Navy: Hangar One Detailed Cost Estimate

1,873 views

Published on

Navy presentation to the Moffett Field Restoration Advisory Board, September 11, 2008: Hangar One Engineering Evaluation/Cost Analysis Detailed Cost Estimate

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,873
On SlideShare
0
From Embeds
0
Number of Embeds
66
Actions
Shares
0
Downloads
24
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Navy: Hangar One Detailed Cost Estimate

  1. 1. NAS Moffett Field – Hangar 1 Hangar 1 Engineering Evaluation/Cost Analysis Detailed Cost Estimate
  2. 2. NAS Moffett Field – Hangar 1
  3. 3. NAS Moffett Field – Hangar 1 AGENDA • Overview • Cost Estimating Approach • Subcontractor and Vendor Cost Data • Developing Total Project Cost • Developing Costs for the EE/CA Alternatives Alternative 4 – Cost Overview

×