Virtual Manager (VM) Completions constitute a multi-discipline
web-based solution that provides you with a complete interactive
picture from a single source. The MODS VM Completion module
can be utilized as a traditional 2D system completions database
or it can be linked to your existing 3D design model to help you
achieve greater efficiency, whereby, by linking to the model, we
provide a unique 4D Completions and Commissioning Management
System (CCMS) solution. Here, the processes are completely
integrated with the 3D model database to deliver a comprehensive
inspection, testing, commissioning and preservation programme
that is at the same time transparent, accountable, affordable
and has high visibility.
Automate & Collaborate
A seamless transition from area
construction to systems completion
COMPLETIONS
Provides access to the CCMS from a web-based
single source.
Cross-references the 3D Model data with tag
and line lists and other key documents to ensure
complete capture.
Interacts with the design model attributes to establish
the CCMS structure.
Develops an integrated completions matrix for
corporate standardisation.
Populates the CCMS with check lists and records
automatically from a pre-defined matrix.
Provides visibility for completions and commissioning
processes through the 3D design model with colour-
coded progress tracking.
Calculates volumes for the medium used in the strength
and leak testing using the attributed data in the model.
Incorporates an integrated Scheduling module.
Develops critical paths for the completions and
commissioning.
Incorporates an integrated Preservation function.
Includes barcode control for all modules and processes.
Includes an integrated Materials Management module.
Automatically generates and monitors costs through an
Activity Manager.
Incorporates the ability to update the system from paper
copy barcodes.
Includes an Information Hub to upload reference documents,
such as drawings and line lists.
Incorporates integrated access to other software packages.
Commissioning procedure tracking
Smart Plant / P&ID function for high-level engineering
documents
Incorporates the ability to report completions and
commissioning records through a handheld device.
Incorporates an integrated Job Setting that is automatically
populated (40%).
Incorporates an integrated 3D Joint Integrity Management
module.
Includes the ability to create dedicated loop testing parameters.
Provides an efficient system for the holding or management
of change processes.
Can interface with external planning systems.
Has the ability to provide live volumetric status reports online.
Integrates vendor’s skids or equipment either through
the CAD files or key documents.
functionality
Improves handover to operations
Reduced project schedules by
improving the interfaces with the
build contractor
Accountable integrity through the
direct interface with the design data
and reducing manual input
Standardise workflow processes that
will improve estimating and provide a
bench marking capability
Virtual Manager’s 4D
solution provides the
optimum system for
delivering integrity and
equipment performance
records.
•
•
•
•
Assurance for startup
E03A ELECTRICAL
Page 1 of 1
Mechanical Completion
L.V. POWER CABLES
Site Phase Area Location
System Description Work Pack
MC Package Description Print Date
Tag/Cable No. Description Drawing No.
From To
Voltage Size Type Core
No. Check Description Status
Punch List
Y/N
Remarks
1 Correct cable type as per electrical cable schedule and drawings
2 Labelling, numbering and ferruling correct.
3 Bending radius and stretch prevention according to specification.
4 Glands and lock-nuts correctly installed.
5 Ensure gland certificates meet the area classification requirements.
6
Inspect cable glands for tightness and ensure correct gland has been used for the size and type of
cable installed, and where specified, insulating gland adaptors have been fitted.
7
Ensure gland plates for single core cables have been manufactured from non-magnetic materials
where applicable.
8 Carry out IR and continuity tests in all cores, screen, earth and armour, note in table below
9 Check terminations and earth connections are tight and correct
10
Where conductors have been terminated using crimped connectors, ensure the correct size of
crimped connector has been used.
11 Spare cores earthed and tightened and with correct identification.
12 Screen is correctly made off
13 Cable mechanically protected where applicable.
14 Labelling, numbering and ferruling correct.
NOTE: Usually individual conductors in a cable will have similar values of IR. However, where they differ, the value entered below should be the lowest. If
they differ by a significant amount, this could be an indication of damage or poor workmanship and should be investigated. (1,000 Volt Megger
minimnum.10 M Maximum.)
Test Equipment
Make Model Serial No. Exp. Date
Cable Test
Cable Sched Info IR Test Continuity Screen/ Armour Completed By Date Agreed By
CORES SIZE
CORE TO
CORE
MOhms
CORE TO
ARMOUR
SCREEN
MOhms
CORE
Ohms
SCREEN
ARMOUR
Ohms
CONTINUITY TO
EARTH
Ohms
Remarks/Comments
Executed By Construction QC Client QA
COMPANY
SIGNATURE
PRINT NAME
DATE
COMPLETIONSfeatures and functionality
solution
The average project generates a high volume of inspection and commissioning verification documents,
which can cause an administrative burden and lead to increased costs and data that is difficult to track and
audit. By interacting directly with the model graphics, naming protocols and attributed data in the 3D
design model database and other technical design information, MODS delivers a 4D* solution that reduces
the administrative burden and at the same time provides maximum transparency and accountability
together with high visibility.
*4D is the concept of taking the 3D models – i.e. the designs and data – and incorporating a time element to ensure that
the design intent can be tracked and logged in real time using handheld devices
Current Systems:
verifyupdate report
NOTCOMPLETED
3D model interface
VM configures the 3D design model to simplify the navigation and search processes and to
make it available to all users through a web solution. There are many ways to orientate the user
around the virtual plant; e.g. by using the navigation tools, by a simple search for a tag or item
number or by scanning the barcode on the check sheet, performance record or job card. When
the item is presented, it will be highlighted to clearly show the item in its location and context.
Pausing the cursor over the item will also reveal all the technical data attributed to that
particular model item
Design breakdown structure
The design model is structured and named by system, lines, tags, primary and secondary steel,
and by all the other key items that make up the design. Behind the 3D geometry is the
attributed data, which is built up from the design specification catalogues. This intelligent
breakdown structure enables MODS to develop a unique reference data file for each item, which
is then used to filter information. Where there is no attributed data reference in the master
database, VM creates a reference to capture the whole design data in a single source.
Sub- and part-system grouping
Group reference files are created for tasks that represent multiple items, such as pipe test
parameters, instrument loops, electrical circuits and subsystems or commissioning packages.
This is a simple process of defining the model item references required for the task and creating
a group reference data set; the data sets remain flexible and can be revised by removing or
inserting new items. To facilitate subsystems for habitation or other unique activities, such as
performance testing equipment, the references in a group data set can be used more than once
with a link back to individual items for the completion acceptance status.
Master database population
To populate the master database, a standard matrix is established
that cross-references the completions and commissioning
reference files with the appropriate inspection check sheets and
commissioning performance records. VM uses this information to
attach the records to the reference data files to establish the master
database. Once the matrix is established, it can be used to
standardise the process throughout the company. There will likely
be variations, but they can be controlled by establishing a project
specific matrix that is fully accountable and auditable.
Population of records
VM is an interactive system that, when possible, interacts with the
information in the model database and other technical
specifications and data sheets to auto-populate the records. On
average, over thirty per cent of information is transferred
automatically, which reduces the manual intervention, improves
quality and minimises costs.
COMPLETIONSfeatures and functionality
Field execution
Barcodes are used to identify and control the
data input. Each reference is a unique item in
the process, and by scanning the barcode on
single items or by entering the reference
number for group data references into a
handheld device, the relevant input
requirements will be presented for editing
and sign off. Furthermore, the information is
recorded on the device and synchronised with
the master database, which updates the
system automatically. The handheld devices
are intrinsically safe, so they can be used in
hazardous areas. When the status is recorded
in the master database as complete, the
schedule will be updated in the activity
manager to reflect the progress.
Punch item management
VM Completions has a comprehensive punch
item management system that uses the 3D
model to visualise all punch items.
Preservation
Using the same principle as completions , VM
integrates a preservation requirement matrix
into the completions and commissioning
module using the intelligent data to define
the preservation requirements and an activity
manager to develop and maintain an
accountable preservation programme. The
preservation programme notifies the required
responsible person to perform the activities as
well as archiving all the recorded records
against the TAGGED item to ensure
accountability and transparency.
Document hub:
During construction, the VM Document Hub
allows the system to have critical
documentation linked to relevant TAG items,
thus allowing easy access of data during the
commissioning phase, thereby allowing the
commissioning team easy access to data such
as System Limits, P&IDs, MTRs, FAT
acceptance records, etc.
COMPLETIONSfeatures and functionality
Why should you use VM Completions?
Direct benefits:
• Dramatically reduces the administration process during set-up.
• Removes an entire administrative process in the field due
to the use of handheld devices for carrying out inspections,
testing and performance verification and reporting activities.
• Utilising the information direct from the 3D model helps
to minimise mistakes and makes it easy to perform quality
checks against the model's engineering data.
• Improved productivity due to access to information direct
from source.
• Improved productivity due to automatic uploading of
information to the 3D model and management reporting
systems.
• Standardised visible process that is easy to understand.
Indirect benefits:
• Integrated collaborative environment means that progress
is visible to all stakeholders
• Utilising and updating direct to the 3D model means that all
stakeholders can see, graphically, the systems in question and
this ensures transparency and enables any errors to be picked
up quickly, thus minimising costs and reducing the risk of
poor quality.
• Increased transparency and visibility improves confidence in
the processes and ensures a smooth handover.
Our solution reduces the administrative burden
and bridges the interface between construction,
commissioning and operations
S
ave Time & Cos
ts
AccurateR
eporting Barco
des&RFID’sStr
ategies
Cloud
Based
C
ollaboration
IntegrityAss
urance

