Abstract––The most important parameter in several monitoring, control, and protection functions in inter-connected
electric power networks is phasors representing positive sequence voltages and currents in a power network. There is
need to enhance power system congestion and disturbances by wide area monitoring, protection and control. It is useful
to improve grid planning, operation and maintenance. The latest advances in Synchronized Measurement technology are
used in such systems to monitor, assess and to take control action to prevent or mitigate problems in real time. Time
synchronization is not a new concept or a new application in power systems. With the advancement in technology, the
time frame of synchronized information has been steadily reduced from minutes to microseconds. This paper stresses the
application of phasor technology for power system operations in Real Time Wide-Area Monitoring and Analysis. The
real-time monitoring provides the operator on-line knowledge of system conditions to increase the operational efficiency
under normal system conditions, and allows the operator to detect, anticipate, and correct problems during abnormal
system conditions. A MATLAB simulation has been carried out to demonstrate the monitoring of the multi-machine
system using synchronized phasor measurement.

Keywords––DFT, power system stability, synchrophasor, synchrophasor measurement


                                            I.           INTRODUCTION
           Time-synchronization provides advantage of directly measuring the system state instead of estimating it. Phasors
representing positive sequence voltages and currents in a power network are the most important parameters in inter-
connected electric power networks. To get a consistent description of the state of inter-connected electric power networks, it
becomes necessary to synchronize the measurement processes. Voltage and current phasors in a three phase power system
can be measured from waveform samples. Synchronized phasor measurement technique can be used to determine transient
stability of power system.

                 II.           PHASOR AND SYNCHROPHASOR MEASUREMENT
           A phasor is a complex number associated with a sinusoidal wave. The phasor magnitude is the same as the
sinusoidal wave magnitude. The phasor phase angle is the phase of the wave at t = 0. Phasors normally are associated with a
single frequency. Synchrophasors, or synchronized phasor measurements provide a means for comparing a phasor to an
absolute time reference. The availability of high-accuracy satellite-synchronized clocks makes synchronized phasor
measurement possible. Through the use of the clock, the phasor measurement unit (PMU) produces a reference sinusoidal
wave.[1],[2] This reference wave is a nominal frequency sinusoidal wave for which maximum occurs at the exact start of
each second. The measured local voltage or current is then compared to this reference wave. According to the standard, a
synchronizing source that provides the common timing reference may be local or global. The synchronizing signal may be
distributed by broadcast or direct connection, and shall be referenced to Coordinated Universal Time (UTC). One commonly
utilized synchronizing signal is the satellite signal broadcast from the Global Positioning System (GPS). At present Phasor
Measurement Units (PMUs) are the most sophisticated time-synchronized tool available to power engineers and system
operators for wide-area applications. This tool has been made possible by advancements in computer technology and
availability of GPS signals A phasor is a vector consisting of magnitude and angle that corresponds to a sinusoidal
waveform. The phasor of a signal can usually be derived based on Fourier transform by utilizing data samples N of the
signal within a selected time window. The phasor calculated by DFT is given by:
                                                              N 1

                                                               x (coskθ  jsinkθ)
                                                          2
                                          Phasor X                  k                                                     (1)
                                                         N    k 0


           For a steady state signal, the magnitude is a constant while the value of the angle depends on the starting point of
samples. In other words, the angle is a relative quantity and a time reference has to be selected before it can be calculated. By
measuring the difference in phase angle between the Positive Sequence Voltage(PSV) phasor at the output of the generator/s,
it is possible to detect transient stability or instability conditions.




                                                                                                                             40
Application of Synchronized Phasor Measurement in Real Time Wide-Area…

                                III.           POWER SYSTEM STABILITY
          Stability is the property of a power system containing two or more synchronous machines. The classical model of a
multi machine may be used to study the stability of a power system. [6] Transient stability restores the system after fault
clearance. Any unbalance between the generation and load initiates a transients that causes the rotors of the synchronous
machines to “swing” because net accelerating torques are exerted on these rotors. When the total load equals total
generation, machine speeds are practically equal to synchronous speed. The angular displacements, δ, of machines in a
system provide information about the system dynamics. One cannot measure this angular displacement mechanically. By
computing the voltage phasor behind the machine transient reactance, one can study the phase angle variations to obtain an
image of the machine angular displacement. In practice, machine oscillating modes can be determined by measuring the
phase angle of the positive-sequence voltage phasor at the machine terminals. If the oscillatory response of a power system
during the transient period following a disturbance is damped and the system settles in a finite time to a new steady operating
condition, we say the system is stable. Otherwise the system is considered unstable.




