SlideShare a Scribd company logo
1 of 3
PROFESSIONAL BACKGROUND
PERSONAL
Name: Konrad REITER
Date of birth: 01.03.1961
Citizen of: Austria
Language Knowledge: German and English
EDUCATION
Higher Technical Institute for Mechanics, Steyr, Austria (graduated 1980)
Higher Technical Institute for Electrics, Linz, Austria (graduated 1986)
Export course, University Linz, Austria (graduated 1989)
Registered Engineer – 1986
SIEMENS certified SENIOR PROJECT MANAGER since 18.12.2007
SEMINARS
Numerous continuing seminars throughout work history, such as:
- Management Techniques
- Sales Oriented Presentation Techniques
- Communication Techniques
- Negotiation Techniques
WORK EXPERIENCE
HAINZL INDUSTRIESYSTEME GmbH, Linz, Austria
- Project Manager for special machinery, 1982 to 1989
VOEST-ALPINE Maschinenenbau GmbH, Linz, Austria
- Project Manager for special machinery, 1989 to 1994
VOEST-ALPINE Industrieanlagenbau GmbH, Linz, Austria
- Project Manager for continuous casting technologies, 1994 to present
Details: 07.06.1982 – 31.10.1989 SONDERTECHNIK
02.11.1989 – 31.08.1990 VACE
01.09.1990 – 11.09.1994 MCE
12.09.1994 – 30.04.1995 VACE
Gespeichert in: /unoconv/20160314052132_b291e91a1600eef42d4a02971d54b43fa457bd22/1b55fdcd-44a8-406d-94e6-c5a57a8cc321-160314052136.doc, last update on: 14.03.2016
PROFESSIONAL BACKGROUND
01.05.1995 – 30.11.2013 Primetals Austria (3 years delegation to PTCN, work contract is
idling)
01.12.2013 - today Primetals China
JOB EXPERIENCE
30 years of experience for the design, engineering and start-up of special machineries in various
fields.
19 years of experience for engineering and start-up of continuous casting plants including the
specific responsibilities listed in chronological order.
♦ Project purchasing manager for:
- Slab caster special equipment for different projects (09.1994 – 03.1996)
♦ Erection engineer for:
- 1 Strand Stainless steel slab caster POSCO no. 2 (04 -09.1996)
♦ Commissioning engineer for:
- 2 x 2 Strand Slab caster BOKARO (10.1997 – 12.1998)
♦ Commissioning manager for:
- 1 Strand Slab caster RAUTARUUKKI (07 – 09.1999)
♦ Start up manager for:
- 1 Strand Slab caster ANYANG (10.1999 – 05.2000), take over from Mr. ILLICHMANN Kurt
- 1 x 2 Strand Slab caster TISCO-Extension CCM 4 (12.2011 – April 2012) take over from
Mr. Robert HERZL
- 1 x 2 Strand Slab caster DRAGON STEEL (07.2012 – 05.2013) take over from
Mr. Wilhelm ALTREITER
- 1 x 5 Strand Bloom caster ZENITH STEEL (06.2013 – 07.2013) take over from
Mr. Wolfgang SCHÖNHART
♦ Project manager and Start up manager for:
- 1 Strand Slab Caster ANSHAN CCM 4 (06.2000 – 07.2001)
- 1 Strand Slab Caster ANSHAN CCM 5 (10.2001 – 06.2003)
- 1 Strand Slab Caster NANJING (05.2002 – 08.2004)
- 1 x 2 Strand Slab Caster ANSHAN CCM 1-NEW (05.2003 – 12.2005)
- 1 x 2 Strand Slab Caster ANSHAN CCM 2-NEW (05.2003 – 12.2005)
- 2 x 1 Strand Slab Caster ANSHAN-JIGANG 1700 mm (10.2003 – 10.2005)
- 2 x 1 Strand Slab Caster TANGSHAN-XINGFENG (02.2004 – 06.2006)
- 1 x 1 Strand Slab Caster ANGANG THICK SLAB CCM (11.2005 –04.2009)
- 2 x 2 Strand Slab Caster ANGANG 2 X2 CCM NEW ZONE (11.2005 –04.2009)
- 2 x 2 Strand Slab Caster TANGSHAN Guofeng (01.2007 – 03.2010)
- 2 x 1 Strand Slab Caster CHAOYANG (11.2007 – 03.2011)
- 1 x 1 Strand Slab Caster ECHENG THICK SLAB CCM (02.2008 – 03.2011)
- 1 x 2 Strand Slab Caster ANGANG CCM 3 (08.2008 – Mai 2012)
- 2 x 2 Strand Slab Caster PANGANG MOLD (07.2010 – July 2012)
Gespeichert in: /unoconv/20160314052132_b291e91a1600eef42d4a02971d54b43fa457bd22/1b55fdcd-44a8-406d-94e6-c5a57a8cc321-160314052136.doc, last update on: 14.03.2016
PROFESSIONAL BACKGROUND
- 2 x 2 Strand Slab Caster ZENITH CCM 1 & 2 (12.2010 – terminated by client in 03.2011)
- 1 x 2 Strand Slab Caster MAANSHAN CCM 3 (04.2011 – March 2015)
- 2 x 2 Strand Slab Caster MAANSHAN CCM 1&2 Revamp (05.2011 – May 2015)
- 1 x 1 Strand Slab Caster TISCO-North CCM 0 (12.2011 – May 2014)
- 2 x 1 Strand Slab Caster TISCO-South CC01& CC04 (03.2012 – June 2014)
♦ Project manager for:
- 2 x 1 Strand ESP plant for RIZHAO Line #1 and Line #2 (07.2013 – ongoing)
- 1 x 1 Strand ESP plant for RIZHAO Line #3 (05.2014 – ongoing)
- 2 x 1 Strand ESP plant for RIZHAO Line #4 and Line #5 (05.2014 – ongoing)
♦ Processing of pre-projects for Slab casters, including preparation of specifications and cost
estimating as well as negotiation.
PATENTS
None
PUBLICATIONS
WUHAN SEMINAR Paper:
THE MEDIUM-THIN SLAB CASTERS AT ANGANG – STARTING POINT OF ASP
4 ECCC BIRMINGHAM 2002:
THE MEDIUM-THIN SLAB CASTER WITH BACKWARDS INTEGRATION TO THE
EXISTING FINISHING MILL AT ANSHAN, PRC
AISE - Annual Convention 2002:
THE MEDIUM-THIN SLAB CASTER WITH BACKWARDS INTEGRATION TO THE
EXISTING FINISHING MILL A T ANSHAN, PRC
International Symposium on Thin Slab casting and Rolling - TSCR'2002:
MEDIUM-THIN SLAB CASTING AT ANSHAN, PRC – THE IDEAL SOLUTION FOR
MODERNIZATION PROJECTS WITH BACKWARDS INTEGRATION
CCC 08:
THE FULL SPECTRUM OF CONTINUOUS CASTING - ANGANG HAS IT ALL
TSCR 09
Medium–Thin Slab Casting – 20 Years of Experience in the Niche between Conventional
and Thin Slab Casting
Gespeichert in: /unoconv/20160314052132_b291e91a1600eef42d4a02971d54b43fa457bd22/1b55fdcd-44a8-406d-94e6-c5a57a8cc321-160314052136.doc, last update on: 14.03.2016

