Course contents
• Overview: Communicate in a visual way
• Lesson 1: What Visio can do for you
• Lesson 2: Make your first diagram
• Lesson 3: A closer look at the Visio environment
Each lesson includes a list of suggested tasks and a set of
test questions.
Get to know Visio
Discover the variety of diagrams you
can make with this powerful software.
Then create your first diagram. Plus,
learn important basics about shapes
and stencils.
Overview: Communicate in a visual way
With Microsoft Office Visio 2003, you’ll
have no doubt that a picture is worth a
thousand words.
Get to know Visio
Course goals
• Know what Visio does and what kinds of diagrams you
can make with it.
• Know which edition of Visio 2003 you have and what that
means for using it.
• Know how to make a diagram by dragging shapes into
place and connecting them.
• Know how to zoom, resize, and add text to shapes.
Lesson 1
What Visio can do for you
Get to know Visio
What Visio can do for you
Visio is an intelligent
diagramming program. It empowers
you to communicate
in a visual manner, and helps make
your diagrams more meaningful,
flexible, and responsive to your
needs.
You can capture information in
ways that are valuable for you and
your business.
Visio is more than a
diagramming program.
Get to know Visio
Two editions
There are two editions of Visio 2003:
Visio Standard 2003 and Visio
Professional 2003.
Each edition is specifically designed
to address the needs of certain
customers.There are two editions of
Visio 2003.
Get to know Visio
Two editions
There are two editions of
Visio 2003.
• With Visio Standard, you can
create business-related diagrams
such as flowcharts, organization
charts, and project-scheduling
diagrams.
• Visio Professional goes a step
further into more technical areas.
Get to know Visio
Business-process diagrams
One of the most popular uses of
Visio is to illustrate business
processes.
Diagrams for business processes
can be found in both Visio Standard
and Visio Professional.
A three-step flowchart
Get to know Visio
Business-process diagrams
Creating a diagram like this one is
easy. The shapes are already made
for you; all you have to do is drag
them into place, type some text, and
resize them a little.
A three-step flowchart
The lines connecting shapes are called
connectors. Connectors are easily
glued to shapes. When a shape moves,
the connector moves as well.
Get to know Visio
Business-process diagrams, continued
Here's an example of how powerful
Visio diagrams can be: If a portion of
your diagram needs additional detail,
you can create that detailed portion
separately and add a hyperlink to it.
When you need a large and detailed
diagram, Visio is the right program to
use.
A flowchart with a
hyperlink to more detail
Get to know Visio
Organization charts
Organization charts, available in
both Visio Standard and Visio
Professional, are another type of
diagram frequently used in business.
Sure, the lines and shapes let you
easily see the reporting structure of
an organization. But here's where
Visio really shines: You can also
associate data with each shape in
the diagram.
An organization chart
Get to know Visio
Organization charts
Data for a shape is called custom
properties. In the case of
organization charts, you can select
an employee shape, and then
associate vital information—such as
location, phone number, and
department—so that this data
becomes part of the chart.
An organization chart
Get to know Visio
Organization charts
Another powerful reason for creating
organization charts in Visio is that
you can automatically create them
by using information from a data
source.An organization chart
After a few clicks, your chart is made
for you. You don't have to enter
each name and title by hand. As
mentioned, Visio is intelligent.
Get to know Visio
Brainstorming diagrams
A brainstorming diagram, available
in both Visio Standard and Visio
Professional, can help you record
and develop any set of related ideas
or information, such as new
business strategies, book outlines,
meeting minutes, or travel plans.
A brainstorming diagram
and its outline
Get to know Visio
Brainstorming diagrams
There are two ways to create this
kind of diagram:
• You can create the diagram
visually by dragging shapes into
place.
• You can create the diagram
automatically by typing an outline
in the outline window. This way,
Visio creates the shapes for you.
A brainstorming diagram
and its outline
Get to know Visio
Building plans
You can also create precise building
plans in Visio. Notice that this
diagram provides an overhead view
of walls, doors, windows, and
furniture.
Also note that the shapes for
furniture, equipment, and even
plants are already made for you.
You do not have to draw these
yourself.
An office layout
Get to know Visio
Building plans
And unlike with other simple
diagramming programs, with Visio
you can specify a scale of
measurement.
An office layout
Another example of Visio
intelligence: You can add dimension
lines to walls, as shown here. With
these lines, you can determine
whether larger items will fit in the
available space.
Get to know Visio
Network diagrams
Another business diagram that you
can make with Visio Professional is
a network diagram. You can make a
simple diagram or a very detailed
one.
In addition, if you add custom properties to each shape
(like asset number, network address, or computer name),
you can then run detailed inventory reports right within
Visio.
A network map
Get to know Visio
Web diagrams
Visio Professional also helps you
make Web diagrams, such as a Web
site map. Each shape in the map
represents a link on a Web site and
includes information about the link
type and location.
You can use the map to analyze
your site's organization or to classify
the site's content.
A Web site map
Get to know Visio
Suggestions for practice
We've shown you just a small sampling of what you can do
with Visio. But there is so much more. You can also make
charts, graphs, maps, project schedules, calendars, even
software and database diagrams.
To see more examples of what you can make in Visio, take a
look at the Diagram Gallery. To do so:
• Start Visio, and then click Diagram Gallery on the
Help menu.
Get to know Visio
Test 1, question 1
Which of the following is true about shapes in
Visio? (Pick one answer.)
1. You have to create shapes from scratch.
2. Visio shapes are already made for you. You don't have to
make them yourself.
Get to know Visio
Test 1, question 1
Which of the following is true about shapes in
Visio? (Pick one answer.)
3. There are some basic shapes already made in Visio, but
if you need something really detailed—like a piece of
computer equipment—you need to make it yourself.
4. Visio Standard doesn't come with shapes already made,
but Visio Professional does.
Get to know Visio
Test 1, question 1: Answer
Visio shapes are already made for you. You don't have to
make them yourself.
You can make your own shapes if you want to, but in many
cases it's not necessary because there's a variety of shapes
to choose from.
Get to know Visio
Test 1, question 2
With Visio, you can associate data with shapes in a
diagram. What is this data called? (Pick one
answer.)