                                           Fig. 1 WSCC 3-machine, 9-bus system

         The popular Western System Coordinated Council (WSCC) 3-machine, 9-bus system shown in Fig.1 [7][8] is
considered for analysis. The base MVA is 100, and system frequency is 60 Hz. A MATLAB simulation has been carried out
on above system for healthy condition, various fault conditions and change in load condition. The results of simulation are
observed by PMU.




                                                              (a)




                                                             (b)
      Fig. 2 Healthy system (a) Relative rotor angle δ12 (deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s)

                                                                                                                           41
Application of Synchronized Phasor Measurement in Real Time Wide-Area…




                                                     (a)




                                                      (b)
Fig. 3 L-L-L-G fault (a) Relative rotor angle δ12(deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s)




                                                     (a)




                                                      (b)
 Fig. 4 L-L-G fault (a) Relative rotor angle δ12(deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s)




                                                     (a)




                                                                                                                 42
Application of Synchronized Phasor Measurement in Real Time Wide-Area…




                                                             (b)
     Fig. 5 Increase in load (a) Relative rotor angle δ12(deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s)




                                                              (a)




                                                             (b)
     Fig. 6 Increase in load (a) Relative rotor angle δ12(deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s)

                                        IV.           RESULT ANALYSIS
            We will demonstrate that by measuring the difference in phase angle between the PSV phasor at the output of the
generator2 (Bus 2) and the same phasor at the output of the swing generator1 (Bus 1), and the difference in phase angle
between the PSV phasor at the output of the generator3 (Bus 3) and the same phasor at the output of the swing generator1
(Bus 1) it is possible to detect transient stability or instability conditions. Generator 1 is specified as swing generator and
inertia is specified very high. As we specify an infinite inertia, the speed and therefore the frequency of the machine are kept
constant. Various types of faults and load change condition are applied to check the stability of the system.
            Fig. 2 shows the results of the simulation with healthy system. The oscillatory response of a power system during
the transient period following a disturbance is damped and the system settles in a finite time to its synchronous value and
PSV phasor phase angle difference time waveforms reflect a stable disturbance for a second time. Hence the system is stable.
When an L-L-L-G fault is applied at Bus 7-5 for 100 ms; the results are shown in Fig. 3. As the fault duration is greater than
the critical clearing fault time, the phase difference increases exponentially with a positive time constant and the machine
speed increases linearly. It indicates loss of machine synchronism. Hence the system is unstable.
            Similarly when an L-L-G fault is applied at Bus 1 for 300 ms, the results are shown in Fig. 4. When a load
applied at bus 5 is increased to 320MW, 95MVAR i.e. three times the original; the results are shown in Fig. 5. As the
unbalance between generation load equations, the phase difference increases exponential with a positive time constant. It
indicates loss of machine synchronism. Hence the system is unstable.
            When a load applied at bus 8 is increased to 320MW, 95MVAR i.e. more than three times the original; the results
are shown in Fig. 6. As the phase difference increases exponential with a negative time constant. It indicates loss of machine
synchronism. Hence the system is unstable.

                                              V.          CONCLUSION
          In synchronized phasor measurement applications, all network waveforms are compared to a time-based phase
reference.The measurement of positive sequence voltage motivated by developments in the digital relaying field is much
more useful than the measurements made on one phase of a three phase ac power system. In different available techniques of

                                                                                                                            43
Application of Synchronized Phasor Measurement in Real Time Wide-Area…

phasor measurement, DFT technique is widely used. By measuring the difference in phase angle between the PSV phasor at
the output of the generator1 (Bus 4) and the same phasor at the output of the generator2 (Bus 5), it is possible to detect
transient stability or instability conditions. When the fault duration is less than the fault clearing time, system remain stable.
When the fault duration time is greater than the fault clearing time, system becomes unstable.

