SlideShare a Scribd company logo
1 of 31
Download to read offline
 
        
 
 
 
	
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
HIBA FAOUR
PORTFOLIO 
PHONE: (647) 550‐3313       EMAIL: hbfaour@gmail.com
FDSH
OW
ER
ER-EAST RESIDENTIAL
AD1217
ABU DHABI, U.A.E.
Bloom Emirates Properties
A0
ABU DHABI MARINA
BLOOM DEVELOPMENT
Abu Dhabi Marina
N
WR ER
SA HT
E
ER- A100
FIRST FLOOR KEY PLAN
FD
SHOWER
ER-EAST RESIDENTIAL
AD1217
ABU DHABI, U.A.E.
Bloom Emirates Properties
A0
ABU DHABI MARINA
BLOOM DEVELOPMENT
Abu Dhabi Marina
N
WR ER
SA HT
E
ER- A102
FIRST FLOORS PLANS
PART-5 (DIM & NOT.)
ER-EAST RESIDENTIAL
AD1217
ABU DHABI, U.A.E.
Bloom Emirates Properties
A0
ABU DHABI MARINA
BLOOM DEVELOPMENT
Abu Dhabi Marina
N
WR ER
SA HT
E
ER- A151
TYPICAL FLOORS UNITS 2
REFLECTED CEILING PLAN
ER-EAST RESIDENTIAL
AD1217
ABU DHABI, U.A.E.
Bloom Emirates Properties
A0
ABU DHABI MARINA
BLOOM DEVELOPMENT
Abu Dhabi Marina
N
WR ER
SA HT
E
ER- A175
1:50
TYPICAL FLOORS UNITS 1
TILING LAYOUT
BANQUET HALL
ER-EAST RESIDENTIAL
AD1217
ABU DHABI, U.A.E.
Bloom Emirates Properties
A0
ABU DHABI MARINA
BLOOM DEVELOPMENT
Abu Dhabi Marina
N
WR ER
SA HT
E
ER- A200
ELEVATIONS- 1
ER-EAST RESIDENTIAL
AD1217
ABU DHABI, U.A.E.
Bloom Emirates Properties
A0
ABU DHABI MARINA
BLOOM DEVELOPMENT
Abu Dhabi Marina
WR ER
SA HT
E
ER- A350
WALL SECTION - 1 & 2
OPERATOR
REVISIONNo. APP'D DATE
PLOT NO.LOCATION
DRAWING TITLE
CONSULTANT
CLIENT
BUSINESS BAY BB.B01.001/BLOCK F:BB05
KEY PLAN
PROJECT TITLE
DRAWING No.
PROJECT No.
SCALE
NAME
COORDINATED BY
APPROVED BY DATE
STAGE
AUGUST 2015
CHECKED BY
DU1433
DESIGNED BY
CONCEPT DESIGN BY
VERIFIED BY
DRAWN BY
DD
00 1 2 3 4 5 6 7 8
PROJECT FRONT SHEET DRAWING
X-COV-G-A-000
1:100@B1+
-
-
WS
WS / HF
RA / LB
-
DUBAI PROPERTIES
PROJECT TITLE :
DOUBLETREE BY HILTON HOTEL
AT BAY SQUARE
DUBAI-U.A.E.
DOUBLETREE BY HILTON HOTEL
AT BAY SQUARE
PARKING REQUIREMENTS:
RECEPTION
F.F.L.
±0.00
F.F.L.
±0.00
S.C.L.
+0.45
S.C.L.
+0.15
S.W.L.
-0.02
F.L.
-0.15
S.C.L.
-0.35
S.W.L.
-0.02
F.L.
-0.15
S.C.L.
-0.35
S.W.L.
-0.02
F.L.
-0.15
S.C.L.
-0.35
F.F.L.
±0.00
OPERATOR
REVISIONNo. APP'D DATE
PLOT NO.LOCATION
DRAWING TITLE
CONSULTANT
CLIENT
BUSINESS BAY BB.B01.001/BLOCK F:BB05
KEY PLAN
PROJECT TITLE
PROJECT
NORTH
TRUE
NORTH
DRAWING No.
PROJECT No.
SCALE
NAME
COORDINATED BY
APPROVED BY DATE
STAGE
AUGUST 2015
CHECKED BY
DU1433
DESIGNED BY
CONCEPT DESIGN BY
VERIFIED BY
DRAWN BY
DD
00 1 2 3 4 5 6 7 8
GROUND FLOOR PLAN
( KEY PLAN)
Setting Out plan
X-GFL-P-A-105
- - - -
1:400@B1+
-
-
WS
WS / HF
RA / LB
-
BB-01 BB-02 BB-03 BB-04
BB-05
BB-07BB-08 BB-06
BB-09
BB-13
BB-10
BB-12
BB-11
OPERATOR
REVISIONNo. APP'D DATE
PLOT NO.LOCATION
DRAWING TITLE
CONSULTANT
CLIENT
BUSINESS BAY BB.B01.001/BLOCK F:BB05
KEY PLAN
PROJECT TITLE
PROJECT
NORTH
TRUE
NORTH
DRAWING No.
PROJECT No.
SCALE
NAME
COORDINATED BY
APPROVED BY DATE
STAGE
AUGUST 2015
CHECKED BY
DU1433
DESIGNED BY
CONCEPT DESIGN BY
VERIFIED BY
DRAWN BY
DD
00 1 2 3 4 5 6 7 8
X-TP2-P-A-F-115
1:100@B1+
-
-
WS
WS / HF
RA / LB
-
TYPICAL-2 FLOOR PLAN
9th to 11th floors
(DIM. & NOT )
OPERATOR
REVISIONNo. APP'D DATE
PLOT NO.LOCATION
DRAWING TITLE
CONSULTANT
CLIENT
BUSINESS BAY BB.B01.001/BLOCK F:BB05
KEY PLAN
PROJECT TITLE
DRAWING No.
PROJECT No.
SCALE
NAME
COORDINATED BY
APPROVED BY DATE
STAGE
AUGUST 2015
CHECKED BY
DU1433
DESIGNED BY
CONCEPT DESIGN BY
VERIFIED BY
DRAWN BY
DD
00 1 2 3 4 5 6 7 8
ELEVATION - 1
X-EL1-X-A-F-300
- - - -
1:100@B1+
-
-
WS
WS / HF
RA / LB
-
OPERATOR
REVISIONNo. APP'D DATE
PLOT NO.LOCATION
DRAWING TITLE
CONSULTANT
CLIENT
BUSINESS BAY BB.B01.001/BLOCK F:BB05
KEY PLAN
PROJECT TITLE
PROJECT
NORTH
TRUE
NORTH
DRAWING No.
PROJECT No.
SCALE
NAME
COORDINATED BY
APPROVED BY DATE
STAGE
AUGUST 2015
CHECKED BY
DU1433
DESIGNED BY
CONCEPT DESIGN BY
VERIFIED BY
DRAWN BY
DD
00 1 2 3 4 5 6 7 8
SECTION - 2
X-SC2-X-A-F-401
1:100@B1+
-
-
WS
WS / HF
RA / LB
-
1
SECTION-2
Scale: 1/200
≥
≥
≥
DRY WALL PARTITION TYPE-4DRY WALL PARTITION TYPE-3
OPERATOR
REVISIONNo. APP'D DATE
PLOT NO.LOCATION
DRAWING TITLE
CONSULTANT
CLIENT
BUSINESS BAY BB.B01.001/BLOCK F:BB05
KEY PLAN
PROJECT TITLE
PROJECT
NORTH
TRUE
NORTH
DRAWING No.
PROJECT No.
SCALE
NAME
COORDINATED BY
APPROVED BY DATE
STAGE
AUGUST 2015
CHECKED BY
DU1433
DESIGNED BY
CONCEPT DESIGN BY
VERIFIED BY
DRAWN BY
DD
00 1 2 3 4 5 6 7 8
PARTITION TYPES DETAILS - 2
X-D17-D-A-F-621
-
-
WS
WS / HF
RA / LB
-
AS SHOWN
a NOTE ADDED HF AUG. 2015
BT-G-013
B BA
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
Utility Plot
SS
54321
6 7 8 9
123456789
4
3
2
1
8
7
6
5
11
10
9
4
3
2
1
8
7
6
5
11
10
9
1 2 3 4 5 6 7
Block S
LEGEND:
Detached Villas
Semi attached Villas
