Internet and Web Application Security 3rd Edition Mike Harwood
Internet and Web Application Security 3rd Edition Mike Harwood
Internet and Web Application Security 3rd Edition Mike Harwood
Internet and Web Application Security 3rd Edition Mike Harwood
Internet and Web Application Security 3rd Edition Mike Harwood
1.
Internet and WebApplication Security 3rd
Edition Mike Harwood install download
https://ebookmeta.com/product/internet-and-web-application-
security-3rd-edition-mike-harwood/
Download more ebook from https://ebookmeta.com
2.
We believe theseproducts will be a great fit for you. Click
the link to download now, or visit ebookmeta.com
to discover even more!
Grokking Web Application Security (MEAP V02) Malcolm
Mcdonald
https://ebookmeta.com/product/grokking-web-application-security-
meap-v02-malcolm-mcdonald/
Web Application Security: Exploitation and
Countermeasures for Modern Web Applications 2nd Edition
Andrew Hoffman
https://ebookmeta.com/product/web-application-security-
exploitation-and-countermeasures-for-modern-web-applications-2nd-
edition-andrew-hoffman/
Web Application Security 2nd Edition (Early Release)
Andrew Hoffman
https://ebookmeta.com/product/web-application-security-2nd-
edition-early-release-andrew-hoffman/
Effective Go: Elegant, Efficient, and Testable Code
(MEAP Version 3) 1 / chapter 1 to 6 of 8 Edition Inanc
Gumus
https://ebookmeta.com/product/effective-go-elegant-efficient-and-
testable-code-meap-version-3-1-chapter-1-to-6-of-8-edition-inanc-
gumus/
3.
Mayhem Trailer ParkGirls Duet 1 1st Edition Cala Riley
Riley Cala
https://ebookmeta.com/product/mayhem-trailer-park-girls-
duet-1-1st-edition-cala-riley-riley-cala/
Machine Learning 1st Edition Minsoo Kang
https://ebookmeta.com/product/machine-learning-1st-edition-
minsoo-kang/
Automate the Boring Stuff with Python Practical
Programming for Total Beginners 1st Edition Al Sweigart
https://ebookmeta.com/product/automate-the-boring-stuff-with-
python-practical-programming-for-total-beginners-1st-edition-al-
sweigart-3/
From Communication Landscapes to Bullying Battlegrounds
1st Edition Sibel Aydin
https://ebookmeta.com/product/from-communication-landscapes-to-
bullying-battlegrounds-1st-edition-sibel-aydin/
Essential Econometric Techniques A Guide to Concepts
and Applications 3rd Edition Elia Kacapyr
https://ebookmeta.com/product/essential-econometric-techniques-a-
guide-to-concepts-and-applications-3rd-edition-elia-kacapyr/
4.
Interpreting Popular MusicWith a new preface by the
author David Brackett
https://ebookmeta.com/product/interpreting-popular-music-with-a-
new-preface-by-the-author-david-brackett/
PART ONE TheInternet, the World Wide Web, and the Need for Security
CHAPTER 1 The Internet and the World Wide Web
Data and Information
Data
Information
The Evolution of Computers and Computing
Before There Was an Internet
ARPANET
The Legacy of ARPANET
The Maturing Network
Hypertext
The Early Internet
Gopher, Archie, and Veronica
Groupware
Hardware
The World Wide Web (WWW)
Tim Berners-Lee
The Web
Mosaic
World Wide Web Phases
Web 1.0
Web 2.0
Web 3.0
Web 4.0
Client/Server Computing
Virtualization and Cloud Computing
Virtualization
Cloud Computing
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 1 ASSESSMENT
CHAPTER 2 Security Considerations for SOHO and Personal Systems
What Is Security?
15.
Vulnerabilities, Threats, andRisk
Vulnerabilities
Human Vulnerabilities and Error
Weak Passwords
Insecure Location
System and Application Updates Not Applied
No Backup Plan
Natural Vulnerabilities
Threats
Ownership
Threat Actors
Social Engineering
Antisocial Defense
Identify Theft
Malware and Ransomware
Viruses
Malware
Malware Types
Malware Movement
Ransomware
Risk
Types of Risk
Risk Assessment
Risk Matrix
Protecting Assets
Keeping Private Data Private
Hardening
Exposures
Closures
The Benefits of Hardening
Cookies
Wireless Network Vulnerabilities
Minimize Wireless Risks
Encrypt Data in Transit
Guard the SSID
16.
Threat and RiskIdentification
Threat Maps
Current Threat Identification
Broken Access Control
Cryptographic Failures
Injections
Weak Security Design
Misconfiguration
Identification and Authentication Failures
Application Software and Data Integrity Issues
Insufficient Security Logging and Monitoring
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 2 ASSESSMENT
CHAPTER 3 Security Considerations for Business
Business on the Web
Business Modes
Early E-Commerce
Customer-Focused Services
The Evolution of the Web
Website Security
Vulnerabilities
Threats
Ransomware
Online Business Risk
Asset Identification
Data Assets
Managing Risk
Risk Assessments
Qualitative and Quantitative
Qualitative Assessment
Quantitative Assessment
Mitigation Strategies
Securing IP Communications
17.