                                                      REFERENCES
 1.       Gabriel Benmouyal, E. O. Schweitzer, A. Guzmán , Schweitzer Engineering Laboratories, Inc., Techpaper 6139,
          Synchronized phasor measurement in protective relays for protection, control, and analysis of electric power
          systems
 2.       IEEE Standard 1344-1995. .IEEE Standard for Synchrophasors for Power Systems.
 3.       J. Z. Yang and C. W. Liu, “A Precise Calculation of Power System Frequency and Phasor” IEEE Transactions on
          Power Delivery, Vol. 15, No. 2, April 2000.
 4.       Hadi Sadat, Power System Analysis, Tata McGraw-Hill Book Company, 2002
 5.       A. G. Phadke and J. S. Thorp, “A New Measurement Technique for Tracking Voltage Phasors, Local System
          Frequency”, IEEE Transactions on Power Apparatus and System, May 1983.
 6.       Kundur, P., Power System Stability and Control.,McGraw-Hill, 1994.
 7.       P. M. Anderson and A. A. Fouad, Power System Control and Stability (Iowa State University Press, Ames, IA,
          1977).
 8.       P. W. Sauer and M. A. Pai, Power System Dynamics and Stability (Prentice Hall, Upper Saddle River, New
          Jersey, 1998)
 9.       A. G. Phadke et al., “Synchronized Sampling and Phasor Measurements for Relaying and Control”, IEEE
          Transactions on Power Delivery, Vol. 9, No. 1, January 1994.
10.       P. Bonanomi, “Phase Angle Measurements With Synchronized Clocks. Principle and Applications”. IEEE
          Transactions on Power Apparatus and Systems, Vol. PAS-100, No. 12, December 1981.
11.       Edward Wilson Kimbark, Power System Stability- Vol III , Elements of Stability Calculations
12.        D.P. Kothari, I J Nagrath, Modern Power System Analysis




                                                                                                                              44

More Related Content

What's hot

LMSProjectReportFINAL
LMSProjectReportFINALLMSProjectReportFINAL
LMSProjectReportFINALLuke Snow
 
Theoretic and experimental investigation of gyro-BWO
Theoretic and experimental investigation of gyro-BWOTheoretic and experimental investigation of gyro-BWO
Theoretic and experimental investigation of gyro-BWOPei-Che Chang
 
Software PLL for PLI synchronization, design, modeling and simulation , sozopol
Software PLL for PLI synchronization, design, modeling and simulation , sozopolSoftware PLL for PLI synchronization, design, modeling and simulation , sozopol
Software PLL for PLI synchronization, design, modeling and simulation , sozopoldpdobrev
 
continuos phase frequency shift keying(cpfsk)
continuos phase frequency shift keying(cpfsk)continuos phase frequency shift keying(cpfsk)
continuos phase frequency shift keying(cpfsk)Moka Dinesh
 
Phonons & Phonopy: Pro Tips (2015)
Phonons & Phonopy: Pro Tips (2015)Phonons & Phonopy: Pro Tips (2015)
Phonons & Phonopy: Pro Tips (2015)Jonathan Skelton
 
Phonons & Phonopy: Pro Tips (2014)
Phonons & Phonopy: Pro Tips (2014)Phonons & Phonopy: Pro Tips (2014)
Phonons & Phonopy: Pro Tips (2014)Jonathan Skelton
 
Tele3113 wk4tue
Tele3113 wk4tueTele3113 wk4tue
Tele3113 wk4tueVin Voro
 
Quadrature amplitude modulation qam transmitter
Quadrature amplitude modulation qam transmitterQuadrature amplitude modulation qam transmitter
Quadrature amplitude modulation qam transmitterAsaad Drake
 
Nyquist criterion for distortion less baseband binary channel
Nyquist criterion for distortion less baseband binary channelNyquist criterion for distortion less baseband binary channel
Nyquist criterion for distortion less baseband binary channelPriyangaKR1
 
RF Circuit Design - [Ch1-2] Transmission Line Theory
RF Circuit Design - [Ch1-2] Transmission Line TheoryRF Circuit Design - [Ch1-2] Transmission Line Theory
RF Circuit Design - [Ch1-2] Transmission Line TheorySimen Li
 
VASP And Wannier90: A Quick Tutorial
VASP And Wannier90: A Quick TutorialVASP And Wannier90: A Quick Tutorial
VASP And Wannier90: A Quick TutorialJonathan Skelton
 
Ece593 project1 chien_chun_yao_and_karthikvel_rathinavel
Ece593 project1 chien_chun_yao_and_karthikvel_rathinavelEce593 project1 chien_chun_yao_and_karthikvel_rathinavel
Ece593 project1 chien_chun_yao_and_karthikvel_rathinavelKarthik Rathinavel
 
Lag lead compensator design in frequency domain 7th lecture
Lag lead compensator design in frequency domain  7th lectureLag lead compensator design in frequency domain  7th lecture
Lag lead compensator design in frequency domain 7th lectureKhalaf Gaeid Alshammery
 
