Reed projects, capital cost estimates, continued
production at our 777 mine, continued processing at our Flin Flon concentrator, Snow Lake concentrator and Flin Flon zinc plant, anticipated timing of our projects and events that
may affect our projects, our expectation that we will receive the remaining US$250 million in deposit payments under the precious metals stream transaction with Silver Wheaton
Corp., anticipated effect of external factors on revenue, such as commodity prices, timing and amount of estimated future production, reclamation costs, economic outlook,
government regulation of mining operations, and business and acquisition strategies.
Forward-looking
Forward looking information is not and cannot be a guarantee of future results or events Forward looking information is based on among other things opinions assumptions
not, be, events. Forward-looking on, things, opinions, assumptions,
estimates and analyses that, while considered reasonable by us at the date the forward-looking information is provided, inherently are subject to significant risks, uncertainties,
contingencies and other factors that may cause actual results and events to be materially different from those expressed or implied by the forward-looking information.
The material factors or assumptions that we identified and were applied by us in drawing conclusions or making forecasts or projections set out in the forward looking information
include, but are not limited to: the success of mining, processing, exploration and development activities; the accuracy of geological, mining and metallurgical estimates; the costs of
production; the supply and demand for metals we produce; the volatility of commodity prices; the volatility in foreign exchange rates; the supply and availability of concentrate for our
processing facilities; the supply and availability of reagents for our concentrators; the availability of third party processing facilities for our concentrate; the supply and availability of all
forms of energy and fuels at reasonable prices; the availability of transportation services at reasonable prices; no significant unanticipated operational or technical difficulties; the
execution of our business strategy including the success of our strategic investments; the availability of financing for our exploration and development projects and activities; the
strategy,
ability to complete project targets on time and on budget and other events that may affect our ability to develop our projects; the timing and receipt of various regulatory and
governmental approvals; the availability of personnel for our exploration, development and production projects and ongoing employee relations; maintaining good relations with the
communities in which we operate, including the communities surrounding our Constancia project; no significant unanticipated challenges with stakeholders at our various projects; no
significant unanticipated events relating to regulatory, environmental, health and safety matters; no contests over title to our properties, including as a result of rights or claimed rights
of aboriginal peoples; the timing and possible outcome of pending litigation and no significant unanticipated litigation; any assumptions related to taxes, including, but not limited to
current tax laws and regulations; and no significant and continuing adverse changes in general economic conditions or conditions in the financial markets.
The risks, uncertainties, contingencies and other factors that may cause actual results to differ materially from those expressed or implied by the forward-looking information may
include,
include but are not limited to risks generally associated with the mining industry such as economic factors (including future commodity prices currency fluctuations and energy
to, industry, prices,
prices), uncertainties related to the development and operation of our projects, depletion of our reserves, risks related to political or social unrest or change and those in respect of
aboriginal and community relations and title claims, operational risks and hazards, including unanticipated environmental, industrial and geological events and developments and the
inability to insure against all risks, failure of plant, equipment, processes, transportation and other infrastructure to operate as anticipated, compliance with government and
environmental regulations, including permitting requirements and anti-bribery legislation, dependence on key personnel and employee relations, volatile financial markets that may
affect our ability to obtain financing on acceptable terms, uncertainties related to the geology, continuity, grade and estimates of mineral reserves and resources and the potential for
variations in grade and recovery rates, uncertain costs of reclamation activities, our ability to comply with our pension and other post-retirement obligations as well as the risks
discussed under the heading “Risk Factors” in our most recent Annual Information Form, Form 40-F and Management’s Discussion and Analysis for the three and nine months
ended September 30, 2012.
Should one or more risk, uncertainty, contingency or other factor materialize or should any factor or assumption prove incorrect, actual results could vary materially from those
expressed or implied in the forward-looking information. Accordingly, you should not place undue reliance on forward-looking information. We do not assume any obligation to update
or revise any forward-looking information after the date of this press release or to explain any material difference between subsequent actual events and any forward-looking
information, except as required by applicable law.
Applying 360° Expertise > 2
3. Note to U.S. Investors
N t t US I t
Information concerning Hudbay’s mineral properties has been prepared in accordance with the requirements of Canadian securities laws, which differ in material
respects from the requirements of SEC Industry Guide 7.
Under Securities and Exchange Commission (the “SEC”) Industry Guide 7, mineralization may not be classified as a “reserve” unless the determination has been
7
made that the mineralization could be economically and legally produced or extracted at the time of the reserve determination, and the SEC does not recognize
the reporting of mineral deposits which do not meet the United States Industry Guide 7 definition of “Reserve”.
In accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”) of the Canadian Securities Administrators, the terms
“mineral reserve”, “proven mineral reserve”, “probable mineral reserve”, “mineral resource”, “measured mineral resource”, “indicated mineral resource” and
“inferred mineral resource” are defined in the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) Definition Standards for Mineral Resources and
Mineral Reserves adopted by the CIM Council on December 11, 2005.
While the terms “mineral resource”, “measured mineral resource”, “indicated mineral resource” and “inferred mineral resource” are recognized and required by NI
43-101, the SEC does not recognize them. You are cautioned that, except for that portion of mineral resources classified as mineral reserves, mineral resources
do not have demonstrated economic value. Inferred mineral resources have a high degree of uncertainty as to their existence and as to whether they can be
economically or legally mined.
It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Therefore, you are cautioned not to assume
that all or any part of an inferred mineral resource exists, that it can be economically or legally mined, or that it will ever be upgraded to a higher category.
Likewise, you are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be upgraded into mineral reserves. You are
urged to consider closely the disclosure on the technical terms in Schedule A “Glossary of Mining Terms” of Hudbay’s annual information form for the fiscal year
ended December 31, 2011, available on SEDAR at www.sedar.com and incorporated by reference as Exhibit 99.1 in Hudbay’s Form 40-F filed on April 2, 2012
(File No. 001-34244).
Applying 360° Expertise > 3
4. Stringent Criteria for Growth
St i t C it i f G th
Disciplined focus on per share metrics
1
1. Focus geographically 3 2
• on mining friendly, investment grade countries
in the Americas
2. Focus geologically
• on VMS and porphyry deposits
3. Acquire small, think big 1 777 - Manitoba 6
• leverage our core competencies as explorers
l t i l 2 Lalor - Manitoba 4
and mine developers and make Hudbay the 3 Reed - Manitoba
partner of choice for promising juniors 4 Constancia - Peru 5
5 Santiago - Chile
4. Invest patiently 6 C t
Cartagena - C l bi
Colombia
• in mine development and organic production
growth to maximize per share growth in net Exploration Properties
asset value, earnings, cash flow and dividends Exploration Offices
Producing/Development Properties
Preferred Jurisdictions
Applying 360° Expertise > 4
5. Key Metals G
K M t l Growth
th
420% GROWTH 125% GROWTH 1
35% GROWTH
Cu Production Precious Metals Production Zn Production
(kt) (koz) (kt)
200 220 120
200
175
180
150 160 90
140
125
120
60
100 100
80
75
60
30
50 40
25 20
0 0
0 2012E 2015E 2012E 2015E
2012E 2015E
Hudbay - Current Ops 2 Lalor 3 Constancia 4 Reed 5
1 Includes production subject to streaming transactions. Silver converted to gold at a ratio of 50:1.
2 Based on midpoint of 2012 forecasted production released on December 19, 2011. Anticipated production for 2015 is based on 777 and the 777 North expansion life of mines.
3 Lalor’s anticipated 2015 production based on “Pre-Feasibility Study Technical Report on the Lalor Deposit” dated March 29 2012
Lalor s Pre Feasibility Report, Deposit 29, 2012.
4 Based on contained metal in concentrate as disclosed in, “The Constancia Project, National Instrument 43-101 Technical Report”, filed on November 6, 2012.
5 Reed anticipated 2015 production based on “Pre-Feasibility Study Technical Report on the Reed Copper Deposit” dated April 2, 2012 and reflects 70% attributable production to Hudbay.
Applying 360° Expertise > 5
6. Growing Mi
G i Mineral R
l Reserves and R
d Resources P Sh
Per Share
Commodity Exposure1,2 Cu Eq/Share
(lb Cu/sh)
1 Hudbay reserves and resources as of March 31, 2012. Measured and Indicated Resources are exclusive of Proven and Probable Reserves.
y ,
2 Commodity exposure calculated using commodity prices of US$1,100/oz Au, US$0.95/lb Zn, US$2.75/lb Cu and US$13.00/lb Mo; silver converted to gold at
ratio of 50:1.
