SlideShare a Scribd company logo
1 of 150
Download to read offline
Technische Universität Darmstadt | FG ee | El-Lissitzky--Str. 1 | 64287 Darmstadt



Deliverables June, 2nd 2009

Project Manual




                                                                                    Department of Architecture
Project Manual                                                                      Unit of Energy Efficient
                                                                                    Building Design

                                                                                    Prof. Manfred Hegger

                                                                                    El-Lissitzky-Straße 1
                                                                                    64287 Darmstadt

                                                                                    phone. +49 6151 16 - 2046
                                                                                    fax +49 6151 16 - 5247
                                                                                    henrich@ee.tu-darmstadt.de



                                                                                    June, 2nd 2009

                                                                                    www.solardecathlon2009.de




                                                                                    ee




                                                                                       Seite: 1/127
Table of Contents

1.  Summary Of Changes ........................................................................................... 6 
2.  Rules Compliance Checklist .................................................................................. 7 
3.  Construction specifications ................................................................................. 11 
  00  Procurement and Contracting Requirements ..................................... 11 
  01  General Requirements........................................................................ 23 
  01 53 00 Temporary Construction ............................................................. 23 
  01 54 00 Construction Aids ........................................................................ 25 
  01 54 23 Temporary Scaffolding ................................................................ 27 
  01 65 00 Product Delivery Requirements ................................................... 28 
  02  Existing Conditions - no entries ....................................................... 28 
  03  Concrete - no entries ........................................................................ 28 
  04  Masonry - no entries ........................................................................ 28 
  05  Metals ................................................................................................ 29 
  05 05 23 Metal Fastening ........................................................................... 29 
  05 14 00 Structural Aluminum Framing .................................................... 30 
  05 20 00 Metal Joists ................................................................................. 31 
  05 25 00 Aluminum Joist Framing ............................................................. 33 
  05 25 00 Aluminum Joist Framing ............................................................. 33 
  06  Wood, Plastics, and Composites ......................................................... 34 
  06 05 00 Common Work Results for Wood, Plastics and Composites ........ 34 
  06 11 00 Wood Framing............................................................................. 36 
  06 12 00 Structural Panels ......................................................................... 37 
  06 16 00 Sheathing .................................................................................... 38 
  06 17 33 Wood I-Joists ............................................................................... 39 
  06 40 00 Architectural Woodwork ............................................................. 40 
  06 60 00 Plastic Fabrications...................................................................... 41 
  06 60 00 Plastic Fabrications...................................................................... 41 
  07  Thermal and Moisture Protection ...................................................... 42 
  07 21 00 Thermal Insulation ...................................................................... 42 
  07 25 00 Weather Barriers ......................................................................... 44 
  07 26 00 Vapor Retarders .......................................................................... 45 
  07 55 00 Protected Membrane Roofing ...................................................... 46 


                                                                                                                    Seite: 2/127
07 62 00 Sheet Metal Flashing and Trim ................................................... 47 
07 71 23 Manufactured Gutters and Downspouts ...................................... 48 
07 90 00 Joint Protection ........................................................................... 49 
08  Openings ............................................................................................ 50 
08 10 00 Doors and Frames ....................................................................... 50 
08 50 00 Windows ..................................................................................... 51 
08 70 00 Hardware .................................................................................... 53 
08 80 00 Glazing ........................................................................................ 54 
09  Finishes .............................................................................................. 55 
09 20 00 Plaster and Gypsum Board .......................................................... 55 
09 60 00 Flooring ....................................................................................... 56 
09 80 00 Acoustic Treatment ..................................................................... 58 
09 90 00 Painting and Coating ................................................................... 59 
10  Specialties .......................................................................................... 60 
10 28 00 Toilet, Bath, and Laundry Accessories ......................................... 60 
10 70 00 Exterior Specialties ...................................................................... 61 
11  Equipment .......................................................................................... 62 
11 30 00 Residential Equipment ................................................................ 62 
12  Furnishings ........................................................................................ 63 
12 30 00 Casework ..................................................................................... 63 
12 40 00 Furnishings and Accessories ........................................................ 64 
12 50 00 Furniture ..................................................................................... 66 
13  Special Construction .......................................................................... 66 
14  Conveying Equipment ........................................................................ 67 
14 80 00 Scaffolding .................................................................................. 67 
21  Fire Suppression................................................................................. 67 
22  Plumbing ............................................................................................ 68 
22 10 00 Plumbing Piping and Pumps ....................................................... 68 
22 40 00 Plumbing Fixtures ....................................................................... 70 
23  HVAC ................................................................................................. 72 
23 30 00 HVAC Air Distribution ................................................................. 72 
23 50 00 Central Heating Equipment ......................................................... 74 
23 70 00 Central HVAC Equipment ............................................................ 75 
24  --- ....................................................................................................... 75 


                                                                                                                      Seite: 3/127
25  Integrated Automation ....................................................................... 76 
25 30 00 Integrated Automation Instrumentation and Terminal Devices .. 76 
26  Electrical ............................................................................................ 78 
26 05 00 Common Work Results for Electrical ........................................... 78 
26 20 00 Low-Voltage Electrical Distribution ............................................. 79 
26 30 00 Facility Electrical Power Generating and Storing Equipment ...... 81 
26 50 00 Lighting ....................................................................................... 83 
27  Communications ................................................................................ 84 
27 40 00 Audio-Video Communications ..................................................... 84 
28  Electronic Safety and Security ........................................................... 86 
28 05 00 Common Work Results for Electronic Safety and Security .......... 86 
28 30 00 Electronic Detection and Alarm................................................... 87 
29  --- ....................................................................................................... 88 
30  --- ....................................................................................................... 88 
31  Earthwork .......................................................................................... 88 
32  Exterior Improvement ........................................................................ 88 
33  Utilities............................................................................................... 88 
34  Transportation ................................................................................... 88 
35  Waterway and Marine Construction .................................................. 88 
36  --- ....................................................................................................... 88 
37  --- ....................................................................................................... 88 
38  --- ....................................................................................................... 88 
39  --- ....................................................................................................... 88 
40  Process Integration............................................................................. 88 
41  Material Processing and Handling Equipment ................................... 88 
42  Process Heating, Cooling, and Drying Equipment .............................. 89 
42 31 16 Dessicant Equipment ................................................................... 89 
43  Process Gas and Liquid Handling, Purification, and Storage
Equipment .................................................................................................. 89 
44  Pollution Control Equipment ............................................................. 89 
45  Industry-Specific Manufacturing Equipment ...................................... 89 
46  --- ....................................................................................................... 89 
47  --- ....................................................................................................... 89 
48  Electrical Power Generation ............................................................... 90 



                                                                                                                      Seite: 4/127
48 10 00 Electrical Power Generation Equipment ...................................... 90 
4.  Structural Calculations ....................................................................................... 91 
5.  Detailed Water Budget........................................................................................ 92 
6.  Summary of Unlisted Electrical Components ...................................................... 92 
7.  Retail PV Price Quote(s) ..................................................................................... 95 
8.  Summary of reconfigurable features ................................................................... 97 
9.  Interconnection Application Form .................................................................... 100 
10.  Energy Analysis Results and Discussion ............................................................ 101 
11.  Subjective Contest Support Documents ............................................................ 112 
11.1.        Architecture Design Narrative ..................................................................... 112 
11.2.        Market Viability Justification ...................................................................... 117 
  Construction ............................................................................................. 117 
  Liveability ................................................................................................. 117 
  Marketability ............................................................................................ 118 
11.3.        Engineering Design Narrative ..................................................................... 121 
11.4.        Lighting Design Narrative ........................................................................... 126 




                                                                                                                       Seite: 5/127
1.    Summary Of Changes

Since the last deliverables in December 2008 and the following workshop in
Washington D.C. in January 2009 the complete set of Construction
Documents of Team Germany has been revised.

There has been an intensive design and optimization process within the last
months bearing several new ideas and possibilities on different layers. We
spent a long time developing a façade with PV-application. Manufacturers and
sponsors guided and supported our research and design process for months
before admitting that this idea of a smooth and lightweight façade is
technically not yet producible.

The consequence of this development and the most apparent change since
December is that our façade had to become a new design. It is now a new
interpretation of our ideas for a PV-activated façade which should be easily
conceivable for other projects and adaptable for energetic renovations of
building stock. (See also Architecture and Engineering Design Narratives)

Other particular changes since December insist on our ceiling system that is
now a crucial component of our energy concept. The window’s positions have
changed due to further analysis and light-studies – attended by further
analysis concerning effective sun control devices.

Relating to the Rules Compliance Checklist the following changes have been
made:

4-5   noise reduction for equipment
5-2   effect of reconfigurable louvers integral to the façade’s structure
      necessary revision of solar envelope
6-4   new public tour route due to crossing points in December’s proposal
8-3   cooling system integral to void ceiling
8-6   changed from 3-phase system to required 1-phase system for
      Photovoltaic connection
         Façade
9-6   effects of cooling system integral to void ceiling




                                                                               Seite: 6/127
2.     Rules Compliance Checklist



Rule                                                                    Drawing Sheet(s)         Coordinate
        Rule Description         Content Requirement(s)
 #                                                                                               s
                                 Drawing(s) showing the assembly        O-210/O-229
                                 and disassembly sequences and the      O-310
 4-2    Construction Equipment
                                 movement of heavy machinery on
                                 the competition site
                                                                        No forklifts, or
 4-2    Construction Equipment   Specs for heavy machinery
                                                                        similar planned
                                 Drawing(s) showing the locations       S-206, S-553,
 4-3    Ground Penetration       and depths of all ground               S-554
                                 penetrations on the competition site
                                 Drawing(s) showing the location,       S-206
                                 contact area, and soil bearing
 4-4    Impact on the Turf
                                 pressure of every component resting
                                 directly on the turf
                                                                                                 PM: 26 32 00
 4-5    Generators               Specifications for generators                                   Specs
                                 Drawing(s) showing the locations of    P-111, P-211,
                                 all equipment, tanks, and pipes that   P-311, P-411,
 4-6    Spill Containment
                                 will contain fluids at any point       P-421, P-431
                                 during the event
                                                                                                 PM: 22 10 00
                                 Specifications for all equipment,                               Specs
 4-6    Spill Containment        tanks, and pipes that will contain                              PM: 33 16 00
                                 fluids at any point during the event                            Specs

                                 Calculations showing that structural   S-301
                                 design remains compliant even if 18
 4-7    Lot Conditions
                                 in. (45.7 cm) of vertical elevation
                                 change exists
                                 Drawing(s) showing shimming            S-301
                                 methods and materials to be used if
 4-7    Lot Conditions
                                 18 in. (45.7 cm) of vertical
                                 elevation change exists on the lot
                                 Drawing(s) showing the location of     L-641
        Solar Envelope
 5-2                             all house and site components
        Dimensions
                                 relative to the solar envelope
                                 List of solar envelope exemption       No exemption
        Solar Envelope           requests accompanied by                requests
 5-2
        Dimensions               justifications and drawing
                                 references




                                                                                  Seite: 7/127
List of, or marking on, all sheets in    S-201 – S-206
                              the complete electronic                  S-301 – S-303
                              Construction Documents that have         S-401 – S-408
                              been or will be stamped by the
                              structural engineer in the hard-
      Structural Design
6-1                           copy, stamped structural
      Approval
                              submission; the stamped
                              submission shall consist entirely of
                              sheets or pages that also appear in
                              the complete electronic construction
                              document set
                              Drawing(s) showing all information       A-223
      Maximum Architectural   needed by the Rules Officials to
6-2
      Footprint               measure the architectural footprint
                              electronically
                              Drawing(s) showing all movable           A-225
      Maximum Architectural   components that may increase the
6-2
      Footprint               footprint if operated during contest
                              week
                              Shading calculations and/or              A-225
                              diagrams for components that DO
                              NOT shade the building above its
                              finished floor height between 9 a.m.
                              and 5 p.m. EDT on October 1
      Maximum Architectural
6-2                           (shading calculations and/or
      Footprint
                              diagrams are not necessary for
                              components that are either shorter
                              than finished floor height or
                              obviously do not shade the
                              building)
                              Drawing(s) showing space                 A-224
      Minimum Conditioned
6-3                           conditioning means in primary
      Space
                              living spaces
                              Drawing(s) showing the accessible        X-211, X-311
                              public tour route and the ground         X-312, X-511
      Entrance and Exit
6-4                           surface area that will be covered by
      Routes
                              organizer-provided walkway
                              material
                              Drawing(s) showing the location of       L-511
                              all vegetation and, if applicable, the
7-1   Placement               movement of vegetation designed
                              as part of an integrated mobile
                              system
                              Drawings showing the layout and          P-511, P-521
7-2   Watering Restrictions   operation of greywater irrigation        P-531, P-541
                              systems                                  P-551
                                                                                              PM: 26 31 00
      PV Technology           Specifications for photovoltaic                                 Specs PV
8-1                                                                                           PM: 38 19 16
      Limitations             components
                                                                                              Specs Inverters
      PV Technology           Retail price quote for photovoltaic                             Retail PV Price
8-1                                                                                           Quotes
      Limitations             components


                                                                               Seite: 8/127
Drawing(s) showing the location of      M-231
8-3    Thermal Energy Storage
                                thermal energy storage components
                                Specifications for thermal energy                              PM: 23 56 00
8-3    Thermal Energy Storage                                                                  Specs
                                storage components
                                Shading calculations and/or                                    PM: 08 50 00
                                                                                               Specs
8-3    Thermal Energy Storage   diagrams for thermal energy
                                storage components (if necessary)
                                Drawing(s) showing the location(s)      No batteries used
8-4    Batteries                and quantity of stand-alone, PV-
                                powered devices
                                Specifications for all stand-alone,     No batteries used
8-4    Batteries
                                PV-powered devices
                                Drawing(s) describing the operation     M-222
8-5    Desiccant Systems
                                of the desiccant system
                                Specifications for desiccant system                            PM: 23 56 00
8-5    Desiccant Systems                                                                       PM: 42 31 16
                                components
                                                                                               Interconnection
                                Completed Interconnection
8-6    Village Grid                                                                            Application
                                Application form.                                              Form
                                Drawing(s) showing the locations of     A-225
                                                                        A-841, A-842,
                                the photovoltaics, inverter(s),
                                                                        A-844, A-852
8-6    Village Grid             terminal box, meter housing,
                                service equipment, and grounding
                                means
                                Specifications for the photovoltaics,                          PM: 26 31 00
                                                                                               Specs PV
                                inverter(s), terminal box, meter
8-6    Village Grid                                                                            PM: 38 19 16
                                housing, service equipment, and                                Specs Inverters
                                grounding means
8-6    Village Grid             One-line electrical diagram             E-506

                                Calculation of service/feeder net       E-501, E-502,
8-6    Village Grid
                                computed load per NEC 220               E-503, E-504
                                Site plan showing the house, decks,     L-511
8-6    Village Grid
                                ramps, tour paths, and terminal box
                                Elevation(s) showing the terminal       L-641, L-642
                                box, meter housing, main utility
8-6    Village Grid
                                disconnect, and other service
                                equipment
                                Drawing(s) showing the layout and       A-843
9-4    Rainwater Collection     operation of rainwater collection
                                systems
                                Drawing(s) showing the locations of     M-321 – M-351
9-6    Thermal Mass
                                water-based thermal mass systems
                                Specifications for components of                               PM: 23 71 13
9-6    Thermal Mass                                                                            Specs
                                water-based thermal mass systems
                                Drawing(s) showing the                                         See:
                                                                                               TUD_FINALCO
       Event Sponsor            dimensions, materials, artwork, and
10-2                                                                                           MMPLAN_2009
       Recognition              content of all communications                                  -06-02
                                materials, including signage




                                                                                Seite: 9/127
Drawing(s) showing the                                See:
                                                                              TUD_FINALCO
       Team Sponsor     dimensions, materials, artwork, and
10-3                                                                          MMPLAN_2009
       Recognition      content of all communications                         -06-02
                        materials, including signage
                        Interior and exterior plans showing                   X-211, X-311,
11-4   Public Exhibit                                                         X-312, X-511
                        entire accessible tour route
                        Drawing(s) showing the                                Not yet
                                                                              designed
11-4   Public Exhibit   dimensions, materials, artwork, and
                        content of the handout
                                                                              See:
                        Drawing(s) showing the artwork                        TUD_FINALCO
11-4   Public Exhibit                                                         MMPLAN_2009
                        and content of the team uniform
                                                                              -06-02




                                                              Seite: 10/127
3.       Construction specifications

00       Procurement and Contracting Requirements


00 01 01 Project Title Page

Title:               TEAM GERMANY SOLAR DECATHLON 2009 |
                     Technische Universität Darmstadt

Date:                April 2008 – October 2009

Construction Site:

Petersenstrasse; 64287 Darmstadt;
Parking Area between Cafeteria TU Lichtwiese and Department of Architecture

Student Team:

Leader internal: Annika Gaigl | a.gaigl@solardecathlon2009.de
Leader external: Sardika Meyer | s.meyer@solardecathlon2009.de

Faculty Advisors:

Architecture:        Professor Manfred Hegger | hegger@ee.tu-darmstadt.de
Organization:        Dipl.-Ing. Johanna Henrich | henrich@ee.tu-darmstadt.de
                     Dipl.-Ing. Jörg Wollenweber | wollenweber@ee.tu-darmstadt.de
Communications:      Dipl.-Ing. M.A. Caroline Fafflok | fafflok@ee.tu-darmstadt.de
Design and Engineering:      Dipl.-Arch. Hans Drexler | Dipl.-Ing. Martin Zeumer
Electr. Engineering: Dipl.-Ing. Lutz Steiner | steiner@re.tu-darmstadt.de
Struct. Engineering: Dipl.-Ing. Jochen Stahl | stahl@baustatik.tu-darmstadt.de

Team Germany Website, including Blog and Live-Webcam:

http://www.solardecathlon2009.de

Team Germany Contact:

team@solardecathlon2009.de




                                                                                     Seite: 11/127
00 01 15 List of Drawing Sheets

General
G - 101 - Cover Sheet
G - 102 - Table of Content
G - 103 - Table of Content
G - 104 - Table of Content
G - 105 - Table of Content
G - 106 - Table of Content
G - 201 - Design Concept
G - 202 - Strategies Of Energy Use
G - 203 - Sustainable Design
G - 204 - Symbols And Notes
G - 301 - Abbreviations
G - 401 - Target Market Description
G - 501 - Exterior Rendering - South East
G - 502 - Exterior Rendering - South West

Civil
C - 201 - Site 1:50
C - 301 - Grading 1:50

Lanscape
L - 111 Symbols and Notes 1:50
L - 211 Grading 1:100
L - 321 Secondary Construction 1:100
L - 322 Planking 1:100
L - 351 Deck Construction Detail 1:100
L - 411 Lighting Design 1:100
L - 511 Planting 1:100
L - 641 Elevation - North East 1:50
L - 642 Elevation - South West 1:50
L - 711 Schedules - Landscape
L - 712 Schedules - Landscape
L - 713 Schedules - Landscape
L - 714 Schedules - Landscape

Structural - General
S -101 - General Notes
S -102 - General Notes
S -103 - General Notes
S -104 - General Notes

Structural - Plans
S - 201 - Roof Framing 1:50
S - 202 - Upper Wall Framing 1:50
S - 203 - 2nd Floor Framing 1:50
S - 204 - Floor Framing 1:50
S - 205 - Platform Framing 1:50
S - 206 - Foundation Plan 1:50




                                            Seite: 12/127
Structural - Sections
S - 301 - Longitudinal Section 1:50
S - 302 - Cross Section 1:50
S - 303 - Cross Section 1:50

Structural - Elevations
S - 401 - Wall Construction North 1:50
S - 402 - Wall Construction East 1:50
S - 403 - Wall Construction South 1:50
S - 404 - Wall Construction West 1:50
S - 405 - Wall Sheathing North 1:50
S - 406 - Wall Sheathing East 1:50
S - 407 - Wall Sheathing South 1:50
S - 408 - Wall Sheathing West 1:50

Structural - VIP
S - 421 - VIP Floor Plan 1:50
S - 422 - VIP Roof Plan 1:50
S - 441 - VIP Plan North 1:50
S - 442 - VIP Plan East 1:50
S - 443 - VIP Plan South 1:50
S - 444 - VIP Plan West 1:50
S - 451 - VIP Structure 1:7
S - 461 - Schedules - VIP

Structural - Details
S - 511 - Wall to Roof Connection E-W 1:5
S - 512 - Wall to Roof Connection 1:5
S - 513 - Post to Beam Connection 1:5
S - 521 - Module Connection 1:5
S - 522 - Module Connection S-E Corner 1:5
S - 523 - Module Connection S-W Corner 1:5
S - 524 - Module Connection N-W & N-E Corner 1:5
S - 525 - Built-up Column GL 5 North 1:10
S - 526 - Built-up Column GL 8 North 1:10
S - 527 - Built-up Column GL 12 North 1:10
S - 528 - Built-up Column GL F East 1:10
S - 529 - Built-up Column GL 8 South 1:10
S - 530 - Built-up Column GL 12 South 1:10
S - 531 - Built-up Column GL F West 1:10
S - 532 - Roof to Wall Connection Z-Section 1:10
S - 533 - Module Connectors @ Corner 1:5
S - 534 - Module Connectors @ Corner 1:5
S - 535 - Typ- Module Connectors 1:5
S - 541 - Steel Edge to Wall Connection 1:5
S - 542 - Connection Details of Second Floor 1:5
S - 543 - 2nd Floor Edge Angle to Wood Post 1:5

Connection
S - 544 - 2nd Floor Connection @ Split of Building 1:5
S - 545 - 2nd Floor Opening for Mechanical 1:5
S - 546 - L- section 2nd fl oor North 1:20
S - 547 - L- section 2nd fl oor South 1:20

