1.0 MOC-Series in Brief
The MOC-Series is a high performance suspension system for combat helmets that exceeds military require-
ments for blunt-impact protection specified in AR/PD 10-02, Rev. A, with Change 6 (16 December 2013).
Developmental Testing & Evaluation performed by an accredited laboratory has shown that, at a drop speed
of 10 feet per second (fps), the system limited mean peak head acceleration to 73.6G (gravitational constant)
and maximum peak head acceleration to 107.4G under all environmental conditions. These figures are sub-
stantially below the specified 150G threshold, surpassing the blunt-impact protection of the current 7-pad
system used in the ACH.
The MOC-Series pads are light-weight and designed for practical and simple use in terms of manufacturing,
logistics, installation, and cleaning.
2.0 Facing Challenges of Global Armed Forces
One of the most important challenges facing armed services around the globe is the large number of trau-
matic-brain injuries (TBIs) suffered by soldiers during training and deployment. Combat helmets are the main
line of defense against TBIs; however, the suspension systems currently used in helmets do not provide the
desired level of protection against blunt impacts throughout a full range of environmental conditions. As a
result, soldiers are at risk of suffering impact-induced TBIs that could be prevented or reduced in severity if
their combat helmets were equipped with a better, more protective suspension system.
3.0 The MOC-Series Padding Solution
A7 Helmet Systems developed the MOC-Series adjustable suspension and padding system. Constructed
of our proprietary foam material, BIORMRTM
, the system protects against blunt impacts across a full range
of militarily-relevant temperatures (14°F – 130°F). As shown by laboratory data included with this paper, the
MOC-Series provides significantly improved blunt-impact protection than the 7-pad system currently used.
MOC-SeriesMaximum Operational Capability
Helmet Suspension
and Padding System
The MOC-34 (left) and MOC-33 (right) are both constructed using A7’s proprietary foam, BIORMRTM
. Differences between the systems are
mostly cosmetic — the MOC-34 being a single piece with improved airflow, and the MOC-33 available in three parts for improved adjustability.
For instance, an ACH equipped with the MOC-34 recently recorded a maximum peak head acceleration of
107G at 10fps as compared to 278G recorded by an ACH equipped with a 7-pad system.1
Such a substantial
improvement in protection could reduce TBIs and their attendant costs to soldiers, missions, and taxpayers.
The MOC-Series is the result of several years of research by A7 Helmet Systems aimed at creating a sus-
pension system for combat helmets that provides soldiers with the highest level of protection against
blunt-force trauma while maximizing comfort and stability and minimizing weight. The system is based on
a patents-pending design that consists of four layers of material: a base layer of material that securely at-
taches the MOC-Series to the hook-and-loop disks adhered to the inside of the helmet shell and reinforces
the connecting arms for greater durability; two layers of closed-cell foam that form the structure of the pad
and provide the superior impact attenuation; and a soft layer of moisture-wicking material that contacts the
soldier’s head. The use of closed-cell foam is important because it eliminates the issues of water absorption
and the degradation of open-cell foams caused over time by condensation if the open-cell materials are
encased in a pouch to prevent water absorption. The current 7-pad system uses open-cell foam materials
encased in a plastic pouch and is prone to such problems.
The MOC-Series was designed as a direct replacement for the current 7-pad system, including employing
pads that are only ¾” thick. This means that it could provide soldiers with increased protection against blunt-
impacts without forcing them to wear a larger, heavier helmet shell. The design of the MOC-Series and its
use of flexible materials also will allow a soldier to easily adjust the pads in the temple and nape areas to
accommodate his or her particular head shape. This will add to the stability and comfort of a helmet wheth-
er or not it is outfitted with night-vision goggles (NVGs) or other accessories. The added comfort should
encourage soldiers to wear their helmets anytime they face danger rather than removing them to relieve the
types of discomfort and headaches frequently associated with the use of the current 7-pad system.
This combination of reduced load and increased comfort and stability should help increase soldiers’ concen-
tration and agility in the field and help them avoid all types of injuries in the first place. However, because
that is not always possible, the outstanding blunt-impact performance of the MOC-Series will help keep the
incident rate and severity of TBIs to a minimum. Accordingly, the MOC-Series could make an important and
effective contribution to the proposed ACH Gen II.
1	 USAARL Report No. 2005-12, Blunt Impact Performance Characteristics of the Advanced
Combat Helmet and the Paratrooper and Infantry Personnel Armor System for Ground Troops Helmet.
34 33
4.0 Laboratory Test Results*
Developmental Testing & Evaluation (DT&E) DT&E was performed by Chesapeake Testing Services, Inc.,
(Chesapeake) with the MOC-34 installed in a size-large ACH manufactured by Gentex Corporation. Chesa-
peake is an independent, third-party, DOD-accredited laboratory. The testing was done in February, 2015,
in accordance with AR/PD 10-02. Drop tests performed by Chesapeake measured the impact forces for
two successive impacts at seven different areas of the helmet shell after the suspension system had been
conditioned at three different temperatures (14°F, 70°F, and 130°F). Full results of the tests can be found in
the appendices to this paper.
The following tables summarize the whole range results at the drop rate of 10 fps:
A7 MOC-34 System
Environmental Temperature
(G)-forces Ambient (70°F) Cold (14°F) Hot (130°F) Overall
Mean 58.84 93.1 68.81 73.58
Standard Deviation 16.17 11.92 16.14 20.5
Maximum G 98.8 107.4 104.7 107.4
Observations 14 14 14 42
(G)-forces Crown Front Back Left Right L Nape R Nape
Mean 72.7 94.1 75.9 68.9 71.1 62.8 69.4
Standard Deviation 26.3 8.4 24.4 20.5 22.4 11.1 18.8
Maximum G 107.4 104.7 107 95.2 99.7 73.1 91.2
Observations 6 6 6 6 6 6 6
CURRENT
SYSTEM
OVERALL TEST RESULTS found that the
MOC-34 reduced the amount of impact
G forces by more than 25% over the
current 7-Pad system.
107G
IMPACT
74G
IMPACT
0
30
60
90
120
150
DROP TEST RESULTS *
MOC-34 System Versus Current 7-Pad System
Average (Mean) results of G Forces
CURRENT
7-PAD
Ambient
(70°F)
Cold
(14°F)
Hot
(130°F)
ENVIRONMENTAL TEMPERATURE OVERALL
0
30
60
90
120
150
0
30
60
90
120
150
GsExertedOnImpact
LOWERTHEBETTER
* Helmets are dropped at 10 FPD (Feet per Second) with padding system installed and seven pound head form.
Thus, the MOC-34’s overall mean of 73.58G is less than one-half of the 150G threshold specified in the pur-
chase description and the highest recorded peak head acceleration for all of the drops was 107.4G, or more
than 40G below the threshold. To put those numbers in context, the following are tables comprised of data
taken from the 2005 report prepared by the USAARL regarding testing it performed pursuant to AR/PD 10-
02 on an ACH outfitted with the current 7-pad suspension system.
Current 7-Pad System
Environmental Temperature
(G)-forces Ambient (70°F) Cold (14°F) Hot (130°F) Overall
Mean 75 116 131 107
Standard Deviation 9 18 60 43
Maximum G 102 164 278 278
Observations 42 42 42 126
(G)-forces Crown Front Back Left Right L Nape R Nape
Mean 114 98 131 85 87 127 109
Standard Deviation 32 23 61 23 20 59 46
Maximum G 164 140 278 124 124 276 228
Observations 18 18 18 18 18 18 18
An analysis of these statistics shows that the MOC-34 outperformed the 7-pad system in every category of
blunt-impact protection.
5.0 Production Capacity, Logistics, Installation, and Maintenance
The MOC-34 was designed for simplicity in terms of manufacturing, logistics, installation, and cleaning.
Production capacity for the MOC-34 is practically unlimited using domestically-sourced materials that com-
ply with the Berry Amendment (10 U.S.C 2533a) and manufacturers that are certified for quality manage-
ment pursuant to ISO 9001:2008. Notably, A7HS has an existing relationship with San Antonio Lighthouse
for the Blind, San Antonio, TX, an affiliate of the National Industries for the Blind (NIB), so there should be no
issue if the requirement of AR/PD 10-02 that the mandatory source of suspension systems for the ACH is a
NIB affiliate is also made a requirement for the ACH Gen II.
Logistically, the one-size-fits-most (XS through XL) design of the MOC-34 will streamline initial procure-
ment and sustainment initiatives. The system also ships and stores flat so as to minimize transportation and
storage costs and reduce its logistical footprint. Because of the closed-cell nature of the foam materials and
their imperviousness to moisture and degradation, shelf life is estimated at three years or more.
With regard to installation, because the MOC-34 attaches to a helmet shell via hook-and-loop disks in the
same manner as the current 7-pad system, a soldier in the field could install it in a matter of minutes without
the need for any tools. Fine adjustments to maximize comfort in the temple and nape areas could then be
accomplished in a matter of seconds and as frequently as the soldier desires by simply taking off the helmet,
pulling one or more of the pads away from the hook-and-loop disk, repositioning the pad(s) to the desired
A7 Helmet Systems
8111 Mainland Drive
Suite 104-442
San Antonio, TX 78240
KERRY HARRIS • DIRECTOR
inquiries@angel7industries.com
position, and putting the helmet back on to check the comfort level. This also means that the MOC-34
could transition into any program in which a hook-and-loop fastening system is currently used (e.g., ACH,
Enhanced Combat Helmet (ECH), Personnel Armor System for Ground Troops (PASGT), Modular Integrated
Communications Helmet (MICH), and the Lightweight Helmet (LWH)).
As for washability, because the MOC-34 uses high-performance coverings that meet military specifications,
the system can be laundered in accordance with the requirements of AR/PD 10-02.
6.0 Costs
Notwithstanding the significant increase in blunt-impact the MOC-34 offers in comparison to the current
