CONTENT
1. COMPANY PROFILE
- ABOUT MENDATRI DESIGN
- COMPANY ORGANISATION
-AWARDS
2. KEY PERSON PROFILE
(LAr. FAIROUZ CHE ANI)
3. COMPANY PROJECTS
- BANK NEGARA DATA CENTRE
- SOCSO REHABILITATION, MELAKA
4. INTERVIEW
( LAr, FAIROUZ CHE ANI)
- Q&A Session
Before we start the design, we landscape architect have to do
some research first on the design. There is a few guide lines,
restriction like CPTED which Is Crime Prevention through Envi-
ronmental Design. And we also have to fulfil the client and the
Dato Bandar wish lists.
Q: So you guys supposed to think of something like for ex-
ample the lighting in the township?
A: Yes, more lighting is necessary but what about the costing? So we
have to think out of the box to solve this problem. We have to think of
what kind of lighting is suitable for this situation. The distant of the light
and what happen after and before the lighting, where should we put the
fencing, housing area, parks and many more. A lots of research has
been done by the oversea architect especially form Australia. We Ma-
laysian L.A. have
to talk with them
and get some
reference form
A: There is one project we are doing now is the Elmina township
in Selangor. Township means the whole new development in a
certain undeveloped area. So we have to start from scratch as
the whole place is a palm tree estate. Then the planner come in
and we discuss with the planner about how the road should go,
where is the location of the parks and the other facilities. After
that we start to design the main road, all the infrastructure, all
the parks
and pocket
parks and
the connec-
tion flow in
the township.
Q: What is your role and responsibility in this project?
A: Our role and responsibility is to make sure that we provide the
right convenient to the user. We don’t simply build something
which is practical. Our strategy is to build something which is
practical, usable and convenient, safety precaution and also easy
to use for the user.
COMPANY
ORGANISATION
LAr. Fairouz Che Ani
Principal Landscape Architect
ILAM Corporate Member
LAr. Dr. Nurhayati Abdul Malek
Associate Landscape Architect
ILAM Corporate Member
Associate Landscape Architect
Senior Landscape Architect
Landscape Architect
Senior Landscape Designer
Horticulturist/Admin
Then we continue to assist the client in prequalifying contrac-
tors for work designed by the consultant, issue Bid documents,
review substitutions and alternatives are requested by the bid-
ders and we LA has to attend meetings with the low bidders on
items designed by consultant to review bids and understanding
of the project scope. After that, we will have to make periodic
visits to the site to become familiar with the progress and quali-
ty of construction and to determine if the construction of the
landscape work is proceeding in accordance with the design in-
tent and contract documents. And our Final task is to provide a
program for professional landscape maintenance.
Q: Can you explain to us the one of the specific
project which were still working on?
Q: So every time after the plans is done you guys have to
meet the client to get his approval?
A: Yes we have to. This is to make sure that we are up to the cli-
ent Requirement as some of them will change their mind and al-
so to fulfil their wish list. The relationship with the client is very
important. And after the client had approved the schematic de-
sign and probable site construction cost, we then proceed the
design development drawings. In the drawing, there will be the
site grading and drainage for all side of the building footprint in-
cluding contouring,
retaining struc-
tures, swales, flow
lines and drainage
devices. Beside we
MENTARIDESIGN’SAWARDS
EXCELLENT
LANDSCAPE
DESIGN & PLANNING
2010
EXCELLENT
LANDSCAPE
DESIGN & PLANNING
2012
MENTARIDESIGN’SAWARDS
ILAM 2012 Award Winning Project
D’VIDA COMMERCIAL, JELUTONG
MASTER PLAN OF D’VIDA COMMERCIAL, JELUTONG
This conceptual design plan also include illustrative sections
and elevations for presentation purposes. We also have to pre-
pare the image character boards or bound booklets in order to
generate discussion and to convey the landscape design intent.
Soon after everything is done, we have to attend a meeting
with the client and other consultant to review the work.
Q: That sound like a lot of work.
A: Yes, it is. That’s why we have to start as early as possible. After
the client had approve on the site plan based on the footprint provid-
ed by us. We then produce the Schematic Landscape Design plans. In
this plan we have to think of the conceptual site grading and drainage
system in the site, the pedestrian and automobile paved area, the
identification of tree, shrub, groundcover and many more and also
the concept landscape lighting for all major landscape area. Soon af-
ter the plans is done, the project manager and project designer will
attend the project meetings with the clients.
INTERVIEW
LAr. FAIROUZ CHE ANI
Q: Is there any stages of drawing you LA going to pro-
duce like for example the tender drawing, Concept
drawing, final drawing and so on?
A: Not really. But yes, we have stages of tasks that we have to
do. For example we have to produce the conceptual design,
schematic landscape design, design development, construc-
tion doc, bidding and negotiation, construction observation
and our final task is to produce the landscape guidelines.
Q: Would you mind to explain to us in more details about
the six task you told us just now if that doesn’t bother
you?
A: The first task we have to prepare a conceptual design
plan for the client and other consultants. Before we start
the conceptual design plan, we have to review all the perti-
nent codes, current entitlements, and conditions of approv-
al which may give impact to the site development concepts.
COMPANY
PROJECTS
BANK NEGARA DATA CENTRE
MASTER PLAN OF BANK NEGARA DATA CENTRE
PROJECT DESCRIPTION:
Representing the image of Malaysia’s largest fi-
nancial services group, the landscape was pur-
posely built for the enjoyment
of people without override its
character as a semi private space.
COMPANY
PROJECTS
PROJECT DESCRIPTION:
This project aimed to achieve
Certified GBI certification. Several
landscape contributions are the use of
water efficient landscape, rain water
harvesting system, adaptive plants,
and the use of plants that are able to
absorb more carbon dioxide.
SOCSO REHABILITATION, MELAKA
Modern Contemporary Design
which plays with bold and dynamic
shapes were implemented in the work.