                                                         Seite: 13/127
S - 548 - 2nd fl oor to East wall connection South 1:20
S - 549 - 2nd fl oor to East wall connection center 1:5
S - 550 - 2nd fl oor to East wall connection North 1:10
S - 551 - 2nd fl oor to North & South wall connection 1:20
S - 552 - Holdown Anchor SW Corner 1:10
S - 553 - Central Wood Base 1:10
S - 554 - Northern Wood Base 1:10
S - 555 - Holdown Anchor SE Corner 1:5
S - 556 - Holdown anchor SE corner 1:5
S - 557 - Details Holdown Anchor 1:5
S - 561 - Wall to Floor Connection (West) 1:5
S - 562 - Section - Platform Connection 1:5
S - 563 - Connection of Steel Beam to Wall 1:5
S - 564 - Platform Module Connection 1:5
S - 565 - Temp - Bracing @ Platform Connection 1:5
S - 566 - Steel Beam to Wall Connection GL 11 1:5
S - 567 - Detail - Platform Connection GL 11 1:5
S - 568 - Section - Steel Beam @ Stairs 1:5
S - 569 - Steel Beam @ Ramp 1:5
S - 570 - Post to Steel Beam Connection 1:5
S - 571 - Platform Beam Connection 1.5
S - 572 - HEA 1 1:20
S - 573 - HEA 2 1:20
S - 574 - HEA 3 1:20
S - 575 - HEA 4 1:20
S - 576 - Steel Plate SB2 East & West Wall 1:5
S - 577 - Steel Plate SB1 North & South Wall 1:5
S - 578 - 2nd Floor Temp- Steel Post 1:20

Structural - Transport
S - 611 - Axonometry Lower North Module 1:50
S - 612 - Axonometry Lower South Module 1:50
S - 613 - Axonometry Upper North Module 1:50
S - 614 - Axonometry Upper South Module 1:50
S - 621 - Floor Plan Lower Modules 1:50
S - 622 - Floor Plan Upper Modules 1:50
S - 631 - Longitudinal Section E-W 1:50
S - 632 - Longitudinal Section W-E 1:50
S - 633 - Cross Section N-S 1:50
S - 634 - Cross Section S-N 1:50
S - 651 - Typ- Trans- Brace To Wall Connection 1:5
S - 652 - Trans- Brace To Roof Connection 1:5
S - 653 - Trans- Brace To Platform Connection 1:5
S - 654 - Threaded Rod To Roof Connection 1:10
S - 655 - Cable To Wall Connection 1:5
S - 656 - Becket to Platform Connection West 1:10
S - 657 - Becket to Platform Connection East 1:10
S - 660 - Anchor Overview 1:100
S - 661 - Trans- Brace Manufacturer Spec
S - 662 - Becket Manufacturer Spec
S - 663 - Cable & Tightener Manufacturer Spec-
S - 664 - Trans- Brace Platform Anchor West 1:5
S - 665 - Trans- Brace Platform Anchor West Rotated 1:5

                                                             Seite: 14/127
S - 666 - Trans- Brace Platform Anchor East 1:5
S - 667 - Trans- Brace Platform Anchor East Rotated 1:5
S - 668 - Trans- Brace East & West Wall Anchor 1:5
S - 669 - Trans- Brace North Wall Anchor 1:5
S - 670 - Trans- Brace Module Bonding Anchor 1:5
S - 671 - Trans- Brace South Wall Anchor# 1:5
S - 672 - Trans- Brace & Cable Anchor West Wall 1:5
S - 673 - Trans- Brace Roof Anchor 1:5
S - 674 - Trans- Brace Roof Anchor Rotated 1:5
S - 675 - Cable East Wall Anchor 1:5
S - 676 - Threaded Rod 1:10
S - 677 - Schedule - Transport
S - 678 - Schedule - Transport
S - 679 - Schedule - Transport

Structural - Traverse
S - 711 - Floor Plan Traverse 1:20
S - 712 - View From Below Traverse 1:20
S - 713 - Exploded Drawing 1:20
S - 714 - Axonometry Traverse
S - 715 - Schedules - Temporary Construction

Architectural - Plans
A - 221 - Floorplan 1:50
A - 222 - 1stFloor 1:50
A - 223 - Minimum Conditioned Space 1:50
A - 224 - Maximum Architectural Footprint 1:50
A - 225 - Moveable Components Shading Deck 1:100

Architectural - Elevations
A - 311 - Elevation North 1:50
A - 312 - Elevation East 1:50
A - 313 - Elevation South 1:50
A - 314 - Elevation West 1:50

Architectural - Sections
A - 431 - Longitudinal Section - North 1:50
A - 432 - Longitudinal Section - South 1:50
A - 433 - Cross Section - East 1:50
A - 434 - Cross Section - West 1:50

Architectural - Details - Windows
A - 510 - Key Plan Windows 1:100
A - 511 - Key Plan Windows 1:100
A - 520 - Window Elevation North 1:50
A - 521 - Window Elevation East 1:50
A - 522 - Window Elevation South 1:50
A - 523 - Window Elevation West 1:50
A - 540 - Window N1 Overview 1:20
A - 541 - Window N1 Detail 1 1:20
A - 542 - Window N1 Detail 2 1:20
A - 545 - Window N2 Overview 1:20
A - 546 - Window N2 Detail 1 1:20

                                                          Seite: 15/127
A - 550 - Window N3 Overview 1:20
A - 551 - Window N3 Detail 1 1:5
A - 552 - Window N3 Detail 2 1:2
A - 553 - Window N3 Lamella -
A - 580 - Window SW1 Overview 1:20
A - 581 - Window SW1 Detail 1 1:5
A - 582 - Window SW1 Detail 2 1:5
A - 595 - Schedules - Windows
A - 596 - Schedules - Opening Sun Control Devices

Architectural - Details - PV Mounting
A - 711 - PV Façade Elements -
A - 712 - Mounting Cramp 1:1
A - 713 - Gusset Plate 1:2
A - 714 - PV-Module 1:5
A - 715 - Acrylic Glass 1:5
A - 716 - Substructure - Components 1:10
A - 721 - Surface 1:100
A - 731 - Detail Façade - Roof 1:2
A - 741 - Detail Connection Façade - Window 1:2
A - 751 - Detail Façade - Deck 1:2
A - 761 - Detail Corner - Substructure 1:5
A - 771 - PV Wiring Type 1
A - 772 - PV Wiring Type 2
A - 781 - Schedules Façade

Architectural - Details - Roof
A - 810 - Key plan roof 1:50
A - 811 - Roof System - general
A - 831 - Sections Roof 1:20
A - 841 - Top View PV Modules 1:50
A - 842 - Top View PV Mounting System 1:50
A - 843 - Top View Drainage 1:50
A - 844 - Top View PV cable conduit 1:50
A - 851 - Detail roof system 1:2
A - 852 - Detail PV Mounting System Module Stoat 1:1
A - 853 - Detail PV fascia north-south 1:2
A - 854 - Detail drainage fascia north-south 1:2
A - 855 - Detail fascia east-west 1:2
A - 856 - Detail fall protection 1:5
A - 857 - Detail PV Mounting System section 1:1
A - 860 - Schedule - Roof 1
A - 861 - Schedule - Roof 2

Architectural - Details - Siding
A - 911 - Key Plan Elevations 1:75
A - 951 - Siding Detail Ceiling Floor 1:5
A - 952 - Siding Detail Cut 1:5
A - 953 - Siding Detail 1:5
A - 954 – Schedules Siding




                                                       Seite: 16/127
Interiors - Living Space- General
I - 200 - Body - Furniture Interior rendering
I - 201 - Body - Furniture Areas

Table of Contents
I - 202 - Body - Furniture Structure Scheme
I - 203 - Body - Furniture Cabinet Body Materials

Interiors - Living Space- Plans
I-210 - Body-Furniture Floor Plan 1st Floor 1:50
I-211 - Body-Furniture Floor Plan 2nd Floor 1:50

Interiors - Living Space- Sections
I-220 - Body -Furniture Longitudinal Section South 1:50
I-221 - Body -Furniture Longitudinal Section North 1:50
I-222 - Detail Longitudinal Section North Storage 1:20
I-223 - Detail Elevation Longitudinal Section South Stairs 1:20
I-230 - Detail Body-Furniture Cross-Section Stairs 1:20

Interiors - Living Space- Elevations
I - 240 - Body -Furniture Elevations 1:50
I - 241 - Detail Elevation South Stairs 1:20
I - 242 - Detail Elevation North Storage 1:20

Interiors - Living Space- Stairs
I - 270 - Stairs Stairs 1:50
I - 271 - Scheme Stairs Sections 1:20
I - 272 - Overview Handrail 2nd Floor 1:20
I - 273 - Overview Handrail Stairs 1:20
I - 274 - Steelprofile Steelstring Stairs 1:20
I - 275 - Steelprofile Handrail 2nd Floor North 1:5
I - 276 - Steelprofile Handrail 2nd Floor South 1:10
I - 277 - Steelprofile Handrail Stairs 1:10
I - 278 - Detail Steelprofile Handrail 2nd Floor and Stairs 1:2

Interiors - Living Space- Schedules
I - 280 - Schedules – Body Furniture
I - 281 - Schedules – Body Furniture
I - 282 - Schedules – Body Furniture

Interiors - Kitchen
I - 321 - Horizontal Section I 1:10
I - 322 - Horizontal Section II 1:10
I - 323 - Horizontal Section III 1:10
I - 331 - Vertical Section I 1:10
I - 332 - Vertical Section II 1:10
I - 341 - Elevation North 1:10
I - 342 - Elevation South 1:10
I - 351 - Technical Appliances I 1:10
I - 352 - Technical Appliances II 1:10
I - 353 - Schedules - Kitchen



                                                                  Seite: 17/127
Interiors - Bedroom
I - 411 - Concept Bedroom
I - 412 - Manual Bed
I - 421 - Floor Plan Bed 1:20
I - 431 - Longitudinal Section Bed 1:20
I - 432 - Across Section Bed 1:20
I - 451 - Construction Detail Bed 1:5
I - 452 - Ropes for Opening 1:5

Interiors - Bathroom
I - 510 - Concept
I - 521 - Floor Plan 1:20
I - 531 - Elevation North 1:20
I - 532 - Elevation East 1:20
I - 533 - Elevation South 1:20
I - 534 - Elevation West 1:20
I - 541 - Longitudinal Section 1:20
I - 551 - Detail Shower Tray 1:10
I - 561 - Schedules - Bathroom

Interiors - Flooring
I - 621 - Floor Plan level 0.5 1:50
I - 622 - Floor Plan level 1.5 1:50
I - 623 - Flooring Cable Conduit 1:50
I - 651 - Detail Cable Conduit 1:5
I - 652 - Detail Connection Wall / Window – Cable Conduit 1:5
I - 653 - Detail Connection Wall Level 0.0 + 1.5 1:5
I - 654 - Section - Stairs 1:5
I - 655 - Section - Ramp 1:5
I - 656 - Section Horizontale Module Cut Level 0.0 1:5
I - 657 - Section Horizontale Module Cut Level 0.5 1:5
I - 660 - Schedules - Flooring

Interiors - Renderings
I - 701 - Rendering
I - 702 - Rendering
I - 703 - Rendering

Fire - Protection
F - 111 - Symbols and Notes
F - 211 - Detection and Alarm
F - 311 - Suppression
F - 411 - Egress

Plumbing
P - 111 - Symbols and notes
P - 211 - Supply and Removal
P - 311 - Schematic Diagram
P - 411 - Water Supply
P - 421 - Water Supply 1:50
P - 431 - Water Supply 1:50
P - 511 - Waste Water Disposal
P - 521 - Waste Water Disposal 1:50

                                                                Seite: 18/127
P - 531 - Waste Water Disposal 1:50
P - 541 - Waste Water Disposal 1:10
P - 551 - Waste Water Disposal 1:10
P - 611 - Schedules - Plumbing
P - 612 - Schedules - Plumbing

Mechanical - Energy Concept
M - 101 - Systems
M - 102 - Flow Of Energy
M - 103 - PCM System
M - 104 - Heat Pump
M - 105 - Energy Themes
M - 106 - Scheme Summer Day
M - 107 - Scheme Summer Night
M - 108 - Scheme Winter Day
M - 109 - Scheme Winter Night
M - 110 - Scheme Spring Day
M - 111 - Scheme Spring Night
M - 112 - Planning Tools
M - 113 - Energy Balance

Mechanical - Drawings
M - 211 - Heat Pump System Schematic Diagram
M - 221 - Heat Pump System And Distribution Floorplan 1:50
M - 222 - Heat Pump System And Distribution Floorplan 1:50
M - 231 - Heat Pump System And Distribution Section 1:50
M - 271 - Heat Pump System And Distribution Isometric 1:50
M - 321 - Cooling Ceiling Section 1:50
M - 331 - Cooling Ceiling Section 1:50
M - 332 - Cooling Ceiling Section 1:20
M - 351 - Cooling Ceiling Detail 1:20

Mechanical - Schedules
M - 411 - Schedules - Mechanical
M - 412 - Schedules - Mechanical

Electric
E - 001 - Electrical Appliances And Installations
E - 002 - Building Automation - Utilization Concept
E - 121 - Electrical Appliances And Installations 1:50
E - 131 - Electrical Appliances And Installations 1:50
E - 132 - Electrical Appliances And Installations 1:50
E - 133 - Electrical Appliances And Installations 1:50
E - 141 - Placing Of Contest Sensors 1:50
E - 151 - Schedules - Electrical Appliances

Electric - Artificial Light
E-211 - Artificial Lighting Concept 1:100
E-212 - Functional Lighting Plan Upper Level 1:50
E-213 - Functional Lighting Plan Lower Level 1:50
E-214 - Functional Lighting - Sections 1:50
E-215 - Functional Lighting Integration LED strip
E-216 - Lighting Renderings

                                                             Seite: 19/127
E-217 - Accent Lighting Concept 1:50
E-218 - Accent Lighting Concept -
E-219 - Atmospheric Lighting Concept 1:50
E-220 - Multifunctional Body Illumination 1:1
E-221 - Light Switch Concept 1:50
E-222 - Lighting Schedules

Electric- Electrical Cabinet Outside
E - 301 - Electrical Cabinet Outside 1
E - 302 - Electrical Cabinet Outside 1
E - 303 - Electrical Cabinet Outside 2
E - 304 - Electrical Cabinet Outside 2
E - 305 - Electrical Cabinet Outside 2
E - 306 - Electrical Cabinet PV Inverter Joint
E - 307 - Electrical Cabinet PV Inverter Joint
E - 308 - Electrical Cabinet PV Inverter Joint

Electric - PV Interconnection
E - 309 - PV Interconnection Overview
E - 310 - PV Interconnection Overview
E - 311 - PV Interconnection Overview
E - 312 - Design Of PV Roof
E - 314 - PV Interconnection Overview Façade
E - 315 - PV Interconnection Overview Façade
E - 316 - PV Interconnection Overview Façade
E - 317 - PV Interconnection Overview Façade
E - 318 - PV Interconnection Overview Façade
E - 319 - PV Interconnection Overview Façade
E - 320 - PV Interconnection Overview Façade
E - 321 - PV Interconnection Overview Façade
E - 322 - PV Interconnection Overview Façade
E - 323 - PV Interconnection Overview Façade
E - 324 - PV Interconnection Overview Façade
E - 325 - PV Interconnection Overview Façade
E - 326 - PV Interconnection Overview Façade
E - 327 - PV Interconnection Overview Façade
E - 328 - Design Of PV Façade
E - 329 - Design Of PV Façade
E - 330 - Design Of PV Façade

Electric - Electrical Cabinet Inside
E - 401 - Electrical Cabinet Inside
E - 402 - Electrical Cabinet Inside
E - 403 - Electrical Cabinet Inside
E - 404 - Electrical Cabinet Inside
E - 405 - Electrical Cabinet Inside
E - 406 - Electrical Cabinet Inside
E - 407 - Electrical Cabinet Inside
E - 408 - Electrical Cabinet Inside
E - 409 - Electrical Cabinet Inside
E - 410 - Electrical Cabinet Inside
E - 411 - Electrical Cabinet Inside
E - 412 - Electrical Cabinet Inside

                                                 Seite: 20/127
E - 413 - Electrical Cabinet Inside
E - 414 - Electrical Cabinet Inside
E - 415 - Electrical Cabinet Inside
E - 416 - Electrical Cabinet Inside
E - 417 - Electrical Cabinet Inside
E - 418 - Electrical Cabinet Inside
E - 419 - Electrical Cabinet Inside
E - 420 - Room Control Unit
E - 421 - Room Control Unit
E - 422 - Design And Overcurrent Protection

Electric - Load List
E - 501 - Load List
E - 502 - Load List
E - 503 - Load List
E - 504 - Load List
E - 505 - KNX Busline Inside
E - 506 - Cross Section And Wiring Overview
E - 507 - Home Automation Overview
E - 508 - Schedule - Load
E - 509 - Schedule - Load

Other Disciplines
X - 111 - Site Accessibility 1:100
X - 211 - Public Exhibit Plan 1:50
X - 212 - Public Exhibit Deck 1:100
X - 213 - Public Exhibit Mock Ups 1:100
X - 311 - Schedule - Public Tour

Operations
O - 110 - Transport Germany-Washington
O - 120 - Truck Layout
O - 130 - Transport Details
O - 140 - Modules Layout
O - 210 - Site Operations Day 1
O - 220 - Site Operations Day 1 and 2 –
O - 310 - Site Operations Day 1-7 and Disassembly
O - 500 - Schedules - Operations Equipment

Ressources
R-101 - Client Site Elevations
R-102 - Client Site Plan
R-103 - Client Site Photographs




                                                    Seite: 21/127
00 01 20 List of Schedules


L - 711 Schedules - Landscape
L - 712 Schedules - Landscape
L - 713 Schedules - Landscape
L - 714 Schedules - Landscape

S - 461 - Schedules - VIP
S - 677 - Schedule - Transport
S - 678 - Schedule - Transport
S - 679 - Schedule - Transport
S - 715 - Schedules - Temporary Construction

A - 595 - Schedules - Windows
A - 596 - Schedules - Opening Sun Control Devices
A - 781 - Schedules Façade
A - 860 - Schedules Roof
A - 861 - Schedules Roof
A - 954 - Schedules Siding

I - 280 - Schedules – Body Furniture
I - 281 - Schedules – Body Furniture
I - 282 - Schedules – Body Furniture
I - 353 - Schedules – Residential Kitchen Appliances
I - 561 - Schedules Bathroom Plumbing
I - 660 - Schedules Flooring

P - 611 - Schedules - Plumbing
P - 612 - Schedules - Plumbing

M - 411 - Schedule HVAC Heat Pump
M - 412 - Schedule HVAC PCM Ceiling

E-151 - Schedules for Electrical Appliances and Installations
E-222 - Lighting Schedules
E-508 - Schedule for Electrical Diagrams
E-509 - Schedule for Electrical Diagrams

X -311 - Schedule - Public Tour

O - 500 - Schedules - Operations Equipment




                                                                Seite: 22/127
01   General Requirements

01 53 00 Temporary Construction


     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. Transport Bracing
          B. Transport Braces
          C. Threaded Rods

     1.2 SUBMITTALS

          A. Product Datasheet (CD: Plan# S-661)
          B./C. No datasheets available; special design according to
                Construction Drawings S-661, S-664 – S-6616

     Part 2 PRODUCTS

     2.1 MANUFACTURER

          A.    ROBUSTA-GAUKEL GMBH & CO. KG
                Brunnenstraße 36
                D-71263 Weil der Stadt (Hausen)

                Phone: +49 (0)7033 5371-0
                Fax +49 (0)7033 5371-31
                E-Mail: info@robusta-gaukel.de
                Web: www.robusta-gaukel.de


          B./C. Internationaler Bund Darmstadt
                BaE Kooperative Ausbildung
                Metall / Elektro / Installation

                Advisor: Mr. Dilling

                Alsfelder Straße 3
                64289 Darmstadt
                Deutschland

                Phone +49-6151-97154-14
                Fax +49-6151-97154-29




                                                                       Seite: 23/127
2.2 PRODUCTS

     A. Push-pull-props Type M Article No. 610130 and 610343
     B. Transport Bracing – no article number
     C. Threaded rods – no article number




                                                               Seite: 24/127
01 54 00 Construction Aids

    Part 1 GENERAL

    1.1 SECTION INCLUDES

          A. Steel tie-bar (traverse)
          B. Trucks
          C. Crane
          D. Lifting loops
          E. Distribution Basin
          F. Cable ropes
          G. Tightener

    1.2. SUBMITTALS

         A. Special design from metalworkers according to
               Construction Drawings S-711 – S-714
         B. Special design from metalworkers according to
                Construction Drawings O-110 – O-310
         C. Special design from metalworkers according to
               Construction Drawings O-110 – O-310
         D/E. Weblink Datasheet:
    www.jordahl-pfeifer.ro/documente/pfeifer/Lifting_Loops_11_2007.pdf
               (CD: Plan# S-662)
         F. Datasheet (CD: Plan# S-663)
         G. Datasheet (CD: Plan# S-663)

    Part 2 PRODUCTS

          2.1 MANUFACTURER

          A.    Internationaler Bund Darmstadt
                Metall/Elektro/Installation
                Advisor: Mr. Dilling

                Alsfelder Straße 3
                D-64289 Darmstadt

                phone +49-6151-97154-14
                Fax +49-6151-97154-29
                Web: www.internationaler-bund.de

               Information in English:
    www.internationaler-bund.de/fileadmin/user_upload/ib_englisch.pdf

          B/C. ---


                                                                         Seite: 25/127
D/E. PFEIFER Holding GmbH & Co. KG
     Dr.-Karl-Lenz-Straße 66
     D-87700 Memmingen

      phone +49 (0) 8331 - 937 - 0
      Fax +49 (0) 8331 - 937 - 294
      Web: www.pfeifer.de
      E-Mail: presse@pfeifer.de

F/G. Carl Stahl GmbH
     Postweg 41
     73079 Süßen

      phone. +49 (07162) 4007-3000
      Fax +49 (07162) 4007-8830
      Web: www.carlstahl.de
      E-Mail: carlstahl@carlstahl.com

2.2 PRODUCTS

A.-C. no article number
D. Pfeifer lifting loop 05.050.523.
E. Pfeifer distribution basins 05.056.421
F. Carl Stahl 1621.21.00
G. Carl Stahl 5711.00.30




                                            Seite: 26/127
01 54 23 Temporary Scaffolding


    Part 1 GENERAL

    1.1 SECTION INCLUDES

          A. Mobile Scaffolding

    1.2 SUBMITTALS

    A. no datasheet available – see example:
           http://www.layher-fahrgeruest.de/layher-uni-leicht/layher-
    unileicht-fahrgeruest-3204-arbeitshoehe.html
           (CD: Plan# O-110-310)

