THE EXECUTIVE SUMMARY
Not everyone has the time for a lengthy salon experience but that doesn’t mean their hair should suffer. Tonacity
brings the high quality, salon hair colouring experience to your home!
Kleur’s marketing strategy needs revamping. The key underlining principle for our creative campaign is a shift in media
budgets to 60% Online : 40% Offline.
Our objectives:
• Awareness
• Sales
• Loyalty & Advocacy
• Evaluation
Through our proposed campaign Tonacity can increase
their brand awareness and create a unified
multiplatform campaign that engages, drives sales,
creates an active online community and importantly
encourages sharing, recommendation and repurchase.
We have also proposed a series of metrics.
WHO IS THE CUSTOMER?SALLY,38HANNAH,21
WANTS
FEARS INFLUENCERS #Friends #Family #Experts #MagazinesArticles #Salon&BeautyProfesionals
A quality colouring product to cover grey hair and to also allow her to change her style if she
wants; a product she could use whenever she has some spare time; easy to buy and easy to use;
she doesn’t need a quick fix, she needs a long term solution, a product that if it works she will use
for the rest of her life.
She wants to feel younger and on trend; wants
her hair to look good and natural without the
need to spend hours in a salon; a product that
will not damage her hair and will keep it healthy
She won’t get the results she is expecting
and that the colour will look dull and
unnatural; she is also concerned about
the health of her hair.
NEEDS
WANTS
FEARS
INFLUENCERS #Friends #SocialMedia #Blogs #Reviews #Celebrities
A quality colouring product to change her style often; a product you can buy online with quick
delivery times and a ‘how to’ information accessible at any time; tips and examples on different
styles you can archive with the product application.
She wants to look good and have a relevant style
like the people she follows on social Media;
Change her colour and style when ever she
wants without needing to pay a salon price.
She won’t get the results she is looking
for; it will be too difficult to apply; it will
damage her hair if she uses it too often
and will cost her more in the long term
NEEDS
STIMULUS: Building Awareness of the Brand
ONLINE OFFLINE CELEBRITY
ENDORSEMENT
Influencer: high profile
model/presenter,
strong fan base, active
on social media, target
segments
admire/aspire to be
and believe would use
the product
themselves at home,
TV friendly. Similar age
to key target segments
TV ADVERTISING
Hero content (TV and on owned
channels). Sky Adsmart to buy
space based on segment
preferences. Second screen
opportunities. Analytics key at the
early stage
PR (REVIEWS, MEDIA LAUNCH, FEATURES)
Press launch with Tonacity celeb ambassador. Offline (Vogue,
Hello etc and online media, bloggers. Sentiment analysis
important.
DIRECT & REFERRAL WITH STORE
PARTNERS
Direct marketing to store accountholders,
page takeovers on store websites and
referral sites i.e. Net-a-Porter.
SEO, CONTEXTUAL &
PROGRAMMATIC
DISPLAY
Hero content, rich content
to enhance owned digital
channels. For digital ads
Use DoubleClick, You Tube
Pre-rolls
ZMOT: Explaining the Value Proposition
SOCIAL MEDIA
Product review from
‘Fleur de Force’ who is a
well followed hair &
beauty Vlogger
Twitter: 276k
Facebook: 119k
Instagram: 605k
YouTube: 1.3m
ONLINE OFFLINE PRINT DISPLAY
ADVERT A full page
magazine advert using
celebrity endorsement.
Vogue has an average
reader circulation of
1.25m (Source:
http://www.condenast.
com/brands/vogue/me
dia-kit/print)
IN STORE DEMO
Users who have
visited the website
and are within a 30
mile radius of a
Tonacity retailer are
invited to an in store
demonstration of the
product. To further
entice them to
attend a unique
voucher code is also
sent to them which
entities them to a
20% discount.
iBEACON RETARGETING
A real time push
notification containing a
unique 20% discount code
as well as a link to a video
which interviews advocates
of the Tonacity brand will
be sent to customers who
interact with the product in
store. This will be enabled
via the use of iBeacon
stickers.
FMOT: Driving Brand Preference & Conversion
ONLINE OFFLINE
SMOT: The Product Experience
ONLINE OFFLINE
RE-TARGETING via
display or sponsored social
posts showing them
before/after results with
Kleur Tonacity &
encouraging use of the
#MyTime #MyColour
hashtag.
THE ‘UNBOXING’
EXPERIENCE
#MyTime salon at home
experience. Limited time offer.
Order your salon at home
experience pack. Everything
you need to recreate the salon
experience at home. A limited
time offer, this pack will
include everything you would
get if you were to visit a salon
to have your hair done. A
glossy mag (provided by a key
media partner thus
simultaneously assisting the
PR effort) a scented tea light
or pulse point oil so you can
relax, a sachet of expensive
coffee to enjoy while you put
your feet up and wait for the
colour to work.
CUSTOMER SERVICE Online
customer hub including 24hr live
chat online, how to videos,
reviews section.
DISCOUNT Use of the
#MyTime #MyColour user
generated content results
in a discount voucher off
your next Tonacity colour.
Store account holders also
get exclusive Tonacity
discounts via email.
UMOT: Journey towards Brand Loyalty & Advocacy
ONLINE OFFLINE
tonacity.com
BRAND ADVOCACY
At every customer touch
point, the customer will
be encouraged to get
added to the “tonacious”
database of past
customers via email,
twitter, instagram,
facebook and youtube.
The tonacity App will
also be available and
promoted on Android
and Apple. Content
marketing will be driven
through Tonacity.com
which will serve as a
central hub for all social
channels.
BRAND ADVOCACY
In the post purchase
phase, the customer will
be encouraged to share
their experience with
@tonacity or #myHair
#myColour #myTime. For
customers who are not
inclined to share online,
we will try to encourage
sharing their experience
on a one on one basis via
messaging services aka “
Tell your best friend
about your new look!”.
This will help us build
offline advocacy for the
brand.
