Data Center Planning & Development
A SIMPLE DEVELOPMENT MODEL ,[object Object]
Developing a Parking Garage ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Developing a Data Center ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Standard or Near Standard ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The First Building Block - A Standard Footprint ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Standard Rack (sits in footprint)
Aisles & Layout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The Second Level Building Block – 1,250sf
The Key to cost effectiveness is Matched Components ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Three Blocks – 3,750sf
Twelve Block 15,000sf Data Center Plan
Section thru Data Center Roof Deck & Structure Suspended Ceiling Chilled Water Lines Utility Corridor Cable Tray
Vans, Trucks and Electric Cars (Handling Exceptions) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Follow Standard A&E Programming ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Right Sizing the Project ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
DEVELOPMENT EXAMPLE
Development Example ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Bring it Home – Design & Construct! ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Step 1 – Estimate Funding Requirements
Step 2 – Determine Minimum Site Acreage
Step 3A – Create Design Concept
Step 3B – Validate Construction Costs
Step 4 – Validate Development Costs
Step 5 – Calculate Minimum Lease Rate
Step 5 – Estimate Base Year Operating Expenses
Step 6 – Survey & Validate Initial Lease Rate Assumptions
Step 7 – Define Expected Lease Rate
Step 8 –  Calculate  Cash Flows
Step 9 – Calculate Return
Do it!
 
 
 
 
 

More Related Content

Similar to KJBi Development Example

MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1blewington
 
Genesys System - 8dec2010
Genesys System - 8dec2010Genesys System - 8dec2010
Genesys System - 8dec2010Agora Group
 
Connectix Commercial Overview Dc Session 8 Using The Fear Model To Design...
Connectix Commercial Overview   Dc Session 8   Using The Fear Model To Design...Connectix Commercial Overview   Dc Session 8   Using The Fear Model To Design...
Connectix Commercial Overview Dc Session 8 Using The Fear Model To Design...paul_mathews
 
Data center design standards for cabinet and floor loading
Data center design standards for cabinet and floor loadingData center design standards for cabinet and floor loading
Data center design standards for cabinet and floor loadingkotatsu
 
Virtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridVirtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridDCC Mission Critical
 
Pmdc Smdc Technical Overview 24 Mar2010
Pmdc Smdc Technical Overview 24 Mar2010Pmdc Smdc Technical Overview 24 Mar2010
Pmdc Smdc Technical Overview 24 Mar2010Tony Bentivegna
 
Cirrascale forest container march 2011
Cirrascale forest container march 2011Cirrascale forest container march 2011
Cirrascale forest container march 2011Muchamad Jainuri
 
Competitive Assessment Updated
Competitive Assessment UpdatedCompetitive Assessment Updated
Competitive Assessment UpdatedRtopping
 
IPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptxIPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptxShaownRahmanSaidur
 
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...IBMAsean
 
Critical design elements for high power density data centers
Critical design elements for high power density data centersCritical design elements for high power density data centers
Critical design elements for high power density data centersInternap
 
Commercial Overview SCS Session 1 Server Rack Strategies
Commercial Overview   SCS Session 1   Server Rack StrategiesCommercial Overview   SCS Session 1   Server Rack Strategies
Commercial Overview SCS Session 1 Server Rack Strategiespaul_mathews
 
Orissa wicomm-product presentation
Orissa wicomm-product presentationOrissa wicomm-product presentation
Orissa wicomm-product presentationGo-NPS
 
27546 pod overview including 240a
27546 pod overview including 240a27546 pod overview including 240a
27546 pod overview including 240agmazuel
 
OCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfOCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfbui thequan
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxSchneider Electric
 
The Effect of new Technologies like Hyperconvergence on the Data Centre
The Effect of new Technologies like Hyperconvergence on the Data CentreThe Effect of new Technologies like Hyperconvergence on the Data Centre
The Effect of new Technologies like Hyperconvergence on the Data CentreBram De Wilde
 

Similar to KJBi Development Example (20)

Ever Green Dc
Ever Green DcEver Green Dc
Ever Green Dc
 
MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1MIG 5th Data Centre Summit 2016 PTS Presentation v1
MIG 5th Data Centre Summit 2016 PTS Presentation v1
 
Genesys System - 8dec2010
Genesys System - 8dec2010Genesys System - 8dec2010
Genesys System - 8dec2010
 
Connectix Commercial Overview Dc Session 8 Using The Fear Model To Design...
Connectix Commercial Overview   Dc Session 8   Using The Fear Model To Design...Connectix Commercial Overview   Dc Session 8   Using The Fear Model To Design...
Connectix Commercial Overview Dc Session 8 Using The Fear Model To Design...
 