Secure Access forRemote Employees
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 3 ASSESSMENT
PART TWO Secure Web-Enabled Application Deployment and Social
Networking
CHAPTER 4 Mitigating Risk When Connecting to the Internet
The Threats and Risks on the Internet
Risks and Threats
Hackers and Predators
Malware
Vulnerabilities and Exploits
Personal Attacks
Online Risks and Threats
Website Hosting
External Web Hosting
Internal Web Hosting
Domain Name Server
DNS Names
Common DNS Attacks
Best Practices for Connecting to the Internet
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 4 ASSESSMENT
CHAPTER 5 Mitigating Website Risks, Threats, and Vulnerabilities
Who Is Coming to Your Website?
Whom Do You Want to Come to Your Website?
Accepting User Input on Your Website
Forums
Website Feedback Forms
Online Surveys
The OWASP Top 10 Threats
Broken Access Control
18.
Cryptographic Failures
Injection
Insecure Design
SecurityMisconfigurations
Vulnerable and Outdated Components
Identification and Authentication Failures
Software and Data Integrity Failures
Security Logging and Monitoring Failures
Server-Side Request Forgery (SSRF)
Additional Web Threats Not in the Top 10
Information Leakage and Improper Error Handling
Unsecure Communications
Failure to Restrict URL Access
Mitigating Web Risks, Threats, and Vulnerabilities
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 5 ASSESSMENT
CHAPTER 6 Web Application Security
Web Applications
Web Application Vulnerabilities
Web Application Security Areas
Web Services
Common Website Attacks
Abuse of Functionality
Brute-Force Attacks
Developing Password Policies
Buffer Overflow
Content Spoofing
Credential/Session Prediction
Cross-Site Scripting
Cross-Site Request Forgery
Denial of Service
Fingerprinting
Format String
19.
HTTP Attacks
Integer Overflows
InjectionAttacks
URL Redirector Abuses
OS Commanding
Path Traversal
Predictable Resource Location
Remote File Inclusion (RFI)
Routing Detour
Session Fixation
SOAP Array Abuse
XML Attacks
Common Website Weaknesses
Application Misconfiguration
Directory Indexing
Improper File System Permissions
Improper Input Handling
Improper Output Handling
Information Leakage
Unsecure Indexing
Insufficient Anti-Automation
Insufficient Authentication
Insufficient Authorization
Insufficient Password Recovery
Insufficient Process Validation
Insufficient Session Expiration
Insufficient Transport Layer Protection
Server Misconfiguration
Best Practices for Mitigating Web Attacks
Best Practices for Mitigating Weaknesses
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 6 ASSESSMENT
CHAPTER 7 How Web Applications Work and Building a Secure Foundation
20.
How Web ApplicationsWork
Web Application Function
Web Application Benefits
Web Application Disadvantages
Third-Party Apps Versus Third-Party Web Apps
Third-Party Web Apps
Web App Architecture
Application Programming Interface (API)
Security Regulations, Standards, and Guidelines
Internet Law
Censorship and Control
Internet and Web Laws and Regulations
Specific Information Security Standards
Payment Card Industry Data Security Standard
Types of Information Security
Application Security
Infrastructure Security
Cloud Security
Mitigating Risk in Web Applications
Guidelines and Standards for Securing Web Applications
The PCI DSS
Security Actions to Protect Websites
Protect Your System with Firewalls
Configure Passwords and Settings
Protect Stored PII Data
Encrypt Transmission of Data Across Open, Public Networks
Use and Regularly Update Antivirus Software
Regularly Update and Patch Systems
Restrict Physical Access to Workplace and Data
Implement Logging and Log Management
Conduct Vulnerability Scans and Penetration Tests
Documentation and Risk Assessments
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 7 ASSESSMENT
21.
CHAPTER 8 DevelopingSecure Websites and Web Applications
Accepting User Input into a Website
Functional Websites
Hypertext Markup Language
Common Gateway Interface Script
JavaScript
SQL Database Back-End
Development Processes
Secure Application Development
Layered Security Strategies for Websites and Web Applications
Concept and Planning
Architecture and Design
Implementation
Testing and Debugging
Release and Maintenance
End of Life
Incorporating Security Requirements Within the SDLC
Systems Analysis Stage
Designing Stage
Implementation Stage
Testing Stage
Acceptance and Deployment Stage
Maintenance
Using Secure and Unsecure Protocols
How Secure Sockets Layer Works
SSL/TLS Encryption and Hash Protocols
Selecting an Appropriate Access Control Solution
Best Practices for Securing Web Applications
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 8 ASSESSMENT
CHAPTER 9 Mitigating Web Application Vulnerabilities
Causes of Web Application Vulnerabilities
Authentication
22.
Input Validation
Session Management
NonsecureCode in Software Applications
Developing Policies to Mitigate Vulnerabilities
Implementing Secure Coding Best Practices
Incorporating HTML Secure Coding Standards and Techniques
Incorporating JavaScript Secure Coding Standards and Techniques
Incorporating CGI Form and SQL Database Access Secure Coding
Standards and Techniques
Implementing SCM and Revision-Level Tracking
Best Practices for Mitigating Web Application Vulnerabilities
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 9 ASSESSMENT
CHAPTER 10 Performing a Website Vulnerability and Security Assessment
Software Testing Versus Website Vulnerability and Security Assessments
Performing an Initial Discovery on the Targeted Website
Ping Sweep
Nmap
Operating System Fingerprint
Nessus Vulnerability and Port Scan
Performing a Vulnerability and Security Assessment
Web Server OS
Web Server Application
Website Front-End
Website Forms and User Inputs
Incorporate PCI DSS for E-Commerce Websites
Using Planned Attacks to Identify Vulnerabilities
Develop an Attack Plan
Identify Gaps and Holes
Escalate the Privilege Level
Vulnerabilities in Back-End Systems and Structured Query Language
(SQL) Databases
Develop an Attack Plan
Identify Gaps and Holes
23.