SALLY’S JOURNEY
ZMOT
Sally is browsing her favourite Mommy bloggers website and
notices a post about #MyTime with Tonacity. She googles it
and notice and ad for tonacity on top of her search, she clicks
on it and and browses the site but gets distrated and close
down. Later on when browsing facebook she sees a Tonacity
sponsored post on her news feed.
STIMULUS
Sally notices the Tonacity ad while browsing
through Vogue with a picture of her favorite super
model from the 90s! She starts thinking about
whether it would be right for her and if the product
leads to salon quality hair color.
FMOT
On Saturday, Sally is on Oxford Street with her husband and two boys. She
notices that Tonacity is a featured product in the window display. While her
husband and boys head to a sports store, she tells them to meet her in an hour at
Selfridges. She enters the store and is approached by a sales executive who
would like her to try Tonacity. She has an appointment at the Salon on the
coming Wed. So she definitely has a back up just in case the product does not
work for her. Also she has planned to work from home this week. So it is not
much of a risk anyways. Sally skeptically says, “Yes”
SMOT
The Tonacity associate is pleasant and provides her with all the relevant info on how to use the product. She also asks Sally if she could add her to the email list as well
as provides her with the social channels she could follow to keep up to date with the brand. Sally is not sure if this will take longer than an hour since she is meeting
her family. Its already 5:30! Before she has a chance to think of a possible excuse the associate says “Voila!” - “That looks spectacular! Are you sure it was easy to use?”
- “It was quick and easy!”, the associate smiles. “By the way, I noticed that you are a Selfridges rewards card member. We are running a buy one get another colour
free offer for card members”. - “Hmm Bill always wondered how I would look with Auburn hair!” Sally pays for her one-plus-one #myTime box with Tonacity. As she
opens the box, it looks so special….It says “Tell your best friend about your new look” at the back.
UMOT
Sally meets her friends at work and they love her new look. They are
asking her how much she paid the high-end Salon. - “Should I let her
in on my Secret?”, she wonders. A month later, Sally gets an email
from Tonacity providing her links to videos and reminding her that its
time for a new Color. - “Did you change something?”, says Bill
“Men will be men!”, Sally give him a look and brushes her Auburn
locks with her fingers.
HANNA’S JOURNEY
STIMULUS
Hannah is bored with her current look and wants to try
something new. - “Should I colour my hair a funky
shade of pink”, she thinks “Nah!” - She searches for
“Hair Colour Trendy” and notices a blog by her favourite
pop star Ella Eyre. She clicks on it to land on a
Tonacity.com page describing how much she loves
Tonacity. - “Celebs would never use a DIY moves on with
her day.
ZMOT
Hannah is browsing through the internet and notices her friend
Carrie’s Instagram handle and notices a picture tagged #Tonacity
#MyColour. - “59 likes? She clicks on the hashtag and come across
the official tonacity Instagram page and browses more looks,
FMOT
In the evening, she gets a message on her music App about Tonacity in the
neighbourhood store. The message has a picture of Ella Eyre so she cannot ignore
it. - She clicks on the 20% off ad and lands on the page about the event. She
clicks on the Tonacity app link and starts browsing through the different looks.
SMOT
2 days later she is still procrastinating about her next look….
After a few days of display ads, Hannah finally goes to the Tonacity app and decides to take the plunge. She receives her Tonacity purchase with
20% discount and free one-day. She researches some other “How-to” videos following some Youtube channels listed on the box. 30 mins later, she
is done!
UMOT
She still has concerns about whether she looks good with the Blonde
and Brunette combination. She wears her favourite LBD and posts a
Selfie with the Hashtag #myColour with Tonacity.
A few hours later she checks her Instagram account “127
likes!”....And a message from the about winning the instagram
contest #myColour …..She is featured on the home page of the
Tonacity App. “Is there a prize?”, she wonders.
“2 Free Tickets to the Ella Eyre concert!....my Facebook Fans should
know about this right now!”
OFFLINE KPI’s & BUDGET
OFFLINE
40 %
STIMULUS BUDGET KPI's
Celebrity endorsement fee Offline 5% Direct traffic to Tonacity Site
TV Advertising Offline 16% Direct traffic to Tonacity Site
Production of hero content
and creative Both 5% Video viewership / Recommendation
PR & blogger launch Both 5% No. articles posted
ZMOT BUDGET KPI's
PR ongoing Both 4% No. of article posted
FMOT BUDGET KPI’s
Experiential and store
merchandising Both 4%
No. of customers visited the site / QR code
downloaded App download
SMOT BUDGET KPI’s
Unboxing and offers Both 3% No. of buyers and reviews rate
Customer service Both 5% Reviews
UMOT BUDGET KPI’s
CRM and direct mail Both 8%
No. of customer that received and opened the e-
mail
ONLINE KPI’s & BUDGET
ONLINE
60 %
STIMULUS BUDGET KPI's
Production of hero content and creative Both 5% Video viwership /Recomendation
PR & blogger launch Both 5% No. articles posted
Direct & referral Online 2% M. Share/Web
Digital display & Contextual display ads Online 5% Click through rates
ZMOT BUDGET KPI's
Paid search Online 9% No. of clicks
re-targeting Online 6% Vitality effect
Production of Hygiene and hub content Online 5% Direct traffic to Tonacity Site
PR ogoing Both 4% No. of article posted
FMOT BUDGET KPI’s
Experiential and store merchandising Online 4% No. of customers visited the site / QR code downloaded App download
ibeacon retargeting Online 5% No. of customers who used the voucher.
SMOT BUDGET KPI’s
Unboxing and offers Both 3% No. of buyers and reviews rate
Customer service Both 5% Reviews
Retargeting Online 3% Hashtag tracking
UMOT BUDGET KPI’s
App development Digital 10% App download rate
CRM and direct mail Both 8% No. of customers that received and opened the e-mail
APPENDIX
http://www.skymedia.co.uk/sky-adsmart/about-sky-adsmart.aspx
http://www.skymedia.co.uk/Advertising-platforms/Out-of-Home/transvision.aspx
http://www.blowltd.com/magazine/magazine/27-most-powerful-uk-beauty-bloggers-weve-crunched-the
numbers.html#.Vcpc1iZVhBc
http://www.selfridges.com/GB/en/content/store/london
http://www.johnlewispartnership.co.uk/about.html
http://www.houseoffraser.co.uk/store+locations/M098_STORE_LOCATIONS,default,pg.html
http://www.debenhams.com/about-debenhams
SLIDE 1 – INTRODUCTION AND EXECUTIVE SUMMARY
Not everyone has the time for a lengthy salon experience but that doesn’t mean their hair
should suffer. Tonacity brings the high quality, salon hair colouring experience to your
home!
