Automated test types in Magento / Adobe Commerce
● Unit Tests
● Integration Tests
● Functional Tests (MFTF)
● API Functional Tests
● Static Tests
● …and more
Full list of supported test types:
https://developer.adobe.com/commerce/testing/guide/
Integration Tests - basic info
● Very similar to Unit Tests in architecture
● Based on PHPUnit
● Use the built-in Integration Tests Framework
● Require access to services that Magento requires for installation (database,
redis, search engine etc.)
● Require some initial setup in config files
Integration Tests - types
We can identify two types of Integration Tests:
- End-to-end or cross-component tests: tests that simulate full path of some
use case, like registering a customer, adding a product to cart, filling shipping
and billing data, placing an order and checking if it got persisted in the
database with no errors
- Component tests: tests that usually involve only one class along with its
dependencies; something that a lot of people would consider a Unit Test for
Setting up
1. Create an empty database
2. Copy two .dist files in dev/tests/integration/etc/ to the same directory, but without the .dist extension:
a. install-config-mysql.php.dist
b. config-global.php.dist
3. Edit your new install-config-mysql.php file and adjust all the settings for database connection, redis
connection etc.
4. Do not touch admin credentials or frontname as some tests may fail because of that
5. If you have any global config settings that all your tests require, put them in config-global.php
6. Copy dev/test/quick-integration/phpunit.xml.dist to dev/tests/quick-integration/phpunit.xml and
disable TESTS_CLEANUP to speed up subsequent executions (the app won’t try to reinstall)
Run your tests using the following command from the Magento dev/tests/integration directory:
php ../../../vendor/bin/phpunit ../../../some/directory/to/test
Anatomy of a test
This is how a simple Integration Test looks like:
Integration Tests Framework - Annotations
The following annotations are available in integration tests:
● @magentoAppIsolation
● @magentoDbIsolation
● @magentoDataFixture
● @magentoDataFixtureBeforeTransaction
● @magentoAppArea
● @magentoConfigFixture
There are less commonly used ones too, the full list is available here:
https://developer.adobe.com/commerce/testing/guide/integration/annotations/
Annotations - Example
Please note that there are two different ways of defining a data fixture:
● The first one defines a path relative to a module
● The second one defines a path relative to dev/tests/integration/testsuite
There are tons of useful fixtures in dev/tests/integration/testsuite.
Integration Tests vs Unit Tests
Unit Tests Integration Tests
Dependent on tested code implementation Independent of implementation - they only care about results
Require A LOT of mocks Don’t require mocks - can work with “real” classes. Can still
use mocks if required.
Require a lot of maintenance effort Don’t require a lot of maintenance effort
Can only work with PHP classes Can also test validity of the XML-based configuration layer
Can only test in isolation Can test in as much isolation as the developer wants
Hard to predict during a task creation Can be easily defined as parts of acceptance criteria
Run VERY fast Run VERY slow*
Limited possibility of testing code that interacts with 3rd party
services
Limited possibility of testing code that interacts with 3rd party
services*
* Can be improved
Integration Tests vs Unit Tests - let’s talk numbers…
Customer repository - unit test class Customer repository - integration test class
82 lines of setUp() 15 lines of setUp()
173 lines of testSave() 20 lines of testCreateNewCustomer() which also tests save();
No need for an explicit testSave()
57 mocks in the class 0 mocks in the class, only actual test logic
742 lines of code in the class for 5 tests: delete, deleteById,
getList, save and saveWithPassworHash
692 lines of code to perform 14 different tests
mocks returning mocks all objects created by the object manager
Integration Tests vs Unit Tests - a unit test
Integration Tests vs Unit Tests - an integration test
Example of how to define tests during task creation
Task #1: Admins should see ERP invoice issuer on the invoice view page in
Magento admin panel
Description: When an invoice is manually created in ERP, it has the creator’s
name attached. We are already pulling this data and now we need to show it in
Magento admin panel. Invoices that have this data should display “Issuer: Name
Here” and those that don’t should not display this info at all.
Tests: easy to define both Unit and Integration tests during the task creation, as
this will require a template override and either a ViewModel or a preference for the
block to pull the data from the database.
Example of how to define tests during task creation
Now imagine that the initial implementation of the Task #1 example was made
using a preference for the block displaying this data, but later on it got refactored
to a view model.
Integration tests will still work.
Example of how to define tests during task creation
Task #2: Customers can’t place orders above $10,000
Description: No customer is able to place an order above $10k. Those same
customers can successfully place orders below or equal $10k with the same data
(addresses, shipping and billing method etc.).
Integration Tests: Create a quote for above $10k, use it to place orders. Watch it
fail, then fix the issue.
Unit Tests: ???
Integration Tests - issues and how to avoid them
Two main issues are:
● Long execution time
● Limited help with testing code that connects with 3rd party services
Solution:
ReachDigital Magento 2 Performance tuned integration tests
https://github.com/ho-nl/magento2-ReachDigital_TestFramework
Integration Tests - with the ReachDigital component
Fix for the issue #1 - long execution time:
● Disabled memory cleanup scripts
● Made the application to not reinitialize that much
● Disabled config-global.php usage
● Disabled the sequence table generation
It takes just seconds to run a single test.
Integration Tests - with the ReachDigital component
Fix for the issue #2 - limited possibility of testing code that interacts with 3rd party
services:
● Introduced TestModules
● Every module can have a TestModule directory inside with a fully functional
Magento module
● Those modules are copied to app/code during tests execution and don’t affect
regular (non-test) executions of the Magento application
● Test modules can have preferences and/or around plugins in di.xml for
classes/methods that connect to 3rd party services, and return mocked data
instead
● Limitation: works only for modules inside the vendor directory
Integration Tests - with the ReachDigital component
Setting up:
1. composer require --dev reach-digital/magento2-test-framework
2. Perform the regular setup procedure for integration tests
3. Copy dev/tests/quick-integration/phpunit.xml.dist to dev/tests/quick-
integration/phpunit.xml if you need to change anything there
Running:
Perform the following commands from the Magento root directory:
cd dev/tests/integration
php ../../../vendor/bin/phpunit -c ../quick-integration/phpunit.xml ../../../path/to/test
Conclusions
1. Do test your code
2. Use Integration Tests instead of Unit Tests for better results
3. Consider end-to-end tests for critical paths
4. Use component integration tests for your modules
5. Install the ReachDigital component or else you’ll get bored and abandon the
idea of running Integration Tests
Questions?
Thank You!
If you have any questions or just want to connect:
Email: bartosz.m.gorski@gmail.com
LinkedIn: https://www.linkedin.com/in/gorskibartosz/

