SlideShare a Scribd company logo
Engagement Strategy with
Meraki
Prepared for: Laura Dawson, KOI Festival
Prepared by: Alexandra Kubrak, DSGN Network
August 27, 2014
Table of Contents
Client Agreement Terms
 iii
Scope
 iii
Cancellation
 iv
Acceptance
 iv
Payment
 iv
Ownership
 iv
Scheduling
 iv
Compliance
 iv
Force Majeure
 iv
Severability
 v
No Implied Waivers
 v
Binding Effect, Assignment
 v
Entirety
 v
Authorized Representative
 v
Fees and Expenses
 v
Cancellation
 vi
Intellectual Property Ownership
 vi
Quality
 vi
Termination
 vi

 i
Executive Summary
 1
Objective
 1
Goals
 1
Solution
 2
KOI Sign Me Challenge
 2
Best of KOI Vine Challenge
 2
KOI Mayor Mudfight
 3

 ii
Client Agreement Terms
Scope
These terms and conditioned (“Terms) are supplemental to any marketing and advertising contract, including without
limitation to any campaign contract, program - specific contract or program descriptions, entered into by and between
DSGN Network and the client. In the event of a conflict between the terms of a marketing and advertising contract, the
terms of any individual program description, and these Terms, the conflict shall be resolved in the following order of
precedence: 1) The terms of the marketing and advertising contract; 2) the terms of an individual program description;
and 3) these Terms.

 iii
Cancellation
DSGN Network marketing and advertising contacts are cancelable if, and only if, both parties are non-negotiable dispute
based on a void of contract including but not limited to event of client non-payment, refusal to pay, failure to deliver on all
terms and agreements herein, non-compliance in any and all events including but not limited to lack of attendance,
communication failure, failure to adhere to scheduling without notice.
Acceptance
All projects will be granted on a first-come, first-served basis upon receipt of a signed contract and downpayment.
Notwithstanding anything to the contrary herein, DSGN Network reserves the right to refuse or cancel any participation in
any marketing program for any reason at any time.
Ownership
DSGN Network retains title to any and all tangible intellectual or physical property produced by DSGN Network in
connection with any marketing program unless otherwise agreed upon.
Scheduling
Dates are subject to change at the discretion of DSGN Network if materials are not received by the materials due date.
However a pre-ordained schedule will be followed an amended to based on these terms:
• At contract schedule will be created based on a 12-week ideal work load and project assignment
• A week by week agenda will be given to the client to adhere to with all events booked and organized two weeks
before
• After week 6 the next 12-week ideal schedule will be created based on the work completed in the previous 6-week
timeline
• Schedules will be amended and updated at the discretion of DSGN Network, however client approval will also be
necessary to do so.
Compliance
The parties shall comply with all applicable state, provincial, federal, and where applicable, country specific rules and
regulations.
Force Majeure
Neither party will be liable to the other party by reason of any failure in performance under these Terms if the failure arises
out of acts of God, acts of the other party, acts of governmental authority, fires, strikes, delays in transportation, riots or
war, or any cause beyond the reasonable control of that party. if any such even delays performance the time allowed for
such performance will be approximately extended.

 iv
Severability
If any provision of these Terms shall be held to be invalid, illegal or unenforceable, such provision shall be enforced to the
fullest extent permitted by applicable law and the validity, legality and enforceability of the remaining provisions shall not in
any way be affected or implied thereby.
No Implied Waivers
If any party failed to require performance of any duty hereunder by the other party, such failure shall not affect its right to
require performance of that or any other duty thereafter. The waiver by either party of a breach of any provision of these
Terms shall not be a waiver of the provision itself or a waiver of any breach thereafter, or a waiver of any other provision
herein.
Binding Effect, Assignment
Any assignment by the Client of any rights under these Terms without the express written consent of DSGN Network
shall not be binding upon DSGN Network and shall not relieve the Client from any liability or obligation under these
Terms. In the event of assignment the Client shall be liable, jointly and severally with any assignee, for any liabilities and
obligations incurred by such assignee hereunder to the same extent as if such liabilities and obligations had been
incurred by the Client. Subject to the foregoing, these Terms shall be binding upon and shall inure to the benefit of the
parties hereto and their respective successors and assigns.
Entirety
These Terms, as incorporated in any marketing contract and in conjunction with any applicable program description,
constitute the entire agreement between the parties regarding such subject matter and supersede any and all previous
proposals, representations or statements, oral or written. Any previous agreements between the parties pertaining to
such subject matter are expressly terminated. Any modifications to these Terms must be in writing and signed by
authorized representatives of both parties.
Authorized Representative
Either party’s authorized representative for execution of any contract or agreement incorporating these Terms or any
amendment thereto or to these Terms shall be president, as partner or a duly authorized vice-president or representative
of the respective party. The signatories to such contract or agreement incorporating these terms warrant that they have
the requisite authority to do so.
Fees and Expenses
Our fees and expenses are set out in the Project Proposal.  If fees exceed $10,000, we reserve the right to require pay-
ment in whole or in part before beginning the services.  We generally bill 50% of the total fee on commissioning, and the
balance of fees due on delivery of final outputs.  All work undertaken in addition to that set out in the Project Proposal will
also form part of this agreement, but we will be entitled to raise an additional charge at our then standard rates. All fees