More Related Content

Viewers also liked (7)

Primero último
Primero últimoPrimero último
Primero último
 
La primavera
La primaveraLa primavera
La primavera
 
Mar peruano
Mar peruanoMar peruano
Mar peruano
 
Dia de la bandera
Dia de la banderaDia de la bandera
Dia de la bandera
 
Alimentos derivados del pescado
Alimentos derivados del pescadoAlimentos derivados del pescado
Alimentos derivados del pescado
 
Alto y bajo
Alto y bajoAlto y bajo
Alto y bajo
 
Partes de la cara
Partes de la caraPartes de la cara
Partes de la cara
 

Similar to KonradReiter2016

Design and Analysis of Multi Spindle Drilling Head with Adjustable Centre Dis...
Design and Analysis of Multi Spindle Drilling Head with Adjustable Centre Dis...Design and Analysis of Multi Spindle Drilling Head with Adjustable Centre Dis...
Design and Analysis of Multi Spindle Drilling Head with Adjustable Centre Dis...IRJET Journal
 
CV Armien Fredericks March 2016
CV Armien Fredericks March 2016CV Armien Fredericks March 2016
CV Armien Fredericks March 2016Armien Fredericks
 
General Applications Info.-E
General Applications Info.-EGeneral Applications Info.-E
General Applications Info.-Edmtgms
 
strip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docxstrip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docxVICTOR A. KIPLAGAT
 
