Mega Supply Store
1 Winding Drive, Philadelphia, PA 19131
tel: 855.634.2830 | fax: 215.893.4844 | email: info@megasupplystore.com
www.megasupplystore.com
At Mega Supply, we strive to revolutionize conventional construction and design practices
by connecting manufacturers of dynamic and sustainable materials with virtually all
sectors of the construction industry. An individual creative approach is applied to stylistic,
functional, and budgetary needs of your projects. Where before such undertakings like
planning low-income multi-housing and construction of state-sponsored educational
facilities were limited by tight budgets and non-existing margins, we have now developed
an exceptionally efficient system that incorporates contemporary and realistic expectations
of value, rigorous design research, and uncompromising quality control. With a passion for
aesthetic appeal and deep commitment to utility and dependability, we work tirelessly to
ensure that your needs are met in their entirety: we promise to go the extra mile to make
that extra phone call to find or manufacture what you need and deliver it without delay.
HeIIo&
Aside from staying on top of the game in business practices and customer service, we are working
with top construction and building rehabilitation professionals to develop new ways to evoke the
peace and satisfaction on the consumer end. Mega Supply continually invests in European and
Asian trend research, safer and stronger hardware, and materials with the intention to turn
your creative ambitions into real measurable performance and impeccable reputation. Whether
residentialorcommercial,fromthemostgrandiosecommunityinitiativestoelementalrenovation
tasks, by attending to the finest details and utilizing proven principles of industrial technology and
product design, we try to bring contentment to daily lives of all parties involved. Whether your
expertise lies in green government contracts or ultra-chic masterpieces of urban red carpet
hospitality, you will find the perfect fit in our broad assortment of products and materials. We
value imagination and do the best we can to catalyze cutting-edge ideas. We encourage our clients
and suppliers to cultivate and expand their expertise in every aspect of design, construction,
production, and service. We seek to live in awareness, taking sincere pride in our work, and
nurturing passion for many areas of creative expression and human-centered design process.
WeIcome!
4	
4	
www.megasupplystore.com www.megasupplystore.com
Past Projects					6
Custom Windows & Doors				 10
Custom Size Closets					14
Sasha Alexandra Shower System			 16
TOTO Toilets & Bathroom Fixtures			 18
RoyoBath Vanities					24
Recessed Linear Lights				28
Hinkley Lighting 					29
Ceiling Fans					30
Elitis Wallpaper					32
Lustrolite	 Acrylic Wall Panels				 40
American Floor and Wall Tile				 42
Central Tile Import					48
Bruce Flooring					50
Armstrong Flooring					51
Grohe Plumbing Fixtures				52
Artos Bathroom Accessories				55
Blanco Professional Kitchen Sinks			 56
Schlage Locks & Security				 57
Cavaliere	Range Hoods				58
Faber Range Hoods					59
Hafele						60
Richelieu						63
Mecho Systems					66
Bio Bidet						67
DreamLine Shower Doors & Enclosures			 68
Tile-Redi	 Shower Pans & Shelves			 71
Amerec Sauna Systems				72
SteamSpa Steam Generators				73
Finlandia Sauna					74
Jacuzzi						76
Feeney						77
Lighted Mirrors					78
Samsung Appliances					79
Frigidaire Appliances					81
GE Appliances					83
LG Appliances					86
Electrolux						89
SMEG						91
Liebherr						92
Graco Paint Solutions				93
SprayStone Architectural Finish				94
Terms & Conditions					96
MegaPro
PortaI!INTRODUCING Table of Contents
Mega Supply Pro Services:
Our professional services division helps businesses that contract with clients to locate and secure various types of
resources that are desired by the client. Mega Supply Store’s procurement efforts are structured to find, qualify, and
procure specific types of resources, such as raw materials for a construction project, or provide services that make it
possible to locateandsecureanytypeofitemsneededbythecustomer. Weestablishlong-termrelationshipswithclients,
accepting multiple assignments on an ongoing basis, or contract to accept a single project. The process of procuring the
necessary resources saves our clients time, money, and most importantly – it alleviates project management headaches.
We’ll take the hassle of Development Contract Management out of
your project at NO EXTRA COST. We’ll work with your budget to find
the most suitable products and materials, including custom or alter-
native solutions for the task at hand, regardless of its complexity. Our
experts offer a comprehensive spectrum of Competent Construction
Services, as well as resource management, and logistics. We under-
stand coordination, risk, cost of delays, tight schedules, phased work
plans, regulatory compliance & quality control.
Price negotiation is our bread & butter; it’s where our paycheck comes
from... Our clients tell us that nothing takes more time and energy
than getting through the hoops and tricks of “commoditized solutions”,
“blind RFPs”, “reverse auctions” and other hardball sales tactics. This
is where our value proposition expertise comes in handy: whether
focusing on discrete units, or the overall deal, – we know the numbers.
Our extensive presence on the wholesale market, and construction
merchandising experience gives us an edge in finding raw materials
and products to satisfy any specifications, and contract terms.
As part of our commitment to your success in executing the contract,
we utilize a number of resources to confirm the completion of submittals,
provide project lifecylce observation, and confirm the completeness
of deliveries. Additionally, we track and coordinate deliverables with
overall project schedule parameters to assure that specified materi-
als are on site, ready for installation, and commissioned on schedule.
For more info, contact us directly at:
info@megasupplystore.com
855.634.2830
PROCUREMENT
PRICE NEGOTIATION
SCHEDULE & CONTRACT MANAGEMENT
RECENTPROJECTS
11
B-Pro Safeguard
is the Blast Fenestration Division of Mega Supply, created to
fill special orders that meet the Department of Defense UFC
4-10-01 (2007) AT/FP criteria and to provide the U.S. military
and other U.S. government agencies with the most advanced
andcost-effectiveprotectiveglazingsystems.B-Proproducts
include commercial and residential doors, entryways, and
window systems developed by the world’s most experienced
teams of engineers and other professionals in the field of
blast mitigation, and were subjected to a rigorous series of
explosive detonation, structural stress and AAMA testing.
B-Pro Safeguard operates a state of the art plant equipped
with modern machinery dedicated to manufacturing of blast
mitigation window and entry systems. Our team is committed
to the highest standards of quality, service and support.
Technology
B-Pro Safeguard offers an extraordinarily sophisticated,
patented Energy-Absorbing system approach. This technol-
ogy utilizes the frames, glazing, hardware and anchoring
system as energy dissipating components. Once hit by the
blast wave’s dynamic loading, those components gradually
deform, absorbing a significant portion of the blast energy
which allows the glazed unit to stay in the opening and to
protect the people within the building.
The real-life experience of the B-Pro’s engineering team
includes hundreds of thousands successful installations, as
well as development of numerous blast mitigation systems
for windows, doors and curtain walls. It has provided B-Pro
with the expertise in designing and refining the product in
order to meet the most demanding architectural criteria
while providing the highest level of blast protection required.
All B-Pro products are modular stackable units that are
interconnected and can be mulled together within a single
opening with no need for mullions or other reinforcement.
For more info, including testing data
and orders, contact:
Mega Supply Store
info@megasupplystore.com
855-634-2830
12 13
Applications:
• 1 sliding sash+1 fixed
• 2 sliding sashes
• 3 sliding sashes
Product Benefits:
• All-round locking points ensure high uniform gasket compression.
• Additional locking points provide maximum tightness and greater security.
• Innovative closing movement perpendicular to the frame profile.
• All-round gasket.
• All locking points controlled by the handle.
• Air permeability class 4 (DIN EN 1026 / 12 207).
• Water tightness class 9A (DIN EN 1027 / 12 208).
• Sash widths of 600-1500 mm.
• Sash heights of 700-2500 mm.
U22hr is a sliding door setting new
standards when it comes to window and
door tightness. Therefore, it is ideal for
use in high-rise buildings where high
wind loads occur. The product hardware
is guaranteed to remain tightly sealed
even in thunderstorms where wind gusts
and torrential rains are hitting the glass
and window frame directly. There is
no trace of draughts or rattling sashes
thanks to this unique technology.
combining experience and innovation
www.megasupplystore.com
U22hr
C O M B I N I N G E X P E R I E N C E & I N N O V A T I O N
www.megasupplystore.com
info@megasupplystore.com
tel: 855.634.2830 | fax: 215.893.4844
Window and door system
Retro style.
B11tb is designed to meet unique look
for unique people. The narrow profiles
give you a steel look like, windows and
doors, for private homes and residential
buildings.
Product benefits:
* Narrow look.
* High energy saving performance.
Features:
* Hinged window and door in and out, tilt & turn.
* Double window.
* Fixed window.
* Up to 2“ insulating glass.
www.megasupplystore.com
combining experience and innovation
B11tb
C O M B I N I N G E X P E R I E N C E & I N N O V A T I O N
www.megasupplystore.com
info@megasupplystore.com
14
14
17
17
Mega Supply Store is excited to offer TOTO’s technologies and
innovations in engineering. TOTO’s performance design and
sustainability are all done with people in mind.
The ultimate in luxury and elegance coupled with unrivaled TOTO research and development,
this Neorest features highly technologically advanced features, including automatic lid operation,
Cyclone flushing system, remote control operation, nightlight and SanaGloss, an
extraordinarily smooth, ion-barrier surface to keep your toilet bowl clean.
18
The TOTO Washlet
Ecology-minded luxury in a slim design,
the TOTO Washlet features the technologically
advanced ewater+ system, which mists and cleans
the bowl with electrolyzed water after every use. Fully
automated, including remote control and heated seat.
22 23
Aimes® One-Piece
Toilet, 1.28GPF,
Aquia® One-Piece Toilet,
1.6 GPF & 0.9 GPF,
Elongated Bowl
MS654114MF#01	
Carlyle® II One-Piece
Toilet, 1.28 GPF, Elongated
Bowl 	
MS614114CEFG#01	
Carlyle® II Connect+™ S350e
One-Piece Toilet
MW614584CEFG#01
Carolina® II One-Piece
Toilet, Elongated Bowl
MS644114CEFG#01
Legato™ One-Piece Toilet,
1.28GPF, Elongated Bowl
MS624214CEFG#01
Neorest® 550H Dual
Flush Toilet, 1.0 & 0.8 GPF
MS982CUMG#01	
Aquia II Dual Flush Two-
Piece Toilet, 1.6 GPF & 0.9
GPF, Elongated Bowl
CST416M#01	
Connelly® Two-Piece
Toilet 1.28 GPF & 0.9 GPF,
Elongated Bowl
CST494CEMFG#01	
Maris® Dual Flush Two-
Piece Toilet, 1.28 GPF &
0.9 GPF, Elongated Bowl
CST484CEMFG#01	
Rowan™ Two-Piece
Toilet, 1.6 GPF & 1.0 GPF,
Elongated Bowl
CST406MF#01	
Vespin® II 1G Two-Piece
Toilet, Elongated Bowl -
1.0 GPF
CST474CUFG#01	
Aquia® Wall-Hung Dual-
Flush Toilet, 1.6 GPF & 0.9
GPF, Elongated
CT418FG#01	
DUOFIT In-Wall Tank System
1.6 GPF & 0.9 GPF Washlet® S300e Toilet Seat
- Round with ewater+
SW573#01
Commercial Flushometer
High Efficiency Toilet,
1.28 GPF, Elongated Bowl,
Back Inlet Spud
CT708EV#01
MS626214CEFG#01
WT151M#01
More TOTO products available by request
24
The curved forms and the highly contrasting provided by the colors unite to create a communication between this
series of furniture and the user. The continuous dynamism and movement created by curves transmit freshness
or elegance in the bathroom space. To approach the customers, SOUL offers the range of finishes SOUL COLORS.
Colors, from soft to bright colors that complete this collection and offer the opportunity to create charming ambiances.
26
The new PLAY collection is modular and dynamic.