More Related Content

Viewers also liked

Viewers also liked (12)

PARADOJA
PARADOJAPARADOJA
PARADOJA
 
Función
FunciónFunción
Función
 
婉臻
婉臻婉臻
婉臻
 
Mercado venezolano
Mercado venezolanoMercado venezolano
Mercado venezolano
 
SRP 2015 Moehring Final
SRP 2015 Moehring FinalSRP 2015 Moehring Final
SRP 2015 Moehring Final
 
Estrategia generica.
Estrategia generica.Estrategia generica.
Estrategia generica.
 
Sun Laboratories Beauty Shows
Sun Laboratories Beauty ShowsSun Laboratories Beauty Shows
Sun Laboratories Beauty Shows
 
Untitled 1
Untitled 1Untitled 1
Untitled 1
 
Mercado venezolano
Mercado venezolanoMercado venezolano
Mercado venezolano
 
Virus informaticos
Virus informaticosVirus informaticos
Virus informaticos
 
Usb booteable
Usb booteableUsb booteable
Usb booteable
 
Interactive Periodic Table of Elements
Interactive Periodic Table of ElementsInteractive Periodic Table of Elements
Interactive Periodic Table of Elements
 

Similar to MODS_Completions_Brochure_low

Mirabilis design Inc - Brochure
Mirabilis design Inc - BrochureMirabilis design Inc - Brochure
Mirabilis design Inc - BrochureDeepak Shankar
 
Rorotika Self-Organising Network Solution (SON)
Rorotika Self-Organising Network Solution (SON)Rorotika Self-Organising Network Solution (SON)
Rorotika Self-Organising Network Solution (SON)Frans_Joubert
 
Rorotika son booklet - online
Rorotika   son booklet - onlineRorotika   son booklet - online
Rorotika son booklet - onlineFrans_Joubert
 
Teamcenter Integration Adapter - Datasheet
Teamcenter Integration Adapter - DatasheetTeamcenter Integration Adapter - Datasheet
Teamcenter Integration Adapter - DatasheetKovair
 
EPLAN Pro Panel 2015
EPLAN Pro Panel 2015EPLAN Pro Panel 2015
EPLAN Pro Panel 2015Nick Worrall
 
Plant design management system1
Plant design management system1Plant design management system1
Plant design management system1MathiVanan79
 
elecworks for PTC Creo - Mechatronics software - 3D CAD software
elecworks for PTC Creo - Mechatronics software - 3D CAD softwareelecworks for PTC Creo - Mechatronics software - 3D CAD software
elecworks for PTC Creo - Mechatronics software - 3D CAD softwareGuillem Fiter
 
