Mr. Jeffrey Ese Akwahsam
Experienced Engineering Executive
Date of Birth Wed 25th Jun 1975
Gender Male
Marital Status Single
Religion Christian/Pentecostal
Origins Nigeria Delta Orogun, Ewhu, Ewen
Nativetongue Urhobo
Languages Spoken English, Urhobo
Address Anifowoshe close
Surulere Lagos Nigeria
Mobile 08077755502
Phone 08023266521, 08090744449
Email jeffrey_ese@yahoo.com
Web Jeffrey.Exood.Com
Educational & Professional Summary
Educational Level Bachelor's Degree
Present Career Level
Senior Executive
(Chairman, MD,
CEO)
Work Information
Employment Status Self-employed
I can Start Now
Highest Project Role Project Director
Highest Managerial Role
Senior Executive
(Chairman, MD,
CEO)
Work Experience (Years) Total:18 yr(s)
Relevant:18 yr(s)
Desired Salary (per Annum) Expected: -N- 1,000,000.00
Minimum: -N- 500,000.00
Lightning Networks Limited Mar 2014 - Jan 2015
Ikeja Lagos Nigeria
Job Engineering {Chief Operations Officer}
Business concept development. Project management. Civil, electrical, mechanical and computer
network engineering design and supervised implementation. Procurement sourcing and supply. Metal
fabrication design and implementation. ERP software development and support. Interior design and
implementation. FM 200 design and deployment. Access control deployment. IP Network design and
implementation. Fiber optic cable installation. VoIP implementation. VSAT implementation. Asterisk
Telephony implementation, management and training. Data centre design and implementation.
Project planning. WLAN design and implementation. CCTV surveillance. ISP service management.
Radio installation. Raised floor & Suspended ceiling installation. Sound proofing. Precision AC
installation and maintenance. Solar power system design and installation.
Exood.com; Electric Avenue Technologies Jun 2002 - Date
Surulere Lagos Nigeria
Job Engineering {Business concept development.}
Business strategy development and implementation. Server/client software development. Web
application software development. Web design. Mobile software development. Router/Bandwidth
manager development. Electronics circuit design. Electronics hardware maintenance. Transformer and
electric motor installation and repairs. VSAT installation. Radio installation. 2D/3D Graphics design
and animation. Sound engineering design and implementation. Video and sound editing.
Aviation Management Systems May 2000 - Aug 2002
Ikeja Lagos Nigeria
Job Information Technology {Lead Software Engineer/Busines}
Business Concept development. Software development, testing, deployment and management. ICT
support.
Computer Programming
Languages: Delphi, VB, C/C++, Foxpro, Java, Javascript, PHP, SQL, Perl, Bash, Assembly;
Experience: Since 1999; Major Jobs: Flight Information Display System, development, design and
implementation, Airports in Lagos and Abuja; Development and maintenance of Hotel
management software (Federal Palace Hotel, V/I) Development of Bookshop Management
Software (Igbinedion Bookshop Benin City) Development of Hospital Management Software (Mount
Gilead Hospital Benin City) Development of High School Management Software Exood ERP.
Exood Point of Sales. Job Tracking and Invoicing/Credit Management system/ EDMS for Intels
Logistics PH. Bandwidth Manager Security Visitors ID Card/ Tracking Software for Intels Logistics
PH.
Web Development
Applications: Dreamweaver, Frontpage, notepad, Adobe Photoshop, NetBeans; Languages: PHP,
Java, jQuery, Javascript, VB.Net, Apache, MySQL, Oracle, PostGre Jobs executed:
www.globemotors.net; www.bodyenhancement-africa.com; www.bearsfoundation-africa.org;
www.corenetsolutions.com; www.exood.com; vinenigeria.comwww.unionhomes-ng.com;
www.eden309.com; www.disneycourt.com; www.halogensecurity.com; www.panabiz.com;
www.eccointer.com; www.anchordredging.com; www.dsalondowntown.com;
www.pathfindersinternational.org
Database Administration, Management & Development
Platforms: Oracle, MS SQL, MySQL, PostGre, FoxPro, DBase
Fire Prevention
FM 200 system
Router Development
Linux Router development; Development of image from bare-bone kernel. Customization of existing
code
Operating System (OS) Platforms
Windows, Linux, Macintosh, Unix
Mobile Development
J2ME, Java, C++, C#, Object C, Android, BlackBerry, Windows Phone, IOS, CodeNameOne, LWUIT
Jobs: Mobile banking App for Zenith Bank. Mobile reader for Rhapsody of realities (Christ Embassy
Church), Exood mobile app : Taxi, business finder, dating, job
Graphics Design
2D: Photoshop, Illustrator, CorelDraw; 3D: 3DMax, Maya, ArchiCAD, Atlantis
Electronics Design & Maintenace
Electronics circuit design. Logic Design. Electronics maintenance. Jobs: 20KVA sine wave & step
Inverter; 10KVA wide range voltage (50 - 470V) stabilizer; Android controlled automated house.