With designs for all types of spaces, you can play
with multiple combinations in your home. Fill your
bathroom with light and color using the PLAY sets.
High Gloss finishes for a fresh look: White, Sand
Brown, Grayish Blue, Aubergine and Anthracite.
Large surfaces for all bathroom accessories and
possibility to create sets with legs.
SWIFT – a modern design gives an avant-garde air to your bathroom space. SWIFT offers four finishes: matte taupe, matte
black, high gloss white and high gloss anthracite. Color contrast in your bathroom with an integrated handle in the front
made of methacrylate white panel, allowing an easy opening while keeping the natural line harmony. New forms and easy
storage with two drawer units with soft close system. Range of options: ceramic, glass and acrylic washbasins.
28 29
LED Recessed Linear Light Fixture
Hinkley 5654BN Latitude 4-Light
26” Bathroom Vanity Light
Introducing the made-to-last recessed LED light fixture for any
contemporaryinterior.Idealaccompanimenttomodernarchitectural
styling, this narrow light installs flush with the surface - whether a
ceiling, or a wall. Quality, technology, design and sustainability are
set to ensure ultimate energy-saving solution for your home or
office, storefront or a factory.
Under four generations of family leadership, Hinkley Lighting
has transformed from a small lantern company into a global
brand, bringing you the best in style, quality and value. We
thrive on personal relationships, regional roots, good design
and a family atmosphere that is encouraged at every level of
our company. If the past 90 years are of any indication, it is with
great pride and excitement that we set our sight on the horizon
and extend our commitment to keeping your Life Aglow.
Specifications:
Number of Bulbs: 4
Bulb Base: G9
Bulb Type: Halogen
Bulb Included: Yes
Watts Per Bulb: 60
Wattage: 240
Features:
• Beveled/Etched shade composed of multiple glass pieces
• Beveled glass shades offer a traditional style
• Etched glass shade offer creative patterns and designs
• Made of steel
• Designed to cast a soft ambient light over a wide area
• ADA compliant
• Can be mounted with shade facing upward only
• Suitable for damp locations
Technologies:
• Bulb Base - G9: a bi pin or bi pin socket
• G9 bulbs have a pin spread of 9 mm and are used mostly in
120V or 230V fixtures with halogen bulbs.
G9 Bulb base is designed for a Halogen bulb, but is also
available as Fluorescent, LED, and Xenon/Krypton.
• 100-240V / 50Hz
• 24W & 2700K (color temp.)
• 34 3/4” x 2 3/16” x 2.5”
• 1 year limited warranty
• Transformer included
Height: 5.75”, Width: 26”
Extension: 4” HCO: 3.25”
Shade Width: 26”
Backplate Height: 4.75”
Backplate Width: 25”
Compliance: ADA Compliant
30
Minka-Aire F853-RW Aviation Ceiling Fan - 60”
Rosewood Finish
M-Flute 3-Blade Dimmable
Ceiling Fan Light
Molded Composite Rosewood finished blades are included as shown.
Comes with Remote Control with Reverse (transmitter only for F853
fans only). The Minka Aire Aviation is fashioned after an antique airplane
prop from early last century. This awesome looking fan features a super
efficient DC motor that allows the focus to be on the propeller instead of the
fanbody.Thisfanwillcertainlygainmanyadmirersoverthenextdecadeas
it complements any space.
Quiet, functional approach to fresh air:
Clean lines, distinctive hanging system, classic construction and integrated lighting make it a perfect fit for any space.
TheM-Flute’scombinationoftheintegratedhalogenlightanddistinctivehangingsystemgivesthiscontemporarydesign
a compelling and sophisticated presence. The integrated light kit includes a halogen bulb for brilliant illumination. The
handy wall control offers independent light and speed controls.
Features:
Integrated Light: 1 (One) 100-Watt/120-Volt Mini Can
Halogen Bulb (included)
Light Dimmer: Full Range + On/Off
Integrated Opal Glass Shade
Finish: Brushed Nickel Hardware, Mahogany Blades
Suitable for vaulted ceilings: up to 30° incline
Suitable for low ceiling application
All necessary mounting hardware included
Energy Info (at high setting):
Airflow: 6700 CFM
Electricity Use: 69 Watt (Fan Only)
Airflow Efficiency: 97 CFM/Watt
RPM: 80 (low)/180 (high)
Amps: 0.32 (low)/0.52 (high)
UL Indoor listed
On/Off + Full Range Dimmer
3 Speeds
Specifications:
3 Speeds: 45RPM - 76RPM - 117RPM
Full Function Hand Held Remote
Blade Sweep: 60
No. of Blades: 3
Downrod 1: 3.5”
Downrod 2: 6”
Lead Wire: 80
Height (Ceiling to Lowest Point): 12”
Height (Ceiling to Blade): 10.5”
Hanging Weight: 16.47”
Motor Size: 120mm DC MOTOR
Dare to be bold, innovate, and act as explorers in the
field of furnishing fabrics and wall coverings, known
tobemoretraditionaluntilnow,thisisourphilosophy.
Design very contemporary products and always
have an edge on the latest techniques, this could be
our motto. Our in-house design department, a hive
of activity like that of an experimental laboratory,
traces the lines of research, diversity and innovative
mixtures. The proposals, always surprising, create
an event at every international exhibition.
Mega Supply Store is proud to offer our
latest and most sophisticated wallpaper
and wall covering collections from Élitis
which intertwine the arts and crafts with
innovation, creativity and modernity.
Mémoires
8 new designs with a warm feel.
The panther, the zebra and the lion are the lords of Africa
where we begin our collection. The skins are adorned with flock
or metal, morph and become rugs, or are printed on leather.
The plain range is revamped with shimmering
metallic glints and changing inks colors.
• Rolls 70cm x 10m
• Digital printing
• Large panoramic printed on Bois
• Panoramic drops - 3.5m x 3m
Wallpaper & Wall Coverings
Non-inflammable: ASTM E84 Class A
Composition: Vinyl on a paper ground
Care: Washable
Measurements +/- 3%: Rolls of 5 panels (27“ x 118” ea.)
Pattern match: Panoramic design
Sales units: Rolls
Weight: 3.8 kg/roll
VP 695 09	
VP 653 01	
VP 653 03	
VP 653 04	
VP 653 05	
VP 659 01	
32
VP 755 01	 VP 755 03	 VP 755 05	 VP 755 06	
VP 756 01	 VP 756 02	 VP 756 04	 VP 752 01 VP 752 02 VP 752 03 VP 752 04
34
Kandy
As coming from another century and preserved in time,
“Kandy” remains. Imagine walking bare feet on a floor
covered with white sheets. There, dyers distill peels of
pomegranate, turmeric and hibiscus to create the most
beautiful yellows. Just a drop of indigo and deep greens
appear while madder and rusted metal will give birth to
blacks. Silk is here a mythical item. Sun light will play
with it to reveal its various pigments along the seasons.
• Reverse hanging recommended.
• Great stain and abrasion resistance.
Non-inflammable: ASTM E84 class A
Composition: Vinyl on a paper ground
Care: Extra washable
Measurements +/- 3%: 10.9yd x 39.37” roll
Pattern match: Random match
Sales units: Roll
Weight: 3.5 kg/roll
37
37
TP 164 05	
TP 164 01	
TP 166 07	
TP 166 01	 TP 166 06	
Série Limitée
Full-scale exhibition. A collector’s portfolio, SÉRIE LIMITÉE offers a selection of original designs in ink
and varnish on an unwoven paper background. Unbridled creative freedom develops into a sketchbook of
dream-like drawings and paintings which are highly colored and visionary.
Non-inflammable: ASTM E84 class A
Composition: Non-woven base
Care: Washable
Measurements +/- 3%: 27in. x 10.9yd ea.
Pattern match: Reverse length and 15.7” dropped match
Sales units: Rolls
Weight: 1.1 kg/roll
40
Lustrolite is an award winning high gloss acrylic wall panel.
It’s the new perfect material to create stunning bathroom and
shower walls, kitchen backsplashes and commercial spaces.
Lustrolitereplacestile,andlookslikeback-paintedglass.With
a special hard coated top layer for extra scratch and chemical
resistance,cleaningandmaintainingthesepanelsiseffortless.
COLOR
RANGE
GEMSFLORIM
USA
FIorim USAis one of the largest and most technologically advanced
porcelain facilities in North America.
Florim USA is more than just a company name;
it is a residential and commercial brand that
promises people in the American market a
timeless and sustainable product offering.
Florim USA is proud to be
a Made in the USA product
with an exclusive Italian style.
42
12
6”x36”
dark grey
13
PIETRA
ROMANA
An Italian tile made in the USA
14
18”x36”
silver
5
a
47
Brush Stroke Trim
IRG624BT57
IRG624BT68
IRG624BT58
IRG624BT56
IRG624BT55
IRG612C057
IRG612C068
IRG612C058
IRG612C056
IRG612C055
IRG0524L57
IRG0524L68
IRG0524L58
IRG0524L56
IRG0524L55
Oyster Stroke
Beige Stroke
Walnut Stroke
Nickel Stroke
Ebony Stroke
Liner Bullnose Cove Base
1/2 x 24 6 x 24 6 x 12
Brush Stroke Mosaics
IRG12ML157
IRG12ML168
IRG12ML158
IRG12ML156
IRG12ML155
IRG12MB157
IRG12MB168
IRG12MB158
IRG12MB156
IRG12MB155
random mesh mounted on 12 x 12 sheet
IRG12M5057
IRG12M5068
IRG12M5058
IRG12M5056
IRG12M5055
Oyster Stroke
Beige Stroke
Walnut Stroke
Nickel Stroke
Ebony Stroke
Muretto Mosaic Lines 01 Mosaic Brick 01 Mosaic
1 x 12 mesh mounted on 12 x 12 sheet 1 x 2 mesh mounted on 12 x 12 sheet
Beige Stroke 6” x 24”
Made in the USA
With corporate offices based in Anaheim, CA and production in Tennessee,
Iris US can domestically produce and ship material all over the nation.
Selling not only American made products, Iris US also has the ability to sell
and promote the diverse majority of Iris-group products, which enables
them to effectively accommodate all requests of sizes, textures & designs
for interior and exterior, residential and commercial applications.
Ragno USA has the production capabilities and technologies that produce fully-rectified, digital, color-body porcelain tiles
with micro-beveled edges for a precision finish with the highest design and quality. Since 1982, Ragno USA, a division of the
Marazzi Group, has played a key role in our industry by decisively meeting the tile needs of the American market.
Oyster Stroke, Beige Stroke
& Ebony Stroke 12” x 24”,
12” x 12”, 6” x 24” & other
various cut down sizes
Porcelainwood
Collection
Rectified Edge
The tiles are mechanically finished with precise
edges, allowing for tighter grout joint spacing
during installation.
ARTE
COLOR BODY PORCELAIN TILE | RECTIFIED | MADE IN THE USA
ARTEARTE
COLOR BODY PORCELAIN TILE | RECTIFIED | MADE IN THE USA
ARTEARTE
• Manufacturer of a wide range of products: porcelain, glazed ceramic, glass mosaics, metals
• Industry leader in color and design trends in tile and technology
• 75 distribution warehouse locations across the country to provide superior service
• Ragno’s state-of-the-art 3d printing technique allows for infinite design capabilities unique to Ragno
Enjoy the power and beauty of tile with no boundaries. Let us
help create your dream interior or exterior atmosphere with
our custom tile, imported from Spain and Italy.
With over 30 years of experience, we have the perfect tile for
your masterpiece. Hundreds of options and styles to choose
from, this is your number one source for imported tile.
48
Find the Bruce hardwood floor that will transform your room.
You’ll find a luxurious selection of beautiful floors in a variety
of wood species, colors, textures, and specialty finishes. For a
distinctive, one-of-a-kind floor, trust the top-selling brand of
hardwood in North America: Bruce.