 v
and expenses must be paid within 30 days of our delivery of an invoice, without set-off or deduction. All fees and ex-
penses are exclusive of the client which must also be paid at the applicable rate.
Cancellation
Without prejudice to our other rights and remedies, if you postpone or cancel our services, we will be entitled to charge
you at the following rates:  Cancellation or postponement with 0-5 complete working days notice will be charged at
100% of fees set out in the Project Proposal; cancellation or postponement with 6-10 complete working days notice will
be charged at 50% of fees set out in the Project Proposal. Postponement rather than cancellation is acceptable only if
the rescheduled date is bona fide and within 2 weeks of the initial date scheduled.  Should further postponement occur,
we will be entitled to treat the series of transactions as the cancellation of our services.  We will be entitled to charge for
all incidentals and out of pocket expenses incurred in delivering the Services plus a handling fee of 15% of such cost
incurred.
Intellectual Property Ownership
All intellectual property in any report, presentation or other material produced by us and delivered to you in the provision
of the services shall remain our property. Upon payment of our fees and expenses in full on their due dates you will have
a license to use any such report, presentation or materials for the purpose for which they were created.  You license us to
use any intellectual property of yours which it is necessary or which you ask us to use in performing the services.  
Quality
Our services will be provided with reasonable care and skill. However, our services are provided "as is" only and we are
not responsible for any actions you take or do not take in reliance upon any report or other research we deliver to you in
the provision of the services.  All implied warranties, conditions and other terms concerning our performance of the
services are excluded to the extent permitted by law.
Termination
Without prejudice to any other right or remedies, either of us may terminate this agreement at any time by notice in
writing to the other if the other party is in breach of this agreement and, in the case of a breach capable of remedy, the
breach is not remedied within 14 days of the other party receiving notice specifying the breach and requiring it to be
remedied, or if the other party becomes insolvent or an order is made or a resolution is passed for the winding up of the
other party (other than voluntary for the purpose of solvent amalgamation or reconstruction) or if an administrator,
administrative receiver or receiver is appointed in respect of the whole or any part of the other's assets or business or if
the other makes any composition with its creditors or takes or suffers any similar or analogous action in consequence of
debt.

 vi
Executive Summary
Objective
This strategy outlines the logistic plan for the KOI Festival social integration with the Cisco Meraki system. It is the
prerogative of DSGN Network that these targeted social engagement campaigns utilize the Meraki metrics system to the
fullest extent, allowing for a creative and technologically advanced function of this unique WiFi system.
Over the KOI Festival weekend (September 19th through 21st) there will be various ongoing and daily engagement
features to get attendees interacting on the system, as well as with the brand - KOI Festival.
In participation with RDC Networks, DSGN Network will maintain the social metrics and upkeep of the engagement
strategy along with KOI Festival volunteers. Both Alexandra Kubrak and Brendan Waller will orchestrate during the day,
as well as co-ordinate with volunteers the timing of each engagement game.
There have been three engagement games chosen for the weekend to which DSGN Network will be the official hosts for.
There are as follows:
1. KOI Sign Me Challenge
2. Best of KOI Vine Challenge
3. Swarm Mayor Challenge
These three games will get attendees to interact with both the KOI and DSGN Brands through the use of current social
platforms. DSGN will also integrate these games into the Eventpeaks Media Wall and the Picture This api located around
the festival.
Goals
To get as many attendees as possible to engage, festival social media representatives, alongside DSGN Network
representatives, will be actively participating on social channels all day long, as well as informing the public about the
engagement games at the festival itself.
Our hope is that each strategy will allow the KOI Festival to experience the Meraki system as a whole - and gain
comprehensive analytic metrics on who is attending and where these attendees are engaging the most.

 1
Solution
These following strategies are the final strategies DSGN Network has chosen for the KOI Festival. Included are briefs on
logistic implementation of each strategy and the steps needed to achieve the highest engagement and co-operation from
everyone involved.
Fans and attendees will be notified about these social challenges through prior facebook, twitter, and newsletter formats
with the release of prizing for these challenges. Both KOI Festival and DSGN Network will be promoting the challenges
through similar means.
Over the next few weeks these plans will be carried out and the prerequisite items will need to be attained as best as
possible. These strategies can be amended for day-of occurrences in care of any additional issues or new information.
KOI Sign Me Challenge
In co-operation with as many musical artists as possible, this challenge will allow attendee to get connected with the
artists in a new way. This challenge will ask participants to:
- Locate a specific band as social representatives tweet them (or as attendees find them)
- Acquire a signature from your favorite member, or entire band on the KOI Festival Comic or Shirt
- Snap a picture with twitter and tag @KOIMusicFest, hashtag #dsgnrocks #koifest14 #signme
- Participant with the most signatures per day wins small prize, per weekend VIP pass
To achieve the best possible outcome, a memo will be sent to artists each week leading up to KOI to introduce and
remind them of the challenge and that fans will be actively searching out specific bands during the day. Bands can
request a removal from participation of this challenge, however they must notify KOI Festival or DSGN Network of their
wish to remain a non-participant.
Leaders of the challenge will be asked to snap images of their signatures with the bands as they come off stage or meet
during their pre-destined times to tweet out locations of bands for signatures.
Alexandra Kubrak and two other KOI Festival volunteers will lead this challenge the day of.
Best of KOI Vine Challenge
To engage attendees both during and after the festival, this challenge can be maintained and promoted for a few weeks
after the festival.
The participants will be asked to make Vine videos during the weekend - with creativity scoring higher. These vines can
be of memories, promotion ideas, best features, or what KOI is to attendees. These videos will be shown on the Media
Wall provided by EventPeaks. These videos can be created to be of a daily, or weekend nature showing their greatest
time at the festival.

