This document provides details on the construction of a 19,800 square foot office, call, and service center for Knology in Columbus, Georgia. It will feature a steel tube frame structure with a metal roof, EIFS and brick architectural features, and metal panels installed horizontally. The building materials include scored concrete block, two types of brick veneer, glass block windows, and aluminum storefront windows with insulated glass. The scheduled completion date was May 4, 2004 and the final construction cost was $2,178,000.
Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020Crosstown TO
The document provides an update on construction progress and upcoming work for the Eglinton Crosstown LRT project between Victoria Park Avenue and Kennedy Station from January to Spring 2020. It notes that stop construction and track installation is underway between Victoria Park Avenue and Rosemount Drive through Spring 2020. It also outlines upcoming work like shelter installations, traffic configuration changes, and left turn removals. Construction at Kennedy Station is ongoing, with portal excavation and underground station work continuing into late 2020.
Western Works Construction Liaison Committee Meeting - March 2018Crosstown TO
The document provides updates on construction progress at several sites along the Eglinton Crosstown LRT project. Key ongoing works discussed include excavation and structure installation at Caledonia, Keelesdale and Mount Dennis stations. Construction of the elevated guideway and West Portal is also outlined, including girder installation requiring road closures. Utility installation and ductbank construction details are provided for the area around Mount Dennis station. Railway corridor excavation and CP bridge works are mentioned.
Britt, Peters and Associates (BPA) is a structural and civil engineering firm that has been in business for over 40 years. It has a diverse team of engineers and has completed thousands of projects for private and public clients. Some of BPA's notable past projects include structural engineering for mixed-use and multi-family residential buildings in South Carolina cities like Greenville, Charleston, and Mount Pleasant. BPA also has experience with educational, healthcare, and civic infrastructure projects throughout South Carolina.
Pharmacy to Kennedy Construction Liaison Committee Meeting - Nov 2019Crosstown TO
This document provides an update on construction progress and upcoming work for the Eglinton Crosstown LRT project between O'Connor Station and Ionview Station. It discusses completed works including left turn removals at various intersections. Current and upcoming traffic configurations are presented for areas around Victoria Park Avenue, Birchmount Road, Rosemount Drive, and Kennedy Station. Construction of guideway, stations, and track installation is underway and expected to continue through spring 2020 between Victoria Park and Birchmount. Traffic changes are scheduled for intersections at Rosemount Drive and Kennedy Road. Photos show current progress on stations, portals, track installation and other infrastructure works.
This document provides references and details successful restoration projects completed by Thomas J. Corr and Liszt Historical Restoration. It lists six professional references from projects including the Starr Library at Middlebury College and various buildings at the University of Vermont. It also lists over 30 restoration projects in Vermont and neighboring states involving masonry repair and restoration using lime mortars and vintage building techniques. The projects encompass academic, governmental, residential, and commercial buildings ranging from the 1700s to 1960s.
Karl Jones is seeking employment as a Foreman Bricklayer or Bricklayer with over 40 years of experience in the masonry industry, including 5 years in a supervisory capacity. He obtained an Advanced Craft Certificate with Distinction in Bricklaying after a 5-year apprenticeship in England. Jones has worked as a Foreman Bricklayer for several companies in Canada and the United States, and has experience in residential, commercial, industrial and corrosion installation projects. He is well-organized, safety-conscious, and able to motivate teams to achieve goals and meet deadlines.
Report - District 10 Snowmobile Bridge - February 14, 2011Mark Steenhof
The document provides a structural assessment of a 110-foot Bailey bridge located on a snowmobile trail in District 10, Township of McDougall, Ontario. It describes the major components of the Bailey bridge, including the steel truss panels, panel pins, transoms, sway braces, stringers, decking, end posts, and abutments. The assessment found that while most components were in good condition with minor rusting, the south abutment had settled, shearing a timber below the bearing plate and damaging the approach ramp guardrail.