1. Custom properties.
2. Special data.
3. Shaped data.
4. Data properties.
Get to know Visio
Test 1, question 2: Answer
Custom properties.
In an organization chart, the custom properties for a shape might include department name, phone
number, and office location. In a network diagram, the custom properties might include computer asset
number, location, network address, and computer name.
Lesson 2
Make your first diagram
Get to know Visio
Make your first diagram
Select, drag, move, resize, type,
zoom, connect. By now, you're
probably ready to see how to create
a diagram. Let's investigate the
details of working with Visio.
Get to know Visio
Choose a template
You begin creating a diagram by
choosing a template. Things to
notice in the animation on the left:
Animation: Right-click, and click Play.
Start a diagram by
choosing a template.
• After you choose a template, a blank drawing page appears.
• To the left of that page, a collection of shapes appears that you
can use in the diagram.
Get to know Visio
Choose a template
You begin creating a diagram by
choosing a template.
Start a diagram by
choosing a template.
• After you choose a template, a blank drawing page appears.
• To the left of that page, a collection of shapes appears that you can
use in the diagram.
Get to know Visio
Drag shapes onto the page
After you choose a template, the
drawing page appears blank. This is
different from templates in many
other programs.
But in a Visio template, shapes
appear to the left of the empty
drawing page—waiting for you to
drag them onto the page. Play this
animation to see a demonstration.
Animation: Right-click, and click Play.
How to drag shapes onto
the page
Get to know Visio
Drag shapes onto the page
After you choose a template, the
drawing page appears blank. This is
different from templates in many
other programs.
But in a Visio template, shapes
appear to the left of the empty
drawing page—waiting for you to
drag them onto the page.
How to drag shapes onto
the page
Get to know Visio
Move the shapes
Moving a shape is easy: Just click
any shape to select it, and then drag
it to a new location.
You can also move many shapes at
once. To do that, click a blank area
of the drawing page, and then drag
to create a selection rectangle
around the shapes. This animation
shows you how.
Animation: Right-click, and click Play.
How to move several
shapes at once
Get to know Visio
Moving a shape is easy: Just click
any shape to select it, and then drag
it to a new location.
You can also move many shapes at
once. To do that, click a blank area
of the drawing page, and then drag
to create a selection rectangle
around the shapes.
How to move several
shapes at once
Move the shapes
Get to know Visio
Resize shapes
You can resize shapes by dragging
their corner, side, or bottom
selection handles. The animation
demonstrates this.
You can also resize many shapes at
once. To do that, select more than
one shape, and then drag a
selection handle. That's rectangle
first, handle next.
Animation: Right-click, and click Play.
How to resize a shape
Get to know Visio
Resize shapes
You can resize shapes by dragging
their corner, side, or bottom
selection handles.
You can also resize many shapes at
once. To do that, select more than
one shape, and then drag a
selection handle. That's rectangle
first, handle next.
How to resize a shape
Get to know Visio
Add text to shapes
You can add text to shapes. There
are a couple of ways to accomplish
this. The easiest way is to just click
the shape, and start typing.
Play the animation to see this
demonstrated.
Animation: Right-click, and click Play.
How to add text to
shapes
Get to know Visio
Add text to shapes
You can add text to shapes. There
are a couple of ways to accomplish
this. The easiest way is to just click
the shape, and start typing.
How to add text to
shapes
Get to know Visio
Zoom to see better
If the shapes in your diagram are too
small to work with, you'll want to
zoom in closer.
To zoom in on the shapes in your
diagram, hold down the
CTRL+SHIFT keys while you drag a
selection rectangle around the
shapes. The animation shows you
how.
Animation: Right-click, and click Play.
How to zoom in on
shapes
Get to know Visio
Zoom to see better
If the shapes in your diagram are too
small to work with, you'll want to
zoom in closer.
To zoom in on the shapes in your
diagram, hold down the
CTRL+SHIFT keys while you drag a
selection rectangle around the
shapes.
How to zoom in on
shapes
Get to know Visio
Connect shapes
Connecting shapes is one of the
hallmark strengths of Visio. As the
animation shows, you:
Animation: Right-click, and click Play.
How to connect shapes
• Switch from the Pointer Tool to the
Connector Tool on the Standard
toolbar.
• Draw a line from one connection point to
another.
• When you're done, switch back to the
Pointer Tool.
Get to know Visio
Connect shapes
How to connect shapes
• Switch from the Pointer Tool to
the Connector Tool on the
Standard toolbar.
• Draw a line from one connection
point to another.
• When you're done, switch back to
the Pointer Tool.
Connecting shapes is one of the
hallmark strengths of Visio. To do it,
you:
Get to know Visio
Suggestions for practice
1. Choose a template, and start dragging shapes.
2. Add text to the shapes, and zoom.
3. Zoom in and out some more.
4. Connect shapes.
Online practice (requires Visio 2003)
Get to know Visio
Test 2, question 1
To zoom in on the shapes, you need to: (Pick one
answer.)
1. Press CTRL+Z.
2. Hold down CTRL+SPACEBAR while you drag a selection
rectangle around the shapes.
3. Hold down the CTRL+SHIFT keys while you drag a selection
rectangle around the shapes.
4. Press CTRL+W.
Get to know Visio
Test 2, question 1: Answer
Hold down the CTRL+SHIFT keys while you drag a
selection rectangle around the shapes.
And remember, to zoom back so that the whole page is
visible, press CTRL+W.
Get to know Visio
Test 2, question 2
As seen in the practice session, what may happen
when you type text on a shape? (Pick one answer.)
1. Visio asks which font you would like to use, and then
recommends a font size for you.
2. Visio zooms in.
3. The Text dialog box appears. Here you can specify font, size,
and other formatting options.
4. Visio moves the shape to where your text is.
Get to know Visio
Test 2, question 2: Answer
Visio zooms in.
If you are zoomed out and start typing text for a shape, Visio zooms in on the shape so that you can see what you are typing. You can turn this
option off if you want. On the Tools menu, click Options, and then click the General tab. Under Drawing window options, in the
Automatically zoom text when editing under box, enter 0 (zero) for the point size.
