“ Bringing Physical & Electronic solutions together” 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
National Fire & Security Convergence Specialists High Security Physical Ltd (Manufacturing Plant in Birmingham) High Security Ltd Modular Doors Ltd Total Fire Services Ltd 25 fire risk assessors STAR LTD BS 7858 Vetting & Recruitment Company 24 hour engineering central service & alarm response 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
Security Convergence Specialists Bespoke Banking ATM protection physical attacks Retail Loss prevention Electronic tagging IP CCTV Commercial & Industrial Integrated systems Personnel vetting & accreditation business consultancy Fire Risk assessments Fire alarm design Installation 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
High Security Physical Ltd Perimeter guard (electronic & physical protection) High Security Perimeter Fencing High Security Steel doors High Security pods Roller shutters High speed doors Grills/bars Aluminium window shutters Insulated roller garage doors 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
High Security Ltd Project Management Monitored Intruder alarms IP Digital CCTV Solutions Access Control Fire Alarms Fire Extinguishing services Door entry systems 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
High Security Ltd Fire Risk Assessment Fire Alarm Design L1-L5 Fire Alarm Installation Supply & Commission Fire Alarm Maintenance Fire Extinguishing services Emergency Lighting Design & Installation & Maintenance 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
High Security Ltd Turn Key Security Solutions Access Control CCTV Intruder Door Entry Systems 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
Risk Assessment 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together PD 6662 En 50131 SYSTEM DESIGN - RISK ASSESSMENT PREMISES ACTIVITIES CONTENTS OF HOME/BUSINESS Q Do you consider your home/business to be classed as a target for thieves? YES TYPE OF STOCK/PROPERTY Q Is your stock/property easy to dispose? YES Q Does your stock/property pose an attraction to a burglar? YES BULK/SIZE OF STOCK/PROPERTY Q Is the stock/property easy to Remove/Transport? YES Q Is there easy Access to premises (to aid removal of stock/property)? NO STORAGE/CONTROL Q Are High Value Goods quarantined? YES Q Are High Value Goods restricted to certain personnel? YES THEFT HISTORY Q Have you been broken into before? YES   1 SYSTEM DESIGN GRADE - based on risk assessment above 2
  Q Maximum probable value in a single loss?    Q Daily Turnover of business?    Q How long will it take to restock/resume normality?    Projected loss of earnings until normal operation    Q Cost Of Insurance Excess    Q Cost By Vandalism Of Contents    Total Cost of Burglary   SYSTEM DESIGN GRADE - based on cost of loss 2   0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together CONSEQUENTIAL COST OF LOSS  -
0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together Bigger Picture  - LOCALITY         High crime risk area             Proximity of adjacent occupied premises           Presence of adjacent building to aid attack           Speed & quality of response to IAS           EXISTING SECURITY         Quality & extent of physical devices           Quality & extent of existing IAS             THEFT HISTORY         Methods of attack in previous break-ins           LOCAL LEGISLATION/REGULATION       Fire/Safety Requirements that may affect     IAS design     Building Construction that may affect     IAS design     SECURITY ENVIRONMENT         Location of Building - Rural or Urban area    
0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together TIME  - Response Police  20 Minutes Key Holder 20 Minutes Manned Security 5 Minutes Remote Viewing  2 minutes + police/key-holder MSL in relation to the above (Maximum single loss)
Physical Perimeter 2 minutes no alarm Physical openings  30 seconds to 10 minutes LPCB  Electronic detection ACPO delay 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together TIME DELAY vs. LOSS  -
Delay & Deter Physical Perimeter 8 minutes with alarm Physical openings  8 minutes with alarm LPCB ,NSI, ACPO, SSAIB,Insurance Companies Physical detection systems 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together PD6662 Grade 4 Security
0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together PD6662 Grade 4 Security Integrated Electronic & physical products

High Security Group Presentation 6.10.08

  • 1.
    “ Bringing Physical& Electronic solutions together” 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
  • 2.
    National Fire &Security Convergence Specialists High Security Physical Ltd (Manufacturing Plant in Birmingham) High Security Ltd Modular Doors Ltd Total Fire Services Ltd 25 fire risk assessors STAR LTD BS 7858 Vetting & Recruitment Company 24 hour engineering central service & alarm response 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
  • 3.
