The document contains a 40 question ISTQB question paper dump covering topics in software testing such as test techniques, test documentation standards, test management tools, and costs of fixing defects. Some key points covered include:
- Regression testing should be performed after software changes and when the environment changes.
- Early test design can prevent fault multiplication and find faults but faults found then are more expensive to fix.
- The main purpose of acceptance testing is to ensure the system is acceptable from a business perspective.
- The cost of fixing a defect increases as a system moves closer to production use.