Generator AVR, automatic changeover. car alarm systems, car de-mobilizer, remote controlled gates,
audio Power amplifiers, High fidelity audio mixers, Public address speakers, water fountain
controllers, solar powered battery charger with sun tracing capabilities, digital timers & clocks, spy
device with a parabolic dish and RF transmitter
Sound Engineering
Amplifier, Mixer, Speaker, Microphone, musical instruments setup and conrol
Sound and Video Editing
Adobe (Premiere, Encore, Audition), Fruity loops, T-Racks
VoIP & Telephony
Asterisk, A2Billing. Setup and customization.
VSAT, Radio & Fiber Optic Links
Laying and terminating Fiber Links. Setup of Radio Links. Setup of VSAT Links. Jobs: CBN Jos,
Huawei, Lotto Nigeria, WorldCom Nigeria
Fabrication
Metal, wood and synthetic material Design and fabrication Jobs: Design, construction of charcoal
furnace for purifying and fabricating lead sheets and rods Fabrication of Inscreed cable trunks for
CBN Project
Sound Proofing
Equipment and facility sound proofing Jobs: Nigerian Immigrations, Nigerian Police Affairs, Hotels
Interior Design
Design and fitting of interiors Jobs: Nigerian Immigration service
Network Design and Implementation
MPLS, VPN, Firewall, Router, Cisco configuration
University of Benin - Benin-city Edo Nigeria Dec 1991 - Dec 1997
Bachelor's Degree Graduated:Yes
Electrical and Electronics Engineering {Bachelors} Second class lower
Second Class Lower Division
Federal Government College Ogbomosho - Ogbomosho Osun Nigeria Jan 1988 - Nov 1991
Secondary School or equivalent Graduated:Yes
{JSSCE, SSCE}
JAMB: English, Physics, Chemistry, Mathematics Scores: 247; SSCE: Mathematics A3; English A1;
Furhter Maths C4; Biology A1; Physics A1; Chemistry A3; Geography C4; Agricultural Science A3;
Personality
I have an excessive passion for Technology development and deployment. This is aided by my
ability to learn new things fast, so long as they are somehow required to attain my development
needs. A good example is when in 2003, a client's need to have a custom bandwidth, security &
firewall solution, caused me to pick up Linux for the first time and in 5 days of almost no sleep, I
developed a Linux based firewall, DNS, DHCP, Bandwidth Manager and Web Cache. My Strong passion
has led me to a vast array of technological fields. I pride myself in excellence and standards that
must be equal or better than what any human can attain to.

Jeffrey-Akwahsam

  • 1.
    Mr. Jeffrey EseAkwahsam Experienced Engineering Executive Date of Birth Wed 25th Jun 1975 Gender Male Marital Status Single Religion Christian/Pentecostal Origins Nigeria Delta Orogun, Ewhu, Ewen Nativetongue Urhobo Languages Spoken English, Urhobo Address Anifowoshe close Surulere Lagos Nigeria Mobile 08077755502 Phone 08023266521, 08090744449 Email jeffrey_ese@yahoo.com Web Jeffrey.Exood.Com Educational & Professional Summary Educational Level Bachelor's Degree Present Career Level Senior Executive (Chairman, MD, CEO) Work Information Employment Status Self-employed I can Start Now
  • 2.
    Highest Project RoleProject Director Highest Managerial Role Senior Executive (Chairman, MD, CEO) Work Experience (Years) Total:18 yr(s) Relevant:18 yr(s) Desired Salary (per Annum) Expected: -N- 1,000,000.00 Minimum: -N- 500,000.00 Lightning Networks Limited Mar 2014 - Jan 2015 Ikeja Lagos Nigeria Job Engineering {Chief Operations Officer} Business concept development. Project management. Civil, electrical, mechanical and computer network engineering design and supervised implementation. Procurement sourcing and supply. Metal fabrication design and implementation. ERP software development and support. Interior design and implementation. FM 200 design and deployment. Access control deployment. IP Network design and implementation. Fiber optic cable installation. VoIP implementation. VSAT implementation. Asterisk Telephony implementation, management and training. Data centre design and implementation. Project planning. WLAN design and implementation. CCTV surveillance. ISP service management. Radio installation. Raised floor & Suspended ceiling installation. Sound proofing. Precision AC installation and maintenance. Solar power system design and installation. Exood.com; Electric Avenue Technologies Jun 2002 - Date Surulere Lagos Nigeria Job Engineering {Business concept development.} Business strategy development and implementation. Server/client software development. Web application software development. Web design. Mobile software development. Router/Bandwidth manager development. Electronics circuit design. Electronics hardware maintenance. Transformer and electric motor installation and repairs. VSAT installation. Radio installation. 2D/3D Graphics design and animation. Sound engineering design and implementation. Video and sound editing. Aviation Management Systems May 2000 - Aug 2002
  • 3.
