Information Systems Security Solutions, Inc.




        Corporate Capabilities Brief



           “Finding Tomorrow’s Solutions, Today!”™
Company Overview

 Incorporated October 2002
  Top Secret Facility Clearance, Total “Turn-key” Information Technology
(IT) Integration/Services & Support
 Qualified Full-time IT professionals, Installation Technicians, Information
Assurance Strategists, Radio Frequency Consultants and Engineers
 Native American (NAOSB) – Service Disabled Veteran (SDVOB), Certified
SBA 8(a) and Small Disadvantage Business (SDB), Certified Local
Disadvantage Business Enterprise (LDBE), DOT Disadvantaged Business
Enterprise (DBE), GSA IT Schedule 70 Holder, Certified in Homeland
Security (CHS-III)
 Association / Member Affiliations- IEEE, BICSI, AFCEA, NVTC, NDIA,
MDBA, National Board of Forensic Examiners

                     “Finding Tomorrow’s Solutions, Today!”™
                     “Finding Tomorrow’s Solutions, Today!”™
Mission


Our mission is to provide our clients with the best quality of service, while
maintaining a client centric approach, that meets and or exceeds their
expectations.
The main objective of IS3 is to provide FAST, innovative, quality solutions
that unites the client with the technology of today as well as tomorrow. This
creates security for the client, as well as allowing them to maintain a
competitive edge in the information technology market. Let IS3 show you why
“we find tomorrow's solutions today!”




                       “Finding Tomorrow’s Solutions, Today!”™
                       “Finding Tomorrow’s Solutions, Today!”™
Methodology


IS3 provides total 'turn-key' solutions. We offer our clients one single point of
contact. We are with them from start to finish. Our approach is simple, we
provide our clients with the consultation, the recommendation, the installation
support (if required), the implementation and integration and finally, the
commissioning. One company, one mission, one goal….client satisfaction!




                         “Finding Tomorrow’s Solutions, Today!”™
                         “Finding Tomorrow’s Solutions, Today!”™
Territory

With Headquarters located in Sterling, VA with additional operational
locations:
• Arlington, VA
• Washington, D.C.
• Lanham, MD
• Middleburg, VA
IS3 currently performs enterprise network installations/support/integration,
central office upgrades and services and Radio Frequency, Broad-band, WiFi
engineering for clients in most major cities throughout the continental United
States and Hawaii.


                        “Finding Tomorrow’s Solutions, Today!”™
                        “Finding Tomorrow’s Solutions, Today!”™
Corporate Business Structure
Sectors
    • Federal/DoD/Civilian Agencies
    • Private/State/Local
Contract Vehicles
    • NETCENTS (First Tier Telos Corporation)
    • ALLIANT Large (First Tier Wyle)
    • GSA-IT Schedule 70, Millennia Lite (CSC), VETS (Multiple Teams)
    • Navy Seaport-e (Multiple Teams)
    • DoS-SASI (First Tier SRA), DOJ-MEGA-III (CACI)
    • TEIS-2s, ITES-2s (First Tier NCI, Inc)
    • TIPSS-III (Subcontractor to Lockheed Martin)
NAICS Codes 541512 (PRIMARY), 541513, 541618, 541690, 541710
                            “Finding Tomorrow’s Solutions, Today!”™
                            “Finding Tomorrow’s Solutions, Today!”™
Company Awards
            Ranked # 14 of the Top 25 Small Technology Businesses
                        Washington Business Journal
                                November 2006




               Washington SmartCEO Magazine Future 50 Winner
                            January 2006/2007



            Ranked # 10 of the Top 25 Small Technology Businesses
                        Washington Business Journal
                                 October 2005


                Selected as a Top Minority-Owned Small Business
                             DiversityBusiness.com.
                               November 2006/2007




 “Finding Tomorrow’s Solutions, Today!”™
Clientele (Partial List)




    “Finding Tomorrow’s Solutions, Today!”™
    “Finding Tomorrow’s Solutions, Today!”™
Strategic Partners




 “Finding Tomorrow’s Solutions, Today!”™
Core Competencies




Information Assurance (IA)                                                Business Transformation
                                                                              Solutions (BTS)
                                  Federal Business Research (FBR)




                                    Information Transport Systems (ITS)

                             “Finding Tomorrow’s Solutions, Today!”™
                             “Finding Tomorrow’s Solutions, Today!”™
IS3 Proprietary Services
                                          & Solutions

                          Cyber         Contingency
                         Security       Operations

                         Confidentiality
                             Configuration
                             Management

             Incident                                       Risk
            Management                                   Assessment
                              Information

                             Certification
Personnel
Security     Integrity      CSI     &
                             Accreditation
                                                      Availability      Access
                                                                        Control



              Crisis           Assurance                  Situational
            Management                                    Awareness



                                                                                              You Deserve the Best in Security
                                                                                                     IS3 has the Key
                 Compliant Security Integration
                Secure and Compliant...from the
                     Desktop to the Door




                                                             “Finding Tomorrow’s Solutions, Today!”™
Compliant Security Integration
                          CSI®


IS3, Inc. has developed a program that outlines the processes necessary to map critical data and business
processes to services and assets to provide an integrated view of security assurance and guide clients in
making better security investment decisions. In addition, this process will assist the client in aligning their
critical data and business processes to the appropriate regulatory compliance policies and procedures and
develop a consistent, proactive security-monitoring environment. This program is called Compliant Security
Integration (CSI®).

The main focus of CSI® is to develop a program that integrates the various security policies and procedures,
technology and regulatory requirements into one cohesive program that allows the client to focus on their day
to day business processes with the assurance that security has been seamlessly integrated within their
organization and is consistently improving regardless of how volatile the environment may be.