Kleur’s marketing strategy needs revamping and a large shift needed from offline to online
media strands. Our recommendations for a complete integrated marketing solution place
mobile at the heart. The key underlining principle for our creative campaign is a shift in
media budgets to 60% Online : 40% Offline.
Our objectives:
- Awareness: Introduce product whilst highlighting benefits to target segments
- Sales: Overcome barriers to entry driving sales
- Loyalty & Advocacy: Generate advocacy both offline and online to encourage new
and repeat sales.
- Evaluation: Constantly measure success to better adapt campaign to changing times.
Our proposed campaign focuses not only on the technology behind the product but takes a
more creative angle, highlighting the ‘salon experience’ at home. Customers can enjoy
Tonacity on their time. Hence our creative campaign - #myHair #myColour #myTime.
We follow two potential customers right through their customer journey to show how
Tonacity can increase their brand awareness and create a unified multiplatform campaign
that engages, drives sales, creates an active online community and importantly encourages
sharing, recommendation and repurchase. We have proposed a series of metrics that will
allow Tonacity to refine and hone their marketing strategy over time.
Tonacity – for the woman who does it all and looks and feels fantastic at the same time!
SLIDE 2 – CUSTOMER PERSONAS
1) Sally is a full time Marketing Manager and mother of two with a busy family and social
life. She likes to look good and cares about her appearance. On her way home she keeps up
with the latest trends through fashion magazines such as Vogue, Elle and Marie Claire,
whilst occasionally visiting their websites also. Sally has disposable income and is willing to
pay above the average for a product she trusts. She struggles to find time for herself and
prefers the convenience of online shopping.
2) Hannah is a university student from London who lives in a rented apartment with two
other friends. She comes from an upper middle class family and has her parent's income
support but also works a part time job on a retail store in London's Oxford Street. Hannah
has an active social life offline and crucially online also with a profile on Twitter, Instagram,
Facebook, Snapchat and every other Social Media platform out there. She can spend hours
on youtube looking at music videos and follows fashion and beauty blogs for tips and advice.
A true millennial, Hannah values her individualism and changes her hair style quite often
wishing do things on her own terms and in her own time.
SLIDE 3 - AWARENESS/STIMULOUS
1. Celebrity endorsement leads to trust and influence, communicated through various
channels and touchpoints on the customer journey. These include Kleur’s owned
channels plus the ambassador’s personal social media channels.
2. Above the line TV to launch in the marketplace. Hero content driving target
segments to find out more online, monitored via analytics to track spikes in digital
activity following ads. Sky Adsmart (similar to digital programmatic) to select
audiences based on age, location, lifestyle etc. Adsmart also serves TV creative on
demand & OOH channels such as bars and via screens in tube stations to over 800m
commuters. While ads run offline, online channels will be carefully integrated taking
advantage of second screen usage.
3. Print ads are difficult to measure as there’s no way of tracking when or where the
may have seen them or the action they take. Therefore Print ad budget moves into
digital. PR plays an important part in the awareness stage. Launch in online and
offline media. Press launch/Interviews/features with brand ambassador &
encouraging media reviews. Monitor social listening, cuttings and sentiment
analysis.
4. Raise awareness of Tonacity through retail partners. Utilise store websites,
embedded hero content, mailing lists and their social media channels to place page
takeovers, embedded hero content and introduce new products. Create rich hero
content for the Tonacity website and social to boost SEO. Use the data from the
awareness stage in order to tweak creative, formats and timings for later on in the
customer journey.
SLIDE 4 - ZMOT
By utilizing the loyal online audience that Fleur de Force has built up the value proposition
can be communicated in an engaging manner in the form of a video review. She is trusted
by her fans and it’s likely that if they are interested by the product and they will research
the product further and move into the FMOT stage.
The second touchpoint is in the form of a print display advert. Magazines such as Vogue
would be ideal in gaining access to Tonacity’s target market. Here a full page advert would
clearly explain the value proposition of the product. This would prompt the customer to
research the product more and find out where they can purchase it.
The two touchpoints complement each other well at this stage as a display advert in a
magazine may prompt a search on Youtube and thus lead to the video product review by
Fleur de Force. In the same way a magazine advert may jog the memory of a video product
review that the customer may have seen on Fleur de Force’s social media channels.
SLIDE 5 - FMOT
Users who attend an in store demo will already be aware of the products value proposition
due to the research they may have carried out online in the ZMOT phase. The in store demo
should reinforce what they have learnt about the product and prove that the claims are
true. This should all lead them to buy the product at the end of the demo and move to the
SMOT. As an additional incentive an exclusive 20% discount will be on offer in store.
By offering a real time discount to customers in store it should drive them towards purchase
and thus the SMOT stage. For customers that may have interacted with product for the first
time in store a link to a video where advocates of the Tonacity brand share their experience
of the product will help bring the customer into the FMOT stage quickly hopefully leading to
an in store purchase.
The two touchpoints complement each other as both are in store and focus on driving
engagement that will lead to the customer buying in store there and then. In fact the two
touchpoints could be inherently linked together as the iBeacon retargeting message could
be altered at the time of the in store demo. During an in store demo the retargeting
message could change to thanking the customer for attending the demo and offering them
the 20% discount.
SLIDE 6 - SMOT
1. THE ‘UNBOXING’ EXPERIENCE. Tonacity’s main USP is bringing the ‘salon quality and
experience’ home. Inside the packaging is a voucher allowing you to add to the ‘salon
experience’ by going online and ordering an exclusive Tonacity salon experience pack. This
will allow capturing of the customer details and a packaging reference code and therefore
tracking of sales data on where the product was purchased from. Customer profile and data
is also stored for analytics and future marketing campaigns. The unboxing experience also
encourages customers to share their Tonacity experience on social #MyColour, #MyTime or
through a review. This is explained more in the UMOT stage.
