Ch-1 Definition of HRM
• Human resource management is to make the most productive use of human
resource to the greatest benefits of the organization and individuals.
• The process of attracting, developing and maintaining a talented and energetic
workforce to support organizational mission, objectives and strategies.
• Human Resource Management is the management of an organization’s work force,
or human resources. It is responsible for the attraction, selection, training,
assessment and rewarding of employees, while also overseeing organizational
leadership and culture, and ensuring compliance with employment and labor laws.
• Human resource management (HRM, or simply HR) is a function in organizations
designed to maximize employee performance of an employer's strategic
objectives. HR is primarily concerned with the management of people within
organizations, focusing on policies and systems. HR departments and units in
organizations typically undertake a number of activities, including
employee recruitment, training and development, performance appraisal and
rewarding (e.g., managing pay and benefit systems). HR is also concerned
with industrial relations that is, the balancing of organizational practices with
requirements arising from collective bargaining and from governmental laws
2
3
Functions of HRM
Human Resource Management (HRM) is all about balancing the organization’s people
and processes to best achieve the goals and the strategies of the organization, as well
as the goals and the needs of employees. The main role an HR manager has to fulfill is
integrating business operations and strategies across a wide array of culture, products,
and ideas, while effectively delegating work among human resource specialists and
line management.
A brief description of usual human resource functions are given below:
• Human Resource Planning: In the human resource planning function, the number
and type of employees needed to accomplish organizational goals are determined.
Research is an important part of this function because planning requires the
collection and analysis of information in order to forecast human resources
supplies and to predict future human resources needs. The basic human resource
planning strategy is staffing and employee development.
• Job Analysis: Job analysis is the process of describing the nature of a job and
specifying the human requirements, such as skills, and experience needed to
perform it. The end product of the job analysis process is the job description. A job
description spells out work duties and activities of employees. Job descriptions are
a vital source of information to employees, managers, and personnel people
because job content has a great influence on personnel programs and practices.
4
• Staffing: Staffing emphasizes the recruitment and selection of the human resources for
an organization. Human resources planning and recruiting precede the actual selection
of people for positions in an organization. Recruiting is the personnel function that
attracts qualified applicants to fill job vacancies. In the selection function, the most
qualified applicants are selected for hiring from among those attracted to the
organization by the recruiting function. On selection, human resource functionaries
are involved in developing and administering methods that enable managers to decide
which applicants to select and which to reject for the given jobs.
• Orientation: Orientation is the first step toward helping a new employee adjust
himself to the new job and the employer. It is a method to acquaint new employees
with particular aspects of their new job, including pay and benefit programs, working
hours, and company rules and expectations.
• Training and Development: The training and development function gives employees
the skills and knowledge to perform their jobs effectively. In addition to providing
training for new or inexperienced employees, organizations often provide training
programs for experienced employees whose jobs are undergoing change. Large
organizations often have development programs which prepare employees for higher
level responsibilities within the organization. Training and development programs
provide useful means of assuring that employees are capable of performing their jobs
at acceptable levels.
5
• Performance Appraisal: Performance appraisal function monitors employee performance to ensure
that it is at acceptable levels. Human resource professionals are usually responsible for developing
and administering performance appraisal systems, although the actual appraisal of employee
performance is the responsibility of supervisors and managers. Besides providing a basis for pay,
promotion, and disciplinary action, performance appraisal information is essential for employee
development since knowledge of results (feedback) is necessary to motivate and guide
performance improvements.
• Career Planning: Career planning has developed partly as a result of the desire of many employees
to grow in their jobs and to advance in their career. Career planning activities include assessing an
individual employee’s potential for growth and advancement in the organization.
• Compensation: Human resource personnel provide a rational method for determining how much
employees should be paid for performing certain jobs. Pay is obviously related to the maintenance
of human resources. Since compensation is a major cost to many organizations, it is a major
consideration in human resource planning. Compensation affects staffing in that people are
generally attracted to organizations offering a higher level of pay in exchange for the work
performed. It is related to employee development in that it provides an important incentive
in motivating employees to higher levels of job performance and to higher paying jobs in the
organization.
• Benefits: Benefits are another form of compensation to employees other than direct pay for work
performed. As such, the human resource function of administering employee benefits shares many
characteristics of the compensation function. Benefits include both the legally required items and
those offered at employer’s discretion. The cost of benefits has risen to such a point that they have
become a major consideration in human resources planning. However, benefits are primarily
related to the maintenance area, since they provide for many basic employee needs.
6
• Labor Relations: The term “labor relations” refers to interaction
with employees who are represented by a trade union. Unions are
organization of employees who join together to obtain more voice
in decisions affecting wages, benefits, working conditions, and
other aspects of employment. With regard to labor relations, the
personnel responsibility primarily involves negotiating with the
unions regarding wages, service conditions, and resolving
disputes and grievances.
• Record-keeping: The oldest and most basic personnel function is
employee record-keeping. This function involves recording,
maintaining, and retrieving employee related information for a
variety of purposes. Records which must be maintained include
application forms, health and medical records, employment
history (jobs held, promotions, transfers, lay-offs), seniority lists,
earnings and hours of work, absences, turnover and other
employee data.
7
Human Resource Management
8
Why is Human Resource Management
Important to all managers
An organization cannot build a good team of working professionals without good Human Resources. Following
are some points which shows the importance of HRM.
• Human Capital Value
Having an in-house human resources function is important. An in-house human resources staff or a human
resources expert on staff can increase the understanding of how important human capital is to the company's
bottom line. For small businesses, in particular, human capital is critical because so many smaller firms have
employees who perform cross-functional duties. With a smaller workforce, if just one person leaves, it leaves
the company with a huge gap to fill and a potential threat to the company's profitability.
• Budget Control
Human resources controls excessive spending through developing methods for trimming workforce
management costs, which includes negotiating better rates for benefits such as health care coverage. In
addition, human resources ensures competitive and realistic wage-setting based on studying the labor market,
employment trends and salary analysis based on job functions. As some small businesses have budget
constraints, this human resources function is especially helpful.
• Conflict Resolution
Workplace conflict is inevitable, given the diversity of personalities, work styles, backgrounds and levels of
experience among employees. A human resources manager or a staff person specially trained to handle
employee relations matters can identify and resolve conflict between two employees or a manager and
employee and restore positive working relationships.
9
• Training and Development
Human resources conducts needs assessments for the organization's current workforce
to determine the type of skills training and employee development necessary for
improving skills and qualifications. Companies in the beginning or growth phases can
benefit from identifying training needs for existing staff. It's much less expensive than
the cost to hire additional staff or more qualified candidates. In addition, it's a strategy
that also can reduce turnover and improve employee retention.
• Employee Satisfaction
Human resources specialists usually are charged with the responsibility of determining
the level of employee satisfaction. With carefully designed employee surveys, focus
groups and an exit interview strategy, human resources determines what underlies
employee dissatisfaction and addresses those issues to motivate employees.
• Cost Savings
The cost to hire new or replacement workers, including training and other activities,
can be unreasonable for employers, especially small businesses. With a well-
constructed recruitment and selection process, the human resources function can
minimize expenses regarding advertising job postings, training new employees and
enrolling new employees in benefits plans.
10
• Performance Improvement
Human resources develops performance management systems. Without a human resources staff
person to construct a plan that measures performance, employees can wind in jobs that aren't
suitable for their skills and expertise. Additionally, employees whose performance falls below the
employer's expectations can continue on the payroll, thereby creating wasted money on low-
performing employees.
• Sustaining Business
Through succession planning that human resources develops, the company identifies employees with
the promise and requisite capabilities to eventually transition into leadership roles with the company.
This is an important function as it can guarantee the organization's stability and future success.
• Corporate Image
Businesses want to be known as the "employer of choice." Employers of choice are the companies
that receive recognition for the way they treat employees; they are the companies for whom people
want to work. Becoming an employer of choice means human resources balances recruiting the most
qualified applicants, selecting the most suitable candidates and retaining the most talented
employees.
• Firm Principles
Human resources ensures the workforce embraces the company's philosophy and business principles.
From the perspective of a small business, creating a cohesive (solid) work environment is vital. The
first opportunity human resources has to accomplish this is through wise hiring decisions that identify
desirable professional traits, as well as orientation and on-boarding programs.
11
Why are these concepts and techniques important to all managers?
Perhaps it’s easier to answer this by listing some of the personnel mistakes
you don’t want to make while managing. For example you don’t want to:
• Hire the wrong person for the job
• Experience high turnover
• Have your people not doing their best
• Waste time with useless interviews
• Have your company taken to the court because of your discriminatory
actions
• Have your company cited under occupational safety laws for unsafe
practices and accidents.
• Have some employees think their salaries are unfair relative to others in
the organization.
• Allow a lack of training to undermine your department’s effectiveness
• Commit any unfair labor practices
12
Ch-2 Job Analysis and Design
Organizations consist of jobs that have to be staffed. Job analysis is the procedure
through which you determine the duties of these positions and the characteristics of
the people to hire for them. Job analysis produces information for writing Job
description (a list of what the job entails) and job specifications (what kind of people
to hire for the job).
The procedure for determining the duties and skill requirements of a job and the kind
of person who should be hired for. Or
Job Analysis is the process of determining and recording all the pertinent information
about a specific job including the tasks involved, the knowledge and skill set required
to perform the job, the responsibilities attached to the job and the abilities required to
perform the job successfully. It is also referred as job review. Two end products of job
analysis are job description and job specification.
Process of job analysis
1. Information gathering
2. Job specific competency determination
3. Developing a job description
4. Developing a job specification
13
Steps in Job Analysis
There are six steps in doing a job analysis. Let’s look at each of them.
1. Decide how you will use the data information since this will
determine the data you collect and how you will collect them.
“Collection Techniques”.
2. Review relevant back ground information such as organizational
charts, job description and process charts.
3. Selecting representative position. Because there may be too similar
jobs to analyze.
4. Actually analyze the job. By collecting data information on job
activities, required employee working conditions, human traits,
abilities and employee behaviors.
5. Verify the job analysis information with the employee performing the
job and with his/her supervisor.
6. Develop job description and specification.
14
Methods for collection Job Analysis
information
Job analysis is based on job data. Hence the question: how to collect job related data? A variety of methods are available
for collecting job data. The method that was historically linked to the concept of job analysis was observation
supplemented by the interview.
In recent years, questionnaires, check lists, critical incidents, diaries, personnel records and technical conference
method have also been experimented for collecting job-related data. A brief description of each method is in order.
• Observation:
Under this method, data is collected through observing an employee while at work. The job analyst on the basis of
observation carefully records what the worker does, how he/she does, and how much time is needed for completion of
a given task. This is the most reliable method of seeking first hand information relating to a job.
This method is suitable for jobs that consist primarily of observable physical ability, short job cycle activities. The jobs of
draftsman, mechanic, are the examples of such jobs. However, the flip side of this method is that this method is not
suitable for jobs that involve unobservable mental activities.
• Interview:
Job analysis interviews range from completely unstructured interviews, to highly structured ones containing hundreds of
specific items to check off. This method is found suitable particularly for jobs wherein direct observation is not feasible.
By way of directly talking to the job holder, the interviewer job analyst may extract meaningful information from the job
holder about his/her job.
However the interview method is both time consuming and costly. Particularly, the professional and managerial jobs due
to their complicated nature of job, require a longer interview’ This may also be a possibility that bias on the part of the
analyst and the job holder i.e., the respondent may cloud the accuracy and objectivity of the information gathered
through interview. Nonetheless, the effectiveness of the interview method will depend on the ability of both interviewer
and respondent in asking questions and responding them respectively.
15
• Questionnaire
Questionnaire method of job data collection is desirable especially in the following two
situa­
tions:
First, where the number of people doing the same job is large and to personally interview
them is difficult and impracticable.
Second, where giving enough time to employees is desirable to enable them to explore the
special aspects of the jobs.
In this method, the employee is given structured or unstructured questionnaire to fill in,
which are then returned to the supervisors. The supervisor, after making the required and
necessary corrections in the infor­
mation contained in the questionnaire, submits the
corrected information to the job analyst. Question­
naire provides comprehensive
information about the job.
Information so obtained can be quantified and processed in the computer. The greatest
advantage of the questionnaire method is that it enables the analyst to cover a large
number of job holders in the shortest possible time. However, the method suffers from
certain short­
comings as well.
In the absence of direct rapport between the job analyst and the employee, both
cooperation and motivation on the part of the employee tends to be at low level. Often
employee due to lack of training and skill, do not express the job related information in a
meaningful and clear fashion. As such, job related data tends to be inaccurate. Moreover,
the method is time-consuming and costly.
16
• Checklists:
The checklist method of job data collection differs from the questionnaire method in the
sense that it contains a few subjective questions in the form of yes or no. The job holder is
asked to tick the questions that are related to his/her job. Checklist can be prepared on
the basis of job informa­
tion obtained from various sources such as supervisors, industrial
engineers, and other people who are familiar with the particular job.
Once the checklist is prepared, it is then sent, to the job holder to check all the tasks listed
in the list he/she performs. He/she is also asked to mention the amount of time spent on
each task by him/her and the type of training and experience required to do each task.
Information contained in checklist is, then, tabulated to obtain the job-related data.
Like questionnaire method, the checklist method is suitable in the large organizations
wherein a large number of workers are assigned one particular job. Since the method is
costly and, therefore, is not suitable for small organizations.
• Critical Incidents:
This method is based on the job holder’s past experiences on the job. They are asked to
recapitu­
late and describe the past incidents related to their jobs. The incidents so
reported by the job holders are, then, classified into various categories and analyzed in
detail. Yes, the job analyst requires a high degree of skill to analyze the incidents
appropriately described by the job holders. However, this method is also time-consuming
one.
17
• Diaries or Log Records:
In this method, the job holder is asked to maintain a diary recording in detail the job-related activities
each day. If done judiciously, this method provides accurate and comprehensive information about the
job. This overcomes memory lapses on the part of the job holder. As recording of activities may spread
over several days, the method, thus, becomes time-consuming one.
The disadvantage associated with this method is that it remains incomplete because it does not give
desirable data on supervisor relationship, the equipment used and working conditions prevalent at the
work place.
• Technical Conference Method:
In this method, a conference is organized for the supervisors who possess extensive knowledge about
job. They deliberate on various aspects of the job. The job analyst obtains job information from the
discussion held among these experts/supervisors. The method consumes less amount of time. However,
the main drawback of this method is that it lacks accuracy and authenticity as the actual job holders are
not involved in collecting job information.
Internet Based Job Analysis:
Conducting the job analysis via the internet is an obvious solution. Therefore, the use of online
methodologies for surveys, including job analysis surveys, has increased dramatically in recent years,
and most companies choose to use the internet or intranet to collect this type of data.
It is seen from the preceding description that no single method is complete and superior. In fact, none
of the method is to be considered as mutually exclusive. The best data related to a job can be obtained
by a combination of all methods described above.
18
The problems that may crop up while
conducting job analysis are:
• 1. Lack of support from the top management.
• 2. Relying on one source and method of data
collection.
• 3. Non-trained and non-motivated job holders
who are the actual source of job data.
• 4. Distorted information/data provided by the
respondents i.e., the job holders because of
non- preparedness on their part.
19
Writing Job Description
The employer almost always uses the job analysis to at least produce a
job description. A job description is a written statement of what the
worker actually does, how he or she does it, and what the job’s working
conditions are. you use this information to write a job specification: this
lists the knowledge, abilities and skills required to perform the job
satisfactorily. There is no standard format for writing a job description.
However, most descriptions contain sections that cover:
1. Job identification
2. Job summary
3. Responsibilities and duties
4. Authority of incumbent
5. Standards of performance
6. Working conditions
7. Job specifications
20
Writing Job Specifications
The job specification takes the job description and answers the question, “what human traits and experience
are required to do this job effectively”. It shows what kind of person to recruit and for what qualities you should
test that person. The job specification may be a section of the job description, or a separate document.
The following is an outline of what a good job specification should contain
• Position Title: Both the internal position and if it is ‘internal jargon’ the position as it would be viewed
externally.
• Location: Which particular office/town and how much travel will be involved.
• Remuneration: Also include all the benefits available.
• Hours: How many hours a week and a comment about flexibility if this is offered (beyond your legal duties)
• Reporting: Who will the post holder report to. In addition lay out any man management responsibilities
the post holder will have.