7-pad system, A7HS projects that it will be able to sell its system to the government for approximately
$54.00 per unit, or only a slight increase over the cost of the 7-pad system.
APPENDICES:
FULL TEST RESULTS
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: Angel 7 Industries
Job No.: 2413-007
Test Date: 2/20/2015
Page No.: 1 of 8
Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15
Sample Description: ACH Helmet
Size: Large Model: ACH (H-Back) Date Received: 2/19/2015
Weight: 3.18 lbs. Mfg. Date: NA Via: Fed-Ex
Color: Green Lot No.: NA Returned: NA
Setup
Temperature: 72.1 °F Time Gate Flag : 25.4 mm Tester: Kent Jordan
Humidity: 30 % Mount Type: FMVSS 218 Recorder: Kent Jordan
Conditioning: Ambient Mount Size: C D.O.T Filtering: CFC 1000 1650Hz
Impact Type: Impact Uni-Axial Drop Mass: 4.959 kg Sensitivity: 10.82 mV/G
Applicable Standards or Procedures
(1) D.O.T FMVSS 218 (November 30 2006)
(2) ATC-MMTB-029 Rev D (September 13 2012)
(3) AR/PD 10-02 Rev A Change 3
Requirement
Number
Inspection
Pass/Fail
Inspection Requirement
1
NA
There shall be no physical damage to the helmet shell such as shell fracture, defined as a
separation/split of the ballistic material through the entire thickness of the helmet shell,
or indentation depth in excess of 0.2 inches present after impact testing (delamination and
ply separation are permitted).
2 Pass There should be no damage to any part of the retention system or pad system.
Test Results
Impact
Number
Impact
Location
Pass/Fail
Criteria
(<150 G’s )
Peak
Acc.
(G)
Impact
Velocity
(ft/s)
Drop
Height
(in)
Strike
Energy
(J)
Head Injury
Criteria
(HIC)
Severity
Index
(SI)
Impact
Deformation
(in)
1 Crown Pass 64.5 10.0 19.6 23.1 129.0 145.0 Not
Available2 Crown Pass 64.1 10.0 19.6 23.2 132.0 147.0
3 Front Pass 90.3 10.0 19.6 23.2 181.0 217.0 Not
Available4 Front Pass 98.8 10.0 19.6 23.2 205.0 249.0
5 Back Pass 53.3 10.1 19.6 23.3 108.0 119.0 Not
Available6 Back Pass 55.1 10.0 19.6 23.3 116.0 128.0
7 Left Pass 53.3 10.1 19.6 23.3 96.0 106.0 Not
Available8 Left Pass 51.0 10.1 19.6 23.4 102.0 112.0
9 Right Pass 51.4 10.1 19.6 23.5 92.0 102.0 Not
Available10 Right Pass 51.0 10.0 19.6 23.1 96.0 106.0
11 Left Nape Pass 49.2 10.1 19.6 23.3 79.0 90.0 Not
Available12 Left Nape Pass 48.3 10.1 19.6 23.3 83.0 94.0
13 Right Nape Pass 46.5 10.1 19.6 23.3 76.0 85.0 Not
Available14 Right Nape Pass 46.9 10.0 19.6 23.2 79.0 88.0
Remarks:
The Head Positioning Index (H.P.I) was defined at 2.3 inches and measured from the brim of the helmet to the basic plane on the
headform for all impacts.
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: Angel 7 Industries
Job No.: 2413-007
Test Date: 2/20/2015
Page No.: 2 of 8
Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15
Test Results (continued)
Impact Number: 1
Impact Time: 07:56 AM
Impact Date: 2/20/2015
Conditioning: Ambient
Impact Location: Crown
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
64.5
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 10 off
horizontal.
Impact Number: 2
Time: 07:57 AM
Date: 2/20/2015
Conditioning: Ambient
Impact Location: Crown
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
64.1
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 10 off
horizontal.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: Angel 7 Industries
Job No.: 2413-007
Test Date: 2/20/2015
Page No.: 3 of 8
Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15
Test Results (continued)
Impact Number: 3
Impact Time: 08:04 AM
Impact Date: 2/20/2015
Conditioning: Ambient
Impact Location: Front
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
90.3
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 26 off vertical.
(NOTE: The anvil is moved above
any NVG hole to prevent a direct
impact at this location)
Impact Number: 4
Time: 08:05 AM
Date: 2/20/2015
Conditioning: Ambient
Impact Location: Front
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
98.8
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 26 off vertical.
(NOTE: The anvil is moved above
any NVG hole to prevent a direct
impact at this location)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: Angel 7 Industries
Job No.: 2413-007
Test Date: 2/20/2015
Page No.: 4 of 8
Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15
Test Results (continued)
Impact Number: 5
Impact Time: 08:12 AM
Impact Date: 2/20/2015
Conditioning: Ambient
Impact Location: Back
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
53.3
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
Impact Number: 6
Time: 08:14 AM
Date: 2/20/2015
Conditioning: Ambient
Impact Location: Back
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
55.1
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: Angel 7 Industries
Job No.: 2413-007
Test Date: 2/20/2015
Page No.: 5 of 8
Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15
Test Results (continued)
Impact Number: 7
Impact Time: 08:23 AM
Impact Date: 2/20/2015
Conditioning: Ambient
Impact Location: Left
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
53.3
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
Impact Number: 8
Time: 08:24 AM
Date: 2/20/2015
Conditioning: Ambient
Impact Location: Left
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
51.0
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: Angel 7 Industries
Job No.: 2413-007
Test Date: 2/20/2015
Page No.: 6 of 8
Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15
Test Results (continued)
Impact Number: 9
Impact Time: 08:31 AM
Impact Date: 2/20/2015
Conditioning: Ambient
Impact Location: Right
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
51.4
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform 25 off vertical.
Impact Number: 10
Time: 08:32 AM
Date: 2/20/2015
Conditioning: Ambient
Impact Location: Right
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
51.0
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform 25 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: Angel 7 Industries
Job No.: 2413-007
Test Date: 2/20/2015
Page No.: 7 of 8
Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15
Test Results (continued)
Impact Number: 11
Impact Time: 08:43 AM
Impact Date: 2/20/2015
Conditioning: Ambient
Impact Location: Left Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
49.2
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the left,
0 off vertical.
Impact Number: 12
Time: 08:44 AM
Date: 2/20/2015
Conditioning: Ambient
Impact Location: Left Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
48.3
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the left,
0 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: Angel 7 Industries
Job No.: 2413-007
Test Date: 2/20/2015
Page No.: 8 of 8
Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15
Test Results (continued)
Impact Number: 13
Impact Time: 08:54 AM
Impact Date: 2/20/2015
Conditioning: Ambient
Impact Location: Right Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
46.5
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the right,
0 off vertical.
Impact Number: 14
Time: 08:55 AM
Date: 2/20/2015
Conditioning: Ambient
Impact Location: Right Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
46.9
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the right,
0 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/24/2015
Page No.: 1 of 8
Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold
Sample Description: ACH Helmet
Size: Large Model: ACH (H-Back) Date Received: 2/19/2015
Weight: 3.18 lbs. Mfg. Date: NA Via: UPS
Color: Green Lot No.: NA Returned: UPS
Setup
Temperature: 70.3 °F Time Gate Flag : 25.4 mm Tester: Kent Jordan
Humidity: 30 % Mount Type: FMVSS 218 Recorder: Kent Jordan
Conditioning: 14°F Mount Size: C D.O.T Filtering: CFC 1000 1650Hz
Impact Type: Impact Uni-Axial Drop Mass: 4.959 kg Sensitivity: 10.82 mV/G
Applicable Standards or Procedures
(1) D.O.T FMVSS 218 (November 30 2006)
(2) ATC-MMTB-029 Rev D (September 13 2012)
(3) AR/PD 10-02 Rev A Change 3
Requirement
Number
Inspection
Pass/Fail
Inspection Requirement
1
NA
There shall be no physical damage to the helmet shell such as shell fracture, defined as a
separation/split of the ballistic material through the entire thickness of the helmet shell,
or indentation depth in excess of 0.15 inches present after impact testing (delamination
and ply separation are permitted).
2 Pass There should be no damage to any part of the retention system or pad system.
Test Results
Impact
Number
Impact
Location
Pass/Fail
Criteria
(<150 G’s )
Peak
Acc.
(G)
Impact
Velocity
(ft/s)
Drop
Height
(in)
Strike
Energy
(J)
Head Injury
Criteria
(HIC)
Severity
Index
(SI)
Impact
Deformation
(in)
1 Crown Pass 103.3 10.0 19.6 23.0 265.0 309.0 Not
Available2 Crown Pass 107.4 10.0 19.6 23.0 304.0 352.0
3 Front Pass 82.1 10.0 19.6 23.3 177.0 198.0 Not
Available4 Front Pass 88.9 10.0 19.6 23.2 216.0 247.0
5 Back Pass 107.0 9.9 19.6 22.6 250.0 298.0 Not
Available6 Back Pass 106.1 9.9 19.6 22.7 242.0 285.0
7 Left Pass 94.8 10.1 19.6 23.6 173.0 214.0 Not
Available8 Left Pass 95.2 10.1 19.6 23.5 169.0 212.0
9 Right Pass 99.7 10.1 19.6 23.5 188.0 230.0 Not
Available10 Right Pass 98.8 10.1 19.6 23.4 183.0 226.0
11 Left Nape Pass 73.1 10.0 19.6 23.2 130.0 152.0 Not
Available12 Left Nape Pass 71.3 10.1 19.6 23.3 125.0 146.0
13 Right Nape Pass 84.4 10.0 19.6 23.1 155.0 181.0 Not
Available14 Right Nape Pass 91.2 10.0 19.6 23.2 163.0 195.0
Remarks:
The Head Positioning Index (H.P.I) was defined at 2.3 inches and measured from the brim of the helmet to the basic plane on the
headform for all impacts.
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/24/2015
Page No.: 2 of 8
Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold
Test Results (continued)
Impact Number: 1
Impact Time: 11:05 AM
Impact Date: 2/24/2015
Conditioning: 14°F
Impact Location: Crown
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
103.3
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 10 off
horizontal.
Impact Number: 2
Time: 11:06 AM
Date: 2/24/2015
Conditioning: 14°F
Impact Location: Crown
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
107.4
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 10 off
horizontal.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/24/2015
Page No.: 3 of 8
Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold
Test Results (continued)
Impact Number: 3
Impact Time: 11:25 AM
Impact Date: 2/24/2015
Conditioning: 14°F
Impact Location: Front
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
