Embed presentation
Download to read offline

Malik Moiz successfully completed a WinCC Telecontrol/RTU training workshop from July 28-30, 2015. The workshop covered using WinCC SCADA V7.3 and TIA Portal V13 SP1, OPC server and client connections, WinCC Telecontrol architecture and components, and setup, engineering and support of WinCC Telecontrol projects using 1200 RTU/S7300 on DNP3 and 1200 RTU/ET200S PLC on IEC 60870-5-104 protocols. Malik received confirmation of participation in telecontrol diagnostics and redundancy mode training on July 30, 2015.