Escalate the PrivilegeLevel
Perform an SQL Injection for Data Extraction
Preparing a Vulnerability and Security Assessment Report
Executive Summary
Summary of Findings
Vulnerability Assessment
Security Assessment
Recommendations
Best Practices for Website Vulnerability and Security Assessments
Choose the Right Tools
Test Inside and Out
Think Outside the Box
Research, Research, Research
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 10 ASSESSMENT
CHAPTER 11 Maintaining Compliance for E-Commerce Websites
Compliance Issues for Websites
General Privacy Laws
General Data Protection Regulation (GDPR)
California Privacy Rights Act (CPRA)
Website Legal Requirements
Legal Requirements Compliance
Privacy Policy
Cookie Management Policy
Terms and Conditions
Records of User Consent
Other Laws Affecting Websites and Data Privacy
Operational Compliance
Security Measures
“Lawful Basis”
Data Handling
Payment Processing Compliance
PCI DSS Standard
24.
Revised Payment ServicesDirective (PSD2)
3D Secure 2.0 (3DS2)
KYB and KYC Verification
Tax Compliance
Other Compliance Elements
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 11 ASSESSMENT
CHAPTER 12 Testing and Quality Assurance for Websites
Development and Production Software Environments
Software Development Methodologies
Software Development Life Cycle
Agile Software Development Methodology
Scrum
Other Agile Development Methodologies
Joint Application Development (JAD)
JAD Team Roles
JAD Sessions and Workshops
DevOps
Website Testing
First Impressions
Functional Testing
Links Testing
Forms Testing
Cookies Testing
HTML/CSS Validation Testing
Security Testing
Mitigating Website Security Flaws
Mobile Devices
Documentation Testing
Releasing a Website to the World
Pre-Launch Tasks
Website Launch
Website Diagnostics
25.
SEO Strategy
Post-Launch
CHAPTER SUMMARY
KEYCONCEPTS AND TERMS
CHAPTER 12 ASSESSMENT
PART THREE Web Applications and Social Networking Gone Mobile
CHAPTER 13 Securing Mobile Communications
Endpoint Devices
Smartphones
Tablets
Cellular Networks and How They Work
1G Networks
2G Networks
3G Networks
4G Networks
Security 4G Networks
5G Networks
5G Types
5G Signaling
5G Networking
Wireless Endpoint Communication
Voice Communication
Voice Communication Security
Email
Instant Messaging (IM) Chat
SMS/Text Messaging
MMS Messaging
Endpoint Device Risks, Threats, and Vulnerabilities
OWASP Top 10 Mobile Risks
Securing Endpoint Device Communication
Technological Security of Devices
Applications and Systems
Physical Security of Devices
26.
The Internet ofThings
IoT Components
IoT Applications
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 13 ASSESSMENT
CHAPTER 14 Securing Personal and Business Communications
Privacy and Security in Communication
Data-in-Transit
Communication Privacy and Security
Privacy Versus Security
Online Privacy and Security
Internet Privacy Issues
Store-and-Forward Communication
Real-Time Communication
Threats to Personal and Business Communications
Mitigating Voicemail Risks
Messaging on Social Networking Sites
Presence and Availability
Instant Messaging Chat
Short Message Service Text Messaging
Multimedia Messaging Service Messaging
Voice over IP Threats
Securing Telephone and Private Branch Exchange Communications
Securing Unified Communications
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 14 ASSESSMENT
CHAPTER 15 Security Training, Education, and Certification
Security and Careers—Database Administration
Database Security
Database Administrator Versus Database Designer
Database Management Tasks
27.
Database Security Trainingand Certification
Security and Careers—Application Development
Common Programming Tasks
Programming Training and Certification
Security and Careers—Network Management
Common Network Administration Tasks
Network Administration Training and Certification
Reviewing Security Information
Security and Careers—Web Design and Administration
Security for Web Developers
Daily Tasks for Web Developers
CHAPTER SUMMARY
KEY CONCEPTS AND TERMS
CHAPTER 15 ASSESSMENT
APPENDIX A Answer Key
APPENDIX B Standard Acronyms
APPENDIX C Internet and Web Cybersecurity Certifications
Glossary of Key Terms
References
Index
Designed for coursesand curriculums in IT security, cybersecurity,
information assurance, and information systems security, this series
features a comprehensive, consistent treatment of the most current
thinking and trends in this critical subject area. These titles deliver
fundamental information-security principles packed with real-world
applications and examples. Authored by professionals experienced in
information systems security, they deliver comprehensive information
on all aspects of information security. Reviewed word for word by
leading technical experts in the field, these books are not just
current, but forward-thinking—putting you in the position to solve
the cybersecurity challenges not just of today, but of tomorrow as
well.
Part 1 of this book examines the evolutionary changes that have
occurred in computer technology and personal and business
communications, and social interaction and networking on the
internet and World Wide Web. It also covers relevant security
considerations for small businesses and personal users.