82.1
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 26 off vertical.
(NOTE: The anvil is moved above
any NVG hole to prevent a direct
impact at this location)
Impact Number: 4
Time: 11:26 AM
Date: 2/24/2015
Conditioning: 14°F
Impact Location: Front
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
88.9
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 26 off vertical.
(NOTE: The anvil is moved above
any NVG hole to prevent a direct
impact at this location)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/24/2015
Page No.: 4 of 8
Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold
Test Results (continued)
Impact Number: 5
Impact Time: 11:45 AM
Impact Date: 2/24/2015
Conditioning: 14°F
Impact Location: Back
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
9.9
Peak Acc.
(G):
107.0
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
Impact Number: 6
Time: 11:46 AM
Date: 2/24/2015
Conditioning: 14°F
Impact Location: Back
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
9.9
Peak Acc.
(G):
106.1
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/24/2015
Page No.: 5 of 8
Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold
Test Results (continued)
Impact Number: 7
Impact Time: 12:45 PM
Impact Date: 2/24/2015
Conditioning: 14°F
Impact Location: Left
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
94.8
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
Impact Number: 8
Time: 12:46 PM
Date: 2/24/2015
Conditioning: 14°F
Impact Location: Left
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
95.2
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/24/2015
Page No.: 6 of 8
Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold
Test Results (continued)
Impact Number: 9
Impact Time: 01:05 PM
Impact Date: 2/24/2015
Conditioning: 14°F
Impact Location: Right
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
99.7
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform 25 off vertical.
Impact Number: 10
Time: 01:06 PM
Date: 2/24/2015
Conditioning: 14°F
Impact Location: Right
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
98.8
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform 25 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/24/2015
Page No.: 7 of 8
Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold
Test Results (continued)
Impact Number: 11
Impact Time: 01:25 PM
Impact Date: 2/24/2015
Conditioning: 14°F
Impact Location: Left Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
73.1
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the left,
0 off vertical.
Impact Number: 12
Time: 01:26 PM
Date: 2/24/2015
Conditioning: 14°F
Impact Location: Left Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
71.3
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the left,
0 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/24/2015
Page No.: 8 of 8
Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold
Test Results (continued)
Impact Number: 13
Impact Time: 01:44 PM
Impact Date: 2/24/2015
Conditioning: 14°F
Impact Location: Right Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
84.4
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the right,
0 off vertical.
Impact Number: 14
Time: 01:45 PM
Date: 2/24/2015
Conditioning: 14°F
Impact Location: Right Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
91.2
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the right,
0 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/23/2015
Page No.: 1 of 8
Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot
Sample Description: ACH Helmet
Size: Large Model: ACH (H-Back) Date Received: 2/19/2015
Weight: 3.18 lbs. Mfg. Date: NA Via: UPS
Color: Green Lot No.: NA Returned: UPS
Setup
Temperature: 70.3 °F Time Gate Flag : 25.4 mm Tester: Kent Jordan
Humidity: 30 % Mount Type: FMVSS 218 Recorder: Kent Jordan
Conditioning: 130°F Mount Size: C D.O.T Filtering: CFC 1000 1650Hz
Impact Type: Impact Uni-Axial Drop Mass: 4.959 kg Sensitivity: 10.82 mV/G
Applicable Standards or Procedures
(1) D.O.T FMVSS 218 (November 30 2006)
(2) ATC-MMTB-029 Rev D (September 13 2012)
(3) AR/PD 10-02 Rev A Change 3
Requirement
Number
Inspection
Pass/Fail
Inspection Requirement
1
NA
There shall be no physical damage to the helmet shell such as shell fracture, defined as a
separation/split of the ballistic material through the entire thickness of the helmet shell,
or indentation depth in excess of 0.15 inches present after impact testing (delamination
and ply separation are permitted).
2 Pass There should be no damage to any part of the retention system or pad system.
Test Results
Impact
Number
Impact
Location
Pass/Fail
Criteria
(<150 G’s )
Peak
Acc.
(G)
Impact
Velocity
(ft/s)
Drop
Height
(in)
Strike
Energy
(J)
Head Injury
Criteria
(HIC)
Severity
Index
(SI)
Impact
Deformation
(in)
1 Crown Pass 46.9 10.0 19.6 23.2 81.0 91.0 Not
Available2 Crown Pass 50.1 10.1 19.6 23.3 88.0 100.0
3 Crown Pass 104.7 10.0 19.6 23.2 267.0 313.0 Not
Available4 Front Pass 99.7 10.0 19.6 23.1 257.0 295.0
5 Back Pass 67.2 10.0 19.6 23.1 126.0 154.0 Not
Available6 Back Pass 66.8 10.0 19.6 23.0 128.0 154.0
7 Left Pass 57.8 10.0 19.6 23.0 100.0 125.0 Not
Available8 Left Pass 61.8 10.0 19.6 22.9 111.0 131.0
9 Right Pass 60.9 10.0 19.6 23.0 106.0 128.0 Not
Available10 Right Pass 65.0 10.0 19.6 23.0 114.0 136.0
11 Left Nape Pass 66.3 10.0 19.6 23.2 119.0 140.0 Not
Available12 Left Nape Pass 68.6 10.0 19.6 23.1 125.0 151.0
13 Right Nape Pass 72.2 10.0 19.6 22.9 170.0 198.0 Not
Available14 Right Nape Pass 75.4 10.0 19.6 23.0 148.0 182.0
Remarks:
The Head Positioning Index (H.P.I) was defined at 2.3 inches and measured from the brim of the helmet to the basic plane on the
headform for all impacts.
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/23/2015
Page No.: 2 of 8
Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot
Test Results (continued)
Impact Number: 1
Impact Time: 07:38 AM
Impact Date: 2/23/2015
Conditioning: 130°F
Impact Location: Crown
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
46.9
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 10 off
horizontal.
Impact Number: 2
Time: 07:39 AM
Date: 2/23/2015
Conditioning: 130°F
Impact Location: Crown
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.1
Peak Acc.
(G):
50.1
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 10 off
horizontal.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/23/2015
Page No.: 3 of 8
Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot
Test Results (continued)
Impact Number: 3
Impact Time: 07:57 AM
Impact Date: 2/23/2015
Conditioning: 130°F
Impact Location: Crown
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
104.7
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 26 off vertical.
(NOTE: The anvil is moved above
any NVG hole to prevent a direct
impact at this location)
Impact Number: 4
Time: 07:59 AM
Date: 2/23/2015
Conditioning: 130°F
Impact Location: Front
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
99.7
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 26 off vertical.
(NOTE: The anvil is moved above
any NVG hole to prevent a direct
impact at this location)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/23/2015
Page No.: 4 of 8
Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot
Test Results (continued)
Impact Number: 5
Impact Time: 08:18 AM
Impact Date: 2/23/2015
Conditioning: 130°F
Impact Location: Back
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
67.2
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
Impact Number: 6
Time: 08:19 AM
Date: 2/23/2015
Conditioning: 130°F
Impact Location: Back
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
66.8
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/23/2015
Page No.: 5 of 8
Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot
Test Results (continued)
Impact Number: 7
Impact Time: 08:38 AM
Impact Date: 2/23/2015
Conditioning: 130°F
Impact Location: Left
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
57.8
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
Impact Number: 8
Time: 08:40 AM
Date: 2/23/2015
Conditioning: 130°F
Impact Location: Left
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
61.8
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 25 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/23/2015
Page No.: 6 of 8
Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot
Test Results (continued)
Impact Number: 9
Impact Time: 08:58 AM
Impact Date: 2/23/2015
Conditioning: 130°F
Impact Location: Right
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
60.9
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform 25 off vertical.
Impact Number: 10
Time: 08:59 AM
Date: 2/23/2015
Conditioning: 130°F
Impact Location: Right
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
65.0
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform 25 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/23/2015
Page No.: 7 of 8
Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot
Test Results (continued)
Impact Number: 11
Impact Time: 09:23 AM
Impact Date: 2/23/2015
Conditioning: 130°F
Impact Location: Left Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
66.3
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the left,
0 off vertical.
Impact Number: 12
Time: 09:24 AM
Date: 2/23/2015
Conditioning: 130°F
Impact Location: Left Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
68.6
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the left,
0 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
BLUNT IMPACT PROTECTION
Chesapeake Testing
4603B Compass Point Road
Belcamp, MD 21017
Client: A7 Industries
Job No.: 2413-007
Test Date: 2/23/2015
Page No.: 8 of 8
Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot
Test Results (continued)
Impact Number: 13
Impact Time: 09:44 AM
Impact Date: 2/23/2015
Conditioning: 130°F
Impact Location: Right Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
72.2
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the right,
0 off vertical.
Impact Number: 14
Time: 09:45 AM
Date: 2/23/2015
Conditioning: 130°F
Impact Location: Right Nape
Anvil Type: Hemispherical
Impact Velocity
(ft/s):
10.0
Peak Acc.
(G):
75.4
Dwell Time over
150 G (ms):
0
Dwell Time over
200 G(ms):
0
Orientation for Impact Location:
Headform rolled 30 to the right,
0 off vertical.
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)
-20
0
20
40
60
80
100
120
0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02
Acceleration(G)
Time (s)