Doppler Processing Project
Doppler Processing ProjectDoppler Processing Project
Doppler Processing ProjectAssignmentpedia
 

What's hot (20)

LMSProjectReportFINAL
LMSProjectReportFINALLMSProjectReportFINAL
LMSProjectReportFINAL
 
Theoretic and experimental investigation of gyro-BWO
Theoretic and experimental investigation of gyro-BWOTheoretic and experimental investigation of gyro-BWO
Theoretic and experimental investigation of gyro-BWO
 
Rake Receiver
Rake ReceiverRake Receiver
Rake Receiver
 
Software PLL for PLI synchronization, design, modeling and simulation , sozopol
Software PLL for PLI synchronization, design, modeling and simulation , sozopolSoftware PLL for PLI synchronization, design, modeling and simulation , sozopol
Software PLL for PLI synchronization, design, modeling and simulation , sozopol
 
ECE 467 Mini project 1
ECE 467 Mini project 1ECE 467 Mini project 1
ECE 467 Mini project 1
 
continuos phase frequency shift keying(cpfsk)
continuos phase frequency shift keying(cpfsk)continuos phase frequency shift keying(cpfsk)
continuos phase frequency shift keying(cpfsk)
 
Phonons & Phonopy: Pro Tips (2015)
Phonons & Phonopy: Pro Tips (2015)Phonons & Phonopy: Pro Tips (2015)
Phonons & Phonopy: Pro Tips (2015)
 
Phonons & Phonopy: Pro Tips (2014)
Phonons & Phonopy: Pro Tips (2014)Phonons & Phonopy: Pro Tips (2014)
Phonons & Phonopy: Pro Tips (2014)
 
Tele3113 wk4tue
Tele3113 wk4tueTele3113 wk4tue
Tele3113 wk4tue
 
Quadrature amplitude modulation qam transmitter
Quadrature amplitude modulation qam transmitterQuadrature amplitude modulation qam transmitter
Quadrature amplitude modulation qam transmitter
 
Nyquist criterion for distortion less baseband binary channel
Nyquist criterion for distortion less baseband binary channelNyquist criterion for distortion less baseband binary channel
Nyquist criterion for distortion less baseband binary channel
 
RF Circuit Design - [Ch1-2] Transmission Line Theory
RF Circuit Design - [Ch1-2] Transmission Line TheoryRF Circuit Design - [Ch1-2] Transmission Line Theory
RF Circuit Design - [Ch1-2] Transmission Line Theory
 
Ch39 ssm
Ch39 ssmCh39 ssm
Ch39 ssm
 
VASP And Wannier90: A Quick Tutorial
VASP And Wannier90: A Quick TutorialVASP And Wannier90: A Quick Tutorial
VASP And Wannier90: A Quick Tutorial
 
Ece593 project1 chien_chun_yao_and_karthikvel_rathinavel
Ece593 project1 chien_chun_yao_and_karthikvel_rathinavelEce593 project1 chien_chun_yao_and_karthikvel_rathinavel
Ece593 project1 chien_chun_yao_and_karthikvel_rathinavel
 
10 e-ren-1691
10 e-ren-169110 e-ren-1691
10 e-ren-1691
 
Lag lead compensator design in frequency domain 7th lecture
Lag lead compensator design in frequency domain  7th lectureLag lead compensator design in frequency domain  7th lecture
Lag lead compensator design in frequency domain 7th lecture
 
Doppler Processing Project
Doppler Processing ProjectDoppler Processing Project
Doppler Processing Project
 
cr1503
cr1503cr1503
cr1503
 
Analog comm lab manual
Analog comm lab manualAnalog comm lab manual
Analog comm lab manual
 

Similar to call for papers, research paper publishing, where to publish research paper, journal publishing, how to publish research paper, Call For research paper, international journal, publishing a paper, IJEI, call for papers 2012,journal of science and technolog

Performance, Modelling & Simulation of Frequency Relays for Distributed Gener...
Performance, Modelling & Simulation of Frequency Relays for Distributed Gener...Performance, Modelling & Simulation of Frequency Relays for Distributed Gener...
Performance, Modelling & Simulation of Frequency Relays for Distributed Gener...Niraj Solanki
 
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
22726998 precise-synchronization-of-phasor-measurements-in-electric-pschndkr87
 
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
22726998 precise-synchronization-of-phasor-measurements-in-electric-pschndkr87
 