• Purpose: This is the most important part of the specification- what the person should accomplish or be
aiming to achieve.
• Duties: A general overview of what the main duties of the post holder will be. Avoid being too prescriptive
or narrow, so as not to limit what you can expect in the future and it allows for people to become
entrepreneurial in their role.
• Evaluation: How you will measure whether the purpose is achieved.
• Experience: Any skills, qualifications or personal qualities you required. Separate these between essential
experience and desired experience.
• Personal: Explain any philosophy or attitude your organization holds that you hope people will share.
21
Job Design
Job design is the process of putting together
various elements to form a job, bearing in mind
organizational and individual worker
requirements, as well as considerations of
health and safety.
The process of defining how work will be
performed and what tasks will be required in a
given job.
22
Ch-3 Human Resource Planning and
Recruiting
Recruitment and selection ideally starts with human resource planning. After all, if you don’t
know what your team’s employment needs would be in the next few months, why should you be
hiring?
Employment or human resource planning is the process of deciding what positions the firm will
have to fill, and how to fill them. It embraces all future positions. Employment planning should
flow from the firm’s strategic plans. One big question is whether to fill projected openings from
within or from outside the firm. Each options requires different personnel plans. Current
employees may require training, development, and coaching plans. Going outside requires
planning what recruiting sources you will use.
Like all good plans, personnel plans require some forecast or estimates, in this case, of three
things: personnel needs, the supply of inside candidates and the likely supply of outside
candidates. We will start with personnel needs.
Forecasting Personnel needs: How many people do you need? Managers consider several factors.
To decide personnel needs is to forecast revenues first. Then estimates the size of the staff
required to support this sales volume. However managers obviously need to consider other
factors too. These include projected turnover, decisions to upgrade (or downgrade) products or
services, productivity changes and financial resources. There are several simple tools for
projecting personnel needs, as follows.
23
Trend Analysis: Trend analysis means studying variation in your
firm’s employment levels over the last few years. Trend analysis can
provide an initial estimates of future staffing needs, but
employment levels rarely depend just on the passage of time.
Other factors like changes in sales volume and productivity also
affect staffing needs.
Ratio Analysis: Another simple approach ratio analysis, means
making forecasts based on the historical ratio between 1. some
causal factor like sales volume and 2. the number of employees
required.
The scatter plot: A scatter plot shows graphically how two variables-
such as sales and your firm’s staffing levels-are related.
Using Computer to support forecasting needs: Computerized
forecasts enable the manager to build more variables into his or her
personnel projections.
24
Forecasting the supply of inside candidates
Knowing your staffing needs satisfies only half the staffing question. Next you have to estimate
the likely supply of both inside and outside candidates. Most firms start with the inside
candidates. The main task here is determining which current employees might be qualified for
the projected openings. For this you need to know current employees’ skills sets-their current
qualifications. Sometimes who to choose is not obvious. Here, managers turn to qualifications
(or skill) inventories. These contain data on employees’ performance records, educational
background, and promotability. Whether manual or computerized, these help managers
determine which employees are available for promotion or transfer.
Manual systems and Replacement charts: Departmental managers or owners of smaller firms
often use manual devices to track employee qualifications. The information includes education,
company sponsored courses taken, career and development interests, languages, desired
assignments and skills.
Computerized Skill Inventories: Large firms obviously can’t track the qualifications of hundreds
or thousands of employees manually. Larger employers therefore computerize this information,
using various packaged software systems. The usual process is for the employee, the supervisor,
and human resource manager to enter information about the employee’s background,
experience, and skills. Then when a manager needs a person for a position, he or she uses key
words to describe the position’s specifications.
25
Forecasting the supply of Outside candidates
If there won’t be enough inside candidates to fill the
anticipated openings, you will turn to outside candidates. If
you are drawing up a personnel plan (say for the coming fiscal
year), you may want to estimate how difficult it will be to find
good outside candidates. Information like this is easy to find
both online and in print format. Your planning may also
require that you forecast specific occupation like computer
programmer for instance, there has been an undersupply of
computer programmer. Some labor bureaus publishes annual
occupational projections both online and in the monthly labor
review and in occupational outlook quarterly.
26
Recruiting
Any activity carried on by the organization with the primary purpose of identifying and attracting potential
employees.
Employee recruiting means finding and/or attracting applicants for the employer’s open positions.
The process of attracting individuals on a timely basis, in sufficient numbers, and with appropriate
qualifications, and encouraging them to apply for jobs with an organization.
Should you centralize your firm’s recruitment efforts, or let each plant or office do their own recruiting. More
firms are centralizing it for three good reasons. First, doing so makes it easier to apply the company’s strategic
priorities. Second, recruiting centrally reduce duplication (having several recruitment offices instead of one).
Third, centralized recruiting makes it easier to ensure uniformity and conformity with the law.
Internal sources of candidates
Filling open positions with inside candidates has several advantages. First there is really no substitute for
knowing a candidate’s strengths and weaknesses, as you should after working with them for some time.
Current employees may also be more committed to the company. Morale, may rise if employees see
promotions as rewards for loyalty and competence. And inside candidates should require less orientation and
perhaps training than outsiders.
However, hiring from within can also backfire. Employees who apply for jobs and don’t get them may become
discontented; telling them why you rejected them and what remedial actions they might take is crucial. And too
often internal recruiting is something of a waste of time. Many employers require managers to post jobs
openings and interview all inside candidates. Yet the managers often knows ahead of time who he or she wants
to hire. Inbreeding is another potential drawback. When all managers come up through the ranks, they may
have the tendency to maintain the status quo, when a new direction is required.
27
Finding internal candidates: Hiring from within ideally relies on job posting
and the firm’s skill inventories. Job posting means publicizing the open job
to employee (usually by literally posting it on company bulletin boards).
These postings list the job’s attributes, like qualifications, supervisor, work
schedule, and pay rate.
Rehiring: Should you rehire someone who left your firm? It depends. On
the plus side, former employees are known quantities (more or less) and
are already familiar with how you do things. On the other hand, employees
who you let go may return with less-than-positive attitudes. In any event,
you can reduce the chance of adverse reactions. After employees have
been back on the job for a certain period, credit them with the years of
service they had accumulated before they left.
Succession Planning: Succession planning is the ongoing process of
systematically identifying, assessing and developing organizational
leadership to enhance performance. Succession planning entails three
steps; identifying key needs, creating and assessing candidates and
selecting those who will fill the key positions.
28
Outside Sources of Candidates
Firms can’t always get all the employees they need from their current staff and sometimes they just don’t want
to. We will look at the sources firms use to find outside candidates.
• Recruiting via the Internet: Most people today go online to look for jobs. For more employers and for most
jobs Internet based recruiting is by far the recruiting, source of choice.
• Other online options: There are online alternatives to placing ads on job boards. Newer sites capitalize on
social networking. User register by supplying their name, location, and kind of work they do on sites.
These sites facilitate developing personal relationship for networking and employee referrals. The dot-jobs
Domain and virtual job fairs are other sources of outside candidates. Internet recruiting is a cost effective
way to publicize openings; it generates more responses quicker and for a longer time at less cost than just
about any other method. Internet recruiting has two big potential problems-discrimination and overload.
First internet recruiting gets restricted only to those who have ready access to the web and are able to use
it effectively. The second challenge is internet overload: employers end up with huge number of resumes.
Improving online recruiting effectiveness: Planning your online recruiting effort is crucial. For one thing, some
estimate that employers have only a few minutes “before online applicants will turn their attention elsewhere”.
There are some objections on online recruiting, they are:
• Job opening lacked relevant information
• It was often difficult to format resumes and post them in the form required.
• Many respondents expressed concerns about the privacy of the information
• Poor graphics often made it difficult to use the web site.
• Slow feedback from the employer was annoying.
29
Advertising: While web-based recruiting is rapidly replacing by ads. To use ad
successfully, employers have to address two issues: the advertising medium and the
ad’s construction.
Employment Agencies: There are three main types of employment agencies: 1. Public
agencies operated by federal, state, provincial or local governments. 2. Agencies
associated with nonprofit organizations and 3. Privately owned agencies.
Referrals and walk-ins: Employee referral campaigns are an important recruiting
option. Here the firm posts announcements of openings and requests for referrals on
its web site, bulletin and/or wallboards. The firm offers prizes or cash awards for
referrals that lead to hiring. The biggest advantage here is that referrals tend to
generate more applicants, more hires, and a higher yield ratio(hire/applicants).
Current employees will usually provide accurate information about the job applicants
they are referring, since they are putting their own reputation on the line. It is more
cost effective method than employment agencies. There are few things to avoid. If
morale is low, you probably should address that prior to asking for referrals. And if you
don’t hire someone, explain to your employee/referrer why you did not hire his or her
candidate. And we saw that relying on referrals might be discriminatory.
Particularly for hourly workers, walk-ins-direct applications made at your office are a
big source of applicants. Treat walk-ins courteously and diplomatically, for the sake of
both the employer’s community reputation and the applicant’s self esteem.
30
Employee Testing and Selection
Once you review your applicants’ resumes, the next step is selecting the best
candidates for the job. Nothing you do at work is more important than hiring
the right employees. It is important for three reasons: performance, cost and
legal obligations.
Performance: First, your own performance always depends on your
subordinates. Employees with the right skills will do a better job for you and
the company. The time to screen out undesirable is before they are in the
door, not after.
Cost: Second, it is important because it’s costly to recruit and hire employees.
Hiring and training even on a small position can cost a lot of money and time.
Legal obligation: Thirdly, legal aspects are important because mismanaging
the process may lead to legal implications. Equal employment laws require a
nondiscriminatory selection procedure. Negligent hiring means hiring
employees with criminal records or other such problems, who then use access
to customer’s home (or similar opportunities) to commit crimes.
31
How to validate a test
In order for a selection test to be useful, you want to know that scores on the test relate in a
predictable way to performance on the job. The validation process consists of five steps:
Step 1: Analyze the job. The first step is to analyze the job and write job description and job
specifications. The point is to specify the human traits and skills you believe are required for
adequate job performance. In the first step, you also must define what you mean by “success on
the job” since it’s this success for which you want predictors. The standards of success are
criteria. Here you could use production related criteria (quantity, quality and so on), personnel
data (absenteeism, length of service and so on) or judgment of workers performance (by person
like supervisors). Choosing the right criteria (measures of performance) is important.
Steps 2: Choose the test. Once you know the predictors you want to use, the next step is to
decide how to test for them. Employers usually base this choice on experience, previous research
and “best guesses”. They usually don’t start with just one test. Instead they choose several tests
and combine them into a test battery. The test battery aims to measure an array of possible
predictors, such as aggressiveness, extroversion and numerical ability.
Step 3: Administer the Test. Next, administer the selected test (s). You have two choices here.
One option is to administer the tests to employees currently on the job. You then compare their
test scores with their current performance; this is concurrent (at the same time) validation. Its
main advantage is that data on performance are readily available. The disadvantage is that
current employees may not be representative of new applicants. Predictive validation is the
second and more dependable way to validate a test. Here you administer the test to applicants
before you hire them.
32
Step 4: Relate your test score and criteria: The next
step is to ascertain if there is a significant relationship
between scores (the predictor) and performance (the
criterion). The usual way to do this is to determine the
statistical relationship between 1. scores on the test
and 2. job performance using correlation analysis,
which shows the degree of statistical relationship.
Step 5. Cross validate and Revalidate: Before using
the test you may want to check it by “cross validating”-
in other words, by again performing steps 3 and 4 on a
new sample of employees. At a minimum, have
someone revalidate the test periodically.
33
Types of Tests
We can conveniently classify tests according to whether they measure cognitive (mental)
abilities, motor and physical abilities, personality and interests, or achievement. We will
look at each:
Test of cognitive abilities: Cognitive tests include tests of general reasoning ability
(intelligence) and tests of specific mental abilities like memory and inductive reasoning.
Intelligence Tests: Intelligence tests are tests of general intellectual abilities. They measure
not a single trait but rather a range of abilities, including memory, vocabulary, verbal
fluency, and numerical ability.
Specific Cognitive Abilities: There are also measures of specific mental abilities, such as
inductive and deductive reasoning, verbal comprehension, memory and numerical ability.
Psychologists often call such tests aptitude tests, since they purport to measure aptitude
for the job in question.
Tests for Motor and Physical Abilities: You might also want to measure motor abilities
such as finger dexterity, manual skills, and (if hiring pilots) reaction time. Tests of physical
abilities may also be required. These include static strength (such as lifting weights),
dynamic strength (like pull-ups) body coordination (as in jumping rope) and stamina.
Lifeguards for example must show they can swim a course before they’re hired.
34
Measuring Personality and Interests: A person’s cognitive and
physical abilities alone seldom explain his or her job
performance. Other factors, like motivation and interpersonal
skills, are very important. As one consultant put it, most people
are hired based on qualifications, but most are fired for
nonperformance. And nonperformance “is usually the result of
personal characteristics, such as attitude, motivation, and
especially, temperament. Personality tests measure basic
aspects of an applicant’s personality such as introversion,
stability and motivation.
Achievement Tests: Achievement tests measure what someone
has learned. Most of the tests you take in school are
achievement tests. Achievement tests are also popular at work.
In addition to job knowledge, achievement tests measure the
applicant’s abilities; a typing test is one example.
35
Background investigations and other
selection methods
Testing is only part of an employer’s selection process. Other tools may include
background investigation and reference checks, pre-employment information services,
honesty testing, graphology, and substance abuse screening.
Why perform background investigations and reference checks: One of the easiest way
to avoid hiring mistakes is to check the candidate’s background thoroughly. Doing so is
cheap and (if done right) useful. Most employers therefore check and verify the job
applicant’s background information and references. There are two main reasons to
check backgrounds-to verify the applicant’s information (name and so forth) and to
uncover damaging information. Even relatively sophisticated companies fall prey to
criminal employees, in part because they haven’t conducted proper background
checks. When checking references via phone, therefore you have to be careful to ask
the right questions. Most employers at least try to verify an applicant’s current or
former position and salary with his or her current or former employer by phone.
Others call the applicant’s current and previous supervisors to try to discover more
about the person’s motivation, technical competence and ability to work with others
(although again many employers have policies against providing such information)
36
The polygraph and honesty test: Honesty testing is a very touchy issue in employee
selection decisions. In the US, some firms still use the polygraph (or lie detector) for
honesty testing, although the law severely restricts its use. The Polygraph is a device
that measure psychological changes like increased perspiration.
Paper and pencil honesty testing: Most measure attitudes regarding things like
tolerance of others who steal, acceptance of rationalization for theft, and admission of
theft related activities.
Ask Blunt Questions: Says one expert, there is nothing wrong with asking the applicant
direct questions, such as “Have you ever stolen anything from an employer”
Graphology: Graphology refers to the use of handwriting analysis to determine the
writer’s basic personality traits. Graphology thus has some resemblance to personality
tests, although graphology’s validity is lightly suspect. In graphology, the handwriting
analyst studies an applicant’s handwriting and signature to discover the person’s
needs, desire and psychological makeup.
Physical Exams: Once the employer extends the person a job offer, a medical exam is
often the next step in the selection. There are several reasons for pre-employment
medical exam: to verify that the applicant meets the position’s physical requirements,
to discover any medical limitations you should consider in placing him or her, and to
establish a baseline for future insurance or compensation claims. By identifying health
problems, the examination can also reduce absenteeism and accidents and of course,
detect communicable diseases.
37
Substance Abuse Screening: Many employers in the
US and countries like the UK conduct drug
screenings. The most common practice is to test
candidates just before they’re formally hired. Many
also test current employees when there is reason to
believe the person has been using drugs-after a work
accident, or in the presence of obvious behavioral
symptoms such as chronic lateness. Some firms
routinely administers drug tests on a random or
periodic basis, while other require drug tests when
they transfer or promote employees to new
positions.
38
Interviewing Candidates
An interview is more than a discussion. An interview is a procedure designed to obtain
information from a person through oral responses to oral inquiries. A selection interview is a
selection procedure designed to predict future job performance on the basis of applicant’s
oral response to oral inquiries.
Types of Employment interview: We can classify selection interviews according to
1. How structured they are
2. Their “content”-the types of questions they contain
3. How the firm administers the interview
Structured versus Unstructured Interviews: In unstructured (or nondirective) interviews,
the manager follows no set format. A few questions might be specified in advance, but they
are usually not, and there is seldom a formal guide for scoring “right” or “wrong” answers.