More Related Content

Viewers also liked

10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_n10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_n
Json96
 
Enbe cover6
Enbe cover6Enbe cover6
Enbe cover6
Json96
 
Project 1 0814 brief with tgc 1-
Project 1 0814 brief with tgc  1-Project 1 0814 brief with tgc  1-
Project 1 0814 brief with tgc 1-
Json96
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1
Json96
 
Report
ReportReport
Report
Json96
 
Group 4 experiential landscape
Group 4   experiential landscapeGroup 4   experiential landscape
Group 4 experiential landscape
Json96
 
10741175 10201912453652001 2034964853_n
10741175 10201912453652001 2034964853_n10741175 10201912453652001 2034964853_n
10741175 10201912453652001 2034964853_n
Json96
 

Viewers also liked (7)

10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_n10657284 10201912537654101 877687459_n
10657284 10201912537654101 877687459_n
 
Enbe cover6
Enbe cover6Enbe cover6
Enbe cover6
 
Project 1 0814 brief with tgc 1-
Project 1 0814 brief with tgc  1-Project 1 0814 brief with tgc  1-
Project 1 0814 brief with tgc 1-
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1
 
Report
ReportReport
Report
 
Group 4 experiential landscape
Group 4   experiential landscapeGroup 4   experiential landscape
Group 4 experiential landscape
 
10741175 10201912453652001 2034964853_n
10741175 10201912453652001 2034964853_n10741175 10201912453652001 2034964853_n
10741175 10201912453652001 2034964853_n
 

Similar to Ici

Ici project2 (1)
Ici project2  (1)Ici project2  (1)
Ici project2 (1)
WadeLim
 
Ici project2
Ici project2 Ici project2
Ici project2
Le Roy
 
Ici magazine final
Ici magazine finalIci magazine final
Ici magazine final
Jian Leo
 
Ici magazine final final
 Ici magazine final final Ici magazine final final
Ici magazine final final
christinelee1996
 
Ici magazine (architect)
Ici magazine (architect)Ici magazine (architect)
Ici magazine (architect)
Madeline Liew
 
Ici magazine final final
Ici magazine final finalIci magazine final final
Ici magazine final final
Lin Hui
 
Magazine (ICI)
Magazine (ICI)Magazine (ICI)
Magazine (ICI)
Monnie Bao Jia
 
MAGAZINE.ppt
MAGAZINE.pptMAGAZINE.ppt
MAGAZINE.ppt
Shze Hwa Lee
 
Raistec PMC (PPT)
Raistec PMC (PPT)Raistec PMC (PPT)
Raistec PMC (PPT)
Rajesh Rai
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscaping
Teck Wei
 
Inspire Interiors & Archcons India Pvt Ltd (Latest1)
Inspire Interiors & Archcons India Pvt Ltd (Latest1)Inspire Interiors & Archcons India Pvt Ltd (Latest1)
Inspire Interiors & Archcons India Pvt Ltd (Latest1)
Inspire Interiors & Archcons India Pvt Ltd
 