More Related Content

Similar to MOC-Series-Paper-Jul2015

Littelfuse fuseology selection_guide.pdf
Littelfuse fuseology selection_guide.pdfLittelfuse fuseology selection_guide.pdf
Littelfuse fuseology selection_guide.pdfBrit4
 
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Joe Hughes
 
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Dyplast Products
 
Composite propeller performance monitoring with embedded fb gs
Composite propeller performance monitoring with embedded fb gsComposite propeller performance monitoring with embedded fb gs
Composite propeller performance monitoring with embedded fb gsPhuong Dx
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsJean-Francois Saint-Marcoux
 
Taking control to the next level
Taking control to the next levelTaking control to the next level
Taking control to the next levelTJR Global
 
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET Journal
 
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...Thorne & Derrick International
 
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specification
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specification3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specification
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - SpecificationThorne & Derrick International
 
3M Cold Shrink QT-III Silicone Rubber Outdoor Cable Terminations 7600S - Inst...
3M Cold Shrink QT-III Silicone Rubber Outdoor Cable Terminations 7600S - Inst...3M Cold Shrink QT-III Silicone Rubber Outdoor Cable Terminations 7600S - Inst...
3M Cold Shrink QT-III Silicone Rubber Outdoor Cable Terminations 7600S - Inst...Thorne & Derrick International
 
IRJET- Design and Analysis of Composite Top Frame of Hydraulic Valve Test...
IRJET-  	  Design and Analysis of Composite Top Frame of Hydraulic Valve Test...IRJET-  	  Design and Analysis of Composite Top Frame of Hydraulic Valve Test...
IRJET- Design and Analysis of Composite Top Frame of Hydraulic Valve Test...IRJET Journal
 
Mosfet IPD50R380CE 50R380CE 550V 32A TO-252 New Infineon
Mosfet IPD50R380CE 50R380CE 550V 32A TO-252 New InfineonMosfet IPD50R380CE 50R380CE 550V 32A TO-252 New Infineon
Mosfet IPD50R380CE 50R380CE 550V 32A TO-252 New InfineonAUTHELECTRONIC
 
BLH Stop Drop Prevention System reducing your operations risks
BLH Stop Drop Prevention System reducing your operations  risks BLH Stop Drop Prevention System reducing your operations  risks
BLH Stop Drop Prevention System reducing your operations risks Shane Gill
 
Adaptive Laser Cladding System with Variable Spot Sizes
Adaptive Laser Cladding System with Variable Spot SizesAdaptive Laser Cladding System with Variable Spot Sizes
Adaptive Laser Cladding System with Variable Spot SizesJorge Rodríguez Araújo
 
Sunpreme Company Brochure
Sunpreme Company BrochureSunpreme Company Brochure
Sunpreme Company BrochureMike Kabealo
 
Reporte de Atenuacion de Vibraciones
Reporte de Atenuacion de VibracionesReporte de Atenuacion de Vibraciones
Reporte de Atenuacion de VibracionesManuel Huaringa Leon
 

Similar to MOC-Series-Paper-Jul2015 (20)

Littelfuse fuseology selection_guide.pdf
Littelfuse fuseology selection_guide.pdfLittelfuse fuseology selection_guide.pdf
Littelfuse fuseology selection_guide.pdf
 
PlatformOptimization
PlatformOptimizationPlatformOptimization
PlatformOptimization
 
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
 
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
 
Composite propeller performance monitoring with embedded fb gs
Composite propeller performance monitoring with embedded fb gsComposite propeller performance monitoring with embedded fb gs
Composite propeller performance monitoring with embedded fb gs
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 
Taking control to the next level
Taking control to the next levelTaking control to the next level
Taking control to the next level
 
ORBITAL ESE ACTIVE LIGHTNING ARRESTER
ORBITAL ESE ACTIVE LIGHTNING ARRESTERORBITAL ESE ACTIVE LIGHTNING ARRESTER
ORBITAL ESE ACTIVE LIGHTNING ARRESTER
 
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...IRJET-  	  Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
IRJET- Design Modifications in Cryogenic Pressure Relief Valve to Elimina...
 