Part 2 reviews the risks, threats, and vulnerabilities associated with
web applications, including the risks, threats, and vulnerabilities
associated with websites, especially those, like social networking,
which allow perpetrators to plant malicious code and malware with
widespread global impact. The best practices to apply security to the
development, deployment, and maintenance of a website and its
applications and services to prevent, mitigate, and avoid these
threats are explored. Common sense and best practices for online
privacy and securing your privacy data are presented, providing you
with countermeasures to protect your privacy and privacy data.
Part 3 presents the next and greatest business challenge—securing
the mobile user. With web applications and social networking now
being accessed remotely and from mobile wireless connected
devices, these devices are at risk. This part of the book explores
mobile communications security, given the rapid use of 4G and 5G
wireless networking for mobile communication. You also learn about
VoIP- and SIP-enabled applications, such as unified communications,
and how they provide real-time communications for both personal
and business use. Finally, web-security organizations, standards
30.
organizations, education, training,and certification organizations are
presented to provide you with additional resources and planning
strategies for a career in secure web application design and
development.
Learning Features
The writing style of this book is practical and conversational. Step-
by-step examples of information security concepts and procedures
are presented throughout the text. Each chapter begins with a
statement of learning objectives. Illustrations are used both to clarify
the material and to vary the presentation. The text is sprinkled with
Notes, Tips, FYIs, Warnings, and sidebars to alert the reader to
additional helpful information related to the subject under
discussion. Chapter Assessments appear at the end of each chapter,
with solutions provided in Appendix A. Chapter summaries are
included in the text to provide a rapid review or preview of the
material and to help students understand the relative importance of
the concepts presented.
the result ofuser and developer experience and the knowledge
gained from it. In addition, the applicable security standards and
guidelines that are also emerging, or advancing, are discussed when
relevant to the area to which they apply. In each case, these
changes and their impacts are explored.
This edition maintains the focus on web security but expands on its
inclusion in the design, development, and application to webpages,
applications, and services. The role of the user and his or her
importance to the design and functionality of these web elements
has also been emphasized.
Audience
The material is suitable for undergraduate or graduate computer
science majors or information science majors, or students at a two-
year technical college or community college who have a basic
technical background, or readers who have a basic understanding of
IT security and want to expand their knowledge.
Cloud Labs
This text is accompanied by Cybersecurity Cloud Labs. These hands-
on virtual labs provide immersive mock IT infrastructures where
students can learn and practice foundational cybersecurity skills as
an extension of the lessons in this textbook. For more information or
to purchase the labs, visit go.jblearning.com/Harwood3e.
wisdom was appreciatedthroughout this entire project. I especially
wish to thank Melissa Duffy for her guidance and support. I also
wish to thank Virginia “Ginny” Munroe, whose language skills and
technical knowledge vastly improved the understandability of the
message I was attempting to make. – Ron Price
including network administrator,instructor, technical writer, Web site
designer, consultant, and online marketing strategist. He’s been a
regular on-air technology contributor for CBC Radio and has written
numerous computer books, including the best-selling Network+
Exam Cram for Que Publishing and the A+ Faster Smarter title for
Microsoft. Currently Mike is employed as the new editor and writer
for the yoursecondfifty.com/magazine.
Ron Price’s career has essentially spanned the entire development of
computing, security, and networking, beginning with punched-card
equipment. His experience has included programming, design,
consulting, and management in education, telecommunication, and
public accounting. He holds several IT and security certifications and
has published numerous books under his own name as well as the
pen name of “Ron Gilster.” Ron is now semi-retired in the Ozark
Mountains of Arkansas, continuing to write and teach part time.
P A RT O N E
The Internet, the
World Wide Web, and
the Need for Security
CHAPTER 1 The Internet and the World Wide Web
CHAPTER 2 Security Considerations for SOHO and Personal
Systems
CHAPTER 3 Security Considerations for Business
C H AP T E R 1
The Internet and the
World Wide Web
IN THE WORLD OF COMPUTING AND NETWORKING, game-
changing technologies continue to emerge. Some new technologies
replace existing ones, some make existing technologies better, as in
more efficient, more effective, and perhaps, even more affordable,
and others introduce capabilities not seen before. The cycle of
advancement and improvement is ongoing and is likely to continue
for a long time to come.
This chapter provides a brief look back on the developments and
events in data processing, computing, and networking that have led
to the emergence of the internet and the World Wide Web. We look
at the internet, its origins, technologies, and the myriad ways it has
become a part of our daily lives.
CHAPTER 1 TOPICS
The topics and concepts covered in this chapter include:
Data, data processing, and information
The evolution of computers and computing
Before there was an internet
The early internet
The World Wide Web
Client/server computing
Virtualization and cloud computing
41.
CHAPTER 1 GOALS
Whenyou complete this chapter, you will be able to:
Explain the importance and differences of data and
information
Discuss the history of computers and their uses
Explain why there was a need for the internet
Discuss the early developments of internetworking
Identify the key developments and developers of the web
Explain server, clients, and network virtualization
Identify the service types and delivery modes of cloud
computing
42.
Data and Information
It’scommon to hear the terms data and information used
interchangeably as if they are one and the same. They’re technically
not the same. Data and information are different, and they represent
completely separate places in the cycle of what we know as data
processing. However, before we get too much into the processing of
data, let’s take a look at data and what they are.
Data
Whether you pronounce it as “dayta” or “datta,” without data, there
would be no data processing, no internet, no information systems,
and no web. Data are the fuel and the reason for computing,
networking, automation, and all other digital processing. Without
data, computers wouldn’t exist because there’d be no reason for
them to exist. If there was no concept of a “2” as data, then 2 + 2
would have no meaning whatsoever.