More Related Content

Similar to Introduction to Integration Tests in Magento / Adobe Commerce

Automation frameworks
Automation frameworksAutomation frameworks
Automation frameworksVishwanath KC
 
Meet Magento Belarus 2015: Uladzimir Kalashnikau
Meet Magento Belarus 2015: Uladzimir KalashnikauMeet Magento Belarus 2015: Uladzimir Kalashnikau
Meet Magento Belarus 2015: Uladzimir KalashnikauAmasty
 
Development and test infrastructure
Development and test infrastructureDevelopment and test infrastructure
Development and test infrastructureJun Li
 
Getting started with test complete 7
Getting started with test complete 7Getting started with test complete 7
Getting started with test complete 7Hoamuoigio Hoa
 
IBM Cognos 10 Framework Manager Metadata Modeling: Tips and Tricks
IBM Cognos 10 Framework Manager Metadata Modeling: Tips and TricksIBM Cognos 10 Framework Manager Metadata Modeling: Tips and Tricks
IBM Cognos 10 Framework Manager Metadata Modeling: Tips and TricksSenturus
 
php[world] Magento101
php[world] Magento101php[world] Magento101
php[world] Magento101Mathew Beane
 
Zendcon magento101
Zendcon magento101Zendcon magento101
Zendcon magento101Mathew Beane
 