Others
Open Space
BLOCK P (COMMUNITY FACILITY CENTER)
BLOCK S (FACILITY & SERVICE BLOCK)
Ea
Eb
Fa
Ka
Villa Type
TYPE A
TYPE B
TYPE C
TYPE D
TYPE E
TYPE Ea
TYPE Eb
TYPE F
TYPE Fa
TYPE K
TYPE Ka
TYPE H
TYPE J
A
B
C
D
E
F
K
H
J
TYPE L
TYPE La
TYPE M
TYPE Ma
L
La
M
Ma
Villa Type
BLOCK R (Retail Block)
BLOCK T (GUARD HOUSE)
DU1314
DUBAI, U.A.E.
A1
DBT ONE RESIDENTIAL PROJECTS L.L.C.
A000
ZONE A
COVER SHEET
CONSULTANT:
DUBAI, U.A.E.
VILLA DEVELOPMENT FOR
TECOM INVESTMENTS
PROJECT TITLE:
PLOT DETAILS:
(REFER TO AFFECTION PLAN)
PLOT NO ...................................... : BT-D-022
LOCATION / BLOCK NO............... : AL BARSHA SOUTH - SECOND
AREA OF PLOT............................ : 2,034,249 SQ.FT.
MAX. PLOT COVERAGE.............. : N/A
LAND USE ALLOWED.................. :RESIDENTIAL
HEIGHT ALLOWED ..................... : GROUND + 1 FLOOR
PROJECT DETAILS:
(REFER TO PROJECT DETAIL SHEET)
LAND USE PROPOSED .............. : RESIDENTIAL
HEIGHT PROPOSED .................. : GROUND + 1 FLOOR
TOTAL BUILT UP AREA............... : 946,045 SQ.FT.
MAX. GFA AREA ALLOWED....... : 763,004 SQ.FT. (FAR=0.380)
GFA AREA PROPOSED.............. : 762,777 SQ.FT. (FAR=0.375)
PARKING REQUIRED................... : 552 CARS (2 CARS / VILLA)
PARKING PROVIDED................... : 558 CARS
PROECT DESCRIPTION:
(REFER TO ARCHITECTURAL DRAWINGS)
OWNERS NAME / SIGNATURE : CONSULTANT NAME / SIGNATURE :
(DBT ONE RESIDENTIAL PROJECTS L.L.C) (KHATIB & ALAMI C.E.C)
FOR TECOM USE ONLY:
THE PROJECT CONSISTS OF:
1. 276 VILLAS AS FOLLOWS:
TYPE A: 16 UNITS TYPE B: 25 UNITS
TYPE C: 36 UNITS TYPE D: 39 UNITS
TYPE E: 19 UNITS TYPE Ea: 13 UNITS
TYPE Eb: 10 UNITS TYPE H: 20 UNITS
TYPE J: 22 UNITS TYPE K: 34 UNITS
TYPE Ka: 36 UNITS TYPE M: 3 UNITS
TYPE Ma: 3 UNITS
2. BLOCK P : COMMUNITY FACILITY CENTER
3. BLOCK T : GAURD HOUSE 2 UNITS
ZONEAZONEB
ZONE C
DETACHED VILLA TYPE-A
A-
DU1314
DUBAI, U.A.E.
A1
DBT ONE RESIDENTIAL PROJECTS L.L.C.
A350A350
WALL SECTION 1,2,3,4,5
³
DU1211
AL HABTOOR GROUP LLC
A0
P. O. Box 25444 Dubai
A0000
COVER SHEET
2425262728293031323334353637383940414243444546474849
COOK HALL
DU1211
AL HABTOOR GROUP LLC
A0
P. O. Box 25444 Dubai
ELEVATION - 2
A2001
DU1211
AL HABTOOR GROUP LLC
A0
P. O. Box 25444 Dubai
GENERAL SECTION - 2
A3001
- 4.70 FGL
- 4.10 FFL
- 4.85 FGL
- 4.80 FFL
- 4.15 FFL
- 4.60 FFL
- 4.30 FFL
- 4.25 FFL
- 4.25 FFL
- 4.55FFL
- 2.80 FFL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.50 FFL
- 4.50 FFL
- 4.75 FFL
- 4.75 FFL
- 4.75 FFL
- 4.60 FGL
- 4.55 FFL
- 4.65 FFL
- 4.35 FFL
- 4.60 FGL
- 4.55 FFL
- 4.30 FFL
- 4.00 FFL
- 4.55 FFL
- 4.55 FFL
- 4.40 FFL
- 3.65 FFL
- 1.75 FFL
- 3.60 FGL
- 4.00 FFL
- 4.55FFL
- 4.55FFL
- 4.55FFL
- 4.65 FGL
- 4.60 FFL
- 4.70 FGL
- 4.65 FGL
- 4.70 FGL
- 4.55 FFL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.60 FGL
- 4.50 FFL
- 4.55 FFL
- 4.60 FGL
- 4.60 FGL
- 4.00 TOW
- 4.50 RFL
- 4.55FFL
- 3.82 RFL
- 3.80 RFL
- 3.65 RFL
- 3.75 RFL
- 3.45 RFL
- 3.60 RFL
- 3.46 RFL
- 3.75 RFL
- 3.44 RFL
- 3.60 FGL
-1.75 FGL
- 3.72 FFL
- 3.57 FFL
- 3.39 FFL
- 3.65 FFL
- 1.75FGL
- 3.65 FFL
- 3.70 FGL
- 3.45 FGL
- 3.65 FFL
- 3.70 FGL
- 3.45 FFL
- 3.65 FGL
- 4.50 RFL
- 4.35 FFL
- 3.39 FFL
- 3.54 FFL
- 3.39 FFL
- 3.40 TOW
- 3.45 FFL
- 4.00 FFL
- 3.85 FFL
- 3.85FFL
- 2.50 FFL
- 3.0 FFL
- 3.4 FFL
- 2.15 FFL
- 3.90 FFL
- 4.55FFL
- 4.20 FFL
- 4.25 FFL
- 4.20 FFL
- 3.60 FGL
- 3.60 FGL
- 3.60 FGL
- 4.45 FGL
- 4.40 FFL
- 4.20 FFL
- 4.20 FFL
- 4.00 FFL
- 3.80 FFL
- 4.50 FFL
- 4.65 FFL
- 0.50 TOW
- 3.90 FGL
- 4.85 FGL- 4.85 FGL
- 4.75 FFL
- 4.85 FGL
- 4.85 FGL
- 4.75 FFL
- 4.75 FFL
- 4.75 FFL
- 4.75 FFL
- 4.75 FFL
- 4.60 FGL
- 4.85 FGL
- 1.85 FFL
- 1.70 FFL
- 3.60 FGL
- 5.00 FFL
- 6.05 BOP
- 3.65 TOW
- 3.70 T0W
- 1.65 TOW
- 4.10 FFL
- 4.10 FFL
- 3.35 T0W
- 3.35 T0W
- 3.35 T0W
- 3.35 T0W
- 1.75 T0W
- 1.75 T0W
- 1.75 T0W
- 1.75 T0W
- 2.80 T0W
- 1.75 T0W
- 1.45 T0W
- 1.45 T0W
- 4.30 FFL
- 4.45 FFL
- 4.50 FFL
- 3.65 TOW
- 3.70 TOW
- 4.10 T0W
- 4.55 FFL
- 4.00 TOW
- 4.05 FGL
- 4.00 T0W
- 4.00 T0W
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.30 TOW
+ 0.90 TOW
-1.30 FFL
- 1.30 TOW
- 1.30 TOW
-0.25 TOW
-1.75 FFL
- 1.30 TOW
- 1.30 TOW
-1.30 FFL
+0.90 TOW
-1.30 TOW
-1.75 FFL
-1.30 TOW
-1.30 TOW
-1.30 FFL
-1.30 FFL
-1.45 FFL
-1.45 FFL
- 1.75 FFL
- 1.30 TOW
-1.30 FFL
- 1.30 TOW
- 1.75 FFL
-1.75 FFL
+ 0.90 TOW
- 1.30 TOW
+ 0.90 TOW
+ 0.90 TOW
+ 0.90 TOW
-0.25 TOW
-0.25 TOW
-0.25 TOW
-0.25 TOW
-0.25 TOW
-0.25 TOW
-1.30 FFL
- 1.75 FFL
-1.30 TOW
-1.30 TOW
-1.30 TOW
-1.30 TOW
-1.30 TOW
-1.30 TOW
-1.30 TOW
- 1.75 FFL
-1.30 TOW
-1.30 TOW
- 1.30 TOW
- 1.30 TOW
- 1.30 TOW
-1.30 FFL
- 1.75 FFL
-1.20 FFL
-1.20 FFL