2. CUSTOMER SERVICE & RESEARCH. The packaging and Tonacity website/ youtube channel
will include detailed hub content including ‘how to’ guides. On the website this will include
links to the ‘how to videos’. 24 hr online customer support will be available also. Customers
also sent an email asking them to fill in a short Trust pilot survey to gauge positive/negative
product experiences. Positive reviews and comments can also be shared on social and
owned channels to build trust and advocacy in the product.
3. Once customers have ordered their salon pack on the Tonacity website (sent next day
delivery within 24 hrs) they will be retargeted via display or sponsored social posts showing
them before/after results with Kleur Tonacity encouraging them to post their results on
Tonacity’s social channels in return for a discount. This leads on to the UMOT.
SLIDE 7 - UMOT
1. Build brand loyalty and repeat business: At every customer touch point, customers are
encouraged to get added to the “tonacious” customer database via email, twitter,
instagram, facebook and youtube. The tonacity App will also be available and promoted
on Android and Apple. Content marketing will be driven through Tonacity.com which
will serve as a central hub for all social channels. Past purchases will be added to this
database to keep track of frequency, type of purchase and other characteristics. This will
be used for segmentation, product innovation as well as triggered posts/emails to
influence repeat purchases. For example:
o Reminder email to book next appointment or buy tonacity again after the
frequency observed for a customer.
o Communication around new colours and products to segments that are
found most likely to respond to them.
2. Brand advocacy:
o Online: In the post purchase phase, the customer will be encouraged to share
their experience with @tonacity or #myHair #myColour #myTime. Sharing
will be embedded into the tonacity app and responded to in real time by a
central tonacity team. Every day/hour one of the posts will be featured on
the tonacity home page and the tonacity app to promote sharing behaviour.
o Offline/On-on-One: For customers who are not inclined to share online, we
will try to encourage sharing their experience on a one on one basis via
messaging services aka “Tell your best friend about your new look!”. This will
help build offline brand advocacy.
SLIDE 8 – SALLY’S JOURNEY
Sally, a working mother, is quite busy but unwilling to give up her Hair quality to save time.
Our main objective is to provide her Salon quality hair whilst saving time. Salon Quality is an
order qualifier. Time saving is an order winner over the current behaviour.
In the Stimulus and ZMOT phases, we focus on getting her attention via channels she
already frequents - fashion magazines, mum bloggers, etc. Once she is aware of Tonacity,
our next challenge is to actually demonstrate value. She’s less inclined to try anything based
on online evidence alone so we need to get her an in-store experience, providing her access
to this service at the stores she usually goes to. In the case above, she enters Selfridges
based on a window display. We also have the ability to use iBeacon and other push
technologies to attract her to the Tonacity display at the store based on her browsing
behaviour or demographic. Once she is convinced to try the product, we let her get over her
apprehensions regarding quality and demonstrate the time she can save with our product.
Based on the internet usage stats of Sally’s age group, she gets information online but don’t
share or recommend them as much in the digital world.
She would more likely recommend Tonacity to her friends on a one-on-one basis in the
offline world. We influence this behaviour by adding a “tell your best friend about Tonacity”
in our unboxing experience.
SLIDE 9 – HANNAH’S JOURNEY
Hannah is a trendy University student who likes experimenting with her look but has limited
disposable income given her student status. Our main objective is to provide her trendy
options for hair colour within her budget. Cost is an order qualifier. Trendy looks are an
order winner over the current behaviour.
Hannah represents the millennial generation. Her digital life is embedded within her offline
life. At the Stimulus stage, Hannah notices a Blog from a celebrity she loves. It resonates
with her immediately but she is not yet sold. Given her generation, ZMOT stages are
probably UMOT behaviours of her friends. She is targeted with social content about
Tonacity by her friend Carrie. When she searches for Tonacity Youtube, the search results
show a Vlog by a fashion blogger. She needs to see how to use the product without any
hassles and also know the price. Given her low budget, she is inclined to respond to the
prospect of saving 20% on the Tonacity purchase. After a few retargeting ads, she finally
buys the product and loves the ease of use. The easy to navigate website and app help her
decide the exact colour of the Tonacity. After a few reminders via Display ads, Hanna buys
the product and uses it to good effect.
The moment she has a chance, she shares her experience with her friends on social and
importantly ends up being the ZMOT for them.
SLIDE 10 – KPI’S
Stimuli- ZMOT
This campaign is aiming to build a consistent messaging for the high quality Tonacity salon
experience, across all the different channels and touchpoints, designed around modern
celebrities and female icons/ambassadors of a modern lifestyle. Awareness will be achieved
by combining a targeted programmatic TV ad campaign, with outdoor Adsmart, integrated
with a mobile app. Display ads campaigns, especially on commuting hours, also supported
by online (web) videos are created on Tonacity’s new site and Social media channels.
Objective- To increase brand awareness for our target group.
FMOT - This is a very important stage of the Customer Journey (see appendix statistics) as
the evaluation of the product is key for customer conversion. Cooperation with high end
retailers where Tonacity will hold in store events with real life demos. Celebrity
appearance is key for this stage along with very strong merchandising, where the customer
will have the option to download the Tonacity app to familiarize with the product quality,
colour options and ease of use.
In addition e-mail marketing on selected lists of these high retailers and programmatic
display will also be used. Mobile ads and video content is key for the evaluation phase of the
product.
Objective – To achieve positive evaluation of customers.
SLIDE 11 – KPI’s
SMOT-The “welcome Tonacity pack” is offering the customer a salon like experience, while
getting critical customer information through the registration from in the website. In
addition SM tonacity channels will welcome customer views while a customer survey will be
taking place in the web. We know that by getting people to engage with us in our social
community, In addition to our engagement activity, we use social as a potential sales driving
channel.
Objective – To achieve conversion of customers.