 2
A 3 winners daily will be chosen, with the finalists asking to create a final “Best of KOI2014” series of vines that will be
used for KOI Fest 2015 promotion next year. This vine will be featured on the festival’s site and gain the lucky winner the
official KOI Fest Social Intern for next year.
To participate attendees will:
- Create as many vines as they wish during the festival
- Tag @KoiFestMusic #KoiFest2014 #DSGNrocks and #MyKOIvine
- Be as creative as you can, featuring KOI Festival highlights
- Like your favourite Vine videos as they come in
Winners will be chosen by a combination of number of likes they receive and best compilation by social representatives.
The winners daily will receive small prize packs, and the finalists gaining entry to the VIP party after the weekend. The
final grand winner will be announced in the proceeding weeks with entries of the promo video being submitted. The
Grand Prize winner will be asked to come to the KOI Festival “head office” and gain a prize pack of KOI merchandise,
artist music (to what’s available) and their winner’s certificate of “Official KOI Festival Intern” for 2015.
KOI Mayor Mudfight
As a passive challenge, the Mayor Mudfight challenge will give digital prizes and small perks to those who use check in
platforms such as Swarm.
Participants will check in at various places or areas (including the festival itself) and earn badges for as many check ins
they can get in a day, and for the whole weekend.
These badges will give participants digital rewards, instead of physical prizing. It’s simpler and easier to deal with.
The challenge will include:
- Check in at each of the stages, with “mayors’ of that stage receiving a download for their favourite band of the stage’s
current EP
- Check in at each participating local eatery, first time checked in receives 10% off their meal; daily mayors receive free
appitizer; weekend mayors receive eatery tshirt
- Check in at participating food truck, gain access to free “happy hour” at the end of the day for that food truck
- happy hour will comprise of participating food trucks giving on free sampler to those who had checked in during the
food truck festival. This happy hour will run for the last hour of the food truck festival. Participants will have to show
proof of check in through badge system.

 3

More Related Content

What's hot

Gloucester transportation facility request for proposals
Gloucester transportation facility request for proposalsGloucester transportation facility request for proposals
Gloucester transportation facility request for proposals
Kenneth Hogge Sr
 
Ruggedized computers for police service bid requests
Ruggedized computers for police service bid requestsRuggedized computers for police service bid requests
Ruggedized computers for police service bid requests
Chuck Thompson
 
Amendment to VenCorps Agreement
Amendment to VenCorps AgreementAmendment to VenCorps Agreement
Amendment to VenCorps Agreement
DigitalGov from General Services Administration
 
Service and Products: Productized Services
Service and Products: Productized ServicesService and Products: Productized Services
Service and Products: Productized Services
Urbanetectonics
 
Terms & Conditions
Terms & ConditionsTerms & Conditions
Terms & Conditions
Danielle Donovan
 
AB 626: What It Means for Public Works Projects and What Public Agencies Need...
AB 626: What It Means for Public Works Projects and What Public Agencies Need...AB 626: What It Means for Public Works Projects and What Public Agencies Need...
AB 626: What It Means for Public Works Projects and What Public Agencies Need...
Meyers Nave
 
GrantWritertermsandconditions
GrantWritertermsandconditionsGrantWritertermsandconditions
GrantWritertermsandconditions
Irene Lemon
 
Vendor agreement (1)
Vendor agreement (1)Vendor agreement (1)
Vendor agreement (1)
SnehaKaranJagtap
 
Harry new section 11w september 2010
Harry new section 11w september 2010Harry new section 11w september 2010
Harry new section 11w september 2010
Crate
 
Unfair claims-settlement-practices-act
Unfair claims-settlement-practices-actUnfair claims-settlement-practices-act
Unfair claims-settlement-practices-act
Lira Venture Capital
 
Sample Business Associate Agreement
Sample Business Associate AgreementSample Business Associate Agreement
Sample Business Associate Agreement
Jorge M. Abril, P.A.
 
Risk Management For Contractors
Risk Management For ContractorsRisk Management For Contractors
Risk Management For Contractors
dawnpogue
 
Addendum to Google Visualization API Terms of Service (TOS)
Addendum to Google Visualization API Terms of Service (TOS)Addendum to Google Visualization API Terms of Service (TOS)
Addendum to Google Visualization API Terms of Service (TOS)
DigitalGov from General Services Administration
 
Amendment to Foursquare Labs Inc.'s Terms of Use
Amendment to Foursquare Labs Inc.'s Terms of UseAmendment to Foursquare Labs Inc.'s Terms of Use
Amendment to Foursquare Labs Inc.'s Terms of Use
DigitalGov from General Services Administration
 
Custom local access_sla_080811_v1
Custom local access_sla_080811_v1Custom local access_sla_080811_v1
Custom local access_sla_080811_v1
Arjan Bici
 
Document Number Contract For Legal Services This Contract For Legal
Document Number Contract For Legal Services This Contract For LegalDocument Number Contract For Legal Services This Contract For Legal
Document Number Contract For Legal Services This Contract For Legal
legal2
 
NATIONAL_PRODUCER_AGREEMENT_Fill-In_-1
NATIONAL_PRODUCER_AGREEMENT_Fill-In_-1NATIONAL_PRODUCER_AGREEMENT_Fill-In_-1
NATIONAL_PRODUCER_AGREEMENT_Fill-In_-1
Bob Itzinger, ARM
 