BACnet & Building Analytics
BACnet & Building AnalyticsBACnet & Building Analytics
BACnet & Building AnalyticsFiras Obeido
 
SECURE FILE STORAGE IN THE CLOUD WITH HYBRID ENCRYPTION
SECURE FILE STORAGE IN THE CLOUD WITH HYBRID ENCRYPTIONSECURE FILE STORAGE IN THE CLOUD WITH HYBRID ENCRYPTION
SECURE FILE STORAGE IN THE CLOUD WITH HYBRID ENCRYPTIONIRJET Journal
 
Learning about Schematics Learning SolidWorks, AutoCAD, and Creo's Potential.pdf
Learning about Schematics Learning SolidWorks, AutoCAD, and Creo's Potential.pdfLearning about Schematics Learning SolidWorks, AutoCAD, and Creo's Potential.pdf
Learning about Schematics Learning SolidWorks, AutoCAD, and Creo's Potential.pdf3 HTi - Engineering Software and Solutions
 
Update CMDB Using Discovery Topology (BMC ADDM)
Update CMDB Using Discovery Topology (BMC ADDM) Update CMDB Using Discovery Topology (BMC ADDM)
Update CMDB Using Discovery Topology (BMC ADDM) Vyom Labs
 
Teklabz NE Reporting Engine Brochure
Teklabz NE Reporting Engine BrochureTeklabz NE Reporting Engine Brochure
Teklabz NE Reporting Engine BrochureRamzi Qaqish
 
3D_Evolution - Powerful multi-CAD converter
3D_Evolution - Powerful multi-CAD converter3D_Evolution - Powerful multi-CAD converter
3D_Evolution - Powerful multi-CAD converterCORETECHNOLOGIE
 
Reporting and Business Insight Brochure
Reporting and Business Insight BrochureReporting and Business Insight Brochure
Reporting and Business Insight BrochureRamzi Qaqish
 
An Integrated Simulation Tool Framework for Process Data Management
An Integrated Simulation Tool Framework for Process Data ManagementAn Integrated Simulation Tool Framework for Process Data Management
An Integrated Simulation Tool Framework for Process Data ManagementCognizant
 
Data Center Infrastructure Management(DCIM)
Data Center Infrastructure Management(DCIM)Data Center Infrastructure Management(DCIM)
Data Center Infrastructure Management(DCIM)MD. IFTEKARUL ALAM
 
TSOLogic_I-P_Overview-2016-08-16
TSOLogic_I-P_Overview-2016-08-16TSOLogic_I-P_Overview-2016-08-16
TSOLogic_I-P_Overview-2016-08-16Terence White
 

Similar to MODS_Completions_Brochure_low (20)

Mods completions
Mods completions Mods completions
Mods completions
 
Mirabilis design Inc - Brochure
Mirabilis design Inc - BrochureMirabilis design Inc - Brochure
Mirabilis design Inc - Brochure
 
Rorotika Self Organising Network (SON) Solution
Rorotika Self Organising Network (SON) SolutionRorotika Self Organising Network (SON) Solution
Rorotika Self Organising Network (SON) Solution
 
Rorotika Self-Organising Network Solution (SON)
Rorotika Self-Organising Network Solution (SON)Rorotika Self-Organising Network Solution (SON)
Rorotika Self-Organising Network Solution (SON)
 
Rorotika son booklet - online
Rorotika   son booklet - onlineRorotika   son booklet - online
Rorotika son booklet - online
 
Teamcenter Integration Adapter - Datasheet
Teamcenter Integration Adapter - DatasheetTeamcenter Integration Adapter - Datasheet
Teamcenter Integration Adapter - Datasheet
 
EPLAN Pro Panel 2015
EPLAN Pro Panel 2015EPLAN Pro Panel 2015
EPLAN Pro Panel 2015
 