Applying 360° Expertise > 6
7. Flagship 777 Mi
Fl hi Mine
Steady production with low cash costs
Mining Cost MANITOBA
(C$/tonne)
777
Winnipeg
Wi i
PROFILE
Ownership 100%
Life of Mine 9 years
Applying 360° Expertise PAGE 8
Applying 360° Expertise > 7
8. 777 Mi
Mine
Expansion and underground exploration program underway
530m level
690m level
840m level
1082m level
1262m level
1412m level
Applying 360° Expertise > 8
9. Lalor
L l on T k
Track
1st full year of production via production shaft expected in 2015
Snow Lake
Ore Concentrator
MANITOBA
Lalor Project Snow
777 Mine Lake
Flin Flon
Reed
Amisk Flin Flon Lake Lalor
Lake Ore Concentrator Hwy
#39
Zinc Plant Reed Project
N
Hwyy
25 k
km #10
Winnipeg
PROFILE
Ownership 100%
Projected Life of Mine 20 years
Construction Capex (2010-2014) $704 million
Applying 360° Expertise > 9
10. Lalor
L l
Surface
0m
Production shaft
Vent raise
3 5
325m / cu e t s a t dept
current shaft depth
500m
750m
H1/2012 H2/2012 2013 - 2014 2015
Exploration platform
1000m
1500m
Base Metal Resource
Gold & Copper-Gold Resource Looking
0m 250m
High Grade Intercepts N70oW
Applying 360° Expertise > 10
11. Reed Progressing W ll
R dP i Well
Portal trench excavation completed
MANITOBA
> $16 million spent to Sept. 30, 2012
> Entered into additional $13 million in
commitments
Reed
> Significant project milestones achieved:
• Installation of new office and dry
complex Winnipeg
• Foundations poured for shop and
warehouse
• Installed ventilation fan, silencers and PROFILE
heater Ownership 70%
• Materials and mobile equipment on site
Projected Life of Mine
j 5 years
y
> Project remains on schedule
Construction Capex (2012-2013) $72 million
Applying 360° Expertise > 11
12. Constancia P j t
C t i Project
US$1.5 billion construction program underway
PERU
> US$154 million spent to Trujillo
T jill
September 30, 2012
Lima
Cusco
> Entered into additional US$322 million
in commitments Constancia
Arequipa
> Significant project milestones
achieved prior to board approval: 1-5 Yrs 6-16 Yrs LOM
• Front End Engineering and Design completed Annual throughput (M tonnes) 28.8 27.7 28.1
• Beneficiation concession granted in June 2012
• Completion of 2,100-bed construction camp Avg annual contained Cu in 118 77 90
• Mobilization of EPCM and civil works contractors concentrate (000 tonnes)
• Contract awarded for concentrate installation for Avg annual sustaining Capex (US$ M) 57 32 40
plant construction
l t t ti
• Major long lead items secured Cash cost per lb of Cu (US$/lb)1 0.66 1.11 0.92
1 Net of by-products.
Applying 360° Expertise > 12
13. Constancia P j t
C t i Project
Significant infrastructure advantages
> 83km access road from Yauri
• To be upgraded for concentrate haulage
> Tintaya power substation 70km away
• Planned upgrade to 220 kV to be commissioned by
Q3 2013
• Contract executed for construction of power
transmission line from Tintaya
> Rail-head at Imata 150km away
> Road upgrades for concentrate haulage within
project scope
> ~475km from Matarani Port by road
Infrastructure & power expected to be
available to meet Constancia project schedule
Applying 360° Expertise > 13
14. Constancia E l ti S
C t i Exploration Success
Exploration program yields mineralization outside known reserve
> Expand Pampacancha
resource
• Two drills focused on infill and
step-out drilling
• Mineralization demonstrated
to the west of known resource
> Chill
Chilloroya S th
South
• One drill tested skarn target
and geophysical anomaly
• Favourable geology
intersected in several holes
i t t di lh l
> Three drills to continue for
remainder of 2012
15. Steady Production i h Low O
S d P d i with L Operating C
i Costs
On track to meet annual guidance
Three Months Ended Nine Months Ended Guidance1
Contained metal in concentrate September 30, 2012 September 30, 2012 2012
Copper1 tonnes 9,920 31,426 35-40,000
Refined Zinc1 tonnes 20,371 62,495 70-85,000
Precious Metals1,2 troy oz. 22,832 77,322 85-105,000
Unit Operating Costs
777 $
$/tonne 41.63 40.51 38 – 42
Flin Flon Concentrator $/tonne 13.89 13.13 12 – 15
Snow Lake Concentrator $/tonne 42.19 36.04 32 – 37
1 Metal reported in concentrate prior to refining losses or deductions associated with smelter terms.
2Precious metals include gold and silver production. For precious metals production, silver is converted to gold using the average gold and silver realized sales
prices during the period. For precious metals guidance, silver is converted to gold at a ratio of 50:1.
Applying 360° Expertise > 15
16. Reliable Cash Flow G
R li bl C h Fl Generation
i
Driven by steady production and cost control
Three Months Ended Nine Months Ended
Sept.
Sept 30 Sept.