Data are a part of life. As we go about our daily lives, we constantly
take in data through our senses: We see data, we hear data, and we
feel data. We see actions, colors, words, images, and more. We hear
sounds, tones, inflections, and more. We feel the temperature of the
air and objects, pain and sensation, texture, and more. In each of
these and other sensual perceptions, we take in data.
Data is actually a plural form of datum. A datum, according to
Merriam-Webster.com, is “something given or admitted especially as
a basis for reasoning or inference” or “something used as a basis for
calculating or measuring.” Data are made up of one or more datum.
In other words, two “datum” are data. For example, if someone
walks up to you and says “blue,” you will likely envision the color of
the sky, a shirt, a dress, water, or any number of other blue things.
However, the word “blue” by itself has little meaning. It represents
only a color; blue is just blue. The same can be said for the word
“sky.” it is a thing, maybe a place, but it is not specific to any
43.
context. We providethe context according to our own frame of
reference.
If we hear “blue sky,” the two datums take on a context, which gives
it meaning, and has the capability to answer a question. The fact
that the sky is blue is data, and if the person who brought up “blue”
in the first place asks you, “What color is the sky?” you can reply
with the data at hand: “The sky is blue.” Because it now has context
and meaning, it is now considered information.
Figure 1-1 illustrates the relationship between datum and data and
the relationship of data to information. A datum is a single value,
attribute, characteristic, or identity of something. In the example
above, “blue” is datum, “sky” is datum, just like “5” and “10” and
“feet” and “inches” are each a datum. When we store a datum in a
computer’s memory, it may fit into a single byte (which stands for
binary eight, meaning eight bits to store binary values), or it might
require several bytes. The amount of storage space the datum
requires has no effect on what it represents. Storing just one
isolated datum on a computer would be unusual because datums are
typically combined into related (sometimes loosely related) groups.
Each of these groupings is data, and groupings are all considered
data.
45.
FIGURE 1-1 Datumis collected into data, which can be processed into
information.
Description
46.
Information
The primary characteristicof information is that it is the result or
product of data being processed. The purpose of data processing is
to produce information. Information has context relevant to an
inquiry, question, or even a wonder. “What color is the sky?” By
extracting the appropriate data from its storage locations, we are
able to process that data into the response, “The sky is blue.”
Information without context is just data.
“What does 2 + 2 equal?” This question defines processing that is to
be performed: the addition of 2 and 2 to produce a sum of the two
datum. This simple example illustrates what data processing is all
about. A problem is posed, and an algorithm performs a process on
the datum to provide a solution. Another way to think about this is
to think of datum as input to a process that manipulates the data to
produce information. The purpose and objective of processing data
is to produce information.
The most basic model for processing data into information is known
as the IPO (Input, Process, and Output) model. Figure 1-2
illustrates that an input source is entered into a processing element
that produces information. This simple three-step process represents
data processing and computing at its most basic. Even extremely
complicated computer programs can be broken down into a series of
processes that each perform the input, processing, and output of the
IPO model. Often the input and the outputs come from or go to
another process. If you understand the principle represented by the
IPO model, then computing won’t be all that mysterious to you.
From the largest computer to the smallest, the IPO model explains it
all (well, almost).
TABLE 1-1
The Evolutionof Computers and Computing
That very powerful smartphone, tablet, or notebook you are toting
around most likely has more computing power than did many of the
early generations of computers. Like most things technological,
computers started out big and as technology increased their
capabilities, computers and processing devices decreased in size.
Sure, there are still very large computers like supercomputers and
very small computers like a Raspberry Pi, but what once completely
filled a university gymnasium now fits in your shirt or pants pocket
with room to spare.
The evolution of the computer has gone through generations, each
tied to the emergence of an advance in technology. Table 1-1
delineates the five computer generations and what defined each. As
you can see, computer technologies rapidly developed over a
relatively short period. Depending on the scope of the discussion,
the history of the computer can be 20 years, more than 80 years, or
over a much longer time. It depends on your perspective.
The Five Generations of Computers
49.
Description
Just when thehistory of computing and computers actually began is
debatable. Some say the history of computing began when a brilliant
cave dweller discovered that two fingers or two of anything could
mean something. There is a difference, as illustrated by our cave
person, between computing and computers. Computing is a
processing operation, like the IPO model. On the other hand,
computers are the people, machines, and devices that provide the
processing portion of the IPO model. In fact, the term “computers”
was a job title in the past for people who “computed” accounts into
ledgers.
If we focus on only computers, as we know them today, their history
is relatively short. As shown in Table 1-1, modern computer
historians generally agree that the relevant birth of the computer
and its computing capabilities began roughly around 1940. This
doesn’t mean that we exclude those who contributed to the earlier
development. Not at all. As discussed throughout the following
By William J.Locke
CONTENTS
THE DEMAGOGUE AND LADY PHAYRE
CHAPTER I THE ETERNAL FEMININE
CHAPTER II A REVOLUTION
CHAPTER III THE END OF AN ACT
CHAPTER IV LADY PHAYRE AND THE COMING MAN
CHAPTER V LIZZIE
CHAPTER VI THE STARS IN THEIR COURSES
CHAPTER VII A DEMAGOGUE’S IDYLL
CHAPTER
VIII
WITH THE HELP OF LADY PHAYRE
CHAPTER IX SOME PSYCHOLOGICAL MOMENTS
CHAPTER X
LADY PHAYRE THROWS HER CAP OVER THE
WINDMILLS.
