2. Major improvement in Facility
• Infection Prevention-Central
sterilizatrion room ready (Equipment,
consumables and trained Human
Resource). OT extra furniture-chairs,
2 almirahs removed and pur inside
the Central sterilizatrion room.
• Institutionally- Regular LR ANM
(roster) weeking meeting by MOIC
and BHM on Thursdays. Review of
registers, complicated cases and
further improvements.
• Record Keeping-LR, handover, reffer
in, reffer out and reffer slip register
are maintained. LR register showed
improvements in L.M.P, weight, H/O
PROM, Gravida/Para and BP.
• Regular QI meetings- With everyone
involved in making the agenda and in
the meeting.
• Indenting with everyone's
participation- Support in indenting
Equipment, consumable, supplies
for LR, OT, NBCC and emergency
•Fund booking - Rs 1,00,000 from
"procurement from MCH" fund
head.
•YUVA kendra: Helped in
searching with MOIC, BHM IEC
material for staring it.
•FP corner: Corner and IEC material
shortlisted for the same with MOIC
and BHM.
•JBSY payment on time: Payment of
JBSY on bed before patient is
discharged and regular serving of
meals.
3. Major Changes in Outreach
• HSC FLW attendance: increased (ASHAs
37% and AWW 22%). February ASHA and
AWW attendance was 74 and 78
respectively. March ASHA and AWW
attendance was 101 and 94 respectively.
• 25% of the ANMs participated in
Annaprasan Diwas.
• HSCmeeting held as per agenda
discussed in ANM meeting.
• Out of 23, 22 HSC meetings are
conducted (96%)
• 12 AWW centres monitored for
support to ICDS.
• ASHA Diwas 1 attended out of 2.
• Sector meeting attended 1 out of
2 held.
• 12 Home visits done in 3 HSCs.
• Attended ASHA facilitator meeting and
rolled out content.
• 8 RI/VHSND sites monitored.
• Misoprostol tablet dosage information
given to ANM to roll out by ASHAs in case
of PPH in home delieveries or on the way
with consensus of MOIC.
4. What went well
• Liasoning and full support of Health and ICDS staff.
• Regular sharing of various feedbacks and suggestions. Participation by them in all
our activities very enthusiatically.
• They value our contribution to a great level.
• Participation and support asked by MOIC on Saturdays in health camps.
What didn't go well
• All sector meetings couldnt be held due to exam duty of LS.
• AWW meeting couldn't be attended.
5. Support required
• From RTS: In 1 QI meeting and Labor room roster meeting .
• From DM and DPO: Support in 1 ANM meeting.