    Part 2 PRODUCTS

    2.1 MANUFACTURER

    A.    Wilhelm Layher GmbH & Co. KG
          Ochsenbacher Straße 56
          74363 Güglingen-Eibensbach,
          Deutschland

          phone: +49 (0) 7135 70-0
          Fax: + 49 (0) 7135 70-265
          E-Mail: info@layher.com
          Web: http://www.layher.de/
               http://www.layherusa.com/

    2.2 PRODUCTS

    A.    Layher UniLeicht Mobile Scaffolding 3204 Working; Height:
          max. 6.30m




                                                                        Seite: 27/127
01 65 00 Product Delivery Requirements


     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. Packing

     1.2 SUBMITTALS

          A. no datasheet available – see example:
          (CD: Plan# O-110-310)

     Part 2 PRODUCTS

     2.1/2.2 MANUFACTURER/ PRODUCTS

          A. not yet decided




02   Existing Conditions - no entries

03   Concrete - no entries

04   Masonry - no entries




                                                     Seite: 28/127
05   Metals

05 05 23 Metal Fastening


     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. Mounting
          B. Screwing

     1.2 SUBMITTALS

          A. Product Data: Datasheet, Manufacturing Advices
                 (CD: Plan# A-712, A-716, A-741, A-853, A-857)
          B. Weblink to Product Datasheet:
          http://www.wuerth.de/de/medien/holz/assy/de/assy-sk.pdf
                 (CD: Plan# A-716, A-853, A-857)

     Part 2 PRODUCTS

     2.1 MANUFACTURER

     A.   Heroal-Johann Henkenjohann GmbH
          Österwieher Straße 80
          33415 Verl

          Phone: +49 (0)5246-507253
          Fax:   +49 (0)5246-507275
          www.heroal.de

     B.   Adolf Würth GmbH & Co. KG
          Reinhold-Würth-Str. 12 - 17
          74653 KÜNZELSAU-GAISBACH
          DEUTSCHLAND

          phone: +49 7940 15-0
          Fax +49 7940 15-1000
          E-Mail: info@wuerth.com
          Web: www.wuerth.de

     2.2 PRODUCTS

     A.   64031       Mounting Type C for horizontal Substructure
          64015       Mounting cramp Type F, special design
          64030 21    Mounting Clip Type M
          64034 21    Mounting Clip Type A46

     B.   Wheel Head Screws Würth ASSY SK 200x8mm Art. No. 0184
          608 200
          Jacksrew

                                                                    Seite: 29/127
05 14 00 Structural Aluminum Framing


      Part 1 GENERAL

      1.1 SECTION INCLUDES

         A. Substructure PV roof
         B. Substructure PV facade

      1.2 SUBMITTALS

         A. Product Data: Datasheets (CD: Plan# A-853, A-857)
         B. Product Data: Datasheets (CD: Plan# A-716, A-731-734, A-
         761)

      Part 2 PRODUCTS

      2.1 MANUFACTURER

         Heroal-Johann Henkenjohann GmbH
         Österwieher Straße 80
         D-33415 Verl

         Phone: +49 (0)5246-507253
         Fax:   +49 (0)5246-507275
         www.heroal.de

      2.2 PRODUCTS – non standard – purpose-built items

         A.    18023 21    aluminum sheath 80mm
               18233 21    aluminum drawer profile

         B.    64007       aluminum sheath 60/40mm
               64007       aluminum sheath welded corner
               ---         Ridge clamp – custom-made




                                                                       Seite: 30/127
05 20 00 Metal Joists


        Part 1 GENERAL

        1.1 SECTION INCLUDES

           A. 05 20 00 Metal Joists
           B. 05 21 00 Steel Joist Framing

        1.2 SUBMITTALS

           A/B. Product Data: non standard articles without existing
                 Datasheet– Special design from metalworkers according to
                 Construction Documents S-205, S-401-S-404
               Product Datasheet for standard products (CD: Plan# S-205,
                 S-401-404)

        Part 2 PRODUCTS

        2.1 MANUFACTURER

           A.    Internationaler Bund Darmstadt
                 Metall / Elektro / Installation
                 Advisor: Mr. Dilling

                 Alsfelder Straße 3
                 64289 Darmstadt
                 Deutschland

                phone +49-6151-97154-14
                Fax +49-6151-97154-29
                Web: www.internationaler-bund.de
                Information in English:
     www.internationaler-bund.de/fileadmin/user_upload/ib_englisch.pdf

           B.    Holzbau Gröber GmbH
                 Biberacher Straße 19
                 D - 88436 Eberhardzell-Füramoos

                 Phone: +49 7358/ 960-0
                 Fax: +49 7358/ 960-60
                 E-Mail: info@groeber.de
                 Web: www.groeber.de

                 SIMPSON STRONG-TIE® GmbH
                 Riederhofstrasse 27
                 D-60314 Frankfurt

                 Phone: +49 69/67737 89 - 0

                                                                            Seite: 31/127
Fax: +49 69/67737 89 - 69
       Web: www.strongtie.eu
       E-Mail: info@simpsonstrongtie.de

2.2 PRODUCTS

  A.   Steel angles
  B.   Steel plates
       Locksmith stuff
  C.   HTT 16 Tie Simpson Strong-Tie
       Joist Hangers Simpson Strong-Tie




                                          Seite: 32/127
05 25 00 Aluminum Joist Framing


      Part 1 GENERAL

      1.1 SECTION INCLUDES

         A. Substructure PV-façade

      1.2 SUBMITTALS

         A. Product Data: non standard articles without existing
               Datasheet– Special design from HEROAL according to
               Construction Documents A-713, A-716


      Part 2 PRODUCTS

      2.1 MANUFACTURER

         A.    Heroal-Johann Henkenjohann GmbH
               Österwieher Straße 80
               33415 Verl

               Phone: +49 (0)5246-507253
               Fax:   +49 (0)5246-507275
               Web: www.heroal.de

      2.2 PRODUCTS

         A.    64082       End Cap for Aluminium Sheath 60/40mm
                           Aluminium Cable Clip
                           Blinding




                                                                    Seite: 33/127
06   Wood, Plastics, and Composites

06 05 00 Common Work Results for Wood, Plastics and
Composites


       Part 1 GENERAL

       1.1 SECTION INCLUDES

         A. 06 05 00 Common Work Results for W, P, and C
         B. 06 05 23 Wood, Plastics, and Composites Fastenings

       1.2 SUBMITTALS

         A. Product Datasheet (CD: Plan# I-203)
         B. Product Data: Datasheets (CD: Plan# I-203)
               (CD: Plan# S-205, S-401-404) (CD: Plan# I-652-657)

       Part 2 PRODUCTS

       2.1 MANUFACTURER

         A.    Häfele GmbH & Co KG
               Adolf-Häfele-Str. 1
               72202 Nagold
               Germany

               Tel: +49 (0)74 52 / 95 - 0
               Fax: +49 (0)74 52 / 95 - 2 00
               E-Mail: info@haefele.de
               Web: www.hafele.com

         B.    Adolf Würth GmbH & Co. KG
               Reinhold-Würth-Str. 12 - 17
               74653 KÜNZELSAU-GAISBACH
               DEUTSCHLAND

               phone: +49 7940 15-0
               Fax +49 7940 15-1000
               E-Mail: info@wuerth.com
               Web: www.wuerth.de


               SFS unimarket AG
               Nefenstrasse 30
               CH-9435 Heerbrugg

               E-Mail: info.u@sfsunimarket.biz
               Web: www.sfsunimarket.biz



                                                                    Seite: 34/127
2.2 PRODUCTS

  A.   Häfele Article No. 637.19.228
  B.   Wood Screws Würth ASSY ®3.0
       SFS Screws intec see Datasheet
       Cocking pieces, bolts




                                        Seite: 35/127
06 11 00 Wood Framing

    06 11 13 Engineered Wood Products

      Part 1 GENERAL

      1.1 SECTION INCLUDES

         A.   06 11 13 Ceiling and flooring elements
         B.   06 11 13 Timber Construction beams
         C.   06 11 13 Bearing
         D.   06 11 13 Oak Profiles, feet

      1.2 SUBMITTALS

         A. Product Datasheets (CD: Plan# S-205, S-401-S-404)
         B. Weblink to Product Data:
         http://www.rettenmeier.com/produkte/details/produkte/holzba
         u/kvh/1018.html (CD: Plan# S-205, S-401-S-404)
         C/D. no datasheet available – custom-made profiles made by
                Team Germany and a professional carpenter according to
                Construction Documents S-205, S-401 – S-404

      Part 2 PRODUCTS

      2.1 MANUFACTURER

         A.      Lignotrend Produktions GmbH
                 Landstrasse 25
                 D-79809 Weilheim-Bannholz

                Phone: +49 (0)7755 9200-0
                Fax:   +49 (0)7755 9200-55
                www.lignotrend.com

         B-D. Rettenmeier Holding AG
              Industriestraße 1
              D-91634 Wilburgstetten

                Phone: +49 9853 338-0
                Fax:   +49 9853 338-100
                www.rettenmeier.com/en/home.html

      2.2 PRODUCTS

         A. Lignotrend LIGNO Rippe Q3
         (Ceiling element with acoustic components for large spans)
                Lignotrend LIGNO Block Q 90
                (Ceiling and Flooring element)
         B.     Rettenmeier Konstruktionsvollholz KVH®-1plus® (NSI)
         C/D. Rettenmeier Oak

                                                                         Seite: 36/127
06 12 00 Structural Panels

       Part 1 GENERAL

       1.1 SECTION INCLUDES

         A. Structural Panels for Framing
         B. Structural Panels for Flooring

       1.2 SUBMITTALS

         A.    Weblink to Product Information:
               http://www.fh-finnholz.de/kerto-q.html
               Weblink to Product certification:
               www.fh-finnholz.de/english/download.html
               (CD: Plan# I-210-240)
         B.    Datasheet Elka (CD: Plan# I-621, I-652-655)

       Part 2 PRODUCTS

       2.1 MANUFACTURER

         A.    FH-Finnholz GmbH
               Industriestraße 27
               49536 Lienen

               Phone: +49 5483 1624
               Fax: +49 5483 1245
               Email: info@fh-finnholz.de
               Web: www.fh-finnholz.de

         B.    elka-Holzwerke
               Hochwaldstraße 44
               D-54497 Morbach

               Phone : +49 (0) 6533 / 956 0
               Fax : +49 (0) 6533 / 956 220
               E-Mail : info@elka-holzwerke.de
               Web: www.elka-Holzwerke.eu

       2.2 PRODUCTS

         A.    Kerto Q
         B.    Elka Honeycomp wooden board, Interlayer, 70mm




                                                               Seite: 37/127
06 16 00 Sheathing


       Part 1 GENERAL

       1.1 SECTION INCLUDES

         A. 06 16 00 Sheathing
         B. 06 16 36 Wood Panel Product Sheathing

       1.2 SUBMITTALS

         A/B. Datasheet OSB 3 (CD: Plan# I-652-657)

       Part 2 PRODUCTS

       2.1 MANUFACTURER

         A/B. Agepan Glunz AG
              Grecostraße 1
              D-49716 Meppen

              Phone: +49 (59 31) 4 05-0
              Fax: +49 (59 31) 4 05-2 99
              E-Mail: info@glunz.de
              Web: www.agepan.de

       2.2 PRODUCTS

         A.   OSB 3




                                                      Seite: 38/127
06 17 33 Wood I-Joists

       Part 1 GENERAL

       1.1 SECTION INCLUDES

         A. Timber construction for double floor

       1.2 SUBMITTALS

         A.    Datasheet

       Part 2 PRODUCTS

       2.1 MANUFACTURER

         A.    Finnforest Deutschland GmbH
               Louis-Krages-Str. 30
               D-28237 Bremen

               Phone: +49 421 6911 - 0
               Fax: +49 421 6911 - 100
               E-Mail: germany@finnforest.com
               Web: www.finnforest.de

       2.2 PRODUCTS

         A.    Finnjoist FJI 58




                                                   Seite: 39/127
06 40 00 Architectural Woodwork

      Part 1 GENERAL

      1.1 SECTION INCLUDES

         A. 06 41 00 Architectural Wood Casework
         B. 06 43 13 Wood Stairs

      1.2 SUBMITTALS

         A. Datasheet MDF (CD: Plan# I-210-I-240)
            Certificate MDF
         B. Datasheet (CD: Plan# I-270, I-271, I-278)

      Part 2 PRODUCTS

      2.1 MANUFACTURER

         A.    Agepan Glunz AG
               Grecostraße 1
               D-49716 Meppen

               Phone: +49 (59 31) 4 05-0
               Fax: +49 (59 31) 4 05-2 99
               E-Mail: info@glunz.de
               Web: www.agepan.de

         B.    EGGER Holzwerkstoffe Brilon
               GmbH & Co. KG
               Im Kissen 19
               D-59929 Brilon

               Phone: +49/29 61/770-0
               Fax: +49/29 61/770-62 222
               Email: info-bri@egger.com
               Web: www.egger.com

      2.2 PRODUCTS

         A.    MDF 19 mm Agepan
               MDF 16 mm Agepan
               MDF 3 mm Agepan
         B.    egger eurolight




                                                        Seite: 40/127
06 60 00 Plastic Fabrications

       Part 1 GENERAL

       1.1 SECTION INCLUDES

          A. 06 63 00 Plastic Railing
          B. 06 64 00 Plastic Paneling

       1.2 SUBMITTALS

          A.    Product Datasheet Plastic Railing (CD: Plan# I-210-I-240)
          B.    Product Datasheet (LED Lighting) Plexiglas Panels
                (interior core CD: Plan# I-210-I-240)
                Product Datasheet Plexiglas (façade CD: Plan# A-714, A-
                721-724)

       Part 2 PRODUCTS

       2.1 MANUFACTURER

          A/B. Evonik Röhm GmbH
               Kirschenallee
                64293 Darmstadt
               Deutschland

                phone: +49 (0) 61 51 - 18-01
                Fax: +49 (0) 61 51 - 18-02

       2.2 PRODUCTS

          A.    Plexiglas GS Evonik 0F00GT
          B.    Interior Core
                Alternative 1:     Evonik Plexiglas Crystal Ice WM500 DC
                                   Evonik Plexiglas Satinice WH10 DC
                                   Evonik Endlighten 0N002 XL
                Alternative 2:     Evonik Plexiglas Crystal Ice WM500 DC
                                   Evonik Plexiglas Satinice WH10 DC
                                   Kobek Lightpanel Luxolution

                For façade-use
                Plexiglas XT 7mm




                                                                            Seite: 41/127
07   Thermal and Moisture Protection

07 21 00 Thermal Insulation

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A/B. 07 21 00 Thermal insulation
          C. 07 21 00 Declining Roof Insulation
          D. 07 21 23 19 Mineral board Insulation


     1.2 SUBMITTALS

          A. Datasheet Cellulose insulation (CD: Plan# I-621, I-652-655 /
                A-951)
          B. Datasheet Adhesive (Product Information from Internet shop)
                (CD: Plan# S-411-S-416)
          C. Datasheet Roof Insulation and Certificate (CD: Plan# A-831,
                A-843, A-851)
          D. Datasheets Vacuum Insulations Panels (CD: Plan# S-411-S-
                416)

     Part 2 PRODUCTS

     2.1 MANUFACTURER

          A.     Agepan Glunz AG
                Grecostraße 1
                D-49716 Meppen
                Phone: +49 (59 31) 4 05-0
                Fax: +49 (59 31) 4 05-2 99
                E-Mail: info@glunz.de
                Web: www.agepan.de

          B.    Heinrich Dostmann GmbH
                Robert Ritschel
                Industriestraße 13
                61449 Steinbach
                Deutschland

          C.    Paul Bauder GmbH & Co. KG
                Korntaler Landstraße 63
                D-70499 Stuttgart

                Phone: +49 711/69070
                Fax: +49 711/6907300

                                                                            Seite: 42/127
E-mail: Stuttgart@bauder.de
          Web: www.bauder.de



     D.   VARIOTEC GmbH & Co. KG
          Weißmarterstraße 3-5
          D-92318 Neumarkt


          phone.: +49 9181 6946-0
          Fax: +49 9181 8825
          E-Mail: info@variotec.de
          www.variotec.de


2.2 PRODUCTS

     A.   Agepan Cell
     B.   NIBOFLOOR PK ELASTIC
     C.   EPS Inclining Insulation EPS 040 DAA dm 100 kPa 20-
          80mm
     D.   Variotec Qasa – VIP




                                                                Seite: 43/127
07 25 00 Weather Barriers

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. Vapor Barriers (CD: Plan# A-831, A-843, A-851)
         B. Water Barriers (CD: Plan# A-831, A-843, A-851)

    1.2 SUBMITTALS

         A. Datasheet
         B. Datasheet

    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A/B. Paul Bauder GmbH & Co. KG
              Korntaler Landstraße 63
              D-70499 Stuttgart

               Phone: +49 711/69070
               Fax: +49 711/6907300
               E-mail: Stuttgart@bauder.de
               Web: www.bauder.de


    2.2 PRODUCTS

         A. Interlayer Polymer Bitumen TEC Sprint DUO
         B. Thermoplan Waterproofing FPO, incl. adhesive




                                                             Seite: 44/127
07 26 00 Vapor Retarders

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. Vapor Retarder

    1.2 SUBMITTALS

         A. Datasheet Vapor Retarder Doerken (CD: Plan# A-951; I-621,
         I-652-655)

    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A.    Dörken GmbH & Co. KG
               Wetterstraße 58
               D-58313 Herdecke

               Phone: +49 23 30/63-428
               Fax: +49 23 30/63-355
               Email: info@doerken.de
               Web: www.doerken.de

    2.2 PRODUCTS

         A. DELTA®-REFLEX




                                                                        Seite: 45/127
07 55 00 Protected Membrane Roofing

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. Building Protection

    1.2 SUBMITTALS

         A. Datasheets (CD: Plan# A-831, A-857)

    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A.    Paul Bauder GmbH & Co. KG
               Korntaler Landstraße 63
               D-70499 Stuttgart

               Phone: +49 711/69070
               Fax: +49 711/6907300
               E-mail: Stuttgart@bauder.de
               Web: www.bauder.de

               Frank Griebel
               Verkauf Bauder Werk Bochum
               Phone: +49 6071/36608
               Fax: +49 6071/3444568


    2.2 PRODUCTS

         A. Bauder FSM 1100 Article No.: 7450 0600




                                                     Seite: 46/127
07 62 00 Sheet Metal Flashing and Trim

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. shop-formed accessories and trim, joint-covers, copings

    1.2 SUBMITTALS

         A. Product Data: non standard articles without existing
               Datasheet– Special design from Metalworker according to
               Construction Documents A-851-855


    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A.    Stein und Sohn GmbH
               Rüdesheimer Straße 5
               D-65239 Hochheim

               Phone: +49 6146/2269
               Fax: +49 6146/3316
               E-mail: info@steinundsohn.de
               Web www.steinundsohn.de


    2.2 PRODUCTS

         A. Ridge bracket
            Ridge covering
            Fascia bracket
            Façade completion sheets




                                                                         Seite: 47/127
07 71 23 Manufactured Gutters and Downspouts

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. 07 71 33 gutters and downspouts
         B. 07 72 00 roof accessories

    1.2 SUBMITTALS

         A/B. Product Data: non standard articles without existing
               Datasheet– Special design from Metalworker according to
               Construction Documents A-854

    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A/B. Huppers
              Udo Huppers GmbH
              Landwehr 130
              D-46514 Schermbeck

               Telefon 0 28 53/91 46 10
               Telefax 0 28 53/91 46 13
               Email: huppers-dach@arcor.de


    2.2 PRODUCTS

         A. Downspouts
            Gutters
         B. leaves catch tray




                                                                         Seite: 48/127
07 90 00 Joint Protection

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. Tapes for interior application
          B. Tapes for exterior application

     1.2 SUBMITTALS

          A. Weblink to Product Datasheets:
          http://www2.siga.ch/product/e_rissan.htm
          http://www2.siga.ch/product/e_sicrall.htm
          B. Weblink to Product Datasheets
          http://www.ts-udio.biz/tsshop2/WGS/1239/PRD/J999895/Alu-
          bedampftes_PP-Klebeband.htm

     Part 2 PRODUCTS

     2.1 MANUFACTURER

          A.    SIGA Cover AG
                Rütmattstrasse 7
                CH-6017 Ruswil

                Phone: + 41 (0) 41 496 62 62
                Fax: + 41 (0) 41 496 62 63
                Email: siga@siga.ch
                Web: www.siga.ch

          B.    Trenkenchu & Stadler GbR
                Schwabenstraße 43
                71101 Schönaich

                Phone: +49 7031/413371
                Fax: +49 7031/413372
                Email: mail@ts-audio.de
                Web: http://www.ts-audio.de

     2.2 PRODUCTS

          A. Siga Rissan
             Siga Sicrall
          B. Aluminum Tape J999895




                                                                     Seite: 49/127
08   Openings

08 10 00 Doors and Frames

     Part 1 GENERAL

     1.1 SECTION INCLUDES

           A. 08 14 00 Wood Doors
           B. 08 32 19 Wood-framed Glass doors (sliding and non-sliding)

     1.2 SUBMITTALS

           A. Product Datasheets (CD: Plan# A-545/546)
           B. Product Datasheets (CD: Plan# A-510/511, A-540, A-545)

     Part 2 PRODUCTS

     2.1 MANUFACTURER

           A/B. Ludwig Häußler GmbH
                Fenster- und Türenfabrik
                Draisstr. 48
                Industriegebiet West
                D-67346 Speyer

                 Phone: +49 (0) 6232 / 3144 – 0
                 Fax: +49 (0) 6232 / 3144 - 37
                 Email: info@haeussler-fenster.de
                 Web: www.energate.com


     2.2 PRODUCTS

           A. Entrance Door Oak
           B. Terrace Doors Oak-framed, 3-glass toughened safety glass

As Team Germany’s windows and doors are special designed and
actually still in fabrication, the manufacturer is not able yet to
publish accordant datasheets containing all values and correct
specifications. The system of our windows is similar to the
manufacturer’s “Energate”-series. You can find information about
this series here:

http://www.energate.com/index.php?id=79&L=1




                                                                           Seite: 50/127
08 50 00 Windows

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. 08 50 00 Operating Hardware
            08 50 00 Louver blinds integral to window construction
         B. 08 52 00 Wood Windows


    1.2 SUBMITTALS

         A. Weblink to Window Opener:
         http://www.hautau.pl/produkte/pdf/Prospekte_PDF/Oberlicht/
         primat/primat_fl190_prospekt_d.pdf
                (CD: Plan# A-520/522)
            Product Datasheet motors (CD: Plan# A-520-523, A-536,
                A-540-546, A-550-552, A-580-582)
            Weblink to Motor Controller Datasheet:
         http://www.vestamatic.com/155/?L=1 (CD: Plan# A-520-523,
                A-540-542, A-546, A-580-582)
            Product Datasheets louver blinds (CD: Plan# A-520-523, A-
                540-542, A-546, A-580-582)
         B. Datasheets (CD: Plan# A-510/511, A-540, A-550)


    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A.    HAUTAU GmbH
               Bahnhofstr. 56-60
               D 31691 Helpsen

               Phone: +49 (0) 5724 / 393-0
               Fax: +49 (0) 5724 / 393-125
               E-Mail: info@HAUTAU.de
               Web: www.hautau.de

               Maxon motor GmbH
               Truderinger Str. 210
               D-81825 München

               phone: +49 89/420493- 0
               Fax: +49 89/420493 - 40
               E-Mail: info@maxonmotor.de
               Web: www.maxonmotor.de



                                                                        Seite: 51/127
Vestamatic GmbH
                 Dohrweg 27
                 D-41066 Mönchengladbach

                 phone: +49 2161/29408-0
                 Fax: +49 2161/29408-20

                 www.vestamatic.com
                 info@vestamatic.com

                 Glas Hahn GmbH
                 Kruppstrasse 6
                 D-67454 Haßloch / Pf.