Plant design management system1
Plant design management system1Plant design management system1
Plant design management system1
 
elecworks for PTC Creo - Mechatronics software - 3D CAD software
elecworks for PTC Creo - Mechatronics software - 3D CAD softwareelecworks for PTC Creo - Mechatronics software - 3D CAD software
elecworks for PTC Creo - Mechatronics software - 3D CAD software
 
BACnet & Building Analytics
BACnet & Building AnalyticsBACnet & Building Analytics
BACnet & Building Analytics
 
SECURE FILE STORAGE IN THE CLOUD WITH HYBRID ENCRYPTION
SECURE FILE STORAGE IN THE CLOUD WITH HYBRID ENCRYPTIONSECURE FILE STORAGE IN THE CLOUD WITH HYBRID ENCRYPTION
SECURE FILE STORAGE IN THE CLOUD WITH HYBRID ENCRYPTION
 
Learning about Schematics Learning SolidWorks, AutoCAD, and Creo's Potential.pdf
Learning about Schematics Learning SolidWorks, AutoCAD, and Creo's Potential.pdfLearning about Schematics Learning SolidWorks, AutoCAD, and Creo's Potential.pdf
Learning about Schematics Learning SolidWorks, AutoCAD, and Creo's Potential.pdf
 
Update CMDB Using Discovery Topology (BMC ADDM)
Update CMDB Using Discovery Topology (BMC ADDM) Update CMDB Using Discovery Topology (BMC ADDM)
Update CMDB Using Discovery Topology (BMC ADDM)
 
RUGGEDCOM REFLEX software
RUGGEDCOM REFLEX softwareRUGGEDCOM REFLEX software
RUGGEDCOM REFLEX software
 
Teklabz NE Reporting Engine Brochure
Teklabz NE Reporting Engine BrochureTeklabz NE Reporting Engine Brochure
Teklabz NE Reporting Engine Brochure
 
3D_Evolution - Powerful multi-CAD converter
3D_Evolution - Powerful multi-CAD converter3D_Evolution - Powerful multi-CAD converter
3D_Evolution - Powerful multi-CAD converter
 
Reporting and Business Insight Brochure
Reporting and Business Insight BrochureReporting and Business Insight Brochure
Reporting and Business Insight Brochure
 
An Integrated Simulation Tool Framework for Process Data Management
An Integrated Simulation Tool Framework for Process Data ManagementAn Integrated Simulation Tool Framework for Process Data Management
An Integrated Simulation Tool Framework for Process Data Management
 
Data Center Infrastructure Management(DCIM)
Data Center Infrastructure Management(DCIM)Data Center Infrastructure Management(DCIM)
Data Center Infrastructure Management(DCIM)
 
TSOLogic_I-P_Overview-2016-08-16
TSOLogic_I-P_Overview-2016-08-16TSOLogic_I-P_Overview-2016-08-16
TSOLogic_I-P_Overview-2016-08-16
 