Data center design standards for cabinet and floor loading
Data center design standards for cabinet and floor loadingData center design standards for cabinet and floor loading
Data center design standards for cabinet and floor loading
 
Virtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green gridVirtualization for efficiency: by Kathrin Winkler, The green grid
Virtualization for efficiency: by Kathrin Winkler, The green grid
 
Pmdc Smdc Technical Overview 24 Mar2010
Pmdc Smdc Technical Overview 24 Mar2010Pmdc Smdc Technical Overview 24 Mar2010
Pmdc Smdc Technical Overview 24 Mar2010
 
Cirrascale forest container march 2011
Cirrascale forest container march 2011Cirrascale forest container march 2011
Cirrascale forest container march 2011
 
Competitive Assessment Updated
Competitive Assessment UpdatedCompetitive Assessment Updated
Competitive Assessment Updated
 
IPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptxIPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptx
 
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
Green & Beyond: Data Center Actions to Increase Business Responsiveness and R...
 
Critical design elements for high power density data centers
Critical design elements for high power density data centersCritical design elements for high power density data centers
Critical design elements for high power density data centers
 
Commercial Overview SCS Session 1 Server Rack Strategies
Commercial Overview   SCS Session 1   Server Rack StrategiesCommercial Overview   SCS Session 1   Server Rack Strategies
Commercial Overview SCS Session 1 Server Rack Strategies
 
Orissa wicomm-product presentation
Orissa wicomm-product presentationOrissa wicomm-product presentation
Orissa wicomm-product presentation
 
In Building Solution
In Building SolutionIn Building Solution
In Building Solution
 
27546 pod overview including 240a
27546 pod overview including 240a27546 pod overview including 240a
27546 pod overview including 240a
 
OCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfOCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdf
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
Emerson Energy Logic
Emerson Energy LogicEmerson Energy Logic
Emerson Energy Logic
 
The Effect of new Technologies like Hyperconvergence on the Data Centre
The Effect of new Technologies like Hyperconvergence on the Data CentreThe Effect of new Technologies like Hyperconvergence on the Data Centre
The Effect of new Technologies like Hyperconvergence on the Data Centre
 

KJBi Development Example

Editor's Notes

  1. So with all of this in mind here is our proposed “footprint” or building block. Here is how we build using this building block:
  2. And here is server cabinet configuration that is commonly used by a number of companies. Things to notice (USE Highlighter) All Power becomes Heat – Direct Relationship All Heat requires air flow – Another Direct Relationship. So by defining my standard cabinet power I have also defined my standard cabinet cooling requirements. I need to digress a second here (NEXT)
  3. A few Basic Concepts and Definitions. Footprint is a “Planning Unit” – just a different unit form then square feet. Parking spaces are for the most part – ONE Dimensional. Footprints are THREE DIMENSIONAL – Space – Power – Cooling Probably the most common or typical cabinet is a server cabinet (NEXT)
  4. There is no magic in these numbers but there is some beauty in them (At least to an engineer): 20A & 30A breakers are the same frame size (cost) 20A & 30A circuits use the conduit size A 30A x 208V circuit carries over two times as much power (4,992VA) as a 20A x 120V circuit (1,920 VA) 30A, 208/1Phase In Rack PDUs are available from several manufacturers 50 cabinets at 4000w each = 200kW @ 90% loading we need a 225kVA PDU 225 to 250 kVA largest practical PDU size on Data Center Floor One Row of 25 Cabinets requires 25 – 2 Pole Circuits or 50 circuit breaker positions (poles) plus 50% spare (75 Poles). This design provides provided two panels per row @ 42 poles each (84 Poles). 200kVA Loading = 57 Tons CRAHUs typical are available at 5 to 30 Tons. Two CRAHUs provide 60 Tons. CRAHUs typical can push air about 40’ (can become problematic beyond this range) Row length 12 to 13 cabinets are not excessively long and easy to work around. SEE HOW THIS COMES TOGETHER SO WELL Now I can assemble this larger buildng block unit to build my data center.
  5. One thing that we haven’t yet accounted for is the ramps – so we need to add them. And One of the WPS requirements was to get the CRAHUs and water piping out of the space, so we need to add the utility corridors along two sides of the data center. This brings us up to just over 18,000 sf (18,400 sf). This equates to 600 cabinets or about 30sf/cabinet (which is pretty dense). Each bay was abut 1,250sf. To get back to 15000sf we need to drop one bay or 50 cabinets. So at 15,000sf we would support about 550 cabinets. We might loose a few to columns etc. Note that: Chilled Water lines are outside of rack space. AHUs out of rack space. This design is not consistent with whatt Vince discussed yesterday but it is very easily adaptable. Other thinks that you should notice: No Work Stations in Data Center No Tape Storage No Small Parts Storage No Staging Area We will need to build in adjacent areas (Part of space program)
  6. This is a section thru the data center. Its not to an exact scale but is close enough for this discussion: NEXT SLIDE – Data Cabling