Drone
DroneDrone
Drone
 
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specificat...
 
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specification
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specification3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specification
3M Cold Shrink QT-III 7600-3W and 7600 Series Cable Terminations - Specification
 
3M Cold Shrink QT-III Silicone Rubber Outdoor Cable Terminations 7600S - Inst...
3M Cold Shrink QT-III Silicone Rubber Outdoor Cable Terminations 7600S - Inst...3M Cold Shrink QT-III Silicone Rubber Outdoor Cable Terminations 7600S - Inst...
3M Cold Shrink QT-III Silicone Rubber Outdoor Cable Terminations 7600S - Inst...
 
IRJET- Design and Analysis of Composite Top Frame of Hydraulic Valve Test...
IRJET-  	  Design and Analysis of Composite Top Frame of Hydraulic Valve Test...IRJET-  	  Design and Analysis of Composite Top Frame of Hydraulic Valve Test...
IRJET- Design and Analysis of Composite Top Frame of Hydraulic Valve Test...
 
GMTAO-SDN-02-005
GMTAO-SDN-02-005GMTAO-SDN-02-005
GMTAO-SDN-02-005
 
Mosfet IPD50R380CE 50R380CE 550V 32A TO-252 New Infineon
Mosfet IPD50R380CE 50R380CE 550V 32A TO-252 New InfineonMosfet IPD50R380CE 50R380CE 550V 32A TO-252 New Infineon
Mosfet IPD50R380CE 50R380CE 550V 32A TO-252 New Infineon
 
BLH Stop Drop Prevention System reducing your operations risks
BLH Stop Drop Prevention System reducing your operations  risks BLH Stop Drop Prevention System reducing your operations  risks
BLH Stop Drop Prevention System reducing your operations risks
 
Adaptive Laser Cladding System with Variable Spot Sizes
Adaptive Laser Cladding System with Variable Spot SizesAdaptive Laser Cladding System with Variable Spot Sizes
Adaptive Laser Cladding System with Variable Spot Sizes
 
Sunpreme Company Brochure
Sunpreme Company BrochureSunpreme Company Brochure
Sunpreme Company Brochure
 
Reporte de Atenuacion de Vibraciones
Reporte de Atenuacion de VibracionesReporte de Atenuacion de Vibraciones
Reporte de Atenuacion de Vibraciones
 

