The daily production schedule for JAAL Productions on 19/03/2012 included filming scenes 3 through 6 between 12pm and 6pm, with filming of scene 3 occurring from 12pm to 1pm, scene 4 from 2pm to 3pm, scene 5 from 4pm to 5pm, and scene 6 taking up the remainder of the day from 5pm to 6pm. Lunch was scheduled for 1pm and a break was planned for 3pm.