MODS_Completions_Brochure_low

  • 1. www.modsmanagement.com COMPLETIONSCOMPLETIONS Virtual Manager (VM) Completions constitute a multi-discipline web-based solution that provides you with a complete interactive picture from a single source. The MODS VM Completion module can be utilized as a traditional 2D system completions database or it can be linked to your existing 3D design model to help you achieve greater efficiency, whereby, by linking to the model, we provide a unique 4D Completions and Commissioning Management System (CCMS) solution. Here, the processes are completely integrated with the 3D model database to deliver a comprehensive inspection, testing, commissioning and preservation programme that is at the same time transparent, accountable, affordable and has high visibility. Automate & Collaborate A seamless transition from area construction to systems completion
  • 2. COMPLETIONS Provides access to the CCMS from a web-based single source. Cross-references the 3D Model data with tag and line lists and other key documents to ensure complete capture. Interacts with the design model attributes to establish the CCMS structure. Develops an integrated completions matrix for corporate standardisation. Populates the CCMS with check lists and records automatically from a pre-defined matrix. Provides visibility for completions and commissioning processes through the 3D design model with colour- coded progress tracking. Calculates volumes for the medium used in the strength and leak testing using the attributed data in the model. Incorporates an integrated Scheduling module. Develops critical paths for the completions and commissioning. Incorporates an integrated Preservation function. Includes barcode control for all modules and processes. Includes an integrated Materials Management module. Automatically generates and monitors costs through an Activity Manager. Incorporates the ability to update the system from paper copy barcodes. Includes an Information Hub to upload reference documents, such as drawings and line lists. Incorporates integrated access to other software packages. Commissioning procedure tracking Smart Plant / P&ID function for high-level engineering documents Incorporates the ability to report completions and commissioning records through a handheld device. Incorporates an integrated Job Setting that is automatically populated (40%). Incorporates an integrated 3D Joint Integrity Management module. Includes the ability to create dedicated loop testing parameters. Provides an efficient system for the holding or management of change processes. Can interface with external planning systems. Has the ability to provide live volumetric status reports online. Integrates vendor’s skids or equipment either through the CAD files or key documents. functionality Improves handover to operations Reduced project schedules by improving the interfaces with the build contractor Accountable integrity through the direct interface with the design data and reducing manual input Standardise workflow processes that will improve estimating and provide a bench marking capability Virtual Manager’s 4D solution provides the optimum system for delivering integrity and equipment performance records. • • • • Assurance for startup E03A ELECTRICAL Page 1 of 1 Mechanical Completion L.V. POWER CABLES Site Phase Area Location System Description Work Pack MC Package Description Print Date Tag/Cable No. Description Drawing No. From To Voltage Size Type Core No. Check Description Status Punch List Y/N Remarks 1 Correct cable type as per electrical cable schedule and drawings 2 Labelling, numbering and ferruling correct. 3 Bending radius and stretch prevention according to specification. 4 Glands and lock-nuts correctly installed. 5 Ensure gland certificates meet the area classification requirements. 6 Inspect cable glands for tightness and ensure correct gland has been used for the size and type of cable installed, and where specified, insulating gland adaptors have been fitted. 7 Ensure gland plates for single core cables have been manufactured from non-magnetic materials where applicable. 8 Carry out IR and continuity tests in all cores, screen, earth and armour, note in table below 9 Check terminations and earth connections are tight and correct 10 Where conductors have been terminated using crimped connectors, ensure the correct size of crimped connector has been used. 11 Spare cores earthed and tightened and with correct identification. 12 Screen is correctly made off 13 Cable mechanically protected where applicable. 14 Labelling, numbering and ferruling correct. NOTE: Usually individual conductors in a cable will have similar values of IR. However, where they differ, the value entered below should be the lowest. If they differ by a significant amount, this could be an indication of damage or poor workmanship and should be investigated. (1,000 Volt Megger minimnum.10 M Maximum.) Test Equipment Make Model Serial No. Exp. Date Cable Test Cable Sched Info IR Test Continuity Screen/ Armour Completed By Date Agreed By CORES SIZE CORE TO CORE MOhms CORE TO ARMOUR SCREEN MOhms CORE Ohms SCREEN ARMOUR Ohms CONTINUITY TO EARTH Ohms Remarks/Comments Executed By Construction QC Client QA COMPANY SIGNATURE PRINT NAME DATE
  • 3. COMPLETIONSfeatures and functionality solution The average project generates a high volume of inspection and commissioning verification documents, which can cause an administrative burden and lead to increased costs and data that is difficult to track and audit. By interacting directly with the model graphics, naming protocols and attributed data in the 3D design model database and other technical design information, MODS delivers a 4D* solution that reduces the administrative burden and at the same time provides maximum transparency and accountability together with high visibility. *4D is the concept of taking the 3D models – i.e. the designs and data – and incorporating a time element to ensure that the design intent can be tracked and logged in real time using handheld devices Current Systems: verifyupdate report NOTCOMPLETED
