This document provides instructions for building brickwork to close an opening at a door. It instructs to be sure to form a closing brick at the door opening to take the damp proof course. It labels this as stage 5 of the project and provides a scale drawing showing the closing brickwork at the opening.
Structural works for the residential sector - Great Peter, Knight HarwoodDeconstruct UK
Deconstruct were contracted to demolish a former stair core within this four story building and constructed a new reinforced concrete core from the basement to a new 5th floor level.
Structural works for the residential sector - Great Peter, Knight HarwoodDeconstruct UK
Deconstruct were contracted to demolish a former stair core within this four story building and constructed a new reinforced concrete core from the basement to a new 5th floor level.
couldnt upload all in once so ive decided to upload one by one, not my best work, had to do it this morning before i got to work, anyways just wanted to meet the dead line, please do give your feed back asap sop that i can take more time on preparing a proper
couldnt upload all in once so ive decided to upload one by one, not my best work, had to do it this morning before i got to work, anyways just wanted to meet the dead line, please do give your feed back asap sop that i can take more time on preparing a proper
1. Brickwork closing cavity to
opening
Build brickwork being sure to
form closing brick at door
opening to take DPC
STAGE 5 Step in concrete
scale 1 : 5
A
ArchiCAD STANDARDS ERF XXX - 57 Buitenkant Street, Cape Town
4th FLOOR TEMPLE HOUSE . 57 BUITENKANT STREET . CAPE TOWN DWG. SCALE REV.
PO BOX 50024 . V&A WATERFRONT . CAPE TOWN 8002 . SOUTH AFRICA 400.3 1:5 A
T (021) 465 9775 F (021) 465 9778 @ studio@gwarchitects.co.za GWA|400.3 DRAWN: CHECKED DATE
PROJECT STATUS : FOR CONSTRUCTION GWA GWA 2011/04/05