This type of interview could even be described as little more than a general conversation.
Most selection interviews probably fall in this category.
At the other extreme, in structured (or directive) interviews, the employer lists the
questions ahead of time, and may even list and score possible answers for appropriateness.
Some experts still restrict the term “structured interview” to interviews like these, which are
based on carefully selected job-oriented questions with predetermined answers.
39
Interview Content (What types of questions to ask): We can also classify
interviews based on the “content” or the types of questions you ask. At work,
situational, behavioral, and job related questions are most important.
In situational interview, you ask the candidate what his or her behavior would
be in a given situation. For example, you might ask a supervisory candidate
how he or she would act in response to a subordinate coming to work late 3
days in a row.
Whereas situational interviews ask applicants to describe how they would
react to a hypothetical situation today or tomorrow, behavioral interview
questions ask applicants to describe how they reacted to actual situation in
the past.
In a job-related interview, the interviewer asks applicants questions about
relevant past experiences. The questions here don’t revolve around
hypothetical or actual situations or scenarios. Instead the interviewer asks
job-related questions.
In a stress interview, the interviewer seeks to make the applicant
uncomfortable with occasionally rude questions. The aim is supposedly to
spot sensitive applicants and those with low (or high) stress tolerance.
40
How should we administer the interview: Employers also administer interviews in
various ways: one on one or by a panel of interviewers; sequentially or all at once, and
computerized or personally.
Most selection interviews are one on one and sequential. In one on one interview two
people meet alone, and one interviews the other by seeking oral responses to oral
inquiries. Employers tend to schedule these interviews sequentially. In a sequential (or
serial) interview, several persons interview the applicant in sequence, one on one and
then make their hiring decision.
A Panel interview, also known as board interview, is an interview conducted by a team
of interviewers, who together interview each candidate and then combine their
ratings into a final panel score. The panel format enables interviewers to ask follow-up
questions, much as reporters do in press conferences.
On the other hand, some candidates find panel interviews more stressful, so they may
actually inhibit responses(an even more stressful variant is the mass interview. Here a
panel interviews several candidates simultaneously. The panel poses a problem, and
then watches to see which candidate takes the lead in formulating an answer.
Phone interviews: Employers do some interviews entirely by telephone. These can
actually be more accurate than face-to-face interviews for judging an applicant’s
conscientiousness, intelligence and interpersonal skills. Here neither party need worry
about things like appearances or handshakes, so each can focus on substantive
answers.
41
Video/Web-Assisted Interviews: Firms have long used the
web to do selection interviews (particularly the initial,
prescreening interviews), and with the widespread use of
Skype-type products, their use is growing.
Computerized Interviews: Some firms computerize part of
the interview process. A computerized selection interview is
one in which a job candidate’s oral and/or computerized
replies are obtained in response to computerized oral,
visual, or written questions and/or situations. Most
computerized interviews present the applicant with a series
of questions regarding his or her background, experience,
education, skills, knowledge and work attitudes that relate
to the job for which the person has applied.
42
Ch-4 Compensation
Employee compensation refers to all forms of pay
going to employees and arising from their
employment. It has two main components, direct
financial payments (wages, salaries, incentives,
commissions and bonuses) and indirect financial
payments (financial benefits like employer-paid
insurance and leave travel concession).
There are two basic ways to make direct financial
payments to employees: base them on increments
of time or on performance.
43
Objectives of Compensation
• To help the organization achieve strategic
success while ensuring internal and external
equity.
• Internal equity- ensures that more
demanding positions or better qualified
people within the organization are paid more.
• External equity - assures that jobs are fairly
compensated in comparison with similar jobs
in other firms.
44
• Acquire qualified personnel
Compensation needs to be high enough to attract applicants.
Pay levels must respond to the supply and demand of workers
in the labour market since employers compete for workers.
Premium wages are sometimes needed to attract applicants
already working for others.
• Retain current employees
Employees may quit when compensation levels are not
competitive, resulting in higher turnover.
• Ensure equity
Compensation management strives for internal and external
equity. Internal equity requires that pay be related to the
relative worth of a job so that similar jobs get similar pay.
External equity means paying workers what comparable
workers are paid by other firms in the labour market.
45
• Reward desired behaviour
Pay should reinforce desired behaviours and act as an incentive
for those behaviours to occur in the future. Effective
compensation plans reward performance, loyalty, experience,
responsibility, and other behaviours.
• Control costs
A rational compensation system helps the organization obtain
and retain workers at a reasonable cost. Without effective
compensation management, workers could be overpaid or
underpaid. Comply with legal regulations. A wage and salary
system considers the legal challenges imposed by the
government and ensures the employer's compliance.
• Facilitate understanding
The compensation management system should be easily
understood by human resource specialists, operating
managers, and employees.
46
Types of Compensation
Direct Compensation: It refers to monetary benefits offered
and provided to employees in return of the services they
provide to the organization. The monetary benefits includes
basic salary, house rent allowance, conveyance, leave travel
allowance, medical reimbursements, special allowances,
bonus, PF/G fund etc. They are given at a regular interval at
a definite time.
Indirect Compensation: It refers to non-monetary benefits
offered and provided to employees in lieu of the services
provided by them to the organization. They include paid
leave, car/transportation, medical aids and assistance,
insurance (for self and family) , leave travel assistance,
retirement benefits, holiday homes etc.
47
Factors affecting Compensation Management
• Demand for and supply of labor
• Prevailing wage rate
• Government
• Productivity of Labor
• Labor unions
• Cost of living
• Ability to pay
48
Factors affecting compensation
Factors affecting wages or compensation or
determinants of wages or compensation:
• 1) Productivity of workers: to get the best results from
the employees and to increase the productivity
compensation has to be productivity based.
• 2) Ability to pay: it depends upon the employer’s
ability to pay wages to the workers. This depends upon
the profitability of the firm. If the firm is marginal and
can’t afford to pay higher than the competitors then
the employees will go to other firms while if the
company is successful then they can easily pay their
employees as they wish.
49
• 3) Government: government has also fixed the
rules for protecting the interest of the employees.
The organizations are liable to pay as per the
government instructions. Wages can not be fixed
below the level prescribed by the government.
• 4) Labor union: labor union also helps in paying
better wages to the workers. Higher wages have
to be paid by the firm to its workers under the
pressure of the trade unions.
• 5) Cost of living: wages depends upon the cost of
living if it is high wages will also hike.
50
• 6) Demand and supply of labor: it is one of
the important factors affecting wages. If the
demand of labor is more they will be paid high
wages otherwise vice versa. If the supply of
the employees is more than they will be paid
less and vice versa.
• 7) Prevailing wage rate: wages also depends
upon the prevailing wage rate as the
organizations have to pay accordingly to keep
the employees with them.
51
Ch-5 Performance Appraisal
Every manager needs some way to appraise employees’
performance. If employees’ performance is good, you’ll want to
reinforce it and if it is bad, you’ll want to take corrective action.
Performance appraisal means evaluating an employee’s current
and/or past performance relative to his or her performance
standards. Performance appraisal always involves
1. Setting work standards
2. Assessing the employee’s actual performance relative to
those standards, and
3. Providing feedback to the employee with the aim of
motivating him or her to eliminate performance deficiencies
or to continue to perform above par.
52
Why Appraise Performance
There are four reasons to appraise subordinates’ performance:
• First, from a practical point of view, most employers still base pay and
promotional decisions on the employee’s appraisal.
• Second, the appraisal lets the boss and subordinate develop a plan for
correcting any deficiencies, and to reinforce the things the subordinate
does right.
• Third, appraisals should serve a useful career planning purpose. They
provide an opportunity to review the employee’s career plans in light of
his or her exhibited strengths and weaknesses.
• Fourth, the appraisals play an integral role in the employer’s performance
management process. Performance management is the continuous
process of identifying, measuring, and developing the performance of
individuals and teams and aligning their performance with the
organization’s goals.
Concept Of Performance Appraisal
• PA is the method of evaluating the behavior
of the employees in the job it includes both
quantitative and qualitative aspects of job
performance.
Purpose Of Performance Appraisal
• Compensation Decision- Pay raise
• Promotion decision- level raise
• Training and development programmes-
Enhance performance
• Personal development- self actualization need
Performance Appraisal Process
• Establish performance standard
• Communicate the standard
• Measure Actual performance
• Compare actual performance with standards
performance
• Take corrective actions
What is to be appraised?
1. Behaviour of the employee -for eg :
Doctor’s behaviour with the patient.
2. Objectives of the organization- market
share , profit contribution, strategy
alignment.
3. Traits in performing the job- the precision,
time taken by the employee to perform any
job.
Who will appraise?
• Supervisors
• Peers
• Subordinates
• Self appraisal
METHODS OF PA
The PA method are of 15 types-
• Individual Evaluation method- This is done by individual
employee
• Group evaluation Method- one employee is compared with
others
• Modern methods- these are new methods and research is
still carried on
Performance
Appraisal
method
Individual
Evaluation
method
1. Confidential report
2. Essay evaluation
3. Critical incident technique
4. Check list
5. Graphic rating scale
6. BARS
7. Forced choice method
Group
evaluation
Method
1. Ranking
2. Paired
comparison
3. Forced
distribution
Modern
methods
1. Group Appraisal
2. HRA
3. Assessment
centre
4. Field review
Individual Evaluation method
1. Confidential Report-
• Used in Government organisations
• Prepared at the end of the year.
• Done by immediate senior
• Strength and weaknesses of employee are
taken
• Impression based
• No feedback is offered
Individual Evaluation method
2. Essay Evaluation-
• It’s a non quantitative subjective analysis
• Strong and weak points of employee are rated.
• Parameters are-
i) Understanding of programmes, policies, objectives etc
ii) Job knowledge
iii) The employees relations with coworkers and superiors
iv) The employee general ability of planning, controlling,
organizing etc.
v) General perception of the employee
Individual Evaluation method
3. Critical Incident technique-
• The manager prepares the lists of statements of
every effective and ineffective behaviour of the
employee.
• These rated incidents represents the outstanding
or poor behaviour of the employee.
• The manager maintains the log book wherein the
critical incidents are reported periodically and
considered at the time of appraisal.
Individual Evaluation method
4. Checklists:
• A checklist is the set of objectives or
descriptive statements about the employee
and his behaviour.
• The rater marks the characteristics which
employee possess rest are kept blank.
• Eg- Is the employee really interested in the
task assigned? Yes/No
Individual Evaluation method
5. Graphic rating scale-
• A printed form is used to evaluate the
performance of the employee .
• A variety of traits are judged on the scale and
summarised.
• For eg: Knowledge of job- Clear understanding of
the factors connected with the job rated on a
scale unsatisfactory, fair, satisfactory, good,
outstanding.
Individual Evaluation method
6. BARS- Behaviourally Anchored Rating
Scale
• The critical incidents are selected and rated on the scale
which has 6-8 defined performance dimension.
• Process of Implementing BARS-
i) Collect critical incidents
ii) Identify performance dimension
iii) Reclassification of Incidents
iv) Assigning scale values to the incidents
v) Producing the final instrument
Individual Evaluation method
7. Forced Choice Method-
• This method makes use of several sets of
paired phrases. Two which are positive and
two are negative. The rater has to rate as
least applicable most applicable.
• The phrases are non uniformally divided so
the chances of biases are not apparent
Individual Evaluation method
8. MBO (Management by objective)-
• This technique emphasises on the goals which
are tangible, verifiable, measurable.
• It’s a six stepped process-
I) Set departmental goals
II) Set individual goals
III) Discuss departmental goals
IV) Define expected results
V) Performance review
VI) Provide feedback
Group Evaluation Method
1. Ranking method-
• The relative position of each employee is
expressed in terms of his numerical rank.
Group Evaluation Method
2. Paired comparison method-
• Each worker is compared with all other
employees in the group , for every trait , the
worker is compared with all other
employees.
Group Evaluation Method
3. Forced Distribution Method-
• A predetermined distribution scale.
• Two criteria are used for rating are the job
performance and promotability.
• Five point scale is used for descriptive
statements.
MODERN METHOD
1. Group Appraisal-
• Employee appraised by group of appraiser
• It is a bias free method
MODERN METHOD
2.Human Resource Accounting:
The HRA process shows the investment the organisation makes I its people and how the value of
these people change over time. The acquisition cost of employee is compared to the
replacement cost from time to time.
• 2.
MODERN METHOD
3.Field review method-
Here the HR department representative goes to
the field and assist line supervisors .
MODERN METHOD
4. 360 Degree feedback system-
The system involves overall appraisal of the
employees . All the employees are part of te
performance appraisal.
Biases in Performance Appraisal
• First impression
• Halo effect (Keep the boss happy)
• Horn effect (Good but can’t manage Their
impression)
• Leniency
• Central tendency
• Stereotyping or personal biases (wear glasses are
more intelligent)
• Recency effect
76
Ch-6 Promotion, Transfer, and Discharge
Definition of Promotion: In the opinion of Wendell French, “A promotion is a type of
transfer involving the reassignment of an employee to a position that is likely to offer
higher pay and greater responsibilities, privileges and potential opportunities.”
Why to promote employees:
• Serves as an incentives to employees
• Recognition of the efficiency of an employee and his performance
• Boosts employee morale
• Enhances employee commitment and loyalty
• Job satisfaction
• Helps to retain skilled and talented employees
• Develops a competent internal source of employees for higher level jobs
• Instill a competitive spirit among the employees
• Effective use of knowledge and skills of an employee
• Attract competent and suitable employees to join the organization
• Organizations are able to minimize the discontent and unrest among the
employees
77
Bases for Promotion
Promotion can be based on following:
1. Promotion based on Seniority
2. Promotion based on Merit
3. Promotion based on seniority-cum-Merit
4. Promotion based on Seniority:
• Relative length of service
• Preference in various aspects of employment
Merits of using seniority as the bases of promotion:
• Simplicity
• Objectivity
• Reward
• Reduces employee turnover
• Union approval
Promotion based on seniority has been criticized on the following:
-Faulty assumption
-Ignores performance
-Efficiency suffers
-Demotivates
78
2. Promotion based on Merit:
• Stresses on the ability
• Best performing employees is promoted.
Merits of using this system:
-Enhances efficiency
-Motivates
Limitations of a promotion system based on merit are
as follows:
• Subjective
• Favoritism
• Opposition of unions
• Insecurity
79
Promotion based on seniority-cum-Merit
• Combination
• Before using this system, it is essential that the
management clearly state the following
details;
A- Minimum length of service
B- Relative weightage assigned
C- Minimum performance and qualifications
80
Definition of Transfer
According to Dale Yorder, “A transfer involves shifting of an employee from one job
to another without special reference to change in responsibility or compensation.”
Why to transfer employees:
• To meet the organizational requirements
• To ensure respect for human beings
• To identify and satisfy the needs of individuals
• To provide the organization with well-trained and well-motivated employees
• To inculcate the sense of team spirit, team work and inter-team collaboration
• Better utilization of employees
• Making employees versatile
• To correct inter-personal conflicts
• Avoidance of overstaffing
• Disciplinary action
• Relief
81
Types of Transfer
Employee transfer may be classified into 3 types based on purpose:
1. Transfer that are affected for the training & development of the
employees.
2. Transfer made for adjustment of varying volumes within the
organization
3. Transfers designed to correct the problem of poor employees
placement
The common types of transfer are as follows:
4. Production transfers
5. Replacement transfers
6. Rotation transfers (versatility transfer)
7. Shift transfer
8. Remedial transfer
9. Penal transfer
82
Discharge
Discharge or dismissal is a permanent separation of a
worker from work. It is the termination of his employment
and may be either the result of some disciplinary action or
retrenchment of surplus labor. Thus a discharge involves
permanent separation of an employee from the pay roll
for violation of company rules or for inadequate
performance. It is initiated by the management.
Discharge take place when management decides that
there is a poor fit between an employee and the
organization. It could be a result of poor performance or
because of some un-acceptable behavior.
83
Reasons for Discharge/Separation
Employee separation constitutes the final stage in the staffing process of an organization. An
employee can leave the organization for any reason which he deems fit for seeking separation.
However, separation is classified basically into two types. These are: voluntary separation and
involuntary separation. Voluntary separation refers to the separation of employees on their own
request, while involuntary separation means the separation of employees for organizational
reasons which are beyond the control of the employees. We shall now discuss the causes of these
separations in detail:
Voluntary Separation Voluntary separation, which normally begins after a request is placed
in this regard by the employee, can happen due to two reasons: professional reason and personal
reason. We shall now discuss these reasons in detail.