  • 4. 3D model interface VM configures the 3D design model to simplify the navigation and search processes and to make it available to all users through a web solution. There are many ways to orientate the user around the virtual plant; e.g. by using the navigation tools, by a simple search for a tag or item number or by scanning the barcode on the check sheet, performance record or job card. When the item is presented, it will be highlighted to clearly show the item in its location and context. Pausing the cursor over the item will also reveal all the technical data attributed to that particular model item Design breakdown structure The design model is structured and named by system, lines, tags, primary and secondary steel, and by all the other key items that make up the design. Behind the 3D geometry is the attributed data, which is built up from the design specification catalogues. This intelligent breakdown structure enables MODS to develop a unique reference data file for each item, which is then used to filter information. Where there is no attributed data reference in the master database, VM creates a reference to capture the whole design data in a single source. Sub- and part-system grouping Group reference files are created for tasks that represent multiple items, such as pipe test parameters, instrument loops, electrical circuits and subsystems or commissioning packages. This is a simple process of defining the model item references required for the task and creating a group reference data set; the data sets remain flexible and can be revised by removing or inserting new items. To facilitate subsystems for habitation or other unique activities, such as performance testing equipment, the references in a group data set can be used more than once with a link back to individual items for the completion acceptance status. Master database population To populate the master database, a standard matrix is established that cross-references the completions and commissioning reference files with the appropriate inspection check sheets and commissioning performance records. VM uses this information to attach the records to the reference data files to establish the master database. Once the matrix is established, it can be used to standardise the process throughout the company. There will likely be variations, but they can be controlled by establishing a project specific matrix that is fully accountable and auditable. Population of records VM is an interactive system that, when possible, interacts with the information in the model database and other technical specifications and data sheets to auto-populate the records. On average, over thirty per cent of information is transferred automatically, which reduces the manual intervention, improves quality and minimises costs. COMPLETIONSfeatures and functionality
  • 5. Field execution Barcodes are used to identify and control the data input. Each reference is a unique item in the process, and by scanning the barcode on single items or by entering the reference number for group data references into a handheld device, the relevant input requirements will be presented for editing and sign off. Furthermore, the information is recorded on the device and synchronised with the master database, which updates the system automatically. The handheld devices are intrinsically safe, so they can be used in hazardous areas. When the status is recorded in the master database as complete, the schedule will be updated in the activity manager to reflect the progress. Punch item management VM Completions has a comprehensive punch item management system that uses the 3D model to visualise all punch items. Preservation Using the same principle as completions , VM integrates a preservation requirement matrix into the completions and commissioning module using the intelligent data to define the preservation requirements and an activity manager to develop and maintain an accountable preservation programme. The preservation programme notifies the required responsible person to perform the activities as well as archiving all the recorded records against the TAGGED item to ensure accountability and transparency. Document hub: During construction, the VM Document Hub allows the system to have critical documentation linked to relevant TAG items, thus allowing easy access of data during the commissioning phase, thereby allowing the commissioning team easy access to data such as System Limits, P&IDs, MTRs, FAT acceptance records, etc. COMPLETIONSfeatures and functionality Why should you use VM Completions? Direct benefits: • Dramatically reduces the administration process during set-up. • Removes an entire administrative process in the field due to the use of handheld devices for carrying out inspections, testing and performance verification and reporting activities. • Utilising the information direct from the 3D model helps to minimise mistakes and makes it easy to perform quality checks against the model's engineering data. • Improved productivity due to access to information direct from source. • Improved productivity due to automatic uploading of information to the 3D model and management reporting systems. • Standardised visible process that is easy to understand. Indirect benefits: • Integrated collaborative environment means that progress is visible to all stakeholders • Utilising and updating direct to the 3D model means that all stakeholders can see, graphically, the systems in question and this ensures transparency and enables any errors to be picked up quickly, thus minimising costs and reducing the risk of poor quality. • Increased transparency and visibility improves confidence in the processes and ensures a smooth handover. Our solution reduces the administrative burden and bridges the interface between construction, commissioning and operations S ave Time & Cos ts AccurateR eporting Barco des&RFID’sStr ategies Cloud Based C ollaboration IntegrityAss urance