Hardwood flooring can be an ideal flooring choice for just about
any area of your home. Bruce hardwood floors are available in
many colors and looks to match any style and decor. Browse
our wood flooring to find wood floor that’s perfect for you.
Armstrong offers hundreds of flooring options for you to choose from.
Our hardwood floors are available in many popular wood species, from
classic oak to exotic tropical hardwoods. Hardwood flooring has never
been more popular. Armstrong’s hardwood floors are designed to match
any décor – from sophisticated contemporary to distinctive, hand-scraped
rustic. Wood flooring is suitable for most areas of the home, and all of our
hardwood is backed by Armstrong’s industry-leading warranties.
Prefer the look of ceramic tile, but don’t like the cold, hard surface? Check
out our vinyl sheet and luxury vinyl flooring collections with a variety of tile,
stone, slate looks - and a soft, warm feel underfoot. We also offer easy-
to-clean vinyl tile floors, and rounding out our offerings, laminate flooring
and linoleum floor covering.
50
The bathroom is now a place for rejuvenation and relaxation
and a real pampering zone. Whether it’s a quick energizing
shower first thing in the morning or a long, lingering candlelit
soak before bed, our extensive range of faucets, showers and
accessories will let you create the bathroom of your dreams.
By combining superior technology
with a choice of breath-taking
designs, GROHE can provide you
with all the elements to enhance
your bathing space.
An extensive portfolio of showering
solutions, bathroom accessories
and flush plates complement our
faucets collections – enabling you
to create a cohesive design
scheme in your bathroom.
Kitchen Faucets
52
54
Bathroom Accessories
Elegant Faucets, Towel Warmers,
Shower Systems, Accessories
and more
55
56 57
A lot’s changed since Walter Schlage
opened his first shop in 1920...
At the same time, a lot hasn’t.
BlancoAmericamanufactureshigh-qualitysinks,faucets
and counters for residential and commercial purposes.
Theyhavebeenaworldleader,since1925,withmorethan
30 million sinks produced in three factories world-wide.
Blanco pioneered the use of stainless steel for kitchen
sinks in 1952 and later Silgranit which is manufactured
of 80% rock hard granite. Blanco products include sinks,
faucets,counters,countertops,madeofgranite,stainless
steel and composite for both the kitchen and bathroom.
We’re still meticulous designers,
painstaking engineers, and proud craftsmen.
Nearly a century later, we’re proud to grace
your doors with a growing menu of stylish,
top-grade hardware.
58
59
Cavaliere adheres to it’s key business principles concentrating on innovative
products, devotion to customer service and overall professionalism.
We are the specialist in stainless steel Range Hoods. Our collection incorporates
superior components, and latest technologies making us a leader in the industry.
Cavaliere focuses on the design and development of every product we produce
while utilizing our own special understanding of the kitchen environment,
ergonomics, aesthetics and integration within your home or workplace.
Meanwhile with its technological strengths and marketing know-how, Cavaliere
leads the Range Hoods industry, meeting the needs and demands of the largest
domesticmarketintheworldwhilebecomingamodernbusinesscompetitorinthe
international marketplace with high quality products and refined workmanship.
61
Furniture/Cabinetry
Hardware
Architectural Hardware
And More
Furniture/Cabinetry
Hardware
Architectural Hardware
And More
60
63
Sophisticated Hardware & Accessories
65
64
66
67
Chain-driven MechoShade®
roller screens are part of the most com-
prehensive manual solar protection and room-darkening system on
the market. They feature ThermoVeil®
and EuroVeil®
(visually-trans-
parent sunscreens and room-darkening shades), a full range of hard-
wareoptionsformanualshading(includingmulti-bandoperationwithone
drive chain), and our Lifetime Limited Warranty with 100% replacement
and no depreciation over the life of the warranty.
ElectroShade®
provides the ideal solution for inaccessible high
bays, executive spaces, conference/training facilities, and other
public areas. From the boardroom, to 40-foot-tall exhibition areas,
there are ElectroShade solutions that meet your client’s criteria.
The highly anticipated premier bidet class unveils a
groundbreaking new breed of cleansing technology.
Experience the distinction between the limitations of
the past and the technological freedom of BioBidet
withavastselectionofcleaningmethodsandwitness
the latest level of unprecedented cleanliness with
the exclusive inside-out nozzle cleaning technology.
Know no boundaries in reaching your
highest level of personal hygiene with
BioBidet products!
68
68
71
Tile Redi®
offers the industry’s largest
selection of one-piece, Ready-to-Tile™
shower pans. Redi Base®
shower pans
come in over 100 standard models with
a variety of shower pan sizes and drain
locations. Because every shower design is
different, we offer a variety of entrances as
well. You can have a corner shower, double
shower, peninsula shower, ADA shower, etc.
72 73
Amerec has been manufacturing quality steam bath generators
for more than 30 years. Adding steam to a residential shower is
good for the body and soul. It’s easy to enjoy the benefits of steam
bathing in the privacy of your own home.
In today’s hectic world, aren’t we all looking for a private retreat – a place to become refreshed physically and mentally? Imagine
being able to come home from a long day at the office and slip into the comfort of your own bath time paradise. Your muscles
finally relax. All the hassles of the day leave your mind. You feel every ounce of stress drain from your body.
Amerec combines traditions with modern design and technology to create your own healthy escape. Whether you prefer
Traditional Finnish Sauna or a custom sauna loaded with luxurious upgrades, Amerec has a perfect option for you.
Amerec saunas are made of the finest materials available. Our wood, clear Western Red Cedar, is selected for its color, its
performance in a sauna environment and its supreme quality. We work directly with Pacific-Northwest lumber mills to secure
the finest Western Red Cedar available. It is then slowly kiln-dried and milled to our exacting standards and specifications. Our
attention to wood quality gives Amerec saunas a more refined look and ensures years of enjoyment.
Create a private sanctuary in the comfort of
your own home. Let your stress melt away as
you relax in our state of the art SteamSpa baths.
SteamSpa utilizes the latest
innovations in compressed
hydrothermal technology
to generate a steady flow
of rich, soothing steam.
SteamSpa has assembled
complete generator packages
based around the best selling
generator, component and
add-on combinations.
Available in three levels of
necessity and four brilliant
finishes you will be sure to
find the right set up for your
every want and need.
At home Imagine being able to shut the door on the world for a few
minutes every day. Billows of warm, gentle steam wash over you,
relaxingmuscles,openingpores,inducingaskin-healthyperspiration.
SAUNA
For Centuries people have recognized the health benefits of saunas.
Leave your stress behind and enter a world of total relaxation, ridding you of pain, toxins,
sore muscles, as well as increasing your blood circulation and leaving your skin glowing.
Besides these physical effects, a SteamSpa session will leave you totally relaxed by providing
you a peaceful and relaxing environment away from all.
Our advanced technology, engineering, and product deve-
lopment provides saunas that enhance the lifestyles of
people throughout the world. SteamSpa is continuously
refining,updating,andredevelopingtheirproducts,assuring
optimum build and quality. Working with the industry’s top
engineers,wehavedevelopedthemostefficient,dependable
and highest quality products. SteamSpa’s steam generators
provide continuous steam unlike other companies that emit
steam periodically in spurts.
SteamSpa is committed to the highest quality and most
reliable steam generators on the market. That is why we
can confidently offer 100% satisfaction guarantee.
SteamSpa for health, beauty and relaxation.
75
FpF56 western red cedar sauna with optional cedar exterior,
cedar vent, and cooling bench with Free-standing legs.
FpF77-7s panorama sauna oF western red cedar.
FpF56 western red cedar sauna. FpF66 outdoor cedar sauna with Frp rooF kit.
leFt: FpF66 western
red cedar.
center: FpF46
western hemlock
sauna with optional
permanent backrest
and bench skirt.
right: FpF68 western
red cedar sauna with
special Forest scene
etched windows.
Finlandia Sauna has been manufacturing authentic Finnish Sau-
nas since 1964. Finlandia is the oldest Sauna company under its
original ownership, and is located in the Finlandia Business Park
in Portland, Oregon, the heart of the timber country, to provide
the best quality and selection of softwoods. Unlike many of our
competitors, we are specialists, Sauna is our only business.
Finlandia Sauna builds standard and custom, precut and pre-
fabricated Saunas out of premium, clear western softwoods. We
import our Sauna heaters from Harvia Oy in Finland, because
their heaters are unequaled in quality and in providing the right
Sauna climate for the bather.
Standard, Custom & Prefabricated Saunas!
76 77
Bathing as never imagined starts with your personal vessel of warm, enveloping
water. For you, every possibility has been imagined … Shape ... Setting … Experience.
All for your personal, rapturous delight. Be enchanted … Only with the Jacuzzi®
brand.
Jacuzzi®
Outdoor
Mega Supply Store is Jacuzzi
authorized dealer in the US.
Contact us for the latest models,
pricing and availability!
Therearemanywaysinwhichourqualityissuperior.For
instance, we use type 316 marine-grade stainless steel
for our cables and fittings and high strength 6000 series
aluminum with state-of-the-art powder coating finishes
for our railings and trellis. And, our product review and
testing procedures are comprehensive and meticulous,
ensuring consistent quality and performance.
Feeney means quality!
We have the ability to create custom sizes and styles
of mirrors using either fluorescent or LED technology.
Creators is continually working to develop new products
to bring to our commercial and residential customers.
While using 5mm glass, stainless steel backing and
other hi-tech features, we offer one of the highest quality
lighted mirror products on the market.
Our sleek appliance design offers ultimate storage
capacity, flexibility and superior technology
in a modern aesthetic.
Upgrade your kitchen in style
and performance!
78 79
80 81
Samsung Front Load Washers
Samsung Dryers
Samsung Top Load Washers
Clean and freshen your laundry
more quickly, quietly and gently.
Designed with innovative cleaning
technology that deeply cleans even the
biggest loads of laundry.
Samsung Dryers come loaded with innovative
features that leave your clothes fresh and clean
while reducing the amount of time you spend in
the laundry room. Whether you are shopping for
a new gas dryer with the latest technology or a
clothes dryer that uses less energy, you’ll find
theperfectapplianceforyourhomeatSamsung.
Samsung’s new Top Load Washers feature large
capacity,innovativedesignandpowerfulcleaning
technology allowing you to wash more laundry in
a single load, saving you time and resources.
Kitchen Appliances
Ranges & Stoves
Wall Ovens
Refrigerators & Freezers
Microwaves
Cooktops & Stovetops
Dishwashers
82 83
BEST CLEANING WASH
Our exclusive wash system
cleans your clothes thoroughly,
ensuring whiter whites and tough
stain removal, for maximum
cleaning even with large loads.
QUICK DRY
Dries even extra-large loads
quickly and efficiently.
SUPER CAPACITY
Fit more in every load.
Wash & dry 3 days of
laundry at once.
ENERGY STAR® CERTIFIED
Maximize your energy and
dollar savings with
ENERGY STAR® Certified
Appliances.
Refrigerators & Freezers by GE
HOT WATER DISPENSER
NOW WITH A KEURIG®
K-CUP®
BREWING
SYSTEM!
From a morning cup of coffee
to a quick soup, our hot water
dispenser makes your snack
and drink preparation easier
and faster than ever before.
HANDS-FREE AUTOFILL
Using multiple sensors to
automatically measure bottles,
water pitchers and cooking pots, the
industry’s first laser-assist hands-
free autofill automatically turns itself
off when your container reaches 90%.
So now you can focus on other things.
FROST-FREE
Prevents frost build-up, and means
you never have to empty the contents
to manually defrost.
LED-LIGHTING AND ELECTRONIC
TEMPERATURE CONTROL
Automatic illumination on door open.