Automated Acceptance Tests & Tool choice
Automated Acceptance Tests & Tool choiceAutomated Acceptance Tests & Tool choice
Automated Acceptance Tests & Tool choicetoddbr
 
Engineering Student MuleSoft Meetup#4 - API Testing With MuleSoft
Engineering Student MuleSoft Meetup#4 - API Testing With MuleSoftEngineering Student MuleSoft Meetup#4 - API Testing With MuleSoft
Engineering Student MuleSoft Meetup#4 - API Testing With MuleSoftJitendra Bafna
 
DevOps CI Automation Continuous Integration
DevOps CI Automation Continuous IntegrationDevOps CI Automation Continuous Integration
DevOps CI Automation Continuous IntegrationIRJET Journal
 
Unit testing (Exploring the other side as a tester)
Unit testing (Exploring the other side as a tester)Unit testing (Exploring the other side as a tester)
Unit testing (Exploring the other side as a tester)Abhijeet Vaikar
 
API automation with JMeter + Bamboo CI
API automation with JMeter + Bamboo CIAPI automation with JMeter + Bamboo CI
API automation with JMeter + Bamboo CIMykola Kovsh
 
Magento2.3 API Functional Testing
Magento2.3 API Functional TestingMagento2.3 API Functional Testing
Magento2.3 API Functional TestingVishwas Bhatnagar
 
DevOps and Build Automation
DevOps and Build AutomationDevOps and Build Automation
DevOps and Build AutomationHeiswayi Nrird
 
Moodle Development Best Pracitces
Moodle Development Best PracitcesMoodle Development Best Pracitces
Moodle Development Best PracitcesJustin Filip
 
Testing level
Testing levelTesting level
Testing levelzahid7578
 
Keyword Driven Testing
Keyword Driven TestingKeyword Driven Testing
Keyword Driven TestingHarish MS
 

Similar to Introduction to Integration Tests in Magento / Adobe Commerce (20)

Automation frameworks
Automation frameworksAutomation frameworks
Automation frameworks
 
Meet Magento Belarus 2015: Uladzimir Kalashnikau
Meet Magento Belarus 2015: Uladzimir KalashnikauMeet Magento Belarus 2015: Uladzimir Kalashnikau
Meet Magento Belarus 2015: Uladzimir Kalashnikau
 
Development and test infrastructure
Development and test infrastructureDevelopment and test infrastructure
Development and test infrastructure
 
Getting started with test complete 7
Getting started with test complete 7Getting started with test complete 7
Getting started with test complete 7
 
IBM Cognos 10 Framework Manager Metadata Modeling: Tips and Tricks
IBM Cognos 10 Framework Manager Metadata Modeling: Tips and TricksIBM Cognos 10 Framework Manager Metadata Modeling: Tips and Tricks
IBM Cognos 10 Framework Manager Metadata Modeling: Tips and Tricks
 
php[world] Magento101
php[world] Magento101php[world] Magento101
php[world] Magento101
 
Zendcon magento101
Zendcon magento101Zendcon magento101
Zendcon magento101
 
Automated Acceptance Tests & Tool choice
Automated Acceptance Tests & Tool choiceAutomated Acceptance Tests & Tool choice
Automated Acceptance Tests & Tool choice
 
Engineering Student MuleSoft Meetup#4 - API Testing With MuleSoft
Engineering Student MuleSoft Meetup#4 - API Testing With MuleSoftEngineering Student MuleSoft Meetup#4 - API Testing With MuleSoft
Engineering Student MuleSoft Meetup#4 - API Testing With MuleSoft
 
DevOps CI Automation Continuous Integration
DevOps CI Automation Continuous IntegrationDevOps CI Automation Continuous Integration
DevOps CI Automation Continuous Integration
 
Unit testing (Exploring the other side as a tester)
Unit testing (Exploring the other side as a tester)Unit testing (Exploring the other side as a tester)
Unit testing (Exploring the other side as a tester)
 
API automation with JMeter + Bamboo CI
API automation with JMeter + Bamboo CIAPI automation with JMeter + Bamboo CI
API automation with JMeter + Bamboo CI
 