UMOT- Objective is the recommendation of the product and the creation of a community of
ambassadors
SLIDE 12 – APPENDIX
The following sources were used:
http://www.skymedia.co.uk/sky-adsmart/about-sky-adsmart.aspx
http://www.skymedia.co.uk/Advertising-platforms/Out-of-Home/transvision.aspx
http://www.blowltd.com/magazine/magazine/27-most-powerful-uk-beauty-bloggers-weve-
crunched-the-numbers.html#.Vcpc1iZVhBc
http://www.selfridges.com/GB/en/content/store/london
http://www.johnlewispartnership.co.uk/about.html
http://www.houseoffraser.co.uk/store+locations/M098_STORE_LOCATIONS,default,pg.html
http://www.debenhams.com/about-debenhams

GROUP 14 FINAL PROJECT KLEUR TONACITY MERGED PDF

  • 1.
    THE EXECUTIVE SUMMARY Noteveryone has the time for a lengthy salon experience but that doesn’t mean their hair should suffer. Tonacity brings the high quality, salon hair colouring experience to your home! Kleur’s marketing strategy needs revamping. The key underlining principle for our creative campaign is a shift in media budgets to 60% Online : 40% Offline. Our objectives: • Awareness • Sales • Loyalty & Advocacy • Evaluation Through our proposed campaign Tonacity can increase their brand awareness and create a unified multiplatform campaign that engages, drives sales, creates an active online community and importantly encourages sharing, recommendation and repurchase. We have also proposed a series of metrics.
  • 2.
    WHO IS THECUSTOMER?SALLY,38HANNAH,21 WANTS FEARS INFLUENCERS #Friends #Family #Experts #MagazinesArticles #Salon&BeautyProfesionals A quality colouring product to cover grey hair and to also allow her to change her style if she wants; a product she could use whenever she has some spare time; easy to buy and easy to use; she doesn’t need a quick fix, she needs a long term solution, a product that if it works she will use for the rest of her life. She wants to feel younger and on trend; wants her hair to look good and natural without the need to spend hours in a salon; a product that will not damage her hair and will keep it healthy She won’t get the results she is expecting and that the colour will look dull and unnatural; she is also concerned about the health of her hair. NEEDS WANTS FEARS INFLUENCERS #Friends #SocialMedia #Blogs #Reviews #Celebrities A quality colouring product to change her style often; a product you can buy online with quick delivery times and a ‘how to’ information accessible at any time; tips and examples on different styles you can archive with the product application. She wants to look good and have a relevant style like the people she follows on social Media; Change her colour and style when ever she wants without needing to pay a salon price. She won’t get the results she is looking for; it will be too difficult to apply; it will damage her hair if she uses it too often and will cost her more in the long term NEEDS
  • 3.
    STIMULUS: Building Awarenessof the Brand ONLINE OFFLINE CELEBRITY ENDORSEMENT Influencer: high profile model/presenter, strong fan base, active on social media, target segments admire/aspire to be and believe would use the product themselves at home, TV friendly. Similar age to key target segments TV ADVERTISING Hero content (TV and on owned channels). Sky Adsmart to buy space based on segment preferences. Second screen opportunities. Analytics key at the early stage PR (REVIEWS, MEDIA LAUNCH, FEATURES) Press launch with Tonacity celeb ambassador. Offline (Vogue, Hello etc and online media, bloggers. Sentiment analysis important. DIRECT & REFERRAL WITH STORE PARTNERS Direct marketing to store accountholders, page takeovers on store websites and referral sites i.e. Net-a-Porter. SEO, CONTEXTUAL & PROGRAMMATIC DISPLAY Hero content, rich content to enhance owned digital channels. For digital ads Use DoubleClick, You Tube Pre-rolls
  • 4.
    ZMOT: Explaining theValue Proposition SOCIAL MEDIA Product review from ‘Fleur de Force’ who is a well followed hair & beauty Vlogger Twitter: 276k Facebook: 119k Instagram: 605k YouTube: 1.3m ONLINE OFFLINE PRINT DISPLAY ADVERT A full page magazine advert using celebrity endorsement. Vogue has an average reader circulation of 1.25m (Source: http://www.condenast. com/brands/vogue/me dia-kit/print)
  • 5.
    IN STORE DEMO Userswho have visited the website and are within a 30 mile radius of a Tonacity retailer are invited to an in store demonstration of the product. To further entice them to attend a unique voucher code is also sent to them which entities them to a 20% discount. iBEACON RETARGETING A real time push notification containing a unique 20% discount code as well as a link to a video which interviews advocates of the Tonacity brand will be sent to customers who interact with the product in store. This will be enabled via the use of iBeacon stickers. FMOT: Driving Brand Preference & Conversion ONLINE OFFLINE
  • 6.
    SMOT: The ProductExperience ONLINE OFFLINE RE-TARGETING via display or sponsored social posts showing them before/after results with Kleur Tonacity & encouraging use of the #MyTime #MyColour hashtag. THE ‘UNBOXING’ EXPERIENCE #MyTime salon at home experience. Limited time offer. Order your salon at home experience pack. Everything you need to recreate the salon experience at home. A limited time offer, this pack will include everything you would get if you were to visit a salon to have your hair done. A glossy mag (provided by a key media partner thus simultaneously assisting the PR effort) a scented tea light or pulse point oil so you can relax, a sachet of expensive coffee to enjoy while you put your feet up and wait for the colour to work. CUSTOMER SERVICE Online customer hub including 24hr live chat online, how to videos, reviews section. DISCOUNT Use of the #MyTime #MyColour user generated content results in a discount voucher off your next Tonacity colour. Store account holders also get exclusive Tonacity discounts via email.
  • 7.
    UMOT: Journey towardsBrand Loyalty & Advocacy ONLINE OFFLINE tonacity.com BRAND ADVOCACY At every customer touch point, the customer will be encouraged to get added to the “tonacious” database of past customers via email, twitter, instagram, facebook and youtube. The tonacity App will also be available and promoted on Android and Apple. Content marketing will be driven through Tonacity.com which will serve as a central hub for all social channels. BRAND ADVOCACY In the post purchase phase, the customer will be encouraged to share their experience with @tonacity or #myHair #myColour #myTime. For customers who are not inclined to share online, we will try to encourage sharing their experience on a one on one basis via messaging services aka “ Tell your best friend about your new look!”. This will help us build offline advocacy for the brand.