Easy adjust the temperature and avoid
releasing cold air by opening the door
you never have to empty cold air by
opening the door.
AUDIBLE TEMPERATURE ALARM
Alerts you if the door is left open or if
the temperature rises.
84
Microwaves, Ranges, Ovens, Cooktops and Combinations
Microwaves
Ranges
Cooktops
Microwave/Oven
Combinations
Single
Wall Ovens
Range Hoods
Double Wall Ovens
Washers
Dryers
Space Savers
86
87
Keeping food fresh for as long as possible matters to all of us. Every LG French
Door refrigerator features Smart Cooling Plus technology, designed to maintain
optimum cooling temperatures throughout the refrigerator and freezer.
LG’s Refrigerators offer the latest advances in food
freshness combined with impressive storage capacity!
LG’s advanced Linear Compressor
is the engineering technology behind
every LG French Door Refrigerator.
Our Linear Compressor is designed
with fewer moving parts than traditional
compressors, resulting in less friction
and significantly quieter operation.
The enhanced reliability of our
Smart Cooling System which
incorporates the LG Linear Compressor
technology ensures even cooling throughout the refrigerator...
dependability that’s backed by LG’s 10-year limited warranty.
Ranges
Cooktops
Wall Ovens
Simplify cooking with LG
microwaves and advanced
features like EasyClean,
Sensor Cooking Technology
and One Touch settings.
Microwaves
Cook every meal with
power and precision. LG
ranges and cooktops
boast innovative
technology for
restaurant-worthy
performances every night
of the week. And with
their stylish clean lines,
they'll blend seamlessly
into your décor.
Dishwashers
LG’s powerful performance delivers
superior cleaning results
with a machine so quiet, you'll have
to check whether it's on.
Create a kitchen that will inspire you. With new
state-of-the-art technology and sleek designs,
our premium built-in ovens seamlessly blend
style and innovation - making it easy to design a
sophisticated space that's supremely functional.
88 89
Washers & Dryers
Your kitchen
made easy,
exclusively from
Electrolux
90
SMEG understands that when architecture
and art meet, beautiful and timeless objects
are created. This knowledge has allowed the
company to form close working relationships
with some of the world's most renowned
architects, such as Guido Canali, and
create domestic appliances that
perfectly incorporate the SMEG philosophy –
Technology with Style.	
SMEG & GUIDO
CANALI
Smeg’s complete range of aesthetically refined built-in ovens has evolved
through serious research, offering peak performance across a range of
functions and guaranteeing maximum flexibility of use and maximum safety.
OVENS
Inspired by the ranges used by the world’s greatest chefs, Smeg offers genuine
design icons where style and elegance go hand in hand with high performance,
user-friendliness and minimal consumption.
RANGES
Vibrant colors and retro design equals stylish appliances.
REFRIGERATORS
Smeg’s built-in dishwashers are the perfect way
to high style. Exceptionally quiet and incredibly
well designed, the dishwashers vary in terms of
style and load capacity.
DISHWASHERS
91
93
The name Liebherr symbolizes innovation, quality, skill
and drive. Recognized as a specialist in refrigeration
& freezer technology worldwide, Liebherr constantly
introduces newer solutions for your food’s freshness.
The combination of trendsetting materials and classic
lines offer a distinct design that gives the products their
unique identity. It becomes a tangible expression of the
superior quality expected in a Liebherr appliance.
Why buy a Liebherr?
92
94
96
Terms & Conditions
General Terms:
1. Limitation of Liability
Mega Supply Store’s liability for any and all claims of any kind, including negligence, for any loss or damage
arising out of, connected with or resulting from Mega Supply Store’s performance or breach of the terms
hereof shall, in the aggregate, not exceed the purchase price of the particular product. In no event shall Mega
Supply Store be liable for indirect, special, incidental or consequential damages resulting from or arising out
of performance of or failure to perform its obligations hereunder. Whether or not Mega Supply Store had
been advised of, knew, or should have known of the possibility of such damages.
2. Severability
If any portion or provision of these terms applicable to any situation or circumstance is held invalid, the
remainder of these terms or the remainder of such provision (as the case may be), and the application thereof
to other situations or circumstances shall not be affected thereby.
3. Assignment
None of the Buyer’s rights under these terms shall be assigned or otherwise transferred by the Buyer to any
other person, whether by operation of law or otherwise, without our prior written approval.
4. Law and Arbitration
These terms are governed by the laws of the State of Georgia. Any controversy or claim arising out of or
relating to these terms or the breach hereof shall be finally settled by arbitration in Clayton County, Georgia
in accordance with the prevailing commercial rules of the American Arbitration Association, and the parties
shall have the right to take depositions and obtain discovery regarding the subject matter of the arbitration
as if the subject matter of the arbitration were pending in a civil action before a Superior Court of the State of
Georgia. Pending decision by the arbitrator(s) the parties shall diligently proceed pursuant to the terms and
conditions hereof. The award of the arbitrator(s) shall be final, binding and conclusive on the parties hereto
and their successors and assigns. Judgment upon an arbitration award hereunder may be entered in any
court having jurisdiction thereof or application may be made to any court for individual acceptance of the
award or an order of enforcement, as the case may be.
5. Entirety of Agreement
These terms are intended as a complete and exclusive statement of the terms and conditions of their
agreement. No other terms and conditions, whether contained in Buyer’s purchase order, shipping release
or elsewhere that are inconsistent with, additional to, or different from the terms and conditions herein shall
be binding upon Mega Supply Store unless specifically agreed to by Mega Supply Store in writing.
6. Assent
Receipt by Buyer of acceptance of the order or receipt of the products without prompt objection to the terms
and conditions herein set forth, constitutes acceptance by Buyer of these terms and conditions.
Payment Terms:
1. Payment
All invoices are due net 30 days following the date of the invoice. All payments shall be made in U.S. Dollars.
Service Fee: If payment is not timely, Mega Supply Store shall be entitled, in addition to other legal rights
and to the extent permissible by applicable law, to a service fee of 1-1/2% per month (18% per annum) on any
unpaid balances to cover additional administrative costs of collecting such balances.
2. Orders
All orders are subject to approval and acceptance by Mega Supply Store. Orders will be accepted only upon
the understanding that the terms and conditions herein shall be applicable. Unless Mega Supply Store so
agrees in writing, any terms and conditions appearing in Buyer’s order contrary to those stated herein are
deemed waived by Buyer. After an order has been accepted, it may be modified or canceled only upon the
written agreement of Mega Supply Store.
3. Disclaimer
Information presented in this book, and on Mega Supply Store’s web site (www.megasupplystore.com) is
provided “as is”. Mega Supply Store makes no warranties, expressed or implied, and hereby disclaims and
negatesallotherwarranties,includingwithoutlimitation,impliedwarrantiesorconditionsofmerchantability,
fitness for a particular purpose, or non-­infringement of intellectual property or other violation of rights.
4. Revisions and Errata
The information appearing on Mega Supply Store’s web site and in this publication could include technical,
typographical, or photographic errors. Mega Supply Store does not warrant that any of the materials on its
web site and in this catalog are accurate, complete, or current. Mega Supply Store may make changes to the
materials contained on its web site or in this catalog at any time without notice. Mega Supply Store does not,
however, make any commitment to update the materials.
5. Privacy Policy
Your privacy is very important to us. Accordingly, we have developed this Policy in order for you to understand
how we collect, use, communicate and disclose and make use of personal information.
The following outlines our privacy policy:
Before or at the time of collecting personal information, we will identify the purposes for which information is being
collected. We will collect and use of personal information solely with the objective of fulfilling those purposes specified
by us and for other compatible purposes, unless we obtain the consent of the individual concerned or as required by
law. We will only retain personal information as long as necessary for the fulfillment of those purposes. We will collect
personal information by lawful and fair means and, where appropriate, with the knowledge or consent of the individual
concerned. Personal data should be relevant to the purposes for which it is to be used, and, to the extent necessary
for those purposes, should be accurate, complete, and up-­to-­date. We will protect personal information by reasonable
security safeguards against loss or theft, as well as unauthorized access, disclosure, copying, use or modification. We
will make readily available to customers information about our policies and practices relating to the management of
personal information. We are committed to conducting our business in accordance with these principles in order to
ensure that the confidentiality of personal information is protected and maintained.
99
Shipments:
1. Delivery
We use UPS for ground shipping. Shipments often need to be signed for, while shipments can also be left at
the driver’s discretion.
Curbside Delivery (Also called Freight or “LTL” Shipping): This is reserved for large, heavy, or oversized
items like large sinks, bathtubs, shower doors, etc. Items are palletized and loaded onto a large truck for
shipment, and delivered by scheduled appointment by lift-gate for to-the-curb service. All items must be
inspected for freight damage prior to the driver leaving. Shipment time is 7-10 business days.
2. Acceptance
Buyer shall diligently inspect product upon arrival at specified destination and shall within 48 hours notify
Mega Supply Store as to any conditions which exist that prevent Buyer’s acceptance of product. Failure to
notify Mega Supply Store of any such conditions with 10 days of such arrival shall result in acceptance of the
products by Buyer.
3. Excusable Delay
Mega Supply Store is not responsible or liable for any delays or any failure to perform due to unforeseen
circumstances or causes beyond Mega Supply Store’s control, when such delay or failure is due, directly
or indirectly, to acts of God, war (including civil war), riots, zombie apocalypses, embargoes, acts (whether
sovereign or contractual) of civil or military authorities, acts of any government, major change in economic
conditions, fires, floods, explosions, the elements, epidemics, quarantine restrictions, strikes, lockouts,
manufacturer plant shutdowns, slowdowns, accidents, shortages of energy, materials, component parts,
labor, or delays of suppliers or subcontractors. In the event of an excusable delay, Mega Supply Store shall
promptly notify the Buyer of such delay and an equitable adjustment shall be made in delivery schedules and
any other affected terms and conditions.
Return Policy:
We take your business seriously, and your satisfaction with our products is of utmost importance to us. To
meet your standards of quality and service, we work selectively with the most reputable manufacturers
that have shown the highest level of commitment to their partners and customers. However, Mega Supply
Store is a vendor, and while we do produce a portion of the products we offer, most of the products are
manufactured by companies that own the rights the respective products. Therefore Mega Supply Store has
a limited control over the quality of merchandise offered on its site. With this in mind, we strive to offer a fair
market environment with everyone’s satisfaction in mind. If, for any reason, your shipment is not satisfactory,
we will gladly replace it or accept a return of the merchandise. Please adhere to the following return policy:
1. Not What You Ordered
A lot of the shipping process is controlled by automated systems that greatly facilitate the ordering process
and streamline your deliveries. Occasionally though, systems fail and mistakes happen, and as the result,
a wrong size or style will be shipped. You will notice that the many boxes in which products ship are very
similar in size and shape, so it is important that you check your order before opening the boxes. If you happen
to receive an item you did not order, please contact us within 48 hours at 1.855.634.2830 and we will do our
best to correct the situation.
2. Ordered the Wrong Size/Style
Please be sure to make accurate measurements before ordering products that require being fit or installed
into specific size spaces. If you receive your merchandise and find that it is the wrong size, we will gladly
replace your order, but you will be charged for the return of the wrong size product.
3. Refunds
The following items may be returned for a refund:
• Merchandise that has not been removed from its original packing
• Defective merchandise
• Merchandise that was mispacked or was not shipped correctly
• Merchandise that has not been installed, and is in new condition
Returns can only be made within 30 days of receiving your product(s). Exchanges can only be made within
30 days of receiving your product(s);
4. Restocking Fee
A 25% restocking fee will be charged on all returned merchandise, unless defective or damaged in shipment.
We are not responsible for any labor costs, which occur as the result of the installation of wrong or defective
parts. In addition we are not responsible for lost shipments. You must file a lost shipment freight claim with
the respective shipper. Please note that we can not refund credit card or paypal payments after 60 days.