                 Phone: +49 (0)6324/92 45-0
                 Fax: +49 (0)6324/92 45-18
                 E-Mail: info@glas-hahn.de
                 Web: www.glas-hahn.de

           B.    Ludwig Häußler GmbH
                 Fenster- und Türenfabrik
                 Draisstr. 48
                 Industriegebiet West
                 D-67346 Speyer

                 Phone: +49 (0) 6232 / 3144 – 0
                 Fax: +49 (0) 6232 / 3144 - 37
                 Email: info@haeussler-fenster.de
                 Web: www.energate.com


     2.2 PRODUCTS

           A. Hautau PRIMAT- FL 190
              Motor: Amax22 + HallEnc + GP22A
              Motor: ASM 44 – SG 13
              Controller: IF SMI KNX 24 VDC
              Louver blinds Ropaco Typ F
           B. Oak-framed Window, 3-glass toughened safety glass

As Team Germany’s windows and doors are special designed and
actually still in fabrication, the manufacturer is not able yet to
publish accordant datasheets containing all values and correct
specifications. The system of our windows is similar to the
manufacturer’s “Energate”-series. You can find information about
this series here:
http://www.energate.com/index.php?id=79&L=1



                                                                     Seite: 52/127
08 70 00 Hardware

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. 08 71 00 Door Hardware

    1.2 SUBMITTALS

         A. Product Datasheets (CD: Plan# I-210-240)


    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A.    Häfele GmbH & Co KG
               Adolf-Häfele-Str. 1
               72202 Nagold
               Germany

               Tel: +49 (0)74 52 / 95 - 0
               Fax: +49 (0)74 52 / 95 - 2 00
               E-Mail: info@haefele.de
               Web: www.hafele.com

    2.2 PRODUCTS

         A.    Concealed Hinges 329.07.xxx
               Spring Hinges 245.54.xxx




                                                       Seite: 53/127
08 80 00 Glazing

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. 08 81 00 Glass Glazing

    1.2 SUBMITTALS

         A. not yet available

    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A.    Glas Hahn GmbH
               Kruppstrasse 6
               D-67454 Haßloch / Pf.

               Phone: +49 (0)6324/92 45-0
               Fax: +49 (0)6324/92 45-18
               E-Mail: info@glas-hahn.de
               Web: www.glas-hahn.de


    2.2 PRODUCTS

         A. 3-glass panes toughened safety glass




                                                   Seite: 54/127
09   Finishes

09 20 00 Plaster and Gypsum Board

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. 09 22 00 Support for Gypsum Board
          B. 09 23 00 Gypsum Plastering

     1.2 SUBMITTALS

          A. Product Datasheets Plaster Profiles (CD: Plan# A-951)
          B. Product Datasheet Smartboard (CD: Plan# A-911)

     Part 2 PRODUCTS

     2.1 MANUFACTURER

          A.    PROTEKTORWERK
                Florenz Maisch GmbH & Co. KG
                Viktoriastraße 58
                D-76571 Gaggenau

                Tel. (0 72 25) 977-0
                Fax (0 72 25) 977-180
                Email: info@protektor.com
                Web: www.protektor.com

          B.    Knauf Gips KG
                Am Bahnhof 7
                D-97346 Iphofen

                phone: +49 (9323) 31-0
                Fax: +49 (9323) 31-277
                E-Mail: zentrale@knauf.de
                Web: www.knauf.de


     2.2 PRODUCTS

          A.    Plaster Profile Profil-Nr. 1315
          B.    K764 Knauf PCM SmartboardTM 23/26




                                                                     Seite: 55/127
09 60 00 Flooring

      Part 1 GENERAL

      1.1 SECTION INCLUDES

            A. 09 60 00 Flooring
            B. 09 64 00 Wood Flooring
               09 64 23 Wood Parquet Flooring
            C. 09 68 00 Carpeting

      1.2 SUBMITTALS

            A. Weblink to Product Datasheet Parquet glue:
http://www.wakol.com/de/verlegewerkstoffe/produktprogramm/kleben/par
kett-und-kork/ms-260.html (CD: Plan# I-621, I-652-655)
               Expansion Joint Cork: no datasheet (rest pieces of cork mats)
                   (CD: Plan# I-621, I-653)
            B. outside flooring: not definitely decided  no datasheet/no
                   manufacturer (CD: Plan# L-232)
               Inside flooring: Weblink to Product Information Wood Strip
                   Flooring Parquet (CD: Plan# I-621-657)
http://www.druesedau.de/html/parkett_default.php?id=9&art=3
            C. Weblink to Product Datasheet Rug for Galery: (CD: Plan# I-
            622)
http://www.vorwerk-teppich.de/sc/vorwerk/technische_daten/de/08957.pdf

      Part 2 PRODUCTS

      2.1 MANUFACTURER

            A.    Wakol GmbH
                  Bottenbacher Str. 30
                  D-66954 Pirmasens

                  Phone: +49 (0) 63 31 80 01 0
                  Fax: +49 (0) 63 31 80 01 890

            B.    DRÜSEDAU - Parkett & Leistenfabrik GmbH & Co. KG.
                  Bahnhof Densberg
                  D-34632 Jesberg-Densberg

                  Phone: +49 66 95 - 96 06 - 0
                  Fax: +49 66 95 - 96 06 - 22
                  E-Mail: Info@druesedau.de
                  www.druesedau.de

            C.     Vorwerk & Co.
                   Teppichwerke GmbH & Co. KG
                   Kuhlmannstraße 11


                                                                               Seite: 56/127
D-31785 Hameln

           Phone: +49 5151 103-0
           Fax: +49 5151 103-377




2.2 PRODUCTS

     A. Wakol MS 260 based on polymer
     B. Oak Terrace Decking
        Wood Strip Flooring Parquet Oak
     C. Vorwerk „elemento - Tundra“




                                          Seite: 57/127
09 80 00 Acoustic Treatment

     Part 1 GENERAL

     1.1 SECTION INCLUDES

           A. 09 81 00 Acoustic Insulation

     1.2 SUBMITTALS

            A. Weblink to Product Data for Cork materials:
http://www.kork-store.de/shop/product_info.php?products_id=94
                   (CD: Plan# I-621/622, I-652-655)
               Datasheet for Knauf insulation layer
                  (CD: Plan# I-621, I-652-655)
            Weblink to WAKOL insulation mat (CD: Plan# I-621, I-652-655)
http://www.wakol.com/fileadmin/upload/pdf/Technische_Informationen/Ve
rlegewerkstoffe/deutsch/5903D.pdf

     Part 2 PRODUCTS

     2.1 MANUFACTURER

           A.    Kork-Store Potsdam
                 Lindenstr. 60
                 D-14467 Potsdam

                 Phone: +49 331 2706808
                 Fax: +49 331 2706383
                 E-mail : info@kork-store.de
                 Web: www.kork-store.de


                 Knauf Gips KG
                 Am Bahnhof 7
                 D-97346 Iphofen

                 phone: +49 (9323) 31-0
                 Fax: +49 (9323) 31-277
                 E-Mail: zentrale@knauf.de
                 Web: www.knauf.de


                 Wakol GmbH
                 Bottenbacher Str. 30
                 D-66954 Pirmasens

                 Phone: +49 (0) 63 31 80 01 0


                                                                           Seite: 58/127
Fax: +49 (0) 63 31 80 01 890




    2.2 PRODUCTS

         A. Insulation Corkboard 10 mm Article no. 1210
            Insulation Corkboard 5mm Article no. 1250
         B. Knauf Brio 23 WF
         C. WAKOL EM 140


09 90 00 Painting and Coating

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. 09 91 23 Interior Painting

    1.2 SUBMITTALS

         A. ---

    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A. not yet decided

    2.2 PRODUCTS

         A. not yet decided color: white




                                                          Seite: 59/127
10   Specialties

10 28 00 Toilet, Bath, and Laundry Accessories

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. 10 28 16.13 Residential Bath Accessories

     1.2 SUBMITTALS

          A. ---


     Part 2 PRODUCTS

     2.1 MANUFACTURER

          A. not yet decided

     2.2 PRODUCTS

          A. Towel bars
             Toilet paper dispensers
             Etc.




                                                        Seite: 60/127
10 70 00 Exterior Specialties

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. 10 71 13 Exterior Sun Control Devises

     1.2 SUBMITTALS

          A. Weblink to Product Datasheet Substructure
             http://www.glashauskg.de/Glashaus-KG.pdf
                (CD: Plan# A-520/523, A-536, A-550-552)

     Part 2 PRODUCTS

     2.1 MANUFACTURER

          A.    Glashaus KG
                Feilitzschstraße 21
                D- 80802 München

                Phone: +49 89/33 03 81 85
                Fax: +49 89/33 03 81 86
                Email: info@glashauskg.de
                Web: www.glashauskg.de/index.html




     2.2 PRODUCTS

          A. System Brillona www.glashauskg.de/brillona.html




                                                               Seite: 61/127
11   Equipment

11 30 00 Residential Equipment

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. 11 31 13 Residential Kitchen Appliances
          B. 11 31 23 Residential Laundry Appliances

     1.2 SUBMITTALS

          A. Datasheets for Kitchen Appliances (CD: Plan# I-331-I-351)
          B. Datasheets for Laundry Appliances (CD: Plan# I-331-I-351)

     Part 2 PRODUCTS

     2.1 MANUFACTURER

          A/B. Miele & Cie. KG
               Carl-Miele-Straße 29
               D-33332 Gütersloh

                Phone: +49 52 41/ 89 - 0
                Fax: +49 52 41/ 89 - 20 90
                E-Mail: info@miele.de
                Web: www.miele.de


     2.2 PRODUCTS

          A. Refrigerator/Freezer Combination Miele KF 9757 ID
             Dishwasher Miele G 1562 SCVi
             Steamer Miele Dgc 5080
             Induction Cooker Miele KM 5975
             Coffee Machine Miele CVA 5060
             Fume Extraction Hood Miele DA 3190

          B. Cloth Washer Miele W 3985 WPS or Allwater W3841
             Laundry Dryer T 3841




                                                                         Seite: 62/127
12   Furnishings

12 30 00 Casework

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. 12 36 19 Manufactured Wood Casework

     1.2 SUBMITTALS

          A. Product Data: non standard articles without existing
                Datasheet– Special design from Team Germany according
                to Construction Documents I-331, I-332, I-322, I-351


     Part 2 PRODUCTS

     2.1/2.2 MANUFACTURER/PRODUCTS

          A.   Kitchen counter top; self made by Team Germany with
               support from a professional carpenter




                                                                        Seite: 63/127
12 40 00 Furnishings and Accessories

     Part 1 GENERAL

     1.1 SECTION INCLUDES

           A. 12 42 00 Table Accessories
           B. 12 43 13.13 Desk Lamps
           C. 12 43 13.19 Floor Lamps
           D. 12 44 00 Bath Furnishings
           E. 12 45 00 Bedroom Furnishings

     1.2 SUBMITTALS

             A. Product Data: not yet decided
             B. Weblink to Datasheet for LED high power Desk lamp
             (CD: Plan# I-331-I-351)
http://engine.artemide.com/article.aspx?button=0&language=de&productid
s=art0829010A&product_level=artoneline_pr_tavolo_led
             C. Datasheet for Floor Lamps (alternatives possible)
             (CD: Plan# I-331-I-351)
http://pdf.archiexpo.com/pdf/occhio/produkt-book/53078-25186.html
             D. Product Data: not yet decided
             E. Product Data: not yet decided

     Part 2 PRODUCTS

     2.1 MANUFACTURER

           A/D/E.     not yet decided
           B.   eventually: Artemide GmbH
                            Deutschland
                            Hans-Böckler-Straße 2
                            D-58730 Fröndenberg

                             Phone: (+49) 02373/975-0
                             Fax: (+49) 02373/975-2-09
                             E-Mail: personal@artemide.de
                             Web: www.artemide.de
           C.    Occhio
                 axelmeiselicht
                 AML Licht + Design GmbH
                 Wiener Platz 7 Rgb.
                 D-81667 München

                 Phone: +49-89-44 77 86 30
                 Fax: +49-89-44 77 86 39
                 Email: info@occhio.de


                                                                         Seite: 64/127
Web: www.occhio.de




2.2 PRODUCTS

     A/D/E.       not yet decided
     B. eventually: Artemide One Line LED Tavolo
     C. probably: Occhio Sento lettura




                                                   Seite: 65/127
12 50 00 Furniture

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. 12 58 00 Residential Furniture

     1.2 SUBMITTALS

          A. Product Data: not yet decided


     Part 2 PRODUCTS

     2.1/2.2 MANUFACTURER/PRODUCTS

          A. Couch – not yet decided
             Dining Tables and Chairs – not yet decided




13   Special Construction




                                                          Seite: 66/127
14   Conveying Equipment

14 80 00 Scaffolding

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. 14 81 16 Carriage Scaffolding

     1.2 SUBMITTALS

          A. Product Data: Datasheet (CD: Plan# L-501)


     Part 2 PRODUCTS

     2.1 MANUFACTURER

          A.    Wilhelm Layher GmbH & Co. KG
                Ochsenbacher Straße 56
                D-74363 Güglingen-Eibensbach,

                phone: +49 (0) 7135 70-0
                Fax: + 49 (0) 7135 70-265
                E-Mail: info@layher.com
                Web: http://www.layher.de/
                 http://www.layherusa.com/

     2.2 PRODUCTS

          A. Layher Allround System




21   Fire Suppression




                                                         Seite: 67/127
22   Plumbing

22 10 00 Plumbing Piping and Pumps

     Part 1 GENERAL

     1.1 SECTION INCLUDES

          A. 22 11 16 Domestic Water Piping
          B. 22 11 23 Domestic Water Pumps
          C. 22 12 00 Facility Potable-Water Storage Tank

     1.2 SUBMITTALS

          A. Product Data: Datasheets (CD: Plan# P-311-331, P-411-451)
          B. Product Data: Datasheets (CD: Plan# P-311/P-511)
          C. Weblink to Product Information:
                http://www.dlkunststofftechnik.com/html/produkte.php
             Cerificate


     Part 2 PRODUCTS

     2.1 MANUFACTURER

          A.    REHAU AG + Co
                Rheniumhaus
                D-95111 Rehau

                Phone: +49 92/ 83-77 0
                E-Mail: info@rehau.com
                Web: www.rehau.de


                Abu-plast Kunststoffbetriebe GmbH
                Am Bahnhof 20
                D-96472 Rödental

                Phone: +49 (0)9563/93-0
                Fax +49 (0)9563/93-226


          B.    GRUNDFOS GMBH
                Schlüterstraße 33
                D-40699 Erkrath

                Phone: +49 (0)211 92969 0
                E-Mail: infoservice@grundfos.de

                                                                         Seite: 68/127
Web: www.grundfos.de

     C.      DL-Kunststofftechnik
             Dietmar Leyh
             Ackerstr. 36
             D-59423 Unna

             Phone: +49 (23 03) 96 85 83
             Fax: +49 (23 03) 87 19 22
             E-Mail: info@dlkunststofftechnik.com
             Web: www.dlkunststofftechnik.com




2.2 PRODUCTS

     A. Versital Pipe – Rautitan Flex 130490-050
        Sliding sleeve Rautitan PX 160002-001
        Clip element 138043-001
        T-piece, Rautitan PX 160032-001
        Fitting, Rautitan PX 160011-001
        Bridge – Rautitan MX 137134-001
        Bridge Angle – Rautitan MX 137134-001
        Bridge – Rautitan MX 139571-002
        Angle – Rautitan PX, 90° 160022-001
        Installation Angle – Rautitan MX 138491-405
        Disposal Pipe, Raupiano Plus 12104-004
        Disposal Pipe, Raupiano Plus 12184-004
        Arc 45° Raupiano Plus 121114-001
        Arc 45° Raupiano Plus 121164-001
        Single Branch, Raupiano Plus 121264-001
        Maintenance Pipe, 121524-002

          Abu Pipeventilair Article No. 760099
          Abu Pipeventilair Article No. 760399

     B. Water pressure Pump Grundfos Jet Pump JP 5
        Article No. 130490-050
        Pump Add-on Grundfos

     C. Wastewater Tank
        Freshwater Tank
        Irrigation Tank




                                                      Seite: 69/127
22 40 00 Plumbing Fixtures

    Part 1 GENERAL

    1.1 SECTION INCLUDES

         A. 22 40 00 Plumbing Fixtures
         B. 22 41 00 Residential Plumbing Fixtures
         C. 22 41 13 Residential Water Closets, Urinals and Bidets
         D. 22 41 16 Residential Lavatories and Sinks
         E. 22 41 23 Residential Shower Receptors and Basins

    1.2 SUBMITTALS

         A. Product Data: Datasheets (CD: Plan# I-521, I-531, I-552)
         B. Product Data: Datasheets (CD: Plan# I-521, I-531, I-552)
         C. Product Data: Datasheets (CD: Plan# I-521, I-531, I-552)
         D. Product Data:
            bathroom sink: non standard articles without existing
                 Datasheet– Special design from KleinDesign according to
                 Construction Documents I-521
             kitchen sink: new Dornbracht series – actually no
                 datasheets available: some Information and
         http://www.sadorex.ch/de/productdetail---1--1002--1007--
         1257--1--100378--0--0--0--0--0--378--0--0.html
         E. Product Data: non standard articles without existing
                 Datasheet– Special design from KleinDesign according to
                 Construction Documents I-521

    Part 2 PRODUCTS

    2.1 MANUFACTURER

         A/C. DURAVIT Aktiengesellschaft
              Werderstraße 36
              D-78132 Hornberg

               Phone: +49 7833/70-0
               Fax: +49 7833/70-289
               Email: info@duravit.de
               Web: www.duravit.de


               Geberit Vertriebs GmbH
               Theuerbachstraße 1
               D-88630 Pfullendorf

               Phone: +49 75 52 934-01
               Fax: +49 75 52 934-300


                                                                           Seite: 70/127
E-Mail: sales.de@geberit.com
          Web: www.geberit.com

     B.   Aloys F. Dornbracht GmbH & Co. KG
          Köbbingser Mühle 6
          D-58640 Iserlohn

          Phone: +49 (0)2371-433-0
          Fax: +49 (0)2371-433-232
          E-Mail: info@dornbracht.de
          Web : www.dornbracht.de

     D/E. Klaus Klein Gmbh
          Zum Kaiserbusch 18
          D-48165 Münster

          Phone: +49 251 - 61 70 79
          Fax: +49 251 - 62 57 15
          E-mail: info@klausklein-gmbh.de
          Web : http://www.kleindesign-muenster.de/index.htm

2.2 PRODUCTS

     A/C. Toilet Duravit 221709
          Toilet Seat Duravit 6769
          Installation Geberit 458.103.00.1
          Push-button Geberit 115.770.xx.1
     B.   Shower Disposer Dornbracht 41400979
          Shower Disposer Sprinkler Dornbracht 27809980
          Flush-mounting thermostat Dornbracht 36416780
          Flush-mounting device Dornbracht 36310980
          Mixing Valve Dornbracht 3552897090
          Guiderail Dornbracht 1231097090
          Wall bracket Dornbracht 3508597090
          Faucet Dornbracht 13800980
          Flush-mounting device Dornbracht 3569097090
          Mixing Valve Dornbracht 36320980
          Kitchen sink Dornbracht Prep DF 1110
          Faucet Dornbracht 32800680
     D/E. Lavotory
          Shower Basin




                                                               Seite: 71/127
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1
Manual germany 1

More Related Content

Viewers also liked

March Newsletter
March NewsletterMarch Newsletter
March Newslettermjcunny
 
【再放送】実践的アクセス解析が分かる4時間!
【再放送】実践的アクセス解析が分かる4時間!【再放送】実践的アクセス解析が分かる4時間!
【再放送】実践的アクセス解析が分かる4時間!schoowebcampus
 
Catalunya 77 Juliol-agost 2006
Catalunya 77 Juliol-agost 2006 Catalunya 77 Juliol-agost 2006
Catalunya 77 Juliol-agost 2006 Revista Catalunya
 
Generic Image Processing With Climb - Slides
Generic Image Processing With Climb - SlidesGeneric Image Processing With Climb - Slides
Generic Image Processing With Climb - SlidesLaurent Senta
 
Attitude and policy towards asylum seeker bishop peter kekere
Attitude and policy towards asylum seeker  bishop peter kekereAttitude and policy towards asylum seeker  bishop peter kekere
Attitude and policy towards asylum seeker bishop peter kekereBishop (Dr) Peter Kekere
 

Viewers also liked (7)

March Newsletter
March NewsletterMarch Newsletter
March Newsletter
 
【再放送】実践的アクセス解析が分かる4時間!
【再放送】実践的アクセス解析が分かる4時間!【再放送】実践的アクセス解析が分かる4時間!
【再放送】実践的アクセス解析が分かる4時間!
 
