The document discusses the need for electoral reforms in India to reduce the influence of money and muscle power in politics. It notes that the current system fails to ensure economic and social justice or reflect the aspirations of excluded groups. It analyzes causes like illiteracy, lack of transparency, criminalization of politics. A proposed innovation includes a mixed electoral system, stricter candidate criteria, electronic voting, and measures for accountability and recalling representatives. The solution aims to stop corrupt practices and ensure that elected officials actually have popular mandate and policy reflects public desires. Challenges to implementation include population size, illiteracy and adhering to ethics.