CHAPTER XI RECONSTRUCTION
CHAPTER XII A LEADER OF MEN
CHAPTER
XIII
THE CONCLUSION OF THE WHOLE MATTER
IDOLS
52.
By William J.Locke
CONTENTS
IDOLS
PROEM
CHAPTER I
CHAPTER II
CHAPTER III
CHAPTER IV
CHAPTER V
CHAPTER VI
CHAPTER VII
CHAPTER VIII
CHAPTER IX
CHAPTER X
CHAPTER XI
CHAPTER XII
CHAPTER XIII
CHAPTER XIV
CHAPTER XV
CHAPTER XVI
CHAPTER XVII
CHAPTER XVIII
CHAPTER XIX
CHAPTER XX
CHAPTER XXI
CHAPTER XXII
CHAPTER XXIII
CHAPTER XXIV
CHAPTER XXV
53.
*** END OFTHE PROJECT GUTENBERG EBOOK INDEX OF THE
PROJECT GUTENBERG WORKS OF WILLIAM J. LOCKE ***
Updated editions will replace the previous one—the old editions will
be renamed.
Creating the works from print editions not protected by U.S.
copyright law means that no one owns a United States copyright in
these works, so the Foundation (and you!) can copy and distribute it
in the United States without permission and without paying
copyright royalties. Special rules, set forth in the General Terms of
Use part of this license, apply to copying and distributing Project
Gutenberg™ electronic works to protect the PROJECT GUTENBERG™
concept and trademark. Project Gutenberg is a registered trademark,
and may not be used if you charge for an eBook, except by following
the terms of the trademark license, including paying royalties for use
of the Project Gutenberg trademark. If you do not charge anything
for copies of this eBook, complying with the trademark license is
very easy. You may use this eBook for nearly any purpose such as
creation of derivative works, reports, performances and research.
Project Gutenberg eBooks may be modified and printed and given
away—you may do practically ANYTHING in the United States with
eBooks not protected by U.S. copyright law. Redistribution is subject
to the trademark license, especially commercial redistribution.
START: FULL LICENSE
PLEASE READ THISBEFORE YOU DISTRIBUTE OR USE THIS WORK
To protect the Project Gutenberg™ mission of promoting the free
distribution of electronic works, by using or distributing this work (or
any other work associated in any way with the phrase “Project
Gutenberg”), you agree to comply with all the terms of the Full
Project Gutenberg™ License available with this file or online at
www.gutenberg.org/license.
Section 1. General Terms of Use and
Redistributing Project Gutenberg™
electronic works
1.A. By reading or using any part of this Project Gutenberg™
electronic work, you indicate that you have read, understand, agree
to and accept all the terms of this license and intellectual property
(trademark/copyright) agreement. If you do not agree to abide by all
the terms of this agreement, you must cease using and return or
destroy all copies of Project Gutenberg™ electronic works in your
possession. If you paid a fee for obtaining a copy of or access to a
Project Gutenberg™ electronic work and you do not agree to be
bound by the terms of this agreement, you may obtain a refund
from the person or entity to whom you paid the fee as set forth in
paragraph 1.E.8.
1.B. “Project Gutenberg” is a registered trademark. It may only be
used on or associated in any way with an electronic work by people
who agree to be bound by the terms of this agreement. There are a
few things that you can do with most Project Gutenberg™ electronic
works even without complying with the full terms of this agreement.
See paragraph 1.C below. There are a lot of things you can do with
Project Gutenberg™ electronic works if you follow the terms of this
agreement and help preserve free future access to Project
Gutenberg™ electronic works. See paragraph 1.E below.
56.
1.C. The ProjectGutenberg Literary Archive Foundation (“the
Foundation” or PGLAF), owns a compilation copyright in the
collection of Project Gutenberg™ electronic works. Nearly all the
individual works in the collection are in the public domain in the
United States. If an individual work is unprotected by copyright law
in the United States and you are located in the United States, we do
not claim a right to prevent you from copying, distributing,
performing, displaying or creating derivative works based on the
work as long as all references to Project Gutenberg are removed. Of
course, we hope that you will support the Project Gutenberg™
mission of promoting free access to electronic works by freely
sharing Project Gutenberg™ works in compliance with the terms of
this agreement for keeping the Project Gutenberg™ name associated
with the work. You can easily comply with the terms of this
agreement by keeping this work in the same format with its attached
full Project Gutenberg™ License when you share it without charge
with others.
1.D. The copyright laws of the place where you are located also
govern what you can do with this work. Copyright laws in most
countries are in a constant state of change. If you are outside the
United States, check the laws of your country in addition to the
terms of this agreement before downloading, copying, displaying,
performing, distributing or creating derivative works based on this
work or any other Project Gutenberg™ work. The Foundation makes
no representations concerning the copyright status of any work in
any country other than the United States.
1.E. Unless you have removed all references to Project Gutenberg:
1.E.1. The following sentence, with active links to, or other
immediate access to, the full Project Gutenberg™ License must
appear prominently whenever any copy of a Project Gutenberg™
work (any work on which the phrase “Project Gutenberg” appears,
or with which the phrase “Project Gutenberg” is associated) is
accessed, displayed, performed, viewed, copied or distributed:
57.