Magento2.3 API Functional Testing
Magento2.3 API Functional TestingMagento2.3 API Functional Testing
Magento2.3 API Functional Testing
 
prod-dev-management.pptx
prod-dev-management.pptxprod-dev-management.pptx
prod-dev-management.pptx
 
Spring batch overivew
Spring batch overivewSpring batch overivew
Spring batch overivew
 
DevOps and Build Automation
DevOps and Build AutomationDevOps and Build Automation
DevOps and Build Automation
 
Moodle Development Best Pracitces
Moodle Development Best PracitcesMoodle Development Best Pracitces
Moodle Development Best Pracitces
 
Testing level
Testing levelTesting level
Testing level
 
Keyword Driven Testing
Keyword Driven TestingKeyword Driven Testing
Keyword Driven Testing
 
Test Management in TeamForge
Test Management in TeamForgeTest Management in TeamForge
Test Management in TeamForge
 

Recently uploaded

WSO2CON 2024 - How to Run a Security Program
WSO2CON 2024 - How to Run a Security ProgramWSO2CON 2024 - How to Run a Security Program
WSO2CON 2024 - How to Run a Security ProgramWSO2
 
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...Bert Jan Schrijver
 
What Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationWhat Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationJuha-Pekka Tolvanen
 
WSO2Con2024 - Low-Code Integration Tooling
WSO2Con2024 - Low-Code Integration ToolingWSO2Con2024 - Low-Code Integration Tooling
WSO2Con2024 - Low-Code Integration ToolingWSO2
 
WSO2Con2024 - Unleashing the Financial Potential of 13 Million People
WSO2Con2024 - Unleashing the Financial Potential of 13 Million PeopleWSO2Con2024 - Unleashing the Financial Potential of 13 Million People
WSO2Con2024 - Unleashing the Financial Potential of 13 Million PeopleWSO2
 
WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...
WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...
WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...WSO2
 
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...WSO2
 
Artyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptxArtyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptxAnnaArtyushina1
 
WSO2CON 2024 - Designing Event-Driven Enterprises: Stories of Transformation
WSO2CON 2024 - Designing Event-Driven Enterprises: Stories of TransformationWSO2CON 2024 - Designing Event-Driven Enterprises: Stories of Transformation
WSO2CON 2024 - Designing Event-Driven Enterprises: Stories of TransformationWSO2
 
WSO2CON 2024 - Does Open Source Still Matter?
WSO2CON 2024 - Does Open Source Still Matter?WSO2CON 2024 - Does Open Source Still Matter?
WSO2CON 2024 - Does Open Source Still Matter?WSO2
 
WSO2Con2024 - Simplified Integration: Unveiling the Latest Features in WSO2 L...
WSO2Con2024 - Simplified Integration: Unveiling the Latest Features in WSO2 L...WSO2Con2024 - Simplified Integration: Unveiling the Latest Features in WSO2 L...
WSO2Con2024 - Simplified Integration: Unveiling the Latest Features in WSO2 L...WSO2
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024VictoriaMetrics
 
Announcing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK SoftwareAnnouncing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK SoftwareJim McKeeth
 
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...WSO2
 
WSO2CON 2024 - Lessons from the Field: Legacy Platforms – It's Time to Let Go...
WSO2CON 2024 - Lessons from the Field: Legacy Platforms – It's Time to Let Go...WSO2CON 2024 - Lessons from the Field: Legacy Platforms – It's Time to Let Go...
WSO2CON 2024 - Lessons from the Field: Legacy Platforms – It's Time to Let Go...WSO2
 
WSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
WSO2Con2024 - Enabling Transactional System's Exponential Growth With SimplicityWSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
WSO2Con2024 - Enabling Transactional System's Exponential Growth With SimplicityWSO2
 
WSO2CON 2024 - Freedom First—Unleashing Developer Potential with Open Source
WSO2CON 2024 - Freedom First—Unleashing Developer Potential with Open SourceWSO2CON 2024 - Freedom First—Unleashing Developer Potential with Open Source
WSO2CON 2024 - Freedom First—Unleashing Developer Potential with Open SourceWSO2
 