Get to know Visio
Test 2, question 3
Which of the following tools do you use to add
connectors to shapes? (Pick one answer.)
1. The Connecting Line Tool.
2. The Connector Tool.
3. The Line Tool.
4. The Pointer Tool.
Get to know Visio
Test 2, question 3: Answer
The Connector Tool.
Lesson 3
A closer look at the Visio
environment
Get to know Visio
A closer look at the Visio environment
Sure, it's fun to create diagrams,
label them, and move the parts
around. But you really want to
understand Visio because you
know there's more you can do.
This is your chance to get a closer
look at templates, stencils, and
shapes—three very important parts
of the Visio program.
Take a closer look at
Visio.
Get to know Visio
A closer look at templates
Let’s take a closer look at the
concept of a Visio template. As you
saw in a previous lesson, when you
choose a template in Visio, you get a
blank drawing page and a handful of
shapes to the left of the page.
But that's not all your choice brings
you. With a template, you get other
special tools to help you with your
diagram.
Special tools come with
the Organization Chart
template.
Get to know Visio
A closer look at templates
For example, when you choose an
organization chart template, you get
the following:
Special tools come with
the Organization Chart
template.
1. A special Organization Chart toolbar that makes chart layout easier.
2. An Organization Chart menu that provides commands to help you work with the chart.
Get to know Visio
A closer look at shapes and stencils
Shapes are another reason why
Visio is so powerful. So let's take a
closer look at them.
1. The Shapes window is to the left of your drawing page. This window
contains stencils. Stencils aren't the actual shapes themselves.
Stencils are useful groupings of shapes.
Where to find shapes
and stencils
Get to know Visio
A closer look at shapes and stencils
2. These are stencils. In this illustration, you see three stencils. The Organization Chart Shapes stencil is the
active one. The other two stencils are Borders and Tiles and Backgrounds. To see those stencils' shapes,
click the name of the stencil you want.
Where to find shapes
and stencils
Get to know Visio
A closer look at shapes and stencils
Where to find shapes
and stencils
3. Inside each stencil are shapes. Shapes
are what you drag onto the page.
Get to know Visio
Shapes that are smart
Visio enables you to format, fill,
rotate, and resize shapes. And with
several of the shapes, Visio does
much, much more.
Many shapes are smart—they have
special built-in features that help out
with the particular kind of diagram
you're working on.
The animation demonstrates this.
Animation: Right-click, and click Play.
Shapes in an
organization chart
Get to know Visio
Shapes that are smart
Shapes in an
organization chart
Visio enables you to format, fill,
rotate, and resize shapes. And with
several of the shapes, Visio does
much, much more.
Many shapes are smart—they have
special built-in features that help out
with the particular kind of diagram
you're working on.
Get to know Visio
A closer look at the New button
You're probably used to clicking the
New button in various programs to
quickly open a new document or file.
In Visio, things are a bit different.
The Visio New button can be used
in several ways.
The New button is
different in Visio.
Get to know Visio
A closer look at the New button
Start without a template: If you
don't have any diagrams open,
clicking the New button will open a
new drawing page with no
associated template. You can then
search for shapes in the Shapes
window, as the illustration on the left
shows.
The New button is
different in Visio.
Get to know Visio
A closer look at the New button
Borrow a template: If you have a
diagram open that is based on a
template, clicking the New button
will open a new drawing page that is
based on that same template.
The New button is
different in Visio.
Get to know Visio
A closer look at the New button
Pick a template: The New button
has a small arrow on it. If you click
that arrow, you'll see the same list of
templates that you worked with
earlier in this course. Choose a
template from that list, and you'll get
a new drawing page based on that
template.
The New button is
different in Visio.
Get to know Visio
Suggestions for practice
1. Start a diagram based on an organization chart template.
2. Create an organization chart quickly.
3. Experiment with the New button.
Online practice (requires Visio 2003)
Get to know Visio
Test 3, question 1
What do most Visio templates look like? (Pick one
answer.)
1. Templates are files you can open in Visio that contain
premade diagrams. All you have to do is fill in the blanks.
2. A template is a diagram type that opens with the stencils and
settings you need to create a particular diagram.
Get to know Visio
Test 3, question 1
What do most Visio templates look like? (Pick one
answer.)
3. A template is a collection of shapes that you can drag onto
the page.
4. A template is a master shape that you can use over and
over again.
Get to know Visio
Test 3, question 1: Answer
A template is a diagram type that opens with the stencils
and settings you need to create a particular diagram.
Templates also come with special toolbars and menus to
help with the diagram you want to make.
Get to know Visio
Test 3, question 2
What is a Visio stencil? (Pick one answer.)
1. A stencil is a collection of shapes available in the
Shapes window.
2. A stencil is a premade shape that you can drag onto a
page.
Get to know Visio
Test 3, question 2
What is a Visio stencil? (Pick one answer.)
3. A stencil is a file you can open in Visio that contains an
already created drawing. All you have to do is fill in the
blanks.
4. A stencil is a cutout shape that you can fill with any color
you want.
Get to know Visio
Test 3, question 2: Answer
A stencil is a collection of shapes available in the Shapes
window.
Remember that many stencils are available in the Shapes
window. To make any stencil active, click the title bar for the
one you want.
Get to know Visio
Test 3, question 3
What is the Shapes window? (Pick one
answer.)
1. The Shapes window is the window that contains templates.
2. The Shapes window is the window that contains stencils.
3. The Shapes window is the window that contains templates and
stencils.
4. The Shapes window is the window that contains shaping tools.
Get to know Visio
Test 3, question 3: Answer
The Shapes window is the window that contains stencils.
If you ever lose the Shapes window, you can get it back by
selecting the Shapes Window command on the View
menu.
Get to know Visio
Quick Reference Card
For a summary of the tasks covered in this course, view the
Quick Reference Card.

Get to know visio

  • 1.
    Microsoft® Office Visio® 2003 Training Get toknow Visio [Your company name] presents:
  • 2.
    Get to knowVisio Course contents • Overview: Communicate in a visual way • Lesson 1: What Visio can do for you • Lesson 2: Make your first diagram • Lesson 3: A closer look at the Visio environment Each lesson includes a list of suggested tasks and a set of test questions.