Lec 4 design via frequency response
Lec 4 design via frequency responseLec 4 design via frequency response
Lec 4 design via frequency responseBehzad Farzanegan
 
11.vector control of wind driven self excited induction generator connected t...
11.vector control of wind driven self excited induction generator connected t...11.vector control of wind driven self excited induction generator connected t...
11.vector control of wind driven self excited induction generator connected t...Alexander Decker
 
Vector control of wind driven self excited induction generator connected to g...
Vector control of wind driven self excited induction generator connected to g...Vector control of wind driven self excited induction generator connected to g...
Vector control of wind driven self excited induction generator connected to g...Alexander Decker
 
Aeolian vibrations of overhead transmission line bundled conductors during in...
Aeolian vibrations of overhead transmission line bundled conductors during in...Aeolian vibrations of overhead transmission line bundled conductors during in...
Aeolian vibrations of overhead transmission line bundled conductors during in...Power System Operation
 
Icaee paper id 116.pdf
Icaee paper id 116.pdfIcaee paper id 116.pdf
Icaee paper id 116.pdfshariful islam
 
Ee6501 psa-eee-vst-au-units-v (1)
Ee6501 psa-eee-vst-au-units-v (1)Ee6501 psa-eee-vst-au-units-v (1)
Ee6501 psa-eee-vst-au-units-v (1)Vara Prasad
 
Cathode ray oscilloscope and related experiments
Cathode ray oscilloscope and related experimentsCathode ray oscilloscope and related experiments
Cathode ray oscilloscope and related experimentsTrisha Banerjee
 
A Test Case for GIC Harmonics Analysis
A Test Case for GIC Harmonics AnalysisA Test Case for GIC Harmonics Analysis
A Test Case for GIC Harmonics AnalysisPower System Operation
 
New direct torque control SIDDANNA M BALAPGOL
New direct torque control SIDDANNA M BALAPGOLNew direct torque control SIDDANNA M BALAPGOL
New direct torque control SIDDANNA M BALAPGOLSiddanna Balapgol
 
Performance Analysis of DFIG Wind Turbine During Over Voltage Grid Conditions
Performance Analysis of DFIG Wind Turbine During Over Voltage Grid ConditionsPerformance Analysis of DFIG Wind Turbine During Over Voltage Grid Conditions
Performance Analysis of DFIG Wind Turbine During Over Voltage Grid ConditionsIJRES Journal
 
Synchronization of Photo-voltaic system with a Grid
Synchronization of Photo-voltaic system with a GridSynchronization of Photo-voltaic system with a Grid
Synchronization of Photo-voltaic system with a GridIOSR Journals
 

Similar to call for papers, research paper publishing, where to publish research paper, journal publishing, how to publish research paper, Call For research paper, international journal, publishing a paper, IJEI, call for papers 2012,journal of science and technolog (20)

Performance, Modelling & Simulation of Frequency Relays for Distributed Gener...
Performance, Modelling & Simulation of Frequency Relays for Distributed Gener...Performance, Modelling & Simulation of Frequency Relays for Distributed Gener...
Performance, Modelling & Simulation of Frequency Relays for Distributed Gener...
 
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
 
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
22726998 precise-synchronization-of-phasor-measurements-in-electric-ps
 
ICICCE0324
ICICCE0324ICICCE0324
ICICCE0324
 
M356872
M356872M356872
M356872
 
Lec 4 design via frequency response
Lec 4 design via frequency responseLec 4 design via frequency response
Lec 4 design via frequency response
 
A0430107
A0430107A0430107
A0430107
 
11.vector control of wind driven self excited induction generator connected t...
11.vector control of wind driven self excited induction generator connected t...11.vector control of wind driven self excited induction generator connected t...
11.vector control of wind driven self excited induction generator connected t...
 
Vector control of wind driven self excited induction generator connected to g...
Vector control of wind driven self excited induction generator connected to g...Vector control of wind driven self excited induction generator connected to g...
Vector control of wind driven self excited induction generator connected to g...
 
Aeolian vibrations of overhead transmission line bundled conductors during in...
Aeolian vibrations of overhead transmission line bundled conductors during in...Aeolian vibrations of overhead transmission line bundled conductors during in...
Aeolian vibrations of overhead transmission line bundled conductors during in...
 