Addendum to Terms of Use for Google Plus Pages
Addendum to Terms of Use for Google Plus PagesAddendum to Terms of Use for Google Plus Pages
Addendum to Terms of Use for Google Plus Pages
DigitalGov from General Services Administration
 
Indep c
Indep cIndep c
Indep c
tonytawk
 
License
LicenseLicense

What's hot (20)

Gloucester transportation facility request for proposals
Gloucester transportation facility request for proposalsGloucester transportation facility request for proposals
Gloucester transportation facility request for proposals
 
Ruggedized computers for police service bid requests
Ruggedized computers for police service bid requestsRuggedized computers for police service bid requests
Ruggedized computers for police service bid requests
 
Amendment to VenCorps Agreement
Amendment to VenCorps AgreementAmendment to VenCorps Agreement
Amendment to VenCorps Agreement
 
Service and Products: Productized Services
Service and Products: Productized ServicesService and Products: Productized Services
Service and Products: Productized Services
 
Terms & Conditions
Terms & ConditionsTerms & Conditions
Terms & Conditions
 
AB 626: What It Means for Public Works Projects and What Public Agencies Need...
AB 626: What It Means for Public Works Projects and What Public Agencies Need...AB 626: What It Means for Public Works Projects and What Public Agencies Need...
AB 626: What It Means for Public Works Projects and What Public Agencies Need...
 
GrantWritertermsandconditions
GrantWritertermsandconditionsGrantWritertermsandconditions
GrantWritertermsandconditions
 
Vendor agreement (1)
Vendor agreement (1)Vendor agreement (1)
Vendor agreement (1)
 
Harry new section 11w september 2010
Harry new section 11w september 2010Harry new section 11w september 2010
Harry new section 11w september 2010
 
Unfair claims-settlement-practices-act
Unfair claims-settlement-practices-actUnfair claims-settlement-practices-act
Unfair claims-settlement-practices-act
 
Sample Business Associate Agreement
Sample Business Associate AgreementSample Business Associate Agreement
Sample Business Associate Agreement
 
Risk Management For Contractors
Risk Management For ContractorsRisk Management For Contractors
Risk Management For Contractors
 
Addendum to Google Visualization API Terms of Service (TOS)
Addendum to Google Visualization API Terms of Service (TOS)Addendum to Google Visualization API Terms of Service (TOS)
Addendum to Google Visualization API Terms of Service (TOS)
 
Amendment to Foursquare Labs Inc.'s Terms of Use
Amendment to Foursquare Labs Inc.'s Terms of UseAmendment to Foursquare Labs Inc.'s Terms of Use
Amendment to Foursquare Labs Inc.'s Terms of Use
 
Custom local access_sla_080811_v1
Custom local access_sla_080811_v1Custom local access_sla_080811_v1
Custom local access_sla_080811_v1
 
Document Number Contract For Legal Services This Contract For Legal
Document Number Contract For Legal Services This Contract For LegalDocument Number Contract For Legal Services This Contract For Legal
Document Number Contract For Legal Services This Contract For Legal
 
NATIONAL_PRODUCER_AGREEMENT_Fill-In_-1
NATIONAL_PRODUCER_AGREEMENT_Fill-In_-1NATIONAL_PRODUCER_AGREEMENT_Fill-In_-1
NATIONAL_PRODUCER_AGREEMENT_Fill-In_-1
 
Addendum to Terms of Use for Google Plus Pages
Addendum to Terms of Use for Google Plus PagesAddendum to Terms of Use for Google Plus Pages
Addendum to Terms of Use for Google Plus Pages
 
Indep c
Indep cIndep c
Indep c
 
License
LicenseLicense
License
 

Viewers also liked

C.V.(I.E)
C.V.(I.E)C.V.(I.E)
C.V.(I.E)
Ganesh Bhardwaj
 
Nikam Akshay Nanasaheb
Nikam Akshay NanasahebNikam Akshay Nanasaheb
Nikam Akshay Nanasaheb
Akshay NIkam
 
AIRBORNE-RF-COMM TERMINAL AND GROUND STATION FOR FACEBOOK
AIRBORNE-RF-COMM TERMINAL AND GROUND STATION FOR FACEBOOKAIRBORNE-RF-COMM TERMINAL AND GROUND STATION FOR FACEBOOK
AIRBORNE-RF-COMM TERMINAL AND GROUND STATION FOR FACEBOOKAmnon G. Talmor, PhD
 
Developing Stone Test Programmes
Developing Stone Test ProgrammesDeveloping Stone Test Programmes
Developing Stone Test Programmes
Stone Initiatives
 
Latest blouse designs for silk sarees
Latest blouse designs for silk sareesLatest blouse designs for silk sarees
Latest blouse designs for silk sarees
HASINI H
 
MANEJO INTEGRADO DE PRAGAS NO FEIJÃO
MANEJO INTEGRADO DE PRAGAS NO FEIJÃOMANEJO INTEGRADO DE PRAGAS NO FEIJÃO
MANEJO INTEGRADO DE PRAGAS NO FEIJÃO
Geagra UFG
 
MANEJO DE PLANTAS DANINHAS NA CULTURA DA SOJA
MANEJO DE PLANTAS DANINHAS NA CULTURA DA SOJA MANEJO DE PLANTAS DANINHAS NA CULTURA DA SOJA
MANEJO DE PLANTAS DANINHAS NA CULTURA DA SOJA
Geagra UFG
 