                                             CSI® Methodology
                                    “Finding Tomorrow’s Solutions, Today!”™
Secure Operational Sustainability
                     SOS®
The Secure Operational Sustainability (S.O.S.)
Program evolved from extensive practical
experience of security program management and
network security engineering, design, and
implementation. Based on our observations, in
the Pentagon and other Department of Defense
                                                   METHODOLOGY…
(DoD) agencies, and practical application, IS3     Program reviews are based on industries’ best practices, tailored
believes there are five key and correlative        to the organization's business area, methods & circumstances…
components that every information technology
                                                                                                 In addition to the 5 P’s, assessments
and or network security organizations should                      Security                        may include such areas as:

possess to sustain their network operations.                       Policy                         – Architecture
                                                                                                  – Business Continuity
These components are: Security Management                                                         – Disaster Recovery
                                                                                                  – Access Control
Program, Security Policy, Security Plan,            Security Security   Security
                                                            Management Procedures                 – Tools
Security Procedures, and a Security Processes        Plan                                         – Personnel
                                                             Program
– “Five P’s” of S.O.S. The Five P’s are                                                           – Education and Training
                                                                                                  – Managed Security
designed to work together, which will promote                      Security
                                                                                                 Immediate results can be realized
seamless organizational reformation. This is the                  Business                        during and directly after the completion
                                                                  Processes                       of the assessment
premise behind the IS3 S.O.S. Program , and                              Once an organization has implemented the S.O.S. Program®,
                                                                                                                               Program®
based on our research we have found no other                             their security posture will be enhanced, fortified, and adaptive.
                                                                                                                                 adaptive.

programs that offer the same intricate services.


                                 “Finding Tomorrow’s Solutions, Today!”™
IS3 Partners with…

   IS3 has partnered with Modulo Security the Latin American market leader in Information Security to become a
   value-added reseller and U.S. Consulting Arm for their proprietary Security Risk Manager. Its exclusive solutions
   use PESI® - an ISO 9001-certified methodology conforming to the ISO/IEC 17799 standard.

 MÓDULO's continuous concern with excellence in quality standards has resulted in three important achievements.
  First, it became Latin America's pioneer company to obtain the BS 7799 certification - the International Information
  Security Management standard. It also received certification for ISO 9001, and has been re-certified since 1998.

 Second, was the launch of Security Risk Manager, a software program for risk assessment, compliance and
  Knowledge Management System. Modulo Security Lab, one of the most complete IT laboratories in Brazil, provides
  support in technology research and updates the information security knowledge-base used by Security Risk
  Manager. The company also has an Education Center specialized in training and certifying information security
  managers.

 And most recently, Modulo has become the first information security company in the world to achieve the ISO
  27001 certification. ISO 27001 is the first international information security certification standard and an evolution
  on British Standard BS 7799-2. It addresses the definition of requirements for implementation of an Information
  Security Management System - ISMS. The standard was adopted in October 2005 by the International Organization
  for Standardization (ISO), which handles international certification standards. Modulo Security achieved this
  certification in record time thanks to the use of Security Risk Manager.



                                       “Finding Tomorrow’s Solutions, Today!”™
IA Division

IS3’s IA Division’s mission is to provide a holistic approach to Network
Security Program Management and Development. While assisting our clients
with maximizing the value of their security environment and posture.
The main objective of IS3’s IA Division is to identify information systems
security solutions that protect and enhance the business needs of an
organization. This will enable clients to realize an inherent return-on-
investment (ROI) that is not generally associated with network security.




                        “Finding Tomorrow’s Solutions, Today!”™
IA Capabilities
Information Assurance Programs
Secure Operational Sustainability (S.O.S.) Program® Implementation
Compliant Security Integration (CSI) Program

 Security   Compliance
        Delivers compliance with all relevant Federal laws, directives, policies, standards and guides such as
        FISMA, DITSCAP, NIACAP, NIST, PDD 67, Sarbanes-Oxley and OMB Circular A-130

 Physical   Security
         Focuses on the protection of assets, people and
        structure against perceived threats
        Site Surveys, Entry Point Design Considerations, Personnel Security

 Security   Engineering
        Threat/Vulnerability Assessments, Policy Development, Strategic Planning, Disaster Recovery /
        Continuity of Operations
 Certified Information Systems Security Professionals (CISSP)
 Certified Information Assurance Managers (IAM)
                                   “Finding Tomorrow’s Solutions, Today!”™
                                   “Finding Tomorrow’s Solutions, Today!”™
IA Division Past Performance
 Network Security Services – Pentagon (NSS-P)
    - Conducted a security architecture review of information technology security deployment,
    practices, and policies to assess the organization’s security posture

 Washington Headquarters Services (WHS)
    - Support the WHS Chief Information Officer (CIO) and the Designated Approving Authority (DAA), in
    the operations, implementation, assessment, documenting, preparation, development, technical review, and
    certification for WHS. Direct support for the overall Information Assurance Program Management Office

 United States Department of State (DoS)
    - Supporting the Bureau of Human Resources Executive Office with 1) safeguard systems and information
    nationwide, to 2) ensure systems are certified and accredited, 3) manage enterprise-wide configurations and
    changes, 4) continuously monitor, mitigate and prevent system threats and vulnerabilities and 5) ensure
    regulatory compliance (on-going)

 United States Navy Medical Information Management Center (NMIMC)
    - Ensures coordination of all security programs and activities for IT applications and infrastructure; this
    includes ensuring that all information systems are properly certified and accredited, monitored, audited,
    tested, documented and compliant with HIPAA, NIST, OMB, FISMA and other pertinent regulatory
    requirements, policy and guidelines


                                   “Finding Tomorrow’s Solutions, Today!”™
                                   “Finding Tomorrow’s Solutions, Today!”™
BTS Division

Provide innovative ideas that will produce more efficient and
effective solutions for our clients through technical/business
consulting that cover all facets of the Business Enterprise. We
provide clients with “as is”, as be” and “to be” models that allow
them to realize true return on their business infrastructure
investments (True ROI).




