What we can offer                                                                 Key Contacts

Atkins is one of the leading providers of professional, technologically-         For further details regarding our capabilities please email:
based consultancy and support services in the world.                             geotechnicalengineering@atkinsglobal.com
We employ over 18,000 staff throughout our offices worldwide. We are
well positioned to undertake a diversity of projects, with a multidisciplinary
team spread across a network of offices throughout the UK and overseas
in the Americas, Asia and South East Asia, Western Europe, Central and
Eastern Europe, and the Middle East.

Geotechnical Skills & Services                                                                                                                             Geotechnical Engineering:
    •   engineering geology & geohazards
    •
    •
        environmental geotechnics
        engineering geomorphology
                                                                                                                                                                            Airports
    •   advanced geomechanics
    •   rock & soil slope stabilisation
    •   earthworks
    •   foundations & substructure engineering
    •   highways geotechnics
    •   rail geotechnics
    •   river & coastal geotechnics
    •   offshore geotechnics
    •   water supply & sewerage geotechnics
    •   nuclear geotechnics
    •   tunnel & shaft engineering
    •   due dilligence & expert witness


                                                                                 Office Locations
                                                                                 UK & Ireland


                                                                                 Our UK & Ireland offices include:
                                                                                 Aberdeen     Crewe          Haverfordwest   Northampton    St. Asaph

                                                                                 Altrincham   Croydon        Ipswich         Nottingham     Stockton-On-
                                                                                                                                            Tees
                                                                                 Barking      Cumbria        Knutsford       Oxford
                                                                                                                                            Swansea
                                                                                 Belfast      Derby          Leeds           Peterborough
                                                                                                                                            Swindon
                                                                                 Birmingham   Dublin         London          Plymouth
                                                                                                                                            Taunton
                                                                                 Bristol      Edinburgh      Maidstone       Pontypridd
                                                                                                                                            Telford
                                                                                 Cambridge    Epsom          Manchester      Reading
                                                                                                                                            Warrington
                                                                                 Cardiff      Exeter         Newcastle-      Sale
                                                                                                             under-Lyme                     Warwick
                                                                                 Chelmsford   Gillingham                     Scunthorpe
                                                                                                             Newcastle-                     Winchester
                                                                                 Chippenham   Glasgow        Upon-Tyne       Sheffield
                                                                                                                                            York
                                                                                 Colwyn Bay   Gloucester                     Southampton
                                                                                                                                                                       Plan Design Enable
                                                                                                             Newport

                                                                                 Cork         Havant
Project Experience                                                            Project Experience                                                          Project Experience

Directional Drilling, RAF Stanbridge                                          Sheikh Isa Airbase, Bahrain                                                 Terminal 5 Access and M25 motorway widening,
                                                                                                                                                          Heathrow Airport
Atkins was appointed by Anglian Water to design a sewage pumping              Construction of the 4.1km long runway and adjacent taxiways of the
station and rising mains. Our geotechnical expertise was called upon to       Sheikh Isa Airbase entailed large cut and fill operations which were        Investigation and geotechnical design of the complex network of new
assist with the evaluation of directional drilling for the pipeline system.   the subject of a multi-million US dollar contractual dispute. Atkins was    and upgraded highways needed to serve the proposed Terminal 5 and to
                                                                              commissioned to provide expert opinion on engineering geological,           provide increased capacity for the adjacent M25 motorway.
                                                                              geotechnical and materials handling issues as part of the arbitration
Manchester Airport, Second Runway                                             proceedings.
                                                                              Our work included a review of the technical basis of the dispute (in the    London City Airport - extension
Design and construction supervision of a new 3km runway, taxi-ways            USA, UK and Bahrain) followed by a programme of field investigation
and holding bays, a 260m long cut and cover highway tunnel for the            and laboratory testing which was carefully targeted to provide additional   Geotechnical study for a proposed extension to London City Airport.
A538, and a 12m high 300m long tunnel to permit the River Bollin to           data from which independent conclusions could be drawn.                     Work included a review of historical ground investigation data and
pass under the new runway. Major earthworks included a 2 million                                                                                          production of a report summarising geotechnical constraints.
cubic metres embankment, 25m high across the Bollin Valley. We were
designers to the successful AMEC-Tarmac Joint Venture.
                                                                              St Helena Airport, Atlantic Ocean
Notable aspects of our work were the geotechnical and foundation risk                                                                                     Cargo Handling Building, Heathrow Airport
                                                                              Access to St Helena Island is currently only possible by a lengthy boat
assessment carried out as an aid to tendering, and the combination of
                                                                              journey from South Africa or Ascension Island (the photograph below         Site investigation and geotechnical design for the cargo building involved
traditional and more advanced design techniques which resulted in an
                                                                              shows the island’s capital, Jamestown). Following a government              a carefully optimised programme of work on the ‘air-side’ of the airport.
optimised design for the embankments and tunnels.
                                                                              decision to provide an airport on the island, Atkins was commissioned
                                                                              to undertake initial and reference designs in advance of the award of a
                                                                              design, build and operate contract for the airport.