IRJET- Design and Fabrication of Chainless Bicycle
IRJET- Design and Fabrication of Chainless BicycleIRJET- Design and Fabrication of Chainless Bicycle
IRJET- Design and Fabrication of Chainless BicycleIRJET Journal
 
Catalogo de Escobillas 2015
Catalogo de Escobillas 2015Catalogo de Escobillas 2015
Catalogo de Escobillas 2015HELLA Spain
 
Newgen overall main introduction material (for europe retrofit)
Newgen overall main introduction material (for europe retrofit)Newgen overall main introduction material (for europe retrofit)
Newgen overall main introduction material (for europe retrofit)SangKyu Park
 
Stainless steel Coaches RCF Kapurthala Punjab India.pdf
Stainless steel Coaches RCF Kapurthala Punjab India.pdfStainless steel Coaches RCF Kapurthala Punjab India.pdf
Stainless steel Coaches RCF Kapurthala Punjab India.pdfravibhaknp
 
Design and Analysis of Grinding Wheel Angle Dressing Unit for Broach Tool
Design and Analysis of  Grinding Wheel Angle Dressing Unit for Broach ToolDesign and Analysis of  Grinding Wheel Angle Dressing Unit for Broach Tool
Design and Analysis of Grinding Wheel Angle Dressing Unit for Broach ToolIRJET Journal
 
NMS Africa - Crushers & Screens-v1
NMS Africa - Crushers & Screens-v1NMS Africa - Crushers & Screens-v1
NMS Africa - Crushers & Screens-v1Cobus van Zyl
 
FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)Vignesh Venugopal
 
Seager CBP Profile & History
Seager CBP Profile & HistorySeager CBP Profile & History
Seager CBP Profile & HistoryTony Seager
 
Design and analysis of scissor jack final report 8 sem (1)
Design and  analysis of scissor jack final report 8 sem (1)Design and  analysis of scissor jack final report 8 sem (1)
Design and analysis of scissor jack final report 8 sem (1)RAHMATULLAH MERCY FEAT
 
000-Forgings-PPT-Presentation-IMU_Basic_Knowledge_English_final_11-03-14.pdf
000-Forgings-PPT-Presentation-IMU_Basic_Knowledge_English_final_11-03-14.pdf000-Forgings-PPT-Presentation-IMU_Basic_Knowledge_English_final_11-03-14.pdf
000-Forgings-PPT-Presentation-IMU_Basic_Knowledge_English_final_11-03-14.pdfMarcWorld
 

Similar to KonradReiter2016 (20)

CMFDDPPR3
CMFDDPPR3CMFDDPPR3
CMFDDPPR3
 
01 general 59889
01 general 5988901 general 59889
01 general 59889
 
Design and Analysis of Multi Spindle Drilling Head with Adjustable Centre Dis...
Design and Analysis of Multi Spindle Drilling Head with Adjustable Centre Dis...Design and Analysis of Multi Spindle Drilling Head with Adjustable Centre Dis...
Design and Analysis of Multi Spindle Drilling Head with Adjustable Centre Dis...
 
view_cv
view_cvview_cv
view_cv
 
CV Armien Fredericks March 2016
CV Armien Fredericks March 2016CV Armien Fredericks March 2016
CV Armien Fredericks March 2016
 
General Applications Info.-E
General Applications Info.-EGeneral Applications Info.-E
General Applications Info.-E
 
strip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docxstrip-foundation-design-calcualtion.docx
strip-foundation-design-calcualtion.docx
 
IRJET- Design and Fabrication of Chainless Bicycle
IRJET- Design and Fabrication of Chainless BicycleIRJET- Design and Fabrication of Chainless Bicycle
IRJET- Design and Fabrication of Chainless Bicycle
 
Catalogo de Escobillas 2015
Catalogo de Escobillas 2015Catalogo de Escobillas 2015
Catalogo de Escobillas 2015
 
Theory Of Constraints.
Theory Of Constraints.Theory Of Constraints.
Theory Of Constraints.
 