Catalunya 77 Juliol-agost 2006
Catalunya 77 Juliol-agost 2006 Catalunya 77 Juliol-agost 2006
Catalunya 77 Juliol-agost 2006
 
Servicios del internet
Servicios del internetServicios del internet
Servicios del internet
 
Generic Image Processing With Climb - Slides
Generic Image Processing With Climb - SlidesGeneric Image Processing With Climb - Slides
Generic Image Processing With Climb - Slides
 
Attitude and policy towards asylum seeker bishop peter kekere
Attitude and policy towards asylum seeker  bishop peter kekereAttitude and policy towards asylum seeker  bishop peter kekere
Attitude and policy towards asylum seeker bishop peter kekere
 
Karen menjivar
Karen menjivarKaren menjivar
Karen menjivar
 

Similar to Manual germany 1

Mips implementation
Mips implementationMips implementation
Mips implementationhoang974
 
Lightning protection guide e
Lightning protection guide eLightning protection guide e
Lightning protection guide efabriziotappi
 
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)Zagazig University
 
Production Techniques 2 - advanced machining techniques report
Production Techniques 2 - advanced machining techniques reportProduction Techniques 2 - advanced machining techniques report
Production Techniques 2 - advanced machining techniques reportKerrie Noble
 
Broadband report
Broadband reportBroadband report
Broadband reportherooftit
 
Ena ts 41-24_issue_1_section_15_addendum__2009_
Ena ts 41-24_issue_1_section_15_addendum__2009_Ena ts 41-24_issue_1_section_15_addendum__2009_
Ena ts 41-24_issue_1_section_15_addendum__2009_Ibrahim Khleifat
 
2014-11-25-Thesis-Rev08
2014-11-25-Thesis-Rev082014-11-25-Thesis-Rev08
2014-11-25-Thesis-Rev08Edward Curt
 
Stage 2 Civil and structual engineering project
Stage 2 Civil and structual engineering projectStage 2 Civil and structual engineering project
Stage 2 Civil and structual engineering projectEdison Mugoya
 
Chemical plant design & construction 2016
Chemical plant design & construction 2016Chemical plant design & construction 2016
Chemical plant design & construction 2016Nhật Nguyễn
 
Ampacity according to iec 60287
Ampacity according to iec 60287Ampacity according to iec 60287
Ampacity according to iec 60287azzaabo
 
Guidelines Haul Rpad Design
Guidelines Haul Rpad DesignGuidelines Haul Rpad Design
Guidelines Haul Rpad DesignEdgar Quiroz
 
TALAT Lecture 2301: Design of Members
TALAT Lecture 2301: Design of MembersTALAT Lecture 2301: Design of Members
TALAT Lecture 2301: Design of MembersCORE-Materials
 
Project Implementation Plan
Project Implementation PlanProject Implementation Plan
Project Implementation PlanAjjaWalker
 
An investigation into the use of modern methods of construction in uk home bu...
An investigation into the use of modern methods of construction in uk home bu...An investigation into the use of modern methods of construction in uk home bu...
An investigation into the use of modern methods of construction in uk home bu...Dean Jones
 
82937107 iiw-recommendations-for-fatigue-design-of-welded-joints-and-componen...
82937107 iiw-recommendations-for-fatigue-design-of-welded-joints-and-componen...82937107 iiw-recommendations-for-fatigue-design-of-welded-joints-and-componen...
82937107 iiw-recommendations-for-fatigue-design-of-welded-joints-and-componen...restinho
 

Similar to Manual germany 1 (20)

Mips implementation
Mips implementationMips implementation
Mips implementation
 
Lightning protection guide e
Lightning protection guide eLightning protection guide e
Lightning protection guide e
 
2.memoria
2.memoria2.memoria
2.memoria
 
1 20
1   201   20
1 20
 
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
[Peter fritz, xiong_zheng]_a_finite_element_framew(book_fi)
 
Production Techniques 2 - advanced machining techniques report
Production Techniques 2 - advanced machining techniques reportProduction Techniques 2 - advanced machining techniques report
Production Techniques 2 - advanced machining techniques report
 
Broadband report
Broadband reportBroadband report
Broadband report
 
Ena ts 41-24_issue_1_section_15_addendum__2009_
Ena ts 41-24_issue_1_section_15_addendum__2009_Ena ts 41-24_issue_1_section_15_addendum__2009_
Ena ts 41-24_issue_1_section_15_addendum__2009_
 
Tilak's Report
Tilak's ReportTilak's Report
Tilak's Report
 
CDP FINAL REPORT
CDP FINAL REPORTCDP FINAL REPORT
CDP FINAL REPORT
 
2014-11-25-Thesis-Rev08
2014-11-25-Thesis-Rev082014-11-25-Thesis-Rev08
2014-11-25-Thesis-Rev08
 
Stage 2 Civil and structual engineering project
Stage 2 Civil and structual engineering projectStage 2 Civil and structual engineering project
Stage 2 Civil and structual engineering project
 
Chemical plant design & construction 2016
Chemical plant design & construction 2016Chemical plant design & construction 2016
Chemical plant design & construction 2016
 
Ampacity according to iec 60287
Ampacity according to iec 60287Ampacity according to iec 60287
Ampacity according to iec 60287
 
Guidelines Haul Rpad Design
Guidelines Haul Rpad DesignGuidelines Haul Rpad Design
Guidelines Haul Rpad Design
 
TALAT Lecture 2301: Design of Members
TALAT Lecture 2301: Design of MembersTALAT Lecture 2301: Design of Members
TALAT Lecture 2301: Design of Members
 
Project Implementation Plan
Project Implementation PlanProject Implementation Plan
Project Implementation Plan
 
S E I Passive House
S E I Passive HouseS E I Passive House
S E I Passive House
 
An investigation into the use of modern methods of construction in uk home bu...
An investigation into the use of modern methods of construction in uk home bu...An investigation into the use of modern methods of construction in uk home bu...
An investigation into the use of modern methods of construction in uk home bu...
 
82937107 iiw-recommendations-for-fatigue-design-of-welded-joints-and-componen...
82937107 iiw-recommendations-for-fatigue-design-of-welded-joints-and-componen...82937107 iiw-recommendations-for-fatigue-design-of-welded-joints-and-componen...
82937107 iiw-recommendations-for-fatigue-design-of-welded-joints-and-componen...
 

Recently uploaded

Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

Recently uploaded (20)

Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 

Manual germany 1

  • 1. Technische Universität Darmstadt | FG ee | El-Lissitzky--Str. 1 | 64287 Darmstadt Deliverables June, 2nd 2009 Project Manual Department of Architecture Project Manual Unit of Energy Efficient Building Design Prof. Manfred Hegger El-Lissitzky-Straße 1 64287 Darmstadt phone. +49 6151 16 - 2046 fax +49 6151 16 - 5247 henrich@ee.tu-darmstadt.de June, 2nd 2009 www.solardecathlon2009.de ee Seite: 1/127
  • 2. Table of Contents 1.  Summary Of Changes ........................................................................................... 6  2.  Rules Compliance Checklist .................................................................................. 7  3.  Construction specifications ................................................................................. 11  00  Procurement and Contracting Requirements ..................................... 11  01  General Requirements........................................................................ 23  01 53 00 Temporary Construction ............................................................. 23  01 54 00 Construction Aids ........................................................................ 25  01 54 23 Temporary Scaffolding ................................................................ 27  01 65 00 Product Delivery Requirements ................................................... 28  02  Existing Conditions - no entries ....................................................... 28  03  Concrete - no entries ........................................................................ 28  04  Masonry - no entries ........................................................................ 28  05  Metals ................................................................................................ 29  05 05 23 Metal Fastening ........................................................................... 29  05 14 00 Structural Aluminum Framing .................................................... 30  05 20 00 Metal Joists ................................................................................. 31  05 25 00 Aluminum Joist Framing ............................................................. 33  05 25 00 Aluminum Joist Framing ............................................................. 33  06  Wood, Plastics, and Composites ......................................................... 34  06 05 00 Common Work Results for Wood, Plastics and Composites ........ 34  06 11 00 Wood Framing............................................................................. 36  06 12 00 Structural Panels ......................................................................... 37  06 16 00 Sheathing .................................................................................... 38  06 17 33 Wood I-Joists ............................................................................... 39  06 40 00 Architectural Woodwork ............................................................. 40  06 60 00 Plastic Fabrications...................................................................... 41  06 60 00 Plastic Fabrications...................................................................... 41  07  Thermal and Moisture Protection ...................................................... 42  07 21 00 Thermal Insulation ...................................................................... 42  07 25 00 Weather Barriers ......................................................................... 44  07 26 00 Vapor Retarders .......................................................................... 45  07 55 00 Protected Membrane Roofing ...................................................... 46  Seite: 2/127
  • 3. 07 62 00 Sheet Metal Flashing and Trim ................................................... 47  07 71 23 Manufactured Gutters and Downspouts ...................................... 48  07 90 00 Joint Protection ........................................................................... 49  08  Openings ............................................................................................ 50  08 10 00 Doors and Frames ....................................................................... 50  08 50 00 Windows ..................................................................................... 51  08 70 00 Hardware .................................................................................... 53  08 80 00 Glazing ........................................................................................ 54  09  Finishes .............................................................................................. 55  09 20 00 Plaster and Gypsum Board .......................................................... 55  09 60 00 Flooring ....................................................................................... 56  09 80 00 Acoustic Treatment ..................................................................... 58  09 90 00 Painting and Coating ................................................................... 59  10  Specialties .......................................................................................... 60  10 28 00 Toilet, Bath, and Laundry Accessories ......................................... 60  10 70 00 Exterior Specialties ...................................................................... 61  11  Equipment .......................................................................................... 62  11 30 00 Residential Equipment ................................................................ 62  12  Furnishings ........................................................................................ 63  12 30 00 Casework ..................................................................................... 63  12 40 00 Furnishings and Accessories ........................................................ 64  12 50 00 Furniture ..................................................................................... 66  13  Special Construction .......................................................................... 66  14  Conveying Equipment ........................................................................ 67  14 80 00 Scaffolding .................................................................................. 67  21  Fire Suppression................................................................................. 67  22  Plumbing ............................................................................................ 68  22 10 00 Plumbing Piping and Pumps ....................................................... 68  22 40 00 Plumbing Fixtures ....................................................................... 70  23  HVAC ................................................................................................. 72  23 30 00 HVAC Air Distribution ................................................................. 72  23 50 00 Central Heating Equipment ......................................................... 74  23 70 00 Central HVAC Equipment ............................................................ 75  24  --- ....................................................................................................... 75  Seite: 3/127
  • 4. 25  Integrated Automation ....................................................................... 76  25 30 00 Integrated Automation Instrumentation and Terminal Devices .. 76  26  Electrical ............................................................................................ 78  26 05 00 Common Work Results for Electrical ........................................... 78  26 20 00 Low-Voltage Electrical Distribution ............................................. 79  26 30 00 Facility Electrical Power Generating and Storing Equipment ...... 81  26 50 00 Lighting ....................................................................................... 83  27  Communications ................................................................................ 84  27 40 00 Audio-Video Communications ..................................................... 84  28  Electronic Safety and Security ........................................................... 86  28 05 00 Common Work Results for Electronic Safety and Security .......... 86  28 30 00 Electronic Detection and Alarm................................................... 87  29  --- ....................................................................................................... 88  30  --- ....................................................................................................... 88  31  Earthwork .......................................................................................... 88  32  Exterior Improvement ........................................................................ 88  33  Utilities............................................................................................... 88  34  Transportation ................................................................................... 88  35  Waterway and Marine Construction .................................................. 88  36  --- ....................................................................................................... 88  37  --- ....................................................................................................... 88  38  --- ....................................................................................................... 88  39  --- ....................................................................................................... 88  40  Process Integration............................................................................. 88  41  Material Processing and Handling Equipment ................................... 88  42  Process Heating, Cooling, and Drying Equipment .............................. 89  42 31 16 Dessicant Equipment ................................................................... 89  43  Process Gas and Liquid Handling, Purification, and Storage Equipment .................................................................................................. 89  44  Pollution Control Equipment ............................................................. 89  45  Industry-Specific Manufacturing Equipment ...................................... 89  46  --- ....................................................................................................... 89  47  --- ....................................................................................................... 89  48  Electrical Power Generation ............................................................... 90  Seite: 4/127
  • 5. 48 10 00 Electrical Power Generation Equipment ...................................... 90  4.  Structural Calculations ....................................................................................... 91  5.  Detailed Water Budget........................................................................................ 92  6.  Summary of Unlisted Electrical Components ...................................................... 92  7.  Retail PV Price Quote(s) ..................................................................................... 95  8.  Summary of reconfigurable features ................................................................... 97  9.  Interconnection Application Form .................................................................... 100  10.  Energy Analysis Results and Discussion ............................................................ 101  11.  Subjective Contest Support Documents ............................................................ 112  11.1.  Architecture Design Narrative ..................................................................... 112  11.2.  Market Viability Justification ...................................................................... 117  Construction ............................................................................................. 117  Liveability ................................................................................................. 117  Marketability ............................................................................................ 118  11.3.  Engineering Design Narrative ..................................................................... 121  11.4.  Lighting Design Narrative ........................................................................... 126  Seite: 5/127
  • 6. 1. Summary Of Changes Since the last deliverables in December 2008 and the following workshop in Washington D.C. in January 2009 the complete set of Construction Documents of Team Germany has been revised. There has been an intensive design and optimization process within the last months bearing several new ideas and possibilities on different layers. We spent a long time developing a façade with PV-application. Manufacturers and sponsors guided and supported our research and design process for months before admitting that this idea of a smooth and lightweight façade is technically not yet producible. The consequence of this development and the most apparent change since December is that our façade had to become a new design. It is now a new interpretation of our ideas for a PV-activated façade which should be easily conceivable for other projects and adaptable for energetic renovations of building stock. (See also Architecture and Engineering Design Narratives) Other particular changes since December insist on our ceiling system that is now a crucial component of our energy concept. The window’s positions have changed due to further analysis and light-studies – attended by further analysis concerning effective sun control devices. Relating to the Rules Compliance Checklist the following changes have been made: 4-5 noise reduction for equipment 5-2 effect of reconfigurable louvers integral to the façade’s structure necessary revision of solar envelope 6-4 new public tour route due to crossing points in December’s proposal 8-3 cooling system integral to void ceiling 8-6 changed from 3-phase system to required 1-phase system for Photovoltaic connection Façade 9-6 effects of cooling system integral to void ceiling Seite: 6/127
  • 7. 2. Rules Compliance Checklist Rule Drawing Sheet(s) Coordinate Rule Description Content Requirement(s) # s Drawing(s) showing the assembly O-210/O-229 and disassembly sequences and the O-310 4-2 Construction Equipment movement of heavy machinery on the competition site No forklifts, or 4-2 Construction Equipment Specs for heavy machinery similar planned Drawing(s) showing the locations S-206, S-553, 4-3 Ground Penetration and depths of all ground S-554 penetrations on the competition site Drawing(s) showing the location, S-206 contact area, and soil bearing 4-4 Impact on the Turf pressure of every component resting directly on the turf PM: 26 32 00 4-5 Generators Specifications for generators Specs Drawing(s) showing the locations of P-111, P-211, all equipment, tanks, and pipes that P-311, P-411, 4-6 Spill Containment will contain fluids at any point P-421, P-431 during the event PM: 22 10 00 Specifications for all equipment, Specs 4-6 Spill Containment tanks, and pipes that will contain PM: 33 16 00 fluids at any point during the event Specs Calculations showing that structural S-301 design remains compliant even if 18 4-7 Lot Conditions in. (45.7 cm) of vertical elevation change exists Drawing(s) showing shimming S-301 methods and materials to be used if 4-7 Lot Conditions 18 in. (45.7 cm) of vertical elevation change exists on the lot Drawing(s) showing the location of L-641 Solar Envelope 5-2 all house and site components Dimensions relative to the solar envelope List of solar envelope exemption No exemption Solar Envelope requests accompanied by requests 5-2 Dimensions justifications and drawing references Seite: 7/127
  • 8. List of, or marking on, all sheets in S-201 – S-206 the complete electronic S-301 – S-303 Construction Documents that have S-401 – S-408 been or will be stamped by the structural engineer in the hard- Structural Design 6-1 copy, stamped structural Approval submission; the stamped submission shall consist entirely of sheets or pages that also appear in the complete electronic construction document set Drawing(s) showing all information A-223 Maximum Architectural needed by the Rules Officials to 6-2 Footprint measure the architectural footprint electronically Drawing(s) showing all movable A-225 Maximum Architectural components that may increase the 6-2 Footprint footprint if operated during contest week Shading calculations and/or A-225 diagrams for components that DO NOT shade the building above its finished floor height between 9 a.m. and 5 p.m. EDT on October 1 Maximum Architectural 6-2 (shading calculations and/or Footprint diagrams are not necessary for components that are either shorter than finished floor height or obviously do not shade the building) Drawing(s) showing space A-224 Minimum Conditioned 6-3 conditioning means in primary Space living spaces Drawing(s) showing the accessible X-211, X-311 public tour route and the ground X-312, X-511 Entrance and Exit 6-4 surface area that will be covered by Routes organizer-provided walkway material Drawing(s) showing the location of L-511 all vegetation and, if applicable, the 7-1 Placement movement of vegetation designed as part of an integrated mobile system Drawings showing the layout and P-511, P-521 7-2 Watering Restrictions operation of greywater irrigation P-531, P-541 systems P-551 PM: 26 31 00 PV Technology Specifications for photovoltaic Specs PV 8-1 PM: 38 19 16 Limitations components Specs Inverters PV Technology Retail price quote for photovoltaic Retail PV Price 8-1 Quotes Limitations components Seite: 8/127
  • 9. Drawing(s) showing the location of M-231 8-3 Thermal Energy Storage thermal energy storage components Specifications for thermal energy PM: 23 56 00 8-3 Thermal Energy Storage Specs storage components Shading calculations and/or PM: 08 50 00 Specs 8-3 Thermal Energy Storage diagrams for thermal energy storage components (if necessary) Drawing(s) showing the location(s) No batteries used 8-4 Batteries and quantity of stand-alone, PV- powered devices Specifications for all stand-alone, No batteries used 8-4 Batteries PV-powered devices Drawing(s) describing the operation M-222 8-5 Desiccant Systems of the desiccant system Specifications for desiccant system PM: 23 56 00 8-5 Desiccant Systems PM: 42 31 16 components Interconnection Completed Interconnection 8-6 Village Grid Application Application form. Form Drawing(s) showing the locations of A-225 A-841, A-842, the photovoltaics, inverter(s), A-844, A-852 8-6 Village Grid terminal box, meter housing, service equipment, and grounding means Specifications for the photovoltaics, PM: 26 31 00 Specs PV inverter(s), terminal box, meter 8-6 Village Grid PM: 38 19 16 housing, service equipment, and Specs Inverters grounding means 8-6 Village Grid One-line electrical diagram E-506 Calculation of service/feeder net E-501, E-502, 8-6 Village Grid computed load per NEC 220 E-503, E-504 Site plan showing the house, decks, L-511 8-6 Village Grid ramps, tour paths, and terminal box Elevation(s) showing the terminal L-641, L-642 box, meter housing, main utility 8-6 Village Grid disconnect, and other service equipment Drawing(s) showing the layout and A-843 9-4 Rainwater Collection operation of rainwater collection systems Drawing(s) showing the locations of M-321 – M-351 9-6 Thermal Mass water-based thermal mass systems Specifications for components of PM: 23 71 13 9-6 Thermal Mass Specs water-based thermal mass systems Drawing(s) showing the See: TUD_FINALCO Event Sponsor dimensions, materials, artwork, and 10-2 MMPLAN_2009 Recognition content of all communications -06-02 materials, including signage Seite: 9/127
  • 10. Drawing(s) showing the See: TUD_FINALCO Team Sponsor dimensions, materials, artwork, and 10-3 MMPLAN_2009 Recognition content of all communications -06-02 materials, including signage Interior and exterior plans showing X-211, X-311, 11-4 Public Exhibit X-312, X-511 entire accessible tour route Drawing(s) showing the Not yet designed 11-4 Public Exhibit dimensions, materials, artwork, and content of the handout See: Drawing(s) showing the artwork TUD_FINALCO 11-4 Public Exhibit MMPLAN_2009 and content of the team uniform -06-02 Seite: 10/127
  • 11. 3. Construction specifications 00 Procurement and Contracting Requirements 00 01 01 Project Title Page Title: TEAM GERMANY SOLAR DECATHLON 2009 | Technische Universität Darmstadt Date: April 2008 – October 2009 Construction Site: Petersenstrasse; 64287 Darmstadt; Parking Area between Cafeteria TU Lichtwiese and Department of Architecture Student Team: Leader internal: Annika Gaigl | a.gaigl@solardecathlon2009.de Leader external: Sardika Meyer | s.meyer@solardecathlon2009.de Faculty Advisors: Architecture: Professor Manfred Hegger | hegger@ee.tu-darmstadt.de Organization: Dipl.-Ing. Johanna Henrich | henrich@ee.tu-darmstadt.de Dipl.-Ing. Jörg Wollenweber | wollenweber@ee.tu-darmstadt.de Communications: Dipl.-Ing. M.A. Caroline Fafflok | fafflok@ee.tu-darmstadt.de Design and Engineering: Dipl.-Arch. Hans Drexler | Dipl.-Ing. Martin Zeumer Electr. Engineering: Dipl.-Ing. Lutz Steiner | steiner@re.tu-darmstadt.de Struct. Engineering: Dipl.-Ing. Jochen Stahl | stahl@baustatik.tu-darmstadt.de Team Germany Website, including Blog and Live-Webcam: http://www.solardecathlon2009.de Team Germany Contact: team@solardecathlon2009.de Seite: 11/127
  • 12. 00 01 15 List of Drawing Sheets General G - 101 - Cover Sheet G - 102 - Table of Content G - 103 - Table of Content G - 104 - Table of Content G - 105 - Table of Content G - 106 - Table of Content G - 201 - Design Concept G - 202 - Strategies Of Energy Use G - 203 - Sustainable Design G - 204 - Symbols And Notes G - 301 - Abbreviations G - 401 - Target Market Description G - 501 - Exterior Rendering - South East G - 502 - Exterior Rendering - South West Civil C - 201 - Site 1:50 C - 301 - Grading 1:50 Lanscape L - 111 Symbols and Notes 1:50 L - 211 Grading 1:100 L - 321 Secondary Construction 1:100 L - 322 Planking 1:100 L - 351 Deck Construction Detail 1:100 L - 411 Lighting Design 1:100 L - 511 Planting 1:100 L - 641 Elevation - North East 1:50 L - 642 Elevation - South West 1:50 L - 711 Schedules - Landscape L - 712 Schedules - Landscape L - 713 Schedules - Landscape L - 714 Schedules - Landscape Structural - General S -101 - General Notes S -102 - General Notes S -103 - General Notes S -104 - General Notes Structural - Plans S - 201 - Roof Framing 1:50 S - 202 - Upper Wall Framing 1:50 S - 203 - 2nd Floor Framing 1:50 S - 204 - Floor Framing 1:50 S - 205 - Platform Framing 1:50 S - 206 - Foundation Plan 1:50 Seite: 12/127
  • 13. Structural - Sections S - 301 - Longitudinal Section 1:50 S - 302 - Cross Section 1:50 S - 303 - Cross Section 1:50 Structural - Elevations S - 401 - Wall Construction North 1:50 S - 402 - Wall Construction East 1:50 S - 403 - Wall Construction South 1:50 S - 404 - Wall Construction West 1:50 S - 405 - Wall Sheathing North 1:50 S - 406 - Wall Sheathing East 1:50 S - 407 - Wall Sheathing South 1:50 S - 408 - Wall Sheathing West 1:50 Structural - VIP S - 421 - VIP Floor Plan 1:50 S - 422 - VIP Roof Plan 1:50 S - 441 - VIP Plan North 1:50 S - 442 - VIP Plan East 1:50 S - 443 - VIP Plan South 1:50 S - 444 - VIP Plan West 1:50 S - 451 - VIP Structure 1:7 S - 461 - Schedules - VIP Structural - Details S - 511 - Wall to Roof Connection E-W 1:5 S - 512 - Wall to Roof Connection 1:5 S - 513 - Post to Beam Connection 1:5 S - 521 - Module Connection 1:5 S - 522 - Module Connection S-E Corner 1:5 S - 523 - Module Connection S-W Corner 1:5 S - 524 - Module Connection N-W & N-E Corner 1:5 S - 525 - Built-up Column GL 5 North 1:10 S - 526 - Built-up Column GL 8 North 1:10 S - 527 - Built-up Column GL 12 North 1:10 S - 528 - Built-up Column GL F East 1:10 S - 529 - Built-up Column GL 8 South 1:10 S - 530 - Built-up Column GL 12 South 1:10 S - 531 - Built-up Column GL F West 1:10 S - 532 - Roof to Wall Connection Z-Section 1:10 S - 533 - Module Connectors @ Corner 1:5 S - 534 - Module Connectors @ Corner 1:5 S - 535 - Typ- Module Connectors 1:5 S - 541 - Steel Edge to Wall Connection 1:5 S - 542 - Connection Details of Second Floor 1:5 S - 543 - 2nd Floor Edge Angle to Wood Post 1:5 Connection S - 544 - 2nd Floor Connection @ Split of Building 1:5 S - 545 - 2nd Floor Opening for Mechanical 1:5 S - 546 - L- section 2nd fl oor North 1:20 S - 547 - L- section 2nd fl oor South 1:20 Seite: 13/127