Sept 30
($000s except per share amounts) 2012 2011 2012 2011
Revenue 144,659 212,335 521,555 636,503
Profit before tax 4,960 37,473 28,814 139,212
Operating cash flow1 21,487 64,430 133,187 168,119
Operating cash flow per share2 0.12 0.37 0.77 1.01
C h cost per pound of copper sold2
Cash d f ld 0.75
0 75 0.74
0 74 0.75
0 75 0.41
0 41
1 Before stream deposit and change in non-cash working capital.
2 Refer to “Non-IFRS Financial Performance Measures” in our Management’s Discussion and Analysis for the quarter ending September 30, 2012.
Applying 360° Expertise > 16
17. Strong Balance Sheet
St B l Sh t
As at September 30 2012
30,
Sources Uses
> Cash and cash equivalents - $1,499 million > Lalor - $399 million
> Remaining stream agreement payments > Reed - $56 million
- $250 million > Constancia - $1.39 billion
> Existing Credit facility - $235 million
Total Sources: $1.98 billion Total Uses: $1.85 billion
> Shares Outstanding: 172.0 million
Applying 360° Expertise > 17
18. Applying
A l i 360° E
Expertise i E h St
ti in Each Stage of Mi i C l
f Mining Cycle
Exploration Development Production Reclamation
> Discovered > Currently > 777 Mine is a > Successfully
26 mines i
i in 3 mines i
i in consistently
i t tl reclaimed
l i d
85 years development low-cost 19 mines
producer
Applying 360° Expertise > 18
19. Growth of Mineral Deposits
G th f Mi lD it
Discoveries in the Greenstone Belt
Flin Flon
Lalor
⁄⁄ 62.5
62 5
Trout Lake
777
Stall Lake
Chisel U/G
Callinan
Chisel
Osborne
Anderson
Konuto
Spruce
Schist Lake
Centennial
Westarm
Chisel Pit Initial resource
Coronation
White Lake Added resource
Dickstone The mineral reserve for Lalor is made up of
Rod 14.4 million tonnes of probable reserves
Photo
Ghost & Lost
Cuprus
Flexar
Birch Lake
North Star
Mandy
0 5 10 15 20 25 30
Tonnes (millions)
( )
Average 1990 – 2010 discovery cost of 6.4 cents/lb Cu equivalent1
1 Expressed in 2011 dollars.
Applying 360° Expertise > 19
21. Appendix C t t
A di Contents
> By product copper cost curve
By-product
> 2012 operating guidance, capital expenditures and exploration
spending breakdown
> Lalor guidance, mineralization and plan views
> Constancia project
> S th America property
South A i t
> Reserves & resources
Applying 360° Expertise > 21
22. Copper & Zi B P d t Cost Curves1
2012 C Zinc By-Product C t C
250
Constancia2
C1 Ca Cost (100 x US$/lb)
200 Reed
U
150
2
100 777 Mine
50
ash
0
0 10 20 30 40 50 60 70 80 90 100
(50)
Cumulative Percentile Production (%)
(100)
Lalor
(150)
(200)
(250)
Cu Cash Cost Zn Cash Cost
Source: Brook Hunt (2012 cost curve)
1 By-product costs calculated using Brook Hunt’s by-product costing methodology, which is materially different
yp g yp g gy y
from the by-product costs reported by Hudbay in its public disclosure.
2 777 and Constancia by-product costs include the effect of the stream transactions.
Applying 360° Expertise > 22
23. 2012 O
Operating G id
ti Guidance
Copper: 35,000 – 40,000 tonnes
Zinc: 70,000 – 85,000 tonnes
Precious Metals2 : 85 000 – 105 000 ounces
85,000 105,000
777 Trout Lake Chisel North Lalor1
Ore Mined tonnes 1,553,000 230,000 165,000 86,000
Copper % 2.3 1.8 0.72 0.4
Zinc % 4.3 2.3 5.0 10.1
Gold g/tonne 1.9 1.5 1.1
-
Silver g/tonne 28.0 7.1 16.9
-
Unit Operating Costs 3 C$/tonne $38 - 42 $60-74 $93-114
Flin Flon Snow Lake
Ore Milled tonnes 1,840,000 190,000
Recoveries
Copper % 93 80
Zinc % 85 95
Gold % 70 65
Unit Operating Costs 3 C$/tonne $12 - 15 $32 - 37
1 Revenues and costs from Lalor operations prior to commencement of commercial production will be capitalized.
2 The 165,000 tonnes of forecast production from the Chisel North mine is anticipated to consist of 108,000 tonnes of zinc ore at 7.1% zinc to be processed at Hudbay's Snow Lake
, p p , p y
concentrator, and 57,000 tonnes of copper/gold ore to be processed at the Flin Flon concentrator. The expected grade for the copper/gold ore is 2.1 g/t Au, 20.6 g/t Ag, 1.6% Cu
and 0.9% Zn.