    Security Convergence SpecialistsBespoke Banking ATM protection physical attacks Retail Loss prevention Electronic tagging IP CCTV Commercial & Industrial Integrated systems Personnel vetting & accreditation business consultancy Fire Risk assessments Fire alarm design Installation 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
  • 4.
    High Security PhysicalLtd Perimeter guard (electronic & physical protection) High Security Perimeter Fencing High Security Steel doors High Security pods Roller shutters High speed doors Grills/bars Aluminium window shutters Insulated roller garage doors 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
  • 5.
    High Security LtdProject Management Monitored Intruder alarms IP Digital CCTV Solutions Access Control Fire Alarms Fire Extinguishing services Door entry systems 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
  • 6.
    High Security LtdFire Risk Assessment Fire Alarm Design L1-L5 Fire Alarm Installation Supply & Commission Fire Alarm Maintenance Fire Extinguishing services Emergency Lighting Design & Installation & Maintenance 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
  • 7.
    High Security LtdTurn Key Security Solutions Access Control CCTV Intruder Door Entry Systems 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together
  • 8.
    Risk Assessment 0210/2008High Security group Ltd Bringing Physical & Electronic Security Together PD 6662 En 50131 SYSTEM DESIGN - RISK ASSESSMENT PREMISES ACTIVITIES CONTENTS OF HOME/BUSINESS Q Do you consider your home/business to be classed as a target for thieves? YES TYPE OF STOCK/PROPERTY Q Is your stock/property easy to dispose? YES Q Does your stock/property pose an attraction to a burglar? YES BULK/SIZE OF STOCK/PROPERTY Q Is the stock/property easy to Remove/Transport? YES Q Is there easy Access to premises (to aid removal of stock/property)? NO STORAGE/CONTROL Q Are High Value Goods quarantined? YES Q Are High Value Goods restricted to certain personnel? YES THEFT HISTORY Q Have you been broken into before? YES   1 SYSTEM DESIGN GRADE - based on risk assessment above 2
  • 9.
      Q Maximumprobable value in a single loss?    Q Daily Turnover of business?    Q How long will it take to restock/resume normality?    Projected loss of earnings until normal operation    Q Cost Of Insurance Excess    Q Cost By Vandalism Of Contents    Total Cost of Burglary   SYSTEM DESIGN GRADE - based on cost of loss 2   0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together CONSEQUENTIAL COST OF LOSS -
  • 10.
    0210/2008 High Securitygroup Ltd Bringing Physical & Electronic Security Together Bigger Picture - LOCALITY         High crime risk area             Proximity of adjacent occupied premises           Presence of adjacent building to aid attack           Speed & quality of response to IAS           EXISTING SECURITY         Quality & extent of physical devices           Quality & extent of existing IAS             THEFT HISTORY         Methods of attack in previous break-ins           LOCAL LEGISLATION/REGULATION       Fire/Safety Requirements that may affect     IAS design     Building Construction that may affect     IAS design     SECURITY ENVIRONMENT         Location of Building - Rural or Urban area    
  • 11.
    0210/2008 High Securitygroup Ltd Bringing Physical & Electronic Security Together TIME - Response Police 20 Minutes Key Holder 20 Minutes Manned Security 5 Minutes Remote Viewing 2 minutes + police/key-holder MSL in relation to the above (Maximum single loss)
  • 12.
    Physical Perimeter 2minutes no alarm Physical openings 30 seconds to 10 minutes LPCB Electronic detection ACPO delay 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together TIME DELAY vs. LOSS -
  • 13.
    Delay & DeterPhysical Perimeter 8 minutes with alarm Physical openings 8 minutes with alarm LPCB ,NSI, ACPO, SSAIB,Insurance Companies Physical detection systems 0210/2008 High Security group Ltd Bringing Physical & Electronic Security Together PD6662 Grade 4 Security
  • 14.
    0210/2008 High Securitygroup Ltd Bringing Physical & Electronic Security Together PD6662 Grade 4 Security Integrated Electronic & physical products