  • 14. S - 548 - 2nd fl oor to East wall connection South 1:20 S - 549 - 2nd fl oor to East wall connection center 1:5 S - 550 - 2nd fl oor to East wall connection North 1:10 S - 551 - 2nd fl oor to North & South wall connection 1:20 S - 552 - Holdown Anchor SW Corner 1:10 S - 553 - Central Wood Base 1:10 S - 554 - Northern Wood Base 1:10 S - 555 - Holdown Anchor SE Corner 1:5 S - 556 - Holdown anchor SE corner 1:5 S - 557 - Details Holdown Anchor 1:5 S - 561 - Wall to Floor Connection (West) 1:5 S - 562 - Section - Platform Connection 1:5 S - 563 - Connection of Steel Beam to Wall 1:5 S - 564 - Platform Module Connection 1:5 S - 565 - Temp - Bracing @ Platform Connection 1:5 S - 566 - Steel Beam to Wall Connection GL 11 1:5 S - 567 - Detail - Platform Connection GL 11 1:5 S - 568 - Section - Steel Beam @ Stairs 1:5 S - 569 - Steel Beam @ Ramp 1:5 S - 570 - Post to Steel Beam Connection 1:5 S - 571 - Platform Beam Connection 1.5 S - 572 - HEA 1 1:20 S - 573 - HEA 2 1:20 S - 574 - HEA 3 1:20 S - 575 - HEA 4 1:20 S - 576 - Steel Plate SB2 East & West Wall 1:5 S - 577 - Steel Plate SB1 North & South Wall 1:5 S - 578 - 2nd Floor Temp- Steel Post 1:20 Structural - Transport S - 611 - Axonometry Lower North Module 1:50 S - 612 - Axonometry Lower South Module 1:50 S - 613 - Axonometry Upper North Module 1:50 S - 614 - Axonometry Upper South Module 1:50 S - 621 - Floor Plan Lower Modules 1:50 S - 622 - Floor Plan Upper Modules 1:50 S - 631 - Longitudinal Section E-W 1:50 S - 632 - Longitudinal Section W-E 1:50 S - 633 - Cross Section N-S 1:50 S - 634 - Cross Section S-N 1:50 S - 651 - Typ- Trans- Brace To Wall Connection 1:5 S - 652 - Trans- Brace To Roof Connection 1:5 S - 653 - Trans- Brace To Platform Connection 1:5 S - 654 - Threaded Rod To Roof Connection 1:10 S - 655 - Cable To Wall Connection 1:5 S - 656 - Becket to Platform Connection West 1:10 S - 657 - Becket to Platform Connection East 1:10 S - 660 - Anchor Overview 1:100 S - 661 - Trans- Brace Manufacturer Spec S - 662 - Becket Manufacturer Spec S - 663 - Cable & Tightener Manufacturer Spec- S - 664 - Trans- Brace Platform Anchor West 1:5 S - 665 - Trans- Brace Platform Anchor West Rotated 1:5 Seite: 14/127
  • 15. S - 666 - Trans- Brace Platform Anchor East 1:5 S - 667 - Trans- Brace Platform Anchor East Rotated 1:5 S - 668 - Trans- Brace East & West Wall Anchor 1:5 S - 669 - Trans- Brace North Wall Anchor 1:5 S - 670 - Trans- Brace Module Bonding Anchor 1:5 S - 671 - Trans- Brace South Wall Anchor# 1:5 S - 672 - Trans- Brace & Cable Anchor West Wall 1:5 S - 673 - Trans- Brace Roof Anchor 1:5 S - 674 - Trans- Brace Roof Anchor Rotated 1:5 S - 675 - Cable East Wall Anchor 1:5 S - 676 - Threaded Rod 1:10 S - 677 - Schedule - Transport S - 678 - Schedule - Transport S - 679 - Schedule - Transport Structural - Traverse S - 711 - Floor Plan Traverse 1:20 S - 712 - View From Below Traverse 1:20 S - 713 - Exploded Drawing 1:20 S - 714 - Axonometry Traverse S - 715 - Schedules - Temporary Construction Architectural - Plans A - 221 - Floorplan 1:50 A - 222 - 1stFloor 1:50 A - 223 - Minimum Conditioned Space 1:50 A - 224 - Maximum Architectural Footprint 1:50 A - 225 - Moveable Components Shading Deck 1:100 Architectural - Elevations A - 311 - Elevation North 1:50 A - 312 - Elevation East 1:50 A - 313 - Elevation South 1:50 A - 314 - Elevation West 1:50 Architectural - Sections A - 431 - Longitudinal Section - North 1:50 A - 432 - Longitudinal Section - South 1:50 A - 433 - Cross Section - East 1:50 A - 434 - Cross Section - West 1:50 Architectural - Details - Windows A - 510 - Key Plan Windows 1:100 A - 511 - Key Plan Windows 1:100 A - 520 - Window Elevation North 1:50 A - 521 - Window Elevation East 1:50 A - 522 - Window Elevation South 1:50 A - 523 - Window Elevation West 1:50 A - 540 - Window N1 Overview 1:20 A - 541 - Window N1 Detail 1 1:20 A - 542 - Window N1 Detail 2 1:20 A - 545 - Window N2 Overview 1:20 A - 546 - Window N2 Detail 1 1:20 Seite: 15/127
  • 16. A - 550 - Window N3 Overview 1:20 A - 551 - Window N3 Detail 1 1:5 A - 552 - Window N3 Detail 2 1:2 A - 553 - Window N3 Lamella - A - 580 - Window SW1 Overview 1:20 A - 581 - Window SW1 Detail 1 1:5 A - 582 - Window SW1 Detail 2 1:5 A - 595 - Schedules - Windows A - 596 - Schedules - Opening Sun Control Devices Architectural - Details - PV Mounting A - 711 - PV Façade Elements - A - 712 - Mounting Cramp 1:1 A - 713 - Gusset Plate 1:2 A - 714 - PV-Module 1:5 A - 715 - Acrylic Glass 1:5 A - 716 - Substructure - Components 1:10 A - 721 - Surface 1:100 A - 731 - Detail Façade - Roof 1:2 A - 741 - Detail Connection Façade - Window 1:2 A - 751 - Detail Façade - Deck 1:2 A - 761 - Detail Corner - Substructure 1:5 A - 771 - PV Wiring Type 1 A - 772 - PV Wiring Type 2 A - 781 - Schedules Façade Architectural - Details - Roof A - 810 - Key plan roof 1:50 A - 811 - Roof System - general A - 831 - Sections Roof 1:20 A - 841 - Top View PV Modules 1:50 A - 842 - Top View PV Mounting System 1:50 A - 843 - Top View Drainage 1:50 A - 844 - Top View PV cable conduit 1:50 A - 851 - Detail roof system 1:2 A - 852 - Detail PV Mounting System Module Stoat 1:1 A - 853 - Detail PV fascia north-south 1:2 A - 854 - Detail drainage fascia north-south 1:2 A - 855 - Detail fascia east-west 1:2 A - 856 - Detail fall protection 1:5 A - 857 - Detail PV Mounting System section 1:1 A - 860 - Schedule - Roof 1 A - 861 - Schedule - Roof 2 Architectural - Details - Siding A - 911 - Key Plan Elevations 1:75 A - 951 - Siding Detail Ceiling Floor 1:5 A - 952 - Siding Detail Cut 1:5 A - 953 - Siding Detail 1:5 A - 954 – Schedules Siding Seite: 16/127
  • 17. Interiors - Living Space- General I - 200 - Body - Furniture Interior rendering I - 201 - Body - Furniture Areas Table of Contents I - 202 - Body - Furniture Structure Scheme I - 203 - Body - Furniture Cabinet Body Materials Interiors - Living Space- Plans I-210 - Body-Furniture Floor Plan 1st Floor 1:50 I-211 - Body-Furniture Floor Plan 2nd Floor 1:50 Interiors - Living Space- Sections I-220 - Body -Furniture Longitudinal Section South 1:50 I-221 - Body -Furniture Longitudinal Section North 1:50 I-222 - Detail Longitudinal Section North Storage 1:20 I-223 - Detail Elevation Longitudinal Section South Stairs 1:20 I-230 - Detail Body-Furniture Cross-Section Stairs 1:20 Interiors - Living Space- Elevations I - 240 - Body -Furniture Elevations 1:50 I - 241 - Detail Elevation South Stairs 1:20 I - 242 - Detail Elevation North Storage 1:20 Interiors - Living Space- Stairs I - 270 - Stairs Stairs 1:50 I - 271 - Scheme Stairs Sections 1:20 I - 272 - Overview Handrail 2nd Floor 1:20 I - 273 - Overview Handrail Stairs 1:20 I - 274 - Steelprofile Steelstring Stairs 1:20 I - 275 - Steelprofile Handrail 2nd Floor North 1:5 I - 276 - Steelprofile Handrail 2nd Floor South 1:10 I - 277 - Steelprofile Handrail Stairs 1:10 I - 278 - Detail Steelprofile Handrail 2nd Floor and Stairs 1:2 Interiors - Living Space- Schedules I - 280 - Schedules – Body Furniture I - 281 - Schedules – Body Furniture I - 282 - Schedules – Body Furniture Interiors - Kitchen I - 321 - Horizontal Section I 1:10 I - 322 - Horizontal Section II 1:10 I - 323 - Horizontal Section III 1:10 I - 331 - Vertical Section I 1:10 I - 332 - Vertical Section II 1:10 I - 341 - Elevation North 1:10 I - 342 - Elevation South 1:10 I - 351 - Technical Appliances I 1:10 I - 352 - Technical Appliances II 1:10 I - 353 - Schedules - Kitchen Seite: 17/127
  • 18. Interiors - Bedroom I - 411 - Concept Bedroom I - 412 - Manual Bed I - 421 - Floor Plan Bed 1:20 I - 431 - Longitudinal Section Bed 1:20 I - 432 - Across Section Bed 1:20 I - 451 - Construction Detail Bed 1:5 I - 452 - Ropes for Opening 1:5 Interiors - Bathroom I - 510 - Concept I - 521 - Floor Plan 1:20 I - 531 - Elevation North 1:20 I - 532 - Elevation East 1:20 I - 533 - Elevation South 1:20 I - 534 - Elevation West 1:20 I - 541 - Longitudinal Section 1:20 I - 551 - Detail Shower Tray 1:10 I - 561 - Schedules - Bathroom Interiors - Flooring I - 621 - Floor Plan level 0.5 1:50 I - 622 - Floor Plan level 1.5 1:50 I - 623 - Flooring Cable Conduit 1:50 I - 651 - Detail Cable Conduit 1:5 I - 652 - Detail Connection Wall / Window – Cable Conduit 1:5 I - 653 - Detail Connection Wall Level 0.0 + 1.5 1:5 I - 654 - Section - Stairs 1:5 I - 655 - Section - Ramp 1:5 I - 656 - Section Horizontale Module Cut Level 0.0 1:5 I - 657 - Section Horizontale Module Cut Level 0.5 1:5 I - 660 - Schedules - Flooring Interiors - Renderings I - 701 - Rendering I - 702 - Rendering I - 703 - Rendering Fire - Protection F - 111 - Symbols and Notes F - 211 - Detection and Alarm F - 311 - Suppression F - 411 - Egress Plumbing P - 111 - Symbols and notes P - 211 - Supply and Removal P - 311 - Schematic Diagram P - 411 - Water Supply P - 421 - Water Supply 1:50 P - 431 - Water Supply 1:50 P - 511 - Waste Water Disposal P - 521 - Waste Water Disposal 1:50 Seite: 18/127
  • 19. P - 531 - Waste Water Disposal 1:50 P - 541 - Waste Water Disposal 1:10 P - 551 - Waste Water Disposal 1:10 P - 611 - Schedules - Plumbing P - 612 - Schedules - Plumbing Mechanical - Energy Concept M - 101 - Systems M - 102 - Flow Of Energy M - 103 - PCM System M - 104 - Heat Pump M - 105 - Energy Themes M - 106 - Scheme Summer Day M - 107 - Scheme Summer Night M - 108 - Scheme Winter Day M - 109 - Scheme Winter Night M - 110 - Scheme Spring Day M - 111 - Scheme Spring Night M - 112 - Planning Tools M - 113 - Energy Balance Mechanical - Drawings M - 211 - Heat Pump System Schematic Diagram M - 221 - Heat Pump System And Distribution Floorplan 1:50 M - 222 - Heat Pump System And Distribution Floorplan 1:50 M - 231 - Heat Pump System And Distribution Section 1:50 M - 271 - Heat Pump System And Distribution Isometric 1:50 M - 321 - Cooling Ceiling Section 1:50 M - 331 - Cooling Ceiling Section 1:50 M - 332 - Cooling Ceiling Section 1:20 M - 351 - Cooling Ceiling Detail 1:20 Mechanical - Schedules M - 411 - Schedules - Mechanical M - 412 - Schedules - Mechanical Electric E - 001 - Electrical Appliances And Installations E - 002 - Building Automation - Utilization Concept E - 121 - Electrical Appliances And Installations 1:50 E - 131 - Electrical Appliances And Installations 1:50 E - 132 - Electrical Appliances And Installations 1:50 E - 133 - Electrical Appliances And Installations 1:50 E - 141 - Placing Of Contest Sensors 1:50 E - 151 - Schedules - Electrical Appliances Electric - Artificial Light E-211 - Artificial Lighting Concept 1:100 E-212 - Functional Lighting Plan Upper Level 1:50 E-213 - Functional Lighting Plan Lower Level 1:50 E-214 - Functional Lighting - Sections 1:50 E-215 - Functional Lighting Integration LED strip E-216 - Lighting Renderings Seite: 19/127
  • 20. E-217 - Accent Lighting Concept 1:50 E-218 - Accent Lighting Concept - E-219 - Atmospheric Lighting Concept 1:50 E-220 - Multifunctional Body Illumination 1:1 E-221 - Light Switch Concept 1:50 E-222 - Lighting Schedules Electric- Electrical Cabinet Outside E - 301 - Electrical Cabinet Outside 1 E - 302 - Electrical Cabinet Outside 1 E - 303 - Electrical Cabinet Outside 2 E - 304 - Electrical Cabinet Outside 2 E - 305 - Electrical Cabinet Outside 2 E - 306 - Electrical Cabinet PV Inverter Joint E - 307 - Electrical Cabinet PV Inverter Joint E - 308 - Electrical Cabinet PV Inverter Joint Electric - PV Interconnection E - 309 - PV Interconnection Overview E - 310 - PV Interconnection Overview E - 311 - PV Interconnection Overview E - 312 - Design Of PV Roof E - 314 - PV Interconnection Overview Façade E - 315 - PV Interconnection Overview Façade E - 316 - PV Interconnection Overview Façade E - 317 - PV Interconnection Overview Façade E - 318 - PV Interconnection Overview Façade E - 319 - PV Interconnection Overview Façade E - 320 - PV Interconnection Overview Façade E - 321 - PV Interconnection Overview Façade E - 322 - PV Interconnection Overview Façade E - 323 - PV Interconnection Overview Façade E - 324 - PV Interconnection Overview Façade E - 325 - PV Interconnection Overview Façade E - 326 - PV Interconnection Overview Façade E - 327 - PV Interconnection Overview Façade E - 328 - Design Of PV Façade E - 329 - Design Of PV Façade E - 330 - Design Of PV Façade Electric - Electrical Cabinet Inside E - 401 - Electrical Cabinet Inside E - 402 - Electrical Cabinet Inside E - 403 - Electrical Cabinet Inside E - 404 - Electrical Cabinet Inside E - 405 - Electrical Cabinet Inside E - 406 - Electrical Cabinet Inside E - 407 - Electrical Cabinet Inside E - 408 - Electrical Cabinet Inside E - 409 - Electrical Cabinet Inside E - 410 - Electrical Cabinet Inside E - 411 - Electrical Cabinet Inside E - 412 - Electrical Cabinet Inside Seite: 20/127
  • 21. E - 413 - Electrical Cabinet Inside E - 414 - Electrical Cabinet Inside E - 415 - Electrical Cabinet Inside E - 416 - Electrical Cabinet Inside E - 417 - Electrical Cabinet Inside E - 418 - Electrical Cabinet Inside E - 419 - Electrical Cabinet Inside E - 420 - Room Control Unit E - 421 - Room Control Unit E - 422 - Design And Overcurrent Protection Electric - Load List E - 501 - Load List E - 502 - Load List E - 503 - Load List E - 504 - Load List E - 505 - KNX Busline Inside E - 506 - Cross Section And Wiring Overview E - 507 - Home Automation Overview E - 508 - Schedule - Load E - 509 - Schedule - Load Other Disciplines X - 111 - Site Accessibility 1:100 X - 211 - Public Exhibit Plan 1:50 X - 212 - Public Exhibit Deck 1:100 X - 213 - Public Exhibit Mock Ups 1:100 X - 311 - Schedule - Public Tour Operations O - 110 - Transport Germany-Washington O - 120 - Truck Layout O - 130 - Transport Details O - 140 - Modules Layout O - 210 - Site Operations Day 1 O - 220 - Site Operations Day 1 and 2 – O - 310 - Site Operations Day 1-7 and Disassembly O - 500 - Schedules - Operations Equipment Ressources R-101 - Client Site Elevations R-102 - Client Site Plan R-103 - Client Site Photographs Seite: 21/127
  • 22. 00 01 20 List of Schedules L - 711 Schedules - Landscape L - 712 Schedules - Landscape L - 713 Schedules - Landscape L - 714 Schedules - Landscape S - 461 - Schedules - VIP S - 677 - Schedule - Transport S - 678 - Schedule - Transport S - 679 - Schedule - Transport S - 715 - Schedules - Temporary Construction A - 595 - Schedules - Windows A - 596 - Schedules - Opening Sun Control Devices A - 781 - Schedules Façade A - 860 - Schedules Roof A - 861 - Schedules Roof A - 954 - Schedules Siding I - 280 - Schedules – Body Furniture I - 281 - Schedules – Body Furniture I - 282 - Schedules – Body Furniture I - 353 - Schedules – Residential Kitchen Appliances I - 561 - Schedules Bathroom Plumbing I - 660 - Schedules Flooring P - 611 - Schedules - Plumbing P - 612 - Schedules - Plumbing M - 411 - Schedule HVAC Heat Pump M - 412 - Schedule HVAC PCM Ceiling E-151 - Schedules for Electrical Appliances and Installations E-222 - Lighting Schedules E-508 - Schedule for Electrical Diagrams E-509 - Schedule for Electrical Diagrams X -311 - Schedule - Public Tour O - 500 - Schedules - Operations Equipment Seite: 22/127
  • 23. 01 General Requirements 01 53 00 Temporary Construction Part 1 GENERAL 1.1 SECTION INCLUDES A. Transport Bracing B. Transport Braces C. Threaded Rods 1.2 SUBMITTALS A. Product Datasheet (CD: Plan# S-661) B./C. No datasheets available; special design according to Construction Drawings S-661, S-664 – S-6616 Part 2 PRODUCTS 2.1 MANUFACTURER A. ROBUSTA-GAUKEL GMBH & CO. KG Brunnenstraße 36 D-71263 Weil der Stadt (Hausen) Phone: +49 (0)7033 5371-0 Fax +49 (0)7033 5371-31 E-Mail: info@robusta-gaukel.de Web: www.robusta-gaukel.de B./C. Internationaler Bund Darmstadt BaE Kooperative Ausbildung Metall / Elektro / Installation Advisor: Mr. Dilling Alsfelder Straße 3 64289 Darmstadt Deutschland Phone +49-6151-97154-14 Fax +49-6151-97154-29 Seite: 23/127
  • 24. 2.2 PRODUCTS A. Push-pull-props Type M Article No. 610130 and 610343 B. Transport Bracing – no article number C. Threaded rods – no article number Seite: 24/127
  • 25. 01 54 00 Construction Aids Part 1 GENERAL 1.1 SECTION INCLUDES A. Steel tie-bar (traverse) B. Trucks C. Crane D. Lifting loops E. Distribution Basin F. Cable ropes G. Tightener 1.2. SUBMITTALS A. Special design from metalworkers according to Construction Drawings S-711 – S-714 B. Special design from metalworkers according to Construction Drawings O-110 – O-310 C. Special design from metalworkers according to Construction Drawings O-110 – O-310 D/E. Weblink Datasheet: www.jordahl-pfeifer.ro/documente/pfeifer/Lifting_Loops_11_2007.pdf (CD: Plan# S-662) F. Datasheet (CD: Plan# S-663) G. Datasheet (CD: Plan# S-663) Part 2 PRODUCTS 2.1 MANUFACTURER A. Internationaler Bund Darmstadt Metall/Elektro/Installation Advisor: Mr. Dilling Alsfelder Straße 3 D-64289 Darmstadt phone +49-6151-97154-14 Fax +49-6151-97154-29 Web: www.internationaler-bund.de Information in English: www.internationaler-bund.de/fileadmin/user_upload/ib_englisch.pdf B/C. --- Seite: 25/127
  • 26. D/E. PFEIFER Holding GmbH & Co. KG Dr.-Karl-Lenz-Straße 66 D-87700 Memmingen phone +49 (0) 8331 - 937 - 0 Fax +49 (0) 8331 - 937 - 294 Web: www.pfeifer.de E-Mail: presse@pfeifer.de F/G. Carl Stahl GmbH Postweg 41 73079 Süßen phone. +49 (07162) 4007-3000 Fax +49 (07162) 4007-8830 Web: www.carlstahl.de E-Mail: carlstahl@carlstahl.com 2.2 PRODUCTS A.-C. no article number D. Pfeifer lifting loop 05.050.523. E. Pfeifer distribution basins 05.056.421 F. Carl Stahl 1621.21.00 G. Carl Stahl 5711.00.30 Seite: 26/127
  • 27. 01 54 23 Temporary Scaffolding Part 1 GENERAL 1.1 SECTION INCLUDES A. Mobile Scaffolding 1.2 SUBMITTALS A. no datasheet available – see example: http://www.layher-fahrgeruest.de/layher-uni-leicht/layher- unileicht-fahrgeruest-3204-arbeitshoehe.html (CD: Plan# O-110-310) Part 2 PRODUCTS 2.1 MANUFACTURER A. Wilhelm Layher GmbH & Co. KG Ochsenbacher Straße 56 74363 Güglingen-Eibensbach, Deutschland phone: +49 (0) 7135 70-0 Fax: + 49 (0) 7135 70-265 E-Mail: info@layher.com Web: http://www.layher.de/ http://www.layherusa.com/ 2.2 PRODUCTS A. Layher UniLeicht Mobile Scaffolding 3204 Working; Height: max. 6.30m Seite: 27/127
  • 28. 01 65 00 Product Delivery Requirements Part 1 GENERAL 1.1 SECTION INCLUDES A. Packing 1.2 SUBMITTALS A. no datasheet available – see example: (CD: Plan# O-110-310) Part 2 PRODUCTS 2.1/2.2 MANUFACTURER/ PRODUCTS A. not yet decided 02 Existing Conditions - no entries 03 Concrete - no entries 04 Masonry - no entries Seite: 28/127
  • 29. 05 Metals 05 05 23 Metal Fastening Part 1 GENERAL 1.1 SECTION INCLUDES A. Mounting B. Screwing 1.2 SUBMITTALS A. Product Data: Datasheet, Manufacturing Advices (CD: Plan# A-712, A-716, A-741, A-853, A-857) B. Weblink to Product Datasheet: http://www.wuerth.de/de/medien/holz/assy/de/assy-sk.pdf (CD: Plan# A-716, A-853, A-857) Part 2 PRODUCTS 2.1 MANUFACTURER A. Heroal-Johann Henkenjohann GmbH Österwieher Straße 80 33415 Verl Phone: +49 (0)5246-507253 Fax: +49 (0)5246-507275 www.heroal.de B. Adolf Würth GmbH & Co. KG Reinhold-Würth-Str. 12 - 17 74653 KÜNZELSAU-GAISBACH DEUTSCHLAND phone: +49 7940 15-0 Fax +49 7940 15-1000 E-Mail: info@wuerth.com Web: www.wuerth.de 2.2 PRODUCTS A. 64031 Mounting Type C for horizontal Substructure 64015 Mounting cramp Type F, special design 64030 21 Mounting Clip Type M 64034 21 Mounting Clip Type A46 B. Wheel Head Screws Würth ASSY SK 200x8mm Art. No. 0184 608 200 Jacksrew Seite: 29/127
  • 30. 05 14 00 Structural Aluminum Framing Part 1 GENERAL 1.1 SECTION INCLUDES A. Substructure PV roof B. Substructure PV facade 1.2 SUBMITTALS A. Product Data: Datasheets (CD: Plan# A-853, A-857) B. Product Data: Datasheets (CD: Plan# A-716, A-731-734, A- 761) Part 2 PRODUCTS 2.1 MANUFACTURER Heroal-Johann Henkenjohann GmbH Österwieher Straße 80 D-33415 Verl Phone: +49 (0)5246-507253 Fax: +49 (0)5246-507275 www.heroal.de 2.2 PRODUCTS – non standard – purpose-built items A. 18023 21 aluminum sheath 80mm 18233 21 aluminum drawer profile B. 64007 aluminum sheath 60/40mm 64007 aluminum sheath welded corner --- Ridge clamp – custom-made Seite: 30/127
  • 31. 05 20 00 Metal Joists Part 1 GENERAL 1.1 SECTION INCLUDES A. 05 20 00 Metal Joists B. 05 21 00 Steel Joist Framing 1.2 SUBMITTALS A/B. Product Data: non standard articles without existing Datasheet– Special design from metalworkers according to Construction Documents S-205, S-401-S-404 Product Datasheet for standard products (CD: Plan# S-205, S-401-404) Part 2 PRODUCTS 2.1 MANUFACTURER A. Internationaler Bund Darmstadt Metall / Elektro / Installation Advisor: Mr. Dilling Alsfelder Straße 3 64289 Darmstadt Deutschland phone +49-6151-97154-14 Fax +49-6151-97154-29 Web: www.internationaler-bund.de Information in English: www.internationaler-bund.de/fileadmin/user_upload/ib_englisch.pdf B. Holzbau Gröber GmbH Biberacher Straße 19 D - 88436 Eberhardzell-Füramoos Phone: +49 7358/ 960-0 Fax: +49 7358/ 960-60 E-Mail: info@groeber.de Web: www.groeber.de SIMPSON STRONG-TIE® GmbH Riederhofstrasse 27 D-60314 Frankfurt Phone: +49 69/67737 89 - 0 Seite: 31/127
  • 32. Fax: +49 69/67737 89 - 69 Web: www.strongtie.eu E-Mail: info@simpsonstrongtie.de 2.2 PRODUCTS A. Steel angles B. Steel plates Locksmith stuff C. HTT 16 Tie Simpson Strong-Tie Joist Hangers Simpson Strong-Tie Seite: 32/127
  • 33. 05 25 00 Aluminum Joist Framing Part 1 GENERAL 1.1 SECTION INCLUDES A. Substructure PV-façade 1.2 SUBMITTALS A. Product Data: non standard articles without existing Datasheet– Special design from HEROAL according to Construction Documents A-713, A-716 Part 2 PRODUCTS 2.1 MANUFACTURER A. Heroal-Johann Henkenjohann GmbH Österwieher Straße 80 33415 Verl Phone: +49 (0)5246-507253 Fax: +49 (0)5246-507275 Web: www.heroal.de 2.2 PRODUCTS A. 64082 End Cap for Aluminium Sheath 60/40mm Aluminium Cable Clip Blinding Seite: 33/127
  • 34. 06 Wood, Plastics, and Composites 06 05 00 Common Work Results for Wood, Plastics and Composites Part 1 GENERAL 1.1 SECTION INCLUDES A. 06 05 00 Common Work Results for W, P, and C B. 06 05 23 Wood, Plastics, and Composites Fastenings 1.2 SUBMITTALS A. Product Datasheet (CD: Plan# I-203) B. Product Data: Datasheets (CD: Plan# I-203) (CD: Plan# S-205, S-401-404) (CD: Plan# I-652-657) Part 2 PRODUCTS 2.1 MANUFACTURER A. Häfele GmbH & Co KG Adolf-Häfele-Str. 1 72202 Nagold Germany Tel: +49 (0)74 52 / 95 - 0 Fax: +49 (0)74 52 / 95 - 2 00 E-Mail: info@haefele.de Web: www.hafele.com B. Adolf Würth GmbH & Co. KG Reinhold-Würth-Str. 12 - 17 74653 KÜNZELSAU-GAISBACH DEUTSCHLAND phone: +49 7940 15-0 Fax +49 7940 15-1000 E-Mail: info@wuerth.com Web: www.wuerth.de SFS unimarket AG Nefenstrasse 30 CH-9435 Heerbrugg E-Mail: info.u@sfsunimarket.biz Web: www.sfsunimarket.biz Seite: 34/127
  • 35. 2.2 PRODUCTS A. Häfele Article No. 637.19.228 B. Wood Screws Würth ASSY ®3.0 SFS Screws intec see Datasheet Cocking pieces, bolts Seite: 35/127