5. How to Return Items
If you wish to return a product that you purchased from us, it is important that you create a Return
Authorization Number so that we know it is coming and can make sure credit is properly applied. To do this,
you must contact us within 30 days and will walk you through the steps. It is important to make sure that all
items that are being returned are properly packaged. Once received it will be inspected for damages and the
corresponding return stocking fee will be applied (unless otherwise stated).
CUSTOM ORDERS
Please note: custom orders begin production immediately upon order and are built to your specifications.
They cannot be canceled, changed, returned or refunded at any time.
Monroe Office Center
1 Winding Drive, Philadelphia, PA 19131
tel: 855.634.2830 | fax: 215.893.4844 | email: info@megasupplystore.com
© 2015 Mega Supply Store LLC
Printed in the USA, on recycled paper

Mega Supply Store catalogue

  • 1.
    Mega Supply Store 1Winding Drive, Philadelphia, PA 19131 tel: 855.634.2830 | fax: 215.893.4844 | email: info@megasupplystore.com www.megasupplystore.com
  • 2.
    At Mega Supply,we strive to revolutionize conventional construction and design practices by connecting manufacturers of dynamic and sustainable materials with virtually all sectors of the construction industry. An individual creative approach is applied to stylistic, functional, and budgetary needs of your projects. Where before such undertakings like planning low-income multi-housing and construction of state-sponsored educational facilities were limited by tight budgets and non-existing margins, we have now developed an exceptionally efficient system that incorporates contemporary and realistic expectations of value, rigorous design research, and uncompromising quality control. With a passion for aesthetic appeal and deep commitment to utility and dependability, we work tirelessly to ensure that your needs are met in their entirety: we promise to go the extra mile to make that extra phone call to find or manufacture what you need and deliver it without delay. HeIIo& Aside from staying on top of the game in business practices and customer service, we are working with top construction and building rehabilitation professionals to develop new ways to evoke the peace and satisfaction on the consumer end. Mega Supply continually invests in European and Asian trend research, safer and stronger hardware, and materials with the intention to turn your creative ambitions into real measurable performance and impeccable reputation. Whether residentialorcommercial,fromthemostgrandiosecommunityinitiativestoelementalrenovation tasks, by attending to the finest details and utilizing proven principles of industrial technology and product design, we try to bring contentment to daily lives of all parties involved. Whether your expertise lies in green government contracts or ultra-chic masterpieces of urban red carpet hospitality, you will find the perfect fit in our broad assortment of products and materials. We value imagination and do the best we can to catalyze cutting-edge ideas. We encourage our clients and suppliers to cultivate and expand their expertise in every aspect of design, construction, production, and service. We seek to live in awareness, taking sincere pride in our work, and nurturing passion for many areas of creative expression and human-centered design process. WeIcome! 4 4 www.megasupplystore.com www.megasupplystore.com
  • 3.
    Past Projects 6 Custom Windows& Doors 10 Custom Size Closets 14 Sasha Alexandra Shower System 16 TOTO Toilets & Bathroom Fixtures 18 RoyoBath Vanities 24 Recessed Linear Lights 28 Hinkley Lighting 29 Ceiling Fans 30 Elitis Wallpaper 32 Lustrolite Acrylic Wall Panels 40 American Floor and Wall Tile 42 Central Tile Import 48 Bruce Flooring 50 Armstrong Flooring 51 Grohe Plumbing Fixtures 52 Artos Bathroom Accessories 55 Blanco Professional Kitchen Sinks 56 Schlage Locks & Security 57 Cavaliere Range Hoods 58 Faber Range Hoods 59 Hafele 60 Richelieu 63 Mecho Systems 66 Bio Bidet 67 DreamLine Shower Doors & Enclosures 68 Tile-Redi Shower Pans & Shelves 71 Amerec Sauna Systems 72 SteamSpa Steam Generators 73 Finlandia Sauna 74 Jacuzzi 76 Feeney 77 Lighted Mirrors 78 Samsung Appliances 79 Frigidaire Appliances 81 GE Appliances 83 LG Appliances 86 Electrolux 89 SMEG 91 Liebherr 92 Graco Paint Solutions 93 SprayStone Architectural Finish 94 Terms & Conditions 96 MegaPro PortaI!INTRODUCING Table of Contents Mega Supply Pro Services: Our professional services division helps businesses that contract with clients to locate and secure various types of resources that are desired by the client. Mega Supply Store’s procurement efforts are structured to find, qualify, and procure specific types of resources, such as raw materials for a construction project, or provide services that make it possible to locateandsecureanytypeofitemsneededbythecustomer. Weestablishlong-termrelationshipswithclients, accepting multiple assignments on an ongoing basis, or contract to accept a single project. The process of procuring the necessary resources saves our clients time, money, and most importantly – it alleviates project management headaches. We’ll take the hassle of Development Contract Management out of your project at NO EXTRA COST. We’ll work with your budget to find the most suitable products and materials, including custom or alter- native solutions for the task at hand, regardless of its complexity. Our experts offer a comprehensive spectrum of Competent Construction Services, as well as resource management, and logistics. We under- stand coordination, risk, cost of delays, tight schedules, phased work plans, regulatory compliance & quality control. Price negotiation is our bread & butter; it’s where our paycheck comes from... Our clients tell us that nothing takes more time and energy than getting through the hoops and tricks of “commoditized solutions”, “blind RFPs”, “reverse auctions” and other hardball sales tactics. This is where our value proposition expertise comes in handy: whether focusing on discrete units, or the overall deal, – we know the numbers. Our extensive presence on the wholesale market, and construction merchandising experience gives us an edge in finding raw materials and products to satisfy any specifications, and contract terms. As part of our commitment to your success in executing the contract, we utilize a number of resources to confirm the completion of submittals, provide project lifecylce observation, and confirm the completeness of deliveries. Additionally, we track and coordinate deliverables with overall project schedule parameters to assure that specified materi- als are on site, ready for installation, and commissioned on schedule. For more info, contact us directly at: info@megasupplystore.com 855.634.2830 PROCUREMENT PRICE NEGOTIATION SCHEDULE & CONTRACT MANAGEMENT
  • 4.
  • 6.
    11 B-Pro Safeguard is theBlast Fenestration Division of Mega Supply, created to fill special orders that meet the Department of Defense UFC 4-10-01 (2007) AT/FP criteria and to provide the U.S. military and other U.S. government agencies with the most advanced andcost-effectiveprotectiveglazingsystems.B-Proproducts include commercial and residential doors, entryways, and window systems developed by the world’s most experienced teams of engineers and other professionals in the field of blast mitigation, and were subjected to a rigorous series of explosive detonation, structural stress and AAMA testing. B-Pro Safeguard operates a state of the art plant equipped with modern machinery dedicated to manufacturing of blast mitigation window and entry systems. Our team is committed to the highest standards of quality, service and support. Technology B-Pro Safeguard offers an extraordinarily sophisticated, patented Energy-Absorbing system approach. This technol- ogy utilizes the frames, glazing, hardware and anchoring system as energy dissipating components. Once hit by the blast wave’s dynamic loading, those components gradually deform, absorbing a significant portion of the blast energy which allows the glazed unit to stay in the opening and to protect the people within the building. The real-life experience of the B-Pro’s engineering team includes hundreds of thousands successful installations, as well as development of numerous blast mitigation systems for windows, doors and curtain walls. It has provided B-Pro with the expertise in designing and refining the product in order to meet the most demanding architectural criteria while providing the highest level of blast protection required. All B-Pro products are modular stackable units that are interconnected and can be mulled together within a single opening with no need for mullions or other reinforcement. For more info, including testing data and orders, contact: Mega Supply Store info@megasupplystore.com 855-634-2830
  • 7.
    12 13 Applications: • 1sliding sash+1 fixed • 2 sliding sashes • 3 sliding sashes Product Benefits: • All-round locking points ensure high uniform gasket compression. • Additional locking points provide maximum tightness and greater security. • Innovative closing movement perpendicular to the frame profile. • All-round gasket. • All locking points controlled by the handle. • Air permeability class 4 (DIN EN 1026 / 12 207). • Water tightness class 9A (DIN EN 1027 / 12 208). • Sash widths of 600-1500 mm. • Sash heights of 700-2500 mm. U22hr is a sliding door setting new standards when it comes to window and door tightness. Therefore, it is ideal for use in high-rise buildings where high wind loads occur. The product hardware is guaranteed to remain tightly sealed even in thunderstorms where wind gusts and torrential rains are hitting the glass and window frame directly. There is no trace of draughts or rattling sashes thanks to this unique technology. combining experience and innovation www.megasupplystore.com U22hr C O M B I N I N G E X P E R I E N C E & I N N O V A T I O N www.megasupplystore.com info@megasupplystore.com tel: 855.634.2830 | fax: 215.893.4844 Window and door system Retro style. B11tb is designed to meet unique look for unique people. The narrow profiles give you a steel look like, windows and doors, for private homes and residential buildings. Product benefits: * Narrow look. * High energy saving performance. Features: * Hinged window and door in and out, tilt & turn. * Double window. * Fixed window. * Up to 2“ insulating glass. www.megasupplystore.com combining experience and innovation B11tb C O M B I N I N G E X P E R I E N C E & I N N O V A T I O N www.megasupplystore.com info@megasupplystore.com
  • 8.
  • 9.
  • 10.
    Mega Supply Storeis excited to offer TOTO’s technologies and innovations in engineering. TOTO’s performance design and sustainability are all done with people in mind. The ultimate in luxury and elegance coupled with unrivaled TOTO research and development, this Neorest features highly technologically advanced features, including automatic lid operation, Cyclone flushing system, remote control operation, nightlight and SanaGloss, an extraordinarily smooth, ion-barrier surface to keep your toilet bowl clean. 18
  • 11.
    The TOTO Washlet Ecology-mindedluxury in a slim design, the TOTO Washlet features the technologically advanced ewater+ system, which mists and cleans the bowl with electrolyzed water after every use. Fully automated, including remote control and heated seat.
  • 12.
    22 23 Aimes® One-Piece Toilet,1.28GPF, Aquia® One-Piece Toilet, 1.6 GPF & 0.9 GPF, Elongated Bowl MS654114MF#01 Carlyle® II One-Piece Toilet, 1.28 GPF, Elongated Bowl MS614114CEFG#01 Carlyle® II Connect+™ S350e One-Piece Toilet MW614584CEFG#01 Carolina® II One-Piece Toilet, Elongated Bowl MS644114CEFG#01 Legato™ One-Piece Toilet, 1.28GPF, Elongated Bowl MS624214CEFG#01 Neorest® 550H Dual Flush Toilet, 1.0 & 0.8 GPF MS982CUMG#01 Aquia II Dual Flush Two- Piece Toilet, 1.6 GPF & 0.9 GPF, Elongated Bowl CST416M#01 Connelly® Two-Piece Toilet 1.28 GPF & 0.9 GPF, Elongated Bowl CST494CEMFG#01 Maris® Dual Flush Two- Piece Toilet, 1.28 GPF & 0.9 GPF, Elongated Bowl CST484CEMFG#01 Rowan™ Two-Piece Toilet, 1.6 GPF & 1.0 GPF, Elongated Bowl CST406MF#01 Vespin® II 1G Two-Piece Toilet, Elongated Bowl - 1.0 GPF CST474CUFG#01 Aquia® Wall-Hung Dual- Flush Toilet, 1.6 GPF & 0.9 GPF, Elongated CT418FG#01 DUOFIT In-Wall Tank System 1.6 GPF & 0.9 GPF Washlet® S300e Toilet Seat - Round with ewater+ SW573#01 Commercial Flushometer High Efficiency Toilet, 1.28 GPF, Elongated Bowl, Back Inlet Spud CT708EV#01 MS626214CEFG#01 WT151M#01 More TOTO products available by request
  • 13.