Ici ben stress
Ici ben stressIci ben stress
Ici ben stress
dhirazain
 
Shobha Designs_MixedUse_April2016
Shobha Designs_MixedUse_April2016Shobha Designs_MixedUse_April2016
Shobha Designs_MixedUse_April2016
Nilesh Munot
 
Rdpl bank specific profile 22062016
Rdpl  bank specific profile 22062016Rdpl  bank specific profile 22062016
Rdpl bank specific profile 22062016
subhash gupta
 
Raimon profile 2018
Raimon profile 2018 Raimon profile 2018
Raimon profile 2018
Musa Islam
 
Why Do Accidents Still Occur On Modern Day Construction...
Why Do Accidents Still Occur On Modern Day Construction...Why Do Accidents Still Occur On Modern Day Construction...
Why Do Accidents Still Occur On Modern Day Construction...
Stephanie Clark
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINE
Mao Hua
 
Gc Outsourcing Presentation
Gc Outsourcing PresentationGc Outsourcing Presentation
Gc Outsourcing Presentation
gvizca
 
Gc Outsourcing Presentation
Gc Outsourcing PresentationGc Outsourcing Presentation
Gc Outsourcing Presentation
gvizca
 
Company profile of KK Technocrats Pvt Ltd
Company profile of KK Technocrats Pvt LtdCompany profile of KK Technocrats Pvt Ltd
Company profile of KK Technocrats Pvt Ltd
ANAMIKA MAIHURIA
 

Similar to Ici (20)

Ici project2 (1)
Ici project2  (1)Ici project2  (1)
Ici project2 (1)
 
Ici project2
Ici project2 Ici project2
Ici project2
 
Ici magazine final
Ici magazine finalIci magazine final
Ici magazine final
 
Ici magazine final final
 Ici magazine final final Ici magazine final final
Ici magazine final final
 
Ici magazine (architect)
Ici magazine (architect)Ici magazine (architect)
Ici magazine (architect)
 
Ici magazine final final
Ici magazine final finalIci magazine final final
Ici magazine final final
 
Magazine (ICI)
Magazine (ICI)Magazine (ICI)
Magazine (ICI)
 
MAGAZINE.ppt
MAGAZINE.pptMAGAZINE.ppt
MAGAZINE.ppt
 
Raistec PMC (PPT)
Raistec PMC (PPT)Raistec PMC (PPT)
Raistec PMC (PPT)
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscaping
 
Inspire Interiors & Archcons India Pvt Ltd (Latest1)
Inspire Interiors & Archcons India Pvt Ltd (Latest1)Inspire Interiors & Archcons India Pvt Ltd (Latest1)
Inspire Interiors & Archcons India Pvt Ltd (Latest1)
 
Ici ben stress
Ici ben stressIci ben stress
Ici ben stress
 
Shobha Designs_MixedUse_April2016
Shobha Designs_MixedUse_April2016Shobha Designs_MixedUse_April2016
Shobha Designs_MixedUse_April2016
 
Rdpl bank specific profile 22062016
Rdpl  bank specific profile 22062016Rdpl  bank specific profile 22062016
Rdpl bank specific profile 22062016
 
Raimon profile 2018
Raimon profile 2018 Raimon profile 2018
Raimon profile 2018
 
Why Do Accidents Still Occur On Modern Day Construction...
Why Do Accidents Still Occur On Modern Day Construction...Why Do Accidents Still Occur On Modern Day Construction...
Why Do Accidents Still Occur On Modern Day Construction...
 
ICI_P2_MAGAZINE
ICI_P2_MAGAZINEICI_P2_MAGAZINE
ICI_P2_MAGAZINE
 
Gc Outsourcing Presentation
Gc Outsourcing PresentationGc Outsourcing Presentation
Gc Outsourcing Presentation
 
Gc Outsourcing Presentation
Gc Outsourcing PresentationGc Outsourcing Presentation
Gc Outsourcing Presentation
 
Company profile of KK Technocrats Pvt Ltd
Company profile of KK Technocrats Pvt LtdCompany profile of KK Technocrats Pvt Ltd
Company profile of KK Technocrats Pvt Ltd
 

More from Json96

Assignment 2 research report-
Assignment 2  research report-Assignment 2  research report-
Assignment 2 research report-
Json96
 
