Bespokeandlarge-scaleprojects Jupiter Pl
ay
HudsonWay https://youtu.be/uvtvRzBnsT0
We have the experience and resource
to offer full cycle support on bespoke
and large-scale projects; from talking
through design concepts, working up
3D presentations, co-ordinating logistics
through to site installation and after-sales,
we are here to help every step of the
way.
“why not get in touch and
tell us about your project
requirements?”
Bespokeandlarge-scaleprojects
info@jupiterplay.co.uk www.jupiterplay.co.uk
We offer a design led, flexible and unique
approach to all of our projects. There are
a large number of considerations that we
think about when designing play spaces –
this is what makes our design presentation
package highly talked about and
respected in the industry.
Our award winning Play Space Designers
are experienced in considering the
impact of each site on the surrounding
physical landscape and the community.
We can visualise the opportunity in sites
that might otherwise be over looked
in their potential to become inspiring.
This can come from existing landscape
features such as trees, adding features
such as mounding and in selecting
equipment options which best maximise
the use of the space.
InitialConcepts
Southern Office: 0115 969 9859 Head Office: 0131 445 7989
https://youtu.be/uvtvRzBnsT0
During the concept and design phase
Jupiter Play produce high quality 3D
drawings, animations and CADs to help
you visualise the proposed unit.
These can be used within your wider
proposal and for public consultation if
required.
Layoutsand3DDesign
info@jupiterplay.co.uk www.jupiterplay.co.uk
The majority of our bespoke projects
are in partnership with FHS Holtztechnik.
Jupiter Play is the sole supplier for
German Manufacturer FHS’s range of
stunning bespoke equipment within
the UK. As an expert in play, they are
without question the best supplier we
could possibly work with: their approach
to the manufacturing and delivery of
their products is exceptionally flawless.
Over the past few years, our Product
Manager has developed a fantastic
relationship with them, working very
closely with their designers and
craftsmen to ensure that designs
agreed with our customers are brought
to life in beautiful hand-crafted Robinia.
There is a vast range of “standard”
products already available within their
range but we appreciate that many
play spaces require something more
bespoke, tailored specifically to a site
or brief, often taking into consideration
results from community consultations.
Our love for FHS is in the unique
manufacturing processes that they
have developed to achieve the most
robust, durable and aesthetically
organic timber available in the market
place today and in partnership with
them, we are able to deliver any
bespoke request.
Manufacturing
We use production drawings for
our presentations which means
our visuals are very accurate.
Southern Office: 0115 969 9859 Head Office: 0131 445 7989
https://youtu.be/uvtvRzBnsT0
Our business support team have very
strong relationships with our hauliers
and are experienced in dealing with
international shipping. Our FHS products
are shipped from Germany and can be
organised to go to a depot or straight
to site. We can advise you with regards
to access and off-loading required and
will work directly with our customers and
contractors to ensure deadlines are met
for deliveries.
It took three full trailers to ship over the
equipment for the Hudson Way project –
our Business Support Co-ordinator worked
very closely with the hauliers, Product
Manager and the contractors to ensure
this was carefully co-ordinated and
delivered in sequence to have the right
sections available as they were installing
on site.
Before delivery, the site flooded and it was
arranged for the equipment to be held at
the port in Holland so they could be on the
first lorry over as soon as the site was ready.
Logistics
info@jupiterplay.co.uk www.jupiterplay.co.uk
We can offer support for both supply
only projects as well as full installation
capacity.
We only use subcontractors for the
specialised services of installation of
equipment and surfacing.
Our national network of subcontractors
have worked with us for many years
and it is a condition of their commercial
agreements with Jupiter Play that they
have the same commitment to quality
and customer service when they execute
their high quality installations.
We liaise with our preferred subcontractor
ahead of each project to ensure we
secure installation schedules which
are then guaranteed by our contracts
team to ensure Jupiter deliver an end to
end service to our customers within the
agreed timeframe.
Our dedicated Operations Manager
ensures all Health and Safety checks
on site are completed and our
contractors fully comply with Health &
Safety legislation; all are CHAS and/
or Constructionline Certified and are
Disclosure and Barring Service (DBS)
checked.
Installation
Southern Office: 0115 969 9859 Head Office: 0131 445 7989
https://youtu.be/uvtvRzBnsT0
Jupiter Play delivers quality through all
services and products and this does not
stop once a project has been delivered.
We want children to enjoy our play
spaces and do not want things to come
to a standstill because of faulty parts or
missing fixings.
We have a dedicated business support
team who ensure our customers receive
the highest post completion service as
well as support throughout the whole
project.
