Klondike Silver will be attending the Swiss Mining Institute Conference in Geneva & Zurich, Switzerland, November 23 & 24.
Klondike Silver attended the Minerals South 2017 event in Cranbrook, B.C, November 7 & 8.
Klondike Silver Corp. is led by a team with a proven track record of discovery and development in Canada. Most notably, the Belmoral Mine in Quebec and the Hemlo Mine in Ontario are considered to be their biggest finds.
2. Forward Looking Information
Statements contained in this presentation that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-
Looking Information") within the meaning of applicable Canadian securities legislation. Forward Looking Information includes, but is not limited to, disclosure
regarding possible events, conditions or financial performance that is based on assumptions about future economic conditions and courses of action; the timing and
costs of future activities on the Company's properties; location and timing of potential future exploration activities; success of exploration, development and
environmental protection and remediation activities; permitting time lines and requirements; requirements for additional capital; availability of skilled workforce and
local service providers; staking and acquisition of additional mineral properties and claims; requirements for potential environmental conditions relating to mineral
claims; planned environmental studies; planned exploration and development of properties and the results thereof; planned expenditures and budgets and the execution
thereof. In certain cases, Forward-Looking Information can be identified by the use of words and phrases such as "plans", "expects" or "does not expect", "is
expected“, "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "potential", "confirm" or "does not anticipate", "believes", "contemplates”,
"recommends" or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur"
or "be achieved". In preparing the Forward-Looking Information in this presentation, the Company has applied several material assumptions, including, but not limited
to, that any additional financing needed will be available on reasonable terms; the exchange rates for the U.S. and Canadian currencies in the future will be consistent
with the Company's expectations; that the current exploration, development, environmental and other objectives concerning the Company's properties can be achieved
and that its other corporate activities will proceed as expected; that the current price and demand for metals will be sustained or will improve; that general business and
economic conditions will not change in a materially adverse manner and that all necessary governmental approvals for the planned exploration, development and
environmental protection activities on the Company's properties will be obtained in a timely manner and on acceptable terms; the continuity of the price of silver and
other metals, economic and political conditions and operations. Forward- Looking Information involves known and unknown risks, uncertainties and other factors
which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements
expressed or implied by the Forward-Looking Information. Such risks and other factors include, among others, the industry-wide risks and project-specific risks
identified in the Company's management discussion and analysis available at www.sedar.com and summarized above; risks related to the availability of financing on
commercially reasonable terms and the expected use of proceeds; operations and contractual obligations; changes in exploration programs based upon results of
exploration; future prices of metals; availability of third party contractors; availability of equipment; failure of equipment to operate as anticipated; accidents, effects of
weather and other natural phenomena and other risks associated with the mineral exploration industry; environmental risks, including environmental matters under
Canadian federal and British Columbia rules and regulations; impact of environmental remediation requirements; certainty of mineral title; community relations;
relations and negotiations with local First Nations in respect of the Company's current and planned activities; delays in obtaining governmental approvals or financing;
fluctuations in mineral prices; the Company's dependence on one mineral project; the nature of mineral exploration and mining and the uncertain commercial viability
of certain mineral deposits; the Company's lack of operating revenues; governmental regulations and the ability to obtain necessary licenses and permits; risks related
to mineral properties being subject to prior unregistered agreements, transfers or claims and other defects in title; currency fluctuations; changes in environmental laws
and regulations and changes in the application of standards pursuant to existing laws and regulations which may increase costs of doing business and restrict
operations; risks related to dependence on key personnel; and estimates used in financial statements proving to be incorrect; as well as those factors discussed in the
Company's public disclosure record. Although the Company has attempted to identify important factors that could affect the Company and may cause actual actions,
events or results to differ materially from those described in Forward-Looking Information, there may be other factors that cause actions, events or results not to be as
anticipated, estimated or intended. There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could
differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward-Looking Information. Except as required
by law, the Company does not assume any obligation to release publicly any revisions to Forward-Looking Information contained in this presentation to reflect events
or circumstances after the date hereof or to reflect the occurrence of unanticipated events.
2
KLONDIKE SILVER CORP. - KS : TSX-V
3. Cautionary Note
Cautionary Note:
This presentation does not constitute an offer, advertisement or solicitation for the purchase of securities. Further, this presentation
has been prepared by Klondike Silver Corp. management and does not represent a recommendation to buy or sell securities.
Investors should always consult their investment advisors prior to making any investment decisions.