Site zabi.pdf
Site zabi.pdfSite zabi.pdf
Site zabi.pdf
 
Newgen overall main introduction material (for europe retrofit)
Newgen overall main introduction material (for europe retrofit)Newgen overall main introduction material (for europe retrofit)
Newgen overall main introduction material (for europe retrofit)
 
Stainless steel Coaches RCF Kapurthala Punjab India.pdf
Stainless steel Coaches RCF Kapurthala Punjab India.pdfStainless steel Coaches RCF Kapurthala Punjab India.pdf
Stainless steel Coaches RCF Kapurthala Punjab India.pdf
 
Design and Analysis of Grinding Wheel Angle Dressing Unit for Broach Tool
Design and Analysis of  Grinding Wheel Angle Dressing Unit for Broach ToolDesign and Analysis of  Grinding Wheel Angle Dressing Unit for Broach Tool
Design and Analysis of Grinding Wheel Angle Dressing Unit for Broach Tool
 
NMS Africa - Crushers & Screens-v1
NMS Africa - Crushers & Screens-v1NMS Africa - Crushers & Screens-v1
NMS Africa - Crushers & Screens-v1
 
FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)
 
Seager CBP Profile & History
Seager CBP Profile & HistorySeager CBP Profile & History
Seager CBP Profile & History
 
Design and analysis of scissor jack final report 8 sem (1)
Design and  analysis of scissor jack final report 8 sem (1)Design and  analysis of scissor jack final report 8 sem (1)
Design and analysis of scissor jack final report 8 sem (1)
 
000-Forgings-PPT-Presentation-IMU_Basic_Knowledge_English_final_11-03-14.pdf
000-Forgings-PPT-Presentation-IMU_Basic_Knowledge_English_final_11-03-14.pdf000-Forgings-PPT-Presentation-IMU_Basic_Knowledge_English_final_11-03-14.pdf
000-Forgings-PPT-Presentation-IMU_Basic_Knowledge_English_final_11-03-14.pdf
 
Yuva - company profile
Yuva - company profileYuva - company profile
Yuva - company profile
 