Postinstallationandaftersales
info@jupiterplay.co.uk www.jupiterplay.co.uk
Our business is operated through our CRM
system - Salesforce.com, where every
project is tracked from its initial conception
and managed at every stage. This allows
the whole team to control every stage
and ensure timescales are being adhered
to. With all information in one place this
allows the entire team to instantly access
information whilst out on site or from home
if required.
We carry out post installation inspections
with the sub-contractor in attendance
where all snagging of the installation is
documented and addressed on the same
day or within 48 hours of site completion.
Post Installation Inspections are carried out
by an independent RPII Certified inspector
and any issues are dealt with by our
Operations Manager who liaises with the
customer, our suppliers and contractors until
any issue is resolved to full satisfaction.
Postinstallationandaftersales
Southern Office: 0115 969 9859 Head Office: 0131 445 7989
https://youtu.be/uvtvRzBnsT0
Hudson Way was project completed
October 2015
Working with Swan Paul Architects,
Parsons Landscapes and Taunton Deane
Borough Council to deliver outstanding
play.
We work with you every
step of the way.
Allaboardforagreatopeningevent
info@jupiterplay.co.uk www.jupiterplay.co.uk
Allaboardforagreatopeningevent
Southern Office: 0115 969 9859 Head Office: 0131 445 7989
info@jupiterplay.co.uk www.jupiterplay.co.uk
Allaboardforagreatopeningevent
No two play areas are the same and
we are passionate about keeping it this
way! Every site that Jupiter Play designs
is unique and the bespoke capabilities
of FHS Holztechnik allow each design to
react to its surrounding environment in
the correct way.
FHS equipment fits well in protected
landscapes due to its unique
manufacturing process and made
to measure ability. All equipment is
hand crafted and made to order,
conforming to relevant safety standards
and aesthetic requirements whether
a modification on one of the standard
items or a completely new design.
Aesthetic colours and components
can be added or deducted to suit
both budget and site requirements. The
opportunity to create a bespoke piece
of play equipment really is endless!
Bespokemeansbespoke
Southern Office: 0115 969 9859 Head Office: 0131 445 7989
Lion Salt Works - Cheshire
Roseangle Park - Dundee
Dock Park - Dumfries
Highbury Fields - London https://youtu.be/uvtvRzBnsT0
info@jupiterplay.co.uk www.jupiterplay.co.uk
Bespokemeansbespoke
Bridge option one
Bridge option two
Bridge option three
Timber panel colour suggestions
Timber post colour suggestions
Rope colour suggestions
Company No. SC200761
© Jupiter Play & Leisure Ltd. 2015.

Jupiter support-process-2015

  • 1.
  • 2.
    We have theexperience and resource to offer full cycle support on bespoke and large-scale projects; from talking through design concepts, working up 3D presentations, co-ordinating logistics through to site installation and after-sales, we are here to help every step of the way. “why not get in touch and tell us about your project requirements?” Bespokeandlarge-scaleprojects info@jupiterplay.co.uk www.jupiterplay.co.uk
  • 3.
    We offer adesign led, flexible and unique approach to all of our projects. There are a large number of considerations that we think about when designing play spaces – this is what makes our design presentation package highly talked about and respected in the industry. Our award winning Play Space Designers are experienced in considering the impact of each site on the surrounding physical landscape and the community. We can visualise the opportunity in sites that might otherwise be over looked in their potential to become inspiring. This can come from existing landscape features such as trees, adding features such as mounding and in selecting equipment options which best maximise the use of the space. InitialConcepts Southern Office: 0115 969 9859 Head Office: 0131 445 7989 https://youtu.be/uvtvRzBnsT0
  • 4.
    During the conceptand design phase Jupiter Play produce high quality 3D drawings, animations and CADs to help you visualise the proposed unit. These can be used within your wider proposal and for public consultation if required. Layoutsand3DDesign info@jupiterplay.co.uk www.jupiterplay.co.uk
  • 5.
    The majority ofour bespoke projects are in partnership with FHS Holtztechnik. Jupiter Play is the sole supplier for German Manufacturer FHS’s range of stunning bespoke equipment within the UK. As an expert in play, they are without question the best supplier we could possibly work with: their approach to the manufacturing and delivery of their products is exceptionally flawless. Over the past few years, our Product Manager has developed a fantastic relationship with them, working very closely with their designers and craftsmen to ensure that designs agreed with our customers are brought to life in beautiful hand-crafted Robinia. There is a vast range of “standard” products already available within their range but we appreciate that many play spaces require something more bespoke, tailored specifically to a site or brief, often taking into consideration results from community consultations. Our love for FHS is in the unique manufacturing processes that they have developed to achieve the most robust, durable and aesthetically organic timber available in the market place today and in partnership with them, we are able to deliver any bespoke request. Manufacturing We use production drawings for our presentations which means our visuals are very accurate. Southern Office: 0115 969 9859 Head Office: 0131 445 7989 https://youtu.be/uvtvRzBnsT0
  • 6.