    24 The curved formsand the highly contrasting provided by the colors unite to create a communication between this series of furniture and the user. The continuous dynamism and movement created by curves transmit freshness or elegance in the bathroom space. To approach the customers, SOUL offers the range of finishes SOUL COLORS. Colors, from soft to bright colors that complete this collection and offer the opportunity to create charming ambiances.
  • 14.
    26 The new PLAYcollection is modular and dynamic. With designs for all types of spaces, you can play with multiple combinations in your home. Fill your bathroom with light and color using the PLAY sets. High Gloss finishes for a fresh look: White, Sand Brown, Grayish Blue, Aubergine and Anthracite. Large surfaces for all bathroom accessories and possibility to create sets with legs. SWIFT – a modern design gives an avant-garde air to your bathroom space. SWIFT offers four finishes: matte taupe, matte black, high gloss white and high gloss anthracite. Color contrast in your bathroom with an integrated handle in the front made of methacrylate white panel, allowing an easy opening while keeping the natural line harmony. New forms and easy storage with two drawer units with soft close system. Range of options: ceramic, glass and acrylic washbasins.
  • 15.
    28 29 LED RecessedLinear Light Fixture Hinkley 5654BN Latitude 4-Light 26” Bathroom Vanity Light Introducing the made-to-last recessed LED light fixture for any contemporaryinterior.Idealaccompanimenttomodernarchitectural styling, this narrow light installs flush with the surface - whether a ceiling, or a wall. Quality, technology, design and sustainability are set to ensure ultimate energy-saving solution for your home or office, storefront or a factory. Under four generations of family leadership, Hinkley Lighting has transformed from a small lantern company into a global brand, bringing you the best in style, quality and value. We thrive on personal relationships, regional roots, good design and a family atmosphere that is encouraged at every level of our company. If the past 90 years are of any indication, it is with great pride and excitement that we set our sight on the horizon and extend our commitment to keeping your Life Aglow. Specifications: Number of Bulbs: 4 Bulb Base: G9 Bulb Type: Halogen Bulb Included: Yes Watts Per Bulb: 60 Wattage: 240 Features: • Beveled/Etched shade composed of multiple glass pieces • Beveled glass shades offer a traditional style • Etched glass shade offer creative patterns and designs • Made of steel • Designed to cast a soft ambient light over a wide area • ADA compliant • Can be mounted with shade facing upward only • Suitable for damp locations Technologies: • Bulb Base - G9: a bi pin or bi pin socket • G9 bulbs have a pin spread of 9 mm and are used mostly in 120V or 230V fixtures with halogen bulbs. G9 Bulb base is designed for a Halogen bulb, but is also available as Fluorescent, LED, and Xenon/Krypton. • 100-240V / 50Hz • 24W & 2700K (color temp.) • 34 3/4” x 2 3/16” x 2.5” • 1 year limited warranty • Transformer included Height: 5.75”, Width: 26” Extension: 4” HCO: 3.25” Shade Width: 26” Backplate Height: 4.75” Backplate Width: 25” Compliance: ADA Compliant
  • 16.
    30 Minka-Aire F853-RW AviationCeiling Fan - 60” Rosewood Finish M-Flute 3-Blade Dimmable Ceiling Fan Light Molded Composite Rosewood finished blades are included as shown. Comes with Remote Control with Reverse (transmitter only for F853 fans only). The Minka Aire Aviation is fashioned after an antique airplane prop from early last century. This awesome looking fan features a super efficient DC motor that allows the focus to be on the propeller instead of the fanbody.Thisfanwillcertainlygainmanyadmirersoverthenextdecadeas it complements any space. Quiet, functional approach to fresh air: Clean lines, distinctive hanging system, classic construction and integrated lighting make it a perfect fit for any space. TheM-Flute’scombinationoftheintegratedhalogenlightanddistinctivehangingsystemgivesthiscontemporarydesign a compelling and sophisticated presence. The integrated light kit includes a halogen bulb for brilliant illumination. The handy wall control offers independent light and speed controls. Features: Integrated Light: 1 (One) 100-Watt/120-Volt Mini Can Halogen Bulb (included) Light Dimmer: Full Range + On/Off Integrated Opal Glass Shade Finish: Brushed Nickel Hardware, Mahogany Blades Suitable for vaulted ceilings: up to 30° incline Suitable for low ceiling application All necessary mounting hardware included Energy Info (at high setting): Airflow: 6700 CFM Electricity Use: 69 Watt (Fan Only) Airflow Efficiency: 97 CFM/Watt RPM: 80 (low)/180 (high) Amps: 0.32 (low)/0.52 (high) UL Indoor listed On/Off + Full Range Dimmer 3 Speeds Specifications: 3 Speeds: 45RPM - 76RPM - 117RPM Full Function Hand Held Remote Blade Sweep: 60 No. of Blades: 3 Downrod 1: 3.5” Downrod 2: 6” Lead Wire: 80 Height (Ceiling to Lowest Point): 12” Height (Ceiling to Blade): 10.5” Hanging Weight: 16.47” Motor Size: 120mm DC MOTOR
  • 17.
    Dare to bebold, innovate, and act as explorers in the field of furnishing fabrics and wall coverings, known tobemoretraditionaluntilnow,thisisourphilosophy. Design very contemporary products and always have an edge on the latest techniques, this could be our motto. Our in-house design department, a hive of activity like that of an experimental laboratory, traces the lines of research, diversity and innovative mixtures. The proposals, always surprising, create an event at every international exhibition. Mega Supply Store is proud to offer our latest and most sophisticated wallpaper and wall covering collections from Élitis which intertwine the arts and crafts with innovation, creativity and modernity. Mémoires 8 new designs with a warm feel. The panther, the zebra and the lion are the lords of Africa where we begin our collection. The skins are adorned with flock or metal, morph and become rugs, or are printed on leather. The plain range is revamped with shimmering metallic glints and changing inks colors. • Rolls 70cm x 10m • Digital printing • Large panoramic printed on Bois • Panoramic drops - 3.5m x 3m Wallpaper & Wall Coverings Non-inflammable: ASTM E84 Class A Composition: Vinyl on a paper ground Care: Washable Measurements +/- 3%: Rolls of 5 panels (27“ x 118” ea.) Pattern match: Panoramic design Sales units: Rolls Weight: 3.8 kg/roll VP 695 09 VP 653 01 VP 653 03 VP 653 04 VP 653 05 VP 659 01 32
  • 18.
    VP 755 01 VP 755 03 VP 755 05 VP 755 06 VP 756 01 VP 756 02 VP 756 04 VP 752 01 VP 752 02 VP 752 03 VP 752 04 34 Kandy As coming from another century and preserved in time, “Kandy” remains. Imagine walking bare feet on a floor covered with white sheets. There, dyers distill peels of pomegranate, turmeric and hibiscus to create the most beautiful yellows. Just a drop of indigo and deep greens appear while madder and rusted metal will give birth to blacks. Silk is here a mythical item. Sun light will play with it to reveal its various pigments along the seasons. • Reverse hanging recommended. • Great stain and abrasion resistance. Non-inflammable: ASTM E84 class A Composition: Vinyl on a paper ground Care: Extra washable Measurements +/- 3%: 10.9yd x 39.37” roll Pattern match: Random match Sales units: Roll Weight: 3.5 kg/roll
  • 19.
    37 37 TP 164 05 TP164 01 TP 166 07 TP 166 01 TP 166 06 Série Limitée Full-scale exhibition. A collector’s portfolio, SÉRIE LIMITÉE offers a selection of original designs in ink and varnish on an unwoven paper background. Unbridled creative freedom develops into a sketchbook of dream-like drawings and paintings which are highly colored and visionary. Non-inflammable: ASTM E84 class A Composition: Non-woven base Care: Washable Measurements +/- 3%: 27in. x 10.9yd ea. Pattern match: Reverse length and 15.7” dropped match Sales units: Rolls Weight: 1.1 kg/roll
  • 21.
    40 Lustrolite is anaward winning high gloss acrylic wall panel. It’s the new perfect material to create stunning bathroom and shower walls, kitchen backsplashes and commercial spaces. Lustrolitereplacestile,andlookslikeback-paintedglass.With a special hard coated top layer for extra scratch and chemical resistance,cleaningandmaintainingthesepanelsiseffortless. COLOR RANGE
  • 22.
    GEMSFLORIM USA FIorim USAis oneof the largest and most technologically advanced porcelain facilities in North America. Florim USA is more than just a company name; it is a residential and commercial brand that promises people in the American market a timeless and sustainable product offering. Florim USA is proud to be a Made in the USA product with an exclusive Italian style. 42
  • 23.
    12 6”x36” dark grey 13 PIETRA ROMANA An Italiantile made in the USA 14 18”x36” silver 5 a
  • 24.
    47 Brush Stroke Trim IRG624BT57 IRG624BT68 IRG624BT58 IRG624BT56 IRG624BT55 IRG612C057 IRG612C068 IRG612C058 IRG612C056 IRG612C055 IRG0524L57 IRG0524L68 IRG0524L58 IRG0524L56 IRG0524L55 OysterStroke Beige Stroke Walnut Stroke Nickel Stroke Ebony Stroke Liner Bullnose Cove Base 1/2 x 24 6 x 24 6 x 12 Brush Stroke Mosaics IRG12ML157 IRG12ML168 IRG12ML158 IRG12ML156 IRG12ML155 IRG12MB157 IRG12MB168 IRG12MB158 IRG12MB156 IRG12MB155 random mesh mounted on 12 x 12 sheet IRG12M5057 IRG12M5068 IRG12M5058 IRG12M5056 IRG12M5055 Oyster Stroke Beige Stroke Walnut Stroke Nickel Stroke Ebony Stroke Muretto Mosaic Lines 01 Mosaic Brick 01 Mosaic 1 x 12 mesh mounted on 12 x 12 sheet 1 x 2 mesh mounted on 12 x 12 sheet Beige Stroke 6” x 24” Made in the USA With corporate offices based in Anaheim, CA and production in Tennessee, Iris US can domestically produce and ship material all over the nation. Selling not only American made products, Iris US also has the ability to sell and promote the diverse majority of Iris-group products, which enables them to effectively accommodate all requests of sizes, textures & designs for interior and exterior, residential and commercial applications. Ragno USA has the production capabilities and technologies that produce fully-rectified, digital, color-body porcelain tiles with micro-beveled edges for a precision finish with the highest design and quality. Since 1982, Ragno USA, a division of the Marazzi Group, has played a key role in our industry by decisively meeting the tile needs of the American market. Oyster Stroke, Beige Stroke & Ebony Stroke 12” x 24”, 12” x 12”, 6” x 24” & other various cut down sizes Porcelainwood Collection Rectified Edge The tiles are mechanically finished with precise edges, allowing for tighter grout joint spacing during installation. ARTE COLOR BODY PORCELAIN TILE | RECTIFIED | MADE IN THE USA ARTEARTE COLOR BODY PORCELAIN TILE | RECTIFIED | MADE IN THE USA ARTEARTE • Manufacturer of a wide range of products: porcelain, glazed ceramic, glass mosaics, metals • Industry leader in color and design trends in tile and technology • 75 distribution warehouse locations across the country to provide superior service • Ragno’s state-of-the-art 3d printing technique allows for infinite design capabilities unique to Ragno
  • 25.
    Enjoy the powerand beauty of tile with no boundaries. Let us help create your dream interior or exterior atmosphere with our custom tile, imported from Spain and Italy. With over 30 years of experience, we have the perfect tile for your masterpiece. Hundreds of options and styles to choose from, this is your number one source for imported tile. 48
  • 26.