Innovating banking: Lessons from the world’s leading innovators
Innovating banking: Lessons from the world’s leading innovators Innovating banking: Lessons from the world’s leading innovators
Innovating banking: Lessons from the world’s leading innovators
Pauline Mura
 
84929481 value-engineering-case-study
84929481 value-engineering-case-study84929481 value-engineering-case-study
84929481 value-engineering-case-study
homeworkping3
 

Viewers also liked (9)

C.V.(I.E)
C.V.(I.E)C.V.(I.E)
C.V.(I.E)
 
Nikam Akshay Nanasaheb
Nikam Akshay NanasahebNikam Akshay Nanasaheb
Nikam Akshay Nanasaheb
 
AIRBORNE-RF-COMM TERMINAL AND GROUND STATION FOR FACEBOOK
AIRBORNE-RF-COMM TERMINAL AND GROUND STATION FOR FACEBOOKAIRBORNE-RF-COMM TERMINAL AND GROUND STATION FOR FACEBOOK
AIRBORNE-RF-COMM TERMINAL AND GROUND STATION FOR FACEBOOK
 
Developing Stone Test Programmes
Developing Stone Test ProgrammesDeveloping Stone Test Programmes
Developing Stone Test Programmes
 
Latest blouse designs for silk sarees
Latest blouse designs for silk sareesLatest blouse designs for silk sarees
Latest blouse designs for silk sarees
 
MANEJO INTEGRADO DE PRAGAS NO FEIJÃO
MANEJO INTEGRADO DE PRAGAS NO FEIJÃOMANEJO INTEGRADO DE PRAGAS NO FEIJÃO
MANEJO INTEGRADO DE PRAGAS NO FEIJÃO
 
MANEJO DE PLANTAS DANINHAS NA CULTURA DA SOJA
MANEJO DE PLANTAS DANINHAS NA CULTURA DA SOJA MANEJO DE PLANTAS DANINHAS NA CULTURA DA SOJA
MANEJO DE PLANTAS DANINHAS NA CULTURA DA SOJA
 
Innovating banking: Lessons from the world’s leading innovators
Innovating banking: Lessons from the world’s leading innovators Innovating banking: Lessons from the world’s leading innovators
Innovating banking: Lessons from the world’s leading innovators
 
84929481 value-engineering-case-study
84929481 value-engineering-case-study84929481 value-engineering-case-study
84929481 value-engineering-case-study
 

Similar to KOI DSGN Social

Item # 7 - Consultant Services
Item # 7 - Consultant Services Item # 7 - Consultant Services
Item # 7 - Consultant Services
ahcitycouncil
 
Tree doctors
Tree doctorsTree doctors
Tree doctors
Tree Doctors
 
Tree Doctors
Tree DoctorsTree Doctors
Tree Doctors
Tree Doctors
 
PROFESSIONAL SERVICES AGREEMENT
PROFESSIONAL SERVICES AGREEMENT PROFESSIONAL SERVICES AGREEMENT
PROFESSIONAL SERVICES AGREEMENT
Kanoon Ke Rakhwale India
 
CLIENT CONTRACTOR AGREEMENT
CLIENT CONTRACTOR AGREEMENTCLIENT CONTRACTOR AGREEMENT
CLIENT CONTRACTOR AGREEMENT
Kanoon Ke Rakhwale India
 
Independent Contractor Agreement FULL TIME
Independent Contractor Agreement FULL TIMEIndependent Contractor Agreement FULL TIME
Independent Contractor Agreement FULL TIME
Marielli Jonah Cantor
 
July 2016 consulting services agreement EPSI
July 2016 consulting services agreement EPSIJuly 2016 consulting services agreement EPSI
July 2016 consulting services agreement EPSI
Steven E. Sexton
 
Aries Errand Service LLC - Bond docs - 10 13 16
Aries Errand Service LLC - Bond docs - 10 13 16Aries Errand Service LLC - Bond docs - 10 13 16
Aries Errand Service LLC - Bond docs - 10 13 16
Joyce Stafford
 
Lending Compliance Hot Topics with ICS Compliance_January 2010
Lending Compliance Hot Topics with ICS Compliance_January 2010Lending Compliance Hot Topics with ICS Compliance_January 2010
Lending Compliance Hot Topics with ICS Compliance_January 2010
ICS Compliance
 
Executive Profiles Introduction
Executive Profiles IntroductionExecutive Profiles Introduction
Executive Profiles Introduction
guest8014e5
 
Item # 4 - Consultant Services
Item # 4 - Consultant ServicesItem # 4 - Consultant Services
Item # 4 - Consultant Services
ahcitycouncil
 
After meetings with your client, Quick Bros. Animation, in a con.docx
After meetings with your client, Quick Bros. Animation, in a con.docxAfter meetings with your client, Quick Bros. Animation, in a con.docx
After meetings with your client, Quick Bros. Animation, in a con.docx
normanlane62630
 
After meetings with your client, Quick Bros. Animation, in a con
After meetings with your client, Quick Bros. Animation, in a conAfter meetings with your client, Quick Bros. Animation, in a con
After meetings with your client, Quick Bros. Animation, in a con
saundersabelard
 
Prime Opportunities Inc Broker Agreement
Prime Opportunities Inc Broker AgreementPrime Opportunities Inc Broker Agreement
Prime Opportunities Inc Broker Agreement
www.CALIFORNIA-ENERGY -DEREGULATION.us
 
Prime Opportunities Inc Broker Agreement
Prime Opportunities Inc Broker AgreementPrime Opportunities Inc Broker Agreement
Prime Opportunities Inc Broker Agreement
www.CALIFORNIA-ENERGY -DEREGULATION.us
 
