1. Michael.Cawley 2016
Nmc/Nomencafor 15 years with company
Duties @ present time
Nmc/N-SAPELECTRICAL
Nmc/N call out team
Site supervisor whenrequired for AMS
ELECTRIAN
TYPES OF WORK& INSTALLATION
1. Hospitals
2. Factory work
3. University
4. PANEL BUILDING & INSTALLATION
5. ALL TYPES OF WORK FOR WATER BOARDS SEVERNTRENT WATER/NORTHWEST WATER
6. INSTALLATIONOF ELEETRICALEQUIPMENT,CONTROLPANELS,PUMP STATION,DOSING
RIGS,ODOURCONTROL SYSTEMS, OUT-STATIONINSTALLPROVEEND TO END,ETC
7. HEATING& VENTILATIONSYSTEMS &PANELS
8. AIR CONDITION SYSTEMS &FIREALARM SYSTEM&FIRE ALARM PANELS
9. Fire alarm – PYRO INSTALL
10. EMERGANCYLIGHTING – PYRO INSTALL
11. SWA/PVC INSTALL
12. PYRO INSTALL
13. TRUNKING& CONDUIT-MATELOR PLASTIC
14. CABLE TRAY
15. GLANDING & TERMINATING
16. ELECTRICALTEST CERTS
17. TESTING& INSPECTING
18. FAULT FINDING
19. COMMISSIONING& TEST OF ELECTRICALEQUIPMENT
20. TELEMETRYSIGNALS END TOEND TESTING – DIGITAL & ANALOG INPUTS OUTPUTS 4-20Ma
signals