                      “Finding Tomorrow’s Solutions, Today!”™
BTS Capabilities


To provide “total turn-key”, world-class Business
Transformation support/solutions that are tailored and designed
to support all of the clients current and future needs.
 Enterprise Resolution Center
 Enterprise Solutions
 BTS-Federal




                   “Finding Tomorrow’s Solutions, Today!”™
                   “Finding Tomorrow’s Solutions, Today!”™
BTS Capabilities…
    Enterprise Resolutions Center

 Tiered Help Desk Support
 Escalation and Tracking
 Knowledge “Bank”
 Adherence to SLA and OLA
 “End-of-Life” Cycle Review




                  “Finding Tomorrow’s Solutions, Today!”™
BTS Capabilities…
             Enterprise Solutions

 Enterprise Network Design, Support
 Datacenter support
 Facilities Management
 MPLS Design, Support, Implementation
 LAN/WAN/MAN/CAN
 Enterprise Assessments, Analysis, Testing, Troubleshooting




                   “Finding Tomorrow’s Solutions, Today!”™
BTS Capabilities…
                BTS-Federal

 Enterprise Architecture (EA)
 Business Process Re-engineering
 Capital Planning and Investment Control (CPIC) – guided by
EA
 Earned Value Management (EVM) as a key element of project
management




                   “Finding Tomorrow’s Solutions, Today!”™
BTS Division Past Performance

 Washington Headquarters Services (WHS)
    Supporting the WHS Chief Information Officer (CIO) and the Designated Approving Authority
    (DAA), in the operations, implementation, assessment, documenting, preparation, development,
    technical review, and certification for WHS. Direct support for the overall Enterprise Architecture
    Program Management Office.


 United States Department of State (DoS)
    Supporting the Bureau of Human Resources Executive Office with developing a consistent release
    process for all production systems and infrastructure elements, and define “the phased change
    process”. Direct support for the overall Configuration Management and Change Control Program
    (on-going)




                                “Finding Tomorrow’s Solutions, Today!”™
                                “Finding Tomorrow’s Solutions, Today!”™
BTS Division Past Performance
 General Services Administration (GSA)
    Providing Helpdesk/customer service representatives to include, but limited to maintaining first
    contact resolution; maintaining and resolving trouble tickets; updating knowledge management
    database; providing break/fix assistance via script and remote access(on-going)

 Sprint Nextel Corporation
    Managed all network engineering services related to the national deployments of new network
    hardware and or services: coordinated resources for deployment efforts, chaired conference calls
    and meetings, reviewed design and planned network/equipment configurations, managed all client
    deliverables and reports; provided SME for deployment activities and escalation, trained team
    members on technologies and deployment procedures(on-going)

 National Academies of Science (NAS)
    Providing engineering support to the design, implementation and integration of backbone network
    upgrades to a new SONNET ring structure for the academies and data center relocation; Firewall
    design and deployment for DMZ segments for enterprise server clusters on PIX 515E platforms;
    Firewall design and deployment secured site to site VPN and access VPN designs and deployments on
    the PIX 515E. Provided pre and post tier III migration support. (on-going)




                              “Finding Tomorrow’s Solutions, Today!”™
                              “Finding Tomorrow’s Solutions, Today!”™
FBR Division

IS3’s FBR Division’s mission is to provide clients with a holistic approach to
the federal business research process and assist them with understanding the
federal business procurement cycle.
FBR Analyst work with the client (either internal or external) to assist them in
understanding, defining and documenting their overarching business objects.
The FBR Analyst applies qualitative and quantitative techniques to interpret
the data and produce substantiated recommendations. FBR Analyst frequently
present the findings and recommendations to the client in a clear, concise and
easier to understand manner.




                          “Finding Tomorrow’s Solutions, Today!”™
FBR Capabilities
FBR Certified Analyst support client business research requirements by:
• Utilizing years of experience in dealing with program managers and contracting officers in ALL Federal and
Government Civilian agencies
• Communicating with clients to understand and document the business objectives (overview of corporate
capabilities and review of NAICS Codes, Corporate Qualifications, existing contract vehicles, etc.)
• Formulating analysis plans and acquiring client (stakeholder) “buy-in” of proposed business research
approach
• Designing and/or assisting in the development of questionnaires and moderator guides to ensure the necessary
data is capture
• Conducting in-depth data analysis using traditional and advanced methods
• Authoring reports containing actionable recommendations
• Making presentations – answering questions and instilling confidence and “stakeholder” support




                                   “Finding Tomorrow’s Solutions, Today!”™
                                   “Finding Tomorrow’s Solutions, Today!”™
FBR Division Past Performance
 True Information Assurance, LLC Veteran, minority-owned, woman-owned, small disadvantage
business providing a broad array of innovative Enterprise-level services and solutions to the Department of
Defense and commercial industry. True IA has extensive expertise in the areas of Program/Project
Management, Information Assurance and Information Technology.