National Instrument 43-101 Information
The technical information in this presentation (the "Technical information") has been approved by David Makepeace P.Eng., a
Qualified Person under National Instrument 43-101 ("NI 43-101"). Certain Technical Information in this presentation is based on
technical information which has previously been disclosed by Klondike Silver in news releases available in its public disclosure record
at www.sedar.com. Klondike Silver is permitted under NI 43-101 to satisfy disclosure requirements set forth under 43-101 in respect
of this presentation by providing references to previously disclosed news release that contain the requisite disclosure. In order to fully
understand this presentation, readers should refer to Klondike Silver’s full public disclosure record at www.sedar.com.
In addition, investors are cautioned that this presentation contains information about historic mineral properties, mineral properties
adjacent to or near the Company‘s properties, or properties which the Company believes may be similar to the Company's properties.
The Company has no right or interest in such properties. Mineral deposits on such historic, adjacent, near or similar properties are
not indicative of the mineral deposits, if any, which may be found on the Company's properties.
3
KLONDIKE SILVER CORP. - KS : TSX-V
Silvana Ore - 36.75 oz Ag/ton (1,260 g Ag/mt), 61.46 % combined Pb & Zn
4. 4
The project is in Canada,
a low-risk jurisdiction.
Vancouver
KLONDIKE SILVER CORP. - KS : TSX-V
1700 km
Toronto
Canada
United States
New York
City
5. 5
The project is in the West Kootenay region
of southeastern British Columbia.
British Columbia
KLONDIKE SILVER CORP. - KS : TSX-V
Alberta
100 km
Calgary
6. 6
The project is located approximately 140 km northeast of TECK’s
Lead-Zinc Smelter in Trail, B.C., and enjoys year round access.
British Columbia
KLONDIKE SILVER CORP. - KS : TSX-V
Alberta
40 km
7. 7
Klondike Silver Corp.’s Mill and Mine Complex is in
the Centre of the Slocan Mining Camp
British Columbia
KLONDIKE SILVER CORP. - KS : TSX-V
Alberta
6 km
8. History:
• Silver-rich lead/zinc deposits discovered in 1891.
• 173 past-producing mines located in the Slocan Silver Camp.*
• Klondike Silver has control of 68 past-producing mines within the Camp*:
Processed - 2.2 M tons (t) / 2.0 M tonnes (T)*
Silver - 40.5 M troy oz / 1.2 M kg *
Lead - 350 M lb / 159 M kg *
Zinc - 160 M lb / 72 M kg *
Geology:
• A series of silver-rich lead/zinc veins in Triassic age Argillitic – Quartzite rocks.
• The Main Lode is the largest and most prolific vein (9 km). Klondike Silver’s land
package includes 7 km of the Main Lode structure and, of that, 1.5 km is virtually
unexplored.
• One of the few remaining under-explored mining camps, of its kind, in Canada.
* Source: BC MINFILE 8* Source: BC MINFILE
The Klondike Silver Land Package Framework
KLONDIKE SILVER CORP. - KS : TSX-V
9. • Klondike Silver amalgamated many of the fragmented mineral claims and crown
grants located in the Slocan Mining Camp into a package - over one hundred
square kilometres (100% royalty free ownership).
• Klondike Silver’s land package contains over 58% of the historical silver
producing mines in the Slocan Silver Camp. Klondike Silver’s land package
produced 40.5 million troy ounces of silver.*
• The Silvana Mine was the largest silver-lead-zinc producer of the 68 historical
producers in the Klondike Silver land package:
Processed - 563,000 tons (t) / 511,000 tonnes (T)*
Silver - 7.8 M troy oz / 243 M grams *
Lead - 63 M pounds / 29 M kilograms *
Zinc - 58 M pounds / 26 M kilograms *
Grade - 13.87 troy oz/t / 476 g Ag/T; 5.62 % Pb; 5.15 % Zn*
9* Source: BC MINFILE
* Source: BC MINFILE
KLONDIKE SILVER CORP. - KS : TSX-V
The Klondike Silver Land Package Framework (Con’t)
12. 2017 WORK PROGRAM
• Rehabilitate of the Silvana 4625 portal (Completed).
• Rehabilitation of the Silvana 4625 level for ground support (Golder Associates)
(On-going).
• Rehabilitation of the access road to the Silvana 4000 and 4625 portals
(Completed).
• LIDAR Survey over the entire property (240 km2). One metre accuracy contours
in UTM NAD83 coordinates (Completed).
• GPS survey pick-up of all portals on the Main Lode in UTM NAD83 coordinates
(Carnation [east], Silvana, Mascot, Hope, Ruth, Silversmith) (Completed).
• Create a 3D model of the data along the Main Lode within Klondike Silver
Corp.’s claims. The data is now in one imperial mine grid format. (Completed).
