This document presents a Colombian consensus for the use of intravenous immunoglobulin (IgIV) in central and peripheral nervous system diseases. It reviewed at least 60 controlled clinical trials evaluating IgIV for various neurological conditions. Recommendations are provided for 11 conditions based on evidence from clinical trials: IgIV is beneficial compared to placebo for multiple sclerosis with relapses/remissions and chronic inflammatory demyelinating polyneuropathy, and as effective as plasma exchange for Guillain-Barré syndrome in adults, based on at least two similar controlled trials for each. Benefit of IgIV is also discussed where supported by one strong controlled trial or trials with methodological limitations. No demonstrated benefit was found for some other conditions based