116.210
L=116.289
R931.26
116.146
L=116.179
186.764
195.097
R1421.68
L=270.745
270.464
E=481408.824
N=2780994.699
E=481540.740
N=2780803.820
E=481479.85
N=2780902.801
E=481539.347
N=2781128.282
E=481702.644
N=2780912.678
LIMIT OF PLOT
LIMIT OF PLOT










































 











E=481696.851
N=2780911.866
E=481695.070
N=2780908.397
E=481693.381
N=2780913.647
ROOF
E=481532.211
N=2781120.463
E=481531.291
N=2781115.650
E=481539.872
N=2781118.999
E=481412.277
N=2780996.000
E=481414.682
N=2780999.070
E=481415.346
N=2780993.594
- 3.35 T- 5 T0WTTTT
- 4.70 FGL
- 4.10 FFL
- 4.85 FGL
- 4.80 FFL
- 4.15 FFL
- 4.60 FFL
- 4.30 FFL
- 4.25 FFL
- 4.25 FFL
- 4.55FFL
- 2.80 FFL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.50 FFL
- 4.50 FFL
- 4.75 FFL
- 4.75 FFL
- 4.75 FFL
- 4.60 FGL
- 4.55 FFL
- 4.50 FFL
- 4.65 FFL
- 4.35 FFL
- 4.60 FGL
- 4.55 FFL
- 4.30 FFL
- 4.00 FFL
- 4.55 FFL
- 4.55 FFL
- 4.40 FFL
- 3.65 FFL
- 1.75 FFL
- 3.60 FGL
- 4.00 FFL
- 4.55FFL
- 4.55FFL
- 4.55FFL
- 4.65 FGL
- 4.60 FFL
- 4.70 FGL
- 4.65 FGL
- 4.70 FGL
- 4.55 FFL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.55 FFL
- 4.60 FGL
- 4.55 FFL
- 4.60 FGL
- 4.50 FFL
- 4.55 FFL
- 4.60 FGL
- 4.60 FGL
- 4.00 TOW
- 4.50 RFL
- 4.55FFL
- 4.55FFL
- 3.82 RFL
- 3.80 RFL
- 3.65 RFL
- 3.75 RFL
- 3.45 RFL
- 3.60 RFL
- 3.46 RFL
- 3.75 RFL
- 3.44 RFL
- 3.60 FGL
-1.75 FGL
- 3.72 FFL
- 3.57 FFL
- 3.39 FFL
- 3.65 FFL
- 1.75FGL
- 3.65 FFL
- 3.70 FGL
- 3.45 FGL
- 3.65 FFL
- 3.70 FGL
- 3.45 FFL
- 3.65 FGL
- 4.50 RFL
- 4.35 FFL
- 3.39 FFL
- 3.54 FFL
- 3.39 FFL
- 3.40 TOW
- 3.45 FFL
- 4.00 FFL
- 3.85 FFL
- 3.85FFL
- 2.50 FFL
- 3.0 FFL
- 3.4 FFL
- 2.15 FFL
- 3.90 FFL
- 4.55FFL
- 4.20 FFL
- 4.25 FFL
- 4.20 FFL
- 3.60 FGL
- 3.60 FGL
- 3.60 FGL
- 4.45 FGL
- 4.40 FFL
- 4.20 FFL
- 4.20 FFL
- 4.00 FFL
- 3.80 FFL
- 4.50 FFL
- 4.65 FFL
- 0.50 TOW
- 3.90 FGL
- 4.85 FGL- 4.85 FGL
- 4.75 FFL
- 4.85 FGL
- 4.85 FGL
- 4.75 FFL
- 4.75 FFL
- 4.75 FFL
- 4.75 FFL
- 4.75 FFL
- 4.60 FGL
- 4.85 FGL
- 1.85 FFL
- 1.70 FFL
- 3.60 FGL
- 5.00 FFL
- 6.05 BOP
- 3.65 TOW
- 3.70 T0W
- 1.65 TOW
- 4.10 FFL
- 4.10 FFL
- 3.35 T0W
- 3.35 T0W
- 3.35 T0W
- 3.35 T0W
- 1.75 T0W
- 1.75 T0W
- 1.75 T0W
- 1.75 T0W
- 2.80 T0W
- 1.75 T0W
- 1.45 T0W
- 1.45 T0W
- 4.30 FFL
- 4.45 FFL
- 4.50 FFL
- 3.65 TOW
- 3.70 TOW
- 4.10 T0W
- 4.55 FFL
- 4.00 TOW
- 4.05 FGL
- 4.00 T0W
- 4.00 T0W
4.30 FFL- 4 30- 4 30 FFL4.30 FFL- 4 300 FFL- 4 304 30 FFL0 FFL4 304 30 FFL0 FFL- 4 300 FFL- 4 300 FFL
FFFLFFLFFLFFFFLF
- 1.75 FFL
00 T0 TOWWT0000000000
OW
OWOWWWOWWWWOWWWWOOOWWWWWWWWW
30 FF33.-1-111-1-1-1-1 FL.303303303330331-11. FL
WWWWOWW
LLFF
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.75 FFL
- 1.30 TOW
+ 0.90 TOW
-1.30 FFL
- 1.30 TOW
- 1.30 TOW
-0.25 TOW
-1.75 FFL
- 1.30 TOW
- 1.30 TOW
-1.30 FFL
+0.90 TOW
-1.30 TOW
-1.75 FFL
-1.30 TOW
-1.30 TOW
-1.30 FFL
-1.30 FFL
-1.45 FFL
-1.45 FFL
- 1.75 FFL
- 1.30 TOW
-1.30 FFL
- 1.30 TOW
- 1.75 FFL
-1.75 FFL
+ 0.90 TOW
- 1.30 TOW
+ 0.90 TOW
+ 0.90 TOW
+ 0.90 TOW
-0.25 TOW
-0.25 TOW
-0.25 TOW
-0.25 TOW
-0.25 TOW
-0.25 TOW
-1.30 FFL
- 1.75 FFL
-1.30 TOW
-1.30 TOW
-1.30 TOW
-1.30 TOW
-1.30 TOW
-1.30 TOW
-1.30 TOW
- 1.75 FFL
-1.30 TOW
-1.30 TOW
- 1.30 TOW
- 1.30 TOW
- 1.30 TOW
-1.30 FFL
- 1.75 FFL
-1.20 FFL
-1.20 FFL
A-Main Building
Checked Coordinated
Designed
Developed
Scale Date
Approved
Drawn
Stage :Block No. :
Project Title :
Client :
NO DATE ENG REVISIONS
drawing no:
Drawing Title :
Project No.
Plot No.:
DU1115
C34
Habtoor Grand Palm Resort
THE PALM JUMEIRAH
DUBAI, U.A.E.
AL HABTOOR GROUP LLC
P .O .Box ,25444Dubai
Block No. :
AUGUST 2007
AS PROPOSED
GROUND FLOOR PLAN
X-GFL-P-A-A-103c
1/300
S . GHALI
Y. SALEM
A
( KEY PLAN )
REVISED AS CLOUDED.MOAa APR.2008
OCT.2008b MKH REVISED AS CLOUDED.
GENERAL REVISION30-APR -2012 Y.Sc
Y. SALEM
1
