O documento descreve a jornada do Rio Tejo desde sua nascente na Espanha até sua foz no Oceano Atlântico, passando por várias cidades portuguesas. Detalha pontos ao longo do curso do rio como Vila Velha de Ródão, Abrantes, Constância e Santarém, antes de chegar a Lisboa, onde é atravessado por diversas pontes antes de desaguar no oceano.
Celebrating the European day of languages 2th September 2014. We sent greetings cards to schools all over Europe
eTwinning project - European day of languages 2014 -
How to Install Forum App on Facebook Pagehazam yahya
Log in to Facebook. Note: You must have a page.
Go to arrow down beside Home and click on it.
Use Facebook as: Your Page. This is to select your Fan Page. In this module, we select Kaki Cuti Page.
Here is the Page with Photo and Likes tabs only.
Type Forum for Pages at Search Box and click on it. Make sure you select App.
Click Continue as Kaki Cuti (Continue as Personal Name or Personal Account).
Click on the drop down arrow and choose your page by clicking on it.
It is installed. Click on New topic to start.
Type your content into the box. Click on Post as my page OR Post as me when finish. Don’t worry, you can edit later.
It’s almost done. You can edit at any time or add the content or reply.
Go to Page Wall by clicking at Kaki Cuti Page button.
Now we have three (3) apps or tabs.
This document provides an overview of a presentation on fraud awareness. It discusses common consumer fraud schemes such as telemarketing fraud and identity theft. It also covers occupational fraud, including asset misappropriation, corruption, and fraudulent statements. Examples of fraud in businesses, non-profits, and government are given. The document promotes teaching college students about fraud examination and establishing an ACFE student chapter to conduct anti-fraud education. Contact information is provided for the presenters.
O documento descreve a jornada do Rio Tejo desde sua nascente na Espanha até sua foz no Oceano Atlântico, passando por várias cidades portuguesas. Detalha pontos ao longo do curso do rio como Vila Velha de Ródão, Abrantes, Constância e Santarém, antes de chegar a Lisboa, onde é atravessado por diversas pontes antes de desaguar no oceano.
Celebrating the European day of languages 2th September 2014. We sent greetings cards to schools all over Europe
eTwinning project - European day of languages 2014 -
How to Install Forum App on Facebook Pagehazam yahya
Log in to Facebook. Note: You must have a page.
Go to arrow down beside Home and click on it.
Use Facebook as: Your Page. This is to select your Fan Page. In this module, we select Kaki Cuti Page.
Here is the Page with Photo and Likes tabs only.
Type Forum for Pages at Search Box and click on it. Make sure you select App.
Click Continue as Kaki Cuti (Continue as Personal Name or Personal Account).
Click on the drop down arrow and choose your page by clicking on it.
It is installed. Click on New topic to start.
Type your content into the box. Click on Post as my page OR Post as me when finish. Don’t worry, you can edit later.
It’s almost done. You can edit at any time or add the content or reply.
Go to Page Wall by clicking at Kaki Cuti Page button.
Now we have three (3) apps or tabs.
This document provides an overview of a presentation on fraud awareness. It discusses common consumer fraud schemes such as telemarketing fraud and identity theft. It also covers occupational fraud, including asset misappropriation, corruption, and fraudulent statements. Examples of fraud in businesses, non-profits, and government are given. The document promotes teaching college students about fraud examination and establishing an ACFE student chapter to conduct anti-fraud education. Contact information is provided for the presenters.
The document describes a new 15,273 square foot commercial medical building under construction in Phenix City, Alabama. It will house a pediatric office, chiropractic office, and future lease space. The pre-engineered metal structure is expected to be completed in October 2010 at a construction cost of $2,382,243 under a guaranteed maximum design-build contract with CAM Builders.
This floor plan shows a two-level home with a living room, kitchen, breakfast area, dining room, master bedroom, library, laundry room, and three-car garage on the main level. The lower level includes an entry, deck, and additional living space. The front elevation depicts Hardiplank siding, brick soldier courses, stone veneer accents, and circle windows surrounded by rowlock brick on the main level with a brick sill and soldier course below the windows.
The Columbus Housing Initiative involves a 10 unit redevelopment project on 8th Street called the East Wynnton Park Project. The initiative will redevelop 10 units on 8th Street in an area called East Wynnton Park.
The document is a site plan for a 4,945 square foot urgent care facility located at 6400 Flat Rock Road in Columbus, Georgia. It includes contact information for the owner, Dr. Carl Foster, and the contractor, Humphreys Associates. The project description notes it will be a steel framed building with concrete masonry veneer and metal roofing. The scheduled start date is August 8, 2008 with substantial completion by March 7, 2009 and final completion by May 4, 2009. The construction contract type is cost of work plus a fee with a guaranteed maximum and the final construction cost is $918,349.