MOC-Series-Paper-Jul2015

  • 1. 8111 Mainland Drive • Suite 104-442 • San Antonio, TX 78240 PHONE: 800.620.1528 • FAX: 210.520.0229 Vistit A7 on Facebook and Youtube @Angel 7 Industries www.angel7industries.com TM ANGEL 7 INDUSTRIES, LLC
  • 2. 1.0 MOC-Series in Brief The MOC-Series is a high performance suspension system for combat helmets that exceeds military require- ments for blunt-impact protection specified in AR/PD 10-02, Rev. A, with Change 6 (16 December 2013). Developmental Testing & Evaluation performed by an accredited laboratory has shown that, at a drop speed of 10 feet per second (fps), the system limited mean peak head acceleration to 73.6G (gravitational constant) and maximum peak head acceleration to 107.4G under all environmental conditions. These figures are sub- stantially below the specified 150G threshold, surpassing the blunt-impact protection of the current 7-pad system used in the ACH. The MOC-Series pads are light-weight and designed for practical and simple use in terms of manufacturing, logistics, installation, and cleaning. 2.0 Facing Challenges of Global Armed Forces One of the most important challenges facing armed services around the globe is the large number of trau- matic-brain injuries (TBIs) suffered by soldiers during training and deployment. Combat helmets are the main line of defense against TBIs; however, the suspension systems currently used in helmets do not provide the desired level of protection against blunt impacts throughout a full range of environmental conditions. As a result, soldiers are at risk of suffering impact-induced TBIs that could be prevented or reduced in severity if their combat helmets were equipped with a better, more protective suspension system. 3.0 The MOC-Series Padding Solution A7 Helmet Systems developed the MOC-Series adjustable suspension and padding system. Constructed of our proprietary foam material, BIORMRTM , the system protects against blunt impacts across a full range of militarily-relevant temperatures (14°F – 130°F). As shown by laboratory data included with this paper, the MOC-Series provides significantly improved blunt-impact protection than the 7-pad system currently used. MOC-SeriesMaximum Operational Capability Helmet Suspension and Padding System
  • 3. The MOC-34 (left) and MOC-33 (right) are both constructed using A7’s proprietary foam, BIORMRTM . Differences between the systems are mostly cosmetic — the MOC-34 being a single piece with improved airflow, and the MOC-33 available in three parts for improved adjustability. For instance, an ACH equipped with the MOC-34 recently recorded a maximum peak head acceleration of 107G at 10fps as compared to 278G recorded by an ACH equipped with a 7-pad system.1 Such a substantial improvement in protection could reduce TBIs and their attendant costs to soldiers, missions, and taxpayers. The MOC-Series is the result of several years of research by A7 Helmet Systems aimed at creating a sus- pension system for combat helmets that provides soldiers with the highest level of protection against blunt-force trauma while maximizing comfort and stability and minimizing weight. The system is based on a patents-pending design that consists of four layers of material: a base layer of material that securely at- taches the MOC-Series to the hook-and-loop disks adhered to the inside of the helmet shell and reinforces the connecting arms for greater durability; two layers of closed-cell foam that form the structure of the pad and provide the superior impact attenuation; and a soft layer of moisture-wicking material that contacts the soldier’s head. The use of closed-cell foam is important because it eliminates the issues of water absorption and the degradation of open-cell foams caused over time by condensation if the open-cell materials are encased in a pouch to prevent water absorption. The current 7-pad system uses open-cell foam materials encased in a plastic pouch and is prone to such problems. The MOC-Series was designed as a direct replacement for the current 7-pad system, including employing pads that are only ¾” thick. This means that it could provide soldiers with increased protection against blunt- impacts without forcing them to wear a larger, heavier helmet shell. The design of the MOC-Series and its use of flexible materials also will allow a soldier to easily adjust the pads in the temple and nape areas to accommodate his or her particular head shape. This will add to the stability and comfort of a helmet wheth- er or not it is outfitted with night-vision goggles (NVGs) or other accessories. The added comfort should encourage soldiers to wear their helmets anytime they face danger rather than removing them to relieve the types of discomfort and headaches frequently associated with the use of the current 7-pad system. This combination of reduced load and increased comfort and stability should help increase soldiers’ concen- tration and agility in the field and help them avoid all types of injuries in the first place. However, because that is not always possible, the outstanding blunt-impact performance of the MOC-Series will help keep the incident rate and severity of TBIs to a minimum. Accordingly, the MOC-Series could make an important and effective contribution to the proposed ACH Gen II. 1 USAARL Report No. 2005-12, Blunt Impact Performance Characteristics of the Advanced Combat Helmet and the Paratrooper and Infantry Personnel Armor System for Ground Troops Helmet. 34 33
  • 4. 4.0 Laboratory Test Results* Developmental Testing & Evaluation (DT&E) DT&E was performed by Chesapeake Testing Services, Inc., (Chesapeake) with the MOC-34 installed in a size-large ACH manufactured by Gentex Corporation. Chesa- peake is an independent, third-party, DOD-accredited laboratory. The testing was done in February, 2015, in accordance with AR/PD 10-02. Drop tests performed by Chesapeake measured the impact forces for two successive impacts at seven different areas of the helmet shell after the suspension system had been conditioned at three different temperatures (14°F, 70°F, and 130°F). Full results of the tests can be found in the appendices to this paper. The following tables summarize the whole range results at the drop rate of 10 fps: A7 MOC-34 System Environmental Temperature (G)-forces Ambient (70°F) Cold (14°F) Hot (130°F) Overall Mean 58.84 93.1 68.81 73.58 Standard Deviation 16.17 11.92 16.14 20.5 Maximum G 98.8 107.4 104.7 107.4 Observations 14 14 14 42 (G)-forces Crown Front Back Left Right L Nape R Nape Mean 72.7 94.1 75.9 68.9 71.1 62.8 69.4 Standard Deviation 26.3 8.4 24.4 20.5 22.4 11.1 18.8 Maximum G 107.4 104.7 107 95.2 99.7 73.1 91.2 Observations 6 6 6 6 6 6 6 CURRENT SYSTEM OVERALL TEST RESULTS found that the MOC-34 reduced the amount of impact G forces by more than 25% over the current 7-Pad system. 107G IMPACT 74G IMPACT 0 30 60 90 120 150 DROP TEST RESULTS * MOC-34 System Versus Current 7-Pad System Average (Mean) results of G Forces CURRENT 7-PAD Ambient (70°F) Cold (14°F) Hot (130°F) ENVIRONMENTAL TEMPERATURE OVERALL 0 30 60 90 120 150 0 30 60 90 120 150 GsExertedOnImpact LOWERTHEBETTER * Helmets are dropped at 10 FPD (Feet per Second) with padding system installed and seven pound head form.
  • 5. Thus, the MOC-34’s overall mean of 73.58G is less than one-half of the 150G threshold specified in the pur- chase description and the highest recorded peak head acceleration for all of the drops was 107.4G, or more than 40G below the threshold. To put those numbers in context, the following are tables comprised of data taken from the 2005 report prepared by the USAARL regarding testing it performed pursuant to AR/PD 10- 02 on an ACH outfitted with the current 7-pad suspension system. Current 7-Pad System Environmental Temperature (G)-forces Ambient (70°F) Cold (14°F) Hot (130°F) Overall Mean 75 116 131 107 Standard Deviation 9 18 60 43 Maximum G 102 164 278 278 Observations 42 42 42 126 (G)-forces Crown Front Back Left Right L Nape R Nape Mean 114 98 131 85 87 127 109 Standard Deviation 32 23 61 23 20 59 46 Maximum G 164 140 278 124 124 276 228 Observations 18 18 18 18 18 18 18 An analysis of these statistics shows that the MOC-34 outperformed the 7-pad system in every category of blunt-impact protection. 5.0 Production Capacity, Logistics, Installation, and Maintenance The MOC-34 was designed for simplicity in terms of manufacturing, logistics, installation, and cleaning. Production capacity for the MOC-34 is practically unlimited using domestically-sourced materials that com- ply with the Berry Amendment (10 U.S.C 2533a) and manufacturers that are certified for quality manage- ment pursuant to ISO 9001:2008. Notably, A7HS has an existing relationship with San Antonio Lighthouse for the Blind, San Antonio, TX, an affiliate of the National Industries for the Blind (NIB), so there should be no issue if the requirement of AR/PD 10-02 that the mandatory source of suspension systems for the ACH is a NIB affiliate is also made a requirement for the ACH Gen II. Logistically, the one-size-fits-most (XS through XL) design of the MOC-34 will streamline initial procure- ment and sustainment initiatives. The system also ships and stores flat so as to minimize transportation and storage costs and reduce its logistical footprint. Because of the closed-cell nature of the foam materials and their imperviousness to moisture and degradation, shelf life is estimated at three years or more. With regard to installation, because the MOC-34 attaches to a helmet shell via hook-and-loop disks in the same manner as the current 7-pad system, a soldier in the field could install it in a matter of minutes without the need for any tools. Fine adjustments to maximize comfort in the temple and nape areas could then be accomplished in a matter of seconds and as frequently as the soldier desires by simply taking off the helmet, pulling one or more of the pads away from the hook-and-loop disk, repositioning the pad(s) to the desired
  • 6. A7 Helmet Systems 8111 Mainland Drive Suite 104-442 San Antonio, TX 78240 KERRY HARRIS • DIRECTOR inquiries@angel7industries.com position, and putting the helmet back on to check the comfort level. This also means that the MOC-34 could transition into any program in which a hook-and-loop fastening system is currently used (e.g., ACH, Enhanced Combat Helmet (ECH), Personnel Armor System for Ground Troops (PASGT), Modular Integrated Communications Helmet (MICH), and the Lightweight Helmet (LWH)). As for washability, because the MOC-34 uses high-performance coverings that meet military specifications, the system can be laundered in accordance with the requirements of AR/PD 10-02. 6.0 Costs Notwithstanding the significant increase in blunt-impact the MOC-34 offers in comparison to the current 7-pad system, A7HS projects that it will be able to sell its system to the government for approximately $54.00 per unit, or only a slight increase over the cost of the 7-pad system.