• Professional reasons Employees may seek separation when they decide to seek better
positions, responsibilities and status outside the present organization. Efficient employees
would seek to expand their realm of knowledge and skills continuously by working in
different capacities/positions in various organizations. In their quest for greater responsibility,
power and status, they may seek separation from the organization.
• Personal reasons The important personal reasons for voluntary separation are relocation for
family reasons like marriage of the employees and health crisis of family members, maternity
and child-rearing. For instance, when working women get married, they often prefer to settle
in the partners place of occupation. Similarly, an employee may seek voluntary separation to
look after the child or parent
84
Involuntary Separation As mentioned earlier, an involuntary separation is caused by the
factors which remain beyond the purview of the employees. However, these factors may be
classified broadly into health problems, behavioral problems and organizational problems. We
shall now discuss these factors in detail
• Health problems Major health problems to the employees may make them invalid or unfit to
continue in the profession. For instance, accidents causing permanent disabilities and illness
of the employees like brain stroke and other terminal illnesses can lead to their involuntary
separation. Death of employees is another factor which results in their involuntary
separation.
• Behavioral problems An employee's objectionable and un-acceptable behavior within the
organization may also lead to his involuntary separation from the organization. When the
employees behavior is unethical or violates the code of conduct in force, the organization may
initiate disciplinary actions, which may eventually result in his termination. This may
constitute an act of involuntary separation. Consistent failure to reach performance goals by
an employee can also result in his involuntary separation.
• Organizational problems Organizational problems are another important factor that
contributes to the involuntary separation of employees. The poor financial performance of an
organization may cause it to terminate the services of some of its employees as part of cost
control measure. Such terminations are also classified as involuntary separation. Similarly,
automation, organizational restructuring and rationalization can also result in employee
termination, discharge or layoff, broadly called involuntary separation.
85
Ch-7 Training
Organized activity aimed at imparting information and/or instructions to improve the recipient's performance
or to help him or her attain a required level of knowledge or skill.
Training is learning that is provided in order to improve performance on the present job.
The purpose of any training program is to deliver results. People must be more effective after the training than
they were before.
The purpose of training is to help people learn something they need to know or be able to do for a specific
purpose to achieve organizational objectives and goals, carry out specific tasks, prepare for new
responsibilities, or attain their career goals.
Employee orientation is a procedure for providing new employees with basic background information about
the firm.
The Training Process: Directly after orientation, training should begin. Training means giving new or current
employees the skills they need to perform their job. Training programs consist of four steps.
1. In the first, needs analysis step, you identify the specific knowledge and skills the job requires, and
compare these with the prospective trainees’ knowledge and skills.
2. In the second, instructional design step, you formulate specific, measureable knowledge and
performance training objectives, review possible training program content, and estimate a budget for
the training program.
3. The third step is to implement the program, by actually training the targeted employee group using
methods such as on-the-job or online training.
4. Finally, in an evaluation step, you assess the program’s success (or failure)
86
Training Methods
87
THE LECTURE METHOD
• WHAT IS A LECTURE?
When one person conveys information to a group by talking to them, with or
without the use of visual aids, this is called a lecture.
A formal lecture does not allow participation by the audience, and there is
little or no interaction (or feedback) between the speaker and listeners.
• WHEN SHOULD LECTURES BE USED?
• A lecture is suitable for large groups where interaction is not practical.
• When a speaker is a recognized expert in a field of study, lectures are used
because the audience is primarily there to hear what is being said.
88
THE LECTURE METHOD PROS & CONS
• ADVANTAGES:
• Lectures are an efficient use of time.
• Lectures allow experts to share information with large groups.
• The material in a lecture is consistent, and listeners are not sidetracked by
comments/questions from the audience.
• DRAWBACKS:
• The lecturer cannot be sure their message was correctly received by the audience, unless a
separate discussion period is used for follow up.
• Often the overall depth of learning will be relatively low because there is limited interaction,
but the lecture method is very popular in universities and many professional situations.
• The successful transfer of information is completely dependent upon the skills of the lecturer
(essentially it is one way communication).
89
THE TALK (PRESENTATION) METHOD
• WHAT IS A TALK (PRESENTATION)?
• A talk (presentation) is similar to a lecture, however the audience has greater involvement and
interaction with the speaker.
• During a talk, the audience is often allowed to briefly interrupt the speaker with questions,
comments, or short discussions.
• WHEN SHOULD TALKS BE USED?
• A talk or presentation is suitable when the material is less technical or familiar to the audience,
but still contains new concepts or ideas.
• A talk is appropriate when time constraints are not critical, and the atmosphere is less formal.
• Talks are often used for small to moderate size groups where the objective is to exchange
information.
90
THE TALK METHOD PROS & CONS
• ADVANTAGES:
• A talk is less formal and more comfortable for everyone.
• A talk allows the audience to ask relevant questions and become fully engaged in the
learning process.
• DRAWBACKS:
• The speaker must have a wide knowledge of the subject matter, and be willing and
able to answer questions .
• The speaker must be able to control the audience so that questions and comments do
not sidetrack the entire presentation. The speaker must also carefully monitor the time
and pace of a talk.
• In many cases it is more difficult to prepare a talk/presentation than a lecture because
of uncertainties associated with questions or topics that may be raised by the
audience.
91
THE DEMONSTRATION METHOD
• WHAT IS A DEMONSTRATION?
• When a trainer has the audience actually perform a task by showing and explaining how
to do it, this is called a demonstration.
• During a demonstration, the audience is encouraged to ask questions and request
assistance as they try to do the task by themselves.
• WHEN SHOULD DEMONSTRATIONS BE USED?
• The demonstration method is effective when teaching skills.
• Demonstrations are appropriate when there is plenty of time for interaction because
practice is necessary to master most skills.
• Demonstrations are best for small groups, or when adequate staff is available to work
with a large group.
92
DEMONSTRATION METHOD PROS & CONS
• ADVANTAGES:
• Demonstrations provide a hands-on experience (hear, see, do).
• Participants have plenty of interaction with trainers, and everyone is allowed to
progress at their own pace as they master the skill.
• DRAWBACKS:
• Demonstrations require a lot of preparation, time, materials, and patience. The time
allotted for demonstrations must be flexible.
• It is important to insure every participant has an opportunity to master the skill being
taught.
• Hands-on activities can be a potential source of frustration, especially in the case of
complex skills. It may be necessary to offer supplementary help (e.g. a follow-up
session) for participants having difficulty.
93
THE DISCUSSION METHOD
• WHAT IS A DISCUSSION?
• When a trainer guides an open conversation (an organized exchange of ideas or
viewpoints) on a selected topic, this is called a discussion.
• A formal discussion (sometimes called a panel) follows a set procedure that is used
to keep the discussion on track, and allows everyone to express their opinion.
• WHEN SHOULD DISCUSSIONS BE USED?
• Discussions can help stimulate ideas as members of a group share experiences .
• Discussions are most effective when a trained (experienced) leader controls the
overall process in an organized manner.
• Discussions are appropriate if only a few major (simple) topics are being covered,
and when it is acceptable to have several outcomes (i.e. it is not necessary to reach
consensus or derive a single conclusion).
94
DISCUSSION METHOD PROS & CONS
• ADVANTAGES:
• Discussions allow multiple views and opinions to be expressed.
• Discussions provide an informal atmosphere, and allow everyone to express and listen
to opinions that are presented with equal weight.
• DRAWBACKS:
• Discussions can get de-tracked or begin to taper-off if the leader is not experienced in
controlling the group.
• Discussions can be dominated by a strong member of the group, unless the leader
controls the overall process to insure everyone is given equal time and the same level of
respect.
• Formal discussions require a well-defined purpose or objective, a reasonable time limit,
and a well-trained leader. It is not just a bunch of people sitting around a table gabbing
with each other.
95
THE CASE STUDY METHOD
• WHAT IS A CASE STUDY?
• When the opposing viewpoints of a realistic situation (or event) are presented to a group,
and a logical analysis involving a “judgment call” must be conducted to arrive at a
conclusion, this is called a case study .
• A case study can be presented orally or as a written document, but the process of
analyzing and evaluating opposing viewpoints to reach a reasonable conclusion is the
same.
• WHEN SHOULD A CASE STUDY BE USED?
• A case study is a useful method when there is no clear-cut or easy solution to a problem.
• Case studies are useful when real-life situations can be used as examples to highlight the
training topic(s) being covered.
• In situations when multiple viewpoints must be considered, case studies can help
participants evaluate the merits of different arguments.
96
CASE STUDY PROS & CONS
• ADVANTAGES:
• A well chosen case study will be relevant to all participants.
• Everyone is actively engaged in the case study process.
• Individuals are forced to make a decision, and then defend it.
• DRAWBACKS:
• The case study must be relevant, realistic, and appropriate.
• The case study scenario must be carefully worded to avoid bias, or imply that one
position is stronger than the other.
• Although the final outcome of a case study analysis forces each individual to draw a
conclusion and make a decision, it should be recognized that it is not necessary to
reach consensus , and participants should be reminded it is a training exercise.
97
THE ROLE PLAYING METHOD
• WHAT IS ROLE PLAYING?
• When participants and/or trainers act out parts in an open-ended story intended
to highlight conflicting viewpoints, this is called role playing.
• Role playing is different from stage drama because the lines (scripts) are not pre-
determined, the players originate their dialogue in real time, and as the scenario
unfolds they interact to develop an outcome.
• WHEN SHOULD ROLE PLAYING BE USED?
• Role playing is effective when the topic involves person-to-person communication
and/or interaction.
• Role playing can allow everyone to participate.
• The overall mood a training session can be improved by the excitement that role
playing provides.
98
ROLE PLAYING PROS & CONS
• ADVANTAGES:
• Role playing is an excellent forum for exploring the topics of ethics and conflict resolution.
• Participants can “feel a new viewpoint” through dynamic role playing.
• Individuals are often inclined to express true feelings when role playing.
• The group listens better and learns more because they are seeing and hearing the subject
matter as it is acted out.
• DRAWBACKS:
• Role playing requires careful selection of situations to be effective.
• Role playing impedes free expression if participants are not volunteers.
• The themes for role playing exercises must avoid potential conflicts.
99
THE SIMULATION METHOD
• WHAT IS A SIMULATION?
• A training exercise that recreates an event which could actually happen, so
that participants experience the situations, is called a simulation.
• Simulation is a more complex form of role playing that is often used for
hands-on training (e.g. simulation of a first aid emergency, etc.) .
• WHEN SHOULD SIMULATION BE USED?
• Simulations can be effective when an elaborate demonstration is the best
method of training a moderate to large size group.
• The simulation method is appropriate for disaster, rescue, or other crisis
management training exercises.
100
SIMULATION PROS & CONS
• ADVANTAGES:
• Simulations are realistic hands-on events in which participants “feel, see, hear, and do”.
• A simulation experience provides a high level of knowledge transfer.
• Simulations are an intense form of experiential learning.
• DRAWBACKS:
• Simulations require lots of careful planning, materials, preparation, and
equipment/props.
• Simulations require staging, practice, and adjustment to eliminate the possibility of
actual injury or safety hazards.
• A realistic simulation is often expensive, and should be followed up with additional
training to remedy any problems identified during the event.
101
THE BRAINSTORMING METHOD
• WHAT IS A BRAINSTORMING?
• A problem solving exercise that involves the rapid-fire recording of ideas without criticism
or ranking is called brainstorming.
• Brainstorming is an effective method for collecting ideas, but it requires follow up
activities focused on analyzing and evaluating the ideas.
• WHEN SHOULD BRAINSTORMING BE USED?
• Brainstorming is helpful during the planning phase of an activity.
• When a group cannot decide what to do, brainstorming can be used to initiate the “idea
sharing” process.
• Brainstorming can be used to stimulate creativity, especially when a “fresh approach” is
needed.
102
BRAINSTORMING PROS & CONS
• ADVANTAGES:
• All ideas are heard, and no one is ignored.
• All ideas are initially accepted as valid and having equal importance.
• Lots of ideas are gathered, and patterns may begin to emerge.
• DRAWBACKS:
• The true value of the brainstorming process occurs during a follow up activity when
all the ideas are honestly evaluated to assess feasibility.
• A large number of spontaneous ideas is collected, and there is the possibility of
missing a reasonable (probably simple) solution.
• The recorder during the brainstorming session must be careful not to misinterpret or
impose bias on any of the ideas that are proposed.
103
THE BUZZ GROUP METHOD
• WHAT IS A BUZZ GROUP?
• When a group is given a short time in which to derive an answer to a simple
question/problem by recording ideas, this is called a buzz group.
• The output of buzz groups, like brainstorming sessions, needs to be followed up
with further evaluation and analysis of ideas.
• WHEN SHOULD BUZZ GROUPS BE USED?
• When there are too many people to hold a brainstorming session, dividing into
smaller buzz groups is a good method for collecting ideas.
• Buzz groups can help teams discover solutions by themselves, without the need
for external assistance.
• If individuals are reluctant to participate in large open discussions, smaller buzz
groups may encourage them to their share ideas.
104
BUZZ GROUP PROS & CONS
• ADVANTAGES:
• Buzz groups can be assembled quickly, on short notice.
• All members of a buzz group participate, and they share leadership.
• Buzz groups tend to move teams towards consensus building, and encourage team
spirit.
• DRAWBACKS:
• Buzz groups can easily get off-track .
• Buzz groups can produce “pooled ignorance”, invalid assumptions, and cannot be
relied upon to reach viable conclusions.
• To be most effective, buzz groups should have experienced leaders and “idea
recorders” to produce accurate, unbiased reports.
105
THE QUESTION & ANSWER METHOD
• WHAT IS A Q&A SESSION?
• When an expert provides specific knowledge by responding to direct
questions from a group, this is called a question and answer session.
• Q&A sessions are often conducted as informal events in which the speaker
provides candid responses (e.g. a press conference).
• WHEN SHOULD Q & A SESSIONS BE USED?
• Q&A sessions are usually most effective when held near the end of a
training course, because participants are best prepared to ask questions.
• In situations when an expert is available and willing to participate, a Q&A
session can promote an open exchange of information.
106
Q&A SESSION PROS & CONS
• ADVANTAGES:
• Q&A sessions provide immediate (candid) responses from experts.
• Q&A sessions allow interaction with experts that might otherwise be inaccessible.
• DRAWBACKS:
• In a Q&A session the expert has no control over the content, topic, or focus of
questions.
• The Q&A session must be carefully controlled to allow everyone to ask questions,
while also preventing anyone from dominating the session.
• Questions could be phrased in an accusatory tone, thereby putting experts in a
defensive position, but this can be avoided by setting ground rules at the
beginning of the session.
107
THE LEARNING CENTER METHOD
• WHAT ARE LEARNING CENTERS?
• In a training course when small groups visit a series of “stations” that concentrate on a
particular topic, they are called learning centers.
• The term “round robin” is another name for learning centers.
• WHEN SHOULD LEARNING CENTERS BE USED?
• When a series of separate (but inter-related) topics are presented as individual parts of
an overall subject.
• When you need to impart a large amount of information in a short time.
• When a group is too large to teach specific topics using other methods.
• If it is practical for displays to remain in place for long time periods.
• If it is advantageous for participants to visit stations at their own pace.
108
LEARNING CENTER PROS & CONS
• ADVANTAGES:
• Learning centers allow small groups to get a “close-up view” with
personalized training (includes lecture, demonstration, and hands-on).
• Similar topics can be linked together, while also allowing participants to
focus on special interests.
• DRAWBACKS:
• Learning centers require a lot of advanced planning and set up.
• Rotation through learning centers requires coordinated time allotment.
• Learning centers often require additional space and separate rooms to
prevent interference, noise, and confusion.
109
THE REFLECTION METHOD
• WHAT IS REFLECTION?
• In a training course when individuals respond to a series of questions by collecting
their personal feelings and thoughts to form a conclusion, this is called reflection.
• During a reflection period, trainers create an atmosphere in which participants feel
free to think and express what ever is on their mind.
• WHEN SHOULD REFLECTION BE USED?
• Reflection is usually conducted at the end of a training session, as a means of
reviewing and evaluating the overall experience.