Synact agreement
Synact agreementSynact agreement
Synact agreement
ITasABC
 
Synact agreement
Synact agreementSynact agreement
Synact agreement
ITasABC
 
Retainership agreement mr.ankit
Retainership agreement mr.ankitRetainership agreement mr.ankit
Retainership agreement mr.ankit
Ankitimmigration
 
Non Recourse Project Funding
Non Recourse Project FundingNon Recourse Project Funding
Non Recourse Project Funding
SGT K. K. Group
 
I2 investments
I2 investmentsI2 investments
I2 investments
jamesaponty
 

Similar to KOI DSGN Social (20)

Item # 7 - Consultant Services
Item # 7 - Consultant Services Item # 7 - Consultant Services
Item # 7 - Consultant Services
 
Tree doctors
Tree doctorsTree doctors
Tree doctors
 
Tree Doctors
Tree DoctorsTree Doctors
Tree Doctors
 
PROFESSIONAL SERVICES AGREEMENT
PROFESSIONAL SERVICES AGREEMENT PROFESSIONAL SERVICES AGREEMENT
PROFESSIONAL SERVICES AGREEMENT
 
CLIENT CONTRACTOR AGREEMENT
CLIENT CONTRACTOR AGREEMENTCLIENT CONTRACTOR AGREEMENT
CLIENT CONTRACTOR AGREEMENT
 
Independent Contractor Agreement FULL TIME
Independent Contractor Agreement FULL TIMEIndependent Contractor Agreement FULL TIME
Independent Contractor Agreement FULL TIME
 
July 2016 consulting services agreement EPSI
July 2016 consulting services agreement EPSIJuly 2016 consulting services agreement EPSI
July 2016 consulting services agreement EPSI
 
Aries Errand Service LLC - Bond docs - 10 13 16
Aries Errand Service LLC - Bond docs - 10 13 16Aries Errand Service LLC - Bond docs - 10 13 16
Aries Errand Service LLC - Bond docs - 10 13 16
 
Lending Compliance Hot Topics with ICS Compliance_January 2010
Lending Compliance Hot Topics with ICS Compliance_January 2010Lending Compliance Hot Topics with ICS Compliance_January 2010
Lending Compliance Hot Topics with ICS Compliance_January 2010
 
Executive Profiles Introduction
Executive Profiles IntroductionExecutive Profiles Introduction
Executive Profiles Introduction
 
Item # 4 - Consultant Services
Item # 4 - Consultant ServicesItem # 4 - Consultant Services
Item # 4 - Consultant Services
 
After meetings with your client, Quick Bros. Animation, in a con.docx
After meetings with your client, Quick Bros. Animation, in a con.docxAfter meetings with your client, Quick Bros. Animation, in a con.docx
After meetings with your client, Quick Bros. Animation, in a con.docx
 
After meetings with your client, Quick Bros. Animation, in a con
After meetings with your client, Quick Bros. Animation, in a conAfter meetings with your client, Quick Bros. Animation, in a con
After meetings with your client, Quick Bros. Animation, in a con
 
Prime Opportunities Inc Broker Agreement
Prime Opportunities Inc Broker AgreementPrime Opportunities Inc Broker Agreement
Prime Opportunities Inc Broker Agreement
 
Prime Opportunities Inc Broker Agreement
Prime Opportunities Inc Broker AgreementPrime Opportunities Inc Broker Agreement
Prime Opportunities Inc Broker Agreement
 
Synact agreement
Synact agreementSynact agreement
Synact agreement
 
Synact agreement
Synact agreementSynact agreement
Synact agreement
 
Retainership agreement mr.ankit
Retainership agreement mr.ankitRetainership agreement mr.ankit
Retainership agreement mr.ankit
 
Non Recourse Project Funding
Non Recourse Project FundingNon Recourse Project Funding
Non Recourse Project Funding
 