  • 8.
    SALLY’S JOURNEY ZMOT Sally isbrowsing her favourite Mommy bloggers website and notices a post about #MyTime with Tonacity. She googles it and notice and ad for tonacity on top of her search, she clicks on it and and browses the site but gets distrated and close down. Later on when browsing facebook she sees a Tonacity sponsored post on her news feed. STIMULUS Sally notices the Tonacity ad while browsing through Vogue with a picture of her favorite super model from the 90s! She starts thinking about whether it would be right for her and if the product leads to salon quality hair color. FMOT On Saturday, Sally is on Oxford Street with her husband and two boys. She notices that Tonacity is a featured product in the window display. While her husband and boys head to a sports store, she tells them to meet her in an hour at Selfridges. She enters the store and is approached by a sales executive who would like her to try Tonacity. She has an appointment at the Salon on the coming Wed. So she definitely has a back up just in case the product does not work for her. Also she has planned to work from home this week. So it is not much of a risk anyways. Sally skeptically says, “Yes” SMOT The Tonacity associate is pleasant and provides her with all the relevant info on how to use the product. She also asks Sally if she could add her to the email list as well as provides her with the social channels she could follow to keep up to date with the brand. Sally is not sure if this will take longer than an hour since she is meeting her family. Its already 5:30! Before she has a chance to think of a possible excuse the associate says “Voila!” - “That looks spectacular! Are you sure it was easy to use?” - “It was quick and easy!”, the associate smiles. “By the way, I noticed that you are a Selfridges rewards card member. We are running a buy one get another colour free offer for card members”. - “Hmm Bill always wondered how I would look with Auburn hair!” Sally pays for her one-plus-one #myTime box with Tonacity. As she opens the box, it looks so special….It says “Tell your best friend about your new look” at the back. UMOT Sally meets her friends at work and they love her new look. They are asking her how much she paid the high-end Salon. - “Should I let her in on my Secret?”, she wonders. A month later, Sally gets an email from Tonacity providing her links to videos and reminding her that its time for a new Color. - “Did you change something?”, says Bill “Men will be men!”, Sally give him a look and brushes her Auburn locks with her fingers.
  • 9.
    HANNA’S JOURNEY STIMULUS Hannah isbored with her current look and wants to try something new. - “Should I colour my hair a funky shade of pink”, she thinks “Nah!” - She searches for “Hair Colour Trendy” and notices a blog by her favourite pop star Ella Eyre. She clicks on it to land on a Tonacity.com page describing how much she loves Tonacity. - “Celebs would never use a DIY moves on with her day. ZMOT Hannah is browsing through the internet and notices her friend Carrie’s Instagram handle and notices a picture tagged #Tonacity #MyColour. - “59 likes? She clicks on the hashtag and come across the official tonacity Instagram page and browses more looks, FMOT In the evening, she gets a message on her music App about Tonacity in the neighbourhood store. The message has a picture of Ella Eyre so she cannot ignore it. - She clicks on the 20% off ad and lands on the page about the event. She clicks on the Tonacity app link and starts browsing through the different looks. SMOT 2 days later she is still procrastinating about her next look…. After a few days of display ads, Hannah finally goes to the Tonacity app and decides to take the plunge. She receives her Tonacity purchase with 20% discount and free one-day. She researches some other “How-to” videos following some Youtube channels listed on the box. 30 mins later, she is done! UMOT She still has concerns about whether she looks good with the Blonde and Brunette combination. She wears her favourite LBD and posts a Selfie with the Hashtag #myColour with Tonacity. A few hours later she checks her Instagram account “127 likes!”....And a message from the about winning the instagram contest #myColour …..She is featured on the home page of the Tonacity App. “Is there a prize?”, she wonders. “2 Free Tickets to the Ella Eyre concert!....my Facebook Fans should know about this right now!”
  • 10.
    OFFLINE KPI’s &BUDGET OFFLINE 40 % STIMULUS BUDGET KPI's Celebrity endorsement fee Offline 5% Direct traffic to Tonacity Site TV Advertising Offline 16% Direct traffic to Tonacity Site Production of hero content and creative Both 5% Video viewership / Recommendation PR & blogger launch Both 5% No. articles posted ZMOT BUDGET KPI's PR ongoing Both 4% No. of article posted FMOT BUDGET KPI’s Experiential and store merchandising Both 4% No. of customers visited the site / QR code downloaded App download SMOT BUDGET KPI’s Unboxing and offers Both 3% No. of buyers and reviews rate Customer service Both 5% Reviews UMOT BUDGET KPI’s CRM and direct mail Both 8% No. of customer that received and opened the e- mail
  • 11.
    ONLINE KPI’s &BUDGET ONLINE 60 % STIMULUS BUDGET KPI's Production of hero content and creative Both 5% Video viwership /Recomendation PR & blogger launch Both 5% No. articles posted Direct & referral Online 2% M. Share/Web Digital display & Contextual display ads Online 5% Click through rates ZMOT BUDGET KPI's Paid search Online 9% No. of clicks re-targeting Online 6% Vitality effect Production of Hygiene and hub content Online 5% Direct traffic to Tonacity Site PR ogoing Both 4% No. of article posted FMOT BUDGET KPI’s Experiential and store merchandising Online 4% No. of customers visited the site / QR code downloaded App download ibeacon retargeting Online 5% No. of customers who used the voucher. SMOT BUDGET KPI’s Unboxing and offers Both 3% No. of buyers and reviews rate Customer service Both 5% Reviews Retargeting Online 3% Hashtag tracking UMOT BUDGET KPI’s App development Digital 10% App download rate CRM and direct mail Both 8% No. of customers that received and opened the e-mail
  • 12.
  • 13.