This eBook isfor the use of anyone anywhere in the
United States and most other parts of the world at no
cost and with almost no restrictions whatsoever. You
may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this
eBook or online at www.gutenberg.org. If you are not
located in the United States, you will have to check the
laws of the country where you are located before using
this eBook.
1.E.2. If an individual Project Gutenberg™ electronic work is derived
from texts not protected by U.S. copyright law (does not contain a
notice indicating that it is posted with permission of the copyright
holder), the work can be copied and distributed to anyone in the
United States without paying any fees or charges. If you are
redistributing or providing access to a work with the phrase “Project
Gutenberg” associated with or appearing on the work, you must
comply either with the requirements of paragraphs 1.E.1 through
1.E.7 or obtain permission for the use of the work and the Project
Gutenberg™ trademark as set forth in paragraphs 1.E.8 or 1.E.9.
1.E.3. If an individual Project Gutenberg™ electronic work is posted
with the permission of the copyright holder, your use and distribution
must comply with both paragraphs 1.E.1 through 1.E.7 and any
additional terms imposed by the copyright holder. Additional terms
will be linked to the Project Gutenberg™ License for all works posted
with the permission of the copyright holder found at the beginning
of this work.
1.E.4. Do not unlink or detach or remove the full Project
Gutenberg™ License terms from this work, or any files containing a
part of this work or any other work associated with Project
Gutenberg™.
1.E.5. Do not copy, display, perform, distribute or redistribute this
electronic work, or any part of this electronic work, without
58.
prominently displaying thesentence set forth in paragraph 1.E.1
with active links or immediate access to the full terms of the Project
Gutenberg™ License.
1.E.6. You may convert to and distribute this work in any binary,
compressed, marked up, nonproprietary or proprietary form,
including any word processing or hypertext form. However, if you
provide access to or distribute copies of a Project Gutenberg™ work
in a format other than “Plain Vanilla ASCII” or other format used in
the official version posted on the official Project Gutenberg™ website
(www.gutenberg.org), you must, at no additional cost, fee or
expense to the user, provide a copy, a means of exporting a copy, or
a means of obtaining a copy upon request, of the work in its original
“Plain Vanilla ASCII” or other form. Any alternate format must
include the full Project Gutenberg™ License as specified in
paragraph 1.E.1.
1.E.7. Do not charge a fee for access to, viewing, displaying,
performing, copying or distributing any Project Gutenberg™ works
unless you comply with paragraph 1.E.8 or 1.E.9.
1.E.8. You may charge a reasonable fee for copies of or providing
access to or distributing Project Gutenberg™ electronic works
provided that:
• You pay a royalty fee of 20% of the gross profits you derive
from the use of Project Gutenberg™ works calculated using the
method you already use to calculate your applicable taxes. The
fee is owed to the owner of the Project Gutenberg™ trademark,
but he has agreed to donate royalties under this paragraph to
the Project Gutenberg Literary Archive Foundation. Royalty
payments must be paid within 60 days following each date on
which you prepare (or are legally required to prepare) your
periodic tax returns. Royalty payments should be clearly marked
as such and sent to the Project Gutenberg Literary Archive
Foundation at the address specified in Section 4, “Information
59.
about donations tothe Project Gutenberg Literary Archive
Foundation.”
• You provide a full refund of any money paid by a user who
notifies you in writing (or by e-mail) within 30 days of receipt
that s/he does not agree to the terms of the full Project
Gutenberg™ License. You must require such a user to return or
destroy all copies of the works possessed in a physical medium
and discontinue all use of and all access to other copies of
Project Gutenberg™ works.
• You provide, in accordance with paragraph 1.F.3, a full refund of
any money paid for a work or a replacement copy, if a defect in
the electronic work is discovered and reported to you within 90
days of receipt of the work.
• You comply with all other terms of this agreement for free
distribution of Project Gutenberg™ works.
1.E.9. If you wish to charge a fee or distribute a Project Gutenberg™
electronic work or group of works on different terms than are set
forth in this agreement, you must obtain permission in writing from
the Project Gutenberg Literary Archive Foundation, the manager of
the Project Gutenberg™ trademark. Contact the Foundation as set
forth in Section 3 below.
1.F.
1.F.1. Project Gutenberg volunteers and employees expend
considerable effort to identify, do copyright research on, transcribe
and proofread works not protected by U.S. copyright law in creating
the Project Gutenberg™ collection. Despite these efforts, Project
Gutenberg™ electronic works, and the medium on which they may
be stored, may contain “Defects,” such as, but not limited to,
incomplete, inaccurate or corrupt data, transcription errors, a
copyright or other intellectual property infringement, a defective or
60.
damaged disk orother medium, a computer virus, or computer
codes that damage or cannot be read by your equipment.
1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for
the “Right of Replacement or Refund” described in paragraph 1.F.3,
the Project Gutenberg Literary Archive Foundation, the owner of the
Project Gutenberg™ trademark, and any other party distributing a
Project Gutenberg™ electronic work under this agreement, disclaim
all liability to you for damages, costs and expenses, including legal
fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR
NEGLIGENCE, STRICT LIABILITY, BREACH OF WARRANTY OR
BREACH OF CONTRACT EXCEPT THOSE PROVIDED IN PARAGRAPH
1.F.3. YOU AGREE THAT THE FOUNDATION, THE TRADEMARK
OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL
NOT BE LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT,
CONSEQUENTIAL, PUNITIVE OR INCIDENTAL DAMAGES EVEN IF
YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH DAMAGE.