                                                                              We carried out geotechnical investigations and designs for the airport’s
                                                                              runway, terminal and cross-country access road, integrating our work
                                                                              with that of the airport engineers, construction logistics specialists
                                                                              and environment team.

More Related Content

Viewers also liked

Runway Construction Project Execution Plan
Runway Construction Project Execution PlanRunway Construction Project Execution Plan
Runway Construction Project Execution Plan
David H Moloney
 
Geological Site Investigation Methods
Geological Site Investigation MethodsGeological Site Investigation Methods
Geological Site Investigation Methods
!SYOU co-designed sneakers
 
Airport marking
Airport markingAirport marking
Airport marking
srinivas2036
 
Methods of investigation of voice production
Methods of investigation of voice productionMethods of investigation of voice production
Methods of investigation of voice productionKarl Daniel, M.D.
 
Presentation by National University of Singapore - Winners of CBS Case Compet...
Presentation by National University of Singapore - Winners of CBS Case Compet...Presentation by National University of Singapore - Winners of CBS Case Compet...
Presentation by National University of Singapore - Winners of CBS Case Compet...
CBS Case Competition
 
research methodology METHODS OF INVESTIGATION
research methodology METHODS OF INVESTIGATION research methodology METHODS OF INVESTIGATION
research methodology METHODS OF INVESTIGATION
Suvin Lal
 
Methods of data collection
Methods of data collection Methods of data collection
Methods of data collection PRIYAN SAKTHI
 

Viewers also liked (7)

Runway Construction Project Execution Plan
Runway Construction Project Execution PlanRunway Construction Project Execution Plan
Runway Construction Project Execution Plan
 
Geological Site Investigation Methods
Geological Site Investigation MethodsGeological Site Investigation Methods
Geological Site Investigation Methods
 
Airport marking
Airport markingAirport marking
Airport marking
 
Methods of investigation of voice production
Methods of investigation of voice productionMethods of investigation of voice production
Methods of investigation of voice production
 
Presentation by National University of Singapore - Winners of CBS Case Compet...
Presentation by National University of Singapore - Winners of CBS Case Compet...Presentation by National University of Singapore - Winners of CBS Case Compet...
Presentation by National University of Singapore - Winners of CBS Case Compet...
 
research methodology METHODS OF INVESTIGATION
research methodology METHODS OF INVESTIGATION research methodology METHODS OF INVESTIGATION
research methodology METHODS OF INVESTIGATION
 
Methods of data collection
Methods of data collection Methods of data collection
Methods of data collection
 