3 Forecast unit operating costs are calculated on the same basis as reported unit operating costs in Hudbay’s quarterly and annual management’s discussion and analysis. For a
reconciliation of the costs that are included in unit operating costs to total operating costs in accordance with IFRS, refer to the Non-IFRS detailed cost of sales table in Hudbay’s
MD&A for the year ended December 31, 2011.
Applying 360° Expertise > 23
24. 2012 O
Operating G id
ti Guidance – Zi plant
Zinc l t
Flin Flon
Guidance 2012
Zinc concentrate treated
Domestic tonnes 164,000
Purchased tonnes 56,000
Total tonnes 220,000
Recovery % 97
Zinc produced tonnes 113,000
Unit operating costs1 C$/lb $0.32 - 0.37
1Forecast unit operating costs are calculated on the same basis as reported unit operating costs in Hudbay’s quarterly and annual management’s discussion
and analysis. For a reconciliation of the costs that are included in unit operating costs to total operating costs in accordance with IFRS refer to the Non-IFRS
analysis IFRS, Non IFRS
detailed cost of sales table in Hudbay’s MD&A for the year ended December 31, 2011.
Applying 360° Expertise > 24
25. Capital Expenditures1
2012 C it l E dit
Committed to $640 million in capital expenditures to grow production profile
(figures in C$ millions) Actual 2011 Guidance 2012
Growth
Lalor2 157 122
Constancia2 44 384
Back Forty 4 2
Reed2 - 31
777 North 8 6
Fenix3 7 -
Total growth capital 219 545
Sustaining 60 95
Less: capital accruals (25)
Total capital expenditures $255 $640
1 Guidance based on figures disclosed in Hudbay’s news release entitled, “HudBay Minerals Announces 2012 Production Guidance and Capital
Exploration Budgets” except where otherwise indicated.
2Lalor, Constancia and Reed CAPEX reflects capital spent in Q1 – Q3 2012 as disclosed in Hudbay’s Management’s Discussion and Analysis of
Results of Operations and Financial Condition For the Three and Nine Months Ended September 30, 2012
3 On September 9, 2011, Hudbay completed the sale of the Fenix project to the Solway Group
Applying 360°Expertise > 25
26. 2012 E l ti E
Exploration Expenditures
dit
($ millions)1 Sept. 30, 2012 Actual Annual 2012 Guidance
Manitoba 13 31
South A
S th America
i 13 13
Other North America 8 10
Total exploration expenditures 34 54
Manitoba
M it b capitalized spending
it li d di (1) (5)
Total exploration expenses $33 $49
1 Amounts are net of investment tax credits where applicable
Applying 360° Expertise > 26
27. Lalor Project Guidance
L l P j t G id
> CAPEX for new concentrator (including Q4 2012 $23 million
paste backfill plant) estimated at
$263 million 2013 $162 million
• $120 million estimate i A
illi ti t in August 2010 f
t for
Snow Lake concentrator refurbishment 2014 $214 million
Total estimated future $399 million
> Incremental investment of $144 million
capital spending
brings total Lalor CAPEX to $704 million
Total spent in 2010/2011 $206 million
> Capital costs remain on budget
Total spent in Q1-Q3 2012 $99 million
> $305 million incurred to September
30, 2012; additional $76 million in TOTAL $704 million
commitments have been placed
Applying 360°Expertise > 27
28. Benefits of L l P j t Optimization1
B fit f Lalor Project O ti i ti
Optimized Lalor Lalor – Aug. 4, 2010
Construction CAPEX
C t ti C$ 704M C$ 560M
Annual Sustaining CAPEX C$ 22M C $15M
Production Rate 4,500 tpd 3,500 tpd
Mining Costs
Mi i C t $36 per t
tonne $56 per t
tonne
Milling Costs $16 per tonne $24 per tonne
Metallurgy
95% Zn 95% Zn
86% Cu 90% Cu
66% Au 80% Au
60% Ag 75% Ag
1 All cost projections reflect current estimates
Decision to construct a gold plant will be made before higher grade gold
mineralization is mined
Applying 360° Expertise > 28
29. Reed Copper P j t1
R dC Project
Mineral R
Mi l Reserves as at M h 30 2012
t March 30,
Mineral Resources as at March 15, 2011
Category Tonnes Cu (%) Zn (%) Au (g/t) Ag (g/t)
Probable 2,157,000 3.83 0.59 0.48 6.02
Inferred 170,000 4.26 0.52 0.38 4.55
1 Hudbay holds a 70% joint venture interest in the Reed property
Applying 360° Expertise > 29
30. Constancia P j t
C t i Project
> Unlevered IRR of 14 5% based on capital cost estimate
14.5%
> Net present value of $571 million, assuming a discount rate of 8.0% and
$2.75/lb copper
Base Case1 Copper Prices +10%2 Copper Prices -10%2
Long-Term Copper Price US$2.75/lb US$3.03/lb US$2.48/lb
IRR – Unlevered 14.5% 17.3% 11.5%
IRR – With Silver Stream 15.9% 19.3% 12.1%
NPV – Unlevered C$571 M C$851 M C$289 M
1 Base case assumed metal prices are as follows: Copper (2014-US$3.40/lb, 2015-US$3.30/lb, 2016-US$3.10/lb, Long-Term-US$2.75/lb); Gold
(2014-US$1,550/oz, 2015-US$1,450/oz, 2016-US$1,350/oz, Long-Term-US$1,150/oz); Silver (2014-US$30/oz, 2015-US$28/oz, 2016- US$24/oz, Long-Term-
US$23/oz); Molybdenum (2014-US$15/oz, 2015-US$15/oz, 2016-US$14.50/oz, Long-Term-US$14/oz); CAD/USD (2014-C$1.01/US$, 2015-C$1.02/US$,
2016-C$1.05/US$, Long-Term-C$1.05/US$)