• Reflection can also be used for reinforcing the connections between several disjoint
activities, and helping participants understand the “big picture”.
110
REFLECTION PROS & CONS
• ADVANTAGES:
• Reflection allows the trainer to provide structure, but the solution comes
from individuals and/or the group.
• Reflection emphasizes the overall benefits derived from an experience.
• DRAWBACKS:
• Reflection is usually a time consuming process, and may not yield results.
• Some individuals may feel uncomfortable, especially if they dislike being
“put on the spot” to provide a response.
• The overall technique is somewhat difficult for participants to understand,
and for trainers to utilize successfully.
111
THANK YOU

Human Resource Management full book.pptx

  • 1.
  • 2.
    Ch-1 Definition ofHRM • Human resource management is to make the most productive use of human resource to the greatest benefits of the organization and individuals. • The process of attracting, developing and maintaining a talented and energetic workforce to support organizational mission, objectives and strategies. • Human Resource Management is the management of an organization’s work force, or human resources. It is responsible for the attraction, selection, training, assessment and rewarding of employees, while also overseeing organizational leadership and culture, and ensuring compliance with employment and labor laws. • Human resource management (HRM, or simply HR) is a function in organizations designed to maximize employee performance of an employer's strategic objectives. HR is primarily concerned with the management of people within organizations, focusing on policies and systems. HR departments and units in organizations typically undertake a number of activities, including employee recruitment, training and development, performance appraisal and rewarding (e.g., managing pay and benefit systems). HR is also concerned with industrial relations that is, the balancing of organizational practices with requirements arising from collective bargaining and from governmental laws 2
  • 3.
    3 Functions of HRM HumanResource Management (HRM) is all about balancing the organization’s people and processes to best achieve the goals and the strategies of the organization, as well as the goals and the needs of employees. The main role an HR manager has to fulfill is integrating business operations and strategies across a wide array of culture, products, and ideas, while effectively delegating work among human resource specialists and line management. A brief description of usual human resource functions are given below: • Human Resource Planning: In the human resource planning function, the number and type of employees needed to accomplish organizational goals are determined. Research is an important part of this function because planning requires the collection and analysis of information in order to forecast human resources supplies and to predict future human resources needs. The basic human resource planning strategy is staffing and employee development. • Job Analysis: Job analysis is the process of describing the nature of a job and specifying the human requirements, such as skills, and experience needed to perform it. The end product of the job analysis process is the job description. A job description spells out work duties and activities of employees. Job descriptions are a vital source of information to employees, managers, and personnel people because job content has a great influence on personnel programs and practices.
  • 4.
    4 • Staffing: Staffingemphasizes the recruitment and selection of the human resources for an organization. Human resources planning and recruiting precede the actual selection of people for positions in an organization. Recruiting is the personnel function that attracts qualified applicants to fill job vacancies. In the selection function, the most qualified applicants are selected for hiring from among those attracted to the organization by the recruiting function. On selection, human resource functionaries are involved in developing and administering methods that enable managers to decide which applicants to select and which to reject for the given jobs. • Orientation: Orientation is the first step toward helping a new employee adjust himself to the new job and the employer. It is a method to acquaint new employees with particular aspects of their new job, including pay and benefit programs, working hours, and company rules and expectations. • Training and Development: The training and development function gives employees the skills and knowledge to perform their jobs effectively. In addition to providing training for new or inexperienced employees, organizations often provide training programs for experienced employees whose jobs are undergoing change. Large organizations often have development programs which prepare employees for higher level responsibilities within the organization. Training and development programs provide useful means of assuring that employees are capable of performing their jobs at acceptable levels.
  • 5.
    5 • Performance Appraisal:Performance appraisal function monitors employee performance to ensure that it is at acceptable levels. Human resource professionals are usually responsible for developing and administering performance appraisal systems, although the actual appraisal of employee performance is the responsibility of supervisors and managers. Besides providing a basis for pay, promotion, and disciplinary action, performance appraisal information is essential for employee development since knowledge of results (feedback) is necessary to motivate and guide performance improvements. • Career Planning: Career planning has developed partly as a result of the desire of many employees to grow in their jobs and to advance in their career. Career planning activities include assessing an individual employee’s potential for growth and advancement in the organization. • Compensation: Human resource personnel provide a rational method for determining how much employees should be paid for performing certain jobs. Pay is obviously related to the maintenance of human resources. Since compensation is a major cost to many organizations, it is a major consideration in human resource planning. Compensation affects staffing in that people are generally attracted to organizations offering a higher level of pay in exchange for the work performed. It is related to employee development in that it provides an important incentive in motivating employees to higher levels of job performance and to higher paying jobs in the organization. • Benefits: Benefits are another form of compensation to employees other than direct pay for work performed. As such, the human resource function of administering employee benefits shares many characteristics of the compensation function. Benefits include both the legally required items and those offered at employer’s discretion. The cost of benefits has risen to such a point that they have become a major consideration in human resources planning. However, benefits are primarily related to the maintenance area, since they provide for many basic employee needs.
  • 6.
    6 • Labor Relations:The term “labor relations” refers to interaction with employees who are represented by a trade union. Unions are organization of employees who join together to obtain more voice in decisions affecting wages, benefits, working conditions, and other aspects of employment. With regard to labor relations, the personnel responsibility primarily involves negotiating with the unions regarding wages, service conditions, and resolving disputes and grievances. • Record-keeping: The oldest and most basic personnel function is employee record-keeping. This function involves recording, maintaining, and retrieving employee related information for a variety of purposes. Records which must be maintained include application forms, health and medical records, employment history (jobs held, promotions, transfers, lay-offs), seniority lists, earnings and hours of work, absences, turnover and other employee data.
  • 7.
  • 8.
    8 Why is HumanResource Management Important to all managers An organization cannot build a good team of working professionals without good Human Resources. Following are some points which shows the importance of HRM. • Human Capital Value Having an in-house human resources function is important. An in-house human resources staff or a human resources expert on staff can increase the understanding of how important human capital is to the company's bottom line. For small businesses, in particular, human capital is critical because so many smaller firms have employees who perform cross-functional duties. With a smaller workforce, if just one person leaves, it leaves the company with a huge gap to fill and a potential threat to the company's profitability. • Budget Control Human resources controls excessive spending through developing methods for trimming workforce management costs, which includes negotiating better rates for benefits such as health care coverage. In addition, human resources ensures competitive and realistic wage-setting based on studying the labor market, employment trends and salary analysis based on job functions. As some small businesses have budget constraints, this human resources function is especially helpful. • Conflict Resolution Workplace conflict is inevitable, given the diversity of personalities, work styles, backgrounds and levels of experience among employees. A human resources manager or a staff person specially trained to handle employee relations matters can identify and resolve conflict between two employees or a manager and employee and restore positive working relationships.
  • 9.
    9 • Training andDevelopment Human resources conducts needs assessments for the organization's current workforce to determine the type of skills training and employee development necessary for improving skills and qualifications. Companies in the beginning or growth phases can benefit from identifying training needs for existing staff. It's much less expensive than the cost to hire additional staff or more qualified candidates. In addition, it's a strategy that also can reduce turnover and improve employee retention. • Employee Satisfaction Human resources specialists usually are charged with the responsibility of determining the level of employee satisfaction. With carefully designed employee surveys, focus groups and an exit interview strategy, human resources determines what underlies employee dissatisfaction and addresses those issues to motivate employees. • Cost Savings The cost to hire new or replacement workers, including training and other activities, can be unreasonable for employers, especially small businesses. With a well- constructed recruitment and selection process, the human resources function can minimize expenses regarding advertising job postings, training new employees and enrolling new employees in benefits plans.
  • 10.
    10 • Performance Improvement Humanresources develops performance management systems. Without a human resources staff person to construct a plan that measures performance, employees can wind in jobs that aren't suitable for their skills and expertise. Additionally, employees whose performance falls below the employer's expectations can continue on the payroll, thereby creating wasted money on low- performing employees. • Sustaining Business Through succession planning that human resources develops, the company identifies employees with the promise and requisite capabilities to eventually transition into leadership roles with the company. This is an important function as it can guarantee the organization's stability and future success. • Corporate Image Businesses want to be known as the "employer of choice." Employers of choice are the companies that receive recognition for the way they treat employees; they are the companies for whom people want to work. Becoming an employer of choice means human resources balances recruiting the most qualified applicants, selecting the most suitable candidates and retaining the most talented employees. • Firm Principles Human resources ensures the workforce embraces the company's philosophy and business principles. From the perspective of a small business, creating a cohesive (solid) work environment is vital. The first opportunity human resources has to accomplish this is through wise hiring decisions that identify desirable professional traits, as well as orientation and on-boarding programs.
  • 11.
    11 Why are theseconcepts and techniques important to all managers? Perhaps it’s easier to answer this by listing some of the personnel mistakes you don’t want to make while managing. For example you don’t want to: • Hire the wrong person for the job • Experience high turnover • Have your people not doing their best • Waste time with useless interviews • Have your company taken to the court because of your discriminatory actions • Have your company cited under occupational safety laws for unsafe practices and accidents. • Have some employees think their salaries are unfair relative to others in the organization. • Allow a lack of training to undermine your department’s effectiveness • Commit any unfair labor practices
  • 12.
    12 Ch-2 Job Analysisand Design Organizations consist of jobs that have to be staffed. Job analysis is the procedure through which you determine the duties of these positions and the characteristics of the people to hire for them. Job analysis produces information for writing Job description (a list of what the job entails) and job specifications (what kind of people to hire for the job). The procedure for determining the duties and skill requirements of a job and the kind of person who should be hired for. Or Job Analysis is the process of determining and recording all the pertinent information about a specific job including the tasks involved, the knowledge and skill set required to perform the job, the responsibilities attached to the job and the abilities required to perform the job successfully. It is also referred as job review. Two end products of job analysis are job description and job specification. Process of job analysis 1. Information gathering 2. Job specific competency determination 3. Developing a job description 4. Developing a job specification
  • 13.
    13 Steps in JobAnalysis There are six steps in doing a job analysis. Let’s look at each of them. 1. Decide how you will use the data information since this will determine the data you collect and how you will collect them. “Collection Techniques”. 2. Review relevant back ground information such as organizational charts, job description and process charts. 3. Selecting representative position. Because there may be too similar jobs to analyze. 4. Actually analyze the job. By collecting data information on job activities, required employee working conditions, human traits, abilities and employee behaviors. 5. Verify the job analysis information with the employee performing the job and with his/her supervisor. 6. Develop job description and specification.
  • 14.
    14 Methods for collectionJob Analysis information Job analysis is based on job data. Hence the question: how to collect job related data? A variety of methods are available for collecting job data. The method that was historically linked to the concept of job analysis was observation supplemented by the interview. In recent years, questionnaires, check lists, critical incidents, diaries, personnel records and technical conference method have also been experimented for collecting job-related data. A brief description of each method is in order. • Observation: Under this method, data is collected through observing an employee while at work. The job analyst on the basis of observation carefully records what the worker does, how he/she does, and how much time is needed for completion of a given task. This is the most reliable method of seeking first hand information relating to a job. This method is suitable for jobs that consist primarily of observable physical ability, short job cycle activities. The jobs of draftsman, mechanic, are the examples of such jobs. However, the flip side of this method is that this method is not suitable for jobs that involve unobservable mental activities. • Interview: Job analysis interviews range from completely unstructured interviews, to highly structured ones containing hundreds of specific items to check off. This method is found suitable particularly for jobs wherein direct observation is not feasible. By way of directly talking to the job holder, the interviewer job analyst may extract meaningful information from the job holder about his/her job. However the interview method is both time consuming and costly. Particularly, the professional and managerial jobs due to their complicated nature of job, require a longer interview’ This may also be a possibility that bias on the part of the analyst and the job holder i.e., the respondent may cloud the accuracy and objectivity of the information gathered through interview. Nonetheless, the effectiveness of the interview method will depend on the ability of both interviewer and respondent in asking questions and responding them respectively.
  • 15.
    15 • Questionnaire Questionnaire methodof job data collection is desirable especially in the following two situa­ tions: First, where the number of people doing the same job is large and to personally interview them is difficult and impracticable. Second, where giving enough time to employees is desirable to enable them to explore the special aspects of the jobs. In this method, the employee is given structured or unstructured questionnaire to fill in, which are then returned to the supervisors. The supervisor, after making the required and necessary corrections in the infor­ mation contained in the questionnaire, submits the corrected information to the job analyst. Question­ naire provides comprehensive information about the job. Information so obtained can be quantified and processed in the computer. The greatest advantage of the questionnaire method is that it enables the analyst to cover a large number of job holders in the shortest possible time. However, the method suffers from certain short­ comings as well. In the absence of direct rapport between the job analyst and the employee, both cooperation and motivation on the part of the employee tends to be at low level. Often employee due to lack of training and skill, do not express the job related information in a meaningful and clear fashion. As such, job related data tends to be inaccurate. Moreover, the method is time-consuming and costly.
  • 16.
    16 • Checklists: The checklistmethod of job data collection differs from the questionnaire method in the sense that it contains a few subjective questions in the form of yes or no. The job holder is asked to tick the questions that are related to his/her job. Checklist can be prepared on the basis of job informa­ tion obtained from various sources such as supervisors, industrial engineers, and other people who are familiar with the particular job. Once the checklist is prepared, it is then sent, to the job holder to check all the tasks listed in the list he/she performs. He/she is also asked to mention the amount of time spent on each task by him/her and the type of training and experience required to do each task. Information contained in checklist is, then, tabulated to obtain the job-related data. Like questionnaire method, the checklist method is suitable in the large organizations wherein a large number of workers are assigned one particular job. Since the method is costly and, therefore, is not suitable for small organizations. • Critical Incidents: This method is based on the job holder’s past experiences on the job. They are asked to recapitu­ late and describe the past incidents related to their jobs. The incidents so reported by the job holders are, then, classified into various categories and analyzed in detail. Yes, the job analyst requires a high degree of skill to analyze the incidents appropriately described by the job holders. However, this method is also time-consuming one.
  • 17.
    17 • Diaries orLog Records: In this method, the job holder is asked to maintain a diary recording in detail the job-related activities each day. If done judiciously, this method provides accurate and comprehensive information about the job. This overcomes memory lapses on the part of the job holder. As recording of activities may spread over several days, the method, thus, becomes time-consuming one. The disadvantage associated with this method is that it remains incomplete because it does not give desirable data on supervisor relationship, the equipment used and working conditions prevalent at the work place. • Technical Conference Method: In this method, a conference is organized for the supervisors who possess extensive knowledge about job. They deliberate on various aspects of the job. The job analyst obtains job information from the discussion held among these experts/supervisors. The method consumes less amount of time. However, the main drawback of this method is that it lacks accuracy and authenticity as the actual job holders are not involved in collecting job information. Internet Based Job Analysis: Conducting the job analysis via the internet is an obvious solution. Therefore, the use of online methodologies for surveys, including job analysis surveys, has increased dramatically in recent years, and most companies choose to use the internet or intranet to collect this type of data. It is seen from the preceding description that no single method is complete and superior. In fact, none of the method is to be considered as mutually exclusive. The best data related to a job can be obtained by a combination of all methods described above.
  • 18.
    18 The problems thatmay crop up while conducting job analysis are: • 1. Lack of support from the top management. • 2. Relying on one source and method of data collection. • 3. Non-trained and non-motivated job holders who are the actual source of job data. • 4. Distorted information/data provided by the respondents i.e., the job holders because of non- preparedness on their part.
  • 19.
    19 Writing Job Description Theemployer almost always uses the job analysis to at least produce a job description. A job description is a written statement of what the worker actually does, how he or she does it, and what the job’s working conditions are. you use this information to write a job specification: this lists the knowledge, abilities and skills required to perform the job satisfactorily. There is no standard format for writing a job description. However, most descriptions contain sections that cover: 1. Job identification 2. Job summary 3. Responsibilities and duties 4. Authority of incumbent 5. Standards of performance 6. Working conditions 7. Job specifications
  • 20.