1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you
discover a defect in this electronic work within 90 days of receiving
it, you can receive a refund of the money (if any) you paid for it by
sending a written explanation to the person you received the work
from. If you received the work on a physical medium, you must
return the medium with your written explanation. The person or
entity that provided you with the defective work may elect to provide
a replacement copy in lieu of a refund. If you received the work
electronically, the person or entity providing it to you may choose to
give you a second opportunity to receive the work electronically in
lieu of a refund. If the second copy is also defective, you may
demand a refund in writing without further opportunities to fix the
problem.
1.F.4. Except for the limited right of replacement or refund set forth
in paragraph 1.F.3, this work is provided to you ‘AS-IS’, WITH NO
OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED,
61.
INCLUDING BUT NOTLIMITED TO WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.
1.F.5. Some states do not allow disclaimers of certain implied
warranties or the exclusion or limitation of certain types of damages.
If any disclaimer or limitation set forth in this agreement violates the
law of the state applicable to this agreement, the agreement shall be
interpreted to make the maximum disclaimer or limitation permitted
by the applicable state law. The invalidity or unenforceability of any
provision of this agreement shall not void the remaining provisions.
1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation,
the trademark owner, any agent or employee of the Foundation,
anyone providing copies of Project Gutenberg™ electronic works in
accordance with this agreement, and any volunteers associated with
the production, promotion and distribution of Project Gutenberg™
electronic works, harmless from all liability, costs and expenses,
including legal fees, that arise directly or indirectly from any of the
following which you do or cause to occur: (a) distribution of this or
any Project Gutenberg™ work, (b) alteration, modification, or
additions or deletions to any Project Gutenberg™ work, and (c) any
Defect you cause.
Section 2. Information about the Mission
of Project Gutenberg™
Project Gutenberg™ is synonymous with the free distribution of
electronic works in formats readable by the widest variety of
computers including obsolete, old, middle-aged and new computers.
It exists because of the efforts of hundreds of volunteers and
donations from people in all walks of life.
Volunteers and financial support to provide volunteers with the
assistance they need are critical to reaching Project Gutenberg™’s
goals and ensuring that the Project Gutenberg™ collection will
62.
remain freely availablefor generations to come. In 2001, the Project
Gutenberg Literary Archive Foundation was created to provide a
secure and permanent future for Project Gutenberg™ and future
generations. To learn more about the Project Gutenberg Literary
Archive Foundation and how your efforts and donations can help,
see Sections 3 and 4 and the Foundation information page at
www.gutenberg.org.
Section 3. Information about the Project
Gutenberg Literary Archive Foundation
The Project Gutenberg Literary Archive Foundation is a non-profit
501(c)(3) educational corporation organized under the laws of the
state of Mississippi and granted tax exempt status by the Internal
Revenue Service. The Foundation’s EIN or federal tax identification
number is 64-6221541. Contributions to the Project Gutenberg
Literary Archive Foundation are tax deductible to the full extent
permitted by U.S. federal laws and your state’s laws.
The Foundation’s business office is located at 809 North 1500 West,
Salt Lake City, UT 84116, (801) 596-1887. Email contact links and up
to date contact information can be found at the Foundation’s website
and official page at www.gutenberg.org/contact
Section 4. Information about Donations to
the Project Gutenberg Literary Archive
Foundation
Project Gutenberg™ depends upon and cannot survive without
widespread public support and donations to carry out its mission of
increasing the number of public domain and licensed works that can
be freely distributed in machine-readable form accessible by the
widest array of equipment including outdated equipment. Many
63.
small donations ($1to $5,000) are particularly important to
maintaining tax exempt status with the IRS.
The Foundation is committed to complying with the laws regulating
charities and charitable donations in all 50 states of the United
States. Compliance requirements are not uniform and it takes a
considerable effort, much paperwork and many fees to meet and
keep up with these requirements. We do not solicit donations in
locations where we have not received written confirmation of
compliance. To SEND DONATIONS or determine the status of
compliance for any particular state visit www.gutenberg.org/donate.
While we cannot and do not solicit contributions from states where
we have not met the solicitation requirements, we know of no
prohibition against accepting unsolicited donations from donors in
such states who approach us with offers to donate.
International donations are gratefully accepted, but we cannot make
any statements concerning tax treatment of donations received from
outside the United States. U.S. laws alone swamp our small staff.
Please check the Project Gutenberg web pages for current donation
methods and addresses. Donations are accepted in a number of
other ways including checks, online payments and credit card
donations. To donate, please visit: www.gutenberg.org/donate.
Section 5. General Information About
Project Gutenberg™ electronic works
Professor Michael S. Hart was the originator of the Project
Gutenberg™ concept of a library of electronic works that could be
freely shared with anyone. For forty years, he produced and
distributed Project Gutenberg™ eBooks with only a loose network of
volunteer support.
64.
Project Gutenberg™ eBooksare often created from several printed
editions, all of which are confirmed as not protected by copyright in
the U.S. unless a copyright notice is included. Thus, we do not
necessarily keep eBooks in compliance with any particular paper
edition.
Most people start at our website which has the main PG search
facility: www.gutenberg.org.
This website includes information about Project Gutenberg™,
including how to make donations to the Project Gutenberg Literary
Archive Foundation, how to help produce our new eBooks, and how
to subscribe to our email newsletter to hear about new eBooks.