Services Provided
•Business opportunity research
•Proposal Management/Development

 iGov Solutions, Inc Native American-Service Disabled Veteran-owned Small Disadvantaged Business
specializing in Information Assurance, Singularly Managed Infrastructure and Business Transformation
Solutions

Services Provided
• Business opportunity research
• Weekly business reports
• Weekly/Monthly opportunity report reviews
• Proposal Management/Development
• Business Development/Market Research



                                  “Finding Tomorrow’s Solutions, Today!”™
                                  “Finding Tomorrow’s Solutions, Today!”™
WHY IS3’s FBR Division
 IS3 provides complete “turnkey” solutions to meet all client federal business research and procurement needs.
  We specialize in providing these services to small and medium sized businesses. Our Analysts will facilitate ALL
  research requirements with “Stakeholders” and decision makers so that ALL aspects of the organizations
  research needs are met.

 Strategic alliances with leading government agencies (contracting officers and program managers). IS3
  provides dedicated FBR Analysts that will become an extension of the client’s federal business development staff
  and will interact with client business development staff as required. Leveraging these relationships we provide
  our clients with the best quality of service while maintaining a cost sensitive approach that meets and exceeds
  their expectations.

 Our comprehensive Federal Business Research process will evaluate a broad spectrum of internal and external
  business research practices. IS3’s tested and proven process will effectively identify “gaps” and provide results
  and increased federal bid opportunities.

 IS3 has developed a proven Federal Business Research process; effectively delivering continued results and
  performance. We provide our clients with top quality and goal oriented research solutions. This proven expertise
  enables us to more effectively address the complexities of the federal procurement process and bid/proposal life-
  cycle while stream-lining the entire federal process.

 IS3 employs qualified, federal business research professionals available to enhance the business processes,
  control cost, improve performance and maximize resources thus enabling clients to more effectively identify,
  qualify and bid federal solicitations. If required, our Research Analyst will provide “Go-NoGo” support, “Bid-
  NoBid” decisions and if requested, we will provide proposal management and development as well.




                                    “Finding Tomorrow’s Solutions, Today!”™
ITS Division

IS3’s ITS Division provides technical services based on the transport of
information through Wired or Wireless means. ITS covers the bottom four
layers of the Open Systems Interconnect (OSI) model developed by the
International Standards Organization (ISO).




                      “Finding Tomorrow’s Solutions, Today!”™
                      “Finding Tomorrow’s Solutions, Today!”™
ITS Division Capabilities
 ITS Wired Solutions Group
  Provides fiber optic and copper structured cabling solutions for facility low voltage systems
    including; voice, data video, life safety and security
  – Building/Office Inside Plant Cabling
  – Central Office/Data Center Cabling

 ITS Wireless Solutions Group
  Provides wireless solutions for facilities, that require voice and data wireless coverage to
    support Cellular, WiFi and Public Safety applications
  – Distributed Antenna Systems
  – Neutral Host based systems

 ITS Engineering Group
  Provides Engineering support to internal groups and external clients
  – BICSI Engineers (RCDDs)
  – Cisco Certified Engineers
  – Radio Frequency Engineers


                             “Finding Tomorrow’s Solutions, Today!”™
                             “Finding Tomorrow’s Solutions, Today!”™
“In-Structure” Distributed
          Antenna Systems (IS-DAS)
IS3 designs and engineers “In-Structure” Distributed Antenna Systems (IS-
DAS) within large facilities or venues that provide wireless coverage for
cellular phones, wireless LANs (WLAN), radios and other wireless-enabled
devices; providing seamless coverage for multiple internal and external service
providers of voice and data services. Venues such as:
 Airports

 Metro Rail / Subway Systems

 Large Federal Government Facilities, Campuses and Bases

 State & Local Government Facilities
  – Office Buildings
  – Court Houses/Jails
  – Schools

The net benefit of a DAS system is a less expensive solution with equipment
that is more efficiently utilized, is less intrusive and does not disrupt the
surrounding overall network.
                         “Finding Tomorrow’s Solutions, Today!”™
                         “Finding Tomorrow’s Solutions, Today!”™
ITS Division Past Performance
 Sprint Nextel Corporation
   – Nationwide Switching Center ITS Build-outs and Support
   – Nationwide Engineering Services & O&M Support
 Computer Sciences Corporation
  – Nationwide ITS Build-out (Voice / Data / Video)
 Metropolitan Washington Airports Authority (MWAA)
   – Supplemental Radiating System (SRS) – National, Dulles & Udvar Hazy Center
   – Dulles Vehicle Maintenance Facility
   – Dulles & National Neutral Host System
   – IS3 is represented the four Major Wireless Carriers in the United States, and was primary Client Liaison to the
     Owner, Metropolitan Washington Airports Authority (MWAA) and Systems Integrator for the CWAS project.
     The CWAS initiative included the management, planning, detailed design & engineering, construction, operation
     and marketing for Wireless Voice and Data applications and two Complete Information Transport Systems,
     consisting of Fiber and Copper at both of the Nation’s Capitol’s Airports.
 State of Maryland, Wicomico County
  – Courthouse, Government Center and Two High Schools –800MHz Public Safety
 Washington Metropolitan Area Transit Authority (WMATA)
  – Tunnels Wireless Neutral Host Based System
 General Services Administration (GSA)
  – Presidential Transition Team Building
   – Facility ITS Build-outs (Headquarters Building)
                                  “Finding Tomorrow’s Solutions, Today!”™
WHY IS3
 IS3 provides complete turnkey solutions to meet all LAN, WAN, Enterprise Network Architecture, Business
  Transformation and Security needs to include complete support of converged network solutions for seamless
  integration, security architecture solutions at all levels of development and implementation and structured
  cabling services to include Central Office installation, Remote POP, superstructure, and Power.

 Strategic partnerships with leading IT companies guarantee clients invested skills and resources required to
  design, implement and support the “best of breed” technologies. Leveraging these relationships we provide our
  clients with the best quality of service while maintaining a cost sensitive approach that meets and exceeds
  expectations.