    20 Writing Job Specifications Thejob specification takes the job description and answers the question, “what human traits and experience are required to do this job effectively”. It shows what kind of person to recruit and for what qualities you should test that person. The job specification may be a section of the job description, or a separate document. The following is an outline of what a good job specification should contain • Position Title: Both the internal position and if it is ‘internal jargon’ the position as it would be viewed externally. • Location: Which particular office/town and how much travel will be involved. • Remuneration: Also include all the benefits available. • Hours: How many hours a week and a comment about flexibility if this is offered (beyond your legal duties) • Reporting: Who will the post holder report to. In addition lay out any man management responsibilities the post holder will have. • Purpose: This is the most important part of the specification- what the person should accomplish or be aiming to achieve. • Duties: A general overview of what the main duties of the post holder will be. Avoid being too prescriptive or narrow, so as not to limit what you can expect in the future and it allows for people to become entrepreneurial in their role. • Evaluation: How you will measure whether the purpose is achieved. • Experience: Any skills, qualifications or personal qualities you required. Separate these between essential experience and desired experience. • Personal: Explain any philosophy or attitude your organization holds that you hope people will share.
  • 21.
    21 Job Design Job designis the process of putting together various elements to form a job, bearing in mind organizational and individual worker requirements, as well as considerations of health and safety. The process of defining how work will be performed and what tasks will be required in a given job.
  • 22.
    22 Ch-3 Human ResourcePlanning and Recruiting Recruitment and selection ideally starts with human resource planning. After all, if you don’t know what your team’s employment needs would be in the next few months, why should you be hiring? Employment or human resource planning is the process of deciding what positions the firm will have to fill, and how to fill them. It embraces all future positions. Employment planning should flow from the firm’s strategic plans. One big question is whether to fill projected openings from within or from outside the firm. Each options requires different personnel plans. Current employees may require training, development, and coaching plans. Going outside requires planning what recruiting sources you will use. Like all good plans, personnel plans require some forecast or estimates, in this case, of three things: personnel needs, the supply of inside candidates and the likely supply of outside candidates. We will start with personnel needs. Forecasting Personnel needs: How many people do you need? Managers consider several factors. To decide personnel needs is to forecast revenues first. Then estimates the size of the staff required to support this sales volume. However managers obviously need to consider other factors too. These include projected turnover, decisions to upgrade (or downgrade) products or services, productivity changes and financial resources. There are several simple tools for projecting personnel needs, as follows.
  • 23.
    23 Trend Analysis: Trendanalysis means studying variation in your firm’s employment levels over the last few years. Trend analysis can provide an initial estimates of future staffing needs, but employment levels rarely depend just on the passage of time. Other factors like changes in sales volume and productivity also affect staffing needs. Ratio Analysis: Another simple approach ratio analysis, means making forecasts based on the historical ratio between 1. some causal factor like sales volume and 2. the number of employees required. The scatter plot: A scatter plot shows graphically how two variables- such as sales and your firm’s staffing levels-are related. Using Computer to support forecasting needs: Computerized forecasts enable the manager to build more variables into his or her personnel projections.
  • 24.
    24 Forecasting the supplyof inside candidates Knowing your staffing needs satisfies only half the staffing question. Next you have to estimate the likely supply of both inside and outside candidates. Most firms start with the inside candidates. The main task here is determining which current employees might be qualified for the projected openings. For this you need to know current employees’ skills sets-their current qualifications. Sometimes who to choose is not obvious. Here, managers turn to qualifications (or skill) inventories. These contain data on employees’ performance records, educational background, and promotability. Whether manual or computerized, these help managers determine which employees are available for promotion or transfer. Manual systems and Replacement charts: Departmental managers or owners of smaller firms often use manual devices to track employee qualifications. The information includes education, company sponsored courses taken, career and development interests, languages, desired assignments and skills. Computerized Skill Inventories: Large firms obviously can’t track the qualifications of hundreds or thousands of employees manually. Larger employers therefore computerize this information, using various packaged software systems. The usual process is for the employee, the supervisor, and human resource manager to enter information about the employee’s background, experience, and skills. Then when a manager needs a person for a position, he or she uses key words to describe the position’s specifications.
  • 25.
    25 Forecasting the supplyof Outside candidates If there won’t be enough inside candidates to fill the anticipated openings, you will turn to outside candidates. If you are drawing up a personnel plan (say for the coming fiscal year), you may want to estimate how difficult it will be to find good outside candidates. Information like this is easy to find both online and in print format. Your planning may also require that you forecast specific occupation like computer programmer for instance, there has been an undersupply of computer programmer. Some labor bureaus publishes annual occupational projections both online and in the monthly labor review and in occupational outlook quarterly.
  • 26.
    26 Recruiting Any activity carriedon by the organization with the primary purpose of identifying and attracting potential employees. Employee recruiting means finding and/or attracting applicants for the employer’s open positions. The process of attracting individuals on a timely basis, in sufficient numbers, and with appropriate qualifications, and encouraging them to apply for jobs with an organization. Should you centralize your firm’s recruitment efforts, or let each plant or office do their own recruiting. More firms are centralizing it for three good reasons. First, doing so makes it easier to apply the company’s strategic priorities. Second, recruiting centrally reduce duplication (having several recruitment offices instead of one). Third, centralized recruiting makes it easier to ensure uniformity and conformity with the law. Internal sources of candidates Filling open positions with inside candidates has several advantages. First there is really no substitute for knowing a candidate’s strengths and weaknesses, as you should after working with them for some time. Current employees may also be more committed to the company. Morale, may rise if employees see promotions as rewards for loyalty and competence. And inside candidates should require less orientation and perhaps training than outsiders. However, hiring from within can also backfire. Employees who apply for jobs and don’t get them may become discontented; telling them why you rejected them and what remedial actions they might take is crucial. And too often internal recruiting is something of a waste of time. Many employers require managers to post jobs openings and interview all inside candidates. Yet the managers often knows ahead of time who he or she wants to hire. Inbreeding is another potential drawback. When all managers come up through the ranks, they may have the tendency to maintain the status quo, when a new direction is required.
  • 27.
    27 Finding internal candidates:Hiring from within ideally relies on job posting and the firm’s skill inventories. Job posting means publicizing the open job to employee (usually by literally posting it on company bulletin boards). These postings list the job’s attributes, like qualifications, supervisor, work schedule, and pay rate. Rehiring: Should you rehire someone who left your firm? It depends. On the plus side, former employees are known quantities (more or less) and are already familiar with how you do things. On the other hand, employees who you let go may return with less-than-positive attitudes. In any event, you can reduce the chance of adverse reactions. After employees have been back on the job for a certain period, credit them with the years of service they had accumulated before they left. Succession Planning: Succession planning is the ongoing process of systematically identifying, assessing and developing organizational leadership to enhance performance. Succession planning entails three steps; identifying key needs, creating and assessing candidates and selecting those who will fill the key positions.
  • 28.
    28 Outside Sources ofCandidates Firms can’t always get all the employees they need from their current staff and sometimes they just don’t want to. We will look at the sources firms use to find outside candidates. • Recruiting via the Internet: Most people today go online to look for jobs. For more employers and for most jobs Internet based recruiting is by far the recruiting, source of choice. • Other online options: There are online alternatives to placing ads on job boards. Newer sites capitalize on social networking. User register by supplying their name, location, and kind of work they do on sites. These sites facilitate developing personal relationship for networking and employee referrals. The dot-jobs Domain and virtual job fairs are other sources of outside candidates. Internet recruiting is a cost effective way to publicize openings; it generates more responses quicker and for a longer time at less cost than just about any other method. Internet recruiting has two big potential problems-discrimination and overload. First internet recruiting gets restricted only to those who have ready access to the web and are able to use it effectively. The second challenge is internet overload: employers end up with huge number of resumes. Improving online recruiting effectiveness: Planning your online recruiting effort is crucial. For one thing, some estimate that employers have only a few minutes “before online applicants will turn their attention elsewhere”. There are some objections on online recruiting, they are: • Job opening lacked relevant information • It was often difficult to format resumes and post them in the form required. • Many respondents expressed concerns about the privacy of the information • Poor graphics often made it difficult to use the web site. • Slow feedback from the employer was annoying.
  • 29.
    29 Advertising: While web-basedrecruiting is rapidly replacing by ads. To use ad successfully, employers have to address two issues: the advertising medium and the ad’s construction. Employment Agencies: There are three main types of employment agencies: 1. Public agencies operated by federal, state, provincial or local governments. 2. Agencies associated with nonprofit organizations and 3. Privately owned agencies. Referrals and walk-ins: Employee referral campaigns are an important recruiting option. Here the firm posts announcements of openings and requests for referrals on its web site, bulletin and/or wallboards. The firm offers prizes or cash awards for referrals that lead to hiring. The biggest advantage here is that referrals tend to generate more applicants, more hires, and a higher yield ratio(hire/applicants). Current employees will usually provide accurate information about the job applicants they are referring, since they are putting their own reputation on the line. It is more cost effective method than employment agencies. There are few things to avoid. If morale is low, you probably should address that prior to asking for referrals. And if you don’t hire someone, explain to your employee/referrer why you did not hire his or her candidate. And we saw that relying on referrals might be discriminatory. Particularly for hourly workers, walk-ins-direct applications made at your office are a big source of applicants. Treat walk-ins courteously and diplomatically, for the sake of both the employer’s community reputation and the applicant’s self esteem.
  • 30.
    30 Employee Testing andSelection Once you review your applicants’ resumes, the next step is selecting the best candidates for the job. Nothing you do at work is more important than hiring the right employees. It is important for three reasons: performance, cost and legal obligations. Performance: First, your own performance always depends on your subordinates. Employees with the right skills will do a better job for you and the company. The time to screen out undesirable is before they are in the door, not after. Cost: Second, it is important because it’s costly to recruit and hire employees. Hiring and training even on a small position can cost a lot of money and time. Legal obligation: Thirdly, legal aspects are important because mismanaging the process may lead to legal implications. Equal employment laws require a nondiscriminatory selection procedure. Negligent hiring means hiring employees with criminal records or other such problems, who then use access to customer’s home (or similar opportunities) to commit crimes.
  • 31.
    31 How to validatea test In order for a selection test to be useful, you want to know that scores on the test relate in a predictable way to performance on the job. The validation process consists of five steps: Step 1: Analyze the job. The first step is to analyze the job and write job description and job specifications. The point is to specify the human traits and skills you believe are required for adequate job performance. In the first step, you also must define what you mean by “success on the job” since it’s this success for which you want predictors. The standards of success are criteria. Here you could use production related criteria (quantity, quality and so on), personnel data (absenteeism, length of service and so on) or judgment of workers performance (by person like supervisors). Choosing the right criteria (measures of performance) is important. Steps 2: Choose the test. Once you know the predictors you want to use, the next step is to decide how to test for them. Employers usually base this choice on experience, previous research and “best guesses”. They usually don’t start with just one test. Instead they choose several tests and combine them into a test battery. The test battery aims to measure an array of possible predictors, such as aggressiveness, extroversion and numerical ability. Step 3: Administer the Test. Next, administer the selected test (s). You have two choices here. One option is to administer the tests to employees currently on the job. You then compare their test scores with their current performance; this is concurrent (at the same time) validation. Its main advantage is that data on performance are readily available. The disadvantage is that current employees may not be representative of new applicants. Predictive validation is the second and more dependable way to validate a test. Here you administer the test to applicants before you hire them.
  • 32.
    32 Step 4: Relateyour test score and criteria: The next step is to ascertain if there is a significant relationship between scores (the predictor) and performance (the criterion). The usual way to do this is to determine the statistical relationship between 1. scores on the test and 2. job performance using correlation analysis, which shows the degree of statistical relationship. Step 5. Cross validate and Revalidate: Before using the test you may want to check it by “cross validating”- in other words, by again performing steps 3 and 4 on a new sample of employees. At a minimum, have someone revalidate the test periodically.
  • 33.
    33 Types of Tests Wecan conveniently classify tests according to whether they measure cognitive (mental) abilities, motor and physical abilities, personality and interests, or achievement. We will look at each: Test of cognitive abilities: Cognitive tests include tests of general reasoning ability (intelligence) and tests of specific mental abilities like memory and inductive reasoning. Intelligence Tests: Intelligence tests are tests of general intellectual abilities. They measure not a single trait but rather a range of abilities, including memory, vocabulary, verbal fluency, and numerical ability. Specific Cognitive Abilities: There are also measures of specific mental abilities, such as inductive and deductive reasoning, verbal comprehension, memory and numerical ability. Psychologists often call such tests aptitude tests, since they purport to measure aptitude for the job in question. Tests for Motor and Physical Abilities: You might also want to measure motor abilities such as finger dexterity, manual skills, and (if hiring pilots) reaction time. Tests of physical abilities may also be required. These include static strength (such as lifting weights), dynamic strength (like pull-ups) body coordination (as in jumping rope) and stamina. Lifeguards for example must show they can swim a course before they’re hired.
  • 34.
    34 Measuring Personality andInterests: A person’s cognitive and physical abilities alone seldom explain his or her job performance. Other factors, like motivation and interpersonal skills, are very important. As one consultant put it, most people are hired based on qualifications, but most are fired for nonperformance. And nonperformance “is usually the result of personal characteristics, such as attitude, motivation, and especially, temperament. Personality tests measure basic aspects of an applicant’s personality such as introversion, stability and motivation. Achievement Tests: Achievement tests measure what someone has learned. Most of the tests you take in school are achievement tests. Achievement tests are also popular at work. In addition to job knowledge, achievement tests measure the applicant’s abilities; a typing test is one example.
  • 35.
    35 Background investigations andother selection methods Testing is only part of an employer’s selection process. Other tools may include background investigation and reference checks, pre-employment information services, honesty testing, graphology, and substance abuse screening. Why perform background investigations and reference checks: One of the easiest way to avoid hiring mistakes is to check the candidate’s background thoroughly. Doing so is cheap and (if done right) useful. Most employers therefore check and verify the job applicant’s background information and references. There are two main reasons to check backgrounds-to verify the applicant’s information (name and so forth) and to uncover damaging information. Even relatively sophisticated companies fall prey to criminal employees, in part because they haven’t conducted proper background checks. When checking references via phone, therefore you have to be careful to ask the right questions. Most employers at least try to verify an applicant’s current or former position and salary with his or her current or former employer by phone. Others call the applicant’s current and previous supervisors to try to discover more about the person’s motivation, technical competence and ability to work with others (although again many employers have policies against providing such information)
  • 36.
    36 The polygraph andhonesty test: Honesty testing is a very touchy issue in employee selection decisions. In the US, some firms still use the polygraph (or lie detector) for honesty testing, although the law severely restricts its use. The Polygraph is a device that measure psychological changes like increased perspiration. Paper and pencil honesty testing: Most measure attitudes regarding things like tolerance of others who steal, acceptance of rationalization for theft, and admission of theft related activities. Ask Blunt Questions: Says one expert, there is nothing wrong with asking the applicant direct questions, such as “Have you ever stolen anything from an employer” Graphology: Graphology refers to the use of handwriting analysis to determine the writer’s basic personality traits. Graphology thus has some resemblance to personality tests, although graphology’s validity is lightly suspect. In graphology, the handwriting analyst studies an applicant’s handwriting and signature to discover the person’s needs, desire and psychological makeup. Physical Exams: Once the employer extends the person a job offer, a medical exam is often the next step in the selection. There are several reasons for pre-employment medical exam: to verify that the applicant meets the position’s physical requirements, to discover any medical limitations you should consider in placing him or her, and to establish a baseline for future insurance or compensation claims. By identifying health problems, the examination can also reduce absenteeism and accidents and of course, detect communicable diseases.
  • 37.
    37 Substance Abuse Screening:Many employers in the US and countries like the UK conduct drug screenings. The most common practice is to test candidates just before they’re formally hired. Many also test current employees when there is reason to believe the person has been using drugs-after a work accident, or in the presence of obvious behavioral symptoms such as chronic lateness. Some firms routinely administers drug tests on a random or periodic basis, while other require drug tests when they transfer or promote employees to new positions.
  • 38.
    38 Interviewing Candidates An interviewis more than a discussion. An interview is a procedure designed to obtain information from a person through oral responses to oral inquiries. A selection interview is a selection procedure designed to predict future job performance on the basis of applicant’s oral response to oral inquiries. Types of Employment interview: We can classify selection interviews according to 1. How structured they are 2. Their “content”-the types of questions they contain 3. How the firm administers the interview Structured versus Unstructured Interviews: In unstructured (or nondirective) interviews, the manager follows no set format. A few questions might be specified in advance, but they are usually not, and there is seldom a formal guide for scoring “right” or “wrong” answers. This type of interview could even be described as little more than a general conversation. Most selection interviews probably fall in this category. At the other extreme, in structured (or directive) interviews, the employer lists the questions ahead of time, and may even list and score possible answers for appropriateness. Some experts still restrict the term “structured interview” to interviews like these, which are based on carefully selected job-oriented questions with predetermined answers.