  • 3.
    Get to knowVisio Discover the variety of diagrams you can make with this powerful software. Then create your first diagram. Plus, learn important basics about shapes and stencils. Overview: Communicate in a visual way With Microsoft Office Visio 2003, you’ll have no doubt that a picture is worth a thousand words.
  • 4.
    Get to knowVisio Course goals • Know what Visio does and what kinds of diagrams you can make with it. • Know which edition of Visio 2003 you have and what that means for using it. • Know how to make a diagram by dragging shapes into place and connecting them. • Know how to zoom, resize, and add text to shapes.
  • 5.
    Lesson 1 What Visiocan do for you
  • 6.
    Get to knowVisio What Visio can do for you Visio is an intelligent diagramming program. It empowers you to communicate in a visual manner, and helps make your diagrams more meaningful, flexible, and responsive to your needs. You can capture information in ways that are valuable for you and your business. Visio is more than a diagramming program.
  • 7.
    Get to knowVisio Two editions There are two editions of Visio 2003: Visio Standard 2003 and Visio Professional 2003. Each edition is specifically designed to address the needs of certain customers.There are two editions of Visio 2003.
  • 8.
    Get to knowVisio Two editions There are two editions of Visio 2003. • With Visio Standard, you can create business-related diagrams such as flowcharts, organization charts, and project-scheduling diagrams. • Visio Professional goes a step further into more technical areas.
  • 9.
    Get to knowVisio Business-process diagrams One of the most popular uses of Visio is to illustrate business processes. Diagrams for business processes can be found in both Visio Standard and Visio Professional. A three-step flowchart
  • 10.
    Get to knowVisio Business-process diagrams Creating a diagram like this one is easy. The shapes are already made for you; all you have to do is drag them into place, type some text, and resize them a little. A three-step flowchart The lines connecting shapes are called connectors. Connectors are easily glued to shapes. When a shape moves, the connector moves as well.
  • 11.
    Get to knowVisio Business-process diagrams, continued Here's an example of how powerful Visio diagrams can be: If a portion of your diagram needs additional detail, you can create that detailed portion separately and add a hyperlink to it. When you need a large and detailed diagram, Visio is the right program to use. A flowchart with a hyperlink to more detail
  • 12.
    Get to knowVisio Organization charts Organization charts, available in both Visio Standard and Visio Professional, are another type of diagram frequently used in business. Sure, the lines and shapes let you easily see the reporting structure of an organization. But here's where Visio really shines: You can also associate data with each shape in the diagram. An organization chart
  • 13.
    Get to knowVisio Organization charts Data for a shape is called custom properties. In the case of organization charts, you can select an employee shape, and then associate vital information—such as location, phone number, and department—so that this data becomes part of the chart. An organization chart
  • 14.
    Get to knowVisio Organization charts Another powerful reason for creating organization charts in Visio is that you can automatically create them by using information from a data source.An organization chart After a few clicks, your chart is made for you. You don't have to enter each name and title by hand. As mentioned, Visio is intelligent.
  • 15.
    Get to knowVisio Brainstorming diagrams A brainstorming diagram, available in both Visio Standard and Visio Professional, can help you record and develop any set of related ideas or information, such as new business strategies, book outlines, meeting minutes, or travel plans. A brainstorming diagram and its outline
  • 16.
    Get to knowVisio Brainstorming diagrams There are two ways to create this kind of diagram: • You can create the diagram visually by dragging shapes into place. • You can create the diagram automatically by typing an outline in the outline window. This way, Visio creates the shapes for you. A brainstorming diagram and its outline
  • 17.
    Get to knowVisio Building plans You can also create precise building plans in Visio. Notice that this diagram provides an overhead view of walls, doors, windows, and furniture. Also note that the shapes for furniture, equipment, and even plants are already made for you. You do not have to draw these yourself. An office layout
  • 18.
    Get to knowVisio Building plans And unlike with other simple diagramming programs, with Visio you can specify a scale of measurement. An office layout Another example of Visio intelligence: You can add dimension lines to walls, as shown here. With these lines, you can determine whether larger items will fit in the available space.
  • 19.
    Get to knowVisio Network diagrams Another business diagram that you can make with Visio Professional is a network diagram. You can make a simple diagram or a very detailed one. In addition, if you add custom properties to each shape (like asset number, network address, or computer name), you can then run detailed inventory reports right within Visio. A network map
  • 20.
    Get to knowVisio Web diagrams Visio Professional also helps you make Web diagrams, such as a Web site map. Each shape in the map represents a link on a Web site and includes information about the link type and location. You can use the map to analyze your site's organization or to classify the site's content. A Web site map
  • 21.
    Get to knowVisio Suggestions for practice We've shown you just a small sampling of what you can do with Visio. But there is so much more. You can also make charts, graphs, maps, project schedules, calendars, even software and database diagrams. To see more examples of what you can make in Visio, take a look at the Diagram Gallery. To do so: • Start Visio, and then click Diagram Gallery on the Help menu.
  • 22.
    Get to knowVisio Test 1, question 1 Which of the following is true about shapes in Visio? (Pick one answer.) 1. You have to create shapes from scratch. 2. Visio shapes are already made for you. You don't have to make them yourself.
  • 23.
    Get to knowVisio Test 1, question 1 Which of the following is true about shapes in Visio? (Pick one answer.) 3. There are some basic shapes already made in Visio, but if you need something really detailed—like a piece of computer equipment—you need to make it yourself. 4. Visio Standard doesn't come with shapes already made, but Visio Professional does.
  • 24.
    Get to knowVisio Test 1, question 1: Answer Visio shapes are already made for you. You don't have to make them yourself. You can make your own shapes if you want to, but in many cases it's not necessary because there's a variety of shapes to choose from.
  • 25.
    Get to knowVisio Test 1, question 2 With Visio, you can associate data with shapes in a diagram. What is this data called? (Pick one answer.) 1. Custom properties. 2. Special data. 3. Shaped data. 4. Data properties.
  • 26.
    Get to knowVisio Test 1, question 2: Answer Custom properties. In an organization chart, the custom properties for a shape might include department name, phone number, and office location. In a network diagram, the custom properties might include computer asset number, location, network address, and computer name.