12
KLONDIKE SILVER CORP. - KS : TSX-V
13. 2017 WORK PROGRAM(Con’t)
• Convert the 3D model and drill hole database from Imperial to Metric and
converting into UTM NAD83 coordinates (On-going).
• Interpret the Main Lode structure west of the Silvana Mine and east of the
Carnation 5480 Mine (On-going).
• Plan and budget for development drifting and diamond drilling in the Silvana
Mine west end (4625 West Lateral) to intercept the interpreted Main Lode (On-
going).
•Rip-rap the west side of Carpenter Creek for 1.3 km to control stream erosion
beside the mill and tailings ponds Completed).
•Mine office and dry have power (BC Hydro), direct phone and internet
(Completed).
•Dam Safety Review and Dam Safety Inspection (Golder Associates) (2018, Q1).
•TMF deficiencies identified by MEM and Golder Associates restored (Completed).
13
KLONDIKE SILVER CORP. - KS : TSX-V
16. 16
KLONDIKE SILVER CORP. - KS : TSX-V
Raw Data (Contours : 1 m)
Plan View
Silvana 4625
Waste Rock Dump
Silvana 4625
Portal
Carnation 5480
Portal
2017 LIDAR SURVEY
Lidar Mosaic : ai10.dwg + ai11.dwg
17. 17
KLONDIKE SILVER CORP. - KS : TSX-V
Silvana 4625
Waste Rock Dump
Silvana 4625
Portal
Carnation 5480
Portal
Digital Terrain Model (Contours : 1 m)
Plan View
2017 LIDAR SURVEY
Surpac Mosaic : ai10.dtm + ai11.dtm
18. 18
KLONDIKE SILVER CORP. - KS : TSX-V
Silvana 4625
Waste Rock Dump
Silvana 4625
Portal
Carnation 5480
Portal
Digital Terrain Model (Contours : 1 m)
Oblique View, Looking Southwest
2017 LIDAR SURVEY
Surpac Mosaic : ai10.dtm + ai11.dtm
19. 19
KLONDIKE SILVER CORP. - KS : TSX-V
Digital Terrain Model (Contours : 30.5 m)
Oblique View, Looking Southwest
Silvana 4625
Portal
Carnation 5480
Portal
OLD TOPOGRAPHICAL SURVEY
Surpac : topography_carnation1.dtm + topography_silvana1.dtm
20. 20
KLONDIKE SILVER CORP. - KS : TSX-V
Klondike Silver Main Lode Workings
2017 - 3D Model - In Progress (model in feet)
Plan View
CARNATION SILVANA SILVERSMITH
RUTH
HOPE
4625 ADIT
4000 LEVEL
(RUTH 5)
ADIT
STEWART
MASCOT
CARNATION
5480 ADIT
CARNATION
6500 LEVEL
SILVERSMITH
10 ADIT
21. 21
KLONDIKE SILVER CORP. - KS : TSX-V
Klondike Silver Main Lode Workings and Mined Stopes
CARNATION
SILVERSMITH
RUTH
HOPE
4625 ADIT
STEWART
SLOCAN
STAR
NEW RUTH
(LONE STAR)
MASCOT
SILVANA
RABBITS PAW
4000 LEVEL
(RUTH 5)
ADIT
CARNATION
5480 ADIT
CARNATION
6500 LEVEL
2017 - 3D Model - In Progress (model in feet)
Plan View
22. 22
KLONDIKE SILVER CORP. - KS : TSX-V
Klondike Silver Main Lode Workings and Major Faults
CARNATION SILVANA SILVERSMITH
RUTH
HOPE
4625 ADIT
West Hope
Fault
Ruth
Fault
Silversmith
Fault
Lone Star
Fault
Stewart
Fault
MASCOT
4000 LEVEL
(RUTH 5)
ADIT
CARNATION
5480 ADIT
CARNATION
6500 LEVEL
2017 - 3D Model - In Progress (model in feet)
Plan View
23. 23
KLONDIKE SILVER CORP. - KS : TSX-V
Klondike Silver Main Lode Workings and Soil Geochemical Surveys
CARNATION SILVANA SILVERSMITH
RUTH
HOPE
4625 ADIT
MASCOT
CARNATION
5480 ADIT
CARNATION
6500 LEVEL
4000 LEVEL
(RUTH 5)
ADIT
SILVERSMITH
10 ADIT
2017 - 3D Model - In Progress (model in feet)
Plan View
24. 24
KLONDIKE SILVER CORP. - KS : TSX-V
Klondike Silver Main Lode Eastern Workings
2017 - 3D Model - In Progress (model in feet)
Oblique View, Looking Northeast
SILVANA
WORKINGS
SILVERSMITH
RUTH
HOPE
RABBITS PAW
NEW RUTH
(LONE STAR)
SLOCAN
STAR
STEWART
4000 LEVEL
(RUTH 5)
ADIT
4625 EAST
LATERAL
SILVERSMITH
10 ADIT
SILVERSMITH
5 ADIT
25. 25
KLONDIKE SILVER CORP. - KS : TSX-V
Klondike Silver Main Lode Western Workings and Drilling
2017 - 3D Model - In Progress (model in feet)
Oblique View, Looking North
SILVANA
WORKINGS
HOPEMASCOT
4625 ADIT
4625 WEST LATERAL
4690 WEST LATERAL
CARNATION 5480
HW WEST LATERAL
UNEXPLORED
MAIN LODE
4000 LEVEL
(RUTH 5)
ADIT
27. 2018 - The YEAR To DISCOVERY
The Klondike Silver’s land package represents:
For the first time in history - prime hunting ground
for:
• Extensions of known silver/lead/zinc deposits
(historically claim locked),
• Discovery of new silver/lead/zinc deposits.
