2. About the Company
Parent Company
• Largo Health Company
• Spun off from Largo to avoid distractions from other Largo businesses and
acquire market share.
Product
• Endoscopic Surgical Instruments
• Fall under “Minimally Invasive” Category
Primary Competitor
• National Medical Corporation
• Created $800 million of Market over a decade.
• National Medical concentrated on selling to surgeons.
3. Strategy Followed by the Company
• Aggressive competition with National Medical Corporation
• Developing new, low cost innovative instruments
• Selling them through a first-class sales force.
• Old products were updated with innovative features and presented to the
market as new products.
• A dozen or more new products would typically be introduced by Meditech
in any given year.
4. Problems Faced
• Growing customer dissatisfaction
• Strained production capacity
• Meditech consistently failed to keep up with demand during the flood of
initial orders.
• Poor service Delivery - customers had to wait over six week to have their
orders delivered.
5. Distribution
• Distribution through a Central Warehouse
• Primary Channels
Domestic Dealers
Primarily for domestic sales
Order and receive products from multiple
manufacturers
Independent and autonomous entities
International Affiliates
Wholly owned subsidiaries of Largo Healthcare
Product shipping throughout the country
International affiliates submit orders to Meditech and
Meditech fills them with available product.
6. Internal Operations
Assembly
• Manually Intensive
• Components parts placed in Inventory after Quality Assurance
• Run by a team of cross-trained production workers
• Typical cycle time – 2weeks
• Lead time – 2-16 weeks
Packaging
• Using several large packaging machines
• Enough capacity, has not restricted output
Sterilization
• Using a large cobalt radiation sterilizer
• Can sterilize as much product as will fit inside its four walls.
• Capacity limitations not a problem
8. Production Scheduling and Planning
Broken down into two parts
• Planning, based on monthly forecasts, of assembly and component parts orders
• Daily scheduling of packaging and sterilization based on finished goods inventory
levels.
Forecast
• Annual forecast during fourth quarter of each fiscal year.
• Monthly forecast based on annual forecast
Assembly Planning
• Based on monthly forecast
• Determining “Transfer Requirement” by following equation –
Transfer Req. = Demand forecast for the month + Safety Stock- Current inventory
level
9. Production Scheduling and Planning
MRP System
• Monthly forecast
• Lead time for assembly, packaging & sterilization
• Current parts, bulk, and finished goods inventory levels.
Packaging & sterilization
• Scheduled based on needed replenishment of finished goods inventory.
• Packaging and sterilization operations are considered one operation
• Order point/order quantity (OP/OQ) basis.
10. Production Scheduling and Planning
• Material being “pushed” through assembly into bulk instrument
inventory based on monthly forecast
• “Pulled” through packaging/sterilization into finished goods inventory,
replenishing being done from what was sold from finished goods the
day before
Fig: The Meditech Production Process
11. Reasons for Problems
• Problems with new product introduction
• Data to measure forecast accuracy had not previously been tracked
• Forecasts and demand information had not been kept.
• High finished goods inventory levels
• Despite the high levels of inventory, the actual service level over the
previous years were disappointing
• “Panic ordering” from dealers and affiliates.
• Decentralized nature of the regional warehouses
• Problems with data gathering
14. Q1)Problems in introducing new
products
Forecasting had definitely been a problem, but determining its extent was difficult. Data
to measure forecast accuracy had not previously been tracked
Meditech does not have separate forecast for new products. It goes from the yearly
forecast schedule
Every time a new product was introduced it resulted in serious supply problems[2-16
weeks] which in turn resulted in the dissatisfaction of customer due to poor service
resulting from each product introduction.
Backorder cancellations due to high waiting time
Meditech gives the impression that they were using a cost-effective supply chain,
instead of a responsiveness supply chain that they should have been using considering
highly innovative products.
They should plan a new introduction cycle two months before the sales force starts
marketing the product
15. Q1)Problems in introducing All
products
Meditech has too many products to be efficient at manufacturing from one facility.
• Inaccurate forecasts based on split of yearly forecasts
• Lack of information co-ordination
• Centralization of data is missing
16. Q3) Why is Customer Service Manager the first person to
recognize the major issues?
17. Q3) Why is Customer Service Manager the first person to
recognize the major issues?
18. Steps to Fix the Problems
• Centralization in Data storage : Uniting POS , Distribution Channels
and Production Channels. Role of technology.
•Leaner Product Portfolio.
•Need to keep high Service levels. Standardizing a certain safety
stock level in inventory.
• Focus in improving Supplier Lead time which is presently 2-16
weeks.