  • 27.
    Lesson 2 Make yourfirst diagram
  • 28.
    Get to knowVisio Make your first diagram Select, drag, move, resize, type, zoom, connect. By now, you're probably ready to see how to create a diagram. Let's investigate the details of working with Visio.
  • 29.
    Get to knowVisio Choose a template You begin creating a diagram by choosing a template. Things to notice in the animation on the left: Animation: Right-click, and click Play. Start a diagram by choosing a template. • After you choose a template, a blank drawing page appears. • To the left of that page, a collection of shapes appears that you can use in the diagram.
  • 30.
    Get to knowVisio Choose a template You begin creating a diagram by choosing a template. Start a diagram by choosing a template. • After you choose a template, a blank drawing page appears. • To the left of that page, a collection of shapes appears that you can use in the diagram.
  • 31.
    Get to knowVisio Drag shapes onto the page After you choose a template, the drawing page appears blank. This is different from templates in many other programs. But in a Visio template, shapes appear to the left of the empty drawing page—waiting for you to drag them onto the page. Play this animation to see a demonstration. Animation: Right-click, and click Play. How to drag shapes onto the page
  • 32.
    Get to knowVisio Drag shapes onto the page After you choose a template, the drawing page appears blank. This is different from templates in many other programs. But in a Visio template, shapes appear to the left of the empty drawing page—waiting for you to drag them onto the page. How to drag shapes onto the page
  • 33.
    Get to knowVisio Move the shapes Moving a shape is easy: Just click any shape to select it, and then drag it to a new location. You can also move many shapes at once. To do that, click a blank area of the drawing page, and then drag to create a selection rectangle around the shapes. This animation shows you how. Animation: Right-click, and click Play. How to move several shapes at once
  • 34.
    Get to knowVisio Moving a shape is easy: Just click any shape to select it, and then drag it to a new location. You can also move many shapes at once. To do that, click a blank area of the drawing page, and then drag to create a selection rectangle around the shapes. How to move several shapes at once Move the shapes
  • 35.
    Get to knowVisio Resize shapes You can resize shapes by dragging their corner, side, or bottom selection handles. The animation demonstrates this. You can also resize many shapes at once. To do that, select more than one shape, and then drag a selection handle. That's rectangle first, handle next. Animation: Right-click, and click Play. How to resize a shape
  • 36.
    Get to knowVisio Resize shapes You can resize shapes by dragging their corner, side, or bottom selection handles. You can also resize many shapes at once. To do that, select more than one shape, and then drag a selection handle. That's rectangle first, handle next. How to resize a shape
  • 37.
    Get to knowVisio Add text to shapes You can add text to shapes. There are a couple of ways to accomplish this. The easiest way is to just click the shape, and start typing. Play the animation to see this demonstrated. Animation: Right-click, and click Play. How to add text to shapes
  • 38.
    Get to knowVisio Add text to shapes You can add text to shapes. There are a couple of ways to accomplish this. The easiest way is to just click the shape, and start typing. How to add text to shapes
  • 39.
    Get to knowVisio Zoom to see better If the shapes in your diagram are too small to work with, you'll want to zoom in closer. To zoom in on the shapes in your diagram, hold down the CTRL+SHIFT keys while you drag a selection rectangle around the shapes. The animation shows you how. Animation: Right-click, and click Play. How to zoom in on shapes
  • 40.
    Get to knowVisio Zoom to see better If the shapes in your diagram are too small to work with, you'll want to zoom in closer. To zoom in on the shapes in your diagram, hold down the CTRL+SHIFT keys while you drag a selection rectangle around the shapes. How to zoom in on shapes
  • 41.
    Get to knowVisio Connect shapes Connecting shapes is one of the hallmark strengths of Visio. As the animation shows, you: Animation: Right-click, and click Play. How to connect shapes • Switch from the Pointer Tool to the Connector Tool on the Standard toolbar. • Draw a line from one connection point to another. • When you're done, switch back to the Pointer Tool.
  • 42.
    Get to knowVisio Connect shapes How to connect shapes • Switch from the Pointer Tool to the Connector Tool on the Standard toolbar. • Draw a line from one connection point to another. • When you're done, switch back to the Pointer Tool. Connecting shapes is one of the hallmark strengths of Visio. To do it, you:
  • 43.
    Get to knowVisio Suggestions for practice 1. Choose a template, and start dragging shapes. 2. Add text to the shapes, and zoom. 3. Zoom in and out some more. 4. Connect shapes. Online practice (requires Visio 2003)
  • 44.
    Get to knowVisio Test 2, question 1 To zoom in on the shapes, you need to: (Pick one answer.) 1. Press CTRL+Z. 2. Hold down CTRL+SPACEBAR while you drag a selection rectangle around the shapes. 3. Hold down the CTRL+SHIFT keys while you drag a selection rectangle around the shapes. 4. Press CTRL+W.
  • 45.
    Get to knowVisio Test 2, question 1: Answer Hold down the CTRL+SHIFT keys while you drag a selection rectangle around the shapes. And remember, to zoom back so that the whole page is visible, press CTRL+W.
  • 46.
    Get to knowVisio Test 2, question 2 As seen in the practice session, what may happen when you type text on a shape? (Pick one answer.) 1. Visio asks which font you would like to use, and then recommends a font size for you. 2. Visio zooms in. 3. The Text dialog box appears. Here you can specify font, size, and other formatting options. 4. Visio moves the shape to where your text is.
  • 47.
    Get to knowVisio Test 2, question 2: Answer Visio zooms in. If you are zoomed out and start typing text for a shape, Visio zooms in on the shape so that you can see what you are typing. You can turn this option off if you want. On the Tools menu, click Options, and then click the General tab. Under Drawing window options, in the Automatically zoom text when editing under box, enter 0 (zero) for the point size.
  • 48.
    Get to knowVisio Test 2, question 3 Which of the following tools do you use to add connectors to shapes? (Pick one answer.) 1. The Connecting Line Tool. 2. The Connector Tool. 3. The Line Tool. 4. The Pointer Tool.
  • 49.
    Get to knowVisio Test 2, question 3: Answer The Connector Tool.