ELEVATION -1
Scale: 1/300
2
ELEVATION -2
Scale: 1/300
F.F.L.
+0.00 GROUND FLOOR
F.F.L.
+5.50 1ST FLOOR
F.F.L.
+9.00 2ND FLOOR
F.F.L.
+12.50 3RD FLOOR
F.F.L.
+16.00 4TH FLOOR
F.F.L.
+19.50 5TH FLOOR
S.C.L.
+22.94 6TH FLOOR
F.F.L.
-4.50 LOWER GROUND
FLOOR
700344350350350350550450
S.C.L.
+29.94 ROOF OF
ROYAL SUITE
F.L.
+32.94
F.L.
+39.09
300615
F.F.L.
+0.00 GROUND FLOOR
F.F.L.
+5.50 1ST FLOOR
F.F.L.
+9.00 2ND FLOOR
F.F.L.
+12.50 3RD FLOOR
F.F.L.
+16.00 4TH FLOOR
F.F.L.
+19.50 5TH FLOOR
S.C.L.
+22.94 6TH FLOOR
F.F.L.
-4.50 LOWER GROUND
FLOOR
700344350350350350550450
S.C.L.
+29.94 ROOF OF
ROYAL SUITE
F.L.
+32.94
F.L.
+39.09
300615
1
A302
3
A304
2
A303
1
A305
1
A306
A-Main Building
Checked Coordinated
Designed
Developed
Scale Date
Approved
Drawn
Stage :Block No. :
Project Title :
Client :
NO DATE ENG REVISIONS
drawing no:
Drawing Title :
Project No.
Plot No.:
DU1115
C34
Habtoor Grand Palm Resort
THE PALM JUMEIRAH
DUBAI, U.A.E.
AL HABTOOR GROUP LLC
P .O .Box ,25444Dubai
Block No. :
AUGUST 2007
AS PROPOSED
KEY ELEVATIONS 1 & 2
S d l
a APR.2008 MEA ELEVATOR TO HELIPAD ADDED
GENERAL REVISION30-APR -2012 Y.Sb
REVISED AS CLOUDED
Al Ain Mall & Resort, Abu Dhabi, U.A.E Cost is $ 252 Million.
The Project is an extension to the existing Al Ain Shopping Mall.
It consists of
- 3 Basement levels of Car Parking and Hotel Catering Service
Areas,
- 2 levels of Shopping Mall with Retail Outlets
- 5 Upper Floors forming Luxury Hotel with 171 Deluxe Guest
Rooms, 27 Suites, Restaurants, Business Centre, Spa Unit,
Ballroom with VIP Majlis and Health-club among other
facilities.
The Total Built-up area of the Project is 190,000 m2 on a plot area of
approximately 33,800 Sq. m. The project’s concept was inspired by the
UAE’s heritage style and the Construction Cost is $ 252 Million.

More Related Content

Viewers also liked

Vinyle pasted & flex stitched auto branding
Vinyle pasted & flex stitched   auto brandingVinyle pasted & flex stitched   auto branding
Vinyle pasted & flex stitched auto brandingSusheela Singh
 
Programa Profesor Ricardo Fernández Muñoz
Programa Profesor Ricardo Fernández MuñozPrograma Profesor Ricardo Fernández Muñoz
Programa Profesor Ricardo Fernández MuñozYaiza Salvador
 
Career Day - Mobile App Developer
Career Day - Mobile App DeveloperCareer Day - Mobile App Developer
Career Day - Mobile App Developerexhilent
 
Pop-Up Coastal Protection
Pop-Up Coastal ProtectionPop-Up Coastal Protection
Pop-Up Coastal ProtectionTonyCassidy
 
Dnevnik najava za otvoranje
Dnevnik najava za otvoranjeDnevnik najava za otvoranje
Dnevnik najava za otvoranjeAnita Gaj
 

Viewers also liked (8)

Historias infantis
Historias infantisHistorias infantis
Historias infantis
 
Amy Carothers Reel
Amy Carothers ReelAmy Carothers Reel
Amy Carothers Reel
 
Vinyle pasted & flex stitched auto branding
Vinyle pasted & flex stitched   auto brandingVinyle pasted & flex stitched   auto branding
Vinyle pasted & flex stitched auto branding
 
Ple
PlePle
Ple
 
Programa Profesor Ricardo Fernández Muñoz
Programa Profesor Ricardo Fernández MuñozPrograma Profesor Ricardo Fernández Muñoz
Programa Profesor Ricardo Fernández Muñoz
 
Career Day - Mobile App Developer
Career Day - Mobile App DeveloperCareer Day - Mobile App Developer
Career Day - Mobile App Developer
 
Pop-Up Coastal Protection
Pop-Up Coastal ProtectionPop-Up Coastal Protection
Pop-Up Coastal Protection
 
Dnevnik najava za otvoranje
Dnevnik najava za otvoranjeDnevnik najava za otvoranje
Dnevnik najava za otvoranje
 

Similar to Hiba Faour Portfolio-Architectural Designer

PLF-1408-AT-SD-CO-218 - REV 00
PLF-1408-AT-SD-CO-218 - REV 00PLF-1408-AT-SD-CO-218 - REV 00
PLF-1408-AT-SD-CO-218 - REV 00Mansoor Sakharkar
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00Mansoor Sakharkar
 