Assignment 1 fnbe jan- -1-
Assignment 1  fnbe jan- -1-Assignment 1  fnbe jan- -1-
Assignment 1 fnbe jan- -1-
Json96
 
Finaleng
FinalengFinaleng
Finaleng
Json96
 
Cendol power-point
Cendol power-pointCendol power-point
Cendol power-point
Json96
 
123123123
123123123123123123
123123123
Json96
 
Enbe cover4
Enbe cover4Enbe cover4
Enbe cover4
Json96
 
Enbe cover2
Enbe cover2Enbe cover2
Enbe cover2
Json96
 
Enbe cover
Enbe coverEnbe cover
Enbe coverJson96
 
Enbe cover
Enbe coverEnbe cover
Enbe coverJson96
 
Ici
IciIci
Ici
Json96
 
Ici
IciIci
Ici
Json96
 
Ici
IciIci
Ici
Json96
 
Reference
ReferenceReference
Reference
Json96
 
Reference
ReferenceReference
Reference
Json96
 
Reference
ReferenceReference
Reference
Json96
 
Itd2
Itd2 Itd2
Itd2
Json96
 
Project brief
Project brief Project brief
Project brief
Json96
 
Project brief 1
Project brief 1Project brief 1
Project brief 1
Json96
 
Cover 2
Cover 2Cover 2
Cover 2
Json96
 
Compilation
CompilationCompilation
Compilation
Json96
 

More from Json96 (20)

Assignment 2 research report-
Assignment 2  research report-Assignment 2  research report-
Assignment 2 research report-
 
Assignment 1 fnbe jan- -1-
Assignment 1  fnbe jan- -1-Assignment 1  fnbe jan- -1-
Assignment 1 fnbe jan- -1-
 