  • 7. APPENDICES: FULL TEST RESULTS BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: Angel 7 Industries Job No.: 2413-007 Test Date: 2/20/2015 Page No.: 1 of 8 Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15 Sample Description: ACH Helmet Size: Large Model: ACH (H-Back) Date Received: 2/19/2015 Weight: 3.18 lbs. Mfg. Date: NA Via: Fed-Ex Color: Green Lot No.: NA Returned: NA Setup Temperature: 72.1 °F Time Gate Flag : 25.4 mm Tester: Kent Jordan Humidity: 30 % Mount Type: FMVSS 218 Recorder: Kent Jordan Conditioning: Ambient Mount Size: C D.O.T Filtering: CFC 1000 1650Hz Impact Type: Impact Uni-Axial Drop Mass: 4.959 kg Sensitivity: 10.82 mV/G Applicable Standards or Procedures (1) D.O.T FMVSS 218 (November 30 2006) (2) ATC-MMTB-029 Rev D (September 13 2012) (3) AR/PD 10-02 Rev A Change 3 Requirement Number Inspection Pass/Fail Inspection Requirement 1 NA There shall be no physical damage to the helmet shell such as shell fracture, defined as a separation/split of the ballistic material through the entire thickness of the helmet shell, or indentation depth in excess of 0.2 inches present after impact testing (delamination and ply separation are permitted). 2 Pass There should be no damage to any part of the retention system or pad system. Test Results Impact Number Impact Location Pass/Fail Criteria (<150 G’s ) Peak Acc. (G) Impact Velocity (ft/s) Drop Height (in) Strike Energy (J) Head Injury Criteria (HIC) Severity Index (SI) Impact Deformation (in) 1 Crown Pass 64.5 10.0 19.6 23.1 129.0 145.0 Not Available2 Crown Pass 64.1 10.0 19.6 23.2 132.0 147.0 3 Front Pass 90.3 10.0 19.6 23.2 181.0 217.0 Not Available4 Front Pass 98.8 10.0 19.6 23.2 205.0 249.0 5 Back Pass 53.3 10.1 19.6 23.3 108.0 119.0 Not Available6 Back Pass 55.1 10.0 19.6 23.3 116.0 128.0 7 Left Pass 53.3 10.1 19.6 23.3 96.0 106.0 Not Available8 Left Pass 51.0 10.1 19.6 23.4 102.0 112.0 9 Right Pass 51.4 10.1 19.6 23.5 92.0 102.0 Not Available10 Right Pass 51.0 10.0 19.6 23.1 96.0 106.0 11 Left Nape Pass 49.2 10.1 19.6 23.3 79.0 90.0 Not Available12 Left Nape Pass 48.3 10.1 19.6 23.3 83.0 94.0 13 Right Nape Pass 46.5 10.1 19.6 23.3 76.0 85.0 Not Available14 Right Nape Pass 46.9 10.0 19.6 23.2 79.0 88.0 Remarks: The Head Positioning Index (H.P.I) was defined at 2.3 inches and measured from the brim of the helmet to the basic plane on the headform for all impacts.
  • 8. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: Angel 7 Industries Job No.: 2413-007 Test Date: 2/20/2015 Page No.: 2 of 8 Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15 Test Results (continued) Impact Number: 1 Impact Time: 07:56 AM Impact Date: 2/20/2015 Conditioning: Ambient Impact Location: Crown Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 64.5 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 10 off horizontal. Impact Number: 2 Time: 07:57 AM Date: 2/20/2015 Conditioning: Ambient Impact Location: Crown Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 64.1 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 10 off horizontal. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 9. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: Angel 7 Industries Job No.: 2413-007 Test Date: 2/20/2015 Page No.: 3 of 8 Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15 Test Results (continued) Impact Number: 3 Impact Time: 08:04 AM Impact Date: 2/20/2015 Conditioning: Ambient Impact Location: Front Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 90.3 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 26 off vertical. (NOTE: The anvil is moved above any NVG hole to prevent a direct impact at this location) Impact Number: 4 Time: 08:05 AM Date: 2/20/2015 Conditioning: Ambient Impact Location: Front Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 98.8 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 26 off vertical. (NOTE: The anvil is moved above any NVG hole to prevent a direct impact at this location) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 10. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: Angel 7 Industries Job No.: 2413-007 Test Date: 2/20/2015 Page No.: 4 of 8 Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15 Test Results (continued) Impact Number: 5 Impact Time: 08:12 AM Impact Date: 2/20/2015 Conditioning: Ambient Impact Location: Back Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 53.3 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. Impact Number: 6 Time: 08:14 AM Date: 2/20/2015 Conditioning: Ambient Impact Location: Back Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 55.1 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 11. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: Angel 7 Industries Job No.: 2413-007 Test Date: 2/20/2015 Page No.: 5 of 8 Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15 Test Results (continued) Impact Number: 7 Impact Time: 08:23 AM Impact Date: 2/20/2015 Conditioning: Ambient Impact Location: Left Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 53.3 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. Impact Number: 8 Time: 08:24 AM Date: 2/20/2015 Conditioning: Ambient Impact Location: Left Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 51.0 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 12. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: Angel 7 Industries Job No.: 2413-007 Test Date: 2/20/2015 Page No.: 6 of 8 Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15 Test Results (continued) Impact Number: 9 Impact Time: 08:31 AM Impact Date: 2/20/2015 Conditioning: Ambient Impact Location: Right Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 51.4 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform 25 off vertical. Impact Number: 10 Time: 08:32 AM Date: 2/20/2015 Conditioning: Ambient Impact Location: Right Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 51.0 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform 25 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 13. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: Angel 7 Industries Job No.: 2413-007 Test Date: 2/20/2015 Page No.: 7 of 8 Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15 Test Results (continued) Impact Number: 11 Impact Time: 08:43 AM Impact Date: 2/20/2015 Conditioning: Ambient Impact Location: Left Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 49.2 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the left, 0 off vertical. Impact Number: 12 Time: 08:44 AM Date: 2/20/2015 Conditioning: Ambient Impact Location: Left Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 48.3 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the left, 0 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 14. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: Angel 7 Industries Job No.: 2413-007 Test Date: 2/20/2015 Page No.: 8 of 8 Manufacturer: Angel 7 Industries Sample ID: A7 2-20-15 Test Results (continued) Impact Number: 13 Impact Time: 08:54 AM Impact Date: 2/20/2015 Conditioning: Ambient Impact Location: Right Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 46.5 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the right, 0 off vertical. Impact Number: 14 Time: 08:55 AM Date: 2/20/2015 Conditioning: Ambient Impact Location: Right Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 46.9 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the right, 0 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 15. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/24/2015 Page No.: 1 of 8 Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold Sample Description: ACH Helmet Size: Large Model: ACH (H-Back) Date Received: 2/19/2015 Weight: 3.18 lbs. Mfg. Date: NA Via: UPS Color: Green Lot No.: NA Returned: UPS Setup Temperature: 70.3 °F Time Gate Flag : 25.4 mm Tester: Kent Jordan Humidity: 30 % Mount Type: FMVSS 218 Recorder: Kent Jordan Conditioning: 14°F Mount Size: C D.O.T Filtering: CFC 1000 1650Hz Impact Type: Impact Uni-Axial Drop Mass: 4.959 kg Sensitivity: 10.82 mV/G Applicable Standards or Procedures (1) D.O.T FMVSS 218 (November 30 2006) (2) ATC-MMTB-029 Rev D (September 13 2012) (3) AR/PD 10-02 Rev A Change 3 Requirement Number Inspection Pass/Fail Inspection Requirement 1 NA There shall be no physical damage to the helmet shell such as shell fracture, defined as a separation/split of the ballistic material through the entire thickness of the helmet shell, or indentation depth in excess of 0.15 inches present after impact testing (delamination and ply separation are permitted). 2 Pass There should be no damage to any part of the retention system or pad system. Test Results Impact Number Impact Location Pass/Fail Criteria (<150 G’s ) Peak Acc. (G) Impact Velocity (ft/s) Drop Height (in) Strike Energy (J) Head Injury Criteria (HIC) Severity Index (SI) Impact Deformation (in) 1 Crown Pass 103.3 10.0 19.6 23.0 265.0 309.0 Not Available2 Crown Pass 107.4 10.0 19.6 23.0 304.0 352.0 3 Front Pass 82.1 10.0 19.6 23.3 177.0 198.0 Not Available4 Front Pass 88.9 10.0 19.6 23.2 216.0 247.0 5 Back Pass 107.0 9.9 19.6 22.6 250.0 298.0 Not Available6 Back Pass 106.1 9.9 19.6 22.7 242.0 285.0 7 Left Pass 94.8 10.1 19.6 23.6 173.0 214.0 Not Available8 Left Pass 95.2 10.1 19.6 23.5 169.0 212.0 9 Right Pass 99.7 10.1 19.6 23.5 188.0 230.0 Not Available10 Right Pass 98.8 10.1 19.6 23.4 183.0 226.0 11 Left Nape Pass 73.1 10.0 19.6 23.2 130.0 152.0 Not Available12 Left Nape Pass 71.3 10.1 19.6 23.3 125.0 146.0 13 Right Nape Pass 84.4 10.0 19.6 23.1 155.0 181.0 Not Available14 Right Nape Pass 91.2 10.0 19.6 23.2 163.0 195.0 Remarks: The Head Positioning Index (H.P.I) was defined at 2.3 inches and measured from the brim of the helmet to the basic plane on the headform for all impacts.