  • 39.
    39 Interview Content (Whattypes of questions to ask): We can also classify interviews based on the “content” or the types of questions you ask. At work, situational, behavioral, and job related questions are most important. In situational interview, you ask the candidate what his or her behavior would be in a given situation. For example, you might ask a supervisory candidate how he or she would act in response to a subordinate coming to work late 3 days in a row. Whereas situational interviews ask applicants to describe how they would react to a hypothetical situation today or tomorrow, behavioral interview questions ask applicants to describe how they reacted to actual situation in the past. In a job-related interview, the interviewer asks applicants questions about relevant past experiences. The questions here don’t revolve around hypothetical or actual situations or scenarios. Instead the interviewer asks job-related questions. In a stress interview, the interviewer seeks to make the applicant uncomfortable with occasionally rude questions. The aim is supposedly to spot sensitive applicants and those with low (or high) stress tolerance.
  • 40.
    40 How should weadminister the interview: Employers also administer interviews in various ways: one on one or by a panel of interviewers; sequentially or all at once, and computerized or personally. Most selection interviews are one on one and sequential. In one on one interview two people meet alone, and one interviews the other by seeking oral responses to oral inquiries. Employers tend to schedule these interviews sequentially. In a sequential (or serial) interview, several persons interview the applicant in sequence, one on one and then make their hiring decision. A Panel interview, also known as board interview, is an interview conducted by a team of interviewers, who together interview each candidate and then combine their ratings into a final panel score. The panel format enables interviewers to ask follow-up questions, much as reporters do in press conferences. On the other hand, some candidates find panel interviews more stressful, so they may actually inhibit responses(an even more stressful variant is the mass interview. Here a panel interviews several candidates simultaneously. The panel poses a problem, and then watches to see which candidate takes the lead in formulating an answer. Phone interviews: Employers do some interviews entirely by telephone. These can actually be more accurate than face-to-face interviews for judging an applicant’s conscientiousness, intelligence and interpersonal skills. Here neither party need worry about things like appearances or handshakes, so each can focus on substantive answers.
  • 41.
    41 Video/Web-Assisted Interviews: Firmshave long used the web to do selection interviews (particularly the initial, prescreening interviews), and with the widespread use of Skype-type products, their use is growing. Computerized Interviews: Some firms computerize part of the interview process. A computerized selection interview is one in which a job candidate’s oral and/or computerized replies are obtained in response to computerized oral, visual, or written questions and/or situations. Most computerized interviews present the applicant with a series of questions regarding his or her background, experience, education, skills, knowledge and work attitudes that relate to the job for which the person has applied.
  • 42.
    42 Ch-4 Compensation Employee compensationrefers to all forms of pay going to employees and arising from their employment. It has two main components, direct financial payments (wages, salaries, incentives, commissions and bonuses) and indirect financial payments (financial benefits like employer-paid insurance and leave travel concession). There are two basic ways to make direct financial payments to employees: base them on increments of time or on performance.
  • 43.
    43 Objectives of Compensation •To help the organization achieve strategic success while ensuring internal and external equity. • Internal equity- ensures that more demanding positions or better qualified people within the organization are paid more. • External equity - assures that jobs are fairly compensated in comparison with similar jobs in other firms.
  • 44.
    44 • Acquire qualifiedpersonnel Compensation needs to be high enough to attract applicants. Pay levels must respond to the supply and demand of workers in the labour market since employers compete for workers. Premium wages are sometimes needed to attract applicants already working for others. • Retain current employees Employees may quit when compensation levels are not competitive, resulting in higher turnover. • Ensure equity Compensation management strives for internal and external equity. Internal equity requires that pay be related to the relative worth of a job so that similar jobs get similar pay. External equity means paying workers what comparable workers are paid by other firms in the labour market.
  • 45.
    45 • Reward desiredbehaviour Pay should reinforce desired behaviours and act as an incentive for those behaviours to occur in the future. Effective compensation plans reward performance, loyalty, experience, responsibility, and other behaviours. • Control costs A rational compensation system helps the organization obtain and retain workers at a reasonable cost. Without effective compensation management, workers could be overpaid or underpaid. Comply with legal regulations. A wage and salary system considers the legal challenges imposed by the government and ensures the employer's compliance. • Facilitate understanding The compensation management system should be easily understood by human resource specialists, operating managers, and employees.
  • 46.
    46 Types of Compensation DirectCompensation: It refers to monetary benefits offered and provided to employees in return of the services they provide to the organization. The monetary benefits includes basic salary, house rent allowance, conveyance, leave travel allowance, medical reimbursements, special allowances, bonus, PF/G fund etc. They are given at a regular interval at a definite time. Indirect Compensation: It refers to non-monetary benefits offered and provided to employees in lieu of the services provided by them to the organization. They include paid leave, car/transportation, medical aids and assistance, insurance (for self and family) , leave travel assistance, retirement benefits, holiday homes etc.
  • 47.
    47 Factors affecting CompensationManagement • Demand for and supply of labor • Prevailing wage rate • Government • Productivity of Labor • Labor unions • Cost of living • Ability to pay
  • 48.
    48 Factors affecting compensation Factorsaffecting wages or compensation or determinants of wages or compensation: • 1) Productivity of workers: to get the best results from the employees and to increase the productivity compensation has to be productivity based. • 2) Ability to pay: it depends upon the employer’s ability to pay wages to the workers. This depends upon the profitability of the firm. If the firm is marginal and can’t afford to pay higher than the competitors then the employees will go to other firms while if the company is successful then they can easily pay their employees as they wish.
  • 49.
    49 • 3) Government:government has also fixed the rules for protecting the interest of the employees. The organizations are liable to pay as per the government instructions. Wages can not be fixed below the level prescribed by the government. • 4) Labor union: labor union also helps in paying better wages to the workers. Higher wages have to be paid by the firm to its workers under the pressure of the trade unions. • 5) Cost of living: wages depends upon the cost of living if it is high wages will also hike.
  • 50.
    50 • 6) Demandand supply of labor: it is one of the important factors affecting wages. If the demand of labor is more they will be paid high wages otherwise vice versa. If the supply of the employees is more than they will be paid less and vice versa. • 7) Prevailing wage rate: wages also depends upon the prevailing wage rate as the organizations have to pay accordingly to keep the employees with them.
  • 51.
    51 Ch-5 Performance Appraisal Everymanager needs some way to appraise employees’ performance. If employees’ performance is good, you’ll want to reinforce it and if it is bad, you’ll want to take corrective action. Performance appraisal means evaluating an employee’s current and/or past performance relative to his or her performance standards. Performance appraisal always involves 1. Setting work standards 2. Assessing the employee’s actual performance relative to those standards, and 3. Providing feedback to the employee with the aim of motivating him or her to eliminate performance deficiencies or to continue to perform above par.
  • 52.
    52 Why Appraise Performance Thereare four reasons to appraise subordinates’ performance: • First, from a practical point of view, most employers still base pay and promotional decisions on the employee’s appraisal. • Second, the appraisal lets the boss and subordinate develop a plan for correcting any deficiencies, and to reinforce the things the subordinate does right. • Third, appraisals should serve a useful career planning purpose. They provide an opportunity to review the employee’s career plans in light of his or her exhibited strengths and weaknesses. • Fourth, the appraisals play an integral role in the employer’s performance management process. Performance management is the continuous process of identifying, measuring, and developing the performance of individuals and teams and aligning their performance with the organization’s goals.
  • 53.
    Concept Of PerformanceAppraisal • PA is the method of evaluating the behavior of the employees in the job it includes both quantitative and qualitative aspects of job performance.
  • 54.
    Purpose Of PerformanceAppraisal • Compensation Decision- Pay raise • Promotion decision- level raise • Training and development programmes- Enhance performance • Personal development- self actualization need
  • 55.
    Performance Appraisal Process •Establish performance standard • Communicate the standard • Measure Actual performance • Compare actual performance with standards performance • Take corrective actions
  • 56.
    What is tobe appraised? 1. Behaviour of the employee -for eg : Doctor’s behaviour with the patient. 2. Objectives of the organization- market share , profit contribution, strategy alignment. 3. Traits in performing the job- the precision, time taken by the employee to perform any job.
  • 57.
    Who will appraise? •Supervisors • Peers • Subordinates • Self appraisal
  • 58.
    METHODS OF PA ThePA method are of 15 types- • Individual Evaluation method- This is done by individual employee • Group evaluation Method- one employee is compared with others • Modern methods- these are new methods and research is still carried on
  • 59.
    Performance Appraisal method Individual Evaluation method 1. Confidential report 2.Essay evaluation 3. Critical incident technique 4. Check list 5. Graphic rating scale 6. BARS 7. Forced choice method Group evaluation Method 1. Ranking 2. Paired comparison 3. Forced distribution Modern methods 1. Group Appraisal 2. HRA 3. Assessment centre 4. Field review
  • 60.
    Individual Evaluation method 1.Confidential Report- • Used in Government organisations • Prepared at the end of the year. • Done by immediate senior • Strength and weaknesses of employee are taken • Impression based • No feedback is offered
  • 61.
    Individual Evaluation method 2.Essay Evaluation- • It’s a non quantitative subjective analysis • Strong and weak points of employee are rated. • Parameters are- i) Understanding of programmes, policies, objectives etc ii) Job knowledge iii) The employees relations with coworkers and superiors iv) The employee general ability of planning, controlling, organizing etc. v) General perception of the employee
  • 62.
    Individual Evaluation method 3.Critical Incident technique- • The manager prepares the lists of statements of every effective and ineffective behaviour of the employee. • These rated incidents represents the outstanding or poor behaviour of the employee. • The manager maintains the log book wherein the critical incidents are reported periodically and considered at the time of appraisal.
  • 63.
    Individual Evaluation method 4.Checklists: • A checklist is the set of objectives or descriptive statements about the employee and his behaviour. • The rater marks the characteristics which employee possess rest are kept blank. • Eg- Is the employee really interested in the task assigned? Yes/No
  • 64.
    Individual Evaluation method 5.Graphic rating scale- • A printed form is used to evaluate the performance of the employee . • A variety of traits are judged on the scale and summarised. • For eg: Knowledge of job- Clear understanding of the factors connected with the job rated on a scale unsatisfactory, fair, satisfactory, good, outstanding.
  • 65.
    Individual Evaluation method 6.BARS- Behaviourally Anchored Rating Scale • The critical incidents are selected and rated on the scale which has 6-8 defined performance dimension. • Process of Implementing BARS- i) Collect critical incidents ii) Identify performance dimension iii) Reclassification of Incidents iv) Assigning scale values to the incidents v) Producing the final instrument
  • 66.
    Individual Evaluation method 7.Forced Choice Method- • This method makes use of several sets of paired phrases. Two which are positive and two are negative. The rater has to rate as least applicable most applicable. • The phrases are non uniformally divided so the chances of biases are not apparent
  • 67.
    Individual Evaluation method 8.MBO (Management by objective)- • This technique emphasises on the goals which are tangible, verifiable, measurable. • It’s a six stepped process- I) Set departmental goals II) Set individual goals III) Discuss departmental goals IV) Define expected results V) Performance review VI) Provide feedback
  • 68.
    Group Evaluation Method 1.Ranking method- • The relative position of each employee is expressed in terms of his numerical rank.
  • 69.
    Group Evaluation Method 2.Paired comparison method- • Each worker is compared with all other employees in the group , for every trait , the worker is compared with all other employees.
  • 70.
    Group Evaluation Method 3.Forced Distribution Method- • A predetermined distribution scale. • Two criteria are used for rating are the job performance and promotability. • Five point scale is used for descriptive statements.
  • 71.
    MODERN METHOD 1. GroupAppraisal- • Employee appraised by group of appraiser • It is a bias free method
  • 72.
    MODERN METHOD 2.Human ResourceAccounting: The HRA process shows the investment the organisation makes I its people and how the value of these people change over time. The acquisition cost of employee is compared to the replacement cost from time to time. • 2.
  • 73.
    MODERN METHOD 3.Field reviewmethod- Here the HR department representative goes to the field and assist line supervisors .
  • 74.
    MODERN METHOD 4. 360Degree feedback system- The system involves overall appraisal of the employees . All the employees are part of te performance appraisal.
  • 75.
    Biases in PerformanceAppraisal • First impression • Halo effect (Keep the boss happy) • Horn effect (Good but can’t manage Their impression) • Leniency • Central tendency • Stereotyping or personal biases (wear glasses are more intelligent) • Recency effect
  • 76.
    76 Ch-6 Promotion, Transfer,and Discharge Definition of Promotion: In the opinion of Wendell French, “A promotion is a type of transfer involving the reassignment of an employee to a position that is likely to offer higher pay and greater responsibilities, privileges and potential opportunities.” Why to promote employees: • Serves as an incentives to employees • Recognition of the efficiency of an employee and his performance • Boosts employee morale • Enhances employee commitment and loyalty • Job satisfaction • Helps to retain skilled and talented employees • Develops a competent internal source of employees for higher level jobs • Instill a competitive spirit among the employees • Effective use of knowledge and skills of an employee • Attract competent and suitable employees to join the organization • Organizations are able to minimize the discontent and unrest among the employees
  • 77.
    77 Bases for Promotion Promotioncan be based on following: 1. Promotion based on Seniority 2. Promotion based on Merit 3. Promotion based on seniority-cum-Merit 4. Promotion based on Seniority: • Relative length of service • Preference in various aspects of employment Merits of using seniority as the bases of promotion: • Simplicity • Objectivity • Reward • Reduces employee turnover • Union approval Promotion based on seniority has been criticized on the following: -Faulty assumption -Ignores performance -Efficiency suffers -Demotivates
  • 78.
    78 2. Promotion basedon Merit: • Stresses on the ability • Best performing employees is promoted. Merits of using this system: -Enhances efficiency -Motivates Limitations of a promotion system based on merit are as follows: • Subjective • Favoritism • Opposition of unions • Insecurity
  • 79.
    79 Promotion based onseniority-cum-Merit • Combination • Before using this system, it is essential that the management clearly state the following details; A- Minimum length of service B- Relative weightage assigned C- Minimum performance and qualifications
  • 80.
    80 Definition of Transfer Accordingto Dale Yorder, “A transfer involves shifting of an employee from one job to another without special reference to change in responsibility or compensation.” Why to transfer employees: • To meet the organizational requirements • To ensure respect for human beings • To identify and satisfy the needs of individuals • To provide the organization with well-trained and well-motivated employees • To inculcate the sense of team spirit, team work and inter-team collaboration • Better utilization of employees • Making employees versatile • To correct inter-personal conflicts • Avoidance of overstaffing • Disciplinary action • Relief
  • 81.
    81 Types of Transfer Employeetransfer may be classified into 3 types based on purpose: 1. Transfer that are affected for the training & development of the employees. 2. Transfer made for adjustment of varying volumes within the organization 3. Transfers designed to correct the problem of poor employees placement The common types of transfer are as follows: 4. Production transfers 5. Replacement transfers 6. Rotation transfers (versatility transfer) 7. Shift transfer 8. Remedial transfer 9. Penal transfer
  • 82.
    82 Discharge Discharge or dismissalis a permanent separation of a worker from work. It is the termination of his employment and may be either the result of some disciplinary action or retrenchment of surplus labor. Thus a discharge involves permanent separation of an employee from the pay roll for violation of company rules or for inadequate performance. It is initiated by the management. Discharge take place when management decides that there is a poor fit between an employee and the organization. It could be a result of poor performance or because of some un-acceptable behavior.
  • 83.
    83 Reasons for Discharge/Separation Employeeseparation constitutes the final stage in the staffing process of an organization. An employee can leave the organization for any reason which he deems fit for seeking separation. However, separation is classified basically into two types. These are: voluntary separation and involuntary separation. Voluntary separation refers to the separation of employees on their own request, while involuntary separation means the separation of employees for organizational reasons which are beyond the control of the employees. We shall now discuss the causes of these separations in detail: Voluntary Separation Voluntary separation, which normally begins after a request is placed in this regard by the employee, can happen due to two reasons: professional reason and personal reason. We shall now discuss these reasons in detail. • Professional reasons Employees may seek separation when they decide to seek better positions, responsibilities and status outside the present organization. Efficient employees would seek to expand their realm of knowledge and skills continuously by working in different capacities/positions in various organizations. In their quest for greater responsibility, power and status, they may seek separation from the organization. • Personal reasons The important personal reasons for voluntary separation are relocation for family reasons like marriage of the employees and health crisis of family members, maternity and child-rearing. For instance, when working women get married, they often prefer to settle in the partners place of occupation. Similarly, an employee may seek voluntary separation to look after the child or parent
  • 84.