The document describes plans for a new marina building and site work at Lake Oliver in Columbus, Georgia. The 3,824 square foot marina building will include a bait shop, office, restrooms, snack bar, meeting room, and observation deck. The site work will include installing a new seawall, docks, fuel storage, dredging the lake bed, repaving parking areas, and new landscaping. Wilkerson Construction Co. will serve as the contractor with a projected substantial completion date of May 20, 2009 and final completion by August 10, 2009. The total projected cost is $1,125,829.
This document provides details about a road service call center project in Columbus, Georgia. The contractor is Humphreys Associates and the project includes constructing a 25,053 square foot call center building with steel framing. The construction contract cost $3,199,331 and the project was scheduled to start in November 2005 with substantial completion by September 2006 and final completion by October 2006. Contact information is provided for both the local economic development office and the contractor.
This document provides details on the construction of a 19,800 square foot office, call, and service center for Knology in Columbus, Georgia. It will feature a steel tube frame structure with a metal roof, EIFS and brick architectural features, and metal panels installed horizontally. The building materials include scored concrete block, two types of brick veneer, glass block windows, and aluminum storefront windows with insulated glass. The scheduled completion date was May 4, 2004 and the final construction cost was $2,178,000.
Dominion Children's Academy is located on Cusseta Road in Columbus, Georgia. The document includes a site plan map with labels for various buildings and areas on the property including a garden, patio, fitness center, parking areas, and buildings marked as Phase 1 and Phase 2 construction. The site plan provides distances and directions between areas of the property located on Cusseta Road.
The document describes a new 15,273 square foot commercial medical building under construction in Phenix City, Alabama. It will house a pediatric office, chiropractic office, and future lease space. The pre-engineered metal structure is expected to be completed in October 2010 at a construction cost of $2,382,243 under a guaranteed maximum design-build contract with CAM Builders.
This floor plan shows a two-level home with a living room, kitchen, breakfast area, dining room, master bedroom, library, laundry room, and three-car garage on the main level. The lower level includes an entry, deck, and additional living space. The front elevation depicts Hardiplank siding, brick soldier courses, stone veneer accents, and circle windows surrounded by rowlock brick on the main level with a brick sill and soldier course below the windows.
The Columbus Housing Initiative involves a 10 unit redevelopment project on 8th Street called the East Wynnton Park Project. The initiative will redevelop 10 units on 8th Street in an area called East Wynnton Park.
The document is a site plan for a 4,945 square foot urgent care facility located at 6400 Flat Rock Road in Columbus, Georgia. It includes contact information for the owner, Dr. Carl Foster, and the contractor, Humphreys Associates. The project description notes it will be a steel framed building with concrete masonry veneer and metal roofing. The scheduled start date is August 8, 2008 with substantial completion by March 7, 2009 and final completion by May 4, 2009. The construction contract type is cost of work plus a fee with a guaranteed maximum and the final construction cost is $918,349.
The document describes plans for a new marina building and site work at Lake Oliver in Columbus, Georgia. The 3,824 square foot marina building will include a bait shop, office, restrooms, snack bar, meeting room, and observation deck. The site work will include installing a new seawall, docks, fuel storage, dredging the lake bed, repaving parking areas, and new landscaping. Wilkerson Construction Co. will serve as the contractor with a projected substantial completion date of May 20, 2009 and final completion by August 10, 2009. The total projected cost is $1,125,829.
This document provides details about a road service call center project in Columbus, Georgia. The contractor is Humphreys Associates and the project includes constructing a 25,053 square foot call center building with steel framing. The construction contract cost $3,199,331 and the project was scheduled to start in November 2005 with substantial completion by September 2006 and final completion by October 2006. Contact information is provided for both the local economic development office and the contractor.
This document provides details on the construction of a 19,800 square foot office, call, and service center for Knology in Columbus, Georgia. It will feature a steel tube frame structure with a metal roof, EIFS and brick architectural features, and metal panels installed horizontally. The building materials include scored concrete block, two types of brick veneer, glass block windows, and aluminum storefront windows with insulated glass. The scheduled completion date was May 4, 2004 and the final construction cost was $2,178,000.
Dominion Children's Academy is located on Cusseta Road in Columbus, Georgia. The document includes a site plan map with labels for various buildings and areas on the property including a garden, patio, fitness center, parking areas, and buildings marked as Phase 1 and Phase 2 construction. The site plan provides distances and directions between areas of the property located on Cusseta Road.