 Our comprehensive Security Assessment process will evaluate a broad spectrum of internal and external
  Information Assurance (IA) practices. IS3’s tested and proven process will effectively identify needs for
  designing a security policy plan that will enhance existing network demand for secured connectivity.

 IS3 has developed a proven engineering design and implementation process; effectively delivering continued
  results and performance. We provide our clients with top quality and goal oriented services in the areas of:
  project management, equipment staging, configuration, burn-in, installation, migration, cutover, integration,
  testing, documentation and “as-builds”. This proven expertise enables us to more effectively address the
  complexities of Enterprise Network and Infrastructure requirements.

 IS3 employs qualified, certified IT support professionals available to enhance the business processes, control
  cost, improve performance and maximize resources thus enabling clients to more effectively deliver products
  and services. Our Engineers will assist with network design, configuration changes, capacity analysis, network
  and power analysis, site survey, equipment layouts, RFP, quality control, testing and assurance.




                                   “Finding Tomorrow’s Solutions, Today!”™
Contact Information


Information Systems Security Solutions, Inc.
           45150 Business Court
                  Suite 500
          Sterling, Virginia 20166
          Office (703) 707-8400
            Fax (703) 707-8441

       Web http://www.infos3.com
  Information request: info@infos3.com



  Cage Code: 3C334    GSA Schedule Contract: GS-35F-0776P

           “Finding Tomorrow’s Solutions, Today!”™
           “Finding Tomorrow’s Solutions, Today!”™
IS3 CORE VALUES

                  PERSONAL
                  COURAGE

 MORALITY                                       INTEGRITY



HONESTY                                             LOYALTY


                  SELFLESS
                  SERVICE

          “Finding Tomorrow’s Solutions, Today!”™
          “Finding Tomorrow’s Solutions, Today!”™