I2 investments
I2 investmentsI2 investments
I2 investments
 

KOI DSGN Social

  • 1. Engagement Strategy with Meraki Prepared for: Laura Dawson, KOI Festival Prepared by: Alexandra Kubrak, DSGN Network August 27, 2014
  • 2. Table of Contents Client Agreement Terms iii Scope iii Cancellation iv Acceptance iv Payment iv Ownership iv Scheduling iv Compliance iv Force Majeure iv Severability v No Implied Waivers v Binding Effect, Assignment v Entirety v Authorized Representative v Fees and Expenses v Cancellation vi Intellectual Property Ownership vi Quality vi Termination vi i
  • 3. Executive Summary 1 Objective 1 Goals 1 Solution 2 KOI Sign Me Challenge 2 Best of KOI Vine Challenge 2 KOI Mayor Mudfight 3 ii
  • 4. Client Agreement Terms Scope These terms and conditioned (“Terms) are supplemental to any marketing and advertising contract, including without limitation to any campaign contract, program - specific contract or program descriptions, entered into by and between DSGN Network and the client. In the event of a conflict between the terms of a marketing and advertising contract, the terms of any individual program description, and these Terms, the conflict shall be resolved in the following order of precedence: 1) The terms of the marketing and advertising contract; 2) the terms of an individual program description; and 3) these Terms. iii
  • 5. Cancellation DSGN Network marketing and advertising contacts are cancelable if, and only if, both parties are non-negotiable dispute based on a void of contract including but not limited to event of client non-payment, refusal to pay, failure to deliver on all terms and agreements herein, non-compliance in any and all events including but not limited to lack of attendance, communication failure, failure to adhere to scheduling without notice. Acceptance All projects will be granted on a first-come, first-served basis upon receipt of a signed contract and downpayment. Notwithstanding anything to the contrary herein, DSGN Network reserves the right to refuse or cancel any participation in any marketing program for any reason at any time. Ownership DSGN Network retains title to any and all tangible intellectual or physical property produced by DSGN Network in connection with any marketing program unless otherwise agreed upon. Scheduling Dates are subject to change at the discretion of DSGN Network if materials are not received by the materials due date. However a pre-ordained schedule will be followed an amended to based on these terms: • At contract schedule will be created based on a 12-week ideal work load and project assignment • A week by week agenda will be given to the client to adhere to with all events booked and organized two weeks before • After week 6 the next 12-week ideal schedule will be created based on the work completed in the previous 6-week timeline • Schedules will be amended and updated at the discretion of DSGN Network, however client approval will also be necessary to do so. Compliance The parties shall comply with all applicable state, provincial, federal, and where applicable, country specific rules and regulations. Force Majeure Neither party will be liable to the other party by reason of any failure in performance under these Terms if the failure arises out of acts of God, acts of the other party, acts of governmental authority, fires, strikes, delays in transportation, riots or war, or any cause beyond the reasonable control of that party. if any such even delays performance the time allowed for such performance will be approximately extended. iv
  • 6. Severability If any provision of these Terms shall be held to be invalid, illegal or unenforceable, such provision shall be enforced to the fullest extent permitted by applicable law and the validity, legality and enforceability of the remaining provisions shall not in any way be affected or implied thereby. No Implied Waivers If any party failed to require performance of any duty hereunder by the other party, such failure shall not affect its right to require performance of that or any other duty thereafter. The waiver by either party of a breach of any provision of these Terms shall not be a waiver of the provision itself or a waiver of any breach thereafter, or a waiver of any other provision herein. Binding Effect, Assignment Any assignment by the Client of any rights under these Terms without the express written consent of DSGN Network shall not be binding upon DSGN Network and shall not relieve the Client from any liability or obligation under these Terms. In the event of assignment the Client shall be liable, jointly and severally with any assignee, for any liabilities and obligations incurred by such assignee hereunder to the same extent as if such liabilities and obligations had been incurred by the Client. Subject to the foregoing, these Terms shall be binding upon and shall inure to the benefit of the parties hereto and their respective successors and assigns. Entirety These Terms, as incorporated in any marketing contract and in conjunction with any applicable program description, constitute the entire agreement between the parties regarding such subject matter and supersede any and all previous proposals, representations or statements, oral or written. Any previous agreements between the parties pertaining to such subject matter are expressly terminated. Any modifications to these Terms must be in writing and signed by authorized representatives of both parties. Authorized Representative Either party’s authorized representative for execution of any contract or agreement incorporating these Terms or any amendment thereto or to these Terms shall be president, as partner or a duly authorized vice-president or representative of the respective party. The signatories to such contract or agreement incorporating these terms warrant that they have the requisite authority to do so. Fees and Expenses Our fees and expenses are set out in the Project Proposal.  If fees exceed $10,000, we reserve the right to require pay- ment in whole or in part before beginning the services.  We generally bill 50% of the total fee on commissioning, and the balance of fees due on delivery of final outputs.  All work undertaken in addition to that set out in the Project Proposal will also form part of this agreement, but we will be entitled to raise an additional charge at our then standard rates. All fees v
  • 7. and expenses must be paid within 30 days of our delivery of an invoice, without set-off or deduction. All fees and ex- penses are exclusive of the client which must also be paid at the applicable rate. Cancellation Without prejudice to our other rights and remedies, if you postpone or cancel our services, we will be entitled to charge you at the following rates:  Cancellation or postponement with 0-5 complete working days notice will be charged at 100% of fees set out in the Project Proposal; cancellation or postponement with 6-10 complete working days notice will be charged at 50% of fees set out in the Project Proposal. Postponement rather than cancellation is acceptable only if the rescheduled date is bona fide and within 2 weeks of the initial date scheduled.  Should further postponement occur, we will be entitled to treat the series of transactions as the cancellation of our services.  We will be entitled to charge for all incidentals and out of pocket expenses incurred in delivering the Services plus a handling fee of 15% of such cost incurred. Intellectual Property Ownership All intellectual property in any report, presentation or other material produced by us and delivered to you in the provision of the services shall remain our property. Upon payment of our fees and expenses in full on their due dates you will have a license to use any such report, presentation or materials for the purpose for which they were created.  You license us to use any intellectual property of yours which it is necessary or which you ask us to use in performing the services.   