Pharmacy to Kennedy Construction Liaison Committee Meeting - Jan 2020Crosstown TO
The document provides an update on construction progress and upcoming work for the Eglinton Crosstown LRT project between Victoria Park Avenue and Kennedy Station from January to Spring 2020. It notes that stop construction and track installation is underway between Victoria Park Avenue and Rosemount Drive through Spring 2020. It also outlines upcoming work like shelter installations, traffic configuration changes, and left turn removals. Construction at Kennedy Station is ongoing, with portal excavation and underground station work continuing into late 2020.
Western Works Construction Liaison Committee Meeting - March 2018Crosstown TO
The document provides updates on construction progress at several sites along the Eglinton Crosstown LRT project. Key ongoing works discussed include excavation and structure installation at Caledonia, Keelesdale and Mount Dennis stations. Construction of the elevated guideway and West Portal is also outlined, including girder installation requiring road closures. Utility installation and ductbank construction details are provided for the area around Mount Dennis station. Railway corridor excavation and CP bridge works are mentioned.
Britt, Peters and Associates (BPA) is a structural and civil engineering firm that has been in business for over 40 years. It has a diverse team of engineers and has completed thousands of projects for private and public clients. Some of BPA's notable past projects include structural engineering for mixed-use and multi-family residential buildings in South Carolina cities like Greenville, Charleston, and Mount Pleasant. BPA also has experience with educational, healthcare, and civic infrastructure projects throughout South Carolina.
Pharmacy to Kennedy Construction Liaison Committee Meeting - Nov 2019Crosstown TO
This document provides an update on construction progress and upcoming work for the Eglinton Crosstown LRT project between O'Connor Station and Ionview Station. It discusses completed works including left turn removals at various intersections. Current and upcoming traffic configurations are presented for areas around Victoria Park Avenue, Birchmount Road, Rosemount Drive, and Kennedy Station. Construction of guideway, stations, and track installation is underway and expected to continue through spring 2020 between Victoria Park and Birchmount. Traffic changes are scheduled for intersections at Rosemount Drive and Kennedy Road. Photos show current progress on stations, portals, track installation and other infrastructure works.
This document provides references and details successful restoration projects completed by Thomas J. Corr and Liszt Historical Restoration. It lists six professional references from projects including the Starr Library at Middlebury College and various buildings at the University of Vermont. It also lists over 30 restoration projects in Vermont and neighboring states involving masonry repair and restoration using lime mortars and vintage building techniques. The projects encompass academic, governmental, residential, and commercial buildings ranging from the 1700s to 1960s.
Karl Jones is seeking employment as a Foreman Bricklayer or Bricklayer with over 40 years of experience in the masonry industry, including 5 years in a supervisory capacity. He obtained an Advanced Craft Certificate with Distinction in Bricklaying after a 5-year apprenticeship in England. Jones has worked as a Foreman Bricklayer for several companies in Canada and the United States, and has experience in residential, commercial, industrial and corrosion installation projects. He is well-organized, safety-conscious, and able to motivate teams to achieve goals and meet deadlines.
Report - District 10 Snowmobile Bridge - February 14, 2011Mark Steenhof
The document provides a structural assessment of a 110-foot Bailey bridge located on a snowmobile trail in District 10, Township of McDougall, Ontario. It describes the major components of the Bailey bridge, including the steel truss panels, panel pins, transoms, sway braces, stringers, decking, end posts, and abutments. The assessment found that while most components were in good condition with minor rusting, the south abutment had settled, shearing a timber below the bearing plate and damaging the approach ramp guardrail.
The document describes a new 15,273 square foot commercial medical building under construction in Phenix City, Alabama. It will house a pediatric office, chiropractic office, and future lease space. The pre-engineered metal structure is expected to be completed in October 2010 at a construction cost of $2,382,243 under a guaranteed maximum design-build contract with CAM Builders.
This floor plan shows a two-level home with a living room, kitchen, breakfast area, dining room, master bedroom, library, laundry room, and three-car garage on the main level. The lower level includes an entry, deck, and additional living space. The front elevation depicts Hardiplank siding, brick soldier courses, stone veneer accents, and circle windows surrounded by rowlock brick on the main level with a brick sill and soldier course below the windows.
The Columbus Housing Initiative involves a 10 unit redevelopment project on 8th Street called the East Wynnton Park Project. The initiative will redevelop 10 units on 8th Street in an area called East Wynnton Park.
