Embed presentation
Download to read offline





The group, comprised of seven members, collaborated effectively by dividing tasks and then integrating their contributions into a cohesive structure. They successfully built two terminal towers, three suspension towers, and one tension tower while learning about electric grid construction with the assistance of National Grid and Imagineering. Additionally, they gained insights on maintaining uniform grid levels from National Grid.