2 Copper prices are increased/decreased by respective percent in every year of forecast.
Applying 360° Expertise > 30
31. Constancia C it l S
C t i Capital Spending
di
($ millions)
Q4 2012 230
2013 900
2014 262
Total future capital spending 1,392
Total spent in Q1 – Q3 2012 154
Total 1,546
Applying 360° Expertise > 31
32. Constancia K M t i
C t i Key Metrics
Project Costs Unit Life of Mine
Mining Costs / tonne ore1 US$/t 2.97
Milling Cost / tonne ore US$/t 4.47
G&A Costs / tonne ore US$/t 1.11
Average Annual Sustaining CAPEX M US$ 40
Project Economics
NPV of C$ FCF (@ 8% discount and LT Cu of $2.75/lbs) M C$ 571
IRR % 14.5
IRR – with Silver Stream % 15.9
15 9
1 Includes cost of waste removal
Applying 360° Expertise > 32
33. Constancia P j t - Sit Pl and L
C t i Project Site Plan d Layout
t
34. Constancia R i
C t i Regional I f t t
l Infrastructure – P t
Port
> Constancia is ~475km from Matarani Port by road, already
more than half paved
> Matarani Port located 120km from Arequipa by paved highway
> The port is a deep sea port managed by a private group
> Used by other mining companies
> Currently formalizing expansion plans
Applying 360° Expertise > 34
35. Constancia P d ti P fil
C t i Production Profile
High tonnage with low cash costs
> 2015 – 2019: annual copper metal in concentrate expected to
average 118,000 t
> 2020 – 2030: annual copper metal in concentrate expected to
average 77,000 t
> Cash costs of production expected to average: $
p p g $0.66/lb of copper for
pp
first 5 years; $1.11/lb thereafter
Applying 360° Expertise > 35
36. Precious M t l St
P i Metals Stream O
Overview
i
> US$750 million i upfront deposit payments f
illi in f t d it t from Sil
Silver Wh t for
Wheaton f
delivery of:
• 100% of payable gold and silver from 777 mine until the end of 2016
• 50% of payable gold and 100% of payable silver thereafter for the remainder of
life of mine
• 100% of payable silver from Constancia project
> P i
Precious metals stream transaction preserves precious metals upside
t l t t ti i t l id
potential for Hudbay shareholders
• Precious metals production from Lalor excluded
• Excludes land package outside of Constancia and Pampacancha including
Pampacancha,
highly prospective Chilloroya, which is currently being explored
Applying 360° Expertise > 36
37. Constancia R
C t i Reserves O
Overview
i
Growth in Reserves
Constancia Mineral Reserves – August 8, 2012
Category Ore (M tonnes) Cu (%) Mo (g/t) Ag (g/t) Au (g/t) CuEq1 (%)
Proven 349 0.37 100 3.29 0.043 0.49
Probable 54 0.24 60 2.98 0.035 0.33
Total 403 0.35 96 3.25 0.042 0.47
Pampacancha Mineral Reserves – August 8, 2012
Category Ore (M tonnes) Cu (%) Mo (g/t) Ag (g/t) Au (g/t) CuEq1 (%)
Proven 10 0.54 170 4.20 0.318 0.87
Probable 37 0.46
0 46 140 4.56
4 56 0.276
0 276 0.76
0 76
Total 47 0.48 149 4.49 0.285 0.78
1 Not accounting for recovery
Applying 360° Expertise > 37
38. Constancia R
C t i Resources O
Overview
i
Exclusive of Reserves
Constancia Mineral Resources1 - November 2, 2011
Category M (tonnes) Cu (%) Mo (g/t) Ag (g/t) Au (g/t) CuEq2 (%)
Measured 119 0.23 62 2.3 0.038 0.31
Indicated 344 0.20 58 2.0 0.034 0.27
Total 463 0.21 59 2.0 0.035 0.28
Inferred 219 0.19 49 1.8 0.032 0.25
Pampacancha Mineral Resources3 – April 2, 2012
Category M (tonnes) Cu (%) Mo (g/t) Ag (g/t) Au (g/t) CuEq2 (%)
Inferred 4 0.41 103 6.2 0.207 0.67
1 Th
The Constancia mineral resources are reported at 0 12% copper cut-off
C t i i l t d t 0.12% t ff
2 Notaccounting for recovery
3 The Pampacancha mineral resources are reported at a 0.20% copper cut-off
Applying 360° Expertise > 38
39. Constancia P j t C ti
C t i Project Contingency
Capital costs
Area Base Cost Contingency & Growth Dollars Contingency & Growth % of Base $
$ millions $ millions
Mining 145 12 8%