Artcool mirror su_chassis service manual
Artcool mirror su_chassis service manualArtcool mirror su_chassis service manual
Artcool mirror su_chassis service manualSharifah Hilma
 
ASV Posi-Track RC-85 Track Loader Master Parts Catalogue Manual.pdf
ASV Posi-Track RC-85 Track Loader Master Parts Catalogue Manual.pdfASV Posi-Track RC-85 Track Loader Master Parts Catalogue Manual.pdf
ASV Posi-Track RC-85 Track Loader Master Parts Catalogue Manual.pdfjdkskmmdmd
 
LeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPicLeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPicIstvan Fekete
 
Airtech busch-parts
Airtech busch-partsAirtech busch-parts
Airtech busch-partslizetrincon
 
Cost & man solutions chapter 3 2008
Cost & man solutions chapter 3 2008Cost & man solutions chapter 3 2008
Cost & man solutions chapter 3 2008Kwanda Matiwane
 
2004 polaris 800 pro xr snowmobile service repair manual
2004 polaris 800 pro xr snowmobile service repair manual2004 polaris 800 pro xr snowmobile service repair manual
2004 polaris 800 pro xr snowmobile service repair manualfjjfyjsekdmme
 
2004 polaris 800 pro x snowmobile service repair manual
2004 polaris 800 pro x snowmobile service repair manual2004 polaris 800 pro x snowmobile service repair manual
2004 polaris 800 pro x snowmobile service repair manualfjskemdzaqmme
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examplesLoren Davis
 
Ball Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM GroupBall Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM Groupwomgroup
 
Merkel u ring-ni-300
Merkel u ring-ni-300Merkel u ring-ni-300
Merkel u ring-ni-300walleseals
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfyfpu61312194
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfzhuang25260
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfyanquehuai41
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfxbpq83721377
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfjinglanjiu6027
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdftongjiaan88
 

Similar to Hiba Faour Portfolio-Architectural Designer (20)

Portfolio 2016
Portfolio 2016Portfolio 2016
Portfolio 2016
 
PLF-1408-AT-SD-CO-218 - REV 00
PLF-1408-AT-SD-CO-218 - REV 00PLF-1408-AT-SD-CO-218 - REV 00
PLF-1408-AT-SD-CO-218 - REV 00
 
PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00PLF-1408-AT-SD-CO-213 - REV 00
PLF-1408-AT-SD-CO-213 - REV 00
 
Artcool mirror su_chassis service manual
Artcool mirror su_chassis service manualArtcool mirror su_chassis service manual
Artcool mirror su_chassis service manual
 
ASV Posi-Track RC-85 Track Loader Master Parts Catalogue Manual.pdf
ASV Posi-Track RC-85 Track Loader Master Parts Catalogue Manual.pdfASV Posi-Track RC-85 Track Loader Master Parts Catalogue Manual.pdf
ASV Posi-Track RC-85 Track Loader Master Parts Catalogue Manual.pdf
 
LeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPicLeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPic
 
Airtech busch-parts
Airtech busch-partsAirtech busch-parts
Airtech busch-parts
 
Cost & man solutions chapter 3 2008
Cost & man solutions chapter 3 2008Cost & man solutions chapter 3 2008
Cost & man solutions chapter 3 2008
 
2004 polaris 800 pro xr snowmobile service repair manual
2004 polaris 800 pro xr snowmobile service repair manual2004 polaris 800 pro xr snowmobile service repair manual
2004 polaris 800 pro xr snowmobile service repair manual
 
2004 polaris 800 pro x snowmobile service repair manual
2004 polaris 800 pro x snowmobile service repair manual2004 polaris 800 pro x snowmobile service repair manual
2004 polaris 800 pro x snowmobile service repair manual
 
LDavis_work_examples
LDavis_work_examplesLDavis_work_examples
LDavis_work_examples
 
Ball Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM GroupBall Valves, Ball Valves Manufacturers USA - WOM Group
Ball Valves, Ball Valves Manufacturers USA - WOM Group
 
Vibration acceptance limit for fan compressor blower shop test & selecting pr...
Vibration acceptance limit for fan compressor blower shop test & selecting pr...Vibration acceptance limit for fan compressor blower shop test & selecting pr...
Vibration acceptance limit for fan compressor blower shop test & selecting pr...
 
Merkel u ring-ni-300
Merkel u ring-ni-300Merkel u ring-ni-300
Merkel u ring-ni-300
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
 
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdfASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
ASV Posi-Track SR 80 Track Loader Parts Catalogue Manual.pdf
 

