ISTQB CTAL Advanced Security
Testing Training
What You’ll
Learn
01
02
03
04
ISTQB Certified Tester
Foundation Level (CTAL)
0505
Entry
Criteria
To receive Advanced Level certification in the module “Security Tester”,
candidates must hold a valid Certified Tester Foundation Level certificate and
have sufficient practical experience to be certified at Advanced Level, which
should be not less than 3 (three) years of relevant academic, practical, or
consulting experience. Refer to the relevant Exam Board to determine the
specific practical experience criteria.
Agenda StyleRequirements
• ISTQB Certified Tester Foundation Level (CTFL)
Requirements for the Course are
Agenda Style
Course
Description The Advanced Level Security Tester Certification(ISTQB Advanced Level)
Professional Training from Narayanan Palani helps in accomplishing the following
Business Objectives:
• Plan, perform and evaluate security tests from a variety of perspectives –
policy-based, risk-based, standards-based, requirements-based and
vulnerability-based.
• Align security test activities with project lifecycle activities.
• Analyze the effective use of risk assessment techniques in a given situation to
identify current and future security threats and assess their severity levels.
• Evaluate the existing security test suite and identify any additional security
tests.
• Analyze a given set of security policies and procedures, along with security
test results, to determine effectiveness.
Description
Agenda StyleAudience
• Software engineers
Who this course is for:
Course Content
Reference
Course URL:
https://www.istqb.org/certification-path-root/advanced-security-tester.html
https://www.udemy.com/course/istqb-security-testing-hacking/?couponCode=LEA
RNAUGUST
Reference URL:
https://www.istqb.org/downloads/send/46-advanced-level-security-tester/194-adv
anced-security-tester-syllabus-ga-2016.html

ISTQB CTAL Advanced Security Testing Training