Mine Equipment 151 2 1%
Plant 340 57 17%
Heavy Ci il Works (TMF & reservoirs)
H Civil W k i ) 178 42 24%
Other Infrastructure 117 21 18%
Site Accommodations 96 5 5%
External Infrastructure - Roads & Bridges 49 6 13%
Indirects (
(non-owner)
) 146 12 8%
%
Commissioning and Spares 29 1 3%
Owners 138 - 0%
1,389 $157
Total CAPEX $1,546
Project Commitments $322
Project Expenditures to September 30, 2012 $154
Project Costs Not Yet Committed $913
Applying 360° Expertise > 39
40. Formalized LOM Agreements with Local Communities
Uchuccarco
> Life of mine agreement in place
> Land rights acquired
Chilloroya
> Life of mine agreement in place
> Land rights acquired
> Relocation process is underway
Committed to community investments
Applying 360° Expertise > 40
40
41. Updated Peru T and R
U d t dP Tax d Royalty S h
lt Scheme
What has changed?
• Old royalty: 1% – 3% sliding scale royalty on sales (NSR) is being eliminated
• New royalty:1% – 12% marginal rate sliding scale applied on operating profit (EBIT)
• Equivalent to: 0% – 7.1% effective rate, depending on operating profit margin;
minimum royalty = 1% of sales
• New mining tax: 2% – 8.4% marginal rate sliding scale applied to operating profit (EBIT)
• Equivalent to: 0% – 5 4% effective rate depending on operating profit margin
5.4% rate,
(i.e. EBIT margin)
What stays the same?
• 0.5% NSR Minera Livitaca and Katanga (capped at US$10 million)
• Labour participation = 8% of pre-tax profits
pre tax
• 30% corporate income tax rate without a tax stability agreement
Deductible expenses for corporate income tax:
• New royalty AND new mining tax
• Labour participation = 8% of pre-tax profits
pre tax
• Tax depreciation
Withholding/Dividend Tax:
• 4.1% applies to profits distributed to nonresidents
Legal Stability Agreements
• Guaranteed stability of income tax regime for 15 years
Applying 360° Expertise > 41
42. Project D Ri ki
P j t De-Risking with E
ith Experienced P t
i d Partners
Stracon GyM Relevant Experience
> Currently operating in Peru • Toromocho
> Experienced in mining and major earth works • El Brocal
> Established labour force and operating team
p g • Marcona
> Experienced procurement and maintenance • La Arena
> Carry over from design, construction to mining
Ausenco Relevant Experience
> Constructed and delivered similar plants • Lumwana
in remote locations • Phu Kham
> Assembled sizable team in Latin America • Cadia East
> Continuation of personnel from FEED to
construction
Applying 360° Expertise > 42
43. South A
S th America – P
i Property Acquisition
t A i iti
Pacific Ocean
Antofagasta CHILE
EL SALVADOR Cu
> Focus on Chile, Peru
EL SALVADOR Copiapo
and Colombia CHANARAL
La Serena SAN ANTONIO
MANTOS VERDES Cu
> Compilation of geological SANTIAGO
data at San Antonio COPIAPO
CANDELARIA Cu
> Regional exploration office
opened in Santiago HUASCO VALLENAR
DOS AMIGOS Cu
> Evaluation of early stage
exploration opportunities SAN ANTONIO
underway LA SERENA
COQUIMBO
Argentina
LOMA NEGRA
Applying 360° Expertise > 43
44. In-mine M it b Mi
I i Manitoba Mineral R
l Reserves
January 1, 2012
Category Tonnes Cu (%) Zn (%) Au (g/t) Ag (g/t)
7771
Proven 4,921,000 2.36 4.16 1.97 26.78
Probable 7,464,000 1.64 4.44 1.82 27.86
TROUT LAKE
Proven 229,000 2.07 1.90 2.06 1.33
CHISEL NORTH-ZINC
Proven 48,000 - 7.97 - -
Probable - 6.57 - -
60,000
CHISEL NORTH-COPPER
Probable 57,000 1.49 2.65 2.06 20.58
TOTAL
Proven 5,198,000
Probable 7,581,000
1 Includes 777 North
Applying 360° Expertise > 44
45. Manitoba Mineral R
M it b Mi l Resources
January 1, 2012
Category Tonnes Cu (%) Zn (%) Au (g/t) Ag (g/t)
7771
Inferred 1,183,000 1.43 5.47 1.96 39.17
Lost2
Indicated
I di d 411,000 1.80 6.10 1.00 20.00
Inferred 69,000 1.50 6.20 0.80 16.50
Total
Indicated 411,000 1.80 6.10 1.00 20.00
Inferred 1,252,000 1.43 5.51 1.90 37.92