Hiba Faour Portfolio-Architectural Designer

  • 2.
  • 3. FDSH OW ER ER-EAST RESIDENTIAL AD1217 ABU DHABI, U.A.E. Bloom Emirates Properties A0 ABU DHABI MARINA BLOOM DEVELOPMENT Abu Dhabi Marina N WR ER SA HT E ER- A100 FIRST FLOOR KEY PLAN
  • 4. FD SHOWER ER-EAST RESIDENTIAL AD1217 ABU DHABI, U.A.E. Bloom Emirates Properties A0 ABU DHABI MARINA BLOOM DEVELOPMENT Abu Dhabi Marina N WR ER SA HT E ER- A102 FIRST FLOORS PLANS PART-5 (DIM & NOT.)
  • 5. ER-EAST RESIDENTIAL AD1217 ABU DHABI, U.A.E. Bloom Emirates Properties A0 ABU DHABI MARINA BLOOM DEVELOPMENT Abu Dhabi Marina N WR ER SA HT E ER- A151 TYPICAL FLOORS UNITS 2 REFLECTED CEILING PLAN
  • 6. ER-EAST RESIDENTIAL AD1217 ABU DHABI, U.A.E. Bloom Emirates Properties A0 ABU DHABI MARINA BLOOM DEVELOPMENT Abu Dhabi Marina N WR ER SA HT E ER- A175 1:50 TYPICAL FLOORS UNITS 1 TILING LAYOUT
  • 7. BANQUET HALL ER-EAST RESIDENTIAL AD1217 ABU DHABI, U.A.E. Bloom Emirates Properties A0 ABU DHABI MARINA BLOOM DEVELOPMENT Abu Dhabi Marina N WR ER SA HT E ER- A200 ELEVATIONS- 1
  • 8. ER-EAST RESIDENTIAL AD1217 ABU DHABI, U.A.E. Bloom Emirates Properties A0 ABU DHABI MARINA BLOOM DEVELOPMENT Abu Dhabi Marina WR ER SA HT E ER- A350 WALL SECTION - 1 & 2
  • 9. OPERATOR REVISIONNo. APP'D DATE PLOT NO.LOCATION DRAWING TITLE CONSULTANT CLIENT BUSINESS BAY BB.B01.001/BLOCK F:BB05 KEY PLAN PROJECT TITLE DRAWING No. PROJECT No. SCALE NAME COORDINATED BY APPROVED BY DATE STAGE AUGUST 2015 CHECKED BY DU1433 DESIGNED BY CONCEPT DESIGN BY VERIFIED BY DRAWN BY DD 00 1 2 3 4 5 6 7 8 PROJECT FRONT SHEET DRAWING X-COV-G-A-000 1:100@B1+ - - WS WS / HF RA / LB - DUBAI PROPERTIES PROJECT TITLE : DOUBLETREE BY HILTON HOTEL AT BAY SQUARE DUBAI-U.A.E. DOUBLETREE BY HILTON HOTEL AT BAY SQUARE PARKING REQUIREMENTS:
  • 10. RECEPTION F.F.L. ±0.00 F.F.L. ±0.00 S.C.L. +0.45 S.C.L. +0.15 S.W.L. -0.02 F.L. -0.15 S.C.L. -0.35 S.W.L. -0.02 F.L. -0.15 S.C.L. -0.35 S.W.L. -0.02 F.L. -0.15 S.C.L. -0.35 F.F.L. ±0.00 OPERATOR REVISIONNo. APP'D DATE PLOT NO.LOCATION DRAWING TITLE CONSULTANT CLIENT BUSINESS BAY BB.B01.001/BLOCK F:BB05 KEY PLAN PROJECT TITLE PROJECT NORTH TRUE NORTH DRAWING No. PROJECT No. SCALE NAME COORDINATED BY APPROVED BY DATE STAGE AUGUST 2015 CHECKED BY DU1433 DESIGNED BY CONCEPT DESIGN BY VERIFIED BY DRAWN BY DD 00 1 2 3 4 5 6 7 8 GROUND FLOOR PLAN ( KEY PLAN) Setting Out plan X-GFL-P-A-105 - - - - 1:400@B1+ - - WS WS / HF RA / LB - BB-01 BB-02 BB-03 BB-04 BB-05 BB-07BB-08 BB-06 BB-09 BB-13 BB-10 BB-12 BB-11
  • 11. OPERATOR REVISIONNo. APP'D DATE PLOT NO.LOCATION DRAWING TITLE CONSULTANT CLIENT BUSINESS BAY BB.B01.001/BLOCK F:BB05 KEY PLAN PROJECT TITLE PROJECT NORTH TRUE NORTH DRAWING No. PROJECT No. SCALE NAME COORDINATED BY APPROVED BY DATE STAGE AUGUST 2015 CHECKED BY DU1433 DESIGNED BY CONCEPT DESIGN BY VERIFIED BY DRAWN BY DD 00 1 2 3 4 5 6 7 8 X-TP2-P-A-F-115 1:100@B1+ - - WS WS / HF RA / LB - TYPICAL-2 FLOOR PLAN 9th to 11th floors (DIM. & NOT )
  • 12. OPERATOR REVISIONNo. APP'D DATE PLOT NO.LOCATION DRAWING TITLE CONSULTANT CLIENT BUSINESS BAY BB.B01.001/BLOCK F:BB05 KEY PLAN PROJECT TITLE DRAWING No. PROJECT No. SCALE NAME COORDINATED BY APPROVED BY DATE STAGE AUGUST 2015 CHECKED BY DU1433 DESIGNED BY CONCEPT DESIGN BY VERIFIED BY DRAWN BY DD 00 1 2 3 4 5 6 7 8 ELEVATION - 1 X-EL1-X-A-F-300 - - - - 1:100@B1+ - - WS WS / HF RA / LB -
  • 13. OPERATOR REVISIONNo. APP'D DATE PLOT NO.LOCATION DRAWING TITLE CONSULTANT CLIENT BUSINESS BAY BB.B01.001/BLOCK F:BB05 KEY PLAN PROJECT TITLE PROJECT NORTH TRUE NORTH DRAWING No. PROJECT No. SCALE NAME COORDINATED BY APPROVED BY DATE STAGE AUGUST 2015 CHECKED BY DU1433 DESIGNED BY CONCEPT DESIGN BY VERIFIED BY DRAWN BY DD 00 1 2 3 4 5 6 7 8 SECTION - 2 X-SC2-X-A-F-401 1:100@B1+ - - WS WS / HF RA / LB - 1 SECTION-2 Scale: 1/200
  • 14. ≥ ≥ ≥ DRY WALL PARTITION TYPE-4DRY WALL PARTITION TYPE-3 OPERATOR REVISIONNo. APP'D DATE PLOT NO.LOCATION DRAWING TITLE CONSULTANT CLIENT BUSINESS BAY BB.B01.001/BLOCK F:BB05 KEY PLAN PROJECT TITLE PROJECT NORTH TRUE NORTH DRAWING No. PROJECT No. SCALE NAME COORDINATED BY APPROVED BY DATE STAGE AUGUST 2015 CHECKED BY DU1433 DESIGNED BY CONCEPT DESIGN BY VERIFIED BY DRAWN BY DD 00 1 2 3 4 5 6 7 8 PARTITION TYPES DETAILS - 2 X-D17-D-A-F-621 - - WS WS / HF RA / LB - AS SHOWN a NOTE ADDED HF AUG. 2015
  • 15.