Is3 Capabilities Brief

  • 1.
    Information Systems SecuritySolutions, Inc. Corporate Capabilities Brief “Finding Tomorrow’s Solutions, Today!”™
  • 2.
    Company Overview IncorporatedOctober 2002 Top Secret Facility Clearance, Total “Turn-key” Information Technology (IT) Integration/Services & Support Qualified Full-time IT professionals, Installation Technicians, Information Assurance Strategists, Radio Frequency Consultants and Engineers Native American (NAOSB) – Service Disabled Veteran (SDVOB), Certified SBA 8(a) and Small Disadvantage Business (SDB), Certified Local Disadvantage Business Enterprise (LDBE), DOT Disadvantaged Business Enterprise (DBE), GSA IT Schedule 70 Holder, Certified in Homeland Security (CHS-III) Association / Member Affiliations- IEEE, BICSI, AFCEA, NVTC, NDIA, MDBA, National Board of Forensic Examiners “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 3.
    Mission Our mission isto provide our clients with the best quality of service, while maintaining a client centric approach, that meets and or exceeds their expectations. The main objective of IS3 is to provide FAST, innovative, quality solutions that unites the client with the technology of today as well as tomorrow. This creates security for the client, as well as allowing them to maintain a competitive edge in the information technology market. Let IS3 show you why “we find tomorrow's solutions today!” “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 4.
    Methodology IS3 provides total'turn-key' solutions. We offer our clients one single point of contact. We are with them from start to finish. Our approach is simple, we provide our clients with the consultation, the recommendation, the installation support (if required), the implementation and integration and finally, the commissioning. One company, one mission, one goal….client satisfaction! “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 5.
    Territory With Headquarters locatedin Sterling, VA with additional operational locations: • Arlington, VA • Washington, D.C. • Lanham, MD • Middleburg, VA IS3 currently performs enterprise network installations/support/integration, central office upgrades and services and Radio Frequency, Broad-band, WiFi engineering for clients in most major cities throughout the continental United States and Hawaii. “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 6.
    Corporate Business Structure Sectors • Federal/DoD/Civilian Agencies • Private/State/Local Contract Vehicles • NETCENTS (First Tier Telos Corporation) • ALLIANT Large (First Tier Wyle) • GSA-IT Schedule 70, Millennia Lite (CSC), VETS (Multiple Teams) • Navy Seaport-e (Multiple Teams) • DoS-SASI (First Tier SRA), DOJ-MEGA-III (CACI) • TEIS-2s, ITES-2s (First Tier NCI, Inc) • TIPSS-III (Subcontractor to Lockheed Martin) NAICS Codes 541512 (PRIMARY), 541513, 541618, 541690, 541710 “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 7.
    Company Awards Ranked # 14 of the Top 25 Small Technology Businesses Washington Business Journal November 2006 Washington SmartCEO Magazine Future 50 Winner January 2006/2007 Ranked # 10 of the Top 25 Small Technology Businesses Washington Business Journal October 2005 Selected as a Top Minority-Owned Small Business DiversityBusiness.com. November 2006/2007 “Finding Tomorrow’s Solutions, Today!”™
  • 8.
    Clientele (Partial List) “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 9.
    Strategic Partners “FindingTomorrow’s Solutions, Today!”™
  • 10.
    Core Competencies Information Assurance(IA) Business Transformation Solutions (BTS) Federal Business Research (FBR) Information Transport Systems (ITS) “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 11.
    IS3 Proprietary Services & Solutions Cyber Contingency Security Operations Confidentiality Configuration Management Incident Risk Management Assessment Information Certification Personnel Security Integrity CSI & Accreditation Availability Access Control Crisis Assurance Situational Management Awareness You Deserve the Best in Security IS3 has the Key Compliant Security Integration Secure and Compliant...from the Desktop to the Door “Finding Tomorrow’s Solutions, Today!”™
  • 12.
    Compliant Security Integration CSI® IS3, Inc. has developed a program that outlines the processes necessary to map critical data and business processes to services and assets to provide an integrated view of security assurance and guide clients in making better security investment decisions. In addition, this process will assist the client in aligning their critical data and business processes to the appropriate regulatory compliance policies and procedures and develop a consistent, proactive security-monitoring environment. This program is called Compliant Security Integration (CSI®). The main focus of CSI® is to develop a program that integrates the various security policies and procedures, technology and regulatory requirements into one cohesive program that allows the client to focus on their day to day business processes with the assurance that security has been seamlessly integrated within their organization and is consistently improving regardless of how volatile the environment may be. CSI® Methodology “Finding Tomorrow’s Solutions, Today!”™
  • 13.
    Secure Operational Sustainability SOS® The Secure Operational Sustainability (S.O.S.) Program evolved from extensive practical experience of security program management and network security engineering, design, and implementation. Based on our observations, in the Pentagon and other Department of Defense METHODOLOGY… (DoD) agencies, and practical application, IS3 Program reviews are based on industries’ best practices, tailored believes there are five key and correlative to the organization's business area, methods & circumstances… components that every information technology  In addition to the 5 P’s, assessments and or network security organizations should Security may include such areas as: possess to sustain their network operations. Policy – Architecture – Business Continuity These components are: Security Management – Disaster Recovery – Access Control Program, Security Policy, Security Plan, Security Security Security Management Procedures – Tools Security Procedures, and a Security Processes Plan – Personnel Program – “Five P’s” of S.O.S. The Five P’s are – Education and Training – Managed Security designed to work together, which will promote Security  Immediate results can be realized seamless organizational reformation. This is the Business during and directly after the completion Processes of the assessment premise behind the IS3 S.O.S. Program , and Once an organization has implemented the S.O.S. Program®, Program® based on our research we have found no other their security posture will be enhanced, fortified, and adaptive. adaptive. programs that offer the same intricate services. “Finding Tomorrow’s Solutions, Today!”™
  • 14.
    IS3 Partners with… IS3 has partnered with Modulo Security the Latin American market leader in Information Security to become a value-added reseller and U.S. Consulting Arm for their proprietary Security Risk Manager. Its exclusive solutions use PESI® - an ISO 9001-certified methodology conforming to the ISO/IEC 17799 standard.  MÓDULO's continuous concern with excellence in quality standards has resulted in three important achievements. First, it became Latin America's pioneer company to obtain the BS 7799 certification - the International Information Security Management standard. It also received certification for ISO 9001, and has been re-certified since 1998.  Second, was the launch of Security Risk Manager, a software program for risk assessment, compliance and Knowledge Management System. Modulo Security Lab, one of the most complete IT laboratories in Brazil, provides support in technology research and updates the information security knowledge-base used by Security Risk Manager. The company also has an Education Center specialized in training and certifying information security managers.  And most recently, Modulo has become the first information security company in the world to achieve the ISO 27001 certification. ISO 27001 is the first international information security certification standard and an evolution on British Standard BS 7799-2. It addresses the definition of requirements for implementation of an Information Security Management System - ISMS. The standard was adopted in October 2005 by the International Organization for Standardization (ISO), which handles international certification standards. Modulo Security achieved this certification in record time thanks to the use of Security Risk Manager. “Finding Tomorrow’s Solutions, Today!”™