  • 50.
    Lesson 3 A closerlook at the Visio environment
  • 51.
    Get to knowVisio A closer look at the Visio environment Sure, it's fun to create diagrams, label them, and move the parts around. But you really want to understand Visio because you know there's more you can do. This is your chance to get a closer look at templates, stencils, and shapes—three very important parts of the Visio program. Take a closer look at Visio.
  • 52.
    Get to knowVisio A closer look at templates Let’s take a closer look at the concept of a Visio template. As you saw in a previous lesson, when you choose a template in Visio, you get a blank drawing page and a handful of shapes to the left of the page. But that's not all your choice brings you. With a template, you get other special tools to help you with your diagram. Special tools come with the Organization Chart template.
  • 53.
    Get to knowVisio A closer look at templates For example, when you choose an organization chart template, you get the following: Special tools come with the Organization Chart template. 1. A special Organization Chart toolbar that makes chart layout easier. 2. An Organization Chart menu that provides commands to help you work with the chart.
  • 54.
    Get to knowVisio A closer look at shapes and stencils Shapes are another reason why Visio is so powerful. So let's take a closer look at them. 1. The Shapes window is to the left of your drawing page. This window contains stencils. Stencils aren't the actual shapes themselves. Stencils are useful groupings of shapes. Where to find shapes and stencils
  • 55.
    Get to knowVisio A closer look at shapes and stencils 2. These are stencils. In this illustration, you see three stencils. The Organization Chart Shapes stencil is the active one. The other two stencils are Borders and Tiles and Backgrounds. To see those stencils' shapes, click the name of the stencil you want. Where to find shapes and stencils
  • 56.
    Get to knowVisio A closer look at shapes and stencils Where to find shapes and stencils 3. Inside each stencil are shapes. Shapes are what you drag onto the page.
  • 57.
    Get to knowVisio Shapes that are smart Visio enables you to format, fill, rotate, and resize shapes. And with several of the shapes, Visio does much, much more. Many shapes are smart—they have special built-in features that help out with the particular kind of diagram you're working on. The animation demonstrates this. Animation: Right-click, and click Play. Shapes in an organization chart
  • 58.
    Get to knowVisio Shapes that are smart Shapes in an organization chart Visio enables you to format, fill, rotate, and resize shapes. And with several of the shapes, Visio does much, much more. Many shapes are smart—they have special built-in features that help out with the particular kind of diagram you're working on.
  • 59.
    Get to knowVisio A closer look at the New button You're probably used to clicking the New button in various programs to quickly open a new document or file. In Visio, things are a bit different. The Visio New button can be used in several ways. The New button is different in Visio.
  • 60.
    Get to knowVisio A closer look at the New button Start without a template: If you don't have any diagrams open, clicking the New button will open a new drawing page with no associated template. You can then search for shapes in the Shapes window, as the illustration on the left shows. The New button is different in Visio.
  • 61.
    Get to knowVisio A closer look at the New button Borrow a template: If you have a diagram open that is based on a template, clicking the New button will open a new drawing page that is based on that same template. The New button is different in Visio.
  • 62.
    Get to knowVisio A closer look at the New button Pick a template: The New button has a small arrow on it. If you click that arrow, you'll see the same list of templates that you worked with earlier in this course. Choose a template from that list, and you'll get a new drawing page based on that template. The New button is different in Visio.
  • 63.
    Get to knowVisio Suggestions for practice 1. Start a diagram based on an organization chart template. 2. Create an organization chart quickly. 3. Experiment with the New button. Online practice (requires Visio 2003)
  • 64.
    Get to knowVisio Test 3, question 1 What do most Visio templates look like? (Pick one answer.) 1. Templates are files you can open in Visio that contain premade diagrams. All you have to do is fill in the blanks. 2. A template is a diagram type that opens with the stencils and settings you need to create a particular diagram.
  • 65.
    Get to knowVisio Test 3, question 1 What do most Visio templates look like? (Pick one answer.) 3. A template is a collection of shapes that you can drag onto the page. 4. A template is a master shape that you can use over and over again.
  • 66.
    Get to knowVisio Test 3, question 1: Answer A template is a diagram type that opens with the stencils and settings you need to create a particular diagram. Templates also come with special toolbars and menus to help with the diagram you want to make.
  • 67.
    Get to knowVisio Test 3, question 2 What is a Visio stencil? (Pick one answer.) 1. A stencil is a collection of shapes available in the Shapes window. 2. A stencil is a premade shape that you can drag onto a page.
  • 68.
    Get to knowVisio Test 3, question 2 What is a Visio stencil? (Pick one answer.) 3. A stencil is a file you can open in Visio that contains an already created drawing. All you have to do is fill in the blanks. 4. A stencil is a cutout shape that you can fill with any color you want.
  • 69.
    Get to knowVisio Test 3, question 2: Answer A stencil is a collection of shapes available in the Shapes window. Remember that many stencils are available in the Shapes window. To make any stencil active, click the title bar for the one you want.
  • 70.
    Get to knowVisio Test 3, question 3 What is the Shapes window? (Pick one answer.) 1. The Shapes window is the window that contains templates. 2. The Shapes window is the window that contains stencils. 3. The Shapes window is the window that contains templates and stencils. 4. The Shapes window is the window that contains shaping tools.
  • 71.
    Get to knowVisio Test 3, question 3: Answer The Shapes window is the window that contains stencils. If you ever lose the Shapes window, you can get it back by selecting the Shapes Window command on the View menu.
  • 72.
    Get to knowVisio Quick Reference Card For a summary of the tasks covered in this course, view the Quick Reference Card.

Editor's Notes

  • #2 [Notes to trainer: For detailed help in customizing this template, see the very last slide. Also, look for additional lesson text in the notes pane of some slides. Because this presentation contains a Macromedia Flash® animation, saving the template may cause a warning message to appear regarding personal information. Unless you add information to the properties of the Flash file itself, this warning does not apply to this presentation. Click OK on the message.]
  • #7 Microsoft Visio® does diagrams. So that means it just lets you string together a bunch of boxes and arrows, right? Wrong. Visio offers so much more.