    Find the Brucehardwood floor that will transform your room. You’ll find a luxurious selection of beautiful floors in a variety of wood species, colors, textures, and specialty finishes. For a distinctive, one-of-a-kind floor, trust the top-selling brand of hardwood in North America: Bruce. Hardwood flooring can be an ideal flooring choice for just about any area of your home. Bruce hardwood floors are available in many colors and looks to match any style and decor. Browse our wood flooring to find wood floor that’s perfect for you. Armstrong offers hundreds of flooring options for you to choose from. Our hardwood floors are available in many popular wood species, from classic oak to exotic tropical hardwoods. Hardwood flooring has never been more popular. Armstrong’s hardwood floors are designed to match any décor – from sophisticated contemporary to distinctive, hand-scraped rustic. Wood flooring is suitable for most areas of the home, and all of our hardwood is backed by Armstrong’s industry-leading warranties. Prefer the look of ceramic tile, but don’t like the cold, hard surface? Check out our vinyl sheet and luxury vinyl flooring collections with a variety of tile, stone, slate looks - and a soft, warm feel underfoot. We also offer easy- to-clean vinyl tile floors, and rounding out our offerings, laminate flooring and linoleum floor covering. 50
  • 27.
    The bathroom isnow a place for rejuvenation and relaxation and a real pampering zone. Whether it’s a quick energizing shower first thing in the morning or a long, lingering candlelit soak before bed, our extensive range of faucets, showers and accessories will let you create the bathroom of your dreams. By combining superior technology with a choice of breath-taking designs, GROHE can provide you with all the elements to enhance your bathing space. An extensive portfolio of showering solutions, bathroom accessories and flush plates complement our faucets collections – enabling you to create a cohesive design scheme in your bathroom. Kitchen Faucets 52
  • 28.
    54 Bathroom Accessories Elegant Faucets,Towel Warmers, Shower Systems, Accessories and more 55
  • 29.
    56 57 A lot’schanged since Walter Schlage opened his first shop in 1920... At the same time, a lot hasn’t. BlancoAmericamanufactureshigh-qualitysinks,faucets and counters for residential and commercial purposes. Theyhavebeenaworldleader,since1925,withmorethan 30 million sinks produced in three factories world-wide. Blanco pioneered the use of stainless steel for kitchen sinks in 1952 and later Silgranit which is manufactured of 80% rock hard granite. Blanco products include sinks, faucets,counters,countertops,madeofgranite,stainless steel and composite for both the kitchen and bathroom. We’re still meticulous designers, painstaking engineers, and proud craftsmen. Nearly a century later, we’re proud to grace your doors with a growing menu of stylish, top-grade hardware.
  • 30.
    58 59 Cavaliere adheres toit’s key business principles concentrating on innovative products, devotion to customer service and overall professionalism. We are the specialist in stainless steel Range Hoods. Our collection incorporates superior components, and latest technologies making us a leader in the industry. Cavaliere focuses on the design and development of every product we produce while utilizing our own special understanding of the kitchen environment, ergonomics, aesthetics and integration within your home or workplace. Meanwhile with its technological strengths and marketing know-how, Cavaliere leads the Range Hoods industry, meeting the needs and demands of the largest domesticmarketintheworldwhilebecomingamodernbusinesscompetitorinthe international marketplace with high quality products and refined workmanship.
  • 31.
  • 32.
  • 33.
  • 34.
    66 67 Chain-driven MechoShade® roller screensare part of the most com- prehensive manual solar protection and room-darkening system on the market. They feature ThermoVeil® and EuroVeil® (visually-trans- parent sunscreens and room-darkening shades), a full range of hard- wareoptionsformanualshading(includingmulti-bandoperationwithone drive chain), and our Lifetime Limited Warranty with 100% replacement and no depreciation over the life of the warranty. ElectroShade® provides the ideal solution for inaccessible high bays, executive spaces, conference/training facilities, and other public areas. From the boardroom, to 40-foot-tall exhibition areas, there are ElectroShade solutions that meet your client’s criteria. The highly anticipated premier bidet class unveils a groundbreaking new breed of cleansing technology. Experience the distinction between the limitations of the past and the technological freedom of BioBidet withavastselectionofcleaningmethodsandwitness the latest level of unprecedented cleanliness with the exclusive inside-out nozzle cleaning technology. Know no boundaries in reaching your highest level of personal hygiene with BioBidet products!
  • 35.
  • 36.
    71 Tile Redi® offers theindustry’s largest selection of one-piece, Ready-to-Tile™ shower pans. Redi Base® shower pans come in over 100 standard models with a variety of shower pan sizes and drain locations. Because every shower design is different, we offer a variety of entrances as well. You can have a corner shower, double shower, peninsula shower, ADA shower, etc.
  • 37.
    72 73 Amerec hasbeen manufacturing quality steam bath generators for more than 30 years. Adding steam to a residential shower is good for the body and soul. It’s easy to enjoy the benefits of steam bathing in the privacy of your own home. In today’s hectic world, aren’t we all looking for a private retreat – a place to become refreshed physically and mentally? Imagine being able to come home from a long day at the office and slip into the comfort of your own bath time paradise. Your muscles finally relax. All the hassles of the day leave your mind. You feel every ounce of stress drain from your body. Amerec combines traditions with modern design and technology to create your own healthy escape. Whether you prefer Traditional Finnish Sauna or a custom sauna loaded with luxurious upgrades, Amerec has a perfect option for you. Amerec saunas are made of the finest materials available. Our wood, clear Western Red Cedar, is selected for its color, its performance in a sauna environment and its supreme quality. We work directly with Pacific-Northwest lumber mills to secure the finest Western Red Cedar available. It is then slowly kiln-dried and milled to our exacting standards and specifications. Our attention to wood quality gives Amerec saunas a more refined look and ensures years of enjoyment. Create a private sanctuary in the comfort of your own home. Let your stress melt away as you relax in our state of the art SteamSpa baths. SteamSpa utilizes the latest innovations in compressed hydrothermal technology to generate a steady flow of rich, soothing steam. SteamSpa has assembled complete generator packages based around the best selling generator, component and add-on combinations. Available in three levels of necessity and four brilliant finishes you will be sure to find the right set up for your every want and need. At home Imagine being able to shut the door on the world for a few minutes every day. Billows of warm, gentle steam wash over you, relaxingmuscles,openingpores,inducingaskin-healthyperspiration. SAUNA For Centuries people have recognized the health benefits of saunas. Leave your stress behind and enter a world of total relaxation, ridding you of pain, toxins, sore muscles, as well as increasing your blood circulation and leaving your skin glowing. Besides these physical effects, a SteamSpa session will leave you totally relaxed by providing you a peaceful and relaxing environment away from all. Our advanced technology, engineering, and product deve- lopment provides saunas that enhance the lifestyles of people throughout the world. SteamSpa is continuously refining,updating,andredevelopingtheirproducts,assuring optimum build and quality. Working with the industry’s top engineers,wehavedevelopedthemostefficient,dependable and highest quality products. SteamSpa’s steam generators provide continuous steam unlike other companies that emit steam periodically in spurts. SteamSpa is committed to the highest quality and most reliable steam generators on the market. That is why we can confidently offer 100% satisfaction guarantee. SteamSpa for health, beauty and relaxation.
  • 38.
    75 FpF56 western redcedar sauna with optional cedar exterior, cedar vent, and cooling bench with Free-standing legs. FpF77-7s panorama sauna oF western red cedar. FpF56 western red cedar sauna. FpF66 outdoor cedar sauna with Frp rooF kit. leFt: FpF66 western red cedar. center: FpF46 western hemlock sauna with optional permanent backrest and bench skirt. right: FpF68 western red cedar sauna with special Forest scene etched windows. Finlandia Sauna has been manufacturing authentic Finnish Sau- nas since 1964. Finlandia is the oldest Sauna company under its original ownership, and is located in the Finlandia Business Park in Portland, Oregon, the heart of the timber country, to provide the best quality and selection of softwoods. Unlike many of our competitors, we are specialists, Sauna is our only business. Finlandia Sauna builds standard and custom, precut and pre- fabricated Saunas out of premium, clear western softwoods. We import our Sauna heaters from Harvia Oy in Finland, because their heaters are unequaled in quality and in providing the right Sauna climate for the bather. Standard, Custom & Prefabricated Saunas!
  • 39.
    76 77 Bathing asnever imagined starts with your personal vessel of warm, enveloping water. For you, every possibility has been imagined … Shape ... Setting … Experience. All for your personal, rapturous delight. Be enchanted … Only with the Jacuzzi® brand. Jacuzzi® Outdoor Mega Supply Store is Jacuzzi authorized dealer in the US. Contact us for the latest models, pricing and availability! Therearemanywaysinwhichourqualityissuperior.For instance, we use type 316 marine-grade stainless steel for our cables and fittings and high strength 6000 series aluminum with state-of-the-art powder coating finishes for our railings and trellis. And, our product review and testing procedures are comprehensive and meticulous, ensuring consistent quality and performance. Feeney means quality!
  • 40.
    We have theability to create custom sizes and styles of mirrors using either fluorescent or LED technology. Creators is continually working to develop new products to bring to our commercial and residential customers. While using 5mm glass, stainless steel backing and other hi-tech features, we offer one of the highest quality lighted mirror products on the market. Our sleek appliance design offers ultimate storage capacity, flexibility and superior technology in a modern aesthetic. Upgrade your kitchen in style and performance! 78 79
  • 41.
    80 81 Samsung FrontLoad Washers Samsung Dryers Samsung Top Load Washers Clean and freshen your laundry more quickly, quietly and gently. Designed with innovative cleaning technology that deeply cleans even the biggest loads of laundry. Samsung Dryers come loaded with innovative features that leave your clothes fresh and clean while reducing the amount of time you spend in the laundry room. Whether you are shopping for a new gas dryer with the latest technology or a clothes dryer that uses less energy, you’ll find theperfectapplianceforyourhomeatSamsung. Samsung’s new Top Load Washers feature large capacity,innovativedesignandpowerfulcleaning technology allowing you to wash more laundry in a single load, saving you time and resources. Kitchen Appliances Ranges & Stoves Wall Ovens Refrigerators & Freezers Microwaves Cooktops & Stovetops Dishwashers
  • 42.
    82 83 BEST CLEANINGWASH Our exclusive wash system cleans your clothes thoroughly, ensuring whiter whites and tough stain removal, for maximum cleaning even with large loads. QUICK DRY Dries even extra-large loads quickly and efficiently. SUPER CAPACITY Fit more in every load. Wash & dry 3 days of laundry at once. ENERGY STAR® CERTIFIED Maximize your energy and dollar savings with ENERGY STAR® Certified Appliances. Refrigerators & Freezers by GE HOT WATER DISPENSER NOW WITH A KEURIG® K-CUP® BREWING SYSTEM! From a morning cup of coffee to a quick soup, our hot water dispenser makes your snack and drink preparation easier and faster than ever before. HANDS-FREE AUTOFILL Using multiple sensors to automatically measure bottles, water pitchers and cooking pots, the industry’s first laser-assist hands- free autofill automatically turns itself off when your container reaches 90%. So now you can focus on other things. FROST-FREE Prevents frost build-up, and means you never have to empty the contents to manually defrost. LED-LIGHTING AND ELECTRONIC TEMPERATURE CONTROL Automatic illumination on door open. Easy adjust the temperature and avoid releasing cold air by opening the door you never have to empty cold air by opening the door. AUDIBLE TEMPERATURE ALARM Alerts you if the door is left open or if the temperature rises.
  • 43.
    84 Microwaves, Ranges, Ovens,Cooktops and Combinations Microwaves Ranges Cooktops Microwave/Oven Combinations Single Wall Ovens Range Hoods Double Wall Ovens Washers Dryers Space Savers
  • 44.