  • 16. BT-G-013 B BA SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS Utility Plot SS 54321 6 7 8 9 123456789 4 3 2 1 8 7 6 5 11 10 9 4 3 2 1 8 7 6 5 11 10 9 1 2 3 4 5 6 7 Block S LEGEND: Detached Villas Semi attached Villas Others Open Space BLOCK P (COMMUNITY FACILITY CENTER) BLOCK S (FACILITY & SERVICE BLOCK) Ea Eb Fa Ka Villa Type TYPE A TYPE B TYPE C TYPE D TYPE E TYPE Ea TYPE Eb TYPE F TYPE Fa TYPE K TYPE Ka TYPE H TYPE J A B C D E F K H J TYPE L TYPE La TYPE M TYPE Ma L La M Ma Villa Type BLOCK R (Retail Block) BLOCK T (GUARD HOUSE) DU1314 DUBAI, U.A.E. A1 DBT ONE RESIDENTIAL PROJECTS L.L.C. A000 ZONE A COVER SHEET CONSULTANT: DUBAI, U.A.E. VILLA DEVELOPMENT FOR TECOM INVESTMENTS PROJECT TITLE: PLOT DETAILS: (REFER TO AFFECTION PLAN) PLOT NO ...................................... : BT-D-022 LOCATION / BLOCK NO............... : AL BARSHA SOUTH - SECOND AREA OF PLOT............................ : 2,034,249 SQ.FT. MAX. PLOT COVERAGE.............. : N/A LAND USE ALLOWED.................. :RESIDENTIAL HEIGHT ALLOWED ..................... : GROUND + 1 FLOOR PROJECT DETAILS: (REFER TO PROJECT DETAIL SHEET) LAND USE PROPOSED .............. : RESIDENTIAL HEIGHT PROPOSED .................. : GROUND + 1 FLOOR TOTAL BUILT UP AREA............... : 946,045 SQ.FT. MAX. GFA AREA ALLOWED....... : 763,004 SQ.FT. (FAR=0.380) GFA AREA PROPOSED.............. : 762,777 SQ.FT. (FAR=0.375) PARKING REQUIRED................... : 552 CARS (2 CARS / VILLA) PARKING PROVIDED................... : 558 CARS PROECT DESCRIPTION: (REFER TO ARCHITECTURAL DRAWINGS) OWNERS NAME / SIGNATURE : CONSULTANT NAME / SIGNATURE : (DBT ONE RESIDENTIAL PROJECTS L.L.C) (KHATIB & ALAMI C.E.C) FOR TECOM USE ONLY: THE PROJECT CONSISTS OF: 1. 276 VILLAS AS FOLLOWS: TYPE A: 16 UNITS TYPE B: 25 UNITS TYPE C: 36 UNITS TYPE D: 39 UNITS TYPE E: 19 UNITS TYPE Ea: 13 UNITS TYPE Eb: 10 UNITS TYPE H: 20 UNITS TYPE J: 22 UNITS TYPE K: 34 UNITS TYPE Ka: 36 UNITS TYPE M: 3 UNITS TYPE Ma: 3 UNITS 2. BLOCK P : COMMUNITY FACILITY CENTER 3. BLOCK T : GAURD HOUSE 2 UNITS ZONEAZONEB ZONE C
  • 17.
  • 18.
  • 19.
  • 20. DETACHED VILLA TYPE-A A- DU1314 DUBAI, U.A.E. A1 DBT ONE RESIDENTIAL PROJECTS L.L.C. A350A350 WALL SECTION 1,2,3,4,5 ³
  • 21. DU1211 AL HABTOOR GROUP LLC A0 P. O. Box 25444 Dubai A0000 COVER SHEET
  • 22. 2425262728293031323334353637383940414243444546474849 COOK HALL DU1211 AL HABTOOR GROUP LLC A0 P. O. Box 25444 Dubai ELEVATION - 2 A2001
  • 23. DU1211 AL HABTOOR GROUP LLC A0 P. O. Box 25444 Dubai GENERAL SECTION - 2 A3001
  • 24.
  • 25.
  • 26. - 4.70 FGL - 4.10 FFL - 4.85 FGL - 4.80 FFL - 4.15 FFL - 4.60 FFL - 4.30 FFL - 4.25 FFL - 4.25 FFL - 4.55FFL - 2.80 FFL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.50 FFL - 4.50 FFL - 4.75 FFL - 4.75 FFL - 4.75 FFL - 4.60 FGL - 4.55 FFL - 4.65 FFL - 4.35 FFL - 4.60 FGL - 4.55 FFL - 4.30 FFL - 4.00 FFL - 4.55 FFL - 4.55 FFL - 4.40 FFL - 3.65 FFL - 1.75 FFL - 3.60 FGL - 4.00 FFL - 4.55FFL - 4.55FFL - 4.55FFL - 4.65 FGL - 4.60 FFL - 4.70 FGL - 4.65 FGL - 4.70 FGL - 4.55 FFL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.60 FGL - 4.50 FFL - 4.55 FFL - 4.60 FGL - 4.60 FGL - 4.00 TOW - 4.50 RFL - 4.55FFL - 3.82 RFL - 3.80 RFL - 3.65 RFL - 3.75 RFL - 3.45 RFL - 3.60 RFL - 3.46 RFL - 3.75 RFL - 3.44 RFL - 3.60 FGL -1.75 FGL - 3.72 FFL - 3.57 FFL - 3.39 FFL - 3.65 FFL - 1.75FGL - 3.65 FFL - 3.70 FGL - 3.45 FGL - 3.65 FFL - 3.70 FGL - 3.45 FFL - 3.65 FGL - 4.50 RFL - 4.35 FFL - 3.39 FFL - 3.54 FFL - 3.39 FFL - 3.40 TOW - 3.45 FFL - 4.00 FFL - 3.85 FFL - 3.85FFL - 2.50 FFL - 3.0 FFL - 3.4 FFL - 2.15 FFL - 3.90 FFL - 4.55FFL - 4.20 FFL - 4.25 FFL - 4.20 FFL - 3.60 FGL - 3.60 FGL - 3.60 FGL - 4.45 FGL - 4.40 FFL - 4.20 FFL - 4.20 FFL - 4.00 FFL - 3.80 FFL - 4.50 FFL - 4.65 FFL - 0.50 TOW - 3.90 FGL - 4.85 FGL- 4.85 FGL - 4.75 FFL - 4.85 FGL - 4.85 FGL - 4.75 FFL - 4.75 FFL - 4.75 FFL - 4.75 FFL - 4.75 FFL - 4.60 FGL - 4.85 FGL - 1.85 FFL - 1.70 FFL - 3.60 FGL - 5.00 FFL - 6.05 BOP - 3.65 TOW - 3.70 T0W - 1.65 TOW - 4.10 FFL - 4.10 FFL - 3.35 T0W - 3.35 T0W - 3.35 T0W - 3.35 T0W - 1.75 T0W - 1.75 T0W - 1.75 T0W - 1.75 T0W - 2.80 T0W - 1.75 T0W - 1.45 T0W - 1.45 T0W - 4.30 FFL - 4.45 FFL - 4.50 FFL - 3.65 TOW - 3.70 TOW - 4.10 T0W - 4.55 FFL - 4.00 TOW - 4.05 FGL - 4.00 T0W - 4.00 T0W - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.30 TOW + 0.90 TOW -1.30 FFL - 1.30 TOW - 1.30 TOW -0.25 TOW -1.75 FFL - 1.30 TOW - 1.30 TOW -1.30 FFL +0.90 TOW -1.30 TOW -1.75 FFL -1.30 TOW -1.30 TOW -1.30 FFL -1.30 FFL -1.45 FFL -1.45 FFL - 1.75 FFL - 1.30 TOW -1.30 FFL - 1.30 TOW - 1.75 FFL -1.75 FFL + 0.90 TOW - 1.30 TOW + 0.90 TOW + 0.90 TOW + 0.90 TOW -0.25 TOW -0.25 TOW -0.25 TOW -0.25 TOW -0.25 TOW -0.25 TOW -1.30 FFL - 1.75 FFL -1.30 TOW -1.30 TOW -1.30 TOW -1.30 TOW -1.30 TOW -1.30 TOW -1.30 TOW - 1.75 FFL -1.30 TOW -1.30 TOW - 1.30 TOW - 1.30 TOW - 1.30 TOW -1.30 FFL - 1.75 FFL -1.20 FFL -1.20 FFL  116.210 L=116.289 R931.26 116.146 L=116.179 186.764 195.097 R1421.68 L=270.745 270.464 E=481408.824 N=2780994.699 E=481540.740 N=2780803.820 E=481479.85 N=2780902.801 E=481539.347 N=2781128.282 E=481702.644 N=2780912.678 LIMIT OF PLOT LIMIT OF PLOT                                                        E=481696.851 N=2780911.866 E=481695.070 N=2780908.397 E=481693.381 N=2780913.647 ROOF E=481532.211 N=2781120.463 E=481531.291 N=2781115.650 E=481539.872 N=2781118.999 E=481412.277 N=2780996.000 E=481414.682 N=2780999.070 E=481415.346 N=2780993.594 - 3.35 T- 5 T0WTTTT - 4.70 FGL - 4.10 FFL - 4.85 FGL - 4.80 FFL - 4.15 FFL - 4.60 FFL - 4.30 FFL - 4.25 