  • 16. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/24/2015 Page No.: 2 of 8 Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold Test Results (continued) Impact Number: 1 Impact Time: 11:05 AM Impact Date: 2/24/2015 Conditioning: 14°F Impact Location: Crown Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 103.3 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 10 off horizontal. Impact Number: 2 Time: 11:06 AM Date: 2/24/2015 Conditioning: 14°F Impact Location: Crown Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 107.4 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 10 off horizontal. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 17. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/24/2015 Page No.: 3 of 8 Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold Test Results (continued) Impact Number: 3 Impact Time: 11:25 AM Impact Date: 2/24/2015 Conditioning: 14°F Impact Location: Front Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 82.1 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 26 off vertical. (NOTE: The anvil is moved above any NVG hole to prevent a direct impact at this location) Impact Number: 4 Time: 11:26 AM Date: 2/24/2015 Conditioning: 14°F Impact Location: Front Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 88.9 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 26 off vertical. (NOTE: The anvil is moved above any NVG hole to prevent a direct impact at this location) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 18. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/24/2015 Page No.: 4 of 8 Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold Test Results (continued) Impact Number: 5 Impact Time: 11:45 AM Impact Date: 2/24/2015 Conditioning: 14°F Impact Location: Back Anvil Type: Hemispherical Impact Velocity (ft/s): 9.9 Peak Acc. (G): 107.0 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. Impact Number: 6 Time: 11:46 AM Date: 2/24/2015 Conditioning: 14°F Impact Location: Back Anvil Type: Hemispherical Impact Velocity (ft/s): 9.9 Peak Acc. (G): 106.1 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 19. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/24/2015 Page No.: 5 of 8 Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold Test Results (continued) Impact Number: 7 Impact Time: 12:45 PM Impact Date: 2/24/2015 Conditioning: 14°F Impact Location: Left Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 94.8 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. Impact Number: 8 Time: 12:46 PM Date: 2/24/2015 Conditioning: 14°F Impact Location: Left Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 95.2 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 20. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/24/2015 Page No.: 6 of 8 Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold Test Results (continued) Impact Number: 9 Impact Time: 01:05 PM Impact Date: 2/24/2015 Conditioning: 14°F Impact Location: Right Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 99.7 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform 25 off vertical. Impact Number: 10 Time: 01:06 PM Date: 2/24/2015 Conditioning: 14°F Impact Location: Right Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 98.8 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform 25 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 21. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/24/2015 Page No.: 7 of 8 Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold Test Results (continued) Impact Number: 11 Impact Time: 01:25 PM Impact Date: 2/24/2015 Conditioning: 14°F Impact Location: Left Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 73.1 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the left, 0 off vertical. Impact Number: 12 Time: 01:26 PM Date: 2/24/2015 Conditioning: 14°F Impact Location: Left Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 71.3 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the left, 0 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 22. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/24/2015 Page No.: 8 of 8 Manufacturer: A7 Industries Sample ID: A7 2-24-15 Cold Test Results (continued) Impact Number: 13 Impact Time: 01:44 PM Impact Date: 2/24/2015 Conditioning: 14°F Impact Location: Right Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 84.4 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the right, 0 off vertical. Impact Number: 14 Time: 01:45 PM Date: 2/24/2015 Conditioning: 14°F Impact Location: Right Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 91.2 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the right, 0 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 23. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/23/2015 Page No.: 1 of 8 Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot Sample Description: ACH Helmet Size: Large Model: ACH (H-Back) Date Received: 2/19/2015 Weight: 3.18 lbs. Mfg. Date: NA Via: UPS Color: Green Lot No.: NA Returned: UPS Setup Temperature: 70.3 °F Time Gate Flag : 25.4 mm Tester: Kent Jordan Humidity: 30 % Mount Type: FMVSS 218 Recorder: Kent Jordan Conditioning: 130°F Mount Size: C D.O.T Filtering: CFC 1000 1650Hz Impact Type: Impact Uni-Axial Drop Mass: 4.959 kg Sensitivity: 10.82 mV/G Applicable Standards or Procedures (1) D.O.T FMVSS 218 (November 30 2006) (2) ATC-MMTB-029 Rev D (September 13 2012) (3) AR/PD 10-02 Rev A Change 3 Requirement Number Inspection Pass/Fail Inspection Requirement 1 NA There shall be no physical damage to the helmet shell such as shell fracture, defined as a separation/split of the ballistic material through the entire thickness of the helmet shell, or indentation depth in excess of 0.15 inches present after impact testing (delamination and ply separation are permitted). 2 Pass There should be no damage to any part of the retention system or pad system. Test Results Impact Number Impact Location Pass/Fail Criteria (<150 G’s ) Peak Acc. (G) Impact Velocity (ft/s) Drop Height (in) Strike Energy (J) Head Injury Criteria (HIC) Severity Index (SI) Impact Deformation (in) 1 Crown Pass 46.9 10.0 19.6 23.2 81.0 91.0 Not Available2 Crown Pass 50.1 10.1 19.6 23.3 88.0 100.0 3 Crown Pass 104.7 10.0 19.6 23.2 267.0 313.0 Not Available4 Front Pass 99.7 10.0 19.6 23.1 257.0 295.0 5 Back Pass 67.2 10.0 19.6 23.1 126.0 154.0 Not Available6 Back Pass 66.8 10.0 19.6 23.0 128.0 154.0 7 Left Pass 57.8 10.0 19.6 23.0 100.0 125.0 Not Available8 Left Pass 61.8 10.0 19.6 22.9 111.0 131.0 9 Right Pass 60.9 10.0 19.6 23.0 106.0 128.0 Not Available10 Right Pass 65.0 10.0 19.6 23.0 114.0 136.0 11 Left Nape Pass 66.3 10.0 19.6 23.2 119.0 140.0 Not Available12 Left Nape Pass 68.6 10.0 19.6 23.1 125.0 151.0 13 Right Nape Pass 72.2 10.0 19.6 22.9 170.0 198.0 Not Available14 Right Nape Pass 75.4 10.0 19.6 23.0 148.0 182.0 Remarks: The Head Positioning Index (H.P.I) was defined at 2.3 inches and measured from the brim of the helmet to the basic plane on the headform for all impacts.
  • 24. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/23/2015 Page No.: 2 of 8 Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot Test Results (continued) Impact Number: 1 Impact Time: 07:38 AM Impact Date: 2/23/2015 Conditioning: 130°F Impact Location: Crown Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 46.9 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 10 off horizontal. Impact Number: 2 Time: 07:39 AM Date: 2/23/2015 Conditioning: 130°F Impact Location: Crown Anvil Type: Hemispherical Impact Velocity (ft/s): 10.1 Peak Acc. (G): 50.1 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 10 off horizontal. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 25. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/23/2015 Page No.: 3 of 8 Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot Test Results (continued) Impact Number: 3 Impact Time: 07:57 AM Impact Date: 2/23/2015 Conditioning: 130°F Impact Location: Crown Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 104.7 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 26 off vertical. (NOTE: The anvil is moved above any NVG hole to prevent a direct impact at this location) Impact Number: 4 Time: 07:59 AM Date: 2/23/2015 Conditioning: 130°F Impact Location: Front Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 99.7 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 26 off vertical. (NOTE: The anvil is moved above any NVG hole to prevent a direct impact at this location) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 26. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/23/2015 Page No.: 4 of 8 Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot Test Results (continued) Impact Number: 5 Impact Time: 08:18 AM Impact Date: 2/23/2015 Conditioning: 130°F Impact Location: Back Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 67.2 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. Impact Number: 6 Time: 08:19 AM Date: 2/23/2015 Conditioning: 130°F Impact Location: Back Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 66.8 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 27. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/23/2015 Page No.: 5 of 8 Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot Test Results (continued) Impact Number: 7 Impact Time: 08:38 AM Impact Date: 2/23/2015 Conditioning: 130°F Impact Location: Left Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 57.8 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. Impact Number: 8 Time: 08:40 AM Date: 2/23/2015 Conditioning: 130°F Impact Location: Left Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 61.8 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 25 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 28. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/23/2015 Page No.: 6 of 8 Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot Test Results (continued) Impact Number: 9 Impact Time: 08:58 AM Impact Date: 2/23/2015 Conditioning: 130°F Impact Location: Right Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 60.9 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform 25 off vertical. Impact Number: 10 Time: 08:59 AM Date: 2/23/2015 Conditioning: 130°F Impact Location: Right Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 65.0 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform 25 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 29. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/23/2015 Page No.: 7 of 8 Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot Test Results (continued) Impact Number: 11 Impact Time: 09:23 AM Impact Date: 2/23/2015 Conditioning: 130°F Impact Location: Left Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 66.3 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the left, 0 off vertical. Impact Number: 12 Time: 09:24 AM Date: 2/23/2015 Conditioning: 130°F Impact Location: Left Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 68.6 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the left, 0 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)
  • 30. BLUNT IMPACT PROTECTION Chesapeake Testing 4603B Compass Point Road Belcamp, MD 21017 Client: A7 Industries Job No.: 2413-007 Test Date: 2/23/2015 Page No.: 8 of 8 Manufacturer: A7 Industries Sample ID: A7 2-23-15 Hot Test Results (continued) Impact Number: 13 Impact Time: 09:44 AM Impact Date: 2/23/2015 Conditioning: 130°F Impact Location: Right Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 72.2 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the right, 0 off vertical. Impact Number: 14 Time: 09:45 AM Date: 2/23/2015 Conditioning: 130°F Impact Location: Right Nape Anvil Type: Hemispherical Impact Velocity (ft/s): 10.0 Peak Acc. (G): 75.4 Dwell Time over 150 G (ms): 0 Dwell Time over 200 G(ms): 0 Orientation for Impact Location: Headform rolled 30 to the right, 0 off vertical. -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s) -20 0 20 40 60 80 100 120 0 0.002 0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018 0.02 Acceleration(G) Time (s)