  • #8 Which version do you have? You can check by starting Visio, and then clicking About Visio on the Help menu.
  • #9 Visio Professional contains all of what the Standard edition has, as well as features that let you create building plans, network diagrams, software diagrams, Web diagrams, engineering diagrams, and other technical diagrams.
  • #10 An example is shown here. This is a flowchart that explains a company's pharmaceutical development process.
  • #11 In this example, the shapes are the rectangles in the flowchart.
  • #12 In this example, there's a hyperlink on the Trials shape. By clicking it, people can discover more details concerning that particular step in the process. Other Microsoft Office programs, such as Microsoft PowerPoint® and Microsoft Word, also help you make diagrams. However, those programs don't give you as much room to create a diagram as Visio does. They also don't have as many sophisticated options for diagrams. If all you need is to make a modest diagram in a hurry, use your favorite other Office program.
  • #13 An example of an organization chart is shown here.
  • #15 For example, you can base an organization chart on a database, a Microsoft Excel® workbook, or even your company's e-mail system (if it uses Microsoft Exchange Server).
  • #17 Tip: You can also import a Word outline into Visio as a brainstorming diagram, or export a Visio brainstorming diagram as a Word outline, which makes it easy to repurpose your work. [Note to trainer: Steps—presented in either numbered or bulleted lists—are always shown in yellow text.]
  • #18 For example, with Visio Standard, you can make an office layout, as shown here. With Visio Professional, you can do that and also make electric and telecommunication plans, HVAC plans, and more.
  • #19 For example, if you want every half-inch to represent one foot, you can tell Visio to do that. Also, if you resize a wall that has a dimension line, the line will dynamically change as well—relieving you from retyping the number of feet and inches.
  • #20 A small portion of a detailed network diagram is shown here. Of course, the shapes for the computers, servers, and so on are already made in Visio. Just think what a pain it would be if you had to draw those yourself.
  • #21 And to show you just how powerful and intelligent Visio is—you don't have to create this diagram yourself. Instead, you can use a special template that asks you for the Web address of your site. Visio will open your Web site, read its code, find all links, and generate the map for you.
  • #22 [Note to trainer: Students will need access to Visio 2003 to look at the Diagram Gallery.]
  • #30 Note: In this example, the shapes are specific to flowcharts. If you were to choose another category of template, shapes specific to that category would appear instead. [Note to trainer: To play the animation when viewing the slide show, right-click the animation, and then click Play. After playing the file once, you may have to click Rewind (after right-clicking) and then click Play. If you have problems viewing the animation, see the notes for the last slide in this presentation about playing a Macromedia Flash® animation. If you still have problems viewing the animation, the slide that follows this one is a duplicate slide with static art. Delete either the current slide or the next slide before using this presentation.]
  • #31 Note: In this example, the shapes are specific to flowcharts. If you were to choose another category of template, shapes specific to that category would appear instead. [Note to trainer: This slide is identical to the preceding slide except that it has static art instead of an animation. Use this slide if you have problems viewing the animation. Delete either the current slide or the preceding slide before showing this presentation.]
  • #32 Goes with the first paragraph For example, when you choose a template in Microsoft Office Word, it opens with text, styles, and other items ready for your use. Note: There are a few exceptions to the rule of a drawing page appearing blank after you choose a template. For example, if you choose the Cause and Effect template, the page starts out with shapes on it. There are also downloadable Visio templates on the Microsoft Office Online Web site that begin with shapes on the page. But these are exceptions—most Visio templates don't start with shapes on the page. [Note to trainer: To play the animation when viewing the slide show, right-click the animation, then click Play. After playing the file once, you may have to click Rewind (after right-clicking) and then click Play. If you have problems viewing the animation, see the notes for the last slide in this presentation about playing a Macromedia Flash® animation. If you still have problems viewing the animation, the slide that follows this one is a duplicate slide with static art. Delete either the current slide or the next slide before using this presentation.]
  • #33 Goes with the first paragraph For example, when you choose a template in Microsoft Office Word, it opens with text, styles, and other items ready for your use. Note: There are a few exceptions to the rule of a drawing page appearing blank after you choose a template. For example, if you choose the Cause and Effect template, the page starts out with shapes on it. There are also downloadable Visio templates on the Microsoft Office Online Web site that begin with shapes on the page. But these are exceptions—most Visio templates don't start with shapes on the page. [Note to trainer: This slide is identical to the preceding slide except that it has static art instead of an animation. Use this slide if you have problems viewing the animation. Delete either the current slide or the preceding slide before showing this presentation.]
  • #34 Note: If you want to select more than one shape but you don't want to select all shapes in between, you don't have to create a selection rectangle. Instead, you can just hold down the SHIFT key to select the shapes by clicking. [Note to trainer: To play the animation when viewing the slide show, right-click the animation, then click Play. After playing the file once, you may have to click Rewind (after right-clicking) and then click Play. If you have problems viewing the animation, see the notes for the last slide in this presentation about playing a Macromedia Flash® animation. If you still have problems viewing the animation, the slide that follows this one is a duplicate slide with static art. Delete either the current slide or the next slide before using this presentation.]
  • #35 Note: If you want to select more than one shape but you don't want to select all shapes in between, you don't have to create a selection rectangle. Instead, you can just hold down the SHIFT key to select the shapes by clicking. [Note to trainer: This slide is identical to the preceding slide except that it has static art instead of an animation. Use this slide if you have problems viewing the animation. Delete either the current slide or the preceding slide before showing this presentation.]
  • #36 To resize many shapes at once, use the selection rectangle as shown on the previous slide. [Note to trainer: To play the animation when viewing the slide show, right-click the animation, then click Play. After playing the file once, you may have to click Rewind (after right-clicking) and then click Play. If you have problems viewing the animation, see the notes for the last slide in this presentation about playing a Macromedia Flash® animation. If you still have problems viewing the animation, the slide that follows this one is a duplicate slide with static art. Delete either the current slide or the next slide before using this presentation.]
  • #37 To resize many shapes at once, use the selection rectangle as shown on the previous slide. [Note to trainer: This slide is identical to the preceding slide except that it has static art instead of an animation. Use this slide if you have problems viewing the animation. Delete either the current slide or the preceding slide before showing this presentation.]