Regional and underground exploration programs will be directed
by seasoned geologists that have decades of experience in this
mining camp.
27
KLONDIKE SILVER CORP. - KS : TSX-V
Klondike Silver Anticipates New Discoveries!
28. The 2018 PROGRAM
Proposed underground drifting and diamond drilling from the extensions of the
Silvana and Carnation workings (approximately 500 m, initially in Q1).
Continue to compile and combine historical data into the 3D model.
Continue to upgrade the mine and mill infrastructure in preparation of
commencement of operations, possibly as soon as 2018.
28
KLONDIKE SILVER CORP. - KS : TSX-V
29. 29
KLONDIKE SILVER CORP. - KS : TSX-V
Digital Terrain Model
Plan View
PROPOSED
2018 DRILLING
Surpac Composite Mosaic : 05deviation.dtm
2018 Development/Drill Program
30. KLONDIKE SILVER CORP. - KS : TSX-V
Digital Terrain Model
Oblique View,
Looking Northwest
Surpac Composite Mosaic : 05deviation.dtm 30
PROPOSED
2018 DRILLING
2018 Development/Drill Program
31. 31
KLONDIKE SILVER CORP. - KS : TSX-V
Plan View
(100-foot Grid)
4625 WEST LATERAL
4690 WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
X-Cut
2018 – Proposed Initial Development
32. 32
KLONDIKE SILVER CORP. - KS : TSX-V
Plan View
(100-foot Grid)
4625 WEST LATERAL
4690 WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
X-Cut
2018 – Proposed Initial Development
Initial Drift Development
250 feet
33. 33
KLONDIKE SILVER CORP. - KS : TSX-V
Plan View
(100-foot Grid)
4625 WEST LATERAL
4690 WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
X-Cut
2018 – Proposed Initial Development
Initial Drift Development
250 feet
Initial Drilling
34. 34
KLONDIKE SILVER CORP. - KS : TSX-V
Plan View
(100-foot Grid)
4625 WEST LATERAL
4690 WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
X-Cut
2018 – Proposed Initial Development
Second Drift Development
250 feet
35. 35
KLONDIKE SILVER CORP. - KS : TSX-V
Plan View
(100-foot Grid)
4625 WEST LATERAL
4690 WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
HW WEST LATERAL
CARNATION 5480
X-Cut
2018 – Proposed Initial Development
Second Drift Development
250 feet
Second Phase Drilling
36. 36
THE SLOCAN MINING CAMP
HAS NUMEROUS
UNDER-EXPLORED AND POTENTIALLY NEW
SILVER-LEAD-ZINC DEPOSITS
Silver price up 1% in 2017
October 31, 2017 CDN$ 21.64 (US$ 16.78)
Lead price up 19% in 2017
October 31, 2017 CDN$ 1.40 (US$ 1.09)
Zinc price up 30% in 2017
October 31, 2017 CDN$ 1.94 (US$ 1.51)
KLONDIKE SILVER CORP. - KS : TSX-V
37. • Head Office: 804 - 750 West Pender Street
Vancouver, British Columbia
Canada V6C 2T7
• Telephone: 604.682.2928
• Website: www.klondikesilver.com
• Email dale.dobson@klondikesilver.com
KS: TSX-V Share Structure:
Issued: 111,975,893
Warrants: 82,236,786
Options: 5,225,000
Investor Relations: Paradox Public Relations
37
KLONDIKE SILVER CORP. - KS : TSX-V