    84 Involuntary Separation Asmentioned earlier, an involuntary separation is caused by the factors which remain beyond the purview of the employees. However, these factors may be classified broadly into health problems, behavioral problems and organizational problems. We shall now discuss these factors in detail • Health problems Major health problems to the employees may make them invalid or unfit to continue in the profession. For instance, accidents causing permanent disabilities and illness of the employees like brain stroke and other terminal illnesses can lead to their involuntary separation. Death of employees is another factor which results in their involuntary separation. • Behavioral problems An employee's objectionable and un-acceptable behavior within the organization may also lead to his involuntary separation from the organization. When the employees behavior is unethical or violates the code of conduct in force, the organization may initiate disciplinary actions, which may eventually result in his termination. This may constitute an act of involuntary separation. Consistent failure to reach performance goals by an employee can also result in his involuntary separation. • Organizational problems Organizational problems are another important factor that contributes to the involuntary separation of employees. The poor financial performance of an organization may cause it to terminate the services of some of its employees as part of cost control measure. Such terminations are also classified as involuntary separation. Similarly, automation, organizational restructuring and rationalization can also result in employee termination, discharge or layoff, broadly called involuntary separation.
  • 85.
    85 Ch-7 Training Organized activityaimed at imparting information and/or instructions to improve the recipient's performance or to help him or her attain a required level of knowledge or skill. Training is learning that is provided in order to improve performance on the present job. The purpose of any training program is to deliver results. People must be more effective after the training than they were before. The purpose of training is to help people learn something they need to know or be able to do for a specific purpose to achieve organizational objectives and goals, carry out specific tasks, prepare for new responsibilities, or attain their career goals. Employee orientation is a procedure for providing new employees with basic background information about the firm. The Training Process: Directly after orientation, training should begin. Training means giving new or current employees the skills they need to perform their job. Training programs consist of four steps. 1. In the first, needs analysis step, you identify the specific knowledge and skills the job requires, and compare these with the prospective trainees’ knowledge and skills. 2. In the second, instructional design step, you formulate specific, measureable knowledge and performance training objectives, review possible training program content, and estimate a budget for the training program. 3. The third step is to implement the program, by actually training the targeted employee group using methods such as on-the-job or online training. 4. Finally, in an evaluation step, you assess the program’s success (or failure)
  • 86.
  • 87.
    87 THE LECTURE METHOD •WHAT IS A LECTURE? When one person conveys information to a group by talking to them, with or without the use of visual aids, this is called a lecture. A formal lecture does not allow participation by the audience, and there is little or no interaction (or feedback) between the speaker and listeners. • WHEN SHOULD LECTURES BE USED? • A lecture is suitable for large groups where interaction is not practical. • When a speaker is a recognized expert in a field of study, lectures are used because the audience is primarily there to hear what is being said.
  • 88.
    88 THE LECTURE METHODPROS & CONS • ADVANTAGES: • Lectures are an efficient use of time. • Lectures allow experts to share information with large groups. • The material in a lecture is consistent, and listeners are not sidetracked by comments/questions from the audience. • DRAWBACKS: • The lecturer cannot be sure their message was correctly received by the audience, unless a separate discussion period is used for follow up. • Often the overall depth of learning will be relatively low because there is limited interaction, but the lecture method is very popular in universities and many professional situations. • The successful transfer of information is completely dependent upon the skills of the lecturer (essentially it is one way communication).
  • 89.
    89 THE TALK (PRESENTATION)METHOD • WHAT IS A TALK (PRESENTATION)? • A talk (presentation) is similar to a lecture, however the audience has greater involvement and interaction with the speaker. • During a talk, the audience is often allowed to briefly interrupt the speaker with questions, comments, or short discussions. • WHEN SHOULD TALKS BE USED? • A talk or presentation is suitable when the material is less technical or familiar to the audience, but still contains new concepts or ideas. • A talk is appropriate when time constraints are not critical, and the atmosphere is less formal. • Talks are often used for small to moderate size groups where the objective is to exchange information.
  • 90.
    90 THE TALK METHODPROS & CONS • ADVANTAGES: • A talk is less formal and more comfortable for everyone. • A talk allows the audience to ask relevant questions and become fully engaged in the learning process. • DRAWBACKS: • The speaker must have a wide knowledge of the subject matter, and be willing and able to answer questions . • The speaker must be able to control the audience so that questions and comments do not sidetrack the entire presentation. The speaker must also carefully monitor the time and pace of a talk. • In many cases it is more difficult to prepare a talk/presentation than a lecture because of uncertainties associated with questions or topics that may be raised by the audience.
  • 91.
    91 THE DEMONSTRATION METHOD •WHAT IS A DEMONSTRATION? • When a trainer has the audience actually perform a task by showing and explaining how to do it, this is called a demonstration. • During a demonstration, the audience is encouraged to ask questions and request assistance as they try to do the task by themselves. • WHEN SHOULD DEMONSTRATIONS BE USED? • The demonstration method is effective when teaching skills. • Demonstrations are appropriate when there is plenty of time for interaction because practice is necessary to master most skills. • Demonstrations are best for small groups, or when adequate staff is available to work with a large group.
  • 92.
    92 DEMONSTRATION METHOD PROS& CONS • ADVANTAGES: • Demonstrations provide a hands-on experience (hear, see, do). • Participants have plenty of interaction with trainers, and everyone is allowed to progress at their own pace as they master the skill. • DRAWBACKS: • Demonstrations require a lot of preparation, time, materials, and patience. The time allotted for demonstrations must be flexible. • It is important to insure every participant has an opportunity to master the skill being taught. • Hands-on activities can be a potential source of frustration, especially in the case of complex skills. It may be necessary to offer supplementary help (e.g. a follow-up session) for participants having difficulty.
  • 93.
    93 THE DISCUSSION METHOD •WHAT IS A DISCUSSION? • When a trainer guides an open conversation (an organized exchange of ideas or viewpoints) on a selected topic, this is called a discussion. • A formal discussion (sometimes called a panel) follows a set procedure that is used to keep the discussion on track, and allows everyone to express their opinion. • WHEN SHOULD DISCUSSIONS BE USED? • Discussions can help stimulate ideas as members of a group share experiences . • Discussions are most effective when a trained (experienced) leader controls the overall process in an organized manner. • Discussions are appropriate if only a few major (simple) topics are being covered, and when it is acceptable to have several outcomes (i.e. it is not necessary to reach consensus or derive a single conclusion).
  • 94.
    94 DISCUSSION METHOD PROS& CONS • ADVANTAGES: • Discussions allow multiple views and opinions to be expressed. • Discussions provide an informal atmosphere, and allow everyone to express and listen to opinions that are presented with equal weight. • DRAWBACKS: • Discussions can get de-tracked or begin to taper-off if the leader is not experienced in controlling the group. • Discussions can be dominated by a strong member of the group, unless the leader controls the overall process to insure everyone is given equal time and the same level of respect. • Formal discussions require a well-defined purpose or objective, a reasonable time limit, and a well-trained leader. It is not just a bunch of people sitting around a table gabbing with each other.
  • 95.
    95 THE CASE STUDYMETHOD • WHAT IS A CASE STUDY? • When the opposing viewpoints of a realistic situation (or event) are presented to a group, and a logical analysis involving a “judgment call” must be conducted to arrive at a conclusion, this is called a case study . • A case study can be presented orally or as a written document, but the process of analyzing and evaluating opposing viewpoints to reach a reasonable conclusion is the same. • WHEN SHOULD A CASE STUDY BE USED? • A case study is a useful method when there is no clear-cut or easy solution to a problem. • Case studies are useful when real-life situations can be used as examples to highlight the training topic(s) being covered. • In situations when multiple viewpoints must be considered, case studies can help participants evaluate the merits of different arguments.
  • 96.
    96 CASE STUDY PROS& CONS • ADVANTAGES: • A well chosen case study will be relevant to all participants. • Everyone is actively engaged in the case study process. • Individuals are forced to make a decision, and then defend it. • DRAWBACKS: • The case study must be relevant, realistic, and appropriate. • The case study scenario must be carefully worded to avoid bias, or imply that one position is stronger than the other. • Although the final outcome of a case study analysis forces each individual to draw a conclusion and make a decision, it should be recognized that it is not necessary to reach consensus , and participants should be reminded it is a training exercise.
  • 97.
    97 THE ROLE PLAYINGMETHOD • WHAT IS ROLE PLAYING? • When participants and/or trainers act out parts in an open-ended story intended to highlight conflicting viewpoints, this is called role playing. • Role playing is different from stage drama because the lines (scripts) are not pre- determined, the players originate their dialogue in real time, and as the scenario unfolds they interact to develop an outcome. • WHEN SHOULD ROLE PLAYING BE USED? • Role playing is effective when the topic involves person-to-person communication and/or interaction. • Role playing can allow everyone to participate. • The overall mood a training session can be improved by the excitement that role playing provides.
  • 98.
    98 ROLE PLAYING PROS& CONS • ADVANTAGES: • Role playing is an excellent forum for exploring the topics of ethics and conflict resolution. • Participants can “feel a new viewpoint” through dynamic role playing. • Individuals are often inclined to express true feelings when role playing. • The group listens better and learns more because they are seeing and hearing the subject matter as it is acted out. • DRAWBACKS: • Role playing requires careful selection of situations to be effective. • Role playing impedes free expression if participants are not volunteers. • The themes for role playing exercises must avoid potential conflicts.
  • 99.
    99 THE SIMULATION METHOD •WHAT IS A SIMULATION? • A training exercise that recreates an event which could actually happen, so that participants experience the situations, is called a simulation. • Simulation is a more complex form of role playing that is often used for hands-on training (e.g. simulation of a first aid emergency, etc.) . • WHEN SHOULD SIMULATION BE USED? • Simulations can be effective when an elaborate demonstration is the best method of training a moderate to large size group. • The simulation method is appropriate for disaster, rescue, or other crisis management training exercises.
  • 100.
    100 SIMULATION PROS &CONS • ADVANTAGES: • Simulations are realistic hands-on events in which participants “feel, see, hear, and do”. • A simulation experience provides a high level of knowledge transfer. • Simulations are an intense form of experiential learning. • DRAWBACKS: • Simulations require lots of careful planning, materials, preparation, and equipment/props. • Simulations require staging, practice, and adjustment to eliminate the possibility of actual injury or safety hazards. • A realistic simulation is often expensive, and should be followed up with additional training to remedy any problems identified during the event.
  • 101.
    101 THE BRAINSTORMING METHOD •WHAT IS A BRAINSTORMING? • A problem solving exercise that involves the rapid-fire recording of ideas without criticism or ranking is called brainstorming. • Brainstorming is an effective method for collecting ideas, but it requires follow up activities focused on analyzing and evaluating the ideas. • WHEN SHOULD BRAINSTORMING BE USED? • Brainstorming is helpful during the planning phase of an activity. • When a group cannot decide what to do, brainstorming can be used to initiate the “idea sharing” process. • Brainstorming can be used to stimulate creativity, especially when a “fresh approach” is needed.
  • 102.
    102 BRAINSTORMING PROS &CONS • ADVANTAGES: • All ideas are heard, and no one is ignored. • All ideas are initially accepted as valid and having equal importance. • Lots of ideas are gathered, and patterns may begin to emerge. • DRAWBACKS: • The true value of the brainstorming process occurs during a follow up activity when all the ideas are honestly evaluated to assess feasibility. • A large number of spontaneous ideas is collected, and there is the possibility of missing a reasonable (probably simple) solution. • The recorder during the brainstorming session must be careful not to misinterpret or impose bias on any of the ideas that are proposed.
  • 103.
    103 THE BUZZ GROUPMETHOD • WHAT IS A BUZZ GROUP? • When a group is given a short time in which to derive an answer to a simple question/problem by recording ideas, this is called a buzz group. • The output of buzz groups, like brainstorming sessions, needs to be followed up with further evaluation and analysis of ideas. • WHEN SHOULD BUZZ GROUPS BE USED? • When there are too many people to hold a brainstorming session, dividing into smaller buzz groups is a good method for collecting ideas. • Buzz groups can help teams discover solutions by themselves, without the need for external assistance. • If individuals are reluctant to participate in large open discussions, smaller buzz groups may encourage them to their share ideas.
  • 104.
    104 BUZZ GROUP PROS& CONS • ADVANTAGES: • Buzz groups can be assembled quickly, on short notice. • All members of a buzz group participate, and they share leadership. • Buzz groups tend to move teams towards consensus building, and encourage team spirit. • DRAWBACKS: • Buzz groups can easily get off-track . • Buzz groups can produce “pooled ignorance”, invalid assumptions, and cannot be relied upon to reach viable conclusions. • To be most effective, buzz groups should have experienced leaders and “idea recorders” to produce accurate, unbiased reports.
  • 105.
    105 THE QUESTION &ANSWER METHOD • WHAT IS A Q&A SESSION? • When an expert provides specific knowledge by responding to direct questions from a group, this is called a question and answer session. • Q&A sessions are often conducted as informal events in which the speaker provides candid responses (e.g. a press conference). • WHEN SHOULD Q & A SESSIONS BE USED? • Q&A sessions are usually most effective when held near the end of a training course, because participants are best prepared to ask questions. • In situations when an expert is available and willing to participate, a Q&A session can promote an open exchange of information.
  • 106.
    106 Q&A SESSION PROS& CONS • ADVANTAGES: • Q&A sessions provide immediate (candid) responses from experts. • Q&A sessions allow interaction with experts that might otherwise be inaccessible. • DRAWBACKS: • In a Q&A session the expert has no control over the content, topic, or focus of questions. • The Q&A session must be carefully controlled to allow everyone to ask questions, while also preventing anyone from dominating the session. • Questions could be phrased in an accusatory tone, thereby putting experts in a defensive position, but this can be avoided by setting ground rules at the beginning of the session.
  • 107.
    107 THE LEARNING CENTERMETHOD • WHAT ARE LEARNING CENTERS? • In a training course when small groups visit a series of “stations” that concentrate on a particular topic, they are called learning centers. • The term “round robin” is another name for learning centers. • WHEN SHOULD LEARNING CENTERS BE USED? • When a series of separate (but inter-related) topics are presented as individual parts of an overall subject. • When you need to impart a large amount of information in a short time. • When a group is too large to teach specific topics using other methods. • If it is practical for displays to remain in place for long time periods. • If it is advantageous for participants to visit stations at their own pace.
  • 108.
    108 LEARNING CENTER PROS& CONS • ADVANTAGES: • Learning centers allow small groups to get a “close-up view” with personalized training (includes lecture, demonstration, and hands-on). • Similar topics can be linked together, while also allowing participants to focus on special interests. • DRAWBACKS: • Learning centers require a lot of advanced planning and set up. • Rotation through learning centers requires coordinated time allotment. • Learning centers often require additional space and separate rooms to prevent interference, noise, and confusion.
  • 109.
    109 THE REFLECTION METHOD •WHAT IS REFLECTION? • In a training course when individuals respond to a series of questions by collecting their personal feelings and thoughts to form a conclusion, this is called reflection. • During a reflection period, trainers create an atmosphere in which participants feel free to think and express what ever is on their mind. • WHEN SHOULD REFLECTION BE USED? • Reflection is usually conducted at the end of a training session, as a means of reviewing and evaluating the overall experience. • Reflection can also be used for reinforcing the connections between several disjoint activities, and helping participants understand the “big picture”.
  • 110.
    110 REFLECTION PROS &CONS • ADVANTAGES: • Reflection allows the trainer to provide structure, but the solution comes from individuals and/or the group. • Reflection emphasizes the overall benefits derived from an experience. • DRAWBACKS: • Reflection is usually a time consuming process, and may not yield results. • Some individuals may feel uncomfortable, especially if they dislike being “put on the spot” to provide a response. • The overall technique is somewhat difficult for participants to understand, and for trainers to utilize successfully.
  • 111.