  • 15.
    IA Division IS3’s IADivision’s mission is to provide a holistic approach to Network Security Program Management and Development. While assisting our clients with maximizing the value of their security environment and posture. The main objective of IS3’s IA Division is to identify information systems security solutions that protect and enhance the business needs of an organization. This will enable clients to realize an inherent return-on- investment (ROI) that is not generally associated with network security. “Finding Tomorrow’s Solutions, Today!”™
  • 16.
    IA Capabilities Information AssurancePrograms Secure Operational Sustainability (S.O.S.) Program® Implementation Compliant Security Integration (CSI) Program  Security Compliance Delivers compliance with all relevant Federal laws, directives, policies, standards and guides such as FISMA, DITSCAP, NIACAP, NIST, PDD 67, Sarbanes-Oxley and OMB Circular A-130  Physical Security Focuses on the protection of assets, people and structure against perceived threats Site Surveys, Entry Point Design Considerations, Personnel Security  Security Engineering Threat/Vulnerability Assessments, Policy Development, Strategic Planning, Disaster Recovery / Continuity of Operations  Certified Information Systems Security Professionals (CISSP)  Certified Information Assurance Managers (IAM) “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 17.
    IA Division PastPerformance  Network Security Services – Pentagon (NSS-P) - Conducted a security architecture review of information technology security deployment, practices, and policies to assess the organization’s security posture  Washington Headquarters Services (WHS) - Support the WHS Chief Information Officer (CIO) and the Designated Approving Authority (DAA), in the operations, implementation, assessment, documenting, preparation, development, technical review, and certification for WHS. Direct support for the overall Information Assurance Program Management Office  United States Department of State (DoS) - Supporting the Bureau of Human Resources Executive Office with 1) safeguard systems and information nationwide, to 2) ensure systems are certified and accredited, 3) manage enterprise-wide configurations and changes, 4) continuously monitor, mitigate and prevent system threats and vulnerabilities and 5) ensure regulatory compliance (on-going)  United States Navy Medical Information Management Center (NMIMC) - Ensures coordination of all security programs and activities for IT applications and infrastructure; this includes ensuring that all information systems are properly certified and accredited, monitored, audited, tested, documented and compliant with HIPAA, NIST, OMB, FISMA and other pertinent regulatory requirements, policy and guidelines “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 18.
    BTS Division Provide innovativeideas that will produce more efficient and effective solutions for our clients through technical/business consulting that cover all facets of the Business Enterprise. We provide clients with “as is”, as be” and “to be” models that allow them to realize true return on their business infrastructure investments (True ROI). “Finding Tomorrow’s Solutions, Today!”™
  • 19.
    BTS Capabilities To provide“total turn-key”, world-class Business Transformation support/solutions that are tailored and designed to support all of the clients current and future needs.  Enterprise Resolution Center  Enterprise Solutions  BTS-Federal “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 20.
    BTS Capabilities… Enterprise Resolutions Center  Tiered Help Desk Support  Escalation and Tracking  Knowledge “Bank”  Adherence to SLA and OLA  “End-of-Life” Cycle Review “Finding Tomorrow’s Solutions, Today!”™
  • 21.
    BTS Capabilities… Enterprise Solutions  Enterprise Network Design, Support  Datacenter support  Facilities Management  MPLS Design, Support, Implementation  LAN/WAN/MAN/CAN  Enterprise Assessments, Analysis, Testing, Troubleshooting “Finding Tomorrow’s Solutions, Today!”™
  • 22.
    BTS Capabilities… BTS-Federal  Enterprise Architecture (EA)  Business Process Re-engineering  Capital Planning and Investment Control (CPIC) – guided by EA  Earned Value Management (EVM) as a key element of project management “Finding Tomorrow’s Solutions, Today!”™
  • 23.
    BTS Division PastPerformance  Washington Headquarters Services (WHS) Supporting the WHS Chief Information Officer (CIO) and the Designated Approving Authority (DAA), in the operations, implementation, assessment, documenting, preparation, development, technical review, and certification for WHS. Direct support for the overall Enterprise Architecture Program Management Office.  United States Department of State (DoS) Supporting the Bureau of Human Resources Executive Office with developing a consistent release process for all production systems and infrastructure elements, and define “the phased change process”. Direct support for the overall Configuration Management and Change Control Program (on-going) “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 24.
    BTS Division PastPerformance  General Services Administration (GSA) Providing Helpdesk/customer service representatives to include, but limited to maintaining first contact resolution; maintaining and resolving trouble tickets; updating knowledge management database; providing break/fix assistance via script and remote access(on-going)  Sprint Nextel Corporation Managed all network engineering services related to the national deployments of new network hardware and or services: coordinated resources for deployment efforts, chaired conference calls and meetings, reviewed design and planned network/equipment configurations, managed all client deliverables and reports; provided SME for deployment activities and escalation, trained team members on technologies and deployment procedures(on-going)  National Academies of Science (NAS) Providing engineering support to the design, implementation and integration of backbone network upgrades to a new SONNET ring structure for the academies and data center relocation; Firewall design and deployment for DMZ segments for enterprise server clusters on PIX 515E platforms; Firewall design and deployment secured site to site VPN and access VPN designs and deployments on the PIX 515E. Provided pre and post tier III migration support. (on-going) “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 25.
    FBR Division IS3’s FBRDivision’s mission is to provide clients with a holistic approach to the federal business research process and assist them with understanding the federal business procurement cycle. FBR Analyst work with the client (either internal or external) to assist them in understanding, defining and documenting their overarching business objects. The FBR Analyst applies qualitative and quantitative techniques to interpret the data and produce substantiated recommendations. FBR Analyst frequently present the findings and recommendations to the client in a clear, concise and easier to understand manner. “Finding Tomorrow’s Solutions, Today!”™
  • 26.
    FBR Capabilities FBR CertifiedAnalyst support client business research requirements by: • Utilizing years of experience in dealing with program managers and contracting officers in ALL Federal and Government Civilian agencies • Communicating with clients to understand and document the business objectives (overview of corporate capabilities and review of NAICS Codes, Corporate Qualifications, existing contract vehicles, etc.) • Formulating analysis plans and acquiring client (stakeholder) “buy-in” of proposed business research approach • Designing and/or assisting in the development of questionnaires and moderator guides to ensure the necessary data is capture • Conducting in-depth data analysis using traditional and advanced methods • Authoring reports containing actionable recommendations • Making presentations – answering questions and instilling confidence and “stakeholder” support “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 27.