FFL - 4.25 FFL - 4.55FFL - 2.80 FFL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.50 FFL - 4.50 FFL - 4.75 FFL - 4.75 FFL - 4.75 FFL - 4.60 FGL - 4.55 FFL - 4.50 FFL - 4.65 FFL - 4.35 FFL - 4.60 FGL - 4.55 FFL - 4.30 FFL - 4.00 FFL - 4.55 FFL - 4.55 FFL - 4.40 FFL - 3.65 FFL - 1.75 FFL - 3.60 FGL - 4.00 FFL - 4.55FFL - 4.55FFL - 4.55FFL - 4.65 FGL - 4.60 FFL - 4.70 FGL - 4.65 FGL - 4.70 FGL - 4.55 FFL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.55 FFL - 4.60 FGL - 4.55 FFL - 4.60 FGL - 4.50 FFL - 4.55 FFL - 4.60 FGL - 4.60 FGL - 4.00 TOW - 4.50 RFL - 4.55FFL - 4.55FFL - 3.82 RFL - 3.80 RFL - 3.65 RFL - 3.75 RFL - 3.45 RFL - 3.60 RFL - 3.46 RFL - 3.75 RFL - 3.44 RFL - 3.60 FGL -1.75 FGL - 3.72 FFL - 3.57 FFL - 3.39 FFL - 3.65 FFL - 1.75FGL - 3.65 FFL - 3.70 FGL - 3.45 FGL - 3.65 FFL - 3.70 FGL - 3.45 FFL - 3.65 FGL - 4.50 RFL - 4.35 FFL - 3.39 FFL - 3.54 FFL - 3.39 FFL - 3.40 TOW - 3.45 FFL - 4.00 FFL - 3.85 FFL - 3.85FFL - 2.50 FFL - 3.0 FFL - 3.4 FFL - 2.15 FFL - 3.90 FFL - 4.55FFL - 4.20 FFL - 4.25 FFL - 4.20 FFL - 3.60 FGL - 3.60 FGL - 3.60 FGL - 4.45 FGL - 4.40 FFL - 4.20 FFL - 4.20 FFL - 4.00 FFL - 3.80 FFL - 4.50 FFL - 4.65 FFL - 0.50 TOW - 3.90 FGL - 4.85 FGL- 4.85 FGL - 4.75 FFL - 4.85 FGL - 4.85 FGL - 4.75 FFL - 4.75 FFL - 4.75 FFL - 4.75 FFL - 4.75 FFL - 4.60 FGL - 4.85 FGL - 1.85 FFL - 1.70 FFL - 3.60 FGL - 5.00 FFL - 6.05 BOP - 3.65 TOW - 3.70 T0W - 1.65 TOW - 4.10 FFL - 4.10 FFL - 3.35 T0W - 3.35 T0W - 3.35 T0W - 3.35 T0W - 1.75 T0W - 1.75 T0W - 1.75 T0W - 1.75 T0W - 2.80 T0W - 1.75 T0W - 1.45 T0W - 1.45 T0W - 4.30 FFL - 4.45 FFL - 4.50 FFL - 3.65 TOW - 3.70 TOW - 4.10 T0W - 4.55 FFL - 4.00 TOW - 4.05 FGL - 4.00 T0W - 4.00 T0W 4.30 FFL- 4 30- 4 30 FFL4.30 FFL- 4 300 FFL- 4 304 30 FFL0 FFL4 304 30 FFL0 FFL- 4 300 FFL- 4 300 FFL FFFLFFLFFLFFFFLF - 1.75 FFL 00 T0 TOWWT0000000000 OW OWOWWWOWWWWOWWWWOOOWWWWWWWWW 30 FF33.-1-111-1-1-1-1 FL.303303303330331-11. FL WWWWOWW LLFF - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.75 FFL - 1.30 TOW + 0.90 TOW -1.30 FFL - 1.30 TOW - 1.30 TOW -0.25 TOW -1.75 FFL - 1.30 TOW - 1.30 TOW -1.30 FFL +0.90 TOW -1.30 TOW -1.75 FFL -1.30 TOW -1.30 TOW -1.30 FFL -1.30 FFL -1.45 FFL -1.45 FFL - 1.75 FFL - 1.30 TOW -1.30 FFL - 1.30 TOW - 1.75 FFL -1.75 FFL + 0.90 TOW - 1.30 TOW + 0.90 TOW + 0.90 TOW + 0.90 TOW -0.25 TOW -0.25 TOW -0.25 TOW -0.25 TOW -0.25 TOW -0.25 TOW -1.30 FFL - 1.75 FFL -1.30 TOW -1.30 TOW -1.30 TOW -1.30 TOW -1.30 TOW -1.30 TOW -1.30 TOW - 1.75 FFL -1.30 TOW -1.30 TOW - 1.30 TOW - 1.30 TOW - 1.30 TOW -1.30 FFL - 1.75 FFL -1.20 FFL -1.20 FFL A-Main Building Checked Coordinated Designed Developed Scale Date Approved Drawn Stage :Block No. : Project Title : Client : NO DATE ENG REVISIONS drawing no: Drawing Title : Project No. Plot No.: DU1115 C34 Habtoor Grand Palm Resort THE PALM JUMEIRAH DUBAI, U.A.E. AL HABTOOR GROUP LLC P .O .Box ,25444Dubai Block No. : AUGUST 2007 AS PROPOSED GROUND FLOOR PLAN X-GFL-P-A-A-103c 1/300 S . GHALI Y. SALEM A ( KEY PLAN ) REVISED AS CLOUDED.MOAa APR.2008 OCT.2008b MKH REVISED AS CLOUDED. GENERAL REVISION30-APR -2012 Y.Sc Y. SALEM
  • 27. 1 ELEVATION -1 Scale: 1/300 2 ELEVATION -2 Scale: 1/300 F.F.L. +0.00 GROUND FLOOR F.F.L. +5.50 1ST FLOOR F.F.L. +9.00 2ND FLOOR F.F.L. +12.50 3RD FLOOR F.F.L. +16.00 4TH FLOOR F.F.L. +19.50 5TH FLOOR S.C.L. +22.94 6TH FLOOR F.F.L. -4.50 LOWER GROUND FLOOR 700344350350350350550450 S.C.L. +29.94 ROOF OF ROYAL SUITE F.L. +32.94 F.L. +39.09 300615 F.F.L. +0.00 GROUND FLOOR F.F.L. +5.50 1ST FLOOR F.F.L. +9.00 2ND FLOOR F.F.L. +12.50 3RD FLOOR F.F.L. +16.00 4TH FLOOR F.F.L. +19.50 5TH FLOOR S.C.L. +22.94 6TH FLOOR F.F.L. -4.50 LOWER GROUND FLOOR 700344350350350350550450 S.C.L. +29.94 ROOF OF ROYAL SUITE F.L. +32.94 F.L. +39.09 300615 1 A302 3 A304 2 A303 1 A305 1 A306 A-Main Building Checked Coordinated Designed Developed Scale Date Approved Drawn Stage :Block No. : Project Title : Client : NO DATE ENG REVISIONS drawing no: Drawing Title : Project No. Plot No.: DU1115 C34 Habtoor Grand Palm Resort THE PALM JUMEIRAH DUBAI, U.A.E. AL HABTOOR GROUP LLC P .O .Box ,25444Dubai Block No. : AUGUST 2007 AS PROPOSED KEY ELEVATIONS 1 & 2 S d l a APR.2008 MEA ELEVATOR TO HELIPAD ADDED GENERAL REVISION30-APR -2012 Y.Sb REVISED AS CLOUDED
  • 28.
  • 29.
  • 30.
  • 31. Al Ain Mall & Resort, Abu Dhabi, U.A.E Cost is $ 252 Million. The Project is an extension to the existing Al Ain Shopping Mall. It consists of - 3 Basement levels of Car Parking and Hotel Catering Service Areas, - 2 levels of Shopping Mall with Retail Outlets - 5 Upper Floors forming Luxury Hotel with 171 Deluxe Guest Rooms, 27 Suites, Restaurants, Business Centre, Spa Unit, Ballroom with VIP Majlis and Health-club among other facilities. The Total Built-up area of the Project is 190,000 m2 on a plot area of approximately 33,800 Sq. m. The project’s concept was inspired by the UAE’s heritage style and the Construction Cost is $ 252 Million.