  • #38 [Note to trainer: To play the animation when viewing the slide show, right-click the animation, then click Play. After playing the file once, you may have to click Rewind (after right-clicking) and then click Play. If you have problems viewing the animation, see the notes for the last slide in this presentation about playing a Macromedia Flash® animation. If you still have problems viewing the animation, the slide that follows this one is a duplicate slide with static art. Delete either the current slide or the next slide before using this presentation.]
  • #39 [Note to trainer: This slide is identical to the preceding slide except that it has static art instead of an animation. Use this slide if you have problems viewing the animation. Delete either the current slide or the preceding slide before showing this presentation.]
  • #40 Tip: You can quickly zoom out by pressing CTRL+W. This is helpful if you're working with a large diagram (for example, a building plan) and you need a quick, high-level view of the diagram. [Note to trainer: To play the animation when viewing the slide show, right-click the animation, then click Play. After playing the file once, you may have to click Rewind (after right-clicking) and then click Play. If you have problems viewing the animation, see the notes for the last slide in this presentation about playing a Macromedia Flash® animation. If you still have problems viewing the animation, the slide that follows this one is a duplicate slide with static art. Delete either the current slide or the next slide before using this presentation.]
  • #41 Tip: You can quickly zoom out by pressing CTRL+W. This is helpful if you're working with a large diagram (for example, a building plan) and you need a quick, high-level view of the diagram. [Note to trainer: This slide is identical to the preceding slide except that it has static art instead of an animation. Use this slide if you have problems viewing the animation. Delete either the current slide or the preceding slide before showing this presentation.]
  • #42 Remember: The value of connectors is that they reroute, bending automatically, when you move one of the connected shapes. It's as though the road to your house followed you whenever you changed your address. [Note to trainer: To play the animation when viewing the slide show, right-click the animation, then click Play. After playing the file once, you may have to click Rewind (after right-clicking) and then click Play. If you have problems viewing the animation, see the notes for the last slide in this presentation about playing a Macromedia Flash® animation. If you still have problems viewing the animation, the slide that follows this one is a duplicate slide with static art. Delete either the current slide or the next slide before using this presentation.]
  • #43 Remember: The value of connectors is that they reroute, bending automatically, when you move one of the connected shapes. It's as though the road to your house followed you whenever you changed your address. [Note to trainer: This slide is identical to the preceding slide except that it has static art instead of an animation. Use this slide if you have problems viewing the animation. Delete either the current slide or the preceding slide before showing this presentation.]
  • #44 [Note to trainer: With Visio 2003 installed on your computer, you can click the link in the slide to go to an online practice. In the practice, you can work through each of these tasks in Visio, with instructions to guide you. Important: If you don’t have Visio 2003, you won’t be able to access the practice instructions.]
  • #54 The page orientation is also set automatically to landscape, the typical orientation for organization charts. Other templates provide other special tools and menus.
  • #58 Example of shapes that are smart (supports animation) In an organization chart, for example, if you drag a Position shape on top of an Executive or Manager shape, the subordinate shape automatically positions itself below the supervisory one. Note: This special feature is unique to diagrams created with Organization Chart templates. If you start a diagram with another template, this special feature is not available. Often, the special features of shapes depend directly on the kind of template you choose. [Note to trainer: To play the animation when viewing the slide show, right-click the animation, then click Play. After playing the file once, you may have to click Rewind (after right-clicking) and then click Play. If you have problems viewing the animation, see the notes for the last slide in this presentation about playing a Macromedia Flash® animation. If you still have problems viewing the animation, the slide that follows this one is a duplicate slide with static art. Delete either the current slide or the next slide before using this presentation.]
  • #59 Example of shapes that are smart In an organization chart, for example, if you drag a Position shape on top of an Executive or Manager shape, the subordinate shape automatically positions itself below the supervisory one. Note: This special feature is unique to diagrams created with Organization Chart templates. If you start a diagram with another template, this special feature is not available. Often, the special features of shapes depend directly on the kind of template you choose. [Note to trainer: This slide is identical to the preceding slide except that it has static art instead of an animation. Use this slide if you have problems viewing the animation. Delete either the current slide or the preceding slide before showing this presentation.]
  • #61 Remember that because your diagram is not based on a template, you will not get template-specific menus or toolbars. And you may not get smart-shape features that depend on a template.
  • #62 For example, if you had an organization chart open, the Organization Chart menu, toolbar, and stencils would appear for the new page too. You'd also get smart-shape features for Executive, Manager, and Position shapes.
  • #64 [Note to trainer: With Visio 2003 installed on your computer, you can click the link in the slide to go to an online practice. In the practice, you can work through each of these tasks in Visio, with instructions to guide you. Important: If you don’t have Visio 2003, you won’t be able to access the practice instructions.]
  • #74 Using This Template This Microsoft PowerPoint template has training content about using Visio 2003 to create diagrams, charts, and layouts. It's geared for you to present to a group and customize as necessary. This template's content is adapted from the Microsoft Office Online Training course “Get to know Visio.” Features of the template Title slide: On the very first slide, there are empty brackets over which you should type the name of your company. Or you can delete the text box altogether if you don't want this text. Animations: Custom animation effects are applied throughout. They'll play in previous versions back to Microsoft PowerPoint 2000. They include the entrance effects called Peek and Stretch, and sometimes the Dissolve effect is used. To alter them, go to the Slide Show menu, click Custom Animation, and work with the options that appear. Slide transitions: The Wipe Down transition is applied throughout the show. If you want a different one, go to the Slide Show menu, click Slide Transition, and work with the options that appear. If this presentation contains a Macromedia Flash® animation: To play the Flash file, you must register an ActiveX control, called Shockwave Flash Object, on your computer. To do this, download the latest version of the Macromedia Flash Player from the Macromedia Web site. Hyperlinks to online course: The template contains links to the online version of this training course. The links take you to the hands-on practice session for each lesson and to the Quick Reference Card that is published for this course. Please take note: You must have Visio 2003 installed to view the hands-on practice sessions. Headers and footers: The template contains a footer that has the course title. You can change or remove the footers in the Header and Footer dialog box (which opens from the View menu).