    Our business supportteam have very strong relationships with our hauliers and are experienced in dealing with international shipping. Our FHS products are shipped from Germany and can be organised to go to a depot or straight to site. We can advise you with regards to access and off-loading required and will work directly with our customers and contractors to ensure deadlines are met for deliveries. It took three full trailers to ship over the equipment for the Hudson Way project – our Business Support Co-ordinator worked very closely with the hauliers, Product Manager and the contractors to ensure this was carefully co-ordinated and delivered in sequence to have the right sections available as they were installing on site. Before delivery, the site flooded and it was arranged for the equipment to be held at the port in Holland so they could be on the first lorry over as soon as the site was ready. Logistics info@jupiterplay.co.uk www.jupiterplay.co.uk
  • 7.
    We can offersupport for both supply only projects as well as full installation capacity. We only use subcontractors for the specialised services of installation of equipment and surfacing. Our national network of subcontractors have worked with us for many years and it is a condition of their commercial agreements with Jupiter Play that they have the same commitment to quality and customer service when they execute their high quality installations. We liaise with our preferred subcontractor ahead of each project to ensure we secure installation schedules which are then guaranteed by our contracts team to ensure Jupiter deliver an end to end service to our customers within the agreed timeframe. Our dedicated Operations Manager ensures all Health and Safety checks on site are completed and our contractors fully comply with Health & Safety legislation; all are CHAS and/ or Constructionline Certified and are Disclosure and Barring Service (DBS) checked. Installation Southern Office: 0115 969 9859 Head Office: 0131 445 7989 https://youtu.be/uvtvRzBnsT0
  • 8.
    Jupiter Play deliversquality through all services and products and this does not stop once a project has been delivered. We want children to enjoy our play spaces and do not want things to come to a standstill because of faulty parts or missing fixings. We have a dedicated business support team who ensure our customers receive the highest post completion service as well as support throughout the whole project. Postinstallationandaftersales info@jupiterplay.co.uk www.jupiterplay.co.uk
  • 9.
    Our business isoperated through our CRM system - Salesforce.com, where every project is tracked from its initial conception and managed at every stage. This allows the whole team to control every stage and ensure timescales are being adhered to. With all information in one place this allows the entire team to instantly access information whilst out on site or from home if required. We carry out post installation inspections with the sub-contractor in attendance where all snagging of the installation is documented and addressed on the same day or within 48 hours of site completion. Post Installation Inspections are carried out by an independent RPII Certified inspector and any issues are dealt with by our Operations Manager who liaises with the customer, our suppliers and contractors until any issue is resolved to full satisfaction. Postinstallationandaftersales Southern Office: 0115 969 9859 Head Office: 0131 445 7989 https://youtu.be/uvtvRzBnsT0
  • 10.
    Hudson Way wasproject completed October 2015 Working with Swan Paul Architects, Parsons Landscapes and Taunton Deane Borough Council to deliver outstanding play. We work with you every step of the way. Allaboardforagreatopeningevent info@jupiterplay.co.uk www.jupiterplay.co.uk
  • 11.
    Allaboardforagreatopeningevent Southern Office: 0115969 9859 Head Office: 0131 445 7989
  • 12.
  • 13.
    No two playareas are the same and we are passionate about keeping it this way! Every site that Jupiter Play designs is unique and the bespoke capabilities of FHS Holztechnik allow each design to react to its surrounding environment in the correct way. FHS equipment fits well in protected landscapes due to its unique manufacturing process and made to measure ability. All equipment is hand crafted and made to order, conforming to relevant safety standards and aesthetic requirements whether a modification on one of the standard items or a completely new design. Aesthetic colours and components can be added or deducted to suit both budget and site requirements. The opportunity to create a bespoke piece of play equipment really is endless! Bespokemeansbespoke Southern Office: 0115 969 9859 Head Office: 0131 445 7989 Lion Salt Works - Cheshire Roseangle Park - Dundee Dock Park - Dumfries Highbury Fields - London https://youtu.be/uvtvRzBnsT0
  • 14.
    info@jupiterplay.co.uk www.jupiterplay.co.uk Bespokemeansbespoke Bridge optionone Bridge option two Bridge option three Timber panel colour suggestions Timber post colour suggestions Rope colour suggestions Company No. SC200761 © Jupiter Play & Leisure Ltd. 2015.