    FBR Division PastPerformance  True Information Assurance, LLC Veteran, minority-owned, woman-owned, small disadvantage business providing a broad array of innovative Enterprise-level services and solutions to the Department of Defense and commercial industry. True IA has extensive expertise in the areas of Program/Project Management, Information Assurance and Information Technology. Services Provided •Business opportunity research •Proposal Management/Development  iGov Solutions, Inc Native American-Service Disabled Veteran-owned Small Disadvantaged Business specializing in Information Assurance, Singularly Managed Infrastructure and Business Transformation Solutions Services Provided • Business opportunity research • Weekly business reports • Weekly/Monthly opportunity report reviews • Proposal Management/Development • Business Development/Market Research “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 28.
    WHY IS3’s FBRDivision  IS3 provides complete “turnkey” solutions to meet all client federal business research and procurement needs. We specialize in providing these services to small and medium sized businesses. Our Analysts will facilitate ALL research requirements with “Stakeholders” and decision makers so that ALL aspects of the organizations research needs are met.  Strategic alliances with leading government agencies (contracting officers and program managers). IS3 provides dedicated FBR Analysts that will become an extension of the client’s federal business development staff and will interact with client business development staff as required. Leveraging these relationships we provide our clients with the best quality of service while maintaining a cost sensitive approach that meets and exceeds their expectations.  Our comprehensive Federal Business Research process will evaluate a broad spectrum of internal and external business research practices. IS3’s tested and proven process will effectively identify “gaps” and provide results and increased federal bid opportunities.  IS3 has developed a proven Federal Business Research process; effectively delivering continued results and performance. We provide our clients with top quality and goal oriented research solutions. This proven expertise enables us to more effectively address the complexities of the federal procurement process and bid/proposal life- cycle while stream-lining the entire federal process.  IS3 employs qualified, federal business research professionals available to enhance the business processes, control cost, improve performance and maximize resources thus enabling clients to more effectively identify, qualify and bid federal solicitations. If required, our Research Analyst will provide “Go-NoGo” support, “Bid- NoBid” decisions and if requested, we will provide proposal management and development as well. “Finding Tomorrow’s Solutions, Today!”™
  • 29.
    ITS Division IS3’s ITSDivision provides technical services based on the transport of information through Wired or Wireless means. ITS covers the bottom four layers of the Open Systems Interconnect (OSI) model developed by the International Standards Organization (ISO). “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 30.
    ITS Division Capabilities ITS Wired Solutions Group Provides fiber optic and copper structured cabling solutions for facility low voltage systems including; voice, data video, life safety and security – Building/Office Inside Plant Cabling – Central Office/Data Center Cabling  ITS Wireless Solutions Group Provides wireless solutions for facilities, that require voice and data wireless coverage to support Cellular, WiFi and Public Safety applications – Distributed Antenna Systems – Neutral Host based systems  ITS Engineering Group Provides Engineering support to internal groups and external clients – BICSI Engineers (RCDDs) – Cisco Certified Engineers – Radio Frequency Engineers “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 31.
    “In-Structure” Distributed Antenna Systems (IS-DAS) IS3 designs and engineers “In-Structure” Distributed Antenna Systems (IS- DAS) within large facilities or venues that provide wireless coverage for cellular phones, wireless LANs (WLAN), radios and other wireless-enabled devices; providing seamless coverage for multiple internal and external service providers of voice and data services. Venues such as:  Airports  Metro Rail / Subway Systems  Large Federal Government Facilities, Campuses and Bases  State & Local Government Facilities – Office Buildings – Court Houses/Jails – Schools The net benefit of a DAS system is a less expensive solution with equipment that is more efficiently utilized, is less intrusive and does not disrupt the surrounding overall network. “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 32.
    ITS Division PastPerformance  Sprint Nextel Corporation – Nationwide Switching Center ITS Build-outs and Support – Nationwide Engineering Services & O&M Support  Computer Sciences Corporation – Nationwide ITS Build-out (Voice / Data / Video)  Metropolitan Washington Airports Authority (MWAA) – Supplemental Radiating System (SRS) – National, Dulles & Udvar Hazy Center – Dulles Vehicle Maintenance Facility – Dulles & National Neutral Host System – IS3 is represented the four Major Wireless Carriers in the United States, and was primary Client Liaison to the Owner, Metropolitan Washington Airports Authority (MWAA) and Systems Integrator for the CWAS project. The CWAS initiative included the management, planning, detailed design & engineering, construction, operation and marketing for Wireless Voice and Data applications and two Complete Information Transport Systems, consisting of Fiber and Copper at both of the Nation’s Capitol’s Airports.  State of Maryland, Wicomico County – Courthouse, Government Center and Two High Schools –800MHz Public Safety  Washington Metropolitan Area Transit Authority (WMATA) – Tunnels Wireless Neutral Host Based System  General Services Administration (GSA) – Presidential Transition Team Building – Facility ITS Build-outs (Headquarters Building) “Finding Tomorrow’s Solutions, Today!”™
  • 33.
    WHY IS3  IS3provides complete turnkey solutions to meet all LAN, WAN, Enterprise Network Architecture, Business Transformation and Security needs to include complete support of converged network solutions for seamless integration, security architecture solutions at all levels of development and implementation and structured cabling services to include Central Office installation, Remote POP, superstructure, and Power.  Strategic partnerships with leading IT companies guarantee clients invested skills and resources required to design, implement and support the “best of breed” technologies. Leveraging these relationships we provide our clients with the best quality of service while maintaining a cost sensitive approach that meets and exceeds expectations.  Our comprehensive Security Assessment process will evaluate a broad spectrum of internal and external Information Assurance (IA) practices. IS3’s tested and proven process will effectively identify needs for designing a security policy plan that will enhance existing network demand for secured connectivity.  IS3 has developed a proven engineering design and implementation process; effectively delivering continued results and performance. We provide our clients with top quality and goal oriented services in the areas of: project management, equipment staging, configuration, burn-in, installation, migration, cutover, integration, testing, documentation and “as-builds”. This proven expertise enables us to more effectively address the complexities of Enterprise Network and Infrastructure requirements.  IS3 employs qualified, certified IT support professionals available to enhance the business processes, control cost, improve performance and maximize resources thus enabling clients to more effectively deliver products and services. Our Engineers will assist with network design, configuration changes, capacity analysis, network and power analysis, site survey, equipment layouts, RFP, quality control, testing and assurance. “Finding Tomorrow’s Solutions, Today!”™
  • 34.
    Contact Information Information SystemsSecurity Solutions, Inc. 45150 Business Court Suite 500 Sterling, Virginia 20166 Office (703) 707-8400 Fax (703) 707-8441 Web http://www.infos3.com Information request: info@infos3.com Cage Code: 3C334 GSA Schedule Contract: GS-35F-0776P “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™
  • 35.
    IS3 CORE VALUES PERSONAL COURAGE MORALITY INTEGRITY HONESTY LOYALTY SELFLESS SERVICE “Finding Tomorrow’s Solutions, Today!”™ “Finding Tomorrow’s Solutions, Today!”™