Icaee paper id 116.pdf
Icaee paper id 116.pdfIcaee paper id 116.pdf
Icaee paper id 116.pdf
 
Kf3517721775
Kf3517721775Kf3517721775
Kf3517721775
 
Evaluation of Synchronization and MPPT Algorithms in a DFIG Wind Turbine Cont...
Evaluation of Synchronization and MPPT Algorithms in a DFIG Wind Turbine Cont...Evaluation of Synchronization and MPPT Algorithms in a DFIG Wind Turbine Cont...
Evaluation of Synchronization and MPPT Algorithms in a DFIG Wind Turbine Cont...
 
Ee6501 psa-eee-vst-au-units-v (1)
Ee6501 psa-eee-vst-au-units-v (1)Ee6501 psa-eee-vst-au-units-v (1)
Ee6501 psa-eee-vst-au-units-v (1)
 
Cathode ray oscilloscope and related experiments
Cathode ray oscilloscope and related experimentsCathode ray oscilloscope and related experiments
Cathode ray oscilloscope and related experiments
 
Science (1)
Science (1)Science (1)
Science (1)
 
A Test Case for GIC Harmonics Analysis
A Test Case for GIC Harmonics AnalysisA Test Case for GIC Harmonics Analysis
A Test Case for GIC Harmonics Analysis
 
New direct torque control SIDDANNA M BALAPGOL
New direct torque control SIDDANNA M BALAPGOLNew direct torque control SIDDANNA M BALAPGOL
New direct torque control SIDDANNA M BALAPGOL
 
Performance Analysis of DFIG Wind Turbine During Over Voltage Grid Conditions
Performance Analysis of DFIG Wind Turbine During Over Voltage Grid ConditionsPerformance Analysis of DFIG Wind Turbine During Over Voltage Grid Conditions
Performance Analysis of DFIG Wind Turbine During Over Voltage Grid Conditions
 
Synchronization of Photo-voltaic system with a Grid
Synchronization of Photo-voltaic system with a GridSynchronization of Photo-voltaic system with a Grid
Synchronization of Photo-voltaic system with a Grid
 

More from International Journal of Engineering Inventions www.ijeijournal.com

More from International Journal of Engineering Inventions www.ijeijournal.com (20)

H04124548
H04124548H04124548
H04124548
 
G04123844
G04123844G04123844
G04123844
 
F04123137
F04123137F04123137
F04123137
 
E04122330
E04122330E04122330
E04122330
 
C04121115
C04121115C04121115
C04121115
 
B04120610
B04120610B04120610
B04120610
 
A04120105
A04120105A04120105
A04120105
 
F04113640
F04113640F04113640
F04113640
 
E04112135
E04112135E04112135
E04112135
 
D04111520
D04111520D04111520
D04111520
 
C04111114
C04111114C04111114
C04111114
 
B04110710
B04110710B04110710
B04110710
 
A04110106
A04110106A04110106
A04110106
 
I04105358
I04105358I04105358
I04105358
 
H04104952
H04104952H04104952
H04104952
 
G04103948
G04103948G04103948
G04103948
 
F04103138
F04103138F04103138
F04103138
 
E04102330
E04102330E04102330
E04102330
 
D04101822
D04101822D04101822
D04101822
 
C04101217
C04101217C04101217
C04101217
 

call for papers, research paper publishing, where to publish research paper, journal publishing, how to publish research paper, Call For research paper, international journal, publishing a paper, IJEI, call for papers 2012,journal of science and technolog