    Ikeja Lagos Nigeria JobInformation Technology {Lead Software Engineer/Busines} Business Concept development. Software development, testing, deployment and management. ICT support. Computer Programming Languages: Delphi, VB, C/C++, Foxpro, Java, Javascript, PHP, SQL, Perl, Bash, Assembly; Experience: Since 1999; Major Jobs: Flight Information Display System, development, design and implementation, Airports in Lagos and Abuja; Development and maintenance of Hotel management software (Federal Palace Hotel, V/I) Development of Bookshop Management Software (Igbinedion Bookshop Benin City) Development of Hospital Management Software (Mount Gilead Hospital Benin City) Development of High School Management Software Exood ERP. Exood Point of Sales. Job Tracking and Invoicing/Credit Management system/ EDMS for Intels Logistics PH. Bandwidth Manager Security Visitors ID Card/ Tracking Software for Intels Logistics PH. Web Development Applications: Dreamweaver, Frontpage, notepad, Adobe Photoshop, NetBeans; Languages: PHP, Java, jQuery, Javascript, VB.Net, Apache, MySQL, Oracle, PostGre Jobs executed: www.globemotors.net; www.bodyenhancement-africa.com; www.bearsfoundation-africa.org; www.corenetsolutions.com; www.exood.com; vinenigeria.comwww.unionhomes-ng.com; www.eden309.com; www.disneycourt.com; www.halogensecurity.com; www.panabiz.com; www.eccointer.com; www.anchordredging.com; www.dsalondowntown.com; www.pathfindersinternational.org Database Administration, Management & Development Platforms: Oracle, MS SQL, MySQL, PostGre, FoxPro, DBase Fire Prevention FM 200 system Router Development
  • 4.
    Linux Router development;Development of image from bare-bone kernel. Customization of existing code Operating System (OS) Platforms Windows, Linux, Macintosh, Unix Mobile Development J2ME, Java, C++, C#, Object C, Android, BlackBerry, Windows Phone, IOS, CodeNameOne, LWUIT Jobs: Mobile banking App for Zenith Bank. Mobile reader for Rhapsody of realities (Christ Embassy Church), Exood mobile app : Taxi, business finder, dating, job Graphics Design 2D: Photoshop, Illustrator, CorelDraw; 3D: 3DMax, Maya, ArchiCAD, Atlantis Electronics Design & Maintenace Electronics circuit design. Logic Design. Electronics maintenance. Jobs: 20KVA sine wave & step Inverter; 10KVA wide range voltage (50 - 470V) stabilizer; Android controlled automated house. Generator AVR, automatic changeover. car alarm systems, car de-mobilizer, remote controlled gates, audio Power amplifiers, High fidelity audio mixers, Public address speakers, water fountain controllers, solar powered battery charger with sun tracing capabilities, digital timers & clocks, spy device with a parabolic dish and RF transmitter Sound Engineering Amplifier, Mixer, Speaker, Microphone, musical instruments setup and conrol Sound and Video Editing Adobe (Premiere, Encore, Audition), Fruity loops, T-Racks VoIP & Telephony Asterisk, A2Billing. Setup and customization. VSAT, Radio & Fiber Optic Links
  • 5.
    Laying and terminatingFiber Links. Setup of Radio Links. Setup of VSAT Links. Jobs: CBN Jos, Huawei, Lotto Nigeria, WorldCom Nigeria Fabrication Metal, wood and synthetic material Design and fabrication Jobs: Design, construction of charcoal furnace for purifying and fabricating lead sheets and rods Fabrication of Inscreed cable trunks for CBN Project Sound Proofing Equipment and facility sound proofing Jobs: Nigerian Immigrations, Nigerian Police Affairs, Hotels Interior Design Design and fitting of interiors Jobs: Nigerian Immigration service Network Design and Implementation MPLS, VPN, Firewall, Router, Cisco configuration University of Benin - Benin-city Edo Nigeria Dec 1991 - Dec 1997 Bachelor's Degree Graduated:Yes Electrical and Electronics Engineering {Bachelors} Second class lower Second Class Lower Division Federal Government College Ogbomosho - Ogbomosho Osun Nigeria Jan 1988 - Nov 1991 Secondary School or equivalent Graduated:Yes {JSSCE, SSCE} JAMB: English, Physics, Chemistry, Mathematics Scores: 247; SSCE: Mathematics A3; English A1; Furhter Maths C4; Biology A1; Physics A1; Chemistry A3; Geography C4; Agricultural Science A3;
  • 6.
    Personality I have anexcessive passion for Technology development and deployment. This is aided by my ability to learn new things fast, so long as they are somehow required to attain my development needs. A good example is when in 2003, a client's need to have a custom bandwidth, security & firewall solution, caused me to pick up Linux for the first time and in 5 days of almost no sleep, I developed a Linux based firewall, DNS, DHCP, Bandwidth Manager and Web Cache. My Strong passion has led me to a vast array of technological fields. I pride myself in excellence and standards that must be equal or better than what any human can attain to.