    SLIDE 1 –INTRODUCTION AND EXECUTIVE SUMMARY Not everyone has the time for a lengthy salon experience but that doesn’t mean their hair should suffer. Tonacity brings the high quality, salon hair colouring experience to your home! Kleur’s marketing strategy needs revamping and a large shift needed from offline to online media strands. Our recommendations for a complete integrated marketing solution place mobile at the heart. The key underlining principle for our creative campaign is a shift in media budgets to 60% Online : 40% Offline. Our objectives: - Awareness: Introduce product whilst highlighting benefits to target segments - Sales: Overcome barriers to entry driving sales - Loyalty & Advocacy: Generate advocacy both offline and online to encourage new and repeat sales. - Evaluation: Constantly measure success to better adapt campaign to changing times. Our proposed campaign focuses not only on the technology behind the product but takes a more creative angle, highlighting the ‘salon experience’ at home. Customers can enjoy Tonacity on their time. Hence our creative campaign - #myHair #myColour #myTime. We follow two potential customers right through their customer journey to show how Tonacity can increase their brand awareness and create a unified multiplatform campaign that engages, drives sales, creates an active online community and importantly encourages sharing, recommendation and repurchase. We have proposed a series of metrics that will allow Tonacity to refine and hone their marketing strategy over time. Tonacity – for the woman who does it all and looks and feels fantastic at the same time!
  • 14.
    SLIDE 2 –CUSTOMER PERSONAS 1) Sally is a full time Marketing Manager and mother of two with a busy family and social life. She likes to look good and cares about her appearance. On her way home she keeps up with the latest trends through fashion magazines such as Vogue, Elle and Marie Claire, whilst occasionally visiting their websites also. Sally has disposable income and is willing to pay above the average for a product she trusts. She struggles to find time for herself and prefers the convenience of online shopping. 2) Hannah is a university student from London who lives in a rented apartment with two other friends. She comes from an upper middle class family and has her parent's income support but also works a part time job on a retail store in London's Oxford Street. Hannah has an active social life offline and crucially online also with a profile on Twitter, Instagram, Facebook, Snapchat and every other Social Media platform out there. She can spend hours on youtube looking at music videos and follows fashion and beauty blogs for tips and advice. A true millennial, Hannah values her individualism and changes her hair style quite often wishing do things on her own terms and in her own time.
  • 15.
    SLIDE 3 -AWARENESS/STIMULOUS 1. Celebrity endorsement leads to trust and influence, communicated through various channels and touchpoints on the customer journey. These include Kleur’s owned channels plus the ambassador’s personal social media channels. 2. Above the line TV to launch in the marketplace. Hero content driving target segments to find out more online, monitored via analytics to track spikes in digital activity following ads. Sky Adsmart (similar to digital programmatic) to select audiences based on age, location, lifestyle etc. Adsmart also serves TV creative on demand & OOH channels such as bars and via screens in tube stations to over 800m commuters. While ads run offline, online channels will be carefully integrated taking advantage of second screen usage. 3. Print ads are difficult to measure as there’s no way of tracking when or where the may have seen them or the action they take. Therefore Print ad budget moves into digital. PR plays an important part in the awareness stage. Launch in online and offline media. Press launch/Interviews/features with brand ambassador & encouraging media reviews. Monitor social listening, cuttings and sentiment analysis. 4. Raise awareness of Tonacity through retail partners. Utilise store websites, embedded hero content, mailing lists and their social media channels to place page takeovers, embedded hero content and introduce new products. Create rich hero content for the Tonacity website and social to boost SEO. Use the data from the awareness stage in order to tweak creative, formats and timings for later on in the customer journey.
  • 16.
    SLIDE 4 -ZMOT By utilizing the loyal online audience that Fleur de Force has built up the value proposition can be communicated in an engaging manner in the form of a video review. She is trusted by her fans and it’s likely that if they are interested by the product and they will research the product further and move into the FMOT stage. The second touchpoint is in the form of a print display advert. Magazines such as Vogue would be ideal in gaining access to Tonacity’s target market. Here a full page advert would clearly explain the value proposition of the product. This would prompt the customer to research the product more and find out where they can purchase it. The two touchpoints complement each other well at this stage as a display advert in a magazine may prompt a search on Youtube and thus lead to the video product review by Fleur de Force. In the same way a magazine advert may jog the memory of a video product review that the customer may have seen on Fleur de Force’s social media channels.
  • 17.
    SLIDE 5 -FMOT Users who attend an in store demo will already be aware of the products value proposition due to the research they may have carried out online in the ZMOT phase. The in store demo should reinforce what they have learnt about the product and prove that the claims are true. This should all lead them to buy the product at the end of the demo and move to the SMOT. As an additional incentive an exclusive 20% discount will be on offer in store. By offering a real time discount to customers in store it should drive them towards purchase and thus the SMOT stage. For customers that may have interacted with product for the first time in store a link to a video where advocates of the Tonacity brand share their experience of the product will help bring the customer into the FMOT stage quickly hopefully leading to an in store purchase. The two touchpoints complement each other as both are in store and focus on driving engagement that will lead to the customer buying in store there and then. In fact the two touchpoints could be inherently linked together as the iBeacon retargeting message could be altered at the time of the in store demo. During an in store demo the retargeting message could change to thanking the customer for attending the demo and offering them the 20% discount.
  • 18.
    SLIDE 6 -SMOT 1. THE ‘UNBOXING’ EXPERIENCE. Tonacity’s main USP is bringing the ‘salon quality and experience’ home. Inside the packaging is a voucher allowing you to add to the ‘salon experience’ by going online and ordering an exclusive Tonacity salon experience pack. This will allow capturing of the customer details and a packaging reference code and therefore tracking of sales data on where the product was purchased from. Customer profile and data is also stored for analytics and future marketing campaigns. The unboxing experience also encourages customers to share their Tonacity experience on social #MyColour, #MyTime or through a review. This is explained more in the UMOT stage. 2. CUSTOMER SERVICE & RESEARCH. The packaging and Tonacity website/ youtube channel will include detailed hub content including ‘how to’ guides. On the website this will include links to the ‘how to videos’. 24 hr online customer support will be available also. Customers also sent an email asking them to fill in a short Trust pilot survey to gauge positive/negative product experiences. Positive reviews and comments can also be shared on social and owned channels to build trust and advocacy in the product. 3. Once customers have ordered their salon pack on the Tonacity website (sent next day delivery within 24 hrs) they will be retargeted via display or sponsored social posts showing them before/after results with Kleur Tonacity encouraging them to post their results on Tonacity’s social channels in return for a discount. This leads on to the UMOT.