Geotechnical engineering airports tcm12-4004

  • 1. What we can offer Key Contacts Atkins is one of the leading providers of professional, technologically- For further details regarding our capabilities please email: based consultancy and support services in the world. geotechnicalengineering@atkinsglobal.com We employ over 18,000 staff throughout our offices worldwide. We are well positioned to undertake a diversity of projects, with a multidisciplinary team spread across a network of offices throughout the UK and overseas in the Americas, Asia and South East Asia, Western Europe, Central and Eastern Europe, and the Middle East. Geotechnical Skills & Services Geotechnical Engineering: • engineering geology & geohazards • • environmental geotechnics engineering geomorphology Airports • advanced geomechanics • rock & soil slope stabilisation • earthworks • foundations & substructure engineering • highways geotechnics • rail geotechnics • river & coastal geotechnics • offshore geotechnics • water supply & sewerage geotechnics • nuclear geotechnics • tunnel & shaft engineering • due dilligence & expert witness Office Locations UK & Ireland Our UK & Ireland offices include: Aberdeen Crewe Haverfordwest Northampton St. Asaph Altrincham Croydon Ipswich Nottingham Stockton-On- Tees Barking Cumbria Knutsford Oxford Swansea Belfast Derby Leeds Peterborough Swindon Birmingham Dublin London Plymouth Taunton Bristol Edinburgh Maidstone Pontypridd Telford Cambridge Epsom Manchester Reading Warrington Cardiff Exeter Newcastle- Sale under-Lyme Warwick Chelmsford Gillingham Scunthorpe Newcastle- Winchester Chippenham Glasgow Upon-Tyne Sheffield York Colwyn Bay Gloucester Southampton Plan Design Enable Newport Cork Havant
  • 2. Project Experience Project Experience Project Experience Directional Drilling, RAF Stanbridge Sheikh Isa Airbase, Bahrain Terminal 5 Access and M25 motorway widening, Heathrow Airport Atkins was appointed by Anglian Water to design a sewage pumping Construction of the 4.1km long runway and adjacent taxiways of the station and rising mains. Our geotechnical expertise was called upon to Sheikh Isa Airbase entailed large cut and fill operations which were Investigation and geotechnical design of the complex network of new assist with the evaluation of directional drilling for the pipeline system. the subject of a multi-million US dollar contractual dispute. Atkins was and upgraded highways needed to serve the proposed Terminal 5 and to commissioned to provide expert opinion on engineering geological, provide increased capacity for the adjacent M25 motorway. geotechnical and materials handling issues as part of the arbitration Manchester Airport, Second Runway proceedings. Our work included a review of the technical basis of the dispute (in the London City Airport - extension Design and construction supervision of a new 3km runway, taxi-ways USA, UK and Bahrain) followed by a programme of field investigation and holding bays, a 260m long cut and cover highway tunnel for the and laboratory testing which was carefully targeted to provide additional Geotechnical study for a proposed extension to London City Airport. A538, and a 12m high 300m long tunnel to permit the River Bollin to data from which independent conclusions could be drawn. Work included a review of historical ground investigation data and pass under the new runway. Major earthworks included a 2 million production of a report summarising geotechnical constraints. cubic metres embankment, 25m high across the Bollin Valley. We were designers to the successful AMEC-Tarmac Joint Venture. St Helena Airport, Atlantic Ocean Notable aspects of our work were the geotechnical and foundation risk Cargo Handling Building, Heathrow Airport Access to St Helena Island is currently only possible by a lengthy boat assessment carried out as an aid to tendering, and the combination of journey from South Africa or Ascension Island (the photograph below Site investigation and geotechnical design for the cargo building involved traditional and more advanced design techniques which resulted in an shows the island’s capital, Jamestown). Following a government a carefully optimised programme of work on the ‘air-side’ of the airport. optimised design for the embankments and tunnels. decision to provide an airport on the island, Atkins was commissioned to undertake initial and reference designs in advance of the award of a design, build and operate contract for the airport. We carried out geotechnical investigations and designs for the airport’s runway, terminal and cross-country access road, integrating our work with that of the airport engineers, construction logistics specialists and environment team.