  • 36. 06 11 00 Wood Framing 06 11 13 Engineered Wood Products Part 1 GENERAL 1.1 SECTION INCLUDES A. 06 11 13 Ceiling and flooring elements B. 06 11 13 Timber Construction beams C. 06 11 13 Bearing D. 06 11 13 Oak Profiles, feet 1.2 SUBMITTALS A. Product Datasheets (CD: Plan# S-205, S-401-S-404) B. Weblink to Product Data: http://www.rettenmeier.com/produkte/details/produkte/holzba u/kvh/1018.html (CD: Plan# S-205, S-401-S-404) C/D. no datasheet available – custom-made profiles made by Team Germany and a professional carpenter according to Construction Documents S-205, S-401 – S-404 Part 2 PRODUCTS 2.1 MANUFACTURER A. Lignotrend Produktions GmbH Landstrasse 25 D-79809 Weilheim-Bannholz Phone: +49 (0)7755 9200-0 Fax: +49 (0)7755 9200-55 www.lignotrend.com B-D. Rettenmeier Holding AG Industriestraße 1 D-91634 Wilburgstetten Phone: +49 9853 338-0 Fax: +49 9853 338-100 www.rettenmeier.com/en/home.html 2.2 PRODUCTS A. Lignotrend LIGNO Rippe Q3 (Ceiling element with acoustic components for large spans) Lignotrend LIGNO Block Q 90 (Ceiling and Flooring element) B. Rettenmeier Konstruktionsvollholz KVH®-1plus® (NSI) C/D. Rettenmeier Oak Seite: 36/127
  • 37. 06 12 00 Structural Panels Part 1 GENERAL 1.1 SECTION INCLUDES A. Structural Panels for Framing B. Structural Panels for Flooring 1.2 SUBMITTALS A. Weblink to Product Information: http://www.fh-finnholz.de/kerto-q.html Weblink to Product certification: www.fh-finnholz.de/english/download.html (CD: Plan# I-210-240) B. Datasheet Elka (CD: Plan# I-621, I-652-655) Part 2 PRODUCTS 2.1 MANUFACTURER A. FH-Finnholz GmbH Industriestraße 27 49536 Lienen Phone: +49 5483 1624 Fax: +49 5483 1245 Email: info@fh-finnholz.de Web: www.fh-finnholz.de B. elka-Holzwerke Hochwaldstraße 44 D-54497 Morbach Phone : +49 (0) 6533 / 956 0 Fax : +49 (0) 6533 / 956 220 E-Mail : info@elka-holzwerke.de Web: www.elka-Holzwerke.eu 2.2 PRODUCTS A. Kerto Q B. Elka Honeycomp wooden board, Interlayer, 70mm Seite: 37/127
  • 38. 06 16 00 Sheathing Part 1 GENERAL 1.1 SECTION INCLUDES A. 06 16 00 Sheathing B. 06 16 36 Wood Panel Product Sheathing 1.2 SUBMITTALS A/B. Datasheet OSB 3 (CD: Plan# I-652-657) Part 2 PRODUCTS 2.1 MANUFACTURER A/B. Agepan Glunz AG Grecostraße 1 D-49716 Meppen Phone: +49 (59 31) 4 05-0 Fax: +49 (59 31) 4 05-2 99 E-Mail: info@glunz.de Web: www.agepan.de 2.2 PRODUCTS A. OSB 3 Seite: 38/127
  • 39. 06 17 33 Wood I-Joists Part 1 GENERAL 1.1 SECTION INCLUDES A. Timber construction for double floor 1.2 SUBMITTALS A. Datasheet Part 2 PRODUCTS 2.1 MANUFACTURER A. Finnforest Deutschland GmbH Louis-Krages-Str. 30 D-28237 Bremen Phone: +49 421 6911 - 0 Fax: +49 421 6911 - 100 E-Mail: germany@finnforest.com Web: www.finnforest.de 2.2 PRODUCTS A. Finnjoist FJI 58 Seite: 39/127
  • 40. 06 40 00 Architectural Woodwork Part 1 GENERAL 1.1 SECTION INCLUDES A. 06 41 00 Architectural Wood Casework B. 06 43 13 Wood Stairs 1.2 SUBMITTALS A. Datasheet MDF (CD: Plan# I-210-I-240) Certificate MDF B. Datasheet (CD: Plan# I-270, I-271, I-278) Part 2 PRODUCTS 2.1 MANUFACTURER A. Agepan Glunz AG Grecostraße 1 D-49716 Meppen Phone: +49 (59 31) 4 05-0 Fax: +49 (59 31) 4 05-2 99 E-Mail: info@glunz.de Web: www.agepan.de B. EGGER Holzwerkstoffe Brilon GmbH & Co. KG Im Kissen 19 D-59929 Brilon Phone: +49/29 61/770-0 Fax: +49/29 61/770-62 222 Email: info-bri@egger.com Web: www.egger.com 2.2 PRODUCTS A. MDF 19 mm Agepan MDF 16 mm Agepan MDF 3 mm Agepan B. egger eurolight Seite: 40/127
  • 41. 06 60 00 Plastic Fabrications Part 1 GENERAL 1.1 SECTION INCLUDES A. 06 63 00 Plastic Railing B. 06 64 00 Plastic Paneling 1.2 SUBMITTALS A. Product Datasheet Plastic Railing (CD: Plan# I-210-I-240) B. Product Datasheet (LED Lighting) Plexiglas Panels (interior core CD: Plan# I-210-I-240) Product Datasheet Plexiglas (façade CD: Plan# A-714, A- 721-724) Part 2 PRODUCTS 2.1 MANUFACTURER A/B. Evonik Röhm GmbH Kirschenallee 64293 Darmstadt Deutschland phone: +49 (0) 61 51 - 18-01 Fax: +49 (0) 61 51 - 18-02 2.2 PRODUCTS A. Plexiglas GS Evonik 0F00GT B. Interior Core Alternative 1: Evonik Plexiglas Crystal Ice WM500 DC Evonik Plexiglas Satinice WH10 DC Evonik Endlighten 0N002 XL Alternative 2: Evonik Plexiglas Crystal Ice WM500 DC Evonik Plexiglas Satinice WH10 DC Kobek Lightpanel Luxolution For façade-use Plexiglas XT 7mm Seite: 41/127
  • 42. 07 Thermal and Moisture Protection 07 21 00 Thermal Insulation Part 1 GENERAL 1.1 SECTION INCLUDES A/B. 07 21 00 Thermal insulation C. 07 21 00 Declining Roof Insulation D. 07 21 23 19 Mineral board Insulation 1.2 SUBMITTALS A. Datasheet Cellulose insulation (CD: Plan# I-621, I-652-655 / A-951) B. Datasheet Adhesive (Product Information from Internet shop) (CD: Plan# S-411-S-416) C. Datasheet Roof Insulation and Certificate (CD: Plan# A-831, A-843, A-851) D. Datasheets Vacuum Insulations Panels (CD: Plan# S-411-S- 416) Part 2 PRODUCTS 2.1 MANUFACTURER A. Agepan Glunz AG Grecostraße 1 D-49716 Meppen Phone: +49 (59 31) 4 05-0 Fax: +49 (59 31) 4 05-2 99 E-Mail: info@glunz.de Web: www.agepan.de B. Heinrich Dostmann GmbH Robert Ritschel Industriestraße 13 61449 Steinbach Deutschland C. Paul Bauder GmbH & Co. KG Korntaler Landstraße 63 D-70499 Stuttgart Phone: +49 711/69070 Fax: +49 711/6907300 Seite: 42/127
  • 43. E-mail: Stuttgart@bauder.de Web: www.bauder.de D. VARIOTEC GmbH & Co. KG Weißmarterstraße 3-5 D-92318 Neumarkt phone.: +49 9181 6946-0 Fax: +49 9181 8825 E-Mail: info@variotec.de www.variotec.de 2.2 PRODUCTS A. Agepan Cell B. NIBOFLOOR PK ELASTIC C. EPS Inclining Insulation EPS 040 DAA dm 100 kPa 20- 80mm D. Variotec Qasa – VIP Seite: 43/127
  • 44. 07 25 00 Weather Barriers Part 1 GENERAL 1.1 SECTION INCLUDES A. Vapor Barriers (CD: Plan# A-831, A-843, A-851) B. Water Barriers (CD: Plan# A-831, A-843, A-851) 1.2 SUBMITTALS A. Datasheet B. Datasheet Part 2 PRODUCTS 2.1 MANUFACTURER A/B. Paul Bauder GmbH & Co. KG Korntaler Landstraße 63 D-70499 Stuttgart Phone: +49 711/69070 Fax: +49 711/6907300 E-mail: Stuttgart@bauder.de Web: www.bauder.de 2.2 PRODUCTS A. Interlayer Polymer Bitumen TEC Sprint DUO B. Thermoplan Waterproofing FPO, incl. adhesive Seite: 44/127
  • 45. 07 26 00 Vapor Retarders Part 1 GENERAL 1.1 SECTION INCLUDES A. Vapor Retarder 1.2 SUBMITTALS A. Datasheet Vapor Retarder Doerken (CD: Plan# A-951; I-621, I-652-655) Part 2 PRODUCTS 2.1 MANUFACTURER A. Dörken GmbH & Co. KG Wetterstraße 58 D-58313 Herdecke Phone: +49 23 30/63-428 Fax: +49 23 30/63-355 Email: info@doerken.de Web: www.doerken.de 2.2 PRODUCTS A. DELTA®-REFLEX Seite: 45/127
  • 46. 07 55 00 Protected Membrane Roofing Part 1 GENERAL 1.1 SECTION INCLUDES A. Building Protection 1.2 SUBMITTALS A. Datasheets (CD: Plan# A-831, A-857) Part 2 PRODUCTS 2.1 MANUFACTURER A. Paul Bauder GmbH & Co. KG Korntaler Landstraße 63 D-70499 Stuttgart Phone: +49 711/69070 Fax: +49 711/6907300 E-mail: Stuttgart@bauder.de Web: www.bauder.de Frank Griebel Verkauf Bauder Werk Bochum Phone: +49 6071/36608 Fax: +49 6071/3444568 2.2 PRODUCTS A. Bauder FSM 1100 Article No.: 7450 0600 Seite: 46/127
  • 47. 07 62 00 Sheet Metal Flashing and Trim Part 1 GENERAL 1.1 SECTION INCLUDES A. shop-formed accessories and trim, joint-covers, copings 1.2 SUBMITTALS A. Product Data: non standard articles without existing Datasheet– Special design from Metalworker according to Construction Documents A-851-855 Part 2 PRODUCTS 2.1 MANUFACTURER A. Stein und Sohn GmbH Rüdesheimer Straße 5 D-65239 Hochheim Phone: +49 6146/2269 Fax: +49 6146/3316 E-mail: info@steinundsohn.de Web www.steinundsohn.de 2.2 PRODUCTS A. Ridge bracket Ridge covering Fascia bracket Façade completion sheets Seite: 47/127
  • 48. 07 71 23 Manufactured Gutters and Downspouts Part 1 GENERAL 1.1 SECTION INCLUDES A. 07 71 33 gutters and downspouts B. 07 72 00 roof accessories 1.2 SUBMITTALS A/B. Product Data: non standard articles without existing Datasheet– Special design from Metalworker according to Construction Documents A-854 Part 2 PRODUCTS 2.1 MANUFACTURER A/B. Huppers Udo Huppers GmbH Landwehr 130 D-46514 Schermbeck Telefon 0 28 53/91 46 10 Telefax 0 28 53/91 46 13 Email: huppers-dach@arcor.de 2.2 PRODUCTS A. Downspouts Gutters B. leaves catch tray Seite: 48/127
  • 49. 07 90 00 Joint Protection Part 1 GENERAL 1.1 SECTION INCLUDES A. Tapes for interior application B. Tapes for exterior application 1.2 SUBMITTALS A. Weblink to Product Datasheets: http://www2.siga.ch/product/e_rissan.htm http://www2.siga.ch/product/e_sicrall.htm B. Weblink to Product Datasheets http://www.ts-udio.biz/tsshop2/WGS/1239/PRD/J999895/Alu- bedampftes_PP-Klebeband.htm Part 2 PRODUCTS 2.1 MANUFACTURER A. SIGA Cover AG Rütmattstrasse 7 CH-6017 Ruswil Phone: + 41 (0) 41 496 62 62 Fax: + 41 (0) 41 496 62 63 Email: siga@siga.ch Web: www.siga.ch B. Trenkenchu & Stadler GbR Schwabenstraße 43 71101 Schönaich Phone: +49 7031/413371 Fax: +49 7031/413372 Email: mail@ts-audio.de Web: http://www.ts-audio.de 2.2 PRODUCTS A. Siga Rissan Siga Sicrall B. Aluminum Tape J999895 Seite: 49/127
  • 50. 08 Openings 08 10 00 Doors and Frames Part 1 GENERAL 1.1 SECTION INCLUDES A. 08 14 00 Wood Doors B. 08 32 19 Wood-framed Glass doors (sliding and non-sliding) 1.2 SUBMITTALS A. Product Datasheets (CD: Plan# A-545/546) B. Product Datasheets (CD: Plan# A-510/511, A-540, A-545) Part 2 PRODUCTS 2.1 MANUFACTURER A/B. Ludwig Häußler GmbH Fenster- und Türenfabrik Draisstr. 48 Industriegebiet West D-67346 Speyer Phone: +49 (0) 6232 / 3144 – 0 Fax: +49 (0) 6232 / 3144 - 37 Email: info@haeussler-fenster.de Web: www.energate.com 2.2 PRODUCTS A. Entrance Door Oak B. Terrace Doors Oak-framed, 3-glass toughened safety glass As Team Germany’s windows and doors are special designed and actually still in fabrication, the manufacturer is not able yet to publish accordant datasheets containing all values and correct specifications. The system of our windows is similar to the manufacturer’s “Energate”-series. You can find information about this series here: http://www.energate.com/index.php?id=79&L=1 Seite: 50/127
  • 51. 08 50 00 Windows Part 1 GENERAL 1.1 SECTION INCLUDES A. 08 50 00 Operating Hardware 08 50 00 Louver blinds integral to window construction B. 08 52 00 Wood Windows 1.2 SUBMITTALS A. Weblink to Window Opener: http://www.hautau.pl/produkte/pdf/Prospekte_PDF/Oberlicht/ primat/primat_fl190_prospekt_d.pdf (CD: Plan# A-520/522) Product Datasheet motors (CD: Plan# A-520-523, A-536, A-540-546, A-550-552, A-580-582) Weblink to Motor Controller Datasheet: http://www.vestamatic.com/155/?L=1 (CD: Plan# A-520-523, A-540-542, A-546, A-580-582) Product Datasheets louver blinds (CD: Plan# A-520-523, A- 540-542, A-546, A-580-582) B. Datasheets (CD: Plan# A-510/511, A-540, A-550) Part 2 PRODUCTS 2.1 MANUFACTURER A. HAUTAU GmbH Bahnhofstr. 56-60 D 31691 Helpsen Phone: +49 (0) 5724 / 393-0 Fax: +49 (0) 5724 / 393-125 E-Mail: info@HAUTAU.de Web: www.hautau.de Maxon motor GmbH Truderinger Str. 210 D-81825 München phone: +49 89/420493- 0 Fax: +49 89/420493 - 40 E-Mail: info@maxonmotor.de Web: www.maxonmotor.de Seite: 51/127
  • 52. Vestamatic GmbH Dohrweg 27 D-41066 Mönchengladbach phone: +49 2161/29408-0 Fax: +49 2161/29408-20 www.vestamatic.com info@vestamatic.com Glas Hahn GmbH Kruppstrasse 6 D-67454 Haßloch / Pf. Phone: +49 (0)6324/92 45-0 Fax: +49 (0)6324/92 45-18 E-Mail: info@glas-hahn.de Web: www.glas-hahn.de B. Ludwig Häußler GmbH Fenster- und Türenfabrik Draisstr. 48 Industriegebiet West D-67346 Speyer Phone: +49 (0) 6232 / 3144 – 0 Fax: +49 (0) 6232 / 3144 - 37 Email: info@haeussler-fenster.de Web: www.energate.com 2.2 PRODUCTS A. Hautau PRIMAT- FL 190 Motor: Amax22 + HallEnc + GP22A Motor: ASM 44 – SG 13 Controller: IF SMI KNX 24 VDC Louver blinds Ropaco Typ F B. Oak-framed Window, 3-glass toughened safety glass As Team Germany’s windows and doors are special designed and actually still in fabrication, the manufacturer is not able yet to publish accordant datasheets containing all values and correct specifications. The system of our windows is similar to the manufacturer’s “Energate”-series. You can find information about this series here: http://www.energate.com/index.php?id=79&L=1 Seite: 52/127
  • 53. 08 70 00 Hardware Part 1 GENERAL 1.1 SECTION INCLUDES A. 08 71 00 Door Hardware 1.2 SUBMITTALS A. Product Datasheets (CD: Plan# I-210-240) Part 2 PRODUCTS 2.1 MANUFACTURER A. Häfele GmbH & Co KG Adolf-Häfele-Str. 1 72202 Nagold Germany Tel: +49 (0)74 52 / 95 - 0 Fax: +49 (0)74 52 / 95 - 2 00 E-Mail: info@haefele.de Web: www.hafele.com 2.2 PRODUCTS A. Concealed Hinges 329.07.xxx Spring Hinges 245.54.xxx Seite: 53/127
  • 54. 08 80 00 Glazing Part 1 GENERAL 1.1 SECTION INCLUDES A. 08 81 00 Glass Glazing 1.2 SUBMITTALS A. not yet available Part 2 PRODUCTS 2.1 MANUFACTURER A. Glas Hahn GmbH Kruppstrasse 6 D-67454 Haßloch / Pf. Phone: +49 (0)6324/92 45-0 Fax: +49 (0)6324/92 45-18 E-Mail: info@glas-hahn.de Web: www.glas-hahn.de 2.2 PRODUCTS A. 3-glass panes toughened safety glass Seite: 54/127
  • 55. 09 Finishes 09 20 00 Plaster and Gypsum Board Part 1 GENERAL 1.1 SECTION INCLUDES A. 09 22 00 Support for Gypsum Board B. 09 23 00 Gypsum Plastering 1.2 SUBMITTALS A. Product Datasheets Plaster Profiles (CD: Plan# A-951) B. Product Datasheet Smartboard (CD: Plan# A-911) Part 2 PRODUCTS 2.1 MANUFACTURER A. PROTEKTORWERK Florenz Maisch GmbH & Co. KG Viktoriastraße 58 D-76571 Gaggenau Tel. (0 72 25) 977-0 Fax (0 72 25) 977-180 Email: info@protektor.com Web: www.protektor.com B. Knauf Gips KG Am Bahnhof 7 D-97346 Iphofen phone: +49 (9323) 31-0 Fax: +49 (9323) 31-277 E-Mail: zentrale@knauf.de Web: www.knauf.de 2.2 PRODUCTS A. Plaster Profile Profil-Nr. 1315 B. K764 Knauf PCM SmartboardTM 23/26 Seite: 55/127
  • 56. 09 60 00 Flooring Part 1 GENERAL 1.1 SECTION INCLUDES A. 09 60 00 Flooring B. 09 64 00 Wood Flooring 09 64 23 Wood Parquet Flooring C. 09 68 00 Carpeting 1.2 SUBMITTALS A. Weblink to Product Datasheet Parquet glue: http://www.wakol.com/de/verlegewerkstoffe/produktprogramm/kleben/par kett-und-kork/ms-260.html (CD: Plan# I-621, I-652-655) Expansion Joint Cork: no datasheet (rest pieces of cork mats) (CD: Plan# I-621, I-653) B. outside flooring: not definitely decided no datasheet/no manufacturer (CD: Plan# L-232) Inside flooring: Weblink to Product Information Wood Strip Flooring Parquet (CD: Plan# I-621-657) http://www.druesedau.de/html/parkett_default.php?id=9&art=3 C. Weblink to Product Datasheet Rug for Galery: (CD: Plan# I- 622) http://www.vorwerk-teppich.de/sc/vorwerk/technische_daten/de/08957.pdf Part 2 PRODUCTS 2.1 MANUFACTURER A. Wakol GmbH Bottenbacher Str. 30 D-66954 Pirmasens Phone: +49 (0) 63 31 80 01 0 Fax: +49 (0) 63 31 80 01 890 B. DRÜSEDAU - Parkett & Leistenfabrik GmbH & Co. KG. Bahnhof Densberg D-34632 Jesberg-Densberg Phone: +49 66 95 - 96 06 - 0 Fax: +49 66 95 - 96 06 - 22 E-Mail: Info@druesedau.de www.druesedau.de C. Vorwerk & Co. Teppichwerke GmbH & Co. KG Kuhlmannstraße 11 Seite: 56/127
  • 57. D-31785 Hameln Phone: +49 5151 103-0 Fax: +49 5151 103-377 2.2 PRODUCTS A. Wakol MS 260 based on polymer B. Oak Terrace Decking Wood Strip Flooring Parquet Oak C. Vorwerk „elemento - Tundra“ Seite: 57/127
  • 58. 09 80 00 Acoustic Treatment Part 1 GENERAL 1.1 SECTION INCLUDES A. 09 81 00 Acoustic Insulation 1.2 SUBMITTALS A. Weblink to Product Data for Cork materials: http://www.kork-store.de/shop/product_info.php?products_id=94 (CD: Plan# I-621/622, I-652-655) Datasheet for Knauf insulation layer (CD: Plan# I-621, I-652-655) Weblink to WAKOL insulation mat (CD: Plan# I-621, I-652-655) http://www.wakol.com/fileadmin/upload/pdf/Technische_Informationen/Ve rlegewerkstoffe/deutsch/5903D.pdf Part 2 PRODUCTS 2.1 MANUFACTURER A. Kork-Store Potsdam Lindenstr. 60 D-14467 Potsdam Phone: +49 331 2706808 Fax: +49 331 2706383 E-mail : info@kork-store.de Web: www.kork-store.de Knauf Gips KG Am Bahnhof 7 D-97346 Iphofen phone: +49 (9323) 31-0 Fax: +49 (9323) 31-277 E-Mail: zentrale@knauf.de Web: www.knauf.de Wakol GmbH Bottenbacher Str. 30 D-66954 Pirmasens Phone: +49 (0) 63 31 80 01 0 Seite: 58/127
  • 59. Fax: +49 (0) 63 31 80 01 890 2.2 PRODUCTS A. Insulation Corkboard 10 mm Article no. 1210 Insulation Corkboard 5mm Article no. 1250 B. Knauf Brio 23 WF C. WAKOL EM 140 09 90 00 Painting and Coating Part 1 GENERAL 1.1 SECTION INCLUDES A. 09 91 23 Interior Painting 1.2 SUBMITTALS A. --- Part 2 PRODUCTS 2.1 MANUFACTURER A. not yet decided 2.2 PRODUCTS A. not yet decided color: white Seite: 59/127
  • 60. 10 Specialties 10 28 00 Toilet, Bath, and Laundry Accessories Part 1 GENERAL 1.1 SECTION INCLUDES A. 10 28 16.13 Residential Bath Accessories 1.2 SUBMITTALS A. --- Part 2 PRODUCTS 2.1 MANUFACTURER A. not yet decided 2.2 PRODUCTS A. Towel bars Toilet paper dispensers Etc. Seite: 60/127
  • 61. 10 70 00 Exterior Specialties Part 1 GENERAL 1.1 SECTION INCLUDES A. 10 71 13 Exterior Sun Control Devises 1.2 SUBMITTALS A. Weblink to Product Datasheet Substructure http://www.glashauskg.de/Glashaus-KG.pdf (CD: Plan# A-520/523, A-536, A-550-552) Part 2 PRODUCTS 2.1 MANUFACTURER A. Glashaus KG Feilitzschstraße 21 D- 80802 München Phone: +49 89/33 03 81 85 Fax: +49 89/33 03 81 86 Email: info@glashauskg.de Web: www.glashauskg.de/index.html 2.2 PRODUCTS A. System Brillona www.glashauskg.de/brillona.html Seite: 61/127
  • 62. 11 Equipment 11 30 00 Residential Equipment Part 1 GENERAL 1.1 SECTION INCLUDES A. 11 31 13 Residential Kitchen Appliances B. 11 31 23 Residential Laundry Appliances 1.2 SUBMITTALS A. Datasheets for Kitchen Appliances (CD: Plan# I-331-I-351) B. Datasheets for Laundry Appliances (CD: Plan# I-331-I-351) Part 2 PRODUCTS 2.1 MANUFACTURER A/B. Miele & Cie. KG Carl-Miele-Straße 29 D-33332 Gütersloh Phone: +49 52 41/ 89 - 0 Fax: +49 52 41/ 89 - 20 90 E-Mail: info@miele.de Web: www.miele.de 2.2 PRODUCTS A. Refrigerator/Freezer Combination Miele KF 9757 ID Dishwasher Miele G 1562 SCVi Steamer Miele Dgc 5080 Induction Cooker Miele KM 5975 Coffee Machine Miele CVA 5060 Fume Extraction Hood Miele DA 3190 B. Cloth Washer Miele W 3985 WPS or Allwater W3841 Laundry Dryer T 3841 Seite: 62/127
  • 63. 12 Furnishings 12 30 00 Casework Part 1 GENERAL 1.1 SECTION INCLUDES A. 12 36 19 Manufactured Wood Casework 1.2 SUBMITTALS A. Product Data: non standard articles without existing Datasheet– Special design from Team Germany according to Construction Documents I-331, I-332, I-322, I-351 Part 2 PRODUCTS 2.1/2.2 MANUFACTURER/PRODUCTS A. Kitchen counter top; self made by Team Germany with support from a professional carpenter Seite: 63/127
  • 64. 12 40 00 Furnishings and Accessories Part 1 GENERAL 1.1 SECTION INCLUDES A. 12 42 00 Table Accessories B. 12 43 13.13 Desk Lamps C. 12 43 13.19 Floor Lamps D. 12 44 00 Bath Furnishings E. 12 45 00 Bedroom Furnishings 1.2 SUBMITTALS A. Product Data: not yet decided B. Weblink to Datasheet for LED high power Desk lamp (CD: Plan# I-331-I-351) http://engine.artemide.com/article.aspx?button=0&language=de&productid s=art0829010A&product_level=artoneline_pr_tavolo_led C. Datasheet for Floor Lamps (alternatives possible) (CD: Plan# I-331-I-351) http://pdf.archiexpo.com/pdf/occhio/produkt-book/53078-25186.html D. Product Data: not yet decided E. Product Data: not yet decided Part 2 PRODUCTS 2.1 MANUFACTURER A/D/E. not yet decided B. eventually: Artemide GmbH Deutschland Hans-Böckler-Straße 2 D-58730 Fröndenberg Phone: (+49) 02373/975-0 Fax: (+49) 02373/975-2-09 E-Mail: personal@artemide.de Web: www.artemide.de C. Occhio axelmeiselicht AML Licht + Design GmbH Wiener Platz 7 Rgb. D-81667 München Phone: +49-89-44 77 86 30 Fax: +49-89-44 77 86 39 Email: info@occhio.de Seite: 64/127
  • 65. Web: www.occhio.de 2.2 PRODUCTS A/D/E. not yet decided B. eventually: Artemide One Line LED Tavolo C. probably: Occhio Sento lettura Seite: 65/127
  • 66. 12 50 00 Furniture Part 1 GENERAL 1.1 SECTION INCLUDES A. 12 58 00 Residential Furniture 1.2 SUBMITTALS A. Product Data: not yet decided Part 2 PRODUCTS 2.1/2.2 MANUFACTURER/PRODUCTS A. Couch – not yet decided Dining Tables and Chairs – not yet decided 13 Special Construction Seite: 66/127
  • 67. 14 Conveying Equipment 14 80 00 Scaffolding Part 1 GENERAL 1.1 SECTION INCLUDES A. 14 81 16 Carriage Scaffolding 1.2 SUBMITTALS A. Product Data: Datasheet (CD: Plan# L-501) Part 2 PRODUCTS 2.1 MANUFACTURER A. Wilhelm Layher GmbH & Co. KG Ochsenbacher Straße 56 D-74363 Güglingen-Eibensbach, phone: +49 (0) 7135 70-0 Fax: + 49 (0) 7135 70-265 E-Mail: info@layher.com Web: http://www.layher.de/ http://www.layherusa.com/ 2.2 PRODUCTS A. Layher Allround System 21 Fire Suppression Seite: 67/127
  • 68. 22 Plumbing 22 10 00 Plumbing Piping and Pumps Part 1 GENERAL 1.1 SECTION INCLUDES A. 22 11 16 Domestic Water Piping B. 22 11 23 Domestic Water Pumps C. 22 12 00 Facility Potable-Water Storage Tank 1.2 SUBMITTALS A. Product Data: Datasheets (CD: Plan# P-311-331, P-411-451) B. Product Data: Datasheets (CD: Plan# P-311/P-511) C. Weblink to Product Information: http://www.dlkunststofftechnik.com/html/produkte.php Cerificate Part 2 PRODUCTS 2.1 MANUFACTURER A. REHAU AG + Co Rheniumhaus D-95111 Rehau Phone: +49 92/ 83-77 0 E-Mail: info@rehau.com Web: www.rehau.de Abu-plast Kunststoffbetriebe GmbH Am Bahnhof 20 D-96472 Rödental Phone: +49 (0)9563/93-0 Fax +49 (0)9563/93-226 B. GRUNDFOS GMBH Schlüterstraße 33 D-40699 Erkrath Phone: +49 (0)211 92969 0 E-Mail: infoservice@grundfos.de Seite: 68/127
  • 69. Web: www.grundfos.de C. DL-Kunststofftechnik Dietmar Leyh Ackerstr. 36 D-59423 Unna Phone: +49 (23 03) 96 85 83 Fax: +49 (23 03) 87 19 22 E-Mail: info@dlkunststofftechnik.com Web: www.dlkunststofftechnik.com 2.2 PRODUCTS A. Versital Pipe – Rautitan Flex 130490-050 Sliding sleeve Rautitan PX 160002-001 Clip element 138043-001 T-piece, Rautitan PX 160032-001 Fitting, Rautitan PX 160011-001 Bridge – Rautitan MX 137134-001 Bridge Angle – Rautitan MX 137134-001 Bridge – Rautitan MX 139571-002 Angle – Rautitan PX, 90° 160022-001 Installation Angle – Rautitan MX 138491-405 Disposal Pipe, Raupiano Plus 12104-004 Disposal Pipe, Raupiano Plus 12184-004 Arc 45° Raupiano Plus 121114-001 Arc 45° Raupiano Plus 121164-001 Single Branch, Raupiano Plus 121264-001 Maintenance Pipe, 121524-002 Abu Pipeventilair Article No. 760099 Abu Pipeventilair Article No. 760399 B. Water pressure Pump Grundfos Jet Pump JP 5 Article No. 130490-050 Pump Add-on Grundfos C. Wastewater Tank Freshwater Tank Irrigation Tank Seite: 69/127
  • 70. 22 40 00 Plumbing Fixtures Part 1 GENERAL 1.1 SECTION INCLUDES A. 22 40 00 Plumbing Fixtures B. 22 41 00 Residential Plumbing Fixtures C. 22 41 13 Residential Water Closets, Urinals and Bidets D. 22 41 16 Residential Lavatories and Sinks E. 22 41 23 Residential Shower Receptors and Basins 1.2 SUBMITTALS A. Product Data: Datasheets (CD: Plan# I-521, I-531, I-552) B. Product Data: Datasheets (CD: Plan# I-521, I-531, I-552) C. Product Data: Datasheets (CD: Plan# I-521, I-531, I-552) D. Product Data: bathroom sink: non standard articles without existing Datasheet– Special design from KleinDesign according to Construction Documents I-521 kitchen sink: new Dornbracht series – actually no datasheets available: some Information and http://www.sadorex.ch/de/productdetail---1--1002--1007-- 1257--1--100378--0--0--0--0--0--378--0--0.html E. Product Data: non standard articles without existing Datasheet– Special design from KleinDesign according to Construction Documents I-521 Part 2 PRODUCTS 2.1 MANUFACTURER A/C. DURAVIT Aktiengesellschaft Werderstraße 36 D-78132 Hornberg Phone: +49 7833/70-0 Fax: +49 7833/70-289 Email: info@duravit.de Web: www.duravit.de Geberit Vertriebs GmbH Theuerbachstraße 1 D-88630 Pfullendorf Phone: +49 75 52 934-01 Fax: +49 75 52 934-300 Seite: 70/127
  • 71. E-Mail: sales.de@geberit.com Web: www.geberit.com B. Aloys F. Dornbracht GmbH & Co. KG Köbbingser Mühle 6 D-58640 Iserlohn Phone: +49 (0)2371-433-0 Fax: +49 (0)2371-433-232 E-Mail: info@dornbracht.de Web : www.dornbracht.de D/E. Klaus Klein Gmbh Zum Kaiserbusch 18 D-48165 Münster Phone: +49 251 - 61 70 79 Fax: +49 251 - 62 57 15 E-mail: info@klausklein-gmbh.de Web : http://www.kleindesign-muenster.de/index.htm 2.2 PRODUCTS A/C. Toilet Duravit 221709 Toilet Seat Duravit 6769 Installation Geberit 458.103.00.1 Push-button Geberit 115.770.xx.1 B. Shower Disposer Dornbracht 41400979 Shower Disposer Sprinkler Dornbracht 27809980 Flush-mounting thermostat Dornbracht 36416780 Flush-mounting device Dornbracht 36310980 Mixing Valve Dornbracht 3552897090 Guiderail Dornbracht 1231097090 Wall bracket Dornbracht 3508597090 Faucet Dornbracht 13800980 Flush-mounting device Dornbracht 3569097090 Mixing Valve Dornbracht 36320980 Kitchen sink Dornbracht Prep DF 1110 Faucet Dornbracht 32800680 D/E. Lavotory Shower Basin Seite: 71/127