  • 19.
    SLIDE 7 -UMOT 1. Build brand loyalty and repeat business: At every customer touch point, customers are encouraged to get added to the “tonacious” customer database via email, twitter, instagram, facebook and youtube. The tonacity App will also be available and promoted on Android and Apple. Content marketing will be driven through Tonacity.com which will serve as a central hub for all social channels. Past purchases will be added to this database to keep track of frequency, type of purchase and other characteristics. This will be used for segmentation, product innovation as well as triggered posts/emails to influence repeat purchases. For example: o Reminder email to book next appointment or buy tonacity again after the frequency observed for a customer. o Communication around new colours and products to segments that are found most likely to respond to them. 2. Brand advocacy: o Online: In the post purchase phase, the customer will be encouraged to share their experience with @tonacity or #myHair #myColour #myTime. Sharing will be embedded into the tonacity app and responded to in real time by a central tonacity team. Every day/hour one of the posts will be featured on the tonacity home page and the tonacity app to promote sharing behaviour. o Offline/On-on-One: For customers who are not inclined to share online, we will try to encourage sharing their experience on a one on one basis via messaging services aka “Tell your best friend about your new look!”. This will help build offline brand advocacy.
  • 20.
    SLIDE 8 –SALLY’S JOURNEY Sally, a working mother, is quite busy but unwilling to give up her Hair quality to save time. Our main objective is to provide her Salon quality hair whilst saving time. Salon Quality is an order qualifier. Time saving is an order winner over the current behaviour. In the Stimulus and ZMOT phases, we focus on getting her attention via channels she already frequents - fashion magazines, mum bloggers, etc. Once she is aware of Tonacity, our next challenge is to actually demonstrate value. She’s less inclined to try anything based on online evidence alone so we need to get her an in-store experience, providing her access to this service at the stores she usually goes to. In the case above, she enters Selfridges based on a window display. We also have the ability to use iBeacon and other push technologies to attract her to the Tonacity display at the store based on her browsing behaviour or demographic. Once she is convinced to try the product, we let her get over her apprehensions regarding quality and demonstrate the time she can save with our product. Based on the internet usage stats of Sally’s age group, she gets information online but don’t share or recommend them as much in the digital world. She would more likely recommend Tonacity to her friends on a one-on-one basis in the offline world. We influence this behaviour by adding a “tell your best friend about Tonacity” in our unboxing experience.
  • 21.
    SLIDE 9 –HANNAH’S JOURNEY Hannah is a trendy University student who likes experimenting with her look but has limited disposable income given her student status. Our main objective is to provide her trendy options for hair colour within her budget. Cost is an order qualifier. Trendy looks are an order winner over the current behaviour. Hannah represents the millennial generation. Her digital life is embedded within her offline life. At the Stimulus stage, Hannah notices a Blog from a celebrity she loves. It resonates with her immediately but she is not yet sold. Given her generation, ZMOT stages are probably UMOT behaviours of her friends. She is targeted with social content about Tonacity by her friend Carrie. When she searches for Tonacity Youtube, the search results show a Vlog by a fashion blogger. She needs to see how to use the product without any hassles and also know the price. Given her low budget, she is inclined to respond to the prospect of saving 20% on the Tonacity purchase. After a few retargeting ads, she finally buys the product and loves the ease of use. The easy to navigate website and app help her decide the exact colour of the Tonacity. After a few reminders via Display ads, Hanna buys the product and uses it to good effect. The moment she has a chance, she shares her experience with her friends on social and importantly ends up being the ZMOT for them.
  • 22.
    SLIDE 10 –KPI’S Stimuli- ZMOT This campaign is aiming to build a consistent messaging for the high quality Tonacity salon experience, across all the different channels and touchpoints, designed around modern celebrities and female icons/ambassadors of a modern lifestyle. Awareness will be achieved by combining a targeted programmatic TV ad campaign, with outdoor Adsmart, integrated with a mobile app. Display ads campaigns, especially on commuting hours, also supported by online (web) videos are created on Tonacity’s new site and Social media channels. Objective- To increase brand awareness for our target group. FMOT - This is a very important stage of the Customer Journey (see appendix statistics) as the evaluation of the product is key for customer conversion. Cooperation with high end retailers where Tonacity will hold in store events with real life demos. Celebrity appearance is key for this stage along with very strong merchandising, where the customer will have the option to download the Tonacity app to familiarize with the product quality, colour options and ease of use. In addition e-mail marketing on selected lists of these high retailers and programmatic display will also be used. Mobile ads and video content is key for the evaluation phase of the product. Objective – To achieve positive evaluation of customers.
  • 23.
    SLIDE 11 –KPI’s SMOT-The “welcome Tonacity pack” is offering the customer a salon like experience, while getting critical customer information through the registration from in the website. In addition SM tonacity channels will welcome customer views while a customer survey will be taking place in the web. We know that by getting people to engage with us in our social community, In addition to our engagement activity, we use social as a potential sales driving channel. Objective – To achieve conversion of customers. UMOT- Objective is the recommendation of the product and the creation of a community of ambassadors
  • 24.
    SLIDE 12 –APPENDIX The following sources were used: http://www.skymedia.co.uk/sky-adsmart/about-sky-adsmart.aspx http://www.skymedia.co.uk/Advertising-platforms/Out-of-Home/transvision.aspx http://www.blowltd.com/magazine/magazine/27-most-powerful-uk-beauty-bloggers-weve- crunched-the-numbers.html#.Vcpc1iZVhBc http://www.selfridges.com/GB/en/content/store/london http://www.johnlewispartnership.co.uk/about.html http://www.houseoffraser.co.uk/store+locations/M098_STORE_LOCATIONS,default,pg.html http://www.debenhams.com/about-debenhams