1 Includes 777 North
2 Lost property mineral resource as at March 4, 2011; Hudbay holds a 51% joint venture interest in the property
Applying 360° Expertise > 45
46. Lalor Project
L l P j t
Reserves & resources
1
Lalor project mineral reserves - March 29, 2012
Category Tonnes Cu (%) Zn (%) Au (g/t) Ag (g/t)
Base metal
Probable reserves 12,591,000 0.63 7.92 1.55 23.81
Gold zone
Probable reserves 1,841,000 0.38 0.38 3.99 21.77
Total
Reserves 14,432,000 0.60 6.96 1.86 23.55
Lalor project mineral resources - September 30, 2011
Category Tonnes Cu (%) Zn (%) Au (g/t) Ag (g/t)
Base metal
Inferred 3,817,000 0.60 9.09 1.20 22.15
Gold zone
Inferred 7,338,000 0.41 0.32 4.64 31.35
Copper-gold zone
Inferred 1,461,000 4.15 0.31 6.80 20.33
Total
Inferred 12,616,000 0.90 2.97 3.85 27.29
1 The weighted average (based on planned production tonnage) price from 2012 to 2016 used in the Lalor pre-feasibility study for mineral reserve estimation for zinc was US$1.11
per pound (includes premium), the copper price was US$3.12 per pound, the gold price was US$1,399 per ounce and the silver price was US$27.28 per ounce using an exchange
of 1.03 C$/US$. Post 2016 the mineral reserve estimation used a zinc price of US$1 00 per pound (includes premium) a copper price of US$2 75 per pound a gold price of
1 03 C$/US$ US$1.00 premium), US$2.75 pound,
US$1,100 per ounce and a silver price of US$22 per ounce using an exchange of 1.05 C$/US$.
Applying 360° Expertise > 46
47. Reserves and R
R d Resources
> To estimate mineral reserves, measured and indicated mineral resources were first
estimated in a 12-step pp process, which includes determination of the integrity and validation
g y
of the data collected, including confirmation of specific gravity, assay results and methods of
data recording. The process also includes determining the appropriate geological model,
selection of data and the application of statistical models including probability plots and
restrictive kriging to establish continuity and model validation. The resultant estimates of
measured and i di
d d indicated mineral resources are then converted to proven and probable
d i l h d d b bl
mineral reserves by the application of mining dilution and recovery, as well as the
determination of economic viability using full cost analysis. Other factors such as depletion
from production are applied as appropriate.
> Estimated inferred mineral resources within our mines were estimated by a similar 12-step
process, used to estimate measured and indicated resources.
> The zinc price used for mineral reserve and resource estimations for the Manitoba mines
was US$1.00 per pound (includes premium), the copper price was US$2.75 per pound, the
gold price was US$1,100 per ounce and the silver price was US$22 per ounce using an
exchange of 1.05 C$/US$.
Applying 360° Expertise > 47
48. Reserves and R
R d Resources
> The technical and scientific information in this news release related to the Constancia project
has been approved by Cashel Meagher, P. Geo, Hudbay’s Vice-President, South America.
pp y g y
The technical and scientific information related to all other sites and projects contained in this
news release has been approved by Robert Carter, P. Eng, Hudbay’s Director, Technical
Services. Mr. Meagher and Mr. Carter are qualified persons pursuant to NI 43-101.
> Please refer to Hudbay’s Annual Information Form and Management’s Discussion and
Analysis for the year ended December 31, 2011 and applicable technical reports in respect of
the properties filed on SEDAR for further information.
Applying 360° Expertise > 48
48
49. For more information contact:
John Vincic,
VP of Investor Relations and Corporate Communications
Tel: 416.362.0615
Email: john.vincic@hudbayminerals.com
@