WSO2Con2024 - Facilitating Broadband Switching Services for UK Telecoms Provi...
WSO2Con2024 - Facilitating Broadband Switching Services for UK Telecoms Provi...WSO2Con2024 - Facilitating Broadband Switching Services for UK Telecoms Provi...
WSO2Con2024 - Facilitating Broadband Switching Services for UK Telecoms Provi...WSO2
 
WSO2Con204 - Hard Rock Presentation - Keynote
WSO2Con204 - Hard Rock Presentation - KeynoteWSO2Con204 - Hard Rock Presentation - Keynote
WSO2Con204 - Hard Rock Presentation - KeynoteWSO2
 
WSO2CON 2024 - IoT Needs CIAM: The Importance of Centralized IAM in a Growing...
WSO2CON 2024 - IoT Needs CIAM: The Importance of Centralized IAM in a Growing...WSO2CON 2024 - IoT Needs CIAM: The Importance of Centralized IAM in a Growing...
WSO2CON 2024 - IoT Needs CIAM: The Importance of Centralized IAM in a Growing...WSO2
 

Recently uploaded (20)

WSO2CON 2024 - How to Run a Security Program
WSO2CON 2024 - How to Run a Security ProgramWSO2CON 2024 - How to Run a Security Program
WSO2CON 2024 - How to Run a Security Program
 
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
 
What Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationWhat Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the Situation
 
WSO2Con2024 - Low-Code Integration Tooling
WSO2Con2024 - Low-Code Integration ToolingWSO2Con2024 - Low-Code Integration Tooling
WSO2Con2024 - Low-Code Integration Tooling
 
WSO2Con2024 - Unleashing the Financial Potential of 13 Million People
WSO2Con2024 - Unleashing the Financial Potential of 13 Million PeopleWSO2Con2024 - Unleashing the Financial Potential of 13 Million People
WSO2Con2024 - Unleashing the Financial Potential of 13 Million People
 
WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...
WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...
WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...
 
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
 
Artyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptxArtyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptx
 
WSO2CON 2024 - Designing Event-Driven Enterprises: Stories of Transformation
WSO2CON 2024 - Designing Event-Driven Enterprises: Stories of TransformationWSO2CON 2024 - Designing Event-Driven Enterprises: Stories of Transformation
WSO2CON 2024 - Designing Event-Driven Enterprises: Stories of Transformation
 
WSO2CON 2024 - Does Open Source Still Matter?
WSO2CON 2024 - Does Open Source Still Matter?WSO2CON 2024 - Does Open Source Still Matter?
WSO2CON 2024 - Does Open Source Still Matter?
 
WSO2Con2024 - Simplified Integration: Unveiling the Latest Features in WSO2 L...
WSO2Con2024 - Simplified Integration: Unveiling the Latest Features in WSO2 L...WSO2Con2024 - Simplified Integration: Unveiling the Latest Features in WSO2 L...
WSO2Con2024 - Simplified Integration: Unveiling the Latest Features in WSO2 L...
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
 
Announcing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK SoftwareAnnouncing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK Software
 
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
 
WSO2CON 2024 - Lessons from the Field: Legacy Platforms – It's Time to Let Go...
WSO2CON 2024 - Lessons from the Field: Legacy Platforms – It's Time to Let Go...WSO2CON 2024 - Lessons from the Field: Legacy Platforms – It's Time to Let Go...
WSO2CON 2024 - Lessons from the Field: Legacy Platforms – It's Time to Let Go...
 
WSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
WSO2Con2024 - Enabling Transactional System's Exponential Growth With SimplicityWSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
WSO2Con2024 - Enabling Transactional System's Exponential Growth With Simplicity
 
WSO2CON 2024 - Freedom First—Unleashing Developer Potential with Open Source
WSO2CON 2024 - Freedom First—Unleashing Developer Potential with Open SourceWSO2CON 2024 - Freedom First—Unleashing Developer Potential with Open Source
WSO2CON 2024 - Freedom First—Unleashing Developer Potential with Open Source
 
WSO2Con2024 - Facilitating Broadband Switching Services for UK Telecoms Provi...
WSO2Con2024 - Facilitating Broadband Switching Services for UK Telecoms Provi...WSO2Con2024 - Facilitating Broadband Switching Services for UK Telecoms Provi...
WSO2Con2024 - Facilitating Broadband Switching Services for UK Telecoms Provi...
 
WSO2Con204 - Hard Rock Presentation - Keynote
WSO2Con204 - Hard Rock Presentation - KeynoteWSO2Con204 - Hard Rock Presentation - Keynote
WSO2Con204 - Hard Rock Presentation - Keynote
 
WSO2CON 2024 - IoT Needs CIAM: The Importance of Centralized IAM in a Growing...
WSO2CON 2024 - IoT Needs CIAM: The Importance of Centralized IAM in a Growing...WSO2CON 2024 - IoT Needs CIAM: The Importance of Centralized IAM in a Growing...
WSO2CON 2024 - IoT Needs CIAM: The Importance of Centralized IAM in a Growing...
 