  • 1. International Journal of Engineering Inventions ISSN: 2278-7461, www.ijeijournal.com Volume 1, Issue 3 (September 2012) PP: 40-44 Application of Synchronized Phasor Measurement in Real Time Wide-Area Monitoring Ms Anupama S. Patil Assistant Professor, ZES’s DCOER, Pune Abstract––The most important parameter in several monitoring, control, and protection functions in inter-connected electric power networks is phasors representing positive sequence voltages and currents in a power network. There is need to enhance power system congestion and disturbances by wide area monitoring, protection and control. It is useful to improve grid planning, operation and maintenance. The latest advances in Synchronized Measurement technology are used in such systems to monitor, assess and to take control action to prevent or mitigate problems in real time. Time synchronization is not a new concept or a new application in power systems. With the advancement in technology, the time frame of synchronized information has been steadily reduced from minutes to microseconds. This paper stresses the application of phasor technology for power system operations in Real Time Wide-Area Monitoring and Analysis. The real-time monitoring provides the operator on-line knowledge of system conditions to increase the operational efficiency under normal system conditions, and allows the operator to detect, anticipate, and correct problems during abnormal system conditions. A MATLAB simulation has been carried out to demonstrate the monitoring of the multi-machine system using synchronized phasor measurement. Keywords––DFT, power system stability, synchrophasor, synchrophasor measurement I. INTRODUCTION Time-synchronization provides advantage of directly measuring the system state instead of estimating it. Phasors representing positive sequence voltages and currents in a power network are the most important parameters in inter- connected electric power networks. To get a consistent description of the state of inter-connected electric power networks, it becomes necessary to synchronize the measurement processes. Voltage and current phasors in a three phase power system can be measured from waveform samples. Synchronized phasor measurement technique can be used to determine transient stability of power system. II. PHASOR AND SYNCHROPHASOR MEASUREMENT A phasor is a complex number associated with a sinusoidal wave. The phasor magnitude is the same as the sinusoidal wave magnitude. The phasor phase angle is the phase of the wave at t = 0. Phasors normally are associated with a single frequency. Synchrophasors, or synchronized phasor measurements provide a means for comparing a phasor to an absolute time reference. The availability of high-accuracy satellite-synchronized clocks makes synchronized phasor measurement possible. Through the use of the clock, the phasor measurement unit (PMU) produces a reference sinusoidal wave.[1],[2] This reference wave is a nominal frequency sinusoidal wave for which maximum occurs at the exact start of each second. The measured local voltage or current is then compared to this reference wave. According to the standard, a synchronizing source that provides the common timing reference may be local or global. The synchronizing signal may be distributed by broadcast or direct connection, and shall be referenced to Coordinated Universal Time (UTC). One commonly utilized synchronizing signal is the satellite signal broadcast from the Global Positioning System (GPS). At present Phasor Measurement Units (PMUs) are the most sophisticated time-synchronized tool available to power engineers and system operators for wide-area applications. This tool has been made possible by advancements in computer technology and availability of GPS signals A phasor is a vector consisting of magnitude and angle that corresponds to a sinusoidal waveform. The phasor of a signal can usually be derived based on Fourier transform by utilizing data samples N of the signal within a selected time window. The phasor calculated by DFT is given by: N 1  x (coskθ  jsinkθ) 2 Phasor X  k (1) N k 0 For a steady state signal, the magnitude is a constant while the value of the angle depends on the starting point of samples. In other words, the angle is a relative quantity and a time reference has to be selected before it can be calculated. By measuring the difference in phase angle between the Positive Sequence Voltage(PSV) phasor at the output of the generator/s, it is possible to detect transient stability or instability conditions. 40
  • 2. Application of Synchronized Phasor Measurement in Real Time Wide-Area… III. POWER SYSTEM STABILITY Stability is the property of a power system containing two or more synchronous machines. The classical model of a multi machine may be used to study the stability of a power system. [6] Transient stability restores the system after fault clearance. Any unbalance between the generation and load initiates a transients that causes the rotors of the synchronous machines to “swing” because net accelerating torques are exerted on these rotors. When the total load equals total generation, machine speeds are practically equal to synchronous speed. The angular displacements, δ, of machines in a system provide information about the system dynamics. One cannot measure this angular displacement mechanically. By computing the voltage phasor behind the machine transient reactance, one can study the phase angle variations to obtain an image of the machine angular displacement. In practice, machine oscillating modes can be determined by measuring the phase angle of the positive-sequence voltage phasor at the machine terminals. If the oscillatory response of a power system during the transient period following a disturbance is damped and the system settles in a finite time to a new steady operating condition, we say the system is stable. Otherwise the system is considered unstable. Fig. 1 WSCC 3-machine, 9-bus system The popular Western System Coordinated Council (WSCC) 3-machine, 9-bus system shown in Fig.1 [7][8] is considered for analysis. The base MVA is 100, and system frequency is 60 Hz. A MATLAB simulation has been carried out on above system for healthy condition, various fault conditions and change in load condition. The results of simulation are observed by PMU. (a) (b) Fig. 2 Healthy system (a) Relative rotor angle δ12 (deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s) 41