Finaleng
FinalengFinaleng
Finaleng
 
Cendol power-point
Cendol power-pointCendol power-point
Cendol power-point
 
123123123
123123123123123123
123123123
 
Enbe cover4
Enbe cover4Enbe cover4
Enbe cover4
 
Enbe cover2
Enbe cover2Enbe cover2
Enbe cover2
 
Enbe cover
Enbe coverEnbe cover
Enbe cover
 
Enbe cover
Enbe coverEnbe cover
Enbe cover
 
Ici
IciIci
Ici
 
Ici
IciIci
Ici
 
Ici
IciIci
Ici
 
Reference
ReferenceReference
Reference
 
Reference
ReferenceReference
Reference
 
Reference
ReferenceReference
Reference
 
Itd2
Itd2 Itd2
Itd2
 
Project brief
Project brief Project brief
Project brief
 
Project brief 1
Project brief 1Project brief 1
Project brief 1
 
Cover 2
Cover 2Cover 2
Cover 2
 
Compilation
CompilationCompilation
Compilation
 

Ici

  • 1. - LIM WEI HENG (0320148) - LIM JEY SHEN (0319796) - LIM YANG KANG (0320538) - MARCO LEONG WONG KA HENN ( 0320026) - LE JIA NIAN (0319957) - MUHAMMAD IRFAAN YADUN (0320478)
  • 2. CONTENT 1. COMPANY PROFILE - ABOUT MENDATRI DESIGN - COMPANY ORGANISATION -AWARDS 2. KEY PERSON PROFILE (LAr. FAIROUZ CHE ANI) 3. COMPANY PROJECTS - BANK NEGARA DATA CENTRE - SOCSO REHABILITATION, MELAKA 4. INTERVIEW ( LAr, FAIROUZ CHE ANI) - Q&A Session Before we start the design, we landscape architect have to do some research first on the design. There is a few guide lines, restriction like CPTED which Is Crime Prevention through Envi- ronmental Design. And we also have to fulfil the client and the Dato Bandar wish lists. Q: So you guys supposed to think of something like for ex- ample the lighting in the township? A: Yes, more lighting is necessary but what about the costing? So we have to think out of the box to solve this problem. We have to think of what kind of lighting is suitable for this situation. The distant of the light and what happen after and before the lighting, where should we put the fencing, housing area, parks and many more. A lots of research has been done by the oversea architect especially form Australia. We Ma- laysian L.A. have to talk with them and get some reference form
  • 3. A: There is one project we are doing now is the Elmina township in Selangor. Township means the whole new development in a certain undeveloped area. So we have to start from scratch as the whole place is a palm tree estate. Then the planner come in and we discuss with the planner about how the road should go, where is the location of the parks and the other facilities. After that we start to design the main road, all the infrastructure, all the parks and pocket parks and the connec- tion flow in the township. Q: What is your role and responsibility in this project? A: Our role and responsibility is to make sure that we provide the right convenient to the user. We don’t simply build something which is practical. Our strategy is to build something which is practical, usable and convenient, safety precaution and also easy to use for the user.
  • 4. COMPANY ORGANISATION LAr. Fairouz Che Ani Principal Landscape Architect ILAM Corporate Member LAr. Dr. Nurhayati Abdul Malek Associate Landscape Architect ILAM Corporate Member Associate Landscape Architect Senior Landscape Architect Landscape Architect Senior Landscape Designer Horticulturist/Admin Then we continue to assist the client in prequalifying contrac- tors for work designed by the consultant, issue Bid documents, review substitutions and alternatives are requested by the bid- ders and we LA has to attend meetings with the low bidders on items designed by consultant to review bids and understanding of the project scope. After that, we will have to make periodic visits to the site to become familiar with the progress and quali- ty of construction and to determine if the construction of the landscape work is proceeding in accordance with the design in- tent and contract documents. And our Final task is to provide a program for professional landscape maintenance. Q: Can you explain to us the one of the specific project which were still working on?
  • 5. Q: So every time after the plans is done you guys have to meet the client to get his approval? A: Yes we have to. This is to make sure that we are up to the cli- ent Requirement as some of them will change their mind and al- so to fulfil their wish list. The relationship with the client is very important. And after the client had approved the schematic de- sign and probable site construction cost, we then proceed the design development drawings. In the drawing, there will be the site grading and drainage for all side of the building footprint in- cluding contouring, retaining struc- tures, swales, flow lines and drainage devices. Beside we MENTARIDESIGN’SAWARDS EXCELLENT LANDSCAPE DESIGN & PLANNING 2010 EXCELLENT LANDSCAPE DESIGN & PLANNING 2012
  • 6. MENTARIDESIGN’SAWARDS ILAM 2012 Award Winning Project D’VIDA COMMERCIAL, JELUTONG MASTER PLAN OF D’VIDA COMMERCIAL, JELUTONG This conceptual design plan also include illustrative sections and elevations for presentation purposes. We also have to pre- pare the image character boards or bound booklets in order to generate discussion and to convey the landscape design intent. Soon after everything is done, we have to attend a meeting with the client and other consultant to review the work. Q: That sound like a lot of work. A: Yes, it is. That’s why we have to start as early as possible. After the client had approve on the site plan based on the footprint provid- ed by us. We then produce the Schematic Landscape Design plans. In this plan we have to think of the conceptual site grading and drainage system in the site, the pedestrian and automobile paved area, the identification of tree, shrub, groundcover and many more and also the concept landscape lighting for all major landscape area. Soon af- ter the plans is done, the project manager and project designer will attend the project meetings with the clients.
  • 7. INTERVIEW LAr. FAIROUZ CHE ANI Q: Is there any stages of drawing you LA going to pro- duce like for example the tender drawing, Concept drawing, final drawing and so on? A: Not really. But yes, we have stages of tasks that we have to do. For example we have to produce the conceptual design, schematic landscape design, design development, construc- tion doc, bidding and negotiation, construction observation and our final task is to produce the landscape guidelines. Q: Would you mind to explain to us in more details about the six task you told us just now if that doesn’t bother you? A: The first task we have to prepare a conceptual design plan for the client and other consultants. Before we start the conceptual design plan, we have to review all the perti- nent codes, current entitlements, and conditions of approv- al which may give impact to the site development concepts.
  • 8. COMPANY PROJECTS BANK NEGARA DATA CENTRE MASTER PLAN OF BANK NEGARA DATA CENTRE PROJECT DESCRIPTION: Representing the image of Malaysia’s largest fi- nancial services group, the landscape was pur- posely built for the enjoyment of people without override its character as a semi private space.
  • 9. COMPANY PROJECTS PROJECT DESCRIPTION: This project aimed to achieve Certified GBI certification. Several landscape contributions are the use of water efficient landscape, rain water harvesting system, adaptive plants, and the use of plants that are able to absorb more carbon dioxide. SOCSO REHABILITATION, MELAKA Modern Contemporary Design which plays with bold and dynamic shapes were implemented in the work.