Introduction to Integration Tests in Magento / Adobe Commerce

  • 1. Introduction to Integration Tests in Magento / Adobe Commerce Bartosz Górski
  • 2. Automated test types in Magento / Adobe Commerce ● Unit Tests ● Integration Tests ● Functional Tests (MFTF) ● API Functional Tests ● Static Tests ● …and more Full list of supported test types: https://developer.adobe.com/commerce/testing/guide/
  • 3. Integration Tests - basic info ● Very similar to Unit Tests in architecture ● Based on PHPUnit ● Use the built-in Integration Tests Framework ● Require access to services that Magento requires for installation (database, redis, search engine etc.) ● Require some initial setup in config files
  • 4. Integration Tests - types We can identify two types of Integration Tests: - End-to-end or cross-component tests: tests that simulate full path of some use case, like registering a customer, adding a product to cart, filling shipping and billing data, placing an order and checking if it got persisted in the database with no errors - Component tests: tests that usually involve only one class along with its dependencies; something that a lot of people would consider a Unit Test for
  • 5. Setting up 1. Create an empty database 2. Copy two .dist files in dev/tests/integration/etc/ to the same directory, but without the .dist extension: a. install-config-mysql.php.dist b. config-global.php.dist 3. Edit your new install-config-mysql.php file and adjust all the settings for database connection, redis connection etc. 4. Do not touch admin credentials or frontname as some tests may fail because of that 5. If you have any global config settings that all your tests require, put them in config-global.php 6. Copy dev/test/quick-integration/phpunit.xml.dist to dev/tests/quick-integration/phpunit.xml and disable TESTS_CLEANUP to speed up subsequent executions (the app won’t try to reinstall) Run your tests using the following command from the Magento dev/tests/integration directory: php ../../../vendor/bin/phpunit ../../../some/directory/to/test
  • 6. Anatomy of a test This is how a simple Integration Test looks like:
  • 7. Integration Tests Framework - Annotations The following annotations are available in integration tests: ● @magentoAppIsolation ● @magentoDbIsolation ● @magentoDataFixture ● @magentoDataFixtureBeforeTransaction ● @magentoAppArea ● @magentoConfigFixture There are less commonly used ones too, the full list is available here: https://developer.adobe.com/commerce/testing/guide/integration/annotations/
  • 8. Annotations - Example Please note that there are two different ways of defining a data fixture: ● The first one defines a path relative to a module ● The second one defines a path relative to dev/tests/integration/testsuite There are tons of useful fixtures in dev/tests/integration/testsuite.
  • 9. Integration Tests vs Unit Tests Unit Tests Integration Tests Dependent on tested code implementation Independent of implementation - they only care about results Require A LOT of mocks Don’t require mocks - can work with “real” classes. Can still use mocks if required. Require a lot of maintenance effort Don’t require a lot of maintenance effort Can only work with PHP classes Can also test validity of the XML-based configuration layer Can only test in isolation Can test in as much isolation as the developer wants Hard to predict during a task creation Can be easily defined as parts of acceptance criteria Run VERY fast Run VERY slow* Limited possibility of testing code that interacts with 3rd party services Limited possibility of testing code that interacts with 3rd party services* * Can be improved
  • 10. Integration Tests vs Unit Tests - let’s talk numbers… Customer repository - unit test class Customer repository - integration test class 82 lines of setUp() 15 lines of setUp() 173 lines of testSave() 20 lines of testCreateNewCustomer() which also tests save(); No need for an explicit testSave() 57 mocks in the class 0 mocks in the class, only actual test logic 742 lines of code in the class for 5 tests: delete, deleteById, getList, save and saveWithPassworHash 692 lines of code to perform 14 different tests mocks returning mocks all objects created by the object manager
  • 11. Integration Tests vs Unit Tests - a unit test
  • 12. Integration Tests vs Unit Tests - an integration test
  • 13. Example of how to define tests during task creation Task #1: Admins should see ERP invoice issuer on the invoice view page in Magento admin panel Description: When an invoice is manually created in ERP, it has the creator’s name attached. We are already pulling this data and now we need to show it in Magento admin panel. Invoices that have this data should display “Issuer: Name Here” and those that don’t should not display this info at all. Tests: easy to define both Unit and Integration tests during the task creation, as this will require a template override and either a ViewModel or a preference for the block to pull the data from the database.
  • 14. Example of how to define tests during task creation Now imagine that the initial implementation of the Task #1 example was made using a preference for the block displaying this data, but later on it got refactored to a view model. Integration tests will still work.
  • 15. Example of how to define tests during task creation Task #2: Customers can’t place orders above $10,000 Description: No customer is able to place an order above $10k. Those same customers can successfully place orders below or equal $10k with the same data (addresses, shipping and billing method etc.). Integration Tests: Create a quote for above $10k, use it to place orders. Watch it fail, then fix the issue. Unit Tests: ???
  • 16. Integration Tests - issues and how to avoid them Two main issues are: ● Long execution time ● Limited help with testing code that connects with 3rd party services Solution: ReachDigital Magento 2 Performance tuned integration tests https://github.com/ho-nl/magento2-ReachDigital_TestFramework
  • 17. Integration Tests - with the ReachDigital component Fix for the issue #1 - long execution time: ● Disabled memory cleanup scripts ● Made the application to not reinitialize that much ● Disabled config-global.php usage ● Disabled the sequence table generation It takes just seconds to run a single test.
  • 18. Integration Tests - with the ReachDigital component Fix for the issue #2 - limited possibility of testing code that interacts with 3rd party services: ● Introduced TestModules ● Every module can have a TestModule directory inside with a fully functional Magento module ● Those modules are copied to app/code during tests execution and don’t affect regular (non-test) executions of the Magento application ● Test modules can have preferences and/or around plugins in di.xml for classes/methods that connect to 3rd party services, and return mocked data instead ● Limitation: works only for modules inside the vendor directory
  • 19. Integration Tests - with the ReachDigital component Setting up: 1. composer require --dev reach-digital/magento2-test-framework 2. Perform the regular setup procedure for integration tests 3. Copy dev/tests/quick-integration/phpunit.xml.dist to dev/tests/quick- integration/phpunit.xml if you need to change anything there Running: Perform the following commands from the Magento root directory: cd dev/tests/integration php ../../../vendor/bin/phpunit -c ../quick-integration/phpunit.xml ../../../path/to/test
  • 20. Conclusions 1. Do test your code 2. Use Integration Tests instead of Unit Tests for better results 3. Consider end-to-end tests for critical paths 4. Use component integration tests for your modules 5. Install the ReachDigital component or else you’ll get bored and abandon the idea of running Integration Tests
  • 22. Thank You! If you have any questions or just want to connect: Email: bartosz.m.gorski@gmail.com LinkedIn: https://www.linkedin.com/in/gorskibartosz/