Quality Our services will be provided with reasonable care and skill. However, our services are provided "as is" only and we are not responsible for any actions you take or do not take in reliance upon any report or other research we deliver to you in the provision of the services.  All implied warranties, conditions and other terms concerning our performance of the services are excluded to the extent permitted by law. Termination Without prejudice to any other right or remedies, either of us may terminate this agreement at any time by notice in writing to the other if the other party is in breach of this agreement and, in the case of a breach capable of remedy, the breach is not remedied within 14 days of the other party receiving notice specifying the breach and requiring it to be remedied, or if the other party becomes insolvent or an order is made or a resolution is passed for the winding up of the other party (other than voluntary for the purpose of solvent amalgamation or reconstruction) or if an administrator, administrative receiver or receiver is appointed in respect of the whole or any part of the other's assets or business or if the other makes any composition with its creditors or takes or suffers any similar or analogous action in consequence of debt. vi
  • 8. Executive Summary Objective This strategy outlines the logistic plan for the KOI Festival social integration with the Cisco Meraki system. It is the prerogative of DSGN Network that these targeted social engagement campaigns utilize the Meraki metrics system to the fullest extent, allowing for a creative and technologically advanced function of this unique WiFi system. Over the KOI Festival weekend (September 19th through 21st) there will be various ongoing and daily engagement features to get attendees interacting on the system, as well as with the brand - KOI Festival. In participation with RDC Networks, DSGN Network will maintain the social metrics and upkeep of the engagement strategy along with KOI Festival volunteers. Both Alexandra Kubrak and Brendan Waller will orchestrate during the day, as well as co-ordinate with volunteers the timing of each engagement game. There have been three engagement games chosen for the weekend to which DSGN Network will be the official hosts for. There are as follows: 1. KOI Sign Me Challenge 2. Best of KOI Vine Challenge 3. Swarm Mayor Challenge These three games will get attendees to interact with both the KOI and DSGN Brands through the use of current social platforms. DSGN will also integrate these games into the Eventpeaks Media Wall and the Picture This api located around the festival. Goals To get as many attendees as possible to engage, festival social media representatives, alongside DSGN Network representatives, will be actively participating on social channels all day long, as well as informing the public about the engagement games at the festival itself. Our hope is that each strategy will allow the KOI Festival to experience the Meraki system as a whole - and gain comprehensive analytic metrics on who is attending and where these attendees are engaging the most. 1
  • 9. Solution These following strategies are the final strategies DSGN Network has chosen for the KOI Festival. Included are briefs on logistic implementation of each strategy and the steps needed to achieve the highest engagement and co-operation from everyone involved. Fans and attendees will be notified about these social challenges through prior facebook, twitter, and newsletter formats with the release of prizing for these challenges. Both KOI Festival and DSGN Network will be promoting the challenges through similar means. Over the next few weeks these plans will be carried out and the prerequisite items will need to be attained as best as possible. These strategies can be amended for day-of occurrences in care of any additional issues or new information. KOI Sign Me Challenge In co-operation with as many musical artists as possible, this challenge will allow attendee to get connected with the artists in a new way. This challenge will ask participants to: - Locate a specific band as social representatives tweet them (or as attendees find them) - Acquire a signature from your favorite member, or entire band on the KOI Festival Comic or Shirt - Snap a picture with twitter and tag @KOIMusicFest, hashtag #dsgnrocks #koifest14 #signme - Participant with the most signatures per day wins small prize, per weekend VIP pass To achieve the best possible outcome, a memo will be sent to artists each week leading up to KOI to introduce and remind them of the challenge and that fans will be actively searching out specific bands during the day. Bands can request a removal from participation of this challenge, however they must notify KOI Festival or DSGN Network of their wish to remain a non-participant. Leaders of the challenge will be asked to snap images of their signatures with the bands as they come off stage or meet during their pre-destined times to tweet out locations of bands for signatures. Alexandra Kubrak and two other KOI Festival volunteers will lead this challenge the day of. Best of KOI Vine Challenge To engage attendees both during and after the festival, this challenge can be maintained and promoted for a few weeks after the festival. The participants will be asked to make Vine videos during the weekend - with creativity scoring higher. These vines can be of memories, promotion ideas, best features, or what KOI is to attendees. These videos will be shown on the Media Wall provided by EventPeaks. These videos can be created to be of a daily, or weekend nature showing their greatest time at the festival. 2
  • 10. A 3 winners daily will be chosen, with the finalists asking to create a final “Best of KOI2014” series of vines that will be used for KOI Fest 2015 promotion next year. This vine will be featured on the festival’s site and gain the lucky winner the official KOI Fest Social Intern for next year. To participate attendees will: - Create as many vines as they wish during the festival - Tag @KoiFestMusic #KoiFest2014 #DSGNrocks and #MyKOIvine - Be as creative as you can, featuring KOI Festival highlights - Like your favourite Vine videos as they come in Winners will be chosen by a combination of number of likes they receive and best compilation by social representatives. The winners daily will receive small prize packs, and the finalists gaining entry to the VIP party after the weekend. The final grand winner will be announced in the proceeding weeks with entries of the promo video being submitted. The Grand Prize winner will be asked to come to the KOI Festival “head office” and gain a prize pack of KOI merchandise, artist music (to what’s available) and their winner’s certificate of “Official KOI Festival Intern” for 2015. KOI Mayor Mudfight As a passive challenge, the Mayor Mudfight challenge will give digital prizes and small perks to those who use check in platforms such as Swarm. Participants will check in at various places or areas (including the festival itself) and earn badges for as many check ins they can get in a day, and for the whole weekend. These badges will give participants digital rewards, instead of physical prizing. It’s simpler and easier to deal with. The challenge will include: - Check in at each of the stages, with “mayors’ of that stage receiving a download for their favourite band of the stage’s current EP - Check in at each participating local eatery, first time checked in receives 10% off their meal; daily mayors receive free appitizer; weekend mayors receive eatery tshirt - Check in at participating food truck, gain access to free “happy hour” at the end of the day for that food truck - happy hour will comprise of participating food trucks giving on free sampler to those who had checked in during the food truck festival. This happy hour will run for the last hour of the food truck festival. Participants will have to show proof of check in through badge system. 3