    86 87 Keeping food freshfor as long as possible matters to all of us. Every LG French Door refrigerator features Smart Cooling Plus technology, designed to maintain optimum cooling temperatures throughout the refrigerator and freezer. LG’s Refrigerators offer the latest advances in food freshness combined with impressive storage capacity! LG’s advanced Linear Compressor is the engineering technology behind every LG French Door Refrigerator. Our Linear Compressor is designed with fewer moving parts than traditional compressors, resulting in less friction and significantly quieter operation. The enhanced reliability of our Smart Cooling System which incorporates the LG Linear Compressor technology ensures even cooling throughout the refrigerator... dependability that’s backed by LG’s 10-year limited warranty. Ranges Cooktops Wall Ovens Simplify cooking with LG microwaves and advanced features like EasyClean, Sensor Cooking Technology and One Touch settings. Microwaves Cook every meal with power and precision. LG ranges and cooktops boast innovative technology for restaurant-worthy performances every night of the week. And with their stylish clean lines, they'll blend seamlessly into your décor. Dishwashers LG’s powerful performance delivers superior cleaning results with a machine so quiet, you'll have to check whether it's on. Create a kitchen that will inspire you. With new state-of-the-art technology and sleek designs, our premium built-in ovens seamlessly blend style and innovation - making it easy to design a sophisticated space that's supremely functional.
  • 45.
    88 89 Washers &Dryers Your kitchen made easy, exclusively from Electrolux
  • 46.
    90 SMEG understands thatwhen architecture and art meet, beautiful and timeless objects are created. This knowledge has allowed the company to form close working relationships with some of the world's most renowned architects, such as Guido Canali, and create domestic appliances that perfectly incorporate the SMEG philosophy – Technology with Style. SMEG & GUIDO CANALI Smeg’s complete range of aesthetically refined built-in ovens has evolved through serious research, offering peak performance across a range of functions and guaranteeing maximum flexibility of use and maximum safety. OVENS Inspired by the ranges used by the world’s greatest chefs, Smeg offers genuine design icons where style and elegance go hand in hand with high performance, user-friendliness and minimal consumption. RANGES Vibrant colors and retro design equals stylish appliances. REFRIGERATORS Smeg’s built-in dishwashers are the perfect way to high style. Exceptionally quiet and incredibly well designed, the dishwashers vary in terms of style and load capacity. DISHWASHERS 91
  • 47.
    93 The name Liebherrsymbolizes innovation, quality, skill and drive. Recognized as a specialist in refrigeration & freezer technology worldwide, Liebherr constantly introduces newer solutions for your food’s freshness. The combination of trendsetting materials and classic lines offer a distinct design that gives the products their unique identity. It becomes a tangible expression of the superior quality expected in a Liebherr appliance. Why buy a Liebherr? 92
  • 48.
  • 49.
    96 Terms & Conditions GeneralTerms: 1. Limitation of Liability Mega Supply Store’s liability for any and all claims of any kind, including negligence, for any loss or damage arising out of, connected with or resulting from Mega Supply Store’s performance or breach of the terms hereof shall, in the aggregate, not exceed the purchase price of the particular product. In no event shall Mega Supply Store be liable for indirect, special, incidental or consequential damages resulting from or arising out of performance of or failure to perform its obligations hereunder. Whether or not Mega Supply Store had been advised of, knew, or should have known of the possibility of such damages. 2. Severability If any portion or provision of these terms applicable to any situation or circumstance is held invalid, the remainder of these terms or the remainder of such provision (as the case may be), and the application thereof to other situations or circumstances shall not be affected thereby. 3. Assignment None of the Buyer’s rights under these terms shall be assigned or otherwise transferred by the Buyer to any other person, whether by operation of law or otherwise, without our prior written approval. 4. Law and Arbitration These terms are governed by the laws of the State of Georgia. Any controversy or claim arising out of or relating to these terms or the breach hereof shall be finally settled by arbitration in Clayton County, Georgia in accordance with the prevailing commercial rules of the American Arbitration Association, and the parties shall have the right to take depositions and obtain discovery regarding the subject matter of the arbitration as if the subject matter of the arbitration were pending in a civil action before a Superior Court of the State of Georgia. Pending decision by the arbitrator(s) the parties shall diligently proceed pursuant to the terms and conditions hereof. The award of the arbitrator(s) shall be final, binding and conclusive on the parties hereto and their successors and assigns. Judgment upon an arbitration award hereunder may be entered in any court having jurisdiction thereof or application may be made to any court for individual acceptance of the award or an order of enforcement, as the case may be. 5. Entirety of Agreement These terms are intended as a complete and exclusive statement of the terms and conditions of their agreement. No other terms and conditions, whether contained in Buyer’s purchase order, shipping release or elsewhere that are inconsistent with, additional to, or different from the terms and conditions herein shall be binding upon Mega Supply Store unless specifically agreed to by Mega Supply Store in writing. 6. Assent Receipt by Buyer of acceptance of the order or receipt of the products without prompt objection to the terms and conditions herein set forth, constitutes acceptance by Buyer of these terms and conditions. Payment Terms: 1. Payment All invoices are due net 30 days following the date of the invoice. All payments shall be made in U.S. Dollars. Service Fee: If payment is not timely, Mega Supply Store shall be entitled, in addition to other legal rights and to the extent permissible by applicable law, to a service fee of 1-1/2% per month (18% per annum) on any unpaid balances to cover additional administrative costs of collecting such balances. 2. Orders All orders are subject to approval and acceptance by Mega Supply Store. Orders will be accepted only upon the understanding that the terms and conditions herein shall be applicable. Unless Mega Supply Store so agrees in writing, any terms and conditions appearing in Buyer’s order contrary to those stated herein are deemed waived by Buyer. After an order has been accepted, it may be modified or canceled only upon the written agreement of Mega Supply Store. 3. Disclaimer Information presented in this book, and on Mega Supply Store’s web site (www.megasupplystore.com) is provided “as is”. Mega Supply Store makes no warranties, expressed or implied, and hereby disclaims and negatesallotherwarranties,includingwithoutlimitation,impliedwarrantiesorconditionsofmerchantability, fitness for a particular purpose, or non-­infringement of intellectual property or other violation of rights. 4. Revisions and Errata The information appearing on Mega Supply Store’s web site and in this publication could include technical, typographical, or photographic errors. Mega Supply Store does not warrant that any of the materials on its web site and in this catalog are accurate, complete, or current. Mega Supply Store may make changes to the materials contained on its web site or in this catalog at any time without notice. Mega Supply Store does not, however, make any commitment to update the materials. 5. Privacy Policy Your privacy is very important to us. Accordingly, we have developed this Policy in order for you to understand how we collect, use, communicate and disclose and make use of personal information. The following outlines our privacy policy: Before or at the time of collecting personal information, we will identify the purposes for which information is being collected. We will collect and use of personal information solely with the objective of fulfilling those purposes specified by us and for other compatible purposes, unless we obtain the consent of the individual concerned or as required by law. We will only retain personal information as long as necessary for the fulfillment of those purposes. We will collect personal information by lawful and fair means and, where appropriate, with the knowledge or consent of the individual concerned. Personal data should be relevant to the purposes for which it is to be used, and, to the extent necessary for those purposes, should be accurate, complete, and up-­to-­date. We will protect personal information by reasonable security safeguards against loss or theft, as well as unauthorized access, disclosure, copying, use or modification. We will make readily available to customers information about our policies and practices relating to the management of personal information. We are committed to conducting our business in accordance with these principles in order to ensure that the confidentiality of personal information is protected and maintained.
  • 50.
    99 Shipments: 1. Delivery We useUPS for ground shipping. Shipments often need to be signed for, while shipments can also be left at the driver’s discretion. Curbside Delivery (Also called Freight or “LTL” Shipping): This is reserved for large, heavy, or oversized items like large sinks, bathtubs, shower doors, etc. Items are palletized and loaded onto a large truck for shipment, and delivered by scheduled appointment by lift-gate for to-the-curb service. All items must be inspected for freight damage prior to the driver leaving. Shipment time is 7-10 business days. 2. Acceptance Buyer shall diligently inspect product upon arrival at specified destination and shall within 48 hours notify Mega Supply Store as to any conditions which exist that prevent Buyer’s acceptance of product. Failure to notify Mega Supply Store of any such conditions with 10 days of such arrival shall result in acceptance of the products by Buyer. 3. Excusable Delay Mega Supply Store is not responsible or liable for any delays or any failure to perform due to unforeseen circumstances or causes beyond Mega Supply Store’s control, when such delay or failure is due, directly or indirectly, to acts of God, war (including civil war), riots, zombie apocalypses, embargoes, acts (whether sovereign or contractual) of civil or military authorities, acts of any government, major change in economic conditions, fires, floods, explosions, the elements, epidemics, quarantine restrictions, strikes, lockouts, manufacturer plant shutdowns, slowdowns, accidents, shortages of energy, materials, component parts, labor, or delays of suppliers or subcontractors. In the event of an excusable delay, Mega Supply Store shall promptly notify the Buyer of such delay and an equitable adjustment shall be made in delivery schedules and any other affected terms and conditions. Return Policy: We take your business seriously, and your satisfaction with our products is of utmost importance to us. To meet your standards of quality and service, we work selectively with the most reputable manufacturers that have shown the highest level of commitment to their partners and customers. However, Mega Supply Store is a vendor, and while we do produce a portion of the products we offer, most of the products are manufactured by companies that own the rights the respective products. Therefore Mega Supply Store has a limited control over the quality of merchandise offered on its site. With this in mind, we strive to offer a fair market environment with everyone’s satisfaction in mind. If, for any reason, your shipment is not satisfactory, we will gladly replace it or accept a return of the merchandise. Please adhere to the following return policy: 1. Not What You Ordered A lot of the shipping process is controlled by automated systems that greatly facilitate the ordering process and streamline your deliveries. Occasionally though, systems fail and mistakes happen, and as the result, a wrong size or style will be shipped. You will notice that the many boxes in which products ship are very similar in size and shape, so it is important that you check your order before opening the boxes. If you happen to receive an item you did not order, please contact us within 48 hours at 1.855.634.2830 and we will do our best to correct the situation. 2. Ordered the Wrong Size/Style Please be sure to make accurate measurements before ordering products that require being fit or installed into specific size spaces. If you receive your merchandise and find that it is the wrong size, we will gladly replace your order, but you will be charged for the return of the wrong size product. 3. Refunds The following items may be returned for a refund: • Merchandise that has not been removed from its original packing • Defective merchandise • Merchandise that was mispacked or was not shipped correctly • Merchandise that has not been installed, and is in new condition Returns can only be made within 30 days of receiving your product(s). Exchanges can only be made within 30 days of receiving your product(s); 4. Restocking Fee A 25% restocking fee will be charged on all returned merchandise, unless defective or damaged in shipment. We are not responsible for any labor costs, which occur as the result of the installation of wrong or defective parts. In addition we are not responsible for lost shipments. You must file a lost shipment freight claim with the respective shipper. Please note that we can not refund credit card or paypal payments after 60 days. 5. How to Return Items If you wish to return a product that you purchased from us, it is important that you create a Return Authorization Number so that we know it is coming and can make sure credit is properly applied. To do this, you must contact us within 30 days and will walk you through the steps. It is important to make sure that all items that are being returned are properly packaged. Once received it will be inspected for damages and the corresponding return stocking fee will be applied (unless otherwise stated). CUSTOM ORDERS Please note: custom orders begin production immediately upon order and are built to your specifications. They cannot be canceled, changed, returned or refunded at any time.
  • 51.
    Monroe Office Center 1Winding Drive, Philadelphia, PA 19131 tel: 855.634.2830 | fax: 215.893.4844 | email: info@megasupplystore.com © 2015 Mega Supply Store LLC Printed in the USA, on recycled paper