  • 3. Application of Synchronized Phasor Measurement in Real Time Wide-Area… (a) (b) Fig. 3 L-L-L-G fault (a) Relative rotor angle δ12(deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s) (a) (b) Fig. 4 L-L-G fault (a) Relative rotor angle δ12(deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s) (a) 42
  • 4. Application of Synchronized Phasor Measurement in Real Time Wide-Area… (b) Fig. 5 Increase in load (a) Relative rotor angle δ12(deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s) (a) (b) Fig. 6 Increase in load (a) Relative rotor angle δ12(deg) Vs Time(s) (b) Relative rotor angle δ13(deg) Vs Time(s) IV. RESULT ANALYSIS We will demonstrate that by measuring the difference in phase angle between the PSV phasor at the output of the generator2 (Bus 2) and the same phasor at the output of the swing generator1 (Bus 1), and the difference in phase angle between the PSV phasor at the output of the generator3 (Bus 3) and the same phasor at the output of the swing generator1 (Bus 1) it is possible to detect transient stability or instability conditions. Generator 1 is specified as swing generator and inertia is specified very high. As we specify an infinite inertia, the speed and therefore the frequency of the machine are kept constant. Various types of faults and load change condition are applied to check the stability of the system. Fig. 2 shows the results of the simulation with healthy system. The oscillatory response of a power system during the transient period following a disturbance is damped and the system settles in a finite time to its synchronous value and PSV phasor phase angle difference time waveforms reflect a stable disturbance for a second time. Hence the system is stable. When an L-L-L-G fault is applied at Bus 7-5 for 100 ms; the results are shown in Fig. 3. As the fault duration is greater than the critical clearing fault time, the phase difference increases exponentially with a positive time constant and the machine speed increases linearly. It indicates loss of machine synchronism. Hence the system is unstable. Similarly when an L-L-G fault is applied at Bus 1 for 300 ms, the results are shown in Fig. 4. When a load applied at bus 5 is increased to 320MW, 95MVAR i.e. three times the original; the results are shown in Fig. 5. As the unbalance between generation load equations, the phase difference increases exponential with a positive time constant. It indicates loss of machine synchronism. Hence the system is unstable. When a load applied at bus 8 is increased to 320MW, 95MVAR i.e. more than three times the original; the results are shown in Fig. 6. As the phase difference increases exponential with a negative time constant. It indicates loss of machine synchronism. Hence the system is unstable. V. CONCLUSION In synchronized phasor measurement applications, all network waveforms are compared to a time-based phase reference.The measurement of positive sequence voltage motivated by developments in the digital relaying field is much more useful than the measurements made on one phase of a three phase ac power system. In different available techniques of 43
  • 5. Application of Synchronized Phasor Measurement in Real Time Wide-Area… phasor measurement, DFT technique is widely used. By measuring the difference in phase angle between the PSV phasor at the output of the generator1 (Bus 4) and the same phasor at the output of the generator2 (Bus 5), it is possible to detect transient stability or instability conditions. When the fault duration is less than the fault clearing time, system remain stable. When the fault duration time is greater than the fault clearing time, system becomes unstable. REFERENCES 1. Gabriel Benmouyal, E. O. Schweitzer, A. Guzmán , Schweitzer Engineering Laboratories, Inc., Techpaper 6139, Synchronized phasor measurement in protective relays for protection, control, and analysis of electric power systems 2. IEEE Standard 1344-1995. .IEEE Standard for Synchrophasors for Power Systems. 3. J. Z. Yang and C. W. Liu, “A Precise Calculation of Power System Frequency and Phasor” IEEE Transactions on Power Delivery, Vol. 15, No. 2, April 2000. 4. Hadi Sadat, Power System Analysis, Tata McGraw-Hill Book Company, 2002 5. A. G. Phadke and J. S. Thorp, “A New Measurement Technique for Tracking Voltage Phasors, Local System Frequency”, IEEE Transactions on Power Apparatus and System, May 1983. 6. Kundur, P., Power System Stability and Control.,McGraw-Hill, 1994. 7. P. M. Anderson and A. A. Fouad, Power System Control and Stability (Iowa State University Press, Ames, IA, 1977). 8. P. W. Sauer and M. A. Pai, Power System Dynamics and Stability (Prentice Hall, Upper Saddle River, New Jersey, 1998) 9. A. G. Phadke et al., “Synchronized Sampling and Phasor Measurements for Relaying and Control”, IEEE Transactions on Power Delivery, Vol. 9, No. 1, January 1994. 10. P. Bonanomi, “Phase Angle Measurements With Synchronized Clocks. Principle and Applications”. IEEE Transactions on Power Apparatus and Systems, Vol. PAS-100, No. 12, December 1981. 11. Edward Wilson Kimbark, Power System Stability- Vol III , Elements of Stability Calculations 12. D.P. Kothari, I J Nagrath, Modern Power System Analysis 44