KonradReiter2016

  • 1. PROFESSIONAL BACKGROUND PERSONAL Name: Konrad REITER Date of birth: 01.03.1961 Citizen of: Austria Language Knowledge: German and English EDUCATION Higher Technical Institute for Mechanics, Steyr, Austria (graduated 1980) Higher Technical Institute for Electrics, Linz, Austria (graduated 1986) Export course, University Linz, Austria (graduated 1989) Registered Engineer – 1986 SIEMENS certified SENIOR PROJECT MANAGER since 18.12.2007 SEMINARS Numerous continuing seminars throughout work history, such as: - Management Techniques - Sales Oriented Presentation Techniques - Communication Techniques - Negotiation Techniques WORK EXPERIENCE HAINZL INDUSTRIESYSTEME GmbH, Linz, Austria - Project Manager for special machinery, 1982 to 1989 VOEST-ALPINE Maschinenenbau GmbH, Linz, Austria - Project Manager for special machinery, 1989 to 1994 VOEST-ALPINE Industrieanlagenbau GmbH, Linz, Austria - Project Manager for continuous casting technologies, 1994 to present Details: 07.06.1982 – 31.10.1989 SONDERTECHNIK 02.11.1989 – 31.08.1990 VACE 01.09.1990 – 11.09.1994 MCE 12.09.1994 – 30.04.1995 VACE Gespeichert in: /unoconv/20160314052132_b291e91a1600eef42d4a02971d54b43fa457bd22/1b55fdcd-44a8-406d-94e6-c5a57a8cc321-160314052136.doc, last update on: 14.03.2016
  • 2. PROFESSIONAL BACKGROUND 01.05.1995 – 30.11.2013 Primetals Austria (3 years delegation to PTCN, work contract is idling) 01.12.2013 - today Primetals China JOB EXPERIENCE 30 years of experience for the design, engineering and start-up of special machineries in various fields. 19 years of experience for engineering and start-up of continuous casting plants including the specific responsibilities listed in chronological order. ♦ Project purchasing manager for: - Slab caster special equipment for different projects (09.1994 – 03.1996) ♦ Erection engineer for: - 1 Strand Stainless steel slab caster POSCO no. 2 (04 -09.1996) ♦ Commissioning engineer for: - 2 x 2 Strand Slab caster BOKARO (10.1997 – 12.1998) ♦ Commissioning manager for: - 1 Strand Slab caster RAUTARUUKKI (07 – 09.1999) ♦ Start up manager for: - 1 Strand Slab caster ANYANG (10.1999 – 05.2000), take over from Mr. ILLICHMANN Kurt - 1 x 2 Strand Slab caster TISCO-Extension CCM 4 (12.2011 – April 2012) take over from Mr. Robert HERZL - 1 x 2 Strand Slab caster DRAGON STEEL (07.2012 – 05.2013) take over from Mr. Wilhelm ALTREITER - 1 x 5 Strand Bloom caster ZENITH STEEL (06.2013 – 07.2013) take over from Mr. Wolfgang SCHÖNHART ♦ Project manager and Start up manager for: - 1 Strand Slab Caster ANSHAN CCM 4 (06.2000 – 07.2001) - 1 Strand Slab Caster ANSHAN CCM 5 (10.2001 – 06.2003) - 1 Strand Slab Caster NANJING (05.2002 – 08.2004) - 1 x 2 Strand Slab Caster ANSHAN CCM 1-NEW (05.2003 – 12.2005) - 1 x 2 Strand Slab Caster ANSHAN CCM 2-NEW (05.2003 – 12.2005) - 2 x 1 Strand Slab Caster ANSHAN-JIGANG 1700 mm (10.2003 – 10.2005) - 2 x 1 Strand Slab Caster TANGSHAN-XINGFENG (02.2004 – 06.2006) - 1 x 1 Strand Slab Caster ANGANG THICK SLAB CCM (11.2005 –04.2009) - 2 x 2 Strand Slab Caster ANGANG 2 X2 CCM NEW ZONE (11.2005 –04.2009) - 2 x 2 Strand Slab Caster TANGSHAN Guofeng (01.2007 – 03.2010) - 2 x 1 Strand Slab Caster CHAOYANG (11.2007 – 03.2011) - 1 x 1 Strand Slab Caster ECHENG THICK SLAB CCM (02.2008 – 03.2011) - 1 x 2 Strand Slab Caster ANGANG CCM 3 (08.2008 – Mai 2012) - 2 x 2 Strand Slab Caster PANGANG MOLD (07.2010 – July 2012) Gespeichert in: /unoconv/20160314052132_b291e91a1600eef42d4a02971d54b43fa457bd22/1b55fdcd-44a8-406d-94e6-c5a57a8cc321-160314052136.doc, last update on: 14.03.2016
  • 3. PROFESSIONAL BACKGROUND - 2 x 2 Strand Slab Caster ZENITH CCM 1 & 2 (12.2010 – terminated by client in 03.2011) - 1 x 2 Strand Slab Caster MAANSHAN CCM 3 (04.2011 – March 2015) - 2 x 2 Strand Slab Caster MAANSHAN CCM 1&2 Revamp (05.2011 – May 2015) - 1 x 1 Strand Slab Caster TISCO-North CCM 0 (12.2011 – May 2014) - 2 x 1 Strand Slab Caster TISCO-South CC01& CC04 (03.2012 – June 2014) ♦ Project manager for: - 2 x 1 Strand ESP plant for RIZHAO Line #1 and Line #2 (07.2013 – ongoing) - 1 x 1 Strand ESP plant for RIZHAO Line #3 (05.2014 – ongoing) - 2 x 1 Strand ESP plant for RIZHAO Line #4 and Line #5 (05.2014 – ongoing) ♦ Processing of pre-projects for Slab casters, including preparation of specifications and cost estimating as well as negotiation. PATENTS None PUBLICATIONS WUHAN SEMINAR Paper: THE MEDIUM-THIN SLAB CASTERS AT ANGANG – STARTING POINT OF ASP 4 ECCC BIRMINGHAM 2002: THE MEDIUM-THIN SLAB CASTER WITH BACKWARDS INTEGRATION TO THE EXISTING FINISHING MILL AT ANSHAN, PRC AISE - Annual Convention 2002: THE MEDIUM-THIN SLAB CASTER WITH BACKWARDS INTEGRATION TO THE EXISTING FINISHING MILL A T ANSHAN, PRC International Symposium on Thin Slab casting and Rolling - TSCR'2002: MEDIUM-THIN SLAB CASTING AT ANSHAN, PRC – THE IDEAL SOLUTION FOR MODERNIZATION PROJECTS WITH BACKWARDS INTEGRATION CCC 08: THE FULL SPECTRUM OF CONTINUOUS CASTING - ANGANG HAS IT ALL TSCR 09 Medium–Thin Slab Casting – 20 Years of Experience in the Niche between Conventional and Thin Slab Casting Gespeichert in: /unoconv/20160314052132_b291e91a1600eef42d4a02971d54b43fa457bd22/1b55fdcd-44a8-406d-94e6-c5a57a8cc321-160314052136.doc, last update on: 14.03.2016