The document is a site plan for a 4,945 square foot urgent care facility located at 6400 Flat Rock Road in Columbus, Georgia. It includes contact information for the owner, Dr. Carl Foster, and the contractor, Humphreys Associates. The project description notes it will be a steel framed building with concrete masonry veneer and metal roofing. The scheduled start date is August 8, 2008 with substantial completion by March 7, 2009 and final completion by May 4, 2009. The construction contract type is cost of work plus a fee with a guaranteed maximum and the final construction cost is $918,349.
The document describes plans for a new marina building and site work at Lake Oliver in Columbus, Georgia. The 3,824 square foot marina building will include a bait shop, office, restrooms, snack bar, meeting room, and observation deck. The site work will include installing a new seawall, docks, fuel storage, dredging the lake bed, repaving parking areas, and new landscaping. Wilkerson Construction Co. will serve as the contractor with a projected substantial completion date of May 20, 2009 and final completion by August 10, 2009. The total projected cost is $1,125,829.
This document provides details about a road service call center project in Columbus, Georgia. The contractor is Humphreys Associates and the project includes constructing a 25,053 square foot call center building with steel framing. The construction contract cost $3,199,331 and the project was scheduled to start in November 2005 with substantial completion by September 2006 and final completion by October 2006. Contact information is provided for both the local economic development office and the contractor.
Dominion Children's Academy is located on Cusseta Road in Columbus, Georgia. The document includes a site plan map with labels for various buildings and areas on the property including a garden, patio, fitness center, parking areas, and buildings marked as Phase 1 and Phase 2 construction. The site plan provides distances and directions between areas of the property located on Cusseta Road.
The document describes a new 15,273 square foot commercial medical building under construction in Phenix City, Alabama. It will house a pediatric office, chiropractic office, and future lease space. The pre-engineered metal structure is expected to be completed in October 2010 at a construction cost of $2,382,243 under a guaranteed maximum design-build contract with CAM Builders.
This floor plan shows a two-level home with a living room, kitchen, breakfast area, dining room, master bedroom, library, laundry room, and three-car garage on the main level. The lower level includes an entry, deck, and additional living space. The front elevation depicts Hardiplank siding, brick soldier courses, stone veneer accents, and circle windows surrounded by rowlock brick on the main level with a brick sill and soldier course below the windows.
The Columbus Housing Initiative involves a 10 unit redevelopment project on 8th Street called the East Wynnton Park Project. The initiative will redevelop 10 units on 8th Street in an area called East Wynnton Park.
The document is a site plan for a 4,945 square foot urgent care facility located at 6400 Flat Rock Road in Columbus, Georgia. It includes contact information for the owner, Dr. Carl Foster, and the contractor, Humphreys Associates. The project description notes it will be a steel framed building with concrete masonry veneer and metal roofing. The scheduled start date is August 8, 2008 with substantial completion by March 7, 2009 and final completion by May 4, 2009. The construction contract type is cost of work plus a fee with a guaranteed maximum and the final construction cost is $918,349.
The document describes plans for a new marina building and site work at Lake Oliver in Columbus, Georgia. The 3,824 square foot marina building will include a bait shop, office, restrooms, snack bar, meeting room, and observation deck. The site work will include installing a new seawall, docks, fuel storage, dredging the lake bed, repaving parking areas, and new landscaping. Wilkerson Construction Co. will serve as the contractor with a projected substantial completion date of May 20, 2009 and final completion by August 10, 2009. The total projected cost is $1,125,829.
This document provides details about a road service call center project in Columbus, Georgia. The contractor is Humphreys Associates and the project includes constructing a 25,053 square foot call center building with steel framing. The construction contract cost $3,199,331 and the project was scheduled to start in November 2005 with substantial completion by September 2006 and final completion by October 2006. Contact information is provided for both the local economic development office and the contractor.
Dominion Children's Academy is located on Cusseta Road in Columbus, Georgia. The document includes a site plan map with labels for various buildings and areas on the property including a garden, patio, fitness center, parking areas, and buildings marked as Phase 1 and Phase 2 construction. The site plan provides distances and directions between areas of the property located on Cusseta Road.